JP3002221U - Trolley with a gondola suspension arm - Google Patents

Trolley with a gondola suspension arm

Info

Publication number
JP3002221U
JP3002221U JP1994002429U JP242994U JP3002221U JP 3002221 U JP3002221 U JP 3002221U JP 1994002429 U JP1994002429 U JP 1994002429U JP 242994 U JP242994 U JP 242994U JP 3002221 U JP3002221 U JP 3002221U
Authority
JP
Japan
Prior art keywords
trolley
guide arm
arm
suspension
gondola
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1994002429U
Other languages
Japanese (ja)
Inventor
勝夫 長田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP1994002429U priority Critical patent/JP3002221U/en
Application granted granted Critical
Publication of JP3002221U publication Critical patent/JP3002221U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

(57)【要約】 【目的】高層ビル等のカーテンウォールの目地処理作業
に使用するゴンドラをカーテンウォールの壁面に沿って
昇降自在に吊下装備できる台車を提供する。 【構成】カウンターウェイト3と、アウトリガー8と、
ウインチ7と、ガイドアーム4と、吊りアーム9とを有
する台車1であって、前記カウンターウェイトは台車の
後端部に、アウトリガーは台車の前端部左右両側に装備
し、ウインチは、台車上に搭載設置し、前記ガイドアー
ムは、台車の前端部側から水平に張り出し、前記吊りア
ームは2本からなり、それぞれ先端部と基端部寄りにワ
イヤーシーブを有し、かつ、基端部寄りを前記ガイドア
ームの先端部左右に支軸10を介して、それぞれ枢支
し、支軸を支点として直線状に開き、双方の基端部同士
は、抜き差し自在な固定ピンを介して前記ガイドアーム
の先端部に一体的に連結固定することができるように構
成したことを特徴とする。
(57) [Summary] [Purpose] To provide a trolley in which a gondola used for joint treatment of a curtain wall of a high-rise building or the like can be hung up and down along the wall surface of the curtain wall. [Structure] Counterweight 3, outrigger 8,
A trolley 1 having a winch 7, a guide arm 4 and a suspension arm 9, wherein the counterweight is mounted on the rear end of the trolley and the outriggers are mounted on the left and right sides of the front end of the trolley, and the winch is mounted on the trolley. It is installed and installed, the guide arm extends horizontally from the front end side of the trolley, and the suspension arm is composed of two wires, each having a wire sheave near the tip end and the base end, and a portion near the base end. The guide arms are pivotally supported on the left and right ends of the guide arm via a support shaft 10, and are linearly opened with the support shaft as a fulcrum. Both base end portions of the guide arm of the guide arm are attached via detachable fixing pins. It is characterized in that it can be integrally connected and fixed to the tip portion.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

この考案は、主として高層ビル等のカーテンウォールの目地処理作業に使用す るゴンドラ(ケージ)の吊りアームを有する台車で、特に高層ビルの中間階の窓 より吊りアームを張り出して、この吊りアームを介して高層ビルの壁面に沿って ゴンドラを昇降自在に吊下装備させることのできる台車に関するものである。 This invention is a trolley having a suspension arm of a gondola (cage) mainly used for joint treatment of curtain walls of high-rise buildings, and particularly this suspension arm is extended from the window on the middle floor of the high-rise building and the suspension arm is extended. The present invention relates to a trolley in which a gondola can be hung up and down along the wall surface of a high-rise building.

【0002】[0002]

【従来の技術】[Prior art]

高さが20階以上にもおよぶ超高層ビルの外装は、一般にプレハブ化されたカ ーテンウォールで構成されているのが普通である。ところで、このカーテンウォ ールは、一般に幅が3メートル前後で、高さは1階分約4メートルで割りつけら れ、かつ各カーテンウォールの目地は、水密性、耐火性の高いシーリング材によ って目地処理しているのが一般である。 The exterior of a skyscraper, which has a height of 20 floors or more, is generally composed of prefabricated curtain walls. By the way, this curtain wall is generally about 3 meters wide and about 4 meters high on the first floor, and the joints of each curtain wall are made of water-tight and fire-resistant sealing material. Therefore, the joint is generally treated.

【0003】 従来、この目地処理作業を行うに際しては、作業用の足場として、最上階より ゴンドラを吊り下げ、このゴンドラを利用して行っていた。つまり、駆体構造部 の最上階が組み上がった時点で、ゴンドラを吊下させ、目地処理作業を行ってい た。Conventionally, when carrying out this joint treatment work, a gondola is suspended from the top floor as a scaffold for work and this gondola is used. In other words, when the top floor of the structure structure was assembled, the gondola was suspended and the joint treatment was performed.

【0004】[0004]

【考案が解決しようとする課題】[Problems to be solved by the device]

その結果、全工期の終了時期、すなわち最上階の組み立て作業終了後に目地処 理作業が集中する傾向にあった。ところが、目地処理作業量は、きわめて大量で 、高層化すればするほど多くなり、しかも手作業の依存度が高く、その上、天候 に左右される関係で、如何に、この目地処理作業を効率的に行うかは、カーテン ウォール工法を採用する高層ビル建設における一つの大きな課題となっていた。 As a result, joint treatment tended to be concentrated at the end of the entire construction period, that is, after the assembly work on the top floor. However, the amount of joint treatment work is extremely large, and the higher the number of layers, the greater the dependence on manual work. In addition, the efficiency of this joint treatment work depends on the weather conditions. It was one of the major challenges in the construction of high-rise buildings that adopt the curtain wall method.

【0005】 この考案は、前記課題を解決する手段として、途中階から目地処理作業用のゴ ンドラを吊下させることのできるゴンドラ吊りアームを備えた台車を提供するこ とを目的として考案したものである。すなわち、最上階の組み立て作業の終了前 の途中階の窓からゴンドラ吊りアームを張り出し、この吊りアームに目地処理作 業用のゴンドラを吊下させて、所望の目地処理作業を効率的に、また安全に行う ことのできる台車を提供することを狙いとして考案したものである。As a means for solving the above problems, the present invention was devised for the purpose of providing a truck equipped with a gondola suspension arm capable of suspending a gondola for joint treatment work from an intermediate floor. Is. That is, before the end of the assembly work on the top floor, the gondola suspension arm is extended from the window on the intermediate floor and the suspension arm is hung to suspend the gondola for joint treatment work. It was designed with the aim of providing a trolley that can be safely operated.

【0006】[0006]

【課題を解決するための手段】[Means for Solving the Problems]

前記目的を達成するため、この考案は、まず、台車を設けた。そして、この台 車上に2連の巻取りドラムを有するウインチを搭載設置した。ついで、台車の後 端部側には、カウンターウェイトを装備させ、前端部側には、アウトリガーを取 り付けた構成とした。さらに台車の前端部両側からガイドアームを水平に張り出 し、かつ双方のガイドアームの先端部間は横梁で一体的に結合させ、平面形状が コ字型を呈するガイドアーム本体に構成し、これを前記台車の前端部に着脱自在 に取り付ける構成とした。 In order to achieve the above object, the present invention firstly provides a trolley. Then, a winch having two winding drums was mounted and installed on this trolley. Next, a counterweight was attached to the rear end of the bogie, and an outrigger was attached to the front end. Further, the guide arms are horizontally extended from both sides of the front end of the trolley, and the end portions of both guide arms are integrally connected by a cross beam to form a guide arm body having a U-shaped planar shape. Is attached to the front end of the bogie in a detachable manner.

【0007】 他方、先端部と基端部に寄った位置に、それぞれワイヤーシーブを有する2本 の吊りアームを設けた。そして、この2本の吊りアームにおけるそれぞれ基端部 近傍すなわち中間部より基端部に寄った位置を前記ガイドアーム本体の左右両端 部に支軸を介して枢支した。On the other hand, two suspension arms each having a wire sheave are provided at positions close to the tip end portion and the base end portion. Then, positions near the base end portions of the two suspension arms, that is, positions closer to the base end portion than the intermediate portion, are pivotally supported to the left and right end portions of the guide arm body via supporting shafts.

【0008】 さらに前記左右の吊りアームの先端部側をそれぞれ前記支軸を支点として左右 直線状に開いた状態で、双方吊りアームの基端部同士を、前記ガイドアーム本体 側に抜き差し自在な固定ピンを介して一体的に連結固定することができる構成と したことを特徴とするものである。[0008] Furthermore, with the tip ends of the left and right suspension arms opened linearly in the left-right direction with the support shaft as a fulcrum, the base ends of both suspension arms are fixed to the guide arm body side so that they can be inserted and removed. It is characterized in that it can be integrally connected and fixed via a pin.

【0009】 なお、前記台車の後端部側に装備させるカウンターウェイトは、台車に対し、 着脱自在に装備させることができるようにした。また、台車より前端部側に張り 出したガイドアーム本体およびガイドアーム本体に枢支した吊りアームは、台車 の前端部に支持ブラケットを介して着脱自在に取り付け、前記カウンターウェイ トおよびガイドアームを台車側より取り外すと台車自体は、建設過程中の建物に 設置されている荷物エレベータに搭載できる構造寸法に設定した。さらに台車の 前端部側より水平に張り出す前記左右ガイドアームの幅は、同じく建設過程中に ある高層ビルの窓幅より狭く設定し、窓より外側に張り出させることができるよ うにした。The counterweight mounted on the rear end side of the trolley can be detachably mounted on the trolley. Also, the guide arm main body that extends to the front end side of the dolly and the suspension arm pivotally supported by the guide arm main body are detachably attached to the front end of the dolly via a support bracket, and the counter weight and the guide arm are attached to the dolly. When removed from the side, the dolly itself has a structural size that allows it to be installed in a luggage elevator installed in a building under construction. Furthermore, the width of the left and right guide arms that horizontally project from the front end side of the bogie is set to be narrower than the window width of a high-rise building that is also under construction, so that it can be projected outward from the window.

【0010】[0010]

【作用】[Action]

本考案は、以上のように構成したので、まず、建設過程にある高層ビルの任意 の途中階に台車を搬入するとともに、台車側より取り外していたカウンターウェ イトとガイドアーム本体とをそれぞれ装備させる。そして、左右のガイドアーム の前端部間に結合させた横梁に枢着させた吊りアームを窓の外に突き出させ、台 車のアウトリガーを調節し、台車自体を窓際の所定位置に固定させる。 Since the present invention is configured as described above, first, the trolley is carried into an arbitrary intermediate floor of a high-rise building in the process of construction, and the counterweight and the guide arm main body, which have been removed from the trolley side, are equipped respectively. . Then, the suspension arm pivotally attached to the cross beam connected between the front end portions of the left and right guide arms is projected to the outside of the window, the outrigger of the carriage is adjusted, and the carriage itself is fixed at a predetermined position near the window.

【0011】 台車の固定作業が終了すると、台車上に設置したウインチにおける2連の巻取 りドラムからそれぞれ巻取りワイヤーを引き出し、その巻取りワイヤーを前記ガ イドアーム本体の左右に枢支させた吊りアームの基端部と先端部の2個のワイヤ ーシーブを介して地上に垂下させる。同時に、左右吊りアームを先に説明したよ うに支軸を支点として左右に開き、左右吊りアームの先端部同志を固定ピンを介 してガイドアームの先端部に一体的に固定させる。After the work of fixing the bogie is completed, the take-up wires are respectively drawn from the two take-up drums of the winch installed on the bogie, and the take-up wires are pivotally supported on the left and right sides of the guide arm body. It hangs on the ground through two wire sheaves, the base end and the tip of the arm. At the same time, the left and right suspension arms are opened to the left and right with the support shaft as the fulcrum as described above, and the tip parts of the left and right suspension arms are integrally fixed to the tip parts of the guide arms via the fixing pins.

【0012】 すると前記左右吊りアームの先端部に取り付けたワイヤーシーブを介して地上 に垂下させた巻取りワイヤーがカーテンウォールに沿って、すなわち外壁カーテ ンウォールに沿って左右に垂下された形をとるので、この左右の巻取りワイヤー をあらかじめ地上に配備しておいた作業用のゴンドラのワインダーに連結し、ゴ ンドラを昇降させれば、ゴンドラはカーテンウォールの壁面に沿って昇降される ので、目地処理作業を行うことが可能となる。Then, the take-up wire hung on the ground through the wire sheave attached to the end portions of the left and right suspension arms has a shape that hangs left and right along the curtain wall, that is, along the outer wall curtain wall. , The left and right take-up wires are connected to the winder of the work gondola that has been placed on the ground in advance, and if the gondola is raised and lowered, the gondola is raised and lowered along the wall surface of the curtain wall. It becomes possible to work.

【0013】[0013]

【実施例】【Example】

さらに、この考案の構成および作用を図面に示す実施例に基づいて、具体的に 説明する。まず、図1は、カーテンウォールCWを取り付けた建設過程中にある 高層ビルの途中階の窓際に、本考案のゴンドラ吊りアームを有する台車を固定設 置した側面図である。図2は、その平面図である。 Further, the configuration and operation of the present invention will be specifically described based on the embodiments shown in the drawings. First, FIG. 1 is a side view in which a trolley having a gondola suspension arm of the present invention is fixedly installed at a window on an intermediate floor of a high-rise building in which a curtain wall CW is attached during a construction process. FIG. 2 is a plan view thereof.

【0014】 台車1は、図1で示すように角形鋼管材等の形鋼材を用いて車体フレームを構 成し、前後左右に車輪2を装備した手押し形式の四輪台車にした。そして、台車 1の後端部側にカウンターウェイト3を着脱自在に装備させる構成とした。具体 的には、台車1の後部にカウンターウェイト3の収納箱3aを設け、この収納箱 3aの中に15kgのカウンターウェイトの複数個を適宜手作業で収納し、吊り アーム9(9)を介して吊下させたゴンドラ(図示せず)の吊荷動に対抗できる ように装備させる構成とした。As shown in FIG. 1, the trolley 1 is a hand-pushed four-wheel trolley in which a body frame is formed by using a shaped steel material such as a rectangular steel pipe material, and wheels 2 are provided on the front, rear, left and right. Then, the counterweight 3 is detachably mounted on the rear end side of the carriage 1. Specifically, a storage box 3a for the counterweight 3 is provided at the rear part of the trolley 1, and a plurality of 15 kg counterweights are manually stored in the storage box 3a as needed, and the suspension arm 9 (9) is used. The gondola (not shown) that was suspended above the equipment was installed to counter the suspended load movement.

【0015】 ついで、台車1の前端部の左右両側から水平方向に張り出すガイドアーム4( 4)は、図1で示すように、支持ブラケット5(5)を介して水平方向に張り出 した。そして、その先端部間、すわなち、図1で言えば右端部間に横梁4aを設 け、双方を一体的に結合し、平面形状がコ字型を呈するガイドアーム本体6とし た。しかも、このガイドアーム本体6と前記支持ブラケット5(5)は、いずれ も台車1に対し、ボルトナットを用いて取り付け、適宜取り外し可能な構成とし て台車1側に取り付けた。Next, as shown in FIG. 1, the guide arms 4 (4) that horizontally project from the left and right sides of the front end of the carriage 1 project horizontally through the support brackets 5 (5). Then, a cross beam 4a is provided between the tip portions, that is, between the right end portions in FIG. 1, and both are integrally connected to form a guide arm body 6 having a U-shaped planar shape. Moreover, both the guide arm main body 6 and the support bracket 5 (5) are attached to the truck 1 by using bolts and nuts, and are attached to the truck 1 side so that they can be appropriately removed.

【0016】 ウインチは、図1で示すように、2連の巻取りドラム7a(7a)を同軸に有 する手動式ウインチ7を台車1の後端寄りに搭載設置した。7b(7b)は、そ の巻取りドラム7a(7a)の作動ハンドルである。なお、前記台車1の前端部 側に取り付けるアウトリガー8(8)は、一般的に接地高さの調節ができるもの を図1および図2に示すように、台車1の前端部左右にそれぞれ取り付けた。As the winch, as shown in FIG. 1, a manual winch 7 having two winding drums 7 a (7 a) coaxially is mounted and installed near the rear end of the carriage 1. 7b (7b) is an operating handle of the winding drum 7a (7a). The outriggers 8 (8) attached to the front end side of the bogie 1 are generally capable of adjusting the ground contact height, and are attached to the left and right front ends of the bogie 1, respectively, as shown in FIGS. 1 and 2. .

【0017】 次に先端部と、基端部寄りとに、ワイヤーシーブ9aおよび9bを有する吊り アーム9の2本を設けた。素材は角パイプで構成した。そして、図3の正面図で 示すように、各吊りアーム9および9の基端部寄りを支軸10および10を介し て前記ガイドアーム本体6の前端部左右に枢支させた。そして、図2の平面図で 示すように、支軸10および10を支点として、それぞれ左右の吊りアーム9お よび9を矢印方向に開き、直線状にしたとき、双方吊りアーム9および9の基端 部9cおよび9c同士が結合され、その結合部を図3で示すようにガイドアーム 本体6側に抜き差し自在な固定ピン11を介して一体的に連結固定する構成とし た。図4は、図3の平面図である。Next, two suspension arms 9 having wire sheaves 9a and 9b were provided at the tip and near the base. The material consisted of square pipes. Then, as shown in the front view of FIG. 3, the suspension arms 9 and 9 are pivotally supported to the left and right of the front end portion of the guide arm body 6 via support shafts 10 and 10, respectively. Then, as shown in the plan view of FIG. 2, when the left and right suspension arms 9 and 9 are opened in the directions of the arrows with the support shafts 10 and 10 as fulcrums to make them straight, the bases of both suspension arms 9 and 9 are formed. The end portions 9c and 9c are connected to each other, and the connecting portion is integrally connected and fixed to the guide arm main body 6 side through a fixing pin 11 which can be inserted and removed as shown in FIG. FIG. 4 is a plan view of FIG.

【0018】 なお、この実施例において、左右2本の吊りアーム9および9の基端部寄りに 取り付けたワイヤーシーブ9bおよび9bは、図3で示すように、先端部側のワ イヤーシーブ9aおよび9a側に上向きに傾斜させた状態で取り付けた。理由は 、前記手動式ウインチ7の巻取りドラム7a(7a)より引き出した巻取りワイ ヤー7c(7c)が、ワイヤーシーブ9a(9a),9b(9b)から離脱する ことなく円滑に作動できるようにするためである。In addition, in this embodiment, the wire sheaves 9b and 9b attached to the two left and right suspension arms 9 and 9 near the base end portions are, as shown in FIG. 3, the wire sheaves 9a and 9a on the tip end side. It was attached to the side while tilted upward. The reason is that the take-up wire 7c (7c) pulled out from the take-up drum 7a (7a) of the manual winch 7 can be operated smoothly without coming off from the wire sheaves 9a (9a) and 9b (9b). This is because

【0019】 図5は、左右の吊りアーム9および9を図3および図4で示すように支軸10 および10を支点として左右に開く前の状態を示す平面図である。つまり、ゴン ドラ台車として使用する前の状態を示す。また、この実施例においては、前記図 3で説明した左右の吊りアーム9および9の基端部寄りを、それぞれガイドアー ム本体6の前端部左右に枢着させた支軸10および10も、固定ピン11と同様 に、着脱自在な構成とした。すなわちゴンドラ台車として使用しない場合は、ガ イドアーム本体6と同様、台車1側から簡単に取り外し、全体をコンパクトに収 納できる構成とした。FIG. 5 is a plan view showing a state before the left and right suspension arms 9 and 9 are opened to the left and right with the support shafts 10 and 10 as fulcrums as shown in FIGS. 3 and 4. In other words, it shows the state before it is used as a gondola truck. In this embodiment, the support shafts 10 and 10 in which the left and right suspension arms 9 and 9 described in FIG. 3 are pivotally attached to the left and right front end portions of the guide arm body 6, respectively, Like the fixing pin 11, it has a detachable structure. That is, when it is not used as a gondola truck, the whole body can be stored compactly by simply removing it from the truck 1 side like the guide arm body 6.

【0020】 なお、図3において示す12は、固定ピン11の紛失を防止するためのもので 、固定ピン11のヘッドと、吊りアーム9側との間に連結したチェンである。ま た、図5において示す13(13)は、左右の吊りアーム9および9の基端部を ガイドアーム本体6側に一時的にロックさせておくためのロックピンで、使用開 始直前までは、このロックピン13(13)を用いて左右吊りアーム9および9 の先端部側を閉じておくようにした。Reference numeral 12 shown in FIG. 3 is for preventing loss of the fixing pin 11, and is a chain connected between the head of the fixing pin 11 and the suspension arm 9 side. In addition, 13 (13) shown in FIG. 5 is a lock pin for temporarily locking the base ends of the left and right suspension arms 9 and 9 to the guide arm body 6 side, and until just before the start of use. The lock pins 13 (13) are used to close the tip portions of the left and right suspension arms 9 and 9.

【0021】 また、先に説明したように、台車1のサイズは、あらかじめ建設現場に設置さ れている資材搬入用の荷物エレベータに収納可能なサイズとして設計するととも に、ガイドアーム本体6の左右幅も、あらかじめカーテンウォールCWの窓枠内 から外側へ張り出し自在なサイズ幅に設定した。Further, as described above, the size of the trolley 1 is designed so as to be able to be stored in the luggage elevator for carrying in materials installed in advance at the construction site, and the left and right sides of the guide arm main body 6 are also designed. The width was also set in advance to a size that allows the curtain wall CW to project outside from the window frame.

【0022】 図6は、図4におけるY−Y線縦断側面図で、左右の吊りアーム9および9の 基端部9cおよび9cの固定ピン11による連結固定部を示すものである。FIG. 6 is a vertical cross-sectional side view taken along the line YY in FIG. 4, showing the connecting and fixing portions by the fixing pins 11 of the base end portions 9c and 9c of the left and right suspension arms 9 and 9.

【0023】 この考案によるゴンドラ台車は、以上実施例を通して説明したように構成した ので、手動式ウインチを搭載設置した台車と、カウンターウェイトと、ガイドア ームと、2本の吊りアームとをそれぞれ分割した状態で、建設過程中の荷物エレ ベータを介して、所望の階層に搬入する。搬入と同時にカウンターウェイトおよ びガイドアーム本体を台車側に取り付け、さらにガイドアーム本体に吊りアーム をそれぞれ取り付ける。そして左右の吊りアームの先端部を閉じた状態にして、 ガイドアーム本体の先端部をカーテンウォールの窓から外側に突き出し、しかる のち吊りアームを左右に開き直線状にして、固定ピンでガイドアーム側に固定さ せる。Since the gondola carriage according to the present invention is configured as described above with reference to the embodiments, the carriage equipped with the manual winch, the counterweight, the guide arm, and the two suspension arms are separated from each other. In this state, the cargo is carried to the desired floor via the cargo elevator during the construction process. At the same time as loading, attach the counterweight and guide arm body to the trolley side, and then attach the suspension arm to the guide arm body. Then, with the ends of the left and right suspension arms closed, project the ends of the guide arm body out of the window of the curtain wall, then open the suspension arms to the left and right to form a straight line, and fix them with the fixing pins on the guide arm side. Fixed to.

【0024】 その吊りアームの固定作業が終了すると、台車自体のアウトリガーを操作して 台車自体を窓際に固定させ手動式ウインチの巻取りワイヤーを引き出し、その巻 取りワイヤーを吊りアームに設けた2つのシーブを介して地上に垂下させる。そ して、垂下させた左右双方の巻取りワイヤーの先端部をワインダーに支持させ、 作業足場となるケージ、つまりゴンドラを懸吊させる。以上で準備作業が終了す るので、以下、手動式ウインチを操作し、ゴンドラを昇降してカーテンウォール の目地処理作業を行えばよい。When the work of fixing the suspension arm is completed, the outrigger of the truck itself is operated to fix the truck itself at the window to pull out the winding wire of the manual winch, and the winding wire is attached to the suspension arm. It hangs down on the ground through the sheave. Then, the winder supports the ends of both the left and right hanging take-up wires, and the cage, which is the working scaffolding, that is, the gondola, is suspended. Now that the preparatory work is complete, the manual winch can be operated to move the gondola up and down to perform curtain wall joint treatment.

【0025】[0025]

【考案の効果】[Effect of device]

この考案による台車を使用すれば、在来のカーテンウォールの目地処理作業に 比較し、次のような効果を発揮することができる。 (1)最上階までのカーテンウォールの取り付け作業が完了する前に、途中階か らゴンドラを吊下させることができるので、目地処理作業の工程を全工程の中に 適切に配分させることができ、工期短縮が可能である。 (2)台車の現場階への搬入が容易であるため、目地処理作業に至るまでの段取 りを円滑に展開でき、作業の効率化に役立つ。 (3)ゴンドラを懸吊する吊りアームを開閉形式の構成とし、所定階の窓から外 側に突き出し、しかるのちに左右に開いて巻取りワイヤーを垂下させ、左右の巻 取りワイヤーでゴンドラを懸吊するので、ゴンドラ自体が安定した状態に保持さ れ、作業の安全性が高い。特に現場における各階への台車の搬入搬出が簡単にで きるため、吊り高さをせいぜい1階〜2階層分と短く区切って作業することがで き、その結果、ゴンドラの振れ等が最小に抑制され、安全な目地処理作業が展開 できる。 By using the dolly according to this invention, the following effects can be achieved as compared with the conventional curtain wall joint processing work. (1) Since the gondola can be hung from the middle floor before the curtain wall installation work up to the top floor is completed, the joint treatment process can be appropriately distributed among all processes. The construction period can be shortened. (2) Since it is easy to carry the dolly to the site floor, it is possible to smoothly perform the setup process up to the joint treatment work, which is useful for work efficiency. (3) The suspension arm that suspends the gondola is configured to open and close. It projects outward from the window on the predetermined floor, then opens to the left and right to hang down the take-up wire, and the left and right take-up wires suspend the gondola. Since it is hung, the gondola itself is kept in a stable state, and work safety is high. In particular, since it is easy to load and unload trucks to and from each floor on the site, it is possible to divide the suspension height into at most one floor and two floors at the most, and as a result, the gondola swing can be minimized. Therefore, safe joint processing work can be developed.

【図面の簡単な説明】[Brief description of drawings]

【図1】この考案によるゴンドラ吊りアームを有する台
車の実施例を示す側面図である。
FIG. 1 is a side view showing an embodiment of a truck having a gondola suspension arm according to the present invention.

【図2】図1の平面図である。FIG. 2 is a plan view of FIG.

【図3】開閉式吊りアームを左右に開いた正面図であ
る。
FIG. 3 is a front view of the opening / closing suspension arm opened to the left and right.

【図4】図3の平面図である。FIG. 4 is a plan view of FIG.

【図5】開閉式吊りアームを閉じた状態で示す正面図で
ある。
FIG. 5 is a front view showing a state in which the opening / closing suspension arm is closed.

【図6】図4のY−Y線縦断面図である。6 is a vertical cross-sectional view taken along the line YY of FIG.

【符号の説明】[Explanation of symbols]

1 …… 台車 2 …… 車輪 3 …… カウンターウェイト 4 …… ガイドアーム 5 …… 支持ブラケット 6 …… ガイドアーム本体 7 …… 手動式ウインチ 7a …… 巻取りドラム 7b …… 作動ハンドル 7c …… 巻取りワイヤー 8 …… アウトリガー 9 …… 吊りアーム 9a,9b …… ワイヤーシーブ 9c …… 吊りアームの基端部 10 …… 支軸 11 … 固定ピン 12 …… 固定ピンの紛失防止チェン 13 …… ロックピン 1 dolly 2 ...... wheels 3 ...... counterweight 4 …… guide arm 5 …… support bracket 6 …… guide arm body 7 …… manual winch 7a …… winding drum 7b …… operating handle 7c …… winding Take wire 8 …… Outrigger 9 …… Suspending arm 9a, 9b …… Wire sheave 9c …… Base end of suspension arm 10 …… Spindle 11 …… Fixing pin 12 …… Locking pin loss prevention chain 13 …… Lock pin

Claims (2)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 台車と、カウンターウェイトと、アウト
リガーと、ウインチと、ガイドアームと、吊りアームと
を有し、前記カウンターウェイトは、前記台車の後端部
に、アウトリガーは、台車の前端部左右両側に装備し、
ウインチは、台車上に搭載設置し、前記ガイドアーム
は、台車の前端部左右両側から水平に張り出し、前記吊
りアームは、2本からなり、それぞれ先端部と基端部寄
りにワイヤーシーブを有するもので、中間部より基端部
寄りを前記左右ガイドアームの先端部に支軸を介して枢
支し、この支軸を支点として双方吊りアームを直線状に
開き、双方吊りアームの基端部同士を抜き差し自在な固
定ピンを介して前記ガイドアームの先端部に一体的に連
結固定する構成としていることを特徴とするゴンドラ吊
りアームを有する台車。
1. A trolley, a counterweight, an outrigger, a winch, a guide arm, and a suspension arm, wherein the counterweight is at the rear end of the trolley, and the outrigger is at the left and right front ends of the trolley. Equip both sides,
The winch is mounted on a bogie, the guide arm extends horizontally from the left and right sides of the front end of the bogie, and the suspension arm consists of two wires, each having a wire sheave near the tip and the base end. Then, a portion closer to the base end portion than the middle portion is pivotally supported to the tip end portions of the left and right guide arms via a support shaft, and both suspension arms are linearly opened with this support shaft as a fulcrum, and the base end portions of both suspension arms are connected to each other. A trolley having a gondola suspension arm, characterized in that it is integrally connected and fixed to the tip end portion of the guide arm via a fixing pin that can be freely inserted and removed.
【請求項2】 前記カウンターウェイト、ガイドアーム
および吊りアームは、台車に対し、着脱自在に装備して
いることを特徴とする請求項1記載のゴンドラ吊りアー
ムを有する台車。
2. The trolley having a gondola suspension arm according to claim 1, wherein the counterweight, the guide arm and the suspension arm are detachably mounted on the trolley.
JP1994002429U 1994-03-22 1994-03-22 Trolley with a gondola suspension arm Expired - Lifetime JP3002221U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1994002429U JP3002221U (en) 1994-03-22 1994-03-22 Trolley with a gondola suspension arm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1994002429U JP3002221U (en) 1994-03-22 1994-03-22 Trolley with a gondola suspension arm

Publications (1)

Publication Number Publication Date
JP3002221U true JP3002221U (en) 1994-09-20

Family

ID=43138188

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1994002429U Expired - Lifetime JP3002221U (en) 1994-03-22 1994-03-22 Trolley with a gondola suspension arm

Country Status (1)

Country Link
JP (1) JP3002221U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200103485A (en) * 2019-02-25 2020-09-02 (주)조명건설 Dustproof booth for painting spray of building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200103485A (en) * 2019-02-25 2020-09-02 (주)조명건설 Dustproof booth for painting spray of building

Similar Documents

Publication Publication Date Title
JP4753932B2 (en) Gondola equipment
JP2000169083A (en) Wall face work robot
JP2008222382A (en) Method for moving lifting device for installation
JP3002221U (en) Trolley with a gondola suspension arm
JPH1045373A (en) Long material transporting method and drop preventive cage for use in it
JPH0628548Y2 (en) Lifting device for self-propelled work platform
JP2000143139A (en) Hoisting jig for crane
JPH0978842A (en) Crane for scaffold
JP2901965B1 (en) Lift equipment for buildings
JP2004155538A (en) Suspension tool
JPH0891770A (en) Long member suspending device
JPH05330758A (en) Elevator guide rail installation assist device and guide rail installation method
JPH0328066Y2 (en)
JPH074492U (en) Lifting device for self-propelled aerial work platforms
JP2516844Y2 (en) Jig for hanging long materials
JPH07291578A (en) Reversal attachment/detachment device for continuous casting facility
JP3084789U (en) Hanging trolley for leaf tobacco drying room
JP2007132087A (en) Suspended working floor device
JPH10297841A (en) Carrying-in method for hoist of elevator
JP3063880U (en) Scaffold unloader
JP3008431U (en) Hanging jig for wall joint material
JPH0618379U (en) Simple crane
JPH0439958Y2 (en)
JP2017031578A (en) Hanger for scaffold
JPH03293295A (en) Construction material lifting device and method thereof