KR20200103485A - Dustproof booth for painting spray of building - Google Patents

Dustproof booth for painting spray of building Download PDF

Info

Publication number
KR20200103485A
KR20200103485A KR1020190022064A KR20190022064A KR20200103485A KR 20200103485 A KR20200103485 A KR 20200103485A KR 1020190022064 A KR1020190022064 A KR 1020190022064A KR 20190022064 A KR20190022064 A KR 20190022064A KR 20200103485 A KR20200103485 A KR 20200103485A
Authority
KR
South Korea
Prior art keywords
frame member
frame
booth
vertical frame
upper frame
Prior art date
Application number
KR1020190022064A
Other languages
Korean (ko)
Other versions
KR102159124B1 (en
Inventor
김하영
Original Assignee
(주)조명건설
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)조명건설 filed Critical (주)조명건설
Priority to KR1020190022064A priority Critical patent/KR102159124B1/en
Publication of KR20200103485A publication Critical patent/KR20200103485A/en
Application granted granted Critical
Publication of KR102159124B1 publication Critical patent/KR102159124B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/80Movable spray booths
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/40Construction elements specially adapted therefor, e.g. floors, walls or ceilings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/02Cages, i.e. cars
    • B66B11/0226Constructional features, e.g. walls assembly, decorative panels, comfort equipment, thermal or sound insulation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B9/00Kinds or types of lifts in, or associated with, buildings or other structures
    • B66B9/16Mobile or transportable lifts specially adapted to be shifted from one part of a building or other structure to another part or to another building or structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Transportation (AREA)
  • Automation & Control Theory (AREA)
  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)

Abstract

The present invention relates to a dustproof booth for spray painting of buildings, which comprises: a lower frame member on which a lower dustproof layer is installed; a vertical frame member on which a side dustproof layer and a front dustproof layer are installed; an upper frame member on which an upper dustproof layer is installed; a plurality of connecting members for connecting the lower frame member, the vertical frame member, and the upper frame member; a booth structure including the lower frame member, the vertical frame member, the upper frame member, and the connecting member; a hanger member on which the booth structure is installed to be lifted by a winch; a shock-relieving movable wheel which is installed on the vertical frame member so that the booth structure does not exert an impact on the outer surface of the building; and a movable wheel which is installed on the bottom of the lower frame member. Accordingly, the present invention provides the following effects: the dustproof layers are installed on each side and top and bottom of the booth structure so that dust generated during spray painting does not scatter; workers can freely lift the booth structure to perform spray painting; each wire is installed on the outer surface of the booth structure to prevent safety accidents caused by falls of workers, etc.; the weight of the winch is increased according to the weight of the booth structure so as to more firmly fix the winch.

Description

건축물의 스프레이 도장용 방진막 전용 부스{Dustproof booth for painting spray of building}Dustproof booth for painting spray of building

본 발명은 건축물의 스프레이 도장용 방진막 전용 부스에 관한 것으로, 더욱 상세하게는 건축물의 외벽에 스프레이 도장 작업 시 작업자가 안전하게 도장 작업을 할 수 있도록 함은 물론 작업자의 방진막 전용 부스를 자유로이 승강시키면서 작업이 이루어지도록 하는 건축물의 스프레이 도장용 방진막 전용 부스에 관한 것이다.The present invention relates to a booth dedicated to a dustproof membrane for spray painting of a building, and more particularly, allowing a worker to safely paint when spray painting the exterior wall of a building, as well as freely raising and lowering the booth for the worker's dustproof membrane. It relates to a booth dedicated to dustproof membranes for spray painting of buildings to be made.

일반적으로 도장작업은 자동차나 철도 차량 등에 사용되는 각종 건축물, 외장물이나 내장물 혹은 여타 부품 등과 같은 피도장물을 도장하고 건조하는 장치들로 이루어진 설비이다.In general, the painting work is a facility consisting of devices that paint and dry various structures used in automobiles or railroad vehicles, exterior materials, interior materials, or other parts to be painted.

이와 같은 도장작업은 그 사용 용도나 도장 방식에 따라 다양하게 구분되고 있으며, 통상적으로는 스프레이식 도장 설비와 전착식 도장 설비가 주로 사용되고 있다.Such painting work is classified in various ways according to its usage or painting method, and generally, spray-type painting equipment and electrodeposition-type painting equipment are mainly used.

여기서 상기 스프레이식 도장 설비는 일정 경로를 따라 이송되는 피도장물의 표면을 순차적으로 세척, 도장 및 건조 작업이 이루어지게 된다.Here, in the spray-type painting facility, the surface of the object to be coated is sequentially cleaned, painted, and dried.

한편 대기환경보전법 제43조에 따른 비산먼지 발생 사업에서 야외도장을 하는 경우에는 동법 시행규칙 별표 14 제9호에 따라 비산먼지 발생을 억제하기 위한 시설의 설치 및 필요한 조치를 하여야 하는 것으로 규정되어 있다.On the other hand, in the case of outdoor painting in a project that generates fugitive dust pursuant to Article 43 of the Air Conservation Act, it is stipulated that installation of facilities and necessary measures to suppress the occurrence of fugitive dust are required pursuant to Attached Table 14 No.

또한 동법 시행규칙 별표 14 제10호에 따라 분사방식에 의한 도장작업을 할 경우에는 작업 부위 혹은 해당 층에 대하여 방진막 등을 설치하여 도장 작업으로 인한 비산먼지 피해를 방지하기 위한 조치를 하여야 하는 것으로 규정되어 있다.In addition, it is stipulated that in the case of painting by spraying method in accordance with Attached Table 14 No. 10 of the Enforcement Regulations of the same Act, measures must be taken to prevent damage from scattering dust caused by painting by installing a dustproof membrane on the work area or the corresponding layer. Has been.

현재의 도로교시방규정에는 현장도장 1회를 현장에서 시공하게 되어 있으나, 환경오염의 우려로 공장에서 완료하고 연결부만을 현장에서 시행하고 있다.The current road bridge specification regulations require that the on-site painting be constructed once on-site, but due to environmental contamination concerns, the factory is completed and only the connection is implemented on-site.

그 결과, 운반, 설치, 상부공 콘크리트 타설 후 오염 등으로 인해 부분도장이 불가피하고 최소한의 도막 두께가 되어야 더스트가 생기지 않는 도장 특성에 따라 시공사는 교량의 하자기간 10년 동안 계속적인 보수를 수행하여야 한다.As a result, partial painting is inevitable due to contamination after transportation, installation, and concrete pouring in the upper part, and the construction company must perform continuous repairs for 10 years during the defect period of the bridge according to the painting characteristics that do not generate dust when the minimum coating thickness is reached. .

건축시공과 재도장에서 대부분의 업체는 스프레이(뿜칠) 대비 비산방지막 비계설치 비용이 과다하다는 이유로 롤러 작업을 병행하여 하부 차량 등은 비닐덮개로 보양 후 불법으로 스프레이 도장을 수행하고 있으며, 지자체가 엄격하게 관리하는 곳에서는 대규모의 공사비 증액을 감안하더라도 롤러 등으로 수작업으로 시공하고 있는 상황이다.In the construction and repainting, most companies perform roller work in parallel because the cost of installing scaffolding is excessive compared to spraying (spraying), and the lower vehicle is protected with a plastic cover and then spray-painted illegally. Even if the large-scale construction cost increase is taken into consideration, construction is carried out manually with rollers.

이와 같이 법규를 위반하면서 시공하고 있고, 환경단체 등에서는 근원적인 대책없이 고발조치 등으로 악순환이 반복되고 있다.As such, construction is being carried out while violating the laws and regulations, and environmental organizations have repeated a vicious cycle with complaints without fundamental measures.

건축, 토목구조물의 건설 및 유지관리에 있어서 도장공사와 스프레이 작업은 필수적이며, 친환경 작업을 위한 비산방지막 비계 비용대비 저비용 고효율의 장비개발이 불가피한다. 특히, 도로구조물 중 강교는 도장열화에 따른 주기적 재도장이 이루어지고 있고, 공사비 중 방진비계비용이 대략 반 정도를 차지하여 관리주체의 유지관리 비용이 증가하므로 무비산 현장도장 시스템에 대한 기술개발의 필요성이 대두되고 있다.In the construction and maintenance of construction and civil engineering structures, painting work and spray work are essential, and development of low-cost and high-efficiency equipment is inevitable for eco-friendly work. In particular, steel bridges among road structures are regularly repainted due to deterioration of painting, and the cost of vibration-proof scaffolding accounts for about half of the construction cost, which increases the maintenance cost of the management entity. The necessity is emerging.

예를 들어, 하기 특허문헌 1에는 '무비산 현장도장 시스템'이 개시되어 있다.For example, the following Patent Document 1 discloses a'non-scattered field coating system'.

하기 특허문헌 1에 따른 무비산 현장도장 시스템은 굴절차 또는 스카이차를 포함한 기본차량, 상기 기본차량의 후미부에 장착되는 이동식 집진기, 상기 기본차량의 운전부와 상기 이동식 집진기 사이에 구비되는 사다리장비, 상기 사다리장비의 단부에 구비되는 탑재함 및 상기 탑재함의 적어도 일측에 구비되는 흡입 플레이트를 포함한다.The non-acid on-site coating system according to the following Patent Document 1 includes a basic vehicle including an excavation procedure or a sky vehicle, a mobile dust collector mounted at the rear of the basic vehicle, a ladder equipment provided between the driving unit of the basic vehicle and the mobile dust collector, It includes a mounting box provided at the end of the ladder equipment and a suction plate provided on at least one side of the mounting box.

상기 탑재함은 상기 사다리장비의 단부에 결합되는 리프팅 프레임, 상기 리프팅 프레임에 회동 가능하도록 연결되는 서포터, 일측 단부가 상기 리프팅 프레임에 회동 가능하도록 연결되는 제1 리프팅 암 및 타측 단부가 상기 서포터에 회동 가능하도록 연결되는 제2 리프팅 암이 힌지 구조로 연결된 리프팅 암, 일측 단부가 상기 제1 리프팅 암에 회동 가능하도록 연결되고 타측 단부가 상기 리프팅 프레임에 회동가능하도록 연결되며 상기 리프팅 암을 접거나 펼치는 리프팅 실린더, 상기 서포터의 내부에 구비되는 석션 호퍼, 일측 단부가 상기 석션 호퍼에 연통되고 타측 단부는 상기 흡입 플레이트에 연통되어 상기 흡입 플레이트로 흡입되는 물질을 상기 석션 호퍼로 전달하는 석션덕트, 상기 서포터 상에 장착되는 페인팅 부스를 포함한다.The mounting box includes a lifting frame coupled to the end of the ladder equipment, a supporter connected to the lifting frame so as to be rotatable, a first lifting arm and the other end connected to the lifting frame so that one end is rotatable to the supporter A lifting arm in which a second lifting arm connected to be possible is connected in a hinge structure, one end is connected to be rotatable to the first lifting arm, and the other end is connected to be rotatable to the lifting frame, and the lifting arm is folded or unfolded. A cylinder, a suction hopper provided inside the supporter, a suction duct having one end communicated with the suction hopper and the other end communicating with the suction plate to transfer the material sucked through the suction plate to the suction hopper, on the supporter Includes a painting booth mounted on.

하기 특허문헌 2에는 '스프레이도장용 부스'가 개시되어 있다.In the following Patent Document 2, a'spray coating booth' is disclosed.

하기 특허문헌 2에 따른 스프레이도장용 부스는 부스와, 이 부스 내부에 설치되는 스프레이도장기와, 상기 부스의 내부에 스프레이도장기와 소정 간격 이격되도록 세워 설치된 수류판과, 이 수류판의 하측 공간과 연통되도록 부스의 일측에 설치되며 내부에 도료수집용 액체가 수용되는 저장조와, 상기 수류판의 상측에 설치되며 펌프가 설치된 관로를 통해 상기 저장조에 연결되어 도료수집용 액체를 수류판 표면을 따라 흐르도록 공급하는 공급노즐과, 상기 저장조와 연통되도록 수류판의 일측에 수직방향으로 형성되어 부스 내부의 공기를 외부로 배출시키는 배기구를 포함한다.The spray coating booth according to the following Patent Document 2 includes a booth, a spray coating device installed inside the booth, a water flow plate erected to be spaced apart from the spray coating machine inside the booth, and a lower space of the water flow plate. It is installed on one side of the booth so as to communicate with and is connected to the storage tank through a conduit installed on the upper side of the water flow plate and a pipe in which the paint collection liquid is accommodated, and the liquid for paint collection is transferred along the surface of the water flow plate. It includes a supply nozzle for supplying to flow, and an exhaust port formed in a vertical direction on one side of the water flow plate so as to communicate with the storage tank to discharge the air inside the booth to the outside.

상기 배기구의 내부에는 배출되는 공기가 통과될 수 있도록 상하 연통된 수집챔버가 구비되며, 이 수집챔버의 내부에는 다수의 통공 및 다수개의 간살이 형성되어 통공을 통과하는 공기중의 도료가 간살에 묻어 수집되게 하는 다수의 도료수집용 수집체가 채워지고, 이 수집체의 상측에는 도료수집용 액체를 수집체 표면으로 분사하여 수집된 도료를 저장조 측으로 흘러내리게 하는 분사노즐이 설치된다.The inside of the exhaust port is provided with a collection chamber that communicates up and down so that the discharged air can pass, and a plurality of through holes and a plurality of skins are formed in the inside of the collection chamber, so that the paint in the air passing through the through holes is buried on the skin. A plurality of paint collection bodies to be collected are filled, and a spray nozzle is installed on the upper side of the collection body to spray the paint collection liquid onto the surface of the collection body to flow the collected paint down to the reservoir side.

대한민국 특허 등록번호 제10-1221665호Korean Patent Registration No. 10-1221665 대한민국 실용신안 등록번호 제20-0306761호Republic of Korea Utility Model Registration No. 20-0306761

본 발명의 목적은 상기한 바와 같은 문제점을 해결하기 위한 것으로, 스프레이 도장 작업으로 인한 먼지 등이 외부로 비산되지 않도록 하는 건축물의 스프레이 도장용 방진막 전용 부스를 제공하는 것이다.It is an object of the present invention to solve the above-described problems, and to provide a booth dedicated to a dustproof membrane for spray painting of a building that prevents dust and the like from scattering to the outside.

본 발명의 다른 목적은 스프레이 도장 작업 시 작업자가 자유로운 자세로 도장을 할 수 있도록 함은 물론 작업자의 안전사고를 방지할 수 있는 건축물의 스프레이 도장용 방진막 전용 부스를 제공하는 것이다.Another object of the present invention is to provide a booth exclusively for spray painting of a building that can prevent a worker's safety accident as well as allowing a worker to paint in a free position during spray painting.

상기한 바와 같은 목적을 달성하기 위하여, 본 발명에 따른 건축물의 스프레이 도장용 방진막 전용 부스는 하부방진막이 설치되도록 소정의 간격으로 다수의 프레임이 이격되게 설치되는 하부프레임부재; 측면방진막 및 정면방진막이 설치되도록 상기 하부프레임부재의 길이 방향 양단에 각각 일정 높이를 갖는 다수의 수직프레임이 설치되는 수직프레임부재; 상부방진막이 설치되도록 상기 수직프레임부재의 상단에 소정의 간격으로 다수의 프레임이 이격되게 설치되는 상부프레임부재; 상기 하부프레임부재, 상기 수직프레임부재 및 상기 상부프레임부재가 서로 연결되도록 구비되는 다수의 연결부재; 상기 하부프레임부재, 상기 수직프레임부재와 상기 상부프레임부재 및 상기 연결부재로 이루어진 부스구조체; 상기 부스구조체가 윈치에 의해 승강 가능하게 설치되도록 상기 상부프레임부재의 상측에 설치되는 행거부재; 상기 부스구조체가 건축물의 외면을 따라 승강 가능하게 하며, 상기 부스구조체가 건축물의 외면에 충격을 가하지 않도록 상기 수직프레임부재의 배면에 설치되는 충격완화용 이동바퀴; 상기 부스구조체를 이동시킬 수 있도록 상기 하부프레임부재의 저면에 설치되는 이동용바퀴;를 포함하는 것을 특징으로 한다.In order to achieve the above object, the booth dedicated to spray painting of a building according to the present invention comprises: a lower frame member in which a plurality of frames are spaced apart from each other at predetermined intervals so that the lower anti-vibration film is installed; A vertical frame member in which a plurality of vertical frames each having a predetermined height are installed at both ends of the lower frame member in the longitudinal direction so that the side dustproof membrane and the front dustproof membrane are installed; An upper frame member in which a plurality of frames are spaced apart from each other at predetermined intervals at an upper end of the vertical frame member so that an upper dustproof membrane is installed; A plurality of connecting members provided to connect the lower frame member, the vertical frame member, and the upper frame member to each other; A booth structure comprising the lower frame member, the vertical frame member, the upper frame member, and the connecting member; A hanger member installed on the upper side of the upper frame member so that the booth structure is installed to be elevating by a winch; An impact relief movable wheel installed on the rear surface of the vertical frame member so that the booth structure can be lifted along the outer surface of the building and the booth structure does not exert an impact on the exterior surface of the building; And a moving wheel installed on the bottom surface of the lower frame member to move the booth structure.

상기 하부프레임부재는 소정의 길이로 형성되어 상기 부스구조체의 정면에 설치되는 제1 가로프레임; 상기 제1 가로프레임으로부터 소정 거리만큼 이격되게 설치되는 제2 가로프레임; 상기 제1 가로프레임과 상기 제2 가로프레임의 양단에 각각 설치되는 제1 세로프레임과 제2 세로프레임; 상기 하부방진막이 안정되게 설치되도록 상기 제1 세로프레임으로부터 소정의 거리만큼 이격되게 설치되는 제3 세로프레임; 상기 하부방진막이 안정되게 설치되도록 상기 제2 세로프레임으로부터 소정의 거리만큼 이격되게 설치되는 제4 세로프레임;으로 이루어지는 것을 특징으로 한다.The lower frame member has a first horizontal frame formed to a predetermined length and installed in front of the booth structure; A second horizontal frame installed to be spaced apart by a predetermined distance from the first horizontal frame; A first vertical frame and a second vertical frame respectively installed at both ends of the first horizontal frame and the second horizontal frame; A third vertical frame spaced apart from the first vertical frame by a predetermined distance so that the lower anti-vibration film is stably installed; And a fourth vertical frame spaced apart from the second vertical frame by a predetermined distance so that the lower anti-vibration film is stably installed.

상기 수직프레임부재는 상기 하부프레임부재의 일단에 수직으로 설치되는 제1 수직프레임과 제2 수직프레임; 상기 하부프레임부재의 타단에 수직으로 설치되는 제3 수직프레임과 제4 수직프레임;을 포함하는 것을 특징으로 한다.The vertical frame member includes a first vertical frame and a second vertical frame vertically installed at one end of the lower frame member; And a third vertical frame and a fourth vertical frame vertically installed at the other end of the lower frame member.

상기 상부프레임부재는 상기 하부프레임부재의 제1 가로프레임과 동일한 길이로 형성되며, 상기 수직프레임부재의 상단에 수평으로 설치되는 제1 상부프레임; 소정의 길이로 형성되며, 상기 수직프레임부재의 일측 상단에 수평으로 설치되는 제2 상부프레임; 상기 제2 상부프레임과 동일한 길이로 형성되며, 상기 제2 상부프레임으로부터 소정의 거리만큼 이격되게 설치되는 제3 상부프레임; 상기 제2 상부프레임과 상기 제3 상부프레임 사이에 설치되는 제4 상부프레임; 상기 제2 상부프레임과 동일한 길이로 형성되며, 상기 수직프레임부재의 타측 상단에 수평으로 설치되는 제5 상부프레임; 상기 제5 상부프레임과 동일한 길이로 형성되며, 상기 제5 상부프레임으로부터 소정의 거리만큼 이격되게 설치되는 제6 상부프레임; 상기 제5 상부프레임과 상기 제6 상부프레임 사이에 설치되는 제7 상부프레임;을 포함하는 것을 특징으로 한다.The upper frame member is formed with the same length as the first horizontal frame of the lower frame member, the first upper frame horizontally installed on the upper end of the vertical frame member; A second upper frame formed to a predetermined length and horizontally installed on an upper end of one side of the vertical frame member; A third upper frame formed to have the same length as the second upper frame and installed to be spaced apart from the second upper frame by a predetermined distance; A fourth upper frame installed between the second upper frame and the third upper frame; A fifth upper frame formed to have the same length as the second upper frame and horizontally installed on the upper end of the other side of the vertical frame member; A sixth upper frame formed to have the same length as the fifth upper frame and installed to be spaced apart from the fifth upper frame by a predetermined distance; And a seventh upper frame installed between the fifth upper frame and the sixth upper frame.

상기 행거부재는 상기 수직프레임부재의 상면에 고정되는 고정행거; 다수의 사슬고리가 연결되도록 다수의 연결구멍이 형성된 행거; 상기 고정행거와 상기 행거 사이에 연결되는 다수의 사슬고리;를 포함하는 것을 특징으로 한다.The hanger member is a fixed hanger fixed to the upper surface of the vertical frame member; A hanger having a plurality of connection holes so that a plurality of chain rings are connected; And a plurality of chain rings connected between the fixed hanger and the hanger.

상기 부스구조체를 승강시키도록 윈치가 구비되고, 상기 윈치에는 상기 부스구조체의 중량에 구애됨이 설치되도록 상기 윈치에 구비되는 바벨추; 상기 바젤추가 안정되게 끼워지도록 상기 윈치(80)에 설치되는 고정봉; 상기 윈치가 자유로이 이동되도록 상기 윈치의 저면에 설치되는 윈치이동바퀴; 상기 윈치를 이동시킬 수 있도록 파지가 가능하게 설치되는 손잡이;를 포함하는 것을 특징으로 한다.A barbell weight provided on the winch such that a winch is provided to lift the booth structure, and the winch is provided with respect to the weight of the booth structure; A fixing rod installed on the winch 80 to stably fit the basel addition; A winch moving wheel installed on the bottom of the winch so that the winch is freely moved; It characterized in that it comprises a; handle is installed to be gripped so as to move the winch.

상술한 바와 같이, 본 발명에 따른 건축물의 스프레이 도장용 방진막 전용 부스에 의하면, 부스구조체의 각 측면 및 상부와 하부에 방진막이 설치되어 스프레이 도장 작업 시 발생되는 먼지가 비산되지 않게 되며, 작업자가 부스구조체를 자유로이 승강시켜 스프레이 도장 작업을 할 수 있고, 부스구조체의 외면에 각각 와이어가 설치되어 작업자의 추락 등에 의한 안전사고를 방지할 수 있으며, 부스구조체의 중량에 따라 윈치의 중량을 증가시켜 윈치를 보다 견고하게 고정시킬 수 있다는 효과가 얻어진다.As described above, according to the booth dedicated for spray painting of a building according to the present invention, a dustproof membrane is installed on each side and upper and lower portions of the booth structure so that dust generated during spray painting is not scattered, and the operator You can freely raise and lower the structure for spray painting, and each wire is installed on the outer surface of the booth structure to prevent safety accidents due to the fall of the operator, and increase the weight of the winch according to the weight of the booth structure. The effect of being able to fix more firmly is obtained.

도 1은 본 발명의 바람직한 실시 예에 따른 건축물의 스프레이 도장용 방진막 전용 부스를 도시한 입체도,
도 2는 본 발명의 바람직한 실시 예에 따른 건축물의 스프레이 도장용 방진막 전용 부스를 도시한 입체도,
도 3은 본 발명의 바람직한 실시 예에 따른 건축물의 스프레이 도장용 방진막 전용 부스에 방진막이 설치되지 않은 상태를 도시한 입체도,
도 4는 본 발명의 바람직한 실시 예에 따른 건축물의 스프레이 도장용 방진막 전용 부스에 방진막이 설치되지 않은 상태를 도시한 입체도,
도 5는 본 발명의 바람직한 실시 예에 따른 건축물의 도장용 방진막 전용 부스의 하부프레임부재를 도시한 평면도,
도 6은 본 발명의 바람직한 실시 예에 따른 건축물의 도장용 방진막 부수의 중간프레임부재를 도시한 평면도,
도 7은 본 발명의 바람직한 실시 예에 따른 건축물의 도장용 방진막 전용 부스의 상부프레임부재를 도시한 평면도,
도 8은 본 발명의 바람직한 실시 예에 따른 건축물의 스프레이 도장용 방진막 전용 부스를 도시한 정면도,
도 9는 도 8의 일부 확대도,
도 10은 본 발명의 바람직한 실시 예에 따른 건축물의 스프레이 도장용 방진막 전용 부스를 도시한 우측면도,
도 11은 도 10의 일부 확대도,
도 12는 본 발명의 바람직한 실시 예에 따른 건축물의 스프레이 도장용 방진막 전용 부스의 연결부재를 도시한 일부 확대 입체도,
도 13은 본 발명의 바람직한 실시 예에 따른 건축물의 도장용 방진막 전용 부스의 행거부재를 도시한 측면도,
도 14는 본 발명의 바람직한 실시 예에 따른 건축물의 도장용 방진막 전용 부스가 설치된 상태를 개략적으로 도시한 측면도,
도 15는 본 발명의 바람직한 다른 실시 예에 따른 건축물의 도장용 방진막 전용 부스의 상부프레임부재를 도시한 평면도.
1 is a three-dimensional view showing a booth dedicated to a dustproof membrane for spray painting of a building according to a preferred embodiment of the present invention,
Figure 2 is a three-dimensional view showing a booth dedicated to the dustproof membrane for spray painting of a building according to a preferred embodiment of the present invention,
Figure 3 is a three-dimensional view showing a state in which the anti-vibration film is not installed in the booth dedicated to the anti-vibration film for spray painting of a building according to a preferred embodiment of the present invention;
Figure 4 is a three-dimensional view showing a state in which the anti-vibration membrane is not installed in the booth dedicated to the spray-painting anti-vibration membrane of a building according to a preferred embodiment of the present invention;
5 is a plan view showing a lower frame member of a booth dedicated to a dustproof membrane for painting of a building according to a preferred embodiment of the present invention;
Figure 6 is a plan view showing an intermediate frame member of the secondary anti-vibration membrane for painting of a building according to a preferred embodiment of the present invention,
7 is a plan view showing an upper frame member of a booth dedicated to a dustproof membrane for painting of a building according to a preferred embodiment of the present invention;
8 is a front view showing a booth dedicated to a dustproof membrane for spray painting of a building according to a preferred embodiment of the present invention,
9 is a partially enlarged view of FIG. 8;
10 is a right side view showing a booth dedicated to a dustproof membrane for spray painting of a building according to a preferred embodiment of the present invention;
11 is a partially enlarged view of FIG. 10;
FIG. 12 is a partially enlarged three-dimensional view showing a connecting member of a booth dedicated to a dustproof membrane for spray painting of a building according to an embodiment of the present invention
13 is a side view showing a hanger member of a booth dedicated to a dustproof membrane for painting of a building according to a preferred embodiment of the present invention;
14 is a side view schematically showing a state in which a booth dedicated to a dustproof membrane for painting of a building according to a preferred embodiment of the present invention is installed;
15 is a plan view showing an upper frame member of a booth dedicated to the anti-vibration membrane for painting of a building according to another preferred embodiment of the present invention.

이하 본 발명의 바람직한 실시 예에 따른 건축물의 스프레이 도장용 방진막 전용 부스를 첨부된 도면을 참조하여 상세하게 설명한다.Hereinafter, a booth dedicated to a dustproof membrane for spray painting of a building according to a preferred embodiment of the present invention will be described in detail with reference to the accompanying drawings.

본 발명의 바람직한 실시 예에 따른 건축물의 스프레이 도장용 방진막 전용 부스는 하부방진막이 설치되도록 소정의 간격으로 다수의 프레임이 이격되게 설치되는 하부프레임부재(10), 측면방진막 및 정면방진막이 설치되도록 상기 하부프레임부재(10)의 길이 방향 양단에 각각 일정 높이를 갖는 다수의 수직프레임이 설치되는 수직프레임부재(20), 상부방진막이 설치되도록 상기 수직프레임부재(20)의 상단에 소정의 간격으로 다수의 프레임이 이격되게 설치되는 상부프레임부재(30), 상기 하부프레임부재(10), 상기 수직프레임부재(20) 및 상기 상부프레임부재(30)가 서로 연결되도록 구비되는 다수의 연결부재(40), 상기 하부프레임부재(10), 상기 수직프레임부재(20)와 상기 상부프레임부재(30) 및 상기 연결부재(40)로 이루어진 부스구조체(1), 상기 부스구조체(1)가 윈치에 의해 승강 가능하게 설치되도록 상기 상부프레임부재(30)의 상측에 설치되는 행거부재(50), 상기 부스구조체(1)가 건축물의 외면을 따라 승강 가능하게 하며, 상기 부스구조체(1)가 건축물의 외면에 충격을 가하지 않도록 상기 수직프레임부재(20)의 배면에 설치되는 충격완화용 이동바퀴(60), 상기 부스구조체(1)를 이동시킬 수 있도록 상기 하부프레임부재(10)의 저면에 설치되는 이동용바퀴(80)를 포함한다.In the booth dedicated to spray painting of a building according to a preferred embodiment of the present invention, a lower frame member 10, a side dust barrier, and a front dust barrier are installed so that a plurality of frames are spaced apart at predetermined intervals so that the lower dust barrier is installed. A vertical frame member 20 in which a plurality of vertical frames having a predetermined height are installed at both ends of the lower frame member 10 in the longitudinal direction, and a plurality of vertical frames at predetermined intervals on the upper end of the vertical frame member 20 so that an upper vibration barrier is installed. A plurality of connecting members 40 provided to connect the upper frame member 30, the lower frame member 10, the vertical frame member 20, and the upper frame member 30 to each other. , The lower frame member 10, the vertical frame member 20, the upper frame member 30, and the booth structure 1 consisting of the connecting member 40, the booth structure 1 is lifted by a winch The hanger member 50 installed on the upper side of the upper frame member 30 so that it is possible to be installed, and the booth structure 1 is able to elevate along the outer surface of the building, and the booth structure 1 is attached to the outer surface of the building. Shock-absorbing movable wheels 60 installed on the rear surface of the vertical frame member 20 so as not to apply impact, and movable wheels installed on the bottom of the lower frame member 10 to move the booth structure 1 It includes (80).

본 발명의 실시 예에 따른 스프레이 도장용 방진막 전용 부스는 하부프레임부재(10), 수직프레임부재(20) 및 상부프레임부재(30)의 내측면에 각각 하부방진막(2), 측면방진막(3), 정면방진만(4) 및 상부방진막(5)을 설치하여 줌으로써, 스프레이 도장 작업 시 발생되는 먼지 등이 비산되지 않도록 한다.The booth dedicated to the dustproof membrane for spray painting according to the embodiment of the present invention includes a lower dustproof membrane 2 and a side dustproof membrane 3 on the inner surfaces of the lower frame member 10, the vertical frame member 20, and the upper frame member 30, respectively. , By installing the front dustproof only (4) and the upper dustproof film (5), dust generated during spray painting work is not scattered.

또한 작업자가 작업 상황에 따라 부스구조체(1)를 자유로이 승강시킬 수 있도록 하며, 부스구조체(1)를 작업하고자 하는 위치로 편리하게 이동시킬 수 있고, 부스구조체(1)에 방진막(2~5) 및 와이어(49)에 의해 작업자의 추락 등에 의한 안전사고를 방지할 수 있도록 한다.In addition, the operator can freely lift the booth structure (1) according to the working situation, and the booth structure (1) can be conveniently moved to the desired position, and the booth structure (1) has a vibration barrier (2-5). And it is possible to prevent safety accidents due to fall of the operator by the wire 49.

도 1은 본 발명의 바람직한 실시 예에 따른 건축물의 스프레이 도장용 방진막 전용 부스를 도시한 입체도이고, 도 2는 본 발명의 바람직한 실시 예에 따른 건축물의 스프레이 도장용 방진막 전용 부스를 도시한 입체도이며, 도 3은 본 발명의 바람직한 실시 예에 따른 건축물의 스프레이 도장용 방진막 전용 부스에 방진막이 설치되지 않은 상태를 도시한 입체도이고, 도 4는 본 발명의 바람직한 실시 예에 따른 건축물의 스프레이 도장용 방진막 전용 부스에 방진막이 설치되지 않은 상태를 도시한 입체도이다.1 is a three-dimensional view showing a booth dedicated for spray painting of a building according to a preferred embodiment of the present invention, and FIG. 2 is a three-dimensional view showing a booth dedicated for spray painting of a building according to a preferred embodiment of the present invention 3 is a three-dimensional view showing a state in which the anti-vibration membrane is not installed in a booth dedicated to spray painting of a building according to a preferred embodiment of the present invention, and FIG. 4 is a spray painting of a building according to a preferred embodiment of the present invention. It is a three-dimensional view showing a state in which the anti-vibration membrane is not installed in the booth dedicated to the anti-vibration membrane.

도 1 내지 도 4에 도시된 바와 같이, 상기 부스구조체(1)는 하부프레임부재(10), 상기 하부프레임부재(10)의 양단에 수직으로 설치되는 수직프레임부재(20), 상기 수직프레임부재(20)의 상단에 설치되는 상부프레임부재(30) 및 상기 프레임부재(10, 20, 30)의 연결 부위에 각각 설치되는 연결부재(40)로 이루어진다.1 to 4, the booth structure 1 includes a lower frame member 10, a vertical frame member 20 vertically installed at both ends of the lower frame member 10, and the vertical frame member It consists of an upper frame member 30 installed on the upper end of (20) and a connecting member 40 that is respectively installed at the connection portion of the frame members 10, 20, 30.

아울러 부스구조체(1)의 상부프레임부재(30)에는 윈치(80) 등의 승강수단에 설치되도록 행거부재(50)가 설치되며, 상기 부스구조체(1)의 배면에는 건축물의 외면에 접촉 시 충격을 완화시키도록 설치되는 충격완화용 바퀴(70) 및 부스구조체(1)를 이동시킬 수 있도록 하부프레임부재(10)의 저면에 이동용바퀴(80)가 설치된다.In addition, a hanger member 50 is installed on the upper frame member 30 of the booth structure 1 so as to be installed on an elevating means such as a winch 80, and the rear surface of the booth structure 1 has an impact upon contact with the outer surface of the building. A movable wheel 80 is installed on the bottom of the lower frame member 10 to move the shock-absorbing wheel 70 and the booth structure 1 that are installed to relieve the shock.

도 5는 본 발명의 바람직한 실시 예에 따른 건축물의 도장용 방진막 전용 부스의 하부프레임부재를 도시한 평면도이고, 도 6은 본 발명의 바람직한 실시 예에 따른 건축물의 도장용 방진막 부수의 중간프레임부재를 도시한 평면도이며, 도 7은 본 발명의 바람직한 실시 예에 따른 건축물의 도장용 방진막 전용 부스의 상부프레임부재를 도시한 평면도이다.5 is a plan view showing a lower frame member of a booth dedicated to a dustproof membrane for painting of a building according to a preferred embodiment of the present invention, and FIG. 6 is a plan view showing an intermediate frame member associated with a dustproof membrane for painting of a building according to a preferred embodiment of the present invention. Fig. 7 is a plan view showing an upper frame member of a booth dedicated to a dustproof membrane for painting in a building according to a preferred embodiment of the present invention.

도 1 내지 도 7에 도시된 바와 같이, 상기 하부프레임부재(10)는 소정의 길이로 형성되어 상기 부스구조체(1)의 정면에 설치되는 제1 가로프레임(11), 상기 제1 가로프레임(11)으로부터 소정 거리만큼 이격되게 설치되는 제2 가로프레임(12), 상기 제1 가로프레임(11)과 상기 제2 가로프레임(12)의 양단에 각각 설치되는 제1 세로프레임(13)과 제2 세로프레임(14), 상기 하부방진막이 안정되게 설치되도록 상기 제1 세로프레임(13)으로부터 소정의 거리만큼 이격되게 설치되는 제3 세로프레임(15), 상기 하부방진막이 안정되게 설치되도록 상기 제2 세로프레임(14)으로부터 소정의 거리만큼 이격되게 설치되는 제4 세로프레임(16)으로 이루어진다.As shown in FIGS. 1 to 7, the lower frame member 10 has a first horizontal frame 11 and a first horizontal frame 11 formed in a predetermined length and installed in front of the booth structure 1. 11), the second horizontal frame 12, which is installed to be spaced apart by a predetermined distance, the first vertical frame 13 and the first vertical frame 13 respectively installed at both ends of the first horizontal frame 11 and the second horizontal frame 12 2 The vertical frame 14, a third vertical frame 15 that is installed to be spaced apart by a predetermined distance from the first vertical frame 13 so that the lower anti-vibration film is stably installed, and the lower anti-vibration film is stably installed. 2 It consists of a fourth vertical frame 16 that is installed to be spaced apart from the vertical frame 14 by a predetermined distance.

상기 하부프레임부재(10)는 하부방진막(2)을 안정되게 지지하는 것으로, 상기 부스구조체(1)의 정면 하부에는 제1 가로프레임(11)이 설치된다. 상기 제1 가로프레임(11)은 소정의 길이로 형성되는데, 상기 제1 가로프레임(11)은 연결부재(40)에 의해 서로 연결되도록 제1 프레임(11a)과 제2 프레임(11b)으로 이루어진다.The lower frame member 10 stably supports the lower anti-vibration membrane 2, and a first horizontal frame 11 is installed under the front side of the booth structure 1. The first horizontal frame 11 is formed to have a predetermined length, and the first horizontal frame 11 is composed of a first frame 11a and a second frame 11b so as to be connected to each other by a connecting member 40. .

아울러 상기 제2 가로프레임(12)은 제1 가로프레임(11)으로부터 소정의 거리만큼 이격되게 설치되며, 상기 제2 가로프레임(12)는 연결부재(40)에 의해 서로 연결되도록 제1 프레임(12a)과 제2 프레임(12b)으로 이루어진다.In addition, the second horizontal frame 12 is installed to be spaced apart from the first horizontal frame 11 by a predetermined distance, and the second horizontal frame 12 is connected to each other by a connection member 40 ( 12a) and a second frame 12b.

상기 제1 가로프레임(11)과 제2 가로프레임(12) 사이에는 제1 세로프레임(13), 제2 세로프레임(14), 제3 세로프레임(15) 및 제4 세로프레임(16)이 설치된다.Between the first horizontal frame 11 and the second horizontal frame 12, a first vertical frame 13, a second vertical frame 14, a third vertical frame 15 and a fourth vertical frame 16 are provided. Installed.

상기 제1 세로프레임(13)은 제1 가로프레임(11)과 제2 가로프레임(12)의 일단에 설치되며, 상기 제2 세로프레임(14)은 제1 세로프레임(13)으로부터 소정의 거리만큼 이격되어 설치된다.The first vertical frame 13 is installed at one end of the first horizontal frame 11 and the second horizontal frame 12, and the second vertical frame 14 is a predetermined distance from the first vertical frame 13 It is installed spaced apart as much.

또 제3 세로프레임(15)은 제1 가로프레임(11)과 제2 가로프레임(12)의 타단에 설치되며, 상기 제4 세로프레임(16)은 제3 세로프레임(15)으로부터 소정의 거리만큼 이격되게 설치된다.In addition, the third vertical frame 15 is installed at the other ends of the first horizontal frame 11 and the second horizontal frame 12, and the fourth vertical frame 16 is a predetermined distance from the third vertical frame 15. It is installed spaced apart.

이러한 하부프레임부재(10)의 상면에는 하부방진막(2)이 설치되며, 상기 하부방진막(2)은 분리 가능하게 설치될 수 있음은 물론이다.It goes without saying that a lower dustproof membrane 2 is installed on the upper surface of the lower frame member 10, and the lower dustproof membrane 2 may be detachably installed.

상기 하부프레임부재(10)에는 수직프레임부재(20)가 설치되며, 상기 하부프레임부재(10)와 수직프레임부재(20)는 연결부재(40)에 의해 연결 설치된다.A vertical frame member 20 is installed in the lower frame member 10, and the lower frame member 10 and the vertical frame member 20 are connected and installed by a connection member 40.

상기 수직프레임부재(20)는 상기 하부프레임부재(10)의 일단에 수직으로 설치되는 제1 수직프레임(21)과 제2 수직프레임(22)과 상기 하부프레임부재(10)의 타단에 수직으로 설치되는 제3 수직프레임(23)과 제4 수직프레임(24)을 포함한다.The vertical frame member 20 is vertically installed at one end of the lower frame member 10 and a first vertical frame 21 and a second vertical frame 22 and the other end of the lower frame member 10. It includes a third vertical frame 23 and a fourth vertical frame 24 to be installed.

상기 수직프레임부재(20)의 제1 수직프레임(21)은 제1 가로프레임(11)의 일단에 수직으로 설치되고, 상기 제2 수직프레임(22)은 제1 가로프레임(11)의 타단에 수직으로 설치된다.The first vertical frame 21 of the vertical frame member 20 is installed vertically at one end of the first horizontal frame 11, and the second vertical frame 22 is at the other end of the first horizontal frame 11 It is installed vertically.

상기 제3 수직프레임(23)은 제2 가로프레임(12)의 일단에 수직으로 설치되고, 상기 제4 수직프레임(24)은 제2 가로프레임(12)의 타단에 수직으로 설치된다.The third vertical frame 23 is vertically installed at one end of the second horizontal frame 12, and the fourth vertical frame 24 is vertically installed at the other end of the second horizontal frame 12.

이러한 수직프레임부재(20)는 하나의 프레임으로 이루어질 수 있으며, 2개의 분할된 프레임으로 이루어질 수 있음은 물론이다.It goes without saying that the vertical frame member 20 may consist of one frame, and may consist of two divided frames.

아울러 상기 부스구조체(1)의 정면에는 십(十)자 형상으로 이루어진 전면프레임(25)이 설치되며, 상기 전면프레임(25)은 수평 방향으로 설치되는 수평프레임(25a)과 수직 방향으로 설치되는 수직프레임(25b)으로 이루어지고, In addition, a front frame 25 in a shape of a cross is installed in the front of the booth structure 1, and the front frame 25 is installed in a horizontal direction with a horizontal frame 25a installed in a horizontal direction. It consists of a vertical frame (25b),

또 상기 제1 수직프레임(21)과 제3 수직프레임(23) 사이에는 수평프레임(25a)과 동일한 높이에 제1 측면프레임(26)이 설치되고, 상기 제2 수직프레임(22)과 제4 수직프레임(24) 사이에는 수평프레임(25b)과 동일한 높이에 제2 측면프레임(27)이 설치된다.In addition, a first side frame 26 is installed at the same height as the horizontal frame 25a between the first vertical frame 21 and the third vertical frame 23, and the second vertical frame 22 and the fourth Between the vertical frames 24, a second side frame 27 is installed at the same height as the horizontal frame 25b.

상기 상부프레임부재(30)는 상기 하부프레임부재(10)의 제1 가로프레임(11)과 동일한 길이로 형성되며, 상기 수직프레임부재(20)의 상단에 수평으로 설치되는 제1 상부프레임(31), 소정의 길이로 형성되며, 상기 수직프레임부재(20)의 일측 상단에 수평으로 설치되는 제2 상부프레임(32), 상기 제2 상부프레임(32)과 동일한 길이로 형성되며, 상기 제2 상부프레임(32)으로부터 소정의 거리만큼 이격되게 설치되는 제3 상부프레임(33), 상기 제2 상부프레임(32)과 상기 제3 상부프레임(33) 사이에 설치되는 제4 상부프레임(34), 상기 제2 상부프레임(32)과 동일한 길이로 형성되며, 상기 수직프레임부재(20)의 타측 상단에 수평으로 설치되는 제5 상부프레임(35), 상기 제5 상부프레임(35)과 동일한 길이로 형성되며, 상기 제5 상부프레임(35)으로부터 소정의 거리만큼 이격되게 설치되는 제6 상부프레임(36), 상기 제5 상부프레임(35)과 상기 제6 상부프레임(36) 사이에 설치되는 제7 상부프레임(37)을 포함한다.The upper frame member 30 is formed to have the same length as the first horizontal frame 11 of the lower frame member 10, and a first upper frame 31 installed horizontally on the upper end of the vertical frame member 20 ), a second upper frame 32 formed to have a predetermined length and horizontally installed on one side of the vertical frame member 20 and the same length as the second upper frame 32, and the second A third upper frame (33) installed spaced apart from the upper frame (32) by a predetermined distance, and a fourth upper frame (34) installed between the second upper frame (32) and the third upper frame (33) , The second upper frame (32) and the same length as the fifth upper frame (35) and the fifth upper frame (35) horizontally installed on the other side of the vertical frame member (20) The sixth upper frame 36 is formed with a predetermined distance from the fifth upper frame 35, and is installed between the fifth upper frame 35 and the sixth upper frame 36. It includes a seventh upper frame (37).

상기 제1 상부프레임(31)은 제1 수직프레임(21)과 제2 수직프레임(22)의 상단에 수평으로 설치되며, 상기 제1 수직프레임(21)과 제3 수직프레임(23)의 상면에는 제2 상부프레임(32)이 수평 방향으로 설치된다.The first upper frame 31 is horizontally installed on the top of the first vertical frame 21 and the second vertical frame 22, and the upper surface of the first vertical frame 21 and the third vertical frame 23 In the second upper frame 32 is installed in the horizontal direction.

아울러 제2 상부프레임(32)의 일측에는 제3 상부프레임(33)이 설치되며, 상기 제2 상부프레임(32)과 제3 상부프레임(33)에는 제4 상부프레임(34)이 설치된다.In addition, a third upper frame 33 is installed on one side of the second upper frame 32, and a fourth upper frame 34 is installed on the second upper frame 32 and the third upper frame 33.

상기 제2 상부프레임(32)과 제3 상부프레임(33)은 수직프레임부재(20)의 일측에 설치되며, 상기 수직프레임부재(20)의 타측에는 제5 상부프레임(35), 제6 상부프레임(36) 및 제7 상부프레임(38)이 설치된다.The second upper frame 32 and the third upper frame 33 are installed on one side of the vertical frame member 20, and the fifth upper frame 35 and the sixth upper frame are provided on the other side of the vertical frame member 20. The frame 36 and the seventh upper frame 38 are installed.

상기 제2 수직프레임(22)과 제4 수직프레임(24)의 상면에는 제2 상부프레임(32)과 동일한 길이로 형성된 제5 상부프레임(35)이 설치되고, 상기 제5 상부프레임(35)과 소정 거리만큼 떨어져 제6 상부프레임(36)이 설치된다.A fifth upper frame 35 formed to have the same length as the second upper frame 32 is installed on the upper surfaces of the second vertical frame 22 and the fourth vertical frame 24, and the fifth upper frame 35 A sixth upper frame 36 is installed apart from and a predetermined distance.

아울러 상기 제5 상부프레임(35)과 제6 상부프레임(36)에는 제7 상부프레임(37)이 설치된다.In addition, a seventh upper frame 37 is installed on the fifth upper frame 35 and the sixth upper frame 36.

도 8은 본 발명의 바람직한 실시 예에 따른 건축물의 스프레이 도장용 방진막 전용 부스를 도시한 정면도이고, 도 9는 도 8의 일부 확대도이며, 도 10은 본 발명의 바람직한 실시 예에 따른 건축물의 스프레이 도장용 방진막 전용 부스를 도시한 우측면도이고, 도 11은 도 10의 일부 확대도이다.8 is a front view showing a booth dedicated to a dustproof membrane for spray painting of a building according to a preferred embodiment of the present invention, FIG. 9 is a partially enlarged view of FIG. 8, and FIG. 10 is a spray of a building according to a preferred embodiment of the present invention It is a right side view showing a booth dedicated to the anti-vibration membrane for painting, and FIG. 11 is a partially enlarged view of FIG. 10.

도 8 내지 도 11에 도시된 바와 같이, 상기 하부프레임부재(10), 수직프레임부재(20) 및 상부프레임부재(30)는 연결부재(40)에 의해 서로 연결시키는 것으로, 상기 연결부재(40)는 2개의 프레임이 연결되는 2방향 연결프레임(41), 3개의 프레임이 연결되는 3방향 연결프레임(42) 및 4방향 연결프레임(44)이 각각 구비된다.8 to 11, the lower frame member 10, the vertical frame member 20, and the upper frame member 30 are connected to each other by a connection member 40, and the connection member 40 ) Is provided with a two-way connection frame 41 to which two frames are connected, a three-way connection frame 42 to which three frames are connected, and a four-way connection frame 44, respectively.

상기 2방향 연결프레임(41)에는 제3 상부프레임(33)과 제4 상부프레임(34) 및 제6 상부프레임(36)과 제7 상부프레임(37)에 설치된다.The two-way connecting frame 41 is installed on the third upper frame 33 and the fourth upper frame 34 and the sixth upper frame 36 and the seventh upper frame 37.

또 3방향 연결프레임(42)은 하부프레임부재(10)와 수직프레임부재(20) 및 상부프레임부재(30)의 연결 부위에 설치될 뿐만 아니라 3개의 프레임이 각각 교차되는 부위에 설치된다.In addition, the three-way connection frame 42 is not only installed at the connection portion between the lower frame member 10, the vertical frame member 20, and the upper frame member 30, but also installed at a portion where the three frames cross each other.

상기 4방향 연결프레임(43)은 전면프레임(25)의 수평프레임(25a)과 수직프레임(25b) 사이에 설치된다.The four-way connection frame 43 is installed between the horizontal frame 25a and the vertical frame 25b of the front frame 25.

상기 2방향 연결프레임(41)은 2개의 프레임이 연결되도록 일직선으로 형성되고, 상기 3방향 연결프레임(42)은 3개의 프레임이 연결되도록 일정 길이를 갖는 X축, Y축, Z축으로 형성되며, 상기 4방향 연결프레임(43)은 4개의 프레임이 연결되도록 십(十)자 형상으로 형성된다.The two-way connection frame 41 is formed in a straight line so that two frames are connected, and the three-way connection frame 42 is formed of an X-axis, Y-axis, and Z-axis having a predetermined length so that the three frames are connected. , The four-way connection frame 43 is formed in a cross (十) shape so that four frames are connected.

도 12는 본 발명의 바람직한 실시 예에 따른 건축물의 스프레이 도장용 방진막 전용 부스의 연결부재를 도시한 일부 확대 입체도이다.12 is a partially enlarged three-dimensional view showing a connecting member of a booth dedicated to spray painting of a building according to a preferred embodiment of the present invention.

도 12에서와 같이, 상기 3방향 연결프레임(42)에는 부스구조체(1)의 정면 및 양 측면에 각각 와이어(49)가 설치되도록 와이어고정고리(44)가 형성된다.As shown in Figure 12, the three-way connection frame 42 is formed with a wire fixing ring 44 so that the wire 49 is installed on the front and both sides of the booth structure (1), respectively.

또한 3방향 연결프레임(42) 및 4방향 연결프레임(43)에는 와이어(49)가 설치되도록 와이어고정판(45)이 고정되고, 상기 와이어고정판(45)에는 와이어(49)를 끼워 결속할 수 있도록 와이어고정구멍(46)이 형성되며, 와이어(49)를 결속할 수 있도록 와이어걸고리(47)가 형성된다.In addition, the wire fixing plate 45 is fixed to the three-way connection frame 42 and the four-way connection frame 43 so that the wire 49 is installed, and the wire 49 is inserted into the wire fixing plate 45 to be bound. A wire fixing hole 46 is formed, and a wire hook 47 is formed to bind the wire 49.

도 13은 본 발명의 바람직한 실시 예에 따른 건축물의 도장용 방진막 전용 부스의 행거부재를 도시한 측면도이다.13 is a side view showing a hanger member of a booth dedicated to a dustproof membrane for painting of a building according to a preferred embodiment of the present invention.

도 13에 도시된 바와 같이, 상기 상부프레임부재(30)의 상부에는 부스구조체(1)를 승강시키는 윈치(70)에 연결되도록 행거부재(50)가 설치된다.13, a hanger member 50 is installed on the upper frame member 30 so as to be connected to a winch 70 for raising and lowering the booth structure 1.

상기 3방향 연결프레임(42)의 상면에는 각각 고정행거(51)가 설치되고, 상기 상부프레임부재(30)의 상측에는 행거(52)가 구비되며, 상기 고정행거(51)와 행거(52) 사이에는 각각 사슬고리(53)가 연결된다.A fixing hanger 51 is installed on the upper surface of the three-way connecting frame 42, and a hanger 52 is provided on the upper side of the upper frame member 30, and the fixing hanger 51 and the hanger 52 Between each chain ring 53 is connected.

도 1 내지 도 14에 도시된 바와 같이, 상기 부스구조체(1)의 제2 수직프레임(22)과 제4 수직프레임(24)에는 부스구조체(1)가 건축물의 벽면 또는 외면에 접촉 시 충격이 가해지지 않도록 함은 물론 부스구조체(1)의 승강이 원활하게 이루어지도록 충격완화용 이동바퀴(60)가 설치된다.1 to 14, the second vertical frame 22 and the fourth vertical frame 24 of the booth structure 1 have an impact when the booth structure 1 contacts the wall or outer surface of the building. In addition to the fact that it is not applied, a moving wheel 60 for mitigating shock is installed so that the lifting of the booth structure 1 is smoothly performed.

이러한 충격완화용 이동바퀴(60)는 연질의 고무 또는 합성수지 재질로 이루어져 건축물 및 부스구조체(1)에 각각 충격이 전달되지 않도록 한다.The shock-relieving moving wheel 60 is made of a soft rubber or synthetic resin material so that the shock is not transmitted to the building and the booth structure 1, respectively.

또 상기 부스구조체(1)의 저면에는 작업자가 부스구조체(1)를 이동시키고자 하는 작업 위치로 용이하게 이동시킬 수 있도록 이동용바퀴(65)가 설치된다.In addition, a moving wheel 65 is installed on the bottom of the booth structure 1 so that the operator can easily move the booth structure 1 to a desired working position.

도 14는 본 발명의 바람직한 실시 예에 따른 건축물의 도장용 방진막 전용 부스가 설치된 상태를 개략적으로 도시한 측면도이다.14 is a side view schematically showing a state in which a booth dedicated to the anti-vibration membrane for painting of a building is installed according to a preferred embodiment of the present invention.

도 14에서와 같이, 상기 부스구조체(1)를 승강시키는 윈치(70)가 마련되고, 상기 윈치(70)에는 부스구조체(1)와 작업자의 중량에 견딜 수 있는 하중을 갖도록 바벨추(71)가 구비된다.14, a winch 70 for lifting the booth structure 1 is provided, and the winch 70 includes a barbell weight 71 to have a load capable of withstanding the weight of the booth structure 1 and the operator. Is equipped.

이러한 바벨추(71)는 중량을 가감할 수 있도록 다수개로 분할되게 형성되며, 상기 바벨추(71)를 윈치(70)에 안전하게 설치할 수 있도록 윈치(70)의 후방에 일정 높이를 갖는 고정봉(72)이 설치된다.These barbell weights 71 are formed to be divided into a plurality of weights so as to increase or decrease the weight, and a fixed bar having a certain height at the rear of the winch 70 so that the barbell weights 71 can be safely installed on the winch 70 72) is installed.

또 윈치(70)에는 작업 위치에 따라 이동될 수 있도록 윈치이동바퀴(73)가 설치되며, 상기 윈치(70)의 일측에는 작업자가 윈치(70)를 이동시키기 위하여 파지할 수 있도록 손잡이(74)가 설치된다.In addition, the winch 70 is provided with a winch moving wheel 73 so that it can be moved according to the working position, and at one side of the winch 70, a handle 74 is provided so that an operator can grip the winch 70 to move the winch 70 Is installed.

도 15는 본 발명의 바람직한 다른 실시 예에 따른 건축물의 도장용 방진막 전용 부스의 상부프레임부재를 도시한 평면도이다.15 is a plan view showing an upper frame member of a booth dedicated to a dustproof membrane for painting of a building according to another preferred embodiment of the present invention.

도 15에 도시된 바와 같이, 상기 상부프레임부재(30)는 제3 상부프레임부재(33)와 제6 상부프레임부재(36) 사이에 제8 상부프레임(38)이 설치된다. 제3 상부프레임부재(33)와 제6 상부프레임부재(36) 사이에 제8 상부프레임(38)을 설치하여 프레임부재(30)의 강성을 높이게 된다.As shown in FIG. 15, the upper frame member 30 has an eighth upper frame 38 installed between the third upper frame member 33 and the sixth upper frame member 36. The eighth upper frame 38 is installed between the third upper frame member 33 and the sixth upper frame member 36 to increase the rigidity of the frame member 30.

다음 도 1 내지 도 14를 참조하여 본 발명의 바람직한 실시 예에 따른 건축물의 스프레이 도장용 방진막 전용 부스의 작동방법을 설명한다.Next, with reference to FIGS. 1 to 14, a method of operating a booth exclusively for spray painting a dustproof membrane for a building according to a preferred embodiment of the present invention will be described.

본 발명의 실시 예에 따른 건축물의 스프레이 도장용 방진막 전용 부스는 건물, 교량 등의 건축물 외부를 스프레이 도장 시 스프레이 작업으로 인한 먼지가 외부로 비산되지 않도록 한다.The booth dedicated to the dustproof membrane for spray painting of a building according to an embodiment of the present invention prevents dust from spraying to the outside when spraying the exterior of a building, such as a building or a bridge.

건축물의 옥상에는 부스구조체(1)를 승강시키는 윈치(70)를 설치하며, 상기 윈치(70)의 후크에는 부스구조체(1)의 행거부재(50)를 설치한다.A winch 70 for lifting the booth structure 1 is installed on the roof of the building, and a hanger member 50 of the booth structure 1 is installed on the hook of the winch 70.

이에 부스구조체(1)는 윈치(70)에 의해 승강 가능하게 설치되며, 부스구조체(1)의 중량 및 작업자의 중량에 따라 윈치(70)의 고정봉(72)에 바벨추(71)를 설치하게 된다.Accordingly, the booth structure 1 is installed to be elevating by a winch 70, and a barbell weight 71 is installed on the fixing rod 72 of the winch 70 according to the weight of the booth structure 1 and the weight of the operator. Is done.

즉, 부스구조체(1), 스프레이 도장장치 및 작업자의 중량이 무거운 경우 바벨추(71)를 추가하여 윈치(70)의 중량을 증가시킴으로써 윈치(70)를 보다 안전하게 설치하게 된다.That is, when the weight of the booth structure 1, the spray painting device and the operator is heavy, the weight of the winch 70 is increased by adding a barbell weight 71, thereby installing the winch 70 more safely.

작업자는 부스구조체(1)에 탑승한 상태에서 윈치(70)를 구동시켜 부스구조체(1)를 하강시키며, 부스구조체(1)에는 스프레이 도장 작업에 필요한 장비를 이용하여 스프레이 도장 작업을 진행하게 된다.The operator drives the winch 70 while boarding the booth structure 1 to lower the booth structure 1, and the booth structure 1 carries out spray painting using equipment required for spray painting. .

이러한 스프레이 도장 작업 시 발생되는 먼지는 부스구조체(1)의 정면 및 측면에 설치된 하부방진막(2), 측면방진막(3), 정면방진막(4) 및 상부방진막(5)에 의해 스프레이 도장 작업으로부터 비산되지 않게 된다.The dust generated during the spray painting work is scattered from the spray painting work by the lower dustproof film 2, the side dustproof film 3, the front dustproof film 4 and the upper dustproof film 5 installed on the front and side of the booth structure (1). It will not be.

이와 같이 스프레이 도장 작업이 진행됨에 따라 작업자는 부스구조체(1)를 하강시키면서 작업을 지속적으로 진행하게 된다.As the spray painting work proceeds in this way, the worker continuously proceeds the work while lowering the booth structure 1.

한편 상기 부스구조체(1)에는 충격완화용 이동바퀴(60)가 설치되어 있으므로, 건축물과 부스구조체(1)가 직접 접촉되지 않게 되며, 건축물과 부스구조체(1)와의 접촉 시 서로 충격을 가해지지 않게 된다.On the other hand, since the booth structure (1) is equipped with a moving wheel for shock relief (60), the building and the booth structure (1) do not come into direct contact, and when the building and the booth structure (1) contact each other, impact is not applied. Will not be.

아울러 스프레이 도장 작업이 완료되어 상기 부스구조체(1)가 지면에 닿게 되면, 부스구조체(1)의 행거부재(50)는 윈치(70)로부터 분리되며, 작업자는 이동용바퀴(65)가 설치되어 있어 부스구조체(1)를 이동시키고자 하는 위치로 자유로이 이동시킬 수 있게 된다.In addition, when the spray painting work is completed and the booth structure (1) comes into contact with the ground, the hanger member 50 of the booth structure (1) is separated from the winch (70), and the operator has a moving wheel (65) installed. It is possible to freely move the booth structure 1 to the desired position.

이상 본 발명자에 의해서 이루어진 발명을 상기 실시 예에 따라 구체적으로 설명하였지만, 본 발명은 상기 실시 예에 한정되는 것은 아니고 그 요지를 이탈하지 않는 범위에서 여러 가지로 변경 가능한 것은 물론이다.Although the invention made by the present inventor has been described in detail according to the above embodiment, the invention is not limited to the above embodiment, and can be changed in various ways without departing from the gist of the invention.

10: 하부프레임부재 11: 제1 가로프레임
12: 제2 가로프레임 13: 제1 세로프레임
14: 제2 세로프레임 15: 제3 세로프레임
16: 제4 세로프레임
20: 수직프레임부재 21: 제1 수직프레임
22: 제2 수직프레임 23: 제3 수직프레임
24: 제4 수직프레임 25: 전면프레임
26: 제1 측면프레임 27: 제2 측면프레임
30: 상부프레임부재 31: 제1 상부프레임
32: 제2 상부프레임 33: 제3 상부프레임
34: 제4 상부프레임 35: 제5 상부프레임
36: 제6 상부프레임 37: 제7 상부프레임
40: 연결부재 41: 2방향 연결프레임
42: 3방향 연결프레임 43: 4방향 연결프레임
44: 와이어고정고리 45: 와이어고정판
46: 와이어고정구멍 47: 와이어걸고리
49: 와이어
50: 행거부재 51: 고정행거
52: 행거 53: 사슬고리
60: 중격완화용바퀴 65: 이동용바퀴
70: 윈치 71: 바벨추
72: 고정봉 73: 윈치이동바퀴
74: 손잡이
10: lower frame member 11: first horizontal frame
12: second horizontal frame 13: first vertical frame
14: second vertical frame 15: third vertical frame
16: fourth vertical frame
20: vertical frame member 21: first vertical frame
22: second vertical frame 23: third vertical frame
24: fourth vertical frame 25: front frame
26: first side frame 27: second side frame
30: upper frame member 31: first upper frame
32: second upper frame 33: third upper frame
34: fourth upper frame 35: fifth upper frame
36: sixth upper frame 37: seventh upper frame
40: connecting member 41: two-way connecting frame
42: 3-way connecting frame 43: 4-way connecting frame
44: wire fixing ring 45: wire fixing plate
46: wire fixing hole 47: wire hook
49: wire
50: hanger member 51: fixed hanger
52: hanger 53: chain ring
60: septum relief wheel 65: moving wheel
70: winch 71: barbell weight
72: fixed rod 73: winch moving wheel
74: handle

Claims (6)

하부방진막이 설치되도록 소정의 간격으로 다수의 프레임이 이격되게 설치되는 하부프레임부재(10);
측면방진막 및 정면방진막이 설치되도록 상기 하부프레임부재(10)의 길이 방향 양단에 각각 일정 높이를 갖는 다수의 수직프레임이 설치되는 수직프레임부재(20);
상부방진막이 설치되도록 상기 수직프레임부재(20)의 상단에 소정의 간격으로 다수의 프레임이 이격되게 설치되는 상부프레임부재(30);
상기 하부프레임부재(10), 상기 수직프레임부재(20) 및 상기 상부프레임부재(30)가 서로 연결되도록 구비되는 다수의 연결부재(40);로 이루어지는 부스구조체(1);
상기 부스구조체(1)가 윈치에 의해 승강 가능하게 설치되도록 상기 상부프레임부재(30)의 상측에 설치되는 행거부재(50);
상기 부스구조체(1)가 건축물의 외면을 따라 승강 가능하게 하며, 상기 부스구조체(1)가 건축물의 외면에 충격을 가하지 않도록 상기 수직프레임부재(20)의 배면에 설치되는 충격완화용 이동바퀴(60);
상기 부스구조체(1)를 이동시킬 수 있도록 상기 하부프레임부재(10)의 저면에 설치되는 이동용바퀴(65);를 포함하는 것을 특징으로 하는 건축물의 스프레이 도장용 방진막 전용 부스.
A lower frame member 10 in which a plurality of frames are spaced apart from each other at predetermined intervals so that the lower dustproof membrane is installed;
A vertical frame member 20 in which a plurality of vertical frames having a predetermined height are installed at both ends of the lower frame member 10 in the longitudinal direction so that the side dustproof membrane and the front dustproof membrane are installed;
An upper frame member (30) in which a plurality of frames are spaced apart from each other at predetermined intervals on the upper end of the vertical frame member (20) so that an upper vibration barrier is installed;
A booth structure (1) consisting of a plurality of connecting members (40) provided to connect the lower frame member (10), the vertical frame member (20) and the upper frame member (30) to each other;
A hanger member 50 installed on the upper side of the upper frame member 30 so that the booth structure 1 is installed to be elevating by a winch;
The booth structure (1) can be lifted along the outer surface of the building, and the booth structure (1) is installed on the rear surface of the vertical frame member 20 to prevent impact on the outer surface of the building, shock-relieving moving wheel ( 60);
A booth dedicated to a dustproof membrane for spray painting of a building, comprising: a moving wheel (65) installed on the bottom of the lower frame member (10) so as to move the booth structure (1).
제1항에 있어서,
상기 하부프레임부재(10)는 소정의 길이로 형성되어 상기 부스구조체(1)의 정면에 설치되는 제1 가로프레임(11);
상기 제1 가로프레임(11)으로부터 소정 거리만큼 이격되게 설치되는 제2 가로프레임(12);
상기 제1 가로프레임(11)과 상기 제2 가로프레임(12)의 양단에 각각 설치되는 제1 세로프레임(13)과 제2 세로프레임(14);
상기 하부방진막이 안정되게 설치되도록 상기 제1 세로프레임(13)으로부터 소정의 거리만큼 이격되게 설치되는 제3 세로프레임(15);
상기 하부방진막이 안정되게 설치되도록 상기 제2 세로프레임(14)으로부터 소정의 거리만큼 이격되게 설치되는 제4 세로프레임(16);으로 이루어지는 것을 특징으로 하는 건축물의 스프레이 도장용 방진막 전용 부스.
The method of claim 1,
The lower frame member 10 includes a first horizontal frame 11 formed in a predetermined length and installed in front of the booth structure 1;
A second horizontal frame 12 that is installed to be spaced apart from the first horizontal frame 11 by a predetermined distance;
A first vertical frame (13) and a second vertical frame (14) respectively installed at both ends of the first horizontal frame (11) and the second horizontal frame (12);
A third vertical frame 15 spaced apart from the first vertical frame 13 by a predetermined distance so that the lower anti-vibration film is stably installed;
A booth dedicated to a dustproof membrane for spray painting of a building, comprising: a fourth vertical frame (16) that is installed spaced apart from the second vertical frame (14) by a predetermined distance so that the lower dustproof membrane is stably installed.
제1항에 있어서,
상기 수직프레임부재(20)는 상기 하부프레임부재(10)의 일단에 수직으로 설치되는 제1 수직프레임(21)과 제2 수직프레임(22);
상기 하부프레임부재(10)의 타단에 수직으로 설치되는 제3 수직프레임(23)과 제4 수직프레임(24);을 포함하는 것을 특징으로 하는 건축물의 스프레이 도장용 방진막 전용 부스.
The method of claim 1,
The vertical frame member 20 includes a first vertical frame 21 and a second vertical frame 22 vertically installed at one end of the lower frame member 10;
A booth dedicated to a dustproof membrane for spray painting of a building, comprising: a third vertical frame 23 and a fourth vertical frame 24 installed vertically at the other end of the lower frame member 10.
제1항에 있어서,
상기 상부프레임부재(30)는 상기 하부프레임부재(10)의 제1 가로프레임(11)과 동일한 길이로 형성되며, 상기 수직프레임부재(20)의 상단에 수평으로 설치되는 제1 상부프레임(31);
소정의 길이로 형성되며, 상기 수직프레임부재(20)의 일측 상단에 수평으로 설치되는 제2 상부프레임(32);
상기 제2 상부프레임(32)과 동일한 길이로 형성되며, 상기 제2 상부프레임(32)으로부터 소정의 거리만큼 이격되게 설치되는 제3 상부프레임(33);
상기 제2 상부프레임(32)과 상기 제3 상부프레임(33) 사이에 설치되는 제4 상부프레임(34);
상기 제2 상부프레임(32)과 동일한 길이로 형성되며, 상기 수직프레임부재(20)의 타측 상단에 수평으로 설치되는 제5 상부프레임(35);
상기 제5 상부프레임(35)과 동일한 길이로 형성되며, 상기 제5 상부프레임(35)으로부터 소정의 거리만큼 이격되게 설치되는 제6 상부프레임(36);
상기 제5 상부프레임(35)과 상기 제6 상부프레임(36) 사이에 설치되는 제7 상부프레임(37);을 포함하는 것을 특징으로 하는 건축물의 스프레이 도장용 방진막 전용 부스.
The method of claim 1,
The upper frame member 30 is formed to have the same length as the first horizontal frame 11 of the lower frame member 10, and a first upper frame 31 installed horizontally on the upper end of the vertical frame member 20 );
A second upper frame 32 formed with a predetermined length and horizontally installed at an upper end of one side of the vertical frame member 20;
A third upper frame (33) formed to have the same length as the second upper frame (32) and installed to be spaced apart from the second upper frame (32) by a predetermined distance;
A fourth upper frame (34) installed between the second upper frame (32) and the third upper frame (33);
A fifth upper frame (35) formed to have the same length as the second upper frame (32) and horizontally installed on the other side of the vertical frame member (20);
A sixth upper frame 36 formed to have the same length as the fifth upper frame 35 and installed to be spaced apart from the fifth upper frame 35 by a predetermined distance;
And a seventh upper frame (37) installed between the fifth upper frame (35) and the sixth upper frame (36).
제4항에 있어서,
상기 행거부재(50)는 상기 수직프레임부재(20)의 상면에 고정되는 고정행거(51);
다수의 사슬고리가 연결되도록 다수의 연결구멍이 형성된 행거(52);
상기 고정행거(51)와 상기 행거(52) 사이에 연결되는 다수의 사슬고리(53);를 포함하는 것을 특징으로 하는 건축물의 스프레이 도장용 방진막 전용 부스.
The method of claim 4,
The hanger member 50 includes a fixed hanger 51 fixed to the upper surface of the vertical frame member 20;
A hanger 52 having a plurality of connection holes to connect a plurality of chain rings;
A booth dedicated to a dustproof membrane for spray painting of a building, comprising: a plurality of chain rings 53 connected between the fixed hanger 51 and the hanger 52.
제1항에 있어서,
상기 부스구조체(1)를 승강시키는 윈치(70)가 마련되고,
상기 윈치(70)에는 상기 부스구조체(1)의 중량에 구애됨이 설치되도록 상기 윈치(70)에 구비되는 바벨추(71);
상기 바젤추(71)가 안정되게 끼워지도록 상기 윈치(70)에 설치되는 고정봉(72);
상기 윈치(70)가 자유로이 이동되도록 상기 윈치(70)의 저면에 설치되는 윈치이동바퀴(73);
상기 윈치(70)을 이동시킬 수 있도록 파지가 가능하게 설치되는 손잡이(74);를 포함하는 것을 특징으로 하는 건축물의 스프레이 도장용 방진막 전용 부스.
The method of claim 1,
A winch 70 for raising and lowering the booth structure 1 is provided,
The winch 70 includes a barbell weight 71 provided on the winch 70 so as to be limited to the weight of the booth structure 1;
A fixing rod 72 installed on the winch 70 so that the basel weight 71 is stably fitted;
A winch moving wheel 73 installed on the bottom of the winch 70 so that the winch 70 moves freely;
A booth dedicated to a dustproof membrane for spray painting of a building, comprising: a handle 74 installed to be gripped so as to move the winch 70.
KR1020190022064A 2019-02-25 2019-02-25 Dustproof booth for painting spray of building KR102159124B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190022064A KR102159124B1 (en) 2019-02-25 2019-02-25 Dustproof booth for painting spray of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190022064A KR102159124B1 (en) 2019-02-25 2019-02-25 Dustproof booth for painting spray of building

Publications (2)

Publication Number Publication Date
KR20200103485A true KR20200103485A (en) 2020-09-02
KR102159124B1 KR102159124B1 (en) 2020-10-14

Family

ID=72469318

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190022064A KR102159124B1 (en) 2019-02-25 2019-02-25 Dustproof booth for painting spray of building

Country Status (1)

Country Link
KR (1) KR102159124B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102232312B1 (en) * 2020-10-29 2021-03-25 김영준 Spray gun nozzle shade for painting
KR102491727B1 (en) * 2022-04-13 2023-01-26 주식회사 대한방수 Dust protection device for painting work

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3002221U (en) * 1994-03-22 1994-09-20 大成建設株式会社 Trolley with a gondola suspension arm
KR200306761Y1 (en) 2002-12-07 2003-03-15 최용묵 A booth for spray painting
KR100579939B1 (en) * 2005-12-26 2006-05-15 주식회사 현신종합건축사사무소 System and method for painting of external wall for a multistoried building
KR100719631B1 (en) * 2006-02-02 2007-05-18 문병기 Painting device
KR101221665B1 (en) 2012-09-24 2013-01-14 (주)페인테크 System for non-scattering field painting
JP3205128U (en) * 2016-04-22 2016-07-07 野口興産株式会社 Spray booth

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3002221B2 (en) * 1990-03-05 2000-01-24 浜松ホトニクス株式会社 Scanning probe microscope
JP3205128B2 (en) * 1993-05-28 2001-09-04 株式会社リコー Electrophotographic recording device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3002221U (en) * 1994-03-22 1994-09-20 大成建設株式会社 Trolley with a gondola suspension arm
KR200306761Y1 (en) 2002-12-07 2003-03-15 최용묵 A booth for spray painting
KR100579939B1 (en) * 2005-12-26 2006-05-15 주식회사 현신종합건축사사무소 System and method for painting of external wall for a multistoried building
KR100719631B1 (en) * 2006-02-02 2007-05-18 문병기 Painting device
KR101221665B1 (en) 2012-09-24 2013-01-14 (주)페인테크 System for non-scattering field painting
JP3205128U (en) * 2016-04-22 2016-07-07 野口興産株式会社 Spray booth

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102232312B1 (en) * 2020-10-29 2021-03-25 김영준 Spray gun nozzle shade for painting
KR102491727B1 (en) * 2022-04-13 2023-01-26 주식회사 대한방수 Dust protection device for painting work

Also Published As

Publication number Publication date
KR102159124B1 (en) 2020-10-14

Similar Documents

Publication Publication Date Title
KR102159124B1 (en) Dustproof booth for painting spray of building
CN206553923U (en) A kind of mobile platform device for being used to install Collison fence for bridge
CN216040667U (en) Multifunctional telescopic cantilever hanging rack
CN202688879U (en) Arch steel tower coating platform running with arch
CN203382467U (en) Hanging operation vehicle
CN211736310U (en) Movable hanging basket for bridge
CN106080965B (en) A kind of method for supporting and device always organized for ship topside curved section
CN210507285U (en) Environment-friendly multifunctional dust-settling vehicle integrating sprinkling, fog spraying and water gun
CN109838055A (en) High-altitude is installed by steel frame and light concrete face-board for room special mounting vehicle
CN108177731B (en) Method for building main pipe platform of liquid cargo ship
CN105178189A (en) Mounting operation platform for cantilever of steel box girder
JP2006348595A (en) Pier undersurface concrete automatic chipping apparatus
JP2005076348A (en) Scaffold device
CN103016843B (en) Pipeline mounting machine and construction method thereof
CN216063855U (en) Steel box girder finish paint spraying operation device
CN114436179A (en) Special type limb operation platform vehicle with mechanical self-locking function and use method
CN205918017U (en) With prefabricated staircase of guardrail integration, prefabricated air conditioner board
CN204959608U (en) Arm installation jobs platform is chosen to steel case roof beam
KR101917870B1 (en) Sky bridge with shock absorber and method of construction
CN210239201U (en) Cart type elevator wellhead and hoistway protection device
CN210126541U (en) Efficient material loading and unloading device for building
JP4425611B2 (en) Installation method of scaffolding for bridge girder repair painting work and scaffold equipment for bridge girder repair painting work
CN112411381A (en) Construction method for erecting precast box girder of overbridge in deep cutting area
CN217631442U (en) Movable protective cover suitable for horizontal hole of operation layer
CN214319570U (en) Construction site dust device for building engineering

Legal Events

Date Code Title Description
GRNT Written decision to grant