Handling device of pipeInfo
- Publication number
- JPH08259177A JPH08259177A JP6430195A JP6430195A JPH08259177A JP H08259177 A JPH08259177 A JP H08259177A JP 6430195 A JP6430195 A JP 6430195A JP 6430195 A JP6430195 A JP 6430195A JP H08259177 A JPH08259177 A JP H08259177A
- Authority
- JP
- Japan
- Prior art keywords
- pipes
- support rail
- longitudinal direction
- handling device
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009412 basement excavation Methods 0.000 claims description 30
- 238000009933 burial Methods 0.000 abstract description 2
- 238000005553 drilling Methods 0.000 abstract 1
- 239000000725 suspension Substances 0.000 description 10
- 238000003466 welding Methods 0.000 description 5
- 229910000831 Steel Inorganic materials 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 229910001018 Cast iron Inorganic materials 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Landscapes
- Sewage (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、パイプ類を掘削溝内に
吊り下ろして位置調整しつつ埋設するためのハンドリン
グ装置に関し、そのうち特に、水道管やガス管等の埋設
工事の際、複数のパイプ類を掘削溝内に吊り下し、長手
方向に連ねる各パイプ類の互いの軸芯を合わせて溶接作
業を行なう際に適するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a handling device for suspending pipes in a digging ditch and burying them while adjusting their positions, and particularly to a plurality of handling devices when burying a water pipe or a gas pipe. This is suitable for performing a welding operation by suspending pipes in an excavation groove and aligning the axial centers of the pipes that are continuous in the longitudinal direction.
【0002】[0002]
【従来の技術】従来、水道管やガス管等に代表されパイ
プ類の埋設工事は、一般的には先ず地盤を溝状に掘削
し、次に掘削溝内の安全性を確保するために、掘削面に
いわゆる腹起こしや切梁等と呼ばれる補強材を取付ける
土留支保工作業を行なう。それから、掘削溝内に通常は
6〜8m、最大12m位のパイプ類を吊り下ろしつつ、
これらのパイプ類を互いに溶接しながら順次延長してい
た。2. Description of the Related Art Conventionally, in the burial work of pipes typified by water pipes and gas pipes, generally, the ground is first excavated in a groove shape, and then the safety in the excavation groove is ensured. Perform earth retaining work to attach reinforcements such as so-called bellows and beams to the excavated surface. Then, while suspending pipes of 6 to 8 m, maximum of about 12 m in the excavation ditch,
These pipes were sequentially extended while welding each other.
【0003】上下水道管等として用いられるパイプ類
は、コンクリート、鋳鉄製のものが多いため、1ブロッ
ク単位でもかなりの重量物となる。従って、これらのパ
イプ類の吊下作業は到底人力のみでは扱いきれず、横置
きしたトラッククレーン等の重機により行われていた。
また、パイプ類の多くは通常は道路下に埋設されるか
ら、前記重機の設置スペースとの関係上、片車線の閉鎖
等の交通規制を行いながらの工事となる。Since many pipes used as water and sewer pipes are made of concrete or cast iron, one block unit becomes a considerable weight. Therefore, the hanging work of these pipes cannot be handled by human power at all, and is performed by heavy equipment such as a truck crane placed horizontally.
In addition, since most of the pipes are usually buried under the road, due to the space for installing the heavy equipment, the work must be done while restricting traffic such as closing one lane.
【0004】[0004]
【発明が解決しようとする課題】しかしながら、近年の
交通量の増大等に伴い道路規制に対する制約も厳しくな
ってきており、道路占用許可を取る場合にも占有領域の
縮小化を迫られると共に、大幅な時間規制を受ける場合
がある。そのため、クレーン等の重機を掘削溝の横に据
えることができない等の問題も発生している。However, with the recent increase in traffic volume, restrictions on road regulations have become stricter, and even when obtaining a road occupancy permit, it is necessary to reduce the occupied area, May be subject to various time restrictions. Therefore, there is a problem that heavy equipment such as a crane cannot be installed beside the excavation groove.
【0005】そこで出願人は、特開平6−271283
号公報に示すように、クレーン等の重機を使用すること
なく、実質的に掘削工事部分のみのスペース占有でパイ
プ類の埋設作業を行なえるハンドリング装置を提案し
た。これは、道路の占用域の縮小化により、交通規制に
よる制約を最小限に抑えられるという優れた効果を奏す
るものであるが、吊り下ろしたパイプを既に埋設された
他のパイプに溶接するに際し、パイプ同士の軸芯を合せ
る位置調整機構が比較的複雑であるため、構造の簡略化
による更なるコスト低減が望まれていた。Therefore, the applicant of the present invention has filed Japanese Patent Application Laid-Open No. 6-271283.
As disclosed in the publication, a handling device that can bury pipes without using a heavy machine such as a crane and occupying a space substantially only in an excavation work portion has been proposed. This has the excellent effect that the restriction due to traffic regulation can be minimized by reducing the occupied area of the road, but when welding the suspended pipe to another pipe already buried, Since the position adjusting mechanism for aligning the axial centers of the pipes with each other is relatively complicated, it has been desired to further reduce the cost by simplifying the structure.
【0006】本発明は、以上のような従来技術が有する
問題点に着目してなされたもので、パイプ類の埋設作業
時の占有スペースを極力省くことができるのみならず、
簡単な構成によりパイプ類の軸芯合せ作業を正確かつ容
易に行なうことができ、コストも大幅に低減することが
できるパイプ類のハンドリング装置を提供することを目
的としている。The present invention has been made by paying attention to the problems of the prior art as described above, and not only can the space occupied when burying pipes be saved as much as possible,
It is an object of the present invention to provide a pipe handling device capable of accurately and easily performing axial alignment work of pipes with a simple configuration and significantly reducing cost.
【0007】[0007]
【課題を解決するための手段】前述した目的を達成する
ための本発明の要旨とするところは、以下の各項に存す
る。The gist of the present invention for achieving the above-mentioned object lies in the following respective items.
【0008】[1] パイプ類(P)を掘削溝(A)内
に吊り下ろして位置調整しつつ埋設するためのハンドリ
ング装置(10)において、掘削溝(A)を間にして地
上に設置され、それぞれ下端側に走行手段(12)を備
えて前記掘削溝(A)に沿って前後方向に移動可能な一
対の脚部(11,11)と、掘削溝(A)を跨ぐよう前
記各脚部(11)間の前端(11a)側に架設された前
方ビーム(20)と、同じく掘削溝(A)を跨ぐよう前
記各脚部(11)間の後端(11b)側に架設された後
方ビーム(30)と、前後方向に延びるように配され、
一端(40b)側が前記各ビームの一方(30)の途中
箇所に回動可能に枢支され、該一端(40b)側を支点
として、他端(40a)側が前記各ビームの他方(2
0)に該ビーム(20)に沿って位置調整可能に支持さ
れた支持レール(40)と、前記支持レール(40)に
その長手方向に移動可能に装着され、前記パイプ類
(P)を昇降可能に吊し持つ吊持手段(60)と、を具
備して成ることを特徴とするパイプ類(P)のハンドリ
ング装置(10)。[1] A handling device (10) for suspending pipes (P) in the excavation groove (A) by suspending them while adjusting the position, and is installed on the ground with the excavation groove (A) in between. , A pair of leg portions (11, 11) each provided with a traveling means (12) on the lower end side and movable in the front-rear direction along the excavation groove (A), and each leg so as to straddle the excavation groove (A). The front beam (20) installed on the front end (11a) side between the parts (11) and the rear beam (11b) installed between the leg parts (11) so as to straddle the excavation groove (A). The rear beam (30) is arranged so as to extend in the front-rear direction,
One end (40b) side is rotatably supported at an intermediate position of one (30) of each beam, and the other end (40a) side is the other (2) of each beam with the one end (40b) side as a fulcrum.
0) is mounted on the support rail (40) so that its position can be adjusted along the beam (20), and is mounted on the support rail (40) so as to be movable in the longitudinal direction thereof, and ascends and descends the pipes (P). A handling device (10) for pipes (P), characterized in that it comprises a suspending means (60) capable of suspending as much as possible.
【0009】[2] 前記支持レール(40)の一端
(40b)側は、前記各ビームの一方(30)の中間箇
所に、枢軸部材(31)を介して略水平方向に回動可能
に枢支され、前記支持レール(40)の他端(40a)
側は、前記各ビームの他方(20)に、スライド部材
(50)を介して該ビーム(20)に沿って位置調整可
能に連結支持され、前記スライド部材(50)は、前記
他方のビーム(20)にその長手方向に移動可能に装着
されたビーム側スライド部(51)と、該ビーム側スラ
イド部(51)に対し略水平方向に回動可能に枢着さ
れ、かつ前記支持レール(40)の他端(40a)側に
その長手方向に相対的に移動可能に装着されたレール側
スライド部(52)とから成ることを特徴とする前記1
項記載のパイプ類(P)のハンドリング装置(10)。[2] The one end (40b) side of the support rail (40) is pivoted in a substantially horizontal direction via a pivot member (31) at an intermediate position of one (30) of the beams. The other end (40a) of the support rail (40) is supported.
The side is connected to and supported by the other side (20) of each beam via the slide member (50) so that the position of the side can be adjusted along the beam (20), and the slide member (50) is connected to the other beam (50). 20) a beam side slide portion (51) mounted movably in the longitudinal direction thereof, and a pivotal support rotatably rotatably in a substantially horizontal direction with respect to the beam side slide portion (51), and the support rail (40). 1) a rail-side slide portion (52) mounted on the other end (40a) side so as to be relatively movable in the longitudinal direction thereof.
A handling device (10) for pipes (P) according to the item.
【0010】[3] 前記スライド部材(50)のビー
ム側スライド部(51)に、手動又は電動により該ビー
ム側スライド部(51)を前記他方のビーム(20)の
長手方向に移動させる駆動手段(54)を設けたことを
特徴とする前記2項記載のパイプ類(P)のハンドリン
グ装置(10)。[3] Driving means for moving the beam side slide portion (51) in the beam side slide portion (51) of the slide member (50) in the longitudinal direction of the other beam (20) manually or electrically. (54) is provided, The handling apparatus (10) of the pipes (P) of said 2 item | term characterized by the above-mentioned.
【0011】[0011]
【作用】本発明に係るハンドリング装置(10)により
パイプ類(P)の埋設工事を行なう場合、かかる装置
(10)の一対の脚部(11,11)を、掘削溝(A)
を間にして地上に設置させる。このとき、一対の脚部
(11,11)の間に架設された前方ビーム(20)と
後方ビーム(30)は掘削溝(A)を跨ぐ状態になる。
一対の脚部(11,11)はその下端側に走行手段(1
2)を備えているから、装置(10)全体を掘削溝
(A)に沿って前後方向に適宜移動させることができ
る。When the pipes (P) are buried by the handling device (10) according to the present invention, the pair of legs (11, 11) of the device (10) are connected to the excavation groove (A).
Install it on the ground with the space in between. At this time, the front beam (20) and the rear beam (30) installed between the pair of legs (11, 11) are in a state of straddling the excavation groove (A).
The pair of legs (11, 11) has traveling means (1
Since 2) is provided, the entire device (10) can be appropriately moved in the front-rear direction along the excavation groove (A).
【0012】前方ビーム(20)と後方ビーム(30)
の間には、支持レール(40)が前後方向に延びるよう
に配されており、この支持レール(40)に対し移動可
能に装着された吊持手段(60)に、地上にてパイプ類
(P)を吊し持たせる。吊持手段(60)は支持レール
(40)の長手方向に移動可能であるばかりでなく、パ
イプ類(P)を昇降させることもできるから、取敢えず
掘削溝(A)内の適当な位置にパイプ類(P)を吊り下
ろせばよい。Front beam (20) and rear beam (30)
Between them, a support rail (40) is arranged so as to extend in the front-rear direction, and pipes (on the ground are attached to the suspension means (60) movably attached to the support rail (40). P) and hold it. The suspending means (60) is not only movable in the longitudinal direction of the support rail (40) but can also move the pipes (P) up and down, so that the suspension means (60) can be moved to an appropriate position in the excavation groove (A). The pipes (P) may be suspended at the position.
【0013】吊り下ろしたパイプ類(P)の端を、既に
埋設された他のパイプ類(P)の端に対して溶接する
際、各パイプ同士の軸芯を正確に合せなければならな
い。ところで、前記吊持手段(60)が装着されている
支持レール(40)は、その一端(40b)側が前記各
ビームの一方(30)の途中箇所に回動可能に枢支さ
れ、他端(40a)側が前記各ビームの他方(20)に
該ビーム(20)に沿って位置調整可能に支持されてい
る。When welding the ends of the suspended pipes (P) to the ends of other pipes (P) already buried, the axes of the pipes must be accurately aligned. By the way, the support rail (40) to which the suspending means (60) is mounted has one end (40b) side rotatably supported at an intermediate position of one (30) of the beams and the other end (40b). The side 40a) is supported by the other of the beams (20) so as to be positionally adjustable along the beam (20).
【0014】従って、吊り下ろしたパイプ類(P)の芯
出しを行なうときには、前記支持レール(40)の一端
(40b)側を支点として、他端(40a)側を容易に
掘削溝(A)の幅方向に位置調整することができる。も
っとも、先ず支持レール(40)の揺動によりパイプ類
(P)の幅方向における位置を定めてから、パイプ類
(P)を掘削溝(A)内の適当な位置に下ろすように作
業してもよい。何れにせよ、以上のような簡単な構成に
より、吊り下げているパイプ類(P)の軸芯を正確に他
のパイプに対して位置決めすることができる。Therefore, when the suspended pipes (P) are centered, the one end (40b) side of the support rail (40) is used as a fulcrum, and the other end (40a) side is easily drilled (A). The position can be adjusted in the width direction. However, first, the position of the pipes (P) in the width direction is determined by swinging the support rail (40), and then the pipes (P) are lowered to a proper position in the excavation groove (A). Good. In any case, with the simple structure as described above, the axial center of the suspended pipes (P) can be accurately positioned with respect to the other pipes.
【0015】支持レール(40)の一端(40b)側
は、例えば前記各ビームの一方(30)の中間箇所に、
枢軸部材(31)を介して略水平方向に回動可能に枢支
すればよく、他端(40a)側は、前記各ビームの他方
(20)に、スライド部材(50)を介して該ビーム
(20)に沿って位置調整可能に連結支持すればよい。
また、前記スライド部材(50)を手動又は電動により
ビーム(20)の長手方向に移動させる駆動手段(5
4)があれば、更に容易に芯出し作業を行なうことがで
きる。One end (40b) side of the support rail (40) is, for example, at an intermediate position of one (30) of the beams.
It suffices that the beam is pivotally supported in a substantially horizontal direction via a pivot member (31), and the other end (40a) side is connected to the other (20) of the beams via a slide member (50). It suffices to connect and support the position adjustable along (20).
Further, driving means (5) for moving the slide member (50) in the longitudinal direction of the beam (20) manually or electrically.
With 4), the centering work can be performed more easily.
【0016】[0016]
【実施例】以下、図面に基づき本発明の一実施例を説明
する。図1〜図4は本発明の一実施例を示している。図
1に示すように、本実施例に係るハンドリング装置10
は、パイプ(パイプ類)Pを掘削溝A内に吊り下ろして
位置調整しつつ埋設するための装置であり、一対の脚部
11,11と、前方ビーム20と、後方ビーム30と、
支持レール40、及び吊持手段60を具備して成る。以
下、順に説明する。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. 1 to 4 show an embodiment of the present invention. As shown in FIG. 1, the handling device 10 according to the present embodiment.
Is a device for suspending a pipe (pipes) P in the excavation groove A and burying it while adjusting its position, and a pair of legs 11, 11, a front beam 20, a rear beam 30,
It comprises a support rail 40 and a suspension means 60. Hereinafter, they will be described in order.
【0017】一対の脚部11,11は、それぞれH形鋼
から形成されており、掘削溝Aを間にして地上に設置さ
れるものである。各脚部11の前後下端側には、走行手
段としての車輪12が固定軸部材13や旋回心軸部材1
3aを介して回転可能に取付けられている。これらの車
輪12,12…によって、各脚部11,11を土台とす
る本装置10全体は、掘削溝Aに沿った前後方向に自由
に移動でき、左右に方向転換もできるように構成されて
いる。The pair of legs 11, 11 are each made of H-shaped steel and are installed on the ground with the excavation groove A in between. Wheels 12 as a traveling means are provided on the front and rear lower ends of each leg 11 with a fixed shaft member 13 and a turning core shaft member 1.
It is rotatably attached via 3a. With these wheels 12, 12, ..., the entire device 10 having the legs 11, 11 as a base is configured to be freely movable in the front-rear direction along the excavation groove A, and to be able to change the direction from side to side. There is.
【0018】また、各脚部11の前後端11a,11b
には、それぞれ上下位置を調整できるアウトリガー1
4,14が配設され、埋設作業時の安定性を十分に確保
できるように構成されている。なお、前記走行手段は車
輪12に限定されるものではなく、例えばクローラ式走
行輪等により構成してもよい。かかるクローラ式の場
合、多少コスト高になるが、接地圧が小さくなり荷重を
分散できるので掘削溝Aの壁面破壊を防ぐ点では優れ
る。The front and rear ends 11a, 11b of each leg 11 are also
The outrigger 1 can be adjusted vertically
4 and 14 are provided so that the stability during the burying operation can be sufficiently ensured. The traveling means is not limited to the wheels 12, and may be, for example, crawler type traveling wheels. In the case of such a crawler type, although the cost is somewhat high, the ground contact pressure is small and the load can be dispersed, so that it is excellent in preventing the wall surface of the excavation groove A from being destroyed.
【0019】前方ビーム20や後方ビーム30も、前記
脚部11と同様にH形鋼から形成されている。前方ビー
ム20は、掘削溝Aを跨ぐよう各脚部11,11の前端
11a,11a側間に架設されており、一方後方ビーム
30は、掘削溝Aを跨ぐよう各脚部11,11の後端1
1b,11b側間に架設されている。なお、本実施例に
おける脚部11の前後は便宜上決めたものであり、図1
中に示された脚部11の左側を前端11aではなく後端
11bとしてもかまわない。The front beam 20 and the rear beam 30 are also made of H-shaped steel similarly to the leg portion 11. The front beam 20 is installed between the front ends 11a, 11a of the legs 11, 11 so as to straddle the excavation groove A, while the rear beam 30 is provided at the rear of the legs 11, 11 so as to straddle the excavation groove A. Edge 1
It is installed between the 1b and 11b sides. It should be noted that the front and rear of the leg portion 11 in this embodiment are determined for the sake of convenience.
The left side of the leg portion 11 shown therein may be the rear end 11b instead of the front end 11a.
【0020】更に詳しく言えば、各脚部11,11の前
端11a側、後端11b側には、それぞれ取付ブラケッ
ト15,15…が上向きに固設されており、かかる取付
ブラケット15に前方ビーム20や後方ビーム30が固
定されている。以上のような一対の脚部11,11と前
方ビーム20と後方ビーム30とにより、簡易な枠形で
ある本装置10の基本的構造が構成されている。More specifically, mounting brackets 15, 15 ... Are fixed upward on the front end 11a side and the rear end 11b side of each leg 11, 11, and the front beam 20 is fixed to the mounting brackets 15. The rear beam 30 is fixed. The pair of leg portions 11 and 11, the front beam 20 and the rear beam 30 as described above constitute a basic structure of the device 10 having a simple frame shape.
【0021】また、後方ビーム30(各ビームの一方に
相当)の中間箇所には、固定ブラケット32を介して枢
軸部材31が上向きに突設されている。かかる枢軸部材
31は、次述する支持レール40の後端40bを回動可
能に枢支するための部材である。一方、前方ビーム20
(各ビームの他方)には、該ビーム20に沿って移動可
能なスライド部材50が装着されている。Further, a pivot member 31 is provided so as to project upward at an intermediate portion of the rear beam 30 (corresponding to one of the beams) via a fixing bracket 32. The pivot member 31 is a member for rotatably supporting the rear end 40b of the support rail 40 described below. On the other hand, the front beam 20
A slide member 50 movable along the beam 20 is attached to (the other side of each beam).
【0022】支持レール40は、各支持ビーム20,3
0等と同様にH形鋼から形成されている。かかる支持レ
ール40の取付構造は本発明の根幹を成すものであり、
各支持ビーム20,30間に渡って前後方向に延びるよ
うに配されている。支持レール40の後端40bは、前
述した後方ビーム30の中間箇所に、前記枢軸部材31
を介して略水平方向に回動可能に枢支されている。一
方、支持レール40の前端40aは、スライド部材50
を介して前方ビーム20に対し、該ビーム20に沿って
位置調整可能に連結支持されている。The support rail 40 is provided with the support beams 20, 3
It is made of H-section steel like 0. The mounting structure of the support rail 40 forms the basis of the present invention,
The support beams 20 and 30 are arranged so as to extend in the front-rear direction. The rear end 40b of the support rail 40 is located at the intermediate portion of the rear beam 30 described above and has the pivot member 31.
Is rotatably supported in a substantially horizontal direction. On the other hand, the front end 40 a of the support rail 40 has a slide member 50.
A front beam 20 is connected to and supported by the front beam 20 via the beam so as to be adjustable in position.
【0023】すなわち、支持レール40は、その後端4
0bが枢支されている枢軸部材31を回動中心たる支点
として、掘削溝Aの幅方向に揺動させて位置調整できる
ようになっている。また、スライド部材50は、前方ビ
ーム20にその長手方向に移動可能に装着されたビーム
側スライド部51と、該スライド部51に対し略水平方
向に回動可能に枢着され、かつ支持レール40の前端4
0a側にその長手方向に相対的に移動可能に装着された
レール側スライド部52とから成る。That is, the support rail 40 has the rear end 4
0b is used as a fulcrum around which the pivot member 31 is pivotally supported, and the position can be adjusted by swinging in the width direction of the excavation groove A. The slide member 50 is pivotally mounted on the beam-side slide portion 51 mounted on the front beam 20 so as to be movable in the longitudinal direction thereof, and rotatable about the slide portion 51 in a substantially horizontal direction, and the support rail 40. Front end 4
The rail-side slide portion 52 is mounted on the 0a side so as to be relatively movable in the longitudinal direction.
【0024】更に詳しく言えば図3に示すように、ビー
ム側スライド部51は、前方ビーム20の途中を上から
挟むような略コ字形部材から成り、その両側壁内側に
は、それぞれ前方ビーム20の下側フランジ上を走行す
る走行ローラ53,53が軸支されている。一側壁内側
の走行ローラ53には歯車53aが一体的に固結されて
おり、一側壁外側には前記歯車53aを人力で回転操作
できる駆動手段としての歯車機構54が設けられてい
る。この歯車機構54には操作用のチェーン55が巻き
掛けられている。なお、歯車機構54をモータ等を用い
て電動により操作できるように構成しても良い。More specifically, as shown in FIG. 3, the beam side slide portion 51 is made of a substantially U-shaped member that sandwiches the middle of the front beam 20 from above. Running rollers 53, 53 running on the lower flange are pivotally supported. A gear 53a is integrally fixed to the traveling roller 53 on the inner side wall side, and a gear mechanism 54 is provided on the outer side of the one side wall as a driving means for rotating the gear 53a manually. An operating chain 55 is wound around the gear mechanism 54. The gear mechanism 54 may be configured to be electrically operated by using a motor or the like.
【0025】一方、レール側スライド部52は、支持レ
ール40の前端40a側を下から挟むような略コ字形部
材から成り、その両側壁内側には、それぞれ支持レール
40の上側フランジ下を走行する走行ローラ56,56
が軸支されている。また、両側壁の上端間には、支持レ
ール40の上側フランジ上を走行する上部ローラ57
(図2参照)が架設されている。そして、前記ビーム側
スライド部51の上端壁とレール側スライド部52の下
端壁とは、相互に対向した状態で枢軸58により、互い
に回動可能に連結されている。On the other hand, the rail-side slide portion 52 is formed of a substantially U-shaped member that sandwiches the front end 40a side of the support rail 40 from below, and the inside of both side walls thereof runs under the upper flange of the support rail 40, respectively. Traveling rollers 56, 56
Is pivotally supported. In addition, between the upper ends of the both side walls, the upper roller 57 running on the upper flange of the support rail 40.
(See FIG. 2) is installed. The upper end wall of the beam-side slide portion 51 and the lower end wall of the rail-side slide portion 52 are rotatably connected to each other by a pivot 58 while facing each other.
【0026】吊持手段60は、前記支持レール40にそ
の長手方向に移動可能に装着された台車61と、該台車
61に掛止されたチェーンブロック67とを組み合わせ
て成る。更に詳しく言えば図3に示すように、先ず台車
61は、支持レール40の下側フランジ側を挾持するよ
うに配された一対のハート形の側壁部62,62を有
し、各側壁部62の上端内側には、それぞれ支持レール
40の下側フランジ上を走行する走行ローラ63,63
が軸支されている。The suspension means 60 is composed of a carriage 61 mounted on the support rail 40 so as to be movable in the longitudinal direction thereof, and a chain block 67 hooked on the carriage 61. More specifically, as shown in FIG. 3, the cart 61 first has a pair of heart-shaped side wall portions 62, 62 arranged so as to hold the lower flange side of the support rail 40. Inside the upper end of the traveling rollers 63, 63 traveling on the lower flange of the support rail 40, respectively.
Is pivotally supported.
【0027】一の側壁部62の走行ローラ63には歯車
63aが一体的に固結されており、その外側には前記歯
車63aを人力で回転操作できる歯車機構64が設けら
れている。この歯車機構64には操作用のチェーン65
が巻き掛けられている。また、側壁部62の下端には、
チェーンブロック67を掛止するためのフック66が設
けられている。チェーンブロック67は、操作用チェー
ン68を動かすことで、かかるチェーン68の一端側に
取り付けられたフック69を昇降させることができる一
般的な簡易昇降機である。A gear 63a is integrally fixed to the traveling roller 63 of the one side wall portion 62, and a gear mechanism 64 capable of rotating the gear 63a manually is provided outside the gear 63a. This gear mechanism 64 has an operating chain 65
Is wrapped around. Further, at the lower end of the side wall portion 62,
A hook 66 for hooking the chain block 67 is provided. The chain block 67 is a general simple elevator that can move the operating chain 68 to raise and lower the hook 69 attached to one end of the chain 68.
【0028】図1に示すように、吊持手段60は、その
チェーンブロック67のフック69にパイプPの二点に
両端を係止したロープRを引っ掛けるいわゆる2点吊り
により、パイプPを吊し持つようになっている。なお、
全長12m位の長いパイプを吊下げる場合には、前記支
持レール40に対して吊持手段60を2組み装着し、各
吊持手段60により長いパイプの両端を吊持するように
設定してもよい。As shown in FIG. 1, the suspending means 60 suspends the pipe P by so-called two-point suspension in which the rope 69 having both ends locked at two points of the pipe P is hooked on the hook 69 of the chain block 67. I'm supposed to have. In addition,
When suspending a long pipe having a total length of about 12 m, two sets of suspension means 60 may be attached to the support rail 40, and each suspension means 60 may be configured to suspend both ends of the long pipe. Good.
【0029】次に本実施例に係るハンドリング装置10
の作用を説明する。パイプPの埋設作業に当たっては、
予め掘削溝A内の土留支保工作業を行なっておく。図1
及び図2に示すように、ハンドリング装置10は、その
一対の脚部11,11を掘削溝Aを間にして地上に設置
させる。本装置10の四隅にあるアウトリガー14,1
4…を地面に当接させれば、動かぬようにしっかりと固
定することができる。かかる固定した状態にて、吊持手
段60を構成するチェーンブロック67のフック69に
対し、2点吊りしたパイプPのロープRを引っ掛ければ
よい。Next, the handling device 10 according to the present embodiment.
The operation of will be described. When burying the pipe P,
Soil retaining work in the excavation groove A is performed in advance. FIG.
Further, as shown in FIG. 2, the handling device 10 installs the pair of legs 11, 11 on the ground with the excavation groove A in between. Outriggers 14, 1 at the four corners of the device 10
If 4 is brought into contact with the ground, it can be firmly fixed so as not to move. In this fixed state, the rope R of the pipe P suspended at two points may be hooked on the hook 69 of the chain block 67 that constitutes the suspension means 60.
【0030】吊持手段60にパイプPを吊し持たせた
後、アウトリガー14,14…を地面から離してハンド
リング装置10を押引きし、脚部11に取付けた車輪1
2,12…を回転させつつ、パイプPの埋設すべき所定
の位置まで掘削溝Aに沿って前後方向に移動させる。図
4に示すように、ハンドリング装置10が所定位置まで
来たら、吊持手段60の台車61を支持レール40の長
手方向に沿って移動させながら、パイプPの前後方向に
おける位置を定める。After suspending the pipe P by the suspending means 60, the outriggers 14, 14 ... Are separated from the ground to push and pull the handling device 10, and the wheel 1 attached to the leg portion 11 is pulled.
While rotating 2, 12, ..., The pipe P is moved in the front-rear direction along the excavation groove A to a predetermined position where the pipe P should be buried. As shown in FIG. 4, when the handling device 10 reaches a predetermined position, the position of the pipe P in the front-rear direction is determined while moving the carriage 61 of the suspension means 60 along the longitudinal direction of the support rail 40.
【0031】これと前後して、後方ビーム30の中間位
置にある枢軸部材31を略中心として、支持レール40
の前端40aを両側方向に揺動させながら、パイプPの
両側方向における位置も定める。支持レール40の揺動
操作は、前方ビーム20に装着されたスライド部材50
を動かすことにより容易に行なうことができる。Before and after this, the support rail 40 is centered around the pivot member 31 at the intermediate position of the rear beam 30.
While swinging the front end 40a of the pipe in both directions, the position of the pipe P in both directions is also determined. The swing operation of the support rail 40 is performed by the slide member 50 mounted on the front beam 20.
It can be easily done by moving.
【0032】パイプPの位置決めが完了したところで、
チェーンブロック67(図3参照)の操作によりパイプ
Pを掘削溝Aの底部まで降ろす。吊り下ろしたパイプP
の端が他のパイプP0の端に対して未だずれるような場
合には、再度支持レール40の揺動操作等によって、各
パイプ同士の軸芯を正確に合せてから互いに溶接する。When the positioning of the pipe P is completed,
By operating the chain block 67 (see FIG. 3), the pipe P is lowered to the bottom of the excavation groove A. Hanging pipe P
If the ends of the pipes are still misaligned with the ends of the other pipes P0, the axes of the pipes are accurately aligned by the swinging operation of the support rail 40 and the like, and then the pipes are welded to each other.
【0033】以上のような簡単な構成及び操作により、
吊り下げたパイプPの軸芯を正確に他のパイプP0に対
して位置決めすることができる。そして、前述した工程
を順次繰り返すことにより、複数のパイプPを掘削溝A
内にて溶接して延長させることができる。With the above-mentioned simple structure and operation,
The axis of the suspended pipe P can be accurately positioned with respect to the other pipe P0. Then, by sequentially repeating the above-mentioned steps, the plurality of pipes P are cut into the excavation groove A.
Can be extended by welding inside.
【0034】なお、前記実施例では支持レールの後端側
を後方ビームに回動可能に枢支し、支持レールの前端側
を前方ビームに位置調整可能に支持したが、逆の態様と
して支持レールの後端側を後方ビームに位置調整可能に
支持し、支持レールの前端側を前方ビームに回動可能に
枢支してもよい。また、本発明に係るパイプ類のハンド
リング装置は図示した実施例に限定されるものではな
い。In the above embodiment, the rear end side of the support rail is rotatably supported by the rear beam and the front end side of the support rail is supported by the front beam in a positionally adjustable manner. The rear end side may be supported by the rear beam in a positionally adjustable manner, and the front end side of the support rail may be pivotally supported by the front beam. Further, the pipe handling device according to the present invention is not limited to the illustrated embodiment.
【0035】[0035]
【発明の効果】本発明に係るパイプ類のハンドリング装
置によれば、走行手段を備えた一対の脚部により掘削溝
に沿って移動でき、支持レールの揺動によりパイプ類の
溝幅方向における位置決めを行なうから、パイプ類の埋
設作業時の占有スペースを極力省くことができるのみな
らず、簡単な構成によりパイプ類の軸芯合せ作業を正確
かつ容易に行なうことができ、コストも大幅に低減する
ことができる。According to the pipe handling apparatus of the present invention, the pair of legs provided with the traveling means can move along the excavation groove, and the swinging of the support rail allows the pipes to be positioned in the groove width direction. Therefore, not only can the space occupied when burying pipes be saved as much as possible, but also the axial alignment work of pipes can be performed accurately and easily with a simple configuration, and the cost can be greatly reduced. be able to.
【図1】本発明の一実施例に係るパイプ類のハンドリン
グ装置を示す斜視図である。FIG. 1 is a perspective view showing a pipe handling device according to an embodiment of the present invention.
【図2】本発明の一実施例に係るパイプ類のハンドリン
グ装置を示す正面図である。FIG. 2 is a front view showing a pipe handling device according to an embodiment of the present invention.
【図3】本発明の一実施例に係るパイプ類のハンドリン
グ装置の要部を拡大して示す斜視図である。FIG. 3 is a perspective view showing an enlarged main part of a pipe handling device according to an embodiment of the present invention.
【図4】本発明の一実施例に係るパイプ類のハンドリン
グ装置の作用を説明するための平面図である。FIG. 4 is a plan view for explaining the operation of the pipe handling device according to the embodiment of the present invention.
10…パイプ類のハンドリング装置 11…脚部 12…車輪 20…前方ビーム 30…後方ビーム 31…枢軸部材 40…支持レール 50…スライド部材 51…レール側スライド部 52…ビーム側スライド部 60…吊持手段 61…台車 67…チェーンブロック 10 ... Pipe handling device 11 ... Legs 12 ... Wheels 20 ... Front beam 30 ... Rear beam 31 ... Axis member 40 ... Support rail 50 ... Slide member 51 ... Rail-side slide 52 ... Beam-side slide 60 ... Suspension Means 61 ... Bogie 67 ... Chain block
Claims (3)
整しつつ埋設するためのハンドリング装置において、 掘削溝を間にして地上に設置され、それぞれ下端側に走
行手段を備えて前記掘削溝に沿って前後方向に移動可能
な一対の脚部と、 掘削溝を跨ぐよう前記各脚部間の前端側に架設された前
方ビームと、同じく掘削溝を跨ぐよう前記各脚部間の後
端側に架設された後方ビームと、 前後方向に延びるように配され、一端側が前記各ビーム
の一方の途中箇所に回動可能に枢支され、該一端側を支
点として、他端側が前記各ビームの他方に該ビームに沿
って位置調整可能に支持された支持レールと、 前記支持レールにその長手方向に移動可能に装着され、
前記パイプ類を昇降可能に吊し持つ吊持手段と、 を具備して成ることを特徴とするパイプ類のハンドリン
グ装置。1. A handling device for burying pipes while suspending them in a digging groove while adjusting their positions, the digging groove being provided on the ground with the digging groove in between and provided with traveling means at the lower end side thereof. A pair of legs that can move in the front-back direction along the front beam that is erected on the front end side between the legs so as to straddle the excavation groove, and a rear end between the legs that also straddles the excavation groove. And a rear beam that is erected on one side, and one end side is rotatably supported at one midway point of each beam so that the other end side is the beam. A support rail supported on the other side of the beam so as to be positionally adjustable, and mounted on the support rail so as to be movable in the longitudinal direction thereof,
A pipe handling device, comprising: a suspending unit that suspends the pipes so that the pipes can be raised and lowered.
の一方の中間箇所に、枢軸部材を介して略水平方向に回
動可能に枢支され、 前記支持レールの他端側は、前記各ビームの他方に、ス
ライド部材を介して該ビームに沿って位置調整可能に連
結支持され、 前記スライド部材は、前記他方のビームにその長手方向
に移動可能に装着されたビーム側スライド部と、該ビー
ム側スライド部に対し略水平方向に回動可能に枢着さ
れ、かつ前記支持レールの他端側にその長手方向に相対
的に移動可能に装着されたレール側スライド部とから成
ることを特徴とする請求項1記載のパイプ類のハンドリ
ング装置。2. One end side of the support rail is rotatably supported at one intermediate position of each beam so as to be rotatable in a substantially horizontal direction via a pivot member, and the other end side of the support rail is The other side of each beam is linked and supported via a slide member so as to be positionally adjustable along the beam, and the slide member is a beam side slide portion mounted to the other beam so as to be movable in the longitudinal direction thereof, And a rail-side slide portion pivotally attached to the beam-side slide portion so as to be rotatable in a substantially horizontal direction and mounted on the other end side of the support rail so as to be relatively movable in the longitudinal direction thereof. The pipe handling device according to claim 1, which is characterized in that.
に、手動又は電動により該ビーム側スライド部を前記他
方のビームの長手方向に移動させる駆動手段を設けたこ
とを特徴とする請求項2記載のパイプ類のハンドリング
装置。3. The beam side slide portion of the slide member is provided with a driving means for moving the beam side slide portion in the longitudinal direction of the other beam manually or electrically. Pipe handling equipment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP07064301A JP3139935B2 (en) | 1995-03-23 | 1995-03-23 | Pipe handling equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP07064301A JP3139935B2 (en) | 1995-03-23 | 1995-03-23 | Pipe handling equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH08259177A true JPH08259177A (en) | 1996-10-08 |
JP3139935B2 JP3139935B2 (en) | 2001-03-05 |
Family
ID=13254299
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP07064301A Expired - Fee Related JP3139935B2 (en) | 1995-03-23 | 1995-03-23 | Pipe handling equipment |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3139935B2 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102431903A (en) * | 2011-08-12 | 2012-05-02 | 河南省第二建设集团有限公司 | Concrete static cutting hoisting mechanism |
CN103438273A (en) * | 2013-09-16 | 2013-12-11 | 北京市水利规划设计研究院 | Method for installing PCCPs (prestressed concrete cylinder pipes) in deep grooves by virtue of gantry crane |
CN107738992A (en) * | 2017-10-18 | 2018-02-27 | 中铁机械装备研究设计院(成都)有限公司 | A kind of vertical lifting and horizontal feed Lift-on/Lift-off System |
CN113479765A (en) * | 2021-06-29 | 2021-10-08 | 河北新兴铸管有限公司 | Installation and transportation device for nodular cast iron pipe |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111039162A (en) * | 2019-12-09 | 2020-04-21 | 湖南顺祥物流有限公司 | Steel is with lifting by crane compensating beam of taking lifting hook |
-
1995
- 1995-03-23 JP JP07064301A patent/JP3139935B2/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102431903A (en) * | 2011-08-12 | 2012-05-02 | 河南省第二建设集团有限公司 | Concrete static cutting hoisting mechanism |
CN103438273A (en) * | 2013-09-16 | 2013-12-11 | 北京市水利规划设计研究院 | Method for installing PCCPs (prestressed concrete cylinder pipes) in deep grooves by virtue of gantry crane |
CN107738992A (en) * | 2017-10-18 | 2018-02-27 | 中铁机械装备研究设计院(成都)有限公司 | A kind of vertical lifting and horizontal feed Lift-on/Lift-off System |
CN107738992B (en) * | 2017-10-18 | 2024-02-09 | 中铁宝桥集团有限公司 | Vertical hoisting and horizontal conveying hoisting system |
CN113479765A (en) * | 2021-06-29 | 2021-10-08 | 河北新兴铸管有限公司 | Installation and transportation device for nodular cast iron pipe |
CN113479765B (en) * | 2021-06-29 | 2022-09-13 | 河北新兴铸管有限公司 | Installation and transportation device for nodular cast iron pipe |
Also Published As
Publication number | Publication date |
---|---|
JP3139935B2 (en) | 2001-03-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP7045936B2 (en) | Hanger unit in deck erection machine | |
JP5852520B2 (en) | Material conveying device and material conveying method | |
JP2971042B2 (en) | Girder transporter and girder transport method | |
JPH08259177A (en) | Handling device of pipe | |
JP4353343B2 (en) | Large elevating stage, lifting method and reverse driving method using the same | |
JPH11147690A (en) | Low head rebar construction equipment | |
JP2001248161A (en) | Method for installing concrete block on face of slope and truck and device for installing it | |
JPH11310921A (en) | Steel pipe pile driving device and steel pipe pile driving method | |
JP2000143139A (en) | Hoisting jig for crane | |
JP4236761B2 (en) | Pipe-type carriage for transporting pipes | |
JP2004155538A (en) | Suspension tool | |
JP4197325B2 (en) | Work device and method for manufacturing mechanical parking equipment | |
JP2794378B2 (en) | Transport system for large heavy objects such as steam generators in nuclear power plants, apparatus and method therefor | |
JP3071840U (en) | Segment loading device | |
JP3380788B2 (en) | Mobile trolley used for box culvert transfer | |
JPH09132078A (en) | Cargo receiving device for carrying and hanging down pipes and the like | |
JPH10131127A (en) | Moving carry-in device for bridge member | |
JP2881524B2 (en) | Monorail track girder erection machine | |
JP3077904B1 (en) | Bogie lifting device | |
JP2023180002A (en) | Internal structural material installation equipment | |
JP3815756B2 (en) | Temporary elevator for fistula and its transportation method | |
JP2023180004A (en) | How to build a shield tunnel inside | |
JP2581772Y2 (en) | Roof shield device | |
JP6738779B2 (en) | Pile driver and method of changing the posture of the pile driver | |
JP2001199674A (en) | Long material lifting equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20071215 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081215 Year of fee payment: 8 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 8 Free format text: PAYMENT UNTIL: 20081215 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091215 Year of fee payment: 9 |
|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313111 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 9 Free format text: PAYMENT UNTIL: 20091215 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091215 Year of fee payment: 9 |
|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313111 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 9 Free format text: PAYMENT UNTIL: 20091215 |
|
R360 | Written notification for declining of transfer of rights |
Free format text: JAPANESE INTERMEDIATE CODE: R360 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091215 Year of fee payment: 9 |
|
R370 | Written measure of declining of transfer procedure |
Free format text: JAPANESE INTERMEDIATE CODE: R370 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091215 Year of fee payment: 9 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101215 Year of fee payment: 10 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111215 Year of fee payment: 11 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111215 Year of fee payment: 11 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121215 Year of fee payment: 12 |
|
LAPS | Cancellation because of no payment of annual fees |