CN101424063A - 临时与永久道路一次性施工工法 - Google Patents

临时与永久道路一次性施工工法 Download PDF

Info

Publication number
CN101424063A
CN101424063A CNA2008101627857A CN200810162785A CN101424063A CN 101424063 A CN101424063 A CN 101424063A CN A2008101627857 A CNA2008101627857 A CN A2008101627857A CN 200810162785 A CN200810162785 A CN 200810162785A CN 101424063 A CN101424063 A CN 101424063A
Authority
CN
China
Prior art keywords
pipeline
interim
single time
construction method
roadbed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008101627857A
Other languages
English (en)
Other versions
CN101424063B (zh
Inventor
王形
章瑞文
尉烈扬
陈铁军
俞昂剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhong Lian Construction Group Co., Ltd.
Original Assignee
周水林
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 周水林 filed Critical 周水林
Priority to CN2008101627857A priority Critical patent/CN101424063B/zh
Publication of CN101424063A publication Critical patent/CN101424063A/zh
Application granted granted Critical
Publication of CN101424063B publication Critical patent/CN101424063B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开一种临时与永久道路一次性施工工法,具体步骤如下:施工准备→测量定位→清除表土→管道施工→管道局部加固→路基铺设→路基局部修整→铺设侧面石→浇筑沥青路面。本发明具有节材节能,加快施工进度,节省了道路重复施工的时间,减少两次挖土所引起的污染的特点。

Description

临时与永久道路一次性施工工法
技术领域
本发明涉及一种临时与永久道路一次性施工工法。
背景技术
随着地球资源日趋紧缺,节能节材已是各行各业应予以重点关注的问题。对于建筑业,已出现很多新型的节能材料、设备和节能节材的施工技术,并作为今后的发展方向。在道路施工方面,特别是建筑施工现场传统做法是先建临时施工道路,待主体结构装修完毕后,再重新开挖,安装给排水管道,再建永久性道路;传统的临时道路材料、人工、机械费用损耗,工期更长,成本高。
发明内容
本发明的目的在于提供了一种临时与永久道路一次性施工工法,本发明的施工工法将临时道路施工程序逆转,先安装管道,做好永久性道路的路基,作为临时道路使用,待工程收尾,将路基局部修整,浇筑路面面层。具有节材节能,加快施工进度,节省了道路重复施工的时间,减少两次挖土所引起的污染的特点。
临时与永久道路一次性施工工法是在工程场地平整测量定位后,按场外工程设计要求,先进行场外道路的路基施工,作为施工期间临时道路使用,同时铺设给排水管道、砌筑窨井等道路以下地下设施。收尾阶段对路基局部修整后按设计要求浇筑路面面层。
基础使用阶段先不浇筑混凝土基层,待基础完工后再浇筑,考虑到施工期间各种机械设备对路基承压会高于设计要求,故通过道路的局部给排水管道需进行加固处理。
为了达到上述目的,本发明的技术方案是:
一种临时与永久道路一次性施工工法,具体步骤如下:施工准备→测量定位→清除表土→管道施工→管道局部加固→路基铺设→路基局部修整→铺设侧面石→浇筑沥青路面。
所述的测量定位是指按场外设计图纸要求测量定位,包括临时水准点和管道轴线控制桩的设置,要便于观测且必须牢固,并应采取保护措施。开槽铺设管道的沿线临时水准点,可利用建筑施工的原水准布置点。
所述的管道施工包括如下施工流程:开挖基槽→砌筑窨井→检查管、井底标高→管材检查→下管→接口→管道局部加固→闭水试验;管基土层应分层夯实,窨井砌筑同时进行。
所述的管道局部加固是指在管道横穿过道路或在道路下沿道路延伸方向埋设时需要进行加固,并埋设管道观察孔,当道路使用频率少,埋深>700mm的,在管道上部加钢筋网片加固,主筋采用HRB335(钢筋强度等级II级)级,直径不小于10mm,分布筋采用HPB235(钢筋强度等级I级)级,直径不小于6mm,间距均不大于250mm;道路使用频率大,埋深≤700mm的,用C15(混凝土强度等级)素混凝土包裹管道,每边厚度不小于100mm;当管道上部荷载较大时把加钢筋网片和混凝土包裹管道两者结合加固。
所述的路基铺设包括如下施工流程:铺设塘渣→沉降检测→铺设二灰碎石→浇筑混凝土基层→伸缩缝设置,由于机械设备对路基频繁负重使用引起的路基凹陷、破损,通过沉降检测不符合的要用塘渣、二灰碎石、混凝土材料进行局部返修,调整。
所述的伸缩缝设置是为防止道路开裂,在混凝土基层浇筑时设置20~30mm宽的伸缩缝或板厚1/3深,宽>5mm的切割缝,并灌沥青或沥青砂,间距5~6m。
所述的沉降观测要先进行观测点的设置:在路基铺设时预埋50×3.0mm的PVC管,PVC管应设在所述管道中心线位置上,且一端与管道加固用混凝土固定,另一端设在路基顶面往下100mm处,PVC管周边用细石粉或黄砂回填保护,回填半径100mm范围内;PVC管顶用木塞塞严,为防止观测时木塞不易拔出,在木塞上钉入U型Φ6钢筋头;观测点每排管道中间设置一个,两侧利用窨井位置设观测点。
所述路基局部修整包括对混凝土基层局部修整、清理、打毛,并摊铺底油一层;局部裂缝用宽度约100~200mm的SBS卷材条沿裂缝方向打压粘密。
所述的铺设侧面石的同时要对窨井盖根据沥青层的铺设用混凝土调整标高,保证封口严密。
本发明的有益效果为:本发明的施工工法节材节能,该工法利用永久性道路路基同时作为临时道路使用,节约了临时道路施工的塘渣、混凝土等材料;工程给排水管道预先铺设,施工期间场内排水就可利用永久管网,节省另设排水措施的费用。其次加快施工进度,永久道路只需局部修整浇筑路面面层即告完成,节省了道路重复施工的时间;减少污染,减少两次挖土所引起的污染。适用于学校、医院、住宅小区、厂房等场外工程道路。
附图说明
图1是本发明施工流程图;
具体实施方式
实施例1
本实施例所指的一种临时与永久道路一次性施工工法,施工流程图见图1,具体步骤如下:施工准备→测量定位→清除表土→管道施工→管道局部加固→路基铺设→路基局部修整→铺设侧面石→浇筑沥青路面。首先进行施工准备,准备各种材料、人员和器材等,建筑与场外施工图同时到位。然后进行测量定位,是指按场外设计图纸要求测量定位,包括临时水准点和管道轴线控制桩的设置,都应便于观测且必须牢固,并应采取保护措施。开槽铺设管道的沿线临时水准点,可利用建筑施工的原水准布置点。之后清除表土,然后进行管道施工,包括如下施工流程:开挖基槽→砌筑窨井→检查管、井底标高→对要埋入的管材进行检查→把管道下埋入基槽→然后对管与管之间进行接口→管道局部加固→闭水试验;管基土层应分层夯实,窨井砌筑同时进行,具体按设计图纸要求和室外给排水管网安装施工工艺操作。管道局部加固是指在管道横穿过道路或在道路下沿道路延伸方向埋设时需要进行加固,并埋设管道观察孔,当道路使用频率少,埋深>700mm的,在管道上部加钢筋网片加固,主筋采用HRB335级,直径不小于10mm,分布筋采用HPB235级,直径不小于6mm,间距均不大于250mm;道路使用频率大,埋深≤700mm的,用C15素混凝土包裹管道,每边厚度不小于100mm;当管道上部荷载较大时把加钢筋网片和混凝土包裹管道两者结合加固。再进行路基铺设,包括如下施工流程:铺设塘渣→沉降检测→铺设二灰碎石→浇筑混凝土基层→伸缩缝设置,由于机械设备对路基频繁负重使用引起的路基凹陷、破损,通过沉降检测不符合的要用塘渣、二灰碎石、混凝土材料进行局部返修,调整。其中伸缩缝设置是为防止道路开裂,在混凝土基层浇筑时设置20~30mm宽的伸缩缝或板厚1/3深,宽>5mm的切割缝,并灌沥青或沥青砂,间距5~6m。而沉降观测要先进行观测点的设置:在路基铺设时预埋50×3.0mm的PVC管,PVC管应设在所述管道中心线位置上,且一端与管道加固用混凝土固定,另一端设在路基顶面往下100mm处,PVC管周边用细石粉或黄砂回填保护,回填半径100mm范围内;PVC管顶用木塞塞严,为防止观测时木塞不易拔出,在木塞上钉入U型Φ6钢筋头;观测点每排管道中间设置一个,两侧利用窨井位置设观测点。然后进行路基局部修整,包括对混凝土基层局部修整、清理、打毛,按设计要求摊铺底油一层;局部裂缝用SBS卷材条(宽度约100~200mm)沿裂缝方向打压粘密。再铺设侧面石,同时要对窨井盖根据沥青层的铺设用混凝土调整标高,保证封口严密。最后浇筑沥青路面,先铺设50mm厚粗粒沥青混凝土,然后再铺设30m厚细粒沥青混凝土。

Claims (9)

1、一种临时与永久道路一次性施工工法,其特征在于具体步骤如下:施工准备→测量定位→清除表土→管道施工→管道局部加固→路基铺设→路基局部修整→铺设侧面石→浇筑沥青路面。
2、如权利要求1所述的临时与永久道路一次性施工工法,其特征在于:所述的测量定位是指按场外设计图纸要求测量定位,包括临时水准点和管道轴线控制桩的设置。
3、如权利要求1所述的临时与永久道路一次性施工工法,其特征在于:所述的管道施工包括如下施工流程:开挖基槽→砌筑窨井→检查管、井底标高→管材检查→下管→接口→管道局部加固→闭水试验;管基土层应分层夯实,窨井砌筑同时进行。
4、如权利要求3所述的临时与永久道路一次性施工工法,其特征在于:所述的管道局部加固是指在管道横穿过道路或在道路下沿道路延伸方向埋设时需要进行加固,并埋设管道观察孔,当道路使用频率少,埋深>700mm的,在管道上部加钢筋网片加固,主筋采用HRB335级,直径不小于10mm,分布筋采用HPB235级,直径不小于6mm,间距均不大于250mm;道路使用频率大,埋深≤700mm的,用C15素混凝土包裹管道,每边厚度不小于100mm;当管道上部荷载较大时把加钢筋网片和混凝土包裹管道两者结合加固。
5、如权利要求1所述的临时与永久道路一次性施工工法,其特征在于:所述的路基铺设包括如下施工流程:铺设塘渣→沉降检测→铺设二灰碎石→浇筑混凝土基层→伸缩缝的设置,通过沉降检测将不符合的要用塘渣、二灰碎石、混凝土材料进行局部返修,调整。
6、如权利要求5所述的临时与永久道路一次性施工工法,其特征在于:所述的伸缩缝设置是在混凝土基层浇筑时设置20~30mm宽的伸缩缝或板厚1/3深,宽>5mm的切割缝,并灌沥青或沥青砂,间距5~6m。
7、如权利要求5所述的临时与永久道路一次性施工工法,其特征在于:所述的沉降观测要先进行观测点的设置:在路基铺设时预埋50×3.0mm的PVC管,PVC管应设在所述管道中心线位置上,且一端与管道加固用混凝土固定,另一端设在路基顶面下降100mm处,PVC管周边用细石粉或黄砂回填保护,回填半径100mm范围内;PVC管顶用木塞塞严,在木塞上钉入U型Φ6钢筋头;观测点每排管道中间设置一个,两侧利用窨井位置设观测点。
8、如权利要求1所述的临时与永久道路一次性施工工法,其特征在于:所述路基局部修整包括对混凝土基层局部修整、清理、打毛,并摊铺底油一层;局部裂缝用宽度约100~200mm的SBS卷材条沿裂缝方向打压粘密。
9、如权利要求1所述的临时与永久道路一次性施工工法,其特征在于:所述的铺设侧面石,同时要对窨井盖根据沥青层的铺设用混凝土调整标高,保证封口严密。
CN2008101627857A 2008-12-11 2008-12-11 临时与永久道路一次性施工方法 Expired - Fee Related CN101424063B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101627857A CN101424063B (zh) 2008-12-11 2008-12-11 临时与永久道路一次性施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101627857A CN101424063B (zh) 2008-12-11 2008-12-11 临时与永久道路一次性施工方法

Publications (2)

Publication Number Publication Date
CN101424063A true CN101424063A (zh) 2009-05-06
CN101424063B CN101424063B (zh) 2011-06-15

Family

ID=40614920

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101627857A Expired - Fee Related CN101424063B (zh) 2008-12-11 2008-12-11 临时与永久道路一次性施工方法

Country Status (1)

Country Link
CN (1) CN101424063B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101638877B (zh) * 2009-08-20 2011-01-05 天津市市政工程设计研究院 基于软基重载交通条件下的沥青路面结构及路基处理方法
CN102433883A (zh) * 2010-09-29 2012-05-02 中国二十冶集团有限公司 深基坑垂直地埋管时空转换施工方法
CN104652238A (zh) * 2015-01-07 2015-05-27 南通大学 一种城市道路无障碍基层施工方法
CN108385460A (zh) * 2018-01-22 2018-08-10 中国十七冶集团有限公司 一种地下室顶板上道路路基层的施工方法
CN108755319A (zh) * 2018-06-06 2018-11-06 上海景铭建设发展有限公司 一种道路施工方法及使用该工法建设的道路
CN110593614A (zh) * 2019-09-05 2019-12-20 青岛平建建筑安装股份有限公司 仓库硬化路面及制作方法、基于硬化路面仓库及安装工艺
CN110629613A (zh) * 2019-09-28 2019-12-31 中建三局集团有限公司 一种适用于大型综合体场内永临结合道路加固方法
CN111350109A (zh) * 2020-03-06 2020-06-30 中冶天工集团有限公司 一种吹填造陆区域厂区道路施工方法
CN114908630A (zh) * 2022-05-13 2022-08-16 山东电力工程咨询院有限公司 一种厂区道路结构及二次永临结合分层施工方法

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1947926A1 (de) * 1969-09-22 1971-04-01 Rommenhoeller Kohlensaeure Verfahren zum Verfestigen von weichen und/oder nassen Boeden
DE19609776C2 (de) * 1996-03-13 1999-08-12 Reinhold Neider Verfahren zum Setzen von Schachtabdeckungen und Schachtabdeckung
CN1465815A (zh) * 2002-07-06 2004-01-07 王六安 砼道路施工方法
JP3805288B2 (ja) * 2002-07-30 2006-08-02 積水化成品工業株式会社 路面標示体施工方法およびそれに用いる仮設路面標示体用シート
DE10261641A1 (de) * 2002-12-27 2004-07-08 Max Bögl Bauunternehmung GmbH & Co. KG Verfahren zum Herstellen einer Festen Fahrbahn und Fahrweg
CN100400750C (zh) * 2004-10-11 2008-07-09 中铁四局集团第一工程有限公司 大面积二灰、石灰土路拌法施工工艺
CN100363560C (zh) * 2005-11-15 2008-01-23 陈玉恒 地下管线检修井周边路面塌陷的处理方法
CN101050619A (zh) * 2006-04-04 2007-10-10 吴方伯 水泥混凝土路面施工方法

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101638877B (zh) * 2009-08-20 2011-01-05 天津市市政工程设计研究院 基于软基重载交通条件下的沥青路面结构及路基处理方法
CN102433883A (zh) * 2010-09-29 2012-05-02 中国二十冶集团有限公司 深基坑垂直地埋管时空转换施工方法
CN104652238A (zh) * 2015-01-07 2015-05-27 南通大学 一种城市道路无障碍基层施工方法
CN104652238B (zh) * 2015-01-07 2016-12-07 南通大学 一种城市道路无障碍基层施工方法
CN108385460A (zh) * 2018-01-22 2018-08-10 中国十七冶集团有限公司 一种地下室顶板上道路路基层的施工方法
CN108755319A (zh) * 2018-06-06 2018-11-06 上海景铭建设发展有限公司 一种道路施工方法及使用该工法建设的道路
CN110593614A (zh) * 2019-09-05 2019-12-20 青岛平建建筑安装股份有限公司 仓库硬化路面及制作方法、基于硬化路面仓库及安装工艺
CN110629613A (zh) * 2019-09-28 2019-12-31 中建三局集团有限公司 一种适用于大型综合体场内永临结合道路加固方法
CN110629613B (zh) * 2019-09-28 2021-08-03 中建三局集团有限公司 一种适用于大型综合体场内永临结合道路加固方法
CN111350109A (zh) * 2020-03-06 2020-06-30 中冶天工集团有限公司 一种吹填造陆区域厂区道路施工方法
CN114908630A (zh) * 2022-05-13 2022-08-16 山东电力工程咨询院有限公司 一种厂区道路结构及二次永临结合分层施工方法

Also Published As

Publication number Publication date
CN101424063B (zh) 2011-06-15

Similar Documents

Publication Publication Date Title
CN101424063B (zh) 临时与永久道路一次性施工方法
US11143027B2 (en) Rectangular working well with preset pipe jacking hole and sliding back wall in water-rich stratum and construction method thereof
CN103343544B (zh) 一种大型沉井的施工方法
CN106978843A (zh) 市政排水管道施工工艺
CN101565964A (zh) 室外埋地高密度聚乙烯双壁波纹排水管安装施工方法
CN102644295A (zh) 防止路面检查井周边和局部沉降的施工方法
CN103195158A (zh) 一种市政排水管线泥水平衡顶管施工方法
CN101597888B (zh) 市政排水涵洞沉槽施工方法
CN106567410A (zh) 市政道路检查井的新建施工方法
CN113774917B (zh) 一种土石方开挖填方及边坡支护工程的安全施工方法
CN108487297A (zh) 一种地铁车站半盖挖施工中钢支撑架设的施工方法
CN109706952A (zh) 大型沉井施工方法
KR100324889B1 (ko) 매설관의 보호층 충진방법
CN109024324B (zh) 用于管道免拆除和保护的陡坡阶梯涵洞及施工方法
CN203096758U (zh) 用于安装排水管道的干硬性混凝土平基
Parashar et al. Performance monitoring of deep shafts at Changi WRP project, Singapore
CN115262730A (zh) 一种雨污水管道的施工方法
CN106758658A (zh) 一种预制钢筋混凝土板块及铺设重载临时道路的施工方法
Kang et al. Assembling Construction Technology of Prefabricated Box Culvert Components
CN114753231B (zh) 一种跨地下管线的框架梁格桥结构及其施工方法
CN213038426U (zh) 大开挖面下箱涵的稳定快速顶进施工用延长滑板
CN107012802A (zh) 一种玻璃钢夹砂管公路涵洞的施工方法
Goduto et al. Design and Construction Cost of a Water Line Underneath I-75 in Bowling Green, Ohio
CN114808858A (zh) 一种叠瓦式钢筋混凝土急流槽施工工艺
CN112376351A (zh) 一种关于山区刀背粱地形的预制粱道路施工方法

Legal Events

Date Code Title Description
ASS Succession or assignment of patent right

Owner name: ZHEJIANG ZHONG LIAN CONSTRUCTION GROUP CO.,LTD.

Free format text: FORMER OWNER: ZHOU SHUILIN

Effective date: 20090403

C06 Publication
C41 Transfer of patent application or patent right or utility model
PB01 Publication
TA01 Transfer of patent application right

Effective date of registration: 20090403

Address after: Zhejiang province Shaoxing City Shanxi Road No. 488

Applicant after: Zhejiang Zhong Lian Construction Group Co., Ltd.

Address before: Zhejiang province Shaoxing City Shanxi Road No. 488 Zhejiang Zoomlion Construction Group Co. Ltd.

Applicant before: Zhou Shuilin

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110615

Termination date: 20171211