CN101565964A - 室外埋地高密度聚乙烯双壁波纹排水管安装施工方法 - Google Patents

室外埋地高密度聚乙烯双壁波纹排水管安装施工方法 Download PDF

Info

Publication number
CN101565964A
CN101565964A CNA2009100156998A CN200910015699A CN101565964A CN 101565964 A CN101565964 A CN 101565964A CN A2009100156998 A CNA2009100156998 A CN A2009100156998A CN 200910015699 A CN200910015699 A CN 200910015699A CN 101565964 A CN101565964 A CN 101565964A
Authority
CN
China
Prior art keywords
pipe
pipeline
backfill
construction
engineering
Prior art date
Application number
CNA2009100156998A
Other languages
English (en)
Inventor
刘效锋
吕强
刘建超
刘兵
王廷敏
Original Assignee
青岛恒生源集团建设有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 青岛恒生源集团建设有限公司 filed Critical 青岛恒生源集团建设有限公司
Priority to CNA2009100156998A priority Critical patent/CN101565964A/zh
Publication of CN101565964A publication Critical patent/CN101565964A/zh

Links

Abstract

一种室外埋地高密度聚乙烯双壁波纹排水管(CPP)安装施工方法,其特点是包括:基槽开挖、管道安装、回填,基槽开挖工艺过程包括测量放线、机械开槽、槽底平整夯实、砂砾垫层、砂基,管道安装工艺过程包括管道安装、井室砌筑抹面,回填工艺过程包括胸腔填土、闭水试验、回填土夯实。它解决了目前市政工程雨水、污水排放;工业废水排放、小区排水工程;预埋管道等工程中水泥、金属管材施工速度慢,管材重量重,运输搬运不方便,劳动强度大,安装费用高等问题,适应于市政工程雨水、污水排放;工业废水排放、小区排水工程;预埋管道等工程排水管安装施工。

Description

室外埋地高密度聚乙烯双壁波纹排水管安装施工方法
技术领域
本发明涉及建筑业技术施工领域,具体的说是一种室外埋地排水管材高密
度聚乙烯双壁波紋排水管(CPP)的安装施工方法。
背景技术
目前,在巿政工程雨水、污水排放;工业废水排放、小区排水工程;预埋 管道等工程室外埋地排水管的施工中主要采用水泥、金属材质排水管施工方法, 其施工速度慢,管材重量重,搬运运输不方便,劳动强度大,安装费用高,既 浪费物质资源,又浪费人力资源。 发明内容
本发明为解决目前在巿政工程雨水、污水排放;工业废水排放、小区排水 工程;预埋管道等工程中水泥、金属管材排水管施工方法存在施工速度慢,管 材重量重,搬运运输不方便,劳动强度大,安装费用高等问题,发明一种在室 外埋地排水管材施工中使用高密度聚乙烯双壁波紋排水管(CPP)的安装施工方 法。
本发明为解决上述技术问题,所采取的技术方案是, 一种室外埋地高密度 聚乙烯双壁波紋排水管安装施工方法,其特殊之处是包括基槽开挖、管道安装、 回填,基槽开挖工艺过程包括测量放线、机械开槽、槽底平整夯实、砂砾垫层、 砂基,管道安装工艺过程包括安装管道、井室砌筑抹面,回填工艺过程包括胸 腔填土、闭水试验、回填土夯实。
l、基槽开挖
(l)测量放线按照工程设计要求,准确测试管线位置及标高控制点。
(2 )机械开槽
① 机械开挖沟槽,严格控制基底标高,基底设计标高以上0.2m-0. 3m的原 状土予以保留,禁止扰动,由人工清理至设计标高,不得挖至设计标高以下。 局部超挖或发生扰动,不回填泥土,换填10mm-15mm天然级配的砂石料或中、 粗砂并整平夯实。在工程中遇到槽底埋有不易清除的块石、碎石、砖块等物质 时,开挖至设计标高以下0.2m,然后铺垫天然级配砂石料,面层铺上沙土整平 夯实。
② 机械开槽后,对槽宽、基础垫层厚度、管底标高、排水沟畅通情况、沟 内是否有污泥、杂物、基层有无扰动等作业项目,分别进行验收,合格后进行 管道安装。遇到地下水位高于开挖沟槽槽底标高(或雨季施工),施工时釆取降 低地下水位的措施,防止沟槽失稳,并及时进行基坑支护。沟槽槽底净宽度, 按管外径加0.6m确定,便于人工在槽底作业。地下水位高时(或雨季施工)做 好排水工作,在施工过程中尽可能縮短开槽长度,同时水位降至槽底最低点以 下O. 3m〜0.5m进行管道安装。做好防泡槽的措施,同时设置排水沟、集水坑, 及时抽排水,做到排水通畅,达到施工要求严禁带水作业。发生泡槽,将水排 除,把受泡的软化土层清除,换填砂石料或中粗砂,做好基础处理。
(3)槽底平整夯实
机械开挖完毕,由人工进行槽底清理、平整、夯实。 (4 )砂砾垫层
对软土地基,槽底又处于地下水位以下时,铺垫一层砂砾或碎石,其厚度 不小于O. 15m,碎石粒为5mm-40mm,上面再铺砂垫层(中、粗砂)厚度不小于 50mm,垫层总厚度不小于20咖。(5 )砂基
对一般的土质地段,基底只需铺一层砂垫层,其厚度为0.1m左右。
2、 管道安装
(1) 安装管道
① 下管。由人工抬管道两端用绳缓缓传给槽底施工人员,将管道平稳地放 在沟槽管位上。严禁用金属绳索勾住两端管口或将管道自槽边翻滚抛入槽中。 在混合槽或支撑槽中施工时,因支撑的影响采用从槽的一端集中下管,在槽底 将管道运至安装位置进行安装。
② 驳接管道。在管端部设置木档板,用撬棍将被安装的管道沿着对准的轴 线徐徐插入承口内,逐节依次安装。对于de〉 400mra的管道,用柔性缆绳系住 管道用手动葫芦提力工具将管道缓缓插入。将插口顺水流方向,承口逆水流方 向,由下游向上游依次安装。
③ 调整管道的长短。用手据或无齿锯切割,断面垂直平整,不得损坏。为 防接口合拢时已排设管道轴线位置移动,采用稳管措施,在编织袋内灌满黄砂, 封口后压在已排设管道的顶部。管道接口后,复核管道的标高和轴线使其符合 设计要求。
(2) 井室砌筑抹面
根据需要每间隔一定距离,设置检查井,检查井砌筑抹面的标准根据《市 政排水管渠工程质量检验评定标准》CJJ3_—90的有关规定。
3、 回填
(1)胸腔填土
用不含有石块的回填土从管的两侧开始回填管沟,在管道两侧对称回填石 屑至管顶上平面30cm以上并冲水振实。回填时,管道接口处的前后端不小于200mm范围内不得回填,以便在管道试水时观察接口是否存在漏水现象。管道试 水时保证回填土的厚度不少于管顶500mm,以防止试水时管道出现漂浮移位现 象。在管道试水或闭水合格后才能进行大规模的回填。分段分层填土交接处填 成阶梯状,每层相互搭接,其搭接长度不少于每层填土厚度的两倍,上下层错 缝距离不少于1. 0m。
(2) 闭水试验
在管道和检査井施工完毕后,管道回填土前,做闭水试验,管道每三个井 段抽验一段。做闭水试验时,用砖块和砂浆封堵检查井进水管口,闭水试验的 水位,为试验段上游管道内顶以上2m,如上游管内顶至检査井口的高度小于2m 时,闭水试验水位可至井口为止。闭水试验应在管道灌满水24小时后再进行, 对渗水量的测定时间不少于30分钟。进行外观检査,没有有漏水现象,且在规 范允许渗水量范围内,管道闭水试验合格。当试验不合格时,应立即将管内的 水抽干,仔细检查渗漏原因,并进行修补。
(3) 回填土夯实
石屑回填后采用机械夯实,每层铺石厚度为200—250 mm,每层压实。
本发明的技术效果是,采用上述的技术方案:
一、 施工操作简单,施工进度快,縮短工期:聚乙烯双壁波紋管重量轻, 施工运输便捷,搬运容易,劳动强度低,施工进度快。
二、 工程安装费用低:与水泥管、铸铁管相比,聚乙烯双壁波紋管重量轻, 减少了施工中二次搬运和吊车配合安装管道的人工费和机械费等费用。
三、 施工质量好:本工法施工的波紋管采用橡胶圏承插连接,密封性好, 方法可靠,施工质量易保证。四、日常维护费用低:本工法施工采用柔性接口,抗不均匀性沉降能力强,
管内不结裙,减少了疏通费用。 具体实施方式
下面结合实施例,对本发明作进一步说明。
该发明在即墨巿服装批发巿场工程中的实施过程如下: 1、基槽开挖 (1)测量放线
测量放线:按照设计要求及规划红线和水准原点,准确测试管线位置及标 高控制点。
(2 )机械开槽
① 机械开挖沟槽,应严格控制基底标高,基底设计标高以上O. 2m~0. 3m的 原状土予以保留,禁止扰动,由人工清理至设计标高,不得挖至设计标高以下。 局部超挖或发生扰动,不回填泥土,换填10mm-15mm天然级配的砂石料或中、 粗砂并整平夯实。在工程中遇到槽底埋有不易清除的块石、碎石、砖块等物质 时,开挖至设计标高以下0.2m,然后铺垫天然级配砂石料,面层铺上沙土整平 夯实。
② 机械开槽后,对槽宽、,基础垫层厚度、管底标高、排水沟畅通情况、沟 内是否有污泥、杂物、基层有无扰动等作业项目,分别进行验收,合格后进行 管道安装。地下水位高于开挖沟槽槽底标高,施工时采取降低地下水位的措施, 防止沟槽失稳,并及时进行基坑支护。沟槽槽底净宽度,按管外径加0.6m确定, 以便于人工在槽底作业。遇到地下水位高,做好排水工作,采用集水井等方法 降水,在施工过程中应尽可能缩短开槽长度,同时水位应降至槽底最低点以下 0. 3m〜0.5m进行管道安装。做好了防泡槽的措施,同时设置排水沟、集水坑,及时抽排水,做到排水通畅,达到施工要求,严禁带水作业。发生泡槽时,将 水排除,把受泡的软化土层清除,换填砂石料或中粗砂,做好基础处理。 (3)槽底平整夯实 机械开挖完毕,由人工进行槽底清理、平整、夯实。
(4 )砂砾垫层
对软土地基,槽底又处于地下水位以下时,铺垫一层砂砾或碎石,其厚度
不小于O. 15m,碎石粒为5mm-40mm,上面再铺砂垫层(中、粗砂)厚度不小于 50mm,垫层总厚度不小于20隱,管道平基及管座的允许偏差须符合规范规定,均 小于2mm。
(5 )砂基
对一般的土质地段,基底只需铺一层砂垫层,其厚度为O.lm 2、管道安装 (1)管道安装:
① 下管。安装时由人工抬管道两端用绳缓缓传给槽底施工人员,将管道平 稳地放在沟槽管位上。在混合槽或支撑槽中施工时,因支撑的影响,采用从槽的 一端集中下管,在槽底将管道运至安装位置进行安装。
② 人工安装管道。在管端部设置木档板,用撬棍将被安装的管道沿着对准 的轴线徐徐插入承口内,逐节依次安装。对于de〉 400mm的管道,用柔性缆绳
系住管道用手动葫芦提力工具将管道缓缓插入。将插口顺水流方向,承口逆水 流方向,由下游向上游依次安装。
③ 管道长短的调整,用手据切割,也可用无齿锯切割,但断面要求垂直平 整,不应有损坏。为防接口合拢时已排设管道轴线位置移动,采用稳管措施。 具体方法:在编织袋内灌满黄砂,封口后压在已排设管道的顶部,其数量因管径大小而异。管道接口后,复核管道的标高和轴线使其符合设计要求。
(2)井室砌筑抹面:根据需要每间隔一定距离,设置检查井,检查井砌筑 抹面的体标准根据《巿政排水管渠工程质量检验评定标准》CJJ3—一90的有关 规定。
3、回填
(1) 胸腔填土
管沟回填土中不含石块,回填从管的两侧开始,在管道两侧对称回填石屑 至管顶上平面30cm以上并冲水振实。回填时,管道接口处的前后端不小于200mm 范围内不回填,以便在管道试水时观察接口是否存在漏水现象。管道试水时保 证回填土的厚度不应少于管顶500mm,以防止试水时管道出现漂浮移位现象。在 管道试水或闭水合格后才进行大规模的回填。分段分层填土交接处填成阶梯状, 每层相互搭接,其搭接长度不少于每层填土厚度的两倍,上下层错缝距离不少 于1. Om。
(2) 闭水试验
在管道和检查井施工完毕后,管道回填土前,做闭水试验,管道每三个井 段抽验一段。做闭水试验时,用砖块和砂浆封堵检查井进水管口,闭水试验的 水位,为试验段上游管道内顶以上2m,如上游管内顶至检查井口的高度小于2m 时,闭水试验水位可至井口为止。闭水试验时在管道灌满水24h后进行,对渗 水量的测定时间不少于30min,进行外观检查,无漏水现象,且在规范允许渗水
量范围内,管道闭水试验合格。
(3) 回填土夯实
石屑回填后采用机械夯实,每层铺石厚度大约为200—250 mm,每层压实遍 数为4遍,每层填土压实后,符合设计及施工规范的要求。

Claims (1)

1、一种室外埋地排水管材高密度聚乙烯双壁波纹排水管的安装施工方法,其特征是:包括基槽开挖、管道安装、回填; 基槽开挖工艺过程包括测量放线、机械开槽、槽底平整夯实、砂砾垫层、砂基; 管道安装工艺过程包括安装管道、井室砌筑抹面; 回填工艺过程包括胸腔填土、闭水试验、回填土夯实; 基槽开挖工艺过程: 测量放线: 首先按照工程设计要求,准确测试管线位置及标高控制点; 机械开槽: ①机械开挖沟槽,严格控制基底标高,基底设计标高以上0.2m~0.3m的原状土予以保留,禁止扰动,由人工清理至设计标高,不得挖至设计标高以下; ②机械开槽后,对槽宽、基础垫层厚度、管底标高、排水沟畅通情况、沟内是否有污泥、杂物、基层有无扰动等作业项目,分别进行验收,合格后进行管道安装; 槽底平整夯实: 机械开挖完毕,由人工进行槽底清理、平整、夯实; 砂砾垫层: 对软土地基,槽底又处于地下水位以下时,铺垫一层砂砾或碎石,其厚度不小于0.15m,碎石粒为5mm~40mm,上面再铺砂垫层(中、粗砂)厚度不小于50mm,垫层总厚度不小于20mm; 砂基: 对一般的土质地段,基底只需铺一层砂垫层,其厚度为0.1m左右; 管道安装工艺过程: 安装管道: ①下管:由人工抬管道两端用绳缓缓传给槽底施工人员,将管道平稳地放在沟槽管位上; ②驳接管道:在管端部设置木档板,用撬棍将被安装的管道沿着对准的轴线徐徐插入承口内,逐节依次安装,将插口顺水流方向,承口逆水流方向,由下游向上游依次安装; ③调整管道的长短:用手据或无齿锯切割,断面垂直平整,不得损坏;为防接口合拢时已排设管道轴线位置移动,采用稳管措施,在编织袋内灌满黄砂,封口后压在已排设管道的顶部; 井室砌筑抹面: 根据需要每间隔一定距离,设置检查井,检查井砌筑抹面的标准根据《市政排水管渠工程质量检验评定标准》CJJ3——90的有关规定; 回填工艺过程: 胸腔填土: 用不含有石块的回填土从管的两侧开始回填管沟,在管道两侧对称回填石屑至管顶上平面30cm以上并冲水振实; 闭水试验: 在管道和检查井施工完毕后,管道回填土前,做闭水试验; 回填土夯实: 石屑回填后采用机械夯实,每层铺石厚度为200-250mm,每层压实。
CNA2009100156998A 2009-05-25 2009-05-25 室外埋地高密度聚乙烯双壁波纹排水管安装施工方法 CN101565964A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2009100156998A CN101565964A (zh) 2009-05-25 2009-05-25 室外埋地高密度聚乙烯双壁波纹排水管安装施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2009100156998A CN101565964A (zh) 2009-05-25 2009-05-25 室外埋地高密度聚乙烯双壁波纹排水管安装施工方法

Publications (1)

Publication Number Publication Date
CN101565964A true CN101565964A (zh) 2009-10-28

Family

ID=41282312

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2009100156998A CN101565964A (zh) 2009-05-25 2009-05-25 室外埋地高密度聚乙烯双壁波纹排水管安装施工方法

Country Status (1)

Country Link
CN (1) CN101565964A (zh)

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101922586A (zh) * 2010-08-06 2010-12-22 云南白药集团股份有限公司 一种室外工艺管线安装方法
CN102182866A (zh) * 2011-03-25 2011-09-14 浙江省火电建设公司 一种大型超深循环水管道回填工艺
CN103114643A (zh) * 2013-03-04 2013-05-22 济南城建集团有限公司 大口径排水管道施工组件及其施工方法
CN103644370A (zh) * 2013-12-04 2014-03-19 中国石油化工集团公司 具有自调节功能的埋地管线施工方法
CN104790512A (zh) * 2015-04-28 2015-07-22 中铁建设集团有限公司 一种塑料管排水沟及其施工方法
CN104895173A (zh) * 2015-06-01 2015-09-09 中国十七冶集团有限公司 砂质土壤埋地波纹管防沉降方法
CN105178341A (zh) * 2014-05-30 2015-12-23 中国二十冶集团有限公司 降水管井临时接长方法
CN105822831A (zh) * 2016-04-19 2016-08-03 中冶天工集团天津有限公司 用于避免房心土回填区域埋地管道沉降的装置及施工方法
CN105971055A (zh) * 2016-05-31 2016-09-28 安庆供水集团公司 一种城市二次供水清洁施工方法
CN105961148A (zh) * 2016-07-20 2016-09-28 安徽朗坤物联网有限公司 一种基于物联网智能化农业种植的滴灌带安装方法
CN106565021A (zh) * 2016-11-01 2017-04-19 浙江水利水电学院 一种用于生态湿地的管道施工方法
CN106679891A (zh) * 2017-02-23 2017-05-17 苏州建设监理有限公司 排水管道安装检测施工方法
CN106759384A (zh) * 2016-12-24 2017-05-31 中铁十八局集团有限公司 一种采用预制管道底板做深基坑支撑的方法
CN106948458A (zh) * 2017-05-19 2017-07-14 中国水利水电第四工程局有限公司 一种排水管道施工方法
CN107035918A (zh) * 2017-06-07 2017-08-11 天津市源泉市政工程有限公司 一种给水管件工程施工方法
CN107269930A (zh) * 2017-06-21 2017-10-20 中国水利水电第九工程局有限公司 波纹管在砂石系统中替代胶带机混凝土廊道的施工工法
CN107587557A (zh) * 2017-09-27 2018-01-16 广东景源建设工程有限公司 室外给水工程施工方法
CN107630500A (zh) * 2017-09-27 2018-01-26 广东景源建设工程有限公司 一种给排水施工方法
CN108223910A (zh) * 2017-12-15 2018-06-29 金川集团股份有限公司 一种球墨铸铁管穿越含水土壤层的施工方法
CN108589885A (zh) * 2018-04-24 2018-09-28 青岛新华友建工集团股份有限公司 复杂地质条件下成品污水管网施工工法
CN108591613A (zh) * 2018-04-24 2018-09-28 天津军勇利预应力制品有限公司 一种双壁波纹管道的施工方法
CN109653238A (zh) * 2018-11-23 2019-04-19 中国五冶集团有限公司 一种总坪排水管道基础处理方法
CN110273424A (zh) * 2018-03-13 2019-09-24 中冶建筑研究总院(上海)有限公司 一种室外管道的施工方法
CN110424518A (zh) * 2019-08-01 2019-11-08 中化明达(福建)地质勘测有限公司 一种岩土工程排水管的施工方法
CN110656621A (zh) * 2019-10-15 2020-01-07 中国建筑一局(集团)有限公司 一种河道截流体系构造及施工方法
CN110905065A (zh) * 2019-11-21 2020-03-24 中国二冶集团有限公司 塑料排水管道不断管连续施工方法
CN110906058A (zh) * 2019-11-28 2020-03-24 中国电建集团河南工程有限公司 热固性树脂管道在沙漠土质中的施工方法
CN111021508A (zh) * 2019-12-16 2020-04-17 南通永泰建设工程有限公司 一种地下排水管道施工工艺
CN111086896A (zh) * 2019-12-11 2020-05-01 郑州第二市政建设集团有限公司 一种管道安装施工方法以及施工设备

Cited By (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101922586A (zh) * 2010-08-06 2010-12-22 云南白药集团股份有限公司 一种室外工艺管线安装方法
CN102182866A (zh) * 2011-03-25 2011-09-14 浙江省火电建设公司 一种大型超深循环水管道回填工艺
CN102182866B (zh) * 2011-03-25 2012-11-07 浙江省火电建设公司 一种大型超深循环水管道回填工艺
CN103114643A (zh) * 2013-03-04 2013-05-22 济南城建集团有限公司 大口径排水管道施工组件及其施工方法
CN103114643B (zh) * 2013-03-04 2014-11-12 济南城建集团有限公司 大口径排水管道施工组件及其施工方法
CN103644370A (zh) * 2013-12-04 2014-03-19 中国石油化工集团公司 具有自调节功能的埋地管线施工方法
CN103644370B (zh) * 2013-12-04 2017-07-18 中国石油化工集团公司 具有自调节功能的埋地管线施工方法
CN105178341A (zh) * 2014-05-30 2015-12-23 中国二十冶集团有限公司 降水管井临时接长方法
CN105178341B (zh) * 2014-05-30 2017-04-19 中国二十冶集团有限公司 降水管井临时接长方法
CN104790512A (zh) * 2015-04-28 2015-07-22 中铁建设集团有限公司 一种塑料管排水沟及其施工方法
CN104895173A (zh) * 2015-06-01 2015-09-09 中国十七冶集团有限公司 砂质土壤埋地波纹管防沉降方法
CN105822831A (zh) * 2016-04-19 2016-08-03 中冶天工集团天津有限公司 用于避免房心土回填区域埋地管道沉降的装置及施工方法
CN105971055A (zh) * 2016-05-31 2016-09-28 安庆供水集团公司 一种城市二次供水清洁施工方法
CN105961148A (zh) * 2016-07-20 2016-09-28 安徽朗坤物联网有限公司 一种基于物联网智能化农业种植的滴灌带安装方法
CN106565021A (zh) * 2016-11-01 2017-04-19 浙江水利水电学院 一种用于生态湿地的管道施工方法
CN106565021B (zh) * 2016-11-01 2020-07-31 浙江水利水电学院 一种用于生态湿地的管道施工方法
CN106759384A (zh) * 2016-12-24 2017-05-31 中铁十八局集团有限公司 一种采用预制管道底板做深基坑支撑的方法
CN106679891A (zh) * 2017-02-23 2017-05-17 苏州建设监理有限公司 排水管道安装检测施工方法
CN106948458A (zh) * 2017-05-19 2017-07-14 中国水利水电第四工程局有限公司 一种排水管道施工方法
CN107035918A (zh) * 2017-06-07 2017-08-11 天津市源泉市政工程有限公司 一种给水管件工程施工方法
CN107269930A (zh) * 2017-06-21 2017-10-20 中国水利水电第九工程局有限公司 波纹管在砂石系统中替代胶带机混凝土廊道的施工工法
CN107269930B (zh) * 2017-06-21 2019-08-02 中国水利水电第九工程局有限公司 波纹管在砂石系统中替代胶带机混凝土廊道的施工工法
CN107587557A (zh) * 2017-09-27 2018-01-16 广东景源建设工程有限公司 室外给水工程施工方法
CN107630500A (zh) * 2017-09-27 2018-01-26 广东景源建设工程有限公司 一种给排水施工方法
CN108223910A (zh) * 2017-12-15 2018-06-29 金川集团股份有限公司 一种球墨铸铁管穿越含水土壤层的施工方法
CN110273424A (zh) * 2018-03-13 2019-09-24 中冶建筑研究总院(上海)有限公司 一种室外管道的施工方法
CN108591613A (zh) * 2018-04-24 2018-09-28 天津军勇利预应力制品有限公司 一种双壁波纹管道的施工方法
CN108589885A (zh) * 2018-04-24 2018-09-28 青岛新华友建工集团股份有限公司 复杂地质条件下成品污水管网施工工法
CN109653238A (zh) * 2018-11-23 2019-04-19 中国五冶集团有限公司 一种总坪排水管道基础处理方法
CN110424518A (zh) * 2019-08-01 2019-11-08 中化明达(福建)地质勘测有限公司 一种岩土工程排水管的施工方法
CN110656621A (zh) * 2019-10-15 2020-01-07 中国建筑一局(集团)有限公司 一种河道截流体系构造及施工方法
CN110905065A (zh) * 2019-11-21 2020-03-24 中国二冶集团有限公司 塑料排水管道不断管连续施工方法
CN110906058A (zh) * 2019-11-28 2020-03-24 中国电建集团河南工程有限公司 热固性树脂管道在沙漠土质中的施工方法
CN111086896A (zh) * 2019-12-11 2020-05-01 郑州第二市政建设集团有限公司 一种管道安装施工方法以及施工设备
CN111021508A (zh) * 2019-12-16 2020-04-17 南通永泰建设工程有限公司 一种地下排水管道施工工艺

Similar Documents

Publication Publication Date Title
CN104532813B (zh) 一种水上建筑施工平台及其搭设方法、使用方法
CN103590425B (zh) 一种泥炭质软土地层地铁车站施工工艺
CN100412275C (zh) 基坑内降水井的防水与封堵施工方法
CN202450536U (zh) 一种基坑内浅降水与封堵施工装置
CN103758084B (zh) 一种生态河道联锁型砌块及其构筑护坎的施工工法
CN102454167B (zh) 大型超深沉井的施工方法
CN106402490B (zh) 基于钢套头工具管的粉砂土地层顶管顶进施工方法
CN100497841C (zh) 支腿式地下连续墙施工工法
CN102537517B (zh) 一种向江、河、湖中顶管施工工艺
CN104631470B (zh) 高水位大粒径砂砾石地质深基坑组合支护施工方法
CN106978843A (zh) 市政排水管道施工工艺
CN104846810B (zh) 自循环后注浆钻孔灌注桩施工方法
CN103741714A (zh) 地下工程全盖挖逆作法施工方法
CN103205978B (zh) 高渗透层水位下电梯基坑沉井胎模施工方法
CN201896316U (zh) 岩石地基深基坑承压水降排水系统
CN105178288A (zh) 高架桥下地下连续墙施工方法
CN103147442B (zh) 超深基坑压灌桩与预应力锚杆联合支护施工方法
CN102486247B (zh) 浆膜内衬法供排水管道修复工艺方法
CN106907159B (zh) 一种浅埋暗挖地铁车站分离开敞式结构及其施工方法
CN103774616B (zh) 自嵌式挡块砌筑的生态挡墙施工方法
CN102937027A (zh) 一种混凝土浇筑隧道边顶拱和底拱的施工方法
CN101315139B (zh) 一种过河管沉管施工工艺
CN106641440B (zh) 一种横向穿越铁路线地下管道顶进施工方法
CN103088814A (zh) 一种旋挖钻机配合冲击钻机成孔施工方法
CN103244128A (zh) 一种大断面岩溶隧道双侧壁导坑预留核心土施工方法

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20091028

C02 Deemed withdrawal of patent application after publication (patent law 2001)