CN103644370B - 具有自调节功能的埋地管线施工方法 - Google Patents
具有自调节功能的埋地管线施工方法 Download PDFInfo
- Publication number
- CN103644370B CN103644370B CN201310651742.6A CN201310651742A CN103644370B CN 103644370 B CN103644370 B CN 103644370B CN 201310651742 A CN201310651742 A CN 201310651742A CN 103644370 B CN103644370 B CN 103644370B
- Authority
- CN
- China
- Prior art keywords
- tubing
- telescopic joint
- pipeline
- trench
- bent
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/028—Laying or reclaiming pipes on land, e.g. above the ground in the ground
- F16L1/036—Laying or reclaiming pipes on land, e.g. above the ground in the ground the pipes being composed of sections of short length
Abstract
本发明公开了一种具有自调节功能的埋地管线施工方法,包括以下步骤:步骤一、开挖管线沟,并在管线沟内每隔30‑50米开挖伸缩节埋设基坑;步骤二、沟底铺设300‑500mm厚中砂;步骤三、焊接并埋设管材;步骤四、在伸缩节埋设基坑内安装弯管式伸缩节,并将弯管式伸缩节两端分别与预先埋设的管材连接;步骤五、重复步骤一至步骤四,直至完成整条管线的安装;步骤六、回填管线沟。本发明与现有技术相比在相邻长度为30‑50米的管材之间增设弯管式伸缩节,当管材受到不均匀沉降的影响时,可以将伸缩变形传递给弯管式伸缩节,避免管材本身受力变形,避免管材损坏,延长管材使用寿命。
Description
技术领域
本发明涉及管线施工方法技术领域,尤其涉及一种具有自调节功能的埋地管线施工方法。
背景技术
埋地管线是目前输油、输气工程常用的设施,将管线埋入地下,不影响地表活动,但是由于气候变化以及地基不均匀沉降容易导致管线伸缩变形,直接影响管线使用寿命,为解决管线寿命短的问题,现有方案为,对埋地管线的地基土进行加固处理,通过减小地基不均匀沉降防止管线伸缩变形,此方案需进行地基处理,增加工程造价和工期,造成资源浪费。
发明内容
为解决现有管线施工中对管线地基进行加固处理而造成资源浪费的问题,本发明提供一种具有自调节功能的埋地管线施工方法,通过设置弯管式伸缩节来调节管线伸缩变形,延长其使用寿命。
本发明的技术方案如下:本发明公开了一种具有自调节功能的埋地管线施工方法,包括以下步骤:
步骤一、开挖管线沟,并在管线沟内每隔30-50米开挖伸缩节埋设基坑;
步骤二、沟底铺设300-500mm厚中砂;
步骤三、焊接并埋设管材;
步骤四、在伸缩节埋设基坑内安装弯管式伸缩节,并将弯管式伸缩节两端分别与预先埋设的管材连接;
步骤五、重复步骤一至步骤四,直至完成整条管线的安装;
步骤六、回填管线沟。
所述步骤二包括在管线沟内以及伸缩节埋设基坑内铺300-500mm厚的中砂。
所述步骤三包括将管材铺设至管线沟内,并将相邻管材固定连接,连接管材长度为30-50米。
所述步骤四将弯管式伸缩节安装在自伸缩基坑内,并将其两端与预先埋设的相邻两段管材端部连接,然后在自伸缩基坑内填埋中砂或炉渣。
本发明与现有技术相比在相邻长度为30-50米的管材之间增设弯管式伸缩节,当管材受到不均匀沉降的影响时,可以将伸缩变形传递给弯管式伸缩节,避免管材本身受力变形,避免管材损坏,延长管材使用寿命。
具体实施方式
下面的实施例是对本发明的进一步详细描述。
本发明实质公开的是一种具有自调节功能的埋地管线施工方法,其特征在于:包括以下步骤:
步骤一、开挖管线沟,并在管线沟内每隔30-50米开挖伸缩节埋设基坑,本发明中选择的伸缩节为;管线沟的深度根据管线本身设计要求开挖,可以根据管材标准长度的整数倍设置伸缩节埋设基坑的间隔长度,开挖管线沟的同时直接开挖伸缩节埋设基坑,节约工期。
步骤二、沟底铺设300-500mm厚中砂;所述步骤二包括在管线沟内以及伸缩节埋设基坑内铺300-500mm厚的中砂或炉渣,铺设中砂层一方面可以起到缓冲的作用,另外一方面还具有调节不均匀沉降作用,改善管材的防腐性能,延长使用寿命。
步骤三、焊接并埋设管材;所述步骤三包括将管材铺设至管线沟内,并将相邻管材固定连接,连接管材长度为30-50米,管材连接长度可根据管材本身的标准长度进行选择,与开挖的伸缩节埋设基坑间隔长度相适应。
步骤四、在伸缩节埋设基坑内安装弯管式伸缩节,并将弯管式伸缩节两端分别与预先埋设的管材连接;所述步骤四将弯管式伸缩节安装在自伸缩基坑内,并将其两端与预先埋设的相邻两段管材端部连接,然后在自伸缩基坑内填埋中砂或炉渣。
步骤五、重复步骤一至步骤四,直至完成整条管线的安装;
步骤六、回填管线沟,回填可以根据施工进度选择整体回填还是阶段性回填,重点考虑施工工期的要求。
总之,本发明通过设置的伸缩节(膨胀节)主要用于补偿管道因地基不均匀沉降及温度变化而引起的伸缩变形,也用于管道因安装调整等需要的长度补偿,主要分为弯管式膨胀节、波纹管膨胀节和套管伸缩节3种结构形式。
弯管式膨胀节将管子弯成U形或其他形体,并利用形体的弹性变形能力进行补偿的一种膨胀节。它的优点是强度好、寿命长、可在现场制作,缺点是占用空间大、消耗钢材多和摩擦阻力大这种膨胀节广泛用于各种蒸汽管道和长管道上。本发明与现有技术相比在相邻长度为30-50米的管材之间增设弯管式伸缩节,当管材受到不均匀沉降的影响时,可以将伸缩变形传递给弯管式伸缩节,避免管材本身受力变形,避免管材损坏,延长管材使用寿命。
Claims (1)
1.一种具有自调节功能的埋地管线施工方法,其特征在于:包括以下步骤:
步骤一、开挖管线沟,并在管线沟内每隔30-50米开挖伸缩节埋设基坑;
步骤二、沟底铺设300-500mm厚中砂;
其中,包括在管线沟内以及伸缩节埋设基坑内铺300-500mm厚的中砂;
步骤三、焊接并埋设管材;
其中,包括将管材铺设至管线沟内,并将相邻管材固定连接,连接管材长度为30-50米;
步骤四、在伸缩节埋设基坑内安装弯管式伸缩节,并将弯管式伸缩节两端分别与预先埋设的管材连接;
其中,将弯管式伸缩节安装在伸缩节埋设基坑内,并将其两端与预先埋设的相邻两段管材端部连接,然后在伸缩节埋设基坑内填埋中砂或炉渣;
步骤五、重复步骤一至步骤四,直至完成整条管线的安装;
步骤六、回填管线沟。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310651742.6A CN103644370B (zh) | 2013-12-04 | 2013-12-04 | 具有自调节功能的埋地管线施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310651742.6A CN103644370B (zh) | 2013-12-04 | 2013-12-04 | 具有自调节功能的埋地管线施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103644370A CN103644370A (zh) | 2014-03-19 |
CN103644370B true CN103644370B (zh) | 2017-07-18 |
Family
ID=50249629
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310651742.6A Active CN103644370B (zh) | 2013-12-04 | 2013-12-04 | 具有自调节功能的埋地管线施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103644370B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104895173A (zh) * | 2015-06-01 | 2015-09-09 | 中国十七冶集团有限公司 | 砂质土壤埋地波纹管防沉降方法 |
CN106939948B (zh) * | 2017-04-12 | 2022-06-28 | 河南理工大学 | 一种煤矿开采沉陷区埋地油气管道保护装置及铺设方法 |
CN112459799A (zh) * | 2020-11-23 | 2021-03-09 | 张同勇 | 一种地下给水管道的施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2574523A1 (fr) * | 1984-12-06 | 1986-06-13 | Chauffage Distance Cie Gle | Procede de pose de canalisations formees de troncons raccordes et canalisations realisees selon ce procede |
CN1101968A (zh) * | 1994-08-04 | 1995-04-26 | 于永辉 | 过热蒸汽管道直埋方法 |
CN101101074A (zh) * | 2006-08-11 | 2008-01-09 | 宋章根 | 地埋式管道的无支撑、长距离补偿方法及其系统 |
CN101457854A (zh) * | 2007-12-11 | 2009-06-17 | 北京市煤气热力工程设计院有限公司 | 大管径热水管道无补偿直埋敷设方法 |
CN101565964A (zh) * | 2009-05-25 | 2009-10-28 | 青岛恒生源集团建设有限公司 | 室外埋地高密度聚乙烯双壁波纹排水管安装施工方法 |
-
2013
- 2013-12-04 CN CN201310651742.6A patent/CN103644370B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2574523A1 (fr) * | 1984-12-06 | 1986-06-13 | Chauffage Distance Cie Gle | Procede de pose de canalisations formees de troncons raccordes et canalisations realisees selon ce procede |
CN1101968A (zh) * | 1994-08-04 | 1995-04-26 | 于永辉 | 过热蒸汽管道直埋方法 |
CN101101074A (zh) * | 2006-08-11 | 2008-01-09 | 宋章根 | 地埋式管道的无支撑、长距离补偿方法及其系统 |
CN101457854A (zh) * | 2007-12-11 | 2009-06-17 | 北京市煤气热力工程设计院有限公司 | 大管径热水管道无补偿直埋敷设方法 |
CN101565964A (zh) * | 2009-05-25 | 2009-10-28 | 青岛恒生源集团建设有限公司 | 室外埋地高密度聚乙烯双壁波纹排水管安装施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103644370A (zh) | 2014-03-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103292035B (zh) | 一种地下顶管的施工方法 | |
CN104153304B (zh) | 一种波纹钢管涵洞填筑结构及其填筑方法 | |
CN204984425U (zh) | 一种盾尾密封组件及盾构机 | |
CN103644370B (zh) | 具有自调节功能的埋地管线施工方法 | |
CN103291326A (zh) | 一种大变形巷道围岩再造承载层控制技术 | |
CN104895173A (zh) | 砂质土壤埋地波纹管防沉降方法 | |
CN105715867B (zh) | 一种拖顶结合球墨铸铁管道铺设方法 | |
CN207453984U (zh) | 一种软土富水隧道下穿既有构筑物的施工结构 | |
CN208651807U (zh) | 一种适用于山区复杂地形浆体输送管线铺设系统 | |
CN105546213B (zh) | 一种柔性复合管快速施工装置及施工方法 | |
CN103591377B (zh) | 直埋保温管道通过沼泽地段的施工方法 | |
CN101575859A (zh) | 地下连续墙防渗接头及其施工方法 | |
CN108253199A (zh) | 内肋增强聚乙烯螺旋波纹管及其接头连接方法 | |
CN105065774B (zh) | 一种地下管道支接施工方法 | |
CN101749485A (zh) | 非开挖顶进与液氮水平冷冻开挖铺设相结合的管道铺设施工法 | |
CN107100100A (zh) | 卡箍式管接头连接的钢波纹管成型涵洞施工方法 | |
JP2008248649A (ja) | 地中構造物近傍の地盤改良方法 | |
CN103469766B (zh) | 水库坝基刚性体与柔性体的连接方法 | |
CN105064384A (zh) | 特殊地质条件下的真空管井降水系统 | |
CN207621557U (zh) | 异形保温管 | |
CN103322295A (zh) | 长距离输煤管道与通信光缆同沟敷设的方法 | |
JP4997424B2 (ja) | 樋管の止水壁構造 | |
CN103437431B (zh) | 电缆排管混凝土包封伸缩缝结构及其施工方法 | |
JP7394344B2 (ja) | 液状化対策工法及び液状化対策構造 | |
CN111042841A (zh) | 一种隧道防排水施工工艺 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |