CA2663156A1 - Building, in particular a dwelling, with frames and columns and method of erecting it - Google Patents

Building, in particular a dwelling, with frames and columns and method of erecting it Download PDF

Info

Publication number
CA2663156A1
CA2663156A1 CA002663156A CA2663156A CA2663156A1 CA 2663156 A1 CA2663156 A1 CA 2663156A1 CA 002663156 A CA002663156 A CA 002663156A CA 2663156 A CA2663156 A CA 2663156A CA 2663156 A1 CA2663156 A1 CA 2663156A1
Authority
CA
Canada
Prior art keywords
frame
frames
facade
post
uprights
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
CA002663156A
Other languages
French (fr)
Inventor
Jean-Francois De Jaham
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SIMPEX ANTILLES Sarl
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of CA2663156A1 publication Critical patent/CA2663156A1/en
Abandoned legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/26Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/26Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
    • E04B1/2604Connections specially adapted therefor
    • E04B2001/268Connection to foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

Un édifice possédant une structure fixée sur un sol comporte des parois s tructurées grâce à des cadres de façade (2) et de pignon (12) fixés entre de s poteaux (1,13,14). Le toit est formé par une structure comportant des chev rons (3) et des pannes (4). Les pannes (4) et les chevrons (3) reposent resp ectivement sur un poteau (1) et sont maintenus latéralement entre deux monta nts verticaux (8) appartenant chacun à un cadre. Des panneaux préfabriqués f ixés sur les cadres (2,12) et sur les poteaux (1,13,14) achèvent la fermetur e des parois et du toit. L'ensemble de la structure est autostable et autoco ntreventée.A building having a structure fixed on a floor has walls structured by facade frames (2) and pinion (12) fixed between poles (1,13,14). The roof is formed by a structure comprising chevrons (3) and purlins (4). The purlins (4) and the rafters (3) rest respectively on a post (1) and are held laterally between two vertical risers (8) each belonging to a frame. Prefabricated panels on the frames (2,12) and on the posts (1,13,14) complete the wall and roof closures. The entire structure is freestanding and self-winding.

Description

EDIFICE ET PROCEDE DE MONTAGE, NOTAMMENT D'HABITATION
La présente invention concerne un édifice, en particulier à usage d'habitation privée ou de bureau. Elle concerne aussi un procédé de montage. L'invention a trait plus précisément aux édifices qualifiés d'habitations légères permettant une construction simplifiée et rapide.
L'invention concerne préférentiellement les édifices possédant une structure de base principalement en bois mais qui peut aussi être constituée à partir de poutrelles métalliques.
Les problèmes rencontrés par ces édifices sont de plusieurs ordres.
Tout d'abord ces édifices, bien souvent, ne présentent pas une robustesse semblable à celle obtenue lors d'une construction d'une habitation traditionnelle disposant de matériaux non seulement plus lourds mais aussi plus long à mettre en ceuvre (ciment, parpaing, ferrailles...).
Un autre problème se pose lors de la réalisation du fait du nombre de personnes nécessaires au montage de la structure et à l'incidence du coût de la main d'ceuvre exigée par la nature même des assemblages nécessaires à la cohésion de la construction.
Le contreventement de l'ensemble et par conséquent la résistance à
de rigoureuses intempéries est également un souci pour ces habitations légères. A cet effet, bien souvent il est nécessaire au préalable de monter les quatre parois, puis le toit, afin que l'ensemble soit autoportant et correctement contreventé. La charge de la charpente et du toit est reportée sur l'ensemble des parois. La solidité de l'ouvrage dépend essentiellement alors de la qualité de la liaison des parois au sol, des parois entre elles et de la liaison entre les parois et les différents éléments constituants la charpente et le toit.
Ainsi, lors de contraintes météorologiques importantes, par exemple par de très forts vents sous des latitudes tropicales, le toit et sa charpente sont principalement sollicités et notamment les jonctions sur les parois avec, dans les cas extrêmes, un toit soufflé indépendamment des murs. Lors de secousses telluriques ou plus simplement de mouvement de terrains, ce sont alors les murs qui sont principalement sollicités en plus de subir la portance du toit avec alors un risque d'un toit écrasant les murs dès lors que leur contreventement ne serait plus correctement assuré.
BUILDING EDIFICE AND METHOD, IN PARTICULAR HOUSING
The present invention relates to a building, in particular for use private house or office. It also relates to a method of mounting. The invention relates more specifically to qualified buildings of light dwellings allowing a simplified and fast construction.
The invention preferably relates to buildings having a basic structure mainly made of wood but which can also be made from metal beams.
The problems faced by these buildings are of several kinds.
First of all, these buildings often do not have a robustness similar to that obtained during a construction of a traditional home with not only heavier materials but also longer to implement (cement, breeze block, scrap metal ...).
Another problem arises during the realization because of the number of people needed to mount the structure and the cost impact of the labor required by the very nature of assemblies necessary for the cohesion of the construction.
The bracing of the whole and therefore the resistance to harsh weather is also a concern for these homes light. For this purpose, it is often necessary to first mount the four walls, then the roof, so that the whole is self-supporting and properly braced. The load of the frame and the roof is postponed on all the walls. The strength of the work depends essentially then the quality of the connection of the walls to the ground, the walls between them and of the connection between the walls and the various elements constituting the frame and the roof.
Thus, during severe weather constraints, for example by very strong winds in tropical latitudes, the roof and its frame are mainly solicited and in particular the junctions on the walls with, in extreme cases, a roof blown independently of the walls. During earthquakes or simply land movement, these are then the walls that are mainly stressed in addition to undergoing the lift roof with the risk of a roof crushing the walls as soon as their bracing would no longer be properly insured.

2 La présente invention se propose de résoudre l'ensemble de ces problèmes grâce à l'utilisation d'une structure assemblée à partir d'éléments modulaires facilement transportables et grâce à un assemblage permettant la réalisation d'une structure autoportante, contreventée et rendant, de plus, totalement solidaire la structure des parois de celle de la charpente et donc du toit.
Cette structure ainsi assemblée, fixée au sol, reçoit, dans un second temps, des panneaux préfabriqués assurant le bardage des parois en apportant l'isolation acoustique et thermique nécessaire à l'édifice.
De plus, une grande partie de ces éléments pouvant être prémontés en atelier, l'assemblage, in situ, de l'édifice est rapide, pouvant être réalisé
par une équipe réduite, à l'extrême une seule personne et par conséquent d'un coût réduit.
L'invention assure un contreventement solidaire de l'ensemble des éléments composant la structure des parois de celle de la charpente. La rigidité conférée alors à l'ensemble de l'édifice se rapproche de celle obtenue dans le cas d'une habitation traditionnelle.
L'édifice de l'invention utilise principalement pour résoudre ce problème des poteaux, des cadres de façade et de pignon, des pannes, des chevrons et de préférence des sabots de fixation.
Selon l'invention, le contreventement facile et efficace est obtenu en plaçant les chevrons et ou les pannes au-dessus des poteaux, entre les cadres qui sont eux-mêmes fixés aux poteaux.
L'invention a donc pour objet un édifice muni, de préférence au-dessus d'un plancher, de parois comportant un ou plusieurs cadres liés de part et d'autre à des poteaux et d'un toit formé par une structure comportant une ou plusieurs pannes et ou chevrons, caractérisé en ce qu'une panne et ou un chevron reposent respectivement sur un poteau et sont maintenus latéralement entre deux montants verticaux, fixés sur le poteau et appartenant chacun à un cadre.
L'invention a également pour objet un procédé de montage d'un édifice muni, de préférence au dessus d'un plancher, de parois comportant un ou plusieurs cadres liés de part et d'autre à des poteaux et d'un toit formé
par une structure comportant une ou plusieurs pannes et ou chevrons caractérisé en ce que, dans l'ordre :
2 The present invention proposes to solve all of these problems through the use of a structure assembled from elements easily transportable modules and thanks to an assembly allowing the realization of a self-supporting structure, braced and rendering, moreover, totally solidary the structure of the walls of that of the frame and therefore of the roof.
This structure thus assembled, fixed on the ground, receives, in a second prefabricated panels for cladding walls providing the necessary acoustic and thermal insulation for the building.
In addition, a large part of these elements can be pre-assembled in the workshop, the assembly, in situ, of the building is fast, which can be realized by a small team, to the extreme only one person and therefore at a reduced cost.
The invention ensures a solidarity bracing of all the elements composing the structure of the walls of that of the frame. The rigidity then conferred on the whole building is close to that obtained in the case of a traditional dwelling.
The building of the invention mainly uses to solve this the problem of poles, facade and gable frames, breakdowns, rafters and preferably fixing shoes.
According to the invention, the easy and effective bracing is obtained by placing the rafters and or purlins above the posts, between frames that are themselves attached to the posts.
The subject of the invention is therefore a building provided, preferably with above a floor, walls with one or more connected frames of on both sides and poles and a roof formed by a structure comprising one or more failures and or chevrons, characterized in that a breakdown and or a chevron rest respectively on a pole and are maintained laterally between two vertical uprights, fixed to the pole and each belonging to a frame.
The invention also relates to a method of mounting a a building provided, preferably over a floor, with walls one or more frames tied on both sides to poles and a roof form by a structure having one or more failures and or chevrons characterized in that, in order:

3 - on érige successivement des poteaux de pignon et de façade, chacun fixé au sol par un sabot, - on adosse et on fixe, sur les poteaux, des cadres de pignon et des cadres de façade, - on pose une panne faîtière sur deux poteaux centraux des pignons et entre deux montants verticaux de cadres de pignon, - on pose les chevrons contre la panne faîtière, au dessus d'un poteau d'une façade et entre des montants verticaux de cadres de façade.
L'invention sera mieux comprise à la lecture de la description qui suit et à l'examen des figures qui l'accompagnent. Celles-ci ne sont présentées qu'à titre indicatif et nullement limitatif de l'invention.
Figure 1 est représentée une vue générale de l'édifice de l'invention.
Figure 2: est représentée une vue de pignon de la structure de l'invention munie d'une panne faîtière.
Figures 3 et 4 : sont représentées, respectivement de profil et en coupe, des vues de l'assemblage par des tiges et des écrous, des cadres et des poteaux.
La figure 1 montre un édifice selon l'invention. Cet édifice comporte des poteaux 1 entre lesquels se trouvent des cadres de façade 2. Des chevrons 3 suspendus à partir d'une panne 4 faîtière sont posés sur les poteaux 1.
Un cadre 2 de façade, comporte un montant inférieur 5, un montant supérieur 6 et, éventuellement, des traverses intermédiaires 7. Ces traverses intermédiaires 7 sont placées à intervalle régulier entre chacun des deux montants verticaux 8 du cadre de façade 2. Le montage des traverses 7 sur les montants verticaux est réalisé, par exemple, selon la technique tenons et mortaises. Les traverses 7 ont pour but de rigidifier et de contreventer les cadres 2 de façade, mais aussi les cadres situés sur le pignon de l'édifice.
Un chevron 3 est fixé selon différentes techniques : sur la panne 4 faîtière, ou bien directement par emboîtement ou en appui sur une lierne 4.1 ou emboîté dans un support métallique fixé et vissé contre la panne 4 faîtière.
Cette extrémité de chevron fixé sur la panne 4 faîtière est biseautée
3 - we erect successively gable poles and frontage, each attached to the ground by a hoof, - we set up and fix, on the poles, frames of pinion and facade frames, - a ridge tip is placed on two central poles gables and between two vertical uprights of frames of pinion, - the rafters are laid against the ridge tip, above of a pole of a facade and between vertical uprights of facade frames.
The invention will be better understood on reading the description following and examining the figures that accompany it. These do not are presented as an indication and in no way limitative of the invention.
Figure 1 is shown a general view of the building of the invention.
Figure 2: is shown a pinion view of the structure of the invention provided with a ridge tip.
Figures 3 and 4 are shown, respectively in profile and in cutting, views of the assembly by rods and nuts, frames and polls.
Figure 1 shows a building according to the invention. This building comprises columns 1 between which are facade frames.
rafters 3 suspended from a fault 4 ridge are placed on the posts 1.
A frame 2 of frontage, comprises a lower amount 5, an amount 6 and possibly intermediate sleepers 7. These sleepers intermediaries 7 are placed at regular intervals between each of the two vertical uprights 8 of the façade frame 2. The mounting of the sleepers 7 on the uprights is made, for example, according to the technique tenons and mortise. The sleepers 7 are intended to stiffen and contravene 2 frames of facade, but also the frames located on the gable of the building.
A chevron 3 is fixed according to different techniques: on the breakdown 4 ridge, or directly by interlocking or resting on a lierne 4.1 or nested in a metal support fixed and screwed against the breakdown 4 umbrella.
This chevron end attached to the ridge tip is tapered

4 afin de donner aux chevrons 3 une pente qui sera celle du toit.
Ainsi, c'est selon ce même angle de coupe qu'un sommet 9 d'un poteau 1 recevant la seconde extrémité du chevron 3 sera également biseauté afin que son sommet 9 reçoive en appui le dessous du chevron 3 tout en lui conférant la pente de toit souhaité.
Le biseautage du sommet 9 d'un poteau de façade peut également se faire au préalable en atelier, à partir de la pente donnée à la couverture du toit.
Un cadre de façade 2 est fixé, le long de ses deux montants verticaux 8, entre deux poteaux de façade. Ainsi la largeur (Ip) correspondant à la section du poteau 1 selon un axe parallèle au chevron et perpendiculaire à la panne faîtière correspond, selon ce même axe, à la largeur (Ic) correspondante à un montant vertical du cadre 2 de façade. Il est toutefois possible, selon une variante, d'avoir une largeur (Ic) du montant vertical 8 du cadre 2 inférieure à celle (Ip) du poteau, ce, par exemple, afin de réserver une partie servant à absorber la largeur d'un bardage et ainsi de faire apparaître, sous forme de colombage, la façade d'un poteau visible. Mais selon une autre variante, ce montant vertical 8 du cadre 2 peut posséder une largeur supérieure à celle (Ip) du poteau.
Un poteau 1, bien que reposant sur le sol, est maintenu, de préférence, fixement par un sabot 10, par exemple métallique, lui-même chevillé solidement dans le sol ou dans le plancher de l'édifice. Cela permet de pouvoir ériger aisément chaque poteau 1 avant que celui-ci ne soit lui-même fixé à un cadre 2. Un sabot 10 de fixation permet également d'éviter un contact direct du poteau avec le sol et par conséquent d'éviter toute remontée d'humidité.
De la même façon les cadres 2 des façades ainsi que des cadres 12 de pignon ne reposent pas directement au sol mais sur une pièce 11 de bois intercalée également entre deux poteaux 1 de façade ou entre deux poteaux 14 de pignon.
Cette pièce 11 dispose d'une épaisseur (e) sensiblement égale à
celle du sabot de fixation 10 d'un poteau et est, de la même façon, vissée et chevillée au sol. La largeur de cette pièce 11 est sensiblement identique à
celle des poteaux 1 et 14. Cette pièce 11 a également pour vocation d'éviter toute remontée d'humidité sur la structure du cadre 2 de façade notamment par son montant inférieur mais aussi d'absorber, en partie, les éventuelles contraintes du sol.
Chaque chevron 3 prend appui sur un poteau 1, un montant vertical 8 d'un cadre 2 de façade est fixé le long de la partie latérale de ce même
4 to give the rafters 3 a slope that will be that of the roof.
Thus, it is according to this same angle of cut that a vertex 9 of a pole 1 receiving the second end of the chevron 3 will also beveled so that its top 9 receives in support the underside of the chevron 3 while giving it the desired roof slope.
The beveling of the top 9 of a facade post can also be do beforehand in the workshop, from the slope given to the cover of the roof.
A front frame 2 is fixed along its two vertical uprights 8, between two facade posts. Thus the width (Ip) corresponding to the section of the post 1 along an axis parallel to the chevron and perpendicular to the edge failure corresponds, according to this same axis, to the width (Ic) corresponding to a vertical amount of the front frame 2. It is however possible, according to a variant, to have a width (Ic) of the vertical upright 8 of frame 2 lower than that (Ip) of the post, this, for example, in order to reserve a part used to absorb the width of a cladding and thus to make appear, in the form of half-timbering, the facade of a visible pole. But according to another variant, this vertical upright 8 of the frame 2 may have a width greater than that (Ip) of the post.
A post 1, although resting on the ground, is maintained, preferably, fixedly by a shoe 10, for example metallic, itself stuck solidly in the floor or floor of the building. This allows to easily erect each post 1 before it is itself even attached to a frame 2. A fixing shoe 10 also makes it possible to avoid direct contact of the pole with the ground and therefore avoid any rise of humidity.
In the same way the frames 2 of the facades as well as frames 12 of sprocket do not rest directly on the ground but on a piece 11 of wood also interposed between two posts 1 of facade or between two poles 14 of pinion.
This piece 11 has a thickness (e) substantially equal to that of the fixing shoe 10 of a post and is, likewise, screwed and pegged to the ground. The width of this piece 11 is substantially identical to that of the posts 1 and 14. This piece 11 also aims to avoid any rise of humidity on the structure of the frame 2 of facade in particular by its lower amount but also to absorb, in part, the possible soil constraints.
Each chevron 3 is supported on a post 1, a vertical post 8 of a frame 2 of facade is fixed along the lateral part of this same

5 poteau 1. Sur la seconde partie latérale du poteau 1 opposée à la première et également parallèle à l'axe longitudinal du chevron 3, est fixé un montant vertical 8 d'un second cadre 2 de façade. Les surfaces respectivement 6.1 et 8.1 du dessus du montant supérieur 6 et du dessus du montant vertical 8 de chaque cadre est alors isoplan avec le dessus 3.1 du chevron. Le chevron 3 est alors maintenu latéralement entre les deux montants 8.
Sur la figure 2 apparaît le sommet d'un pignon de l'édifice de l'invention. Sur cette figure, deux cadres de pignon 12 possèdent un de leur montant respectivement monté sur l'une des deux faces d'un poteau central 13 sur lequel repose la panne 4 faîtière. Le plan de ces faces est orienté
selon l'axe longitudinal de la panne faîtière. Le second montant vertical (8) de chacun des deux cadres (12) des pignons est fixé respectivement sur un poteau de pignon 14.
Le montant supérieur 15 de chacun des deux cadres de pignon 12 épouse une pente identique à celle donnée à la structure du toit. Ce montant présente un plan défini par sa longueur et sa largeur orienté vers le sol et un plan selon sa longueur et son épaisseur parallèle au pignon. La largeur (Im) de ce montant 15 est identique à la largeur (Ic) d'un montant vertical 8 de cadre 12 de pignon et de préférence à la largeur du plan du poteau de pignon 14 perpendiculaire au plan du pignon.
L'intersection du montant vertical 8 d'un cadre 12 de pignon et de son montant supérieur 15 posé et fixé contre le flanc de la panne 4 faîtière, vient mourir, de préférence, au sommet de cette même panne 4 faîtière. Ainsi la totalité de la hauteur H de la panne faîtière reposant sur le poteau central est en totalité encadré et maintenu latéralement entre deux montants verticaux 8 appartenant chacun à un cadre 12 de pignon.
On peut envisager dans une variante de l'invention que cette extrémité
supérieure d'un cadre 12 de pignon ne vienne pas mourir au sommet de la panne faîtière mais, par exemple, au deux tiers afin de conserver un espace suffisant pour y placer l'épaisseur de panneaux préfabriqués assurant la couverture finale du toit. On peut aussi, grâce à cet espace, prévoir la pose
5 post 1. On the second side portion of post 1 opposite the first and also parallel to the longitudinal axis of the chevron 3, is a fixed amount vertical 8 of a second frame 2 front. The surfaces respectively 6.1 and 8.1 from above the upper upright 6 and the top of the vertical upright 8 of each frame is then isoplan with the top 3.1 of the chevron. The chevron 3 is then held laterally between the two uprights 8.
Figure 2 shows the top of a gable in the building of the invention. In this figure, two pinion frames 12 have one of their amount respectively mounted on one of the two faces of a central pole 13 on which rests the fault 4 ridge. The plane of these faces is oriented along the longitudinal axis of the ridge tip. The second vertical upright (8) of each of the two frames (12) of the gears is respectively fixed on a sprocket post 14.
The upper amount 15 of each of the two gable frames 12 has a slope identical to that given to the structure of the roof. This amount has a plane defined by its length and width oriented towards the ground and a plan according to its length and its thickness parallel to the pinion. The width (Im) of this amount 15 is identical to the width (Ic) of a vertical amount 8 of frame 12 of pinion and preferably to the width of the plane of the post of pinion 14 perpendicular to the plane of the pinion.
The intersection of the vertical upright 8 of a gable frame 12 and its upper amount 15 placed and fixed against the flank of the fault 4 ridge, just die, preferably, at the top of this same blackout 4 ridge. So the the entire height H of the ridge tip resting on the central post is completely framed and held laterally between two uprights vertical 8 each belonging to a frame 12 of pinion.
It can be envisaged in a variant of the invention that this end top of a gable frame 12 does not come to die at the top of the ridge but, for example, two-thirds to conserve space enough to place the thickness of prefabricated panels ensuring the final cover of the roof. We can also, thanks to this space, to envisage the pose

6 d'un chevron 3 supplémentaire venant couvrir la totalité du dessus d'un pignon, à savoir le dessus des montants supérieurs 15 des cadres ainsi que le dessus des poteaux 14 de pignon. Ce chevron supplémentaire accroît alors la rigidité du pignon.
Selon l'invention, la largeur du poteau central 13 située dans le plan du pignon est identique à l'épaisseur (e) de la panne 4 faîtière. Selon une variante similaire à celle donnée pour les cadres 2 de façades, on peut prévoir une largeur (Ic) du montant vertical 8 d'un cadre de pignon inférieure à la largeur d'un poteau de pignon 14, largeur située dans un plan perpendiculaire au plan du pignon et sur laquelle est fixé le cadre de pignon 12.
Ainsi, on réserve un espace correspondant à une épaisseur d'un éventuel panneau d'habillage des cadres du pignon laissant alors apparaître, une fois posé, la largeur d'un poteau de pignon 14 située dans le plan du pignon, tel un colombage sur le pignon. Dans ce cas, la surface du panneau d'habillage vient sensiblement à fleur de la surface apparente du poteau 14 située coté pignon extérieur de l'édifice.
Les plans correspondant respectivement au-dessus d'un montant supérieur 15 et du montant vertical 8 de cadre 12 de pignon, au-dessus 3.1 d'un chevron 3 et au sommet 14.1 d'un poteau 14 de pignon sont isoplans et inclinés selon la pente donnée au toit.
De la sorte, des panneaux préfabriqués sont fixés, par exemple vissés par le dessus ou fixés par des pattes de fixation par le dessous, sur les chevrons 3 et autre montants supérieurs 6 et 15 respectivement de cadre 2 et 12 afin de constituer la toiture. Les cadres de pignons et de façade sont prémontés et comportent deux montants 8 verticaux, un montant inférieur horizontal 5 et un montant supérieur 6,15. Entre les deux montants verticaux 8 sont assemblés des traverses horizontales 7. Ces traverses 7 ont pour but d'améliorer la rigidité du cadre.
Les poteaux 1, 13 et 14 ont pour objet de transmettre intégralement la charge de la toiture au sol, ce, en supportant le poids des pannes 4, des chevrons 3 ou autres éléments porteurs constituants la charpente.
La structure de l'édifice ne nécessite pas de fondations. Les poteaux sont tout d'abord dressés puis fixés à des sabots métalliques 10, eux-mêmes solidement arrimés au sol ou au plancher. Ces poteaux 1,13 et 14 sont, dans
6 an additional chevron 3 covering the entire top of a pinion, namely the top of the upper uprights 15 frames as well as the top of the gable posts 14. This extra chevron increases then the rigidity of the pinion.
According to the invention, the width of the central pole 13 located in the plane the pinion is identical to the thickness (e) of the ridge 4 failure. According to one variant similar to that given for frames 2 of facades, it is possible to provide a width (Ic) of the vertical upright 8 of a lower pinion frame to the width of a pinion post 14, width lying in a plane perpendicular to the plane of the pinion and on which is fixed the pinion frame 12.
Thus, we reserve a space corresponding to a thickness of one possible covering panel of the frames of the pinion then appearing, once laid, the width of a pinion post 14 located in the plane of the pinion, like a timber on the gable. In this case, the panel surface of dressing comes substantially flush with the apparent surface of the post 14 located on the exterior gable side of the building.
Plans corresponding respectively above an amount upper 15 and vertical upright 8 of gable frame 12, above 3.1 of a chevron 3 and at the top 14.1 of a pinion post 14 are isoplanes and inclined according to the slope given to the roof.
In this way, prefabricated panels are fixed, for example screwed from above or fastened by brackets from below, on the rafters 3 and other upper uprights 6 and 15 respectively of frame 2 and 12 to form the roof. The gable frames and facade are pre-assembled and include two uprights 8 vertical, a lower amount horizontal 5 and an amount greater than 6.15. Between the two uprights 8 are assembled horizontal cross 7. These sleepers 7 are intended to improve the rigidity of the frame.
The purpose of columns 1, 13 and 14 is to transmit the entire load of the roof on the ground, by supporting the weight of the breakdowns 4, rafters 3 or other supporting elements constituting the framework.
The structure of the building does not require foundations. Poles are first erected and then fixed to metal shoes 10, themselves securely stowed on the floor or floor. These posts 1,13 and 14 are, in

7 un premier temps, grâce aux sabots 10, simplement érigés tout autour de la périphérie de l'édifice selon, dans un exemple simplifié, deux pignons et deux façades. On peut néanmoins concevoir des édifices comprenant plus de deux pignons ou façades.
Le positionnement d'un poteau par rapport à un autre tient compte à la fois de l'écart que l'on souhaite donner entre deux chevrons 3 pour ce qui concerne les poteaux 1 présents sur une façade ou de l'écart entre deux pannes 4 pour les poteaux 14 présents sur un pignon mais aussi de la taille des cadres 2 et 12 placés respectivement entre deux poteaux 1 et deux poteaux 14.
La taille de ces cadres 2 et 12 dépendent de la rigidité que l'on souhaite leur donner en fonction de la section de leur montants verticaux 8, horizontaux 5 et de leurs éventuelles traverses 7. Elles dépendent également des dimensions que l'on souhaite accorder aux ouvertures prévues à
l'intérieur de ces mêmes cadres 2 et 12 pour y placer portes et fenêtres.
Si la simplicité et la vitesse de montage dépendent essentiellement d'éléments comme les cadres préfabriqués de pignons 12 et de façades 2, la robustesse de l'édifice ainsi que son contreventement sont assurés grâce à
l'idée de faire reposer, à la fois la panne 4 faîtière et ou les pannes 4 intermédiaires et les chevrons 3 sur les poteaux 1,13 et 14 et de maintenir chacun de ces éléments latéralement entre deux montants verticaux 8 appartenant chacun à un cadre 2,12 fixé de part et d'autre d'un poteau 1,13 et 14.
Les deux cadres de pignon 12 entourant la panne 4 faîtière sont ainsi solidaires entre eux et du poteau 13 de pignon central. De la même façon, de chaque côté des deux pans de la toiture, entre le deuxième et le troisième poteau de pignon 14 est également fixé un second cadre de pignon 12 ayant également un montant supérieur 6 dans l'alignement de la pente donnée au premier cadre de pignon. Ce faisant, le second poteau de pignon 14 et tous les suivants possèdent leur surface de dessus 14.1 biseautée et orientée selon la pente de toit.
De la même façon, les tiges 16 boulonnées tout le long d'un poteau 1,13 et 14 rendent solidaires les montants verticaux 8 dressés de chaque côté de ce poteau. Ainsi sont assemblés les deux pignons de l'édifice supportant la panne 4 faîtière.
7 first, thanks to the hooves 10, simply erected all around the periphery of the building according to, in a simplified example, two gables and two facades. However, buildings with more than two gables or facades.
The positioning of one pole with respect to another takes into account the times the gap that we want to give between two chevrons 3 for what regards the posts 1 present on a facade or the difference between two breakdowns 4 for the posts 14 present on a pinion but also the size frames 2 and 12 placed respectively between two posts 1 and two posts 14.
The size of these frames 2 and 12 depend on the rigidity that one wish to give them according to the section of their uprights 8, 5 and their cross members 7. They also depend on dimensions that we wish to grant to the openings provided for in inside these same frames 2 and 12 to place doors and windows.
If simplicity and speed of assembly depend essentially elements such as prefabricated frames of gables 12 and facades 2, the the strength of the building and its bracing are ensured thanks to the idea of resting, at the same time, the ridge and faults 4 intermediates and rafters 3 on posts 1,13 and 14 and maintain each of these elements laterally between two uprights 8 each belonging to a frame 2,12 fixed on either side of a post 1,13 and 14.
The two pinion frames 12 surrounding the ridge tip 4 are thus integral with each other and the post 13 of central gear. In the same way, each side of both sides of the roof, between the second and the third pinion post 14 is also attached a second pinion frame 12 having also an amount greater than 6 in the alignment of the slope given to the first gear frame. In doing so, the second gable 14 pole and all the following have their top surface 14.1 beveled and oriented according to the roof slope.
In the same way, rods 16 bolted all along a pole 1,13 and 14 make the upright uprights 8 of each side of this pole. Thus are assembled the two gables of the building supporting the 4 ridge failure.

8 En procédant de même des pannes 4 intermédiaires peuvent être placées entre la panne 4 faîtière et une façade afin d'assurer une portance pour des chevrons 3 plus longs et d'éviter ainsi un effet de flambage sur une pente de toit.
A ces fins, chaque panne 4 intermédiaire prend place sur un poteau 14 de pignon non biseauté. Le sommet de la panne intermédiaire est alors biseauté selon la pente donnée au toit.
Préférentiellement afin d'accroître la rigidité d'un cadre de pignon ou de façade mais aussi de toute la structure de l'édifice, des traverses hautes, basses et intermédiaires sont placées entre les deux montants verticaux 8 d'un cadre 2 et 12 de telle sorte qu'une fois la structure des façades et des pignons réalisée, une ou plusieurs lignes de traverses se forment sensiblement à une même hauteur tout à la périphérie de l'édifice. Une ligne peut s'interrompre par la présence d'une ouverture de type porte ou fenêtres.
La structure de l'édifice ainsi conçue permet d'obtenir une structure autoportante et autocontreventée assurant une très grande rigidité de l'ensemble.
Pour autant le montage est simple et rapide puisqu'il l'ensemble des parois (pignons et façades) définissant l'édifice sont assemblées avant la pose puis la fixation de la panne 4 faîtière et du tout premier chevron 3.
Les cadres 2 et 12 s'érigent simplement en les posant sur leur base au sol et permet ainsi une manipulation aisée et un placement simplifié lors de leur fixation le long des poteaux de la construction de l'édifice.
Enfin, sur les parois de l'édifice, est apposé un bardage selon les caractéristiques que l'on veut donner à l'habitation. Ce bardage prend place sur les différents cadres et est vissé, à la fois sur le profil des quatre montants et des traverses.
La structure étant autoportante, le bardage composé de panneaux préfabriqués ne supporte pas la charge correspondante à la charpente et à
sa toiture.
Les panneaux préfabriqués en fonction de leurs dimensions, nécessitent parfois un calepinage supplémentaire. Ces panneaux possède une structure en sandwich avec une première couche d'environ 13 mm d'aggloméré suivi d'un isolant tel du polyuréthanne ou du polystyrène ou encore de la laine de roche permettant d'assurer une isolation thermique et WO 2008/03198
8 By doing the same, 4 intermediate breakdowns can be placed between the ridge tip and a facade to provide lift for rafters 3 longer and thus avoid a buckling effect on a roof slope.
For these purposes, each intermediate failure 4 takes place on a pole 14 of not beveled pinion. The top of the intermediate breakdown is then Beveled according to the slope given to the roof.
Preferably to increase the rigidity of a gable frame or facade but also the whole structure of the building, high sleepers, low and intermediate are placed between the two uprights 8 of a frame 2 and 12 so that once the structure of the facades and gears made, one or more lines of sleepers are formed substantially at the same height at the periphery of the building. A line can be interrupted by the presence of a door-type opening or windows.
The structure of the building thus designed makes it possible to obtain a structure self-supporting and self-winding ensuring a very high rigidity of all.
However, the editing is simple and fast since all the walls (gables and facades) defining the building are assembled before the laying and fixing the fault 4 ridge and the very first chevron 3.
Frames 2 and 12 simply erect by placing them on their base on the ground and thus allows easy handling and simplified placement when of their fixation along the poles of the construction of the building.
Finally, on the walls of the building, is affixed a cladding according to characteristics that one wants to give to the dwelling. This cladding takes place on the different frames and is screwed, both on the profile of the four uprights and sleepers.
The structure being self-supporting, the cladding consists of panels prefabricated structures do not support the load corresponding to the framework and its roof.
Prefabricated panels according to their dimensions, sometimes require additional layout. These panels possesses a sandwich structure with a first layer of about 13 mm agglomerate followed by an insulator such as polyurethane or polystyrene or still rock wool to ensure thermal insulation and WO 2008/03198

9 PCT/FR2007/051915 phonique. Enfin, une troisième couche de 13 mm environ également composé d'aggloméré referme ce même panneau. La charpente peut aussi recevoir de façon traditionnelle un calepinage pour des tuiles ou des ardoises.
Selon la dimension de l'édifice et donc de la hauteur des cadres de pignon, les traverses sont placées préférentiellement à des distances identiques les unes des autres .
La fixation des quatre montants formant un cadre 2 et 12 ainsi que la fixation éventuelle des traverses sur les deux montants verticaux 8 peut se faire de façon traditionnelle avec, par exemple, des vis mais aussi, et préférentiellement, sous la forme de tenons et mortaises.
Cette dernière possibilité, en plus d'offrir une grande rigidité au cadre, permet de plus d'absorber plus aisément d'éventuelles contraintes sans le présence de points durs à l'intérieur du bois pouvant fragiliser un élément.
On peut noter que pour des structures relativement modestes, le simple fait de désolidariser les sabots métalliques 10 du sol permet à
l'ensemble de la structure dont les structures respectives du toit et des parois sont totalement solidaires, de pouvoir être déplacée d'un lieu à un autre, sur de gros camions par exemple.
Les figures 3 et 4 représentent un mode d'assemblage utilisé pour relier entre eux les montants verticaux des cadres aux poteaux ainsi qu'aux chevrons 3 et pannes 4.
On utilise pour cela des tiges 16 avec boulons d'une section, à titre indicatif, d'environ de 8 à 12 mm. Les boulons présentent, éventuellement, des têtes rondes ou carrées, vissées de part et d'autre des pièces à
assembler, les tiges 16 associées traversant chacune de ces mêmes pièces.
Les tiges boulonnées 16 passent au travers de chacun des montants verticaux 8 appartenant à un cadre de pignon 12 et au travers de la panne 4.
Les suivantes sont placées tout le long du poteau 14, au travers du poteau et des deux montants verticaux 8 appartenant chacun à cadre de pignon 12 distinct.
De la même façon, au sommet d'un cadre 2 de façade, une première tige 16 traverse de part en part le montant vertical 8 de ce même cadre de façade, le chevron 3 reposant sur le poteau 1 recevant le cadre 2 et enfin le second montant vertical 8 d'un second cadre 2 de façade placé de l'autre côté du poteau 1 et du chevron 3.
Les boulons vissés alors de chaque coté de la tige 16, contre la face de chaque montant vertical 8 orientée vers l'intérieur du cadre 2, enserre l'ensemble en sandwich.
5 La structure de la charpente du toit est ainsi totalement solidaire de la structure des parois de l'édifice tant vis à vis de contraintes verticales, par exemple un très fort vent avec un risque d'un toit qui s'envole, que de contraintes horizontales, par exemple un effet de cisaillement du sol.
Le mode de fixation est le même pour les tiges 16 placés en dessous
9 PCT / FR2007 / 051915 sound. Finally, a third layer of about 13 mm also agglomerate compound closes the same panel. The frame can also traditionally receive a calepinage for tiles or slates.
Depending on the size of the building and therefore the height of the frames pinion, the sleepers are preferably placed at distances identical to each other.
The fixing of the four amounts forming a frame 2 and 12 as well as the possible fixing of the crosspieces on the two vertical uprights 8 can be do it in a traditional way with, for example, screws but also, and preferentially, in the form of tenons and mortises.
This last possibility, in addition to offering a high rigidity to the frame, allows more easily to absorb possible constraints without the hard spots inside the wood can weaken an element.
It can be noted that for relatively modest structures, the simple fact of separating the metal shoes 10 from the ground allows the entire structure including the respective structures of the roof and walls are fully supportive, to be moved from one place to another, on big trucks for example.
Figures 3 and 4 show an assembly method used for connect the vertical uprights of the frames to the posts as well as chevrons 3 and breakdowns 4.
It uses for this purpose rods 16 with bolts of a section, as indicative, from about 8 to 12 mm. The bolts present, possibly, round or square heads, screwed on both sides of the pieces to assemble, the associated rods 16 passing through each of these same parts.
The bolted rods 16 pass through each of the uprights verticals 8 belonging to a pinion frame 12 and through the fault 4.
The following ones are placed all along the pole 14, through the pole and two vertical uprights 8 each belonging to sprocket frame 12 separate.
In the same way, at the top of a frame 2 frontage, a first rod 16 passes right through the vertical upright 8 of the same frame of facade, the chevron 3 resting on the post 1 receiving the frame 2 and finally the second vertical upright 8 of a second frame 2 placed on the other side side of post 1 and chevron 3.
The bolts then screwed on each side of the rod 16, against the face of each vertical upright 8 oriented towards the inside of the frame 2, encloses the sandwich set.
5 The structure of the roof structure is thus totally in solidarity with the structure of the walls of the building with respect to vertical stresses, by example a very strong wind with a risk of a roof that flies, that of horizontal stresses, for example a shear effect of the soil.
The method of attachment is the same for the rods 16 placed below

10 de la première tige exception du fait qu'elles ne traversent pas le chevron en appui sur le poteau.
A titre indicatif, l'espace entre deux boulons le long d'un montant vertical 8 est d'environ 20 à 30 cm.
De préférence, l'endroit où la tête du boulon d'une tige 16 prend appui sur un montant vertical 8, le montant 8 est chanfreiné afin que le boulon ne présente pas de relief à la surface de ce même montant 8.
De la même façon, un boulon placé sur un poteau d'angle c'est à dire à l'intersection d'une façade et d'un pignon, présente également deux chanfreins dans son épaisseur afin de recevoir les boulons des tiges 16 permettant de fixer le montant vertical 8 d'un cadre 2 de façade d'un coté et celui d'un cadre 12 de pignon de l'autre.
Sur la figure 4, apparaît le profil 17 du bardage venant s'appliquer à la fois sur les surfaces des poteaux côté façade et côté pignon ainsi que sur les cadres de façade et de pignon.
Ces bardages sont fixés par exemple grâce à des vis au travers des poteaux 1,13 et 14 et des montants verticaux 8 des cadres. Ce bardage consiste en des panneaux d'aggloméré ou encore de panneaux de type sandwich comme décrit précédemment. Ces panneaux permettant de recevoir le long des parois de l'édifice des revêtements tels que, par exemple, un crépis ou une peinture.
Le plancher de l'édifice consiste en un revêtement fixé au sol, par exemple un sol carrelé ou bien un calepinage revêtu de lattes de bois.
Une simple chape de ciment coulée au sol et aux dimensions de la base de la structure sur laquelle vient directement s'arrimer les sabots 10 métalliques et les supports 11 à la base des cadres 2 et 12 se suffit
10 of the first stem exception because they do not cross the rafter resting on the pole.
As an indication, the space between two bolts along an amount vertical 8 is about 20 to 30 cm.
Preferably, the place where the bolt head of a rod 16 is supported on a vertical upright 8, the amount 8 is chamfered so that the bolt has no relief on the surface of this same amount 8.
In the same way, a bolt placed on a corner post, that is to say at the intersection of a façade and a gable, also presents two chamfers in its thickness to receive the bolts of the rods 16 to fix the vertical upright 8 of a frame 2 of facade on one side and that of a frame 12 pinion of the other.
In Figure 4, appears the profile 17 of the cladding coming to apply to the both on the facade and the gable side of the columns, as well as on the facade and gable frames.
These cladding are fixed for example by means of screws through posts 1,13 and 14 and uprights 8 of the frames. This cladding consists of chipboard panels or panels of type sandwich as described previously. These panels allow receive along the walls of the building coatings such as, for example, for example, plaster or paint.
The floor of the building consists of a floor-mounted cladding example a tiled floor or a calepinage coated with wooden slats.
A simple cement screed cast on the ground and the dimensions of the base of the structure on which the hoofs come directly 10 metal and supports 11 at the base of frames 2 and 12 are sufficient

11 également à elle-même.
Les chambranles de portes ou de fenêtres prennent place directement entre les montants verticaux 8 tout en supprimant les traverses 7.
Selon un mode de réalisation préféré, le matériau employé pour la construction des cadres, des pannes et des chevrons est le bois avec des essences exotiques du type teck, jatoba et takama ou des essences du type sapin des landes traité classe 4.
Dans une variante, ces éléments peuvent être constitués à partir d'éléments métalliques tels des tubes serruriers et assemblés, par exemple, avec des vis et des écrous.
Le procédé de montage de la structure de l'édifice consiste, dans l'ordre, à :
- ériger successivement des poteaux de pignon 14 et de façade 1, chacun fixé au sol par un sabot 10, - adosser et à fixer, sur les poteaux 1, des cadres de pignon 12 et des cadres de façade 2, - poser une panne 4 faîtière sur deux poteaux centraux 13 des pignons et entre deux montants verticaux 8 de cadres 12 de pignon, - poser les chevrons 3 contre la panne 4 faîtière, au dessus d'un poteau de façade 1 et entre des montants verticaux 8 de cadres 2 de façade.
De préférence, la pose des premiers poteaux 1 et ou 14 et respectivement des premiers cadres 2 et ou 12 se font à un angle de l'édifice pour une meilleure stabilité et à partir des cadres les moins hauts vers les plus haut de façon à simplifier la pose et la fixation de ces derniers.
11 also to herself.
Door or window frames take place directly between the uprights 8 while removing the sleepers 7.
According to a preferred embodiment, the material used for the construction of frames, purlins and rafters is wood with exotic species of the teak, jatoba and takama type or species of the type Grade 4 treated heath fir.
In a variant, these elements can be constituted from metal elements such as locksmith tubes and assembled, for example, with screws and nuts.
The assembly process of the structure of the building consists, in order, to:
- successively erect gable posts 14 and facade 1, each fixed to the ground by a shoe 10, - lean against and fix, on the posts 1, frames of pinion 12 and facade frames 2, - to put a fault 4 ridge on two central poles 13 of the gables and between two uprights 8 of frames 12 pinion, - put the rafters 3 against the 4 ridge failure, at above a facade post 1 and between uprights 8 of frames 2 of facade.
Preferably, the laying of the first posts 1 and or 14 and respectively the first frames 2 and 12 are at an angle of the building for better stability and from the lowest frames to the higher so as to simplify the installation and fixing of the latter.

Claims (8)

REVENDICATIONS 1 - Edifice muni, de préférence au-dessus d'un plancher, de parois comportant un ou plusieurs cadres (2, 12) liés de part et d'autre à des poteaux (1,13,14) et d'un toit formé par une structure comportant une ou plusieurs pannes (4) et ou chevrons (3), caractérisé en ce qu'un chevron (3) repose sur un poteau (1,13,14) dont le sommet (9) est biseauté selon une pente donnée au toit, lesdits chevrons (3) étant maintenus latéralement entre deux montants verticaux (8) fixés sur le poteau (1,13,14) et appartenant chacun à un cadre (2,12), ledit cadre (2,12) comportant deux montants verticaux (8), un montant horizontal inférieur (5), un montant supérieur (6) et des traverses (7) horizontales intermédiaires, le montant supérieur (6) d'un cadre (2,12) épousant un angle identique à la pente donnée au toit. 1 - Building provided, preferably over a floor, with walls having one or more frames (2, 12) connected on both sides to poles (1,13,14) and a roof formed by a structure having one or several purlins (4) and or rafters (3), characterized in that a chevron (3) rests on a post (1,13,14) whose vertex (9) is beveled according to a slope given to the roof, said rafters (3) being held laterally between two uprights (8) fixed on the pole (1,13,14) and belonging each to a frame (2,12), said frame (2,12) having two uprights vertical (8), lower horizontal amount (5), greater amount (6) and horizontal crosspieces (7), the upper amount (6) of a frame (2,12) following an angle identical to the slope given to the roof. 2 - Edifice selon la revendication 1 caractérisé en ce qu'une panne (4) repose sur un poteau et est maintenue latéralement entre deux montants verticaux (8), fixés sur le poteau (1,13,14) et appartenant à un cadre (2,12), ledit cadre (2,12) comportant deux montants verticaux (8), un montant horizontal inférieur (5), un montant supérieur (6) et des traverses (7) horizontales intermédiaires, le montant supérieur (6) d'un cadre (2,12) épousant un angle identique à la pente donnée au toit 2 - Building according to claim 1 characterized in that a breakdown (4) rests on a pole and is held laterally between two uprights vertical (8), fixed to the pole (1,13,14) and belonging to a frame (2,12), said frame (2, 12) having two vertical uprights (8), a stud lower horizontal (5), a higher upright (6) and sleepers (7) horizontal bars, the upper amount (6) of a frame (2,12) marrying an angle identical to the slope given to the roof 3 - Edifice selon l'une des revendications 1 à 2 caractérisé en ce que la largeur d'un côté correspondant à la section d'un poteau central (13) de pignon est identique à l'épaisseur (e) d'une panne (4) faîtière. 3 - Building according to one of claims 1 to 2 characterized in that the width of one side corresponding to the section of a central post (13) of pinion is identical to the thickness (e) of a fault (4) ridge. 4 - Edifice selon l'une des revendications 1 à 3 caractérisé en ce que l'épaisseur (ec) d'un chevron (3) est identique à un côté correspondant à la section d'un poteau (1) de façade. 4 - Building according to one of claims 1 to 3 characterized in that the thickness (ec) of a chevron (3) is identical to a side corresponding to the section of a post (1) facade. - Edifice selon l'une des revendications 1 à 4 caractérisé en ce qu'une partie correspondante à la hauteur respectivement d'une panne ou d'un chevron est en tout ou partie insérée entre deux montants verticaux (8) appartenant chacun respectivement à un cadre (12) d'un pignon ou d'un cadre (2) de façade. - Building according to one of claims 1 to 4 characterized in that that a corresponding part at the height respectively of a breakdown or a chevron is wholly or partly inserted between two uprights (8) each respectively belonging to a frame (12) of a pinion or a frame (2) of facade. 6 - Edifice selon l'une des revendications 1 à 5 caractérisé en ce qu'un poteau (1,13,14) est fixé au sol par un sabot de fixation (10). 6 - Building according to one of claims 1 to 5 characterized in that post (1,13,14) is fixed to the ground by a fixing shoe (10). 7 - Edifice selon l'une des revendications 1 à 6 caractérisé en ce que des surfaces représentées par un dessus d'un poteau (1) de pignon, par un dessus (3.1) d'un chevron et un dessus d'un montant vertical (8) et d'un montant supérieur (6,15) d'un cadre (2,12) sont isoplanes. 7 - Building according to one of claims 1 to 6 characterized in that surfaces represented by a top of a pinion post (1), by a above (3.1) a chevron and a top of a vertical upright (8) and a upper amount (6,15) of a frame (2,12) are isoplanes. 8 - Procédé de montage d'un édifice muni, de préférence au-dessus d'un plancher, de parois comportant un ou plusieurs cadres (2,12) liés de part et d'autre à des poteaux (1,13,14), d'un toit formé par une structure comportant une à plusieurs pannes (4) et des chevrons (3) caractérisé en ce que, dans l'ordre :
- on érige successivement des poteaux de pignon (13,14) et de façade (1), chacun fixé au sol par un sabot (10), - on adosse et on fixe, sur les poteaux (1,13,14), des cadres de pignon (12) et des cadres de façade (2), - on pose une panne (4) faîtière sur deux poteaux centraux (13) des pignons et entre deux montants verticaux (8) de cadres (12) de pignon, - on pose les chevrons (3) contre la panne (4) faîtière, au dessus d'un poteau (1) d'une façade et entre des montants verticaux (8) de cadres (2) de façade.
8 - Method for mounting a building provided, preferably above a floor, walls with one or more frames (2, 12) on both sides to posts (1,13,14), a roof formed by a structure having one to several failures (4) and chevrons (3) characterized in that that, in order:
- we erect successively sprocket posts (13,14) and facade (1), each fixed to the ground by a shoe (10), - one leans and fixes, on the posts (1,13,14), frames of sprocket (12) and facade frames (2), - it poses a fault (4) ridge on two central posts (13) of gables and between two vertical uprights (8) of frames (12) pinion, - the rafters (3) are placed against the ridge tip (4), above a post (1) of a facade and between vertical uprights (8) of frames (2) of facade.
CA002663156A 2006-09-13 2007-09-12 Building, in particular a dwelling, with frames and columns and method of erecting it Abandoned CA2663156A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
FR0653715A FR2905710A1 (en) 2006-09-13 2006-09-13 BUILDING EDIFICE AND METHOD, IN PARTICULAR HOUSING
FR0653715 2006-09-13
PCT/FR2007/051915 WO2008031989A2 (en) 2006-09-13 2007-09-12 Building, in particular a dwelling, with frames and columns and method of erecting it

Publications (1)

Publication Number Publication Date
CA2663156A1 true CA2663156A1 (en) 2008-03-20

Family

ID=37909536

Family Applications (1)

Application Number Title Priority Date Filing Date
CA002663156A Abandoned CA2663156A1 (en) 2006-09-13 2007-09-12 Building, in particular a dwelling, with frames and columns and method of erecting it

Country Status (5)

Country Link
US (1) US20090277103A1 (en)
EP (1) EP2061936B1 (en)
CA (1) CA2663156A1 (en)
FR (1) FR2905710A1 (en)
WO (1) WO2008031989A2 (en)

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10640425B2 (en) 1996-01-19 2020-05-05 Romeo Ilarian Ciuperca Method for predetermined temperature profile controlled concrete curing container and apparatus for same
US8555583B2 (en) 2010-04-02 2013-10-15 Romeo Ilarian Ciuperca Reinforced insulated concrete form
CN102759963A (en) * 2011-04-28 2012-10-31 鸿富锦精密工业(深圳)有限公司 Server case
US8555584B2 (en) 2011-09-28 2013-10-15 Romeo Ilarian Ciuperca Precast concrete structures, precast tilt-up concrete structures and methods of making same
US8756890B2 (en) 2011-09-28 2014-06-24 Romeo Ilarian Ciuperca Insulated concrete form and method of using same
US8545749B2 (en) 2011-11-11 2013-10-01 Romeo Ilarian Ciuperca Concrete mix composition, mortar mix composition and method of making and curing concrete or mortar and concrete or mortar objects and structures
US8532815B1 (en) 2012-09-25 2013-09-10 Romeo Ilarian Ciuperca Method for electronic temperature controlled curing of concrete and accelerating concrete maturity or equivalent age of concrete structures and objects
US8877329B2 (en) 2012-09-25 2014-11-04 Romeo Ilarian Ciuperca High performance, highly energy efficient precast composite insulated concrete panels
US8636941B1 (en) 2012-09-25 2014-01-28 Romeo Ilarian Ciuperca Methods of making concrete runways, roads, highways and slabs on grade
US9458637B2 (en) * 2012-09-25 2016-10-04 Romeo Ilarian Ciuperca Composite insulated plywood, insulated plywood concrete form and method of curing concrete using same
US8844227B1 (en) 2013-03-15 2014-09-30 Romeo Ilarian Ciuperca High performance, reinforced insulated precast concrete and tilt-up concrete structures and methods of making same
CA2911409C (en) 2013-05-13 2021-03-02 Romeo Ilarian Ciuperca Insulated concrete battery mold, insulated passive concrete curing system, accelerated concrete curing apparatus and method of using same
US10065339B2 (en) 2013-05-13 2018-09-04 Romeo Ilarian Ciuperca Removable composite insulated concrete form, insulated precast concrete table and method of accelerating concrete curing using same
US9776920B2 (en) * 2013-09-09 2017-10-03 Romeo Ilarian Ciuperca Insulated concrete slip form and method of accelerating concrete curing using same
US9862118B2 (en) 2013-09-09 2018-01-09 Romeo Ilarian Ciuperca Insulated flying table concrete form, electrically heated flying table concrete form and method of accelerating concrete curing using same
US8966845B1 (en) 2014-03-28 2015-03-03 Romeo Ilarian Ciuperca Insulated reinforced foam sheathing, reinforced vapor permeable air barrier foam panel and method of making and using same
US9574341B2 (en) 2014-09-09 2017-02-21 Romeo Ilarian Ciuperca Insulated reinforced foam sheathing, reinforced elastomeric vapor permeable air barrier foam panel and method of making and using same
CA2956649A1 (en) 2016-01-31 2017-07-31 Romeo Ilarian Ciuperca Self-annealing concrete forms and method of making and using same
US20200299960A1 (en) * 2019-03-20 2020-09-24 Kps Global Llc Structurally reinforced insulated panel
USD925775S1 (en) * 2020-09-13 2021-07-20 Thomsa G. Frein Framing assembly

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2010874A (en) * 1933-04-11 1935-08-13 Charles B Matheny Knockdown building
FR992318A (en) * 1944-06-16 1951-10-17 Method for manufacturing and assembling demountable constructions with a wooden structure, buildings obtained by said method
US3206903A (en) * 1960-10-13 1965-09-21 William G Johnson House framing
US3999338A (en) * 1975-09-18 1976-12-28 Hill-Behan Lumber Company Roof framework employing slotted gable construction
US4586300A (en) * 1983-10-28 1986-05-06 Mullin Edward L Building construction
US5007216A (en) * 1989-07-18 1991-04-16 Pearson David H Ventilation baffle and insulation stop
US5526614A (en) * 1994-10-12 1996-06-18 Huang; Chun-Chi Connector structure of assembled house truss
US5660005A (en) * 1994-12-05 1997-08-26 Tacoma; Michael T. High strength, light weight, portable building
US20020026767A1 (en) * 1998-05-04 2002-03-07 Dowland Thomas Eugene Post-frame building
US6272796B1 (en) * 1999-12-30 2001-08-14 Harold E. Metzler Mortise and tenon joint for post and beam I-beams composed of fiber reinforced pultruded polymer composite
CA2331098A1 (en) * 2001-01-04 2002-07-04 David Timony Eze framer

Also Published As

Publication number Publication date
FR2905710A1 (en) 2008-03-14
EP2061936B1 (en) 2013-07-17
WO2008031989A3 (en) 2008-05-08
WO2008031989A2 (en) 2008-03-20
US20090277103A1 (en) 2009-11-12
EP2061936A2 (en) 2009-05-27

Similar Documents

Publication Publication Date Title
EP2061936B1 (en) Building, in particular a dwelling, and method of erecting it
WO2010086533A1 (en) Module for a modular construction system, and modular construction consisting of said modules
WO2014053905A2 (en) Structured beam and modular construction element made using said beam
WO1998054418A1 (en) Building framework
BE1019464A3 (en) PREFABRICATED ELEMENT HIGHLY ISOLATED.
FR2950910A1 (en) Panel for construction in e.g. factory, has end faces comprising groove of housing of assembling element, where groove is parallel to plane of framework, and walls provided with shoulder that constitutes positioning unit of adjacent panel
FR2939817A1 (en) Prefabricated elementary block for constructing e.g. outer insulating wall of building, has connection elements connecting reinforcement structures to fix inner bearing wall and outer protective shell to maintain constant transversal gap
FR3107067A1 (en) Ecological modular element for the construction of a building
CH674233A5 (en) Prefabricated wooden wall panel construction - has rectangular grid-form frame, supporting covering slats and insulating panels, with attachment points for internal cladding
FR2564882A1 (en) Method for converting initially unconvertible lofts and structure resulting therefrom
FR2610022A1 (en) CONSTRUCTIVE SYSTEM, BY MODULAR WOOD FRAMES, FORMING STRUCTURES, AND METHOD OF MOUNTING
FR2497858A1 (en) SUPPORTING ELEMENT FOR THE CONSTRUCTION OF CEILINGS OR ROOFS
FR3041978B1 (en) CONSTRUCTION PANEL FOR BUILDINGS
EP2593613B1 (en) Construction system of a building
EP1784544A1 (en) Load-bearing structure for buildings and method for construction of a load-bearing structure
FR3136490A1 (en) Double concrete frame structure
WO2018178522A1 (en) Building panel for buildings
FR3082536A1 (en) MODULAR CONSTRUCTION SYSTEM INCLUDING A PLURALITY OF WALL ELEMENTS
WO1982004453A1 (en) Industrialized metallic multi-storey building system with elements finished at the work-shop
FR2626595A1 (en) System of prefabricated lightweight units which assemble together and form a framework for all types of constructions, the timber structure of which remains visible on the elevations
FR3096995A1 (en) Self-supporting prefabricated wood frame panel, process, extension and construction using this prefabricated panel
EP2784236B1 (en) Wall structural element
FR2529599A1 (en) Method for constructing buildings having several stories, especially dwelling houses joined together in so-called "terraces" and houses thus obtained.
FR2939814A1 (en) Prefabricated device for forming twisted wooden walls of multistory building, has vacuum space formed with insulating material whose width is adapted to regular interval separating two mortar joints formed with thickness of ten cm
FR2557900A1 (en) Fixed constructions with a timber frame incorporating cylindrical members made of round wood

Legal Events

Date Code Title Description
EEER Examination request
FZDE Dead