BE511396A - - Google Patents

Info

Publication number
BE511396A
BE511396A BE511396DA BE511396A BE 511396 A BE511396 A BE 511396A BE 511396D A BE511396D A BE 511396DA BE 511396 A BE511396 A BE 511396A
Authority
BE
Belgium
Prior art keywords
frame
walls
removable
construction
wall
Prior art date
Application number
Other languages
French (fr)
Publication of BE511396A publication Critical patent/BE511396A/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements
    • E04G21/185Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

       

   <Desc/Clms Page number 1> 
 
 EMI1.1 
 



  PROCEDE DE CONSTRUCTION RAPIDE D?HABITATIONS EN MACONNERIE ET BATIMENTS ANALOGUES. 
 EMI1.2 
 



  On sait que les dépenses en mai;-d?oeuvre et les frais qui dcou- lent directement de cette maîn-dpoeuvre constituent un pourcentage important du prix de revient des bâtiments notamment des maisons d'habitation en ma- gonnerie, Il y a donc lieu-de s?efforcer de réduire au minimum ces dépenses en maîn-d9oeuvre et dans ce but  on a préconisé notamment 1?utilisation d9- 1'p-'Ments standardisés faciles à poser et à assembler. 



  Cependant les proopdees proposes usquici ne réduisent pas sensiblement 19 importance de la main-dyoelvre nécessaire aux travaux de finition exigés par   1?hygiène. et   le confort de la maison moderne. 



   La présente invention pallie ces inconvénients elle a pour ob- jet un procédé de construction caractérise par le fait qu'après avoir réali- sé la fouille et les semelles de fondation de la construction projetée  on érige une charpente provisoire, rigide, démontable,,, constituée par des élé- ments métalliques  charpente présentant des faces parallèles aux murs futurs de la construction mais décalée par rapport à ceux-ci; on fixe sur cette charpente de façon amovible et dans la position définitive qu'ils doivent occuper lorsque la construction sera achevée tous les éléments qui seront ultérieurement tenus par les murs à construire;

   on construit ces murs en se 
 EMI1.3 
 repérant sur les faces de la. charpente provisoire précitée les murs enro- bant au fur et à mesure qu'ils montent les éléments et parties'.d9éléments qu' ils   rencontrent.et   doivent contenir; enfin on démonte et enlève cette char- pente provisoire lorsque les murs sont achevés et   qu9ils   portent les diffé- rents éléments qui auraient été fixés provisoirement à la charpente amovible. 



   Le   procède   conforme à 1?invention peut en outre présenter les caractéristiques suivantes prises isolément ou en combinaison : 
1 ) On dispose sur la charpente provisoire à   1-'aide   de tous moyens convenables des plaques rigides amovibles de telle façon que l'une de leurs faces coïncide avec une face de 1?un des parements des murs à édi- 

 <Desc/Clms Page number 2> 

 fier, on maintient ces plaques pour quelles ne puissent   s9écarter   hors de 
 EMI2.1 
 lyaplomb du mur; on pose les matériaux constituant le mur en les faisant bu- ter contre ces plaques; enfin on déplace ces plaques après quelles ont permis de construire une partie de mur afin de les utiliser de la même fagon pour construire une nouvelle partie de mur.

   Autrement dite il nest plus ne'*cessai- re de repérer la position des matériaux en cours de pose car on les met auto- matiquement en place en les faisant buter contre des plaques de guidage. 



   2 ) On érige une charpente rigide démontable sur une hauteur qui 
 EMI2.2 
 correspond à un nombre limita d9étages de la construction prévue et on comnen- ce par construire ce nombre limité d9étages conformément au procède de l9in¯ vention; on fait supporter par les murs construits une partie supérieure de la charpente démontables on démonte et enlève la partie de la charpente dé- 
 EMI2.3 
 montable située au-dessous de cette partie supérieures on utilise la partie de cha penbâ enlevée pour prolonger la partie de charpente supportée par les murs et poursuivre la construction des étages supérieurs;

   on   répètes   si besoin est, 
 EMI2.4 
 les opérations de démontage et de remontage précitées jusqu9à l'achèvement de la construction des   murs,,,   en complètant la charpente démontable par des éléments rigides nécessaires pour supporter provisoirement la toitureo 
3 ) On suspend des échafaudages rigides à la partie supérieure de la charpente démontable et on maintient par un dispositif de guidage fi- xé au sol ou à une hauteur convenable sur la charpente démontable la partie inférieure de ces 'échafaudages, de façon que ce dispositif de guidage ne supporte aucune charge verticale;enfin on établit sur ces échafaudages des planchers de travail destinés à supporter les matériaux et les ouvriers qui 
 EMI2.5 
 utilisent ces mat(riaux;

   il résulte de cette organisation la possibilité de se contenter   d9échafaudages   très légers parce qu'ils   nont   pratiquement pas besoin   d'être   contreventés et que leurs barres verticales, qui suppor- tent les efforts principaux,. ne travaillent qu'à la traction. 



   On va décrire   maintenant,,   à titre d'illustration des possibi- lités de mise en oeuvre de   l'invention.!!   sans aucun caractère limitatif de la portée de celle-ci quelques modes de réalisation pris comme exemples . et représentés sur le dessin schématique annexé sur lequel 
La fig. 1 représente en perspective une petite maison   dhabi-   
 EMI2.6 
 tation en cours de construction par le procédé conforme à 19invention. 



   La fig. 2 est une vue partielle en perspective de la charpente provisoire à proximité d'un poteau muni d'un dispositif pour supporter des plaques de guidage limitant un parement extérieur de mur de   façade   
 EMI2.7 
 La figo 3 est une coupe partielle par un plan vertical d9un dispositif analogue à celui de la fig. 1 mais qui supporte des plaques de guidage pour les parements extérieur et intérieur d'un mur de fagade. 



   Sur le dessina les mêmes signes de référence désignent les mê- 
 EMI2.8 
 mes éléments eu-dot éléments jouant le même rôle. 



   Pour construire la maison d'habitation représentée sur la fig. 



  1,après avoir exécuté les fouilles et un socle de fondation F de la maniè- re habituelles on érige sur ce socle F une charpente 1 métallique comportant des poteaux 2 réunis par des barres horizontales 3 et   4   à chaque étage et à la partie supérieure par des barres 5 obliques ayant la pente de la toiture future et réunies elles-mêmes par une barre 6 horizontale parallèle à la ligne de faîtage. 



   Les poteaux 2 reposent sur des angles A prévus à cet effet à 1' intérieur des murs de fondation F, par l'intermédiaire   d'un   dispositif 7 fi- guré schématiquement et qui peut être constitué par un vérin de tout type con- venant aux charges à supporter, ou par un système de calage permettant de ré- 
 EMI2.9 
 gler le niveau de la base des poteaux 2 et d9baisser ce niveau lorsque la construction des murs sera terminée. 



   La charpente 1 doit être rigide et indéformable et 19assemblage de 

 <Desc/Clms Page number 3> 

 ses éléments principaux   2 - 3 - 4 -    5 - 6   doit comporter aux angles des moy- ens pour assurer l'indéformabilité de ces angles et permettant néanmoins le démontage facile de cette charpente 1. 



   Les barres horizontales supérieures 3   et 4   comportent de préféren- ce des prolongements 8 et 9. éventuellement démontables,, permettant la fixation de poulies 10 destinées à supporter des échafaudages volants devant être utili- ses comme planchers de travail pour l'érection des murs M. 



   Lorsque la charpente 1 est montée, on peut poser les éléments de la toiture; la panne faîtière Pf reposant au-dessus de la barre 6 et les pan- nes courantes P sur les barres obliques 5.les chevrons C étant ensuite po- sés sur les pannes Pf et P; les sablières S qui supporteront définitivement les chevrons C sont provisoirement suspendues à ces derniers par tous moyens   convenableso   Les éléments de la couverture peuvent ensuite être posés sur la charpente de toiture selon la technique habituelle, la couverture posée per- mettant de travailler à   l'abri   des intempéries. 



   On fixe ensuite à la charpente 1, en commençant par l'étage in- férieur et à l'aide de moyens amovibles les cadres de baies; c'est ainsi que le cadre E de la porte   d'entrée   est suspendu par des ferrures 11 à une poutre 3 du premier étage; le cadre G de la fenêtre du rez-de-chaussée est accroché par des ferrures 12 à une poutre 3 et le cadre H   d'une   fenêtre du premier éta- ge est suspendu à une poutre 3 supérieure par des ferrures 13. 



   On fixe également   à   la charpente 1 par des moyens amovibles des bandes d'un treillage T métallique,,, par exemple des bandes du type connu sous le nom de   "METAL   DEPLOYE"; ce treillage T est tenu par des attaches provisoi- res telles que les ferrures   14   et 15 fixées respectivement à une barre 4 et à un poteau 2 par des moyens amovibles. 



   Le treillage T permet avant   Inexécution   de toute maçonnerie de poser toutes les   canalisations Q   que l'on fixe définitivement au treillage T après les avoir pliées à la forme convenable sans être gêné comme c'est le cas lorsque leur pose est effectuée sur des murs mêmes. 



   On fixe également sur la charpente et les éléments de plancher,, les escaliers, cage d'ascenseur.menuiseries enrobées dans la maçonnerie avant de commencer cette dernière. 



   Lorsque tous les éléments d'un étage que la maçonnerie doit porter ont été fixés' à titre provisoire sur la charpente l, on commence la maçonnerie en se repérant sur cette charpente parfaitement dressée pour ali- gner les murs; il suffit d'utiliser des règles ou gabarits prenant appui contre les poteaux 2 verticaux.Avant que les murs M parviennent au plan- cher du premier étage., on pose sur les barres 3 les solives B auxquelles on peut accrocher une poutre sablière ou un fer plat d'ancrage désigne par N que l'on viendra à caler lorsque le mur M sera à hauteur suffisante. Un autre plat d'ancrage pourra être associé aux angles du bâtiment avec le plat N pour cein- turer chaque étage. 



   La construction se poursuit ainsi d'étage en étage jusqu'à ce que les sablières S. les pannes P et la panne faîtière Pf soient calées pour reposer sur les murs élevés. 



  Bien entendu, dès qu'un cadre de baie est supporté par la maçonnerie on élè- ve les ferrures supports telles que 11=12 et 13. De même on fixe au mur par tous moyens de scellement convenables les treillis T et l'on enlève les fer- rures amovibles telles que 14 et 15. Comme il a été indiqué précédemment on utilise des échafaudages mobiles suspendus à la charpente 1 pour faciliter la constructiono 
Lorsque la maçonnerie est achevées on enlève la charpente 1 amo- vible en abaissant légèrement cette charpente à 1?aide d'un dispositif 7 pré- vu à cet effets pour faciliter le démontage de cette charpente qui est alors dégagée de toute   chargeo   

 <Desc/Clms Page number 4> 

 
Pour plus de clarté  on a représenté une maison comportant un seul étage au-dessus du rez-de-chaussée,

   mais il est bien évident qu'on peut construire un bâtiment d'un nombre quelconque d9étages; pour un bâtiment comportant un grand nombre d'étages superposés  la charpente rigide démon- table peut être avantageusement prévue pour construire d'abord les murs de deux (ou plusieurs) étages seulement; dans ce cas, lorsque les murs de ces deux étages sont construits,: on peut les utiliser pour supporter la partie supérieure de la charpente; on démonte ensuite la partie de la charpente si- tuée au-dessous de cet étage supérieur et on la remonte par tous moyens con- venables prévus de façon à surélever et à prolonger la partie supérieure de la charpente qui a été fixée aux murs déjà construits.

   La construction des murs se poursuit ainsi   d9étage   en étage et au dernier étage on complète la charpente rigide amovible par la pose des éléments 5 et 6 destinés   à   por- ter provisoirement la toiture. 



   Sur la figo 2, on désigne par 2 un poteau   d9angle   de la char- pente amovible et par 4 une poutre horizontale réunissant deux poteaux 2; 14 est une   querre   permettant la fixation provisoire des ferrures R' d'an- crage qui seront prises ultérieurement dans le mur pour tenir les tuyau- teries Q. F désigne le mur de fondation. 



   Pour construire un mur de   façade,   on monte respectivement sur la face extérieure de deux poteaux 2, parallèles à ce mur, une potence 20, constituée par un profilé plié en U; on fixe un bras de cette potence 20 sur un ,poteau 2 correspondant, de façon amovibles par exemple au moyen de boulons 21 avec Écrous et rondelles ou cales 26 des trous étant prévus à cet effet pour ces boulons 21 sur toute la hauteur du poteau 2. ainsi que sur un bras latéral correspondant de la potence 20. Dans cette position de fixation les deux bras latéraux de chaque potence 20 sont verticaux et la traverse qui les réduit est sensiblement horizontale.

   On utilise deux potences 20 fixées de fagon amovible à une même hauteur sur un poteau 2 correspondant pour por- ter des profilés horizontaux.. par exemple à section en double T, tels que 22; cette fixation est obtenue au moyen de tiges 23 filetées avec Écrou et contre-écrou et rondelle 24   d'appui,-,   du côte de la rondelle 24, la tige 23 se termine par une partie solidaire formant un crochet 25 double dont les branches se font   vis-à-vis   en laissant entre elles un évidement vertical, évidement dans lequel on peut introduire comme dans une coulisse deux des ailes en prolongement   d9une   poutrelle 22.

   Lorsque deux poutrelles 22 sont ainsi fixées du côté intérieur des bras extérieurs de deux potences 20, on peut facilement accrocher à l'aile supérieure de la poutrelle 22 supérieure des plaques 27,en tôle par exemple  dont une extrémité est repliée en forme de crochet. Dans ces conditions,,, pour construire un mur, en briques par ex- emple, il suffit pour poser convenablement les blocs unitaires à assembler de les pousser sur leur assise vers l'extérieur de la construction jusqu'à ce   qu9ils   viennent buter contre les plaques   27   qui prennent appui contre les deux poutrelles 22 horizontaleso 
Pour construire les angles de murs ou de baies,, on utilise un profilé 28 (en U par exemple) auxiliaires coude en équerre;

   une extrémité 29 de cette équerre est écartée parallèlement à la branche   correspondante   afin de permettre la fixation de   l'équerre   28 dans la gouttière horizon- tale formée par le profilé 22; il est alors possible d'accrocher sur l9au- tre branche de 1?équerre 28 une plaque 30 perpendiculaire à une plaque 27 voisine et pouvant buter contre celle-ci, ou même d'accrocher à cette équerre 28 une plaque ayant la forme d'un angle dièdre droit. Afin d'éviter tout dé- placement longitudinal des poutrelles 22. on peut fixer à ces poutrelles des cales 31 qui viennent buter contre les potences 20 qui supportent les pou- trelles 22 à chaoune de leurs extrémités. 



   Pour réaliser une maçonnerie à   1?aide   de blocs noyés dans un béton (ou même éventuellement des murs en béton)on dispose (voir fige 3) à 1?intérieur des potences 20, de la même façon que précédemment, des pou- trelles 22 portées par le bras extérieur de ces potences, et en outre des poutrelles 22 identiques portées de la même façon que le bras intérieur qui 

 <Desc/Clms Page number 5> 

 sert à fixer les potences 20 aux poteaux 20 
Après avoir monté les murs à 1?aide des   plaques'27..   on peut pré- voir un dispositif qui permette le décalage des plaques à l'extérieurs de telle façon qu'on puisse   couler.!,   entre ces dernières et le mur déjà montés un enduit qui doit servir de parement au mur. 



   Conformément à   l'inventions   on utilise de préférence des plan- chers de travail soutenus par des échafaudages rigides suspendus à une par- tie haute de la charpente démontable, et on maintient le pied des barres profilées verticales formant l'ossature résistante principale de ces écha- faudages par un dispositif de guidage fixé soit au sols soit à une hauteur intermédiaire sur la charpente amovible ou aux murs déjà construits.

   On   n'a   pas jugé utile de représenter en détail un mode de réalisation de tels écha- faudages, car cette réalisation est du domaine de l'homme de métier et la demande concerne seulement l'utilisation de tels échafaudages dans la mise en oeuvre du   procède   conforme à   l'inventiono   
Il est bien entendu possible d'apporter des modifications aux dispositifs décrits pour mettre en oeuvre le procède perfectionné objet de   l'inventions   sans modifier les caractéristiques de ce procédé.

   On pourrait notamment faire coulisser les potences verticalement le long des poteaux et les maintenir dans toute position convenable,, grâce à des moyens de guida- ge et de fixation prévus à cet effet; dans ce cas, il serait avantageux de prévoir en outre des moyens pour équilibrer au moins en partie le poids de l'ensemble des plaques de guidage et de leurs supports. 



   REVENDICATIONS. 



   1. Procédé de construction caractérisé par le fait qu'après avoir réalisé la fouille et les fondations de la construction projetée, on érige une charpente provisoire, rigide, démontable, constituée par des élé- ments métalliques, charpente présentant des faces parallèles aux murs fu- ' turs de la construction mais décalée par rapport à ceux-ci; on fixe sur cette charpente, de façon amovible et dans la position définitive   qu9ils   doivent occuper lorsque la construction sera achevée., tous les éléments qui seront ultérieurement pris dans et soutenus par les murs à construire; on construit ensuite ces murs en se repérant sur les faces de la charpente provisoire pré- citée, les murs enrobant au fur et à mesure qu'ils montent les éléments et parties d'élements qu'ils rencontrent et doivent soutenir;

   enfin, on démon- te et enlève cette charpente provisoire lorsque les murs sont achevés et qu' ils portent les différents éléments qui avaient été fixés provisoirement à la charpente amovible.



   <Desc / Clms Page number 1>
 
 EMI1.1
 



  FAST CONSTRUCTION PROCESS OF MASONRY HOUSING AND SIMILAR BUILDINGS.
 EMI1.2
 



  We know that the expenses in May; -work and the costs which result directly from this project constitute a significant percentage of the cost price of buildings, in particular of residential houses in brickwork. Instead of trying to minimize these labor costs and for this purpose it has been advocated in particular the use of standardized parts easy to install and assemble.



  However, the procedures proposed here do not significantly reduce the amount of labor required for hygienic finishing work. and the comforts of a modern home.



   The present invention overcomes these drawbacks; its object is a construction process characterized by the fact that after having carried out the excavation and the foundation flanges of the proposed construction, a temporary, rigid, removable framework is erected ,,, made up of metal frame elements with faces parallel to the future walls of the building but offset with respect to them; all the elements which will subsequently be held by the walls to be built are fixed on this frame in a removable manner and in the final position which they must occupy when the construction is completed;

   we build these walls by
 EMI1.3
 spotting on the faces of the. aforementioned provisional framework the walls covering as they go up the elements and parts'.d9élements which they meet.and must contain; finally, this provisional frame is dismantled and removed when the walls are completed and they bear the various elements which would have been temporarily fixed to the removable frame.



   The process according to the invention can also have the following characteristics taken individually or in combination:
1) Removable rigid plates are placed on the temporary frame, using any suitable means, so that one of their faces coincides with one face of one of the facings of the walls to be built.

 <Desc / Clms Page number 2>

 proud, we keep these plates so that they cannot move out of
 EMI2.1
 plumb of the wall; the materials constituting the wall are laid by making them butt against these plates; Finally, these plates are moved after which they have made it possible to build a part of the wall in order to use them in the same way to build a new part of the wall.

   In other words, it is no longer necessary to keep track of the position of the materials being laid because they are automatically placed in place by making them abut against the guide plates.



   2) A rigid removable frame is erected to a height that
 EMI2.2
 corresponds to a limited number of floors of the planned construction and we start by constructing this limited number of floors in accordance with the procedure of the invention; an upper part of the demountable frame is supported by the constructed walls, the part of the demountable frame is dismantled and removed.
 EMI2.3
 mountable located below this upper part we use the part of cha penbâ removed to extend the frame part supported by the walls and continue the construction of the upper floors;

   we repeat if necessary,
 EMI2.4
 the aforementioned dismantling and reassembly operations until the completion of the construction of the walls ,,, by completing the dismountable frame with rigid elements necessary to temporarily support the roof
3) Rigid scaffolding is suspended from the upper part of the removable frame and the lower part of the scaffolding is maintained by a guide device fixed to the ground or at a suitable height on the removable frame. guide does not support any vertical load; finally, working floors are established on these scaffoldings intended to support the materials and workers who
 EMI2.5
 use these materials;

   the result of this organization is the possibility of being satisfied with very light scaffoldings because they practically do not need to be braced and their vertical bars, which support the main forces. only work in traction.



   The possibilities for carrying out the invention will now be described by way of illustration. without any limiting nature of the scope thereof, a few embodiments taken as examples. and shown in the attached schematic drawing in which
Fig. 1 represents in perspective a small habitation house
 EMI2.6
 tation under construction by the method according to 19invention.



   Fig. 2 is a partial perspective view of the provisional framework near a post provided with a device for supporting guide plates limiting an exterior facing of a facade wall
 EMI2.7
 Figo 3 is a partial section through a vertical plane of a device similar to that of fig. 1 but which supports guide plates for the exterior and interior facings of a fagade wall.



   On the drawing the same reference signs designate the same
 EMI2.8
 my elements eu-dot elements playing the same role.



   To build the dwelling house shown in fig.



  1, after having carried out the excavations and a foundation plinth F in the usual way, a metal frame 1 is erected on this plinth F comprising posts 2 joined by horizontal bars 3 and 4 on each floor and in the upper part by oblique bars 5 having the slope of the future roof and joined together by a horizontal bar 6 parallel to the ridge line.



   The posts 2 rest on angles A provided for this purpose inside the foundation walls F, by means of a device 7 shown schematically and which can be constituted by a jack of any type suitable for the requirements. loads to be supported, or by a wedging system allowing
 EMI2.9
 lower the level of the base of posts 2 and lower this level when the construction of the walls is finished.



   The frame 1 must be rigid and undeformable and the assembly of

 <Desc / Clms Page number 3>

 its main elements 2 - 3 - 4 - 5 - 6 must include means at the angles to ensure the undeformability of these angles and nevertheless allow easy dismantling of this frame 1.



   The upper horizontal bars 3 and 4 preferably comprise extensions 8 and 9 which may be dismantled, allowing the attachment of pulleys 10 intended to support flying scaffolding to be used as working floors for the erection of walls M .



   When the frame 1 is assembled, the roof elements can be installed; the ridge Pf resting above the bar 6 and the current purlins P on the slashes 5. the rafters C then being placed on the purlins Pf and P; the runners S which will definitively support the rafters C are temporarily suspended from the latter by any suitable means o The elements of the roofing can then be placed on the roof frame according to the usual technique, the roofing laid making it possible to work in the shelter inclement weather.



   The bay frames are then fixed to the frame 1, starting with the lower floor and using removable means; thus, the frame E of the entrance door is suspended by fittings 11 from a beam 3 of the first floor; the frame G of the window on the ground floor is hung by fittings 12 on a beam 3 and the frame H of a window on the first floor is suspended from an upper beam 3 by fittings 13.



   Also fixed to the frame 1 by removable means are bands of a metallic T trellis ,,, for example bands of the type known under the name of "METAL DEPLOYE"; this trellis T is held by temporary fasteners such as fittings 14 and 15 fixed respectively to a bar 4 and to a post 2 by removable means.



   The T trellis allows before non-execution of any masonry to lay all the Q pipes which are fixed definitively to the T trellis after having bent them to the appropriate shape without being hampered as is the case when their installation is carried out on the same walls. .



   We also fix on the frame and the floor elements, stairs, elevator shaft. Joinery coated in the masonry before starting the latter.



   When all the elements of a storey which the masonry is to bear have been fixed provisionally on the framework 1, the masonry begins by locating ourselves on this perfectly erected framework to align the walls; all you have to do is use rulers or templates resting against the vertical posts 2.Before the walls M reach the floor of the first floor., the joists B are placed on the bars 3, to which a sand beam or a beam can be hung. anchoring flat iron designates by N which will be wedged when the wall M is at sufficient height. Another anchor plate can be associated with the corners of the building with the N plate to surround each storey.



   Construction thus continues from floor to floor until the runners S. the purlins P and the ridge purlin Pf are wedged to rest on the high walls.



  Of course, as soon as a bay frame is supported by the masonry, the supporting fittings such as 11 = 12 and 13. Likewise, the lattices T are fixed to the wall by any suitable sealing means and the trellis T is removed. removable brackets such as 14 and 15. As indicated above, mobile scaffolding suspended from the frame 1 is used to facilitate construction.
When the masonry is completed, the removable frame 1 is removed by slightly lowering this frame using a device 7 provided for this purpose to facilitate the dismantling of this frame which is then free of any load.

 <Desc / Clms Page number 4>

 
For greater clarity, a house has been shown with a single storey above the ground floor,

   but it is quite obvious that one can construct a building of any number of floors; for a building comprising a large number of superimposed storeys, the removable rigid frame can be advantageously provided to first build the walls of two (or more) storeys only; in this case, when the walls of these two floors are built: they can be used to support the upper part of the frame; the part of the frame located below this upper floor is then dismantled and it is reassembled by any suitable means provided so as to raise and extend the upper part of the frame which has been fixed to the walls already built .

   The construction of the walls thus continues from floor to floor and on the top floor, the removable rigid frame is completed by the installation of elements 5 and 6 intended to temporarily support the roof.



   In figo 2, 2 denotes a corner post of the removable frame and 4 a horizontal beam joining two posts 2; 14 is a square allowing the provisional fixing of the anchoring fittings R 'which will be taken later in the wall to hold the pipes Q. F designates the foundation wall.



   To construct a front wall, a bracket 20 is mounted respectively on the outer face of two posts 2, parallel to this wall, consisting of a bent U-shaped section; an arm of this bracket 20 is fixed on a corresponding post 2, removably for example by means of bolts 21 with nuts and washers or wedges 26 holes being provided for this purpose for these bolts 21 over the entire height of the post 2 as well as on a corresponding side arm of the bracket 20. In this fixing position, the two side arms of each bracket 20 are vertical and the cross member which reduces them is substantially horizontal.

   Two brackets 20 fixed removably at the same height on a corresponding post 2 are used to support horizontal profiles, for example with a double T section, such as 22; this fixing is obtained by means of threaded rods 23 with nut and locknut and support washer 24, -, on the side of the washer 24, the rod 23 ends in an integral part forming a double hook 25 whose branches are make vis-à-vis leaving between them a vertical recess, recess in which one can introduce as in a slide two of the wings in extension of a beam 22.

   When two beams 22 are thus fixed on the inner side of the outer arms of two brackets 20, plates 27, made of sheet metal for example, one end of which is bent in the form of a hook, can easily be attached to the upper flange of the upper beam 22. Under these conditions ,,, to build a wall, in bricks for example, in order to properly lay the unit blocks to be assembled, it suffices to push them on their base towards the outside of the construction until they come up against the plates 27 which rest against the two horizontal beams 22
To construct the angles of walls or openings, a section 28 (U-shaped for example) auxiliary elbow at right angles is used;

   one end 29 of this bracket is spaced parallel to the corresponding branch in order to allow the fixing of the bracket 28 in the horizontal gutter formed by the section 22; it is then possible to hang on the other branch of the bracket 28 a plate 30 perpendicular to a neighboring plate 27 and capable of abutting against it, or even to hook to this bracket 28 a plate having the shape of a. a right dihedral angle. In order to avoid any longitudinal displacement of the beams 22, wedges 31 can be fixed to these beams which abut against the brackets 20 which support the beams 22 at each of their ends.



   To make a masonry using blocks embedded in concrete (or even possibly concrete walls), we have (see fig. 3) inside the brackets 20, in the same way as above, the gates 22. carried by the outer arm of these brackets, and furthermore identical beams 22 carried in the same way as the inner arm which

 <Desc / Clms Page number 5>

 used to fix the jib cranes 20 to the posts 20
After having mounted the walls with the aid of the plates'27 .. a device can be provided which allows the offset of the plates to the outside so that it is possible to flow.! Between them and the wall already. mounted a plaster which should serve as a facing to the wall.



   In accordance with the inventions, use is preferably made of working floors supported by rigid scaffolding suspended from an upper part of the removable frame, and the foot of the vertical profiled bars forming the main resistant frame of these scaffolds is maintained. - cracks by a guide device fixed either to the ground or at an intermediate height on the removable frame or on the walls already built.

   It has not been considered useful to represent in detail an embodiment of such scaffolds, because this embodiment is within the domain of those skilled in the art and the application relates only to the use of such scaffolds in the implementation of the system. proceeds in accordance with the invention
It is of course possible to make modifications to the devices described in order to implement the improved process which is the subject of the invention without modifying the characteristics of this process.

   In particular, the brackets could be slid vertically along the posts and held in any suitable position, by means of guiding and fixing means provided for this purpose; in this case, it would be advantageous to also provide means for at least partially balancing the weight of the assembly of guide plates and their supports.



   CLAIMS.



   1. Construction process characterized by the fact that after having carried out the excavation and the foundations of the proposed construction, a provisional, rigid, removable frame is erected, consisting of metal elements, frame having faces parallel to the walls fu - 'turs of the construction but shifted in relation to these; one fixes on this frame, in a removable way and in the final position which they must occupy when the construction will be completed., all the elements which will be subsequently taken in and supported by the walls to be built; these walls are then built by locating themselves on the faces of the aforementioned provisional framework, the walls encasing as they go up the elements and parts of elements that they meet and must support;

   finally, this temporary frame is dismantled and removed when the walls are completed and they bear the various elements which had been temporarily fixed to the removable frame.


    

Claims (1)

2. Procédé de construction suivant la revendication 1? caracté- risé par le fait quon dispose sur la charpente provisoire, à l'aide. de tous moyens convenables., des plaques rigides amovibles, de telle façon que l'une de leurs faces coïncide avec une face de 1?un .des parements des murs à édi- fier; on maintient ces plaques pour quelles ne puissent s'écarter¯hors de l'aplomb du mur ; pose les matériaux constituant le mur en les faisant bu- ter contre ces plaques; 2. Construction method according to claim 1? charac- terized by the fact that one has on the temporary frame, with the aid. by any suitable means, removable rigid plates, so that one of their faces coincides with one face of one of the facings of the walls to be built; these plates are kept so that they cannot move out of line with the wall; install the materials constituting the wall by making them butt against these plates; enfin on déplace ces plaques après quelles ont per- mis de construire une partie de mur afin de les utiliser de la même façon pour construire une nouvelle partie de mura 3. Procédé de construction suivant la revendication 1, carac- térisé par le fait qu'on érige une charpente rigide démontable sur une hau- teur qui correspond à un nombre limité d'étages de la construction prévue et on commence par construire ce nombre limité d'étages conformément au procé- dé de l'invention; on fait supporter par les murs construits une partie su- périeure de la charpente démontable ; démonte et enlève la partie de la charpente démontable située au-dessous de cette partie supérieure; finally we move these plates after which they have allowed to build a part of wall in order to use them in the same way to build a new part of wall. 3. Construction method according to claim 1, charac- terized by the fact that a removable rigid frame is erected to a height which corresponds to a limited number of floors of the planned construction and this limited number is first constructed. of floors according to the method of the invention; an upper part of the demountable frame is supported by the constructed walls; dismantle and remove the part of the removable frame located below this upper part; on uti- lise la partie de charpente enlevée pour prolonger la partie de charpente <Desc/Clms Page number 6> supportée par les murs et poursuivre la construction des étages supérieurs; on répète, si besoin est, les opérations de démontage et de remontage pré- citées jusqu'à Inachèvement de la construction des murs, en complétant la charpente démontable par des éléments rigides nécessaires pour supporter provisoirement la toiture. the part of the frame removed is used to extend the part of the frame <Desc / Clms Page number 6> supported by the walls and continue construction of the upper floors; the aforementioned dismantling and reassembly operations are repeated, if necessary, until the construction of the walls is completed, completing the removable frame with rigid elements necessary to temporarily support the roof. 4. Procédé de construction suivant la revendication-1 carac- térisé par le fait qu'on suspend des échafaudages rigides à la partie su- périeure de la charpente démontable et on maintient par un dispositif de guidage fixé au sol ou à une hauteur convenable sur la charpente démonta- ble la partie inférieure de ces 'échafaudages, de façon que ce dispositif de guidage ne supporte aucune charge verticale; enfin on établit sur ces échafaudages des planchers de travail destinés à supporter les matériaux et les ouvriers qui utilisent ces matériaux. en annexe 2 dessins,,- . 4. Construction method according to claim 1, characterized by the fact that rigid scaffolding is suspended from the upper part of the removable frame and is maintained by a guide device fixed to the ground or at a suitable height on the frame dismantles the lower part of these scaffolds, so that this guiding device does not support any vertical load; finally, working floors are set up on these scaffolds to support the materials and the workers who use these materials. in appendix 2 drawings ,, -.
BE511396D BE511396A (en)

Publications (1)

Publication Number Publication Date
BE511396A true BE511396A (en)

Family

ID=150180

Family Applications (1)

Application Number Title Priority Date Filing Date
BE511396D BE511396A (en)

Country Status (1)

Country Link
BE (1) BE511396A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1128114B (en) * 1958-01-28 1962-04-19 Nicolai Jannsen Dipl Ing Process for erecting buildings with the help of assembly supports
DE1177315B (en) * 1955-08-30 1964-09-03 Eugen Wullschleger Reusable jig for laying installation cables
FR2597536A1 (en) * 1986-04-16 1987-10-23 Dutheil Rene Construction method and device for the implementation thereof
EP0480295A1 (en) * 1990-10-04 1992-04-15 Klaus Schumann Set for the construction of private or holiday homes

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1177315B (en) * 1955-08-30 1964-09-03 Eugen Wullschleger Reusable jig for laying installation cables
DE1128114B (en) * 1958-01-28 1962-04-19 Nicolai Jannsen Dipl Ing Process for erecting buildings with the help of assembly supports
FR2597536A1 (en) * 1986-04-16 1987-10-23 Dutheil Rene Construction method and device for the implementation thereof
EP0480295A1 (en) * 1990-10-04 1992-04-15 Klaus Schumann Set for the construction of private or holiday homes

Similar Documents

Publication Publication Date Title
EP0208626B1 (en) Method and device for erecting walls insulated at the exterior
CA2663156A1 (en) Building, in particular a dwelling, with frames and columns and method of erecting it
AU2018319415B2 (en) A modular building system
US20230014744A1 (en) Method of Construction
BE1003666A3 (en) Framework for buildings.
JP2004528497A (en) Reinforced building panels and triangular columns
WO1985003966A1 (en) Structural elements and method for making the same
BE511396A (en)
FR2950910A1 (en) Panel for construction in e.g. factory, has end faces comprising groove of housing of assembling element, where groove is parallel to plane of framework, and walls provided with shoulder that constitutes positioning unit of adjacent panel
FR3058744A1 (en) SUPPORT FOR PANEL FOR REAL ESTATE CONSTRUCTION
CH300483A (en) Construction process.
EP0147456B1 (en) Prefabricated formwork elements intended to the building of walls, method and device related thereto
FR2610022A1 (en) CONSTRUCTIVE SYSTEM, BY MODULAR WOOD FRAMES, FORMING STRUCTURES, AND METHOD OF MOUNTING
FR2529599A1 (en) Method for constructing buildings having several stories, especially dwelling houses joined together in so-called &#34;terraces&#34; and houses thus obtained.
NL8702969A (en) Construction scaffolding system - has strip pierced by rod and lockable connector clamping between strip and wall with rod extending into opening in wall
KR100962001B1 (en) Constuction structure and method of RC wall integrated with finish panel
JP6045215B2 (en) Column foundation and construction method
JP3396600B2 (en) Seismic reinforcement structure of existing building
CH397217A (en) Construction process for a single storey room
FR2744471A1 (en) Prefabricated hollow brick modules for cladding, load bearing walls, acoustic insulation, low walls and other construction
BE1023535B1 (en) CONSTRUCTION MODULE AND MODULAR BUILDING SYSTEM COMPRISING ONE OR MORE OF SUCH CONSTRUCTION MODULES
FR2574837A1 (en) Methods for constructing walls at the edge of floors of buildings
BE858946A (en) BUILDING CONSTRUCTION PROCESS
EP1382759A1 (en) Prefabricated construction elements for a building and building with such elements
BE465741A (en)