Construction process.

Info

Publication number
CH300483A
CH300483A CH300483DA CH300483A CH 300483 A CH300483 A CH 300483A CH 300483D A CH300483D A CH 300483DA CH 300483 A CH300483 A CH 300483A
Authority
CH
Switzerland
Prior art keywords
frame
walls
construction
removable
elements
Prior art date
Application number
Other languages
French (fr)
Inventor
Bernaudin Maurice
Original Assignee
Bernaudin Maurice
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bernaudin Maurice filed Critical Bernaudin Maurice
Publication of CH300483A publication Critical patent/CH300483A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

  

  Procédé de construction.    On sait que les     dépenses    de     main-d'#uvre     et les frais qui découlent directement de cette       main-d'oeuvre    constituent un pourcentage im  portant du prix de revient des     bâtiments,    no  tamment des maisons d'habitation en maçon  nerie. Il y a donc lieu de s'efforcer de réduire  au minimum ces dépenses de     main-d'oeuvre    et,  dans ce but., on a préconisé notamment l'uti  lisation d'éléments standardisés faciles à po  ser et à assembler.

   Cependant, les procédés  proposés     jusqu'ici    ne réduisent pas sensible  ment l'importance de la     main-d'oeuvre    néces  saire aux travaux de finition exigés par  l'hygiène et le confort de la maison moderne.  



  La présente invention a pour but de pal  lier ces inconvénients; elle a pour objet un  procédé de construction caractérisé en ce  qu'après avoir réalisé la fouille et les fonda  tions de la construction projetée, on érige  une charpente provisoire, rigide, démontable,  constituée par des éléments métalliques, char  pente présentant des faces parallèles aux murs  futurs de la construction, mais décalées par  rapport à ceux-ci, en ce qu'on fixe sur cette  charpente, de façon amovible et dans la posi  tion définitive qu'ils doivent occuper lorsque  la construction sera achevée, tous les éléments  qui seront ultérieurement tenus par les murs  à construire, en ce qu'on     construit    ensuite ces  murs en se repérant sur les faces de la char  pente provisoire précitée,

   les murs enrobant  au fur et à mesure qu'ils montent les éléments  et parties d'éléments qu'ils rencontrent et doi-    vent soutenir, enfin, en ce qu'on démonte et  enlève cette charpente provisoire lorsque les  murs sont achevés et qu'ils portent les diffé  rents éléments qui avaient été fixés provi  soirement à la charpente     amovible.     



  On peut     disposer    sur la charpente provi  soire à l'aide de tous moyens convenables des  plaques rigides amovibles de telle façon que  l'une de leurs faces coïncide avec une face  de l'un des parements des murs à édifier; on  maintient ces plaques pour qu'elles ne puis  sent s'écarter hors de l'aplomb du mur; on  pose les matériaux constituant le mur en les  faisant buter contre ces plaques; enfin, on  déplace ces plaques -après qu'elles ont permis  de construire une partie de mur, afin de les       utiliser    de la même façon pour construire une  nouvelle partie de mur. Autrement dit, il  n'est plus nécessaire de repérer la position des  matériaux en cours de pose, car on les met  automatiquement en place en les faisant buter  contre des plaques de guidage.  



  On peut ériger une charpente rigide dé  montable sur une hauteur qui correspond à  un nombre limité d'étages de la construction  prévue et on commence par construire ce  nombre limité d'étages; on fait supporter par  les murs     construits    une partie supérieure de  la charpente démontable; on démonte et en  lève la partie de la charpente démontable  située au-dessous de cette partie supérieure;

    on utilise la partie de charpente enlevée pour  prolonger la partie de charpente supportée      par les murs et     poursuivre    la construction des  étages supérieurs-; on répète, si besoin est, les  opérations de démontage et de     remontage.    pré  citées jusqu'à l'achèvement de la construction  des murs, en complétant la charpente démon  table par des éléments rigides nécessaires pour       supporter    provisoirement la toiture.  



  On peut     suspendre    des échafaudages ri  gides à la partie     supérieure    de la     ch & rpente     démontable et maintenir par un dispositif de  guidage fixé au sol ou à une hauteur conve  nable     sur    la charpente démontable la partie  inférieure de ces échafaudages, de façon que  ce dispositif de     guidage    ne supporte aucune  charge verticale; enfin, on peut établir sur ces  échafaudages des planchers de travail desti  nés à supporter les matériaux et les ouvriers  qui     utilisent    ces matériaux;

   il résulte de cette  organisation la possibilité de se contenter  d'échafaudages très légers parce qu'ils n'ont  pratiquement pas besoin d'être contreventés  et que leurs barres verticales, qui supportent  les efforts principaux, ne     travaillent    qu'à la  traction.  



  Le dessin annexé représente, à titre  d'exemple, une forme d'exécution et quelques  détails des moyens pour la     mise    en     couvre    du  procédé faisant l'objet de l'invention.  



  La     fig.    1 représente, en perspective, une  petite     maison    d'habitation en cours de cons  truction. .  



  La     fig.    2 est     une    vue partielle en pers  pective de la charpente provisoire à proximité  d'un poteau     muni    d'un dispositif pour sup  porter des plaques de guidage limitant un  parement extérieur de mur de façade.  



  La     fig.    3 est une coupe partielle par un  plan vertical d'un dispositif analogue à celui  de la     fig.    2, mais qui supporte des plaques de  guidage pour les parements extérieur et inté  rieur     .d'un    mur de façade.  



  Sur . le dessin, les mêmes signes de réfé  rence désignent ; les mêmes éléments ou des       éléments-    jouant le même rôle.  



  Pour - construire la maison d'habitation  représentée sur la     fig.    1,. après avoir exécuté  les     fouilles    et un socle de fondation P de la  manière habituelle, on érige sur ce socle P    une charpente 1 métallique comportant des  poteaux 2 réunis par des barres horizontales 3  et 4 à chaque étage et à la partie supérieure  par des barres 5 obliques ayant la pente de  la toiture future et réunies     elles-mêmes    par  une barre 6 horizontale parallèle à la ligne  de faîtage.  



  Les poteaux 2 reposent sur des angles     Ï1     prévus à cet effet à l'intérieur des murs de  fondation P, par l'intermédiaire d'un dispo  sitif 7 figuré schématiquement et qui peut  être constitué par un vérin de tout type con  venant aux charges à supporter, ou par un  dispositif de calage permettant de régler le  niveau de la base des poteaux 2 et     d'abaisser     ce niveau lorsque la construction des murs  sera terminée.  



  La charpente 1 doit être rigide et indéfor  mable et l'assemblage de ses éléments princi  paux 2, 3, 4, 5, 6 doit comporter aux angles  des moyens pour assurer l'indéformabilité de  ces angles et permettant néanmoins le démon  tage facile de cette charpente 1.  



  Les barres horizontales supérieures 3 et 4  comportent des prolongements 8 et 9, éven  tuellement démontables, permettant la fixa  tion de poulies 10 destinées à supporter     des,     échafaudages volants devant être utilisés  comme planchers de travail pour l'érection  des murs M.  



  Lorsque la charpente 1 est montée, on peut  poser les éléments de la toiture: la panne  faîtière     Pf    reposant     au-dessus    de la barre 6  et les pannes courantes P sur les barres obli  ques 5, les chevrons C étant ensuite posés sur  les pannes     Pf    et P; les sablières S, qui sup  porteront     définitivement    les     chevrons    C, sont       provisoirement    suspendues à ces derniers par  tous moyens convenables.

   Les éléments de la  couverture peuvent ensuite être posés     sur    la  charpente de toiture selon la technique habi  tuelle, la couverture posée permettant de tra  vailler à l'abri     des        intempéries.     



  On fixe     ensuite    à la charpente 1, en com  mençant par l'étage inférieur et à l'aide de  moyens amovibles, les cadres de baies; c'est  ainsi que le cadre E de la porte d'entrée  est suspendu par des ferrures 11 à     une    poutre      3 du premier étage; le cadre G de la fenêtre  du rez-de-chaussée est accroché par des fer  rures 12 à une poutre 3 et le cadre H d'une  fenêtre du premier étage est suspendu à une  poutre 3 supérieure par des ferrures 13.  



  On fixe également à la charpente 1 par  des moyens amovibles des bandes d'un treil  lage<I>T</I> métallique; ce treillage<I>T</I> est tenu par  des attaches provisoires telles que les ferrures  14 et 15 fixées respectivement à une barre  4 et à un poteau 2 par des moyens amovibles.  



  Le treillage T permet, avant l'exécution de  toute maçonnerie, de poser toutes les canali  sations Q que l'on fixe définitivement au treil  lage T après les avoir pliées à la forme con  venable sans être gêné, comme c'est le cas  lorsque leur pose est effectuée sur des murs  mêmes.  



  On fixe également sur la charpente et les  éléments de plancher les     escaliers,    cage  d'ascenseur,     menuiseries    enrobées dans la ma  qonnerie avant de commencer cette dernière.  



  Lorsque tous les éléments d'un étage que  la maçonnerie doit porter ont été fixés à titre  provisoire sur la charpente 1, on commence  la maçonnerie en se repérant sur cette char  pente parfaitement dressée pour aligner les  murs; il suffit d'utiliser des règles ou gabarits  prenant appui contre les poteaux 2 verticaux.  Avant que les murs 111 parviennent au plan  cher du premier étage, on pose sur les barres  3 les solives     13    auxquelles on peut accrocher  une poutre sablière ou un fer plat d'ancrage  désigné par N que l'on viendra caler lorsque  le mur     11l    sera à     -hauteur    suffisante. Un autre  plat d'ancrage pourra être associé. aux angles  du bâtiment avec le plat N pour ceinturer  chaque étage.  



  La construction se poursuit ainsi d'étage  en étage jusqu'à ce que les sablières S, les  pannes P et la panne faîtière     Pf    soient calées  pour reposer sur les murs élevés. Bien en  tendu, dès qu'un cadre de baie est supporté  par la maçonnerie, on enlève les     ferrures-          supports    telles que 11, 12 et 13. De même, on  fixe au mur     par    tous moyens de scellement  convenables les treillis T et l'on enlève les  ferrures amovibles telles que 14 et 15. On    utilise des échafaudages mobiles suspendus à  la charpente 1 pour faciliter la construction.  



  Lorsque la maçonnerie est achevée, on en  lève la charpente 1 amovible en abaissant  légèrement cette charpente à l'aide du dispo  sitif 7 prévu à cet effet, pour faciliter le dé  montage de cette charpente qui est alors dé  gagée de toute charge.  



  Pour plus de clarté, on a représenté     une     maison comportant un seul étage au-dessus du       rez-de-chaussée,    mais il est bien évident qu'on  peut construire un bâtiment d'un nombre  quelconque d'étages; pour un bâtiment com  portant un grand nombre d'étages superposés,  la charpente rigide démontable peut être  avantageusement prévue pour     construire     d'abord les murs de     deunx    (ou plusieurs)  étages seulement; dans ce cas, lorsque les  murs de ces deux étages sont construits, on  peut les utiliser pour     supporter    la partie su  périeure de la charpente;

   on démonte ensuite  la partie de la charpente située au-dessous de  cet. étage supérieur et on la remonte par tous  moyens convenables     prévus    de façon à sur  élever et à prolonger la partie supérieure de  la charpente qui a été fixée aux murs déjà       construits.    La     construction    des murs se pour  suit     ainsi    d'étage en étage et au dernier  étage on complète la charpente rigide amovi  ble par la pose     dés    éléments 5 et 6 destinés à  porter provisoirement la toiture.  



  Sur la     fig.    2, on désigne par 2 un poteau  d'angle de la charpente amovible et par 4  une poutre horizontale réunissant deux     po-          teallx    2; 14 est     tune    équerre permettant la  fixation provisoire des ferrures R d'ancrage  qui seront prises ultérieurement dans le mur  pour tenir les tuyauteries Q.     F    désigne le mur  de fondation.  



  Pour     construire    un mur de façade, on  monte respectivement sur la face extérieure.  de deux poteaux 2, parallèles à ce mur, une  potence 20 constituée par un profilé plié en  U; on fixe un bras de cette potence 20 sur  un poteau 2 correspondant, de façon amo  vible, par exemple au moyen de boulons 21  avec écrous et     rondelles    ou cales 26, des trous  étant prévus à cet effet pour ces     boulons    21           sur    toute la hauteur du poteau 2, ainsi que  sur un bras latéral correspondant de la po  tence 20. Dans cette position de fixation, les       deux    bras latéraux de chaque potence 20 sont  verticaux et la traverse qui les réunit est       sensiblement    horizontale.

   On utilise deux po  tences 20     fixées    de façon amovible à une  même hauteur sur un poteau 2 correspondant  pour porter des profilés     horizontaux,    par  3 exemple à section en double T, tels que 22;  cette fixation est     obtenue    au moyen de tiges  23 filetées     avec,    écrou et contre-écrou et ron  delle 24 d'appui; du côté de la rondelle 24,  la tige 23 se termine par une partie solidaire       s    formant un crochet 25 double dont les bran  ches se font vis-à-vis en laissant entre elles  un évidement vertical, évidement     dans    lequel  on peut.     introduire    comme dans une coulisse  deux des ailes en prolongement d'une pou  trelle 22.

   Lorsque deux poutrelles 22 sont  ainsi fixées du côté intérieur des bras exté  rieurs de deux     potences    20, on peut facile  ment accrocher à l'aile supérieure de la pou  trelle 22 supérieure des plaques 27, en tôle  par exemple, dont une extrémité est repliée  en forme de crochet. Dans ces     conditions,     pour construire un mur, en briques par  exemple, il suffit pour poser convenablement       les    blocs unitaires à assembler de les pousser  sur leur assise vers l'extérieur de la construc  tion jusqu'à ce qu'ils viennent. buter contre les  plaques 27 qui prennent appui contre les deux  poutrelles 22 horizontales.  



  Pour     construire    les angles de murs ou de  baies, on utilise un profilé 28 (en     [j    par  exemple) auxiliaire, coudé en équerre; une       extrémité    29 de cette équerre est écartée pa  rallèlement à la branche correspondante, afin  de permettre la fixation de l'équerre 28 dans  la gouttière horizontale formée par le profilé  22; il est alors possible d'accrocher sur l'autre  branche de l'équerre 28 une plaque 30 per  pendiculaire à une plaque 27 voisine et pou  vant buter contre celle-ci, ou même d'accro  cher à cette équerre 28 une     plaque    ayant la  forme d'un angle dièdre droit.

   Afin d'éviter  tout déplacement longitudinal des poutrelles  22, on peut fixer à ces poutrelles des cales 31    qui viennent buter contre les potences 20 qui  supportent les poutrelles 22 à chacune de  leurs extrémités.  



  Pour réaliser une maçonnerie à l'aide de  blocs noyés dans un béton (ou même éven  tuellement des murs en béton), on     dispose     (voir     fig.    3) à l'intérieur des potences 20, de  la même façon que précédemment, des pou  trelles 22 portées par le bras extérieur de ces  potences, et en outre des poutrelles 22 iden  tiques portées de la même façon par le bras  intérieur qui sert à fixer les potences 20 aux  poteaux 2.  



  Après avoir monté les murs à l'aide des  plaques 27, on peut prévoir un dispositif qui  permette le décalage des plaques à l'extérieur,  de telle façon qu'on puisse couler entre ces  dernières et le mur déjà monté un enduit qui  doit servir de parement au mur.  



  On utilise, de préférence, des planchers de  travail soutenus par des échafaudages rigides  suspendus à une partie haute de la charpente  démontable, et on maintient le pied des barres  profilées verticales formant l'ossature résis  tante principale de ces échafaudages par un  dispositif de guidage fixé soit au sol, soit à.  une hauteur intermédiaire sur la charpente  amovible ou aux murs déjà construits.  



  On pourrait faire coulisser les potences  verticalement le long des poteaux et les main  tenir dans toute position convenable, grâce à  des moyens de guidage et de fixation prévus  à cet effet; dans ce cas, il serait avantageux  de prévoir en outre des moyens pour équili  brer au moins en     partie    le poids de     l'ensemble     des plaques de     guidage    et de leurs     supports.  



  Construction process. We know that the expenditure on labor and the costs which flow directly from this labor constitute an important percentage of the cost price of buildings, in particular of masonry dwelling houses. Efforts should therefore be made to minimize these labor costs and, to this end, the use of standardized elements easy to install and assemble has been advocated in particular.

   However, the methods proposed heretofore do not appreciably reduce the amount of manpower necessary for the finishing work required by the hygiene and comfort of the modern house.



  The object of the present invention is to overcome these drawbacks; its object is a construction process characterized in that after having carried out the excavation and the foundations of the planned construction, a temporary, rigid, removable frame is erected, consisting of metal elements, sloping tank having faces parallel to the future walls of the construction, but offset in relation to them, in that we fix on this frame, in a removable manner and in the final position that they must occupy when the construction is completed, all the elements that will be subsequently held by the walls to be built, in that these walls are then built by locating themselves on the faces of the aforementioned temporary sloping chariot,

   the walls enclosing as they go up the elements and parts of elements which they meet and must support, finally, in that this temporary frame is dismantled and removed when the walls are completed and that they carry the various elements which had been provisionally fixed to the removable frame.



  Removable rigid plates can be placed on the provisional frame using any suitable means so that one of their faces coincides with one face of one of the facings of the walls to be built; these plates are maintained so that they cannot be felt to move out of line with the wall; the materials constituting the wall are placed by making them abut against these plates; finally, these plates are moved - after they have made it possible to build a part of the wall, in order to use them in the same way to build a new part of the wall. In other words, it is no longer necessary to mark the position of the materials during installation, because they are automatically put in place by making them abut against the guide plates.



  It is possible to erect a rigid demountable frame to a height which corresponds to a limited number of floors of the planned construction and one begins by constructing this limited number of floors; an upper part of the removable frame is supported by the constructed walls; the part of the removable frame located below this upper part is dismantled and removed;

    the part of the frame removed is used to extend the part of the frame supported by the walls and continue the construction of the upper floors; the dismantling and reassembly operations are repeated, if necessary. cited above until the completion of the construction of the walls, by completing the demon table frame with the rigid elements necessary to temporarily support the roof.



  Rigid scaffolding can be suspended from the upper part of the removable frame and maintained by a guide device fixed to the ground or at a suitable height on the removable frame the lower part of these scaffolds, so that this device for guide does not support any vertical load; finally, it is possible to establish working floors on these scaffolds intended to support the materials and the workers who use these materials;

   The result of this organization is the possibility of being satisfied with very light scaffolding because they hardly need to be braced and their vertical bars, which support the main forces, only work on traction.



  The appended drawing shows, by way of example, an embodiment and some details of the means for implementing the method forming the subject of the invention.



  Fig. 1 shows, in perspective, a small residential house under construction. .



  Fig. 2 is a partial perspective view of the provisional framework near a post provided with a device for supporting guide plates limiting an exterior facing of a facade wall.



  Fig. 3 is a partial section through a vertical plane of a device similar to that of FIG. 2, but which supports guide plates for the exterior and interior facings of a facade wall.



  Sure . the drawing, the same reference signs designate; the same elements or elements - playing the same role.



  To - build the dwelling house shown in fig. 1 ,. after having carried out the excavations and a foundation plinth P in the usual way, we erect on this plinth P a metal frame 1 comprising posts 2 joined by horizontal bars 3 and 4 on each floor and at the top by bars 5 obliques having the slope of the future roof and joined together by a horizontal bar 6 parallel to the ridge line.



  The posts 2 rest on angles Ï1 provided for this purpose inside the foundation walls P, by means of a device 7 shown schematically and which can be constituted by a jack of any type suitable for the loads at support, or by a wedging device making it possible to adjust the level of the base of the posts 2 and to lower this level when the construction of the walls is finished.



  The frame 1 must be rigid and indeformable and the assembly of its main elements 2, 3, 4, 5, 6 must include means at the angles to ensure the indeformability of these angles and nevertheless allow easy dismantling of this frame 1.



  The upper horizontal bars 3 and 4 have extensions 8 and 9, possibly removable, allowing the attachment of pulleys 10 intended to support flying scaffolding to be used as working floors for the erection of walls M.



  When the frame 1 is fitted, the roof elements can be installed: the ridge Pf resting above the bar 6 and the running purlins P on the oblique bars 5, the rafters C then being placed on the Pf purlins and P; the runners S, which will permanently support the rafters C, are temporarily suspended from the latter by any suitable means.

   The elements of the roofing can then be laid on the roof frame using the usual technique, the installed roofing making it possible to work sheltered from the elements.



  The bay frames are then fixed to the frame 1, starting with the lower level and using removable means; thus, the frame E of the entrance door is suspended by fittings 11 from a beam 3 of the first floor; the frame G of the window on the ground floor is hung by iron bars 12 on a beam 3 and the frame H of a window on the first floor is suspended from an upper beam 3 by fittings 13.



  Also fixed to the frame 1 by removable means strips of a metal <I> T </I> trellis; this <I> T </I> trellis is held by temporary fasteners such as fittings 14 and 15 fixed respectively to a bar 4 and to a post 2 by removable means.



  The T trellis makes it possible, before the execution of any masonry, to lay all the Q channels which are definitively fixed to the T trellis after having bent them to the suitable shape without being hampered, as is the case when their installation is carried out on the walls themselves.



  The stairs, elevator shaft, joinery coated in the masonry are also fixed on the frame and the floor elements before starting the latter.



  When all the elements of a floor that the masonry must bear have been fixed provisionally on the framework 1, we begin the masonry by locating ourselves on this perfectly erected sloping tank to align the walls; it suffices to use rulers or templates resting against the vertical posts 2. Before the walls 111 reach the expensive floor plan of the first floor, the joists 13 are placed on the bars 3, to which can be hung a sand beam or an anchoring flat iron designated by N which will be wedged when the wall 11l is at sufficient height. Another anchoring plate can be associated. at the corners of the building with the flat N to surround each floor.



  Construction thus continues from floor to floor until the runners S, the purlins P and the ridge purlin Pf are wedged to rest on the high walls. Well stretched, as soon as a window frame is supported by the masonry, the brackets are removed, such as 11, 12 and 13. Likewise, the T grids and the lattice are fixed to the wall by any suitable sealing means. removable fittings such as 14 and 15 are removed. Mobile scaffolding suspended from the frame 1 is used to facilitate construction.



  When the masonry is completed, the removable frame 1 is lifted by slightly lowering this frame using the device 7 provided for this purpose, to facilitate the dismantling of this frame which is then released from any load.



  For the sake of clarity, a house has been shown having a single storey above the ground floor, but it is quite obvious that a building can be constructed with any number of floors; for a building comprising a large number of superimposed floors, the removable rigid frame can be advantageously provided to first build the walls of deunx (or more) floors only; in this case, when the walls of these two floors are built, they can be used to support the upper part of the frame;

   the part of the frame located below this is then removed. upper floor and it is reassembled by any suitable means provided so as to elevate and extend the upper part of the frame which has been fixed to the walls already built. The construction of the walls is thus continued from floor to floor and on the top floor, the removable rigid frame is completed by the installation of elements 5 and 6 intended to temporarily support the roof.



  In fig. 2 denotes by 2 a corner post of the removable frame and by 4 a horizontal beam joining two posts 2; 14 is a bracket allowing the temporary fixing of the anchoring fittings R which will be taken later in the wall to hold the pipes Q. F designates the foundation wall.



  To build a facade wall, we go up respectively on the outside face. two posts 2, parallel to this wall, a bracket 20 constituted by a section bent in U; an arm of this bracket 20 is fixed on a corresponding post 2, in a removable manner, for example by means of bolts 21 with nuts and washers or wedges 26, holes being provided for this purpose for these bolts 21 over the entire height of the post 2, as well as on a corresponding side arm of the post 20. In this fixing position, the two side arms of each bracket 20 are vertical and the cross member which joins them is substantially horizontal.

   Two positions 20 fixed in a removable manner at the same height on a corresponding post 2 are used to carry horizontal profiles, for example 3 with a double T section, such as 22; this fixing is obtained by means of threaded rods 23 with, nut and locknut and ron delle 24 for support; on the side of the washer 24, the rod 23 ends in an integral part s forming a double hook 25 whose branches are vis-à-vis leaving between them a vertical recess, recess in which one can. introduce as in a slide two of the wings as an extension of a dustbin 22.

   When two beams 22 are thus fixed on the inner side of the outer arms of two brackets 20, it is easily possible to hang from the upper flange of the upper trellis 22 plates 27, made of sheet metal for example, one end of which is folded in. hook shape. Under these conditions, to build a wall, of bricks for example, it suffices to properly lay the unit blocks to be assembled by pushing them on their base towards the outside of the construction until they come. abut against the plates 27 which bear against the two horizontal beams 22.



  To construct the angles of walls or openings, an auxiliary profile 28 (in [j for example) is used, angled at an angle; one end 29 of this bracket is spaced apart from the corresponding branch, in order to allow the fixing of the bracket 28 in the horizontal gutter formed by the profile 22; it is then possible to hang on the other branch of the square 28 a plate 30 per pendicular to a neighboring plate 27 and able to abut against it, or even to attach to this square 28 a plate having the forms a right dihedral angle.

   In order to avoid any longitudinal displacement of the beams 22, wedges 31 can be fixed to these beams which abut against the brackets 20 which support the beams 22 at each of their ends.



  To make masonry using blocks embedded in concrete (or even possibly concrete walls), we have (see fig. 3) inside the brackets 20, in the same way as above, trelles 22 carried by the outer arm of these jib cranes, and in addition identical joists 22 carried in the same way by the inner arm which serves to fix the brackets 20 to the posts 2.



  After having mounted the walls using the plates 27, one can provide a device which allows the offset of the plates to the outside, so that a plaster can be poured between the latter and the wall already mounted. facing the wall.



  Preferably, working floors supported by rigid scaffolding suspended from an upper part of the removable frame are used, and the foot of the vertical profiled bars forming the main resistant frame of these scaffolds is maintained by a fixed guide device. either on the ground or at. an intermediate height on the removable frame or on walls already built.



  The brackets could be slid vertically along the posts and hold them in any suitable position, by means of guiding and fixing means provided for this purpose; in this case, it would be advantageous to also provide means for balancing at least in part the weight of the assembly of guide plates and their supports.

 

Claims (1)

REVENDICATION: Procédé de construction, caractérisé en ce qu'après avoir réalisé la fouille et les fonda tions de la construction projetée, on érige une charpente provisoire, rigide, démontable, cons tituée par des éléments métalliques, charpente présentant des faces parallèles aux murs futurs de la construction, mais décalées par rapport à ceux-ci, en ce qu'on fixe sur cette charpente de façon amovible et dans la posi tion définitive qu'ils doivent occuper lorsque la construction sera achevée tous les éléments qui seront ultérieurement pris dans et soute nus par les murs à construire, en ce qu'on construit ensuite ces murs en se repérant sur les faces de la charpente provisoire précitée, CLAIM: Construction process, characterized in that after having carried out the excavation and the foundations of the proposed construction, a temporary, rigid, removable frame is erected, consisting of metal elements, frame having faces parallel to the future walls of the construction, but offset with respect to them, in that it is fixed on this frame in a removable manner and in the final position that they must occupy when the construction is completed all the elements which will be subsequently taken in and bare hold by the walls to be built, in that these walls are then built by locating themselves on the faces of the aforementioned provisional frame, les murs enrobant au fur et à mesure qu'ils montent les éléments et parties d'éléments qu'ils rencontrent et doivent soutenir, enfin. en ce qu'on démonte et enlève cette charpente provisoire lorsque les murs sont achevés et qu'ils portent les différents éléments qui avaient été fixés provisoirement à la char pente amovible. SOUS-REVENDICATIONS 1. the walls enclosing as they go up the elements and parts of elements that they meet and must support, finally. in that this temporary frame is dismantled and removed when the walls are completed and they carry the various elements which had been temporarily fixed to the removable sloping tank. SUB-CLAIMS 1. Procédé de construction suivant la revendication, caractérisé en ce qu'on dispose sur la charpente provisoire des plaques rigides amovibles de façon que l'une de leurs faces coïncide avec une face de l'un des parements des murs à édifier, en ce qu'on maintient ces plaques pour qu'elles ne puissent s'écarter hors de l'aplomb du mur, en ce qu'on pose les matériaux constituant le mur en les fai sant buter contre ces plaques et, enfin, en ce qu'on déplace ces plaques après qu'elles ont permis de construire une partie de mur afin de les utiliser de la même façon pour cons truire une nouvelle partie de mur. 2. Construction method according to claim, characterized in that removable rigid plates are placed on the temporary framework so that one of their faces coincides with one face of one of the facings of the walls to be built, in that these plates are maintained so that they cannot move out of line with the wall, in that the materials constituting the wall are placed by making them abut against these plates and, finally, by moving these plates after they have made it possible to build a part of the wall in order to use them in the same way to build a new part of the wall. 2. Procédé de construction suivant la revendication, caractérisé en ce qu'on érige une charpente rigide démontable sur une hau teur qui correspond à un nombre limité d'étages de la construction prévue et en ce qu'on commence par construire ce nombre limité d'étages, en ce qu'on fait supporter par les murs construits une partie supérieure de la charpente démontable; Construction method according to claim, characterized in that a removable rigid frame is erected to a height which corresponds to a limited number of floors of the planned construction and in that this limited number of floors is first constructed. , in that the constructed walls are made to support an upper part of the removable frame; en ce qu'on démonte et enlève la partie de la charpente démon table située au-dessous de cette partie supé rieure, en ce qu'on utilise la partie de char pente enlevée pour prolonger la partie de charpente supportée par les murs et pour suivre la construétion des étages supérieurs jusqu'à l'achèvement de la construction des murs, en complétant la charpente démontable par des éléments rigides nécessaires pour sup porter provisoirement la toiture. 3. Procédé de construction suivant la revendication, caractérisé en ce qu'on suspend des échafaudages rigides ' à la partie supé rieure de la charpente démontable, en ce qu'on maintient par un dispositif de guidage la. in that the part of the frame demon table located below this upper part is dismantled and removed, in that the part of the sloping tank removed is used to extend the part of the frame supported by the walls and to follow the construction of the upper floors until the completion of the construction of the walls, completing the removable frame with the rigid elements necessary to temporarily support the roof. 3. Construction method according to claim, characterized in that rigid scaffolding 'is suspended from the upper part of the removable frame, in that it is maintained by a guide device. partie inférieure de ces échafaudages, de façon que ce dispositif de guidage ne sup porte aucune charge verticale et, enfin, en ce qu'on établit sur ces échafaudages des plan chers de travail destinés à supporter les ma tériaux et les ouvriers qui utilisent ces maté riaux. lower part of these scaffolds, so that this guiding device does not support any vertical load and, finally, in that expensive work surfaces are established on these scaffolding intended to support the materials and the workers who use these materials. riaux.
CH300483D 1951-05-18 1952-05-14 Construction process. CH300483A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR300483X 1951-05-18
FR90552X 1952-05-09

Publications (1)

Publication Number Publication Date
CH300483A true CH300483A (en) 1954-08-15

Family

ID=26196876

Family Applications (1)

Application Number Title Priority Date Filing Date
CH300483D CH300483A (en) 1951-05-18 1952-05-14 Construction process.

Country Status (1)

Country Link
CH (1) CH300483A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3283693A (en) * 1963-07-19 1966-11-08 Reynolds Metals Co Building construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3283693A (en) * 1963-07-19 1966-11-08 Reynolds Metals Co Building construction

Similar Documents

Publication Publication Date Title
EP0208626B1 (en) Method and device for erecting walls insulated at the exterior
SG185173A1 (en) A prefabricated element of a multi-storey building and a semi-prefabricating construction method thereof
BE1003666A3 (en) Framework for buildings.
US3364647A (en) Method for erecting tall buildings with balconies
WO1985003966A1 (en) Structural elements and method for making the same
CH300483A (en) Construction process.
BE511396A (en)
FR2538428A1 (en) Method for constructing weatherproof buildings
FR3058744A1 (en) SUPPORT FOR PANEL FOR REAL ESTATE CONSTRUCTION
EP0147456B1 (en) Prefabricated formwork elements intended to the building of walls, method and device related thereto
CN108412033B (en) External vertical forest overhanging balcony structure of building and construction method thereof
AU2015100344A4 (en) Building system and method
FR2744471A1 (en) Prefabricated hollow brick modules for cladding, load bearing walls, acoustic insulation, low walls and other construction
CH397217A (en) Construction process for a single storey room
JP6045215B2 (en) Column foundation and construction method
CN110242040B (en) Construction method based on building post-cast strip
EP1382759A1 (en) Prefabricated construction elements for a building and building with such elements
RU78835U1 (en) ASSEMBLY NUMBER OF COLUMN WITH LATCHES FOR PREMIUM MONOLITHIC BUILDINGS (STRUCTURES)
FR2529599A1 (en) Method for constructing buildings having several stories, especially dwelling houses joined together in so-called &#34;terraces&#34; and houses thus obtained.
BE356359A (en)
FR2842552A1 (en) Prefabricated structural component for buildings comprises insulated load-bearing and decorative panels with spacers to maintain air gap
RU2078180C1 (en) A set of prefabricated travelling tunnel-type forms
FR2802951A1 (en) Frame for building supporting wall has wooden uprights with lateral grooves for insulating panels and notches for cross beams
BE502215A (en)
BE1007969A6 (en) I.H.S. (International Housing System)