EP1382759A1 - Prefabricated construction elements for a building and building with such elements - Google Patents

Prefabricated construction elements for a building and building with such elements Download PDF

Info

Publication number
EP1382759A1
EP1382759A1 EP02370031A EP02370031A EP1382759A1 EP 1382759 A1 EP1382759 A1 EP 1382759A1 EP 02370031 A EP02370031 A EP 02370031A EP 02370031 A EP02370031 A EP 02370031A EP 1382759 A1 EP1382759 A1 EP 1382759A1
Authority
EP
European Patent Office
Prior art keywords
walls
load
bearing
construction elements
elements according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP02370031A
Other languages
German (de)
French (fr)
Inventor
Roger Julien Cornil Logie
Pascal Hugues Antoine Vuylstecker
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Manufacture Logie Sarl
Original Assignee
Manufacture Logie Sarl
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Manufacture Logie Sarl filed Critical Manufacture Logie Sarl
Priority to EP02370031A priority Critical patent/EP1382759A1/en
Publication of EP1382759A1 publication Critical patent/EP1382759A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/02Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
    • E04B1/04Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B2001/7679Means preventing cold bridging at the junction of an exterior wall with an interior wall or a floor

Definitions

  • the invention relates to prefabricated building elements for the realization of a building.
  • the best known method after having laid the foundations, is to use bricks or concrete blocks which are assembled with mortar to form the walls of the building.
  • the insulation is then placed inside.
  • the invention proposes to improve this situation.
  • the invention also relates to the building obtained with the elements prefabricated.
  • This building is made in part by 2,3 construction elements prefabricated especially for the realization of walls.
  • the resistant structure 2A of the support wall is in material with thermal and / or acoustic insulation properties greater than that of concrete.
  • It can be aerated concrete or better still concrete with balls of expanded clay.
  • the insulating layer 2B covers the entire external surface of the structure resistant 2A.
  • the top of the carrier wall 2 has, set back from the external face 6 and this shrinkage being greater than the thickness “e” of the insulating layer, a face 7 called support located under the upper face 8 of said wall, the distance between the face support and the upper face of the load-bearing wall corresponding to the thickness of a slab 10.
  • the construction elements include advantageously a pre-slab 10A which, placed on the bearing faces 7 of the walls load-bearing, serves as lost formwork.
  • the decorative walls 3 which surround the enclosure formed by the walls 2 carriers are kept at the required distance from the carrier wall, below by means 4A for nesting and at the top by legs 4B fixed on the field of load-bearing and decorative walls.
  • struts support the prefabricated elements.
  • the foot of these struts can be anchored on legs 14 awaiting in the slab or slab receiving the walls.
  • the side edges of the elements prefabricated are provided with a fraction of a fitting means 4A of the type groove and rib.
  • this supporting wall has a fraction of a fitting means 4A of the groove and rib type provided during manufacture prefabricated elements.
  • the fixing of this interior wall is made in the same way as for the wall load-bearing, i.e. using stand-by concrete irons embedded in the slab of the ceiling and floor.
  • lifting rings 17 are provided during manufacture.
  • it can be a V-shaped concrete iron protruding from the top of the prefabricated element.
  • the top of the load-bearing walls has sand pits to support the frame.
  • the top of the walls will present a notch 18 which will then be filled.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The construction system consists of prefabricated components with internal load-bearing and insulating layers and external decorative layers, with spacers to maintain the required air gap between the internal and external layers. The spacers are in the form of tenon and mortise joints (4A) between adjacent prefabricated component, and mechanical supports (4B) that hold the layers apart between assembly and construction. The load-bearing layer of each component has higher acoustic/thermal insulating properties than plain concrete and is made e.g. from cellular concrete or concrete containing expanded clay balls.

Description

L'invention se rapporte à des éléments de construction préfabriqués pour la réalisation d'un bâtiment.The invention relates to prefabricated building elements for the realization of a building.

Elle se rapporte également aux bâtiments obtenus à l'aide des éléments préfabriqués.It also relates to buildings obtained using the elements prefabricated.

Il existe plusieurs méthodes pour construire un bâtiment.There are several methods for constructing a building.

La méthode la plus connue consiste, après avoir érigé les fondations, à utiliser des briques ou des parpaings qui sont assemblés au mortier pour former les murs du bâtiment.The best known method, after having laid the foundations, is to use bricks or concrete blocks which are assembled with mortar to form the walls of the building.

Lorsque l'on souhaite un étage supplémentaire, on coule parfois une dalle en béton qui s'étend sur toute la surface du bâtiment ou alors on pose une structure portante en bois pour y placer un plancher avant de poursuivre la construction des murs qui, bien souvent, se limitent aux deux pignons de la maison.When you want an additional floor, you sometimes pour a slab in concrete which extends over the entire surface of the building or else a structure is laid wooden support to place a floor before continuing the construction of walls which, very often, are limited to the two gables of the house.

Ces murs étant créés et la charpente et le toit étant posée, on procède à l'isolation de la construction en fixant sur la face interne de la construction des panneaux composites comprenant une couche de plâtre et une couche de matériau isolant, tel du polystyrène.These walls being created and the frame and the roof being laid, we proceed to the insulation of the construction by fixing on the internal face of the construction composite panels comprising a layer of plaster and a layer of material insulator, such as polystyrene.

Suivant une autre méthode, au lieu de constituer les murs au moyen de briques, il est connu de couler sur place les murs en béton en utilisant des coffrages.According to another method, instead of constituting the walls by means of bricks, it is known to pour concrete walls on site using formwork.

Cette solution est plus généralement réservée aux immeubles à plusieurs étages plutôt qu'aux habitations traditionnelles.This solution is more generally reserved for buildings with several floors rather than traditional dwellings.

L'isolant est ensuite posé à l'intérieur.The insulation is then placed inside.

Il est également connu pour la réalisation des murs de faire appel à des panneaux préfabriqués en béton qui, une fois posés, sont revêtus à l'intérieur d'un isolant et à l'extérieur d'un parement qui, généralement, est un enduit ou parfois des briquettes collées sur la face externe des panneaux.It is also known for the construction of walls to use precast concrete panels which, once installed, are coated inside a insulation and on the outside of a facing which, generally, is a coating or sometimes briquettes glued to the outside of the panels.

Cette dernière solution permet d'améliorer le délai entre la commande de la maison ou d'un bâtiment pour tout autre usage et la livraison mais les habitations ainsi réalisées ne sont pas mieux isolées que les autres et le temps de construction n'est que réduit partiellement.The latter solution improves the time between ordering the house or building for any other use and delivery but the dwellings thus produced are not better insulated than the others and the construction time is only partially reduced.

Par ailleurs, on fait souvent appel à une structure métallique composée de montants entre lesquels on dispose les panneaux préfabriqués.In addition, a metallic structure composed of uprights between which the prefabricated panels are placed.

L'invention se propose d'améliorer cette situation.The invention proposes to improve this situation.

A cet effet, l'invention a pour objet des éléments de construction préfabriqués pour la réalisation d'immeubles, ces élément de construction étant caractérisés en ce qu'il comprennent :

  • une paroi porteuse composite préfabriquée comprenant elle-même une structure résistante et une couche d'un isolant disposée sur la face externe de la structure portante,
  • une paroi dite décorative composite préfabriquée comprenant une couche de parement fixée sur une couche de béton et
  • des moyens de maintien à distance des parois porteuse et décorative en vue de délimiter, entre les deux parois précitées, une couche d'air.
To this end, the invention relates to prefabricated construction elements for the realization of buildings, these construction elements being characterized in that they comprise:
  • a prefabricated composite load-bearing wall itself comprising a resistant structure and a layer of insulator placed on the external face of the load-bearing structure,
  • a so-called prefabricated composite decorative wall comprising a facing layer fixed on a concrete layer and
  • means for maintaining the supporting and decorative walls at a distance in order to delimit, between the two aforementioned walls, a layer of air.

L'invention a également pour objet l'immeuble obtenu avec les éléments préfabriqués.The invention also relates to the building obtained with the elements prefabricated.

L'invention sera bien comprise à l'aide de la description ci-après faite à titre d'exemple non limitatif en regard du dessin ci-annexé qui représente schématiquement :

  • figure 1 : une coupe verticale d'une partie d'un bâtiment,
  • figure 2 : une coupe horizontale d'une partie d'un bâtiment,
  • figures 3 et 4 : variantes de la coupe verticale,
  • figures 5 et 6 : détails de réalisation.
The invention will be clearly understood with the aid of the description below given by way of nonlimiting example with regard to the appended drawing which schematically represents:
  • Figure 1: a vertical section of part of a building,
  • Figure 2: a horizontal section of part of a building,
  • Figures 3 and 4: variants of the vertical section,
  • Figures 5 and 6: details of construction.

En se reportant au dessin, on voit partiellement un bâtiment 1.Referring to the drawing, we partially see a building 1.

Cet immeuble est fait en partie au moyen d'éléments 2,3 de construction préfabriqués notamment pour la réalisation des murs.This building is made in part by 2,3 construction elements prefabricated especially for the realization of walls.

Ces éléments de construction comprennent :

  • une paroi porteuse 2 composite préfabriquée comprenant elle-même une structure 2A résistante et une couche 2B d'un isolant disposée sur la face externe de la structure résistante,
  • une paroi 3 dite décorative composite préfabriquée comprenant une couche 3A de parement fixée sur une couche 3B de béton et
  • des moyens 4 de maintien à distance des parois porteuse et décorative en vue de délimiter, entre les deux parois précitées, une couche 5 d'air.
These building elements include:
  • a prefabricated composite supporting wall 2 itself comprising a resistant structure 2A and a layer 2B of an insulator arranged on the external face of the resistant structure,
  • a wall 3 known as a prefabricated composite decorative wall comprising a facing layer 3A fixed on a concrete layer 3B and
  • means 4 for keeping the load-bearing and decorative walls at a distance in order to delimit, between the two aforementioned walls, a layer 5 of air.

Avantageusement la structure résistante 2A de la paroi porteuse est en matériau ayant des propriétés d'isolation thermique et/ou acoustique supérieures à celle du béton.Advantageously, the resistant structure 2A of the support wall is in material with thermal and / or acoustic insulation properties greater than that of concrete.

Il peut s'agir du béton cellulaire ou mieux encore du béton avec des billes d'argile expansée.It can be aerated concrete or better still concrete with balls of expanded clay.

En utilisant ce béton avec billes d'argile, on constitue alors un mur qui « respire » et qui, tout en étant plus isolant que le béton, accumule de la chaleur.Using this concrete with clay balls, we then constitute a wall which "Breathes" and which, while being more insulating than concrete, accumulates heat.

La couche isolante 2B couvre la totalité de la surface externe de la structure résistante 2A.The insulating layer 2B covers the entire external surface of the structure resistant 2A.

Afin d'éviter les ponts thermiques, lors de la réalisation d'une dalle supérieure formant le plafond de l'immeuble et pour réaliser une liaison entre toutes les parois porteuses, le haut de la paroi porteuse 2 présente, en retrait de la face externe 6 et ce retrait étant supérieur à l'épaisseur « e » de la couche isolante, une face 7 dite d'appui située sous la face supérieure 8 de la dite paroi, la distance entre la face d'appui et la face supérieure de la paroi porteuse correspondant à l'épaisseur d'une dalle 10.To avoid thermal bridges, when making an upper slab forming the ceiling of the building and to make a connection between all the walls carriers, the top of the carrier wall 2 has, set back from the external face 6 and this shrinkage being greater than the thickness “e” of the insulating layer, a face 7 called support located under the upper face 8 of said wall, the distance between the face support and the upper face of the load-bearing wall corresponding to the thickness of a slab 10.

Des fers 9 à béton en attente, faisant saillies sur la face interne du mur porteur, permettent de liaisonner les murs porteurs et la dalle 10 plafond ou la dalle 11 du sol qui seront ultérieurement coulées après mise en place des parois porteuses.Concrete irons 9 waiting, protruding from the inside of the wall load-bearing, make it possible to link load-bearing walls and the ceiling slab or slab 11 from the ground which will later be poured after the walls have been put in place carriers.

Pour constituer la dalle 10 plafond, les éléments de construction comprennent avantageusement une pré-dalle 10A qui, posée sur les faces 7 d'appui des parois porteuses, sert de coffrage perdu.To constitute the ceiling slab 10, the construction elements include advantageously a pre-slab 10A which, placed on the bearing faces 7 of the walls load-bearing, serves as lost formwork.

Les parois 3 décoratives qui entourent l'enceinte formée par les parois 2 porteuses sont maintenues à distance requise de la paroi porteuse, en bas par des moyens 4A d'emboítement et en haut par des pattes 4B fixées sur le champ des parois porteuse et décorative. The decorative walls 3 which surround the enclosure formed by the walls 2 carriers are kept at the required distance from the carrier wall, below by means 4A for nesting and at the top by legs 4B fixed on the field of load-bearing and decorative walls.

Lors de la fabrication de ces parois préfabriquées, on prévoit de mettre en place en divers points une vis 50 en acier inoxydable en attente de recevoir ces pattes 4B.During the manufacture of these prefabricated walls, provision is made to places a stainless steel screw 50 at various points waiting to receive these legs 4B.

Comme indiqué plus haut, pour l'immobilisation du pied de la paroi porteuse, des fers en bétons en attente font saillies latéralement et sont ensuite noyés dans une chape de ciment qui recevra ultérieurement le carrelage de sol.As indicated above, for the immobilization of the foot of the bearing wall, waiting concrete irons protrude laterally and are then embedded in a cement screed which will later receive the floor tiles.

Lors de la construction afin de maintenir les parois porteuses verticales, des jambes de force permettent de soutenir les éléments préfabriqués.During construction in order to keep the load-bearing walls vertical, struts support the prefabricated elements.

Le pied de ces jambes de force peut s'ancrer sur des pattes 14 en attente dans le radier ou la dalle recevant les parois.The foot of these struts can be anchored on legs 14 awaiting in the slab or slab receiving the walls.

Comme on peut le voir sur les dessins, les bords latéraux des éléments préfabriqués sont pourvus d'une fraction d'un moyen d'emboítement 4A du type rainure et nervure.As can be seen in the drawings, the side edges of the elements prefabricated are provided with a fraction of a fitting means 4A of the type groove and rib.

On choisira de préférence une rainure et une nervure de section triangulaire qui faciliteront la mise en place et le positionnement automatique des éléments préfabriqués entre eux.We will preferably choose a groove and a rib of triangular section which will facilitate the automatic positioning and positioning of the elements prefabricated with each other.

Les différents panneaux seront donc mis côte à côte emboítés sans ciment.The different panels will therefore be placed side by side fitted without cement.

En ce qui concerne les murs 16 intérieurs destinés à séparer la surface disponible en plusieurs pièces utilisables, au droit de la jonction entre ces murs 16 intérieurs et la paroi 2 porteuse, cette paroi porteuse présente une fraction d'un moyen d'emboítement 4A du type rainure et nervure prévues lors de la fabrication des éléments préfabriqués.Regarding the interior walls 16 intended to separate the surface available in several usable parts, at the junction between these walls 16 interior and the supporting wall 2, this supporting wall has a fraction of a fitting means 4A of the groove and rib type provided during manufacture prefabricated elements.

De préférence, il s'agira de la rainure.Preferably, it will be the groove.

La fixation de ce mur intérieur est faite de la même manière que pour la paroi porteuse, c'est à dire à l'aide de fers à béton en attente noyés dans la dalle du plafond et du sol.The fixing of this interior wall is made in the same way as for the wall load-bearing, i.e. using stand-by concrete irons embedded in the slab of the ceiling and floor.

Pour la manipulation des éléments préfabriqués, des anneaux 17 de levage sont prévus lors de la fabrication.For the handling of the prefabricated elements, lifting rings 17 are provided during manufacture.

Par exemple, il peut s'agir de fer à béton plié en Vé faisant saillie sur le haut de l'élément préfabriqué.For example, it can be a V-shaped concrete iron protruding from the top of the prefabricated element.

Ces anneaux 17 ne seront pas localisés au niveau des moyens de fixation des pattes assurant la liaison entre les parois porteuse et décorative. These rings 17 will not be located at the level of the means for fixing the legs ensuring the connection between the load-bearing and decorative walls.

Ils participeront à la liaison avec la dalle plafond.They will participate in the connection with the ceiling tile.

Comme on peut le voir, par exemple, le haut des parois porteuses comporte des sablières pour l'appui de la charpente.As can be seen, for example, the top of the load-bearing walls has sand pits to support the frame.

Ces sablières sont fixées lors de la fabrication.These sand plates are fixed during manufacture.

Au niveau de ces points particuliers, le haut des parois présentera une échancrure 18 qui sera ensuite comblée.At these particular points, the top of the walls will present a notch 18 which will then be filled.

Le principe de la pose consiste :

  • a) première semaine :
    • le premier jour à poser les fondations plus le radier 20 en béton,
    • le deuxième jour, à tracer sur le radier 20 les emplacements des panneaux et poser les niveaux avec deux cales par panneau,
    • le troisième jour, à poser le sous-sol, comprenant tous les murs 30, pré-dalles 31 et couler le béton en compression,
    • le quatrième jour, finition du solin coin extérieur et pose du drainage et égouttage,
    • le cinquième jour, à tracer et poser des cales pour le rez-de-chaussée et nivellement des terres sur le périmètre du sous-sol.
  • b) deuxième semaine :
    • premier jour, à poser toutes les parois porteuses du rez-de-chaussée, les pré-dalles et à couler le béton 32, 10 de compression de la dalle inférieure et du plafond,
    • deuxième jour, à poser des panneaux 3 de parement en briques de façade sur le périmètre extérieur du rez-de-chaussée, poser des pignons de béton et de briques, poser le conduit de cheminée et poser provisoirement la charpente préfabriquée,
    • troisième jour, finition des façades, pose des plaquettes de liaison des panneaux, rejointoiement et pose de la charpente,
    • quatrième jour, à poser la charpente et à poser les seuils extérieurs,
    • cinquième jour, mise à sec provisoire par la sous-toiture plus pose de la zinguerie.
  • c) troisième semaine : la semaine complète pour la couverture et pose de toutes les menuiseries extérieures. A la fin de la semaine, le bâtiment est terminé en « clos couvert ».
  • The principle of the installation consists:
  • a) first week:
    • the first day to lay the foundations plus the concrete slab 20,
    • on the second day, mark the locations of the panels on the raft 20 and lay the levels with two shims per panel,
    • on the third day, to lay the basement, including all the walls 30, pre-slabs 31 and pour the concrete in compression,
    • on the fourth day, finish the external corner flashing and apply drainage and drainage,
    • on the fifth day, to draw and place shims for the ground floor and leveling of the land on the perimeter of the basement.
  • b) second week:
    • first day, laying all the load-bearing walls of the ground floor, the pre-slabs and pouring the concrete 32, 10 for compression of the lower slab and the ceiling,
    • second day, lay facade brick facing panels 3 on the outside perimeter of the ground floor, lay concrete and brick gables, lay the chimney flue and temporarily lay the prefabricated frame,
    • third day, finishing of the facades, installation of the panels connecting panels, repointing and installation of the framework,
    • fourth day, to lay the frame and to lay the external thresholds,
    • fifth day, provisional drying by the roofing plus laying of zinc works.
  • c) third week: the full week for covering and installing all exterior joinery. At the end of the week, the building is finished in “closed enclosure”.
  • Concernant les renseignements techniques pour la pose sur chantier :

  • 1) après avoir le bon sol pour les murs porteurs, les fondations se terminent toujours par un radier général. Au moment de couler le béton, il est placé toutes les attaches 33 panneaux (suivant le plan de pose) ;
  • 2) le niveau du sol-sol comprend trois solutions, en vide sanitaire, en cave ou en sol-sol avec rampe d'accès. Pour les trois cas, la structure est identique, il n'y a que la hauteur des murs qui varie,
  • 3) au moins un jour avant la pose du sous-sol, il faut prévoir :
    • de tracer sur le radier tous les murs ainsi que la longueur des panneaux 30,
    • de poser au mortier des cales de niveaux à plus ou moins cinquante centimètres des extrémités de chaque panneau (cale métallique 50/5 suivant largeur du mur),
  • 4) pose dans un bain de mortier frais de tous les panneaux 30 du sous-sol ; le premier panneau aura deux attaches panneaux, ensuite une attache panneaux du côté opposé de l'emboítement avec le précédent pour le réglage des panneaux. Le problème ne se pose pas horizontalement puisque les panneaux se posent sur des les cales. Verticalement, il suffit de visser ou dévisser les étais 34 pour être d'aplomb ;
  • 5) une fois tous les panneaux dressés et stabilisés par les étais-attaches, on peut commercer à poser les pré-dalles en prenant soin :
    • de garder tous les crochets de levage de chaque panneau pour relier dans le béton de compression,
    • de placer des filières et des étais pour supporter les pré-dalles ;
  • 6) plier toutes les barres acier en attente de chaque panneau et mettre des barres d'ancrage à chaque crochet de levage, le tout pour être enrobé dans le béton de compression,
  • 7) au moins un jour avant la pose du rez-de-chaussée, faire la préparation identique au sol-sol ;
  • 8) la pose du rez-de-chaussée comprend deux journées, le premier jour pour poser toute la partie murs en béton y compris le plancher haut rez-de-chaussée ; pour le principe de pose, se reporter aux points 4, 5 et,
  • 9) le lendemain ou plus tard :
    • commencer par poser sur le périmètre extérieur du rez-de-chaussée les panneaux de parement en briques de façade, voire le profil à la base de ces panneaux qui correspond au profil de la tête des panneaux sous-sol et le maintien vertical des panneaux est assuré par les fers plats galvanisés environ tous les un mètre cinquante,
    • une fois le périmètre placé, pose des pignons en béton au mortier frais sur la dalle et maintenus verticalement par deux étais à vis, ensuite pose du panneau parement en briques de façade (même principe que le point 9),
    • pose du conduit de cheminée ou de conduit technique, maintenu verticalement par deux étais opposés et profiter de la grue de montage pour monter les éléments de charpente ;
  • 10) le jour suivant : finition des parements par pose des briques de liaison panneaux dans un bain de mastic et ensuite rejointoiement en finition avec mortier de la même composition que celui de l'usine.
  • Regarding technical information for installation on site:
  • 1) after having the right soil for load-bearing walls, the foundations always end with a general raft. When pouring the concrete, all the 33 panel fasteners are placed (according to the laying plan);
  • 2) the ground-floor level includes three solutions, in crawl space, in a cellar or in ground-floor with an access ramp. For the three cases, the structure is identical, only the height of the walls varies,
  • 3) at least one day before laying the basement, you must plan:
    • to trace on the raft all the walls as well as the length of the panels 30,
    • place level shims more or less fifty centimeters from the ends of each panel in the mortar (metal shim 50/5 depending on the width of the wall),
  • 4) laying in a fresh mortar bath all the panels 30 of the basement; the first panel will have two panel fasteners, then a panel fastener on the opposite side of the socket with the previous one for adjusting the panels. The problem does not arise horizontally since the panels are posed on wedges. Vertically, it suffices to screw or unscrew the struts 34 to be plumb;
  • 5) once all the panels are erected and stabilized by the props, we can start installing the pre-slabs, taking care:
    • to keep all the lifting hooks of each panel to connect in the compression concrete,
    • to place dies and props to support the pre-slabs;
  • 6) bend all the steel bars awaiting each panel and put anchor bars on each lifting hook, all to be embedded in the compression concrete,
  • 7) at least one day before laying the ground floor, make the preparation identical to the ground-floor;
  • 8) the laying of the ground floor includes two days, the first day to lay all the concrete walls part including the high ground floor; for the installation principle, see points 4, 5 and,
  • 9) the next day or later:
    • start by placing the facade brick facing panels on the outside perimeter of the ground floor, or even the profile at the base of these panels which corresponds to the profile of the head of the basement panels and the vertical support of the panels is supplied by flat irons galvanized approximately every 1.5 meters,
    • once the perimeter has been placed, put concrete gables in fresh mortar on the slab and held vertically by two screw stays, then install the facing brick facing panel (same principle as point 9),
    • installation of the chimney or technical conduit, held vertically by two opposite props and take advantage of the assembly crane to mount the structural elements;
  • 10) the following day: finishing of the facing by laying the bricks connecting the panels in a bath of mastic and then repointing in finishing with mortar of the same composition as that of the factory.
  • Claims (10)

    Eléments de construction préfabriqués pour la réalisation d'un bâtiment, ces éléments de constructions étant CARACTERISES en ce qu'ils comprennent : une paroi porteuse (2) composite préfabriquée comprenant elle-même une structure (2A) résistante et une couche (2B) d'un isolant disposée sur la face externe de la structure résistante, une paroi (3) dite décorative composite préfabriquée comprenant une couche (3A) de parement fixée sur une couche (3B) de béton et des moyens (4) de maintien à distance des parois porteuse et décorative en vue de délimiter, entre les deux parois précitées, une couche (5) d'air. Prefabricated construction elements for the realization of a building, these construction elements being CHARACTERIZED in that they include: a prefabricated composite bearing wall (2) itself comprising a resistant structure (2A) and a layer (2B) of an insulator disposed on the external face of the resistant structure, a prefabricated composite decorative wall (3) comprising a facing layer (3A) fixed on a concrete layer (3B) and means (4) for keeping the load-bearing and decorative walls at a distance in order to delimit, between the two aforementioned walls, a layer (5) of air. Eléments de construction selon la revendication 1 caractérisés en ce que la structure résistante (2A) de la paroi porteuse est en matériau ayant des propriétés d'isolation thermique et/ou acoustique supérieure à celle du béton.Construction elements according to claim 1, characterized in that the resistant structure (2A) of the load-bearing wall is made of a material having thermal and / or acoustic insulation properties superior to that of concrete. Eléments de construction selon la revendication 2 caractérisés en ce que le matériau consiste en du béton cellulaire ou du béton avec des billes d'argile expansée.Construction elements according to claim 2, characterized in that the material consists of aerated concrete or concrete with expanded clay balls. Eléments de construction selon la revendication 1 caractérisés en ce que la couche isolante (2B) couvre la totalité de la surface externe de la structure résistante (2A).Construction elements according to claim 1, characterized in that the insulating layer (2B) covers the entire external surface of the resistant structure (2A). Eléments de construction selon la revendication 1 caractérisés en ce que le haut de la paroi porteuse (2) présente, en retrait de la face externe (6) et ce retrait étant supérieur à l'épaisseur (e) de la couche isolante, une face (7) dite d'appui située sous la face supérieure (8) de la dite paroi, la distance entre la face d'appui et la face supérieure de la paroi porteuse correspondant à l'épaisseur d'une dalle (10).Construction elements according to claim 1 characterized in that the top of the load-bearing wall (2) has, set back from the external face (6) and this setback being greater than the thickness (e) of the insulating layer, a face (7) said support located under the upper face (8) of said wall, the distance between the support face and the upper face of the bearing wall corresponding to the thickness of a slab (10). Eléments de construction selon la revendication 1 caractérisés en ce qu'ils comprennent une pré-dalle (10A) qui, posée sur des faces (7) d'appui des parois porteuses, sert de coffrage perdu.Construction elements according to claim 1, characterized in that they include a pre-slab (10A) which, placed on the bearing faces (7) of the load-bearing walls, serves as lost formwork. Eléments de constructions selon la revendication 1 caractérisés en ce que les parois (3) décoratives qui entourent l'enceinte formée par les parois (2) porteuses sont maintenues à distance requise de la paroi porteuse, en bas par des moyens (4A) d'emboítement et en haut par des pattes (4B) fixées sur le champ des parois porteuse et décorative. Construction elements according to claim 1, characterized in that the decorative walls (3) which surround the enclosure formed by the supporting walls (2) are kept at the required distance from the supporting wall, below by means (4A) of nesting and at the top by legs (4B) fixed on the field of the load-bearing and decorative walls. Eléments de construction selon la revendication 7 caractérisés en ce qu'une rainure et une nervure de section triangulaire facilitent la mise en place et le positionnement automatique des éléments préfabriqués entre eux.Building elements according to claim 7, characterized in that a groove and a rib of triangular section facilitate the positioning and the automatic positioning of the prefabricated elements together. Eléments de construction selon la revendication 1 caractérisés en ce qu'au droit de la jonction entre les murs (16) intérieurs et la paroi (2) porteuses, la paroi porteuse présente une fraction d'un moyen d'emboítement (4A) du type rainure et nervure prévues lors de la fabrication des éléments préfabriquésConstruction elements according to claim 1, characterized in that, at the junction between the interior walls (16) and the load-bearing wall (2), the load-bearing wall has a fraction of a fitting means (4A) of the type groove and rib provided during the manufacture of the prefabricated elements Bâtiment caractérisé en ce qu'il est constitué au moyen des éléments de construction selon l'une quelconque des revendications 1 à 9.Building characterized in that it is constituted by means of the construction elements according to any one of claims 1 to 9.
    EP02370031A 2002-07-16 2002-07-16 Prefabricated construction elements for a building and building with such elements Withdrawn EP1382759A1 (en)

    Priority Applications (1)

    Application Number Priority Date Filing Date Title
    EP02370031A EP1382759A1 (en) 2002-07-16 2002-07-16 Prefabricated construction elements for a building and building with such elements

    Applications Claiming Priority (1)

    Application Number Priority Date Filing Date Title
    EP02370031A EP1382759A1 (en) 2002-07-16 2002-07-16 Prefabricated construction elements for a building and building with such elements

    Publications (1)

    Publication Number Publication Date
    EP1382759A1 true EP1382759A1 (en) 2004-01-21

    Family

    ID=29762739

    Family Applications (1)

    Application Number Title Priority Date Filing Date
    EP02370031A Withdrawn EP1382759A1 (en) 2002-07-16 2002-07-16 Prefabricated construction elements for a building and building with such elements

    Country Status (1)

    Country Link
    EP (1) EP1382759A1 (en)

    Cited By (2)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    EP2118388A1 (en) * 2007-02-08 2009-11-18 Selvaag Creo AS A building element
    WO2015044533A1 (en) * 2013-09-27 2015-04-02 SARRAIL, Jean-Luc Device forming a wall construction element

    Citations (2)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    FR2209021A1 (en) * 1972-09-07 1974-06-28 Pailler Jean Prefabricated pavilion with polystyrene mattress - for thermal insulation, embedded in single-span prestressed concrete floor
    DE4323011A1 (en) * 1993-07-09 1995-01-12 Martin Dipl Ing Wochner Precast reinforced concrete component and building erected with it

    Patent Citations (2)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    FR2209021A1 (en) * 1972-09-07 1974-06-28 Pailler Jean Prefabricated pavilion with polystyrene mattress - for thermal insulation, embedded in single-span prestressed concrete floor
    DE4323011A1 (en) * 1993-07-09 1995-01-12 Martin Dipl Ing Wochner Precast reinforced concrete component and building erected with it

    Cited By (3)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    EP2118388A1 (en) * 2007-02-08 2009-11-18 Selvaag Creo AS A building element
    EP2118388A4 (en) * 2007-02-08 2014-03-12 Selvaag Creo As A building element
    WO2015044533A1 (en) * 2013-09-27 2015-04-02 SARRAIL, Jean-Luc Device forming a wall construction element

    Similar Documents

    Publication Publication Date Title
    CA2718375C (en) Prefabricated self-supporting construction element
    AU2018319415B2 (en) A modular building system
    FR2950638A1 (en) Constructive system for building, has wall elements equipped with two concrete strips spaced and connected together by vertical spacers, where parts of strips blades external to spacers form walls of slide boxes of framework of building
    KR101170103B1 (en) Assembly Trench And Trench Structure Using The Same
    EA013175B1 (en) Outer multi-story frame building wall of arcos system and method of erection thereof
    KR20090130711A (en) Insulating panel for construction, manufacturing method thereof and wall constructing method using this
    GB2428434A (en) Modular floor units
    EP1382759A1 (en) Prefabricated construction elements for a building and building with such elements
    WO2016046496A1 (en) Building having enhanced heat insulation, method for constructing said building, and fasteners designed for implementing said method
    FR2842552A1 (en) Prefabricated structural component for buildings comprises insulated load-bearing and decorative panels with spacers to maintain air gap
    AU2014252765B2 (en) Slab construction
    RU117943U1 (en) WALL AND MONOLITHIC FLOOR COVERING ASSEMBLY OVER COOL OR VENTILATED UNDERGROUND
    ES2362896T3 (en) COMPLETE WOODEN WOOL WALL ELEMENT STABILIZED WITH CEMENT, METHOD FOR MANUFACTURING IT AND CONSTRUCTION METHOD USING IT.
    EP0784128B1 (en) Process for the manufacturing of a half timbered panel, panel obtained by the process and construction comprising at least one such panel
    HRP20010056A2 (en) The flat-soffit large-span industrial building system
    EA011624B1 (en) Reinforced fill-dam body for a unilaterally thermally insulated prefabricated wall section and prefabricated wall section and method for its production
    FR2540161A1 (en) Method and elements for constructing a reinforced concrete building floor
    FR3128724A1 (en) Reinforcement element for prefabricated facades and process for the implementation of this element.
    FR2631054A1 (en) Building wall structure and method for forming such a structure
    FR2562583A1 (en) Externally insulated precast concrete elements
    JP3026929B2 (en) Pouch unit and construction method
    KR100356035B1 (en) Structure for contruction of floor heater
    CH300483A (en) Construction process.
    FR2480332A1 (en) Building construction using concrete components - has lightweight and hollow wall panels infilled on site with sound insulation
    FR2529599A1 (en) Method for constructing buildings having several stories, especially dwelling houses joined together in so-called "terraces" and houses thus obtained.

    Legal Events

    Date Code Title Description
    PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

    Free format text: ORIGINAL CODE: 0009012

    AK Designated contracting states

    Kind code of ref document: A1

    Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR IE IT LI LU MC NL PT SE SK TR

    AX Request for extension of the european patent

    Extension state: AL LT LV MK RO SI

    AKX Designation fees paid
    REG Reference to a national code

    Ref country code: DE

    Ref legal event code: 8566

    STAA Information on the status of an ep patent application or granted ep patent

    Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

    18D Application deemed to be withdrawn

    Effective date: 20040722