BE356359A - - Google Patents

Info

Publication number
BE356359A
BE356359A BE356359DA BE356359A BE 356359 A BE356359 A BE 356359A BE 356359D A BE356359D A BE 356359DA BE 356359 A BE356359 A BE 356359A
Authority
BE
Belgium
Prior art keywords
emi
floor
pillars
construction
posts
Prior art date
Application number
Other languages
French (fr)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Publication of BE356359A publication Critical patent/BE356359A/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • E04B1/3511Lift-slab; characterised by a purely vertical lifting of floors or roofs or parts thereof
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block

Description

       

   <EMI ID=1.1> 

-REIL POUR LA REALISATION DE CE PROCEDE..-

  
Jusqu'à présent&#65533;, les immeubles sont construits

  
en commençant par le rez de chaussée et en édifiant les. étages les uns au-dessus des autres. Cette manière

  
de procéder nécessite des échafaudages dispendieux et

  
des travaux de montage considérables.

  
Suivant la présente invention, on construit l'immeuble étage par.étage en commençant par l'étage

  
 <EMI ID=2.1> 

  
ou les étages construits étant exhaussés d'une hauteur correspondant à un étage, de manière à permettra ' la construction de l'étage immédiatement inférieur toujours à la même hauteur, de préférence au niveau du sol.

  
 <EMI ID=3.1> 

  
procédé un appareil de soulèvement, qui supportera le ou les étages construits et servira d'appui pour l'étage en construction et permettra de soulever le ou les étages, construits au moment voulu.

  
En particulier on pourra procéder à l'édification de l'immeuble comme il suit 

  
On effectuera, une fouille de profondeur convenable sur l'il que doit occuper l'immeuble. Au fond de celle-ci ci établira soit une fondation continue, soit plusieurn piles de maçonnerie sur lesquellés on établira un appareil destiné à élever les étages construits au fur et à mesure de leur construction tel que celui qui est représenté au dessin annexé.

  
Cet appareil comporte essentiellement des poteaux verticaux 5, que maintiennent des cadres inférieurs 1"[pound] et supérieurs 6,7. Ce dernier sert à supporter le ou les étages construits pendant la construction d'un étage. Un plancher de service 11 facilite la construction de ce dernier.

  
Les panneaux destinés à constituer le plancher haut de l'étage supérieur sont posés sur le plancher

  
de service 11, en ayant soin de laisser entra aux

  
des espaces suffisants pour le passage des poteaux 5 de l'appareil et des diverses entretoises et contreventements qui assurent leur rigidité. On assemble alors les piliers de l'immeuble aux angles des panneaux précédents. Tout l'ensemble est alors soulevé audessus du cadre supérieur 6,7, sur lequel repose le plancher dont les intervalles entre panneaux sont alors garnis par des éléments moulés d'avance qui le complètent et assurent sa rigidité. 

  
A ce moment on établit définitivement la couverture, terrasse, charpente, toiture etc...avec tous

  
 <EMI ID=4.1> 

  
sur le chantier à l'abri des intempéries.

  
On construit alors sur le plancher de service
11, le plancher bas de l'étage supérieur. On monte les piliers de l'immeuble qui relieront les deux planchers.

  
L'étage ainsi terminé comme gros oeuvre est alors exhaussé au moyen d'un appareil de levage tel que celui décrit ci-dessous, de manière que son plancher bas tienne au-dessus du cadre supérieur de l'appareil pour s'y reposer et supportant l'étage construit. Avant l'exhaussement, on a placé sur le plancher bas les panneaux destinés à la façade lorsque ce plancher est

  
 <EMI ID=5.1> 

  
les dits panneaux et on les met en place, par exemple au moyen d'une grue. On complète alors avantageusement la construction notamment en mettant/place les cloisons, parquets, canalisations, peinture, vitrerie etc...

  
 <EMI ID=6.1> 

  
étages suivants et pour leur exhaussement&#65533;*

  
Cependant il y a lieu de remarquer qu'une fois construit le rez-de-chaussée de l'immeuble, il faudra caler les piliers de l'immeuble sur les. piles de maçonnerie&#65533; du sous-sol.

  
Dans le cas d'un immeuble de grandes dimensions on peut l'édifier par tranches verticales successives.

  
Les. travaux de construction sont particulièrement facilités par L'appareil représenté au dessin annexé, dont la figure 1 est une vue suivant la ligne

  
BOUE de,;'la figure 3, tandis que la figure 2. en est une vue suivant la ligne ABCD de la figure 3, qui est <EMI ID=7.1>  

  
L*appareil représenté au dessin annexé comporte un poutrage inférieur formé par des entretoises longitudinales L et transversales 2, reposant sur les piles de maçonnerie 3= établies au fond de la fouille\4: Sur

  
ce poutrage sont montés des poteaux 5, dont les têtes sont maintenues par un second poutrage formé également par des en&#65533;retoises longitudinales 6 et transversales 7. C'est sur ce poutrage que viendront s'appuyer le ou les étages construits au moyen de taquets 8. On pourra même prévoir sur le poutrage des chemins de roulement 12-pour une grue. La rigidité de l'appareil est assurée par

  
des contreventements verticaux 9 entre les poteaux 5 et des contrefiches 10. 

  
L'appareil comporte également un plancher de

  
 <EMI ID=8.1> 

  
l'étage en construction et formé par des poutrelles longitudinales et transversales fixées aux poteaux 5.

  
Ces derniers supportent les dispositifs de levage constitués par des vis 14, maintenues par le haut sur des consoles 16, et sur le bas desquelles sont cla. vêtes des pignons coniques 17, entraînés par des arbres
18. Ces derniers reçoivent leur mouvement soit d'un arbre de commande générale entrainé par un moteur quel-
- conque 13, soit de dispositifs de manoeuvre à bras 19. Sur les via 14 peuvent se déplacer verticalement sans tourner des sabots 20, sur lesquels viendront s'appuyer les piliers de l'immeuble. Cet appareil dans lequel il n'y a. ni câble , ni chaine, offre une sécurité complète et possède en outre l'avantage de l'irréversibilité absolue.

  
Sur les chemins de roulement 12, peut se déplacer horizontalement une grue servant principalement à la pose des revêtements de façade.

  
la ou les étages construits reposeront donc sur

  
 <EMI ID=9.1>  construotion sont de préférence assemblés aux amorces des piliers déjà construits des étages supérieurs et sont en quelque sorte suspendus à eux.Enfin le plancher

  
 <EMI ID=10.1> 

  
en construction, et pourra comporter avantageusement

  
des voies de roulement pour faciliter les manoeuvres. La grue permettra notamment de poser les panneaux de façade rapidement et d'une manière générale les diverses parties de la construction.Enfin le soulèvement des étages construits est assuré par le déplacement des sabots 20

  
 <EMI ID=11.1> 

  
dispositifs de rattrapage particulier. La grue peut se

  
 <EMI ID=12.1> 

  
min de roulement comporte des rails mobiles dans les angles.,de manière à. pouvoir se mettre successivement dans. le prolongement de. deux chemins de roulement consécutifs à 90[deg.]..

  
La présente invention couvre également différentes réalisations de piliers de la construction, dont la forme permet la constitution d'une ossature métallique très robuste et facilite leur placement sur les sabots

  
de l'appareil élévatoire.

  
Ainsi les piliers situés au milieu de l'immeuble ont été représentés en plan figure 4 et en coupe élévation partielle figure 5.

  
Les piliers sont formés de quatre montants verticaux 30 formés d'un laminé en forme d'Y comme

  
 <EMI ID=13.1> 

  
recourbées comme le montre la figure 5 et venant s'assem- <EMI ID=14.1> 

  
rieure. Cette forme de pilier laisse intérieurement le passage du poteau 5 de l'appareil et ménage le logement des diverses canalisations. 

  
Les piliers de façade peuvent être réalisés comme il a été représenté à la figure 6 qui montre une coupe de ces piliers.Des montants verticaux 30 sont liaisonnés par des entretoises 31, et recouverts par

  
 <EMI ID=15.1> 

  
Les piliers d'angle sont formés par des montants verticaux 30, comme il a été représenté à la figure 7, recouverts de panneaux 33 et 37.

  
Naturellement la présente invention n'est pas limitée aux réalisations décrites ci-dessus, mais englobe tous les modes de réalisation retombant dans

  
la définition de l'invention.



   <EMI ID = 1.1>

-REIL FOR THE PERFORMANCE OF THIS PROCESS ..-

  
So far &#65533;, buildings are being built

  
starting with the ground floor and building them. floors one above the other. This way

  
to proceed requires expensive scaffolding and

  
considerable assembly work.

  
According to the present invention, the building is constructed floor by floor, starting with the floor

  
 <EMI ID = 2.1>

  
or the constructed floors being raised to a height corresponding to one storey, so as to allow the construction of the next lower storey always at the same height, preferably at ground level.

  
 <EMI ID = 3.1>

  
process a lifting device, which will support the floor (s) built and will serve as a support for the floor under construction and will allow the floor (s) to be lifted at the desired time.

  
In particular, we can proceed with the construction of the building as follows:

  
A suitable depth excavation will be carried out on the eye that the building must occupy. At the bottom of it will establish either a continuous foundation, or several masonry piles on which will be established a device intended to raise the floors built as and when their construction such as that shown in the accompanying drawing.

  
This apparatus essentially comprises vertical posts 5, which are held by lower 1 "[pound] and upper 6,7 frames. The latter serves to support the floor (s) constructed during the construction of a floor. A service floor 11 facilitates the installation. construction of the latter.

  
The panels intended to constitute the upper floor of the upper floor are placed on the floor

  
service 11, taking care to let the

  
sufficient spaces for the passage of the posts 5 of the apparatus and the various spacers and bracings which ensure their rigidity. The pillars of the building are then assembled at the angles of the previous panels. The whole assembly is then lifted above the upper frame 6, 7, on which the floor rests, the intervals between the panels of which are then lined with elements molded in advance which complete it and ensure its rigidity.

  
At this time we definitively establish the cover, terrace, frame, roof etc ... with all

  
 <EMI ID = 4.1>

  
on site sheltered from bad weather.

  
We then build on the service floor
11, the lower floor of the upper floor. The pillars of the building are mounted which will connect the two floors.

  
The floor thus finished as a shell is then raised by means of a lifting device such as that described below, so that its low floor is held above the upper frame of the device to rest and supporting the built floor. Before raising, the panels intended for the facade were placed on the low floor when this floor is

  
 <EMI ID = 5.1>

  
said panels and they are put in place, for example by means of a crane. The construction is then advantageously completed, in particular by installing the partitions, parquet floors, pipes, painting, glazing, etc.

  
 <EMI ID = 6.1>

  
following floors and for their enhancement &#65533; *

  
However, it should be noted that once the ground floor of the building has been constructed, the pillars of the building will have to be wedged on them. masonry piles &#65533; from the basement.

  
In the case of a large building, it can be built in successive vertical sections.

  
The. construction work is particularly facilitated by the apparatus shown in the accompanying drawing, of which Figure 1 is a view along the line

  
MUD of Figure 3, while Figure 2 is a view along the line ABCD of Figure 3, which is <EMI ID = 7.1>

  
The apparatus shown in the appended drawing comprises a lower beam formed by longitudinal L and transverse spacers 2, resting on the masonry piles 3 = established at the bottom of the excavation \ 4: On

  
This beam are mounted posts 5, the heads of which are held by a second beam formed also by longitudinal 6 and transverse braces 7. It is on this beam that the storey or floors built by means of cleats 8. It is even possible to provide on the beams bearing tracks 12 for a crane. The rigidity of the device is ensured by

  
vertical braces 9 between the posts 5 and struts 10.

  
The appliance also has a floor of

  
 <EMI ID = 8.1>

  
the floor under construction and formed by longitudinal and transverse beams fixed to the posts 5.

  
The latter support the lifting devices constituted by screws 14, held from above on consoles 16, and on the bottom of which are cla. bevel gears 17, driven by shafts
18. The latter receive their movement either from a general control shaft driven by a motor some-
- conch 13, or maneuvering devices with arms 19. On the via 14 can move vertically without turning the shoes 20, on which the pillars of the building will rest. This device in which there is. neither cable nor chain, offers complete security and also has the advantage of absolute irreversibility.

  
On the tracks 12, can move horizontally a crane serving mainly for the installation of facade coverings.

  
the floor (s) built will therefore be based on

  
 <EMI ID = 9.1> construotion are preferably assembled to the primers of the already constructed pillars of the upper floors and are in a way suspended from them.

  
 <EMI ID = 10.1>

  
under construction, and may advantageously include

  
running tracks to facilitate maneuvering. In particular, the crane will allow the facade panels to be installed quickly and the various parts of the construction in general. Finally, the lifting of the floors built is ensured by the movement of the shoes 20

  
 <EMI ID = 11.1>

  
special retrofit devices. The crane can be

  
 <EMI ID = 12.1>

  
min of bearing has movable rails in the angles., so as to. to be able to place themselves successively in. the extension of. two consecutive raceways at 90 [deg.] ..

  
The present invention also covers different embodiments of pillars of the construction, the shape of which allows the constitution of a very robust metal framework and facilitates their placement on the shoes.

  
of the lifting device.

  
Thus the pillars located in the middle of the building have been shown in plan in FIG. 4 and in partial elevation section in FIG. 5.

  
The pillars are formed of four vertical posts 30 formed of a Y-shaped laminate like

  
 <EMI ID = 13.1>

  
curved as shown in figure 5 and coming together- <EMI ID = 14.1>

  
higher. This form of pillar internally leaves the passage of the post 5 of the apparatus and protects the housing of the various pipes.

  
The facade pillars can be made as shown in Figure 6 which shows a section of these pillars. Vertical uprights 30 are linked by spacers 31, and covered by

  
 <EMI ID = 15.1>

  
The corner pillars are formed by vertical uprights 30, as shown in Figure 7, covered with panels 33 and 37.

  
Of course, the present invention is not limited to the embodiments described above, but encompasses all the embodiments falling within

  
the definition of the invention.


    

Claims (1)

La présente invention a pour objet un procédé The present invention relates to a method ainsi so de construction des édifices et les édifices/construits; ce procédé consiste à édifier successivement chacun des <EMI ID=16.1> construction of buildings and buildings / constructed; this process consists of successively building each of the <EMI ID = 16.1> manière à permettre la construction de l'étage immédiatement inférieur tout jours à la même hauteur et de préférence au niveau du sol. so as to allow the construction of the immediately lower storey all days at the same height and preferably at ground level. La présente invention couvre également un ap- The present invention also covers an application <EMI ID=17.1> <EMI ID = 17.1> dessus et applicable à la construction d'un genre différent. Cet appareil comporte des taquets ou analogues pour maintenir le ou les étages construits, des supports ou analogues pour soutenir l'étage en construction et & des dispositifs de soulèvement pour exhausser le ou les étages construits , above and applicable to the construction of a different kind. This apparatus comprises cleats or the like for holding the constructed story (s), brackets or the like for supporting the story under construction and lifting devices for raising the constructed story (s), Une bonne disposition consiste à construire A good arrangement is to build <EMI ID=18.1> <EMI ID = 18.1> poteaux dressés au voisinage des piliers de fondation. Autour de chaque pilier on pourra prévoir plusieurs piliers qui ,après soulèvement ,seront réunis\par des poles erected in the vicinity of the foundation pillars. Around each pillar, several pillars can be provided which, after lifting, will be joined by <EMI ID=19.1> <EMI ID = 19.1> exemple un seul poteau , pour les piliers de façade, deux poteaux , et pour les piliers d'intérieur, quatre poteaux,- Il est avantageux de former ces poteaux par un laminé ayant une section en forme d'Y. Le lavage pourra se faire au moyen de vérins à vis et écrous ,reliés de"préférence ensemble par une transmission rigide. example a single post, for the facade pillars, two posts, and for the interior pillars, four posts, - It is advantageous to form these posts by a laminate having a Y-shaped section. The washing can be done by means of screw jacks and nuts, preferably connected together by a rigid transmission. Dans une disposition intéressante, on place In an interesting arrangement, we place <EMI ID=20.1> <EMI ID = 20.1> vient d'être construit tandis que ce dernier et au niveau du sol; puis on relève les panneaux et on les met en place lorsque le dit plancher a été soulevé au niveau du premier étage. just built while the latter and at ground level; then the panels are raised and they are put in place when the said floor has been raised to the level of the first floor.
BE356359D 1927-12-09 BE356359A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR658203T 1927-12-09

Publications (1)

Publication Number Publication Date
BE356359A true BE356359A (en)

Family

ID=9008940

Family Applications (1)

Application Number Title Priority Date Filing Date
BE356359D BE356359A (en) 1927-12-09

Country Status (2)

Country Link
BE (1) BE356359A (en)
FR (1) FR658203A (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2758467A (en) * 1950-08-12 1956-08-14 Philip N Youtz Building apparatus
US3052449A (en) * 1958-10-06 1962-09-04 John C Long Jacking means for building construction
FR2285500A1 (en) * 1974-09-19 1976-04-16 Harouimi Armande Erecting building from stacked floor modules - by jacking up and securing successive modules

Also Published As

Publication number Publication date
FR658203A (en) 1929-06-01

Similar Documents

Publication Publication Date Title
CA2663156A1 (en) Building, in particular a dwelling, with frames and columns and method of erecting it
BE1003666A3 (en) Framework for buildings.
EP0507623B1 (en) Building construction
BE356359A (en)
FR2581112A1 (en) Method for increasing the height of a roof of an existing building and means for the implementation of the method
FR2635550A1 (en) Method for raising buildings
CH139454A (en) Method of constructing buildings, apparatus for carrying out this method and building obtained by this method.
FR2464339A1 (en) Multi-storey building frame made of precast units - uses columns between doubled rectangular floor slabs with cavity connected by ties in column ducts
EP1148184A3 (en) An overflow system with a spillway rim, particularly for a prefabricated swimming pool to be sunk into the ground, and a method and apparatus for its construction
BE552986A (en)
FR1465539A (en) Building construction process
EP0136241B1 (en) Device for the production of elements in one piece designed for the construction of burial vaults
BE511396A (en)
WO1993019264A1 (en) Earthquake-proof building
JP2935591B2 (en) Semi-underground multi-story parking lot unit and construction method
CH300483A (en) Construction process.
JP3042865B2 (en) Method of forming semi-underground multi-story parking unit and semi-underground multi-story parking unit constructed by the method
FR2688018A1 (en) Modular construction for use as a dwelling and method for erecting such a construction
WO2006008293A1 (en) Load-bearing structure for buildings and method for construction of a load-bearing structure
FR2998321A1 (en) METHOD AND INSTALLATION FOR MANUFACTURING A MONOBLOC MORTAR CONSTRUCTION
JP3448359B2 (en) Unit type building with attached unit and its construction method
JP3231511B2 (en) Lift-up device for all-weather temporary roof
FR2585388A1 (en) A load-bearing structure and a method for constructing dwelling places according to a use of the said load-bearing structure
FR2896522A1 (en) Building construction e.g. single family house, has two reinforced concrete pillars that support central framework installed in innovative triangle, where triangle supports special truss, chevron, roof covering, ceiling
FR2574837A1 (en) Methods for constructing walls at the edge of floors of buildings