连接管组件及具有其的控制阀组件 Download PDFInfo
- Publication number
- WO2023045984A1 WO2023045984A1 PCT/CN2022/120311 CN2022120311W WO2023045984A1 WO 2023045984 A1 WO2023045984 A1 WO 2023045984A1 CN 2022120311 W CN2022120311 W CN 2022120311W WO 2023045984 A1 WO2023045984 A1 WO 2023045984A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- connecting pipe
- sleeve
- connecting sleeve
- wall
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L21/00—Joints with sleeve or socket
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L41/00—Branching pipes; Joining pipes to walls
- F16L41/08—Joining pipes to walls or pipes, the joined pipe axis being perpendicular to the plane of a wall or to the axis of another pipe
- F16L41/082—Non-disconnectable joints, e.g. soldered, adhesive or caulked joints
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L13/00—Non-disconnectable pipe joints, e.g. soldered, adhesive, or caulked joints
- F16L13/02—Welded joints
- F16L13/0209—Male-female welded joints
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K31/00—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by any single one of main groups B23K1/00 - B23K28/00
- B23K31/02—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by any single one of main groups B23K1/00 - B23K28/00 relating to soldering or welding
- B23K31/027—Making tubes by soldering or welding
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16K—VALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
- F16K27/00—Construction of housing; Use of materials therefor
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L13/00—Non-disconnectable pipe joints, e.g. soldered, adhesive, or caulked joints
- F16L13/02—Welded joints
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L13/00—Non-disconnectable pipe joints, e.g. soldered, adhesive, or caulked joints
- F16L13/08—Soldered joints
Definitions
- the present application relates to the technical field of control valves, in particular, to a connecting pipe assembly and a control valve assembly having the same.
- the existing control valve includes a valve body and a connecting pipe.
- the valve body is provided with a valve pipe, and the connecting pipe communicates with the valve body through the valve pipe.
- the valve pipe and the connecting pipe are fixed by welding. Due to the addition of too much solder or repeated plug-and-pull welding, welding bumps and welding slag will be formed in the welding area. The welding bumps and welding slag are easy to fall from the valve tube into the valve body, which will cause the passage in the valve body to be blocked and affect the control. normal use of the valve.
- the present application provides a connecting pipe assembly and a control valve assembly having the same, so as to solve the problem in the prior art that the poor welding of the connecting pipe assembly affects the normal use of the control valve.
- a connecting pipe assembly the connecting pipe assembly includes: a first connecting pipe having a first end and a second end oppositely disposed; a connecting sleeve, the first end of the first connecting pipe is located In the connection sleeve, the connection sleeve has a first end and a second end oppositely arranged, the first end of the connection sleeve is connected to the outer wall of the first connection pipe, and the inner wall of the middle part of the connection sleeve is connected to the second end of the first connection pipe.
- the first end of the first connecting pipe is arranged in the connecting sleeve, and there is a gap between the inner wall of the middle part of the connecting sleeve and the outer wall of the first end of the first connecting pipe, and the gap forms an accommodating cavity.
- the accommodating cavity can accommodate the welding spatter, welding slag or excess solder generated when the connecting sleeve and the second connecting pipe are welded, which can prevent the welding spatter, welding slag or excess solder from flowing out from the welding place, and ensures the normal use of the control valve.
- the wall thickness of the connecting sleeve 20 is T
- the maximum dimension of the gap in the radial direction is t
- 0 ⁇ t ⁇ T The wall thickness of the connecting sleeve is set as T
- the maximum dimension of the gap in the radial direction is set as t, 0 ⁇ t ⁇ T, which can further ensure the normal use of the control valve while improving the welding effect.
- the end of the second connecting pipe inside the connecting sleeve abuts against the first end of the first connecting pipe, and the end of the second connecting pipe inside the connecting sleeve is in contact with the outer wall of the first end of the first connecting pipe.
- the inner wall of the middle part of the connecting sleeve cooperates with each other to close the accommodating cavity.
- the accommodating chamber is closed by connecting the first connecting pipe, the connecting sleeve and the second connecting pipe to each other, which can prevent welding spatter, welding slag or excess solder from overflowing from the accommodating chamber, thereby avoiding welding spatter, welding Slag or excess solder flows into the control valve, ensuring the stability of the control valve during operation.
- the connecting sleeve includes a first section, a second section and a third section connected to each other, the first section of the connecting sleeve is connected to the first connecting pipe, and the third section of the connecting sleeve is connected to the second connecting pipe, An accommodation cavity is formed between the inner wall of the second section and the outer wall of the first end of the first connecting pipe, and the inner diameter of the second section increases gradually from the first section to the third section.
- the inner diameter of the third section is D
- the diameter of the outer wall of the first end of the first connecting pipe is d
- t (D-d)*0.5.
- the length of the first section is L1
- the distance between the end face of the first end of the connecting sleeve and the end face of the first end of the first connecting pipe is L2
- a limiting structure is provided on the inner wall of the connecting sleeve, the limiting structure is spaced from the first end of the first connecting pipe in the axial direction, and the limiting structure is used to limit the axial direction of the second connecting pipe in the connecting sleeve. Location.
- the limiting structure there is a certain distance between the second connecting pipe and the end surface of the first connecting pipe, which further increases the accommodation area of the accommodation cavity, thereby being able to accommodate more welding bumps, welding slag or excess solder , to further improve the welding effect.
- the plurality of protrusions form a position-limiting structure, and the plurality of protrusions are annularly arranged on the inner wall of the connecting sleeve at intervals.
- the limiting structure includes a protrusion, and the protrusion is annularly arranged on the inner wall of the connecting sleeve.
- Such setting can increase the contact area between the protrusion and the second connecting pipe, can limit the axial position of the second connecting pipe in the connecting sleeve, facilitates the welding of the second connecting pipe and the connecting sleeve, thereby further ensuring the second connection The stability of the connection between the pipe and the connecting sleeve.
- a control valve assembly is provided, and the control valve assembly includes the above connecting pipe assembly.
- Fig. 1 shows the sectional view of the connecting pipe assembly provided by the present application
- Fig. 2 shows the schematic diagram of the dimensions of the connecting pipe assembly provided by the present application
- Figure 3 shows a cross-sectional view of the first embodiment of the control valve assembly provided by the present application
- Figure 4 shows a cross-sectional view of a second embodiment of the control valve assembly provided by the present application
- Fig. 5 shows a schematic structural view of the second embodiment of the control valve assembly provided by the present application.
- Embodiment 1 of the present application provides a connecting pipe assembly, which includes: a first connecting pipe 10 , a connecting sleeve 20 and a second connecting pipe 40 .
- the first connecting pipe 10 has a first end and a second end oppositely arranged, and a connecting sleeve 20, the first end of the first connecting pipe 10 is located in the connecting sleeve 20, and the connecting sleeve 20 has a first end oppositely arranged.
- the first connecting pipe is connected to the valve port, and the second connecting pipe is connected to other external equipment.
- the first end of the first connecting pipe 10 is arranged in the connecting sleeve 20, and there is a gap between the inner wall of the middle part of the connecting sleeve 20 and the outer wall of the first end of the first connecting pipe 10, the gap An accommodation cavity 30 is formed, which can accommodate welding bumps, welding slag or excess solder generated when the connecting sleeve 20 and the second connecting pipe 40 are welded, so as to prevent welding bumps, welding slag or excess solder from flowing out from the welding place , to ensure the normal use of the control valve.
- the wall thickness of the connecting sleeve 20 is T
- the maximum dimension of the gap in the radial direction is t
- 0 ⁇ t ⁇ T The wall thickness of the connecting sleeve is set as T
- the maximum dimension of the gap in the radial direction is set as t, 0 ⁇ t ⁇ T, which can further ensure the normal use of the control valve while improving the welding effect.
- t can be set to 0.3T, 0.5T or 0.8T.
- the end portion of the second connecting pipe 40 located in the connecting sleeve 20 is in contact with the first end of the first connecting pipe 10
- the end portion of the second connecting pipe located in the connecting sleeve 20 is in contact with the first connecting pipe 10 .
- the outer wall of the first end of the connecting sleeve 20 and the inner wall of the middle part of the connecting sleeve 20 cooperate with each other to close the accommodating cavity 30 .
- the receiving chamber 30 is closed by connecting the first connecting pipe 10, the connecting sleeve 20 and the second connecting pipe to each other, which can prevent welding spatter, welding slag or excess solder from overflowing from the receiving chamber 30, thereby avoiding Prevent welding spatter, welding slag or excess solder from flowing into the control valve, and ensure the stability of the control valve during operation.
- the connecting sleeve 20 includes a first segment 21, a second segment 22 and a third segment 23 connected to each other, the first segment 21 of the connecting sleeve 20 is connected to the first connecting pipe 10, and the third segment of the connecting sleeve 20 Section 23 is connected to the second connecting pipe, and an accommodation cavity 30 is formed between the inner wall of the second section 22 and the outer wall of the first end of the first connecting pipe 10, and the inner diameter of the second section 22 is from the first section 21 to the third section 23 direction gradually increases.
- the above arrangement setting the connecting sleeve 20 as a variable diameter structure, can not only ensure the connection between the connecting sleeve 20 and the first connecting pipe 10 and the second connecting pipe 40, improve the stability during welding, but also facilitate the formation of the accommodating cavity 30 to accommodate weld flashes, slag, or excess solder after soldering.
- the inner diameter of the third section 23 is D
- the diameter of the outer wall of the first end of the first connecting pipe 10 is d
- t (D ⁇ d)*0.5.
- the length of the third section 23 is greater than the length of the first section 21 .
- Such arrangement can increase the connection area between the third section 23 and the second connecting pipe, thereby facilitating the welding of the connecting sleeve 20 and the second connecting pipe, and improving the structural strength of the two after welding.
- the length of the first section 21 is L1
- the distance between the end surface of the first end of the connecting sleeve 20 and the end surface of the first end of the first connecting pipe 10 is L2
- Embodiment 2 of the present application provides a connecting pipe assembly.
- the difference from Embodiment 1 is that a limiting structure 24 is provided on the inner wall of the connecting sleeve 20, and the limiting structure 24 is connected to the first connecting pipe assembly.
- the first end of the tube 10 has an interval in the axial direction, and the limiting structure 24 is used to limit the axial position of the second connecting tube in the connecting sleeve 20 .
- the limiting structure 24 there can be a certain distance between the second connecting pipe and the end surface of the first connecting pipe 10, which further increases the accommodation area of the accommodation chamber 30, thereby being able to accommodate more welding spatter, welding slag or The excess solder further improves the soldering effect.
- the multiple limiting structures 24 are annularly arranged on the inner wall of the connecting sleeve 20 .
- the limiting structure 24 includes a protrusion, and the protrusion is annularly arranged on the inner wall of the connecting sleeve 20 .
- Such arrangement can increase the contact area between the protrusion and the second connecting pipe 40, can limit the axial position of the second connecting pipe 40 in the connecting sleeve 20, and facilitate the welding of the second connecting pipe 40 and the connecting sleeve 20, thereby This further ensures the stability of the connection between the second connecting pipe 40 and the connecting sleeve 20 .
- Another embodiment of the present application provides a control valve assembly, which includes the connecting pipe assembly provided in the above embodiment.
- the first end of the first connecting pipe 10 is arranged in the connecting sleeve 20, and there is a gap between the inner wall of the middle part of the connecting sleeve 20 and the outer wall of the first end of the first connecting pipe 10. Gap, the gap forms a housing cavity 30, which can accommodate the welding bumps, welding slag or excess solder generated when the connecting sleeve 20 and the second connecting pipe 40 are welded, and can prevent the welding bumps, welding slag or redundant solder from The outflow from the welding place can ensure the normal use of the control valve while improving the welding effect.
- a limiting structure 24 is provided on the inner wall of the connecting sleeve 20 , so as to ensure the stability of the connection between the second connecting pipe 40 and the connecting sleeve 20 .
- orientation words such as “front, back, up, down, left, right", “horizontal, vertical, vertical, horizontal” and “top, bottom” etc. indicate the orientation Or positional relationship is generally based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the application and simplifying the description. In the absence of a contrary statement, these orientation words do not indicate or imply the device or element referred to It must have a specific orientation or be constructed and operated in a specific orientation, so it should not be construed as limiting the protection scope of the present application; the orientation words “inner and outer” refer to the inner and outer relative to the outline of each component itself.
- spatially relative terms may be used here, such as “on !, “over !, “on the surface of !, “above”, etc., to describe the The spatial positional relationship between one device or feature shown and other devices or features. It will be understood that the spatially relative terms are intended to encompass different orientations of the device in use or operation in addition to the orientation depicted in the figures. For example, if the device in the figures is turned over, devices described as “above” or “above” other devices or configurations would then be oriented “beneath” or “above” the other devices or configurations. under other devices or configurations”. Thus, the exemplary term “above” can encompass both an orientation of “above” and “beneath”. The device may be otherwise oriented (rotated 90 degrees or at other orientations) and the spatially relative descriptions used herein interpreted accordingly.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Valve Housings (AREA)
- Non-Disconnectible Joints And Screw-Threaded Joints (AREA)
- Quick-Acting Or Multi-Walled Pipe Joints (AREA)
Abstract
Description
Claims (10)
- 一种连接管组件,其特征在于,所述连接管组件包括:第一连接管(10),具有相对设置的第一端和第二端;连接套管(20),所述第一连接管(10)的第一端位于所述连接套管(20)内,所述连接套管(20)具有相对设置的第一端和第二端,所述连接套管(20)的第一端与所述第一连接管(10)的外侧壁连接,所述连接套管(20)的中部的内壁与所述第一连接管(10)的第一端的外壁之间具有间隙,所述间隙形成容纳腔(30);第二连接管(40),所述第二连接管(40)的一端与所述连接套管(20)的第二端连接,且所述第二连接管(40)的端部位于所述连接套管(20)内。
- 根据权利要求1所述的连接管组件,其特征在于,所述连接套管(20)的壁厚为T,所述间隙在径向上的最大尺寸为t,0<t<T。
- 根据权利要求1所述的连接管组件,其特征在于,所述第二连接管(40)的位于所述连接套管(20)内的端部与所述第一连接管(10)的第一端相抵接,所述第二连接管(40)的位于所述连接套管(20)内的端部与所述第一连接管(10)的第一端的外壁以及所述连接套管(20)的中部的内壁相互配合以封闭所述容纳腔(30)。
- 根据权利要求1所述的连接管组件,其特征在于,所述连接套管(20)包括相互连接的第一段(21)、第二段(22)和第三段(23),所述连接套管(20)的第一段(21)与所述第一连接管(10)连接,所述连接套管(20)的第三段(23)与所述第二连接管(40)连接,所述第二段(22)的内壁与所述第一连接管(10)的第一端的外壁之间形成所述容纳腔(30),所述第二段(22)的内径由所述第一段(21)至所述第三段(23)的方向逐渐增大。
- 根据权利要求4所述的连接管组件,其特征在于,所述第三段(23)的内径为D,所述第一连接管(10)的第一端的外壁的直径为d,t=(D-d)*0.5。
- 根据权利要求4所述的连接管组件,其特征在于,所述第一段(21)的长度为L1,所述连接套管(20)的第一端的端面与所述第一连接管(10)的第一端的端面之间的距离为L2,所述容纳腔(30)沿轴向的最大长度为L,L=L2-L1且L>0。
- 根据权利要求1所述的连接管组件,其特征在于,所述连接套管(20)的内壁上设置有限位结构(24),所述限位结构(24)与所述第一连接管(10)的第一端在轴向上具有间隔,所述限位结构(24)用于限制所述第二连接管(40)在所述连接套管(20)内的轴向位置。
- 根据权利要求7所述的连接管组件,其特征在于,所述连接套管(20)的内壁上有多个凸起,多个所述凸起形成所述限位结构(24),多个所述凸起环形间隔设置在所述连接套管(20)的内壁上。
- 根据权利要求7所述的连接管组件,其特征在于,所述限位结构(24)包括凸起,所述凸起环形设置在所述连接套管(20)的内壁上。
- 一种控制阀组件,其特征在于,所述控制阀组件包括权利要求1至9中任一项所述的连接管组件。
Priority Applications (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US18/694,842 US12467562B2 (en) | 2021-09-22 | 2022-09-21 | Connecting pipe assembly and control valve assembly with connecting pipe assembly |
| DE112022004496.9T DE112022004496T5 (de) | 2021-09-22 | 2022-09-21 | Verbindungsrohr-Baugruppe und Steuerventil-Baugruppe mit Verbindungsrohr-Baugruppe |
| JP2024516754A JP7811639B2 (ja) | 2021-09-22 | 2022-09-21 | 接続管アセンブリ及びそれを有する制御弁アセンブリ |
| KR1020247010558A KR20240049617A (ko) | 2021-09-22 | 2022-09-21 | 연결관 어셈블리 및 이를 구비한 제어 밸브 어셈블리 |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202122297347.5 | 2021-09-22 | ||
| CN202122297347.5U CN216158525U (zh) | 2021-09-22 | 2021-09-22 | 连接管组件及具有其的控制阀组件 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2023045984A1 true WO2023045984A1 (zh) | 2023-03-30 |
Family
ID=80853570
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/CN2022/120311 Ceased WO2023045984A1 (zh) | 2021-09-22 | 2022-09-21 | 连接管组件及具有其的控制阀组件 |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US12467562B2 (zh) |
| JP (1) | JP7811639B2 (zh) |
| KR (1) | KR20240049617A (zh) |
| CN (1) | CN216158525U (zh) |
| DE (1) | DE112022004496T5 (zh) |
| WO (1) | WO2023045984A1 (zh) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN216158525U (zh) | 2021-09-22 | 2022-04-01 | 浙江盾安人工环境股份有限公司 | 连接管组件及具有其的控制阀组件 |
| CN115306961B (zh) * | 2022-07-26 | 2023-04-25 | 含山瑞可金属有限公司 | 组合式管件及空调系统管路 |
| CN219139966U (zh) * | 2022-10-26 | 2023-06-06 | 浙江盾安禾田金属有限公司 | 针阀连接结构 |
| EP4617538A1 (en) * | 2022-12-28 | 2025-09-17 | Rifeng Enterprise (Foshan) Co., Ltd. | Welded quick-connect fitting, piping system, and pipeline connection method |
| CN120940801B (zh) * | 2025-10-17 | 2025-12-16 | 常州润来科技有限公司 | 一种铜管对接焊接装置及焊接方法 |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB391966A (en) * | 1931-12-22 | 1933-05-11 | Arthur La Rue Parker | Improvements in or relating to soldered joints |
| CN205781507U (zh) * | 2016-05-24 | 2016-12-07 | 浙江同星制冷有限公司 | 铜铝异形管防电化学连接装置 |
| CN109519389A (zh) * | 2018-12-06 | 2019-03-26 | 珠海格力节能环保制冷技术研究中心有限公司 | 管组件、压缩机 |
| CN110366655A (zh) * | 2017-03-07 | 2019-10-22 | 斯瓦戈洛克公司 | 混合软管组件 |
| EP3683484A1 (de) * | 2019-01-16 | 2020-07-22 | Helmut Jannach | Rohrkoppelsystem |
| CN111594669A (zh) * | 2019-02-21 | 2020-08-28 | 浙江三花智能控制股份有限公司 | 管件连接结构 |
| CN113236879A (zh) * | 2021-04-21 | 2021-08-10 | 广东美的暖通设备有限公司 | 空调管件、空调管路及空调器 |
| US20210285579A1 (en) * | 2020-03-13 | 2021-09-16 | Steere Enterprises, Inc. | Duct connector |
| CN216158525U (zh) * | 2021-09-22 | 2022-04-01 | 浙江盾安人工环境股份有限公司 | 连接管组件及具有其的控制阀组件 |
Family Cites Families (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS52118615A (en) | 1976-03-31 | 1977-10-05 | Hitachi Ltd | Specials welded joint |
| JPH05133489A (ja) | 1991-11-08 | 1993-05-28 | Furukawa Electric Co Ltd:The | ろう付け継手 |
| FR2727188A1 (fr) | 1994-11-21 | 1996-05-24 | Poujoulat Sa | Element tubulaire soude pour un conduit de gaz chaud, et son procede de realisation |
| US20040239115A1 (en) | 2001-01-19 | 2004-12-02 | Victaulic Company Of America | Mechanical pipe coupling derived from a standard fitting |
| US20050151369A1 (en) * | 2001-08-17 | 2005-07-14 | Baruh Bradford G. | Device and method for coupling pipes |
| JP2005121131A (ja) * | 2003-10-16 | 2005-05-12 | Ranco Japan Ltd | 弁ハウジングに管を接合する方法及びそのための接続部材 |
| JP2007046880A (ja) | 2005-08-12 | 2007-02-22 | Daikin Ind Ltd | 冷凍装置の冷媒配管構造 |
| US20080106095A1 (en) | 2006-11-08 | 2008-05-08 | Harris Richard K | Heater core connector tube |
| US20150097369A1 (en) | 2013-10-03 | 2015-04-09 | GM Global Technology Operations LLC | Duct connection system |
| EP4005718B1 (en) * | 2019-07-31 | 2023-10-04 | Daikin Industries, Ltd. | Refrigerant pipeline, and refrigeration device |
| JP6950735B2 (ja) | 2019-07-31 | 2021-10-13 | ダイキン工業株式会社 | 冷凍装置及び当該冷凍装置の冷媒配管 |
| JP7370833B2 (ja) | 2019-11-29 | 2023-10-30 | 株式会社鷺宮製作所 | 配管の接続構造、および、それを備える弁装置 |
-
2021
- 2021-09-22 CN CN202122297347.5U patent/CN216158525U/zh active Active
-
2022
- 2022-09-21 KR KR1020247010558A patent/KR20240049617A/ko active Pending
- 2022-09-21 JP JP2024516754A patent/JP7811639B2/ja active Active
- 2022-09-21 US US18/694,842 patent/US12467562B2/en active Active
- 2022-09-21 DE DE112022004496.9T patent/DE112022004496T5/de active Pending
- 2022-09-21 WO PCT/CN2022/120311 patent/WO2023045984A1/zh not_active Ceased
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB391966A (en) * | 1931-12-22 | 1933-05-11 | Arthur La Rue Parker | Improvements in or relating to soldered joints |
| CN205781507U (zh) * | 2016-05-24 | 2016-12-07 | 浙江同星制冷有限公司 | 铜铝异形管防电化学连接装置 |
| CN110366655A (zh) * | 2017-03-07 | 2019-10-22 | 斯瓦戈洛克公司 | 混合软管组件 |
| CN109519389A (zh) * | 2018-12-06 | 2019-03-26 | 珠海格力节能环保制冷技术研究中心有限公司 | 管组件、压缩机 |
| EP3683484A1 (de) * | 2019-01-16 | 2020-07-22 | Helmut Jannach | Rohrkoppelsystem |
| CN111594669A (zh) * | 2019-02-21 | 2020-08-28 | 浙江三花智能控制股份有限公司 | 管件连接结构 |
| US20210285579A1 (en) * | 2020-03-13 | 2021-09-16 | Steere Enterprises, Inc. | Duct connector |
| CN113236879A (zh) * | 2021-04-21 | 2021-08-10 | 广东美的暖通设备有限公司 | 空调管件、空调管路及空调器 |
| CN216158525U (zh) * | 2021-09-22 | 2022-04-01 | 浙江盾安人工环境股份有限公司 | 连接管组件及具有其的控制阀组件 |
Also Published As
| Publication number | Publication date |
|---|---|
| US12467562B2 (en) | 2025-11-11 |
| JP2024532586A (ja) | 2024-09-05 |
| CN216158525U (zh) | 2022-04-01 |
| DE112022004496T5 (de) | 2024-07-18 |
| JP7811639B2 (ja) | 2026-02-05 |
| KR20240049617A (ko) | 2024-04-16 |
| US20240392909A1 (en) | 2024-11-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2023045984A1 (zh) | 连接管组件及具有其的控制阀组件 | |
| CN219954236U (zh) | 电子膨胀阀 | |
| WO2023098767A1 (zh) | 电子膨胀阀 | |
| CN219345540U (zh) | 阀针组件及具有其的电子膨胀阀 | |
| WO2025092754A1 (zh) | 电子膨胀阀 | |
| CN218000490U (zh) | 滑块及具有其的四通阀 | |
| WO2023078363A1 (zh) | 管组件及具有其的四通阀 | |
| CN215806313U (zh) | 膨胀阀 | |
| CN114738495B (zh) | 电磁阀 | |
| CN210920266U (zh) | 电子膨胀阀 | |
| WO2025146145A1 (zh) | 电子膨胀阀 | |
| WO2024230697A1 (zh) | 电磁阀 | |
| WO2023143024A1 (zh) | 电子膨胀阀 | |
| CN220556052U (zh) | 电子膨胀阀 | |
| CN217736415U (zh) | 阀座结构及电子膨胀阀 | |
| WO2022148444A1 (zh) | 电磁阀 | |
| CN216479264U (zh) | 主阀座及四通阀 | |
| CN218523044U (zh) | 电子膨胀阀 | |
| CN218000487U (zh) | 换向阀 | |
| WO2023143025A1 (zh) | 阀座及具有其的电子膨胀阀 | |
| JP2501414B2 (ja) | 流体連絡装置およびその組立て方法 | |
| CN116557555A (zh) | 节流阀及具有其的换热系统 | |
| WO2025036484A1 (zh) | 单向阀 | |
| CN219345621U (zh) | 主阀装置及具有其的切换阀 | |
| CN221683682U (zh) | 流体管理装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 22872029 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: 2024516754 Country of ref document: JP Kind code of ref document: A |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 18694842 Country of ref document: US Ref document number: 2401001895 Country of ref document: TH |
|
| ENP | Entry into the national phase |
Ref document number: 20247010558 Country of ref document: KR Kind code of ref document: A |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 112022004496 Country of ref document: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 22872029 Country of ref document: EP Kind code of ref document: A1 |
|
| WWG | Wipo information: grant in national office |
Ref document number: 18694842 Country of ref document: US |