WO2022190816A1 - 生産計画立案装置、及び生産計画立案方法 - Google Patents
生産計画立案装置、及び生産計画立案方法 Download PDFInfo
- Publication number
- WO2022190816A1 WO2022190816A1 PCT/JP2022/006611 JP2022006611W WO2022190816A1 WO 2022190816 A1 WO2022190816 A1 WO 2022190816A1 JP 2022006611 W JP2022006611 W JP 2022006611W WO 2022190816 A1 WO2022190816 A1 WO 2022190816A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- information
- product
- production
- capacity
- work
- Prior art date
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 203
- 238000000034 method Methods 0.000 title claims abstract description 191
- 239000000047 product Substances 0.000 claims abstract description 260
- 230000008569 process Effects 0.000 claims abstract description 177
- 238000013439 planning Methods 0.000 claims abstract description 122
- 230000008520 organization Effects 0.000 claims abstract description 58
- 239000006227 byproduct Substances 0.000 claims abstract description 20
- 230000029087 digestion Effects 0.000 claims description 72
- 230000001079 digestive effect Effects 0.000 claims description 41
- 238000003860 storage Methods 0.000 claims description 20
- 238000012384 transportation and delivery Methods 0.000 claims description 17
- 230000010365 information processing Effects 0.000 claims description 7
- 238000004364 calculation method Methods 0.000 description 40
- 238000012545 processing Methods 0.000 description 33
- 238000010586 diagram Methods 0.000 description 30
- 238000009825 accumulation Methods 0.000 description 9
- 230000006870 function Effects 0.000 description 7
- 230000015654 memory Effects 0.000 description 7
- 238000004891 communication Methods 0.000 description 6
- 230000000694 effects Effects 0.000 description 5
- 230000003111 delayed effect Effects 0.000 description 3
- 230000007774 longterm Effects 0.000 description 3
- 230000008707 rearrangement Effects 0.000 description 3
- 239000004065 semiconductor Substances 0.000 description 3
- 230000004308 accommodation Effects 0.000 description 2
- 238000005401 electroluminescence Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 239000003086 colorant Substances 0.000 description 1
- 238000013500 data storage Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 238000009776 industrial production Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 239000004973 liquid crystal related substance Substances 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000002195 synergetic effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
Definitions
- the present invention relates to a production planning device and a production planning method.
- JIS Z 8141 2001 (3302) of the Japanese Industrial Standards (JIS)
- production plans are divided into large schedule plans, medium schedule plans, and small schedule plans.
- the large-scale schedule is a long-term production plan that serves as the master for the production schedule, and determines the monthly production volume.
- the middle schedule determines the production schedule for each department based on the long schedule.
- a daily work schedule is determined in a shorter span.
- the large schedule plan and medium schedule plan will be referred to as planning
- the small schedule plan will be referred to as scheduling
- digestion capacity means the ability of a specific worker or group of workers to perform specific work such as the final assembly of product A.
- the digestion capacity is doubled when two workers with the same capacity perform the work.
- Patent Document 1 when making a production plan, in order to make it possible to make an executable production plan while considering the workplace placement of workers, when making a production plan, For production workplaces, consider the period in which production capacity is fixed at each workplace, the period in which workers can be flexible between workplaces, and the period in which production capacity does not need to be considered when hiring new personnel. It is described to create a production plan that can be executed while making adjustments (summary).
- Patent Document 2 based on screw tightening work skill information of each worker in consideration of work experience and the number of work mistakes, and screw tightening work difficulty information of each work process defined quantitatively, In order to plan the allocation of screw tightening workers to each work process, screw tightening work skill information consisting of worker information, model information, work process information, parts information, work experience information, work error information, and work rank is collected.
- the step of generating and recording is performed by the screw tightening work skill information recording unit 10, and the generated screw tightening work skill information, the degree of difficulty in each work process of each model, the production plan of each model, and each worker
- the worker placement information recording unit 20 executes a step of generating worker placement information for each work process of each model whose production is planned based on the attendance status of each worker. It is described that the worker rearrangement information recording unit 30 executes a step of generating worker rearrangement information when rearrangement is required due to progress delay (abstract).
- Patent Document 1 proposes a technique that can determine the surplus or insufficient digestion capacity of each work group, and make a plan that considers personnel accommodation (support) between work groups. Further, Patent Document 2 proposes a technique of automatically generating skill information for each worker based on work performance, and of arranging or scheduling workers based on this.
- Patent Documents 1 and 2 do not consider planning based on work performance.
- each work group seeks the ability to digest the product groups and processes that the organization is in charge of as an organization, past short-term support results for other teams, and Considering the work in other teams that belonged to different skill determination methods, grasping the total digestive capacity (supportable digestive capacity) of workers in one's own organization in other organizations, and personnel accommodation between work teams It is necessary to formulate a plan that considers (support).
- the techniques described in Patent Documents 1 and 2 do not take the above into consideration.
- support is the lending and borrowing of personnel between organizations, and is carried out based on coordination between the heads of organizations and the exchange of personnel costs.
- planning for support is done during planning, rather than scheduling, which is done a few days before manufacturing execution.
- scheduling which is done a few days before manufacturing execution.
- the process of the own organization will be delayed due to the support from one organization to another organization, and even if the support is received, the other organization will not meet expectations.
- Patent Document 2 does not take this into account.
- on-site installation and other business trips are generally coordinated during planning, such as one week before the start of work. , the process in the factory is delayed, etc., and it is not possible to make effective business trip adjustments.
- the present invention has been made in view of these problems.
- One object is to provide a method.
- one of the inventions of the present application is a production planning apparatus having a processor and a storage device connected to the processor, wherein the storage device is used for work involved in the production of products.
- Skill rank information which is an index indicating the superiority or inferiority of each worker's skill set for each worker
- Digestive capacity information which is the work capacity required for each production process of the product corresponding to the skill rank
- correspondence for each product Project information which is information about the delivery date of the product
- work amount information for each product process which is information about the amount of work associated with each process of the product
- production results which is information about the past production period for each process of the product.
- Information and product process manager information that is information of the main responsible organization engaged in work for each product process, and the processor stores information about workers who make up the main responsible organization and the entire organization engaged in production; Based on the skill rank information and the production performance information, for each product process, the digestion capacity of the main responsible organization, the digestion capacity of the entire organization, and the maximum actual digestion capacity and minimum actual digestion capacity based on the production performance information are calculated. calculating the required work amount for each item included in the item information from the item information and the work amount information for each product process; Calculate and produce the amount of work required for each product process for the production of the products related to each of the aforementioned projects using either the capacity selected from the maximum actual capacity and minimum actual capacity based on information. It is a production planning device that executes planning processing to be output as plan information.
- FIG. 1 is a block diagram showing a configuration example of a production planning system according to one embodiment of the present invention.
- FIG. 2 is an explanatory diagram showing an example of the skill rank table in this embodiment.
- FIG. 3 is an explanatory diagram showing an example of the rank/skill definition table in this embodiment.
- FIG. 4 is an explanatory diagram showing an example of the item storage table in this embodiment.
- FIG. 5 is an explanatory diagram showing an example of the product/process master in this embodiment.
- FIG. 6 is an explanatory diagram showing an example of the actual production table in this embodiment.
- FIG. 7 is an explanatory diagram showing an example of the product group/process/group relation table in this embodiment.
- FIG. 8 is an explanatory diagram showing an example of a performance calculation result table in this embodiment.
- FIG. 1 is a block diagram showing a configuration example of a production planning system according to one embodiment of the present invention.
- FIG. 2 is an explanatory diagram showing an example of the skill rank table in this embodiment.
- FIG. 9 is an explanatory diagram showing an example of a production planning table in this embodiment.
- FIG. 10 is an explanatory diagram showing an example of the surplus capacity table in this embodiment.
- FIG. 11 is an explanatory diagram showing an example of the sales candidate product table in this embodiment.
- FIG. 12 is an explanatory diagram showing an example of the individual ability calculation result table in this embodiment.
- FIG. 13 is an explanatory diagram showing an example of an input screen output by the production planning system of this embodiment.
- FIG. 14 is an explanatory diagram showing an example of a surplus capacity/sales candidate product calculation result output screen output by the production planning system of the present embodiment.
- FIG. 15 is an explanatory diagram showing an example of a load accumulation result output screen output by the production planning system of this embodiment.
- FIG. 16 is a flow chart showing an example of processing of a capacity calculation program in the production planning system of this embodiment.
- FIG. 17 is a flow chart showing an example of processing of a plan/surplus relationship main program in the production planning system of this embodiment.
- FIG. 18 is a flow chart showing an example of processing of the production planning program in the production planning system of this embodiment.
- FIG. 19 is a flow chart showing an example of processing of a product group/process-specific surplus capacity calculation program in the production planning system of the present embodiment.
- FIG. 20 is a flow chart showing an example of processing of a sales candidate product identification program in the production planning system of this embodiment.
- FIG. 1 is a block diagram showing a configuration example of a production planning system 1 according to this embodiment.
- the production planning system 1 is a system for determining the digestion capacity of an organization based on work results and using that digestion capacity for planning.
- the production planning system 1 includes a production planning device 100 configured as a general computer, and communication enabling mutual communication between the production planning device 100 and other external devices 190, an intranet, the Internet, etc. It has a network 180 .
- the external device 190 includes another information processing device belonging to the same company or organization as the production planning system 1, a mobile terminal such as a smart phone possessed by the head of an organization engaged in production, or a worker belonging to the system.
- the production planning device 100 is an information processing device that implements the main functions of the production planning system 1, and includes a storage device 110, a processor 150 composed of a central processing unit (CPU), a memory 155, an input device 160, It has an output device 165 , a recording medium reading device 170 and a communication interface 175 .
- the storage device 110 is a device that obtains the digestion capacity as an organization from the work results and stores information necessary for planning in the production plan, and is composed of a storage device such as a hard disk (HDD). .
- the storage device 110 may be a semiconductor drive (SSD) using flash memory or the like.
- the storage device 110 includes a skill rank table 121, a rank/capability definition table 122, a product/process master 123, a case table 124, a production performance table 125, as tables for storing data used for executing planning. It has at least a product group/process/team relationship table 126, a capacity calculation result table 131, a production plan table 132, a surplus capacity table 133, a sales candidate product table 134, and an individual capacity calculation result table 135.
- the storage device 110 also stores a capacity calculation program 141, a plan/surplus related main program 142, a production planning program 143, a surplus capacity by product group/process, as programs 140 for causing the processor 150 to execute the planning of this embodiment. It has at least a calculation program 144 and a sales candidate product identification program 145 .
- the processor 150 is an arithmetic device for executing the programs described above.
- the processor 150 also performs management functions as a computer of the production planning apparatus 100, such as data input/output.
- the memory 155 is a storage device that stores programs to be executed by the processor 150 and data necessary for executing the programs, and is composed of RAM, ROM, flash memory, and the like.
- the input device 160 is a device for inputting information necessary for planning, such as a keyboard, mouse and microphone.
- the output device 165 is a device for outputting an input/output interface screen or the like, for example, a device such as a CRT (Cathode Ray Tub) display, a liquid crystal display (LCD) or an organic EL (Electro-Luminescence) display, a speaker, a printer, or the like.
- a device such as a CRT (Cathode Ray Tub) display, a liquid crystal display (LCD) or an organic EL (Electro-Luminescence) display, a speaker, a printer, or the like.
- the recording medium reader 170 is a device that reads information from a portable storage medium.
- portable storage media include flexible disks, CD-ROMs, DVD-ROMs, semiconductor memories, servers, and communication paths such as LANs.
- the recording medium reading device 170 may be built in the production planning device 100 or may be externally attached.
- the production planning device 100 may be realized by, for example, one arbitrary information processing device, or may be distributed and realized by a plurality of arbitrary information processing devices. All or part of the production planning device 100 can also be configured by a virtual computer.
- part or all of the production planning device 100 may be realized as hardware by circuits or the like.
- the capacity calculation program 141, the plan/surplus relationship main program 142, the production planning program 143, the product group/process-specific surplus capacity calculation program 144, and the sales candidate product identification program 145 are read from the storage device 110 into the memory 155 by the processor 150. Each program is executed by the processor 150 .
- the above program can be input from the communication network 180 via the communication interface 175 and installed in the storage device 110, for example.
- FIG. 2 is an explanatory diagram showing an example of the skill rank table 121 in this embodiment.
- the skill rank table 121 in FIG. 2, which is skill rank information, is a worker/product group automatically calculated from the work performance described in Japanese Patent Application No. 2020-028712 filed on February 21, 2020, for example.
- the worker ID 210 is information for identifying a worker belonging to an organization such as a work group.
- the product group 220 and the process 230 are information for identifying the product group and process that the worker with the corresponding worker ID 210 was in charge of.
- the skill rank 240 is automatically calculated based on some predefined criteria, for example, the working time of the relevant product group/process, or the work identified by the corresponding worker ID 210 determined and input by the head of the organization. It is information for specifying the skill rank of the person, product group and process.
- the determination date 250 indicates the date when the corresponding skill rank 240 was determined.
- the skill rank table 121 is input with updated values on a monthly basis.
- the skill rank table 121 can be said to store automatically updated skill map information in the sense that the skill of each worker is mapped by automatic update.
- the data of the skill rank table 121 may be periodically input from a mobile terminal or the like held by the head of the organization.
- FIG. 3 is an explanatory diagram showing an example of the rank/skill definition table 122 in this embodiment.
- Product group 310 , process 320 , and skill rank 330 are similar to skill rank table 121 .
- Digestive capacity [man-day] 340 is the amount of work that can be performed by a worker having a corresponding skill rank for a specific product group/process based on past work results.
- information indicating how long ago the latest judgment date 350 of the skill rank 330 is counted from today is registered for each corresponding product group/process. "Today" means the day on which the production planning device 100 executes planning. The older the latest skill determination date 350 is, the lower the ability to digest the skill, even if the skill rank is the same.
- FIG. 4 is an explanatory diagram showing an example of the case table 124 in this embodiment.
- the item ID 410 is information for uniquely identifying the received item.
- the product code 420 is information for identifying a specific product such as the product group 220 included in the corresponding item.
- the due date 430 is information indicating the due date of the corresponding item ID 410 . From this case table 124, it is possible to obtain the amount of work that will occur in response to the product code until the delivery date for each case.
- FIG. 5 is an explanatory diagram showing an example of the product/process master 123 in this embodiment.
- the product/process master 123 shown in FIG. 5, which is the work amount information for each product process, is a table storing information related to the manufacture of each product. Day] 550, Profit rate by product [%] 560, Profit amount by product [million yen] 570, Sales amount by product [million yen] 580, and the like.
- Product group 520 is information for identifying the product group that includes product code 510 .
- Product name 530 is information for identifying the product name corresponding to product code 510 .
- the required processes are stored in the process 540 for each record.
- the amount of work required for each process is stored in the amount of work [man-days] 550 .
- the profit rate corresponding to each product code 510 is shown in Profit Rate by Product [%] 560, the amount of profit is shown in Profit Amount by Product [million yen] 570, and the amount of sales is shown in Sales Amount by Product [million yen] 580.
- the unit of calculation for each item of the amount of work 550, the profit rate by product 560, the profit amount by product 570, and the sales amount by product 580 may be appropriately determined for ease of use.
- the profit rate, the amount of profit, and the amount of sales corresponding to the product code 510 can be understood as economic efficiency index information as an indicator of the economic efficiency of manufacturing the product.
- the product process literally means an individual process when producing a certain product, but in the present application, the product includes not only individual products but also product groups consisting of multiple related products.
- a process also includes various resources that are input or used in the process. Resources will be discussed later.
- the average value for each product code, etc. may be stored.
- FIG. 6 is an explanatory diagram showing an example of the actual production table 125 in this embodiment.
- the actual production table 125 shown in FIG. 6, which is the actual production information, is a table that stores the information on the actual production, and consists of items such as an item ID 610, a product code 620, a process 630, a production start date and time 640, and a production end date and time 650. be done.
- items such as an item ID 610, a product code 620, a process 630, a production start date and time 640, and a production end date and time 650.
- a product code 620 indicating the product related to the item
- a process 630 which is the process in which the work was performed
- the manufacturing start date and time of the corresponding process are stored in the manufacturing start date and time 640
- the manufacturing end date and time are stored in the manufacturing end date and time 650, respectively.
- the manufacturing start date and time 640 and the manufacturing end date and time 650 can be input and recorded from a portable terminal or the like as the external device 190 in FIG. Workers can input production performance information such as manufacturing start and end dates and times in each process from their own mobile terminals, or similar production performance information can be sent to work managers such as work team leaders on their mobile terminals in a timely manner. By inputting to the production planning device 100 from an external device 190 such as a PC, the record of the production result table 125 can be updated in a timely manner.
- FIG. 7 is an explanatory diagram showing an example of the product group/process/group relation table 126 in this embodiment.
- the product group/process/team relationship table 126 in FIG. 7, which is the product process responsible information, is a master table that associates the product group/process with the main team that is the group of workers who are mainly in charge of the process. It consists of items such as group 710 , process 720 , and primary team 730 . When a team other than the main team in charge of a certain product group/process is in charge of the work, the latter team in charge is positioned as a worker group that supports the corresponding work.
- FIG. 8 is an explanatory diagram showing an example of the capacity calculation result table 131 in this embodiment.
- the capacity calculation result table 131 in FIG. 8 is a table for storing the output results of the capacity calculation program 141, and includes product group 810, process 820, digestive capacity main team 830, overall digestive capacity [man-day] 840, digestion It is composed of items such as past performance_maximum [man-days] 850 and past performance_minimum [man-days] 860 of digestive capacity.
- the digestive capacity of the main team in charge is the digestive capacity main team [man-day] 830
- the digestive capacity of the entire organization including the main team and other teams is the total digestive capacity [man-day] 840.
- the daily maximum and minimum digestive capacity of the product group/process calculated from the actual production results will be changed to the past actual digestive capacity_maximum [person-days] 850 and the past actual digestive capacity_minimum [person-days] 860. , respectively.
- the unit of counting for each item of digestive capacity is man-days, other units of counting may be used.
- FIG. 9 is an explanatory diagram showing an example of the production planning table 132 in this embodiment.
- Item ID 910, process 920, date It consists of items such as a day 930 and a work amount [man-day] 940 .
- the amount of work required on each date when the work is performed is stored as the amount of work [man-days] 940 for each product group/process for each project.
- Man-days are used as the counting unit for the work load item, but other counting units may be used.
- FIG. 10 is an explanatory diagram showing an example of the surplus capacity table 133 in this embodiment.
- the surplus capacity table 133 in FIG. 10 is a table for storing the output results of the product group/process surplus capacity calculation program 144, which is a subroutine in the plan/surplus related main program 142.
- the average surplus capacity for each period specified in advance, for example, for each week, is stored in the column of surplus capacity [man-day] (average) 1040 in units of man-days.
- FIG. 11 is an explanatory diagram showing an example of the sales candidate product table 134 in this embodiment.
- the sales candidate product table 134 in FIG. 11 is a table for storing the output results of the sales candidate product identification program 145, which is a subroutine in the plan/surplus relationship main program 142, and includes a product group 1110, a product name 1120, and a producible quantity. 1130 and scheduled delivery date 1140.
- the sales candidate product table 134 for each product specified by the product group 1110 and the product name 1120, based on the values of the surplus capacity table 133 in FIG. , and the scheduled completion date of the corresponding quantity are stored in the Producible Quantity 1130 and Scheduled Delivery Date 1140 columns, respectively.
- FIG. 12 is an explanatory diagram showing an example of the individual ability calculation result table 135 in this embodiment.
- the individual capacity calculation result table 135 of FIG. 12 is a table for storing the output results of the capacity calculation program 141, which is a subroutine in the plan/surplus relationship main program 142, and includes a group 1210, a product group 1220, a process 1230, and a person in charge type. 1240 and digestive capacity [man-day] 1250.
- FIG. 13 is an explanatory diagram showing an example of an input screen 2000 output by the production planning device 100 of this embodiment.
- the input screen 2000 in FIG. 13 is a screen displayed by the output device 165 of the production planning device 100, for example, in order to accept input of parameters for planning by the user of the production planning device 100.
- the input screen 2000 includes a production planning button 2001 and a close button 2002 .
- the production planning button 2001 is operated (for example, pressed using a mouse or a touch sensor)
- the plan/surplus related main program 142 which will be described later, is executed based on the information input to the input screen 2000.
- FIG. When the close button 2002 is operated, the input screen 2000 is closed.
- the input screen 2000 also displays a capacity line selection section 2010, a sales candidate product identification threshold value setting section 2020, and a sales candidate product identification order setting section 2030 that receive input of parameters for planning.
- the performance line selection unit 2010 and the sales candidate product specific order setting unit 2030 operate the input device 160 by the user who refers to the input screen 2000, and operate, for example, a radio button from the displayed options. One parameter can be selected.
- the sales candidate product specific threshold value setting unit 2020 allows the user who refers to the input screen 2000 to operate the input device 160 to input a numerical value, for example, an integer. How to use these parameters will be described later with respect to the description of the capacity calculation program 141 and sales candidate product identification program 145 .
- the capacity line here is a concept that serves as an index for setting the digestion capacity based on what assumptions for a certain product group/process.
- FIG. 14 is an explanatory diagram showing an example of a surplus capacity/sales candidate product calculation result output screen 3000 output by the production planning apparatus 100 of this embodiment.
- a surplus capacity/sales candidate product calculation result output screen 3000 in FIG. It consists of elements such as a button 3002 and a close button 3003 .
- the print button 3002 When the print button 3002 is operated, the contents of the output screen are printed in a predetermined format via the output device 165 .
- the close button 3003 When the close button 3003 is operated, the surplus capacity/sales candidate product calculation result output screen 3000 is closed.
- Each item of the product group/process/period-specific surplus capacity calculation result column and the sales candidate product column, which are the message display portions, correspond to the data stored in the surplus capacity table 133 and the sales candidate product table 134, respectively. That is, the data stored in the product group 3010, process 3015, period 3020, and surplus capacity [man-days] (average) 3025 of the surplus capacity table 133 are the product group 1010, process 1020, period 1030, and surplus capacity Data stored in the product group 3050, product name 3055, producible quantity 3060, and scheduled delivery date 3065 of the sales candidate product table 134 are stored in the [man-days] (average) 1040 column, respectively. 1120 , producible quantity 1130 , and scheduled delivery date 1140 .
- FIG. 15 is an explanatory diagram showing an example of a load accumulation result output screen 3100 output by the production planning device 100 of this embodiment.
- a load accumulation result output screen 3100 in FIG. 15 is a screen displayed for outputting the execution results of the production planning program 143, and is composed of elements such as a print button 3102 and a close button 3103.
- the print button 3002 When the print button 3002 is operated, the output contents of the load accumulation result output screen 3100 are printed in a predetermined format via the output device 165 .
- the close button 3003 When the close button 3003 is operated, the load accumulation result output screen 3100 is closed.
- the parameter display section 3110 displays selection items in the performance line selection section 2010 of the input screen 2000 .
- the load heap graph display unit 3120 displays the load (required work volume) due to orders for each day of the planning period in a bar graph, and various capacity lines are identified by line types such as solid lines and dashed lines. Various capacity lines may be distinguished by using colors.
- the parameter display section 3110 displays the load accumulation result for each product group/process. is input or used, the parameter display section 3110 may be configured to output load accumulation results for each product group/process/resource or for each product group/resource.
- resources are equipment and facilities such as machine tools required to carry out work in each process, areas used for work, organizations engaged in work, workers, and work used Electricity, water, various gases, etc. are included.
- Data processing by the production planning device 100 includes a capacity calculation program 141, a plan/surplus relationship main program 142, a production planning program 143, a product group/process-specific surplus capacity calculation program 144, and a sales candidate product specification program shown in FIG. 145 is executed by the processor 150 using data stored in various tables. Data processing by each program will be described below with reference to flowcharts.
- FIG. 16 is a flowchart showing an example of capacity calculation processing by the capacity calculation program 141 in the production planning device 100 of this embodiment.
- This capacity calculation process is executed by the processor 150 according to the capacity calculation program 141 in order to calculate the digestion capacity of each organization such as a team according to a product group or process.
- the ability calculation program 141 is set to be executed periodically, for example, every week, at a predefined timing.
- the processor 150 reads the skill rank table 121, the rank/ability definition table 122, the actual production table 125, and the product group/process/team relationship table 126 (S1610).
- the processor 150 calculates the digestion capacity [man-days] of the main team in charge for each product group/process, Digestive capacity [man-day] is calculated.
- the processor 150 also determines the digestion capacity [man-days] for each team/product group/process and whether or not the team is the main team in charge of the product group/process (S1620).
- the digestive capacity [man-days] of the main team in charge and the digestive capacity [man-days] of the entire organization are obtained from the digestive capacity main team [man-days] 830 and the overall digestive capacity [man-days] 840 of the capacity calculation result table 131. , respectively.
- the digestion capacity [man-days] for each team/product group/process and whether or not the product group/process is the main team in charge are determined respectively in the digestion capacity [man-days] 1250 of the individual capacity calculation result table 135, Corresponds to the type 1240 .
- the processor 150 calculates the daily maximum and minimum values of digestion capacity [man-days] for each product group/process based on the actual production table 125 and the product group/process/group relation table 126. (S1630). This corresponds to past actual digestive capacity_maximum [man-days] 850 and past actual digestive capacity_minimum [man-days] 860 of the capacity calculation result table 131, respectively. If it takes a plurality of days, for example, two days for the product group/process, the digestion capacity is calculated as 0.5 [man-day] by proportional division, for example, equal division by the number of days.
- the processor 150 outputs the calculation results of S1620 and S1630 to the ability calculation result table 131 and the individual ability calculation result table 135 (S1640).
- the data used for calculating the surplus capacity later is stored in the capacity calculation result table 131 and the individual capacity calculation result table 135 .
- FIG. 17 is a flow chart showing an example of data processing by the plan/surplus relationship main program 142 in the production planning apparatus 100 of this embodiment.
- Processor 150 executes according to plan/surplus relationship main program 142 to identify products. Execution of the plan/surplus relationship main program 142 is started by operating the production plan formulation button 2001 provided on the input screen 2000 illustrated in FIG.
- the processor 150 executes the production planning program 143 (S1710).
- the production planning program 143 will be described later with reference to FIG.
- the processor 150 executes the product group/process surplus capacity calculation program 144 (S1720).
- the product group/process surplus capacity calculation program 144 will be described later with reference to FIG.
- processor 150 executes sales candidate product identification program 145 (S1730).
- the sales candidate product identification program 145 will be described later with reference to FIG.
- the processor 150 executes the above three subprograms, the user is presented with the surplus capacity/sales candidate product calculation result output screen 3000 illustrated in FIG. 14 and the accumulation result output screen 3100 illustrated in FIG. .
- FIG. 18 is a flowchart showing an example of data processing by the production planning program 143 in the production planning device 100 of this embodiment.
- This data processing is executed by the processor 150 according to the production planning program 143 for planning in the production plan.
- the input screen 2000 displays the result of the user's selection of the capacity line selection section 2010, the sales candidate product identification threshold value setting section 2020, and the sales candidate product identification order setting section 2030. is read (S1810).
- the processor 150 reads the case table 124, product/process master 123, and capacity calculation result table 131 (S1820).
- the processor 150 performs planning based on the value of the digestive capacity main team [person-days] 830 in the capacity calculation result table 131 (S1830). This corresponds to the case where the main team in charge is selected in the performance line selection section 2010 of the input screen 2000 .
- the reason why this process is performed prior to S1840 is that after confirming whether or not the amount of work can be digested by the main team in planning, if the main team is unable to complete the work, adjustments will be made to receive support from other teams, assuming overtime work. This is because it is common to perform operations such as re-planning with the maximum digestion capacity.
- the production planning device 100 of this embodiment also incorporates such general operation. As for the planning logic, the same logic as a commercially available general-purpose production planning tool may be adopted.
- the processor 150 determines whether there is an item (order) that will cause a delay in delivery due to the shortage of the necessary work volume with the capacity of the main team in charge alone, or is excessive and the amount of work always falls below the digestion capacity during the planning period, planning is performed according to the capacity line selected in the capacity line selection section 2010 of the input screen 2000 (S1840).
- the performance line selection unit 2010, when overall, past performance_maximum, and past performance_minimum indicating responsibility in the entire organization are selected, the overall digestion capacity [person-days] 840 in the capacity calculation result table 131, Planning is carried out based on the values of past actual digestive capacity_maximum [man-days] 850 and past actual digestive capacity_minimum [man-days] 860.
- S1840 is omitted because there is no need to redo the planning.
- the processor 150 selects a group having a digestion capacity that can be supported for the product group/process with insufficient capacity, according to the charge type in the individual capacity calculation result table 135. One is taken out of the records in which "secondary" is stored in the item 1240. If it is determined that the lack of digestion ability can be replenished by the selected team's digestion ability [man-day] 1250 and that the selected team will not cause a delivery delay, the amount to be supported by the team
- the planning result is the result of subtracting the digestion capacity [man-days] of the above from the digestion capacity of the product group/process that the group is mainly in charge of.
- the processor 150 then outputs the planning results of S1830 and S1840 to the production planning table 132 and ends the process (S1850).
- FIG. 19 is a flow chart showing an example of data processing of the product group/process surplus capacity calculation program 144 in the production planning apparatus 100 of the present embodiment.
- This product group/process surplus capacity calculation program 144 is executed by the processor 150 according to the product group/process surplus capacity calculation program 144 in order to calculate the surplus capacity by product group/process.
- the processor 150 calculates the required digestion capacity for each product group/process for a predetermined period of time, for example, up to three months from now, from the workload [man-days] 940 of the production plan storage table 132 (S1910).
- the product group is determined using the product code 420 and delivery date 430 stored in the case table 124 and the work amount [man-days] 550 stored for the product code 510 in the product/process master 123 . ⁇ Calculate the required digestion capacity for each process.
- the processor 150 calculates the digestion capacity of the main team in charge for each product group/process for the predetermined period from the digestion capacity main team [person-days] 830 of the capacity calculation result table 131 in the same manner as in S1910. (S1920).
- the processor 150 subtracts the overall digestive capacity by product group/process calculated in S1910 from the digestive capacity of the main team in charge by product group/process calculated in S1920. , daily average digestive capacity is calculated (S1930). This difference is the surplus capacity or insufficient digestion capacity for each product group/process during the certain period of time.
- the processor 150 outputs the calculation result of S1930 to the surplus capacity table 133 and ends the process (S1940).
- FIG. 20 is a flow chart showing an example of data processing by the sales candidate product specifying program 145 in the production planning device 100 of this embodiment.
- the processor 150 calculates the individual capacity calculation result table 135 in order to specify which products should be sold for receiving orders according to the surplus capacity calculated by the product group/process surplus capacity calculation program 144 . Execute according to
- the processor 150 When the processor 150 starts this data processing, it first refers to the surplus capacity table 133 and selects products whose surplus capacity, such as daily average, is equal to or greater than the threshold entered in the sales candidate product identification threshold setting 2020 on the input screen 2000. A group is extracted (S2010).
- the processor 150 refers to the product/process master 123 for the product group extracted in S2010, and specifies or orders the profit ratio, profit amount, and sales amount selected in the sales candidate product specific order setting 2030 on the input screen 2000. Enter dummy projects (orders) one by one in , do planning, and calculate when it can be completed within the capacity of the main team in charge. This is repeated for all main teams in charge of the product groups extracted in S2010 until the surplus capacity becomes 0 or less for the first time during a predefined planning period, for example, three months (S2020).
- the dummy project is the profit rate [%] 560 for each product code 510 stored in the product/process master 123, the profit amount [million yen] 570 for each product, and the sales amount [million yen] for each product. Based on 580 the input order is chosen.
- the product/process master 123 is referred to for the product group extracted in S2010, and dummy projects (orders) are randomly input one by one to perform planning. Then, the calculation is repeated until the surplus capacity becomes 0 or less for the first time for all the main teams in charge of the product groups extracted in S2010. .
- the processor 150 outputs the identification result in S2020 to the sales candidate product display field of the surplus capacity/sales candidate product calculation result output screen 3000, and ends the process (S2030).
- the sales candidate product identification program 145 it is possible to calculate the producible quantity of products with excellent economic indicators such as profitability based on the surplus digestive capacity obtained with high accuracy. Based on this, it is possible to develop efficient sales order activities.
- the production planning device 100 of the present embodiment obtains the digestion capacity as an organization from the work results, thereby enabling effective planning, support coordination at the manufacturing site, business trip coordination, It becomes possible to support strategic sales activities.
- each of the above configurations, functions, processing units, processing means, etc. may be implemented in hardware by designing, for example, integrated circuits in part or in whole.
- each of the above configurations, functions, etc. may be realized by software by a processor interpreting and executing a program for realizing each function.
- Information such as programs, tables, files, etc. that realize each function is stored in storage devices such as non-volatile semiconductor memories, hard disk drives, SSDs (Solid State Drives), or computer-readable non-readable devices such as IC cards, SD cards, and DVDs. It can be stored on a temporary data storage medium.
- control lines and information lines indicate what is considered necessary for explanation, and not all control lines and information lines are necessarily indicated on the product. In fact, it may be considered that almost all configurations are interconnected.
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- General Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- Theoretical Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Health & Medical Sciences (AREA)
- General Engineering & Computer Science (AREA)
- General Health & Medical Sciences (AREA)
- Automation & Control Theory (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Primary Health Care (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Abstract
作業実績から組織としての消化能力を求めておき、プランニングを行うシステム、方法を提供する。生産計画立案装置は、各作業者の技能ランク情報と、技能ランクに対応する製品の生産工程ごとに必要な作業能力の消化能力情報と、製品ごとの案件情報と、製品工程別作業量情報と、製品工程ごとの生産実績情報と、製品工程ごとの作業に従事する主担当組織の情報である製品工程担当情報とを保持し、主担当組織及び組織全体を構成する作業員に関する情報、技能ランク情報、及び生産実績情報に基づいて、製品工程ごとに、主担当組織、組織全体、生産実績に基づく最大実績及び最小実績消化能力を算出し、案件情報と製品工程別作業量情報とから各案件についての必要作業量を算出し、選択したいずれかの消化能力を用いて、各案件に係る製品の生産に必要な製品工程別の作業量を算出して生産計画情報として出力する。
Description
本発明は、生産計画立案装置、及び生産計画立案方法に関する。
===参照による取り込み===
本出願は、2021年3月9日に出願された日本特許出願第2021-037178号の優先権を主張し、その内容を参照することにより、本出願に取り込む。
工業的な製品生産は、種々の条件に基づいて策定される生産計画に従って行われる。生産計画は、その時間的なスパンに応じて分類される。
本出願は、2021年3月9日に出願された日本特許出願第2021-037178号の優先権を主張し、その内容を参照することにより、本出願に取り込む。
工業的な製品生産は、種々の条件に基づいて策定される生産計画に従って行われる。生産計画は、その時間的なスパンに応じて分類される。
日本産業規格(JIS)のJIS Z 8141 : 2001 (3302)によれば、生産計画は、大日程計画、中日程計画、小日程計画に分けられる。その定義によれば、大日程計画は、生産日程に関しマスタとなる長期の生産計画であり、月別の生産量を決める。中日程計画は、その大日程計画に基づき部門別の生産予定を決める。小日程計画は、さらに短いスパンで、日々の作業予定を決める。
また、米国国家規格協会(ANSI)が規定するANSI/ISA-95.00.01-2010 (IEC 62264-1 Mod)、Marcela Vegetti and Gabriela Henning: "ISA-88 Formalization. A Step Towards its Integration with the ISA-95 Standard"、 Proceedings of the 6th Workshop on Formal Ontologies meet Industry、 Rio de Janeiro、 Brazil、 22-SEP-2014等の文献によれば、生産計画はプランニング(Planning)とスクジューリング(Scheduling)とに大別され、前出のJIS Z 8141 : 2001 (3302)と対照すると、前者は大日程計画及び中日程計画に、後者は小日程計画に対応する。
本明細書では以降、大日程計画及び中日程計画のことをプランニングと、小日程計画のことをスケジューリングと呼ぶ。
従来、生産計画を実施するに当たっては、作業者による作業を必要とする製造工程においては作業班が作られ、作業班ごとに担当する製品群や工程が決められてきた。プランニングの際には、作業班の所属人数に日別の就業時間を乗じた値を、当該製品群・工程に対する日別の消化能力として、生産計画を立案してきた。またスケジューリングの際には、作業班の班長の経験的な知見から班員の作業者ができること、及びその能力に鑑みて作業の割付を行い、あるいは、以下の特許文献で示すように、作業者別の作業実績から自動で算出した消化能力などを基に生産計画を立案してきた。
なお、ここで「消化能力」とは、特定の作業員、作業員集団が、製品Aの最終組立といった特定の作業を実行する能力のことを意味している。ある能力を有する作業員が製品Aの最終組立を実行する場合、同一の能力を有する二人の作業員が当該作業を行う場合の消化能力は2倍となる。
そのような中で、例えば特許文献1には、生産計画を立案する際に作業者の職場配置を考慮しながら実行可能な生産計画の立案を可能にすべく、生産計画を立案する際に、生産職場に対して、各職場で生産能力が固定の期間、職場間で作業者の融通が可能な期間、人員の新規採用で生産能力を考慮しなくてよい期間を考慮しながら、生産能力を調整しながら実行可能な生産計画を作成することが記載されている(要約書)。
また特許文献2には、作業経験と、作業ミスの回数が考慮されてなる各作業者のネジ締め作業スキル情報と、定量的に定義された各作業工程のネジ締め作業難易度情報とに基づいてネジ締め作業者の各作業工程への配置態様を計画すべく、作業者情報、機種情報、作業工程情報、部品情報、作業経験情報、作業ミス情報、作業ランクからなるネジ締め作業スキル情報を生成し、記録するステップをネジ締め作業スキル情報記録部10にて実施し、この生成されたネジ締め作業スキル情報、各機種の各作業工程における難易度、各機種の生産計画、及び各作業者の出勤状況に基づき、生産が計画されている各機種の各作業工程への作業者配置情報を生成するステップを作業者配置情報記録部20にて実施すること、また、作業者に起因した生産進捗遅れが発生していることにより再配置を要する場合に、作業者再配置情報を生成するステップを作業者再配置情報記録部30にて実施することが記載されている(要約書)。
特許文献1は、作業班ごとの余剰の、あるいは不足する消化能力を判定し、作業班間の人員融通(応援)を考慮したプランニングができる技術を提案している。また特許文献2は、作業実績に基づき自動的に作業者別のスキル情報を生成しておき、これを基に作業者の配置すなわちスケジューリングができる技術を提案している。
しかしながら、作業実績に基づくプランニングは、特許文献1、特許文献2に記載の技術では考慮されていない。
プランニングではスケジューリングと異なり、作業班ごとに、自組織が担当する製品群・工程の組織としての消化能力を求めることや、過去の短期的な他班への応援実績、自組織の作業者が以前所属していたスキルの判定方法が異なる他班での作業も考慮して自組織の作業者の他組織における消化能力(応援可能な消化能力)の合計を把握して、作業班間の人員融通(応援)を考慮した計画立案をすることが必要である。しかしながら、特許文献1、特許文献2に記載の技術では上記は考慮されていない。
一般的に応援は組織間の人員の貸し借りであり、組織長間での調整や人件費のやり取りなどを踏まえて行われる。そのため、応援の計画は、製造実行の2~3日前に立案するスケジューリングではなく、プランニングの際に行われる。この際に、組織としての消化能力を正しく把握できていないと、ある組織から他の組織に応援を出したことにより自組織の工程が遅延してしまったり、応援をもらっても他組織が期待通りの作業をしてもらえなかったりと、実効性のある応援調整ができないことがある。
組織としての消化能力を正しく把握することは、組織の人数や作業の多様性、評価期間の長期化などに比例して人手では難しくなる。さらに、個々人の作業実績を自動で収集して分析するだけでは組織の消化能力を把握することは難しく、時々刻々と変化する組織に所属する作業者同士の相性といったプラス・マイナスの相乗効果を捉えることが必要である。また、日々の心理的・体調的な要因で作業実績を分析して判定される能力にブレがあっては現場運用では実用性に乏しく、また長期的な分析では組織の能力の実態を捉える上で有用ではないため、例えば月次などの時間スパンとして適切な周期で自動で分析をすることが必要であり、これらのニーズは特許文献1、特許文献2に記載の技術では考慮されていないと考えられる。
また、特に大型製品などでは作業者個々人の作業だけでなくチームでの作業が必要となり、作業者個々人のスキルだけでなく組織としての消化能力を正しく把握してプランニングする必要があるが、特許文献1、特許文献2に記載の技術では考慮されていないと考えられる。
さらに現地据付などの出張は、一般に作業開始の1週間前などにプランニングにおいて調整が行われるが、この際に、組織としての消化能力を正しく把握できていないと、出張に人員を送ったことにより、工場内の工程が遅延してしまうなど、実効性のある出張調整ができない。
加えて、組織としての正確な消化能力が把握できないと、製品群や工程に対する中長期の余剰能力を正しく把握したうえでの営業活動ができず、ある製品群については組織の能力を超える注文を取ってしまい、ある製品群については受注量が組織の能力を下回って人員が余ってしまうなどの状況が発生してしまい、やはり実効性のある人員の過不足の把握と、営業計画の立案ができないという問題もある。
本発明はこれらの課題に鑑みてなされたもので、作業実績から組織としての消化能力を精度よく求めておき、その消化能力を用いてプランニングを行うことができる生産計画立案装置、及び生産計画立案方法を提供することを一つの目的とする。
上記課題を解決するために、本願の発明の一つは、プロセッサと、前記プロセッサに接続される記憶装置とを有する生産計画立案装置であって、前記記憶装置は、製品の生産に従事する作業者ごとに設定される、各作業者の技能優劣を示す指標である技能ランク情報と、前記技能ランクに対応する製品の生産工程ごとに必要な作業能力である消化能力情報と、製品ごとに対応づけられた製品納期に関する情報である案件情報と、製品の工程ごとに対応づけられた作業量の情報である製品工程別作業量情報と、製品工程ごとの過去の生産期間に関する情報である生産実績情報と、製品工程ごとの作業に従事する主担当組織の情報である製品工程担当情報とを保持し、前記プロセッサは、前記主担当組織及び生産に従事する組織全体を構成する作業員に関する情報、前記技能ランク情報、及び前記生産実績情報に基づいて、製品工程ごとに、主担当組織の消化能力、組織全体の消化能力、前記生産実績情報に基づく最大実績消化能力及び最小実績消化能力を算出して保持し、前記案件情報と前記製品工程別作業量情報とから前記案件情報に含まれる各案件についての必要作業量を算出し、主担当組織の消化能力、組織全体の消化能力、前記生産実績情報に基づく最大実績消化能力及び最小実績消化能力のうちから、選択されたいずれかの消化能力を用いて、前記各案件に係る製品の生産に必要な製品工程別の作業量を算出して生産計画情報として出力するプランニング処理を実行する生産計画立案装置とする。
前記一つの発明によれば、作業実績から組織としての消化能力を精度よく求めておき、その消化能力を用いてプランニングを行うことができる。
前述した以外の課題、構成及び効果は、以下の実施形態の説明によって明らかにされる。
以下、本発明を実施するための一実施形態を、図面を参照して説明する。
<生産計画立案システム>
まず、本実施形態に係る生産計画立案システムの構成について説明する。図1は、本実施形態における生産計画立案システム1の構成例を示すブロック図である。
まず、本実施形態に係る生産計画立案システムの構成について説明する。図1は、本実施形態における生産計画立案システム1の構成例を示すブロック図である。
生産計画立案システム1は、作業実績に基づいて組織としての消化能力を求めておき、その消化能力を利用してプランニングを行うためのシステムである。生産計画立案システム1は、一般的なコンピュータとして構成される生産計画立案装置100、及び生産計画立案装置100と他の外部装置190、イントラネット、インターネット等との間での相互通信を可能とする通信ネットワーク180を有する。外部装置190としては、生産計画立案システム1と同じ企業等の組織に属する他の情報処理装置、生産に従事する組織の長、所属作業員等が所持するスマートフォン等の携帯端末等が含まれる。
<生産計画立案装置>
生産計画立案装置100は、生産計画立案システム1の主要な機能を実現する情報処理装置であり、記憶装置110、中央処理装置(CPU)等で構成されるプロセッサ150、メモリ155、入力装置160、出力装置165、記録媒体読取装置170、及び通信インターフェイス175を有する。
生産計画立案装置100は、生産計画立案システム1の主要な機能を実現する情報処理装置であり、記憶装置110、中央処理装置(CPU)等で構成されるプロセッサ150、メモリ155、入力装置160、出力装置165、記録媒体読取装置170、及び通信インターフェイス175を有する。
記憶装置110は、作業実績から組織としての消化能力を求めておき、生産計画におけるプランニングを行うために必要な情報を記憶する装置であり、例えば、ハードディスク(HDD)などの記憶デバイスで構成される。記憶装置110は、フラッシュメモリなどを用いた半導体ドライブ(SSD)であってもよい。
記憶装置110は、プランニングを実行するために利用されるデータを格納するためのテーブルとして、技能ランクテーブル121、ランク・能力定義テーブル122、製品・工程マスタ123、案件テーブル124、生産実績テーブル125、製品群・工程・班 関係テーブル126、能力算出結果テーブル131、生産計画テーブル132、余剰能力テーブル133、営業候補製品テーブル134、及び個別能力算出結果テーブル135を少なくとも有する。
また、記憶装置110は、本実施形態のプランニングをプロセッサ150に実行させるためのプログラム140として、能力算出プログラム141、計画・余剰関係メインプログラム142、生産計画立案プログラム143、製品群・工程別余剰能力算出プログラム144、及び営業候補製品特定プログラム145を少なくとも有する。
プロセッサ150は、前記したプログラムを実行するための演算装置である。プロセッサ150は、データ入出力等、生産計画立案装置100のコンピュータとしての管理機能も実行する。
メモリ155は、プロセッサ150により実行されるプログラム、及び、プログラムの実行に必要なデータなどを格納する記憶デバイスであり、RAM、ROM、フラッシュメモリ等で構成される。
入力装置160は、プランニングに必要な情報を入力するための装置であり、例えば、キーボード、マウス及びマイクロフォンなどの装置である。
出力装置165は、入出力インターフェイス画面などを出力する装置であり、例えば、CRT(Cathode Ray Tub)ディスプレイ、液晶ディスプレイ(LCD)又は有機EL(Electro-Luminescence)ディスプレイなどの装置、スピーカ、プリンタ等である。
記録媒体読取装置170は、可搬性を有する可搬型記憶媒体の情報を読み出す装置である。可搬型記憶媒体の例としては、フレキシブルディスク、CD-ROM、DVD-ROM、半導体メモリ、サーバ、LANなどの通信経路等を用いることができる。なお、記録媒体読取装置170は、生産計画立案装置100に内蔵されていてもよいし、外付けされていてもよい。
生産計画立案装置100は、例えば1つの任意の情報処理装置で実現されてもよいし、複数の任意の情報処理装置で分散して実現されてもよい。生産計画立案装置100の全部又は一部を仮想計算機により構成することもできる。
また、生産計画立案装置100の一部又は全ては、回路等によりハードウェアとして実現されてもよい。
<生産計画立案装置に実装されるプログラム>
次に、本実施形態の生産計画立案装置100の機能を実現するためのプログラムについて説明する。
次に、本実施形態の生産計画立案装置100の機能を実現するためのプログラムについて説明する。
能力算出プログラム141、計画・余剰関係メインプログラム142、生産計画立案プログラム143、製品群・工程別余剰能力算出プログラム144、及び営業候補製品特定プログラム145は、プロセッサ150によって記憶装置110からメモリ155に読み込まれ、プロセッサ150が実行することによって、それぞれのプログラムによる処理が実行される。
なお、各プログラムが実現する処理は、それぞれ図16、図17、図18、図19、及び図20に示されており、後述する。なお上記のプログラムとは、例えば、オペレーションシステム(OS)プログラム上で実行可能なアプリケーションプログラムである。
上記のプログラムは、例えば、通信インターフェイス175を介して通信ネットワーク180から入力し、記憶装置110にインストールすることができる。
<テーブル>
次に、前記した生産計画立案装置100のプログラム140が利用するデータを格納するテーブルについて説明する。
次に、前記した生産計画立案装置100のプログラム140が利用するデータを格納するテーブルについて説明する。
・技能ランクテーブル121
図2は、本実施形態における技能ランクテーブル121の一例を示す説明図である。
図2は、本実施形態における技能ランクテーブル121の一例を示す説明図である。
技能ランク情報である図2の技能ランクテーブル121は、例えば2020年2月21日に出願された特願2020-028712号に記載されている作業実績から自動的に算出された作業者・製品群・工程ごとのスキルレベルを登録するためのテーブルであり、作業者ID210、製品群220、工程230、技能ランク240、及び判定年月日250などの項目から構成される。なお念のため、特願2020-028712号に開示されている内容全てが本願に援用されるものとする。
作業者ID210は、作業班などの組織に所属する作業者を識別するための情報である。製品群220及び工程230は、対応する作業者ID210の作業者が担当した製品群及び工程を識別するための情報である。技能ランク240は、あらかじめ定義された何らかの基準、例えば、当該製品群・工程の作業時間によって自動的に算出される、あるいは組織長が判定して入力した、対応する作業者ID210により識別される作業者、製品群・工程の技能ランクを特定するための情報である。判定年月日250は、対応する技能ランク240の判定が行われた日を示す。
なお、技能ランクテーブル121には、月次などの周期で更新された値が入力される。技能ランクテーブル121は、各作業者のスキルが自動更新によってマッピングされるという意味で、自動更新型スキルマップ情報を格納しているということもできる。技能ランクテーブル121のデータは、組織の長が保持する携帯端末等から定期的に入力するようにしてもよい。
・ランク・能力定義テーブル122
図3は、本実施形態におけるランク・能力定義テーブル122の一例を示す説明図である。
図3は、本実施形態におけるランク・能力定義テーブル122の一例を示す説明図である。
消化能力情報である図3のランク・能力定義テーブル122は、製品群・工程・技能ランク・最新技能判定日に応じた消化能力を定義したテーブルであり、製品群310、工程320、技能ランク330、消化能力[人日]340、及び最新技能判定日350などの項目から構成される。製品群310、工程320、及び技能ランク330は、技能ランクテーブル121と同様である。消化能力[人日]340は、過去の作業実績から特定の製品群・工程について、対応する技能ランクを有する作業者が実行可能な作業量である。最新技能判定日350には、対応する製品群・工程ごとに、技能ランク330の最新の判定年月日350が本日から数えてどれほど前か、という情報が登録される。なお、「本日」とは、生産計画立案装置100によりプランニングを実行する日を意味する。最新技能判定日350が古いほど、同一技能ランクあっても技量の低下により消化能力の低下するのが通常であるので、最新技能判定日350に応じて消化能力は異なっている。
・案件テーブル124
図4は、本実施形態における案件テーブル124の一例を示す説明図である。
図4は、本実施形態における案件テーブル124の一例を示す説明図である。
案件情報である図4の案件テーブル124は、プランニング対象の案件に関する情報を格納したテーブルであり、案件ID410、製品コード420、及び納期430などの項目から構成される。案件ID410は受注案件を一意に識別するため情報である。製品コード420は、対応する案件に含まれる製品群220などの具体的な製品を識別するための情報である。納期430は、対応する案件ID410の納期を示す情報である。この案件テーブル124により、案件ごとに納期までの間に製品コードに対応して発生する作業量を求めることができる。
・製品・工程マスタ123
図5は、本実施形態における製品・工程マスタ123の一例を示す説明図である。
図5は、本実施形態における製品・工程マスタ123の一例を示す説明図である。
製品工程別作業量情報である図5の製品・工程マスタ123は、各製品の製造に関する情報を格納したテーブルであり、製品コード510、製品群520、製品名530、工程540、作業量[人日]550、製品別利益率[%]560、製品別利益額[百万円]570、及び製品別売上額[百万円]580などの項目から構成される。製品群520は製品コード510が含まれる製品群を識別するための情報である。製品名530は製品コード510に対応する製品名を特定するための情報である。各製品コード510について、必要な工程が工程540に1レコードごとに格納されている。当該工程ごとに必要な作業量が、作業量[人日]550に格納されている。また各製品コード510に応じた利益率が製品別利益率[%]560に、利益額が製品別利益額[百万円]570に、売上額が製品別売上額[百万円]580に格納される。作業量550、製品別利益率560、製品別利益額570、及び製品別売上額580の各項目の計数単位は、利用しやすいように適宜に決めればよい。製品コード510に対応した利益率、利益額、及び売上額は、その製品を製造した場合の経済性に関する指標として、経済性指標情報と把握することができる。
ここで、製品工程とは、文字通りある製品を生産するときの個々の工程を意味するが、本願においては、製品には個々の製品の他、複数の関連製品からなる製品群も含まれる。また、工程には、当該工程において投入され、あるいは利用される各種のリソースも含まれる。リソースについては後述する。
なお、製品・工程マスタ123には、多品種少量生産や完全受注生産で、同一の製品コードであってもオプション品などに応じて利益率などが変わる場合には、製品コードごとの平均値などを格納してもよい。
・生産実績テーブル125
図6は、本実施形態における生産実績テーブル125の一例を示す説明図である。
図6は、本実施形態における生産実績テーブル125の一例を示す説明図である。
生産実績情報である図6の生産実績テーブル125は、生産実績の情報を格納したテーブルであり、案件ID610、製品コード620、工程630、製造開始日時640、及び製造終了日時650などの項目から構成される。各案件ID610について、当該案件に係る製品を示す製品コード620と作業を行った工程である工程630とが1レコードごとに格納されている。また当該案件IDに関して、対応する工程の製造開始日時が製造開始日時640に、製造終了日時が製造終了日時650に、それぞれ格納されている。製造開始日時640、製造終了日時650は、図1における外部装置190としての携帯端末等から入力して記録するようにすることができる。作業員が自身の携帯端末から各工程において製造開始・終了日時等の生産実績情報を入力することで、あるいは同様の生産実績情報を作業班長等の作業管理者が適時に自身の携帯端末、現場PC等の外部装置190から生産計画立案装置100に入力することで、生産実績テーブル125の記録を適時に更新しておくことができる。
・製品群・工程・班関係テーブル126
図7は、本実施形態における製品群・工程・班関係テーブル126の一例を示す説明図である。
図7は、本実施形態における製品群・工程・班関係テーブル126の一例を示す説明図である。
製品工程担当情報である図7の製品群・工程・班関係テーブル126は、製品群・工程と、その工程を主に担当する作業員集団である主担当班とを対応付けるマスタテーブルであり、製品群710、工程720、及び主担当班730などの項目から構成される。ある製品群・工程について対応する主担当班以外の班が作業を担当する場合、その後者の担当班は該当する作業の応援を行う作業員集団と位置づけられる。
・能力算出結果テーブル131
図8は、本実施形態における能力算出結果テーブル131の一例を示す説明図である。
図8は、本実施形態における能力算出結果テーブル131の一例を示す説明図である。
図8の能力算出結果テーブル131は、能力算出プログラム141の出力結果を格納するためのテーブルであり、製品群810、工程820、消化能力主担当班830、消化能力全体[人日]840、消化能力過去実績_最大[人日]850、及び消化能力過去実績_最小[人日]860などの項目から構成される。各製品群・工程について、主担当班の消化能力が消化能力主担当班[人日]830に、主担当班及びその他の班を含めた全組織の消化能力が消化能力全体[人日]840に、生産実績から算出した当該製品群・工程の日別の最大消化能力と最小消化能力が、消化能力過去実績_最大[人日]850、及び消化能力過去実績_最小[人日]860に、それぞれ格納されている。各消化能力の項目の計数単位は人日としているが、他の計数単位を用いてもよい。
・生産計画テーブル132
図9は、本実施形態における生産計画テーブル132の一例を示す説明図である。
図9は、本実施形態における生産計画テーブル132の一例を示す説明図である。
生産計画情報である図9の生産計画テーブル132は、計画・余剰関係メインプログラム142におけるサブルーチンである生産計画立案プログラム143の出力結果を格納するためのテーブルであり、案件ID910、工程920、年月日930、及び作業量[人日]940などの項目から構成される。生産計画テーブル132の各レコードには、案件ごとに各製品群・工程について、作業を実施する各日付において必要な作業量が、作業量[人日]940として格納されている。作業量の項目の計数単位は人日としているが、他の計数単位を用いてもよい。
・余剰能力テーブル133
図10は、本実施形態における余剰能力テーブル133の一例を示す説明図である。
図10は、本実施形態における余剰能力テーブル133の一例を示す説明図である。
図10の余剰能力テーブル133は、計画・余剰関係メインプログラム142におけるサブルーチンである製品群・工程別余剰能力算出プログラム144の出力結果を格納するためのテーブルであり、製品群1010、工程1020、期間1030、及び余剰能力[人日](平均)1040などの項目から構成される。各製品群・工程について、あらかじめ指定した各期間、例えば週ごとの平均余剰能力が、人日単位で余剰能力[人日](平均)1040の欄に格納されている。
・営業候補製品テーブル134
図11は、本実施形態における営業候補製品テーブル134の一例を示す説明図である。
図11は、本実施形態における営業候補製品テーブル134の一例を示す説明図である。
図11の営業候補製品テーブル134は、計画・余剰関係メインプログラム142におけるサブルーチンである営業候補製品特定プログラム145の出力結果を格納するためのテーブルであり、製品群1110、製品名1120、生産可能数量1130、及び予定納期1140などの項目から構成される。営業候補製品テーブル134には、製品群1110、製品名1120で特定される各製品について、図10の余剰能力テーブル133の値を基に、予め指定されたプランニングの期間内において、生産可能な数量と、当該数量が完成する予定の日付が、それぞれ生産可能数量1130、及び予定納期1140の欄に格納されている。
・個別能力算出結果テーブル135
図12は、本実施形態における個別能力算出結果テーブル135の一例を示す説明図である。
図12は、本実施形態における個別能力算出結果テーブル135の一例を示す説明図である。
図12の個別能力算出結果テーブル135は、計画・余剰関係メインプログラム142におけるサブルーチンである能力算出プログラム141の出力結果を格納するためのテーブルであり、班1210、製品群1220、工程1230、担当種別1240、及び消化能力[人日]1250などの項目から構成される。このように、個別能力算出結果テーブル135には、各班について、製品群・工程ごとに、主担当か否か、及び消化能力[人日]が、それぞれ担当種別1240、及び消化能力[人日]1250の欄に格納されており、各レコードに、班ごとに、担当製品群・工程に対応した個別の消化能力が記録されている。なお、ある班が対応する製品群・工程について主担当でない場合は、担当種別1240の項目に「副」のデータが格納される。このテーブルにより、ある製品工程について主担当の作業者の消化能力のみでは不足する場合、主担当でない、副担当の他の組織の作業者が作業を担当した場合、すなわちある製品工程で応援を受け入れた場合、その応援に係る消化能力を取得することができる。
<生産計画立案装置の入出力インターフェイス>
次に、生産計画立案装置100の入力装置160、出力装置165を介して利用者からの情報入力、及び利用者への情報提示を可能とする入出力インターフェイスについて説明する。
次に、生産計画立案装置100の入力装置160、出力装置165を介して利用者からの情報入力、及び利用者への情報提示を可能とする入出力インターフェイスについて説明する。
・入力画面2000
図13は、本実施形態の生産計画立案装置100が出力する入力画面2000の一例を示す説明図である。
図13は、本実施形態の生産計画立案装置100が出力する入力画面2000の一例を示す説明図である。
図13の入力画面2000は、生産計画立案装置100の利用者によるプランニングの際のパラメータの入力を受け付けるために、例えば生産計画立案装置100の出力装置165によって表示される画面である。入力画面2000は、生産計画立案ボタン2001、及び閉じるボタン2002を含む。生産計画立案ボタン2001が操作(例えばマウス又はタッチセンサを使用した押下)されると、入力画面2000に入力された情報を基に、後述の計画・余剰関係メインプログラム142が実行される。閉じるボタン2002が操作されると、入力画面2000が閉じる。
また、入力画面2000には、プランニングの際のパラメータの入力を受け付ける、能力線選択部2010、営業候補製品特定閾値設定部2020、営業候補製品特定順設定部2030が表示される。能力線選択部2010、及び営業候補製品特定順設定部2030は、入力画面2000を参照した利用者が、入力装置160を操作して、表示された選択肢から、例えばラジオボタンを操作することによって、1つのパラメータを選択することができる。営業候補製品特定閾値設定部2020は、入力画面2000を参照した利用者が、入力装置160を操作して、数値、例えば整数を入力できる。これらのパラメータの利用方法は、能力算出プログラム141、及び営業候補製品特定プログラム145の説明に関して後述する。
なお、ここで能力線とは、ある製品群・工程について、どのような前提をおいて消化能力を設定するかの指標となる概念である。本実施形態では、過去の作業実績において最大・最小に相当する消化能力、主担当班が作業する場合の消化能力、主担当班を含む上位の組織全体が作業に携わった場合の消化能力の4種類から選択できるように構成されている。能力線選択部2010については、例えば、初期又は数ヶ月先の作業のプランニングでは、過去実績_最小を選択してプランニングすることで消化能力を小さめに見積もってリスク管理をしておき、特急オーダーが発生した場合には、過去実績_最大を選択してプランニングするなど、状況に応じてプランニングする活用案が考えられる。またプランニングした結果、主担当班だけの消化能力では対応する案件に納期遅延が発生する場合には、組織全体を選択してプランニングする活用案も考えられる。
・余剰能力・営業候補製品算出結果出力画面3000
図14は、本実施形態の生産計画立案装置100が出力する、余剰能力・営業候補製品算出結果出力画面3000の一例を示す説明図である。
図14は、本実施形態の生産計画立案装置100が出力する、余剰能力・営業候補製品算出結果出力画面3000の一例を示す説明図である。
図14の余剰能力・営業候補製品算出結果出力画面3000は、製品群・工程別余剰能力算出プログラム144、及び営業候補製品特定プログラム145の実行結果を出力するために表示される画面であり、印刷ボタン3002、及び閉じるボタン3003などの要素から構成される。印刷ボタン3002が操作されると、出力装置165を介して出力画面の内容が所定の書式で印刷される。閉じるボタン3003が操作されると、余剰能力・営業候補製品算出結果出力画面3000が閉じる。
メッセージ表示部である、製品群・工程・期間別余剰能力算出結果欄、営業候補製品欄の各項目はそれぞれ、余剰能力テーブル133、営業候補製品テーブル134に格納されているデータに対応する。すなわち、余剰能力テーブル133の製品群3010、工程3015、期間3020、及び余剰能力[人日] (平均)3025に格納されているデータがそれぞれ、製品群1010、工程1020、期間1030、及び余剰能力[人日] (平均)1040の欄に、営業候補製品テーブル134の製品群3050、製品名3055、生産可能数量3060、及び予定納期3065に格納されているデータがそれぞれ、製品群1110、製品名1120、生産可能数量1130、及び予定納期1140の欄に対応して出力される。
・負荷山積み結果出力画面3100
図15は、本実施形態の生産計画立案装置100が出力する、負荷山積み結果出力画面3100の一例を示す説明図である。
図15は、本実施形態の生産計画立案装置100が出力する、負荷山積み結果出力画面3100の一例を示す説明図である。
図15の負荷山積み結果出力画面3100は、生産計画立案プログラム143の実行結果を出力するために表示される画面であり、印刷ボタン3102、及び閉じるボタン3103などの要素から構成される。印刷ボタン3002が操作されると、出力装置165を介して、負荷山積み結果出力画面3100の出力内容が所定の書式で印刷される。閉じるボタン3003が操作されると、負荷山積み結果出力画面3100が閉じる。
パラメータ表示部3110は、入力画面2000の、能力線選択部2010での選択項目を表示する。負荷山積みグラフ表示部3120は、プランニング期間の各日の注文による負荷(必要な作業量)を棒グラフで、各種の能力線を実線、破線等の線種で識別して表示する。各種能力線は、色を用いて区別するようにしてもよい。なお、本実施形態では、説明の簡便のため、パラメータ表示部3110に、製品群・工程ごとの負荷山積み結果を表示しているが、製品の生産工程における作業には、1又は2以上のリソースがが投入され、あるいは利用されることから、パラメータ表示部3110には、製品群・工程・リソース別もしくは製品群・リソース別の負荷山積み結果を出力するように構成してもよい。製品群に代えて、単一の製品に対するリソース、工程の組み合わせを採用してもよい。ここでリソースとは、各工程での作業を遂行する上で必要とされる、工作機械等の機器・設備、作業に供されるエリア、作業に従事する組織、作業員、作業に使用される電力、水、各種ガスなどを含む。
<生産計画立案装置によるデータ処理>
以上説明した生産計画立案装置100に設けられる各種のテーブル、プログラムによって、生産計画立案装置100が実行するデータ処理について、次に説明する。
以上説明した生産計画立案装置100に設けられる各種のテーブル、プログラムによって、生産計画立案装置100が実行するデータ処理について、次に説明する。
生産計画立案装置100によるデータ処理は、図1に示す能力算出プログラム141、計画・余剰関係メインプログラム142、生産計画立案プログラム143、製品群・工程別余剰能力算出プログラム144、及び営業候補製品特定プログラム145を、プロセッサ150が各種テーブルに格納されているデータを用いて実行することにより実現される。以下、各プログラムによるデータ処理を、フローチャートにより例示しながら説明する。
・能力算出プログラムによるデータ処理
図16は、本実施形態の生産計画立案装置100における能力算出プログラム141による能力算出処理の一例を示すフローチャートである。
図16は、本実施形態の生産計画立案装置100における能力算出プログラム141による能力算出処理の一例を示すフローチャートである。
この能力算出処理は、製品群や工程に応じた班などの組織別の消化能力を算出するために、プロセッサ150が能力算出プログラム141に従って実行する。
能力算出プログラム141は、あらかじめ定義されたタイミングで、例えば1週間ごとに、定期的に実行されるように設定する。まずプロセッサ150は、技能ランクテーブル121、ランク・能力定義テーブル122、生産実績テーブル125、及び製品群・工程・班関係テーブル126を読み込む(S1610)。
プロセッサ150は、技能ランクテーブル121、ランク・能力定義テーブル122、製品群・工程・班関係テーブル126を基に、製品群・工程ごとの、主担当班の消化能力[人日]、組織全体の消化能力[人日]を算出する。また、プロセッサ150は、班・製品群・工程ごとの消化能力[人日]と、当該班が、当該製品群・工程について主担当班か否かを判定する(S1620)。前記主担当班の消化能力[人日]と、前記組織全体の消化能力[人日]は、能力算出結果テーブル131の消化能力主担当班[人日]830、消化能力全体[人日]840、にそれぞれ対応する。また、前記班・製品群・工程ごとの消化能力[人日]と、当該製品群・工程について主担当班か否かは、それぞれ個別能力算出結果テーブル135の消化能力[人日]1250、担当種別1240に対応する。
次にプロセッサ150は、生産実績テーブル125、製品群・工程・班関係テーブル126を基に、製品群・工程ごとの、消化能力[人日]の日別の最大値と最小値とを算出する(S1630)。これは能力算出結果テーブル131の消化能力過去実績_最大[人日]850、消化能力過去実績_最小[人日]860、にそれぞれ対応する。なお、当該製品群・工程について複数日、例えば2日要した場合は、按分処理、例えば日数での均等割をして、消化能力0.5[人日]と算出する。
プロセッサ150は、S1620、S1630での算出結果を、能力算出結果テーブル131、及び個別能力算出結果テーブル135に出力する(S1640)。
以上の能力算出プログラム141によるデータ処理では、後の余剰能力の算出に使用されるデータが、能力算出結果テーブル131、及び個別能力算出結果テーブル135に格納される。
・計画・余剰関係メインプログラム142によるデータ処理
図17は、本実施形態の生産計画立案装置100における計画・余剰関係メインプログラム142によるデータ処理の一例を示すフローチャートである。
図17は、本実施形態の生産計画立案装置100における計画・余剰関係メインプログラム142によるデータ処理の一例を示すフローチャートである。
このデータ処理は、生産計画のプランニングや、製品群・工程別の余剰能力の算出、及び前記余剰能力に応じて経済性の点で優先して生産すべき製品、すなわち受注活動の対象とすべき製品の特定をするために、プロセッサ150が計画・余剰関係メインプログラム142に従って実行する。計画・余剰関係メインプログラム142は、図13に例示した入力画面2000に設けられている生産計画立案ボタン2001を操作することにより実行が開始される。
まずプロセッサ150は、生産計画立案プログラム143を実行する(S1710)。生産計画立案プログラム143については、後出の図18を参照して説明する。
次にプロセッサ150は、製品群・工程別余剰能力算出プログラム144を実行する(S1720)。製品群・工程別余剰能力算出プログラム144については、後出の図19を参照して説明する。
次にプロセッサ150は、営業候補製品特定プログラム145を実行する(S1730)。営業候補製品特定プログラム145については、後出の図20を参照して説明する。
プロセッサ150が以上の3つのサブプログラムを実行することで、利用者に、図14に例示した余剰能力・営業候補製品算出結果出力画面3000、図15に例示した山積み結果出力画面3100が提示される。
以下、各サブルーチンによるデータ処理について説明する。
・生産計画立案プログラム143によるデータ処理
図18は、本実施形態の生産計画立案装置100における生産計画立案プログラム143によるデータ処理の一例を示すフローチャートである。
図18は、本実施形態の生産計画立案装置100における生産計画立案プログラム143によるデータ処理の一例を示すフローチャートである。
このデータ処理は、生産計画におけるプランニングをするために、プロセッサ150が生産計画立案プログラム143に従って実行する。
プロセッサ150は生産計画立案プログラム143の実行を開始すると、入力画面2000から、能力線選択部2010、営業候補製品特定閾値設定部2020、営業候補製品特定順設定部2030について利用者が行った選択結果を読み込む(S1810)。
次いでプロセッサ150は、案件テーブル124、製品・工程マスタ123、及び能力算出結果テーブル131を読み込む(S1820)。
プロセッサ150は、能力算出結果テーブル131における消化能力主担当班[人日]830の値を基に、プランニングを行う(S1830)。これは入力画面2000の能力線選択部2010において、主担当班が選択された場合に相当する。この処理をS1840に先行して行う理由は、プランニングにおいてまず主担当班で消化できる作業量かを確認した後、主担当班では消化できない場合において他班から応援をもらう調整をする、残業を前提とした最大消化能力で再プランニングする、などの運用を行うのが一般的であるためである。本実施形態の生産計画立案装置100でも、このような一般的な運用を取り入れている。なおプランニングのロジックについては市販の汎用的な生産計画ツールと同様のロジックを採用すればよい。
次にプロセッサ150は、S1830において、主担当班の消化能力だけでは必要な作業量に対して不足して、納期遅延が発生してしまう案件(注文)が存在する、あるいは主担当班の消化能力が過剰でありプランニング期間において常に作業量が消化能力を下回るという状況が生じる場合には、入力画面2000の能力線選択部2010において選択された能力線に応じて、プランニングを行う(S1840)。能力線選択部2010において、組織全体での担当を示す全体、過去実績_最大、過去実績_最小が選択された場合には、それぞれ、能力算出結果テーブル131における消化能力全体[人日]840、消化能力過去実績_最大[人日]850、消化能力過去実績_最小[人日]860の値を基にプランニングを行う。能力線選択部2010において、主担当班が選択された場合にはプランニングをやり直す必要がないのでS1840は省略される。
S1840では、能力線選択部2010で全体が選択された場合には、プロセッサ150は、能力が不足する製品群・工程に応援可能な消化能力を持つ班を、個別能力算出結果テーブル135における担当種別1240の項目に「副」が格納されているレコードの中から1つ取り出す。選択した班の消化能力[人日]1250で消化能力の不足分を補充することができ、かつ、前記選択した班について納期遅延が発生しないと判定された場合には、前記班の応援する分の消化能力[人日]を、前記班の主担当の製品群・工程の消化能力から差し引いた結果をプランニング結果とする。前記班について納期遅延が発生する場合には、応援可能な別の班を選択して同様に消化能力の不足分を補えるか、納期遅延が発生しないかを検討する。前記選択した班について納期遅延は発生しないが、前記班の消化能力[人日]1250では不足分が補えない場合には、他の応援可能な班を1つずつ追加して、同様に検討する。なおこの際、主担当と応援に入る副担当、あるいは副担当同士の組み合わせについて、構成作業者の相性等により設定しないことが望ましい組み合わせについて、あらかじめ組み合わせができないようにプログラムを構成しておくこともできる。
次いでプロセッサ150は、S1830、S1840でのプランニング結果を、生産計画テーブル132に出力して処理を終了する(S1850)。
以上の生産計画立案プログラム143のデータ処理によれば、特定の案件に含まれる製品群・工程それぞれについて、主担当の班のみで消化能力が充足されるか判定され、不足の場合には納期遅延が発生しないように他の班から応援を提供することができるので、案件に適した効率的なプランニングが可能である。
・製品群・工程別余剰能力算出プログラム144によるデータ処理例
次に、製品群・工程別余剰能力算出プログラム144によるデータ処理例を説明する。図19は、本実施形態の生産計画立案装置100における製品群・工程別余剰能力算出プログラム144のデータ処理の一例を示すフローチャートである。
次に、製品群・工程別余剰能力算出プログラム144によるデータ処理例を説明する。図19は、本実施形態の生産計画立案装置100における製品群・工程別余剰能力算出プログラム144のデータ処理の一例を示すフローチャートである。
この製品群・工程別余剰能力算出プログラム144のデータ処理は、製品群・工程別の余剰能力を算出するために、プロセッサ150が製品群・工程別余剰能力算出プログラム144に従って実行する。
プロセッサ150は、あらかじめ定義された一定期間、例えば現在から3ヶ月先までにおける製品群・工程別の必要消化能力を、生産計画格納テーブル132の作業量[人日]940から算出する(S1910)。具体的には、案件テーブル124に格納されている製品コード420、納期430と、製品・工程マスタ123において製品コード510に対して格納されている作業量[人日]550とを用いて製品群・工程別の必要消化能力を算出する。
次に、プロセッサ150は、前記一定期間における、製品群・工程ごとの主担当班の消化能力を、S1910と同様にして、能力算出結果テーブル131の消化能力主担当班[人日]830から算出する(S1920)。
次いでプロセッサ150は、S1920で算出した製品群・工程別の主担当班消化能力から、S1910で算出した製品群・工程別の消化能力全体を差し引き、例えば一定期間における各日の消化能力に基づいて、日別平均の消化能力を算出する(S1930)。この差分が前記一定期間における、製品群・工程別の余剰能力又は不足する消化能力となる。
最後に、プロセッサ150は、S1930での算出結果を、余剰能力テーブル133に出力して処理を終了する(S1940)。
以上の製品群・工程別余剰能力算出プログラム144のデータ処理によれば、現在から一定期間内における製品群・工程別の余剰消化能力又は不足消化能力を、精度よく定量的に把握することができる。
・営業候補製品特定プログラム145によるデータ処理例
次に、営業候補製品特定プログラム145によるデータ処理例について説明する。図20は、本実施形態の生産計画立案装置100における営業候補製品特定プログラム145によるデータ処理の一例を示すフローチャートである。
次に、営業候補製品特定プログラム145によるデータ処理例について説明する。図20は、本実施形態の生産計画立案装置100における営業候補製品特定プログラム145によるデータ処理の一例を示すフローチャートである。
この処理は、製品群・工程別余剰能力算出プログラム144により算出された余剰能力に応じて、どの製品を受注するための営業をすべきか特定をするために、プロセッサ150が個別能力算出結果テーブル135に従って実行する。
プロセッサ150は本データ処理を開始するとまず、余剰能力テーブル133を参照し、日別平均などの余剰能力が、入力画面2000における営業候補製品特定閾値設定2020に入力された閾値以上となっている製品群を抽出する(S2010)。
次いでプロセッサ150は、S2010で抽出した製品群について、製品・工程マスタ123を参照し、入力画面2000における営業候補製品特定順設定2030で選択された利益率、利益額、売上額の指定又は指定順でダミー案件(注文)を1件ずつ入力してプランニングを行い、主担当班の消化能力以内でいつまでに完成できるかを算出する。これを予め定義されたプランニング期間、例えば3ヶ月間において、S2010で抽出した製品群を担当する全ての主担当班について、初めて余剰能力が0以下になるまで繰り返す(S2020)。なお、ダミー案件は、製品・工程マスタ123に格納されている各製品コード510に対する製品別利益率[%]560、製品別利益額[百万円]570、製品別売上額[百万円]580に基づいて入力順が選定される。
営業候補製品特定順設定2030でランダムが選択された場合には、S2010で抽出した製品群について、製品・工程マスタ123を参照し、ランダムにダミー案件(注文)を1件ずつ入力してプランニングを行い、主担当班の消化能力以内でいつまでに完成できるかを算出し、同様にS2010で抽出した製品群を担当する全ての主担当班について、初めて余剰能力が0以下になるまで前記算出を繰り返す。
最後にプロセッサ150は、S2020での特定結果を、余剰能力・営業候補製品算出結果出力画面3000の営業候補製品の表示欄に出力して処理を終了する(S2030)。
以上の営業候補製品特定プログラム145によれば、精度よく求められた余剰の消化能力に基づいて、より収益性といった経済性指標に優れた製品の生産可能数量を算出することができ、その結果に基づいて効率的な営業受注活動を展開することが可能となる。
以上説明したように、本実施形態の生産計画立案装置100により、作業実績から組織としての消化能力を求めておくことで、実効性のあるプランニングができ、製造現場における応援調整、出張調整や、戦略的な営業活動の支援等が可能になる。
なお、本発明は上記した実施例に限定されるものではなく、様々な変形例が含まれる。例えば、上記した実施例は本発明のより良い理解のために詳細に説明したのであり、必ずしも説明の全ての構成を備えるものに限定されるものではない。
また、上記の各構成、機能、処理部、処理手段等は、それらの一部又は全部を、例えば集積回路で設計する等によってハードウェアで実現してもよい。また、上記の各構成、機能等は、プロセッサがそれぞれの機能を実現するプログラムを解釈し、実行することによってソフトウェアで実現してもよい。各機能を実現するプログラム、テーブル、ファイル等の情報は、不揮発性半導体メモリ、ハードディスクドライブ、SSD(Solid State Drive)等の記憶デバイス、又は、ICカード、SDカード、DVD等の計算機読み取り可能な非一時的データ記憶媒体に格納することができる。
また、制御線及び情報線は説明上必要と考えられるものを示しており、製品上必ずしも全ての制御線及び情報線を示しているとは限らない。実際にはほとんど全ての構成が相互に接続されていると考えてもよい。
1:生産計画立案システム、100:生産計画立案装置、110:記憶装置、121:技能ランクテーブル、122:ランク・能力定義テーブル、123:製品・工程マスタ、124:案件テーブル、125:生産実績テーブル、126:製品群・工程・班関係テーブル、131:能力算出結果テーブル、132:生産計画テーブル、133:余剰能力テーブル、134:営業候補製品テーブル、141:能力算出プログラム、142:計画・余剰関係メインプログラム、143:生産計画立案プログラム、144:製品群・工程別余剰能力算出プログラム、145:営業候補製品特定プログラム
Claims (13)
- プロセッサと、前記プロセッサに接続される記憶装置とを有する生産計画立案装置であって、
前記記憶装置は、
製品の生産に従事する作業者ごとに設定される、各作業者の技能優劣を示す指標である技能ランク情報と、前記技能ランクに対応する製品の生産工程ごとに必要な作業能力である消化能力情報と、製品ごとに対応づけられた製品納期に関する情報である案件情報と、製品の工程ごとに対応づけられた作業量の情報である製品工程別作業量情報と、製品工程ごとの過去の生産期間に関する情報である生産実績情報と、製品工程ごとの作業に従事する主担当組織の情報である製品工程担当情報とを保持し、
前記プロセッサは、
前記主担当組織及び生産に従事する組織全体を構成する作業員に関する情報、前記技能ランク情報、及び前記生産実績情報に基づいて、製品工程ごとに、主担当組織の消化能力、組織全体の消化能力、前記生産実績情報に基づく最大実績消化能力及び最小実績消化能力を算出して保持し、
前記案件情報と前記製品工程別作業量情報とから前記案件情報に含まれる各案件についての必要作業量を算出し、主担当組織の消化能力、組織全体の消化能力、前記生産実績情報に基づく最大実績消化能力及び最小実績消化能力のうちから、選択されたいずれかの消化能力を用いて、前記各案件に係る製品の生産に必要な製品工程別の作業量を算出して生産計画情報として出力するプランニング処理を実行する、
生産計画立案装置。 - 前記技能ランク情報は、当該技能ランクが対応づけられている作業者についての最新の技能ランク判定日を含み、
前記プロセッサが製品工程ごとの消化能力を算出する際に、前記最新の技能ランク判定日の情報に応じて各作業員の消化能力に重み付けを行う、
請求項1に記載の生産計画立案装置。 - 前記技能ランク情報は、前記生産実績情報に基づいて定期的に更新される、
請求項1乃至請求項2に記載の生産計画立案装置。 - 前記技能ランク情報は、さらに各作業者と製品工程とを対応づけて保持している、
請求項1に記載の生産計画立案装置。 - 前記プロセッサが、算出された各案件についての必要作業量を製品工程ごとに作業日各日の必要作業量を表す棒グラフで表示し、当該棒グラフ表示に、主担当組織の消化能力、組織全体の消化能力、前記生産実績情報に基づく最大実績消化能力及び最小実績消化能力を示すレベルを線分により重畳して表示する、
請求項1に記載の生産計画立案装置。 - 前記製品工程には、製品ごとに対応する各工程、製品ごとに対応する各リソース、製品及び工程ごとに対応するリソース、製品群ごとに対応する各工程、製品群ごとに対応する各リソース、及び、製品群及び工程ごとに対応する各リソースが含まれる、
請求項1に記載の生産計画立案装置。 - 前記プロセッサが、前記生産計画情報から将来の一定期間において必要な作業量を製品工程別に所定の時間単位によって算出し、前記主担当組織の消化能力を用いて当該一定期間における消化能力を前記時間単位によって算出し、算出された消化能力から前記必要作業量を差し引いた差分を算出して前記一定期間における時間単位ごとの余剰の消化能力として出力する、
請求項1に記載の生産計画立案装置。 - 前記製品工程別作業量情報に、当該製品に関する収益の情報を含む経済性指標情報が対応づけて保持されており、
前記余剰の消化能力と、前記製品工程別作業量情報とに基づいて、各前記製品が前記余剰の消化能力で生産可能な生産量を算出する処理を各製品について実行し、あらかじめ指定された前記経済性指標情報と前記生産可能な生産量とから生産可能な製品について経済性指標情報に応じた順位付けを行って出力する、
請求項7に記載の生産計画立案装置。 - 前記製品の製造開始時点及び製造終了時点に関する情報を含む、前記生産実績情報に関する情報が、前記生産計画立案装置と通信可能に接続されている外部装置から入力されるように構成されている、
請求項1に記載の生産計画立案装置。 - プロセッサと記憶装置とを有する情報処理装置が実行する生産計画立案方法であって、前記情報処理装置が、
製品の生産に従事する作業者ごとに設定される、各作業者の技能優劣を示す指標である技能ランク情報と、前記技能ランクに対応する製品の生産工程ごとに必要な作業能力である消化能力情報と、製品ごとに対応づけられた製品納期に関する情報である案件情報と、製品の工程ごとに対応づけられた作業量の情報である製品工程別作業量情報と、製品工程ごとの過去の生産期間に関する情報である生産実績情報と、製品工程ごとの作業に従事する主担当組織の情報である製品工程担当情報とを保持し、
前記主担当組織及び生産に従事する組織全体を構成する作業員に関する情報、前記技能ランク情報、及び前記生産実績情報に基づいて、製品工程ごとに、主担当組織の消化能力、組織全体の消化能力、前記生産実績情報に基づく最大実績消化能力及び最小実績消化能力を算出して保持し、
前記案件情報と前記製品工程別作業量情報とから前記案件情報に含まれる各案件についての必要作業量を算出し、主担当組織の消化能力、組織全体の消化能力、前記生産実績情報に基づく最大実績消化能力及び最小実績消化能力のうちから、選択されたいずれかの消化能力を用いて、前記各案件に係る製品の生産に必要な製品工程別の作業量を算出して生産計画情報として出力するプランニング処理を実行する、
生産計画立案方法。 - 前記製品工程には、製品ごとに対応する各工程、製品ごとに対応する各リソース、製品及び工程ごとに対応するリソース、製品群ごとに対応する各工程、製品群ごとに対応する各リソース、及び、製品群及び工程ごとに対応する各リソースが含まれる、
請求項10に記載の生産計画立案方法。 - 前記情報処理装置が、前記生産計画情報から将来の一定期間において必要な作業量を製品工程別に所定の時間単位によって算出し、前記主担当組織の消化能力を用いて当該一定期間における消化能力を前記時間単位によって算出し、算出された消化能力から前記必要作業量を差し引いた差分を算出して前記一定期間における時間単位ごとの余剰の消化能力として出力する、
請求項10に記載の生産計画立案方法。 - 前記製品工程別作業量情報に、当該製品に関する収益の情報を含む経済性指標情報が対応づけて保持されており、
前記余剰の消化能力と、前記製品工程別作業量情報とに基づいて、各前記製品が前記余剰の消化能力で生産可能な生産量を算出する処理を各製品について実行し、あらかじめ指定された前記経済性指標情報と前記生産可能な生産量とから生産可能な製品について経済性指標情報に応じた順位付けを行って出力する、
請求項12に記載の生産計画立案方法。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2021-037178 | 2021-03-09 | ||
JP2021037178A JP7487129B2 (ja) | 2021-03-09 | 2021-03-09 | 生産計画立案装置、及び生産計画立案方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2022190816A1 true WO2022190816A1 (ja) | 2022-09-15 |
Family
ID=83227664
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2022/006611 WO2022190816A1 (ja) | 2021-03-09 | 2022-02-18 | 生産計画立案装置、及び生産計画立案方法 |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP7487129B2 (ja) |
WO (1) | WO2022190816A1 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117726152A (zh) * | 2024-02-18 | 2024-03-19 | 安徽泰然信息技术有限公司 | 基于企业信息的储能方案生成方法及装置 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7515086B2 (ja) | 2022-03-23 | 2024-07-12 | パナソニックIpマネジメント株式会社 | 計画作成システム、計画管理システム、計画作成方法、及びプログラム |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2019117454A (ja) * | 2017-12-26 | 2019-07-18 | 株式会社日立製作所 | 生産計画立案支援システム |
JP2019200597A (ja) * | 2018-05-16 | 2019-11-21 | 株式会社日立製作所 | 標準作業時間推定方法、標準作業時間推定装置及びプログラム |
JP2020173519A (ja) * | 2019-04-08 | 2020-10-22 | 株式会社日立製作所 | 作業工数予測システムおよび作業工数予測システムを備える生産計画立案支援システム |
-
2021
- 2021-03-09 JP JP2021037178A patent/JP7487129B2/ja active Active
-
2022
- 2022-02-18 WO PCT/JP2022/006611 patent/WO2022190816A1/ja active Application Filing
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2019117454A (ja) * | 2017-12-26 | 2019-07-18 | 株式会社日立製作所 | 生産計画立案支援システム |
JP2019200597A (ja) * | 2018-05-16 | 2019-11-21 | 株式会社日立製作所 | 標準作業時間推定方法、標準作業時間推定装置及びプログラム |
JP2020173519A (ja) * | 2019-04-08 | 2020-10-22 | 株式会社日立製作所 | 作業工数予測システムおよび作業工数予測システムを備える生産計画立案支援システム |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117726152A (zh) * | 2024-02-18 | 2024-03-19 | 安徽泰然信息技术有限公司 | 基于企业信息的储能方案生成方法及装置 |
CN117726152B (zh) * | 2024-02-18 | 2024-05-17 | 安徽泰然信息技术有限公司 | 基于企业信息的储能方案生成方法及装置 |
Also Published As
Publication number | Publication date |
---|---|
JP7487129B2 (ja) | 2024-05-20 |
JP2022137616A (ja) | 2022-09-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2022190816A1 (ja) | 生産計画立案装置、及び生産計画立案方法 | |
US20170147960A1 (en) | Systems and Methods for Project Planning and Management | |
US9423989B2 (en) | System and method for dynamically reconfiguring one or more autonomous cells in a print shop environment | |
US8024275B2 (en) | Method and system for monitoring a business process | |
US8028294B2 (en) | Progress management for projects | |
JP5453334B2 (ja) | 作業計画作成装置及び作業計画作成方法 | |
US20160048785A1 (en) | A computer implemented system and method for project controls | |
US20110093365A1 (en) | System and Process for Monitoring, Control and Withdrawal of Consumable Items in a Production Environment | |
GB2416882A (en) | Project management method assigning business objectives to employees | |
JP2010282524A (ja) | 間接費配賦計算システム | |
JP2021144756A (ja) | プロジェクト計画策定システム | |
Bowhill | Business planning and control: integrating accounting, strategy, and people | |
JP2009289056A (ja) | 人員配置計画支援装置 | |
JP2018206000A (ja) | 生産計画システム、生産計画方法及び人員能力計算方法 | |
JP2017111481A (ja) | 昇降機保全作業用品質評価及び教育システム | |
JP6802103B2 (ja) | 営業支援装置 | |
JP7075906B2 (ja) | 作業指示支援システム及び作業指示支援方法 | |
JP2004258717A (ja) | 原価管理システムおよび方法 | |
JP2007004386A (ja) | 事業管理プログラム及びそれを用いた管理装置 | |
CN111311187A (zh) | 基于Revit的项目进度监控方法、系统及存储介质 | |
JP2002073147A (ja) | 製造コスト算出システム及び製造コスト算出プログラムを記録した記録媒体 | |
JP2005092382A (ja) | 設計変更支援システムおよび設計変更方法ならびに設計変更支援プログラムおよびそれを記録した記録媒体 | |
JP3864128B2 (ja) | ソフトウェア開発進捗管理方式 | |
Hoang et al. | Inventory Visibility in Apparel Make-To-Order Production | |
JP7471334B2 (ja) | 生産性改善システム、生産性改善方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 22766779 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 22766779 Country of ref document: EP Kind code of ref document: A1 |