WO2021124880A1 - 作業機械、計測方法およびシステム - Google Patents

作業機械、計測方法およびシステム Download PDF

Info

Publication number
WO2021124880A1
WO2021124880A1 PCT/JP2020/044793 JP2020044793W WO2021124880A1 WO 2021124880 A1 WO2021124880 A1 WO 2021124880A1 JP 2020044793 W JP2020044793 W JP 2020044793W WO 2021124880 A1 WO2021124880 A1 WO 2021124880A1
Authority
WO
WIPO (PCT)
Prior art keywords
bucket
boom
actuator
attached
machine body
Prior art date
Application number
PCT/JP2020/044793
Other languages
English (en)
French (fr)
Inventor
翔太 山脇
Original Assignee
株式会社小松製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社小松製作所 filed Critical 株式会社小松製作所
Priority to US17/773,270 priority Critical patent/US20240159022A1/en
Priority to EP20900895.2A priority patent/EP4053345A4/en
Priority to CN202080079979.XA priority patent/CN114761641B/zh
Publication of WO2021124880A1 publication Critical patent/WO2021124880A1/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices
    • E02F9/264Sensors and their calibration for indicating the position of the work tool
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01GWEIGHING
    • G01G19/00Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups
    • G01G19/08Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for incorporation in vehicles
    • G01G19/083Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for incorporation in vehicles lift truck scale
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/42Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/43Control of dipper or bucket position; Control of sequence of drive operations
    • E02F3/431Control of dipper or bucket position; Control of sequence of drive operations for bucket-arms, front-end loaders, dumpers or the like

Definitions

  • This disclosure relates to work machines, measurement methods and systems.
  • Patent Document 1 A method of estimating the load weight in a bucket in a work machine such as a wheel loader is disclosed in, for example, Japanese Patent Application Laid-Open No. 2017-8633 (see Patent Document 1).
  • Patent Document 1 a list defining the relationship between the boom angle and the bottom pressure is used in order to estimate the load weight in the bucket. This list shows the relationship between the boom angle and the bottom pressure when the bucket is empty, the rated weight is loaded, and a predetermined percentage of the rated weight is loaded.
  • An object of the present disclosure is to provide a work machine, a measurement method and a system capable of accurately estimating the load mass in a bucket.
  • the work machine of the present disclosure includes a machine body, a boom, a bucket, a first actuator, a second actuator, and a controller.
  • the boom is attached to the machine body.
  • the bucket is attached to the boom.
  • the first actuator is attached to the machine body and drives the boom.
  • the second actuator is attached to the machine body and drives the bucket with respect to the boom.
  • the controller calculates the mass of the load in the bucket based on the thrust of the first actuator and the thrust of the second actuator.
  • the measuring method of the present disclosure is a measuring method for measuring the mass of a load in a bucket in a work machine.
  • the work machine has a machine body, a boom attached to the machine body, a bucket attached to the boom, a first actuator attached to the machine body to drive the boom, and a bucket attached to the machine body to drive the boom. It has a second actuator.
  • This measurement method includes the following steps.
  • Information on the thrust of the first actuator is acquired.
  • Information about the thrust of the second actuator is acquired.
  • the mass of the cargo in the bucket is calculated based on the information on the thrust of the first actuator and the information on the thrust of the second actuator.
  • the system of the present disclosure includes a machine body, a boom, a bucket, a first actuator, and a second actuator.
  • the boom is attached to the machine body.
  • the bucket is attached to the boom.
  • the first actuator is attached to the machine body and drives the boom.
  • the second actuator is attached to the machine body and drives the bucket with respect to the boom.
  • the mass of the load in the bucket is calculated based on the thrust of the first actuator and the thrust of the second actuator.
  • FIG. It is a side view of the wheel loader as an example of the work machine which concerns on Embodiment 1.
  • FIG. It is a figure which shows the functional block of the controller which measures the load mass in the bucket in the work machine which concerns on Embodiment 1.
  • FIG. It is a flow chart which shows the measurement method which measures the load mass in the bucket in the work machine which concerns on Embodiment 1.
  • FIG. It is a figure which shows the relationship between the bucket angle and the load amount when the bucket cylinder force F bucket is considered and the case where it is not considered when measuring the load mass in a bucket.
  • FIG. It is a figure which shows the functional block of the controller which measures the load mass in the bucket in the work machine which concerns on Embodiment 2.
  • FIG. 7 is a flow chart showing a measurement method for measuring the load mass in the bucket when the front-rear direction of the work machine is inclined with respect to the horizontal plane as shown in FIG. 7.
  • the configuration of the wheel loader will be described with reference to FIG. 1 as an example of the work machine according to the present embodiment.
  • the work machine in this embodiment is not limited to the wheel loader.
  • the work machine of the present embodiment may be any work machine having wheels to be excavated while traveling, and may be a backhoe loader, a skid steer loader, or the like.
  • FIG. 1 is a side view of a wheel loader as an example of the work machine according to the first embodiment.
  • the wheel loader 1 includes a vehicle body frame 2, a working machine 3, a traveling device 4, and a cab 5.
  • the machine body of the wheel loader 1 is composed of the body frame 2 and the cab 5.
  • a seat on which the operator sits, an operating device, and the like are arranged.
  • a working machine 3 and a traveling device 4 are attached to the machine body of the wheel loader 1.
  • the working machine 3 is arranged in front of the machine body, and a counterweight 6 is provided at the rearmost end of the machine body.
  • the body frame 2 includes a front frame 11 and a rear frame 12.
  • a steering cylinder 13 is attached to the front frame 11 and the rear frame 12.
  • the steering cylinder 13 is a hydraulic cylinder.
  • the steering cylinder 13 expands and contracts with hydraulic oil from a steering pump (not shown). Due to the expansion and contraction of the steering cylinder 13, the front frame 11 and the rear frame 12 can swing in the left-right direction with each other. As a result, the traveling direction of the wheel loader 1 can be changed to the left or right.
  • the direction in which the wheel loader 1 travels straight is referred to as the front-rear direction of the wheel loader 1.
  • the front-rear direction of the wheel loader 1 the side on which the work machine 3 is arranged with respect to the vehicle body frame 2 is the front direction, and the side opposite to the front direction is the rear direction.
  • the left-right direction of the wheel loader 1 is a direction orthogonal to the front-rear direction in a plan view. Looking forward, the right and left sides of the left and right directions are the right direction and the left direction, respectively.
  • the vertical direction of the wheel loader 1 is a direction orthogonal to the plane defined by the front-rear direction and the left-right direction. In the vertical direction, the side with the ground is the lower side, and the side with the sky is the upper side.
  • the traveling device 4 includes traveling wheels 4a and 4b. Each of the traveling wheels 4a and 4b is a wheel and has a tire made of rubber.
  • the traveling wheel (front wheel) 4a is rotatably attached to the front frame 11.
  • the traveling wheel (rear wheel) 4b is rotatably attached to the rear frame 12.
  • the wheel loader 1 can self-propell by rotationally driving the traveling wheels 4a and 4b.
  • the work machine 3 is for performing work such as excavation.
  • the working machine 3 is attached to the front frame 11.
  • the working machine 3 includes a bucket 14, a boom 15, a bell crank 16, a tilt rod 17, a boom cylinder 18 (first actuator), and a bucket cylinder 19 (second actuator).
  • the base end of the boom 15 is rotatably attached to the front frame 11 by a boom pin 21.
  • the boom 15 is rotatably attached to the machine body.
  • the bucket 14 is rotatably attached to the tip of the boom 15 by a bucket pin 22.
  • the boom cylinder 18 drives the boom 15.
  • One end of the boom cylinder 18 is rotatably attached to the front frame 11 of the machine body by a pin 23.
  • the boom cylinder 18 is rotatably attached to the machine body.
  • the other end of the boom cylinder 18 is rotatably attached to the boom 15 by a pin 24.
  • the boom cylinder 18 is, for example, a hydraulic cylinder.
  • the boom cylinder 18 expands and contracts with hydraulic oil from a working machine pump (not shown). As a result, the boom 15 is driven, and the bucket 14 attached to the tip of the boom 15 moves up and down.
  • the bell crank 16 is rotatably supported by the boom 15 by the support pin 29.
  • the bell crank 16 has a first end located on one side of the support pin 29 and a second end located on the opposite side of the support pin 29 from the first end.
  • the first end of the bell crank 16 is connected to the bucket 14 via a tilt rod 17.
  • the second end of the bell crank 16 is connected to the front frame 11 of the machine body via the bucket cylinder 19.
  • One end of the tilt rod 17 is rotatably attached to the first end of the bell crank 16 by a pin 27.
  • the other end of the tilt rod 17 is rotatably attached to the bucket 14 by a pin 28.
  • the bucket cylinder 19 drives the bucket 14 with respect to the boom 15.
  • the bucket cylinder 19 has one end (third end) and the other end (fourth end) on the opposite side of one end.
  • One end of the bucket cylinder 19 is rotatably attached to the front frame 11 of the machine body by a pin 25.
  • the other end of the bucket cylinder 19 is rotatably attached to the second end of the bell crank 16 by a pin 26.
  • the bucket cylinder 19 is, for example, a hydraulic cylinder.
  • the bucket cylinder 19 expands and contracts with hydraulic oil from a working machine pump (not shown). As a result, the bucket 14 is driven, and the bucket 14 rotates up and down with respect to the boom 15.
  • the wheel loader 1 further has a sensor for detecting information on the thrust F boom (boom cylinder force) of the boom cylinder 18 and a sensor for detecting information on the thrust F bucket (bucket cylinder force) of the bucket cylinder 19. ..
  • the sensors that detect the information related to the thrust of the boom cylinder 18 are, for example, pressure sensors 31b and 31h.
  • Each of the pressure sensors 31b and 31h detects the cylinder pressure of the boom cylinder 18.
  • the pressure sensor 31b detects the bottom pressure of the boom cylinder 18.
  • the pressure sensor 31h detects the head pressure of the boom cylinder 18.
  • the head pressure means the pressure on the cylinder rod side with respect to the piston of the hydraulic cylinder
  • the bottom pressure means the pressure on the tube side with respect to the piston
  • the sensors that detect the information related to the thrust of the bucket cylinder 19 are, for example, pressure sensors 32b and 32h.
  • Each of the pressure sensors 32b and 32h detects the cylinder pressure of the bucket cylinder 19.
  • the pressure sensor 32b detects the bottom pressure of the bucket cylinder 19.
  • the pressure sensor 32h detects the head pressure of the bucket cylinder 19.
  • the wheel loader 1 further has a sensor that detects information regarding the posture of the work machine 3.
  • the sensor that detects the information on the posture of the work machine 3 includes, for example, a first sensor that detects information on the boom angle and a second sensor that detects information on the bucket angle with respect to the boom.
  • the information regarding the posture of the work machine 3 is dimension L1 and dimension L4.
  • the dimension L1 is a dimension between the boom pin 21 and the pin 23, and is a dimension in a direction orthogonal to the extending direction of the boom cylinder 18.
  • the dimension L4 is a dimension between the boom pin 21 and the pin 26, and is a dimension in a direction orthogonal to the extending direction of the bucket cylinder 19.
  • the boom angle is the angle of the boom 15 with respect to the front frame 11 of the machine body.
  • the bucket angle is the angle of the bucket 14 with respect to the boom 15.
  • the first sensor that detects information about the boom angle is, for example, a potentiometer 33.
  • the potentiometer 33 is attached so as to be concentric with the boom pin 21.
  • the stroke sensor 35 of the boom cylinder 18 may be used instead of the potentiometer 33.
  • an IMU (Inertial Measurement Unit) 37 or an imaging device (for example, a camera) 39 may be used as the first sensor for detecting the information regarding the boom angle.
  • the IMU 37 is attached to, for example, a boom 15.
  • the image pickup device 39 is attached to the machine body (for example, the cab 5).
  • the second sensor that detects information about the bucket angle is, for example, a potentiometer 34.
  • the potentiometer 34 is attached so as to be concentric with the support pin 29.
  • the stroke sensor 36 of the bucket cylinder 19 may be used instead of the potentiometer 34.
  • the IMU 38 or the imaging device 39 may be used as the second sensor for detecting the information regarding the bucket angle.
  • the IMU 38 is attached to, for example, a tilt rod 17.
  • the potentiometers 33, 34, stroke sensors 35, 36, IMU 37, 38, and imaging device 39 may be used as sensors for detecting information regarding the position of the center of gravity GC1 of the work equipment 3.
  • the information regarding the position of the center of gravity GC1 of the working machine 3 is the dimension L2.
  • the dimension L2 is the dimension L2 between the center of gravity GC1 and the boom pin 21, and is a dimension along the front-rear direction of the wheel loader 1.
  • the dimension L2 is a dimension along the horizontal direction between the center of gravity GC1 and the boom pin 21 when the wheel loader 1 is placed on the horizontal ground.
  • potentiometers 33 and 34, stroke sensors 35 and 36, IMU 37 and 38, and the imaging device 39 may be used as sensors for detecting information regarding the position of the center of gravity GC2 of the cargo in the bucket 14.
  • the information regarding the position of the center of gravity GC2 of the cargo in the bucket 14 is the dimension L3.
  • the dimension L3 is the dimension L3 between the center of gravity GC2 and the boom pin 21, and is a dimension along the front-rear direction of the wheel loader 1.
  • the dimension L3 is a dimension along the horizontal direction between the center of gravity GC2 and the boom pin 21 when the wheel loader 1 is placed on the horizontal ground.
  • the wheel loader 1 may further have an angle sensor 40.
  • the angle sensor 40 detects the inclination angle (pitch angle) of the machine body with respect to the direction (horizontal plane) perpendicular to the reference gravity direction.
  • an IMU attached to the machine body may be used.
  • the angle sensor 40 may be attached to any of the front frame 11, the rear frame 12, and the cab 5 as long as it is attached to the machine body.
  • FIG. 2 is a diagram showing a functional block of a controller that measures the load mass in a bucket in the work machine shown in FIG.
  • the controller 50 includes a boom cylinder force calculation unit 50a, a bucket cylinder force calculation unit 50b, a work machine posture calculation unit 50c, a center of gravity position calculation unit 50d, and a balance equation generation of a moment related to the boom. It has a unit 50e, a cargo mass calculation unit 50f, and a storage unit 50g.
  • the boom cylinder force calculation unit 50a calculates the boom cylinder force F boom based on the cylinder pressure detected by the pressure sensors 31b and 31h. Specifically, the boom cylinder force calculation unit 50a calculates the boom cylinder force F boom based on the bottom pressure of the boom cylinder 18 acquired from the pressure sensor 31b and the head pressure acquired from the pressure sensor 31h. The boom cylinder force calculation unit 50a may calculate the boom cylinder force F boom only from the acquired bottom pressure of the boom cylinder 18. The boom cylinder force calculation unit 50a outputs the calculated boom cylinder force F boom to the moment balancing type generation unit 50e related to the boom.
  • the bucket cylinder force calculation unit 50b calculates the bucket cylinder force F bucket based on the cylinder pressure detected by the pressure sensors 32b and 32h. Specifically, the bucket cylinder force calculation unit 50b calculates the bucket cylinder force F bucket based on the bottom pressure of the bucket cylinder 19 acquired from the pressure sensor 32b and the head pressure acquired from the pressure sensor 32h. The bucket cylinder force calculation unit 50b may calculate the bucket cylinder force F bucket only from the acquired bottom pressure of the bucket cylinder 19. The bucket cylinder force calculation unit 50b outputs the calculated bucket cylinder force F bucket to the moment balancing type generation unit 50e related to the boom.
  • the work machine posture calculation unit 50c acquires information on the boom angle from the first sensor (potentiometer 33, stroke sensor 35, IMU 37, imaging device 39, etc.).
  • the work equipment attitude calculation unit 50c acquires information on the bucket angle from the second sensor (potentiometer 34, stroke sensor 36, IMU 38, imaging device 39, etc.).
  • the work machine posture calculation unit 50c calculates the dimension L1 and the dimension L4 based on the information regarding the boom angle and the information regarding the bucket angle.
  • the work machine posture calculation unit 50c outputs the calculated dimensions L1 and L4 to the moment balancing type generation unit 50e related to the boom.
  • the center of gravity position calculation unit 50d acquires information on the boom angle from the first sensor (potentiometer 33, stroke sensor 35, IMU 37, imaging device 39, etc.).
  • the center of gravity position calculation unit 50d acquires information on the bucket angle from the second sensor (potentiometer 34, stroke sensor 36, IMU 38, imaging device 39, etc.).
  • the center of gravity position calculation unit 50d calculates the dimension L2 and the dimension L3 based on the information regarding the boom angle and the information regarding the bucket angle.
  • the center of gravity position calculation unit 50d outputs the calculated dimensions L2 and L3 to the moment balance type generation unit 50e related to the boom.
  • the storage unit 50 g stores the mass M1 of the entire working machine 3, the gravitational acceleration g, and the like. Information such as mass M1 and gravitational acceleration g may be input to the storage unit 50g from an input unit 51 outside the controller 50.
  • the storage unit 50g is not included in the controller 50 and may be arranged outside the controller 50.
  • the moment balancing type generation unit 50e related to the boom acquires the mass M1 and the gravitational acceleration g of the entire working machine 3 from the storage unit 50g.
  • the moment balancing formula generation unit 50e related to the boom obtains the moment balancing formula (1) related to the boom from the acquired cylinder forces F boom and F bucket , the dimensions L1 to L4, the masses M1 and M2, and the gravitational acceleration g. Generate.
  • the unit of the cylinder force F boom and F bucket in the formula (1) is N, and the unit of the dimensions L1 to L4 is m.
  • the unit of mass M1 and M2 is kg, and the unit of gravitational acceleration g is m / s 2 .
  • the moment balancing formula generation unit 50e related to the boom outputs the formula (1) to the load mass calculation unit 50f.
  • the cargo mass calculation unit 50f solves the equation (1) for the mass M2 as in the following equation (2). As a result, the cargo mass calculation unit 50f can calculate the mass M2 of the cargo in the bucket 14.
  • the controller 50 calculates the mass M2 based on the boom cylinder force F boom , the bucket cylinder force F bucket , the dimensions L1 to L4, the mass M1, and the gravitational acceleration g. calculate.
  • the cargo mass calculation unit 50f outputs the calculated mass M2 to the display unit 52 outside the controller 50.
  • the display unit 52 may be arranged in the cab 5 (FIG. 1), for example, or may be arranged in a remote place away from the wheel loader 1.
  • the display unit 52 displays the calculated mass M2 or weight M2 ⁇ g on the screen.
  • Each of the input unit 51 and the display unit 52 may be connected to the controller 50 by wire or wirelessly.
  • the load mass M2 in the bucket 14 was calculated by collecting the entire working machine 3 as a whole, but as shown in the following formula (3), individual parts such as the bucket 14, the boom 15, and the bell crank 16 are calculated. You may calculate the moments of and add up those moments.
  • M1g ⁇ L2 of the equation (3) is substituted as M1g ⁇ L2 of the equation (2).
  • the mass M2 of the cargo in the bucket 14 is calculated in the same manner as described above.
  • FIG. 3 is a flow chart showing an example of a measurement method for measuring the load mass in the bucket in the work machine according to the first embodiment.
  • first sensor information about the boom angle is measured by the first sensor.
  • Information about the boom angle is measured, for example, by the potentiometer 33 shown in FIG.
  • the potentiometer 33 measures the rotation angle of the boom 15 with respect to the front frame 11 of the machine body.
  • the information regarding the boom angle may be the stroke length of the boom cylinder 18 measured by the stroke sensor 35. Further, the information regarding the boom angle may be the angle (or angular velocity) and acceleration of the three axes of the boom 15 measured by the IMU 37, or may be an image captured by the imaging device 39.
  • step S1a: FIG. 3 The information regarding the boom angle measured by the first sensor as described above is acquired by the controller 50 shown in FIG. 2 (step S1a: FIG. 3).
  • information about the bucket angle is measured by the second sensor.
  • Information about the bucket angle is measured, for example, by the potentiometer 34 shown in FIG.
  • the potentiometer 34 measures the rotation angle of the bell crank 16 with respect to the boom 15.
  • the information regarding the bucket angle may be the stroke length of the bucket cylinder 19 measured by the stroke sensor 36. Further, the information regarding the bucket angle may be the angle (or angular velocity) and acceleration of the three axes of the tilt rod 17 measured by the IMU 38, or may be an image captured by the imaging device 39.
  • step S1b The information regarding the bucket angle measured by the second sensor as described above is acquired by the controller 50 shown in FIG. 2 (step S1b: FIG. 3).
  • the cylinder pressure is measured.
  • the cylinder pressure is the cylinder pressure of each of the boom cylinder 18 and the bucket cylinder 19 shown in FIG.
  • the bottom pressure of the boom cylinder 18 is measured by the pressure sensor 31b, and the head pressure is measured by the pressure sensor 31h.
  • the bottom pressure of the bucket cylinder 19 is measured by the pressure sensor 32b, and the head pressure is measured by the pressure sensor 32h.
  • step S1c FIG. 3
  • the controller 50 determines the dimensions L1 and L4 regarding the posture of the work machine 3, the dimensions L3 representing the position of the center of gravity GC2, and the work machine 3 based on the acquired information about the boom angle and the information about the bucket angle.
  • the dimension L2 representing the position of the center of gravity GC1 is calculated (step S2: FIG. 3).
  • Each of the dimensions L1 and L4 is calculated by the work machine posture calculation unit 50c in FIG.
  • the dimensions L2 and L3 are calculated by the center of gravity position calculation unit 50d in FIG.
  • the controller 50 calculates the boom cylinder force F boom and the bucket cylinder force F bucket based on the acquired cylinder pressure (step S3: FIG. 3).
  • the boom cylinder force F boom is calculated by the boom cylinder force calculation unit 50a in FIG.
  • the bucket cylinder force F bucket is calculated by the bucket cylinder force calculation unit 50b in FIG.
  • the controller 50 calculates the mass M2 of the cargo in the bucket 4 (step S4: FIG. 3).
  • the load mass M2 is calculated by adding the dimensions L1 to L4 and the cylinder forces F bucket and F boom calculated above, and the mass M1 and the gravitational acceleration g of the entire working machine 3 stored in the storage unit of FIG. This is done by substituting into equation (2).
  • the load mass M2 is calculated by the load mass calculation unit 50f in FIG.
  • the mass M2 of the cargo in the bucket 14 is calculated by the controller 50.
  • the order of the calculation of the dimensions L1 to L4 (step S2) and the calculation of the cylinder force F boom and the F bucket (step S3) is not limited to the order shown in FIG.
  • the calculation of the dimensions L1 to L4 (step S2) may be performed after the calculation of the cylinder force F boom and the F bucket (step S3). Further, the calculation of the dimensions L1 to L4 (step S2) and the calculation of the cylinder force F boom and the F bucket (step S3) may be performed at the same time.
  • FIG. 4 is a diagram showing the relationship between the bucket angle and the load mass when the bucket cylinder force F bucket is taken into consideration and when the bucket cylinder force F bucket is not taken into consideration when measuring the load mass in the bucket.
  • the tilted state of the bucket 14 means a state in which the bucket 14 is rotated with respect to the boom 15 so that the front end of the bucket 14 is lifted as compared with the dump state.
  • the full tilt state means a state in which the front end of the bucket 14 is lifted until the bucket 14 is stopped by the tilt side stopper.
  • the full dump state means a state in which the front end of the bucket 14 is lowered until the bucket 14 is stopped by the dump side stopper.
  • FIG. 4 shows a calculation result assuming a case where the cargo is not discharged from the bucket 14 even when the bucket 14 is in the full dump state.
  • the load mass M2 is calculated based on the boom cylinder force F boom and the bucket cylinder force F bucket. In this way, when calculating the load mass M2 , not only the cylinder force F boom but also the bucket cylinder force F bucket is taken into consideration. Therefore, even if the position of the bucket 14 with respect to the boom 15 changes, the load mass M2 can be calculated accurately as shown by the solid line in FIG.
  • the accuracy of the load mass M2 is improved at all angles of the bucket 14 with respect to the boom 15. Therefore, the accuracy of the load mass M2 at the time of the so-called chip-off operation, in which the load amount in the bucket is adjusted at the final round trip to the dump truck or the like and the amount is confirmed in real time, is improved.
  • the equation for balancing the moment includes not only the boom cylinder force F boom but also the bucket cylinder force F bucket. Therefore, it is not necessary to perform calibration for correcting the influence of the angle of the bucket 14 after once calculating the load mass in the bucket 14. This makes it possible to easily and accurately calculate the load mass M2 in the bucket 14.
  • the bucket cylinder force F bucket is calculated based on at least the bottom pressure of the bucket cylinder 19 measured by the pressure sensor 32b. Therefore, the bucket cylinder force F bucket can be directly obtained.
  • FIG. 5 is a diagram showing a functional block of a controller that measures the load mass in a bucket in the work machine according to the second embodiment.
  • FIG. 6 is a diagram for explaining the dimensions of each part of the working machine.
  • the controller 50 of the present embodiment relates to a boom cylinder force calculation unit 50a, a bucket cylinder force calculation unit 50b, a work machine posture calculation unit 50c, a center of gravity position calculation unit 50d, and a boom. It has a moment balancing type generation unit 50e, a cargo mass calculation unit 50f, and a storage unit 50g.
  • the boom cylinder force calculation unit 50a calculates the boom cylinder force F boom and outputs the boom cylinder force F boom to the moment balancing type generation unit 50e related to the boom, as in the first embodiment.
  • the work machine posture calculation unit 50c calculates the dimensions L1 and L4 as in the first embodiment.
  • the work machine posture calculation unit 50c outputs the calculated dimensions L1 and L4 to each of the moment balancing type generation unit 50e and the bucket cylinder force calculation unit 50b related to the boom.
  • the work machine posture calculation unit 50c calculates the dimensions Rb2, Rb3, and Rb4 shown in FIG. 6 based on the information on the boom angle and the information on the bucket angle.
  • Information on the boom angle is detected by the first sensor as in the first embodiment.
  • the information detected by the first sensor is the rotation angle of the boom 15 measured by the potentiometer 33, the stroke length of the boom cylinder 18 measured by the stroke sensor 35, and the three-axis angles of the boom 15 measured by the IMU 37 ( Or angular velocity) and acceleration, or an image captured by the imaging device 39.
  • Information on the bucket angle is detected by the second sensor as in the first embodiment.
  • the information detected by the second sensor is the rotation angle of the bell crank 16 measured by the potentiometer 34, the stroke length of the bucket cylinder 19 measured by the stroke sensor 36, and the tilt rod 17 measured by the IMU 38.
  • the dimension Rb2 is the dimension between the pin 22 and the pin 27, and is the dimension in the direction orthogonal to the extending direction of the tilt rod 17.
  • the dimension Rb3 is a dimension between the pin 27 and the support pin 29, and is a dimension in a direction orthogonal to the extending direction of the tilt rod 17.
  • the dimension Rb4 is a dimension between the pin 26 and the support pin 29, and is a dimension in a direction orthogonal to the extending direction of the bucket cylinder 19.
  • the work equipment attitude calculation unit 50c outputs the calculated dimensions Rb2, Rb3, and Rb4 to each of the moment balancing type generation unit 50e and the bucket cylinder force calculation unit 50b related to the boom.
  • the center of gravity position calculation unit 50d calculates the dimensions L2 and L3 as in the first embodiment.
  • the center of gravity position calculation unit 50d outputs the calculated dimensions L2 and L3 to each of the moment balancing type generation unit 50e and the bucket cylinder force calculation unit 50b related to the boom.
  • center of gravity position calculation unit 50d calculates the dimensions Rb1 and Rb6 shown in FIG. 6 based on the information on the boom angle detected by the first sensor and the information on the bucket angle detected by the second sensor.
  • the dimension Rb1 is a dimension between the load center GC2 and the pin 22, and is a dimension along the front-rear direction of the wheel loader 1.
  • the dimension Rb2 is a dimension between the center of gravity GC3 of the bucket 14 and the pin 22, and is a dimension along the front-rear direction of the wheel loader 1.
  • the dimension Rb1 is a dimension along the horizontal direction between the load center GC2 and the pin 22 when the wheel loader 1 is placed on the horizontal ground.
  • the dimension Rb6 is a dimension along the horizontal direction between the center of gravity GC3 of the bucket 14 and the pin 22 when the wheel loader 1 is placed on the horizontal ground.
  • the center of gravity position calculation unit 50d outputs the calculated dimensions Rb1 and Rb6 to each of the moment balance type generation unit 50e and the bucket cylinder force calculation unit 50b related to the boom.
  • the storage unit 50 g stores the mass M1 of the entire working machine 3, the gravitational acceleration g, the mass M bucket of the bucket 14, and the like. Information such as the mass M1, the gravitational acceleration g, and the mass M bucket of the bucket 14 may be stored in the storage unit 50 g from the input unit 51 outside the controller 50.
  • the moment balancing equation generation unit 50e relating to the boom generates the above equation (1) and outputs the equation (1) to the load mass calculation unit 50f as in the first embodiment.
  • the bucket cylinder force calculation unit 50b acquires the mass M bucket of the bucket 14 and the gravitational acceleration g from the storage unit 50g.
  • the bucket cylinder force calculation unit 50b obtains the equation (4) of the moment balance with respect to the bucket 14 from the acquired bucket cylinder force F bucket , the dimensions Rb1 to Rb4, Rb6, the mass M bucket, M2, and the gravitational acceleration g. Generate.
  • the unit of the dimensions Rb1 to Rb4 and Rb6 in the formula (4) is m.
  • the unit of the mass M bucket is kg.
  • the controller 50 (bucket cylinder force calculation unit 50b) is based on the information on the boom angle detected by the first sensor and the information on the bucket angle detected by the second sensor.
  • the dimensions Rb1 to Rb4 and Rb6 are calculated, and the bucket cylinder force F bucket is calculated based on the dimensions Rb1 to Rb4 and Rb6.
  • the bucket cylinder force calculation unit 50b outputs the equation (4) to the cargo mass calculation unit 50f.
  • the cargo mass calculation unit 50f obtains the mass M2 by substituting the F bucket of the equation (4) for the F bucket of the equation (1). As a result, the cargo mass calculation unit 50f can calculate the mass M2 of the cargo in the bucket 14.
  • the information regarding the boom angle, the information regarding the bucket angle, and the cylinder pressures of the boom cylinder 18 and the bucket cylinder 19 are acquired (steps S1a and S1b). , S1c).
  • the controller 50 sets the dimensions L1, L4, Rb2, Rb3, Rb4 regarding the posture of the work equipment 3 and the dimensions L3, Rb1 of the load center GC2 based on the acquired information on the boom angle and the information on the bucket angle.
  • the dimension Rb6 representing the position of the bucket center of gravity GC3 and the dimension L2 of the center of gravity GC1 of the working machine 3 are calculated (step S2: FIG. 3).
  • Each of the dimensions L1, L4, Rb2, Rb3, and Rb4 is calculated by the work machine posture calculation unit 50c in FIG.
  • Each of the dimensions L2, L3, Rb1 and Rb6 is calculated by the center of gravity position calculation unit 50d in FIG.
  • the controller 50 calculates the boom cylinder force F boom and the bucket cylinder force F bucket (step S3: FIG. 3).
  • the boom cylinder force F boom is calculated by the boom cylinder force calculation unit 50a in FIG. 5 based on the acquired cylinder pressure.
  • the bucket cylinder force F bucket is calculated by the above equation (4) from the acquired dimensions Rb1 to Rb4, Rb6 and the like.
  • the bucket cylinder force F bucket is calculated by the bucket cylinder force calculation unit 50b in FIG.
  • the controller 50 calculates the mass M2 of the cargo in the bucket 4 (step S4: FIG. 3).
  • the load mass M2 is calculated by substituting the F bucket of the equation (4) for the F bucket of the equation (1) to obtain the mass M2.
  • the load mass M2 is calculated by the load mass calculation unit 50f in FIG.
  • the mass M2 of the cargo in the bucket 14 is calculated by the controller 50. ⁇ Effect> Next, the action and effect of the present embodiment will be described.
  • the load mass M2 is calculated based on the boom cylinder force F boom and the bucket cylinder force F bucket. Therefore, even if the position of the bucket 14 with respect to the boom 15 changes, the load mass M2 can be calculated accurately.
  • the bucket cylinder force F bucket is calculated based on the information regarding the angle of the boom 15 and the information regarding the angle of the bucket. Therefore, a pressure sensor for measuring the bucket cylinder force F bucket becomes unnecessary. Therefore, in the present embodiment, the number of parts can be reduced as compared with the first embodiment.
  • FIG. 7 is a diagram showing a state in which the front-rear direction of the work machine is inclined with respect to the horizontal plane.
  • FIG. 8 is a flow chart showing a measurement method for measuring the load mass in the bucket when the front-rear direction of the work machine is inclined with respect to the horizontal plane as shown in FIG. 7.
  • the wheel loader 1 is placed on an inclined surface (ground surface inclined with respect to a horizontal plane).
  • the wheel loader 1 is inclined by a pitch angle ⁇ pitch in the front-rear direction with respect to the horizontal plane.
  • ⁇ pitch it is desirable that the load mass M2 in the bucket 14 can be calculated accurately without being affected by the pitch angle ⁇ pitch.
  • the pitch angle ⁇ pitch is acquired, and the acquired pitch angle ⁇ pitch is taken into consideration to calculate the load mass M2 in the bucket 14. The contents will be specifically described below.
  • the wheel loader 1 has an angle sensor 40 attached to the machine body.
  • the pitch angle ⁇ pitch of the wheel loader 1 is measured by the angle sensor 40.
  • the angle sensor 40 may be attached to any of the front frame 11, the rear frame 12, and the cab 5.
  • the controller 50 acquires the measured pitch angle ⁇ pitch (step S1d: FIG. 8). Specifically, the center of gravity position calculation unit 50d of the controller 50 acquires the pitch angle ⁇ pitch.
  • the pitch angle ⁇ pitch is a positive value when the front of the machine body is tilted so as to be located above the rear, and the rear of the machine body is tilted so as to be located above the front. It is a negative number in the state. Therefore, in the state shown in FIG. 7, the pitch angle ⁇ pitch is a negative numerical value.
  • the center of gravity position calculation unit 50d calculates the dimensions L2 and L3 in consideration of the acquired pitch angle ⁇ pitch (step S2: FIG. 8).
  • Each of the dimensions L2 and L3 is calculated from, for example, the following equations (5) and (6).
  • the dimension L2x (unit: m) in the formula (5) is a dimension between the center of gravity GC1 of the working machine 3 and the boom pin 21, and is a dimension in the direction along the inclined surface.
  • the dimension L2y (unit: m) in the formula (5) is a dimension between the center of gravity GC1 of the working machine 3 and the boom pin 21 as shown in FIG. 7, and is a dimension along the direction perpendicular to the inclined surface. Is.
  • the dimension L3x (unit: m) in the formula (6) is the dimension between the center of gravity GC2 of the cargo in the bucket 14 and the boom pin 21, and is the dimension in the direction along the inclined surface. is there.
  • the dimension L3y (unit: m) in the equation (6) is a dimension between the center of gravity GC2 of the cargo in the bucket 14 and the boom pin 21 as shown in FIG. 7, and is in the direction perpendicular to the inclined surface. It is a dimension along.
  • the dimensions L2x, L2y, L3x, L3y in the equations (5) and (6) are calculated from the information on the boom angle and the information on the bucket angle.
  • the center of gravity position calculation unit 50d calculates the dimensions Rb1 and Rb6 in consideration of the pitch angle ⁇ pitch as well as the dimensions L2 and L3.
  • Each of the dimensions Rb1 and Rb6 is calculated from, for example, the following equations (7) and (8).
  • the controller 50 calculates the boom cylinder force F boom and the bucket cylinder force F bucket based on the acquired cylinder pressure (step S3: FIG. 8).
  • the bucket cylinder force F bucket may be calculated from the cylinder pressure of the bucket cylinder 19 measured as described in the first embodiment, or calculated from the dimensions of each part of the working machine 3 as described in the second embodiment. May be done.
  • the boom cylinder force F boom is calculated by the boom cylinder force calculation unit 50a in FIG. 2 or FIG.
  • the bucket cylinder force F bucket is calculated by the bucket cylinder force calculation unit 50b in FIG. 2 or FIG.
  • the controller 50 calculates the mass M2 of the cargo in the bucket 4 (step S4: FIG. 8).
  • the load mass M2 is calculated by using the dimensions L1 to L4 and the cylinder forces F bucket and F boom calculated above, and the mass M1 and the gravitational acceleration g of the entire working machine 3 stored in the storage unit of FIG. 2 or FIG. Is substituted into the above equation (2).
  • the controller 50 is calculated by using L2 and L3 calculated by the above equations (5) and (6) in the first embodiment, and by the above equations (5) to (8) in the second embodiment.
  • L2, L3, Rb1, and Rb6 are used to calculate the mass M2 of the cargo in the bucket 4.
  • the load mass M2 is calculated by the load mass calculation unit 50f in FIG. 2 or FIG.
  • the mass M2 of the cargo in the bucket 14 is calculated by the controller 50. Since the configuration of the work machine and the calculation method of the load mass M2 in the modified examples other than the above are almost the same as those in the first and second embodiments, the description thereof will not be repeated.
  • the dimensions L2, L3, Rb1 and Rb6 are calculated in consideration of the pitch angle ⁇ pitch. Therefore, the load mass M2 in the bucket 14 can be calculated easily and accurately on any slope and at any bucket angle.
  • the controller 50 shown in FIGS. 2 and 4 may be mounted on the work machine 1 or may be arranged apart from the outside of the work machine 1. When the controller 50 is arranged apart from the outside of the work machine 1, the controller 50 may be wirelessly connected to the sensors 31b, 31h, 32b, 32h, 33-40, and the like.
  • the controller 50 is, for example, a processor, and may be a CPU (Central Processing Unit).
  • a control system for controlling the work machine 1 by the function of the controller 50 is configured.
  • the hydraulic cylinder has been described as the boom cylinder 18 (first actuator), but the first actuator 18 is not limited to the hydraulic cylinder, and may be any one that generates a thrust for driving the boom 15, for example, electric. It may be a cylinder or the like.
  • the hydraulic cylinder has been described as the bucket cylinder 19 (second actuator), the second actuator 19 is not limited to the hydraulic cylinder, and may be any one that generates a thrust for driving the bucket 14, for example, an electric cylinder or the like. It may be.
  • the pressure sensors 31b, 31h, 32b, and 32h have been described as sensors that detect information on the thrusts of the first actuator 18 and the second actuator 19, but the sensors that detect the information on these thrusts are thrusts such as electric cylinders. It may detect information about.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Operation Control Of Excavators (AREA)
  • Component Parts Of Construction Machinery (AREA)

Abstract

ブーム(15)は、機械本体に取り付けられる。バケット(14)は、ブーム(15)に取り付けられる。ブームシリンダ(18)は、機械本体に取り付けられ、ブーム(15)を駆動する。バケットシリンダ(19)は、機械本体に取り付けられ、ブーム(15)に対してバケット(14)を駆動する。コントローラ(50)は、ブームシリンダ力(Fboom)とバケットシリンダ力(Fbucket)とに基づいてバケット(14)内の積荷の質量(M2)を算出する。

Description

作業機械、計測方法およびシステム
 本開示は、作業機械、計測方法およびシステムに関する。
 ホイールローダなどの作業機械において、バケット内の積載重量を推定する方法が、たとえば特開2017-8633号公報(特許文献1参照)に開示されている。特許文献1では、バケット内の積載重量を推定するために、ブーム角度とボトム圧との関係を定義したリストが用いられる。このリストには、バケットが空荷の状態と、定格重量積載の状態と、定格重量の所定割合の荷が積載された状態との各々におけるブーム角度とボトム圧との関係が示されている。
特開2017-8633号公報
 特許文献1における積載重量の推定方法では、上記リストに示された状態以外の重量の積荷がバケット内に積載されていると、積載重量を精度良く推定することができない。
 本開示の目的は、バケット内の積荷質量を精度良く推定できる作業機械、計測方法およびシステムを提供することである。
 本開示の作業機械は、機械本体と、ブームと、バケットと、第1アクチュエータと、第2アクチュエータと、コントローラとを備えている。ブームは、機械本体に取り付けられる。バケットは、ブームに取り付けられる。第1アクチュエータは、機械本体に取り付けられ、ブームを駆動する。第2アクチュエータは、機械本体に取り付けられ、ブームに対してバケットを駆動する。コントローラは、第1アクチュエータの推力と第2アクチュエータの推力とに基づいてバケット内の積荷の質量を算出する。
 本開示の計測方法は、作業機械におけるバケット内の積荷の質量を計測する計測方法である。作業機械は、機械本体と、機械本体に取り付けられるブームと、ブームに取り付けられるバケットと、機械本体に取り付けられブームを駆動する第1アクチュエータと、機械本体に取り付けられブームに対してバケットを駆動する第2アクチュエータと、を有している。この計測方法は、以下のステップを備えている。
 第1アクチュエータの推力に関する情報が取得される。第2アクチュエータの推力に関する情報が取得される。第1アクチュエータの推力に関する情報と第2アクチュエータの推力に関する情報とに基づいてバケット内の積荷の質量が算出される。
 本開示のシステムは、機械本体と、ブームと、バケットと、第1アクチュエータと、第2アクチュエータとを備えている。ブームは、機械本体に取り付けられる。バケットは、ブームに取り付けられる。第1アクチュエータは、機械本体に取り付けられ、ブームを駆動する。第2アクチュエータは、機械本体に取り付けられ、ブームに対してバケットを駆動する。第1アクチュエータの推力と第2アクチュエータの推力とに基づいてバケット内の積荷の質量が算出される。
 本開示によれば、バケット内の積荷質量を精度良く推定できる作業機械、計測方法およびシステムを実現することができる。
実施の形態1に係る作業機械の一例としてのホイールローダの側面図である。 実施の形態1に係る作業機械におけるバケット内の積荷質量を計測するコントローラの機能ブロックを示す図である。 実施の形態1に係る作業機械におけるバケット内の積荷質量を計測する計測方法を示すフロー図である。 バケット内の積荷質量を計測する際にバケットシリンダ力Fbucketを考慮した場合と考慮しない場合とにおけるバケット角度と積荷重量との関係を示す図である。 実施の形態2に係る作業機械におけるバケット内の積荷質量を計測するコントローラの機能ブロックを示す図である。 作業機の各部の寸法を説明するための図である。 作業機械の前後方向が水平面に対して傾斜した状態を示す図である。 図7に示すように作業機械の前後方向が水平面に対して傾斜した場合におけるバケット内の積荷質量を計測する計測方法を示すフロー図である。
 以下、本開示の実施の形態について、図面を参照して詳細に説明する。なお、明細書および図面において、同一の構成要素または対応する構成要素には、同一の符号を付し、重複する説明を繰り返さない。また、図面では、説明の便宜上、構成を省略または簡略化している場合もある。また、各実施の形態と各変形例との少なくとも一部は、互いに任意に組み合わされてもよい。
 (実施の形態1)
 <作業機械の構成>
 本実施の形態に係る作業機械の一例としてホイールローダの構成について図1を用いて説明する。なお本実施の形態における作業機械はホイールローダに限定されるものではない。本実施の形態の作業機械は、走行しながら掘削する車輪を有する作業機械であればよく、バックホーローダ、スキッドステアローダなどであってもよい。
 図1は、実施の形態1に係る作業機械の一例としてのホイールローダの側面図である。図1に示されるように、ホイールローダ1は、車体フレーム2と、作業機3と、走行装置4と、キャブ5とを有している。
 車体フレーム2およびキャブ5からホイールローダ1の機械本体が構成されている。キャブ5内には、オペレータが着座するシートおよび操作装置などが配置されている。ホイールローダ1の機械本体には、作業機3および走行装置4が取り付けられている。作業機3は機械本体の前方に配置されており、機械本体の最後端にはカウンタウエイト6が設けられている。
 車体フレーム2は、前フレーム11と後フレーム12とを含んでいる。前フレーム11と後フレーム12とには、ステアリングシリンダ13が取り付けられている。ステアリングシリンダ13は、油圧シリンダである。ステアリングシリンダ13はステアリングポンプ(図示せず)からの作動油で伸縮する。ステアリングシリンダ13の伸縮により、前フレーム11と後フレーム12とは互いに左右方向に揺動可能である。これにより、ホイールローダ1の進行方向が左右に変更可能である。
 本明細書中において、ホイールローダ1が直進走行する方向を、ホイールローダ1の前後方向という。ホイールローダ1の前後方向において、車体フレーム2に対して作業機3が配置されている側を前方向とし、前方向と反対側を後方向とする。ホイールローダ1の左右方向とは、平面視において前後方向と直交する方向である。前方向を見て左右方向の右側、左側が、それぞれ右方向、左方向である。ホイールローダ1の上下方向とは、前後方向および左右方向によって定められる平面に直交する方向である。上下方向において地面のある側が下側、空のある側が上側である。
 走行装置4は、走行輪4a、4bを含んでいる。走行輪4a、4bの各々は車輪であり、ゴムよりなるタイヤを有している。走行輪(前輪)4aは、前フレーム11に回転可能に取り付けられている。走行輪(後輪)4bは、後フレーム12に回転可能に取り付けられている。ホイールローダ1は、走行輪4a、4bが回転駆動されることにより自走可能である。
 作業機3は、掘削などの作業を行うためのものである。作業機3は、前フレーム11に取り付けられている。作業機3は、バケット14と、ブーム15と、ベルクランク16と、チルトロッド17、ブームシリンダ18(第1アクチュエータ)と、バケットシリンダ19(第2アクチュエータ)とを含んでいる。
 ブーム15の基端部は、ブームピン21によって前フレーム11に回転自在に取付けられている。これによりブーム15は機械本体に回転可能に取り付けられている。バケット14は、バケットピン22によってブーム15の先端に回転自在に取付けられている。
 ブームシリンダ18はブーム15を駆動する。ブームシリンダ18の一端は、機械本体の前フレーム11にピン23によって回転可能に取り付けられている。これによりブームシリンダ18は、機械本体に回転可能に取り付けられている。ブームシリンダ18の他端は、ブーム15にピン24によって回転可能に取り付けられている。
 ブームシリンダ18はたとえば油圧シリンダである。ブームシリンダ18は、作業機ポンプ(図示せず)からの作動油によって伸縮する。これによりブーム15が駆動し、ブーム15の先端に取り付けられたバケット14が昇降する。
 ベルクランク16は、支持ピン29によってブーム15に回転自在に支持されている。ベルクランク16は、支持ピン29の一方側に位置する第1端部と、支持ピン29に対して第1端部と反対側に位置する第2端部とを有している。ベルクランク16の第1端部はチルトロッド17を介在してバケット14に接続されている。ベルクランク16の第2端部はバケットシリンダ19を介在して機械本体の前フレーム11に接続されている。
 チルトロッド17の一端はベルクランク16の第1端部にピン27によって回転可能に取り付けられている。チルトロッド17の他端はバケット14にピン28によって回転可能に取り付けられている。
 バケットシリンダ19は、ブーム15に対してバケット14を駆動する。バケットシリンダ19は、一端(第3端部)と、一端の反対側の他端(第4端部)とを有している。バケットシリンダ19の一端は機械本体の前フレーム11にピン25によって回転可能に取り付けられている。バケットシリンダ19の他端はベルクランク16の第2端部にピン26によって回転可能に取り付けられている。
 バケットシリンダ19はたとえば油圧シリンダである。バケットシリンダ19は、作業機ポンプ(図示せず)からの作動油によって伸縮する。これによりバケット14が駆動し、バケット14がブーム15に対して上下に回動する。
 ホイールローダ1は、ブームシリンダ18の推力Fboom(ブームシリンダ力)に関する情報を検知するセンサと、バケットシリンダ19の推力Fbucket(バケットシリンダ力)に関する情報を検知するセンサとをさらに有している。
 ブームシリンダ18の推力に関する情報を検知するセンサは、たとえば圧力センサ31b、31hである。圧力センサ31b、31hの各々は、ブームシリンダ18のシリンダ圧力を検知する。圧力センサ31bは、ブームシリンダ18のボトム圧を検知する。圧力センサ31hは、ブームシリンダ18のヘッド圧を検知する。
 ヘッド圧とは油圧シリンダのピストンに対してシリンダーロッド側の圧力を意味し、ボトム圧とはピストンに対してチューブ側の圧力を意味する。
 バケットシリンダ19の推力に関する情報を検知するセンサは、たとえば圧力センサ32b、32hである。圧力センサ32b、32hの各々は、バケットシリンダ19のシリンダ圧力を検知する。圧力センサ32bは、バケットシリンダ19のボトム圧を検知する。圧力センサ32hは、バケットシリンダ19のヘッド圧を検知する。
 ホイールローダ1は、作業機3の姿勢に関する情報を検知するセンサをさらに有している。作業機3の姿勢に関する情報を検知するセンサは、たとえばブーム角度に関する情報を検知する第1センサと、ブームに対するバケット角度に関する情報を検知する第2センサとを含む。
 作業機3の姿勢に関する情報とは、寸法L1および寸法L4である。寸法L1は、ブームピン21とピン23との間の寸法であって、ブームシリンダ18の延びる方向に直交する方向の寸法である。寸法L4は、ブームピン21とピン26との間の寸法であって、バケットシリンダ19の延びる方向に直交する方向の寸法である。
 ブーム角度は、機械本体の前フレーム11に対するブーム15の角度である。バケット角度は、ブーム15に対するバケット14の角度である。
 ブーム角度に関する情報を検知する第1センサは、たとえばポテンショメータ33である。ポテンショメータ33は、ブームピン21と同心となるように取り付けられている。ブーム角度に関する情報を検知する第1センサとして、ポテンショメータ33に代えて、ブームシリンダ18のストロークセンサ35が用いられてもよい。
 またブーム角度に関する情報を検知する第1センサとして、IMU(Inertial Measurement Unit)37、または撮像デバイス(たとえばカメラ)39が用いられてもよい。IMU37は、たとえばブーム15に取り付けられている。撮像デバイス39は、機械本体(たとえばキャブ5)に取り付けられている。
 バケット角度に関する情報を検知する第2センサは、たとえばポテンショメータ34である。ポテンショメータ34は、支持ピン29と同心となるように取り付けられている。バケット角度に関する情報を検知する第2センサとして、ポテンショメータ34に代えて、バケットシリンダ19のストロークセンサ36が用いられてもよい。
 またバケット角度に関する情報を検知する第2センサとして、IMU38、または撮像デバイス39が用いられてもよい。IMU38は、たとえばチルトロッド17に取り付けられている。
 上記のポテンショメータ33、34、ストロークセンサ35、36、IMU37、38、および撮像デバイス39は、作業機3の重心GC1の位置に関する情報を検知するセンサとして用いられてもよい。作業機3の重心GC1の位置に関する情報とは、寸法L2である。
 寸法L2は、重心GC1とブームピン21との間の寸法L2であって、ホイールローダ1の前後方向に沿う寸法である。寸法L2は、ホイールローダ1が水平な地面に載置されている状態においては、重心GC1とブームピン21との間の水平方向に沿う寸法である。
 また上記のポテンショメータ33、34、ストロークセンサ35、36、IMU37、38、および撮像デバイス39は、バケット14内の積荷の重心GC2の位置に関する情報を検知するセンサとして用いられてもよい。バケット14内の積荷の重心GC2の位置に関する情報とは、寸法L3である。
 寸法L3は、重心GC2とブームピン21との間の寸法L3であって、ホイールローダ1の前後方向に沿う寸法である。寸法L3は、ホイールローダ1が水平な地面に載置されている状態においては、重心GC2とブームピン21との間の水平方向に沿う寸法である。
 またホイールローダ1は、角度センサ40をさらに有していてもよい。角度センサ40は、基準である重力方向に垂直な方向(水平面)に対する機械本体の傾斜角度(ピッチ角度)を検知する。この角度センサ40として、たとえば機械本体に取り付けられたIMUが用いられてもよい。角度センサ40は、機械本体に取り付けられていれば、前フレーム11、後フレーム12およびキャブ5のいずれに取り付けられていてもよい。
 <コントローラの機能ブロック>
 次に、図1に示す作業機械1のバケット14内の積荷質量を計測するコントローラ50の機能ブロックについて図2を用いて説明する。
 図2は、図1に示す作業機械におけるバケット内の積荷質量を計測するコントローラの機能ブロックを示す図である。図2に示されるように、コントローラ50は、ブームシリンダ力算出部50aと、バケットシリンダ力算出部50bと、作業機姿勢算出部50cと、重心位置算出部50dと、ブームに関するモーメントのつり合い式生成部50eと、積荷質量算出部50fと、記憶部50gとを有している。
 ブームシリンダ力算出部50aは、圧力センサ31b、31hにより検知されたシリンダ圧力に基づいてブームシリンダ力Fboomを算出する。具体的には、ブームシリンダ力算出部50aは、圧力センサ31bから取得したブームシリンダ18のボトム圧と、圧力センサ31hから取得したからヘッド圧とに基づいてブームシリンダ力Fboomを算出する。ブームシリンダ力算出部50aは、取得したブームシリンダ18のボトム圧のみからブームシリンダ力Fboomを算出してもよい。ブームシリンダ力算出部50aは、算出したブームシリンダ力Fboomを、ブームに関するモーメントつり合い式生成部50eへ出力する。
 バケットシリンダ力算出部50bは、圧力センサ32b、32hにより検知されたシリンダ圧力に基づいてバケットシリンダ力Fbucketを算出する。具体的には、バケットシリンダ力算出部50bは、圧力センサ32bから取得したバケットシリンダ19のボトム圧と、圧力センサ32hから取得したからヘッド圧とに基づいてバケットシリンダ力Fbucketを算出する。バケットシリンダ力算出部50bは、取得したバケットシリンダ19のボトム圧のみからバケットシリンダ力Fbucketを算出してもよい。バケットシリンダ力算出部50bは、算出したバケットシリンダ力Fbucketを、ブームに関するモーメントつり合い式生成部50eへ出力する。
 作業機姿勢算出部50cは、ブーム角度に関する情報を第1センサ(ポテンショメータ33、ストロークセンサ35、IMU37、撮像デバイス39など)から取得する。作業機姿勢算出部50cは、バケット角度に関する情報を第2センサ(ポテンショメータ34、ストロークセンサ36、IMU38、撮像デバイス39など)から取得する。
 作業機姿勢算出部50cは、ブーム角度に関する情報とバケット角度に関する情報とに基づいて寸法L1および寸法L4を算出する。作業機姿勢算出部50cは、算出した寸法L1、L4を、ブームに関するモーメントつり合い式生成部50eへ出力する。
 重心位置算出部50dは、ブーム角度に関する情報を第1センサ(ポテンショメータ33、ストロークセンサ35、IMU37、撮像デバイス39など)から取得する。重心位置算出部50dは、バケット角度に関する情報を第2センサ(ポテンショメータ34、ストロークセンサ36、IMU38、撮像デバイス39など)から取得する。
 重心位置算出部50dは、ブーム角度に関する情報とバケット角度に関する情報とに基づいて、寸法L2および寸法L3を算出する。重心位置算出部50dは、算出した寸法L2、L3を、ブームに関するモーメントつり合い式生成部50eへ出力する。
 記憶部50gは、作業機3全体の質量M1、重力加速度gなどを記憶している。記憶部50gには、コントローラ50外部の入力部51から質量M1、重力加速度gなどの情報が入力されてもよい。記憶部50gは、コントローラ50に含まれておらず、コントローラ50の外部に配置されていてもよい。
 ブームに関するモーメントつり合い式生成部50eは、記憶部50gから作業機3全体の質量M1と重力加速度gとを取得する。
 ブームに関するモーメントつり合い式生成部50eは、取得したシリンダ力Fboom、Fbucketと、寸法L1~L4と、質量M1、M2と、重力加速度gとから、ブームに関するモーメントのつり合いの式(1)を生成する。
Figure JPOXMLDOC01-appb-M000001
 式(1)におけるシリンダ力Fboom、Fbucketの単位はNであり、寸法L1~L4の単位はmである。また質量M1、M2の単位はkgであり、重力加速度gの単位はm/s2である。
 ブームに関するモーメントつり合い式生成部50eは、式(1)を積荷質量算出部50fへ出力する。
 積荷質量算出部50fは、式(1)を以下の式(2)のように質量M2について解く。これにより積荷質量算出部50fは、バケット14内の積荷の質量M2を算出することができる。
Figure JPOXMLDOC01-appb-M000002
 上式(2)に示されるように、コントローラ50は、ブームシリンダ力Fboomと、バケットシリンダ力Fbucketと、寸法L1~L4と、質量M1と、重力加速度gとに基づいて、質量M2を算出する。
 積荷質量算出部50fは、算出した質量M2をコントローラ50外の表示部52に出力する。表示部52は、たとえばキャブ5(図1)内に配置されていてもよく、またホイールローダ1から離れた遠隔地に配置されていてもよい。表示部52は、算出した質量M2または重量M2×gを画面に表示する。これによりキャブ5内でホイールローダ1を操作するオペレータ、遠隔地でホイールローダ1の動作を監視する監視者などがバケット14内の積荷質量M2または積荷重量M2×gを認識することができる。
 なお入力部51および表示部52の各々は、コントローラ50と有線で接続されていてもよく、また無線で接続されていてもよい。
 式(1)においては作業機3全体をひとまとめにしてバケット14内の積荷質量M2を算出したが、以下の式(3)に示すようにバケット14、ブーム15、ベルクランク16などの個々の部品のモーメントを計算し、それらのモーメントを合算してもよい。
Figure JPOXMLDOC01-appb-M000003
 この場合、式(3)のM1g×L2が、式(2)のM1g×L2として代入される。これにより上記と同様、バケット14内の積荷の質量M2が算出される。
 <積荷質量M2の計測方法>
 次に、本実施の形態に係る積荷質量M2の計測方法について図1~図3を用いて説明する。図3は、実施の形態1に係る作業機械におけるバケット内の積荷質量を計測する計測方法の一の例を示すフロー図である。
 まずブーム角度に関する情報が第1センサにより計測される。ブーム角度に関する情報は、たとえば図1に示されるポテンショメータ33により計測される。ポテンショメータ33は、機械本体の前フレーム11に対するブーム15の回転角度を計測する。
 ブーム角度に関する情報は、ストロークセンサ35により計測されるブームシリンダ18のストローク長さであってもよい。またブーム角度に関する情報は、IMU37により計測されるブーム15の3軸の角度(または角速度)および加速度であってもよく、また撮像デバイス39により撮像される画像であってもよい。
 上記のように第1センサにより計測されたブーム角度に関する情報は、図2に示されるコントローラ50により取得される(ステップS1a:図3)。
 またバケット角度に関する情報が第2センサにより計測される。バケット角度に関する情報は、たとえば図1に示されるポテンショメータ34により計測される。ポテンショメータ34は、ブーム15に対するベルクランク16の回転角度を計測する。
 バケット角度に関する情報は、ストロークセンサ36により計測されるバケットシリンダ19のストローク長さであってもよい。またバケット角度に関する情報は、IMU38により計測されるチルトロッド17の3軸の角度(または角速度)および加速度であってもよく、また撮像デバイス39により撮像される画像であってもよい。
 上記のように第2センサにより計測されたバケット角度に関する情報は、図2に示されるコントローラ50により取得される(ステップS1b:図3)。
 またシリンダ圧力が計測される。シリンダ圧力は、図1に示されるブームシリンダ18およびバケットシリンダ19の各々のシリンダ圧力である。ブームシリンダ18のボトム圧は圧力センサ31bにより計測され、ヘッド圧は圧力センサ31hにより計測される。バケットシリンダ19のボトム圧は圧力センサ32bにより計測され、ヘッド圧は圧力センサ32hにより計測される。
 上記のように計測された複数のシリンダ圧力は、図2に示されるコントローラ50により取得される(ステップS1c:図3)。
 この後、コントローラ50は、取得したブーム角度に関する情報とバケット角度に関する情報とに基づいて、作業機3の姿勢に関する寸法L1、L4と、積荷重心GC2の位置を表す寸法L3と、作業機3の重心GC1の位置を表す寸法L2とを算出する(ステップS2:図3)。
 寸法L1、L4の各々は、図2における作業機姿勢算出部50cにより算出される。寸法L2、L3は、図2における重心位置算出部50dにより算出される。
 さらにコントローラ50は、取得したシリンダ圧力に基づいて、ブームシリンダ力Fboomと、バケットシリンダ力Fbucketとを算出する(ステップS3:図3)。ブームシリンダ力Fboomは、図2におけるブームシリンダ力算出部50aにより算出される。バケットシリンダ力Fbucketは、図2におけるバケットシリンダ力算出部50bにより算出される。
 この後、コントローラ50は、バケット4内の積荷の質量M2を算出する(ステップS4:図3)。積荷質量M2の算出は、上記により算出された寸法L1~L4およびシリンダ力Fbucket、Fboomと、図2の記憶部に記憶された作業機3全体の質量M1および重力加速度gとを、上式(2)に代入することにより行なわれる。積荷質量M2の算出は、図2における積荷質量算出部50fにより行われる。
 以上によりバケット14内の積荷の質量M2がコントローラ50により算出される。
 なお寸法L1~L4の算出(ステップS2)と、シリンダ力Fboom、Fbucketの算出(ステップS3)との順序は図3に示された順序に限定されるものではない。寸法L1~L4の算出(ステップS2)が、シリンダ力Fboom、Fbucketの算出(ステップS3)の後で行なわれてもよい。また寸法L1~L4の算出(ステップS2)と、シリンダ力Fboom、Fbucketの算出(ステップS3)とは同時に行なわれてもよい。
 <作用効果>
 次に、本実施の形態の作用効果について図4を用いて説明する。
 図4は、バケット内の積荷質量を計測する際にバケットシリンダ力Fbucketを考慮した場合と考慮しない場合とにおけるバケット角度と積荷質量との関係を示す図である。
 図4に示されるように、バケットシリンダ力Fbucketを考慮せずに積荷重量を算出した場合、バケット14内の積荷に実際には変化がないにもかかわらず、フルダンプ状態からフルチルト状態までの間で算出された積荷重量は一点鎖線で示すように変化する。これはブーム15に対するバケット14の位置が変化することにより、ブームシリンダ18およびバケットシリンダ19に作用する力が変化し、それに伴って各シリンダの反力が変化したためと考えられる。このようにバケットシリンダ力Fbucketを考慮せずに積荷重量を算出した場合には、バケット14がフルチルト状態にあるとき以外は積荷重量を正確に算出することができない。
 バケット14のチルト状態とは、ダンプ状態と比較してバケット14の前端が持ち上がるようにバケット14がブーム15に対して回動した状態を意味する。フルチルト状態とは、バケット14がチルト側ストッパで停止するまでバケット14の前端が持ち上がった状態を意味する。またフルダンプ状態とは、バケット14がダンプ側ストッパで停止するまでバケット14の前端が下がった状態を意味する。
 なおバケット14がフルダンプ状態にあるときには、実際にはバケット14内の積荷はバケット14から排出される。図4は、バケット14がフルダンプ状態になっても積荷がバケット14内から排出されない場合を想定した算出結果を示している。
 これに対して本実施の形態においては、ブームシリンダ力Fboomとバケットシリンダ力Fbucketとに基づいて積荷質量M2が算出される。このように積荷質量M2の算出に際し、シリンダ力Fboomだけでなくバケットシリンダ力Fbucketも考慮される。このためブーム15に対するバケット14の位置が変化した場合でも、図4の実線で示すように積荷質量M2を精度よく算出することが可能となる。
 上記により、ブーム15に対するバケット14のあらゆる角度において積荷質量M2の精度が向上する。このため、ダンプトラックなどへの最終往復時にバケット内の積載量を調整して、その量をリアルタイムで確認する、いわゆるチップオフ操作時における積荷質量M2の精度が向上する。
 また本実施の形態においては、上式(2)に示されるようにモーメントのつり合いの式にブームシリンダ力Fboomだけでなくバケットシリンダ力Fbucketも含まれている。このためバケット14内の積荷質量を一旦算出した後にバケット14の角度の影響を補正するための較正が不要となる。これによりバケット14内の積荷質量M2を簡易かつ精度良く算出することが可能となる。
 また本実施の形態においては、少なくとも圧力センサ32bにより計測されたバケットシリンダ19のボトム圧に基づいてバケットシリンダ力Fbucketが算出される。このためバケットシリンダ力Fbucketを直接的に求めることができる。
 (実施の形態2)
 実施の形態1においては、計測したバケットシリンダ19のシリンダ圧力からバケットシリンダ力Fbucketを算出する場合について説明したが、バケットシリンダ力Fbucketは作業機3の各部の寸法から算出されてもよい。以下、実施の形態2においては、作業機3の各部の寸法からバケットシリンダ力Fbucketを算出する例について説明する。
 <コントローラの機能ブロック>
 本実施の形態に係るコントローラの機能ブロックについて図5および図6を用いて説明する。
 図5は、実施の形態2に係る作業機械におけるバケット内の積荷質量を計測するコントローラの機能ブロックを示す図である。図6は、作業機の各部の寸法を説明するための図である。
 図5に示されるように、本実施の形態のコントローラ50は、ブームシリンダ力算出部50aと、バケットシリンダ力算出部50bと、作業機姿勢算出部50cと、重心位置算出部50dと、ブームに関するモーメントのつり合い式生成部50eと、積荷質量算出部50fと、記憶部50gとを有している。
 ブームシリンダ力算出部50aは、実施の形態1と同様、ブームシリンダ力Fboomを算出し、ブームに関するモーメントつり合い式生成部50eへ出力する。
 作業機姿勢算出部50cは、実施の形態1と同様、寸法L1、L4を算出する。作業機姿勢算出部50cは、算出した寸法L1、L4を、ブームに関するモーメントつり合い式生成部50eとバケットシリンダ力算出部50bとの各々へ出力する。
 また作業機姿勢算出部50cは、ブーム角度に関する情報とバケット角度に関する情報とに基づいて、図6に示す寸法Rb2、Rb3、Rb4を算出する。
 ブーム角度に関する情報は、実施の形態1と同様、第1センサにより検知される。第1センサにより検知された情報は、ポテンショメータ33により計測されたブーム15の回転角度、ストロークセンサ35により計測されるブームシリンダ18のストローク長さ、IMU37により計測されるブーム15の3軸の角度(または角速度)および加速度、または撮像デバイス39により撮像される画像である。
 バケット角度に関する情報は、実施の形態1と同様、第2センサにより検知される。第2センサにより検知される情報は、ポテンショメータ34により計測されるベルクランク16の回転角度、ストロークセンサ36により計測されるバケットシリンダ19のストローク長さ、IMU38により計測されるチルトロッド17の3軸の角度(または角速度)および加速度、または撮像デバイス39により撮像される画像である。
 図6に示されるように、寸法Rb2は、ピン22とピン27との間の寸法であって、チルトロッド17の延びる方向に直交する方向における寸法である。寸法Rb3は、ピン27と支持ピン29との間の寸法であって、チルトロッド17の延びる方向に直交する方向における寸法である。寸法Rb4は、ピン26と支持ピン29との間の寸法であって、バケットシリンダ19の延びる方向に直交する方向における寸法である。
 図5に示されるように、作業機姿勢算出部50cは、算出した寸法Rb2、Rb3、Rb4を、ブームに関するモーメントつり合い式生成部50eとバケットシリンダ力算出部50bとの各々へ出力する。
 重心位置算出部50dは、実施の形態1と同様、寸法L2、L3を算出する。重心位置算出部50dは、算出した寸法L2、L3を、ブームに関するモーメントつり合い式生成部50eとバケットシリンダ力算出部50bとの各々へ出力する。
 また重心位置算出部50dは、第1センサにより検知されるブーム角度に関する情報と第2センサにより検知されるバケット角度に関する情報とに基づいて、図6に示す寸法Rb1、Rb6を算出する。
 図6に示されるように、寸法Rb1は、積荷重心GC2とピン22との間の寸法であって、ホイールローダ1の前後方向に沿う寸法である。また寸法Rb2は、バケット14の重心GC3とピン22との間の寸法であって、ホイールローダ1の前後方向に沿う寸法である。
 また寸法Rb1は、ホイールローダ1が水平な地面に載置されている状態においては、積荷重心GC2とピン22との間の水平方向に沿う寸法である。寸法Rb6は、ホイールローダ1が水平な地面に載置されている状態においては、バケット14の重心GC3とピン22との間の水平方向に沿う寸法である。
 図5に示されるように、重心位置算出部50dは、算出した寸法Rb1、Rb6を、ブームに関するモーメントつり合い式生成部50eとバケットシリンダ力算出部50bとの各々へ出力する。
 記憶部50gは、作業機3全体の質量M1、重力加速度g、バケット14の質量Mbucketなどを記憶している。記憶部50gには、コントローラ50外部の入力部51から質量M1、重力加速度g、バケット14の質量Mbucketなどの情報が記憶されてもよい。
 ブームに関するモーメントつり合い式生成部50eは、実施の形態1と同様、上式(1)を生成し、式(1)を積荷質量算出部50fへ出力する。
 バケットシリンダ力算出部50bは、記憶部50gからバケット14の質量Mbucketと重力加速度gとを取得する。
 バケットシリンダ力算出部50bは、取得したバケットシリンダ力Fbucketと、寸法Rb1~Rb4、Rb6と、質量Mbucket、M2と、重力加速度gとから、バケット14に関するモーメントのつり合いの式(4)を生成する。
Figure JPOXMLDOC01-appb-M000004
 式(4)における寸法Rb1~Rb4、Rb6の単位はmである。また質量Mbucketの単位はkgである。
 上式(4)に示されるように、コントローラ50(バケットシリンダ力算出部50b)は、第1センサにより検知されたブーム角度に関する情報と第2センサにより検知されたバケット角度に関する情報とに基づいて寸法Rb1~Rb4、Rb6を算出し、その寸法Rb1~Rb4、Rb6に基づいてバケットシリンダ力Fbucketを算出する。バケットシリンダ力算出部50bは、式(4)を積荷質量算出部50fへ出力する。
 積荷質量算出部50fは、式(1)のFbucketに式(4)のFbucketを代入することにより質量M2を求める。これにより積荷質量算出部50fは、バケット14内の積荷の質量M2を算出することができる。
 なお本実施の形態に係る上記以外のコントローラ50の機能ブロックは、実施の形態1に係るコントローラ50の機能ブロックとほぼ同じであるため、同一の要素については同一の符号を付し、その説明を繰り返さない。
 <積荷質量M2の計測方法>
 次に、本実施の形態に係る積荷質量M2の計測方法について図1、図3、図5を用いて説明する。
 図3に示されるように、実施の形態1と同様に、ブーム角度に関する情報と、バケット角度に関する情報と、ブームシリンダ18およびバケットシリンダ19の各々のシリンダ圧力とが取得される(ステップS1a、S1b、S1c)。
 この後、コントローラ50は、取得したブーム角度に関する情報とバケット角度に関する情報とに基づいて、作業機3の姿勢に関する寸法L1、L4、Rb2、Rb3、Rb4と、積荷重心GC2の寸法L3、Rb1と、バケット重心GC3の位置を表す寸法Rb6と、作業機3の重心GC1の寸法L2とを算出する(ステップS2:図3)。
 寸法L1、L4、Rb2、Rb3、Rb4の各々は、図5における作業機姿勢算出部50cにより算出される。寸法L2、L3、Rb1、Rb6の各々は、図5における重心位置算出部50dにより算出される。
 この後、コントローラ50は、ブームシリンダ力Fboomと、バケットシリンダ力Fbucketとを算出する(ステップS3:図3)。ブームシリンダ力Fboomは、取得したシリンダ圧力に基づいて、図5におけるブームシリンダ力算出部50aにより算出される。バケットシリンダ力Fbucketは、取得した寸法Rb1~Rb4、Rb6などから上式(4)により算出される。バケットシリンダ力Fbucketは、図5におけるバケットシリンダ力算出部50bにより算出される。
 この後、コントローラ50は、バケット4内の積荷の質量M2を算出する(ステップS4:図3)。積荷質量M2の算出は、式(1)のFbucketに式(4)のFbucketを代入することにより質量M2を求める。積荷質量M2の算出は、図5における積荷質量算出部50fにより行われる。
 以上によりバケット14内の積荷の質量M2がコントローラ50により算出される。
 <作用効果>
 次に、本実施の形態の作用効果について説明する。
 本実施の形態においても、実施の形態1と同様、ブームシリンダ力Fboomとバケットシリンダ力Fbucketとに基づいて積荷質量M2が算出される。このためブーム15に対するバケット14の位置が変化した場合でも、積荷質量M2を精度よく算出することが可能となる。
 また本実施の形態においては、バケット14内の積荷質量を一旦算出した後にバケット14の角度の影響を補正するための較正が不要となる。これによりバケット14内の積荷質量M2を簡易かつ精度良く算出することが可能となる。
 また本実施の形態においては、ブーム15の角度に関する情報とバケットの角度に関する情報とに基づいてバケットシリンダ力Fbucketが算出される。このためバケットシリンダ力Fbucketを計測するための圧力センサが不要となる。よって本実施の形態においては実施の形態1よりも部品点数を少なくすることができる。
 (変形例)
 次に、実施の形態1、2の変形例について図7および図8を用いて説明する。
 図7は、作業機械の前後方向が水平面に対して傾斜した状態を示す図である。図8は、図7に示すように作業機械の前後方向が水平面に対して傾斜した場合におけるバケット内の積荷質量を計測する計測方法を示すフロー図である。
 図7に示されるように、ホイールローダ1が、傾斜面(水平面に対して傾斜した地表面)上に載置されている。ホイールローダ1は水平面に対して前後方向にピッチ角θpitchだけ傾斜している。この場合、ピッチ角θpitchの影響を受けることなく、バケット14内の積荷質量M2を精度よく算出できることが望ましい。
 そこで本変形例では、ピッチ角θpitchが取得され、取得されたピッチ角θpitchが考慮されて、バケット14内の積荷質量M2が算出される。以下、その内容を具体的に説明する。
 図1に示されるように、ホイールローダ1は、機械本体に取り付けられた角度センサ40を有している。角度センサ40によりホイールローダ1のピッチ角θpitchが計測される。角度センサ40は、前フレーム11、後フレーム12およびキャブ5のいずれかに取り付けられていればよい。
 図2および図5に示されるように、コントローラ50は、計測されたピッチ角θpitchを取得する(ステップS1d:図8)。具体的にはコントローラ50の重心位置算出部50dがピッチ角θpitchを取得する。ピッチ角θpitchは、機械本体の前方が後方よりも上方に位置するように傾斜している状態においては正の数値となり、機械本体の後方が前方よりも上方に位置するように傾斜している状態においては負の数値となる。このため図7に示されている状態では、ピッチ角θpitchは負の数値となる。
 重心位置算出部50dは、取得したピッチ角θpitchを考慮して寸法L2、L3を算出する(ステップS2:図8)。寸法L2、L3の各々は、たとえば以下の式(5)、(6)から算出される。
Figure JPOXMLDOC01-appb-M000005
Figure JPOXMLDOC01-appb-M000006
 式(5)における寸法L2x(単位:m)は、図7に示されるように、作業機3の重心GC1とブームピン21との間の寸法であって、傾斜面に沿う方向の寸法である。また式(5)における寸法L2y(単位:m)は、図7に示されるように、作業機3の重心GC1とブームピン21との間の寸法であって、傾斜面に垂直な方向に沿う寸法である。
 式(6)における寸法L3x(単位:m)は、図7に示されるように、バケット14内の積荷の重心GC2とブームピン21との間の寸法であって、傾斜面に沿う方向の寸法である。また式(6)における寸法L3y(単位:m)は、図7に示されるように、バケット14内の積荷の重心GC2とブームピン21との間の寸法であって、傾斜面に垂直な方向に沿う寸法である。
 式(5)、(6)における寸法L2x、L2y、L3x、L3yは、ブーム角度に関する情報およびバケット角度に関する情報から算出される。
 また実施の形態2では、重心位置算出部50dは、寸法L2、L3と同様に、ピッチ角θpitchを考慮して寸法Rb1、Rb6も算出する。寸法Rb1、Rb6の各々は、たとえば以下の式(7)、(8)から算出される。
Figure JPOXMLDOC01-appb-M000007
Figure JPOXMLDOC01-appb-M000008
 この後、コントローラ50は、取得したシリンダ圧力に基づいて、ブームシリンダ力Fboomと、バケットシリンダ力Fbucketとを算出する(ステップS3:図8)。バケットシリンダ力Fbucketは、実施の形態1で説明したように計測したバケットシリンダ19のシリンダ圧力から算出されてもよく、また実施の形態2で説明したように作業機3の各部の寸法から算出されてもよい。
 ブームシリンダ力Fboomは、図2または図5におけるブームシリンダ力算出部50aにより算出される。バケットシリンダ力Fbucketは、図2または図5におけるバケットシリンダ力算出部50bにより算出される。
 この後、コントローラ50は、バケット4内の積荷の質量M2を算出する(ステップS4:図8)。積荷質量M2の算出は、上記により算出された寸法L1~L4およびシリンダ力Fbucket、Fboomと、図2または図5の記憶部に記憶された作業機3全体の質量M1および重力加速度gとを、上式(2)に代入することにより行なわれる。
 この際、コントローラ50は、実施の形態1では上式(5)、(6)で算出されたL2、L3を用いて、また実施の形態2では上式(5)~(8)で算出されたL2、L3、Rb1、Rb6を用いて、バケット4内の積荷の質量M2を算出する。
 積荷質量M2の算出は、図2または図5における積荷質量算出部50fにより行われる。
 以上によりバケット14内の積荷の質量M2がコントローラ50により算出される。
 なお上記以外の変形例における作業機械の構成および積荷質量M2の算出方法は、実施の形態1、2とほぼ同じであるため、その説明を繰り返さない。
 本変形例によれば、ピッチ角θpitchが考慮されて寸法L2、L3、Rb1、Rb6が算出される。このため、あらゆる傾斜地でかつあらゆるバケット角度において、バケット14内の積載質量M2を簡易かつ精度良く算出することができる。
 図2および図4に示されるコントローラ50は、作業機械1に搭載されていてもよく、作業機械1の外部に離れて配置されていてもよい。コントローラ50が作業機械1の外部に離れて配置されている場合、コントローラ50は、センサ31b、31h、32b、32h、33~40などと無線により接続されていてもよい。コントローラ50は、たとえばプロセッサであり、CPU(Central Processing Unit)であってもよい。コントローラ50の機能により作業機械1を制御する制御システムが構成されている。
 上記においてはブームシリンダ18(第1アクチュエータ)として油圧シリンダについて説明したが、第1アクチュエータ18は油圧シリンダに限定されるものではなく、ブーム15を駆動する推力を生じるものであればよく、たとえば電動シリンダなどであってもよい。
 またバケットシリンダ19(第2アクチュエータ)として油圧シリンダについて説明したが、第2アクチュエータ19は油圧シリンダに限定されるものではなく、バケット14を駆動する推力を生じるものであればよく、たとえば電動シリンダなどであってもよい。
 また第1アクチュエータ18および第2アクチュエータ19の各々の推力に関する情報を検知するセンサとして圧力センサ31b、31h、32b、32hについて説明したが、これらの推力に関する情報を検知するセンサは電動シリンダなどの推力に関する情報を検知するものであってもよい。
 今回開示された実施の形態はすべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は上記した説明ではなくて請求の範囲によって示され、請求の範囲と均等の意味および範囲内でのすべての変更が含まれることが意図される。
 1 作業機械(ホイールローダ)、2 車体フレーム、3 作業機、4 走行装置、4a 前輪、4b 後輪、5 キャブ、6 カウンタウエイト、11 前フレーム、12 後フレーム、13 ステアリングシリンダ、14 バケット、15 ブーム、16 ベルクランク、17 チルトロッド、18 ブームシリンダ(第1アクチュエータ)、19 バケットシリンダ(第2アクチュエータ)、21 ブームピン、22 バケットピン、29 支持ピン、31b,31h,32b,32h 圧力センサ、33,34 ポテンショメータ、35,36 ストロークセンサ、39 撮像デバイス、50 コントローラ、50a ブームシリンダ力算出部、50b バケットシリンダ力算出部、50c 作業機姿勢算出部、50d 重心位置算出部、50e 式生成部、50f 積荷質量算出部、50g 記憶部、51 入力部、52 表示部、GC1 作業機重心、GC2 積荷重心、GC3 バケット重心。

Claims (11)

  1.  機械本体と、
     前記機械本体に取り付けられるブームと、
     前記ブームに取り付けられるバケットと、
     前記機械本体に取り付けられ、前記ブームを駆動する第1アクチュエータと、
     前記機械本体に取り付けられ、前記ブームに対して前記バケットを駆動する第2アクチュエータと、
     前記第1アクチュエータの推力と前記第2アクチュエータの推力とに基づいて前記バケット内の積荷の質量を算出するコントローラと、を備えた、作業機械。
  2.  前記第1アクチュエータの一端は前記機械本体に取り付けられ、前記第1アクチュエータの他端は前記ブームに取り付けられており、
     前記第1アクチュエータは油圧シリンダである、請求項1に記載の作業機械。
  3.  前記第2アクチュエータは油圧シリンダであり、
     前記第2アクチュエータのシリンダ圧力を検知する圧力センサをさらに備え、
     前記コントローラは、前記圧力センサにより検知されたシリンダ圧力に基づいて前記第2アクチュエータの推力を算出する、請求項1または請求項2に記載の作業機械。
  4.  前記コントローラは、前記第2アクチュエータの推力に基づいて前記ブームに関するモーメントのつり合いの式を生成する、請求項1から請求項3のいずれか1項に記載の作業機械。
  5.  前記作業機械のピッチ角度を検知する角度センサをさらに備え、
     前記コントローラは、前記角度センサにより検知された前記ピッチ角度を考慮して前記バケット内の積荷の質量を算出する、請求項1から請求項4のいずれか1項に記載の作業機械。
  6.  第1端部と前記第1端部の反対側の第2端部とを有するベルクランクをさらに備え、
     前記第1端部が前記バケットに接続され、
     前記第2アクチュエータは、第3端部と前記第3端部の反対側の第4端部とを有し、
     前記第3端部は前記機械本体に取り付けられ、前記第4端部は前記ベルクランクの前記第2端部に取り付けられている、請求項1から請求項5のいずれか1項に記載の作業機械。
  7.  前記ブームは前記機械本体に回転可能に取り付けられ、前記バケットは前記ブームに回転可能に取り付けられており、
     前記機械本体に対する前記ブームの角度に関する情報を検知する第1センサと、
     前記ブームに対する前記バケットの角度に関する情報を検知する第2センサと、をさらに備え、
     前記コントローラは、前記第1センサにより検知された前記ブームの角度に関する情報と前記第2センサにより検知された前記バケットの角度に関する情報とに基づいて前記第2アクチュエータの推力を算出する、請求項1から請求項6のいずれか1項に記載の作業機械。
  8.  前記機械本体に取り付けられた車輪をさらに備える、請求項1から請求項7のいずれか1項に記載の作業機械。
  9.  機械本体と、前記機械本体に取り付けられるブームと、前記ブームに取り付けられるバケットと、前記機械本体に取り付けられ前記ブームを駆動する第1アクチュエータと、前記機械本体に取り付けられ前記ブームに対して前記バケットを駆動する第2アクチュエータと、を有する作業機械における前記バケット内の積荷の質量を計測する計測方法であって、
     前記第1アクチュエータの推力に関する情報を取得するステップと、
     前記第2アクチュエータの推力に関する情報を取得するステップと、
     前記第1アクチュエータの推力に関する情報と前記第2アクチュエータの推力に関する情報とに基づいて前記バケット内の積荷の質量を算出するステップと、を備えた、計測方法。
  10.  前記作業機械のピッチ角を取得するステップをさらに備え、
     前記バケット内の積荷の質量を算出するステップにおいて、取得された前記ピッチ角を考慮して前記バケット内の積荷の質量を算出する、請求項9に記載の計測方法。
  11.  機械本体と、
     前記機械本体に取り付けられるブームと、
     前記ブームに取り付けられるバケットと、
     前記機械本体に取り付けられ、前記ブームを駆動する第1アクチュエータと、
     前記機械本体に取り付けられ、前記ブームに対して前記バケットを駆動する第2アクチュエータと、を備え、
     前記第1アクチュエータの推力と前記第2アクチュエータの推力とに基づいて前記バケット内の積荷の質量を算出する、システム。
PCT/JP2020/044793 2019-12-16 2020-12-02 作業機械、計測方法およびシステム WO2021124880A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US17/773,270 US20240159022A1 (en) 2019-12-16 2020-12-02 Work machine, measurement method, and system
EP20900895.2A EP4053345A4 (en) 2019-12-16 2020-12-02 CONSTRUCTION MACHINERY, MEASUREMENT METHOD AND SYSTEM
CN202080079979.XA CN114761641B (zh) 2019-12-16 2020-12-02 作业机械、计测方法以及系统

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2019226408A JP7353958B2 (ja) 2019-12-16 2019-12-16 作業機械、計測方法およびシステム
JP2019-226408 2019-12-16

Publications (1)

Publication Number Publication Date
WO2021124880A1 true WO2021124880A1 (ja) 2021-06-24

Family

ID=76430793

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/044793 WO2021124880A1 (ja) 2019-12-16 2020-12-02 作業機械、計測方法およびシステム

Country Status (5)

Country Link
US (1) US20240159022A1 (ja)
EP (1) EP4053345A4 (ja)
JP (1) JP7353958B2 (ja)
CN (1) CN114761641B (ja)
WO (1) WO2021124880A1 (ja)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7252762B2 (ja) * 2019-01-08 2023-04-05 日立建機株式会社 作業機械
CN115450278B (zh) * 2022-09-16 2023-09-22 江苏电子信息职业学院 一种装载机铲斗辅助铲掘控制方法
CN116657695B (zh) * 2023-08-01 2023-10-03 徐工集团工程机械股份有限公司科技分公司 装载机工作装置的控制方法、装置及系统

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6082595A (ja) * 1983-10-11 1985-05-10 日立建機株式会社 作業機械の荷重演算装置
JPH0586636A (ja) * 1991-09-30 1993-04-06 Komatsu Ltd 作業車両の転倒防止装置
JPH10245874A (ja) * 1997-03-06 1998-09-14 Sumitomo Constr Mach Co Ltd 油圧ショベルの積荷重量演算装置
US20090187527A1 (en) * 2006-04-20 2009-07-23 Cmte Development Limited Payload estimation system and method
JP2012103029A (ja) * 2010-11-08 2012-05-31 Hitachi Constr Mach Co Ltd 油圧ショベルの荷重計測装置
JP2017008633A (ja) 2015-06-24 2017-01-12 株式会社小松製作所 ホイールローダと、当該ホイールローダの運搬作業情報の自動積算方法
JP2019066310A (ja) * 2017-09-29 2019-04-25 株式会社Kcm ホイールローダおよびバケット積載荷重演算方法

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07252091A (ja) * 1994-03-15 1995-10-03 Sumitomo Constr Mach Co Ltd クレーン仕様ショベルの吊り荷重量演算装置
US8515627B2 (en) * 2008-12-23 2013-08-20 Caterpillar Inc. Method and apparatus for calculating payload weight
JP2012220216A (ja) * 2011-04-04 2012-11-12 Hitachi Constr Mach Co Ltd ホイルローダの載荷荷重計測方法と計測装置
JP5969380B2 (ja) * 2012-12-21 2016-08-17 住友建機株式会社 ショベル及びショベル制御方法
JP2014173949A (ja) * 2013-03-07 2014-09-22 Hitachi Constr Mach Co Ltd 作業機械の荷重計測装置
CN203373804U (zh) * 2013-05-31 2014-01-01 徐州徐工挖掘机械有限公司 挖掘机防倾翻保护系统
JP6238294B2 (ja) * 2014-02-21 2017-11-29 キャタピラー エス エー アール エル 積載部の外力算出方法およびその装置
KR102479557B1 (ko) * 2015-11-09 2022-12-20 현대두산인프라코어(주) 휠로더의 적재 중량 측정 방법 및 측정 시스템
US10900824B2 (en) * 2016-01-12 2021-01-26 Mwi Veterinary Supply Co. System and method for weighing animal feed ingredients
JP6855247B2 (ja) * 2016-11-09 2021-04-07 株式会社小松製作所 作業機械
CN109281345A (zh) * 2018-02-06 2019-01-29 上海云统信息科技有限公司 挖掘机远程监控云服务系统
CN109680738B (zh) * 2019-02-12 2024-02-27 徐州徐工挖掘机械有限公司 一种液压挖掘机物料在线称重装置及方法
CN110374163A (zh) * 2019-07-17 2019-10-25 三一重机有限公司 挖掘机称重系统、方法和挖掘机

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6082595A (ja) * 1983-10-11 1985-05-10 日立建機株式会社 作業機械の荷重演算装置
JPH0586636A (ja) * 1991-09-30 1993-04-06 Komatsu Ltd 作業車両の転倒防止装置
JPH10245874A (ja) * 1997-03-06 1998-09-14 Sumitomo Constr Mach Co Ltd 油圧ショベルの積荷重量演算装置
US20090187527A1 (en) * 2006-04-20 2009-07-23 Cmte Development Limited Payload estimation system and method
JP2012103029A (ja) * 2010-11-08 2012-05-31 Hitachi Constr Mach Co Ltd 油圧ショベルの荷重計測装置
JP2017008633A (ja) 2015-06-24 2017-01-12 株式会社小松製作所 ホイールローダと、当該ホイールローダの運搬作業情報の自動積算方法
JP2019066310A (ja) * 2017-09-29 2019-04-25 株式会社Kcm ホイールローダおよびバケット積載荷重演算方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP4053345A4

Also Published As

Publication number Publication date
CN114761641B (zh) 2024-04-05
EP4053345A4 (en) 2024-01-03
JP2021095709A (ja) 2021-06-24
EP4053345A1 (en) 2022-09-07
JP7353958B2 (ja) 2023-10-02
CN114761641A (zh) 2022-07-15
US20240159022A1 (en) 2024-05-16

Similar Documents

Publication Publication Date Title
WO2021124880A1 (ja) 作業機械、計測方法およびシステム
KR20170053909A (ko) 휠로더의 적재 중량 측정 방법 및 측정 시스템
CN110300827B (zh) 工程机械
CN104769188A (zh) 用于包括平土铲的轮式装载机的机器控制系统
US20190284783A1 (en) Construction machine
WO2021111963A1 (ja) 作業機械および作業機械の制御方法
WO2021124881A1 (ja) 作業機械、計測方法およびシステム
WO2020195880A1 (ja) 作業機械、システムおよび作業機械の制御方法
WO2013088816A1 (ja) 油圧ショベルの荷重計測装置
JP7059309B2 (ja) ショベル及びショベルの重量算出装置
JP2021147772A (ja) 作業機械及び作業機械の疲労検出方法
KR20230002980A (ko) 작업기 모멘트를 추정하는 방법
JP7143117B2 (ja) ショベル
WO2022209214A1 (ja) 演算装置および演算方法
WO2021085167A1 (ja) 作業機械
JP7471891B2 (ja) ショベル及び較正方法
JP7390991B2 (ja) 作業機械および施工支援システム
WO2024090014A1 (ja) スイング角度較正方法、姿勢検出方法、スイング角度較正システムおよび姿勢検出システム
CN117836487A (zh) 用于控制作业机械的系统、方法以及程序
JP2022165576A (ja) 作業車両
KR20240042101A (ko) 작업 기계를 위한 시스템, 방법, 및 작업 기계
CN117836489A (zh) 用于控制作业机械的系统以及方法
JP2022106036A (ja) 建設機械
JP2022176724A (ja) 作業機械

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20900895

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 17773270

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2020900895

Country of ref document: EP

Effective date: 20220718