WO2021105771A1 - Système de coffrage auto-grimpant indépendant pour construire des structures verticales - Google Patents

Système de coffrage auto-grimpant indépendant pour construire des structures verticales Download PDF

Info

Publication number
WO2021105771A1
WO2021105771A1 PCT/IB2020/020070 IB2020020070W WO2021105771A1 WO 2021105771 A1 WO2021105771 A1 WO 2021105771A1 IB 2020020070 W IB2020020070 W IB 2020020070W WO 2021105771 A1 WO2021105771 A1 WO 2021105771A1
Authority
WO
WIPO (PCT)
Prior art keywords
trusses
support towers
independent self
form system
climbing form
Prior art date
Application number
PCT/IB2020/020070
Other languages
English (en)
Inventor
Oliver MORK
Original Assignee
OM Engineering Pty Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OM Engineering Pty Ltd filed Critical OM Engineering Pty Ltd
Priority to CA3159823A priority Critical patent/CA3159823A1/fr
Priority to AU2020392963A priority patent/AU2020392963A1/en
Priority to EP20891886.2A priority patent/EP4065794A4/fr
Publication of WO2021105771A1 publication Critical patent/WO2021105771A1/fr
Priority to AU2024204671A priority patent/AU2024204671A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height
    • E04G1/22Scaffolds having a platform on an extensible substructure, e.g. of telescopic type or with lazy-tongs mechanism
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/28Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/22Sliding forms raised continuously or step-by-step and being in contact with the poured concrete during raising and which are not anchored in the hardened concrete; Arrangements of lifting means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/002Workplatforms, railings; Arrangements for pouring concrete, attached to the form
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G2011/067Integrated forms comprising shuttering skin, bracing or strutting arrangements, workplatforms and railings

Definitions

  • Scaffolding structures may be used to support workers and materials to aid in the construction, maintenance, and repairs of building, bridges, and other vertically rising structures.
  • Conventional scaffolding structures include a scaffold that is attached and anchored to a vertically rising structure being constructed, maintained, or repaired. Additionally, conventional scaffolding structures are limited to a set work area when they are attached and anchored to the corresponding vertically rising structure.
  • the embodiments disclosed herein relate to an independent self-climbing form system.
  • the independent self-climbing form system may include a plurality of support towers and at least two trusses connected to the plurality of support towers.
  • the trusses may be spaced apart from each other, and one or more platforms formed within a perimeter delimited by the at least two trusses.
  • the at least one or more platforms may be configured to extend or retract within the perimeter.
  • Screw jacks may be disposed at each connection point of the at least two trusses on the plurality of support towers, where the screw jacks may be configured to vertically move the at least two trusses up and down the plurality of support towers.
  • Each of the support towers of the plurality of support towers may be formed from a plurality of tower segments stacked on top of each other.
  • An end truss may be disposed at ends of the at least two trusses to connect the at least two trusses together.
  • a peripheral edge of the at least two trusses and the end trusses may form the perimeter.
  • One or more housings may be disposed on the end trusses.
  • the one or more platforms may be a work platform.
  • the work platform may be a multi-level deck platform.
  • the screw jacks may include a motor, a gearbox, and a threaded rod.
  • a locking device may be configured lock the trusses at a vertically position on the plurality of support towers.
  • An anti-rotational device may be disposed on the threaded rod.
  • Controls and a computer system may be disposed on the trusses to manually and/or automatically operate the independent self-climbing form system.
  • the embodiments disclosed herein relate to a method for installing an independent self-climbing form system at a site.
  • the method may include erecting a plurality of support towers at the site, and connecting at least two trusses to the plurality of support towers.
  • the trusses may be spaced apart from each other, and at least one or more platforms may be formed within a perimeter delimited by the at least two trusses.
  • Screw jacks may be provided at each connection point of the at least two trusses on the plurality of support towers.
  • the method may further include stacking and coupling a plurality of tower segments on top of each other to increase a height of the plurality of support towers, as well as providing an end truss at ends of the at least two trusses to connect the at least two trusses together, and installing wood planks or plywood or composite boards or metal grate flooring on the trusses, the platforms, and the end trussed to form walkways.
  • the embodiments disclosed herein relate to a method for using the independent self-climbing form system to build a vertical structure.
  • the method may include vertically moving the at least two trusses up or down a plurality of support towers with screw jacks at each connection point between the at least two trusses and the plurality of support towers.
  • the at least two trusses may be locked at a vertical positon on the plurality of support towers to access the vertical structure.
  • the method may also include extending or retracting at least one or more of the platforms connected to the at least two trusses around the vertical structure.
  • the vertically moving of the at least two trusses may include moving a motor of the screw jacks up a threaded rod.
  • the locking of the at least two trusses may include removably bolting an arm at an end of the threaded rod to a rigid framework of the plurality of support towers.
  • the method may further include leveling each of the at least two trusses at a same height on the plurality of support towers.
  • a non-transitory computer- readable medium may also be provided, including instructions, executable by a processor, wherein the instructions include functionality to control the independent self-climbing form system.
  • Figures 1A and IB illustrate various schematic views of an independent self-climbing form system according to one or more embodiments of the present disclosure.
  • Figures 2A-2I illustrate various perspective views of an independent self-climbing form system according to one or more embodiments of the present disclosure.
  • FIG. 3 shows a flowchart in accordance with one or more embodiments.
  • Figure 4 shows a computing system in accordance with one or more embodiments.
  • Coupled or “coupled to” or “connected” or “connected to” may indicate establishing either a direct or indirect connection, and is not limited to either unless expressly referenced as such.
  • operationally coupled or “operationally coupled to” or “operationally connected” or “operationally connected to” may indicate establishing either a direct or indirect connection to allow movement between components, and is not limited to either unless expressly referenced as such.
  • embodiments disclosed herein are described with terms designating a vertical structure in reference to a structure that vertically extends, but any terms designating vertical structure type should not be deemed to limit the scope of the disclosure.
  • embodiments of the disclosure may be used on buildings and bridges, such as skyscrapers, columns, piers, abutments, piles, substructure and superstructure components of bridges and support structures.
  • the various embodiments described herein may be used in various stages of the vertical structure, such as site preparation, constructing and erecting the vertical structure, maintenance, repairs, etc., and in other environments, such as oil and gas rig sites, refineries, power plants, and other sites that require vertical structures, without departing from the scope of the present disclosure.
  • the vertical structures may be man-made or naturally occurring.
  • the vertical structures may be made from concrete, steel or other metals, wood, composite, glass, or any combination thereof.
  • an independent self-climbing form system is assembled at a work site to aid in constructing, maintaining and/or repairing the vertical structure. It is further envisioned that the independent self-climbing form system may be manually operated or automated. The embodiments are described merely as examples of useful applications, which are not limited to any specific details of the embodiments herein.
  • the Figures illustrate various views of an independent self-climbing form system according to the present disclosure. Because the system and methods may apply to any of the embodiments, reference numbers are not referenced to avoid confusion of the numbering between the different embodiments.
  • the independent self-climbing form system may be assembled at a work site to build, maintain, or repair vertical structures.
  • the independent self-climbing form system may include a plurality of support towers spaced a distance away from each other.
  • the plurality of support towers may be formed from a plurality of tower segments stacked on top of each other.
  • each tower segment may be a size similar to that of a shipping container to allow for easy transportation.
  • the plurality of support towers may have platforms, stairs, ladders or elevators attached thereto for workers to use.
  • the plurality of support towers may be anchored into a ground at the site.
  • trusses may be connected to the plurality of support towers such that the trusses are spaced apart from each other.
  • the plurality of support towers and the trusses may form a perimeter around the vertical structures.
  • an end truss may be disposed at ends of the trusses such that the trusses are connected together.
  • the end truss may provide a weight balance to minimize or eliminate sagging in the trusses.
  • at least one or more platforms are provided within the independent self-climbing form system.
  • the platforms are formed and delimited by a peripheral edge of the trusses and the end truss to form a work perimeter.
  • the platforms may provide an area for workers such that the platforms are a work platform.
  • the platforms may be reconfigurable any way (vertically, horizontally, etc.) to be arranged with respect to the vertical structure.
  • the platforms may extend and retract to adjust the work perimeter based on the size and shape of the vertical structure.
  • one or more offices, break areas, storage spaces, or living corridors may be provided on the plurality of support towers, the trusses, and/or the end truss.
  • lifting mechanisms may be used to vertically move the trusses up and down the plurality of support towers.
  • the lifting mechanisms may be screw jacks disposed at each connection point of the trusses on the plurality of support towers.
  • a motor and a gearbox may work in conjunction to move the screw jacks up and down.
  • the motor and the gearbox may power a jack of the screw jack which in turn moves a jackscrew of the screw jack to climb up or down a mast leg of the plurality of support towers.
  • a latch arm may be provided at an end of the jackscrew to latch onto the mast leg.
  • a nut may be used to lock the latch arm to the jackscrew. It is further envisioned that the latch arm may be two pieces hinged together and one of the hinged pieces may include a removable lock to lock onto the mast leg. In one or more embodiments, at end opposite the latch arm, an anti-rotation device may be attached to the jackscrew.
  • one or more locking mechanisms may be provided to lock the screw jacks such that the trusses are secured at a positon on the plurality of support towers to build the vertical structure.
  • the locking mechanism may be a rod with one end removably fixed to the screw jacks and an opposite end removably fixed to a mast leg.
  • a control panel may be provided on the trusses to operate the independent self-climbing form system. The control panel may be manually operated or automated.
  • the independent self-climbing form system 100 may include one or more support towers 101 at a work site 1.
  • the one or more support towers 101 may be spaced on at the work site 1 to be adjacent to one or more vertically rising structures 2.
  • the one or more support towers 101 may be formed from a plurality of tower segments 102 stacked and coupled on top of each other.
  • any number of tower segments 102 may be used to have the one or more support towers 101 reach a height for operations on the one or more vertically rising structures 2.
  • each tower segment 102 may have a rigid framework made from a plurality of steel beams, steel columns, pipe sections, square hollow sections or a combination thereof connected together.
  • the plurality of support towers 102 may have platforms, stairs, ladders or elevators 103 attached thereto for workers to use.
  • the platforms, stairs, ladders or elevators 103 may be attached within or outside the plurality of support towers 102. It is further envisioned that the platforms, stairs, ladders or elevators 103 may be independent of the plurality of support towers 102 in a free standing structure. For simplicity purposes only, the platforms, stairs, ladders or elevators 103 are only shown in one tower segment 102 to avoid confusion in the drawings.
  • the independent self-climbing form system 100 may include one or more trusses 104 operationally connected to the one or more support towers 101.
  • the one or more trusses 104 may extend from a first end 105 to a second end 106 such that the one or more support towers 101 is connected to the one or more trusses 104 between the first end 105 and the second end 106. While it is noted that the one or more trusses 104 are shown as being horizontal trusses, the one or more trusses 104 may be shaped to have a curve or may be circular without departing from the present scope of the disclosure.
  • the one or more trusses 104 may have a rigid framework made from a plurality of steel beams connected together such that walkways and other surfaces may be formed within and on top of the one or more trusses 104 for workers to use.
  • wood planks or plywood or composite boards or metal grate flooring may be placed on the plurality of steel beams to form the walkways and surfaces.
  • a plurality of platforms may be operationally connected to the one or more trusses 104.
  • the plurality of platforms may include upper platforms 107 and lower platforms (207a, 207b, 207c). Both the upper platforms 107 and the lower platforms (207a, 207b, 207c) may be adjustable in real-time to slide toward and away from the one or more vertically rising structures 2 to accommodate shape and design changes in the one or more vertically rising structures 2.
  • the upper platforms 107 may be formed by various platforms (see 107a, 107b, 107c in Figure IB) on a top surface of the one or more trusses 104. Additionally, the lower platforms (207a, 207b, 207c) may be connected on a bottom surface of the one or more trusses 104. In a non-limiting example, a middle lower platform 207a may be provided to access surfaces of the one or more vertically rising structures 2 below the one or more trusses 104. Further, an outer surface of the one or more vertically rising structures 2 below the one or more trusses 104 may be accessed by a two tier lower platform having a first lower platform 207b on top of a second lower platform 207c.
  • the first lower platform 207b may be offset from the second lower platform 207c to allow for angled movement along the one or more vertically rising structures 2.
  • the plurality of platforms (107, 207a, 207b, 207c) may each be work platforms for workers to work on the one or more vertically rising structures 2.
  • the plurality of platforms (107, 207a, 207b, 207c) may retract or extend with respect to the one or more vertically rising structures 2 to allow for various shapes of the one or more vertically rising structures 2 to be accommodated within the independent self climbing form system 100.
  • any of the plurality of platforms 107 may be a multi-level deck platform such that platforms may be on top and below the one or more trusses 104.
  • wood planks or plywood or composite boards or metal grate flooring may be placed on the plurality of platforms (107, 207a, 207b, 207c) to form a path for workers to use.
  • one or more end trusses 108 may be connected at the first end 105 and the second end 106 of the one or more trusses 104.
  • One skilled in the art will appreciate how the one or more end trusses 108 may be used to add weight to the first end 105 and the second end 106 of the one or more trusses 104 to eliminate a sagging in the one or more trusses 104.
  • one or more housings 109 may be disposed on and/or within the one or more end trusses 108 and/or the one or more trusses 104.
  • the one or more housings 109 may be a control room, break room, living corridors, restrooms, and office buildings.
  • the control room may include controls and a computer system to manually and/or automatically operate the independent self-climbing form system 100.
  • the screw jacks 111 may be disposed at each connection point of the one or more trusses 104 on the one or more support towers 101.
  • the screw jacks 111 may be used to vertically move the one or more trusses 104 up and down the one or more support towers 101. While it is noted that only one screw jack 111 is shown on each support tower 101, this is merely for example purposes only and a plurality of screw jacks may be used at each support tower 101.
  • the screw jacks 111 including a motor and gearbox 112, may be coupled to a threaded rod 113.
  • the threaded rod 113 may extend a length along an outer surface of the screw jack 111 such that the screw jack 111 climbs up and down the threaded rod 113. It is further envisioned that an anti-rotational device 114 may be disposed on the threaded rod 113 to ensure that the threaded rod 113 does not rotate. In a non-limiting example, the anti-rotational device 114 may be a bolt or nut. Further, a locking device 115 may be used to lock the one or more trusses 104 at a vertical position on the one or more support towers 101. In a non-limiting example, the locking device 115 may be an arm extending from the threaded rod 113, where the arm may be removably bolted to the support tower 101.
  • FIG. IB a schematic top view of the independent self-climbing form system 100 to embodiments herein is illustrated.
  • four support towers 101a, 101b, 101c, lOld may be spaced around the vertically rising structures 2 to space apart a first truss 104a and a second truss 104b.
  • a first end truss 105a and a second end truss 105b may extend between the first truss 104a and the second truss 104b.
  • an inner peripheral edge of the first truss 104a, the second truss 104b, the first end truss 105a, and the second end truss 105b may delimit a perimeter 116 around the vertically rising structures 2. It is further envisioned that a middle truss 110 may be connected from the first truss 104a to the second truss 104b between the vertically rising structures 2 to split the perimeter 116 in two and to provide additional workspace between the vertically rising structures 2.
  • upper platforms (107, Figure 1A), disposed on the first truss 104a and the second truss 104b, may include various movable platforms around each vertically rising structures 2.
  • the upper platforms (107) may have two end platforms 107a, two side platforms 107b, and two middle platforms 107c. Additionally, each of the platforms (107a, 107b, 107c) may extend and retract in a direction shown by arrows in Figure IB.
  • each of the platforms (107a, 107b, 107c) may individually move with respect to each other. By individually moving each of the platforms (107a, 107b, 107c), the independent self climbing form system 100 may accommodate essentially any shape or size change in the vertically rising structures 2.
  • Figures 2A-2I illustrate various perspective views of the independent self-climbing form system 100 being installed, assembled, and operated according to one or more embodiments of the present disclosure.
  • the plurality of support towers 101a, 101b, 101c, lOld may be erected at the work site 1 to surround the vertically rising structures 2. While it is noted that four support towers are shown in Figure 2A, this is merely for example purposes only and any number of support towers may be used without departing from the scope of the present disclosure.
  • a crane 200 may lift the rigid framework of the plurality of support towers 101a, 101b, 101c, lOld to be upright at the work site 1.
  • each of the plurality of support towers 101a, 101b, 101c, lOld may have a height H corresponding to an initial height iH of the vertically rising structures 2.
  • the height H of the plurality of support towers 101a, 101b, 101c, lOld may be greater than the initial height iH of the vertically rising structures 2 (for example, the lower portions of the rising structures 2 may not require scaffolding or an elevated work surface, whereas the sections to be built above iH may require such).
  • the plurality of support towers 101a, 101b, 101c, lOld may be anchored to a ground of the work site 1.
  • the first truss 104a and the second truss 104b are operationally coupled to the plurality of support towers 101a, 101b, 101c, lOld as shown in Figure 2B.
  • the first truss 104a may be operationally coupled to the first support tower 101a and the second support tower 101b.
  • the second truss 104b may be operationally coupled to the third support tower 101c and the fourth support tower lOld.
  • a crane may lift the first truss 104a and the second truss 104b onto the first support tower 101a and the second support tower 101b, respectively. It is further envisioned that the first truss 104a and the second truss 104b may be directly assembled onto the first support tower 101a and the second support tower 101b, respectively, on a ground level of the work site 1. Additionally, the first truss 104a may be spaced a distance D from the second truss 104b such that the vertically rising structures 2 are in the space between the first truss 104a and the second truss 104b.
  • the first end truss 105a and the second end truss 105b may be coupled to the ends of the first truss 104a and the second truss 104b.
  • the first end truss 105a and the second end truss 105b may each extend from the first truss 104a to the second truss 104b at ends opposite from each other.
  • first end truss 105a and the second end truss 105b may provide additional workspace, restrooms, break rooms, storage space, and be used for connectivity of the one or more platforms (see 107 in Figures 1A and IB). It is further envisioned that the first end truss 105a and the second end truss 105b may be replaced with counter weight measures at each end of the first truss 104a to the second truss 104b. In a non-limiting example, steel or concrete blocks may be provided in each end of the first truss 104a to the second truss 104b to prevent sagging.
  • the independent self-climbing form system 100 forms a work perimeter (116) around the vertically rising structures 2.
  • the work perimeter (116) may be delimited by the first truss 104a, the second truss 104b, the first end truss 105a, and the second end truss 105b.
  • the first truss 104a and the second truss 104b may be positioned and locked on the plurality of support towers 101a, 101b, 101c, lOld at a vertical positon that may have a height FT less than the height H of the plurality of support towers 101a, 101b, 101c, lOld.
  • the middle truss 110 may be connected to and extend from the first truss 104a to the second truss 104b. Additionally, the middle truss 110 may split the work perimeter (116) to have one vertically rising structure 2 on adjacent sides of the middle truss 110.
  • the one or more platforms 107 may be operationally connected to the first truss 104a and the second truss 104b.
  • one or more formwork panels 202 may be landed on the vertically rising structures 2 and operationally coupled to the one or more platforms 107.
  • the one or more formwork panels 202 may be used to form an outer surface of the vertically rising structures 2.
  • the one or more formwork panels 202 may be rigid such that a shape of the one or more formwork panels 202 is maintained to allow the outer surface of the vertically rising structures 2 to be formed. Additionally, the one or more formwork panels 202 may enclose the vertically rising structures 2 to form an inner chamber 203 and allow for a settling of materials of the vertically rising structures 2 such as concrete that have been poured.
  • an internal formwork frame 204 may be inserted into the inner chamber 203 formed from the one or more formwork panels 202.
  • the internal formwork frame 204 may be independent of the one or more formwork panels 202 such that the internal formwork frame 204 may be installed before landing the one or more formwork panels 202.
  • the internal formwork frame 204 may be a steel frame.
  • the internal formwork frame 204 may be used to support an inner housing of the vertically rising structures 2. With the internal formwork frame 204, materials such as concrete or composite may be poured into or onto the vertically rising structures 2. It is further envisioned that materials such as concrete or composite may be poured into or onto the vertically rising structures 2 without using the internal formwork frame 204.
  • the vertically rising structures 2 may be further built to have a new height nH greater than the initial Height iH.
  • the first truss 104a and the second truss 104b may be raised to higher vertical position on the plurality of support towers 101a, 101b, 101c, 10 Id at a height H”.
  • the height H” may be greater than the previous height (See H’ in Figure 2C) of the first truss 104a and the second truss 104b.
  • the vertically rising structures 2 may be built such that they are inclined toward each other.
  • the work platforms may each be adjusted before or during vertical movement of the first truss 104a and the second truss 104b so as to not damage the vertically rising structures 2. Additionally, the work platforms (see 107 107a, 107b, 107c, 207a, 207b, 207c) may be set once the first truss 104a and the second truss 104b reach the new height so as to provide the appropriate work surfaces to access and continue building the vertically rising structures 2.
  • a height of the plurality of support towers 101a, 101b, 101c, lOld may be increased.
  • each of the plurality of support towers 101a, 101b, 101c, lOld may have a second tower segment 102b stacked on top of a first tower segment 102a.
  • a rigid framework of the second tower segment 102b may couple to a rigid framework of the first tower segment 102a.
  • the first tower segment 102a and the second tower segment 102b may be bolted together to be locked in place.
  • first tower segment 102a and the second tower segment 102b may be interchangeable such that either tower segment 102a, 102b may be on the bottom or top and have additional tower segments added thereon. It is further envisioned that alignment features may be provided on both the first tower segment 102a and the second tower segment 102b to ensure coupling connection between each other.
  • Figure 3 describes a general method for using the independent self-climbing form system 100 as described in Figures 1A-2I.
  • One or more blocks in Figure 3 may be performed by a computer system as described in Figures 4A and 4B.
  • the computer system may include a non-transitory computer-readable medium with instructions executable by a processor.
  • the instructions may include functionality to control the independent self-climbing form system. While the various blocks in Figure 3 are presented and described sequentially, one of ordinary skill in the art will appreciate that some or all of the blocks may be executed in different orders, may be combined or omitted, and some or all of the blocks may be executed in parallel. Furthermore, the blocks may be performed actively or passively.
  • trusses may vertically move up or down a plurality of support towers in accordance with one or more embodiments.
  • screw jacks at each connection point between the at least two trusses and the plurality of support towers may vertically move the trusses.
  • the screw jacks may be operated by having each motor and gearbox move the screw jacks up or down a threaded rod.
  • an anti-rotation device e.g., bolt or nut
  • one or more sensors may be disposed on or provided within the screw jacks and/or trusses to determine a rate at which the trusses are moving.
  • each truss may be leveled to be at a same height in accordance with one or more embodiments.
  • the screw jacks may raise the trusses at a rate such that each truss is horizontal and even for workers to use and meet safety regulations.
  • one or more sensors may be used to provide measurements to ensure that the trusses are level.
  • the one or more sensors may provide real-time data to a rate of the vertical movement of each truss.
  • the trusses may be locked at the vertical position on the plurality of support towers with a locking device.
  • the locking device may be an arm extending from an end of each threaded rod of the screw jacks and may be removably bolted to a rigid framework of the plurality of support towers. By locking the trusses, workers may safely access the vertical structures.
  • the screw jacks may also be locked.
  • an anti-rotational device may be disposed on the threaded rod such that the threaded rod does not rotate to ensure the screw jacks are non-operational while the trusses are locked.
  • platforms operationally connected to the trusses may be extended or retracted in accordance with one or more embodiments.
  • the platforms surround the vertical structures to allow for workers to access the vertical structures.
  • the platforms may be extended to be adjacent and/or rest against the vertical structures. Additionally, the platforms may be retracted to create space for the vertical structures and allow movement of the trusses without damaging the vertical structures and the components of the independent self-climbing form system.
  • Block 340 a determination is made whether the trusses need to be raised or lowered in accordance with one or more embodiments.
  • the vertical structure may be built or repaired in sections based on a required height needed such that the trusses are at the vertical positon on the plurality of support towers to build or repair the vertical structure. If the answer to the vertical structure needing being raised or lowered is yes (e.g., building or repairing the vertical structure at other vertical positions), the flowchart will proceed to Block 350.
  • the trusses may be unlocked (e.g., unbolting the arm) and will go back to the Block 300 to repeat the previously mentioned Blocks (300-340).
  • a position of the trusses may be adjusted in Block 355 prior to returning to the Block 300 from the Block 350.
  • the trusses alignment with respect to the plurality of support towers may be adjusted or leveled such that the trusses are ready to be vertically moved.
  • Block 360 the vertical position of trusses may be maintained in accordance with one or more embodiments. For example, the vertical position is maintained to allow workers to perform operations on the vertical structures. It is further envisioned that the independent self-climbing form system may also be prepared for disassembly in Block 360.
  • the flowchart of Figure 3 allows for a worker to manual operate controls of the independent self-climbing form system or the computer system may automatically operate the independent self climbing form system.
  • the independent self-climbing form system may help workers repair or build the vertical structures without having to anchor into the vertical structures.
  • One skilled in the art will appreciate how utilizing the independent self-climbing form systems disclosed herein allow for fast and quick access to vertical structures of all shapes and sizes.
  • a movement of the trusses may be programmed to automatically occur based on a height of the vertical structure.
  • the platforms extending or retracting may be programmed to automatically occur based on a shape and size of the vertical structure or based on a movement of the trusses, for example.
  • Implementations herein for operating the independent self-climbing form system (100) may be implemented on a computing system coupled to a controller. Any combination of mobile, desktop, server, router, switch, embedded device, or other types of hardware may be used with the emulsion generating system (100, 200, 300).
  • the computing system 400 may include one or more computer processors 402, non- persistent storage 404 (e.g., volatile memory, such as random access memory (RAM), cache memory), persistent storage 406 (e.g., a hard disk, an optical drive such as a compact disk (CD) drive or digital versatile disk (DVD) drive, a flash memory, etc.), a communication interface 412 (e.g., Bluetooth interface, infrared interface, network interface, optical interface, etc.), and numerous other elements and functionalities.
  • non- persistent storage 404 e.g., volatile memory, such as random access memory (RAM), cache memory
  • persistent storage 406 e.g., a hard disk, an optical drive such as a compact disk (CD) drive or digital versatile disk (DVD) drive, a flash memory, etc.
  • a communication interface 412 e.g., Bluetooth interface, infrared interface, network interface, optical interface, etc.
  • software instructions in a form of computer readable program code to perform embodiments of the disclosure may be stored, in whole or in part, temporarily or permanently, on a non-transitory computer readable medium such as a CD, DVD, storage device, a diskette, a tape, flash memory, physical memory, or any other computer readable storage medium.
  • the software instructions may correspond to computer readable program code that, when executed by a processor(s), is configured to perform one or more embodiments of the disclosure.
  • the computing system 400 may also include one or more input devices 410, such as a touchscreen, keyboard, mouse, microphone, touchpad, electronic pen, or any other type of input device. Additionally, the computing system 400 may include one or more output devices 408, such as a screen (e.g., a liquid crystal display (LCD), a plasma display, touchscreen, cathode ray tube (CRT) monitor, projector, or other display device), a printer, external storage, or any other output device. One or more of the output devices may be the same or different from the input device(s). The input and output device(s) may be locally or remotely connected to the computer processor(s) 402, non-persistent storage 404, and persistent storage 406. Many different types of computing systems exist, and the aforementioned input and output device(s) may take other forms.
  • input devices 410 such as a touchscreen, keyboard, mouse, microphone, touchpad, electronic pen, or any other type of input device.
  • the computing system 400 may include one or more output devices 408, such as a screen (e.
  • the computing system 400 of Figure 4 may include functionality to present raw and/or processed data, such as results of comparisons and other processing.
  • presenting data may be accomplished through various presenting methods.
  • data may be presented through a user interface provided by a computing device.
  • the user interface may include a GUI that displays information on a display device, such as a computer monitor or a touchscreen on a handheld computer device.
  • the GUI may include various GUI widgets that organize what data is shown as well as how data is presented to a user.
  • the GUI may present data directly to the user, e.g., data presented as actual data values through text, or rendered by the computing device into a visual representation of the data, such as through visualizing a data model.
  • a GUI may first obtain a notification from a software application requesting that a particular data object be presented within the GUI.
  • the GUI may determine a data object type associated with the particular data object, e.g., by obtaining data from a data attribute within the data object that identifies the data object type.
  • the GUI may determine any rules designated for displaying that data object type, e.g., rules specified by a software framework for a data object class or according to any local parameters defined by the GUI for presenting that data object type.
  • the GUI may obtain data values from the particular data object and render a visual representation of the data values within a display device according to the designated rules for that data object type.
  • Data may also be presented through various audio methods.
  • data may be rendered into an audio format and presented as sound through one or more speakers operably connected to a computing device.
  • Data may also be presented to a user through haptic methods.
  • haptic methods may include vibrations or other physical signals generated by the computing system.
  • data may be presented to a user using a vibration generated by a handheld computer device with a predefined duration and intensity of the vibration to communicate the data.
  • embodiments herein are directed toward an independent self-climbing form system that may be used to erect, build, repair, or otherwise work on a structure.
  • the independent self-climbing form system may be used in a manner that minimizes or eliminates the need to anchor to or otherwise interact with the structure, other than to perform the desired work.
  • the moving internal platforms provided at one or multiple levels may allow for unique shaped structures to be accommodated.
  • the independent self-climbing form system may be altered in height in real time corresponding to a height of the structure being worked such that the height of the independent self-climbing form system is not fixed.
  • the independent self-climbing form system may include housing for workers to remain on site during down time to allow for easy and quick startup.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

L'invention concerne un système de coffrage auto-grimpant indépendant qui peut être assemblé au niveau d'un site de travail pour construire, maintenir ou réparer des structures verticales. Le système de coffrage auto-grimpant indépendant peut comprendre une pluralité de tours de support. De plus, au moins deux fermes peuvent être reliées à la pluralité de tours de support. Les fermes peuvent être espacées les unes des autres. En outre, une ou plusieurs plateformes peuvent être formées à l'intérieur d'un périmètre délimité par les au moins deux fermes. La ou les plateformes peuvent être conçues pour s'étendre ou se rétracter à l'intérieur du périmètre. En outre, des vérins à vis peuvent être disposés au niveau de chaque point de raccordement des au moins deux fermes sur la pluralité de tours de support. Les vérins à vis peuvent être conçus pour déplacer verticalement les au moins deux fermes vers le haut et vers le bas de la pluralité de tours de support.
PCT/IB2020/020070 2019-11-27 2020-11-04 Système de coffrage auto-grimpant indépendant pour construire des structures verticales WO2021105771A1 (fr)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CA3159823A CA3159823A1 (fr) 2019-11-27 2020-11-04 Systeme de coffrage auto-grimpant independant pour construire des structures verticales
AU2020392963A AU2020392963A1 (en) 2019-11-27 2020-11-04 Independent self-climbing form system for building vertical structures
EP20891886.2A EP4065794A4 (fr) 2019-11-27 2020-11-04 Système de coffrage auto-grimpant indépendant pour construire des structures verticales
AU2024204671A AU2024204671A1 (en) 2019-11-27 2024-07-05 Independent self-climbing form system for building vertical structures

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201962941306P 2019-11-27 2019-11-27
US62/941,306 2019-11-27

Publications (1)

Publication Number Publication Date
WO2021105771A1 true WO2021105771A1 (fr) 2021-06-03

Family

ID=75973878

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/IB2020/020070 WO2021105771A1 (fr) 2019-11-27 2020-11-04 Système de coffrage auto-grimpant indépendant pour construire des structures verticales

Country Status (5)

Country Link
US (1) US20210156156A1 (fr)
EP (1) EP4065794A4 (fr)
AU (2) AU2020392963A1 (fr)
CA (1) CA3159823A1 (fr)
WO (1) WO2021105771A1 (fr)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2695626B2 (es) * 2017-06-30 2020-05-19 Hws Concrete Towers S L Dispositivo auto-trepante por superficies de hormigón verticales y cuasi-verticales y procedimiento de operación.
US11655641B2 (en) * 2019-12-29 2023-05-23 The Third Construction Co., Ltd Of China Construction Third Engneering Bureau Construction building equipment and construction method thereof
CN113585743B (zh) * 2021-08-02 2022-09-02 中铁一局集团建筑安装工程有限公司 一种建筑物施工方法
CN114182635A (zh) * 2021-11-11 2022-03-15 中交第四航务工程局有限公司 一种桥梁薄壁墩高墩步履式顶升模架及其施工方法
CN117365079B (zh) * 2023-12-05 2024-02-02 上海建工一建集团有限公司 一种大爬距钢柱筒架交替支撑整体爬升钢平台模架

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070068733A1 (en) * 2005-09-23 2007-03-29 Barry Schlecht Scaffold structure
KR100817883B1 (ko) * 2006-11-02 2008-04-01 안종식 슬래브 거푸집 설치구조
US20080131209A1 (en) * 2004-01-28 2008-06-05 Pierre-Armand Thomas Structure For Transporting, Commissioning and Decommissioning the Elements of a Fixed Oil Platform and Methods For Implementing Such a Structure
US20130048430A1 (en) * 2010-02-25 2013-02-28 John Clement Preston Scaffolding
KR101562665B1 (ko) * 2014-07-29 2015-10-23 서보산업 주식회사 슬래브 거푸집의 시공과 탈형이 용이한 자가 승강식 서포트 및 이를 이용한 슬래브 시공 방법

Family Cites Families (39)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3194532A (en) * 1961-11-17 1965-07-13 Chivous G Harrill Apparatus for pouring floors of a multi-story building
US3831902A (en) * 1971-02-11 1974-08-27 Research Corp Method of erecting a multi-story building and apparatus therefor
US3920780A (en) * 1972-08-09 1975-11-18 Research Corp Method of erecting a multi-story building and apparatus
US3973885A (en) * 1973-03-07 1976-08-10 Enor Nominees Pty. Limited Apparatus for progressively constructing a wall of cementitious material
US3841596A (en) * 1973-08-10 1974-10-15 A Cull Concrete shaft forming unit
US4108583A (en) * 1976-12-06 1978-08-22 Elspan International Limited Vertically moving slip forms
GB2003112B (en) * 1977-08-03 1982-01-20 Norwest Holst Specialised Eng Suspended platform
DE2759088C2 (de) * 1977-12-30 1985-06-20 Philipp Holzmann Ag, 6000 Frankfurt Klettergerüst mit Kletterschalung zur Herstellung einer Stahlbetonwand
US4252291A (en) * 1978-04-05 1981-02-24 Armas Eduardo S Apparatus and method for molding building modules
DE2936115C2 (de) * 1979-09-07 1982-06-09 August Steingass & Sohn GmbH & Co, 5650 Solingen Verfahren zum Einbau einer verfahrbaren Arbeitsbühne in den Brennraum eines Wärmekraftwerkes o.dgl.
US4456404A (en) * 1982-02-17 1984-06-26 Atlantic Pacific Marine Corporation Method and apparatus for positioning a working barge above a sea surface
US4530648A (en) * 1984-04-18 1985-07-23 Economy Forms Corporation Wall climbing form hoist
US4650150A (en) * 1985-04-19 1987-03-17 Opako, S.A. Mold apparatus for vertical elements of concrete
EP0487516B1 (fr) * 1988-09-05 1995-01-18 Ohbayashi Corporation Appareil et méthode de construction
JPH04505040A (ja) * 1989-02-08 1992-09-03 ルベカ・コンストラクション・システムズ・ピーテーワイ・リミテッド ビルディング建造システム
US5329742A (en) * 1992-07-08 1994-07-19 Lee Wen Yuan Process for constructing a concrete building
US5490367A (en) * 1992-07-08 1996-02-13 Lee; Wen-Yuan Apparatus for supporting and moving vertically an erected form assembly
US5469684A (en) * 1993-08-10 1995-11-28 Franklin; James W. Concrete building frame construction method
DE19639038C1 (de) * 1996-09-23 1998-06-04 Doka Ind Gmbh Kletterschalungssystem und Verfahren zum sukzessiven Betonieren von hohen vertikalen Wänden
US5980160A (en) * 1997-02-19 1999-11-09 Vanderklaauw; Peter M. Apparatus and method for a modular lifting and shoring system
US20070096006A1 (en) * 2005-09-30 2007-05-03 Randy Pauley Overhead beam assembly
AT503924B1 (de) * 2006-08-18 2008-02-15 Rund Stahl Bau Gmbh & Co Kletterschalung zum betonieren einer wand eines bauwerks
US8020271B2 (en) * 2007-07-11 2011-09-20 Norton Baum Self-raising form control system and method
CN102587643A (zh) * 2012-03-28 2012-07-18 北京安德固脚手架工程有限公司 大吨位长行程油缸顶升模架
US9279260B2 (en) * 2012-10-12 2016-03-08 Norton Baum Modular panel concrete form for self-lifting concrete form system
US9217255B2 (en) * 2012-11-30 2015-12-22 Chicago Bridge & Iron Company Self-jacking scaffold for large cylindrical tanks
CN103669832B (zh) * 2013-12-13 2016-06-29 中建三局第一建设工程有限责任公司 一种标准型贝雷架装配式顶升模架体系
DE102016205956A1 (de) * 2016-04-08 2017-10-12 Peri Gmbh Selbstklettersystem, Selbstklettereinheit sowie Verfahren zum Umsetzen einer solchen Selbstklettereinheit an einem Betonbaukörper
US11136769B2 (en) * 2017-06-02 2021-10-05 James Zitting System and method for automating vertical slip forming in concrete construction
DE102017217715A1 (de) * 2017-10-05 2019-04-11 Peri Gmbh Hydraulik-Anordnung mit vernetzten Hydraulikaggregaten sowie Kletterschalung und Verfahren zum Bewegen der Kletterschalung mit einer solchen Hydraulik-Anordnung
US10415204B1 (en) * 2018-04-30 2019-09-17 Northern Offshore Ltd. Multi-environment self-elevating drilling platform
US10914083B2 (en) * 2018-06-11 2021-02-09 Wilian Holding Co. Wall-climbing concrete form lifting system
SG11202104983PA (en) * 2018-12-18 2021-06-29 Inventio Ag Method for operating a construction site device, and construction site device
US10829927B2 (en) * 2019-03-08 2020-11-10 Big Time Investment, Llc Vertical slip form construction system with multi-function platform, and method of constructing a building therewith
US10745906B1 (en) * 2019-04-24 2020-08-18 Big Time Investment, Llc Vertical slip form construction system with multi-function platform, and method of constructing a building therewith
US10900218B2 (en) * 2019-04-24 2021-01-26 Big Time Investment, Llc Method and apparatus for fabricating a floor plate for a building
US11655641B2 (en) * 2019-12-29 2023-05-23 The Third Construction Co., Ltd Of China Construction Third Engneering Bureau Construction building equipment and construction method thereof
WO2021237049A1 (fr) * 2020-05-21 2021-11-25 The Tisdale Group, LLC Plate-forme sur mât
US11248382B1 (en) * 2020-11-10 2022-02-15 Peri Ag Climbing support subsystem

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080131209A1 (en) * 2004-01-28 2008-06-05 Pierre-Armand Thomas Structure For Transporting, Commissioning and Decommissioning the Elements of a Fixed Oil Platform and Methods For Implementing Such a Structure
US20070068733A1 (en) * 2005-09-23 2007-03-29 Barry Schlecht Scaffold structure
KR100817883B1 (ko) * 2006-11-02 2008-04-01 안종식 슬래브 거푸집 설치구조
US20130048430A1 (en) * 2010-02-25 2013-02-28 John Clement Preston Scaffolding
KR101562665B1 (ko) * 2014-07-29 2015-10-23 서보산업 주식회사 슬래브 거푸집의 시공과 탈형이 용이한 자가 승강식 서포트 및 이를 이용한 슬래브 시공 방법

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP4065794A4 *

Also Published As

Publication number Publication date
EP4065794A1 (fr) 2022-10-05
AU2020392963A1 (en) 2022-06-16
AU2024204671A1 (en) 2024-07-25
CA3159823A1 (fr) 2021-06-03
US20210156156A1 (en) 2021-05-27
EP4065794A4 (fr) 2023-12-27

Similar Documents

Publication Publication Date Title
US20210156156A1 (en) Independent self-climbing form system for building vertical structures
US10738488B2 (en) Lift truck operated stacking formwork table system and a method of operation thereof
CN201158933Y (zh) 一种高层外挑结构维修脚手架装置
KR19990072014A (ko) 위에서지면으로건축물을건설하는리프트업공법
US9279260B2 (en) Modular panel concrete form for self-lifting concrete form system
MXPA03006286A (es) Extraccion de datos de atributo de producto en relacion con un proceso de fabricacion de conversion de tejido.
US20140202087A1 (en) Work platform system configured for use structure with internal cavity, and related methods of assembly and use
US20200284026A1 (en) Vertical slip form construction system with multi-function platform, and method of constructing a building therewith
JP2016145448A (ja) 解体システムおよび解体方法
US4003541A (en) Portable decking form
JP6882034B2 (ja) 免震構造物用の外部足場
JP6712501B2 (ja) 高層建物の解体システム及び解体方法
CN114775806B (zh) 利用顶升网架的墙体及上部混凝土结构施工平台及其方法
CN104878942B (zh) 一种用于预制结构构件吊装的高精度就位辅助装置和方法
JP6508959B2 (ja) 解体システムおよび解体方法
JP6757179B2 (ja) 建築物の構築方法
JP6885888B2 (ja) 足場設置方法及び足場設置構造
JP6744778B2 (ja) 仮設計画図支援システム
KR20090129574A (ko) 상승 및 하강 가능한 승강 작업대 및 그 이동 방법
RU2282700C1 (ru) Универсальная система модульной опалубки
RU2808791C1 (ru) Многофункциональная подъёмная система
JPH0730637B2 (ja) ビルの解体工法
CN217326382U (zh) 一种适用于有侧墙电梯井道的提升电梯井架
CN114380179B (zh) 一种井道电梯的安全施工方法
CN114737790B (zh) 高层框架结构逆向拆除方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20891886

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 3159823

Country of ref document: CA

ENP Entry into the national phase

Ref document number: 2020392963

Country of ref document: AU

Date of ref document: 20201104

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2020891886

Country of ref document: EP

Effective date: 20220627