WO2021095363A1 - プロジェクション溶接装置及びその電極清掃方法 - Google Patents

プロジェクション溶接装置及びその電極清掃方法 Download PDF

Info

Publication number
WO2021095363A1
WO2021095363A1 PCT/JP2020/035715 JP2020035715W WO2021095363A1 WO 2021095363 A1 WO2021095363 A1 WO 2021095363A1 JP 2020035715 W JP2020035715 W JP 2020035715W WO 2021095363 A1 WO2021095363 A1 WO 2021095363A1
Authority
WO
WIPO (PCT)
Prior art keywords
stud
electrode
hole
magazine
switching mechanism
Prior art date
Application number
PCT/JP2020/035715
Other languages
English (en)
French (fr)
Inventor
岩谷泰士
古野琢也
寺垣内洋平
美和浩
平田裕一
Original Assignee
本田技研工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 本田技研工業株式会社 filed Critical 本田技研工業株式会社
Priority to US17/776,243 priority Critical patent/US20220388089A1/en
Priority to JP2021555927A priority patent/JPWO2021095363A1/ja
Priority to CN202080079288.XA priority patent/CN114728365A/zh
Publication of WO2021095363A1 publication Critical patent/WO2021095363A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K11/00Resistance welding; Severing by resistance heating
    • B23K11/14Projection welding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K11/00Resistance welding; Severing by resistance heating
    • B23K11/30Features relating to electrodes
    • B23K11/3063Electrode maintenance, e.g. cleaning, grinding

Definitions

  • the present invention relates to a projection welding apparatus that welds studs to a work and a method for cleaning the electrodes thereof.
  • the projection welding device that welds studs to the work has a robot that operates the stud gun with an arm and a stud supply device that supplies studs to the welding electrodes attached to the stud gun.
  • a hole for holding the shaft portion of the stud supplied from the stud feeding device is formed along the axis of the stud. This hole is called a stud holding hole.
  • dust accumulates inside the stud holding hole. Accumulated dust not only reduces the durability of the weld electrode, but also prevents the stud from being inserted into the stud holding hole.
  • Japanese Patent Application Laid-Open No. 54-12537 discloses a welded electrode that prevents dust from accumulating in the stud holding hole.
  • This weld electrode has a through hole that communicates the stud holding hole to the outside.
  • the through hole functions as a passage for allowing dust scattered in the stud holding hole during welding to escape to the outside.
  • the present invention has been made in consideration of such a problem, and an object of the present invention is to provide a projection welding apparatus capable of keeping a stud holding hole formed in a welding electrode clean and a method for cleaning the electrode.
  • the first aspect of the present invention is A projection welding device that holds a stud with a welding electrode, brings the stud into contact with a work, applies a welding current to the welding electrode, and welds the stud to the work.
  • the weld electrode has a stud holding hole extending from the first opening formed at the tip to the bottom formed on the proximal end side, and one or more lateral holes extending from the second opening formed on the side wall to the bottom.
  • Have and An air injection portion for injecting air from the first opening of the welding electrode into the stud holding hole is provided.
  • the second aspect of the present invention is A method of cleaning an electrode of a projection welding apparatus in which a stud is held by a welding electrode, the stud is brought into contact with a work, a welding current is passed through the welding electrode, and the stud is welded to the work.
  • the weld electrode has a stud holding hole extending from the first opening formed at the tip to the bottom formed on the proximal end side, and one or more lateral holes extending from the second opening formed on the side wall to the bottom. Have and When the stud is not inserted into the stud holding hole, air is injected into the stud holding hole from the first opening of the welding electrode using an air injection unit.
  • the stud holding holes of the weld electrode can be kept clean.
  • FIG. 1 is a diagram showing a projection welding system.
  • FIG. 2 is a diagram showing the appearance of the stud.
  • FIG. 3 is a diagram showing the appearance of the second electrode.
  • FIG. 4 is a diagram showing a cross section of the second holding portion.
  • FIG. 5 is a diagram showing a state in which cleaning air flows into the second holding portion.
  • FIG. 6 is a diagram showing the appearance of the stud feeding device.
  • FIG. 7 is a view showing a side surface of the stud feeding device.
  • FIG. 8 is a diagram showing a cross section of the magazine.
  • FIG. 9 is a diagram showing the structure of the switching mechanism and its surroundings.
  • 10A to 10E are diagrams showing a stud supply procedure.
  • FIG. 11 is a diagram showing the appearance of the stud filling device.
  • FIG. 11 is a diagram showing the appearance of the stud filling device.
  • FIG. 12 is a view showing a side surface of the stud filling device.
  • FIG. 13A is a diagram showing a state in which the studs are housed in the tube
  • FIG. 13B is a diagram showing a state in which the studs are supplied from the tube to the magazine.
  • FIG. 14A is a diagram showing a locked state of the switching mechanism
  • FIG. 14B is a diagram showing an unlocked state of the switching mechanism.
  • FIG. 15 is a diagram showing a state in which the stud filling device is aligned under the stud feeding device.
  • FIG. 16 is a diagram showing a state in which the stud filling device is moved from below the stud feeding device.
  • FIG. 13A is a diagram showing a state in which the studs are housed in the tube
  • FIG. 13B is a diagram showing a state in which the studs are supplied from the tube to the magazine.
  • FIG. 14A is a diagram showing a locked state of the switching mechanism
  • FIG. 17 is a diagram showing a state in which the stud supply device approaches the stud filling device.
  • FIG. 18 is a diagram showing a state in which the stud supply device is aligned with the stud filling device.
  • FIG. 19 is a diagram showing a state in which studs are supplied from the stud filling device to the stud supply device.
  • the projection welding system 10 includes a projection welding device 12, a stud filling device 14, and a stud feeding device 16.
  • the projection welding device 12 includes an articulated robot 18, a stud gun 20 operated by the robot 18, and a stud supply device 22 that supplies studs 24 (FIG. 2) to the second electrode 38 of the stud gun 20. ..
  • the stud 24 used in the present embodiment is a flanged stud having a shaft portion 26 and a flange 28 formed at the base end of the shaft portion 26.
  • the stud 24 is housed in the stud feeding device 16, is sent from the stud feeding device 16 to the stud filling device 14, is sent from the stud filling device 14 to the stud feeding device 22, is ejected from the stud feeding device 22, and is second. It is supplied to the electrode 38.
  • the longitudinal direction of the stud gun 20 is the X direction (left and right direction on the paper surface in FIG. 1)
  • the height direction orthogonal to the X direction is the Y direction (vertical direction on the paper surface in FIG. 1)
  • the direction is orthogonal to the X direction and the Y direction.
  • the width direction is the Z direction (FIG. 1, the direction perpendicular to the paper surface).
  • one of the X directions is the + X direction, and the other is the ⁇ X direction. The same applies to the Y direction and the Z direction.
  • the stud gun 20 has a first arm 30 and a second arm 32 that can be approached to each other and separated from each other.
  • a first electrode 34 as a welding electrode is attached to the tip of the first arm 30 with the tip facing the second electrode 38.
  • An electrode switching device 36 is attached to the tip of the second arm 32.
  • a stud supply device 22 is attached to the second arm 32 on the proximal end side of the electrode switching device 36.
  • the electrode switching device 36 has two second electrodes 38 as welding electrodes.
  • One second electrode 38a is arranged on the + Z direction side (front side of the paper surface) with respect to the other second electrode 38b.
  • the two second electrodes 38 can swing in the XY plane about an axis extending in the Z direction, and can move in the Z direction at the same time.
  • the electrode switching device 36 is controlled by a control device (not shown).
  • one second electrode 38a When the two second electrodes 38 are arranged on the + Z direction side (front side of the paper surface), one second electrode 38a has its tip directed toward the stud supply device 22 on the + X direction side, and the other second electrode 38b The tip thereof is directed to the first electrode 34 on the + Y direction side.
  • the first electrode 34 and the other second electrode 38b perform projection welding with the stud 24 and the work W sandwiched between them, and the stud supply device 22 supplies the stud 24 to the one second electrode 38a.
  • one second electrode 38a When two second electrodes 38 are arranged on the ⁇ Z direction side (back side of the paper surface), one second electrode 38a has its tip directed toward the first electrode 34 on the + Y direction side, and the other second electrode 38b Directs its tip toward the stud supply device 22 on the + X direction side.
  • the first electrode 34 and one of the second electrodes 38a perform projection welding with the stud 24 and the work W sandwiched between them, and the stud supply device 22 supplies the stud 24 to the other second electrode 38b.
  • Second electrode 38 [3.1. Configuration of the second electrode 38]
  • the configuration of the second electrode 38 will be described with reference to FIGS. 3 and 4.
  • the end portion on the tip end side of the second electrode 38 is set as the tip end, and the portion located on the tip end side is set as the tip end portion.
  • the end portion on the proximal end side of the second electrode 38 is the proximal end, and the portion located on the proximal end side is the proximal end portion.
  • the second electrode 38 has a first holding portion 40 and a second holding portion 42.
  • the first holding portion 40 is a rod-shaped member located on the proximal end side of the second electrode 38, and a conductive member (not shown) is inserted therein.
  • the conductive member is connected to a circuit (not shown) that supplies a welding current.
  • the base end portion of the first holding portion 40 is attached to a swing arm (not shown) of the electrode switching device 36.
  • the tip of the first holding portion 40 holds the second holding portion 42.
  • the second holding portion 42 includes an electrode body 46, a magnet portion 48 that attracts the stud 24 by magnetic force, and a cap 50 that functions as an electrode tip.
  • the electrode body 46 is a conductive member such as metal, and has a magnet storage hole 52 and one or more horizontal holes 54.
  • the electrode body 46 is attached to the tip of the first holding portion 40 and is connected to the conductive member of the first holding portion 40.
  • the magnet accommodating hole 52 is formed along the axis of the electrode body 46 from the tip opening 56a formed on the tip surface 56 of the electrode body 46 to the bottom 58 formed on the base end side of the tip opening 56a.
  • the lateral hole 54 is formed along the diameter of the electrode body 46 from the side wall opening 60a formed in the side wall 60 of the electrode body 46 to the bottom portion 58.
  • the magnet portion 48 has a cylindrical magnet 62 and a non-magnetic body 64 that covers the entire surface of the magnet 62.
  • the non-magnetic material 64 has a first stud holding hole 66 penetrating the center.
  • the magnet portion 48 is fitted in the magnet storage hole 52 of the electrode body 46, and is held at a position where the lateral hole 54 is not blocked.
  • the magnet portion 48 may be provided with a flow path through which the cooling medium flows.
  • the cap 50 is a conductive member such as metal.
  • the cap 50 has a cap opening 68 formed at the tip thereof and a second stud holding hole 70 connected to the cap opening 68 and penetrating the center of the cap 50.
  • the cap 50 is screwed into the side wall 60 at the tip of the electrode body 46 and comes into contact with the tip of the electrode body 46 and the tip of the non-magnetic body 64 of the magnet portion 48 fitted in the magnet storage hole 52.
  • the first stud holding hole 66 and the second stud holding hole 70 form the stud holding hole 72 by aligning their axes with each other.
  • the stud holding hole 72 is connected to the lateral hole 54 at the position of the bottom portion 58. Therefore, the cap opening 68 (first opening) and the side wall opening 60a (second opening) communicate with each other through the stud holding hole 72 and the lateral hole 54.
  • the diameter of the stud holding hole 72 is larger than the diameter of the shaft portion 26 of the stud 24. Further, the diameter of the cap opening 68 is smaller than the diameter of the flange 28 of the stud 24.
  • the stud 24 is pulled by the magnetic force of the magnet 62 with the shaft portion 26 inserted into the stud holding hole 72 and the flange 28 in contact with the tip of the cap 50.
  • an air injection portion for injecting air from the cap opening 68 (first opening) of the second electrode 38 into the stud holding hole 72 is provided.
  • the tip of the second electrode 38 is directed toward the stud supply device 22 according to the operation of the electrode switching device 36.
  • the stud supply device 22 is an air transport type stud supply unit that inserts the stud 24 into the stud holding hole 72 by utilizing the pressure of air.
  • the stud supply device 22 is used as an air injection unit.
  • the cleaning air 74 blows the dust 76 accumulated in the stud holding hole 72 and the lateral hole 54 to the outside from the side wall opening 60a.
  • the stud holding hole 72 and the lateral hole 54 are cleaned by removing dust 76.
  • the projection welding device 12 has two stud supply devices 22.
  • One stud supply device 22 is arranged on the + Z direction side with respect to the second arm 32 (FIG. 7), and supplies the stud 24 to the second electrode 38a.
  • the other stud supply device 22 is arranged on the ⁇ Z direction side with respect to the second arm 32 (FIG. 7), and supplies the stud 24 to the second electrode 38b.
  • the stud supply device 22 includes a magazine 80, a plurality of switching mechanisms 82 (first switching mechanism 82a to third switching mechanism 82c), a first cylinder 84, a second cylinder 86, a third cylinder 88, and a first cylinder. It has an air injection unit 90 and a second air injection unit 92. Further, the base 94 is fixed to the inner surface of the second arm 32 (the surface on the first arm 30 side). The support member 96 is fixed to the base 94. The support member 96 projects over the second arm 32 in the + Z direction side and the ⁇ Z direction side to support the two stud supply devices 22.
  • the magazine 80 supported by the support member 96 will be described.
  • the magazine 80 is a cylinder that stores a predetermined number of studs 24.
  • the axis of the magazine 80 is arranged parallel to the X direction (supply direction of the stud 24), and the magazine 80 is movably supported in the + X direction and the ⁇ X direction by the support member 96.
  • the magazine 80 has a magazine hole 98 penetrating from one end on the + X direction side to the other end on the ⁇ X direction side, a guide port 100 located at one end of the magazine hole 98, and an injection port 102 located at the other end of the magazine hole 98. And have.
  • a stop portion 104 for stopping the stud 24 immediately before injection is provided in a portion of the magazine hole 98 near the injection port 102.
  • a first standby portion 106 and a second standby portion 108 for stopping the stud 24 before moving it to the stop portion 104 are provided. ..
  • the diameter of the magazine hole 98 is longer than the diameter of the flange 28 of the stud 24 and shorter than the total length of the stud 24. Further, the length of the magazine hole 98 in the axial direction is longer than the total length of the studs 24 for a predetermined number of minutes. Therefore, the magazine 80 can store a predetermined number of studs 24 in series (one row) from the stop portion 104 toward the + X direction inside the magazine hole 98. Further, the magazine 80 can insert the stud 24 through the guide port 100 and eject it from the injection port 102.
  • a magazine sensor 110 that detects the tip of the stud 24 that stops at the stop portion 104 is provided.
  • the magazine sensor 110 is, for example, a photoelectric sensor.
  • the magazine 80 has a plurality of magazine through holes 116 penetrating from the magazine outer wall 112 to the magazine inner wall 114 at the position of the stop portion 104.
  • a plurality of magazine through holes 116 are provided in the stop portion 104.
  • the plurality of magazine through holes 116 are arranged in the circumferential direction of the cross section of the stop portion 104 (the cross section orthogonal to the axis of the magazine 80).
  • the magazine 80 has a magazine through hole 116 having the same shape as the stop portion 104 at the position of the first standby portion 106 and the position of the second standby portion 108. The distance between the first standby unit 106 and the second standby unit 108 is shorter than the length of the stud 24.
  • the stop portion 104 is provided with a first switching mechanism 82a.
  • the first switching mechanism 82a has a plurality of balls 122 (FIGS. 8 and 9) and a reciprocating member 124 (FIGS. 6 to 9). The first switching mechanism 82a switches between a state in which the stud 24 is stopped and a state in which the stud 24 is passed by the stop portion 104.
  • the balls 122 are housed inside each magazine through hole 116, and can move inside and outside the magazine 80 in the radial direction inside the magazine through hole 116.
  • the ball 122 is smaller than the outer wall opening 120 of the magazine through hole 116 and larger than the inner wall opening 118. When the outer end of the ball 122 is in the vicinity of the outer wall opening 120, a part of the ball 122 projects from the inner wall opening 118 into the magazine hole 98.
  • the reciprocating member 124 is a cylindrical member.
  • the reciprocating member 124 is provided around the magazine outer wall 112 and can slide in the + X direction and the ⁇ X direction along the magazine outer wall 112.
  • the reciprocating member 124 has a recess 128 that circulates on the inner peripheral surface 126 that faces the outer wall 112 of the magazine.
  • the recess 128 has a large diameter portion 130 having a large diameter on the + X direction side and a small diameter portion 132 having a small diameter on the ⁇ X direction side.
  • the second switching mechanism 82b switches between a state in which the stud 24 is stopped and a state in which the stud 24 is passed by the first standby unit 106.
  • the third switching mechanism 82c switches between a state in which the stud 24 is stopped and a state in which the stud 24 is passed by the second standby unit 108.
  • the structure and operation of the second switching mechanism 82b and the third switching mechanism 82c are the same as the structure and operation of the first switching mechanism 82a.
  • the switching mechanism 82 operates as follows.
  • the ball 122 is between the large diameter portion 130 and the magazine through hole 116 when the reciprocating member 124 moves in the ⁇ X direction and the large diameter portion 130 of the reciprocating member 124 faces the outer wall opening 120 of the magazine through hole 116. It becomes possible to move with.
  • the plurality of balls 122 can make the size of the magazine hole 98 (FIG. 8) larger than the diameter of the flange 28 of the stud 24.
  • the stud 24 pushes the plurality of balls 122 outward to widen the diameter of the stop portion 104, so that the stud 24 can pass through the stop portion 104.
  • the ball 122 comes into contact with the peripheral surface of the small diameter portion 132 when the reciprocating member 124 moves in the + X direction and the small diameter portion 132 of the reciprocating member 124 faces the outer wall opening 120 of the magazine through hole 116.
  • the movement of the ball 122 is restricted by the reciprocating member 124 in a state where a part of the ball 122 protrudes from the inner wall opening 118 of the magazine through hole 116 into the magazine hole 98.
  • the stud 24 cannot push the plurality of balls 122 to the outside, so that the stud 24 cannot pass through the stop portion 104.
  • the first cylinder 84 is a fluid pressure cylinder that operates the first rod 134 in the + X direction and the ⁇ X direction.
  • the first cylinder 84 is arranged on the + X direction side of the first switching mechanism 82a to the third switching mechanism 82c and is connected to the magazine 80.
  • the first rod 134 extends from the first cylinder 84 in the ⁇ X direction and is connected to the reciprocating member 124 of the first switching mechanism 82a and the reciprocating member 124 of the third switching mechanism 82c.
  • the first cylinder 84 operates the first switching mechanism 82a and the third switching mechanism 82c at the same time.
  • the second cylinder 86 is a fluid pressure cylinder that operates the second rod 136 in the + X direction and the ⁇ X direction.
  • the second cylinder 86 is arranged on the + X direction side of the first switching mechanism 82a to the third switching mechanism 82c and is fixed to the magazine 80.
  • the second rod 136 extends from the second cylinder 86 in the ⁇ X direction and is connected to the reciprocating member 124 of the second switching mechanism 82b.
  • the second cylinder 86 operates the second switching mechanism 82b separately from the first switching mechanism 82a and the third switching mechanism 82c.
  • the third cylinder 88 is a fluid pressure cylinder that operates the third rod 138 in the + X direction and the ⁇ X direction.
  • the third cylinder 88 is fixed to the surface of the support member 96 on the ⁇ X direction side.
  • the third rod 138 penetrates the support member 96 and extends in the + X direction, and is connected to the surface of the connecting plate 140 fixed to the base end portion of the magazine 80 on the ⁇ X direction side.
  • the first guide shaft 142 is connected to the surface of the connecting plate 140 on the + X direction side.
  • the first guide shaft 142 extends from the connecting plate 140 in the + X direction and is connected to the pedestal 158 of the second air injection unit 92, which will be described later.
  • the first guide shaft 142 is movably supported in the + X direction and the ⁇ X direction by the guide member 144 fixed to the end of the support member 96 on the + X direction side.
  • the third cylinder 88 is a member connected to the connecting plate 140, specifically, a magazine 80 and each configuration connected to the magazine 80 (each switching mechanism 82, the first cylinder 84, the second cylinder 86, the first air injection). (Part 90, etc.) and each configuration (second air injection part 92) connected to the pedestal 158 are operated in the + X direction and the ⁇ X direction with reference to the support member 96.
  • the first air injection unit 90 is provided between the stop unit 104 of the magazine 80 and the first standby unit 106.
  • the first air injection unit 90 has an air supply path 146 that goes around the magazine outer wall 112.
  • the first air injection unit 90 is connected to an air supply circuit (not shown) having an air pump.
  • an air supply hole 148 is formed from the magazine outer wall 112 to the magazine inner wall 114.
  • a plurality of air supply holes 148 are provided.
  • the air supply hole 148 communicates with the air supply path 146.
  • the air supply hole 148 has a structure in which the flow path on the downstream side is located on the ⁇ X direction side with respect to the flow path on the upstream side. Therefore, the first air injection unit 90 injects the air flowing into the air supply hole 148 from the air supply path 146 toward the ⁇ X direction inside the magazine hole 98.
  • the second air injection unit 92 is provided on the + X direction side of the base end of the magazine 80.
  • the second air injection unit 92 is connected to an air supply circuit (not shown) having an air pump.
  • the second air injection unit 92 brings the nozzle 150 close to the guide port 100 of the magazine 80. Therefore, the second air injection unit 92 injects air from the nozzle 150 toward the inside of the magazine hole 98.
  • the second air injection unit 92 has an injection unit bracket 152 extending in the + Z direction.
  • the second guide shaft 154 is parallel to the Y direction and is inserted into the holes formed in the coil spring 156 and the pedestal 158.
  • the end of the second guide shaft 154 on the + Y direction side is fixed to the injection portion bracket 152, and the end of the second guide shaft 154 on the ⁇ Y direction side is fixed to the stop member 160 on the ⁇ Y direction side of the pedestal 158.
  • the stop member 160 is larger than the hole of the pedestal 158 through which the second guide shaft 154 is inserted, the second guide shaft 154 does not come out of the hole.
  • the coil spring 156 comes into contact with the end face of the injection portion bracket 152 on the ⁇ Y direction side and the end face of the pedestal 158 on the + Y direction side.
  • the second air injection unit 92 stops with the nozzle 150 close to the base end of the magazine 80, and supplies air to the magazine hole 98 of the magazine 80. Further, the second air injection unit 92 can compress the coil spring 156 and move in the ⁇ Y direction by being pushed in the ⁇ Y direction. In this state, the guide port 100 of the magazine 80 is not blocked by the second air injection unit 92, so that the stud 24 can be filled into the magazine hole 98 of the magazine 80.
  • the work of filling the stud 24 into the magazine hole 98 is performed by the stud filling device 14 (FIG. 1 and the like).
  • the stud supply device 22 is provided with a first male portion 162 and a first female portion 164.
  • the first male portion 162 is fixed to the base 94 and projects in the + Y direction from between the magazine 80 of one stud supply device 22 and the magazine 80 of the other stud supply device 22.
  • the first female portion 164 is fixed to the surface of the support member 96 on the + Y direction side.
  • the filling work of the stud 24 will be described in [5.2].
  • each switching mechanism 82 (82a to 82c) operates the reciprocating member 124 to switch between a state in which the movement of the ball 122 is restricted and a state in which the restriction on the movement of the ball 122 is released.
  • the state in which the switching mechanism 82 restricts the movement of the ball 122 is referred to as a locked state
  • the state in which the switching mechanism 82 releases the restriction on the movement of the ball 122 is referred to as an unlocked state.
  • the three studs 24 are also referred to as a first stud 24a, a second stud 24b, and a third stud 24c in order from the beginning.
  • FIG. 10A shows the first step in which the stud 24 is filled in the magazine hole 98.
  • the reciprocating member 124 of the second switching mechanism 82b is arranged on the + X direction side to lock the second switching mechanism 82b.
  • the reciprocating member 124 of the third switching mechanism 82c is arranged on the ⁇ X direction side to bring the third switching mechanism 82c into the unlocked state.
  • the first stud 24a passes through the second standby unit 108. Further, the ball 122 of the second switching mechanism 82b comes into contact with the flange 28 of the first stud 24a. Therefore, the first stud 24a stops at the first standby unit 106. At this time, the second stud 24b comes into contact with the first stud 24a and stops on the + X direction side of the second standby portion 108. As a result, the state shown in FIG. 10A is obtained.
  • FIG. 10B shows a second step performed after the first step.
  • the reciprocating member 124 of the first switching mechanism 82a and the third switching mechanism 82c is arranged on the + X direction side, and the first switching mechanism 82a and the third switching mechanism 82c are locked. To do.
  • the state shown in FIG. 10B is obtained.
  • the stop position of each stud 24 does not change.
  • air is injected into the magazine hole 98 from the second air injection unit 92 (FIG. 6 and the like).
  • the posture of each stud 24 is corrected by air, and the tip thereof is directed in the air flow direction, that is, in the ⁇ X direction.
  • FIG. 10C shows a third step performed after the second step.
  • the reciprocating member 124 of the second switching mechanism 82b is arranged on the ⁇ X direction side to bring the second switching mechanism 82b into the unlocked state.
  • the ball 122 of the second switching mechanism 82b is pushed by the first stud 24a provided with propulsive force by air and moves outward. Therefore, the first stud 24a passes through the first standby unit 106 and proceeds to the stop unit 104.
  • the ball 122 of the first switching mechanism 82a comes into contact with the flange 28 of the first stud 24a. Therefore, the first stud 24a stops at the stop portion 104.
  • the second stud 24b to which the propulsion force is given by the air advances to the second standby portion 108.
  • the ball 122 of the third switching mechanism 82c comes into contact with the flange 28 of the second stud 24b. Therefore, the second stud 24b stops at the second standby unit 108.
  • air is injected from the first air injection unit 90 into the magazine hole 98.
  • the posture of the first stud 24a is corrected by the air, and the tip thereof is directed in the air flow direction, that is, in the ⁇ X direction. As a result, the state shown in FIG. 10C is obtained.
  • FIG. 10D shows a fourth step performed after the third step.
  • the second cylinder 86 arranges the reciprocating member 124 of the second switching mechanism 82b on the + X direction side to lock the second switching mechanism 82b.
  • the state shown in FIG. 10D is obtained.
  • the stop position of each stud 24 does not change.
  • FIG. 10E shows a fifth step performed after the fourth step.
  • the reciprocating member 124 of the first switching mechanism 82a and the third switching mechanism 82c is arranged on the ⁇ X direction side to bring the first switching mechanism 82a and the third switching mechanism 82c into the unlocked state.
  • the ball 122 of the first switching mechanism 82a is pushed by the first stud 24a provided with propulsive force by air and moves outward. Therefore, the first stud 24a passes through the stop portion 104 and is ejected from the injection port 102. Further, the ball 122 of the second switching mechanism 82b comes into contact with the flange 28 of the second stud 24b. Therefore, the second stud 24b stops at the first standby unit 106.
  • Stud filling device 14 [5.1. Configuration of stud filling device 14] The configuration of the stud filling device 14 will be described with reference to FIGS. 1 and 11 to 16. As shown in FIG. 1, the stud filling device 14 is supported by a support base 170, rotates about an axis extending in the vertical direction, and receives a stud 24 from the stud feeding device 16 (FIG. 15). , It is possible to move between the position where the stud supply device 22 is filled with the stud 24 (FIG. 16).
  • the stud filling device 14 is composed of a plurality of parts attached to the vertical plate 172 supported by the support base 170 and a plurality of parts attached to those parts.
  • a second female portion 174, a second male portion 176, two first brackets 178, two horizontal plates 180, and two second brackets 182 are attached to the vertical plate 172 in this order from the bottom.
  • the second female part 174 and the second male part 176 project forward from the vertical plate 172.
  • the two first brackets 178 extend forward from the vertical plate 172 and individually support the sensor support member 184.
  • the sensor support member 184 supports the lower tube sensor 186.
  • the lower tube sensor 186 is located below the lower end of the tube 190.
  • the two horizontal plates 180 extend forward from the vertical plate 172 and individually support the tube 190 and the roller support 192.
  • a pin 189 extending downward is rotatably attached to the horizontal plate 180 about its axis.
  • a fourth cylinder 188 is fixed to the lower end of the pin 189.
  • the pin 189 rotatably supports the fourth cylinder 188.
  • the roller support portion 192 rotatably supports the roller 194.
  • the roller 194 projects forward of the tube 190.
  • the two second brackets 182 extend forward from the vertical plate 172 and individually support the upper tube sensor 196.
  • the tube 190 extends in the vertical direction and is supported by the horizontal plate 180.
  • the upper end of the tube 190 is located above the horizontal plate 180 and the lower end of the tube 190 is located below the horizontal plate 180.
  • a switching mechanism 198 is provided at the lower end of the tube 190 arranged below the horizontal plate 180.
  • One tube 190 fills one of the two stud feeders 22 with the stud 24, and the other tube 190 fills the other of the two stud feeders 22 with the stud 24.
  • a flange 199 extending in the horizontal direction is formed on the outer peripheral surface of the switching mechanism 198.
  • the shaft member of the joint 201 is inserted through a part of the flange 199.
  • the shaft member of the joint 201 extends in the vertical direction.
  • the rear end of the joint 201 is connected to the tip of the fourth rod 200 extending forward from the fourth cylinder 188.
  • the tube 190 is a cylinder for accommodating a predetermined number of studs 24.
  • the tube 190 has a tube hole 210 that penetrates from one upper end to the other end of the lower side, a guide port 212 located at one end of the tube hole 210, and a discharge port 214 located at the other end of the tube hole 210. ..
  • a stop portion 216 for stopping the leading stud 24 is provided in a portion of the tube hole 210 close to the discharge port 214.
  • the diameter of the tube hole 210 is longer than the diameter of the flange 28 of the stud 24 and shorter than the total length of the stud 24. Further, the axial length of the tube hole 210 is longer than the total length of the studs 24 for a predetermined number of minutes. Therefore, the tube 190 can store a predetermined number of studs 24 in series (one row) downward from the stop portion 216 inside the tube hole 210. Further, the tube 190 can insert the stud 24 through the guide port 212 and eject it from the discharge port 214.
  • a lower tube sensor 186 that detects the tip of the stud 24 that stops at the stop portion 216 is provided below the lower end of the tube 190.
  • an upper tube sensor 196 for detecting the stud 24 located at the end of a predetermined number of studs 24 housed in the tube hole 210 is provided at the upper end of the tube 190.
  • the lower tube sensor 186 and the upper tube sensor 196 are, for example, photoelectric sensors.
  • the tube 190 has a plurality of tube through holes 222 penetrating from the tube outer wall 218 to the tube inner wall 220 at the position of the stop portion 216.
  • the plurality of tube through holes 222 are arranged in the circumferential direction of the cross section of the stop portion 216 (the cross section orthogonal to the axis of the tube 190).
  • the switching mechanism 198 has a plurality of balls 224 and a rotating member 226.
  • the switching mechanism 198 switches between a state in which the stud 24 is stopped and a state in which the stud 24 is passed by the stop portion 216.
  • the ball 224 is housed inside each tube through hole 222 and can be moved inside and outside the tube 190 in the radial direction inside the tube through hole 222.
  • the ball 224 is smaller than the outer wall opening 228 of the tube through hole 222 and larger than the inner wall opening 230.
  • a portion of the ball 224 projects from the inner wall opening 230 into the tube hole 210.
  • the rotating member 226 is a cylindrical member.
  • the rotating member 226 is provided around the tube outer wall 218 and is slidable along the tube outer wall 218 in the circumferential direction of the tube 190.
  • the rotating member 226 has a recess 234 on the inner peripheral surface 232 facing the outer wall 218 of the tube.
  • the recesses 234 are arranged in the circumferential direction of the cross section of the stop portion 216 (the cross section orthogonal to the axis of the tube 190).
  • the switching mechanism 198 operates as follows.
  • the ball 224 can move between the recess 234 and the tube through hole 222 when the rotating member 226 rotates and the recess 234 of the rotating member 226 faces the outer wall opening 228 of the tube through hole 222. ..
  • the plurality of balls 224 can make the size of the stop portion 216 larger than the diameter of the flange 28 of the stud 24.
  • the stud 24 pushes the plurality of balls 224 outward by its own weight to expand the stop portion 216, so that the stud 24 can pass through the stop portion 216.
  • the ball 224 comes into contact with the inner peripheral surface 232 when the rotating member 226 rotates and the recess 234 of the rotating member 226 does not face the outer wall opening 228 of the tube through hole 222.
  • the movement of the ball 224 is restricted by the rotating member 226 with a part of the ball 224 protruding from the inner wall opening 230 of the tube through hole 222 into the tube hole 210. Then, since the stud 24 cannot push the plurality of balls 224 outward, it cannot pass through the stop portion 216.
  • the switching mechanism 198 operates the rotating member 226 to switch between a state in which the movement of the ball 224 is restricted and a state in which the movement of the ball 224 is released.
  • the state in which the switching mechanism 198 restricts the movement of the ball 224 is referred to as a locked state
  • the state in which the switching mechanism 198 releases the restriction on the movement of the ball 122 is referred to as an unlocked state.
  • a control device (not shown) controls the operation of each device in an integrated manner.
  • the support base 170 arranges the stud filling device 14 under the stud feeding portion 171 of the stud feeding device 16.
  • the arm 240 provided on the support 170 can rotate between two positions. When the arm 240 turns in one direction, the stud filling device 14 is arranged under the stud feeding portion 171 of the stud feeding device 16 and can receive the stud 24 from the stud feeding device 16.
  • the parts storage process is performed.
  • the fourth cylinder 188 rotates the rotating member 226 of the switching mechanism 198 to lock the switching mechanism 198.
  • the ball 224 moves toward the inside of the stop portion 216 to make the size of the stop portion 216 smaller than the flange 28 of the stud 24.
  • the stud feeding device 16 drops a predetermined number of studs 24 toward the tube holes 210.
  • the stud 24 is inserted into the tube hole 210 with its tip facing down.
  • the upper tube sensor 196 detects the filling completion state. Then, the stud feed device 16 stops the supply of the stud 24.
  • the support 170 moves the stud filling device 14 from below the stud feeding device 16 as shown in FIG.
  • the arm 240 turns to the other side, the stud filling device 14 moves from under the stud feeding device 16.
  • the robot 18 brings the stud supply device 22 closer to the stud filling device 14 with the tip side ( ⁇ X direction side) of the stud gun 20 facing downward. At this time, the robot 18 adjusts the positions of the stud supply device 22 in the X direction and the Z direction, and moves the stud supply device 22 in front of the stud filling device 14. Then, the robot 18 arranges the injection portion bracket 152 in front of the roller 194, the first female portion 164 in front of the second male portion 176, and the first male portion 162 in front of the second female portion 174. Deploy.
  • the robot 18 gradually moves the stud gun 20 in the rear direction (+ Y direction) to bring the stud supply device 22 closer to the stud filling device 14. Then, the injection portion bracket 152 and the roller 194 come into contact with each other. Further, the robot 18 moves the stud gun 20 in the rear direction (+ Y direction). Then, as shown in FIG. 18, the second air injection unit 92 moves in the forward direction ( ⁇ Y direction) together with the injection unit bracket 152 and the second guide shaft 154. At this time, the coil spring 156 is compressed. When the first female portion 164 and the second male portion 176 come into contact with each other and the first male portion 162 and the second female portion 174 come into contact with each other, the robot 18 stops the movement of the stud gun 20. At this time, the axis of the tube 190 and the axis of the magazine 80 coincide with each other.
  • the third cylinder 88 moves the magazine 80 upward (+ X direction) as shown in FIG.
  • the injection portion bracket 152 moves smoothly in the upward direction (+ X direction) due to the rotation of the roller 194.
  • the first male portion 162 fixed to the base 94 and the first female portion 164 fixed to the support member 96 do not move.
  • the guide port 100 of the magazine 80 approaches the discharge port 214 of the tube 190, as shown in FIG. 13A.
  • the position of the light passage hole 242 formed around the guide port 100 of the magazine 80 and the position of the lower tube sensor 186 are aligned, and the lower tube sensor 186 stores a predetermined number of studs 24 in the magazine 80. You will be able to detect that.
  • the fourth cylinder 188 rotates the rotating member 226 of the switching mechanism 198 to bring the switching mechanism 198 into the unlocked state.
  • the ball 224 is pushed toward the outside of the stop portion 216 by the weight of the stud 24. Therefore, the ball 224 moves toward the outside of the stop portion 216 to make the size of the stop portion 216 larger than the flange 28 of the stud 24.
  • the stud 24 falls with its tip facing downward and is inserted into the magazine hole 98.
  • the configuration of the stud supply device 22 and the stud filling device 14 described above can be used for other component supply devices and component filling devices.
  • the configuration of the stud supply device 22 can be used for a bolt supply device that supplies bolts to the tip of the arm of the robot 18.
  • the configuration of the stud filling device 14 can be used for a bolt filling device or the like for filling the bolt supply device with bolts.
  • the first aspect of the present invention is In the projection welding device 12, the stud 24 is held by the welding electrode (second electrode 38), the stud 24 is brought into contact with the work W, a welding current is passed through the welding electrode, and the stud 24 is welded to the work W.
  • the weld electrode has a stud holding hole 72 extending from a first opening (cap opening 68) formed at the tip to a bottom 58 formed on the proximal end side, and a second opening (side wall opening 60a) formed on the side wall 60. It has one or more lateral holes 54 extending from the bottom 58 to the bottom 58.
  • An air injection unit (stud supply device 22) for injecting air from the first opening of the welding electrode into the stud holding hole 72 is provided.
  • the air injection unit injects air from the first opening (cap opening 68) of the welding electrode (second electrode 38) into the stud holding hole 72, so that the stud is tentatively studded. Even if the dust 76 is accumulated in the holding hole 72, the dust 76 can be discharged from the lateral hole 54 together with the air. Therefore, according to the above configuration, the stud holding hole 72 of the welding electrode (second electrode 38) can be kept clean.
  • the air injection unit may be an air transport type stud supply unit (stud supply device 22) that inserts the stud 24 into the stud holding hole 72 by utilizing the pressure of air.
  • the device configuration can be simplified.
  • the second aspect of the present invention is The projection welding apparatus 12 holds the stud 24 with a welding electrode (second electrode 38), brings the stud 24 into contact with the work W, applies a welding current to the welding electrode, and welds the stud 24 to the work W.
  • the weld electrode has a stud holding hole 72 extending from a first opening (cap opening 68) formed at the tip to a bottom 58 formed on the proximal end side, and a second opening (side wall opening 60a) formed on the side wall 60. It has one or more lateral holes 54 extending from the bottom 58 to the bottom 58.
  • the projection welding apparatus and the electrode cleaning method thereof according to the present invention are not limited to the above-described embodiments, and it goes without saying that various configurations can be adopted without departing from the gist of the present invention.

Abstract

溶接電極に形成されるスタッド保持孔を清浄に保つことができるプロジェクション溶接装置及びその電極清掃方法を提供する。第2電極(38)でスタッド(24)を保持し、スタッド(24)をワーク(W)に接触させ、第2電極(38)に溶接電流を流して、ワーク(W)にスタッド(24)を溶接するプロジェクション溶接装置(12)であって、第2電極(38)は、先端に形成されるキャップ開口(68)から基端側に形成される底部(58)まで延びるスタッド保持孔(72)と、側壁(60)に形成される側壁開口(60a)から底部(58)まで延びる1以上の横孔(54)と、を有し、第2電極(38)のキャップ開口(68)からスタッド保持孔(72)にエアを噴射するスタッド供給装置(22)を備える。

Description

プロジェクション溶接装置及びその電極清掃方法
 本発明は、ワークにスタッドを溶接するプロジェクション溶接装置及びその電極清掃方法に関する。
 ワークにスタッドを溶接するプロジェクション溶接装置は、アームでスタッドガンを動作させるロボットと、スタッドガンに取り付けられる溶接電極にスタッドを供給するスタッド供給装置と、を有する。溶接電極の先端には、スタッド供給装置から供給されるスタッドの軸部を保持する孔がスタッドの軸線に沿って形成される。この孔をスタッド保持孔と称する。
 溶接が繰り返し行われると、スタッド保持孔の内部には塵(ヒューム)が堆積する。堆積した塵は、溶接電極の耐久性を低下させるだけでなく、スタッド保持孔へのスタッドの挿入を妨げる。
 実開昭54-120537号公報には、スタッド保持孔に塵が溜まることを防止する溶接電極が開示される。この溶接電極は、スタッド保持孔を外部に連通する透孔を有する。透孔は、溶接時にスタッド保持孔に飛散する塵を外部に逃がす通り道として機能する。
 実開昭54-120537号公報で示される溶接電極によれば、一部の塵は飛散時の勢いでスタッド保持孔の外部に出ていくものの、一部の塵はスタッド保持孔に溜まる。このため、溶接が繰り返し実行されると、スタッド保持孔に塵が徐々に溜まる。
 本発明はこのような課題を考慮してなされたものであり、溶接電極に形成されるスタッド保持孔を清浄に保つことができるプロジェクション溶接装置及びその電極清掃方法を提供することを目的とする。
 本発明の第1態様は、
 溶接電極でスタッドを保持し、前記スタッドをワークに接触させ、前記溶接電極に溶接電流を流して、前記ワークに前記スタッドを溶接するプロジェクション溶接装置であって、
 前記溶接電極は、先端に形成される第1開口から基端側に形成される底部まで延びるスタッド保持孔と、側壁に形成される第2開口から前記底部まで延びる1以上の横孔と、を有し、
 前記溶接電極の前記第1開口から前記スタッド保持孔にエアを噴射するエア噴射部を備える。
 本発明の第2態様は、
 溶接電極でスタッドを保持し、前記スタッドをワークに接触させ、前記溶接電極に溶接電流を流して、前記ワークに前記スタッドを溶接するプロジェクション溶接装置の電極清掃方法であって、
 前記溶接電極は、先端に形成される第1開口から基端側に形成される底部まで延びるスタッド保持孔と、側壁に形成される第2開口から前記底部まで延びる1以上の横孔と、を有し、
 前記スタッド保持孔に前記スタッドが挿入されていないときに、エア噴射部を用いて前記溶接電極の前記第1開口から前記スタッド保持孔にエアを噴射する。
 本発明によれば、溶接電極のスタッド保持孔を清浄に保つことができる。
図1はプロジェクション溶接システムを示す図である。 図2はスタッドの外観を示す図である。 図3は第2電極の外観を示す図である。 図4は第2保持部の断面を示す図である。 図5は第2保持部に清掃用エアが流入する状態を示す図である。 図6はスタッド供給装置の外観を示す図である。 図7はスタッド供給装置の側面を示す図である。 図8はマガジンの断面を示す図である。 図9は切替機構の構造とその周辺を示す図である。 図10A~図10Eはスタッド供給手順を示す図である。 図11はスタッド充填装置の外観を示す図である。 図12はスタッド充填装置の側面を示す図である。 図13Aはチューブにスタッドが収納された状態を示す図であり、図13Bはチューブからマガジンにスタッドが供給される状態を示す図である。 図14Aは切替機構のロック状態を示す図であり、図14Bは切替機構のロック解除状態を示す図である。 図15はスタッド送り装置の下にスタッド充填装置が位置合わせされた状態を示す図である。 図16はスタッド送り装置の下からスタッド充填装置が移動された状態を示す図である。 図17はスタッド充填装置にスタッド供給装置が接近する状態を示す図である。 図18はスタッド充填装置にスタッド供給装置が位置合わせされた状態を示す図である。 図19はスタッド充填装置からにスタッド供給装置にスタッドが供給される状態を示す図である。
 以下、本発明に係るプロジェクション溶接装置及びその電極清掃方法について、好適な実施形態を挙げ、添付の図面を参照して詳細に説明する。
[1.プロジェクション溶接システム10]
 図1に示されるように、プロジェクション溶接システム10は、プロジェクション溶接装置12と、スタッド充填装置14と、スタッド送り装置16と、を含む。プロジェクション溶接装置12は、多関節のロボット18と、ロボット18によって操作されるスタッドガン20と、スタッドガン20の第2電極38にスタッド24(図2)を供給するスタッド供給装置22と、を有する。
 図2に示されるように、本実施形態で使用されるスタッド24は、軸部26と軸部26の基端に形成されるフランジ28とを有するフランジ付きスタッドである。スタッド24は、スタッド送り装置16に収納されており、スタッド送り装置16からスタッド充填装置14に送られ、スタッド充填装置14からスタッド供給装置22に送られ、スタッド供給装置22から射出され、第2電極38に供給される。
[2.スタッドガン20]
 図1を用いてスタッドガン20の一例を簡単に説明する。ここで説明の便宜のために各方向を定義する。本実施形態では、スタッドガン20の長手方向をX方向(図1紙面左右方向)とし、X方向と直交する高さ方向をY方向(図1紙面上下方向)とし、X方向及びY方向と直交する幅方向をZ方向(図1紙面直交方向)とする。また、X方向の一方を+X方向とし、他方を-X方向とする。Y方向とZ方向についても同様とする。
 スタッドガン20は、互いに接近することが可能であり且つ互いに離間することが可能な第1アーム30と第2アーム32を有する。第1アーム30の先端には、溶接電極としての第1電極34がその先端を第2電極38に向けて取り付けられる。第2アーム32の先端には、電極切替装置36が取り付けられる。また、第2アーム32には、電極切替装置36よりも基端側にスタッド供給装置22が取り付けられる。
 電極切替装置36は、溶接電極としての2つの第2電極38を有する。一方の第2電極38aは他方の第2電極38bよりも+Z方向側(紙面手前側)に配置される。2つの第2電極38は、Z方向に延びる軸を中心にしてX-Y平面内で揺動可能であり、また、同時にZ方向に移動可能である。電極切替装置36は、図示しない制御装置によって制御される。
 2つの第2電極38が+Z方向側(紙面手前側)に配置される場合、一方の第2電極38aはその先端を+X方向側にあるスタッド供給装置22に向け、他方の第2電極38bはその先端を+Y方向側にある第1電極34に向ける。この状態で、第1電極34と他方の第2電極38bとがスタッド24とワークWを挟んでプロジェクション溶接を行い、また、スタッド供給装置22が一方の第2電極38aにスタッド24を供給する。
 2つの第2電極38が-Z方向側(紙面奥側)に配置される場合、一方の第2電極38aはその先端を+Y方向側にある第1電極34に向け、他方の第2電極38bはその先端を+X方向側にあるスタッド供給装置22に向ける。この状態で、第1電極34と一方の第2電極38aとがスタッド24とワークWを挟んでプロジェクション溶接を行い、また、スタッド供給装置22が他方の第2電極38bにスタッド24を供給する。
[3.第2電極38]
[3.1.第2電極38の構成]
 図3、図4を用いて第2電極38の構成を説明する。ここでは、第2電極38を構成する各部材のうち、第2電極38の先端側の端部を先端とし、先端側に位置する部分を先端部とする。また、第2電極38を構成する各部材のうち、第2電極38の基端側の端部を基端とし、基端側に位置する部分を基端部とする。第2電極38は、第1保持部40と第2保持部42を有する。
 第1保持部40は、第2電極38の基端側に位置する棒状の部材であり、内部に導電部材(不図示)が挿通される。導電部材は、溶接電流を供給する回路(不図示)に接続される。第1保持部40の基端部は、電極切替装置36の揺動アーム(不図示)に取り付けられる。第1保持部40の先端部は、第2保持部42を保持する。
 図4に示されるように、第2保持部42は、電極本体46と、磁力でスタッド24を引き付ける磁石部48と、電極チップとして機能するキャップ50と、で構成される。
 電極本体46は、金属等の導電部材であり、磁石収納孔52と、1以上の横孔54と、を有する。電極本体46は、第1保持部40の先端部に取り付けられ、第1保持部40の導電部材に接続される。磁石収納孔52は、電極本体46の先端面56に形成される先端開口56aから先端開口56aよりも基端側に形成される底部58まで、電極本体46の軸線に沿って形成される。横孔54は、電極本体46の側壁60に形成される側壁開口60aから底部58まで、電極本体46の径に沿って形成される。
 磁石部48は、円筒形の磁石62と、磁石62の全面を覆う非磁性体64と、を有する。非磁性体64は、中心を貫通する第1スタッド保持孔66を有する。磁石部48は、電極本体46の磁石収納孔52に嵌合され、横孔54を塞がない位置で保持される。なお、磁石部48に冷却媒体を流す流路が設けられてもよい。
 キャップ50は、金属等の導電部材である。キャップ50は、先端に形成されるキャップ開口68と、キャップ開口68に接続されてキャップ50の中心を貫通する第2スタッド保持孔70と、を有する。キャップ50は、電極本体46の先端部の側壁60にねじ込まれ、電極本体46の先端及び磁石収納孔52に嵌合された磁石部48の非磁性体64の先端に当接する。
 第1スタッド保持孔66と第2スタッド保持孔70は、互いの軸線を一致させて並んでスタッド保持孔72を構成する。スタッド保持孔72は、底部58の位置で横孔54に繋がる。従って、キャップ開口68(第1開口)と側壁開口60a(第2開口)は、スタッド保持孔72と横孔54を介して連通する。スタッド保持孔72の径は、スタッド24の軸部26の径よりも大きい。また、キャップ開口68の径は、スタッド24のフランジ28の径よりも小さい。スタッド24は、軸部26がスタッド保持孔72に挿入され、フランジ28がキャップ50の先端に当接した状態で、磁石62の磁力で引っ張られる。
 第2電極38の先端と対向する位置には、第2電極38のキャップ開口68(第1開口)からスタッド保持孔72の内部にエアを噴射するエア噴射部が設けられる。上述したように、第2電極38は、電極切替装置36の動作に応じてその先端をスタッド供給装置22に向ける。[4]で説明するように、スタッド供給装置22は、スタッド24をエアの圧力を利用してスタッド保持孔72に挿入するエア搬送式のスタッド供給部である。本実施形態では、スタッド供給装置22がエア噴射部として使用される。
[3.2.第2電極38の清掃方法]
 図5に示されるように、第2電極38の第2保持部42がスタッド供給装置22に向けられると、キャップ開口68とスタッド供給装置22のマガジン80の射出口102は、互いに対向する。スタッド保持孔72にスタッド24が挿入されていない状態で、スタッド供給装置22は、射出口102からキャップ開口68に向けて清掃用エア74を噴射する。清掃用エア74は、キャップ開口68からスタッド保持孔72に流入し、スタッド保持孔72と横孔54を通過し、側壁開口60aから外部に流出する。このとき、清掃用エア74は、スタッド保持孔72と横孔54に溜まる塵76を側壁開口60aから外部に吹き飛ばす。その結果、スタッド保持孔72と横孔54は、塵76を取り除かれて清浄になる。
[4.スタッド供給装置22]
[4.1.スタッド供給装置22の構成]
 図6~図9を用いてスタッド供給装置22の構成を説明する。本実施形態において、プロジェクション溶接装置12は、2つのスタッド供給装置22を有する。一方のスタッド供給装置22は、第2アーム32(図7)よりも+Z方向側に配置され、第2電極38aにスタッド24を供給する。他方のスタッド供給装置22は、第2アーム32(図7)よりも-Z方向側に配置され、第2電極38bにスタッド24を供給する。
 スタッド供給装置22は、マガジン80と、複数の切替機構82(第1切替機構82a~第3切替機構82c)と、第1シリンダ84と、第2シリンダ86と、第3シリンダ88と、第1エア噴射部90と、第2エア噴射部92と、を有する。また、第2アーム32の内側の面(第1アーム30側の面)には基台94が固定される。基台94には、支持部材96が固定される。支持部材96は、第2アーム32を跨いで+Z方向側と-Z方向側に張り出し、2つのスタッド供給装置22を支持する。
 先ず、支持部材96によって支持されるマガジン80について説明する。図8に示されるように、マガジン80は、所定数のスタッド24を収納する筒である。マガジン80は、その軸線がX方向(スタッド24の供給方向)と平行して配置されており、支持部材96によって+X方向及び-X方向に移動可能に支持される。マガジン80は、+X方向側の一端から-X方向側の他端に貫通するマガジン孔98と、マガジン孔98の一端に位置する案内口100と、マガジン孔98の他端に位置する射出口102と、を有する。マガジン孔98のうち、射出口102に近い部分には、射出直前のスタッド24を停止させる停止部104が設けられる。
 マガジン孔98のうち、停止部104よりも案内口100側(+X方向側)には、スタッド24を停止部104に移動させる前に停止させる第1待機部106及び第2待機部108が設けられる。
 マガジン孔98の径は、スタッド24のフランジ28の径よりも長く、スタッド24の全長よりも短い。また、マガジン孔98の軸線方向の長さは、所定数分のスタッド24の全長を合算した長さよりも長い。従って、マガジン80は、所定数のスタッド24を、マガジン孔98の内部に、停止部104から+X方向側に向けて直列(1列)に整列させて収納することが可能である。また、マガジン80は、スタッド24を案内口100から入れて射出口102から出すことが可能である。マガジン80の先端には、停止部104に停止するスタッド24の先端を検出するマガジンセンサ110が設けられる。マガジンセンサ110は、例えば光電センサである。
 図9に示されるように、マガジン80は、停止部104の位置にマガジン外壁112からマガジン内壁114にかけて貫通する複数のマガジン貫通孔116を有する。複数のマガジン貫通孔116は、停止部104に複数設けられる。複数のマガジン貫通孔116は、停止部104の断面(マガジン80の軸線と直交する断面)の周方向に並べられる。また、マガジン80は、第1待機部106の位置及び第2待機部108の位置に停止部104と同じ形態のマガジン貫通孔116を有する。第1待機部106と第2待機部108の間隔は、スタッド24の長さよりも短い。
 停止部104には第1切替機構82aが設けられる。第1切替機構82aは、複数のボール122(図8、図9)と、往復部材124(図6~図9)と、を有する。第1切替機構82aは、停止部104でスタッド24を停止させる状態と通過させる状態とを切り替える。
 ボール122は、各マガジン貫通孔116の内部に収納され、マガジン貫通孔116の内部でマガジン80の径方向の外側と内側に移動可能である。ボール122は、マガジン貫通孔116の外壁開口120よりも小さく内壁開口118よりも大きい。ボール122の外側端部が外壁開口120の近傍位置にあるとき、ボール122の一部は、内壁開口118からマガジン孔98の内部に突出する。
 往復部材124は、円筒形の部材である。往復部材124は、マガジン外壁112の周囲に設けられ、マガジン外壁112に沿って+X方向及び-X方向に摺動可能である。往復部材124は、マガジン外壁112と対向する内周面126に、周回する凹部128を有する。凹部128は、+X方向側に径が大きい大径部130を有し、-X方向側に径が小さい小径部132を有する。
 第2切替機構82bは、第1待機部106でスタッド24を停止させる状態と通過させる状態とを切り替える。第3切替機構82cは、第2待機部108でスタッド24を停止させる状態と通過させる状態とを切り替える。第2切替機構82bと第3切替機構82cの構造及び動作は、第1切替機構82aの構造及び動作と同じである。
 切替機構82は次のように動作する。ボール122は、往復部材124が-X方向に移動し、往復部材124の大径部130がマガジン貫通孔116の外壁開口120と正対する場合に、大径部130とマガジン貫通孔116との間で移動することが可能となる。このとき、複数のボール122は、マガジン孔98(図8)のサイズをスタッド24のフランジ28の径よりも大きくすることが可能となる。すると、スタッド24は、複数のボール122を外側に押して停止部104の径を広げるため、停止部104を通過することが可能となる。
 ボール122は、往復部材124が+X方向に移動し、往復部材124の小径部132がマガジン貫通孔116の外壁開口120と正対する場合に、小径部132の周面に当接する。その結果、ボール122は、マガジン貫通孔116の内壁開口118からマガジン孔98の内部に一部を突出させた状態で、往復部材124により移動を規制される。すると、スタッド24は、複数のボール122を外側に押すことができなくなるため、停止部104を通過することが不可となる。
 図6、図7に戻り、スタッド供給装置22の構成の説明を続ける。第1シリンダ84は、第1ロッド134を+X方向及び-X方向に動作させる流体圧シリンダである。第1シリンダ84は、第1切替機構82a~第3切替機構82cよりも+X方向側に配置され、マガジン80に連結される。第1ロッド134は、第1シリンダ84から-X方向に延びており、第1切替機構82aの往復部材124と第3切替機構82cの往復部材124に接続される。第1シリンダ84は、第1切替機構82a及び第3切替機構82cを同時に動作させる。
 第2シリンダ86は、第2ロッド136を+X方向及び-X方向に動作させる流体圧シリンダである。第2シリンダ86は、第1切替機構82a~第3切替機構82cよりも+X方向側に配置され、マガジン80に固定される。第2ロッド136は、第2シリンダ86から-X方向に延びており、第2切替機構82bの往復部材124に接続される。第2シリンダ86は、第2切替機構82bを第1切替機構82a及び第3切替機構82cとは別に動作させる。
 第3シリンダ88は、第3ロッド138を+X方向及び-X方向に動作させる流体圧シリンダである。第3シリンダ88は、支持部材96の-X方向側の面に固定される。第3ロッド138は、支持部材96を貫通して+X方向に延びており、マガジン80の基端部に固定される連結プレート140の-X方向側の面に接続される。一方、連結プレート140の+X方向側の面には第1ガイドシャフト142が接続される。
 第1ガイドシャフト142は、連結プレート140から+X方向に延びて、後述する第2エア噴射部92の台座158に接続される。第1ガイドシャフト142は、支持部材96の+X方向側の端部に固定されるガイド部材144によって+X方向及び-X方向に移動自在に支持される。第3シリンダ88は、連結プレート140に連結される部材、具体的には、マガジン80とそこに連結される各構成(各切替機構82、第1シリンダ84、第2シリンダ86、第1エア噴射部90等)と、台座158に連結される各構成(第2エア噴射部92)を、支持部材96を基準にして、+X方向及び-X方向に動作させる。
 図8に示されるように、第1エア噴射部90は、マガジン80の停止部104と第1待機部106との間に設けられる。第1エア噴射部90は、マガジン外壁112を周回するエア供給路146を有する。第1エア噴射部90は、エアポンプを有するエア供給回路(不図示)に接続される。一方、マガジン80には、マガジン外壁112からマガジン内壁114にかけてエア供給孔148が形成される。エア供給孔148は、複数設けられる。エア供給孔148は、エア供給路146に連通する。エア供給孔148は、下流側の流路が上流側の流路よりも-X方向側に位置する構造である。このため、第1エア噴射部90は、エア供給路146からエア供給孔148に流入するエアを、マガジン孔98の内部で-X方向に向けて噴射する。
 第2エア噴射部92は、マガジン80の基端よりも+X方向側に設けられる。第2エア噴射部92は、エアポンプを有するエア供給回路(不図示)に接続される。第2エア噴射部92は、ノズル150をマガジン80の案内口100に近接させる。このため、第2エア噴射部92は、エアを、ノズル150からマガジン孔98の内部に向けて噴射する。第2エア噴射部92は、+Z方向に延びる噴射部ブラケット152を有する。
 第2ガイドシャフト154は、Y方向と平行し、コイルばね156及び台座158に形成される孔に挿通される。第2ガイドシャフト154の+Y方向側の端部は噴射部ブラケット152に固定され、第2ガイドシャフト154の-Y方向側の端部は台座158よりも-Y方向側で停止部材160に固定される。停止部材160は、第2ガイドシャフト154が挿通される台座158の孔よりも大きいため、第2ガイドシャフト154が孔から抜けることはない。コイルばね156は、噴射部ブラケット152の-Y方向側の端面と台座158の+Y方向側の端面に当接する。
 このような構造により、第2エア噴射部92は、ノズル150をマガジン80の基端に近接させた状態で停止し、マガジン80のマガジン孔98にエアを供給する。また、第2エア噴射部92は、-Y方向に押されることでコイルばね156を圧縮させて-Y方向側に移動することが可能である。この状態で、マガジン80の案内口100は、第2エア噴射部92で遮られないため、マガジン80のマガジン孔98に対するスタッド24の充填作業が可能になる。
 マガジン孔98に対するスタッド24の充填作業は、スタッド充填装置14(図1等)によって行われる。スタッド供給装置22とスタッド充填装置14の位置ずれを防止するために、スタッド供給装置22には、第1雄部162と第1雌部164が設けられる。第1雄部162は、基台94に固定されており、一方のスタッド供給装置22のマガジン80と他方のスタッド供給装置22のマガジン80との間から+Y方向側に突出する。第1雌部164は、支持部材96の+Y方向側の面に固定される。スタッド24の充填作業については[5.2]で説明する。
[4.2.スタッド供給手順]
 図10A~図10Eを用いてスタッド供給装置22から第2電極38に対してスタッド24を供給する手順、及び、マガジン孔98の内部でスタッド24を先端側に送る手順を説明する。以下の説明では、各切替機構82(82a~82c)は、往復部材124を動作させて、ボール122の移動を規制する状態とボール122の移動の規制を解除する状態とを切り替える。以下では、切替機構82がボール122の移動を規制する状態をロック状態と称し、切替機構82がボール122の移動の規制を解除する状態をロック解除状態と称する。なお、ここではマガジン孔98に3つのスタッド24が収納される状態を説明する。そして、3つのスタッド24を先頭から順に、第1スタッド24a、第2スタッド24b、第3スタッド24cとも称する。
 図10Aは、マガジン孔98に対してスタッド24が充填される第1工程を示す。第2シリンダ86(図6等)は、第2切替機構82bの往復部材124を+X方向側に配置して、第2切替機構82bをロック状態にする。第1シリンダ84は、第3切替機構82cの往復部材124を-X方向側に配置して、第3切替機構82cをロック解除状態にする。この状態でマガジン孔98の基端から所定数(複数)のスタッド24が充填されると、第3切替機構82cのボール122は、第1スタッド24aに押されて外側に移動する。このため、第1スタッド24aは、第2待機部108を通過する。また、第2切替機構82bのボール122は、第1スタッド24aのフランジ28に当接する。このため、第1スタッド24aは、第1待機部106で停止する。このとき、第2スタッド24bは、第1スタッド24aに当接し、第2待機部108よりも+X方向側で停止する。その結果、図10Aに示される状態になる。
 図10Bは、第1工程の次に行われる第2工程を示す。第1シリンダ84(図6等)は、第1切替機構82a及び第3切替機構82cの往復部材124を+X方向側に配置して、第1切替機構82a及び第3切替機構82cをロック状態にする。その結果、図10Bに示される状態になる。このとき、各スタッド24の停止位置は変わらない。この状態で、第2エア噴射部92(図6等)からマガジン孔98の内部にエアが噴射される。各スタッド24は、エアによって姿勢を矯正され、先端をエアの流れ方向、すなわち-X方向に向ける。
 図10Cは、第2工程の次に行われる第3工程を示す。第2シリンダ86は、第2切替機構82bの往復部材124を-X方向側に配置して、第2切替機構82bをロック解除状態にする。第2切替機構82bのボール122は、エアによって推進力を与えられた第1スタッド24aに押されて外側に移動する。このため、第1スタッド24aは、第1待機部106を通過し、停止部104まで進む。第1切替機構82aのボール122は、第1スタッド24aのフランジ28に当接する。このため、第1スタッド24aは、停止部104で停止する。更に、エアによって推進力を与えられた第2スタッド24bは、第2待機部108まで進む。第3切替機構82cのボール122は、第2スタッド24bのフランジ28に当接する。このため、第2スタッド24bは、第2待機部108で停止する。この状態で、第1エア噴射部90からマガジン孔98の内部にエアが噴射される。第1スタッド24aは、エアによって姿勢を矯正され、先端をエアの流れ方向、すなわち-X方向に向ける。その結果、図10Cに示される状態になる。
 図10Dは、第3工程の次に行われる第4工程を示す。第2シリンダ86は、第2切替機構82bの往復部材124を+X方向側に配置して、第2切替機構82bをロック状態にする。その結果、図10Dに示される状態になる。このとき、各スタッド24の停止位置は変わらない。
 図10Eは、第4工程の次に行われる第5工程を示す。第1シリンダ84は、第1切替機構82a及び第3切替機構82cの往復部材124を-X方向側に配置して、第1切替機構82a及び第3切替機構82cをロック解除状態にする。第1切替機構82aのボール122は、エアによって推進力を与えられた第1スタッド24aに押されて外側に移動する。このため、第1スタッド24aは、停止部104を通過し、射出口102から射出される。また、第2切替機構82bのボール122は、第2スタッド24bのフランジ28に当接する。このため、第2スタッド24bは、第1待機部106で停止する。このとき、第3スタッド24cは、第2スタッド24bに当接し、第2待機部108よりも+X方向側で停止する。その結果、図10Eに示される状態になる。この状態は図10Aに示される第1工程の状態と同じである。従って、その後は、第2工程~第5工程の処理が繰り返し行われる。
[5.スタッド充填装置14]
[5.1.スタッド充填装置14の構成]
 図1、図11~図16を用いてスタッド充填装置14の構成を説明する。図1に示されるように、スタッド充填装置14は、支持台170によって支持されており、鉛直方向に延びる軸を中心にして回転し、スタッド送り装置16からスタッド24を受け取る位置(図15)と、スタッド供給装置22にスタッド24を充填する位置(図16)との間で移動することが可能である。
 図11、図12に示されるように、スタッド充填装置14は、支持台170によって支持される鉛直プレート172に取り付けられる複数の部品及びそれらの部品に取り付けられる複数の部品で構成される。鉛直プレート172には、下から順に、第2雌部174、第2雄部176、2つの第1ブラケット178、2つの水平プレート180、2つの第2ブラケット182が取り付けられる。
 第2雌部174、第2雄部176は、鉛直プレート172から前方向に突出する。2つの第1ブラケット178は、鉛直プレート172から前方向に延び、個別にセンサ支持部材184を支持する。センサ支持部材184は、下側チューブセンサ186を支持する。下側チューブセンサ186は、チューブ190の下端よりも下に配置される。2つの水平プレート180は、鉛直プレート172から前方向に延び、個別にチューブ190とローラ支持部192を支持する。水平プレート180には、下方向に延びるピン189がその軸線を中心に回転自在に取り付けられる。ピン189の下端には、第4シリンダ188が固定される。ピン189は、第4シリンダ188を回転自在に支持する。ローラ支持部192は、ローラ194を回転自在に支持する。ローラ194は、チューブ190よりも前方向に突出する。2つの第2ブラケット182は、鉛直プレート172から前方向に延び、個別に上側チューブセンサ196を支持する。
 チューブ190は、鉛直方向に延びており、水平プレート180で支持される。チューブ190の上端は水平プレート180の上に配置され、チューブ190の下端は水平プレート180の下に配置される。水平プレート180の下に配置されるチューブ190の下端部には、切替機構198が設けられる。一方のチューブ190は、2つのスタッド供給装置22のうちの一方にスタッド24を充填し、他方のチューブ190は、2つのスタッド供給装置22のうちの他方にスタッド24を充填する。
 切替機構198の外周面には、水平方向に広がるフランジ199が形成される。フランジ199の一部には、ジョイント201の軸部材が挿通される。ジョイント201の軸部材は、鉛直方向に延びる。ジョイント201の後端は、第4シリンダ188から前方向に延びる第4ロッド200の先端に接続される。この構造により、第4シリンダ188が第4ロッド200を前方向又は後方向に移動させると、切替機構198の回転部材226(図14A、図14B)が停止部216(図13A、図13B)の軸心を中心にして一方向又は逆方向に回転する。この際、第4シリンダ188は、ピン189を中心にして回転する。
 図13A、図13Bに示されるように、チューブ190は、所定数のスタッド24を収納する筒である。チューブ190は、上側の一端から下側の他端に貫通するチューブ孔210と、チューブ孔210の一端に位置する案内口212と、チューブ孔210の他端に位置する排出口214と、を有する。チューブ孔210のうち、排出口214に近い部分には、先頭のスタッド24を停止させる停止部216が設けられる。
 チューブ孔210の径は、スタッド24のフランジ28の径よりも長く、スタッド24の全長よりも短い。また、チューブ孔210の軸線方向の長さは、所定数分のスタッド24の全長を合算した長さよりも長い。従って、チューブ190は、所定数のスタッド24をチューブ孔210の内部に停止部216から下に向けて直列(1列)に整列させて収納することが可能である。また、チューブ190は、スタッド24を案内口212から入れて排出口214から出すことが可能である。
 チューブ190の下端の下には、停止部216に停止するスタッド24の先端を検出する下側チューブセンサ186が設けられる。また、チューブ190の上端部には、チューブ孔210に収納された所定数のスタッド24のうちの最後尾に位置するスタッド24を検出する上側チューブセンサ196が設けられる。下側チューブセンサ186及び上側チューブセンサ196は、例えば光電センサである。
 チューブ190は、停止部216の位置にチューブ外壁218からチューブ内壁220にかけて貫通する複数のチューブ貫通孔222を有する。複数のチューブ貫通孔222は、停止部216の断面(チューブ190の軸線と直交する断面)の周方向に並べられる。
 図14A、図14Bに示されるように、切替機構198は、複数のボール224と、回転部材226と、を有する。切替機構198は、停止部216でスタッド24を停止させる状態と通過させる状態とを切り替える。
 ボール224は、各チューブ貫通孔222の内部に収納され、チューブ貫通孔222の内部でチューブ190の径方向の外側と内側に移動可能である。ボール224は、チューブ貫通孔222の外壁開口228よりも小さく内壁開口230よりも大きい。ボール224の外側端部が外壁開口228の近傍位置にあるとき、ボール224の一部は、内壁開口230からチューブ孔210の内部に突出する。
 回転部材226は、円筒形の部材である。回転部材226は、チューブ外壁218の周囲に設けられ、チューブ外壁218に沿ってチューブ190の周方向に摺動可能である。回転部材226は、チューブ外壁218と対向する内周面232に、凹部234を有する。凹部234は、停止部216の断面(チューブ190の軸線と直交する断面)の周方向に並べられる。
 切替機構198は次のように動作する。ボール224は、回転部材226が回転し、回転部材226の凹部234がチューブ貫通孔222の外壁開口228と正対する場合に、凹部234とチューブ貫通孔222との間で移動することが可能となる。このとき、複数のボール224は、停止部216のサイズをスタッド24のフランジ28の径よりも大きくすることが可能となる。すると、スタッド24は、複数のボール224を自重で外側に押して停止部216を広げるため、停止部216を通過することが可能となる。
 ボール224は、回転部材226が回転し、回転部材226の凹部234がチューブ貫通孔222の外壁開口228と正対しない場合に、内周面232に当接する。その結果、ボール224は、チューブ貫通孔222の内壁開口230からチューブ孔210の内部に一部を突出させた状態で、回転部材226により移動を規制される。すると、スタッド24は、複数のボール224を外側に押すことができなくなるため、停止部216を通過することが不可となる。
[5.2.スタッド充填手順]
 図15~図19を用いてスタッド送り装置16からスタッド充填装置14に対してスタッド24を送り、次いでスタッド充填装置14からスタッド供給装置22にスタッド24を供給する手順を説明する。以下の説明では、切替機構198は、回転部材226を動作させて、ボール224の移動を規制する状態とボール224の移動の規制を解除する状態とを切り替える。以下では、切替機構198がボール224の移動を規制する状態をロック状態と称し、切替機構198がボール122の移動の規制を解除する状態をロック解除状態と称する。なお、以下の説明では、制御装置(不図示)が各装置の動作を統括して制御する。
 先ず、第1位置合わせ工程が行われる。支持台170は、図15に示されるように、スタッド送り装置16のスタッド送り部171の下にスタッド充填装置14を配置する。支持台170に設けられるアーム240は、2位置の間で回転することができる。アーム240が一方に旋回すると、スタッド充填装置14は、スタッド送り装置16のスタッド送り部171の下に配置され、スタッド送り装置16からスタッド24を受け取ることができる。
 次に、部品収納工程が行われる。第4シリンダ188は、図14Aに示されるように、切替機構198の回転部材226を回転させて、切替機構198をロック状態にする。すると、ボール224は、停止部216の内部に向かって移動して停止部216のサイズをスタッド24のフランジ28よりも小さくする。この状態で、スタッド送り装置16は、所定数のスタッド24をチューブ孔210に向けて落下させる。スタッド24は、先端を下に向けてチューブ孔210に挿入される。図13Aで示されるように、チューブ孔210に所定数のスタッド24が収納されると、上側チューブセンサ196は充填完了状態を検知する。すると、スタッド送り装置16は、スタッド24の供給を停止する。
 次に、第2位置合わせ工程が行われる。支持台170は、図16に示されるように、スタッド送り装置16の下からスタッド充填装置14を移動させる。アーム240が他方に旋回すると、スタッド充填装置14は、スタッド送り装置16の下から移動する。
 ロボット18は、図17に示されるように、スタッドガン20の先端側(-X方向側)を下に向けて、スタッド供給装置22をスタッド充填装置14に近づける。このとき、ロボット18は、スタッド供給装置22のX方向及びZ方向の位置を調整し、スタッド供給装置22をスタッド充填装置14の前に移動させる。すると、ロボット18は、噴射部ブラケット152をローラ194の正面に配置し、第1雌部164を第2雄部176の正面に配置し、第1雄部162を第2雌部174の正面に配置する。
 この状態で、ロボット18は、スタッドガン20を徐々に後方向(+Y方向)に移動させて、スタッド供給装置22をスタッド充填装置14に接近させる。すると、噴射部ブラケット152とローラ194が当接する。更に、ロボット18は、スタッドガン20を後方向(+Y方向)に移動させる。すると、図18に示されるように、第2エア噴射部92は、噴射部ブラケット152及び第2ガイドシャフト154と共に前方向(-Y方向)に移動する。このとき、コイルばね156は圧縮される。第1雌部164と第2雄部176が当接し、第1雄部162と第2雌部174が当接すると、ロボット18は、スタッドガン20の移動を停止させる。このとき、チューブ190の軸線とマガジン80の軸線は一致する。
 この状態で、第3シリンダ88は、図19に示されるように、マガジン80を上方向(+X方向)に移動させる。噴射部ブラケット152は、ローラ194が回転することにより上方向(+X方向)に滑らかに移動する。一方、基台94に固定される第1雄部162と、支持部材96に固定される第1雌部164は、移動しない。
 マガジン80が上方向(+X方向)に移動すると、図13Aに示されるように、マガジン80の案内口100は、チューブ190の排出口214に接近する。このとき、マガジン80の案内口100の周辺に形成される光通過孔242の位置と下側チューブセンサ186の位置が合わせられ、下側チューブセンサ186がマガジン80に所定数のスタッド24が収納されたことを検知できるようになる。
 次に、部品充填工程が行われる。第4シリンダ188は、図13B及び図14Bに示されるように、切替機構198の回転部材226を回転させて、切替機構198をロック解除状態にする。ボール224は、スタッド24の自重により、停止部216の外部に向かう方向に押される。このため、ボール224は、停止部216の外部に向かって移動して停止部216のサイズをスタッド24のフランジ28よりも大きくする。すると、スタッド24は、先端を下に向けて落下し、マガジン孔98に挿入される。チューブ孔210に収納されていた所定数のスタッド24は、マガジン孔98に供給されると、マガジン80の充填は終了する。
[6.変形例]
 上述したスタッド供給装置22及びスタッド充填装置14の構成は、他の部品供給装置、部品充填装置に使用可能である。例えば、スタッド供給装置22の構成は、ロボット18のアーム先端にボルトを供給するボルト供給装置に使用することができる。また、スタッド充填装置14の構成は、ボルト供給装置にボルトを充填するボルト充填装置等に使用することができる。
[7.実施形態から得られる技術的思想]
 上記実施形態から把握しうる技術的思想について、以下に記載する。
 本発明の第1態様は、
 溶接電極(第2電極38)でスタッド24を保持し、前記スタッド24をワークWに接触させ、前記溶接電極に溶接電流を流して、前記ワークWに前記スタッド24を溶接するプロジェクション溶接装置12であって、
 前記溶接電極は、先端に形成される第1開口(キャップ開口68)から基端側に形成される底部58まで延びるスタッド保持孔72と、側壁60に形成される第2開口(側壁開口60a)から前記底部58まで延びる1以上の横孔54と、を有し、
 前記溶接電極の前記第1開口から前記スタッド保持孔72にエアを噴射するエア噴射部(スタッド供給装置22)を備える。
 上記構成によれば、エア噴射部(スタッド供給装置22)が、溶接電極(第2電極38)の第1開口(キャップ開口68)からスタッド保持孔72の内部にエアを噴射するため、仮にスタッド保持孔72に塵76が溜まっていたとしても、その塵76をエアと共に横孔54から排出することができる。従って、上記構成によれば、溶接電極(第2電極38)のスタッド保持孔72を清浄に保つことができる。
 第1態様において、
 前記エア噴射部は、前記スタッド24をエアの圧力を利用して前記スタッド保持孔72に挿入するエア搬送式のスタッド供給部(スタッド供給装置22)であってもよい。
 上記構成によれば、スタッド供給部(スタッド供給装置22)がエア噴射部としても使用されるため、装置構成を簡素にすることができる。
 本発明の第2態様は、
 溶接電極(第2電極38)でスタッド24を保持し、前記スタッド24をワークWに接触させ、前記溶接電極に溶接電流を流して、前記ワークWに前記スタッド24を溶接するプロジェクション溶接装置12の電極清掃方法であって、
 前記溶接電極は、先端に形成される第1開口(キャップ開口68)から基端側に形成される底部58まで延びるスタッド保持孔72と、側壁60に形成される第2開口(側壁開口60a)から前記底部58まで延びる1以上の横孔54と、を有し、
 前記スタッド保持孔72に前記スタッド24が挿入されていないときに、エア噴射部(スタッド供給装置22)を用いて前記溶接電極の前記第1開口から前記スタッド保持孔72にエアを噴射する。
 なお、本発明に係るプロジェクション溶接装置及びその電極清掃方法は、上述の実施形態に限らず、本発明の要旨を逸脱することなく、種々の構成を採り得ることはもちろんである。

Claims (3)

  1.  溶接電極(38)でスタッド(24)を保持し、前記スタッドをワークに接触させ、前記溶接電極に溶接電流を流して、前記ワークに前記スタッドを溶接するプロジェクション溶接装置(12)であって、
     前記溶接電極は、先端に形成される第1開口(68)から基端側に形成される底部(58)まで延びるスタッド保持孔(72)と、側壁(60)に形成される第2開口(60a)から前記底部まで延びる1以上の横孔(54)と、を有し、
     前記溶接電極の前記第1開口から前記スタッド保持孔にエアを噴射するエア噴射部(22)を備える、プロジェクション溶接装置。
  2.  請求項1に記載のプロジェクション溶接装置であって、
     前記エア噴射部は、前記スタッドをエアの圧力を利用して前記スタッド保持孔に挿入するエア搬送式のスタッド供給部(22)である、プロジェクション溶接装置。
  3.  溶接電極(38)でスタッド(24)を保持し、前記スタッドをワークに接触させ、前記溶接電極に溶接電流を流して、前記ワークに前記スタッドを溶接するプロジェクション溶接装置(12)の電極清掃方法であって、
     前記溶接電極は、先端に形成される第1開口(68)から基端側に形成される底部(58)まで延びるスタッド保持孔(72)と、側壁(60)に形成される第2開口(60a)から前記底部まで延びる1以上の横孔(54)と、を有し、
     前記スタッド保持孔に前記スタッドが挿入されていないときに、エア噴射部(22)を用いて前記溶接電極の前記第1開口から前記スタッド保持孔にエアを噴射する、プロジェクション溶接装置の電極清掃方法。
PCT/JP2020/035715 2019-11-13 2020-09-23 プロジェクション溶接装置及びその電極清掃方法 WO2021095363A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US17/776,243 US20220388089A1 (en) 2019-11-13 2020-09-23 Projection welding device, and electrode cleaning method for same
JP2021555927A JPWO2021095363A1 (ja) 2019-11-13 2020-09-23
CN202080079288.XA CN114728365A (zh) 2019-11-13 2020-09-23 凸焊装置及其电极清洁方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2019-205121 2019-11-13
JP2019205121 2019-11-13

Publications (1)

Publication Number Publication Date
WO2021095363A1 true WO2021095363A1 (ja) 2021-05-20

Family

ID=75912179

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/035715 WO2021095363A1 (ja) 2019-11-13 2020-09-23 プロジェクション溶接装置及びその電極清掃方法

Country Status (4)

Country Link
US (1) US20220388089A1 (ja)
JP (1) JPWO2021095363A1 (ja)
CN (1) CN114728365A (ja)
WO (1) WO2021095363A1 (ja)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05200561A (ja) * 1992-01-27 1993-08-10 Sango:Kk ウエルドボルト確認装置
JP2002035949A (ja) * 2000-07-15 2002-02-05 Yoshitaka Aoyama プロジェクションボルトの溶接装置
JP2017047469A (ja) * 2015-09-01 2017-03-09 青山 省司 電気抵抗溶接用電極
WO2019188815A1 (ja) * 2018-03-29 2019-10-03 本田技研工業株式会社 溶接ガン及び溶接方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1400301A4 (en) * 2001-06-28 2007-01-24 Yoshitaka Aoyama METHOD AND DEVICE FOR WELDING A PRESENTING BOLT
WO2008108165A1 (ja) * 2007-03-02 2008-09-12 Yoshitaka Aoyama プロジェクションボルト溶接方法および溶接装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05200561A (ja) * 1992-01-27 1993-08-10 Sango:Kk ウエルドボルト確認装置
JP2002035949A (ja) * 2000-07-15 2002-02-05 Yoshitaka Aoyama プロジェクションボルトの溶接装置
JP2017047469A (ja) * 2015-09-01 2017-03-09 青山 省司 電気抵抗溶接用電極
WO2019188815A1 (ja) * 2018-03-29 2019-10-03 本田技研工業株式会社 溶接ガン及び溶接方法

Also Published As

Publication number Publication date
US20220388089A1 (en) 2022-12-08
JPWO2021095363A1 (ja) 2021-05-20
CN114728365A (zh) 2022-07-08

Similar Documents

Publication Publication Date Title
US11883908B2 (en) System and method with floating welder for high rate production welding
KR101622500B1 (ko) 롤러 정렬 장치 및 롤러 정렬 방법
WO2007049374A1 (ja) 軸状部品の供給装置
JP6352007B2 (ja) 超高速ボルト送出システム
JP2008285301A (ja) 物品搬送方法及び物品搬送装置
WO2021095363A1 (ja) プロジェクション溶接装置及びその電極清掃方法
WO2021095365A1 (ja) 部品充填装置及び部品充填方法
WO2021095364A1 (ja) スタッド供給装置及びスタッド供給方法
JP2007167947A (ja) 軸状部品の供給装置
WO2003002288A1 (fr) Procede et dispositif de soudage d'un boulon a bossage
KR100734604B1 (ko) 너트 공급장치
JP2008213032A (ja) プロジェクションボルトの通過制御装置
JP3689847B2 (ja) フランジ付き軸状部品の供給方法およびその装置
JP2008246575A (ja) プロジェクションボルト溶接方法および溶接装置
JP4207168B2 (ja) プロジェクションボルト溶接装置および溶接方法
JP6444850B2 (ja) スタッド溶接機におけるスタッドの保留、排出装置
JP2004082193A (ja) 溶接ボルト供給方法と装置
TWI609740B (zh) 連續式供料設備
JP4188646B2 (ja) 溶接ナット供給装置
JP5686257B2 (ja) 部品供給装置の保持ヘッド構造
JPH09220676A (ja) 部品供給ロッド装置とそれによる供給方法
KR100743926B1 (ko) 프로젝션볼트의 용접방법 및 장치
JP4529165B2 (ja) 部品送出制御装置
KR102619185B1 (ko) 필터 오링 삽입기
JPH1058154A (ja) プロジェクションナットの溶接装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20887004

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2021555927

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20887004

Country of ref document: EP

Kind code of ref document: A1