WO2020262201A1 - 油圧ショベル - Google Patents

油圧ショベル Download PDF

Info

Publication number
WO2020262201A1
WO2020262201A1 PCT/JP2020/024023 JP2020024023W WO2020262201A1 WO 2020262201 A1 WO2020262201 A1 WO 2020262201A1 JP 2020024023 W JP2020024023 W JP 2020024023W WO 2020262201 A1 WO2020262201 A1 WO 2020262201A1
Authority
WO
WIPO (PCT)
Prior art keywords
arm
pressure
boom
pilot
speed limit
Prior art date
Application number
PCT/JP2020/024023
Other languages
English (en)
French (fr)
Inventor
輝樹 五十嵐
昭広 楢▲崎▼
勝道 伊東
Original Assignee
日立建機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日立建機株式会社 filed Critical 日立建機株式会社
Priority to KR1020217025262A priority Critical patent/KR102580139B1/ko
Priority to US17/437,484 priority patent/US20220186459A1/en
Priority to CN202080014717.5A priority patent/CN113423895B/zh
Priority to EP20830683.7A priority patent/EP3992371A4/en
Publication of WO2020262201A1 publication Critical patent/WO2020262201A1/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2296Systems with a variable displacement pump
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/30Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with a dipper-arm pivoted on a cantilever beam, i.e. boom
    • E02F3/32Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with a dipper-arm pivoted on a cantilever beam, i.e. boom working downwardly and towards the machine, e.g. with backhoes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/42Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/43Control of dipper or bucket position; Control of sequence of drive operations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/42Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/43Control of dipper or bucket position; Control of sequence of drive operations
    • E02F3/435Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/42Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/425Drive systems for dipper-arms, backhoes or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/42Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/43Control of dipper or bucket position; Control of sequence of drive operations
    • E02F3/435Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like
    • E02F3/436Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like for keeping the dipper in the horizontal position, e.g. self-levelling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/2025Particular purposes of control systems not otherwise provided for
    • E02F9/2033Limiting the movement of frames or implements, e.g. to avoid collision between implements and the cabin
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2203Arrangements for controlling the attitude of actuators, e.g. speed, floating function
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2221Control of flow rate; Load sensing arrangements
    • E02F9/2225Control of flow rate; Load sensing arrangements using pressure-compensating valves
    • E02F9/2228Control of flow rate; Load sensing arrangements using pressure-compensating valves including an electronic controller
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2285Pilot-operated systems
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices
    • E02F9/264Sensors and their calibration for indicating the position of the work tool
    • E02F9/265Sensors and their calibration for indicating the position of the work tool with follow-up actions (e.g. control signals sent to actuate the work tool)
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B11/00Servomotor systems without provision for follow-up action; Circuits therefor
    • F15B11/08Servomotor systems without provision for follow-up action; Circuits therefor with only one servomotor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/2004Control mechanisms, e.g. control levers
    • E02F9/2012Setting the functions of the control levers, e.g. changing assigned functions among operations levers, setting functions dependent on the operator or seat orientation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/30Directional control
    • F15B2211/32Directional control characterised by the type of actuation
    • F15B2211/329Directional control characterised by the type of actuation actuated by fluid pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/30Directional control
    • F15B2211/355Pilot pressure control
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/60Circuit components or control therefor
    • F15B2211/63Electronic controllers
    • F15B2211/6303Electronic controllers using input signals
    • F15B2211/6336Electronic controllers using input signals representing a state of the output member, e.g. position, speed or acceleration
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/60Circuit components or control therefor
    • F15B2211/63Electronic controllers
    • F15B2211/6303Electronic controllers using input signals
    • F15B2211/6346Electronic controllers using input signals representing a state of input means, e.g. joystick position
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/60Circuit components or control therefor
    • F15B2211/635Circuits providing pilot pressure to pilot pressure-controlled fluid circuit elements
    • F15B2211/6355Circuits providing pilot pressure to pilot pressure-controlled fluid circuit elements having valve means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/60Circuit components or control therefor
    • F15B2211/67Methods for controlling pilot pressure

Definitions

  • the present invention relates to a hydraulic excavator having a so-called machine control function.
  • Some hydraulic excavators are equipped with a machine control (hereinafter, appropriately referred to as MC) function that assists the operator in operating the work equipment.
  • MC machine control
  • area limitation control that forcibly controls the boom cylinder so that the tip of the bucket does not enter the area below the excavation target surface by intervening in the excavation operation of the operator.
  • Patent Document 1 discloses a system for decelerating and correcting the target velocity vector of the work device in the direction toward the excavation target surface when the work device approaches the excavation target surface.
  • the rolling work cannot be performed because the velocity component of the working device toward the excavation target surface is reduced as the working device approaches the excavation target surface.
  • Patent Document 2 when it is determined that the rolling compaction condition is satisfied based on the operation of the operator, the speed limit of the boom lowering operation of the work device near the excavation target surface is weakened, and the excavation target is controlled even during the area limitation control.
  • a system capable of rolling a surface is disclosed.
  • the MC function is realized by reducing the pilot pressure input from the operation lever device to the flow control valve that controls the operation of the hydraulic actuator of the work device such as the boom cylinder with the electromagnetic pressure reducing valve depending on the situation.
  • the standby opening degree of the electromagnetic pressure reducing valve is set to the closed side in order to suppress sudden operation of the working device from the viewpoint of preventing excavation beyond the target excavation surface.
  • the electromagnetic pressure reducing valve opens when the rapid operation of the hydraulic actuator is allowed.
  • the speed limit of the boom lowering operation is weakened when it is determined that the work is rolling.
  • the compaction work is not performed only by the boom lowering operation, but is performed in combination with the operation of the arm cloud or the arm dump for adjusting the compaction position. Since the operation of the arm cloud and the arm dump is restricted near the excavation surface, the rolling compaction position adjustment operation is delayed, and the rolling compaction work cannot be smoothly executed.
  • An object of the present invention is to provide a hydraulic excavator capable of performing work such as rolling compaction work involving the operation of an arm cloud and an arm dump even during machine control control with good response near an excavation target surface.
  • the present invention comprises an articulated working device including a boom and an arm, a plurality of hydraulic actuators for driving the working device including a boom cylinder for driving the boom, and the above. It controls a plurality of attitude sensors for detecting the posture of a work device, a hydraulic pump for discharging pressure oil for driving the plurality of hydraulic actuators, and a flow of pressure oil supplied from the hydraulic pump to the plurality of hydraulic actuators.
  • the speed limit of the plurality of hydraulic actuators is calculated based on the electromagnetic valve unit configured including the electromagnetic pressure reducing valve of the above and the signals of the plurality of attitude sensors, and the speed limit is exceeded based on the speed limit.
  • the controller is attached to the electromagnetic valve unit while a boom raising operation signal is output from the operation lever device. It is characterized in that the opening degree of the electromagnetic pressure reducing valve corresponding to the operation of the included arm cloud and arm dump is controlled to be larger than the opening degree based on the speed limit.
  • Configuration diagram of the hydraulic excavator according to the first embodiment of the present invention The hydraulic circuit diagram of the hydraulic system provided in the hydraulic excavator shown in FIG. Detailed view of the solenoid valve unit provided in the hydraulic excavator shown in FIG. Explanatory drawing of calculation method of bucket toe position Hardware configuration diagram of the controller provided in the hydraulic excavator shown in FIG. The figure of an example of the display screen of the display device provided in the hydraulic excavator shown in FIG. Functional block diagram of the controller provided in the hydraulic excavator shown in FIG. Diagram showing an example of the trajectory of the bucket toe controlled by machine control A flowchart showing the procedure for determining the limit pilot pressure for the arm cloud, arm dump, and boom lowering by the controller provided in the hydraulic excavator shown in FIG.
  • FIG. 9 A block diagram showing the calculation logic of the transition pressure according to the first embodiment of the present invention.
  • FIG. 12 A block diagram showing the calculation logic of the transition pressure according to the first embodiment of the present invention.
  • FIG. 7 A block diagram showing the speed limit correction calculation logic for the arm cloud and the arm dump in the speed limit correction unit shown in FIG.
  • FIG. 1 is a block diagram of a hydraulic excavator according to the first embodiment of the present invention.
  • a hydraulic excavator having a bucket 10 attached to the tip of a working device as an attachment (working tool) will be described as an example, but the present invention can also be applied to a hydraulic excavator equipped with an attachment other than the bucket.
  • the hydraulic excavator 1 shown in the figure includes an articulated work device (front work machine) 1A and a vehicle body 1B.
  • the vehicle body 1B includes a traveling body 11 that travels by left and right traveling motors (hydraulic motors) 3a and 3b (FIG. 2), and a swivel body 12 mounted on the traveling body 11.
  • the swivel body 12 is swiveled with respect to the traveling body 11 by a swivel motor (hydraulic motor) 4 (FIG. 2).
  • the turning center axis of the turning body 12 is vertical when the hydraulic excavator 1 is stopped on a horizontal ground.
  • the swivel body 12 is provided with a driver's cab 16.
  • the working device 1A is configured by connecting a plurality of driven members (boom 8, arm 9 and bucket 10) that rotate in a vertical plane.
  • the base end of the boom 8 is rotatably connected to the front portion of the swivel body 12 via a boom pin.
  • An arm 9 is rotatably connected to the tip of the boom 8 via an arm pin, and a bucket 10 is rotatably connected to the tip of the arm 9 via a bucket pin.
  • the boom 8 is driven by the boom cylinder 5, the arm 9 is driven by the arm cylinder 6, and the bucket 10 is driven by the bucket cylinder 7.
  • an angle sensor R1 is attached to the boom pin
  • an angle sensor R2 is attached to the arm pin
  • an angle sensor R3 is attached to the bucket link 13
  • a vehicle body inclination angle sensor (for example, IMU) R4 is attached to the swivel body 12.
  • the angle sensors R1, R2, and R3 measure the rotation angles ⁇ , ⁇ , and ⁇ (FIG. 4) of the boom 8, arm 9, and bucket 10, respectively, and output them to the controller 40 (described later).
  • the vehicle body tilt angle sensor R4 measures the tilt angle ⁇ (FIG. 4) of the swivel body 12 (vehicle body 1B) with respect to a reference plane (for example, a horizontal plane) and outputs it to the controller 40 (described later).
  • the angle sensors R1 to R3 can be replaced by sensors (IMU or the like) that measure the inclination angle with respect to the reference plane.
  • the swivel body 12 is provided with a pair of GNSS antennas G1 and G2. Based on the information from the GNSS antennas G1 and G2, the positions of the reference points of the hydraulic excavator 1 and the working device 1A in the global coordinate system can be calculated.
  • the reference point of the working device 1A is set as the bucket toe
  • the setting of the reference point can be changed as appropriate.
  • a reference point may be set on the back surface (outer surface) of the bucket 10 or the bucket link 13, or a point at the shortest distance from the excavation target surface St in the entire bucket may be set as the reference point (that is, depending on the situation). The reference point may change accordingly).
  • FIG. 2 is a hydraulic circuit diagram of a hydraulic system provided in the hydraulic excavator shown in FIG.
  • Operation lever devices A1 to A6 are installed in the driver's cab 16.
  • the operating lever devices A1 and A3 share the operating levers B1 arranged on one of the left and right sides of the driver's seat (not shown).
  • the boom cylinder 5 boost 8
  • the bucket cylinder 7 bucket cylinder 7
  • the operating lever devices A2 and A4 share the operating levers B2 arranged on the left and right sides of the driver's seat.
  • the operating lever device A5 has an operating lever B3, and when the operating lever device A5 is operated by the operating lever B3, the traveling motor 3a (traveling body 11) on the right side is driven.
  • the operating lever device A6 has an operating lever B4, and when the operating lever device A6 is operated by the operating lever B4, the traveling motor 3b (traveling body 11) on the left side is driven.
  • the operating levers B3 and B4 are arranged side by side in front of the driver's seat on the left and right.
  • the swivel body 12 is equipped with a hydraulic pump 2 and a pilot pump 48 in addition to the engine 18 which is a prime mover, and the hydraulic pump 2 and the pilot pump 48 are driven by the engine 18.
  • the hydraulic pump 2 is a variable capacity type whose capacity is controlled by a regulator 2a, and discharges pressure oil for driving a plurality of hydraulic actuators (boom cylinder 5, arm cylinder 6, bucket cylinder 7, etc.).
  • the pilot pump 48 is a fixed capacity type. In the example of FIG. 2, the regulator 2a is driven by the pilot pressures from the operating lever devices A1 to A6 input via the shuttle block SB, and controls the discharge flow rate of the hydraulic pump 2 according to the input pilot pressure.
  • the shuttle block SB includes a plurality of shuttle valves and is provided in the middle of the pilot lines C1 to C12 for transmitting the pilot pressures of the operating lever devices A1 to A6, and the maximum pilot pressure of the operating lever devices A1 to A6. Select a value and input it to the regulator 2a.
  • the pump line 48a which is the discharge pipe of the pilot pump 48, is branched into a plurality of parts via the lock valve 39 and connected to the operating lever devices A1 to A6 and the solenoid valve unit 160 for machine control.
  • the lock valve 39 of the present embodiment is an electromagnetic switching valve, and its solenoid is electrically connected to a position sensor of a gate lock lever (not shown) arranged in the cab 16 of the swivel body 12. The position of the gate lock lever is detected by the position sensor, and a signal corresponding to the position of the gate lock lever is input from the position sensor to the lock valve 39. If the gate lock lever is in the locked position, the lock valve 39 is closed and the pump line 48a is shut off. If the gate lock lever is in the unlocked position, the lock valve 39 is opened and the pump line 48a is opened. When the pump line 48a is cut off, the operation by the operation lever devices A1 to A6 is invalidated, and operations such as turning and excavation are prohibited.
  • the above-mentioned operating lever devices A1 to A6 are each composed of a pair of hydraulic pilot type pressure reducing valves. These operating lever devices A1 to A6 use the discharge pressure of the pilot pump 48 as the original pressure to generate and output the pilot pressure for driving the control valve unit 15 according to the operating amount and operating direction of the operating levers B1 to B4 by the operator, respectively. ..
  • the control valve unit 15 includes flow control valves D1 to D6, and is a pressure oil supplied from the hydraulic pump 2 to the boom cylinder 5, arm cylinder 6, bucket cylinder 7, traveling motors 3a and 3b, and swivel motor 4. Control the flow of.
  • the flow rate control valve D1 is driven by the pilot pressure input from the operation lever device A1 to the pressure receiving chambers E1 and E2 via the pilot lines C1 and C2, and controls the supply direction and flow rate of the pressure oil from the hydraulic pump 2 to boom. Drive the cylinder 5.
  • the flow control valve D2 is driven by the pilot pressure input from the operating lever device A2 to the pressure receiving chambers E3 and E4 via the pilot lines C3 and C4 to drive the arm cylinder 6.
  • the flow rate control valve D3 is driven by the pilot pressure input from the operating lever device A3 to the pressure receiving chambers E5 and E6 via the pilot lines C5 and C6 to drive the bucket cylinder 7.
  • the flow control valves D4 to D6 are driven by the pilot pressure input from the operating lever devices A4 to A6 to the pressure receiving chambers E7 to E12 via the pilot lines C7 to C12 to drive the corresponding hydraulic actuators.
  • FIG. 3 is a detailed view of the solenoid valve unit 160 shown in FIG.
  • the solenoid valve unit 160 is provided between the plurality of operating lever devices A1 to A3 and the control valve unit 15.
  • the solenoid valve unit 160 includes electromagnetic pressure reducing valves V2 to V6, V1', V5', V6', which are electromagnetic proportional drive type pressure reducing valves, and shuttle valves SV1, SV5, SV6.
  • first command signals electromagnetic pressure reducing valves V2 to V6, V1', V5',.
  • the pilot pressure output from V6' is referred to as a "second command signal".
  • the second command signal includes the pilot pressure generated by depressurizing the first command signal with the electromagnetic pressure reducing valves V2 to V6 and the discharge pressure of the pilot pump 38 bypassing the operation lever devices A1 to A3. It includes the pilot pressure separately generated by depressurizing with', V5', and V6'.
  • Machine control (hereinafter abbreviated as MC) can be defined as control of the flow control valves D1 to D3 based on the second command signal.
  • the primary side port of the electromagnetic pressure reducing valve V1' is connected to the pilot pump 48 via the pump line 48a, and the discharge pressure of the pilot pump 48 is reduced and output as a pilot pressure (second command signal) for raising the boom.
  • the primary side port of the shuttle valve SV1 is connected to the pilot line C1 for raising the boom of the operating lever device A1 and the secondary side port of the electromagnetic pressure reducing valve V1', and the secondary side port is the pressure receiving chamber E1 of the flow control valve D1. It is connected to the.
  • the high pressure side of the first command signal (boom raising operation signal) of the pilot line C1 and the second command signal of the electromagnetic pressure reducing valve V1' is selected by the shuttle valve SV1 and guided to the pressure receiving chamber E1 of the flow control valve D1. Be taken.
  • the electromagnetic pressure reducing valve V2 is installed in the pilot line C2 for lowering the boom of the operating lever device A1. Regarding the boom lowering operation, the pilot pressure of the pilot line C2 decompressed by the electromagnetic pressure reducing valve V2 is guided to the pressure receiving chamber E2 of the flow rate control valve D1 as needed.
  • the electromagnetic pressure reducing valve V3 is installed in the pilot line C3 for the arm cloud of the operating lever device A2. Regarding the arm cloud operation, the pilot pressure of the pilot line C3 decompressed by the electromagnetic pressure reducing valve V3 is guided to the pressure receiving chamber E3 of the flow rate control valve D2 as needed.
  • the electromagnetic pressure reducing valve V4 is installed in the pilot line C4 for the arm dump of the operating lever device A2. Regarding the arm dump operation, the pilot pressure of the pilot line C4 decompressed by the electromagnetic pressure reducing valve V4 is guided to the pressure receiving chamber E4 of the flow rate control valve D2 as needed.
  • the electromagnetic pressure reducing valve V5 is installed in the pilot line C5 for the bucket cloud of the operating lever device A3.
  • the primary side port of the electromagnetic pressure reducing valve V5' is connected to the pilot pump 48 via the pump line 48a, and the discharge pressure of the pilot pump 48 is reduced and output as the pilot pressure (second command signal) for the bucket cloud.
  • the primary side port of the shuttle valve SV5 is connected to the pilot line C5 and the secondary side port of the electromagnetic pressure reducing valve V5', and the secondary side port is connected to the pressure receiving chamber E5 of the flow control valve D3.
  • the high pressure side of the pilot pressure of the pilot line C5 and the pilot pressure of the electromagnetic pressure reducing valve V5' is selected by the shuttle valve SV5 and guided to the pressure receiving chamber E5 of the flow control valve D3.
  • the electromagnetic pressure reducing valve V6 is installed in the pilot line C6 for the bucket dump of the operating lever device A3.
  • the primary side port of the electromagnetic pressure reducing valve V6' is connected to the pilot pump 48 via the pump line 48a, and the discharge pressure of the pilot pump 48 is reduced and output as a pilot pressure (second command signal) for bucket dumping.
  • the primary side port of the shuttle valve SV6 is connected to the pilot line C6 and the secondary side port of the electromagnetic pressure reducing valve V6', and the secondary side port is connected to the pressure receiving chamber E6 of the flow control valve D3.
  • the high pressure side of the pilot pressure of the pilot line C6 and the pilot pressure of the electromagnetic pressure reducing valve V6' is selected by the shuttle valve SV6 and guided to the pressure receiving chamber E6 of the flow control valve D3.
  • the electromagnetic pressure reducing valves V2 to V6 are normally open types in which the maximum opening (open state) is reached when the solenoid is demagnetized, and the minimum opening (this) is proportional to the increase in the command signal (electric signal) from the controller 40. In the embodiment, the opening degree is reduced to 0).
  • the electromagnetic pressure reducing valves V1', V5', and V6' are normally closed types in which the minimum opening (opening 0 in this embodiment) is obtained when the solenoid is demagnetized, and the command signal from the controller 40 is increased. The opening increases proportionally to the maximum opening.
  • the pilot pressure (second command signal) obtained by reducing the pressure of the pilot pressure (first command signal) generated by the operating lever devices A1 to A3 is generated.
  • the boom is raised regardless of the operation of the operating lever devices A1 and A3, and the pilot pressure related to the bucket cloud and the bucket dump (second command). Signal) is generated.
  • the second command signal is the pilot pressure controlled by the controller 40 under MC.
  • the “excavation target surface” is the outer surface of the design terrain that the hydraulic excavator in the present embodiment targets for leveling, or a surface offset upward by a set distance from this outer surface.
  • the hydraulic excavator 1 is equipped with pressure sensors P1 to P6.
  • the pressure sensors P1 and P2 are provided on the pilot lines C1 and C2 that connect the operating lever device A1 and the flow rate control valve D1 for the boom.
  • the pressure of the pilot lines C1 and C2 on the upstream side of the electromagnetic pressure reducing valve, that is, the pilot pressure (first command signal) is detected by the pressure sensors P1 and P2 as the boom operation amount by the operating lever B1, respectively.
  • the pressure sensors P3 and P4 are provided on the pilot lines C3 and C4 that connect the operation lever device A2 and the flow control valve D2 for the arm.
  • the pressure of the pilot lines C3 and C4 on the upstream side of the electromagnetic pressure reducing valves V3 and V4, that is, the pilot pressure (first command signal) is detected by the pressure sensors P3 and P4 as the amount of arm operation by the operating lever B2, respectively.
  • the pressure sensors P5 and P6 are provided on the pilot lines C5 and C6 that connect the operating lever device A3 and the flow control valve D3 for the bucket.
  • the pressure of the pilot lines C5 and C6 on the upstream side of the electromagnetic pressure reducing valves V5 and V6, that is, the pilot pressure (first command signal) is detected by the pressure sensors P5 and P6 as the bucket operation amount by the operation lever B1, respectively.
  • the detection signals of the pressure sensors P1 to P6 are input to the controller 40.
  • the connection line between the pressure sensors P1 to P6 and the controller 40 is omitted.
  • FIG. 4 is an explanatory diagram of a method of calculating the bucket toe position.
  • the posture of the work device 1A can be defined by the local coordinate system based on the excavator shown in FIG.
  • the local coordinate system of FIG. 4 is a coordinate system set with reference to the swivel body 12, with the base (fulcrum) of the boom 8 as the origin and parallel to the swivel center axis of the swivel body 12 (directly above the swivel body 12).
  • the Z-axis was set (in the direction), and the X-axis was set in the direction orthogonal to the Z-axis (in front of the swivel body 12).
  • the inclination angle of the boom 8 with respect to the X axis was defined as the boom angle ⁇
  • the inclination angle of the arm 9 with respect to the boom 8 was defined as the arm angle ⁇
  • the inclination angle of the bucket 10 with respect to the arm 9 was defined as the bucket angle ⁇ .
  • the tilt angle of the vehicle body 1B (swivel body 12) with respect to the horizontal plane (reference plane) was defined as the tilt angle ⁇ .
  • the boom angle ⁇ is detected by the boom angle sensor R1
  • the arm angle ⁇ is detected by the arm angle sensor R2
  • the bucket angle ⁇ is detected by the bucket angle sensor R3
  • the tilt angle ⁇ is detected by the vehicle body tilt angle sensor R4.
  • the boom angle ⁇ is a value that is minimum when the boom 8 is raised to the upper limit (the boom cylinder 5 is in the maximum extension state) and is maximum when the boom 8 is lowered to the lower limit (the boom cylinder 5 is the maximum contraction affection).
  • the arm angle ⁇ is a value that is the minimum when the arm cylinder 6 is in the maximum contracted state and the maximum when the arm cylinder 6 is in the maximum extended state.
  • the bucket angle ⁇ is a value that is the minimum when the bucket cylinder 7 is in the maximum contracted state (state of FIG. 4) and is maximum when the bucket cylinder 7 is in the maximum extended state.
  • L1 is the length from the base of the boom 8 to the connecting part with the arm 9
  • L2 is the length from the connecting part between the arm 9 and the boom 8 to the connecting part between the arm 9 and the bucket
  • L3 is the length of the arm 9 and the bucket 10. It is the length from the connecting portion to the tip portion of the bucket 10.
  • the controller 40 is provided with an MC function that, when at least one of the operating lever devices A1 to A3 is operated, intervenes in the operation of the operator under certain conditions and limits the operation of the working device 1A.
  • MC is executed by the controller 40 controlling the electromagnetic pressure reducing valves V2 to V6, V1', V5', and V6' according to the position of the toe of the bucket and the operating condition.
  • the MC functions that can be implemented in the controller 40 include "area limitation control” that is executed when the operation lever device A2 operates the arm, and “stop control” that is executed when the boom is lowered without the arm operation. And “rolling control” are included.
  • Area restriction control is also called "leveling control”. While the area limiting control is functioning, at least one of the boom cylinder 5, the arm cylinder 6 and the bucket cylinder 7 is controlled so that the work device 1A does not excavate the area below the excavation target surface St, and the bucket is operated by the arm operation. The tip of the toe moves along the excavation target surface St. Specifically, a fine movement of boom raising or boom lowering is commanded during the arm operation accompanying the arm operation so that the velocity vector of the bucket toe in the direction perpendicular to the excavation target surface St becomes zero. This is to correct the trajectory of the bucket toe due to the arm movement, which is a rotational motion, to a straight trajectory along the excavation target surface St.
  • the stop control is a control for stopping the boom lowering operation so that the bucket toe does not invade the area below the excavation target surface St, and the boom lowering operation as the bucket toe approaches the excavation target surface St during the boom lowering operation. Decelerate.
  • Rolling control is a control to allow rolling work.
  • the compaction work is a work of compacting the ground by vigorously pressing the back side surface of the bucket 10.
  • the MC basically reduces the approach speed of the bucket tip with respect to the excavation target surface St near the excavation target surface St, the bucket 10 is operated to lower the boom even if the boom is lowered with the intention of rolling the formed excavation target surface St. Cannot be vigorously pressed against the excavation target surface St.
  • the rolling compaction control is functioning, the deceleration of the boom lowering operation is suppressed even if the excavation target surface St and the bucket toe are close to each other (described later).
  • FIG. 5 is a hardware configuration diagram of the controller 40 of the hydraulic excavator
  • FIG. 6 is a diagram of an example of a display screen of the display device DS.
  • the controller 40 shown in FIG. 5 is an in-vehicle computer, and includes an input interface 41, a CPU (central processing unit) 42, a ROM (read-only memory) 43, a RAM (random access memory) 44, and an output interface 45. ing.
  • the posture sensor R is a plurality of sensors installed to detect the posture of the work device 1A, and specifically, the angle sensors R1 to R3 and the vehicle body tilt angle sensor R4.
  • the operation sensors P are pressure sensors P1 to P6.
  • the target surface setting device Ts is an interface for inputting information on the excavation target surface St (including position information and inclination angle information of each excavation target surface).
  • This target surface setting device Ts is connected to an external terminal (not shown) that stores three-dimensional data of the excavation target surface defined by the global coordinate system (absolute coordinate system), and the three-dimensional excavation target surface is connected from the external terminal. Data is entered. However, the input of the excavation target surface to the controller 40 via the target surface setting device Ts can be manually input by the operator.
  • the mode switch SW is an input device for setting a work mode.
  • the ROM 43 stores a control program for executing the MC function including the processes described later with reference to FIGS. 7 to 11 and various information necessary for executing the processes.
  • the RAM 44 stores the calculation result by the CPU 42 and the signal input from the input interface 41.
  • the controller 40 provided with semiconductor memories such as ROM 43 and RAM 44 is illustrated as the storage device, but the type of storage device is not particularly limited, and for example, a magnetic storage device such as a hard disk drive may be used. it can.
  • the CPU 42 executes a predetermined arithmetic process based on the signals taken from the input interface 41, the ROM 43, and the RAM 44 according to the control program stored in the ROM 43.
  • the output interface 45 generates an output signal based on the calculation result by the CPU 42, and outputs the signal to the electromagnetic pressure reducing valves V2 to V6, V1', V5', V6'and the display device DS.
  • the electromagnetic pressure reducing valves V2 to V6, V1', V5', V6'and the display device DS are operated.
  • the display device DS is a touch panel type liquid crystal monitor, and is installed inside the driver's cab 16. As shown in FIG. 6, on the display screen of the display device DS, the distance between the excavation target surface St and the toe of the bucket 10 (target surface distance) is shown as the positional relationship between the excavation target surface St and the work device 1A (for example, the bucket 10). H1) is displayed.
  • the target surface distance H1 takes a positive value in the upward direction and a negative value in the downward direction with reference to the excavation target surface St.
  • the display as shown in FIG. 6 can be displayed on the display device DS even when the MC function is added or removed by the mode switch SW, and the operator can operate the work device 1A with reference to this display (so-called machine guidance). function).
  • FIG. 7 is a functional block diagram of the controller 40
  • FIG. 8 is a diagram showing an example of the locus of the bucket toe controlled by the MC.
  • the CPU 42 of the controller 40 includes an operation amount calculation unit 42A, an attitude calculation unit 42B, a target surface calculation unit 42C, a speed limit calculation unit 42D, an electromagnetic pressure reducing valve control unit 42E, and a display control unit 42F. It has been.
  • the operation amount calculation unit 42A, the attitude calculation unit 42B, the target surface calculation unit 42C, the speed limit calculation unit 42D, the electromagnetic pressure reducing valve control unit 42E, and the display control unit 42F are the functions of the CPU 42 in the controller 40 graphically represented.
  • the electromagnetic pressure reducing valve control unit 42E further includes a limiting pilot pressure calculation unit 42a, a limiting pilot pressure intervention determination unit 42b (hereinafter abbreviated as intervention determination unit 42b), and a valve command calculation unit 42c.
  • the operation amount calculation unit 42A calculates the operation amount of the operation lever devices A1, A2, A3 (operation levers B1, B2) based on the detected values of the operation sensors P (pressure sensors P1 to P6). Will be done.
  • the boom raising operation amount is calculated from the detection value of the pressure sensor P1
  • the boom lowering operation amount is calculated from the detection value of the pressure sensor P2.
  • the operation amount of the arm cloud is calculated from the detected value of the pressure sensor P3
  • the operation amount of the arm dump (arm push) is calculated from the detected value of the pressure sensor P4.
  • the operation amount of the bucket cloud is calculated from the detected value of the pressure sensor P5, and the operation amount of the bucket dump is calculated from the detected value of the pressure sensor P6.
  • the manipulated variable thus converted from the detected values of the pressure sensors P1 to P6 by the manipulated variable calculation unit 42A is output to the speed limit calculation unit 42D.
  • the calculation of the operation amount by the pressure sensors P1 to P6 is only an example.
  • the operation amount of the operation lever is detected by a position sensor (for example, a rotary encoder) that detects the rotational displacement of the operation levers of the operation lever devices A1 to A3. It may be configured to be used.
  • the posture calculation unit 42B calculates the posture of the work device 1A and the position of the toe of the bucket 10 in the local coordinate system based on the detection signal of the posture sensor R.
  • the position (Xbk, Zbk) of the toe of the bucket 10 can be calculated by the equations (1) and (2) as described above.
  • the posture calculation unit 42B calculates the position and posture of the swivel body 12 in the global coordinate system from the signals of the GNSS antennas G1 and G2. Converts the local coordinate system to the global coordinate system.
  • Target surface calculation unit 42C calculates the position information of the excavation target surface St based on the information input via the target surface setting device Ts, and the calculated position information of the excavation target surface St. Is recorded in the RAM 44.
  • a cross section (previously shown in FIG. 4) obtained by cutting an excavation target surface provided by three-dimensional data via the target surface setting device Ts on a plane (operating plane of the work device) on which the work device 1A moves.
  • Such two-dimensional excavation target surface) information is calculated as position information of the excavation target surface St.
  • the excavation target surface St is one, but there may be a plurality of excavation target surfaces.
  • the method of setting the one closest to the bucket toe as the excavation target surface for example, the method of setting the one located vertically below the bucket toe as the excavation target surface, and the method arbitrarily selected. There is a method of setting the excavation target surface.
  • Speed limit calculation unit 42D the boom during MC (during area limitation control) is based on the signal of the attitude sensor R so that the work device 1A does not excavate the ground beyond the excavation target surface St.
  • Each speed limit (limit value of extension speed) of the cylinder 5, the arm cylinder 6, and the bucket cylinder 7 is calculated.
  • the primary target speeds of the boom cylinder 5, the arm cylinder 6, and the bucket cylinder 7 are calculated based on the operation amount of the operation lever devices A1 to A3 input from the operation amount calculation unit 42A.
  • the target speed vector of the bucket toe is obtained from these primary target speeds, the position of the bucket toe obtained by the attitude calculation unit 42B, and the dimensions of each part (L1, L2, L3, etc.) of the work device 1A stored in the ROM 43.
  • Vc (FIG. 8) is required.
  • the boom cylinder 5, the arm cylinder 6, and the bucket cylinder 7 so that the orthogonal component Vcy of the target velocity vector Vc with the excavation target surface St approaches zero.
  • One or more primary target velocities are limited and corrected.
  • the target speed vector Vc of the bucket toe is Vca (FIG. 8) as shown in FIG. Is converted to (direction change control).
  • the velocity vector Vca ( ⁇ 0) is only the component Vcx parallel to the excavation target surface St.
  • the bucket toe is held in the region above the excavation target surface St so that the bucket toe does not enter the region below the excavation target surface St.
  • the direction change control may be executed by combining the boom raising or boom lowering with the arm cloud, or by combining the boom raising or boom lowering with the arm dump.
  • the speed limit calculation unit 42D limits the boom cylinder 5 in the boom raising direction that cancels the downward component. The speed is calculated.
  • the speed limit calculation unit 42D calculates the speed limit of the boom cylinder 5 in the boom lowering direction that cancels the upward component. ..
  • the rate of increase in the speed limit of the arm cloud is limited and output immediately after the operation of the arm cloud. Immediately after the arm dump operation, the rate of increase in the speed limit of the arm dump is also limited and output.
  • the speed limit calculation unit 42D calculates and outputs the speed limit (primary target speed) of each hydraulic cylinder according to the operation of the operation lever devices A1 to A3 as it is as the speed limit. ..
  • the speed limit calculated by the speed limit calculation unit 42D is output to the speed limit pilot pressure calculation unit 42a.
  • Limited pilot pressure calculation unit 42a In the limited pilot pressure calculation unit 42a, the flow control valve D1 corresponding to the boom cylinder 5, arm cylinder 6, and bucket cylinder 7 is based on each speed limit calculated by the speed limit calculation unit 42D. , D2, D3 limit pilot pressure Pr1 is calculated. The limited pilot pressure Pr1 calculated by the limited pilot pressure calculation unit 42a is output to the intervention determination unit 42b.
  • Restricted pilot pressure intervention determination unit In the intervention determination unit 42b, changes are made as necessary under certain conditions based on the limited pilot pressure Pr1 calculated by the limited pilot pressure calculation unit 42a, and the final restriction is made.
  • the pilot pressure RPr2 is determined. Specifically, in a situation where it is desired to suppress the limitation of the operating speed by the MC for the boom lowering, the arm dump, and the arm cloud, the flow control valves D1 and D2 calculated by the limiting pilot pressure calculation unit 42a with respect to the pressure receiving chambers E2 to E4.
  • the limiting pilot pressure Pr2 is changed in the increasing direction.
  • the opening degree of the electromagnetic pressure reducing valves V2 to V4 is calculated by the MC (calculated by the speed limit calculation unit 42D) under certain conditions even under a situation where the actuator speed is limited by the MC. It increases from the opening based on the speed limit. In this case, the restrictions imposed by the MC on the boom lowering, arm dump, and arm cloud operations are relaxed.
  • the change of the limit pilot pressure in the intervention determination unit 42b is executed based on the target surface distance H1, the situation of the boom raising operation, and the limit pilot pressure corresponding to each operation of the arm cloud, the arm dump, and the boom lowering.
  • the limit pilot pressure Pr2 determined by the intervention determination unit 42b is the limit pilot pressure Pr1 calculated by the limit pilot pressure calculation unit 42a (the limit calculated by the speed limit calculation unit 42D). Pilot pressure based on speed).
  • the processing content in the intervention decision unit 42b will be described later with reference to FIG.
  • Valve command calculation unit 42c calculates an electric signal based on the limiting pilot pressure Pr2 determined by the intervention determination unit 42b, and sets the electromagnetic pressure reducing valves V2 to V6, V1', V5', and V6', respectively. It is output. Each solenoid is excited by the electric signal output from the valve command calculation unit 42c to operate the electromagnetic pressure reducing valves V2 to V6, V1', V5', V6', and the pilot pressure acting on the flow control valves D1 to D3 is the situation. It is limited by the limiting pilot pressure Pr2 according to.
  • the electromagnetic pressure reducing valves V1'and V3 are used depending on the situation so that the bucket toe does not enter the area below the excavation target surface St. Is controlled.
  • the deceleration operation and boom raising operation of the arm cloud are automatically combined with the arm cloud operation according to the operator's operation, and the horizontal excavation operation is executed only by the arm cloud operation with the assistance of the controller 40.
  • the opening degree of the electromagnetic pressure reducing valves V2 to V4 is limited by the intervention determination of the target pilot pressure of the intervention determination unit 42b as described later in FIG. It is determined to be larger than the opening based on the speed.
  • the restriction is relaxed for each operation of the arm cloud, the arm dump, and the boom lowering.
  • FIG. 9 is a flowchart showing a procedure for determining the limit pilot pressure Pr2 for the arm cloud, arm dump, and boom lowering by the intervention determination unit 42b.
  • the intervention determination unit 42b repeatedly executes the process of FIG. 9 in a predetermined cycle (for example, 1 ms).
  • the intervention determination unit 42b has a characteristic function of increasing the setting of the limiting pilot pressure Pr2 to the maximum pressure Pmax for the operation of the arm cloud and the arm dump while the boom raising operation is performed by the operating lever device A1.
  • the maximum pressure Pmax is the maximum pressure that can be output to the pressure receiving chambers E2 to E4 of the flow control valves D1 and D2 in the circuit of FIG. 3, and the limited pilot pressure calculated by the limiting pilot pressure calculation unit 42a based on the speed limit. Higher than Pr1.
  • the intervention determination unit 42b determines whether the bucket toe is sufficiently separated from the excavation target surface St based on the target surface distance H1 input from the attitude calculation unit 42B (step S301). Here, it is determined whether the bucket toe is sufficiently separated from the excavation target surface St depending on whether H1 ⁇ Hth. Hth is a preset distance (> 0) for the target surface distance H1. Further, the set distance of the bucket toe is set from the excavation target surface St that defines the area where the electromagnetic pressure reducing valves V2 to V6, V1', V5', and V6'are controlled by the MC (the operation of the work device 1A is restricted by the MC). If H2, then H2 ⁇ Hth.
  • H2 it is desirable that H2 ⁇ Hth. If H1 ⁇ Hth, the intervention decision unit 42b determines that the bucket toe is sufficiently separated from the excavation target surface St, and shifts the procedure to step S302. If H1 ⁇ Hth, the bucket toe is close to the excavation target surface St. And the procedure is moved to step S303.
  • the intervention determination unit 42b When H1 ⁇ Hth, the intervention determination unit 42b unconditionally maximizes the limiting pilot pressure Pr2 for the pressure receiving chambers E2 to E4 of the flow control valves D1 and D2 so as to maximize the opening degree of the electromagnetic pressure reducing valves V2 to V4.
  • the pressure Pmax is determined (step S302).
  • the intervention determination unit 42b determines whether the boom raising operation is performed based on the detection signal (pressure) P0 of the pressure sensor P1 (step S303). Here, it is determined whether or not the boom raising operation is performed depending on whether or not P0 ⁇ Pth.
  • Pth is a threshold value preset in the detection signal P0 of the pressure sensor P1 and stored in the ROM 43, and is a pilot pressure at which the boom 8 starts to rise. If P0 ⁇ Pth, the intervention determination unit 42b determines that the boom raising operation has been performed and shifts the procedure to step S302, and if P0 ⁇ Pth, determines that the boom raising operation has not been performed and proceeds to step S304. Move the procedure.
  • the electromagnetic pressure reducing valves V2 to V4 unconditionally stand by at the maximum opening, and the MC performs the arm cloud, arm dump, and boom lowering operations regardless of the target surface distance H1. It will be released. Therefore, when, for example, an arm cloud operation or an arm dump operation is performed at the same time as the boom raising operation, the arm 9 can be moved in the cloud direction or the dump direction at a speed corresponding to the operation without being restricted by the MC function.
  • the intervention determination unit 42b determines whether the non-operation duration Tbm [s] for boom raising is less than Tth [s]. (Step S304).
  • Tth is a preset predetermined time as a threshold value preset and stored in the ROM 43 for the non-operation duration Tbm.
  • the intervention decision unit 42b if Tbm ⁇ Tth, the procedure moves to step S305, and if Tbm ⁇ Tth, the procedure moves to step S306.
  • the intervention determination unit 42b calculates the transition pressure Ps according to the non-operation duration Tbm for the arm cloud, the arm dump, and the boom lowering. To. Then, these transition pressures Ps are determined as the limiting pilot pressure Pr2 for the arm cloud, the arm dump, and the boom lowering (step S305). The details will be described later, but the transition pressure Ps calculated here changes the opening degree of the electromagnetic pressure reducing valves V2 to V4 from the maximum opening degree (opening in the MC release state) to the opening degree according to the limiting pilot pressure Pr1 (MC function).
  • the intervention determination unit 42b determines whether the limit pilot pressure Pr1 calculated by the limit pilot pressure calculation unit 42a for the arm cloud, arm dump, and boom lowering is less than the threshold value Pth2.
  • Pth2 is a preset threshold value for the limited pilot pressure Pr1 calculated by the limited pilot pressure calculation unit 42a for each operation of arm cloud, arm dump, and boom lowering. For example, each operation of arm cloud, arm dump, and boom lowering. Is the pressure at which. Since the limiting pilot pressure Pr1 may differ for each operation of the arm cloud, arm dump, and boom lowering, the determination result in step S306 may also differ depending on the operation. In FIG. 9, each operation of arm cloud, arm dump, and boom lowering also serves as a flowchart, but strictly speaking, the procedure of FIG. 9 is executed individually for these three operations.
  • the intervention determination unit 42b determines the minimum pressure Pmin to be the limiting pilot pressure Pr2 (step S307).
  • the intervention determination unit 42b determines the limiting pilot pressure Pr1 to be the limiting pilot pressure Pr2 (step S308).
  • the MC functions normally.
  • the intervention determination unit 42b outputs the determined limit pilot pressure Pr2 to the valve command calculation unit 42c, and the procedure returns to step S301 (step S309).
  • FIG. 10 is a block diagram showing the calculation logic of the transition pressure in step S305 of the flowchart of FIG. 9 by the intervention determination unit 42b.
  • the transition pressure as a transient limiting pilot pressure is calculated for each operation of boom lowering, arm cloud, and arm dump by the calculation logic of FIG.
  • the case where the transition pressure is calculated for the arm cloud operation will be described with reference to FIG. 10, but the calculation of the transition pressure for each operation of the arm dump and the boom lowering is also the same.
  • the boom raising pilot pressure calculated by the manipulated variable calculation unit 42A is first input (S1), and the elapsed time from the time when the boom raising pilot pressure becomes less than Pth from Pth (non-operation duration). Tbm) is calculated (S2). The non-operation duration Tbm is reset to zero every time the boom raising pilot pressure becomes Pth or more.
  • the calculated non-operation duration Tbm is input to the pressure ratio table, and the pressure ratio ⁇ (FIG. 11) is calculated based on the pressure ratio table (S3).
  • the pressure ratio ⁇ is the ratio of the limit pilot pressure Pr1 (value corresponding to the target speed) for the arm cloud to the transition pressure Ps.
  • the pressure ratio table is set so that the pressure ratio ⁇ increases from 0 (minimum) to 1.0 (maximum) while the non-operation duration Tbm of boom raising is from zero to a predetermined time Tth (FIG. 11). ). Further, the limiting pilot pressure Pr1 for the arm cloud is input (S4), and the pressure ratio ⁇ calculated based on the pressure ratio table is multiplied by the limiting pilot pressure Pr1 (S5). Further, the specified maximum pressure Pmax that can act on the pressure receiving chamber E3 of the flow control valve D2 with respect to the arm cloud operation is input from the ROM 43 (S6), and this value is multiplied by (1- ⁇ ) (S7). The multiplication value of the maximum pressure Pmax and (1- ⁇ ) is added to the multiplication value of the limiting pilot pressure Pr1 and ⁇ , and is output as the transition pressure Ps (S8).
  • FIG. 11 is a diagram showing the relationship between the limit pilot pressure Pr2 calculated by the procedure of FIG. 9 and the boom raising operation.
  • the maximum pressure Pmax becomes the limiting pilot pressure Pr2 during the boom raising operation
  • the transition pressure Ps becomes the limiting pilot pressure Pr2 during the predetermined time Tth after the boom raising operation is stopped.
  • the limiting pilot pressure Pr1 becomes the limiting pilot pressure Pr2.
  • the fluctuation of the limiting pilot pressure Pr1 in FIG. 11 is an example.
  • the pressure ratio ⁇ is monotonously increased from 0 to 1.0 at a predetermined time Tth after the boom raising pilot pressure changes from the operating state (Pth or more) to the non-operating state (less than Pth). It is stipulated.
  • the pressure ratio table By defining the pressure ratio table in this way, when the boom raising operation is stopped as shown in FIG. 11, the transition pressure Ps is limited from the maximum pressure Pmax at a predetermined time Tth under the condition that the target surface distance H1 is less than Hth.
  • the pilot pressure decreases monotonically to Pr1.
  • the present embodiment is characterized by controlling the solenoid pressure reducing valves V2 to V4 with respect to the boom lowering of the solenoid valve unit 160, the arm cloud, and the arm dump.
  • the operation of the electromagnetic pressure reducing valves V2 to V4 will be described below for each condition.
  • the maximum pressure Pmax is set for the limit pilot pressure Pr2 of the arm cloud, the arm dump, and the boom lowering regardless of the operation amount, and the electromagnetic pressure reducing valves V2 to V4 are controlled in the opening direction (in this example, they are opened).
  • the pilot pressure generated by the operating lever devices A1 and A2 acts on the pressure receiving chambers E2 to E4 of the flow control valves D2 and D3 in response to the operator's operation, and the boom and arm operate at a speed corresponding to the operator's operation.
  • the operation of the electromagnetic pressure reducing valves V2 to V4 does not immediately return to the operation under MC.
  • the transition pressure Ps is set to the limited pilot pressure Pr2 for each operation of the arm cloud, the arm dump, and the boom lowering regardless of the operation amount.
  • the electromagnetic pressure reducing valves V2 to V4 are in the half-released state of the MC, and the operation restriction by the MC becomes stronger as time elapses from the state in which the boom 8 and the arm 9 operate according to the operator's operation.
  • Tth elapses for a predetermined time without the boom raising operation the operation of the electromagnetic pressure reducing valves V2 to V4 returns to the normal operation under MC.
  • the opening degree of the electromagnetic pressure reducing valves V2 and V3 corresponding to the operation of the arm cloud and the arm dump is set based on the speed limit (this). In the embodiment, it is made larger than the maximum opening degree).
  • the MC is automatically set for a specific electromagnetic pressure reducing valve regardless of the target surface distance H1 without operating the mode switch SW, for example, by using the boom raising operation as a trigger. It was made to be released.
  • rolling work or the like is not intended for leveling (MC), and electromagnetic pressure reducing valves V2 to V4, which are strongly related to these works, are opened.
  • the arm 9 operates at a speed corresponding to the operation even during MC.
  • work efficiency is improved and the operator's psychological fatigue is reduced.
  • the same effect can be obtained when the bucket 10 is aligned by the combined operation of raising the boom and arm cloud (or dump).
  • the opening degree of the electromagnetic pressure reducing valves V2 to V4 is monotonically reduced, and after the boom raising operation is stopped, the opening degree is restored to the opening degree based on the limited pilot pressure Pr1 within a predetermined time Tth.
  • the longer the predetermined time Tth the longer the opening time of the electromagnetic pressure reducing valves V2 to V4 becomes larger than the value under MC, so that the response of the arm cloud, the arm dump, and the boom lowering is improved after the boom raising operation. You can secure a long time.
  • the shorter the predetermined time Tth the sooner the arm cloud, arm dump, and boom lowering operations are restricted by the MC, and the ground is excavated beyond the excavation target surface St. Can be suppressed.
  • Tth for a predetermined time the responsiveness of the work device 1A and the protection of the excavation target surface St can be flexibly adjusted.
  • FIG. 12 is a flowchart showing a procedure for determining the limit pilot pressure for the arm cloud, arm dump, and boom lowering by the controller provided in the hydraulic excavator according to the second embodiment of the present invention, and corresponds to FIG. 9 of the first embodiment. It is a figure.
  • FIG. 13 is a diagram showing the relationship between the limit pilot pressure Pr2 calculated in the procedure of FIG. 12 and the boom raising operation, and is a diagram corresponding to FIG. 11 of the first embodiment.
  • the difference between this embodiment and the first embodiment lies in the procedure for determining the limit pilot pressure Pr2 for the arm cloud, arm dump, and boom lowering by the intervention determination unit 42b.
  • the transition pressure calculation procedure (FIG. This is a point in which steps S304 and S305) of 9 are omitted.
  • the procedure is moved to step S306 regardless of the non-operation duration Tbm for raising the boom. Therefore, under the condition that the target surface distance H1 is Hth or less, the limited pilot pressure Pr1 calculated by the limited pilot pressure calculation unit 42a becomes the limited pilot pressure Pr2 at the same time when the boom raising operation is stopped.
  • the opening degree of the electromagnetic pressure reducing valves V2 to V4 is changed from the maximum opening degree to the opening degree according to the target speed immediately after the boom raising operation is stopped.
  • the present embodiment is the same as the first embodiment in other points including the configuration and the function.
  • the basic effect (1) described in the first embodiment can be obtained, and the possibility of excavating the ground beyond the excavation target surface St after the boom raising operation is increased from the first embodiment. Can also be suppressed.
  • FIG. 14 is a functional block diagram of a controller provided in the hydraulic excavator according to the third embodiment of the present invention, and is a diagram corresponding to FIG. 7 of the first embodiment.
  • the difference between this embodiment and the first embodiment is that the speed limit correction unit 42Da as a speed limit correction calculation function is added to the speed limit calculation unit 42D.
  • the speed limit correction unit 42Da corrects the speed limit for the arm cloud and arm dump to be output to the limit pilot pressure calculation unit 42a based on the boom raising operation amount and the speed limit of the arm cloud and arm dump.
  • the speed limit calculated for the arm cloud or arm dump for a certain period of time after the boom raising operation is stopped is based on the elapsed time (non-operation duration Tbm) after the boom raising operation is stopped. It is corrected in the increasing direction by the correction increase rate (described later).
  • FIG. 15 is a block diagram showing the speed limit correction calculation logic for the arm cloud and the arm dump in the speed limit correction unit 42Da.
  • the speed limits of the arm cloud and the arm dump are appropriately corrected by the calculation logic of FIG. 15 and calculated individually.
  • the calculation logic for the speed limit for the arm cloud operation will be described as a representative with reference to FIG. 15, but the calculation logic for the speed limit for the arm dump operation is also the same.
  • the boom raising pilot pressure calculated by the operation amount calculation unit 42A is input (S11), and the elapsed time from the time when the boom raising pilot pressure becomes less than Pth from Pth (non-operation duration). Tbm) is calculated (S12). The non-operation duration Tbm is reset to zero every time the boom raising pilot pressure becomes Pth or more.
  • the calculated non-operation duration Tbm is input to the deceleration ratio table, and the deceleration ratio ⁇ (FIG. 16) is calculated based on the deceleration ratio table (S13).
  • the deceleration ratio ⁇ is the rate of increase of the speed limit before correction obtained based on the arm cloud operation amount and the position of the bucket toe obtained by the attitude calculation unit 42B in the speed limit calculation unit 42D for the arm cloud operation. It is the ratio to the correction increase rate.
  • the deceleration ratio ⁇ increases from 0 (minimum) to 1.0 (maximum) while the non-operation duration Tbm of boom raising is from zero to a preset predetermined time ⁇ T'(linear in this example). (Fig. 16).
  • the speed limit increase rate (S14) before correction obtained by the speed limit calculation unit 42D for the arm cloud operation is multiplied by the deceleration ratio ⁇ calculated based on the deceleration ratio table (S15). ).
  • the correction increase rate is calculated by adding the value of (1- ⁇ ) times the speed limit increase rate after the boom raising operation and the value of ⁇ times the speed limit increase rate before correction (S18).
  • the speed limit before correction for the arm cloud is the correction increase rate described above only immediately after the arm cloud operation (for example, a predetermined time ⁇ T'after the boom raising operation is stopped). It is corrected in the increasing direction (S20). As described above, for a certain period of time after the boom raising operation, the shorter the elapsed time, the greater the rate of increase in the speed limit after the boom raising operation, which is larger than the speed limit before the correction, and the increase is greatly corrected. On the other hand, the speed limit for the arm cloud is not corrected except immediately after the arm cloud operation (for example, other than the predetermined time ⁇ T'after the boom raising operation is stopped).
  • the speed limit calculation unit 42D outputs the speed limit speed limit corrected by the speed limit correction unit 42Da to the speed limit pilot pressure calculation unit 42a (S21), and the speed limit pilot pressure calculation unit 42a outputs the speed limit pilot pressure. It is converted to Pr1.
  • FIG. 16 is a diagram showing the relationship with the boom raising operation of the limited pilot pressure such as the arm cloud calculated by the controller (intervention determination unit 42b) provided in the hydraulic excavator in the present embodiment.
  • FIG. 16 illustrates a case where the intervention determination unit 42b calculates the speed limit pilot pressure in the manner shown in FIG. 13 (second embodiment), but the speed limit calculation method according to the present embodiment is the first embodiment. Of course can also be applied.
  • the limit pilot pressure Pr2 is calculated larger and the opening degrees of the electromagnetic pressure reducing valves V3 and V4 are also increased for a certain period of time after the boom raising operation is stopped, as compared with the case where the speed limit is not corrected.
  • the opening degree of the electromagnetic pressure reducing valve is increased by increasing the apparent speed limit pilot pressure under certain conditions, but by increasing the apparent speed limit as in this example.
  • the opening degree of the electromagnetic pressure reducing valve can be increased.
  • the case where the arm cloud, the arm dump, and the boom lowering are targeted for the switching control of the limiting pilot pressure Pr2 has been described as an example.
  • the boom lowering may be excluded from the target of the switching control of the limiting pilot pressure Pr2.
  • the limiting pilot pressure may be calculated in the same manner as for the arm cloud and the operating degree of the electromagnetic pressure reducing valve may be controlled.
  • each parameter of ⁇ , ⁇ , Tth, Pth, and Hth may be shared by the arm cloud, arm dump, boom lowering, bucket cloud, and bucket dump, or may be set to separate values.
  • the electromagnetic pressure reducing valve V1'for forced boom raising is not particularly described, it can be controlled in the same manner as the electromagnetic pressure reducing valve V3 or the like, but for example, when the MC is released or when the half is released (for example, before Tht in FIG. 11). ) Can be in a degaussed state (opening 0).

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Operation Control Of Excavators (AREA)
  • Fluid-Pressure Circuits (AREA)

Abstract

油圧ポンプから複数の油圧アクチュエータに供給される圧油の流れを制御する制御弁ユニットと、パイロットポンプの吐出圧を元圧として前記制御弁ユニットを駆動するパイロット圧を出力する複数の操作レバー装置と、前記複数の操作レバー装置及び前記制御弁ユニットの間に設けた複数の電磁減圧弁を含んで構成された電磁弁ユニットと、前記複数の姿勢センサの信号を基に前記複数の油圧アクチュエータの制限速度を演算し前記電磁減圧弁の開度を制御するコントローラとを備えた油圧ショベルにおいて、前記操作レバー装置からブーム上げ操作信号が出力されている間、アームクラウド及びアームダンプについて前記電磁減圧弁の開度を前記制限速度に基づく開度よりも大きくなるように制御する。

Description

油圧ショベル
 本発明は、いわゆるマシンコントロール機能を備えた油圧ショベルに関する。
 油圧ショベルには、オペレータによる作業装置の操作を補助するマシンコントロール(以下、適宜MCと記載する)機能が備えたものがある。MC機能としては、例えばオペレータの掘削操作に介入してバケットの爪先が掘削目標面より下側の領域に進入しないように例えばブームシリンダを強制的に制御する領域制限制御が代表例である。
 領域制限制御に関し、特許文献1には、掘削目標面に作業装置が接近する場合に掘削目標面に向かう方向の作業装置の目標速度ベクトルを減速補正するシステムが開示されている。しかし、領域制限制御中においては作業装置が掘削目標面に近付くにつれて作業装置が掘削目標面に向かう速度成分が減じられるため転圧作業をすることができない。
 それに対し、特許文献2には、オペレータの操作に基づいて転圧条件が満たされていると判定すると、掘削目標面付近における作業装置のブーム下げ動作の速度制限を弱め、領域制限制御中でも掘削目標面を転圧できるシステムが開示されている。
国際公開第95/30059号 特許第6062115号公報
 MC機能は、ブームシリンダ等の作業装置の油圧アクチュエータの動作を制御する流量制御弁に対して操作レバー装置から入力されるパイロット圧を状況に応じて電磁減圧弁で減圧することで実現される。そして、MC機能の下では、目標掘削面を超えて掘削することを防止する観点で、作業装置の急動作を抑えるべく電磁減圧弁の待機中の開度が閉じ側に設定されている。油圧アクチュエータの速い動作が許容されるときに電磁減圧弁が開くようになっている。
 特許文献2のシステムにおいては、転圧作業と判定された場合にブーム下げ動作の速度制限が弱まる。しかし、転圧作業はブーム下げ動作のみで行われるものではなく、転圧位置の調整のためにアームクラウドやアームダンプの動作と組み合わせて行われる。アームクラウドやアームダンプの動作は掘削面付近で制限されるため転圧位置の調整動作に遅延が生じ、転圧作業を円滑に実行することができない。
 本発明の目的は、マシンコントロール制御の最中でもアームクラウド及びアームダンプの動作を伴う転圧作業等の作業を掘削目標面付近で応答良く行うことができる油圧ショベルを提供することにある。
 上記目的を達成するために、本発明は、ブーム及びアームを含んで構成された多関節型の作業装置と、前記ブームを駆動するブームシリンダを含む作業装置駆動用の複数の油圧アクチュエータと、前記作業装置の姿勢を検出する複数の姿勢センサと、前記複数の油圧アクチュエータを駆動する圧油を吐出する油圧ポンプと、前記油圧ポンプから前記複数の油圧アクチュエータに供給される圧油の流れを制御する制御弁ユニットと、パイロットポンプの吐出圧を元圧として前記制御弁ユニットを駆動するパイロット圧を出力する複数の操作レバー装置と、前記複数の操作レバー装置及び前記制御弁ユニットの間に設けた複数の電磁減圧弁を含んで構成された電磁弁ユニットと、前記複数の姿勢センサの信号を基に前記複数の油圧アクチュエータの制限速度を演算し、前記制限速度に基づいて、掘削目標面を超えて地面を掘削しないように前記電磁減圧弁の開度を制御するコントローラとを備えた油圧ショベルにおいて、前記コントローラは、前記操作レバー装置からブーム上げ操作信号が出力されている間、前記電磁弁ユニットに含まれるアームクラウド及びアームダンプの動作に対応する電磁減圧弁の開度を前記制限速度に基づく開度よりも大きくなるように制御することを特徴とする。
 本発明によれば、マシンコントロール制御の最中でもアームクラウド及びアームダンプの動作を伴う転圧作業等の作業を掘削目標面付近で応答良く行うことができる。
本発明の第1実施形態における油圧ショベルの構成図 図1に示した油圧ショベルに備わった油圧システムの油圧回路図 図1に示した油圧ショベルに備わった電磁弁ユニットの詳細図 バケット爪先位置の演算方法の説明図 図1に示した油圧ショベルに備わったコントローラのハードウェア構成図 図1に示した油圧ショベルに備わった表示装置の表示画面の一例の図 図1に示した油圧ショベルに備わったコントローラの機能ブロック図 マシンコントロールにより制御されたバケット爪先の軌跡の一例を示す図 図1に示した油圧ショベルに備わったコントローラによるアームクラウド、アームダンプ及びブーム下げについての制限パイロット圧の決定手順を表すフローチャート 本発明の第1実施形態における遷移圧力の演算ロジックを表すブロック線図 図9の手順で演算される制限パイロット圧とブーム上げ操作との関係を表す図 本発明の第2実施形態における油圧ショベルに備わったコントローラによるアームクラウド、アームダンプ及びブーム下げについての制限パイロット圧の決定手順を表すフローチャートであって第1実施形態の図9に対応する図 図12の手順で演算される制限パイロット圧とブーム上げ操作との関係を表す図であって第1実施形態の図11に対応する図 本発明の第3実施形態における油圧ショベルに備わったコントローラの機能ブロック図であって第1実施形態の図7に対応する図 図14に示した制限速度補正部におけるアームクラウド及びアームダンプについての制限速度の補正演算ロジックを表すブロック線図 本発明の第3実施形態における油圧ショベルに備わったコントローラで演算されるアームクラウド等の制限パイロット圧のブーム上げ操作との関係を表す図
 以下に図面を用いて本発明の実施の形態を説明する。
 <第1実施形態>
 -油圧ショベル-
 図1は本発明の第1実施形態における油圧ショベルの構成図である。なお、本実施形態では作業装置の先端にアタッチメント(作業具)としてバケット10を装着した油圧ショベルを例示して説明するが、バケット以外のアタッチメントを装着した油圧ショベルにも本発明は適用され得る。
 同図に示した油圧ショベル1は、多関節型の作業装置(フロント作業機)1Aと車体1Bとを含んで構成されている。車体1Bは、左右の走行モータ(油圧モータ)3a,3b(図2)により走行する走行体11と、走行体11の上に取り付けられた旋回体12とからなる。旋回体12は、旋回モータ(油圧モータ)4(図2)により走行体11に対して旋回する。旋回体12の旋回中心軸は油圧ショベル1が水平地に停車した状態で鉛直である。旋回体12には運転室16が設けられている。
 作業装置1Aは、鉛直面内でそれぞれ回動する複数の被駆動部材(ブーム8、アーム9及びバケット10)を連結して構成されている。ブーム8の基端はブームピンを介して旋回体12の前部に回動可能に連結されている。このブーム8の先端にはアームピンを介してアーム9が回動可能に連結されており、アーム9の先端にはバケットピンを介してバケット10が回動可能に連結されている。ブーム8はブームシリンダ5によって駆動され、アーム9はアームシリンダ6によって駆動され、バケット10はバケットシリンダ7によって駆動される。
 また、ブームピンには角度センサR1、アームピンには角度センサR2、バケットリンク13には角度センサR3、旋回体12には車体傾斜角センサ(例えばIMU)R4が取り付けられている。角度センサR1,R2,R3により、それぞれブーム8、アーム9、バケット10の回動角度α,β,γ(図4)が測定されてコントローラ40(後述)に出力される。車体傾斜角センサR4は、基準面(例えば水平面)に対する旋回体12(車体1B)の傾斜角θ(図4)を測定してコントローラ40(後述)に出力する。なお、角度センサR1~R3はそれぞれ基準面に対する傾斜角を測定するセンサ(IMU等)で代替することもできる。加えて、旋回体12には一対のGNSSアンテナG1,G2が備わっている。GNSSアンテナG1,G2からの情報を基に、グローバル座標系における油圧ショベル1や作業装置1Aの基準点の位置を算出することができる。
 なお、本実施形態では作業装置1Aの基準点をバケット爪先とした場合を例に挙げて説明する。但し、基準点の設定は適宜変更可能である。例えばバケット10の背側面(外面)やバケットリンク13に基準点を設定しても良いし、バケット全体において掘削目標面Stと最短距離にある点を基準点に設定しても良い(つまり状況に応じて基準点が変化しても良い)。
 -油圧システム-
 図2は図1に示した油圧ショベルに備わった油圧システムの油圧回路図である。運転室16内には、操作レバー装置A1~A6が設置されている。操作レバー装置A1,A3は、運転席(不図示)の左右の一方側に配置された操作レバーB1を共有している。本実施形態では、操作レバーB1で操作レバー装置A1を操作するとブームシリンダ5(ブーム8)が駆動され、操作レバーB1で操作レバー装置A3を操作するとバケットシリンダ7(バケット10)が駆動される。操作レバー装置A2,A4は、運転席の左右の他方側に配置された操作レバーB2を共有している。本実施形態では、操作レバーB2で操作レバー装置A2を操作するとアームシリンダ6(アーム9)が駆動され、操作レバーB2で操作レバー装置A4を操作すると旋回モータ4(旋回体12)が駆動される。操作レバー装置A5は操作レバーB3を有し、操作レバーB3で操作レバー装置A5を操作すると右側の走行モータ3a(走行体11)が駆動される。操作レバー装置A6は操作レバーB4を有し、操作レバーB4で操作レバー装置A6を操作すると左側の走行モータ3b(走行体11)が駆動される。操作レバーB3,B4は運転席の前方に右左に並べて配置されている。
 旋回体12には原動機であるエンジン18の他、油圧ポンプ2やパイロットポンプ48が搭載されており、エンジン18によって油圧ポンプ2やパイロットポンプ48が駆動される。油圧ポンプ2はレギュレータ2aによって容量が制御される可変容量型であり、複数の油圧アクチュエータ(ブームシリンダ5、アームシリンダ6、バケットシリンダ7等)を駆動する圧油を吐出する。パイロットポンプ48は固定容量型である。図2の例では、レギュレータ2aはシャトルブロックSBを介して入力される操作レバー装置A1~A6からのパイロット圧により駆動され、入力されたパイロット圧に応じて油圧ポンプ2の吐出流量を制御する。シャトルブロックSBは複数のシャトル弁を含んで構成され、操作レバー装置A1~A6のパイロット圧を伝達するパイロットラインC1~C12の途中に設けられており、操作レバー装置A1~A6のパイロット圧の最大値を選択してレギュレータ2aに入力する。
 パイロットポンプ48の吐出配管であるポンプライン48aはロック弁39を経由し、複数に分岐して操作レバー装置A1~A6やマシンコントロール用の電磁弁ユニット160に接続している。本実施形態のロック弁39は電磁切換弁であり、そのソレノイドは旋回体12の運転室16に配置されたゲートロックレバー(不図示)の位置センサと電気的に接続している。ゲートロックレバーのポジションがその位置センサで検出され、位置センサからゲートロックレバーのポジションに応じた信号がロック弁39に入力される。ゲートロックレバーのポジションがロック位置にあればロック弁39が閉じてポンプライン48aが遮断され、ロック解除位置にあればロック弁39が開いてポンプライン48aが開通する。ポンプライン48aが遮断された状態では操作レバー装置A1~A6による操作が無効化され、旋回や掘削等の動作が禁止される。
 上記の操作レバー装置A1~A6はそれぞれ油圧パイロット方式の一対の減圧弁を含んで構成されている。これら操作レバー装置A1~A6はパイロットポンプ48の吐出圧を元圧として、それぞれオペレータによる操作レバーB1~B4の操作量と操作方向に応じて制御弁ユニット15を駆動するパイロット圧を生成し出力する。制御弁ユニット15は流量制御弁D1~D6を含んで構成されており、油圧ポンプ2からブームシリンダ5、アームシリンダ6、バケットシリンダ7、走行モータ3a,3b及び旋回モータ4に供給される圧油の流れを制御する。流量制御弁D1は操作レバー装置A1からパイロットラインC1,C2を介して受圧室E1,E2に入力されるパイロット圧で駆動され、油圧ポンプ2からの圧油の供給方向や流量を制御してブームシリンダ5を駆動する。流量制御弁D2は操作レバー装置A2からパイロットラインC3,C4を介して受圧室E3,E4に入力されるパイロット圧で駆動されてアームシリンダ6を駆動する。流量制御弁D3は操作レバー装置A3からパイロットラインC5,C6を介して受圧室E5,E6に入力されるパイロット圧で駆動されてバケットシリンダ7を駆動する。同様に流量制御弁D4~D6は操作レバー装置A4~A6からパイロットラインC7~C12を介して受圧室E7~E12に入力されるパイロット圧で駆動されて対応する油圧アクチュエータを駆動する。
 -電磁弁ユニット-
 図3は図2に示した電磁弁ユニット160の詳細図である。同図に示したように、電磁弁ユニット160は、複数の操作レバー装置A1~A3及び制御弁ユニット15の間に設けられている。この電磁弁ユニット160は、電磁比例駆動式の減圧弁である電磁減圧弁V2~V6,V1’,V5’,V6’、及びシャトル弁SV1,SV5,SV6を含んで構成されている。以下の説明において、流量制御弁D1~D3に対するパイロット圧のうち、操作レバー装置A1~A3から出力されるパイロット圧を「第1指令信号」、電磁減圧弁V2~V6,V1’,V5’,V6’から出力されるパイロット圧を「第2指令信号」と称する。第2指令信号には、電磁減圧弁V2~V6で第1指令信号を減圧補正して生成したパイロット圧と、操作レバー装置A1~A3をバイパスしてパイロットポンプ38の吐出圧を電磁減圧弁V1’,V5’,V6’で減圧して別途生成したパイロット圧とが含まれる。マシンコントロール(以下、MCと略称する)は、第2指令信号に基づく流量制御弁D1~D3の制御と定義できる。
 電磁減圧弁V1’は、一次側ポートがポンプライン48aを介してパイロットポンプ48に接続されており、パイロットポンプ48の吐出圧を減圧してブーム上げ用のパイロット圧(第2指令信号)として出力する。シャトル弁SV1は、その一次側ポートが操作レバー装置A1のブーム上げ用のパイロットラインC1と電磁減圧弁V1’の二次側ポートに接続され、二次側ポートが流量制御弁D1の受圧室E1に接続されている。ブーム上げ動作に関し、パイロットラインC1の第1指令信号(ブーム上げ操作信号)と電磁減圧弁V1’の第2指令信号の高圧側がシャトル弁SV1で選択されて流量制御弁D1の受圧室E1に導かれる。
 電磁減圧弁V2は、操作レバー装置A1のブーム下げ用のパイロットラインC2に設置されている。ブーム下げ動作に関し、必要に応じて電磁減圧弁V2で減圧されたパイロットラインC2のパイロット圧が流量制御弁D1の受圧室E2に導かれる。
 電磁減圧弁V3は、操作レバー装置A2のアームクラウド用のパイロットラインC3に設置されている。アームクラウド動作に関し、必要に応じて電磁減圧弁V3で減圧されたパイロットラインC3のパイロット圧が流量制御弁D2の受圧室E3に導かれる。
 電磁減圧弁V4は、操作レバー装置A2のアームダンプ用のパイロットラインC4に設置されている。アームダンプ動作に関し、必要に応じて電磁減圧弁V4で減圧されたパイロットラインC4のパイロット圧が流量制御弁D2の受圧室E4に導かれる。
 電磁減圧弁V5は、操作レバー装置A3のバケットクラウド用のパイロットラインC5に設置されている。電磁減圧弁V5’は、一次側ポートがポンプライン48aを介してパイロットポンプ48に接続されており、パイロットポンプ48の吐出圧を減圧してバケットクラウド用のパイロット圧(第2指令信号)として出力する。シャトル弁SV5は、その一次側ポートがパイロットラインC5と電磁減圧弁V5’の二次側ポートに接続され、二次側ポートが流量制御弁D3の受圧室E5に接続されている。バケットクラウド動作に関し、パイロットラインC5のパイロット圧と電磁減圧弁V5’のパイロット圧の高圧側がシャトル弁SV5で選択されて流量制御弁D3の受圧室E5に導かれる。
 電磁減圧弁V6は、操作レバー装置A3のバケットダンプ用のパイロットラインC6に設置されている。電磁減圧弁V6’は、一次側ポートがポンプライン48aを介してパイロットポンプ48に接続されており、パイロットポンプ48の吐出圧を減圧してバケットダンプ用のパイロット圧(第2指令信号)として出力する。シャトル弁SV6は、その一次側ポートがパイロットラインC6と電磁減圧弁V6’の二次側ポートに接続され、二次側ポートが流量制御弁D3の受圧室E6に接続されている。バケットダンプ動作に関し、パイロットラインC6のパイロット圧と電磁減圧弁V6’のパイロット圧の高圧側がシャトル弁SV6で選択されて流量制御弁D3の受圧室E6に導かれる。
 電磁減圧弁V2~V6はソレノイドが消磁された状態で最大開度(開放状態)となるノーマルオープンタイプであり、コントローラ40からの指令信号(電気信号)の増加に比例して最小開度(本実施形態では開度0)まで開度が減少する。一方、電磁減圧弁V1’,V5’,V6’はソレノイドが消磁された状態で最小開度(本実施形態では開度0)となるノーマルクローズタイプであり、コントローラ40からの指令信号の増加に比例して最大開度まで開度が増加する。コントローラ40からの指令信号により電磁減圧弁V2~V6が作動すると、操作レバー装置A1~A3で生成されたパイロット圧(第1指令信号)を減圧補正したパイロット圧(第2指令信号)が生成される。一方、コントローラ40からの指令信号により電磁減圧弁V1’,V5’,V6’が作動すると、操作レバー装置A1,A3の操作に関係なくブーム上げ、バケットクラウド、バケットダンプに関するパイロット圧(第2指令信号)が発生する。第2指令信号はMC下でコントローラ40が制御したパイロット圧である。こうした電磁減圧弁V2~V6,V1’,V5’,V6’の作用により、例えば掘削目標面St(図4)を超えて作業装置1Aが地面を掘削しないように一定条件下でオペレータの操作にコントローラ40が介入して作業装置1Aの動作を補正する。「掘削目標面」とは本実施形態における油圧ショベルが整地対象とする設計地形の外形面、又はこの外形面から上方に設定距離だけオフセットした面である。
 なお、油圧ショベル1には圧力センサP1~P6が備わっている。圧力センサP1,P2は、操作レバー装置A1とブーム用の流量制御弁D1とを接続するパイロットラインC1,C2に設けられている。電磁減圧弁よりも上流側におけるパイロットラインC1,C2の圧力つまりパイロット圧(第1指令信号)がそれぞれ圧力センサP1,P2で操作レバーB1によるブーム操作量として検出される。圧力センサP3,P4は、操作レバー装置A2とアーム用の流量制御弁D2とを接続するパイロットラインC3,C4に設けられている。電磁減圧弁V3,V4よりも上流側におけるパイロットラインC3,C4の圧力つまりパイロット圧(第1指令信号)がそれぞれ圧力センサP3,P4で操作レバーB2によるアーム操作量として検出される。圧力センサP5,P6は、操作レバー装置A3とバケット用の流量制御弁D3とを接続するパイロットラインC5,C6に設けられている。電磁減圧弁V5,V6よりも上流側におけるパイロットラインC5,C6の圧力つまりパイロット圧(第1指令信号)がそれぞれ圧力センサP5,P6で操作レバーB1によるバケット操作量として検出される。圧力センサP1~P6の検出信号はコントローラ40に入力される。圧力センサP1~P6とコントローラ40との接続線は省略してある。
 -バケット爪先位置(作業装置基準点)の演算方法-
 図4はバケット爪先位置の演算方法の説明図である。
 作業装置1Aの姿勢は図4のショベル基準のローカル座標系で定義できる。図4のローカル座標系は、旋回体12を基準に設定された座標系であり、ブーム8の基部(支点)を原点とし、旋回体12の旋回中心軸と平行に(旋回体12の真上方向に)Z軸を設定し、Z軸と直交する方向(旋回体12の前方)にX軸を設定した。X軸に対するブーム8の傾斜角をブーム角α、ブーム8に対するアーム9の傾斜角をアーム角β、アーム9に対するバケット10の傾斜角をバケット角γとした。水平面(基準面)に対する車体1B(旋回体12)の傾斜角を傾斜角θとした。ブーム角αはブーム角度センサR1により、アーム角βはアーム角度センサR2により、バケット角γはバケット角度センサR3により、傾斜角θは車体傾斜角センサR4により検出される。ブーム角αは、ブーム8を上限まで上げた状態(ブームシリンダ5が最伸長状態)で最小、ブーム8を下限まで下げた状態(ブームシリンダ5が最収縮情愛)で最大となる値である。アーム角βは、アームシリンダ6が最収縮状態で最小、アームシリンダ6が最伸長状態で最大となる値である。バケット角γは、バケットシリンダ7が最収縮状態(図4の状態)で最小、バケットシリンダ7が最伸長状態で最大となる値である。
 このとき、ローカル座標系におけるバケット爪先の位置(Xbk,Zbk)は、次の式(1)(2)で表される。
 Xbk=L1cos(α)+L2cos(α+β)+L3cos(α+β+γ)…式(1)
 Zbk=L1sin(α)+L2sin(α+β)+L3sin(α+β+γ)…式(2)
 L1はブーム8の基部からアーム9との連結部までの長さ、L2はアーム9とブーム8の連結部からアーム9とバケット10の連結部までの長さ、L3はアーム9とバケット10の連結部からバケット10の先端部までの長さである。
 -マシンコントロール-
 コントローラ40には、操作レバー装置A1~A3の少なくとも1つが操作された場合に、一定条件下でオペレータの操作に介入して作業装置1Aの動作を制限するMC機能が備わっている。MCはバケット爪先位置や操作状況に応じてコントローラ40が電磁減圧弁V2~V6,V1’,V5’,V6’を制御することで実行される。コントローラ40に実装され得るMC機能には、操作レバー装置A2でアーム操作をする際に実行される「領域制限制御」、アーム操作を伴わずブーム下げ操作をする際に実行される「停止制御」や「転圧制御」が含まれる。
 領域制限制御は「整地制御」とも呼ばれる。領域制限制御が機能している間、掘削目標面Stから下側の領域を作業装置1Aが掘削しないようにブームシリンダ5、アームシリンダ6及びバケットシリンダ7の少なくとも1つが制御され、アーム操作によってバケット爪先が掘削目標面Stに沿って移動する。具体的には、掘削目標面Stに垂直な方向のバケット爪先の速度ベクトルがゼロになるように、アーム操作に伴うアーム動作中にブーム上げ又はブーム下げの微動が指令される。回動運動であるアーム動作によるバケット爪先の軌跡を掘削目標面Stに沿って直線軌道に補正するためである。
 停止制御は、掘削目標面Stよりも下方の領域にバケット爪先が侵入しないようにブーム下げ動作を停止する制御であり、ブーム下げ操作中にバケット爪先が掘削目標面Stに接近するにつれブーム下げ動作を減速させる。
 転圧制御は転圧作業を許容するための制御である。転圧作業とは、バケット10の背側面を勢い良く押し当てることで地面を押し固める作業である。しかし、MCは基本的に掘削目標面Stの付近で掘削目標面Stに対するバケット爪先の接近速度を減じるため、成形した掘削目標面Stの転圧を意図してブーム下げ操作をしてもバケット10を掘削目標面Stに勢い良く押しあてることができない。転圧制御が機能している間は、掘削目標面Stとバケット爪先との距離が近くても、ブーム下げ動作の減速が抑制される(後述)。
 -コントローラ(ハードウェア)-
 図5は油圧ショベルのコントローラ40のハードウェア構成図、図6は表示装置DSの表示画面の一例の図である。
 図5に示したコントローラ40は車載コンピュータであり、入力インターフェース41、CPU(中央演算処理装置)42、ROM(リードオンリーメモリ)43、RAM(ランダムアクセスメモリ)44、出力インターフェース45を含んで構成されている。
 入力インターフェース41には、姿勢センサR、目標面設定装置Ts、GNSSアンテナG1,G2、操作センサP、モードスイッチSWからの各信号が入力され、CPU42による演算のために必要に応じてデジタル変換する。なお、姿勢センサRは作業装置1Aの姿勢を検出するために設置された複数のセンサであって、具体的には角度センサR1~R3及び車体傾斜角センサR4である。操作センサPは圧力センサP1~P6である。目標面設定装置Tsは掘削目標面Stに関する情報(各掘削目標面の位置情報や傾斜角度情報を含む)を入力するインターフェースである。この目標面設定装置Tsはグローバル座標系(絶対座標系)で規定された掘削目標面の3次元データを格納した外部端末(不図示)と接続されており、外部端末から掘削目標面の3次元データが入力される。但し目標面設定装置Tsを介したコントローラ40への掘削目標面の入力は、オペレータによる手動入力も可能である。モードスイッチSWは作業モードを設定する入力装置である。
 ROM43は、後で図7~図11により説明する処理を含めたMC機能を実行するための制御プログラムや処理の実行に必要な各種情報等が記憶されている。RAM44はCPU42による演算結果や入力インターフェース41から入力された信号を記憶する。なお、本実施形態では記憶装置としてROM43及びRAM44といった半導体メモリを備えたコントローラ40を例示しているが、記憶装置の種類に特別な限定はなく、例えばハードディスクドライブ等の磁気記憶装置を用いることもできる。
 CPU42は、ROM43に記憶された制御プログラムに従って入力インターフェース41、ROM43、RAM44から取り入れた信号に基づいて所定の演算処理を実行する。
 出力インターフェース45は、CPU42による演算結果に基づく出力用の信号を生成し、その信号を電磁減圧弁V2~V6,V1’,V5’,V6’及び表示装置DSに出力する。これにより電磁減圧弁V2~V6,V1’,V5’,V6’や表示装置DSが作動する。表示装置DSはタッチパネル式の液晶モニタであり、運転室16の内部に設置されている。図6に示すように、表示装置DSの表示画面には、掘削目標面Stと作業装置1A(例えばバケット10)の位置関係として、掘削目標面Stとバケット10の爪先までの距離(目標面距離H1)が表示される。目標面距離H1は掘削目標面Stを基準に上方向に正の値、下方向に負の値をとる。なお、図6のような表示はモードスイッチSWでMC機能を加除した状態でも表示装置DSに表示させることができ、オペレータはこの表示を参考に作業装置1Aを操作することができる(いわゆるマシンガイダンス機能)。
 -コントローラ(機能)-
 図7はコントローラ40の機能ブロック図、図8はMCにより制御されたバケット爪先の軌跡の一例を示す図である。
 図7に示すように、コントローラ40のCPU42には、操作量演算部42A、姿勢演算部42B、目標面演算部42C、制限速度演算部42D、電磁減圧弁制御部42E、表示制御部42Fが含まれている。操作量演算部42A、姿勢演算部42B、目標面演算部42C、制限速度演算部42D、電磁減圧弁制御部42E、表示制御部42Fは、図式化して表したコントローラ40におけるCPU42の機能である。電磁減圧弁制御部42Eには更に、制限パイロット圧演算部42a、制限パイロット圧介入決定部42b(以下、介入決定部42bと略称する)、バルブ指令演算部42cが含まれている。
 (1)操作量演算部
 操作量演算部42Aでは、操作センサP(圧力センサP1~P6)の検出値を基に操作レバー装置A1,A2,A3(操作レバーB1,B2)の操作量が算出される。圧力センサP1の検出値からはブーム上げの操作量、圧力センサP2の検出値からはブーム下げの操作量が算出される。圧力センサP3の検出値からはアームクラウド(アーム引き)の操作量、圧力センサP4の検出値からはアームダンプ(アーム押し)の操作量が算出される。圧力センサP5の検出値からはバケットクラウドの操作量、圧力センサP6の検出値からはバケットダンプの操作量が算出される。こうして操作量演算部42Aで圧力センサP1~P6の検出値から変換された操作量は制限速度演算部42Dに出力される。
 なお、圧力センサP1~P6による操作量の算出は一例に過ぎず、例えば各操作レバー装置A1~A3の操作レバーの回転変位を検出する位置センサ(例えばロータリーエンコーダ)で操作レバーの操作量を検出する構成としても良い。
 (2)姿勢演算部
 姿勢演算部42Bでは、姿勢センサRの検出信号に基づき、ローカル座標系における作業装置1Aの姿勢とバケット10の爪先の位置が演算される。バケット10の爪先の位置(Xbk,Zbk)は、既述の通り式(1)及び式(2)により演算できる。グローバル座標系における作業装置1Aの姿勢と、バケット10の爪先の位置が必要な場合、姿勢演算部42Bは、GNSSアンテナG1,G2の信号から旋回体12のグローバル座標系における位置と姿勢を算出してローカル座標系をグローバル座標系に変換する。
 (3)目標面演算部
 目標面演算部42Cでは、目標面設定装置Tsを介して入力される情報に基づいて掘削目標面Stの位置情報が演算され、演算された掘削目標面Stの位置情報がRAM44に記録される。本実施形態では、目標面設定装置Tsを介して3次元データで提供される掘削目標面を作業装置1Aが移動する平面(作業装置の動作平面)で切断した断面(先に図4に示したような2次元の掘削目標面)の情報が掘削目標面Stの位置情報として演算される。
 なお、図4の例では掘削目標面Stは1つだが、掘削目標面が複数存在する場合もある。掘削目標面が複数存在する場合には、例えば、バケット爪先に最も近いものを掘削目標面と設定する方法、バケット爪先の鉛直下方に位置するものを掘削目標面とする方法、任意に選択したものを掘削目標面とする方法等がある。
 (4)制限速度演算部
 制限速度演算部42Dでは、作業装置1Aで掘削目標面Stを超えて地面を掘削しないように、姿勢センサRの信号を基にMC時(領域制限制御時)のブームシリンダ5、アームシリンダ6、バケットシリンダ7の各制限速度(伸長速度の制限値)が演算される。本実施形態では、まず操作量演算部42Aから入力される操作レバー装置A1~A3の操作量を基にブームシリンダ5、アームシリンダ6、バケットシリンダ7の一次目標速度がそれぞれ計算される。次にこれら一次目標速度と、姿勢演算部42Bで求めたバケット爪先の位置と、ROM43に記憶してある作業装置1Aの各部寸法(上記L1,L2,L3等)とからバケット爪先の目標速度ベクトルVc(図8)が求められる。そして、バケット10が降下して目標面距離H1がゼロに近付くにつれて目標速度ベクトルVcの掘削目標面Stとの直交成分Vcyがゼロに近付くように、ブームシリンダ5、アームシリンダ6、バケットシリンダ7の1つ以上の一次目標速度が制限補正される。このようにてブームシリンダ5、アームシリンダ6、バケットシリンダ7の制限速度を演算することで、オペレータの操作に応じたバケット爪先の目標速度ベクトルVcが図8に示したようにVca(図8)に変換(方向変換制御)される。目標面距離H1がゼロの場合の速度ベクトルVca(≠0)は掘削目標面Stに平行な成分Vcxのみになる。これにより掘削目標面Stより下側の領域にバケット爪先が侵入しないように、掘削目標面Stから上の領域にバケット爪先が保持される。
 このとき、方向変換制御は、ブーム上げ又はブーム下げとアームクラウドとの組み合わせにより実行される場合と、ブーム上げ又はブーム下げとアームダンプとの組み合わせにより実行される場合とがある。いずれの場合においても、目標速度ベクトルVcが掘削目標面Stに接近する下向き成分(Vcy<0)を含むとき、制限速度演算部42Dでは、その下向き成分を打ち消すブーム上げ方向のブームシリンダ5の制限速度が演算される。反対に目標速度ベクトルVcが掘削目標面Stから離れる上向き成分(Vcy>0)を含むとき、制限速度演算部42Dでは、その上向き成分を打ち消すブーム下げ方向のブームシリンダ5の制限速度が演算される。また、ブーム動作用の電磁減圧弁V2,V1’等の応答遅れを加味し、アームクラウド操作直後はアームクラウドの制限速度の増加率を制限して出力するようにする。アームクダンプ操作直後も同じくアームクダンプの制限速度の増加率を制限して出力するようにする。
 なお、領域制限制御が行われない場合、制限速度演算部42Dでは、操作レバー装置A1~A3の操作に応じた各油圧シリンダの制限速度(一次目標速度)がそのまま制限速度として演算され出力される。
 制限速度演算部42Dで演算された制限速度は、制限パイロット圧演算部42aに出力される。
 (5)制限パイロット圧演算部
 制限パイロット圧演算部42aでは、制限速度演算部42Dで算出された各制限速度を基にブームシリンダ5、アームシリンダ6、バケットシリンダ7に各対応する流量制御弁D1,D2,D3への制限パイロット圧Pr1が演算される。制限パイロット圧演算部42aで演算された制限パイロット圧Pr1は、介入決定部42bに出力される。
 (6)制限パイロット圧介入決定部
 介入決定部42bでは、制限パイロット圧演算部42aで演算された制限パイロット圧Pr1を基に、一定条件下で必要に応じて変更が加えられて最終的な制限パイロット圧RPr2が決定される。具体的には、ブーム下げ、アームダンプ及びアームクラウドについてMCによる動作速度の制限を抑えたい状況下で、制限パイロット圧演算部42aで演算された流量制御弁D1,D2の受圧室E2~E4に対する制限パイロット圧Pr2が増加方向に変更される。介入決定部42bの機能に伴い、MCによりアクチュエータ速度が制限される状況下においても一定条件下で電磁減圧弁V2~V4の開度がMCによる本来の開度(制限速度演算部42Dで演算された制限速度に基づく開度)から増加する。この場合、ブーム下げ、アームダンプ及びアームクラウドの各動作についてMCによる制限が緩和される。介入決定部42bにおける制限パイロット圧の変更は、目標面距離H1、ブーム上げ操作の状況、アームクラウド、アームダンプ、ブーム下げの各動作にそれぞれ対応する制限パイロット圧に基づいて実行される。制限パイロット圧の変更を要しない場合は、介入決定部42bで決定される制限パイロット圧Pr2は、制限パイロット圧演算部42aで演算された制限パイロット圧Pr1(制限速度演算部42Dで演算された制限速度に基づくパイロット圧)となる。介入決定部42bにおける処理内容については図9を用いて後述する。
 (7)バルブ指令演算部
 バルブ指令演算部42cでは、介入決定部42bで決定した制限パイロット圧Pr2に基づく電気信号が演算され、それぞれ電磁減圧弁V2~V6,V1’,V5’,V6’に出力される。バルブ指令演算部42cから出力された電気信号で各ソレノイドが励磁されて電磁減圧弁V2~V6,V1’,V5’,V6’が作動し、流量制御弁D1~D3に作用するパイロット圧が状況に応じて制限パイロット圧Pr2で制限される。例えばオペレータがアームクラウド動作による水平掘削を意図して操作レバー装置A2を操作した場合には、バケット爪先が掘削目標面Stの下方領域に侵入しないように状況に応じて電磁減圧弁V1’,V3が制御される。この場合、オペレータの操作に応じたアームクラウド動作にアームクラウドの減速動作やブーム上げ動作が自動的に合成され、コントローラ40のアシストを得てアームクラウド操作のみで水平掘削動作が実行される。その一方で、操作レバー装置A1からブーム上げ操作信号が出力されている間、図9で後述するように介入決定部42bの目標パイロット圧の介入決定により電磁減圧弁V2~V4の開度が制限速度に基づく開度よりも大きく決定される。これにより本来的にはMCにより動作速度が制限される条件下でも、アームクラウド、アームダンプ及びブーム下げの各動作については制限が緩和される。
 -電磁弁開度決定手順-
 図9は介入決定部42bによるアームクラウド、アームダンプ及びブーム下げについての制限パイロット圧Pr2の決定手順を表すフローチャートである。介入決定部42bは所定の周期(例えば1ms)で図9の処理を繰り返し実行する。介入決定部42bは、操作レバー装置A1によりブーム上げ操作がされている間、アームクラウド及びアームダンプの動作について制限パイロット圧Pr2の設定を最大圧力Pmaxまで増加させる特徴的機能を備えている。最大圧力Pmaxは、図3の回路において流量制御弁D1,D2の受圧室E2~E4に出力し得る最大の圧力であり、制限パイロット圧演算部42aで制限速度に基づいて演算された制限パイロット圧Pr1よりも高い。
 同図の処理を開始すると、介入決定部42bは、姿勢演算部42Bから入力される目標面距離H1に基づいて掘削目標面Stからバケット爪先が十分に離れているかを判定する(ステップS301)。ここではH1≧Hthであるか否かで掘削目標面Stからバケット爪先が十分離れているかを判定する。Hthは目標面距離H1について予め設定された設定距離(>0)である。また、MCにより電磁減圧弁V2~V6,V1’,V5’,V6’が制御される(MCによる作業装置1Aの動作制限がかかる)領域を規定する掘削目標面Stからバケット爪先の設定距離をH2とすると、H2≦Hthである。MCを適正に機能させる観点ではH2<Hthであることが望ましい。介入決定部42bは、H1≧Hthであれば掘削目標面Stからバケット爪先が十分離れていると判定してステップS302に手順を移し、H1<Hthであれば掘削目標面Stからバケット爪先が近いと判定してステップS303に手順を移す。
 H1≧Hthの場合、介入決定部42bは、電磁減圧弁V2~V4の開度を最大開度にすべく流量制御弁D1,D2の受圧室E2~E4に対する制限パイロット圧Pr2が無条件で最大圧力Pmaxに決定される(ステップS302)。
 H1<Hthの場合、介入決定部42bは、圧力センサP1の検出信号(圧力)P0に基づいてブーム上げ操作がされているかを判定する(ステップS303)。ここではP0≧Pthであるか否かでブーム上げ操作がされているかを判定する。Pthは圧力センサP1の検出信号P0について予め設定されてROM43に記憶された閾値であり、ブーム8が上昇し始めるパイロット圧である。介入決定部42bは、P0≧Pthの場合はブーム上げ操作がされていると判定してステップS302に手順を移し、P0<Pthであればブーム上げ操作がされていないと判定してステップS304に手順を移す。結果、ブーム上げ操作中においては、無条件で電磁減圧弁V2~V4が最大開度で待機した状態となり、アームクラウド、アームダンプ、ブーム下げの各操作については目標面距離H1によらずMCが解除される。従って、ブーム上げ操作と同時に例えばアームクラウド操作又はアームダンプ操作をした場合には、MC機能による制限を受けることなくアーム9をクラウド方向又はダンプ方向に操作に応じた速度で動かせるようになる。
 他方、掘削目標面Stにバケット爪先が接近していてブーム上げ操作もない場合、介入決定部42bは、ブーム上げについて無操作継続時間Tbm[s]がTth[s]未満であるかを判定する(ステップS304)。Tthは無操作継続時間Tbmについて予め設定されてROM43に記憶されている閾値としての予め設定された所定時間である。ここでは圧力センサP1の検出信号P0がPth以上からPth未満となった時点をTbm=0として、これ以降の経過時間(=Tbm)がTth未満かが判定される。介入決定部42bでは、Tbm<TthであればステップS305に手順が移り、Tbm≧TthであればステップS306に手順が移る。
 ブーム上げ操作が停止して所定時間Tthが到来するまで(Tbm<Tth)は、介入決定部42bでは、アームクラウド、アームダンプ、ブーム下げについて無操作継続時間Tbmに応じた遷移圧力Psが計算される。そして、これら遷移圧力Psがアームクラウド、アームダンプ、ブーム下げについての制限パイロット圧Pr2として決定される(ステップS305)。詳細は後述するが、ここで計算される遷移圧力Psは、電磁減圧弁V2~V4の開度を最大開度(MC解除状態の開度)から制限パイロット圧Pr1に応じた開度(MC機能状態の開度)に所定時間Tthをかけて戻す(例えば単調に減少させる)ための値である。制限パイロット圧として遷移圧力Psが設定される間については、アームクラウド、アームダンプ、ブーム下げについてMC機能は半解除状態となる(時間経過に伴ってMCによる制限が強くなっていく状態である)。
 無操作継続時間Tbmが所定時間Tthに達したら、介入決定部42bでは、アームクラウド、アームダンプ、ブーム下げについて制限パイロット圧演算部42aで演算された制限パイロット圧Pr1が閾値Pth2未満かどうかが判定される(ステップS306)。Pth2はアームクラウド、アームダンプ、ブーム下げの各動作に関して制限パイロット圧演算部42aで演算された制限パイロット圧Pr1について各々予め設定された閾値であり、例えばアームクラウド、アームダンプ、ブーム下げの各動作が始まる圧力である。アームクラウド、アームダンプ、ブーム下げの動作毎に制限パイロット圧Pr1は異なり得るため、ステップS306の判定結果も動作によって異なり得る。図9ではアームクラウド、アームダンプ、ブーム下げの各動作についてフローチャートを兼ねているが、厳密にはこれら3つの動作について図9の手順が個別に実行される。
 制限パイロット圧がPth2未満の場合、介入決定部42bでは、最小圧力Pminが制限パイロット圧Pr2に決定される(ステップS307)。制限パイロット圧Pr1がPth2以上の場合、介入決定部42bでは、制限パイロット圧Pr1が制限パイロット圧Pr2に決定される(ステップS308)。ステップS306-S308の手順ではMCが通常に機能する。
 ステップS302,S305,S307,S309において制限パイロット圧Pr2が決定したら、介入決定部42bでは、決定した制限パイロット圧Pr2がバルブ指令演算部42cに出力され、ステップS301に手順が戻る(ステップS309)。
 -遷移圧力演算方法-
 図10は介入決定部42bによる図9のフローチャートのステップS305における遷移圧力の演算ロジックを表すブロック線図である。図10の演算ロジックによりブーム下げ、アームクラウド、アームダンプの各動作について過渡的な制限パイロット圧としての遷移圧力が演算される。ここでは図10を用いてアームクラウド動作に関して遷移圧力を演算する場合を代表して説明するが、アームダンプ及びブーム下げの各動作についての遷移圧力の演算も同様である。
 遷移圧力の演算に当たっては、まず操作量演算部42Aで演算されたブーム上げパイロット圧が入力され(S1)、ブーム上げパイロット圧がPthからPth未満となった時点からの経過時間(無操作継続時間Tbm)が演算される(S2)。無操作継続時間Tbmはブーム上げパイロット圧がPth以上となる度にゼロにリセットされる。演算された無操作継続時間Tbmは圧力比率テーブルに入力され、圧力比率テーブルに基づいて圧力比率δ(図11)が演算される(S3)。圧力比率δとは、遷移圧力Psに占めるアームクラウドについての制限パイロット圧Pr1(目標速度に応じた値)の割合である。圧力比率テーブルは、ブーム上げの無操作継続時間Tbmがゼロから所定時間Tthに至る間に0(最小)から1.0(最大)まで圧力比率δが増加するように設定されている(図11)。また、アームクラウドについての制限パイロット圧Pr1が入力され(S4)、圧力比率テーブルに基づいて演算された圧力比率δが制限パイロット圧Pr1に乗算される(S5)。また、アームクラウド動作に関して流量制御弁D2の受圧室E3に作用し得る規定の最大圧力PmaxがROM43から入力され(S6)、この値に(1-δ)が乗算される(S7)。最大圧力Pmaxと(1-δ)の乗算値は、制限パイロット圧Pr1とδの乗算値に加算されて(S8)遷移圧力Psとして出力される(S9)。
 図11は図9の手順で演算される制限パイロット圧Pr2とブーム上げ操作との関係を表す図である。同図に示すように、ブーム上げ操作中は最大圧力Pmaxが制限パイロット圧Pr2、ブーム上げ操作停止後所定時間Tthは遷移圧力Psが制限パイロット圧Pr2となる。ブーム上げ操作が停止して所定時間Tthが経過した後は、制限パイロット圧Pr1が制限パイロット圧Pr2となる。図11における制限パイロット圧Pr1の変動は一例である。遷移圧力Psの演算に関し、圧力比率δは、ブーム上げパイロット圧が操作状態(Pth以上)から非操作状態(Pth未満)となってから所定時間Tthで0から1.0まで単調増加するように規定されている。このように圧力比テーブルを規定することで、図11に示したようにブーム上げ操作を停止すると、目標面距離H1がHth未満の条件下では所定時間Tthで遷移圧力Psは最大圧力Pmaxから制限パイロット圧Pr1まで単調に減少する。
 -動作-
 本実施形態においては、電磁弁ユニット160のブーム下げ、アームクラウド、アームダンプに関して電磁減圧弁V2~V4の制御に特徴がある。以下に電磁減圧弁V2~V4の動作について条件毎に説明する。
 (1)掘削目標面Stからバケット爪先が十分に離れている場合
 姿勢演算部42Bで演算される目標面距離H1がHth以上の場合、掘削目標面Stに作業装置1Aが干渉する恐れがなく、オペレータの操作に介入してブーム下げ、アームクラウド、アームダンプの減速制御を実行する必要がない。そのため、アームクラウド、アームダンプ、及びブーム下げの制限パイロット圧Pr2に操作量によらず最大圧力Pmaxが設定され、電磁減圧弁V2~V4が開放される方向に制御される(本例では開放される)。これによりオペレータの操作に応じて操作レバー装置A1,A2で生成されるパイロット圧が流量制御弁D2,D3の受圧室E2~E4に作用し、オペレータの操作に応じた速度でブームやアームが動作する。
 (2)バケット爪先が掘削目標面Stに接近している場合
 目標面距離H1がHth未満の状況でも、ブーム上げ操作がされている間、アームクラウド、アームダンプ及びブーム下げについて操作量によらず制限パイロット圧Pr2に最大圧力Pmaxが設定され、電磁減圧弁V2~V4が開放される。本実施形態ではブーム上げ操作が行われたことがトリガとなって、モードスイッチSW(図5)の操作がなくても目標面距離H1に関わらず、アームクラウド、アームダンプ及びブーム下げについて自動的にMCが解除される。これによりオペレータの操作に応じて操作レバー装置A1,A2で生成されるパイロット圧が流量制御弁D2,D3の受圧室E2~E4に作用し、オペレータの操作に応じた速度でブーム8やアーム9が動作する。
 また、本実施形態においては、ブーム上げ操作を停止した際、目標面距離H1がHth未満であれば電磁減圧弁V2~V4の動作はMC下の動作に直ちには復帰しない。ブーム上げ操作の停止から所定時間Tthは、アームクラウド、アームダンプ及びブーム下げの各動作について操作量によらず制限パイロット圧Pr2に遷移圧力Psが設定される。これにより電磁減圧弁V2~V4についてはMCの半解除状態となり、オペレータの操作に応じてブーム8やアーム9が動作する状態から時間経過に伴ってMCによる動作制限の効き方が強くなる。ブーム上げ操作がないまま所定時間Tthが経過すると電磁減圧弁V2~V4の動作は通常のMC下の動作に復帰する。
 -効果-
 (1)本実施形態では、操作レバー装置A1によりブーム上げ操作がされている間、アームクラウド及びアームダンプの動作に対応する電磁減圧弁V2,V3の開度を制限速度に基づく開度(本実施形態では最大開度)よりも大きくする。これにより、MC制御に介入して掘削目標面St付近で応答良く作業装置1Aのアームクラウド及びアームダンプの動作を含む転圧作業等の作業を円滑にすることができる。
 MCによるアシストを要する場面では主にアーム操作が行われ、一般にブーム上げ操作は行われない。この点に着眼し、本実施形態ではブーム上げ操作が行われたことをトリガとして、例えばモードスイッチSWを操作しなくても目標面距離H1に関わらず特定の電磁減圧弁について自動的にMCが解除されるようにした。本実施形態では整地(MC)を意図しない転圧作業等を想定し、これら作業に関連の強い電磁減圧弁V2~V4を開放することとしている。この場合、掘削目標面Stの近傍でブーム上げ操作で掘削目標面Stとバケット10との距離をとってからアーム操作で位置合わせを行う際、MC時でも操作に応じた速度でアーム9が動作して作業効率が向上し、オペレータの心理的疲労も軽減される。ブーム上げとアームクラウド(又はダンプ)の複合操作でバケット10の位置合わせを行う際にも同様の効果が得られる。
 (2)本実施形態では、ブーム上げ操作の停止後、電磁減圧弁V2~V4の開度を単調に減少させ、ブーム上げ操作の停止から所定時間Tthで制限パイロット圧Pr1に基づく開度に復帰させる。これにより例えば転圧作業時におけるブーム上げ後のブーム下げ動作もMCによる制限が抑えられ、作業効率の向上や、オペレータの心理的疲労軽減の効果が大きい。
 また、所定時間Tthが長い程、電磁減圧弁V2~V4の開度がMC下での値より大きくなる時間が長くなるため、ブーム上げ操作後にアームクラウド、アームダンプ及びブーム下げの応答が改善する時間を長く確保できる。反対に、所定時間Tthが短い程、ブーム上げ操作後早期にアームクラウド、アームダンプ及びブーム下げの動作についてMCによる本来の制限が効くようになり、掘削目標面Stを超えて地面を掘削することを抑制できる。所定時間Tthの調整によって作業装置1Aの応答性と掘削目標面Stの保護性を柔軟に調整することができる。
 <第2実施形態>
 図12は本発明の第2実施形態における油圧ショベルに備わったコントローラによるアームクラウド、アームダンプ及びブーム下げについての制限パイロット圧の決定手順を表すフローチャートであって第1実施形態の図9に対応する図である。図13は図12の手順で演算される制限パイロット圧Pr2とブーム上げ操作との関係を表す図であって第1実施形態の図11に対応する図である。
 本実施形態が第1実施形態と相違する点は、介入決定部42bによるアームクラウド、アームダンプ及びブーム下げについての制限パイロット圧Pr2の決定手順にあり、具体的には遷移圧力の演算手順(図9のステップS304,S305)を省略した点である。本実施形態では、ステップS303でブーム上げ操作なしと判定された場合、ブーム上げについての無操作継続時間Tbmに関係なくステップS306に手順を移す。従って、目標面距離H1がHth以下の条件では、ブーム上げ操作の停止と同時に制限パイロット圧演算部42aで演算された制限パイロット圧Pr1が制限パイロット圧Pr2となる。従って、目標面距離H1がHth以下の条件では、ブーム上げ操作の停止後速やかに、電磁減圧弁V2~V4の開度が最大開度から目標速度に応じた開度に変更される。構成及び機能を含めてその他の点について本実施形態は第1実施形態と同様である。
 本実施形態においても、第1実施形態で説明した基本的効果(1)を得ることができ、またブーム上げ操作後において掘削目標面Stを超えて地面を掘削する可能性を第1実施形態よりも抑制できる。
 <第3実施形態>
 図14は本発明の第3実施形態における油圧ショベルに備わったコントローラの機能ブロック図であって第1実施形態の図7に対応する図である。本実施形態が第1実施形態と相違する点は、制限速度演算部42Dに制限速度の補正演算機能としての制限速度補正部42Daが付加された点である。制限速度補正部42Daでは、ブーム上げ操作量と、アームクラウド、アームダンプの制限速度に基づいて、制限パイロット圧演算部42aに出力するアームクラウド、アームダンプについての制限速度が補正される。具体的には、ブーム上げ操作を停止してから一定時間の間、アームクラウド又はアームダンプについて演算された制限速度がブーム上げ操作を停止してからの経過時間(無操作継続時間Tbm)に基づく補正増加率で増加方向に補正される(後述)。
 図15は制限速度補正部42Daにおけるアームクラウド及びアームダンプについての制限速度の補正演算ロジックを表すブロック線図である。図15の演算ロジックによりアームクラウド、アームダンプの制限速度が適宜補正されて個々に演算される。ここでは図15を用いてアームクラウド動作に関する制限速度の演算ロジックを代表して説明するが、アームダンプ動作の制限速度についての演算ロジックも同様である。
 制限速度の補正に当たっては、まず操作量演算部42Aで演算されたブーム上げパイロット圧が入力され(S11)、ブーム上げパイロット圧がPthからPth未満となった時点からの経過時間(無操作継続時間Tbm)が演算される(S12)。無操作継続時間Tbmはブーム上げパイロット圧がPth以上となる度にゼロにリセットされる。演算された無操作継続時間Tbmは減速比率テーブルに入力され、減速比率テーブルに基づいて減速比率ε(図16)が演算される(S13)。減速比率εとは、アームクラウド動作について制限速度演算部42Dでアームクラウド操作量と姿勢演算部42Bで求めたバケット爪先の位置に基づいて求められた補正前の制限速度の増加率が、後に求める補正増加率に占める割合である。減速比率テーブルは、ブーム上げの無操作継続時間Tbmがゼロから予め設定された所定時間ΔT’に至る間に0(最小)から1.0(最大)まで減速比率εが増加(本例では線形的に増加)するように規定されている(図16)。制限速度補正部42Daでは、アームクラウド動作について制限速度演算部42Dで求められた補正前の制限速度増加率(S14)に、減速比率テーブルに基づいて演算された減速比率εが乗算される(S15)。
 その一方で、アームクラウドについてのブーム上げ操作後制限速度増加率(=既定値>補正前の制限速度増加率)が例えばROM43から入力され(S16)、この値に比率(1-ε)が乗算される(S17)。ブーム上げ操作後制限速度増加率の(1-ε)倍の値と、補正前の制限速度増加率のε倍の値とが加算されて補正増加率が演算される(S18)。
 そしてアームクラウドについて演算された制限速度(S19)について、アームクラウド操作の直後(例えばブーム上げ操作停止後の所定時間ΔT’)に限ってアームクラウドについて補正前の制限速度が前述した補正増加率で増加方向に補正される(S20)。上記の通り、ブーム上げ操作後一定時間は、経過時間が短い程、補正前の制限速度よりも大きなブーム上げ操作後制限速度増加率が強く影響し、大きく増加補正される。他方、アームクラウド操作の直後を除き(例えばブーム上げ操作停止後の所定時間ΔT’以外)、アームクラウドについての制限速度は補正されない。このようにして制限速度演算部42Dにおいて制限速度補正部42Daにより必要に応じて増加補正された制限速度が制限パイロット圧演算部42aに出力され(S21)、制限パイロット圧演算部42aで制限パイロット圧Pr1に変換される。
 図16は本実施形態における油圧ショベルに備わったコントローラ(介入決定部42b)で演算されるアームクラウド等の制限パイロット圧のブーム上げ操作との関係を表す図である。図16では介入決定部42bにおいて図13(第2実施形態)に示した態様で制限パイロット圧を演算した場合を例示しているが、本実施形態による制限速度の演算方法は第1実施形態にも当然に適用できる。
 図16に示すように、ブーム上げ操作の停止後一定時間は制限速度の補正をしない場合に比べて制限パイロット圧Pr2が大きく演算され、電磁減圧弁V3,V4の開度も増加する。第1及び第2実施形態では一定条件下で見かけ上の制限パイロット圧を増加させることで電磁減圧弁の開度を増加させたが、本例のように見かけ上の制限速度を増加させることで電磁減圧弁の開度を上げることができる。制限速度の補正を組み合わせることで、制限パイロット圧Pr2の制御態様のバリエーションが増し、より柔軟な操作性の実現に寄与し得る。
 <変形例>
 第1及び第2実施形態では、アームクラウド、アームダンプ、ブーム下げを制限パイロット圧Pr2の切換制御の対象とした場合を例に挙げて説明した。しかし、アームクラウドとアームダンプのみが応答遅れ改善の対象であれば、ブーム下げについては制限パイロット圧Pr2の切換制御の対象から外しても良い。反対にバケットダンプやバケットクラウドについての応答遅れの改善も必要であれば、これらを対象に含めることもできる。バケットクラウドやバケットダンプについても、アームクラウド等と同じように制限パイロット圧を演算し、電磁減圧弁の作動度合を制御すれば良い。この場合、δ,ε,Tth,Pth,Hthの各パラメータについては、アームクラウド、アームダンプ、ブーム下げ、バケットクラウド、バケットダンプで共用しても良いし別個の値を設定しても良い。なお、強制ブーム上げについての電磁減圧弁V1’について特に説明していないが、電磁減圧弁V3等と同様に制御することもできるが、例えばMC解除時、半解除時(例えば図11におけるTht以前)は消磁状態(開度0)としておくことができる。
1…油圧ショベル、1A…作業装置、2…油圧ポンプ、5…ブームシリンダ(油圧アクチュエータ)、6…アームシリンダ(油圧アクチュエータ)、7…バケットシリンダ(油圧アクチュエータ)、8…ブーム、9…アーム、10…バケット、15…制御弁ユニット、40…コントローラ、42b…制限パイロット圧介入決定部、42D…制限速度演算部、160…電磁弁ユニット、A1~A6…操作レバー装置、R1~R3…角度センサ(姿勢センサ)、R4…車体傾斜角センサ(姿勢センサ)、St…掘削目標面,Tth…所定時間、V2~V6,V1’,V5’,V6’…電磁減圧弁、ΔT’…一定時間

Claims (5)

  1.  ブーム及びアームを含んで構成された多関節型の作業装置と、
     前記ブームを駆動するブームシリンダを含む作業装置駆動用の複数の油圧アクチュエータと、
     前記作業装置の姿勢を検出する複数の姿勢センサと、
     前記複数の油圧アクチュエータを駆動する圧油を吐出する油圧ポンプと、
     前記油圧ポンプから前記複数の油圧アクチュエータに供給される圧油の流れを制御する制御弁ユニットと、
     パイロットポンプの吐出圧を元圧として前記制御弁ユニットを駆動するパイロット圧を出力する複数の操作レバー装置と、
     前記複数の操作レバー装置及び前記制御弁ユニットの間に設けた複数の電磁減圧弁を含んで構成された電磁弁ユニットと、
     前記複数の姿勢センサの信号を基に前記複数の油圧アクチュエータの制限速度を演算し、前記制限速度に基づいて、掘削目標面を超えて地面を掘削しないように前記電磁減圧弁の開度を制御するコントローラとを備えた油圧ショベルにおいて、
     前記コントローラは、前記操作レバー装置からブーム上げ操作信号が出力されている間、前記電磁弁ユニットに含まれるアームクラウド及びアームダンプの動作に対応する電磁減圧弁の開度を前記制限速度に基づく開度よりも大きくなるように制御することを特徴とする油圧ショベル。
  2.  請求項1に記載の油圧ショベルにおいて、前記コントローラは、前記アームクラウド及びアームダンプの動作に対応する電磁減圧弁の開度を前記制限速度に基づく開度よりも大きくなるように制御する際、ブーム下げの動作に対応する電磁減圧弁の開度も前記制限速度に基づく開度より大きくなるように制御することを特徴とする油圧ショベル。
  3.  請求項1に記載の油圧ショベルにおいて、前記コントローラは、前記操作レバー装置からブーム上げ操作信号が出力されている間、前記アームクラウド及びアームダンプの動作に対応する電磁減圧弁を開放する方向に制御することを特徴とする油圧ショベル。
  4.  請求項3に記載の油圧ショベルにおいて、前記コントローラは、前記ブーム上げ操作の停止後、前記アームクラウド及びアームダンプの動作に対応する電磁減圧弁の開度を単調に減少するように制御し、前記ブーム上げ操作の停止後所定時間で前記制限速度に基づく開度に復帰させるように制御することを特徴とする油圧ショベル。
  5.  請求項1に記載の油圧ショベルにおいて、前記コントローラは、ブーム上げ操作を停止してから一定時間の間、アームクラウド又はアームダンプについて演算した制限速度をブーム上げ操作を停止してからの経過時間に基づく補正増加率で増加方向に補正することを特徴とする油圧ショベル。
PCT/JP2020/024023 2019-06-27 2020-06-18 油圧ショベル WO2020262201A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
KR1020217025262A KR102580139B1 (ko) 2019-06-27 2020-06-18 유압 셔블
US17/437,484 US20220186459A1 (en) 2019-06-27 2020-06-18 Hydraulic excavator
CN202080014717.5A CN113423895B (zh) 2019-06-27 2020-06-18 液压挖掘机
EP20830683.7A EP3992371A4 (en) 2019-06-27 2020-06-18 HYDRAULIC EXCAVATOR

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2019120376A JP7146701B2 (ja) 2019-06-27 2019-06-27 油圧ショベル
JP2019-120376 2019-06-27

Publications (1)

Publication Number Publication Date
WO2020262201A1 true WO2020262201A1 (ja) 2020-12-30

Family

ID=74059751

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/024023 WO2020262201A1 (ja) 2019-06-27 2020-06-18 油圧ショベル

Country Status (6)

Country Link
US (1) US20220186459A1 (ja)
EP (1) EP3992371A4 (ja)
JP (1) JP7146701B2 (ja)
KR (1) KR102580139B1 (ja)
CN (1) CN113423895B (ja)
WO (1) WO2020262201A1 (ja)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4212144A1 (en) 2020-09-07 2023-07-19 Amorepacific Corporation Sanitizer composition in emulsion formulation
US11873621B2 (en) * 2020-11-30 2024-01-16 Deere & Company System and method for tracking motion of linkages for self-propelled work vehicles in independent coordinate frames
JP7167223B2 (ja) * 2021-03-19 2022-11-08 日立建機株式会社 油圧システム
JP7269301B2 (ja) * 2021-09-30 2023-05-08 日立建機株式会社 作業機械
CN115030248B (zh) * 2022-06-29 2024-04-19 中联重科土方机械有限公司 正流量挖掘机及其破碎控制方法、破碎控制装置和控制器

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1995030059A1 (fr) 1994-04-28 1995-11-09 Hitachi Construction Machinery Co., Ltd. Dispositif de commande d'excavation a limitation de surface de travail pour engin de terrassement
JP2003247504A (ja) * 2002-02-27 2003-09-05 Hitachi Constr Mach Co Ltd 作業機械の油圧制御装置
JP2016061307A (ja) * 2014-09-12 2016-04-25 日立建機株式会社 作業機械の油圧制御装置
JP6062115B1 (ja) 2016-03-17 2017-01-18 株式会社小松製作所 作業車両の制御システム、制御方法、及び作業車両
WO2018008188A1 (ja) * 2016-07-06 2018-01-11 日立建機株式会社 作業機械

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3106268A1 (de) * 1981-02-20 1982-09-09 Cordes, Hugo, Dipl.-Ing., 2000 Hamburg "schnell ladende baggereinrichtung"
JPH0244964B2 (ja) * 1981-03-30 1990-10-05 Toshiba Machine Co Ltd Seigyobensochi
JPS6062115U (ja) 1983-10-05 1985-05-01 三菱電機株式会社 可動体の制御装置
JP3241837B2 (ja) * 1992-12-24 2001-12-25 日立建機株式会社 油圧駆動装置
KR0173835B1 (ko) * 1994-06-01 1999-02-18 오까다 하지모 건설기계의 영역제한 굴삭제어장치
JP3091667B2 (ja) * 1995-06-09 2000-09-25 日立建機株式会社 建設機械の領域制限掘削制御装置
JP3609164B2 (ja) * 1995-08-14 2005-01-12 日立建機株式会社 建設機械の領域制限掘削制御の掘削領域設定装置
JP3750841B2 (ja) * 1998-11-12 2006-03-01 新キャタピラー三菱株式会社 作業機械における油圧制御装置
US8666610B2 (en) * 2012-03-15 2014-03-04 Komatsu Ltd. Work vehicle and method for controlling work vehicle
CN202544013U (zh) * 2012-04-11 2012-11-21 中联重科股份有限公司渭南分公司 挖掘机液压系统以及挖掘机
JP6285787B2 (ja) * 2014-04-14 2018-02-28 日立建機株式会社 油圧駆動装置
US9598845B2 (en) * 2014-06-04 2017-03-21 Komatsu Ltd. Posture computing apparatus for work machine, work machine, and posture computation method for work machine
US9447562B2 (en) * 2014-09-10 2016-09-20 Komatsu Ltd. Work vehicle and method of controlling work vehicle
DE202015008410U1 (de) * 2015-12-05 2016-01-13 Helmut Uhrig Strassen- und Tiefbau GmbH Kupplungseinrichtung für Baggerlöffel
JP6666209B2 (ja) * 2016-07-06 2020-03-13 日立建機株式会社 作業機械
EP3680395B1 (en) * 2017-09-06 2022-08-03 Hitachi Construction Machinery Co., Ltd. Work machinery

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1995030059A1 (fr) 1994-04-28 1995-11-09 Hitachi Construction Machinery Co., Ltd. Dispositif de commande d'excavation a limitation de surface de travail pour engin de terrassement
JP2003247504A (ja) * 2002-02-27 2003-09-05 Hitachi Constr Mach Co Ltd 作業機械の油圧制御装置
JP2016061307A (ja) * 2014-09-12 2016-04-25 日立建機株式会社 作業機械の油圧制御装置
JP6062115B1 (ja) 2016-03-17 2017-01-18 株式会社小松製作所 作業車両の制御システム、制御方法、及び作業車両
WO2018008188A1 (ja) * 2016-07-06 2018-01-11 日立建機株式会社 作業機械

Also Published As

Publication number Publication date
CN113423895B (zh) 2022-06-03
KR20210113325A (ko) 2021-09-15
EP3992371A4 (en) 2023-07-05
US20220186459A1 (en) 2022-06-16
KR102580139B1 (ko) 2023-09-19
JP2021004540A (ja) 2021-01-14
JP7146701B2 (ja) 2022-10-04
EP3992371A1 (en) 2022-05-04
CN113423895A (zh) 2021-09-21

Similar Documents

Publication Publication Date Title
WO2020262201A1 (ja) 油圧ショベル
JP6526321B2 (ja) 作業機械
JP5654144B1 (ja) 建設機械の制御システム及び制御方法
JP5732598B1 (ja) 作業車両
JP5732599B1 (ja) 作業車両
EP3184700B1 (en) Hydraulic control system for construction machine
CN111032969B (zh) 作业机械
KR101907938B1 (ko) 건설 기계의 제어 장치 및 건설 기계의 제어 방법
KR20180102137A (ko) 작업 기계
WO2018056289A1 (ja) 建設機械
CN107532409B (zh) 工程机械的控制装置
WO2019124520A1 (ja) 作業機械
WO2016111384A1 (ja) 作業機械の制御装置、作業機械及び作業機械の制御方法
EP3382104B1 (en) Work machine
CN111771027A (zh) 作业机械
JP6511415B2 (ja) 作業機械
JP7395521B2 (ja) ショベル、ショベルのシステム
KR102378143B1 (ko) 작업 기계
EP4283049A1 (en) Work machine
JP2023138083A (ja) 作業機械
JP2024061373A (ja) 作業機械の制御装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20830683

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20217025262

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2020830683

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2020830683

Country of ref document: EP

Effective date: 20220127