WO2020230229A1 - エレベータの乗場敷居装置の据付構造および据付方法 - Google Patents

エレベータの乗場敷居装置の据付構造および据付方法 Download PDF

Info

Publication number
WO2020230229A1
WO2020230229A1 PCT/JP2019/018898 JP2019018898W WO2020230229A1 WO 2020230229 A1 WO2020230229 A1 WO 2020230229A1 JP 2019018898 W JP2019018898 W JP 2019018898W WO 2020230229 A1 WO2020230229 A1 WO 2020230229A1
Authority
WO
WIPO (PCT)
Prior art keywords
sill
weir plate
support member
landing
wall
Prior art date
Application number
PCT/JP2019/018898
Other languages
English (en)
French (fr)
Inventor
圭悟 山本
敬 石田
圭利 中村
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to CN201980073929.8A priority Critical patent/CN113795450B/zh
Priority to PCT/JP2019/018898 priority patent/WO2020230229A1/ja
Priority to JP2021519069A priority patent/JP7099629B2/ja
Publication of WO2020230229A1 publication Critical patent/WO2020230229A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B13/00Doors, gates, or other apparatus controlling access to, or exit from, cages or lift well landings
    • B66B13/30Constructional features of doors or gates

Definitions

  • the present invention relates to an installation structure and an installation method of an elevator landing sill device.
  • the sill mounting metal 1 has the support arm 1b vertical, and the mounting portions 1a are anchored to the wall surface of the concrete floor 11 on the hoistway side, and a plurality of mounting portions 1a are arranged in the frontage direction of the landing entrance. ing.
  • the sill receiving metal fitting 2 is the upper surface of the sill mounting portion 2b, and the sill mounting surface is made the same horizontal plane, and the mounting portion 2a is fastened and fixed to the support arm 1b of each sill mounting metal 1 by bolts 12 and nuts 13.
  • the concrete receiving plate 3 places the concrete receiving portion 3b on the sill mounting surface of each mounting portion 2b, and the contact portion 3a is brought into contact with the wall surface of the concrete floor 11 on the hoistway side in the direction of the frontage of the landing entrance. It extends beyond the entire area.
  • the sill member 5 is fastened and fixed to the mounting portion 2b of each sill receiving metal fitting 2 with a bolt 14 and a nut 15 interposed therebetween, and extends in the direction of the frontage of the landing entrance (for example). See Patent Document 1).
  • the gap between the concrete floor 11 and the sill member 5 is closed by the concrete receiving plate 3, so that the steel plate that closes the gap that has been conventionally produced for each landing can be used. It is no longer necessary, and a landing threshold device can be easily attached. Further, when the mortars 7 and 8 are applied to the concrete floor 11, the mortar coating thickness on the sill member 5 side can be increased, and sufficient strength can be obtained. Therefore, it is possible to prevent cracks from occurring on the finished surface of the landing floor.
  • the contact portion 3a of the concrete receiving plate 3 is in contact with the wall surface of the concrete floor 11 on the hoistway side, and the gap between the concrete floor 11 and the sill member 5 is closed.
  • the concrete receiving portion 3b of the concrete receiving plate 3 is interposed between the sill member 5 and the mounting portion 2b of each sill receiving metal fitting 2 and is fastened and fixed by the bolt 14 and the nut 15, the sill member 5 And when one position of the concrete receiving plate 3 is adjusted, the other position may shift, and the installation time is long.
  • the present invention has been made to solve the above problems.
  • the installation structure of the landing sill device of the elevator according to the present invention is a sill arranged at the lower part of the entrance / exit connecting the hoistway and the landing, and the sill fixed to the inner wall surface of the hoistway below the entrance / exit. It is placed at the corner formed by the sill support member that supports the sill, the first weir plate that hangs downward from the sill, the wall surface, and the upper surface of the sill support member, and is leaned against the first weir plate. A second weir plate is provided, and the gap between the sill and the wall surface is closed by the first weir plate and the second weir plate.
  • the method for installing the platform sill device for an elevator according to the present invention is supported by a sill support member that is arranged below the doorway that communicates the hoistway and the landing and is fixed to the inner wall surface of the hoistway below the doorway. It is a method of installing an elevator landing sill device that closes a gap between a sill and a wall surface with a first weir plate and a second weir plate, and attaches a first weir plate that hangs the first weir plate downward from the sill.
  • a second step which is performed after the step and the first weir plate attaching step, places the second weir plate at a corner formed by the wall surface and the upper surface of the sill support member, and leans against the first weir plate. Includes a weir plate mounting process.
  • the second weir plate is placed at a corner formed by the wall surface and the upper surface of the sill support member, and the second weir plate hangs downward from the sill. Since it is leaned against one weir plate, even if the relative position between the sill and the wall surface changes, the second weir plate leans against the first weir plate side and the sill and the wall surface are leaned against. Since it is possible to maintain the state in which the gap is closed and it is not necessary to readjust the position of the weir plate 11, the installation time can be reduced.
  • FIG. 1 is a front view of the elevator landing threshold device according to the present invention.
  • FIG. 2 is a front view of the elevator landing threshold device of the portion shown by A in FIG.
  • FIG. 3 is a right side view of the elevator landing sill device of the portion shown by A in FIG.
  • 1 is a hoistway
  • 2 is a landing
  • 3 is a skeleton wall
  • 4 is a finishing wall
  • 5 is a skeleton floor
  • 6 is a finishing floor
  • 7 is a finishing floor.
  • It is a doorway
  • 8 is a three-sided frame
  • 9 is a sill
  • 10 is a sill support member
  • 11 is a weir plate
  • 12 is a filler.
  • the skeleton wall 3 separates the hoistway 1 and the landing 2.
  • the skeleton wall 3 is formed with a wall hole portion 3a.
  • the finishing wall 4 is provided on the side of the landing 2 with respect to the skeleton wall 3.
  • the finishing wall 4 is provided around the three-sided frame 8.
  • the skeleton floor 5 divides the floor of the landing 2 and the floor below the landing 2.
  • the skeleton floor 5 extends from the skeleton wall 3 of the hoistway 1 toward the landing 2.
  • the finishing floor 6 is provided on the skeleton floor 5.
  • the finishing floor 6 extends from the side surface 9a of the threshold 9 on the side of the landing 2 to the side of the landing 2.
  • the doorway 7 is provided in the wall hole 3a of the skeleton wall 3.
  • the doorway 7 communicates the hoistway 1 and the landing 2.
  • the three-sided frame 8 is arranged in the wall hole portion 3a of the skeleton wall 3 of the landing 2.
  • the three-sided frame 8 forms an entrance / exit 7.
  • the threshold 9 is located below the doorway 7.
  • the threshold 9 is located inside the hoistway 1.
  • the sill 9 has a groove portion 9c extending in the width direction of the doorway 7 formed on the lower surface 9b.
  • the sill 9 is formed with a groove portion 9d (groove portion) extending in the width direction of the doorway 7 on the side surface 9a.
  • the sill support member 10 is fixed to the inner wall surface 1a of the hoistway 1 below the doorway 7.
  • the sill support member 10 supports the sill 9.
  • the sill support member 10 has a wall side support member 13 and a sill side support member 14.
  • the wall side support member 13 is formed by bending one plate-shaped member.
  • the wall-side support member 13 has a wall-side fixing piece 13a and a wall-side connection piece 13b extending in the height direction of the doorway 7.
  • the wall-side fixing piece 13a extends in the width direction of the doorway 7 along the wall surface 1a of the hoistway 1.
  • the wall-side fixing piece 13a is formed with an elongated hole 13c long in the width direction of the doorway 7.
  • the wall-side fixing piece 13a is fixed to the wall surface 1a of the hoistway 1 by the first joining member 15.
  • the first joining member 15 has an anchor bolt 15a, a nut 15b, and a washer 15c.
  • the anchor bolt 15a is driven into the wall surface 1a of the hoistway 1.
  • the elongated hole 13c and the washer 15c of the wall-side fixing piece 13a are sequentially passed through the threaded portion of the anchor bolt 15a.
  • the nut 15b is screwed into the threaded portion of the anchor bolt 15a and tightens the wall-side fixing piece 13a to the wall surface 1a of the hoistway 1 via the washer 15c.
  • the wall-side connecting piece 13b extends inward of the hoistway 1 from the wall-side fixing piece 13a.
  • the wall-side connecting piece 13b is formed with an elongated hole 13d long in the depth direction of the doorway 7.
  • the sill side support member 14 is formed by bending one plate-shaped member.
  • the side surface 14a of the sill-side support member 14 on the landing 2 side is arranged without a step with the side surface 9a of the sill 9.
  • the sill-side support member 14 has a sill-side fixing piece 14b and a sill-side connecting piece 14c extending in the depth direction of the doorway 7.
  • the sill-side fixed piece 14b extends in the width direction of the doorway 7 along the lower surface 9b of the sill 9.
  • a slit 14d is formed in the sill-side fixing piece 14b.
  • the sill-side fixing piece 14b is fixed to the lower surface 9b of the sill 9 with a second joining member 16.
  • the second joining member 16 has a bolt 16a and a nut 16b.
  • the head of the bolt 16a fits into the groove 9c formed on the lower surface 9b of the threshold 9.
  • the slit 14d of the sill-side fixing piece 14b is passed through the threaded portion of the bolt 16a.
  • the nut 16b is screwed into the threaded portion of the bolt 16a to tighten the sill-side fixing piece 14b to the lower surface 9b of the sill 9.
  • the sill-side connecting piece 14c extends downward from the sill-side fixed piece 14b.
  • the sill-side connecting piece 14c is formed with an elongated hole 14e that is long in the height direction of the doorway 7.
  • the wall-side connection piece 13b of the wall-side support member 13 and the sill-side connection piece 14c of the sill-side support member 14 are fixed by the third joint member 17.
  • the third joining member 17 has a bolt 17a, a nut 17b, a washer 17c, and a washer 17d.
  • the washer 17c, the elongated hole 14e of the sill-side connecting piece 14c, the elongated hole 13d of the wall-side connecting piece 13b, and the washer 17d are sequentially passed through the threaded portion of the bolt 17a.
  • the nut 17b is screwed into the threaded portion of the bolt 17a to tighten the wall-side connecting piece 13b and the sill-side connecting piece 14c via the washer 17c and the washer 17d.
  • the position of the sill 9 can be adjusted in the width direction, the height direction, and the depth direction of the doorway 7. it can.
  • the sill support member 10 may be fixed to the wall surface 1a of the hoistway 1 to support the sill 9, and may not have the above-described configuration.
  • the sill support member 10 may have one wall side support member 13 and two sill side support members 14, in which case the wall side support member 13 has one wall side fixing piece 13a and 2 It suffices to have one wall-side connection piece 13b.
  • the wall side support member 13 and the sill side support member 14 may be joined by welding.
  • the wall-side support member 13 and the sill-side support member 14 may be integrally formed by bending one plate-shaped member.
  • the long hole 13c, the long hole 13d, the slit 14d, and the long hole 14e may be a long hole, a round hole, or a slit, and the directions of the long hole and the slit may be appropriately determined.
  • sill support members 10 are provided, two or more sill support members 10 may be provided.
  • the weir plate 11 closes the gap 18 between the threshold 9 and the wall surface 1a of the hoistway 1.
  • the weir plate 11 has a first weir plate 19 and a second weir plate 20 extending at least longer than the wall hole portion 3a of the skeleton wall 3 in the width direction of the entrance / exit 7.
  • the first weir plate 19 hangs downward from the threshold 9.
  • the first weir plate 19 hangs downward along the side surface 9a of the threshold 9.
  • the first weir plate 19 hangs downward along the side surface 14a of the sill-side support member 14.
  • a round hole 19a is formed in the first weir plate 19.
  • the first weir plate 19 is fixed to the side surface 9a of the threshold 9 by the fourth joining member 21.
  • the fourth joining member 21 has a bolt 21a and a nut 21b.
  • the head of the bolt 21a fits into the groove 9d of the threshold 9.
  • the round hole 19a of the first weir plate 19 is passed through the threaded portion of the bolt 21a.
  • the nut 21b is screwed into the threaded portion of the bolt 21a to tighten the first weir plate 19 to the side surface 9a of the threshold 9.
  • the second weir plate 20 is placed at a corner portion 22 having one end 20a formed by the wall surface 1a of the hoistway 1 and the upper surface 13e of the wall-side support member 13.
  • the other end 20b of the second weir plate 20 is leaned against the first weir plate 19 and applied.
  • the upper surface 13e of the wall-side support member 13 is recessed at the corner portion 22 forming the wall surface 1a of the hoistway 1.
  • the upper surface 13e of the wall-side support member 13 forms a recess 23 with the wall surface 1a of the hoistway 1.
  • One end 20a of the second weir plate 20 is fitted in the recess 23.
  • One end 20a of the second weir plate 20 is in contact with the wall surface 1a of the hoistway 1.
  • the filler 12 is filled between the threshold 9 and the wall surface 1a of the hoistway 1.
  • the filler 12 is filled in a liquid state and hardens after being filled.
  • the filler 12 is, for example, mortar.
  • the second weir plate 20 is placed on the corner portion 21 formed by the wall surface 1a of the hoistway 1 and the upper surface 13e of the sill support member 10, and the sill. Since it is leaned against the first weir plate 19 that hangs downward from 9, the second weir plate 20 is the first weir plate 19 even if the relative position of the threshold 9 and the wall surface 1a of the hoistway 1 changes. Since it is possible to maintain the state in which the gap 18 is closed by leaning on the side of the weir plate 11 and it is not necessary to readjust the position of the weir plate 11, the installation time can be reduced.
  • the second weir plate 20 is placed on the corner portion 21 formed by the wall surface 1a of the hoistway 1 and the upper surface 13e of the sill support member 10, and is leaned against the first weir plate 19 hanging downward from the sill 9. Therefore, when the filler 12 is filled between the threshold 9 and the wall surface 1a of the hoistway 1, the second weir plate 20 is the first weir plate 19 even if the weight of the filler 12 is applied to the weir plate 11. It is possible to maintain a state in which the gap 18 is closed by leaning on the side of the weir, and it is not necessary to fix the first weir plate 19 and the second weir plate 20 to each other, so that the installation time can be reduced.
  • the installation time can be reduced.
  • the filler 12 is between the sill 9 and the side surface 1a of the hoistway 1. Even if the weight of the filler 12 is applied to the weir plate 11 when the weir plate 11 is filled, the first weir plate 19 hits the side surface 14a of the sill support member 10, so that the first weir plate 19 is the side surface of the sill support member 10. Since it is suppressed from bending in the depth direction of the entrance / exit 7 more than 14a and it is not necessary to fix the lower portion of the first weir plate 19, the installation time can be reduced.
  • the side surface 14a of the sill-side support member 14 is arranged without a step with the side surface 9a of the sill 9, but the side surface 14a of the sill-side support member 14 has a hoistway 1 rather than the side surface 9a of the sill 9. It may be arranged inside, and may not be arranged without a step with the side surface 9a of the threshold 9. In this case as well, the above-mentioned effect is obtained.
  • FIG. 4 is a flowchart of a method of installing the elevator landing threshold device according to the present invention.
  • the method for installing the elevator landing sill device according to the present invention comprises the first to seventh steps shown in S1 to S7 in FIG.
  • the reference position for installing the threshold 9 is determined.
  • the first step is performed as follows.
  • the position of the plumb bob provided between the top and bottom of the hoistway 1 is used as the reference for the position of the doorway 7 in the width direction and the depth direction.
  • the height of the finished floor surface is used as a reference for the position of the doorway 7 in the height direction.
  • the sill support member 10 is attached to the wall surface 1a of the hoistway 1.
  • the second step is performed as follows.
  • the wall side support member 13 of the sill support member 10 is attached to the wall surface of the hoistway 1.
  • Anchor bolts 15a are driven into predetermined positions on the wall surface 1a of the hoistway 1.
  • the elongated hole 13c and the washer 15c of the wall-side fixing piece 13a of the wall-side support member 13 are sequentially passed through the threaded portion of the anchor bolt 15a.
  • the nut 15b is screwed into the threaded portion of the anchor bolt 15a and temporarily tightened, and the wall-side fixing piece 13a is tightened to the wall surface 1a of the hoistway 1 via the washer 15c.
  • the washer 17c, the long hole 14e of the sill-side connection piece 14c of the sill-side support member 14, the long hole 13d of the wall-side connection piece 13b of the wall-side support member 13, and the washer 17d are passed through the threaded portion of the bolt 17a in this order.
  • the nut 17b is screwed into the threaded portion of the bolt 17a and temporarily tightened to tighten the wall side connection piece 13b and the sill side connection piece 14c via the washer 17c and the washer 17d.
  • the sill support member 10 When the skeleton of the hoistway 1 is made of concrete, the sill support member 10 is attached to the skeleton of the hoistway 1 with anchor bolts 15a as described above, and when the skeleton of the hoistway 1 is made of steel. , The sill support member 10 is attached to the frame of the hoistway 1 by welding.
  • sill-side support member 14 may be attached to the wall-side support member 13 before the second step.
  • the sill 9 is attached to the sill support member 10.
  • the third step is performed as follows.
  • the head of the bolt 16a is fitted into the groove 9c of the threshold 9.
  • the slit 14d of the sill-side fixing piece 14b of the sill-side support member 14 is passed through the threaded portion of the bolt 16a.
  • the nut 16b is screwed into the threaded portion of the bolt 16a and temporarily tightened, and the sill-side fixing piece 14b is tightened to the lower surface 9b of the sill 9.
  • sill 9 may be attached to the sill support member 10 before the third step.
  • the position of the threshold 9 is adjusted.
  • the fourth step is performed as follows.
  • the positions of the entrance / exit 7 of the threshold 9 in the width direction and the depth direction are adjusted based on the plumb bob provided in the hoistway 1 in the first step.
  • the position of the entrance / exit 7 of the sill 9 in the height direction is adjusted with reference to the height of the finished floor surface.
  • the sill 9 and the sill support member 10 are fixed.
  • the nut 15b of the first joining member 15 is finally tightened to fix the wall surface 1a of the hoistway 1 and the wall side support member 13 of the sill support member 10.
  • the nut 16b of the second joining member 16 is finally tightened to fix the sill 9 and the sill-side support member 14 of the sill support member 10.
  • the nut 17b of the third joint member 17 is finally tightened to fix the wall side support member 13 and the sill side support member 14.
  • the first weir plate 19 is attached.
  • the fifth step is performed as follows.
  • the round hole 19a of the first weir plate 19 is passed through the threaded portion of the bolt 21a.
  • the nut 21b is screwed into the threaded portion of the bolt 21a and finally tightened to tighten the first weir plate 19 to the side surface 9a of the threshold 9.
  • the fifth step may be performed before the sixth step, and may be performed before the first step, the second step, the third step, or the fourth step.
  • the second weir plate 20 is attached.
  • the sixth step is performed as follows.
  • One end 20a of the second weir plate 20 is placed on the corner portion 22 formed by the wall surface 1a of the hoistway 1 and the upper surface 13e of the wall-side support member 13.
  • One end 20a of the second weir plate 20 is fitted into the recess 23 formed by the upper surface 13e of the wall-side support member 13 and the wall surface 1a of the hoistway 1.
  • One end 20a of the second weir plate 20 is brought into contact with the wall surface 1a of the hoistway 1.
  • the other end 20b of the second weir plate 20 is leaned against the first weir plate 19 and hit.
  • the filler 12 is filled between the threshold 9 and the wall surface 1a of the hoistway 1.
  • the elevator landing threshold device is installed by the 1st to 7th steps.
  • the method of installing the elevator landing sill device according to the first embodiment of the present invention has the same effect as the installation structure of the elevator landing sill device according to the first embodiment of the present invention.
  • the elevator landing sill device has the first weir plate 19, but the first weir plate 19 may be the first weir plate 24 or the first weir plate 25. Good.
  • the first weir plate 24 is a first modification of the first weir plate 19.
  • the first weir plate 25 is a second modification of the first weir plate 19.
  • FIG. 5 is a right side view corresponding to FIG. 3 of a first modification of the elevator landing sill device according to the present invention.
  • the first weir plate 24 extends at least longer than the wall hole portion 3a of the skeleton wall 3 in the width direction of the entrance / exit 7.
  • the first weir plate 24 is formed by bending one plate-shaped member.
  • the first weir plate 24 has a fixing portion 24a and a closing portion 24b.
  • the fixing portion 24a extends in the depth direction of the doorway 7 along the lower surface 9b of the threshold 9.
  • the fixed portion 24a extends to the front of the end portion of the lower surface 9b of the threshold 9 on the hoistway 1 side.
  • the fixing portion 24a is sandwiched between the sill 9 and the sill support member 10.
  • a round hole 24c is formed in the fixing portion 24a.
  • the round hole 24c of the fixing portion 24a and the slit 14d of the sill-side fixing piece 14b are sequentially passed through the threaded portion of the bolt 16a.
  • the nut 16b is screwed into the threaded portion of the bolt 16a to tighten the fixing portion 24a and the sill-side fixing piece 14b to the lower surface 9b of the sill 9.
  • the closing portion 24b hangs downward from the end of the fixing portion 24a on the landing 2 side.
  • the closing portion 24b hangs downward along the side surface 14a of the sill-side support member 14.
  • the other end 20b of the second weir plate 20 is leaned against the closing portion 24b of the first weir plate 24.
  • the first weir plate 24 and the second weir plate 20 block the gap 18 between the threshold 9 and the wall surface 1a of the hoistway 1.
  • the first modification of the first embodiment of the present invention has the same effect as that of the first embodiment of the present invention.
  • the number of joining members can be reduced, the manufacturing cost can be reduced, and the installation time can be reduced. ..
  • the position of the first weir plate 24 can be adjusted in the depth direction of the doorway 7, and the embodiment of the present invention Even if the relative position of the threshold 9 and the wall surface 1a of the hoistway 1 changes more than 1, the gap 18 can be closed.
  • the groove 9d of the threshold 9 does not have to be formed. In this case as well, the above-mentioned effect is obtained.
  • the side surface 14a of the sill side support member 14 does not have to be arranged without a step with the side surface 9a of the sill 9. In this case as well, the above-mentioned effect is obtained.
  • FIG. 6 is a right side view corresponding to FIG. 3 of a second modification of the elevator landing sill device according to the present invention.
  • the first weir plate 25 extends at least longer than the wall hole portion 3a of the skeleton wall 3 in the width direction of the doorway 7.
  • the first weir plate 25 is formed by bending one plate-shaped member.
  • the first weir plate 25 has a hook portion 25a and a closing portion 25b.
  • the hook portion 25a is hooked on the groove portion 9d of the threshold 9.
  • the hook portion 25a extends horizontally or downward from the outside to the inside of the groove portion 9d of the threshold 9.
  • the closing portion 25b hangs downward from the end on the side of the landing 2 of the hook portion 25a.
  • the closing portion 25b hangs downward along the side surface 9a of the threshold 9.
  • the closing portion 25b hangs downward along the side surface 14a of the sill-side support member 14.
  • the other end 20b of the second weir plate 20 is leaned against the closing portion 25b of the first weir plate 25.
  • the first weir plate 25 and the second weir plate 20 block the gap 18 between the threshold 9 and the wall surface 1a of the hoistway 1.
  • the second modification of the first embodiment of the present invention has the same effect as that of the first embodiment of the present invention.
  • the first weir plate 25 is attached by hooking the hook portion 25a on the groove portion 9d of the threshold 9, the number of joining members can be reduced, the manufacturing cost can be reduced, and the installation time can be reduced. it can.
  • the installation structure and installation method of the elevator landing sill device according to the present invention can be suitably used for the elevator landing sill device that closes the gap between the threshold and the wall surface of the hoistway with a weir plate.

Landscapes

  • Elevator Door Apparatuses (AREA)

Abstract

本発明のエレベータの乗場敷居装置の据付構造は、昇降路と乗場とを連通する出入口の下部に配置された敷居と、前記出入口の下方の前記昇降路の内側の壁面に固定されて前記敷居を支える敷居支持部材と、前記敷居から下方に垂れ下げられた第1堰板と、前記壁面と前記敷居支持部材の上面とが成す角部に置かれるとともに、前記第1堰板に立て掛けられて当てられた第2堰板とを備え、前記敷居と前記壁面との隙間を前記第1堰板および前記第2堰板で塞ぎ、前記敷居と前記壁面との相対的な位置が変化しても、前記第2堰板が前記第1堰板側に凭り掛って前記隙間を塞いだ状態を維持することができ、堰板11の位置を調整し直す必要がないので、据付時間を削減することができる。

Description

エレベータの乗場敷居装置の据付構造および据付方法
 この発明はエレベータの乗場敷居装置の据付構造および据付方法に関するものである。
 従来のエレベータの乗り場敷居装置では、敷居取付金1が支持腕1bを鉛直にして、コンクリート床11の昇降路側の壁面に取付部1aをアンカー固定されて、乗り場出入り口の間口方向に複数配設されている。敷居受け金具2が載置部2bの上面である敷居載置面を同一水平面にして、取付部2aを各敷居取付金1の支持腕1bにボルト12とナット13により締着固定されている。コンクリート受け板3がコンクリート受け部3bを各載置部2bの敷居載置面上に載置し、当て部3aをコンクリート床11の昇降路側の壁面に当接させて、乗り場出入り口の間口方向の全域を超える範囲に延設されている。敷居部材5がコンクリート受け部3bを介在させて各敷居受け金具2の載置部2bにボルト14とナット15とにより締着固定されて、乗り場出入り口の間口方向に延設されている(例えば、特許文献1参照)。
 上記したエレベータの乗り場敷居装置によれば、コンクリート床11と敷居部材5との間の隙間がコンクリート受け板3により塞口されるので、従来乗り場毎に作製していた隙間を塞口する鋼板が不要となり、乗り場敷居装置を簡易に付設することができる。また、モルタル7,8をコンクリート床11に塗設した際に、敷居部材5側のモルタル塗設厚みを厚くでき、十分な強度が得られる。そこで、乗り場床の仕上げ面に亀裂が発生することも防止できる。
特開2008-265939号公報
 しかしながら、従来のエレベータの乗り場敷居装置では、コンクリート受け板3の当て部3aがコンクリート床11の昇降路側の壁面に当接されてコンクリート床11と敷居部材5との間の隙間が塞口されるとともに、コンクリート受け板3のコンクリート受け部3bが敷居部材5と各敷居受け金具2の載置部2bとの間に介在してボルト14とナット15とにより締着固定されるため、敷居部材5およびコンクリート受け板3の一方の位置を調整すると他方の位置がずれることがあり、据付時間が長くなっていた。
 本発明は、上記のような課題を解決するためになされたものである。
 本発明に係るエレベータの乗場敷居装置の据付構造は、昇降路と乗場とを連通する出入口の下部に配置された敷居と、前記出入口の下方の前記昇降路の内側の壁面に固定されて前記敷居を支える敷居支持部材と、前記敷居から下方に垂れ下げられた第1堰板と、前記壁面と前記敷居支持部材の上面とが成す角部に置かれるとともに、前記第1堰板に立て掛けられて当てられた第2堰板とを備え、前記敷居と前記壁面との隙間を前記第1堰板および前記第2堰板で塞ぐ。
 本発明に係るエレベータの乗場敷居装置の据付方法は、昇降路と乗場とを連通する出入口の下部に配置されて前記出入口の下方の前記昇降路の内側の壁面に固定された敷居支持部材に支えられる敷居と前記壁面との隙間を第1堰板および第2堰板で塞ぐエレベータの乗場敷居装置の据付方法であって、前記第1堰板を前記敷居から下方に垂れ下げる第1堰板取付け工程と、前記第1堰板取付け工程の後に行われ、前記第2堰板を前記壁面と前記敷居支持部材の上面とが成す角部に置いて、前記第1堰板に立て掛けて当てる第2堰板取付け工程とを含む。
 本発明に係るエレベータの乗場敷居装置の据付構造および据付方法では、前記第2堰板が前記壁面と前記敷居支持部材の上面とが成す角部に置かれるとともに、前記敷居から下方に垂れ下がる前記第1堰板に当てられて立て掛けられるので、前記敷居と前記壁面との相対的な位置が変化しても、前記第2堰板が前記第1堰板側に凭り掛って前記敷居と前記壁面との前記隙間を塞いだ状態を維持することができ、堰板11の位置を調整し直す必要がないので、据付時間を削減することができる。
本発明に係るエレベータの乗場敷居装置の正面図である。 図1にAで示された部分のエレベータの乗場敷居装置の正面図である。 図1にAで示された部分のエレベータの乗場敷居装置の右側面図である。 本発明に係るエレベータの乗場敷居装置の据付方法のフローチャートである。 本発明に係るエレベータの乗場敷居装置の第1変形例の図3に相当する右側面図である。 本発明に係るエレベータの乗場敷居装置の第2変形例の図3に相当する右側面図である。
 以下、本発明のエレベータの乗場敷居装置の据付構造および据付方法の好適な実施の形態につき、図面を用いて説明する。
 実施の形態1.
 図1は、本発明に係るエレベータの乗場敷居装置の正面図である。図2は、図1にAで示された部分のエレベータの乗場敷居装置の正面図である。図3は、図1にAで示された部分のエレベータの乗場敷居装置の右側面図である。
 図1から図3において、1は昇降路であり、2は乗場であり、3は躯体壁であり、4は仕上げ壁であり、5は躯体床であり、6は仕上げ床であり、7は出入口であり、8は三方枠であり、9は敷居であり、10は敷居支持部材であり、11は堰板であり、12は充填材である。
 躯体壁3は、昇降路1と乗場2とを区画している。躯体壁3は、壁穴部3aを形成されている。
 仕上げ壁4は、躯体壁3よりも乗場2の側に設けられている。仕上げ壁4は、三方枠8の周囲に設けられている。
 躯体床5は、乗場2の階と乗場2の下の階とを区画している。躯体床5は、昇降路1の躯体壁3から乗場2の側へ伸びている。
 仕上げ床6は、躯体床5の上に設けられている。仕上げ床6は、敷居9の乗場2の側の側面9aから乗場2の側へ伸びている。
 出入口7は、躯体壁3の壁穴部3aに設けられている。出入口7は、昇降路1と乗場2とを連通している。
 三方枠8は、乗場2の躯体壁3の壁穴部3aに配置されている。三方枠8は、出入口7を形成している。
 敷居9は、出入口7の下部に配置されている。敷居9は、昇降路1の内側に位置している。敷居9は、下面9bに出入口7の幅方向に伸びる溝部9cが形成されている。敷居9は、側面9aに出入口7の幅方向に伸びる溝部9d(溝部)が形成されている。
 敷居支持部材10は、出入口7の下方の昇降路1の内側の壁面1aに固定されている。敷居支持部材10は、敷居9を支えている。敷居支持部材10は、壁側支持部材13および敷居側支持部材14を有している。
 壁側支持部材13は、板状の1つの部材が曲げられて形成されている。壁側支持部材13は、出入口7の高さ方向に伸びている壁側固定片13aおよび壁側接続片13bを有している。
 壁側固定片13aは、昇降路1の壁面1aに沿って出入口7の幅方向に伸びている。壁側固定片13aは、出入口7の幅方向に長い長穴13cが形成されている。壁側固定片13aは、昇降路1の壁面1aに第1接合部材15で固定されている。第1接合部材15は、アンカーボルト15a、ナット15b、および座金15cを有している。アンカーボルト15aは、昇降路1の壁面1aに打ち込まれている。壁側固定片13aの長穴13cおよび座金15cは、アンカーボルト15aのねじ部に順に通されている。ナット15bは、アンカーボルト15aのねじ部にねじ込まれて座金15cを介して壁側固定片13aを昇降路1の壁面1aに締め付けている。
 壁側接続片13bは、壁側固定片13aから昇降路1の内側に伸びている。壁側接続片13bは、出入口7の奥行方向に長い長穴13dが形成されている。
 敷居側支持部材14は、板状の1つの部材が曲げられて形成されている。敷居側支持部材14の乗場2の側の側面14aは、敷居9の側面9aと段差無く配置されている。敷居側支持部材14は、出入口7の奥行方向に伸びている敷居側固定片14bおよび敷居側接続片14cを有している。
 敷居側固定片14bは、敷居9の下面9bに沿って出入口7の幅方向に伸びている。敷居側固定片14bは、スリット14dが形成されている。敷居側固定片14bは、敷居9の下面9bに第2接合部材16で固定されている。第2接合部材16は、ボルト16aおよびナット16bを有している。ボルト16aの頭部は、敷居9の下面9bに形成された溝部9cに嵌っている。敷居側固定片14bのスリット14dは、ボルト16aのねじ部に通されている。ナット16bは、ボルト16aのねじ部にねじ込まれて敷居側固定片14bを敷居9の下面9bに締め付けている。
 敷居側接続片14cは、敷居側固定片14bから下方に伸びている。敷居側接続片14cは、出入口7の高さ方向に長い長穴14eが形成されている。
 壁側支持部材13の壁側接続片13bと敷居側支持部材14の敷居側接続片14cとは、第3接合部材17で固定されている。第3接合部材17は、ボルト17a、ナット17b、座金17c、および座金17dを有している。座金17c、敷居側接続片14cの長穴14e、壁側接続片13bの長穴13d、および座金17dは、ボルト17aのねじ部に順に通されている。ナット17bは、ボルト17aのねじ部にねじ込まれて座金17cおよび座金17dを介して壁側接続片13bと敷居側接続片14cとを締め付けている。
 このように、敷居9は敷居支持部材10を介して昇降路1の壁面1aに固定されているので、敷居9の位置を出入口7の幅方向、高さ方向、および奥行方向に調整することができる。
 なお、敷居支持部材10は、昇降路1の壁面1aに固定されて敷居9を支えられればよく、前述の構成でなくてもよい。例えば、敷居支持部材10は、1つの壁側支持部材13および2つの敷居側支持部材14を有していてもよく、この場合、壁側支持部材13は、1つの壁側固定片13aおよび2つの壁側接続片13bを有していればよい。また、例えば、壁側支持部材13および敷居側支持部材14は溶接で接合されてもよい。また、例えば、壁側支持部材13および敷居側支持部材14は、板状の1つの部材が曲げられて一体に形成されてもよい。また、例えば、長穴13c、長穴13d、スリット14d、および長穴14eは、長穴、丸穴、またはスリットであってもよいし、長穴およびスリットの向きは適宜決められてよい。
 なお、敷居支持部材10は3つ設けられているが、2つ以上設けられればよい。
 堰板11は、敷居9と昇降路1の壁面1aとの隙間18を塞いでいる。堰板11は、出入口7の幅方向に少なくとも躯体壁3の壁穴部3aよりも長く伸びている第1堰板19および第2堰板20を有している。
 第1堰板19は、敷居9から下方に垂れ下げられている。第1堰板19は、敷居9の側面9aに沿って下方に垂れ下げられている。第1堰板19は、敷居側支持部材14の側面14aに沿って下方に垂れ下げられている。第1堰板19は、丸穴19aが形成されている。第1堰板19は、敷居9の側面9aに第4接合部材21で固定されている。第4接合部材21は、ボルト21aおよびナット21bを有している。ボルト21aの頭部は、敷居9の溝部9dに嵌っている。第1堰板19の丸穴19aは、ボルト21aのねじ部に通されている。ナット21bは、ボルト21aのねじ部にねじ込まれて第1堰板19を敷居9の側面9aに締め付けている。
 第2堰板20は、一端20aが昇降路1の壁面1aと壁側支持部材13の上面13eとが成す角部22に置かれている。第2堰板20は、他端20bが第1堰板19に立て掛けられて当てられている。
 ここで、壁側支持部材13の上面13eは、昇降路1の壁面1aと成す角部22で凹んでいる。壁側支持部材13の上面13eは、昇降路1の壁面1aと凹部23を形成している。第2堰板20の一端20aは、凹部23に嵌っている。第2堰板20の一端20aは、昇降路1の壁面1aに当たっている。
 充填材12は、敷居9と昇降路1の壁面1aとの間に充填されている。充填材12は、液状で充填され、充填された後に固まる。充填材12は、例えば、モルタルである。
 本発明の実施の形態1によるエレベータの乗場敷居装置の据付構造では、第2堰板20が昇降路1の壁面1aと敷居支持部材10の上面13eとが成す角部21に置かれるとともに、敷居9から下方に垂れ下がる第1堰板19に当てられて立て掛けられるので、敷居9と昇降路1の壁面1aとの相対的な位置が変化しても、第2堰板20が第1堰板19の側に凭り掛って隙間18を塞いだ状態を維持することができ、堰板11の位置を調整し直す必要がないので、据付時間を削減することができる。
 また、第2堰板20が昇降路1の壁面1aと敷居支持部材10の上面13eとが成す角部21に置かれるとともに、敷居9から下方に垂れ下がる第1堰板19に当てられて立て掛けられるので、敷居9と昇降路1の壁面1aとの間に充填材12を充填する際に、堰板11に充填材12の重さが掛かっても、第2堰板20が第1堰板19の側に凭り掛って隙間18を塞いだ状態を維持することができ、第1堰板19と第2堰板20とを互いに固定する必要がないので、据付時間を削減することができる。
 また、敷居支持部材10は、上面13eが昇降路1の壁面1aと凹部23を形成して、第2堰板20の一端20aは、凹部23に嵌っているので、第2堰板20の一端20aの位置がずれるのを防ぎ、第2堰板20の一端20aを固定する必要がないので、据付時間を削減することができる。
 また、第1堰板19は、敷居9の側面9aおよび敷居支持部材10の側面14aに沿って下方に垂れ下げられているので、敷居9と昇降路1の側面1aとの間に充填材12が充填される際に、堰板11に充填材12の重さが掛かっても、第1堰板19が敷居支持部材10の側面14aに当たるので、第1堰板19が敷居支持部材10の側面14aよりも出入口7の奥行方向へ撓むのが抑制され、第1堰板19の下部を固定する必要がないので、据付時間を削減することができる。
 なお、敷居側支持部材14の側面14aは、敷居9の側面9aと段差無く配置されているのが好ましいが、敷居側支持部材14の側面14aは、敷居9の側面9aよりも昇降路1の内側に配置されていればよく、敷居9の側面9aと段差無く配置されていなくてもよい。この場合も、前述の効果を奏する。
 次に、本発明のエレベータの乗場敷居装置の据付方法につき、図面を用いて説明する。
 図4は、本発明に係るエレベータの乗場敷居装置の据付方法のフローチャートである。本発明に係るエレベータの乗場敷居装置の据付方法は、図4にS1からS7で示される第1工程から第7工程で構成される。
 第1工程では、敷居9を取付ける基準となる位置を決める。第1工程は、次のように行う。
 例えば、昇降路1の頂部と底部との間に設けた下げ振りの位置を出入口7の幅方向および奥行方向の位置の基準とする。例えば、床仕上げ面の高さを出入口7の高さ方向の位置の基準とする。
 第2工程では、昇降路1の壁面1aに敷居支持部材10を取り付ける。第2工程は、次のように行う。
 敷居支持部材10の壁側支持部材13を昇降路1の壁面に取り付ける。昇降路1の壁面1aの所定の位置にアンカーボルト15aを打ち込む。壁側支持部材13の壁側固定片13aの長穴13cおよび座金15cを、アンカーボルト15aのねじ部に順に通す。ナット15bを、アンカーボルト15aのねじ部にねじ込んで仮締めして座金15cを介して壁側固定片13aを昇降路1の壁面1aに締め付ける。
 壁側支持部材13に敷居支持部材10の敷居側支持部材14を取り付ける。座金17c、敷居側支持部材14の敷居側接続片14cの長穴14e、壁側支持部材13の壁側接続片13bの長穴13d、および座金17dを、ボルト17aのねじ部に順に通す。ナット17bを、ボルト17aのねじ部にねじ込んで仮締めして座金17cおよび座金17dを介して壁側接続片13bと敷居側接続片14cとを締め付ける。
 なお、昇降路1の躯体がコンクリートで形成される場合は、前述のように昇降路1の躯体に敷居支持部材10をアンカーボルト15aで取り付け、昇降路1の躯体が鉄骨で形成される場合は、昇降路1の躯体に敷居支持部材10を溶接で取り付ける。
 なお、第2工程よりも前に、壁側支持部材13に敷居側支持部材14を取り付けてもよい。
 第3工程では、敷居支持部材10に敷居9を取り付ける。第3工程は、次のように行う。
 敷居9を敷居側支持部材14に取り付ける。ボルト16aの頭部を、敷居9の溝部9cに嵌める。敷居側支持部材14の敷居側固定片14bのスリット14dを、ボルト16aのねじ部に通す。ナット16bを、ボルト16aのねじ部にねじ込んで仮締めして敷居側固定片14bを敷居9の下面9bに締め付ける。
 なお、第3工程よりも前に、敷居9を敷居支持部材10に取り付けてもよい。
 第4工程では、敷居9の位置を調整する。第4工程は、次のように行う。
 例えば、第1工程で昇降路1の中に設けた下げ振りを基準として、敷居9の出入口7の幅方向、および奥行方向の位置を調整する。例えば、床仕上げ面の高さを基準として、敷居9の出入口7の高さ方向の位置を調整する。
 敷居9の位置を調整した後、敷居9および敷居支持部材10を固定する。第1接合部材15のナット15bを本締めして、昇降路1の壁面1aと敷居支持部材10の壁側支持部材13とを固定する。第2接合部材16のナット16bを本締めして、敷居9と敷居支持部材10の敷居側支持部材14とを固定する。第3接合部材17のナット17bを本締めして、壁側支持部材13と敷居側支持部材14とを固定する。
 第5工程(第1堰板取付け工程)では、第1堰板19を取り付ける。第5工程は、次のように行う。
 ボルト21aの頭部を、敷居9の溝部9dに嵌める。第1堰板19の丸穴19aを、ボルト21aのねじ部に通す。ナット21bを、ボルト21aのねじ部にねじ込んで本締めして第1堰板19を敷居9の側面9aに締め付ける。
 なお、第5工程は、第6工程よりも前に行われればよく、第1工程、第2工程、第3工程、または第4工程よりも前に行われてもよい。
 第6工程(第2堰板取付け工程)では、第2堰板20を取り付ける。第6工程は、次のように行う。
 第2堰板20の一端20aを昇降路1の壁面1aと壁側支持部材13の上面13eとが成す角部22に置く。第2堰板20の一端20aを、壁側支持部材13の上面13eと昇降路1の壁面1aとが成す凹部23に嵌める。第2堰板20の一端20aを、昇降路1の壁面1aに当てる。第2堰板20の他端20bを第1堰板19に立て掛けて当てる。
 第7工程では、敷居9と昇降路1の壁面1aとの間に充填材12を充填する。
 上述のように、第1工程から第7工程によりエレベータの乗場敷居装置を据え付ける。
 本発明の実施の形態1によるエレベータの乗場敷居装置の据付方法は、本発明の実施の形態1によるエレベータの乗場敷居装置の据付構造と同様の効果を奏する。
 なお、本発明の実施の形態1では、エレベータの乗場敷居装置は第1堰板19を有しているが、第1堰板19は第1堰板24または第1堰板25であってもよい。第1堰板24は、第1堰板19の第1変形例である。第1堰板25は、第1堰板19の第2変形例である。
 図5を用いて第1堰板24について説明する。図5は、本発明に係るエレベータの乗場敷居装置の第1変形例の図3に相当する右側面図である。
 第1堰板24は、出入口7の幅方向に少なくとも躯体壁3の壁穴部3aよりも長く伸びている。第1堰板24は、板状の1つの部材が曲げられて形成されている。第1堰板24は、固定部24aおよび塞ぎ部24bを有する。
 固定部24aは、敷居9の下面9bに沿って、出入口7の奥行方向に伸びている。固定部24aは、敷居9の下面9bの昇降路1の側の端部よりも手前まで伸びている。固定部24aは、敷居9と敷居支持部材10の間に挟まれている。固定部24aは、丸穴24cが形成されている。固定部24aの丸穴24cおよび敷居側固定片14bのスリット14dは、ボルト16aのねじ部に順に通されている。ナット16bは、ボルト16aのねじ部にねじ込まれて固定部24aおよび敷居側固定片14bを敷居9の下面9bに締め付けている。
 塞ぎ部24bは、固定部24aの乗場2の側の端部から下方に垂れ下げられている。塞ぎ部24bは、敷居側支持部材14の側面14aに沿って下方に垂れ下げられている。
 第2堰板20は、他端20bが第1堰板24の塞ぎ部24bに立て掛けられて当てられている。
 上述のように、本発明の実施の形態1の第1変形例では、敷居9と昇降路1の壁面1aとの隙間18を第1堰板24および第2堰板20が塞いでいる。
 本発明の実施の形態1の第1変形例は、本発明の実施の形態1と同様の効果を奏する。
 また、第1堰板24は、敷居9と敷居支持部材10の間に挟まれて固定されるので、接合部材を少なくでき、製造コストを低減することができるとともに据付時間を削減することができる。
 なお、固定部24aの丸穴24cを出入口7の奥行方向に長い長穴にすることで、第1堰板24の位置を出入口7の奥行方向に調整することができ、本発明の実施の形態1よりもさらに敷居9と昇降路1の壁面1aとの相対的な位置が変化しても隙間18を塞ぐことができる。
 なお、敷居9の溝部9dは形成されていなくてもよい。この場合も前述の効果を奏する。
 なお、敷居側支持部材14の側面14aは、敷居9の側面9aと段差無く配置されていなくてもよい。この場合も、前述の効果を奏する。
 次に、図6を用いて第1堰板25について説明する。図6は、本発明に係るエレベータの乗場敷居装置の第2変形例の図3に相当する右側面図である。
 第1堰板25は、出入口7の幅方向に少なくとも躯体壁3の壁穴部3aよりも長く伸びている。第1堰板25は、板状の1つの部材が曲げられて形成されている。第1堰板25は、鉤部25aおよび塞ぎ部25bを有する。
 鉤部25aは、敷居9の溝部9dに引っ掛けられている。鉤部25aは、敷居9の溝部9dの外側から内側にかけて、水平方向または下方向に伸びている。
 塞ぎ部25bは、鉤部25aの乗場2の側の端部から下方に垂れ下げられている。塞ぎ部25bは、敷居9の側面9aに沿って下方に垂れ下げられている。塞ぎ部25bは、敷居側支持部材14の側面14aに沿って下方に垂れ下げられている。
 第2堰板20は、他端20bが第1堰板25の塞ぎ部25bに立て掛けられて当てられている。
 上述のように、本発明の実施の形態1の第2変形例では、敷居9と昇降路1の壁面1aとの隙間18を第1堰板25および第2堰板20が塞いでいる。
 本発明の実施の形態1の第2変形例は、本発明の実施の形態1と同様の効果を奏する。
 また、第1堰板25は、鉤部25aが敷居9の溝部9dに引っ掛けられて取り付けられているので、接合部材を少なくでき、製造コストを低減することができるとともに据付時間を削減することができる。
 本発明に係るエレベータの乗場敷居装置の据付構造および据付方法は、敷居と昇降路の壁面との隙間を堰板で塞ぐエレベータの乗場敷居装置に好適に利用可能である。
 1 昇降路、1a 壁面、2 乗場、3 躯体壁、3a 壁穴部、4 仕上げ壁、5 躯体床、6 仕上げ床、7 出入口、 8 三方枠、9 敷居、9a 側面、9b 下面、9c 溝部、9d 溝部、10 敷居支持部材、11 堰板、12 充填材、13 壁側支持部材、13a 壁側固定片、13b 壁側接続片、13c 長穴、13d 長穴、13e 上面、14 敷居側支持部材、14a 側面、14b 敷居側固定片、14c 敷居側接続片、14d スリット、14e 長穴、15 第1接合部材、15a アンカーボルト、15b ナット、15c 座金、16 第2接合部材、16a ボルト、16b ナット、17 第3接合部材、17a ボルト、17b ナット、17c 座金、17d 座金、18 隙間、19 第1堰板、19a 丸穴、20 第2堰板、20a 一端、20b 他端、21 第4接合部材、21a ボルト、21b ナット、22 角部、23 凹部、24 第1堰板、24a 固定部、24b 塞ぎ部、24c 丸穴、25 第1堰板、25a 鉤部、25b 塞ぎ部。

Claims (6)

  1.  昇降路と乗場とを連通する出入口の下部に配置された敷居と、
     前記出入口の下方の前記昇降路の内側の壁面に固定されて前記敷居を支える敷居支持部材と、
     前記敷居から下方に垂れ下げられた第1堰板と、
     前記壁面と前記敷居支持部材の上面とが成す角部に置かれるとともに、前記第1堰板に立て掛けられて当てられた第2堰板とを備え、
     前記敷居と前記壁面との隙間を前記第1堰板および前記第2堰板で塞ぐエレベータの乗場敷居装置の据付構造。
  2.  前記敷居支持部材は、前記上面が前記角部で凹んで前記壁面と凹部を形成する請求項1に記載のエレベータの乗場敷居装置の据付構造。
  3.  前記第1堰板は、前記敷居と前記敷居支持部材の間に挟まれた請求項1または請求項2に記載のエレベータの乗場敷居装置の据付構造。
  4.  前記敷居および前記敷居支持部材の前記乗場の側の側面は、段差無く配置され、
     前記第1堰板は、前記敷居および前記敷居支持部材の前記乗場の側の前記側面に沿って垂れ下げられている請求項1または請求項2に記載のエレベータの乗場敷居装置の据付構造。
  5.  前記敷居は、前記乗場の側の前記側面に前記出入口の幅方向に伸びる溝部が形成され、
     前記第1堰板は、前記溝部に引っ掛けられて下方に垂れ下げられた請求項4に記載のエレベータの乗場敷居装置の据付構造。
  6.  昇降路と乗場とを連通する出入口の下部に配置されて前記出入口の下方の前記昇降路の内側の壁面に固定された敷居支持部材に支えられる敷居と前記壁面との隙間を第1堰板および第2堰板で塞ぐエレベータの乗場敷居装置の据付方法であって、
     前記第1堰板を前記敷居から下方に垂れ下げる第1堰板取付け工程と、
     前記第1堰板取付け工程の後に行われ、前記第2堰板を前記壁面と前記敷居支持部材の上面とが成す角部に置いて、前記第1堰板に立て掛けて当てる第2堰板取付け工程とを含むエレベータの乗場敷居装置の据付方法。
PCT/JP2019/018898 2019-05-13 2019-05-13 エレベータの乗場敷居装置の据付構造および据付方法 WO2020230229A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201980073929.8A CN113795450B (zh) 2019-05-13 2019-05-13 电梯的层站地坎装置的安装结构以及安装方法
PCT/JP2019/018898 WO2020230229A1 (ja) 2019-05-13 2019-05-13 エレベータの乗場敷居装置の据付構造および据付方法
JP2021519069A JP7099629B2 (ja) 2019-05-13 2019-05-13 エレベータの乗場敷居装置の据付構造および据付方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2019/018898 WO2020230229A1 (ja) 2019-05-13 2019-05-13 エレベータの乗場敷居装置の据付構造および据付方法

Publications (1)

Publication Number Publication Date
WO2020230229A1 true WO2020230229A1 (ja) 2020-11-19

Family

ID=73289877

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/018898 WO2020230229A1 (ja) 2019-05-13 2019-05-13 エレベータの乗場敷居装置の据付構造および据付方法

Country Status (3)

Country Link
JP (1) JP7099629B2 (ja)
CN (1) CN113795450B (ja)
WO (1) WO2020230229A1 (ja)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6973673B1 (ja) * 2021-02-17 2021-12-01 三菱電機株式会社 エレベータの乗場敷居装置の据付構造および据付方法
JP7173391B1 (ja) * 2022-04-28 2022-11-16 三菱電機株式会社 エレベータの乗場敷居取付装置
JP7470029B2 (ja) 2020-12-16 2024-04-17 株式会社日立製作所 エレベーターの乗場敷居装置
JP7506837B2 (ja) 2020-12-23 2024-06-26 ジョンチョル チャン 敷居の取り替えが容易なエレベータ用乗場およびその施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5485728U (ja) * 1977-11-30 1979-06-18
JPS5931287A (ja) * 1982-08-12 1984-02-20 株式会社日立製作所 エレベ−タ−の乗場装置
JPS59199981A (ja) * 1983-04-26 1984-11-13 株式会社東芝 エレベ−タ乗場床
JPS6035886U (ja) * 1983-08-17 1985-03-12 三菱電機株式会社 エレベ−タ用敷居
JPH02310287A (ja) * 1989-05-26 1990-12-26 Mitsubishi Electric Corp エレベータの扉装置
JP2008265939A (ja) * 2007-04-19 2008-11-06 Mitsubishi Electric Building Techno Service Co Ltd エレベータの乗り場敷居装置

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0570072A (ja) * 1991-09-13 1993-03-23 Mitsubishi Electric Corp エレベーターの乗場装置
JPH0786261B2 (ja) * 1992-01-31 1995-09-20 梶田建設株式会社 建築物の床施工法
JP2713013B2 (ja) * 1992-03-27 1998-02-16 三菱電機株式会社 エレベーター用敷居の取付構造
JP2005343588A (ja) * 2004-05-31 2005-12-15 Mitsubishi Electric Corp エレベータの乗場敷居の据付装置及びその据付方法
JP2009084029A (ja) * 2007-10-02 2009-04-23 Hitachi Building Systems Co Ltd エレベータの乗場敷居装置
KR200484298Y1 (ko) * 2017-03-20 2017-09-05 장귀경 엘리베이터 도어 실 보강 프레임
CN207811030U (zh) * 2018-01-29 2018-09-04 杭州西奥电梯有限公司 一种电梯厅门挡泥板

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5485728U (ja) * 1977-11-30 1979-06-18
JPS5931287A (ja) * 1982-08-12 1984-02-20 株式会社日立製作所 エレベ−タ−の乗場装置
JPS59199981A (ja) * 1983-04-26 1984-11-13 株式会社東芝 エレベ−タ乗場床
JPS6035886U (ja) * 1983-08-17 1985-03-12 三菱電機株式会社 エレベ−タ用敷居
JPH02310287A (ja) * 1989-05-26 1990-12-26 Mitsubishi Electric Corp エレベータの扉装置
JP2008265939A (ja) * 2007-04-19 2008-11-06 Mitsubishi Electric Building Techno Service Co Ltd エレベータの乗り場敷居装置

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7470029B2 (ja) 2020-12-16 2024-04-17 株式会社日立製作所 エレベーターの乗場敷居装置
JP7506837B2 (ja) 2020-12-23 2024-06-26 ジョンチョル チャン 敷居の取り替えが容易なエレベータ用乗場およびその施工方法
JP6973673B1 (ja) * 2021-02-17 2021-12-01 三菱電機株式会社 エレベータの乗場敷居装置の据付構造および据付方法
JP2022125727A (ja) * 2021-02-17 2022-08-29 三菱電機株式会社 エレベータの乗場敷居装置の据付構造および据付方法
JP7173391B1 (ja) * 2022-04-28 2022-11-16 三菱電機株式会社 エレベータの乗場敷居取付装置

Also Published As

Publication number Publication date
CN113795450B (zh) 2023-07-28
CN113795450A (zh) 2021-12-14
JPWO2020230229A1 (ja) 2021-10-21
JP7099629B2 (ja) 2022-07-12

Similar Documents

Publication Publication Date Title
WO2020230229A1 (ja) エレベータの乗場敷居装置の据付構造および据付方法
US20110219722A1 (en) Fixture for securing a balustrade
KR200394330Y1 (ko) 조립식 철골계단
US20070266659A1 (en) Perimeter foundation panel, and method of use
JP2008265939A (ja) エレベータの乗り場敷居装置
JP6973673B1 (ja) エレベータの乗場敷居装置の据付構造および据付方法
JP6579591B1 (ja) エレベータの乗場装置、エレベータの乗場装置の据え付け方法
JP2007168964A (ja) 乗場ドア装置の仮吊部材、仮吊部材を用いた乗場ドア装置及び乗場ドア据付方法
JP3759500B2 (ja) 建物の壁
KR200376612Y1 (ko) 사다리의 고정 구조
NL2017629B1 (en) Anchoring device for anchoring a facade element to a building
JP3652344B2 (ja) 建物の立上り壁
JP4867230B2 (ja) エレベータの三方枠装置
JP3431429B2 (ja) 建物の壁及びその施工方法
JP6016839B2 (ja) 接合部材
JP6906344B2 (ja) 胴縁取付用金具
JPS6211892Y2 (ja)
JP2008280732A (ja) 外壁パネルの取付構造及び取付施工方法
JP5146076B2 (ja) エレベータの乗場装置
JP2022147902A (ja) エレベータの乗場敷居装置
JPH11200478A (ja) ベランダ手摺壁の取付け構造
JP7058079B2 (ja) 外壁改修構造
JPH07208040A (ja) 間仕切り装置の取付工法
EA202000013A1 (ru) Кронштейн и узел крепления вертикальной стойки системы навесного фасада
JP2010070345A (ja) エレベータの乗場出入口枠

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19928322

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2021519069

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19928322

Country of ref document: EP

Kind code of ref document: A1