WO2020203315A1 - 作業機械および作業機械の制御方法 - Google Patents

作業機械および作業機械の制御方法 Download PDF

Info

Publication number
WO2020203315A1
WO2020203315A1 PCT/JP2020/012075 JP2020012075W WO2020203315A1 WO 2020203315 A1 WO2020203315 A1 WO 2020203315A1 JP 2020012075 W JP2020012075 W JP 2020012075W WO 2020203315 A1 WO2020203315 A1 WO 2020203315A1
Authority
WO
WIPO (PCT)
Prior art keywords
cylinder
bucket
boom
drive command
bell crank
Prior art date
Application number
PCT/JP2020/012075
Other languages
English (en)
French (fr)
Inventor
翔太 山脇
彰吾 宮▲崎▼
Original Assignee
株式会社小松製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社小松製作所 filed Critical 株式会社小松製作所
Priority to CN202080012824.4A priority Critical patent/CN113396256B/zh
Priority to EP20782694.2A priority patent/EP3907334A4/en
Priority to US17/426,399 priority patent/US20220106763A1/en
Publication of WO2020203315A1 publication Critical patent/WO2020203315A1/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/42Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/43Control of dipper or bucket position; Control of sequence of drive operations
    • E02F3/431Control of dipper or bucket position; Control of sequence of drive operations for bucket-arms, front-end loaders, dumpers or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/283Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with a single arm pivoted directly on the chassis
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/34Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with bucket-arms, i.e. a pair of arms, e.g. manufacturing processes, form, geometry, material of bucket-arms directly pivoted on the frames of tractors or self-propelled machines
    • E02F3/3405Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with bucket-arms, i.e. a pair of arms, e.g. manufacturing processes, form, geometry, material of bucket-arms directly pivoted on the frames of tractors or self-propelled machines and comprising an additional linkage mechanism
    • E02F3/3411Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with bucket-arms, i.e. a pair of arms, e.g. manufacturing processes, form, geometry, material of bucket-arms directly pivoted on the frames of tractors or self-propelled machines and comprising an additional linkage mechanism of the Z-type
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/42Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/422Drive systems for bucket-arms, front-end loaders, dumpers or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2203Arrangements for controlling the attitude of actuators, e.g. speed, floating function
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2203Arrangements for controlling the attitude of actuators, e.g. speed, floating function
    • E02F9/2214Arrangements for controlling the attitude of actuators, e.g. speed, floating function for reducing the shock generated at the stroke end
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2221Control of flow rate; Load sensing arrangements
    • E02F9/2225Control of flow rate; Load sensing arrangements using pressure-compensating valves
    • E02F9/2228Control of flow rate; Load sensing arrangements using pressure-compensating valves including an electronic controller
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2264Arrangements or adaptations of elements for hydraulic drives
    • E02F9/2271Actuators and supports therefor and protection therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2296Systems with a variable displacement pump
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/08Superstructures; Supports for superstructures
    • E02F9/0841Articulated frame, i.e. having at least one pivot point between two travelling gear units
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/2004Control mechanisms, e.g. control levers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2285Pilot-operated systems
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2292Systems with two or more pumps

Definitions

  • the present invention relates to a work machine and a method for controlling the work machine.
  • a wheel loader as an example of a work machine has a work machine in which a bucket is provided at the tip of a boom.
  • a hydraulic cylinder for boom is provided between the vehicle body of the wheel loader and the boom, and the boom rotates in the vertical direction due to expansion and contraction of the hydraulic cylinder.
  • a bell crank is attached to the boom, and a hydraulic cylinder for a bucket is provided between one end of the bell crank and the vehicle body.
  • a rod is attached between the other end of the bell crank and the bucket.
  • the bucket reaches the tilt end or dump end due to the structure of the work equipment link mechanism before the stroke of the bucket cylinder reaches the maximum or minimum value, so that the boom angle
  • the maximum stroke of the bucket cylinder corresponds to the tilt end and the minimum does not correspond to the dump end.
  • impact mitigation control at the tilt end or dump end was performed based on a map that defines the stroke end of the cylinder length in consideration of the bucket shape with respect to the boom angle.
  • An object of the present invention is to provide a work machine and a control method of the work machine capable of mitigating an impact at a tilt end or a dump end without considering a boom angle. (Means to solve problems)
  • the work machine of the present invention includes a boom, a work tool, an actuator, a sublink, and a control unit.
  • the working unit is driven against the boom.
  • the actuator drives the work tool.
  • the sublink is attached to the boom and transmits the driving force of the actuator to the work tool.
  • the control unit controls the actuator based on the attitude of the sublink with respect to the boom.
  • the method of controlling a working machine of the present invention includes a control step.
  • the control step controls the actuator based on the posture of the sublink with respect to the boom, which transmits the driving force of the actuator to the work tool that drives the boom. (The invention's effect)
  • a side view of the wheel loader of the embodiment according to the present invention The side view of the work machine of FIG.
  • the block diagram which shows the control system of FIG.
  • the figure which shows the change of the bucket cylinder length at the time of a tilt end with respect to a boom angle, and the change of the bucket cylinder length at the time of a dump end with respect to a boom angle.
  • the figure which shows an example of the state of the working machine in P1 of FIG.
  • the graph in which the minimum value of the bucket cylinder length, the maximum value of the bucket cylinder length, the minimum value of the bell crank angle, and the change of the maximum value of the bell crank angle with respect to the boom angle are added to the graph of FIG.
  • the block diagram which shows the structure of the processing part of FIG. The flow chart which shows the control method of the work machine of embodiment which concerns on this invention. A flow chart showing how to calibrate the maximum bell crank angle.
  • FIG. 1 is a schematic view showing the configuration of the wheel loader 1 of the present embodiment.
  • the wheel loader 1 of the present embodiment includes a vehicle body 2 (an example of a vehicle body) and a working machine 3.
  • the vehicle body 2 includes a vehicle body frame 10, a pair of front tires 4, a cab 5, an engine room 6, a pair of rear tires 7, and a control system 8 (see FIG. 3).
  • the wheel loader 1 performs earth and sand loading work using the work machine 3.
  • the body frame 10 is a so-called articulated type, and has a front frame 11, a rear frame 12, and a connecting shaft portion 13.
  • the front frame 11 is arranged in front of the rear frame 12.
  • the connecting shaft portion 13 is provided at the center in the vehicle width direction, and connects the front frame 11 and the rear frame 12 so as to be swingable to each other.
  • the cab 5 is provided on the rear frame 12 and has a driver's seat.
  • the cab 5 is provided with an input / output device 50, a boom operating lever 61, a bucket operating lever 62, and the like, which will be described later.
  • a pair of front tires 4 are attached to the left and right sides of the front frame 11. Further, a pair of rear tires 7 are attached to the left and right sides of the rear frame 12.
  • FIG. 2 is an enlarged side view of the working machine 3.
  • the working machine 3 has a boom 14, a bucket 15 (an example of a working tool), a boom cylinder 16, a bucket cylinder 17 (an example of an actuator), and a bell crank 18 (an example of a sublink).
  • One mounting portion 14a of the boom 14 is rotatably mounted on the front portion of the front frame 11.
  • the other attachment portion 14b of the boom 14 is rotatably attached to the rear portion of the bucket 15.
  • the tip of the cylinder rod 16a of the boom cylinder 16 is rotatably attached to the attachment portion 14c provided between the attachment portion 14a and the attachment portion 14b of the boom 14.
  • the cylinder body of the boom cylinder 16 is rotatably attached to the front frame 11 at the attachment portion 16b.
  • the bell crank 18 has a bell crank main body 18e and a rod 18f.
  • the attachment portion 18a provided at one end of the bell crank body 18e is rotatably attached to the tip of the cylinder rod 17a of the bucket cylinder 17.
  • One end of the rod 18f is rotatably attached to an attachment portion 18b provided at the other end of the bell crank body 18e.
  • the other end of the rod 18f is rotatably attached to the rear portion of the bucket 15 at the attachment portion 18g.
  • the bell crank body 18e has a boom 14 at a mounting portion 18c (an example of a fourth mounting portion) provided between a mounting portion 18a (an example of a second mounting portion) and a mounting portion 18b (an example of a third mounting portion).
  • the cylinder body of the bucket cylinder 17 is rotatably attached to the front frame 11 at the attachment portion 17b (an example of the first attachment portion).
  • the expansion and contraction force of the bucket cylinder 17 is converted into rotational motion by the bell crank and transmitted to the bucket 15.
  • the sublink may include a quick coupler or the like in addition to the bell crank 18.
  • the bucket 15 rotates with respect to the boom 14 and performs a tilt operation (see arrow J) and a dump operation (see arrow K).
  • the tilting operation of the bucket 15 is an operation of tilting by rotating the opening 15b and the claw 15c of the bucket 15 toward the cab 5.
  • the dump operation of the bucket 15 is the opposite of the tilt operation, and is an operation of tilting by rotating the opening 15b and the claw 15c of the bucket 15 so as to move away from the cab 5.
  • the boom angle sensor 54 is provided on the mounting portion 14a of the boom 14.
  • the boom angle sensor 54 detects the boom angle (indicated by ⁇ a in the figure) between the center line L1 of the boom 14 and the horizontal line H, and outputs a detection signal.
  • the center line L1 of the boom 14 is a line connecting the mounting portion 14a and the mounting portion 14b of the boom 14.
  • the boom angle has a negative value when the center line L1 is inclined toward the road surface R (see FIG. 1) with respect to the horizontal line H.
  • the bell crank angle sensor 55 is provided on the mounting portion 18c of the bell crank 18.
  • the bell crank angle sensor 55 detects the bell crank angle (indicated by ⁇ b in the figure) between the line L2 connecting the mounting portion 18a and the mounting portion 18c of the bell crank 18 and the center line L1 of the boom 14, and detects the detection signal. Is output.
  • the bell crank angle is an example of the posture of the bell crank 18.
  • FIG. 3 is a diagram showing a control system 8 that controls the operation of the work machine 3.
  • the control system 8 controls the operation of the working machine 3.
  • the control system 8 includes a working machine hydraulic pump 21, a boom operating valve 22, a bucket operating valve 23, a pilot pump 24, a discharge circuit 25, an electromagnetic proportional control valve 26, a control device 27, and an EG (engine). It has a control device 29 and.
  • the working machine hydraulic pump 21 is driven by the engine 30 mounted in the engine room 6.
  • the engine 30 is an internal combustion engine, and for example, a diesel engine is used.
  • the output of the engine 30 is input to the PTO (power Take Off) 31, and then output to the working machine hydraulic pump 21 and the transmission 34.
  • the working machine hydraulic pump 21 is driven by the engine 30 via the PTO 31 to discharge hydraulic oil.
  • the input side of the clutch 32 is attached to the engine 30.
  • the output side of the clutch 32 is attached to the torque converter (TC) 33.
  • the output of the engine 30 is transmitted to the transmission 34 via the PTO 31.
  • the transmission 34 transmits the output of the engine 30 transmitted via the PTO 31 to the front tire 4 and the rear tire 7, and the front tire 4 and the rear tire 7 are driven.
  • the transmission 34 can be appropriately used for HST (Hydro Static Transmission), electric drive, and the like.
  • the discharge circuit 25 is an oil passage through which the hydraulic oil passes, and is attached to a discharge port through which the working machine hydraulic pump 21 discharges the hydraulic oil.
  • the discharge circuit 25 is attached to the boom operation valve 22 and the bucket operation valve 23.
  • the boom operation valve 22 and the bucket operation valve 23 are hydraulic pilot type operation valves.
  • the boom operating valve 22 and the bucket operating valve 23 are attached to the vehicle body 2.
  • the working machine hydraulic pump 21, the boom operating valve 22, the bucket operating valve 23, and the discharge circuit 25 form a parallel hydraulic circuit.
  • the boom operation valve 22 is a 4-position switching valve that can be switched between the A position, the B position, the C position, and the D position.
  • the boom operating valve 22 raises the boom 14 when it reaches the A position, holds the position in a neutral position when it reaches the B position, lowers the boom 14 when it reaches the C position, and floats at the D position.
  • the bucket operation valve 23 is a three-position switching valve that can be switched between the E position, the F position, and the G position.
  • the bucket operating valve 23 tilts the bucket 15 when it reaches the E position (see arrow J in FIG. 2), holds the position neutrally when it reaches the F position, and dumps the bucket 15 when it reaches the G position (arrow in FIG. 2). See K).
  • the pilot pump 24 is attached to the pilot pressure receiving portion of the boom operating valve 22 and the pilot pressure receiving portion of the bucket operating valve 23 via an electromagnetic proportional control valve 26.
  • the pilot pump 24 is connected to the PTO 31 and is driven by the engine 30.
  • the pilot pump 24 supplies the pilot pressure hydraulic oil to the pilot pressure receiving portion 22R of the boom operating valve 22 and the pilot pressure receiving portion 23R of the bucket operating valve 23 via the electromagnetic proportional control valve 26.
  • the electromagnetic proportional control valve 26 includes a boom lowering electromagnetic proportional control valve 41, a boom raising electromagnetic proportional control valve 42, a bucket dump electromagnetic proportional control valve 43, and a bucket tilt electromagnetic proportional control valve 44.
  • the boom lowering electromagnetic proportional control valve 41 and the boom raising electromagnetic proportional control valve 42 are attached to each pilot pressure receiving portion 22R of the boom operating valve 22.
  • the bucket dump electromagnetic proportional control valve 43 and the bucket tilt electromagnetic proportional control valve 44 are attached to each pilot pressure receiving portion 23R of the bucket operation valve 23.
  • a command signal from the control device 27 to each solenoid proportional control valve is input to the unit 44S.
  • the boom 14 is rotated upward or downward by the operation of the boom lowering electromagnetic proportional control valve 41, the boom raising electromagnetic proportional control valve 42, the boom operating valve 22, and the boom cylinder 16.
  • the bucket 15 is tilted and dumped by the operations of the bucket dump electromagnetic proportional control valve 43, the bucket tilt electromagnetic proportional control valve 44, the bucket operation valve 23, and the bucket cylinder 17.
  • the control system 8 is provided with a boom operating lever 61 and a bucket operating lever 62 operated by an operator.
  • the boom operating lever 61 is a lever for operating the boom 14.
  • a first potentiometer 63 for detecting the amount of operation of the boom operating lever 61 is attached to the boom operating lever 61.
  • the bucket operation lever 62 is a lever for operating the bucket 15.
  • a second potentiometer 64 for detecting the operation amount of the bucket operation lever 62 is attached to the bucket operation lever 62.
  • the detection signals of the first potentiometer 63 and the second potentiometer 64 are input to the input unit 47 of the control device 27.
  • the boom operating lever 61 and the bucket operating lever 62 may be PPC levers that directly drive the operating valve that operates the cylinder with pilot pressure.
  • the control device 27 includes, for example, a processing unit 45 such as a CPU (Central Processing Unit), a storage unit 46 such as a ROM (Read Only Memory), an input unit 47, and an output unit 48.
  • a processing unit 45 such as a CPU (Central Processing Unit)
  • a storage unit 46 such as a ROM (Read Only Memory)
  • an input unit 47 and an output unit 48.
  • the processing unit 45 controls the operation of the work machine 3 by executing a computer program.
  • the processing unit 45 is electrically connected to the storage unit 46, the input unit 47, and the output unit 48.
  • the processing unit 45 reads the information from the storage unit 46 and writes the information to the storage unit 46.
  • the processing unit 45 receives information from the input unit 47.
  • the processing unit 45 outputs information from the output unit 48.
  • the storage unit 46 stores a computer program that controls the operation of the work machine 3 and information used for controlling the work machine 3.
  • the storage unit 46 stores a computer program for realizing the control method of the work machine, and the processing unit 45 reads and executes this program.
  • the storage unit 46 stores the maximum and minimum values of the cylinder length (an example of stroke) of the bucket cylinder 17 and the maximum and minimum values of the bell crank angle.
  • the maximum and minimum values of the bell crank angle correspond to an example of the limit posture.
  • the maximum and minimum values of the cylinder length correspond to an example of the end position.
  • the storage unit 46 stores four tables.
  • the first table is a table showing the limit amount of hydraulic oil to the bucket cylinder 17 set for the difference between the bell crank angle and the maximum value of the bell crank angle acquired from the bell crank angle sensor 55.
  • the second table is a table showing the limit amount of hydraulic oil to the bucket cylinder 17 set for the difference between the bell crank angle acquired from the bell crank angle sensor 55 and the minimum value of the bell crank angle.
  • the third table shows the limit amount of hydraulic oil on the bucket cylinder 17 set for the difference between the cylinder length of the bucket cylinder 17 and the maximum value of the cylinder length acquired from the boom angle sensor 54 and the bell crank angle sensor 55. It is a table.
  • the fourth table shows the limit amount of hydraulic oil on the bucket cylinder 17 set for the difference between the cylinder length of the bucket cylinder 17 and the minimum value of the cylinder length acquired from the boom angle sensor 54 and the bell crank angle sensor 55. It is a table.
  • Detection signals are input to the input unit 47 from the boom angle sensor 54, the bell crank angle sensor 55, the first potentiometer 63, and the second potentiometer 64.
  • the processing unit 45 acquires these detection signals and controls the operation of the work machine 3.
  • the cylinder length of the bucket cylinder 17 (indicated by La in FIG. 2) is obtained from the boom angle detected by the boom angle sensor 54 and the bell crank angle detected by the bell crank angle sensor 55.
  • the control device 27 obtains the cylinder length of the boom cylinder 16 and the cylinder length of the bucket cylinder 17 by using the detected values of at least one of the boom angle sensor 54 and the bell crank angle sensor 55, and controls the operations of the boom 14 and the bucket 15. ..
  • the output unit 48 includes a solenoid command unit 41S of the boom lowering electromagnetic proportional control valve 41, a solenoid command unit 42S of the boom raising electromagnetic proportional control valve 42, a solenoid command unit 43S of the bucket dump electromagnetic proportional control valve 43, and a bucket tilt electromagnetic wave.
  • a drive command is output to the solenoid command unit 44S of the proportional control valve 44 and the input / output device 50.
  • the processing unit 45 gives a command value for operating the boom cylinder 16 to the solenoid command unit 41S of the boom lowering electromagnetic proportional control valve 41 or the solenoid command unit 42S of the boom raising electromagnetic proportional control valve 42, and expands and contracts the boom cylinder 16.
  • the boom 14 is raised and lowered.
  • the processing unit 45 gives a command value for operating the bucket cylinder 17 to the solenoid command unit 43S of the bucket dump electromagnetic proportional control valve 43 or the solenoid command unit 44S of the bucket tilt electromagnetic proportional control valve 44, and expands and contracts the bucket cylinder 17.
  • the bucket 15 is tilted or dumped.
  • the input / output device 50 is provided inside the cab 5.
  • the input / output device 50 is attached to both the input unit 47 and the output unit 48.
  • the input / output device 50 includes an input device 51 and a display device 52.
  • the operator can input a command value from the input device 51 to the control device 27.
  • the display device 52 displays information regarding the state or control of the work machine 3.
  • the input device 51 can use a touch panel or a push button type switch. As will be described later, by operating the input device 51, it is possible to display a calibration mode for calibrating the maximum value of the bell crank angle at the tilt end.
  • slow stop control In the wheel loader 1 of the present embodiment, slow stop control is performed at the tilt end and the dump end in order to alleviate the impact at the tilt end and the dump end.
  • the control device 27 of the present embodiment performs slow stop control based on the bell crank angle and the stroke length of the bucket cylinder 17.
  • FIG. 4 is a diagram showing a change in the bucket cylinder length at the tilt end with respect to the boom angle (G1) and a change in the bucket cylinder length at the dump end with respect to the boom angle (G2).
  • the vertical axis shows the bucket cylinder length
  • the horizontal axis shows the boom angle.
  • FIG. 5 is a diagram showing a state in which the tilt end is reached at the maximum value of the bucket cylinder 17, and is a diagram showing an example of a state of the working machine in P1 of FIG.
  • FIG. 5 shows a state in which the boom angle is the maximum value, the bucket cylinder 17 is fully extended, and the bucket 15 reaches the tilt end.
  • FIG. 6 is a diagram showing an example of the working machine 3 in P2 of FIG. In the state shown in FIG. 6, since the bucket 15 is in contact with the bell crank 18, the bucket cylinder 17 cannot be extended any further.
  • the contact point is shown as C1, but the contact position changes at the mechanical limit depending on the structure of the link of the working machine 3.
  • the bucket 15 reaches the tilt end due to the mechanical limit of the link machine of the work machine 3, and from the angle A1 to the maximum value, the bucket 15 tilts at the maximum value of the cylinder length of the bucket cylinder 17. Reach the end.
  • FIG. 7 is a diagram showing an example of the working machine 3 in P3 of FIG. In the state shown in FIG. 7, since the bell crank 18 is in contact with the frame portion of the boom 14 arranged along the left-right direction, the bucket cylinder 17 cannot be further contracted (see point C2).
  • the stroke length of the bucket cylinder 17 depends on the boom angle, but since the mechanism limit is reached, the bell crank angle is constant.
  • FIG. 8 shows the graph of FIG. 5, the minimum value of the bucket cylinder length (G3), the maximum value of the bucket cylinder length (G4), the minimum value of the bell crank angle (G5), and the maximum value of the bell crank angle (G6). It is a figure which added.
  • the vertical axis shows the bucket cylinder length, and the horizontal axis shows the boom angle.
  • the maximum value G6 of the bell crank angle matches G1 in the region where the stroke length of the bucket cylinder 17 does not reach the maximum value. To do.
  • the minimum value G5 of the bell crank angle matches G2 in the region where the bucket cylinder length does not reach the minimum value.
  • FIG. 9 is a graph showing a graph in which the vertical axis of the graph of FIG. 8 is converted into a bell crank angle.
  • the graph corresponding to G1 in FIG. 8 is shown as G1', showing the change of the bell crank angle at the tilt end with respect to the boom angle.
  • the graph corresponding to G2 in FIG. 8 is shown as G2', and shows the change of the bell crank angle at the dump end with respect to the boom angle.
  • the end line G7 when the boom is lowered is drawn at A3 degree
  • the end line G8 when the boom is raised is drawn at A4 degree.
  • the bucket 15 in the region where the stroke length of the bucket cylinder 17 does not reach the maximum value at the tilt end, the bucket 15 reaches the tilt end at the maximum value G6 of the bell crank angle. Further, in the region where the stroke length of the bucket cylinder does not reach the minimum value at the dump end, the bucket 15 reaches the dump end at the minimum value G5 of the bell crank angle.
  • G11 shown by a dotted line in FIG. 4 is a graph showing the bucket cylinder length at the tilt end when the bucket 15 is replaced with another one.
  • the graph corresponding to G11 in FIG. 4 is shown as G11'in FIG.
  • G11 and G11' unlike G1 and G1', when the boom angle is between the maximum value and A5 degrees, the tilt end is reached at the maximum value of the cylinder length of the bucket cylinder 17, and the boom angle is from A5 degrees to the minimum value. The tilt end is reached before the cylinder length of the bucket cylinder 17 reaches the maximum value.
  • the bucket 15 may be replaced with one having a different size depending on the operator.
  • the mechanical limit also changes and the maximum value of the bell crank angle also changes, but as described above, the bell crank angle at the mechanical limit is It is constant. Therefore, when the bucket is replaced, it is possible to detect that the bucket 15 reaches the tilt end by obtaining the maximum value of the bell crank angle at the mechanical limit by calibration and using the maximum value and the bucket cylinder length. it can. The calibration of the maximum value of the bell crank angle when the bucket is replaced will be described later.
  • the dump end is determined by the shapes of the boom 14 and the bell crank 18 regardless of the bucket 15, so that it is not necessary to perform calibration and it is determined by the design value.
  • FIG. 10 is a block diagram showing the configuration of the processing unit 45 of the present embodiment.
  • the processing unit 45 includes a drive command creation unit 70, a bell crank limit amount calculation unit 71, a cylinder limit amount calculation unit 72, a limit amount determination unit 73, a drive command determination unit 74, and a tilt / dump determination unit 75.
  • the drive command creation unit 70 creates a drive command based on the operation of the boom operation lever 61 and the bucket operation lever 62 by the operator.
  • the drive command creation unit 70 moves the boom operation lever 61 and the bucket operation lever 62 from the first potentiometer 63 and the second potentiometer 64 via the input unit 47. Acquire the operation amount signal.
  • the drive command creation unit 70 creates a drive command (an example of a target cylinder drive command) corresponding to the signal of the operation amount.
  • This drive command is a command to drive the boom cylinder 16 or the bucket cylinder 17 so as to correspond to the operation amount signal, and defines the flow rate of the hydraulic oil supplied to the boom cylinder 16 or the bucket cylinder 17.
  • the drive command corresponds to the operation amount with respect to the boom lowering electromagnetic proportional control valve 41, the boom raising electromagnetic proportional control valve 42, the bucket dump electromagnetic proportional control valve 43, or the bucket tilt electromagnetic proportional control valve 44. It is a command to set the opening so that the hydraulic oil of the flow rate flows.
  • the tilt / dump determination unit 75 determines whether the bucket 15 is operated to the tilt side or the dump side based on the detection signal from the second potentiometer 64 that detects the operation amount of the bucket operation lever 62.
  • the tilt / dump determination unit 75 transmits the determination result to the bell crank limit amount calculation unit 71 and the cylinder limit amount calculation unit 72.
  • the bell crank limit amount calculation unit 71 calculates the flow rate limit amount when driving the bucket cylinder 17 based on the bell crank angle acquired from the bell crank angle sensor 55 via the input unit 47.
  • the bell crank limit amount calculation unit 71 has a first tilt side limit amount calculation unit 81 and a first dump side limit amount calculation unit 82.
  • the first tilt side limit amount calculation unit 81 has acquired the maximum value of the bell crank angle stored in the storage unit 46 and the bell crank angle sensor 55 when it is determined that the bucket 15 is operated to the tilt side.
  • the difference between the bell crank angles is calculated, and the first tilt side limit amount (an example of the first cylinder drive command) is acquired from the first table stored in the storage unit 46.
  • the smaller the difference (the closer the bell crank angle is to the maximum value), the larger the limit amount of the flow rate of the hydraulic oil supplied to the bucket cylinder 17 is set.
  • the moving speed of the cylinder rod 17a of the bucket cylinder 17 is limited. That is, by limiting the moving speed of the bell crank 18 before reaching the maximum value of the bell crank angle, it is possible to stop gently when reaching the tilt end due to the mechanism limit.
  • the first dump side limit amount calculation unit 82 acquired the minimum value of the bell crank angle stored in the storage unit 46 and the bell crank angle sensor 55 when it was determined that the operation was to the dump side of the bucket 15. The difference between the bell crank angles is calculated, and the first dump side limit amount (an example of the first cylinder drive command) is acquired from the second table stored in the storage unit 46. In the second table, the smaller the difference (the closer the bell crank angle is to the minimum value), the larger the limit amount of the flow rate of the hydraulic oil supplied to the bucket cylinder 17 is set.
  • the cylinder limit amount calculation unit 72 includes a cylinder length calculation unit 85, a second tilt side limit amount calculation unit 83, and a second dump side limit amount calculation unit 84.
  • the cylinder length calculation unit 85 calculates the cylinder length of the bucket cylinder 17 based on the boom angle acquired from the boom angle sensor 54 and the bell crank angle acquired from the bell crank angle sensor 55.
  • the second tilt side limit amount calculation unit 83 calculates the maximum value of the bucket cylinder length stored in the storage unit 46 and the cylinder length calculation unit 85 when it is determined that the bucket 15 is operated to the tilt side.
  • the difference between the cylinder lengths is calculated, and the second tilt side limit amount (an example of the second cylinder drive command) is acquired from the third table stored in the storage unit 46.
  • the third table the smaller the difference (the closer the cylinder length is to the maximum value), the larger the limit amount of the flow rate of the hydraulic oil supplied to the bucket cylinder 17 is set.
  • the second dump side limit amount calculation unit 84 is calculated by the cylinder length calculation unit 85 and the minimum value of the bucket cylinder length stored in the storage unit 46 when it is determined that the operation is to the dump side of the bucket 15.
  • the difference between the cylinder lengths is calculated, and the second dump side limit amount (an example of the second cylinder drive command) is acquired from the fourth table stored in the storage unit 46.
  • the fourth table the smaller the difference (the closer the cylinder length is to the minimum value), the larger the limit amount of the flow rate of the hydraulic oil supplied to the bucket cylinder 17 is set.
  • the limit amount determination unit 73 determines that the operation is to the tilt side of the bucket 15, the drive command of the bucket cylinder 17 is given to the larger limit amount of the first tilt side limit amount and the second tilt side limit amount. It is determined as a limit amount for. Further, when the limit amount determination unit 73 determines that the operation is to the dump side of the bucket 15, the limit amount of the first dump side limit amount and the second dump side limit amount, whichever is larger, is set by the bucket cylinder 17. Determined as a limit amount for the drive command. As described above, in the case of the operation of the bucket 15 to the tilt side, the limit amount for the closer one of the maximum value of the bell crank angle and the maximum value of the bucket cylinder length is adopted. Further, in the case of the operation of the bucket 15 to the dump side, the limit amount for the closer one of the minimum value of the bell crank angle and the minimum value of the bucket cylinder length is adopted.
  • the larger limit amount means that the limited flow rate is larger. For example, when the maximum flow rate is 100% and the limit amount is 40%, the hydraulic oil is supplied to the bucket cylinder 17 at a flow rate of 60%. That is, the larger the limit amount, the smaller the flow rate of the hydraulic oil supplied to the bucket cylinder 17.
  • the limit amount increases as it approaches the maximum value of the bell crank angle or the maximum value of the bucket cylinder length, so that the moving speed of the bucket 15 slows down and the impact at the tilt end. Can be alleviated. Further, in the case of the operation of the bucket 15 to the dump side, the limit amount increases as the bell crank angle minimum value or the bucket cylinder length minimum value approaches, so that the moving speed of the bucket 15 slows down and the impact at the dump end is caused. It can be relaxed.
  • the drive command determination unit 74 When the flow rate of the hydraulic oil supplied to the bucket cylinder 17 by the drive command created by the drive command creation unit 70 exceeds the limit amount, the drive command determination unit 74 has a maximum flow rate that keeps the limit amount. Create a drive command for. That is, when the limit amount is 40%, the flow rate can be supplied up to 60%, but the flow rate of the hydraulic oil supplied to the bucket cylinder 17 of the drive command created by the drive command creation unit 70 is set to 80%. When this is done, the drive command determination unit 74 determines the drive command so that the flow rate becomes 60%. That is, the limit amount is the upper limit value of the flow rate that can be driven.
  • the drive command determination unit 74 creates the drive command (cylinder drive).
  • the bucket cylinder 17 is controlled by an example of a command).
  • the opening degree of the bucket tilt electromagnetic proportional control valve 44 is narrowed in order to increase the limit amount of the flow rate of the hydraulic oil when it is determined that the bucket 15 is operated to the tilt side. As a result, the pilot pressure can be lowered, so that the flow rate of the hydraulic oil to the bucket cylinder 17 can be limited. Further, in order to increase the limit amount of the flow rate of the hydraulic oil when it is determined that the operation of the bucket 15 is to the dump side, the opening degree of the bucket dump electromagnetic proportional control valve 43 is narrowed. As a result, the pilot pressure can be lowered, so that the flow rate of the hydraulic oil to the bucket cylinder 17 can be limited.
  • FIG. 11 is a flow chart showing a control method of the work machine of the present embodiment.
  • step S10 when the bucket operating lever 62 is operated by the operator, the second potentiometer 64 detects the operating amount of the bucket operating lever 62, and the detection signal is input to the input unit 47 of the control device 27.
  • step S11 the tilt / dump determination unit 75 determines whether the bucket 15 is operated to the tilt side or the dump side based on the detection signal of the second potentiometer 64.
  • step S11 If it is determined in step S11 that the operation is on the tilt side, the control proceeds to step S12.
  • step S12 the drive command creation unit 70 uses the solenoid command unit 44S of the bucket tilt electromagnetic proportional control valve 44 so that the flow rate of the hydraulic oil based on the detection signal by the second potentiometer 64 is supplied to the bucket cylinder 17. Create a drive command to send to.
  • step S13 the first tilt side limit amount calculation unit 81 calculates the difference between the maximum value of the bell crank angle stored in the storage unit 46 and the bell crank angle acquired from the bell crank angle sensor 55. , The first tilt side limit amount is calculated from the first table stored in the storage unit 46.
  • step S14 the cylinder length calculation unit 85 calculates the cylinder length of the bucket cylinder 17 based on the boom angle acquired from the boom angle sensor 54 and the bell crank angle acquired from the bell crank angle sensor 55.
  • step S15 the second tilt side limit amount calculation unit 83 calculates the difference between the maximum value of the bucket cylinder length stored in the storage unit 46 and the cylinder length calculated by the cylinder length calculation unit 85.
  • the second tilt side limit amount is acquired from the third table stored in the storage unit 46.
  • step S16 the limit amount determination unit 73 determines the larger limit amount of the calculated first tilt side limit amount and the second tilt side limit amount as the limit amount for the drive command of the bucket cylinder 17. To do.
  • step S17 the drive command determination unit 74 determines whether or not the flow rate of the hydraulic oil supplied to the bucket cylinder 17 by the drive command created by the drive command creation unit 70 exceeds the limit amount. .. If it is determined in step S17 that the flow rate of the supplied hydraulic oil does not exceed the limit amount, the control proceeds to step S18, and in step S18, the drive command created in step S12 is sent to the output unit 48. Is output to the solenoid command unit 44S of the bucket tilt electromagnetic proportional control valve 44.
  • step S17 determines whether the flow rate of the supplied hydraulic oil exceeds the limit amount. If it is determined in step S17 that the flow rate of the supplied hydraulic oil exceeds the limit amount, the control proceeds to step S19, and in step S19, the drive command determination unit 74 does not exceed the limit amount. Change the drive command to maximize the flow rate. Subsequently, in step S18, the changed drive command is output from the output unit 48 to the solenoid command unit 44S of the bucket tilt electromagnetic proportional control valve 44, while in step S11, the tilt / dump determination unit 75 is the second potentiometer. If it is determined that the operation is to the dump side of the bucket 15 based on the detection signal of 64, the control proceeds to step S20.
  • the drive command creation unit 70 is a solenoid command unit of the bucket dump electromagnetic proportional control valve 43 so that the flow rate of hydraulic oil based on the detection signal by the second potentiometer 64 is supplied to the boom cylinder 16 and the bucket cylinder 17.
  • the first dump side limit amount calculation unit 82 calculates the difference between the minimum value of the bell crank angle stored in the storage unit 46 and the bell crank angle acquired from the bell crank angle sensor 55, and stores the storage unit. The first dump side limit amount is acquired from the second table stored in 46.
  • step S22 the cylinder length calculation unit 85 calculates the cylinder length of the bucket cylinder 17 based on the boom angle acquired from the boom angle sensor 54 and the bell crank angle acquired from the bell crank angle sensor 55.
  • step S23 the second dump side limit amount calculation unit 84 calculates the difference between the minimum value of the bucket cylinder length stored in the storage unit 46 and the cylinder length calculated by the cylinder length calculation unit 85. , The second dump side limit amount is acquired from the fourth table stored in the storage unit 46.
  • step S24 the limit amount determination unit 73 determines the larger limit amount of the calculated first dump side limit amount and the second dump side limit amount as the limit amount for the drive command of the bucket cylinder 17. To do.
  • step S25 the drive command determination unit 74 determines whether or not the flow rate of the hydraulic oil supplied to the bucket cylinder 17 by the drive command created by the drive command creation unit 70 exceeds the limit amount. ..
  • step S25 If it is determined in step S25 that the flow rate of the supplied hydraulic oil does not exceed the limit amount, the control proceeds to step S26, and in step S26, the drive command created in step S20 is sent to the output unit 48. Is output to the solenoid command unit 43S of the bucket dump electromagnetic proportional control valve 43.
  • step S25 determines whether the flow rate of the supplied hydraulic oil exceeds the limit amount. If it is determined in step S25 that the flow rate of the supplied hydraulic oil exceeds the limit amount, the control proceeds to step S27, and in step S27, the drive command determination unit 74 does not exceed the limit amount. Change the drive command to maximize the flow rate. Subsequently, in step S26, the changed drive command is output from the output unit 48 to the solenoid command unit 43S of the bucket dump electromagnetic proportional control valve 43.
  • FIG. 12 is a flow chart showing a method of calibrating the maximum value of the bell crank angle.
  • step S30 the operator operates the input device 51 of the input / output device 50 to switch to the calibration mode screen of the maximum value of the bell crank angle.
  • step S31 according to the instruction displayed on the display device 52 of the input / output device 50, the operator tilts the bucket 15 within the mechanical limit range in which the bucket cylinder length does not reach the maximum value (the boom 14 hits the bucket 15). Operate up to the contact position).
  • the boom angle may be set to a value lower than ⁇ 15 degrees and the bucket 15 may be operated to the tilt end. Actually, since the boom angle that reaches the mechanism limit is not known, the bucket 15 may be tilted with the boom angle lowered as much as possible.
  • step S32 the bell crank angle at the tilt end is stored as the maximum value of the bell crank angle.
  • the wheel loader 1 (an example of a work machine) of the present embodiment includes a boom 14, a bucket 15 (an example of a work tool), a bucket cylinder 17 (an example of an actuator), and a bell crank 18 (an example of a sublink).
  • a control device 27 (an example of a control unit).
  • the bucket 15 is driven with respect to the boom 14.
  • the bell crank 18 is attached to the boom 14 and transmits the driving force of the bucket cylinder 17 to the bucket 15.
  • the control device 27 controls the bucket cylinder 17 based on the angle of the bell crank 18 with respect to the boom 14 (an example of posture).
  • the tilt end and the dump end when the mechanism limit of the link mechanism of the work machine 3 is reached can be detected based on the angle of the bell crank 18, so that the control for alleviating the impact when the mechanism limit is reached can be detected. Can be done.
  • one end of the bucket cylinder 17 is rotatably attached to the vehicle body 2 (an example of a vehicle body) at a mounting portion 17b (an example of a first mounting portion).
  • the bell crank 18 is rotatably attached to the other end of the bucket cylinder 17 at an attachment portion 18a (an example of a second attachment portion).
  • the bell crank 18 is rotatably attached to the bucket 15 at the attachment portion 18b (an example of the third attachment portion).
  • the bell crank 18 is rotatably attached to the boom 14 at the attachment portion 18c (an example of the fourth attachment portion) between the attachment portions 18a and the attachment portion 18b.
  • the bucket 15 can be rotated to the tilt side and the dump side by expanding and contracting the bucket cylinder 17.
  • the bucket 15 is rotatably attached to the boom 14 at the attachment portion 14b (an example of the fifth attachment portion), and the boom 14 is attached to the attachment portion 14a (an example of the attachment portion 14a). It is rotatably attached to the vehicle body 2 in the sixth attachment portion).
  • the posture of the bell crank 18 includes an angle formed by a line connecting the mounting portion 18a and the mounting portion 18c and a line connecting the mounting portion 14a and the mounting portion 14b.
  • the posture of the bell crank 18 can be defined by this angle.
  • the wheel loader 1 (an example of a work machine) of the present embodiment includes a boom angle sensor 54 for detecting the stroke of the bucket cylinder 17 and a bell crank angle sensor 55 (an example of a detection unit).
  • the control device 27 has a first tilt limit amount and a first tilt limit amount based on the difference between the bell crank angle of the bell crank 18 (an example of the posture) and the maximum and minimum values of the bell crank angle of the bell crank 18 (an example of the limit posture).
  • a second tilt limit and a second dump limit based on the difference between the dump limit (an example of driving the first cylinder) and the maximum and minimum values of the cylinder length and the cylinder length of the bucket cylinder 17 (an example of the end position).
  • a drive command (an example of a target cylinder drive command) is issued based on one of (an example of a second cylinder drive command).
  • the wheel loader 1 (an example of a working machine) of the present embodiment further includes a bucket operating lever 62 (an example of an operating member) for operating the bucket 15.
  • the drive command (an example of a target cylinder drive command) includes information on the amount of hydraulic oil supplied to the bucket cylinder 17.
  • Each of the first tilt limit amount, the first dump limit amount, the second tilt limit amount, and the second dump limit amount provides information on the limit amount for the amount of hydraulic oil supplied to the bucket cylinder 17 by operating the bucket operation lever 62.
  • the control device 27 issues a target cylinder drive command using the largest limit amount of the first tilt limit amount, the first dump limit amount, the second tilt limit amount, and the second dump limit amount.
  • the control device 27 gives a target cylinder drive command when the supply amount of hydraulic oil based on the operation of the bucket operation lever 62 exceeds the limit amount. Set the supply amount of hydraulic oil in the above to a value that does not exceed the limit amount. If the amount of hydraulic oil supplied based on the operation of the bucket operating lever 62 does not exceed the limit amount, the amount of hydraulic oil supplied in the target cylinder drive command is set to the amount of hydraulic oil supplied based on the operation of the bucket operating lever 62. Set to.
  • control can be performed so as to mitigate the impact.
  • the control method of the wheel loader 1 (an example of a work machine) of the present embodiment includes steps S11 to S20 (an example of a control step). Steps S11 to S20 (an example of a control step) control the bucket cylinder 17 based on the posture of the bell crank 18 with respect to the boom 14 that transmits the driving force of the bucket cylinder 17 to the bucket 15 that drives the boom 14.
  • the tilt end and the dump end when the mechanism limit of the link mechanism of the work machine 3 is reached can be detected based on the angle of the bell crank 18, so that the control for alleviating the impact when the mechanism limit is reached can be detected. Can be done.
  • the control method of the wheel loader 1 (an example of a working machine) of the present embodiment includes step S31 (an example of a moving step) and step S32 (an example of a storage step).
  • step S31 an example of a moving step
  • the bucket 15 is moved to the tilt end.
  • step S32 the bell crank angle (an example of posture) at the tilt end of the bell crank 18 is stored.
  • Steps S11 to S20 control the bucket cylinder 17 based on the angle (an example of a posture) of the bell crank 18 at the tilt end.
  • the maximum value of the bucket 15 can be easily acquired and the tilt can be detected.
  • steps S11 to S26 are the bell crank angle of the bell crank 18 (an example of the posture) and the bell crank of the bell crank 18.
  • the first tilt limit or the first dump limit (an example of the first cylinder drive) based on the difference from the maximum or minimum value of the angle (an example of the limit posture), and the maximum of the cylinder length and the cylinder length of the bucket cylinder 17.
  • Drive command (example of target cylinder drive command) based on either the second tilt limit amount or the second dump limit amount (an example of the second cylinder drive command) based on the difference from the value or the minimum value (an example of the end position). I do.
  • the mounting portion 18a of the bell crank 18 with the bucket cylinder 17 is arranged on the cab 5 side in the rotation direction with respect to the mounting portion 18b of the bucket 15 with the rod 15a.
  • the attachment portion of the bell crank 18 to the rod 15a of the bucket 15 may be arranged on the cab 5 side of the attachment portion to the bucket cylinder 17.
  • the bucket 15 rotates to the tilt side when the bucket cylinder 17 extends, and the bucket 15 rotates to the dump side when the bucket cylinder 17 contracts, but the present invention is not limited to this.
  • the bucket 15 may rotate to the dump side when the bucket cylinder 17 extends, and the bucket 15 may rotate to the tilt side when the bucket cylinder 17 contracts.
  • both the tilt end and the dump end are detected by using the angle of the bell crank 18, but for example, only the tilt end may be detected.
  • the dump end may be detected only by the stroke length of the bucket cylinder 17. This is because the dump end does not change even if the bucket 15 is replaced, so that it only needs to be set once, and it is not necessary to perform the above-mentioned calibration every time the bucket is replaced.
  • the tilt / dump determination unit 75 determines whether the bucket 15 is moved to the tilt side or the dump side, and the bell crank limit amount calculation unit 71 determines the first tilt side limit amount and the first tilt side limit amount. 1 One of the dump side limit amount is obtained, and the cylinder limit amount calculation unit 72 obtains one of the second tilt side limit amount and the second dump side limit amount, but the present invention is not limited to this.
  • the bell crank limit amount calculation unit 71 detects the difference between the maximum value and the minimum value of the bell crank angle detected by the bell crank angle sensor 55, and is based on the difference. The limit amount may be calculated.
  • the cylinder limit calculation unit 72 may detect the difference between the maximum value and the minimum value of the calculated stroke, and calculate one limit based on the cylinder length based on the difference. Good. Further, for example, without determining whether the bucket 15 is moved to the tilt side or the dump side, the first tilt side limit amount, the first dump side limit amount, the second tilt side limit amount, and the second dump truck are not determined. All of the side limit amounts may be obtained, and the one with the largest limit amount may be adopted.
  • the bell crank angle sensor 55 uses, for example, a potentiometer, but is not limited to this, and may be an IMU (Inertial measurement unit) or the like.
  • the stroke of the bucket cylinder 17 is obtained based on the detected values of the boom angle sensor 54 and the bell crank angle sensor 55, but the stroke is not limited to this, and the cylinder length may be directly measured. ..
  • the angle of the bell crank shown in FIG. 2 is used as an example of the posture of the bell crank 18 with respect to the boom 14, but if the posture of the bell crank 18 with respect to the boom 14 is uniquely determined, ⁇ b in FIG. It is not limited to, and may be a combination of a plurality of angles.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Operation Control Of Excavators (AREA)

Abstract

ホイールローダ(1)は、ブーム(14)と、バケット(15)と、バケットシリンダ(17)と、ベルクランク(18)と、制御装置(27)と、を備える。バケット(15)は、ブーム(14)に対して駆動する。ベルクランク(18)は、ブーム(14)に取り付けられ、バケットシリンダ(17)の駆動力をバケット(15)へ伝達する。制御装置(27)は、ブーム(14)に対するベルクランク(18)の角度に基づいてバケットシリンダ(17)を制御する。

Description

作業機械および作業機械の制御方法
 本発明は、作業機械および作業機械の制御方法に関する。
 作業機械の一例としてのホイールローダは、ブームの先端にバケットが設けられた作業機を有する。ホイールローダの車両本体とブームの間には、ブーム用油圧シリンダが設けられており、油圧シリンダの伸縮によってブームが上下方向に回動する。
 また、ブームにはベルクランクが取り付けられており、ベルクランクの一端と車両本体の間には、バケット用油圧シリンダが設けられている。ベルクランクの他端とバケットの間は、ロッドによって取り付けられている。バケット用油圧シリンダが伸長するとバケットはチルト方向に回動し、バケット用油圧シリンダが縮退するとバケットはダンプ方向に回動する(例えば、特許文献1参照。)。
 このようなホイールローダでは、ブーム角度によっては、バケット用シリンダのストロークが最大値または最小値に達するまえに、作業機のリンク機構の構造によってバケットがチルトエンドまたはダンプエンドに達するので、ブーム角度の全体にわたって、バケット用シリンダのストロークの最大値がチルトエンドに対応し、最小値がダンプエンドに対応していない。
 このため、チルトエンドまたはダンプエンドにおける衝撃の緩和制御は、バケット形状を考慮したシリンダ長のストロークエンドをブーム角度に対して規定したマップに基づいて行われていた。
特許第5717923号明細書
 しかしながら、ブーム角度を考慮せずに緩和制御を行うことが要望されている。
 本発明は、ブーム角度を考慮せずにチルトエンドまたはダンプエンドにおける衝撃を緩和可能な作業機械および作業機械の制御方法を提供することを目的とする。
(課題を解決するための手段)
 発明の作業機械は、ブームと、作業具と、アクチュエータと、サブリンクと、制御部と、を備える。作業部は、ブームに対して駆動する。アクチュエータは、作業具を駆動する。サブリンクは、ブームに取り付けられ、アクチュエータの駆動力を作業具へ伝達する。制御部は、ブームに対するサブリンクの姿勢に基づいてアクチュエータを制御する。
 発明の作業機械の制御方法は、制御ステップを備える。制御ステップは、ブームに対して駆動する作業具へアクチュエータの駆動力を伝達するサブリンクのブームに対する姿勢に基づいてアクチュエータを制御する。
(発明の効果)
 本発明によれば、ブーム角度を考慮せずにチルトエンドまたはダンプエンドにおける衝撃を緩和可能な作業機械および作業機械の制御方法を提供することができる。
本発明にかかる実施の形態のホイールローダの側面図。 図1の作業機の側面図。 図1の制御系統を示すブロック図。 ブーム角度に対するチルトエンドの時のバケットシリンダ長の変化と、ブーム角度に対するダンプエンドの時のバケットシリンダ長の変化を示す図。 図4のP1における作業機の状態の一例を示す図。 図4のP2における作業機の状態の一例を示す図。 図4のP3における作業機の状態の一例を示す図。 図5のグラフに、バケットシリンダ長の最小値、バケットシリンダ長の最大値、ベルクランク角度の最小値、およびベルクランク角度の最大値のブーム角度に対する変化を加えた図。 図8のグラフの縦軸をベルクランク角度に変換したグラフを示す図。 図3の処理部の構成を示すブロック図。 本発明にかかる実施の形態の作業機械の制御方法を示すフロー図。 ベルクランク角度の最大値を校正する方法を示すフロー図。
以下、本発明にかかる実施の形態のホイールローダ1(作業機械の一例)について図面を参照しながら説明する。
 <構成>
 (ホイールローダ1の構成の概要)
 図1は、本実施の形態のホイールローダ1の構成を示す模式図である。
 本実施の形態のホイールローダ1は、車体2(車両本体の一例)と、作業機3と、を備える。車体2は、車体フレーム10と、一対のフロントタイヤ4と、キャブ5と、エンジンルーム6と、一対のリアタイヤ7と、制御系統8(図3参照)と、を備えている。
 ホイールローダ1は、作業機3を用いて土砂積み込み作業などを行う。
 車体フレーム10は、いわゆるアーティキュレート式であり、フロントフレーム11とリアフレーム12と、連結軸部13と、を有している。フロントフレーム11は、リアフレーム12の前方に配置されている。連結軸部13は、車幅方向の中央に設けられており、フロントフレーム11とリアフレーム12を互いに揺動可能に連結する。
 キャブ5には、リアフレーム12に設けられ、運転席が配置される。キャブ5には、後述する入出力装置50、ブーム操作レバー61、およびバケット操作レバー62等が設けられる。
 一対のフロントタイヤ4は、フロントフレーム11の左右に取り付けられている。また、一対のリアタイヤ7は、リアフレーム12の左右に取り付けられている。
 作業機3は、作業機ポンプからの作動油によって駆動される。図2は、作業機3の拡大側面図である。
 作業機3は、ブーム14と、バケット15(作業具の一例)と、ブームシリンダ16と、バケットシリンダ17(アクチュエータの一例)と、ベルクランク18(サブリンクの一例)と、を有する。
 ブーム14の一方の取付部14aはフロントフレーム11の前部に回動可能に取り付けられている。ブーム14の他方の取付部14bは、バケット15の後部に回動可能に取り付けられている。ブーム14の取付部14aと取付部14bの間に設けられた取付部14cには、ブームシリンダ16のシリンダロッド16aの先端が回動可能に取り付けられている。ブームシリンダ16のシリンダ本体は、取付部16bにおいてフロントフレーム11に回動可能に取り付けられている。
 ベルクランク18は、ベルクランク本体18eと、ロッド18fと、を有する。ベルクランク本体18eの一方の端部に設けられた取付部18aは、バケットシリンダ17のシリンダロッド17aの先端に回動可能に取り付けられている。ロッド18fの一端は、ベルクランク本体18eの他方の端部に設けられた取付部18bに回動可能に取り付けられている。ロッド18fの他端は、取付部18gにおいてバケット15の後部に回動可能に取り付けられている。ベルクランク本体18eは、取付部18a(第2取付部の一例)と取付部18b(第3取付部の一例)の間に設けられた取付部18c(第4取付部の一例)においてブーム14の中央近傍のベルクランクサポート14dに回動可能に支持されている。バケットシリンダ17のシリンダ本体は、取付部17b(第1取付部の一例)においてフロントフレーム11に回動可能に取り付けられている。バケットシリンダ17の伸縮力は、ベルクランクによって回転運動に変換されてバケット15に伝達される。なお、サブリンクは、ベルクランク18に加えてクイックカプラ等を含んでもよい。
 バケットシリンダ17の伸縮によって、バケット15はブーム14に対して回動し、チルト動作(矢印J参照)およびダンプ動作(矢印K参照)を行う。ここで、バケット15のチルト動作とは、バケット15の開口部15bおよび爪15cがキャブ5に向かって回動することにより傾く動作である。バケット15のダンプ動作とは、チルト動作とは反対であって、バケット15の開口部15bおよび爪15cがキャブ5から遠ざかるように回動することにより傾く動作である。
 ブーム角度センサ54がブーム14の取付部14aに設けられている。ブーム角度センサ54は、ブーム14の中心線L1と水平線Hとの間のブーム角度(図においてθaで示す)を検出し、検出信号を出力する。ブーム14の中心線L1は、ブーム14の取付部14aと取付部14bを結ぶ線である。ブーム角度は、中心線L1が水平線Hよりも路面R(図1参照)側に傾斜している場合には、負の値となる。
 ベルクランク角度センサ55が、ベルクランク18の取付部18cに設けられている。ベルクランク角度センサ55は、ベルクランク18の取付部18aと取付部18cを結ぶ線L2と、ブーム14の中心線L1との間のベルクランク角度(図においてθbで示す)を検出し、検出信号を出力する。ベルクランク角度は、ベルクランク18の姿勢の一例である。
 (制御系統)
 図3は、作業機3の動作を制御する制御系統8を示す図である。
 制御系統8は、作業機3の動作を制御する。制御系統8は、作業機油圧ポンプ21と、ブーム操作弁22と、バケット操作弁23と、パイロットポンプ24と、吐出回路25と、電磁比例制御弁26と、制御装置27と、EG(エンジン)制御装置29と、を有する。
 (作業機油圧ポンプ)
 作業機油圧ポンプ21は、エンジンルーム6に搭載されるエンジン30によって駆動される。エンジン30は、内燃機関であり、例えばディーゼルエンジンが用いられる。エンジン30の出力はPTO(power Take Off)31に入力された後、作業機油圧ポンプ21と、トランスミッション34に出力される。作業機油圧ポンプ21は、PTO31を介してエンジン30に駆動されて、作動油を吐出する。クラッチ32の入力側はエンジン30に取り付けられている。クラッチ32の出力側は、トルクコンバータ(TC)33に取り付けられている。エンジン30の出力は、PTO31を介してトランスミッション34に伝達される。トランスミッション34は、PTO31を介して伝達されたエンジン30の出力をフロントタイヤ4及びリアタイヤ7に伝達し、フロントタイヤ4およびリアタイヤ7が駆動する。なお、トランスミッション34は、HST(Hydro Static Transmission)、電動駆動等、適宜用いることができる。
 (吐出回路、ブーム操作弁、バケット操作弁)
 吐出回路25は、作動油が通過する油路であり、作業機油圧ポンプ21が作動油を吐出する吐出口に取り付けられている。吐出回路25は、ブーム操作弁22とバケット操作弁23に取り付けられている。ブーム操作弁22およびバケット操作弁23は、油圧パイロット式の操作弁である。ブーム操作弁22およびバケット操作弁23は、車体2に取り付けられている。作業機油圧ポンプ21と、ブーム操作弁22と、バケット操作弁23と、吐出回路25は、パラレル式の油圧回路を形成している。
 ブーム操作弁22は、A位置、B位置、C位置およびD位置の間で切り替え可能な4位置切換弁である。ブーム操作弁22は、A位置になるとブーム14が上昇し、B位置になると中立で位置を保持し、C位置になるとブーム14が下降し、D位置は浮きとなる。
 バケット操作弁23は、E位置、F位置、およびG位置の間で切換可能な3位置切換弁である。バケット操作弁23は、E位置になるとバケット15をチルト動作(図2の矢印J参照)し、F位置になると中立で位置を保持し、G位置になるとバケット15がダンプ動作(図2の矢印K参照)する。
 (パイロットポンプ)
 パイロットポンプ24は、ブーム操作弁22のパイロット受圧部とバケット操作弁23のパイロット受圧部に電磁比例制御弁26を介して取り付けられている。パイロットポンプ24は、PTO31に接続されており、エンジン30によって駆動される。パイロットポンプ24は、電磁比例制御弁26を介して、ブーム操作弁22のパイロット受圧部22Rおよびバケット操作弁23のパイロット受圧部23Rにパイロット圧力の作動油を供給する。
 (電磁比例制御弁)
 電磁比例制御弁26は、ブーム下げ電磁比例制御弁41と、ブーム上げ電磁比例制御弁42と、バケットダンプ電磁比例制御弁43と、バケットチルト電磁比例制御弁44と、を有している。
 ブーム下げ電磁比例制御弁41およびブーム上げ電磁比例制御弁42は、ブーム操作弁22の各パイロット受圧部22Rに取り付けられている。バケットダンプ電磁比例制御弁43とバケットチルト電磁比例制御弁44は、バケット操作弁23の各パイロット受圧部23Rに取り付けられている。
 ブーム下げ電磁比例制御弁41のソレノイド指令部41S、ブーム上げ電磁比例制御弁42のソレノイド指令部42S、バケットダンプ電磁比例制御弁43のソレノイド指令部43S,およびバケットチルト電磁比例制御弁44のソレノイド指令部44Sには、制御装置27からのそれぞれの電磁比例制御弁への指令信号が入力される。
 ブーム下げ電磁比例制御弁41、ブーム上げ電磁比例制御弁42、ブーム操作弁22およびブームシリンダ16の動作によってブーム14の上方または下方への回動が行われる。
 バケットダンプ電磁比例制御弁43とバケットチルト電磁比例制御弁44、バケット操作弁23およびバケットシリンダ17の動作によってバケット15のチルト動作およびダンプ動作が行われる。
 (ブーム操作レバー、バケット操作レバー)
 制御系統8には、オペレータによって操作されるブーム操作レバー61とバケット操作レバー62が設けられている。ブーム操作レバー61は、ブーム14を操作するためのレバーである。ブーム操作レバー61には、ブーム操作レバー61の操作量を検出する第1ポテンショメータ63が取り付けられている。
 バケット操作レバー62は、バケット15を操作するためのレバーである。バケット操作レバー62には、バケット操作レバー62の操作量を検出するための第2ポテンショメータ64が取り付けられている。
 第1ポテンショメータ63および第2ポテンショメータ64の検出信号は、制御装置27の入力部47に入力される。
 なお、ブーム操作レバー61およびバケット操作レバー62は、シリンダを操作する操作弁をパイロット圧で直接駆動するPPCレバーであってもよい。
 (制御装置)
 制御装置27は、例えば、CPU(Central Processing Unit)等の処理部45と、ROM(Read Only Memory)等の記憶部46と、入力部47と、出力部48と、を有する。
 処理部45は、コンピュータプログラムを実行することによって作業機3の動作を制御する。処理部45は、記憶部46、入力部47および出力部48と電気的に接続されている。処理部45は、記憶部46からの情報を読み出し、記憶部46への情報の書き込みを行う。処理部45は、入力部47から情報を受けとる。処理部45は、出力部48から情報を出力する。
 記憶部46は、作業機3の動作を制御するコンピュータプログラムおよび作業機3の制御に用いる情報を記憶する。記憶部46は、作業機械の制御方法を実現するためのコンピュータプログラムを記憶しており、処理部45が、このプログラムを読み出して実行する。
 記憶部46は、バケットシリンダ17のシリンダ長(ストロークの一例)の最大値と最小値と、ベルクランク角度の最大値と最小値を記憶する。ベルクランク角度の最大値と最小値は、限界姿勢の一例に対応する。シリンダ長の最大値と最小値は、終端位置の一例に対応する。
 また、記憶部46は、4つのテーブルを記憶している。第1テーブルは、ベルクランク角度センサ55より取得したベルクランク角度とベルクランク角度の最大値との差分に対して設定されたバケットシリンダ17への作動油の制限量を示すテーブルである。第2テーブルは、ベルクランク角度センサ55より取得したベルクランク角度とベルクランク角度の最小値との差分に対して設定されたバケットシリンダ17への作動油の制限量を示すテーブルである。第3テーブルは、ブーム角度センサ54とベルクランク角度センサ55より取得したバケットシリンダ17のシリンダ長とシリンダ長の最大値との差分に対して設定されたバケットシリンダ17への作動油の制限量のテーブルである。第4テーブルは、ブーム角度センサ54とベルクランク角度センサ55より取得したバケットシリンダ17のシリンダ長とシリンダ長の最小値との差分に対して設定されたバケットシリンダ17への作動油の制限量のテーブルである。
 入力部47には、ブーム角度センサ54と、ベルクランク角度センサ55と、第1ポテンショメータ63と、第2ポテンショメータ64から検出信号が入力される。処理部45は、これらの検出信号を取得して作業機3の動作を制御する。
 また、バケットシリンダ17のシリンダ長(図2にLaで示す)は、ブーム角度センサ54によって検出されたブーム角度と、ベルクランク角度センサ55によって検出されたベルクランク角度から求められる。
 制御装置27は、ブーム角度センサ54及びベルクランク角度センサ55の少なくとも一方の検出値を用いてブームシリンダ16のシリンダ長およびバケットシリンダ17のシリンダ長を求め、ブーム14およびバケット15の動作を制御する。
 出力部48は、ブーム下げ電磁比例制御弁41のソレノイド指令部41Sと、ブーム上げ電磁比例制御弁42のソレノイド指令部42Sと、バケットダンプ電磁比例制御弁43のソレノイド指令部43Sと、バケットチルト電磁比例制御弁44のソレノイド指令部44Sと、入出力装置50に駆動指令を出力する。
 処理部45は、ブーム下げ電磁比例制御弁41のソレノイド指令部41Sまたはブーム上げ電磁比例制御弁42のソレノイド指令部42Sにブームシリンダ16を動作させるための指令値を与えて、ブームシリンダ16を伸縮させ、ブーム14を昇降させる。
 処理部45は、バケットダンプ電磁比例制御弁43のソレノイド指令部43Sまたはバケットチルト電磁比例制御弁44のソレノイド指令部44Sにバケットシリンダ17を動作させるための指令値を与えて、バケットシリンダ17を伸縮させ、バケット15をチルト動作またはダンプ動作させる。
 入出力装置50は、キャブ5の内部に設けられている。入出力装置50は、入力部47および出力部48の双方に取り付けられている。入出力装置50は、入力装置51と、表示装置52と、を有する。オペレータは、入力装置51から制御装置27に指令値を入力できる。表示装置52は、作業機3の状態または制御に関する情報を表示する。入力装置51は、タッチパネルや、押しボタン式のスイッチを用いることができる。後述するが、入力装置51が操作されることによって、チルトエンドにおけるベルクランク角度の最大値を校正するための校正モードを表示することができる。
 (緩停止制御)
 本実施の形態のホイールローダ1では、チルトエンドおよびダンプエンドにおける衝撃を緩和するために、チルトエンドおよびダンプエンドにおいて緩停止制御が行われる。
 本実施の形態の制御装置27は、ベルクランク角度と、バケットシリンダ17のストローク長に基づいて緩停止制御を行う。
 緩停止制御を行うための処理部45の構成について説明を行う前に、ベルクランク角度と、バケットシリンダ17のストローク長でチルトエンドおよびダンプエンドに達することを検出する点について説明を行う。
 図4は、ブーム角度に対するチルトエンドの時のバケットシリンダ長の変化(G1)と、ブーム角度に対するダンプエンドの時のバケットシリンダ長の変化(G2)を示す図である。縦軸がバケットシリンダ長を示し、横軸がブーム角度を示している。
 G1に示すように、ブーム角度が最大値からA1度までの間では、バケットシリンダ17のシリンダ長の最大値でチルトエンドに達している。
 図5は、バケットシリンダ17の最大値でチルトエンドに達した状態を示す図であり、図4のP1における作業機の状態の一例を示す図である。図5は、ブーム角度が最大値であり、バケットシリンダ17が伸びきってバケット15がチルトエンドに達した状態を示す。
 一方、ブーム角度がA1度から最小値までの間では、バケットシリンダ17のシリンダ長が最大値に達する前にチルトエンドに達する。
 これは、バケットシリンダ17のシリンダ長が最大値に達する前に作業機3のリンク機構の機構限界に達し、それ以上バケットシリンダ17を伸ばすことができないためである。図6は、図4のP2における作業機3の一例を示す図である。図6に示す状態では、バケット15がベルクランク18に接触しているため、これ以上バケットシリンダ17を伸ばすことができない。図6では、接触箇所がC1として示されているが、作業機3のリンクの構造によっては、機構限界において接触する位置は変化する。
 このように、最小値から角度A1までは作業機3のリンク機の機構限界によってバケット15はチルトエンドに達し、角度A1から最大値まではバケットシリンダ17のシリンダ長の最大値においてバケット15はチルトエンドに達する。
 一方、G2に示すように、ブーム角度が最小値からA2度までの間では、バケットシリンダ17の最小値でダンプエンドに達するが、ブーム角度がA2度から最大値までの間では、バケットシリンダ17のシリンダ長が最小値に達する前にダンプエンドに達する。
 これは、バケットシリンダ17のシリンダ長が最小値に達する前に作業機3のリンク機構の機構限界に達し、それ以上バケットシリンダ17を縮めることができないためである。図7は、図4のP3における作業機3の一例を示す図である。図7に示す状態では、ベルクランク18が左右方向に沿って配置されたブーム14のフレーム部分に接触しているため、これ以上バケットシリンダ17を縮めることができない(点C2参照)。
 このように、ブーム角度が最小値からA2度まではバケットシリンダ17のシリンダ長の最小値でバケットシリンダ17はチルトエンドに達し、ブーム角度が所定値から最大値までの間では、作業機3のリンク機構の機構限界によってバケット15はダンプエンドに達する。
 上述のように、機構限界によってチルトエンドおよびダンプエンドに達している領域では、バケットシリンダ17のストローク長は、ブーム角度に依存するが、機構限界に達しているためベルクランク角度は一定となる。
 図8は、図5のグラフに、バケットシリンダ長の最小値(G3)、バケットシリンダ長の最大値(G4)、ベルクランク角度の最小値(G5)、およびベルクランク角度の最大値(G6)を加えた図である。縦軸がバケットシリンダ長を示し、横軸がブーム角度を示している。
 チルトエンドにおけるバケットシリンダ長のG1とバケットシリンダ長の最大値のG4に示すように、バケットシリンダ17のストローク長さが最大値に達していない領域では、ベルクランク角度の最大値G6がG1に一致する。
 一方、ダンプエンドにおけるバケットシリンダ長のG2とバケットシリンダ長の最小値のG3に示すように、バケットシリンダ長が最小値に達していない領域では、ベルクランク角度の最小値G5がG2に一致する。
 図9は、図8のグラフの縦軸をベルクランク角度に変換したグラフを示す図である。図9に示すように、図8のG1に対応するグラフがG1´と示され、チルトエンドにおけるベルクランク角度のブーム角度に対する変化を示す。また、図8のG2に対応するグラフがG2´と示され、ダンプエンドにおけるベルクランク角度のブーム角度に対する変化を示す。また、A3度にブーム下げの場合のエンドラインG7が引かれ、A4度にブーム上げの場合のエンドラインG8が引かれている。
 図9に示すように、チルトエンドにおいて、バケットシリンダ17のストローク長が最大値に達していない領域では、ベルクランク角度の最大値G6でバケット15はチルトエンドに達している。また、ダンプエンドにおいて、バケットシリンダのストローク長が最小値に達していない領域では、ベルクランク角度の最小値G5でバケット15がダンプエンドに達している。
 図8および図9に示すように、バケットシリンダ長の最大値とベルクランク角度の最大値を組み合わせることによって、バケット15がチルトエンドに達することを検出することができる。
 なお、図4中の点線で示すG11は、バケット15を他のものに付け替えた際のチルトエンドにおけるバケットシリンダ長を示すグラフである。図4のG11に対応するグラフが図9においてG11´として示されている。G11、G11´では、G1、G1´と異なり、ブーム角度が最大値からA5度までの間では、バケットシリンダ17のシリンダ長の最大値でチルトエンドに達し、ブーム角度がA5度から最小値までの間では、バケットシリンダ17のシリンダ長が最大値に達する前にチルトエンドに達する。
 バケット15は、オペレータによって大きさの異なるものに付け替えられる場合があり、その場合には、機構限界も変化しベルクランク角度の最大値も変化するが、上述したように機構限界におけるベルクランク角度は一定である。そのため、バケットを付け替えた場合には、機構限界におけるベルクランク角度の最大値を校正によって取得し、その最大値とバケットシリンダ長を用いることによって、バケット15がチルトエンドに達することを検出することができる。バケットを付け替えた際のベルクランク角度の最大値の校正については後述する。
 また、バケットシリンダ長の最小値とベルクランク角度の最小値を組み合わせることによって、バケット15がダンプエンドに達することを検出することができる。
 なお、本実施の形態では、ダンプエンドは、バケット15によらずブーム14とベルクランク18の形状によって決定されるため校正を行う必要がなく設計値によって決められる。
 (処理部)
 図10は、本実施の形態の処理部45の構成を示すブロック図である。処理部45は、駆動指令作成部70と、ベルクランク制限量算出部71と、シリンダ制限量算出部72と、制限量決定部73と、駆動指令決定部74と、チルト/ダンプ判定部75と、を有する。
 駆動指令作成部70は、オペレータによるブーム操作レバー61およびバケット操作レバー62の操作に基づいて駆動指令を作成する。オペレータによってブーム操作レバー61およびバケット操作レバー62が操作されると、駆動指令作成部70は、入力部47を介して第1ポテンショメータ63および第2ポテンショメータ64からブーム操作レバー61およびバケット操作レバー62の操作量の信号を取得する。そして、駆動指令作成部70は、操作量の信号に対応する駆動指令(目標シリンダ駆動指令の一例)を作成する。
 この駆動指令は、操作量の信号に対応するように、ブームシリンダ16またはバケットシリンダ17を駆動する指令であり、ブームシリンダ16またはバケットシリンダ17に供給する作動油の流量を規定する。具体的には、駆動指令は、ブーム下げ電磁比例制御弁41、ブーム上げ電磁比例制御弁42、バケットダンプ電磁比例制御弁43、またはバケットチルト電磁比例制御弁44に対して、操作量に対応する流量の作動油を流すような開度にする指令である。
 駆動指令が、ブーム下げ電磁比例制御弁41、ブーム上げ電磁比例制御弁42、バケットダンプ電磁比例制御弁43、またはバケットチルト電磁比例制御弁44に出力されると、駆動指令の開度情報に応じて、ブーム下げ電磁比例制御弁41、ブーム上げ電磁比例制御弁42、バケットダンプ電磁比例制御弁43、またはバケットチルト電磁比例制御弁44が駆動する。これによって、駆動指令に応じたパイロット圧力がブーム下げ電磁比例制御弁41、ブーム上げ電磁比例制御弁42、バケットダンプ電磁比例制御弁43、またはバケットチルト電磁比例制御弁44から、ブーム操作弁22またはバケット操作弁23のパイロット受圧部に出力される。そして、ブームシリンダ16またはバケットシリンダ17は、それぞれのパイロット油圧に応じた速度で、対応する方向に作動する。
 チルト/ダンプ判定部75は、バケット操作レバー62の操作量を検出する第2ポテンショメータ64からの検出信号に基づいて、バケット15のチルト側への操作かダンプ側への操作かの判定を行う。チルト/ダンプ判定部75は、判定結果をベルクランク制限量算出部71とシリンダ制限量算出部72に送信する。
 ベルクランク制限量算出部71は、入力部47を介してベルクランク角度センサ55から取得したベルクランク角度に基づいて、バケットシリンダ17を駆動するときの流量の制限量を算出する。
 ベルクランク制限量算出部71は、第1チルト側制限量算出部81と、第1ダンプ側制限量算出部82と、有する。
 第1チルト側制限量算出部81は、バケット15のチルト側への操作と判定された場合に、記憶部46に記憶されているベルクランク角度の最大値と、ベルクランク角度センサ55より取得したベルクランク角度の差分を演算し、記憶部46に記憶されている第1テーブルより第1チルト側制限量(第1シリンダ駆動指令の一例)を取得する。第1テーブルでは、差分が小さいほど(ベルクランク角度が最大値に近いほど)、バケットシリンダ17に供給する作動油の流量の制限量が大きくなるように設定されている。制限量を大きくすることによって、バケットシリンダ17のシリンダロッド17aの移動速度が制限される。すなわち、ベルクランク角度の最大値に達する前にベルクランク18の移動速度を制限することにより、機構限界によるチルトエンドに達する際に緩やかに停止することができる。
 第1ダンプ側制限量算出部82は、バケット15のダンプ側への操作と判定された場合に、記憶部46に記憶されているベルクランク角度の最小値と、ベルクランク角度センサ55より取得したベルクランク角度の差分を演算し、記憶部46に記憶されている第2テーブルより第1ダンプ側制限量(第1シリンダ駆動指令の一例)を取得する。第2テーブルでは、差分が小さいほど(ベルクランク角度が最小値に近いほど)、バケットシリンダ17に供給する作動油の流量の制限量が大きくなるように設定されている。
 シリンダ制限量算出部72は、シリンダ長算出部85と、第2チルト側制限量算出部83と、第2ダンプ側制限量算出部84と、を有する。
 シリンダ長算出部85は、ブーム角度センサ54から取得したブーム角度とベルクランク角度センサ55から取得したベルクランク角度に基づいて、バケットシリンダ17のシリンダ長を算出する。
 第2チルト側制限量算出部83は、バケット15のチルト側への操作と判定された場合に、記憶部46に記憶されているバケットシリンダ長の最大値と、シリンダ長算出部85で算出されたシリンダ長の差分を演算し、記憶部46に記憶されている第3テーブルより第2チルト側制限量(第2シリンダ駆動指令の一例)を取得する。第3テーブルでは、差分が小さいほど(シリンダ長が最大値に近いほど)、バケットシリンダ17に供給する作動油の流量の制限量が大きくなるように設定されている。
 第2ダンプ側制限量算出部84は、バケット15のダンプ側への操作と判定された場合に、記憶部46に記憶されているバケットシリンダ長の最小値と、シリンダ長算出部85で算出されたシリンダ長の差分を演算し、記憶部46に記憶されている第4テーブルより第2ダンプ側制限量(第2シリンダ駆動指令の一例)を取得する。第4テーブルでは、差分が小さいほど(シリンダ長が最小値に近いほど)、バケットシリンダ17に供給する作動油の流量の制限量が大きくなるように設定されている。
 制限量決定部73は、バケット15のチルト側への操作と判定された場合には、第1チルト側制限量と第2チルト側制限量のうち大きいほうの制限量をバケットシリンダ17の駆動指令に対する制限量として決定する。また、制限量決定部73は、バケット15のダンプ側への操作と判定された場合には、第1ダンプ側制限量と第2ダンプ側制限量のうち大きいほうの制限量をバケットシリンダ17の駆動指令に対する制限量として決定する。
 このように、バケット15のチルト側への操作の場合、ベルクランク角の最大値とバケットシリンダ長の最大値のうち接近しているほうに対する制限量が採用されることになる。また、バケット15のダンプ側への操作の場合、ベルクランク角の最小値とバケットシリンダ長の最小値のうち接近しているほうに対する制限量が採用されることになる。
 なお、大きいほうの制限量とは、制限される流量が大きいことを意味する。例えば、最大の流量を100%とした場合に制限量を40%としたときには60%の流量で作動油がバケットシリンダ17に供給される。すなわち、制限量が大きいほうが、バケットシリンダ17に供給される作動油の流量は少なくなる。
 これによって、バケット15のチルト側への操作の場合、ベルクランク角の最大値またはバケットシリンダ長の最大値に近づくにつれて制限量が大きくなるため、バケット15の移動速度が遅くなり、チルトエンドにおける衝撃を緩和することができる。また、バケット15のダンプ側への操作の場合、ベルクランク角の最小値またはバケットシリンダ長の最小値に近づくにつれて制限量が大きくなるため、バケット15の移動速度が遅くなり、ダンプエンドにおける衝撃を緩和することができる。
 駆動指令決定部74は、駆動指令作成部70によって作成された駆動指令によってバケットシリンダ17に供給される作動油の流量が、制限量を超えている場合には、制限量を守るような最大流量の駆動指令を作成する。すなわち、制限量が40%の場合には流量は60%まで供給可能となるが、駆動指令作成部70で作成された駆動指令のバケットシリンダ17に供給される作動油の流量が80%に設定されているときには、駆動指令決定部74は流量が60%となるように駆動指令を決定する。すなわち、制限量は駆動指令が可能な流量の上限値となる。駆動指令決定部74は、駆動指令作成部70によって作成された駆動指令によってバケットシリンダ17に供給される作動油の流量が、制限量を超えていない場合には、作成された駆動指令(シリンダ駆動指令の一例)でバケットシリンダ17の制御を行う。
 なお、バケット15のチルト側への操作と判定された場合に作動油の流量の制限量を大きくするためには、バケットチルト電磁比例制御弁44の開度が絞られる。これにより、パイロット圧力が低くできるため、バケットシリンダ17への作動油の流量を制限することができる。
 また、バケット15のダンプ側への操作と判定された場合に作動油の流量の制限量を大きくするためには、バケットダンプ電磁比例制御弁43の開度が絞られる。これにより、パイロット圧力が低くできるため、バケットシリンダ17への作動油の流量を制限することができる。
 <動作>
 次に、本発明にかかる実施の形態の動作について説明する。
 (制御方法)
 図11は、本実施の形態の作業機械の制御方法を示すフロー図である。
 はじめに、ステップS10において、オペレータによってバケット操作レバー62が操作されると、第2ポテンショメータ64がバケット操作レバー62の操作量を検出し、検出信号が制御装置27の入力部47に入力される。
 次に、ステップS11において、チルト/ダンプ判定部75が、第2ポテンショメータ64の検出信号に基づいて、バケット15のチルト側への操作かダンプ側への操作かの判定を行う。
 ステップS11において、チルト側の操作と判定された場合、制御はステップS12に進む。
 次に、ステップS12において、駆動指令作成部70は、第2ポテンショメータ64による検出信号に基づいた作動油の流量がバケットシリンダ17に供給されるようにバケットチルト電磁比例制御弁44のソレノイド指令部44Sに送信する駆動指令を作成する。
 次に、ステップS13において、第1チルト側制限量算出部81が、記憶部46に記憶されているベルクランク角度の最大値と、ベルクランク角度センサ55より取得したベルクランク角度の差分を演算し、記憶部46に記憶されている第1テーブルより第1チルト側制限量を算出する。
 次に、ステップS14において、シリンダ長算出部85が、ブーム角度センサ54から取得したブーム角度とベルクランク角度センサ55から取得したベルクランク角度に基づいて、バケットシリンダ17のシリンダ長を算出する。
 次に、ステップS15において、第2チルト側制限量算出部83が、記憶部46に記憶されているバケットシリンダ長の最大値と、シリンダ長算出部85で算出されたシリンダ長の差分を演算し、記憶部46に記憶されている第3テーブルより第2チルト側制限量を取得する。
 次に、ステップS16において、制限量決定部73が、算出された第1チルト側制限量と第2チルト側制限量のうち、大きい方の制限量をバケットシリンダ17の駆動指令に対する制限量として決定する。
 次に、ステップS17において、駆動指令決定部74は、駆動指令作成部70で作成された駆動指令によってバケットシリンダ17に供給される作動油の流量が、制限量を超えているか否かを判定する。
 ステップS17において、供給される作動油の流量が制限量を超えていないと判定された場合には、制御はステップS18に進み、ステップS18において、ステップS12で作成された駆動指令が、出力部48からバケットチルト電磁比例制御弁44のソレノイド指令部44Sに出力される。
 一方、ステップS17において、供給される作動油の流量が制限量を超えていると判定された場合には、制御はステップS19に進み、ステップS19において駆動指令決定部74は、制限量を超えない最大流量になるように駆動指令を変更する。続いて、ステップS18において、変更された駆動指令が出力部48からバケットチルト電磁比例制御弁44のソレノイド指令部44Sに出力される
 一方、ステップS11において、チルト/ダンプ判定部75が、第2ポテンショメータ64の検出信号に基づいて、バケット15のダンプ側への操作と判定した場合、制御は、ステップS20に進む。
 ステップS20において、駆動指令作成部70は、第2ポテンショメータ64による検出信号に基づいた作動油の流量がブームシリンダ16およびバケットシリンダ17に供給されるようにバケットダンプ電磁比例制御弁43のソレノイド指令部43Sに送信する駆動指令を作成する。
 ステップS21において、第1ダンプ側制限量算出部82が、記憶部46に記憶されているベルクランク角度の最小値と、ベルクランク角度センサ55より取得したベルクランク角度の差分を演算し、記憶部46に記憶されている第2テーブルより第1ダンプ側制限量を取得する。
 次に、ステップS22において、シリンダ長算出部85が、ブーム角度センサ54から取得したブーム角度とベルクランク角度センサ55から取得したベルクランク角度に基づいて、バケットシリンダ17のシリンダ長を算出する。
 次に、ステップS23において、第2ダンプ側制限量算出部84が、記憶部46に記憶されているバケットシリンダ長の最小値と、シリンダ長算出部85で算出されたシリンダ長の差分を演算し、記憶部46に記憶されている第4テーブルより第2ダンプ側制限量を取得する。
 次に、ステップS24において、制限量決定部73が、算出された第1ダンプ側制限量と第2ダンプ側制限量のうち、大きい方の制限量をバケットシリンダ17の駆動指令に対する制限量として決定する。
 次に、ステップS25において、駆動指令決定部74は、駆動指令作成部70で作成された駆動指令によってバケットシリンダ17に供給される作動油の流量が、制限量を超えているか否かを判定する。
 ステップS25において、供給される作動油の流量が制限量を超えていないと判定された場合には、制御はステップS26に進み、ステップS26において、ステップS20で作成された駆動指令が、出力部48からバケットダンプ電磁比例制御弁43のソレノイド指令部43Sに出力される。
 一方、ステップS25において、供給される作動油の流量が制限量を超えていると判定された場合には、制御はステップS27に進み、ステップS27において駆動指令決定部74は、制限量を超えない最大流量になるように駆動指令を変更する。続いて、ステップS26において、変更された駆動指令が出力部48からバケットダンプ電磁比例制御弁43のソレノイド指令部43Sに出力される。
 (校正方法)
 次に、バケット15を付け替えた際にベルクランク角度の最大値を校正する方法について説明する。図12は、ベルクランク角度の最大値を校正する方法を示すフロー図である。
 バケット15を付け替えた際に、ステップS30において、オペレータは入出力装置50の入力装置51を操作してベルクランク角度の最大値の校正モード画面に切り換える。
 ステップS31において、入出力装置50の表示装置52に表示される指示に従って、オペレータが、バケットシリンダ長が最大値に達しない機構限界の範囲内においてバケット15をチルトエンド(バケット15をブーム14が当接する位置)まで操作する。例えば、図4のG11のグラフの場合、ブーム角度が-15度よりも低い値にしてバケット15をチルトエンドまで操作させればよい。実際には、機構限界に達するブーム角度がわからないため、ブーム角度を出来るだけ下げた状態でバケット15をチルトさせればよい。
 次に、ステップS32において、チルトエンドにおけるベルクランク角度をベルクランク角度の最大値として記憶する。
 この記憶したベルクランク角度の最大値は、上述した制御方法において用いられる。
 <特徴>
 (1)
 本実施の形態のホイールローダ1(作業機械の一例)は、ブーム14と、バケット15(作業具の一例)と、バケットシリンダ17(アクチュエータの一例)と、ベルクランク18(サブリンクの一例)と、制御装置27(制御部の一例)と、を備える。バケット15は、ブーム14に対して駆動する。ベルクランク18は、ブーム14に取り付けられ、バケットシリンダ17の駆動力をバケット15へ伝達する。制御装置27は、ブーム14に対するベルクランク18の角度(姿勢の一例)に基づいてバケットシリンダ17を制御する。
 これにより、ベルクランク18の角度に基づいて、作業機3のリンク機構の機構限界に達したときのチルトエンドおよびダンプエンドを検出することができるため、機構限界に達するときの衝撃を緩和する制御を行うことが可能となる。
 (2)
 本実施の形態のホイールローダ1(作業機械の一例)では、バケットシリンダ17の一端は、車体2(車両本体の一例)に取付部17b(第1取付部の一例)において回動可能に取り付けられている。ベルクランク18は、バケットシリンダ17の他端に取付部18a(第2取付部の一例)において回動可能に取り付けられている。ベルクランク18は、バケット15に取付部18b(第3取付部の一例)において回動可能に取り付けられている。ベルクランク18は、取付部18aと取付部18bの間の取付部18c(第4取付部の一例)において、ブーム14に回動可能に取り付けられている。
 これにより、バケットシリンダ17の伸縮によって、バケット15がチルト側およびダンプ側に回動することができる。
 (3)
 本実施の形態のホイールローダ1(作業機械の一例)では、バケット15は、取付部14b(第5取付部の一例)においてブーム14に回動可能に取り付けられ、ブーム14は、取付部14a(第6取付部の一例)において車体2に回動可能に取り付けられている。ベルクランク18の姿勢は、取付部18aと取付部18cを結ぶ線と、取付部14aと取付部14bを結ぶ線によって形成される角度を含む。
 この角度によって、ベルクランク18の姿勢を規定することができる。
 (4)
 本実施の形態のホイールローダ1(作業機械の一例)では、バケットシリンダ17のストロークを検出するブーム角度センサ54およびベルクランク角度センサ55(検出部の一例)を備える。制御装置27は、ベルクランク18のベルクランク角度(姿勢の一例)とベルクランク18のベルクランク角度の最大値および最小値(限界姿勢の一例)との差分に基づく第1チルト制限量および第1ダンプ制限量(第1シリンダ駆動の一例)と、シリンダ長とバケットシリンダ17のシリンダ長の最大値および最小値(終端位置の一例)との差分に基づく第2チルト制限量および第2ダンプ制限量(第2シリンダ駆動指令の一例)との一方に基づき駆動指令(目標シリンダ駆動指令の一例)を行う。
 このように、ベルクランク角度の最大値および最小値に基づいて制限量を設定することにより、作業機3のリンク機構の機構限界によるチルトエンドおよびダンプエンドにバケット15が達する際の緩和制御を行うことができる。
 また、バケットシリンダ17のシリンダ長の最大値および最小値に基づいて制限量を設定することにより、作業機3のシリンダ長によるチルトエンドおよびダンプエンドにバケット15が達する際の緩和制御を行うことができる。
 (5)
 本実施の形態のホイールローダ1(作業機械の一例)は、バケット15を操作するバケット操作レバー62(操作部材の一例)を更に備えている。駆動指令(目標シリンダ駆動指令の一例)は、バケットシリンダ17への作動油の供給量に関する情報を含む。第1チルト制限量および第1ダンプ制限量と第2チルト制限量および第2ダンプ制限量の各々は、バケット操作レバー62の操作によるバケットシリンダ17への作動油の供給量に対する制限量の情報を含む。制御装置27は、第1チルト制限量および第1ダンプ制限量と第2チルト制限量および第2ダンプ制限量のうち最も大きい制限量を用いて目標シリンダ駆動指令を行う。
 これにより、作業機3のリンク機構の機構限界によるチルトエンドおよびダンプエンドと、作業機3のシリンダ長によるチルトエンドおよびダンプエンドのいずれかに、バケット15が達することに対して緩和制御を行うことができる。
 (6)
 本実施の形態のホイールローダ1(作業機械の一例)は、制御装置27は、バケット操作レバー62の操作に基づく作動油の供給量が、制限量を超えている場合には、目標シリンダ駆動指令における作動油の供給量を、制限量を超えない値に設定する。バケット操作レバー62の操作に基づく作動油の供給量が、制限量を超えていない場合には、目標シリンダ駆動指令における作動油の供給量を、バケット操作レバー62の操作に基づく作動油の供給量に設定する。
 これにより、チルトエンドおよびダンプエンドに達する場合に、衝撃を緩和するように制御を行うことができる。
 (7)
 本実施の形態のホイールローダ1(作業機械の一例)の制御方法は、ステップS11~S20(制御ステップの一例)を備える。ステップS11~S20(制御ステップの一例)は、ブーム14に対して駆動するバケット15へバケットシリンダ17の駆動力を伝達するベルクランク18のブーム14に対する姿勢に基づいてバケットシリンダ17を制御する。
 これにより、ベルクランク18の角度に基づいて、作業機3のリンク機構の機構限界に達したときのチルトエンドおよびダンプエンドを検出することができるため、機構限界に達するときの衝撃を緩和する制御を行うことが可能となる。
 (8)
 本実施の形態のホイールローダ1(作業機械の一例)の制御方法は、ステップS31(移動ステップの一例)と、ステップS32(記憶ステップの一例)と、を備える。ステップS31(移動ステップの一例)では、バケット15をチルトエンドまで移動させる。ステップS32では、ベルクランク18のチルトエンドにおけるベルクランク角度(姿勢の一例)を記憶する。ステップS11~S20(制御ステップの一例)は、チルトエンドにおけるベルクランク18の角度(姿勢の一例)に基づいてバケットシリンダ17を制御する。
 これにより、バケット15を交換した際にバケット15の最大値を簡単に取得し、チルトを検出することができる。
 (9)
 本実施の形態のホイールローダ1(作業機械の一例)の制御方法では、ステップS11~S26(制御ステップの一例)は、ベルクランク18のベルクランク角度(姿勢の一例)とベルクランク18のベルクランク角度の最大値または最小値(限界姿勢の一例)との差分に基づく第1チルト制限量または第1ダンプ制限量(第1シリンダ駆動の一例)と、シリンダ長とバケットシリンダ17のシリンダ長の最大値または最小値(終端位置の一例)との差分に基づく第2チルト制限量または第2ダンプ制限量(第2シリンダ駆動指令の一例)との一方に基づき駆動指令(目標シリンダ駆動指令の一例)を行う。
 このように、ベルクランク角度の最大値および最小値に基づいて制限量を設定することにより、作業機3のリンク機構の機構限界によるチルトエンドおよびダンプエンドにバケット15が達する際の緩和制御を行うことができる。
 また、バケットシリンダ17のシリンダ長の最大値および最小値に基づいて制限量を設定することにより、作業機3のシリンダ長によるチルトエンドおよびダンプエンドにバケット15が達する際の緩和制御を行うことができる。
 <他の実施形態>
 以上、本発明の一実施形態について説明したが、本発明は上記実施形態に限定されるものではなく、発明の要旨を逸脱しない範囲で種々の変更が可能である。
 (A)
 上記実施の形態の作業機3では、ベルクランク18のバケットシリンダ17との取付部18aが、バケット15のロッド15aとの取付部18bよりも回動方向においてキャブ5側に配置されているが、これに限らなくても良く、ベルクランク18のバケット15のロッド15aとの取付部が、バケットシリンダ17との取付部よりもキャブ5側に配置されていてもよい。
 (B)
 上記実施の形態の作業機3では、バケットシリンダ17が伸長した際にバケット15がチルト側に回動し、収縮した際にバケット15がダンプ側に回動しているが、これに限らなくても良く、バケットシリンダ17が伸長した際にバケット15がダンプ側に回動し、収縮した際にバケット15がチルト側に回動してもよい。
 (C)
 上記実施の形態では、ベルクランク18の角度を用いてチルトエンドおよびダンプエンドの双方を検出しているが、たとえばチルトエンドのみを検出してもよい。ダンプエンドに関しては、バケットシリンダ17のストローク長だけでダンプエンドを検出してもよい。これは、ダンプエンドに関してはバケット15を交換しても変化しないため、一度設定すればよく、バケットを付け替えるたびに上述した校正を行う必要がないためである。
 (D)
 上記実施の形態では、チルト/ダンプ判定部75によってバケット15のチルト側への移動かダンプ側への移動かを判定して、ベルクランク制限量算出部71は、第1チルト側制限量と第1ダンプ側制限量の一方を求め、シリンダ制限量算出部72は、第2チルト側制限量と第2ダンプ側制限量の一方を求めているが、これに限られるものではない。例えば、ベルクランク制限量算出部71は、ベルクランク角度センサ55によって検出されたベルクランク角度が最大値と最小値のうち近い方との差分を検出し、その差分に基づいてベルクランク角度に基づいた制限量を算出してもよい。シリンダ制限量算出部72も同様に、算出されたストロークが最大値と最小値のうち近い方との差分を検出し、その差分に基づいてシリンダ長に基づいた制限量を一つ算出してもよい。
 さらに、例えば、バケット15のチルト側への移動かダンプ側への移動かを判定を行わずに、第1チルト側制限量と第1ダンプ側制限量と第2チルト側制限量と第2ダンプ側制限量の全てを求め、制限量が最も大きいものを採用しても良い。
 (E)
 上記実施の形態では、作業機3の機構限界によるチルトエンドとダンプエンドをベルクランク18の角度に基づいて検出し、バケットシリンダ17のシリンダ長によるチルトエンドとダンプエンドをストローク長に基づいて検出しているが、一般的に衝撃が強い機構限界によるチルトエンドとダンプエンドのみを検出してもよい。
 (F)
 上記実施の形態では、ベルクランク角度センサ55は、例えば、ポテンショメータが用いられているが、これに限らなくても良く、IMU(Inertial measurement unit)等であってもよい。
 (G)
 上記実施の形態では、バケットシリンダ17のストロークをブーム角度センサ54とベルクランク角度センサ55の検出値に基づいて求めているが、これに限らなくても良く、シリンダ長を直接計測してもよい。
 (H)
 上記実施の形態では、ブーム14に対するベルクランク18の姿勢の一例として図2に示すベルクランクの角度が用いられているが、ブーム14に対するベルクランク18の姿勢が一義的に決まれば図2のθbに限られるものでなく、複数の角度の組み合わせであってもよい。
 本発明によれば、ブーム角度を考慮せずにチルトエンドまたはダンプエンドにおける衝撃を緩和可能な作業機械および作業機械の制御方法を提供することができる。
1   :ホイールローダ
14  :ブーム
15  :バケット
17  :バケットシリンダ
18  :ベルクランク
27  :制御装置

Claims (11)

  1.  ブームと、
     前記ブームに対して駆動する作業具と、
     前記作業具を駆動するアクチュエータと、
     前記ブームに取り付けられ、前記アクチュエータの駆動力を前記作業具へ伝達するサブリンクと、
     前記ブームに対する前記サブリンクの姿勢に基づいて前記アクチュエータを制御する制御部と、を備えた、
    作業機械。
  2.  前記アクチュエータは、シリンダであり、
     前記シリンダの一端は、車両本体に第1取付部において回動可能に取り付けられ、
     前記サブリンクは、前記シリンダの他端に第2取付部において回動可能に取り付けられ、
     前記サブリンクは、前記作業具に第3取付部において回動可能に取り付けられ、
     前記サブリンクは、前記第2取付部と前記第3取付部の間の第4取付部において、前記ブームに回動可能に取り付けられている、
    請求項1に記載の作業機械。
  3.  前記作業具は、第5取付部において前記ブームに回動可能に取り付けられ、
     前記ブームは、第6取付部において前記車両本体に回動可能に取り付けられ、
     前記サブリンクの姿勢は、前記第2取付部と前記第4取付部を結ぶ線と、前記第5取付部と前記第6取付部を結ぶ線によって形成される角度を含む、
    請求項2に記載の作業機械。
  4.  前記アクチュエータは、シリンダであり、
     前記シリンダのストロークを検出する検出部を備え、
     前記制御部は、
     前記サブリンクの姿勢と前記サブリンクの限界姿勢との差分に基づく第1シリンダ駆動指令と、前記ストロークと前記シリンダの終端位置との差分に基づく第2シリンダ駆動指令との一方に基づき目標シリンダ駆動指令を行う、
    請求項1に記載の作業機械。
  5.  前記作業具を操作する操作部材を更に備え、
     前記目標シリンダ駆動指令は、前記シリンダへの作動油の供給量に関する情報を含み、
     前記第1シリンダ駆動指令と前記第2シリンダ駆動指令の各々は、前記操作部材の操作による前記シリンダへの作動油の供給量に対する制限量の情報を含み、
     前記制御部は、前記第1シリンダ駆動指令と前記第2シリンダ駆動指令の双方のうち大きい制限量を用いて前記目標シリンダ駆動指令を行う、
    請求項4に記載の作業機械。
  6.  前記制御部は、
     前記操作部材の操作に基づく作動油の供給量が、前記制限量を超えている場合には、前記目標シリンダ駆動指令における前記作動油の供給量を、前記制限量を超えない値に設定し、
     前記操作部材の操作に基づく作動油の供給量が、前記制限量を超えていない場合には、前記目標シリンダ駆動指令における前記作動油の供給量を、前記操作部材の操作に基づく作動油の供給量に設定する、
    請求項5に記載の作業機械。
  7.  前記シリンダの終端位置は、前記シリンダの前記ストロークの最大値および最小値であり、
     前記サブリンクの限界姿勢は、前記作業具のチルトエンドおよびダンプエンドにおける前記サブリンクの姿勢である、
    請求項4に記載の作業機械。
  8.  前記作業機械は、フロントフレームとリアフレームが連結されたアーティキュレート式のホイールローダである、
     請求項1~7のいずれか1項に記載の作業機械。
  9.  ブームに対して駆動する作業具へアクチュエータの駆動力を伝達するサブリンクの前記ブームに対する姿勢に基づいて前記アクチュエータを制御する制御ステップを備えた、
    作業機械の制御方法。
  10.  前記作業具をチルトエンドまで移動させる移動ステップと、
     前記サブリンクの前記チルトエンドにおける姿勢を記憶する記憶ステップと、を更に備え、
     前記制御ステップは、前記チルトエンドにおける前記サブリンクの姿勢に基づいて前記アクチュエータを制御する、
    請求項9に記載の作業機械の制御方法。
  11.  前記アクチュエータは、シリンダであり、
     前記制御ステップは、
     前記サブリンクの姿勢と前記サブリンクの限界姿勢との差分に基づく第1シリンダ駆動指令と、前記シリンダのストロークと前記シリンダの終端位置との差分に基づく第2シリンダ駆動指令との一方に基づき目標シリンダ駆動指令を行う、
    請求項9に記載の作業機械の制御方法。
PCT/JP2020/012075 2019-03-29 2020-03-18 作業機械および作業機械の制御方法 WO2020203315A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN202080012824.4A CN113396256B (zh) 2019-03-29 2020-03-18 作业机械以及作业机械的控制方法
EP20782694.2A EP3907334A4 (en) 2019-03-29 2020-03-18 CONSTRUCTION MACHINE AND METHOD FOR CONTROLLING CONSTRUCTION MACHINE
US17/426,399 US20220106763A1 (en) 2019-03-29 2020-03-18 Work machine and method for controling work machine

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2019-067317 2019-03-29
JP2019067317A JP7232691B2 (ja) 2019-03-29 2019-03-29 作業機械および作業機械の制御方法

Publications (1)

Publication Number Publication Date
WO2020203315A1 true WO2020203315A1 (ja) 2020-10-08

Family

ID=72668805

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/012075 WO2020203315A1 (ja) 2019-03-29 2020-03-18 作業機械および作業機械の制御方法

Country Status (5)

Country Link
US (1) US20220106763A1 (ja)
EP (1) EP3907334A4 (ja)
JP (1) JP7232691B2 (ja)
CN (1) CN113396256B (ja)
WO (1) WO2020203315A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
USD977031S1 (en) * 2018-12-12 2023-01-31 Bruder Spielwaren Gmbh + Co. Kg Toy

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5717923B2 (ja) 1979-03-09 1982-04-14
JP2010203109A (ja) * 2009-03-02 2010-09-16 Komatsu Ltd 建設機械
WO2010110386A1 (ja) * 2009-03-26 2010-09-30 株式会社小松製作所 作業車両の制御方法および制御装置
JP2014055439A (ja) * 2012-09-12 2014-03-27 Komatsu Ltd ホイールローダ
WO2015083753A1 (ja) * 2013-12-03 2015-06-11 株式会社小松製作所 作業車両
WO2016006716A1 (ja) * 2015-08-07 2016-01-14 株式会社小松製作所 作業車両
WO2017126182A1 (ja) * 2016-10-28 2017-07-27 株式会社小松製作所 積込機械の制御システム及び積込機械の制御方法

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05196004A (ja) * 1992-01-20 1993-08-06 Komatsu Ltd 作業機シリンダの自動クッション制御装置
JP2001132009A (ja) * 1999-11-08 2001-05-15 Hitachi Constr Mach Co Ltd 作業車両の姿勢制御装置、および作業車両
EP2505722B1 (en) * 2010-03-15 2014-05-14 Komatsu, Ltd. Control device for work machine on construction vehicle and control method
US8899143B2 (en) * 2011-06-28 2014-12-02 Caterpillar Inc. Hydraulic control system having variable pressure relief
US9809948B2 (en) * 2014-05-30 2017-11-07 Komatsu Ltd. Work vehicle control method, work vehicle control device, and work vehicle
JP5717923B1 (ja) 2014-05-30 2015-05-13 株式会社小松製作所 作業車両の制御方法、作業車両の制御装置及び作業車両

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5717923B2 (ja) 1979-03-09 1982-04-14
JP2010203109A (ja) * 2009-03-02 2010-09-16 Komatsu Ltd 建設機械
WO2010110386A1 (ja) * 2009-03-26 2010-09-30 株式会社小松製作所 作業車両の制御方法および制御装置
JP2014055439A (ja) * 2012-09-12 2014-03-27 Komatsu Ltd ホイールローダ
WO2015083753A1 (ja) * 2013-12-03 2015-06-11 株式会社小松製作所 作業車両
WO2016006716A1 (ja) * 2015-08-07 2016-01-14 株式会社小松製作所 作業車両
WO2017126182A1 (ja) * 2016-10-28 2017-07-27 株式会社小松製作所 積込機械の制御システム及び積込機械の制御方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3907334A4

Also Published As

Publication number Publication date
CN113396256B (zh) 2023-03-24
JP2020165215A (ja) 2020-10-08
EP3907334A1 (en) 2021-11-10
JP7232691B2 (ja) 2023-03-03
EP3907334A4 (en) 2022-11-30
CN113396256A (zh) 2021-09-14
US20220106763A1 (en) 2022-04-07

Similar Documents

Publication Publication Date Title
EP2924176B1 (en) Front loader
JP5037561B2 (ja) 作業車両
WO2016148311A1 (ja) 作業車両の制御システム、制御方法、及び作業車両
JP6407132B2 (ja) 作業機械の操作支援装置
US10590623B2 (en) Construction machine
WO2019082600A1 (ja) 作業車両
WO2020203315A1 (ja) 作業機械および作業機械の制御方法
JP2017186875A5 (ja)
US20230129066A1 (en) Work machine and control method for work machine
WO2022264713A1 (ja) 作業機械および作業機械を制御するための方法
WO2020203314A1 (ja) 作業機械の校正方法、作業機械のコントローラ、および作業機械
JP5315443B2 (ja) ホイールローダ
WO2023127436A1 (ja) 作業機の油圧システム、及び作業機の油圧システムの制御方法
JP5320003B2 (ja) 作業機械の油圧制御装置
JP7381768B2 (ja) 建設機械
WO2022071584A1 (ja) 作業機械
WO2023067943A1 (ja) 作業機械の制御システムおよび制御方法
JP2004239304A (ja) 建設機械の油圧シリンダ駆動制御装置
JP2023049997A (ja) 油圧ショベル
JP2023094315A (ja) 作業機
JP5073330B2 (ja) 作業機
JP2021154834A (ja) ステアリング装置、および作業機械
JP2022099992A (ja) 作業機
JP2004100814A (ja) 建設機械の油圧回路制御装置
JP2004239303A (ja) 建設機械の油圧シリンダ駆動制御装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20782694

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2020782694

Country of ref document: EP

Effective date: 20210803

NENP Non-entry into the national phase

Ref country code: DE