WO2020110633A1 - 情報処理装置、情報処理方法、及びプログラム - Google Patents

情報処理装置、情報処理方法、及びプログラム Download PDF

Info

Publication number
WO2020110633A1
WO2020110633A1 PCT/JP2019/043421 JP2019043421W WO2020110633A1 WO 2020110633 A1 WO2020110633 A1 WO 2020110633A1 JP 2019043421 W JP2019043421 W JP 2019043421W WO 2020110633 A1 WO2020110633 A1 WO 2020110633A1
Authority
WO
WIPO (PCT)
Prior art keywords
information
power
information processing
cost
power generation
Prior art date
Application number
PCT/JP2019/043421
Other languages
English (en)
French (fr)
Inventor
集 歌丸
三浩 北地
Original Assignee
京セラ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 京セラ株式会社 filed Critical 京セラ株式会社
Priority to US17/297,460 priority Critical patent/US20220012822A1/en
Priority to EP19890152.2A priority patent/EP3889857A4/en
Publication of WO2020110633A1 publication Critical patent/WO2020110633A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00001Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00016Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using a wired telecommunication network or a data transmission bus
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00022Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using wireless data transmission
    • H02J13/00026Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using wireless data transmission involving a local wireless network, e.g. Wi-Fi, ZigBee or Bluetooth
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/10The network having a local or delimited stationary reach
    • H02J2310/12The local stationary network supplying a household or a building
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/56The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
    • H02J2310/62The condition being non-electrical, e.g. temperature
    • H02J2310/64The condition being economic, e.g. tariff based load management
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • Y02P90/84Greenhouse gas [GHG] management systems
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Definitions

  • the present disclosure relates to an information processing device, an information processing method, and a program.
  • Patent Document 1 discloses a system that aggregates and manages energy data at a plurality of bases.
  • An information processing apparatus includes first information about power supplied from a power generation device and/or a power storage device at a predetermined base and power supplied from a commercial power source to the predetermined base, and the power storage device stores the first information. Second information on the generated power, third information on the power consumed at the predetermined location, information on the cost corresponding to the power, and information on the cost of the power generation device and/or the power storage device, On the basis of calculating the economic benefit of energy saving caused by the power generation device and/or the power storage device, and calculating the period during which the cost of the power generation device and/or the power storage device is recovered by the economic profit. And a control unit for controlling. Based on the input of a predetermined period, the control unit outputs information about the configuration of the power generation device and/or the storage battery that can be realized by the cost of recovering the economic profit in the predetermined period.
  • An information processing method is First information about electric power supplied from a power generation device and/or a power storage device at a predetermined base and electric power supplied from a commercial power source to the predetermined base; second information about electric power stored at the power storage device; A step of acquiring third information about power consumed at a predetermined base, information about a cost corresponding to the power, and information about a cost of the power generation device and/or the power storage device; The power generation based on the acquired first information, the second information, the third information, information about the cost corresponding to the power, and information about the cost of the power generation device and/or the power storage device.
  • the program according to one embodiment is On the computer, First information about electric power supplied from a power generation device and/or a power storage device at a predetermined base and electric power supplied from a commercial power source to the predetermined base; second information about electric power stored at the power storage device; A step of acquiring third information about power consumed at a predetermined base, information about a cost corresponding to the power, and information about a cost of the power generation device and/or the power storage device; The power generation based on the acquired first information, the second information, the third information, information about the cost corresponding to the power, and information about the cost of the power generation device and/or the power storage device.
  • An object of the present disclosure is to provide an information processing device, an information processing method, and a program that contribute to efficient use of electric power. According to one embodiment, it is possible to provide an information processing device, an information processing method, and a program that contribute to efficient use of power.
  • the information processing apparatus according to the first embodiment will be described with reference to the drawings.
  • the information processing device performs a predetermined process based on information input by a user, information stored in the information processing device, information acquired from outside the information processing device, and the like. Output the result.
  • the information processing device may be, for example, a terminal designed exclusively.
  • the information processing apparatus adopts various configurations such as a personal computer (PC), a notebook PC, a tablet terminal, a smartphone, a game terminal, or a mobile phone with application software installed. You can do it.
  • FIG. 1 is a functional block diagram showing a schematic configuration of an information processing device according to an embodiment.
  • the information processing device 1 according to the embodiment includes a control unit 10, a storage unit 20, an input unit 30, an output unit 40, and a communication unit 50. Further, as illustrated in FIG. 1, the information processing device 1 according to an embodiment can be connected to an external device such as the external server 100 via a network N by wire or wirelessly.
  • the control unit 10 may include at least one processor such as a CPU (Central Processing Unit) in order to provide control and processing capability for executing various functions.
  • the control unit 10 may be implemented collectively by one processor, several processors, or each individual processor.
  • the processor may be implemented as a single integrated circuit.
  • An integrated circuit is also called an IC (Integrated Circuit).
  • the processor may be implemented as a plurality of communicatively connected integrated circuits and discrete circuits.
  • the processor may be implemented based on various other known techniques.
  • the control unit 10 may be configured as a CPU and a program executed by the CPU, for example.
  • the program executed by the control unit 10 and the result of the processing executed by the control unit 10 may be stored in the storage unit 20. The operation of the control unit 10 of the information processing device 1 according to the embodiment will be further described later.
  • the storage unit 20 stores various information acquired from the control unit 10, the communication unit 50, and the like. In one embodiment, the storage unit 20 may also store information input by the user through the input unit 30. The storage unit 20 also stores a program executed by the control unit 10 and the like. In addition, the storage unit 20 also stores various data such as a calculation result by the control unit 10. Further, the storage unit 20 may include a work memory or the like when the control unit 10 operates.
  • the storage unit 20 can be configured by, for example, a semiconductor memory, a magnetic disk, or the like, but is not limited to these, and can be any storage device.
  • the storage unit 20 may be a storage medium such as a memory card inserted in the information processing device 1 according to the present embodiment.
  • the storage unit 20 may be an internal memory of the CPU used as the control unit 10.
  • the input unit 30 detects an operation input by the user.
  • the input unit 30 can be various input devices such as a dedicated controller, a keyboard, and/or a mouse.
  • the output unit 40 is a display unit such as a liquid crystal display (LCD)
  • the input unit 30 may detect an input corresponding to the display on the display unit.
  • the input unit 30 can detect a user operation of moving a cursor, a pointer, or the like to a position such as an object of an icon displayed on the display unit. Further, the input unit 30 can detect an input corresponding to the display of such an object, that is, an input of a user who selects the object.
  • the input unit 30 may be a touch panel that detects an operation that the user directly touches with a finger or the like.
  • a touch panel is made of a translucent material and placed on the front surface of the display unit, it is possible to detect an operation such as a user's direct contact with an object such as an icon displayed on the display unit. be able to. Therefore, the input unit 30 having the touch panel having such a configuration can provide the user with intuitive operability.
  • description will be given on the assumption that the input unit 30 configured by the transparent touch panel is arranged on the front surface of the display unit in this manner.
  • the output unit 40 may be a display unit such as an LCD as described above. If the information processing device 1 does not include a display unit such as an LCD, the output unit 40 may be an external output interface.
  • the display unit may display information indicating the result of information processing by the information processing device 1.
  • the display unit can be configured by various display devices such as an LCD or an organic EL display.
  • the display unit can display not only characters, numbers, symbols, etc., but also drawn objects of various icons.
  • the display unit may use a monochrome display or a gray scale display, but in order to display in a manner that a general user can easily understand at a glance, a color display is provided. You may use the thing corresponding to.
  • the output unit 40 When the output unit 40 is used as an interface for external output, it may be an interface for connecting the information processing device 1 to various display devices such as an LCD or an organic EL display.
  • the interface can be a receptacle of a connector for connecting the cable connected to the display device to the information processing device 1 when the information processing device 1 is connected to the external display device by wire.
  • the interface can be a wireless unit that configures a transmission/reception unit that transmits a signal to the display device and receives a signal from the display device.
  • the display device also has an interface corresponding to the interface of the information processing device 1.
  • the communication unit 50 can realize various functions including wireless communication.
  • the communication unit 50 may realize communication by various communication methods such as LTE (Long Term Evolution).
  • the communication unit 50 may include, for example, a modem whose communication method is standardized in ITU-T (International Telecommunication Union Telecommunication Standardization Sector). Further, the communication unit 50 may realize wireless communication by various methods such as WiFi or Bluetooth (registered trademark).
  • the communication unit 50 may wirelessly communicate with the communication unit of the external server 100, for example, via an antenna.
  • the various information transmitted and received by the communication unit 50 may be stored in the storage unit 20, for example.
  • the communication unit 50 may be configured to include, for example, an antenna that transmits and receives radio waves and an appropriate RF unit. Since the communication unit 50 can be configured by a known technique for performing wireless communication, a more detailed description of hardware will be omitted.
  • the communication unit 50 may wirelessly communicate with a communication unit of an information processing device other than the external server 100, for example.
  • the network N is configured by wire, wireless, or any combination of wire and wireless.
  • the network N may be any network such as the Internet or an intranet as long as it can communicate the information processing device 1 with another information processing device such as the external server 100.
  • the external server 100 may be any information processing device as long as it can be connected to the information processing device 1 via the network N.
  • the external server 100 may be a database server, an application server, or the like.
  • the external server 100 may be, for example, a cloud server or the like.
  • the external server 100 may communicate with another information processing device other than the information processing device 1.
  • the information processing device 1 and the external server 100 may be wireless.
  • at least a part of the external server 100 and the network N may be wired.
  • the network N of the present disclosure may have a configuration other than these configurations.
  • the information processing device 1 By communicating with the information processing device 1 and the external server 100, various information regarding the information processing device 1 can be transmitted to the external server 100. Further, the information processing device 1 can receive various information from the external server 100 by communicating with the external server 100. Thereby, for example, the information processing device 1 can obtain information not stored in the storage unit 20 or information not input by the user from the external server 100.
  • the information processing device 1 may be used by a user in a general household who is considering introducing or changing the configuration of a distributed power source such as a solar cell, a fuel cell, and a storage battery. Further, the information processing device 1 according to an embodiment may be used by a user of a business operator whose base is a manufacturing site or a business site that uses energy of a certain scale or more.
  • a user of the information processing apparatus 1 according to an embodiment is a business operator (for example, a subsidiary) based at a manufacturing site or a business site that uses energy of a certain scale or more, or a position to integrally manage the business company. Will be described assuming a business operator (for example, a parent company) in.
  • FIG. 2 is a diagram illustrating an example of a user of the information processing device 1 according to the embodiment.
  • Company A, Company B, and Company C each have a relationship between Company X and a subsidiary and parent company. That is, it is assumed that the parent company, Company X, has subsidiaries A, B, and C. In this case, the companies A, B, and C, which are subsidiaries, may have the same parent company X, but may be different entities.
  • Company A has a factory
  • Company B has a retail store
  • Company C has a restaurant.
  • the company A, the company B, and the company C have different required power and balance requirements.
  • the company X which is a parent company
  • the parent company X which is the managing company, may introduce energy equipment to each subsidiary in order to achieve the energy saving target of the entire group company.
  • the desired conditions may differ in each company.
  • examples of the desired conditions include the following.
  • BCP Business continuity planning
  • investment payback period Period for the investment for achieving the energy saving target to be recovered by the profit of the energy saving
  • the parent company X which is the general business operator, determines the energy saving target for the entire group company, it is assumed that the overall energy saving target cannot be achieved. For example, if each subsidiary prioritizes the desired investment payback period, it is feared that the energy saving target of the entire group company cannot be achieved. Further, if priority is given to achieving the energy saving target for the entire group company, there is a concern that the BCP and/or the investment payback period desired by each subsidiary may not be satisfied.
  • the information processing apparatus 1 is capable of simulating a configuration of a distributed power supply that satisfies various conditions from the perspectives of a parent company and a subsidiary.
  • a distributed power source is newly introduced or the configuration of an existing distributed power source is changed, the effect of doing so can be grasped from various viewpoints.
  • the information processing apparatus 1 can simulate the configuration of a distributed power supply that satisfies various conditions from the perspectives of a parent company and a subsidiary.
  • the information processing apparatus 1 outputs a combination of energy facilities that satisfies the conditions of each subsidiary, while also considering each priority item, based on the input of various conditions of each subsidiary.
  • the input conditions may be a plurality of conditions such as an overall energy saving target, an individual energy saving target (primary energy reduction effect), an investment payback period, a CO2 reduction effect, and a BCP effect.
  • the overall energy saving target may indicate the overall energy saving target including the parent company and subsidiaries as shown in Fig. 2. Further, the overall energy saving target may indicate an overall energy saving target including all subsidiaries, not including the parent company as shown in FIG.
  • the overall energy saving target may indicate the effect of energy saving that can be caused by the total introduction of energy equipment.
  • the individual energy saving target (primary energy reduction effect) may indicate the energy saving target of any of the subsidiaries as shown in FIG.
  • the individual energy-saving target (primary energy reduction effect) may indicate the energy-saving effect that can be caused by introducing the energy equipment to the subsidiary.
  • the CO2 reduction effect may indicate the amount of CO2 expected to be reduced by the energy equipment to be introduced.
  • the BCP effect may indicate the time when the business is expected to be continued by the above-mentioned BCP.
  • the information processing device 1 may be able to specify any of the above conditions as a priority item.
  • the information processing device 1 calculates a combination of energy facilities that satisfy the conditions based on the above inputs, also considering priority items.
  • the information processing device 1 can output the calculated result and present it to the user or the like.
  • the user who is presented with the calculation result by the information processing device 1 can grasp the energy equipment that can also achieve the overall energy saving target while satisfying the conditions for each subsidiary.
  • the information processing device 1 can calculate the combination of energy facilities satisfying the conditions for each subsidiary. When some conditions are changed, the information processing device 1 can present a combination of energy facilities that achieves the overall energy-saving target according to the changed conditions. That is, when some conditions are changed, the information processing device 1 can present a combination of energy facilities that achieves the overall energy-saving target, including the effect of the changed conditions on others.
  • the control unit 10 displays the input screen on the output unit 40. Then, the control unit 10 detects the input by the user through the input unit 30 while the input screen is displayed on the output unit 40. When the input unit 30 detects an input, the control unit 10 performs a predetermined calculation and outputs the result to the output unit 40.
  • the control unit 10 performs a predetermined calculation and outputs the result to the output unit 40.
  • the information processing apparatus 1 may display a display screen as shown in FIG. 3, for example, when prompting the user for input.
  • the control unit 10 controls the output unit 40 so as to display the display screen as shown in FIG.
  • the information processing device 1 may store various data for displaying such a display screen in the storage unit 20 in advance.
  • the information processing apparatus 1 may receive various data for displaying such a display screen from the external server 100 via the network N by the communication unit 50.
  • FIG. 3 is a diagram showing an example of a condition input screen at each subsidiary.
  • the information processing apparatus 1 has a plurality of conditions such as the energy saving effect as individual energy saving target, the investment payback period, and the BCP for the subsidiary A, for example.
  • the user can be prompted for input. With this screen displayed, the user can input various conditions from the input unit 30.
  • the information processing apparatus 1 can prompt the user to select which of a plurality of conditions is to be a priority item.
  • FIG. 3 shows a state in which the “investment payback period” is selected as a priority item among a plurality of conditions. That is, here, the user has selected that the investment payback period has priority over the conditions such as the energy saving effect and the BCP among the plurality of conditions.
  • the information processing device 1 selects whether the range of numerical values such as the output of the distributed power supply is set or whether the fixed value is set. Can be urged to the user.
  • the distributed power source has three systems of a solar cell, a storage battery, and a fuel cell.
  • the distributed power source is not limited to these three systems, and any one of them may be omitted or another power generation system may be added.
  • FIG. 3 shows a state in which all of the solar cell, the storage cell, and the fuel cell are set so that a range of values is designated instead of a fixed value.
  • the control unit 10 may output an output screen as shown in FIG. 5 or 6 to the output unit 40.
  • 5 and 6 show the specifications of the distributed power source as an example of the configuration of the energy facility that satisfies the conditions input in FIG. That is, when the user inputs various conditions on the input screen shown in FIG. 3, as shown in FIG. 5 or 6, the configuration of the distributed power source that satisfies the various conditions is presented.
  • the user can easily understand, for example, what kind of configuration of the distributed power source is introduced in the subsidiary A to satisfy the various conditions as the entire group company and as the subsidiary A.
  • FIG. 4 is a diagram showing an example of information collected by the information processing device 1.
  • the overall energy saving target may be input as a condition of the parent company, for example. This input may be performed by a user who is an employee of the parent company or by a user who is an employee of any of the subsidiary companies.
  • a plurality of conditions as shown in FIG. 3 may be input as the conditions of the subsidiary.
  • a plurality of conditions of the subsidiary companies A and B are input. Further, as shown in FIG.
  • the company A cites BCP as a priority item among a plurality of conditions
  • the company B cites an investment payback period as a priority item among the plurality of conditions.
  • the information processing apparatus 1 can present energy equipment that meets each condition in consideration of each priority item, even if the condition that the subsidiary wants to prioritize is different.
  • the information processing device 1 when the conditions for each company as shown in FIG. 4 are all set for the entire group company, it is possible to present the energy facilities that satisfy various conditions to each subsidiary.
  • the scale of the energy facility includes, for example, among the distributed power sources, the generated power (power amount) of the solar cell, the generated power (power amount) of the fuel cell, the capacity of the storage battery, and the output (power amount) of the storage battery.
  • BCP tends to increase as the scale of energy equipment increases.
  • the cost tends to increase, and therefore the investment payback period tends to increase.
  • the control unit 10 may determine an energy facility that satisfies a plurality of conditions, based on various data as described above.
  • FIG. 5 is a diagram showing an example of a combination of energy facilities presented by the information processing device 1. Based on the input of the conditions described above, the information processing device 1 may read a combination of energy facilities that satisfy the conditions from the storage unit 20 and output the combination to the output unit 40 as an output screen.
  • the information processing apparatus 1 determines a combination of energy equipment that satisfies the conditions of each subsidiary while satisfying the overall energy saving target, and outputs the combination to the output unit 40.
  • the entered overall energy saving target is shown.
  • a combination of energy facilities that satisfy the respective conditions is shown.
  • the [Company A] column in FIG. 5 shows three examples of combinations of energy facilities that satisfy the conditions.
  • the combination of the solar cell 200 kW, the storage battery 200 kWh, and the fuel cell 100 kW satisfies the condition of the company A.
  • the combination of the solar cell 300 kW, the storage battery 200 kWh, and the fuel cell 150 kW also satisfies the company A condition.
  • the combination of the solar cell 400 kW, the storage battery 200 kWh, and the fuel cell 200 kW also satisfies the company A condition.
  • FIG. 5 shows three examples of combinations of energy facilities that satisfy the conditions.
  • BCP is set as a priority item in the subsidiary A. Therefore, as shown in the column of [Company A] in FIG. 5, the BCPs of Company A are all fixed at 72 hours.
  • the BCP column and/or numerical value is displayed in a different color from the others, etc. Alternatively, the display mode may be distinguished from others.
  • the [Company B] column in FIG. 5 also shows three examples of combinations of energy facilities that satisfy the conditions.
  • the combination of the solar cell 100 kW, the storage battery 20 kWh, and the fuel cell 30 kW satisfies the condition of the company B.
  • the combination of the solar battery 50 kW, the storage battery 15 kWh, and the fuel cell 20 kW also satisfies the condition of the company B.
  • the combination of the solar cell 30 kW, the storage battery 10 kWh, and the fuel cell 20 kW also satisfies the condition of the company B.
  • the energy saving effect and the BCP are different in each combination satisfying these conditions.
  • the investment recovery period is set as a priority item in the subsidiary B. Therefore, as shown in the column of [company B] in FIG. 5, the investment recovery period of company B is fixed at 5 years.
  • the display mode may be distinguished from the others, such as by displaying as.
  • the information processing device 1 may present a plurality of combinations of energy facilities that meet the overall energy-saving achievement target and the conditions (and priority items) for each company.
  • the control unit 10 may calculate each numerical value by variously changing the combination of energy equipment within a preset range, for example.
  • the control unit 10 may calculate a charge/discharge pattern of a storage battery, a power generation pattern of a fuel cell, a power generation pattern of a solar cell, a power purchase pattern from a grid, and the like for each combination of energy equipment. Based on such a pattern, the control unit 10 may calculate the energy saving effect, the investment payback period, the BCP, and the like for each combination of energy equipment.
  • the investment recovery period of Company B is set to year. This is because, for example, in the [company B] column of FIG. 4, the investment payback period is input as “within 5 years”.
  • the user calls the condition input screen as shown in FIG. 3 to change the condition of the company B, and inputs the investment payback period from “within 5 years” to “within 3 years”.
  • the control unit 10 recalculates based on the changed value, and newly calculates and outputs a combination of energy equipment.
  • FIG. 6 is a diagram showing a new example of a combination of energy facilities presented by the information processing device 1.
  • the information processing device 1 may read the combination of the energy equipment satisfying the changed condition from the storage unit 20 based on the change in the condition described above, and output the combination to the output unit 40 as an output screen.
  • the [Company B] column in FIG. 6 shows three examples of combinations of energy facilities that meet the changed conditions.
  • the investment payback period is changed from 5 years to 3 years in the column of [company B] in FIG.
  • the investment recovery period is set as a priority item in the subsidiary B. Therefore, as shown in the column of [company B] in FIG. 6, the investment recovery period of company B is fixed at 3 years.
  • the column of investment recovery period and/or numerical value is shown in the [company B] column of FIG.
  • the display mode may be distinguished from the investment recovery period column and/or the numerical value.
  • control unit 10 controls the energy consumption of the subsidiary A in order to satisfy the overall energy saving target when the effect of reducing the obtained energy saving effect is exerted even when the condition of the subsidiary B is changed, for example.
  • the combination of equipment is also calculated again.
  • the control unit 10 may update the information of the recalculated combination of energy facilities and output the updated information from the output unit 40.
  • the information processing apparatus 1 it is possible to present the user with the configuration of the energy facility that satisfies the changed condition as part of the condition is changed.
  • the screen displays shown in FIGS. 5 and 6 may be displayed, for example, based on the input to the “calculate” button shown in the lower right of FIG.
  • the information processing apparatus 1 displays a screen in which information about detailed setting can be input. Good.
  • control unit 10 may output either the screen of FIG. 7 or the screen of FIG. 8 to the output unit 40 in response to the input for selecting the tab at the upper end of the screen.
  • FIG. 7 is a diagram showing an example of a (building information setting) screen for setting detailed building information.
  • the control unit 10 may display a screen prompting the user to input the presence/absence of the actual data of the power load of the building. For example, when there is actual data on the power load of the building, the control unit 10 may prompt the user to input such data.
  • the control unit 10 may obtain such data by communicating with the external server 100 from the communication unit 50 via the network N.
  • control unit 10 may display a screen as shown in FIG. 7 that prompts the user to input various information.
  • the user inputs or selects the type of customer, the area in which the building is located, the total floor area, the coefficient used to calculate the building power load, the presence or absence of actual data of electricity charges, and the like. can do.
  • the control unit 10 may calculate the correction value data using the data of the representative value prepared in advance.
  • the representative value data may be prepared in 30-minute units, and the value obtained by multiplying the representative value data by the total floor area may be used as the correction value data.
  • the total floor area ratio may be a ratio between the value input as the total floor area and the total floor area prepared as the representative value data.
  • representative value data for example, prepare an “office” folder and collect representative load pattern data for each office nationwide in this “office” folder. You may save it.
  • a “store” folder may be prepared, and data of typical load patterns may be collected and stored in the “store” folder for each store nationwide.
  • the control unit 10 may display a screen prompting the user to input the presence/absence of data on the load of building power at the time of a disaster. For example, if there is data on the load of building power at the time of a disaster, the control unit 10 may start reading the data file based on the input to the object for reading the data file. On the other hand, when there is no data on the load of building power at the time of disaster, the control unit 10 may prompt the user to input the utilization load factor at the time of power failure.
  • control unit 10 may start reading the data file based on the input to the object to read the data file.
  • control unit 10 displays a screen for setting detailed information of the building from the viewpoint of the heat load, and prompts the user to input. You may urge me.
  • control unit 10 may store the information on the screen shown in FIG. 7 in the storage unit 20.
  • FIG. 8 is a diagram showing an example of a (distributed power supply related setting) screen for making settings related to the distributed power supply.
  • the control unit 10 may display a screen that prompts the user to input information regarding various distributed power sources that the user is considering introducing.
  • data based on the distributed power supply already introduced by each subsidiary or the like may be input on the screen of the distributed power supply related settings.
  • the control unit 10 displays a screen that prompts the user to input the minimum value and the maximum value as the information that defines the target range of the output of the solar power generation system (solar cell). You may.
  • the control unit 10 may display a screen that prompts the user to input the presence or absence of power generation performance data of the solar power generation system. For example, when there is data on the power generation performance of the solar power generation system, the control unit 10 may start reading the data file based on the input to the object for reading the data file.
  • the control unit 10 may display a screen that prompts the user to input the cost for introducing the solar power generation system and the cost for maintaining the solar power generation system.
  • control unit 10 displays a screen that prompts the user to input the minimum value and the maximum value, respectively, as information that defines the capacity of the power storage system (storage battery) and the target range of the output. You may.
  • control unit 10 may display a screen prompting the user to input the information.
  • control unit 10 may display an object of “detailed setting” in which the details of the capacity deterioration characteristic of the power storage system can be set and detect the user's input to the object.
  • control unit 10 may set the deterioration characteristic of the power storage system based on, for example, the deterioration data of the power storage system acquired in real time.
  • control unit 10 may display a screen that prompts the user to input the cost for introducing the power storage system and the cost for maintaining the power storage system.
  • control unit 10 displays a screen prompting the user to input the minimum value and the maximum value as information defining the target range of the output of the gas power generation system (fuel cell). Good. Further, when there is information on the partial load characteristics of the gas power generation system, the control unit 10 may display a screen prompting the user to input the information. Further, the control unit 10 may display an object of “detailed setting” in which details of the efficiency deterioration characteristic of the gas power generation system can be set and detect the user's input to the object.
  • the control unit 10 may set the deterioration characteristic of the gas power generation system based on, for example, the deterioration data of the gas power generation system acquired in real time. .. Further, the control unit 10 may display a screen that prompts the user to input the cost for introducing the gas power generation system and the cost for maintaining the gas power generation system.
  • the control unit 10 may display a screen prompting the user to input information on the power conditioner.
  • the power conditioner may be, for example, a power conditioner capable of inputting outputs of a plurality of DC power supplies.
  • the control unit 10 may display a screen that prompts the user to input the rated output of the power conditioner.
  • the control unit 10 may display a screen that prompts the user to input the cost for introducing the power conditioner and the cost for maintaining the power conditioner.
  • control unit 10 may store the information on the screen shown in FIG. 8 in the storage unit 20.
  • the information processing device 1 can present the user with a combination of energy facilities based on more accurate information.
  • the control unit 10 displays not only a screen for distributed power source related settings and a screen for building information, but also a screen for performing charge setting, energy conversion, and device setting. Then, the user may be prompted to input various settings.
  • FIG. 9 is a diagram showing an example of a detailed graph output by the information processing device 1 according to the embodiment.
  • FIG. 9 shows a screen displaying more detailed information about the combination of energy facilities presented to each subsidiary. The tabs at the top of FIG. 9 indicate that this screen displays information specifically related to the payback period.
  • the information processing device 1 may output a detailed graph such as the energy saving effect and BCP.
  • the graph shown in FIG. 9 may be a screen displayed on the output unit 40 in response to an input to the “detailed display” object displayed on the output unit 40, for example.
  • the detail display object may be displayed at an arbitrary position on the screen as shown in FIG. 5 or 6, for example.
  • the [Fixed value data] column in FIG. 9 shows a display for prompting the user to select a parameter to be set as a fixed value and a parameter to be set as a variable value in the graph shown below. That is, in the [Fixed value data] column of FIG. 9, the user can select and set a parameter that is fixed without being output to the graph.
  • “fuel cell output” is a fixed value. That is, in the graph shown in FIG. 9, since the "fuel cell output” is a fixed value, its change is not displayed.
  • “solar cell output” and “storage battery capacity” are not fixed values, they are grayed out and cannot be selected. This is because “solar cell output” and “storage battery capacity” are selected as axes showing changes in the graph shown in FIG.
  • the vertical axis represents the investment payback period.
  • the horizontal axis is selected so as to show the solar cell output. Therefore, since the solar cell output is treated as a variable, the solar cell output cannot be selected in the [Fixed value data] column in FIG. 9.
  • the display of the graph shown in FIG. 9 is also changed.
  • the graph shown in FIG. 9 is displayed three-dimensionally using three axes.
  • the axis in the depth direction is selected to show the storage battery capacity. Therefore, since the storage battery capacity is treated as a variable, the storage battery capacity cannot be selected in the [Fixed value data] column of FIG. 9.
  • the display of the graph shown in FIG. 9 is also changed.
  • the graph shown in Fig. 9 is displayed only for the results that satisfy the conditions as input in Fig. 3. Therefore, the user can easily obtain detailed information of the energy facility satisfying the conditions by looking at the graph shown in FIG. 9.
  • the control unit 10 may display a screen as shown in FIG. 10 in addition to the graph shown in FIG. FIG. 10 shows an example of a screen displaying detailed results of the graph shown in FIG.
  • the control unit 10 not only displays how much the economic effect is per year when the investment payback period is a predetermined period, but also before and after the introduction of the distributed power source. The difference in may be displayed in an easy-to-understand manner. As in the example illustrated in FIG. 10, the control unit 10 may list the electricity charge and the gas charge before and after the introduction of the energy facility (distributed power source) that satisfies the conditions. As a result, the user can easily understand the cost merit when introducing the energy facility (distributed power source) satisfying the conditions while comparing them.
  • control unit 10 may display a screen as shown in FIG. 10 on the output unit 40 in response to, for example, an input to the “detailed display” object.
  • the detail display object may be displayed at an arbitrary position on the screen as shown in FIG. 5 or 6, for example.
  • control unit 10 may display the graph shown in FIG. 9 and the screen shown in FIG. 10 on the output unit 40 in a manner in which they can be switched or transitioned to each other. Further, in one embodiment, the control unit 10 may collectively display the graph shown in FIG. 9 and the screen shown in FIG. 10 on the same screen.
  • control unit 10 provides an effect when an energy facility (distributed power source) that satisfies a condition is introduced, for example, according to an input to the “introduction effect graph” object shown in the lower right of FIG. 10.
  • a screen shown as a graph may be displayed on the output unit 40.
  • control unit 10 may display the time change of each parameter in the form of a graph when introducing an energy facility (distributed power source) satisfying the conditions.
  • the parameters shown in the graph are, for example, the load of the building, the power purchased, the output of solar power generation, the output of gas power generation, the power charged to the rechargeable battery, the power discharged from the rechargeable battery, and the gas consumption by the gas power generation system. , SOC (State of Charge) of rechargeable battery, etc.
  • the control unit 10 may appropriately display information such as the power usage status, the gas usage status, the amount of energy created/consumed by energy saving, and the amount of CO 2 emission.
  • control unit 10 may display various kinds of detailed information regarding the bar graph in response to, for example, an input to an object of any bar portion shown in the bar graph of FIG. 9.
  • FIG. 11 is a flowchart illustrating the operation of the information processing device 1 according to the first embodiment.
  • the user inputs on the input screen as shown in FIG. 3, and the information as shown in FIG. 4 is stored in, for example, the storage unit 20. It may start in a state.
  • the user makes an input on the input screen shown in FIG. 3, and the information shown in FIG. 4 is collected in the external server 100 or the like. It may be started in the state of being reset.
  • the control unit 10 acquires the overall energy saving target Wt (step S1).
  • the control unit 10 may acquire information on the overall energy-saving target, for example, as shown in the [Condition] column of FIG.
  • the control unit 10 may read the information of the overall energy saving target from the storage unit 20 if the information of the overall energy saving target is stored in the storage unit 20.
  • the control unit 10 may acquire the information via the communication unit 50 when the information of the overall energy saving target is stored in the storage unit of the information processing device of another subsidiary or parent company, for example.
  • the control unit 10 sets a combination of energy equipment (step S2).
  • the control unit 10 may read and set all or some of the patterns of combinations that can be considered as combinations of distributed power sources that are energy equipment, as the calculation range by the control unit 10.
  • the pattern of the combination of the distributed power sources as the energy equipment may be a combination in which the outputs of the distributed power sources such as the solar cell, the storage battery, and the fuel cell are different as shown in FIG. 5, for example. ..
  • the control unit 10 reads the information of the combination of the distributed power sources that are energy equipment from the storage unit 20 or from another information processing device such as the external server 100 via the communication unit 50. You can set it.
  • the information acquired by the control unit 10 may be information acquired by reading from the storage unit 20 or another information processing device such as the external server 100 via the communication unit 50 as appropriate.
  • step S2 the control unit 10 acquires priority items of each subsidiary (step S3).
  • step S3 the control unit 10 obtains, for example, the priority item information for each subsidiary as shown in FIG. 4 as the priority item selected in the [Priority item] column of FIG. Good.
  • control unit 10 When the priority items of each company are acquired in step S3, the control unit 10 respectively acquires a plurality of conditions of each subsidiary (step S4).
  • the control unit 10 may acquire information such as the investment payback period, the energy saving target, and the BCP, as described above, as the condition for each company.
  • the control unit 10 may obtain, for example, the information of the condition for each subsidiary as shown in FIG. 4 as the item input in the “condition” column of FIG. 3 by reading each item.
  • step S4 When each condition of each company is acquired in step S4, the control unit 10 calculates each condition for each energy facility combination (step S5). That is, in step S5, as shown in FIG. 5, the control unit 10 may calculate the energy saving effect, the investment payback period, and the BCP for each combination of energy equipment.
  • step S5 When each condition for each equipment combination is calculated in step S5, the control unit 10 determines whether or not there is an energy equipment combination that satisfies each condition by taking priority items into consideration (step S6).
  • step S6 the control unit 10 may display the result other than the priority item on the output unit 40 so as to prompt the user to change the condition (step S7). Further, in step S7, the control unit 10 detects an input from the input unit 30 by which the user changes the condition. When the conditions are changed for the results other than the priority items in step S7, the control unit 10 returns to step S6, and again determines whether or not there is a combination of energy facilities that satisfies each condition by adding the priority items again. ..
  • the processing from step S5 to step S7 may be performed for each subsidiary, for example.
  • step S6 when there is a combination of energy facilities that satisfy each condition in step S6, the control unit 10 calculates the sum Ws of the energy saving effects of each company for the combination (step S8). That is, in step S8, the control unit 10 calculates the sum Ws of the energy saving effects of each company for the combination of energy equipment that satisfies each condition by taking priority items into consideration.
  • step S8 the control unit 10 determines whether the sum Ws is equal to or more than the overall energy saving target Wt acquired in step S1 (step S9).
  • the control unit 10 may display the result other than the priority item on the output unit 40 so as to prompt the user to change the condition (step S10).
  • step S10 the control unit 10 detects an input from the input unit 30 by the user to change the condition.
  • the control unit 10 returns to step S8 and recalculates the sum Ws of the energy saving effects of each company for the combination.
  • the process of step S10 may also be performed for each subsidiary, for example.
  • step S11 when the sum Ws is greater than or equal to the overall energy saving target Wt in step S9, the control unit 10 displays the combination of energy facilities on the output unit 40 (step S11). That is, in step S11, the control unit 10 displays a combination of energy facilities that satisfy each condition by considering the overall energy-saving target and priority items for each company. Further, in step S11, when there are a plurality of combinations of energy facilities that satisfy each condition by taking into consideration the overall energy saving target and priority items for each company, the control unit 10 may display all the plurality of combinations. In step S11, the control unit 10 may display the output unit 40 as shown in FIG. 5, for example.
  • control unit 10 may return to step S3 or step S4 and continue the processing. That is, for example, when the investment payback period is changed from “within 5 years” to “within 3 years” in the column of “company B” in FIG. 4, the control unit 10 returns to step S3 or step S4. You may continue the process. As a result, a new combination of energy equipment is displayed.
  • control unit 10 may perform the calculation by taking into account the electric power purchased from the commercial power source (system), for example. Further, in the processing shown in FIG. 11, the control unit 10 may perform the calculation, for example, in consideration of the power consumed by the load of each subsidiary.
  • each company may include a parent company and a subsidiary, or may include only a subsidiary. Further, in the above description, the parent company may be treated as one subsidiary from the viewpoint of electric power.
  • the information processing device 1 outputs information regarding the profit of the business based on various information.
  • the information about the electric power supplied from the power generation device, the power storage device, and the commercial power source is referred to as first information.
  • information regarding electric power stored in the power storage device is referred to as second information.
  • information regarding the power consumed by the load is referred to as third information.
  • the information processing device 1 according to the first embodiment outputs information regarding the profit of the business based on the first information, the second information, and the third information. That is, the information processing device 1 may output information regarding the period for recovering the investment in electric power, based on the first information, the second information, and the third information.
  • the information processing device 1 displays at least one of the first information, the second information, and the third information based on information about a period (for example, an investment payback period) for recovering an investment in electric power. You may output.
  • the information processing device 1 according to the first embodiment is based on a change in at least one of the first information, the second information, the third information, and the information regarding the period for recovering the investment in power, and is accompanied by the change. Information indicating the result of the influence may be output.
  • the first information is the amount of power generated by the power generation device and the cost of the power amount, the amount of power discharged by the power storage device and the cost of the power amount, and the amount of power purchased by the commercial power source and the power. It may include at least one of the costs associated with the quantity.
  • the information processing apparatus 1 it is possible to simulate the configuration of the distributed power supply that satisfies various conditions from the viewpoints of the parent company and the subsidiary. Therefore, when a user newly introduces a distributed power source or changes the configuration of an existing distributed power source, the user can grasp the effect of doing so from various viewpoints. Therefore, according to the first embodiment, it is possible to provide the information processing device 1 that contributes to efficient use of electric power.
  • the second embodiment can be implemented by an information processing device configured similarly to the information processing device 1 according to the first embodiment. Therefore, description of the configuration of the information processing apparatus according to the second embodiment is omitted.
  • the information stored in the storage unit 20, the information received by the communication unit 50, and the information input from the input unit 30 are the same as those of the information processing apparatus 1 according to the first embodiment. Is different. Based on such a difference, the information output device according to the second embodiment also differs from the information processing device 1 according to the first embodiment in the information output from the output unit 40.
  • the information processing apparatus In recent years, many new power companies such as regional new power companies are starting up businesses, for example, in local governments. For example, when starting a power business in a local government or the like, it is not always easy to determine the success or failure of the business, and it may take time to research the feasibility. Therefore, in the information processing apparatus according to the second embodiment, the presence or absence and the scale of power generation equipment such as renewable energy and/or energy equipment such as a storage battery are input to the user, thereby changing the profit of the power business. Output in a manner that can be easily understood by the user. Therefore, the user of the information processing apparatus according to the second embodiment can easily study a business plan or introduce equipment or the like. Further, the information processing apparatus according to the second embodiment enables even a user who does not have specialized knowledge to handle it easily.
  • the control unit 10 causes the input unit 30 to input the following information, for example.
  • Information on energy equipment solar cells, storage batteries, wind power generation, etc.
  • Information on capacity of energy equipment rated output (kW) for power generation equipment, charge/discharge power (kW) for storage batteries, and Capacity (kWh, etc.)
  • Information on the position where the energy facility is installed (4) Demand power (kW) of all the consumers sold in the electric power business, amount of power demand (kWh), information on the position of the consumer, and consumer information (demand (Family type)
  • the storage unit 20 may store the following information, for example.
  • Power generation facility information in the case of solar cells, capacity, amount of solar radiation, amount of power generation for weather conditions, information on power generation pattern, etc.
  • Weather information weather information and solar radiation information at the position indicated by the position information
  • Customer power pattern average load pattern by customer type
  • Electric power price information information about the price of each power source (for example, JEPX (Japan Wholesale Electric Power Exchange), past information; for electric power companies, contract fee, pay-per-use fee, delivery charge, etc.))
  • FIG. 12 is a flowchart illustrating the operation of the information processing device according to the second embodiment.
  • the process illustrated in FIG. 12 may be started, for example, in a state in which the above-mentioned information is input by the user and stored in the storage unit 20 in an electric power company such as a local government.
  • the process illustrated in FIG. 12 may be started in a state in which various types of information as described above are collected in the external server 100 or the like, for example, in an electric power company such as a local government.
  • control unit 10 acquires various kinds of information (step S21).
  • the control unit 10 may obtain the above-described various information input from the input unit 30, for example.
  • the control unit 10 may acquire the various kinds of information stored in the storage unit 20, for example, as described above.
  • step S22 the control unit 10 calculates the power generation amount (step S22).
  • step S22 the control unit 10 calculates the generated power (power amount) by the input energy facility. That is, in step S22, the control unit 10 calculates the amount of power generation and the power generation pattern by the power generation device that constitutes the energy facility. In this case, the amount of power generation and the power generation pattern by the power generator are calculated based on the power generator specifications (generator type, kW, kWh, etc.) regarding the power generator, which is the information input from the input unit 30, and the installation position of the power generator. You can do it.
  • the amount of power generation and the power generation pattern by the power generation device may be calculated based on the weather conditions at the installation position read from the storage unit 20. Further, the control unit 10 may calculate the CO2 reduction amount as needed, based on the CO2 credit and the like.
  • step S23 the control unit 10 calculates the adjustment cost (step S23).
  • the control unit 10 may calculate, for example, an imbalance charge, a power cost reduction charge due to peak cut, and a reduction charge due to a difference in power prices due to time zones and the like.
  • the control unit 10 determines at least the procured power (power amount), the generated power sales amount, the imbalance cost, the peak cut reduction cost, the power value difference reduction cost, and the procured power (power amount). Either may be calculated.
  • the control unit 10 performs the above calculation based on the demand power (power amount) input from the input unit 30, the customer information, and the input storage battery spec information, if there is such information. You can go. Further, in this case, the control unit 10 may perform the above calculation based on the customer power pattern information corresponding to the customer information stored in the storage unit 20. Thus, when the consumer power pattern is known, the accuracy of the calculation result can be improved by performing the calculation based on this.
  • the procured power may be calculated from the difference between the demand power (power amount) and the generated power (power amount).
  • the generated power sales amount is generated only when the generated power exceeds the demand power, and may be calculated as the difference.
  • the imbalance cost may be calculated based on the imbalance power and the imbalance charge unit price.
  • the imbalanced electric power represents the electric power that can be reduced by adjusting the storage battery from the consumer electric power amount, the storage battery output, and the storage battery capacity.
  • the imbalance charge unit price may be acquired from the power price stored in the storage unit 20.
  • the peak cut reduction cost may be calculated based on the demand power, the power pattern, the power generation pattern, the power generation amount, and the storage battery specification.
  • the power value difference reduction cost may be calculated based on the charge reduction obtained by the power value difference due to the time zone or the like.
  • the power value difference caused by the above may be based on the specifications of the storage battery, the power price information stored in the storage unit 20, and the like.
  • the imbalance cost, the peak cut reduction cost, and the power value difference reduction cost described above are all effects obtained by using the storage battery. Therefore, there may be a trade-off in some cases, and the minimum cost may be calculated.
  • step S24 the control unit 10 calculates the power income (step S24).
  • step S24 the control unit 10 may calculate the sales income of the electric power to the consumer and the sales income of the electric power generated by the facility. That is, in step S24, the control unit 10 sells the amount of CO2 reduction obtained by the power sales income obtained from the power sold to the consumer, the income if the generated power can be sold, and the CO2 credit. If possible, the income may be calculated.
  • the control unit 10 may perform the above calculation based on the power generation amount, the power generation pattern, the procured power and the power amount, and the power amount that can be sold among the generated power. Further, in this case, the control unit 10 may perform the above calculation based on the power price information stored in the storage unit 20.
  • the control unit 10 calculates the power procurement cost, that is, the cost for power procurement (step S25).
  • the control unit 10 may calculate the cost required for procuring the electric power required to sell the electric power to the consumer.
  • the control unit 10 described above is based on the power price and the procured power (power amount) based on the power price information, and the imbalance cost minus the reduction charge due to the peak cut and the reduction charge due to the power value difference. Calculation may be performed.
  • step S26 the control unit 10 calculates profit (step S26).
  • the control unit 10 may calculate the profit of the business based on the power procurement cost, the power income, the equipment cost, and the like.
  • the control unit 10 may calculate the profit of the electric power business based on the income of selling the power, the income of selling the generated power, and the power source procurement cost.
  • the control unit 10 may calculate the profit of the electric power business based on the depreciated portion of the equipment cost input from the input unit 30.
  • step S26 the control unit 10 outputs the result of the calculated profit (step S27).
  • step S27 the control unit 10 may display the calculated profit result on the output unit 40.
  • the information processing apparatus allows the user to input the presence or absence and the scale of power generation equipment such as renewable energy and/or energy equipment such as a storage battery, so that the profit of the power business can be improved.
  • the change can be output in a manner that can be easily understood by the user. Therefore, the user can easily study the business plan or the introduction of the equipment. Further, for example, even a user who does not have specialized knowledge can easily handle the information processing apparatus according to the second embodiment. Therefore, according to the second embodiment as well, it is possible to provide an information processing device that contributes to efficient use of electric power.
  • the information processing apparatus stores map information and information on potential installation locations for energy equipment in the storage unit 20. Further, in the information processing apparatus according to the modified example of the second embodiment, the control unit 10 adds a step of performing calculation regarding installation of energy equipment in the flowchart shown in FIG.
  • the control unit 10 determines the energy equipment (including the electricity storage equipment) based on the information on the position of the customer, the power information on demand, and the map information input from the input unit 30.
  • the specifications may be calculated.
  • the control unit 10 performs the above-described calculation, for example, based on the capacity capable of installing the energy equipment in a place where the energy equipment can be installed within 5 km and the required specifications estimated from the power demand. Good. Therefore, in the modified example of the second embodiment, the user does not need to input the energy facility information from the input unit 30.
  • control unit 10 can thereafter calculate the business feasibility as in the flowchart shown in FIG. In this way, the information processing apparatus according to the modified example of the second embodiment outputs the information on the result of the proposal of the energy facility and the business feasibility.
  • the modification of the second embodiment for example, when calculating the installation of energy equipment based on map information, if there is a database of previously registered candidate locations for installation of energy equipment, etc. Good.
  • the calculation result regarding the business feasibility is output from the customer information, the facility information, and the like.
  • the necessary specifications of the energy facility may be calculated based on the customer information and the profit target by repeating the same calculation process a plurality of times.
  • the information processing apparatus can also output the change in the profit of the electric power business in a manner that the user can easily understand. Therefore, the user can easily study the business plan or the introduction of the equipment. Therefore, the modification of the second embodiment can also provide an information processing device that contributes to efficient use of electric power.
  • the information processing apparatus outputs information about the profit of the business based on the first information, the second information, and the third information.
  • the first information, the second information, and the third information can be the same as those in the above-described first embodiment.
  • the first information may be information about the electric power supplied from the power generation device, the power storage device, and the commercial power supply.
  • the second information may be information regarding electric power stored in the power storage device.
  • the third information may be information regarding the power consumed by the load.
  • the information processing apparatus outputs information about profits of an electric power business by a business operator at a plurality of bases based on information about electric power at a plurality of bases.
  • the information processing device is based on information on electric power of a plurality of businesses, and is information on profit of an electric power business by a business operator that controls the plurality of businesses. May be output.
  • the information processing apparatus may output information on the feasibility of the power business based on the information on the profit of the power business.
  • the first information may include information about the amount of electric power output from the power generation device, the power storage device, and the commercial power source, and the cost of the amount of electric power.
  • each member, each means, and each step can be rearranged so as not to logically contradict, and a plurality of means and/or steps may be combined into one or divided. It is possible.
  • first embodiment and the second embodiment described above are not limited to being independently implemented as different embodiments, and may be implemented by appropriately combining at least a part of each. Good.
  • the embodiment described above is not limited to the implementation as the information processing device 1.
  • the above-described embodiment may be implemented as an information processing method of an information processing device such as the information processing device 1.
  • the above-described embodiment may be implemented as a program of an information processing device such as the information processing device 1.
  • the information processing method of the information processing device includes the following steps.
  • the program of the information processing device causes a computer to execute the following steps.
  • Control Unit 20 Storage Unit 30 Input Unit 40 Output Unit 50 Communication Unit 100 External Server

Abstract

情報処理装置は、所定の拠点における発電装置及び/又は蓄電装置から供給される電力並びに商用電源から所定の拠点に供給される電力に関する第1情報と、蓄電装置に蓄電される電力に関する第2情報と、所定の拠点において消費される電力に関する第3情報と、電力に対応するコストに関する情報と、発電装置及び/又は蓄電装置にかかるコストに関する情報と、に基づいて、発電装置及び/又は蓄電装置に起因する省エネルギーの経済的利益を算出するとともに、発電装置及び/又は蓄電装置にかかるコストが経済的利益によって回収される期間を算出する制御部を備える。制御部は、所定の期間の入力に基づいて、所定の期間に経済的利益が回収するコストによって実現可能な発電装置及び/又は蓄電池の構成に関する情報を出力する。

Description

情報処理装置、情報処理方法、及びプログラム 関連出願の相互参照
 本出願は、2018年11月28日に日本国に特許出願された特願2018-222725の優先権を主張するものであり、この先の出願の開示全体を、ここに参照のために取り込む。
 本開示は、情報処理装置、情報処理方法、及びプログラムに関する。
 近年、太陽電池、燃料電池、及び蓄電池のような分散型電源が普及しつつある。これらの分散型電源を適切に導入することにより、電力を効率的に使用する試みがなされている。最近の省エネルギー(省エネ)に対する意識の高まりにも起因して、一般家庭のみならず、一定規模以上のエネルギーを使用する製造拠点及び事業所などにおいても、電力の効率的な使用が望まれている。電力の効率的な使用に関する技術として、例えば特許文献1は、複数の拠点におけるエネルギーのデータを集計して管理するシステムを開示している。
特開2011-192010号公報
 一実施形態に係る情報処理装置は、所定の拠点における発電装置及び/又は蓄電装置から供給される電力並びに商用電源から前記所定の拠点に供給される電力に関する第1情報と、前記蓄電装置に蓄電される電力に関する第2情報と、前記所定の拠点において消費される電力に関する第3情報と、前記電力に対応するコストに関する情報と、前記発電装置及び/又は前記蓄電装置にかかるコストに関する情報と、に基づいて、前記発電装置及び/又は前記蓄電装置に起因する省エネルギーの経済的利益を算出するとともに、前記発電装置及び/又は前記蓄電装置にかかるコストが前記経済的利益によって回収される期間を算出する制御部を備える。
 前記制御部は、所定の期間の入力に基づいて、当該所定の期間に前記経済的利益が回収するコストによって実現可能な前記発電装置及び/又は前記蓄電池の構成に関する情報を出力する。
 一実施形態に係る情報処理方法は、
 所定の拠点における発電装置及び/又は蓄電装置から供給される電力並びに商用電源から前記所定の拠点に供給される電力に関する第1情報と、前記蓄電装置に蓄電される電力に関する第2情報と、前記所定の拠点において消費される電力に関する第3情報と、前記電力に対応するコストに関する情報と、前記発電装置及び/又は前記蓄電装置にかかるコストに関する情報と、を取得するステップと、
 取得した前記第1情報、前記第2情報、前記第3情報、前記電力に対応するコストに関する情報、並びに、前記発電装置及び/又は前記蓄電装置にかかるコストに関する情報と、に基づいて、前記発電装置及び/又は前記蓄電装置に起因する省エネルギーの経済的利益を算出するとともに、前記発電装置及び/又は前記蓄電装置にかかるコストが前記経済的利益によって回収される期間を算出するステップと、
 所定の期間の入力に基づいて、当該所定の期間に前記経済的利益が回収するコストによって実現可能な前記発電装置及び/又は前記蓄電池の構成に関する情報を出力するステップと、
 を含む。
 一実施形態に係るプログラムは、
 コンピュータに、
 所定の拠点における発電装置及び/又は蓄電装置から供給される電力並びに商用電源から前記所定の拠点に供給される電力に関する第1情報と、前記蓄電装置に蓄電される電力に関する第2情報と、前記所定の拠点において消費される電力に関する第3情報と、前記電力に対応するコストに関する情報と、前記発電装置及び/又は前記蓄電装置にかかるコストに関する情報と、を取得するステップと、
 取得した前記第1情報、前記第2情報、前記第3情報、前記電力に対応するコストに関する情報、並びに、前記発電装置及び/又は前記蓄電装置にかかるコストに関する情報と、に基づいて、前記発電装置及び/又は前記蓄電装置に起因する省エネルギーの経済的利益を算出するとともに、前記発電装置及び/又は前記蓄電装置にかかるコストが前記経済的利益によって回収される期間を算出するステップと、
 所定の期間の入力に基づいて、当該所定の期間に前記経済的利益が回収するコストによって実現可能な前記発電装置及び/又は前記蓄電池の構成に関する情報を出力するステップと、
 を実行させる。
一実施形態に係る情報処理装置の概略構成を示す機能ブロック図である。 一実施形態に係る情報処理装置のユーザを説明する図である。 一実施形態に係る情報処理装置による入力画面の例を示す図である。 一実施形態に係る情報処理装置による入力情報の例を示す図である。 一実施形態に係る情報処理装置による出力画面の例を示す図である。 一実施形態に係る情報処理装置による出力画面の例を示す図である。 一実施形態に係る情報処理装置による入力画面の例を示す図である。 一実施形態に係る情報処理装置による入力画面の例を示す図である。 一実施形態に係る情報処理装置による出力画面の例を示す図である。 一実施形態に係る情報処理装置による出力画面の例を示す図である。 一実施形態に係る情報処理装置の処理を示すフローチャートである。 他の実施形態に係る情報処理装置の処理を示すフローチャートである。
(第1実施形態)
 分散型電源を新たに導入したり、既存の分散型電源の構成を変更したりする際に、そのようにした場合の効果を種々の観点からシミュレートすることができれば、極めて有益である。本開示の目的は、電力の効率的な使用に資する情報処理装置、情報処理方法、及びプログラムを提供することにある。一実施形態によれば、電力の効率的な使用に資する情報処理装置、情報処理方法、及びプログラムを提供することができる。以下、第1実施形態に係る情報処理装置について、図面を参照して説明する。
 一実施形態に係る情報処理装置は、ユーザによって入力された情報、情報処理装置に記憶された情報、及び情報処理装置の外部から取得された情報などに基づいて所定の処理を行い、当該処理の結果を出力する。一実施形態に係る情報処理装置は、例えば、専用に設計された端末としてよい。また、一実施形態に係る情報処理装置は、例えば、パソコン(PC)、ノートPC、タブレット端末、スマートフォン、ゲーム端末、又は携帯電話などにアプリケーションソフトウェアをインストールしたものとするなど、種々の構成を採用してよい。
 図1は、一実施形態に係る情報処理装置の概略構成を示す機能ブロック図である。図1に示すように、一実施形態に係る情報処理装置1は、制御部10と、記憶部20と、入力部30と、出力部40と、通信部50とを備えている。また、図1に示すように、一実施形態に係る情報処理装置1は、例えばネットワークNを介して、外部サーバ100のような外部機器に、有線又は無線によって接続されることができる。
 制御部10は、種々の機能を実行するための制御及び処理能力を提供するために、例えばCPU(Central Processing Unit)のような、少なくとも1つのプロセッサを含んでよい。制御部10は、まとめて1つのプロセッサで実現してもよいし、いくつかのプロセッサで実現してもよいし、それぞれ個別のプロセッサで実現してもよい。プロセッサは、単一の集積回路として実現されてよい。集積回路は、IC(Integrated Circuit)ともいう。プロセッサは、複数の通信可能に接続された集積回路及びディスクリート回路として実現されてよい。プロセッサは、他の種々の既知の技術に基づいて実現されてよい。一実施形態において、制御部10は、例えばCPU及び当該CPUで実行されるプログラムとして構成してよい。制御部10において実行されるプログラム、及び、制御部10において実行された処理の結果などは、記憶部20に記憶してよい。一実施形態に係る情報処理装置1の制御部10の動作については、さらに後述する。
 記憶部20は、制御部10及び通信部50などから取得した各種情報を記憶する。一実施形態において、記憶部20は、ユーザなどが入力部30から入力した情報も記憶してよい。また、記憶部20は、制御部10によって実行されるプログラム等を記憶する。その他、記憶部20は、例えば制御部10による演算結果などの各種データも記憶する。さらに、記憶部20は、制御部10が動作する際のワークメモリ等も含むものとしてもよい。記憶部20は、例えば半導体メモリ又は磁気ディスク等により構成することができるが、これらに限定されず、任意の記憶装置とすることができる。例えば、記憶部20は、本実施形態に係る情報処理装置1に挿入されたメモリカードのような記憶媒体としてもよい。また、記憶部20は、制御部10として用いられるCPUの内部メモリであってもよい。
 入力部30は、ユーザによる操作入力を検出する。入力部30は、専用のコントローラ、キーボード、及びマウスの少なくともいずれかとするなど、各種の入力装置とすることができる。入力部30は、出力部40を例えば液晶ディスプレイ(LCD)のような表示部とした場合に、当該表示部における表示に対応する入力を検出してもよい。一実施形態において、入力部30は、表示部に表示したアイコンのオブジェクトなどの箇所までカーソル又はポインタなどを移動させるユーザの操作を検出することができる。また、入力部30は、このようなオブジェクトなどの表示に対応する入力、すなわちオブジェクトなどを選択するユーザの入力を検出することができる。
 あるいは、入力部30は、ユーザが指などにより直接触れる操作を検出するタッチパネルとすることもできる。特に、このようなタッチパネルを透光性の素材で構成して、表示部の前面に重ねて配置すれば、表示部に表示したアイコンのオブジェクトなどにユーザが直接触れようとする操作などを検出することができる。したがって、このような構成のタッチパネルによる入力部30は、ユーザに直感的な操作性を提供することができる。以下、本実施形態においては、このように、透明なタッチパネルで構成される入力部30を、表示部の前面に配置した構成を想定して説明する。
 出力部40は、上述のように、例えばLCDなどのような表示部としてもよい。また、情報処理装置1がLCDなどのような表示部を備えない場合、出力部40は、外部出力用のインタフェースとしてもよい。
 出力部40を表示部とする場合、当該表示部は、情報処理装置1による情報処理の結果を示す情報を表示してよい。この場合、表示部は、例えばLCD又は有機ELディスプレイとする等、各種の表示装置により構成することができる。表示部は、文字、数字、記号などを表示するのみならず、各種のアイコンのオブジェクトなどを描画したものを表示することもできる。また、本実施形態において、表示部は、単色表示又はグレイスケールによって表示するものを用いることもできるが、一般のユーザが一見して容易に把握できるような態様で表示を行うために、カラー表示に対応したものを用いてもよい。
 出力部40を外部出力用のインタフェースとする場合、例えばLCD又は有機ELディスプレイとする等、各種の表示装置に情報処理装置1を接続するためのインタフェースとしてよい。当該インタフェースは、情報処理装置1が有線で外部の表示装置に接続される場合、表示装置に接続されたケーブルを情報処理装置1に接続するためのコネクタのレセプタクルとすることができる。一方、インタフェースは、情報処理装置1が表示装置に無線で接続される場合、表示装置に信号を送信するとともに表示装置からの信号を受信する送受信部を構成する無線部とすることができる。これらの場合において、表示装置も、情報処理装置1のインタフェースに対応するインタフェースを備えるものとする。
 通信部50は、無線通信をはじめとする各種の機能を実現することができる。通信部50は、例えばLTE(Long Term Evolution)等の種々の通信方式による通信を実現してよい。通信部50は、例えばITU-T(International Telecommunication Union Telecommunication Standardization Sector)において通信方式が標準化されたモデムを含んでよい。また、通信部50は、例えばWiFi又はBluetooth(登録商標)等の種々の方式による無線通信を実現してもよい。通信部50は、例えばアンテナを介して、例えば外部サーバ100の通信部と無線通信してもよい。通信部50が送受信する各種の情報は、例えば記憶部20に記憶してもよい。通信部50は、例えば電波を送受信するアンテナ及び適当なRF部などを含めて構成してよい。通信部50は、無線通信を行うための既知の技術により構成することができるため、より詳細なハードウェアの説明は省略する。また、通信部50は、例えば、外部サーバ100以外の他の情報処理装置の通信部と無線通信してもよい。
 ネットワークNは、有線、無線、又は有線と無線との任意の組み合わせにより構成される。ネットワークNは、情報処理装置1と、例えば外部サーバ100のような他の情報処理装置とを通信可能にするものであれば、インターネット又はイントラネットなど、任意のネットワークとしてよい。
 外部サーバ100は、ネットワークNを介して情報処理装置1と接続することができれば、任意の情報処理装置としてよい。例えば、外部サーバ100は、データベースサーバとしてもよいし、アプリケーションサーバなどとしてもよい。また、外部サーバ100は、例えばクラウドサーバなどとしてもよい。また、外部サーバ100は、情報処理装置1以外の他の情報処理装置と通信してもよい。本開示において、情報処理装置1と外部サーバ100との間は無線であるとしてよい。また例えば、本開示において、外部サーバ100とネットワークNの少なくとも一部区間は有線であるとしてもよい。本開示のネットワークNの構成としてこれら構成以外もとることができる。
 情報処理装置1、外部サーバ100と通信することで、情報処理装置1に関する各種情報を外部サーバ100に送信することができる。また、情報処理装置1は、外部サーバ100と通信することで、外部サーバ100から各種情報を受信することができる。これにより、例えば情報処理装置1は、記憶部20に記憶されていない情報又はユーザによって入力されていない情報を、外部サーバ100から得ることができる。
 次に、一実施形態に係る情報処理装置1が使用を想定するユーザについて説明する。
 一実施形態に係る情報処理装置1は、例えば太陽電池、燃料電池、及び蓄電池のような分散型電源の導入又は構成変更を検討している一般家庭のユーザが使用するものとしてよい。また、一実施形態に係る情報処理装置1は、一定規模以上のエネルギーを使用する製造拠点及び事業所などを拠点とする事業者のユーザが使用するものとしてもよい。以下、一実施形態に係る情報処理装置1のユーザは、一定規模以上のエネルギーを使用する製造拠点及び事業所などを拠点とする事業者(例えば子会社)、又は、当該事業者を統括管理する立場にある事業者(例えば親会社)を想定して説明する。
 図2は、一実施形態に係る情報処理装置1のユーザの例を説明する図である。
 図2に示すように、例えば、会社A、会社B、及び会社Cは、それぞれ、会社Xに対し、子会社と親会社との関係にあるとする。すなわち、親会社である会社Xは、子会社である会社A、会社B、及び会社Cを有するものとする。この場合、子会社である会社A、会社B、及び会社Cは、それぞれ同じ親会社Xを有するとしても、それぞれ異なる事業体である場合も想定される。
 例えば、図2に示すように、会社Aは工場を有し、会社Bは物販の店舗を有し、会社Cは飲食の店舗を有するような場合も想定される。このような場合、会社A、会社B、及び会社Cにおいて、それぞれ必要な電力及び収支の要件が異なることも想定される。
 以下、親会社である会社Xが、子会社である会社A、会社B、及び会社Cを統括する事業者である場合を想定して説明する。統括事業者である親会社Xは、グループ会社全体における省エネの目標を達成するために、各子会社にエネルギー設備を導入することがある。このような場合、各会社において、所望される条件は種々異なり得る。ここで、所望される条件とは、例えば、以下のようなものが挙げられる。
(1)災害又は停電などの緊急事態が発生したときに事業を継続できる時間(以下、「事業継続計画」(Business continuity planning:BCP)とも記す)
(2)省エネ目標を達成するための投資が当該省エネの利益によって回収されるための期間(以下、「投資回収期間」とも記す)
 各子会社が省エネに向けた施策を導入したとしても、各子会社においては所望されるBCP及び/又は投資回収期間などは異なり得る。特に、図2に示すように、子会社が工場、物販店舗、及び飲食店舗のように、それぞれ異なる業態の事業所である場合、所望されるBCP及び/又は投資回収期間などは著しく異なり得る。このため、統括事業者である親会社Xが、グループ会社全体における省エネの目標を決定したとしても、全体での省エネの目標は達成できないことも想定される。例えば、各子会社がそれぞれ所望する投資回収期間を優先させると、グループ会社全体における省エネの目標を達成できないことが懸念される。また、グループ会社全体における省エネ目標の達成を優先させると、各子会社がそれぞれ所望するBCP及び/又は投資回収期間が満たされないことも懸念される。
 このような事情に鑑みて、第1実施形態に係る情報処理装置1は、親会社及び子会社のそれぞれの観点から種々の条件が満たされるような分散型電源の構成をシミュレートできるようにする。このようなシミュレーションにより、分散型電源を新たに導入したり、既存の分散型電源の構成を変更したりする際に、そのようにした場合の効果を種々の観点から把握することができる。
 平成30年(2018年)、「エネルギーの使用の合理化等に関する法律」(いわゆる「省エネ法」)の改正法案、「エネルギーの使用の合理化等に関する法律の一部を改正する法律(平成30年法律第45号)」が公布された。この法律は、企業連携による省エネの評価について規定している。この法律は、複数事業者が連携する省エネ取組を認定し、省エネ量を事業者間で分配して報告することを認めることで、取り組んだ各事業者が適切に評価される制度の創設を趣旨としている。改正前の省エネ法では、事業者のエネルギー消費効率を、事業者単位で評価している。改正法においては、新たに「連携省エネルギー計画」の認定制度を設け、認定を受けた複数の事業者が、事業者間の連携により削減した省エネ量を、それぞれの事業者に分配して報告できることとしている。このように、より適正な省エネの評価を得られることで、事業者が積極的に連携し、省エネに取り組むことが期待される。
 このような状況においても、一実施形態に係る情報処理装置1によって、親会社及び子会社のそれぞれの観点から種々の条件が満たされるような分散型電源の構成をシミュレートできれば、極めて有益である。
 以下、一実施形態に係る情報処理装置1の動作の例について説明する。一実施形態に係る情報処理装置1は、各子会社における各種の条件の入力に基づいて、それぞれの優先項目も考慮した上で、各子会社における条件を満たすようなエネルギー設備の組合せを出力する。ここで、入力される条件は、例えば、全体省エネ目標、個別省エネ目標(一次エネルギー削減効果)、投資回収期間、CO2削減効果、BCP効果などの複数の条件としてよい。
 全体省エネ目標とは、図2に示したような親会社及び子会社を含む全体的な省エネの目標を示すものとしてよい。また、全体省エネ目標とは、図2に示したような親会社を含まずに、全ての子会社を含む全体的な省エネの目標を示すものとしてよい。全体省エネ目標とは、エネルギー設備を全体的に導入したことによって生じ得る省エネの効果を示すものとしてもよい。個別省エネ目標(一次エネルギー削減効果)とは、図2に示したような子会社のいずれかにおける省エネの目標を示すものとしてよい。個別省エネ目標(一次エネルギー削減効果)とは、エネルギー設備を子会社に導入したことによって生じ得る省エネの効果を示すものとしてもよい。CO2削減効果とは、導入するエネルギー設備によって削減が期待されるCO2の量を示すものとしてよい。BCP効果とは、上述したBCPによって事業の継続が期待される時間を示すものとしてよい。
 また、情報処理装置1は、上述の条件のいずれかを優先項目として指定できるようにしてよい。情報処理装置1は、以上のような入力に基づいて、条件を満たすエネルギー設備の組合せを、優先項目も考慮して算出する。情報処理装置1は、算出された結果を出力して、ユーザなどに提示することができる。情報処理装置1による算出の結果を呈示されたユーザは、各子会社ごとの条件を満たしつつ、全体省エネ目標も達成することができるエネルギー設備を把握することができる。
 また、情報処理装置1は、条件を満たすエネルギー設備の組合せの算出を、各子会社ごとに実施することができる。一部の条件が変更された場合、情報処理装置1は、変更された条件に応じて、全体省エネ目標を達成するエネルギー設備の組合せを提示することができる。すなわち、情報処理装置1は、一部の条件が変更された場合、変更された条件が他に及ぼす影響も含めて、全体省エネ目標を達成するエネルギー設備の組合せを提示することができる。
 次に、一実施形態に係る情報処理装置1の入力画面及び出力画面の例について説明する。
 一実施形態に係る情報処理装置1において、制御部10は、出力部40に入力画面を表示する。そして、制御部10は、出力部40に入力画面を表示した状態で、入力部30によってユーザによる入力を検出する。制御部10は、入力部30によって入力を検出すると、所定の演算を行い、その結果を出力部40に出力する。以下、このような動作の具体例について、図面を参照して説明する。
 一実施形態に係る情報処理装置1は、ユーザに入力を促す際に、例えば、図3に示すような表示画面を表示させてよい。この場合、制御部10は、図3に示すような表示画面を表示するように、出力部40を制御する。また、一実施形態に係る情報処理装置1は、このような表示画面を表示するための各種データを、予め記憶部20に記憶しておいてもよい。一方、一実施形態に係る情報処理装置1は、このような表示画面を表示するための各種データを、外部サーバ100からネットワークNを介して通信部50によって受信するようにしてもよい。
 図3は、各子会社における条件の入力画面の一例を示す図である。
 図3の[条件]の欄に示すように、一実施形態に係る情報処理装置1は、例えば子会社Aについて、個別の省エネ目標としての省エネ効果、投資回収期間、及びBCPなどの複数の条件の入力をユーザに促すことができる。この画面が表示された状態で、ユーザは、入力部30から各種の条件を入力することができる。
 また、図3の[条件]の欄に示すように、一実施形態に係る情報処理装置1は、複数の条件のうち、いずれを優先項目とするかの選択をユーザに促すことができる。図3は、複数の条件のうち「投資回収期間」が優先項目として選択されている状態を示している。すなわち、ここでは、ユーザは、複数の条件のうち、投資回収期間が、省エネ効果、及びBCPなどの条件よりも優先することを選択したことになる。
 さらに、図3の[分散型電源を固定化させる場合]の欄に示すように、情報処理装置1は、分散型電源の出力などの数値の範囲をしているか、数値を固定するかの選択を、ユーザに促すことができる。以下、分散型電源は、太陽電池と、蓄電池と、燃料電池との3系統の場合について説明する。しかしながら、分散型電源は、これら3系統に限定されるものではなく、いずれかを省略したり、他の発電システムなどを追加したりしてもよい。図3は、太陽電池、蓄電池、及び燃料電池のいずれも、固定値ではなく、値の範囲が指定されるように設定した状態を示している。
 図3に示した例では、あるユーザが子会社Aについて各種の条件を入力する場合について説明した。ここで、例えば同じユーザが子会社B及び/又は子会社Cについても各種の条件を入力してもよい。一方、子会社Bについては他のユーザが各種の条件を入力し、子会社Cについてはさらに他のユーザが各種の条件を入力してもよい。
 図3において、これらのパラメータがユーザによって入力された後、右下の「計算」のボタンが表示されたオブジェクトがユーザによってタップ(又はクリックなど)されたとする。この場合、情報処理装置1は、所定の演算を開始して、その結果を出力部40に表示する。
 例えば、図3の右下に示す「計算」のボタンに対する入力が検出されると、制御部10は、図5又は図6に示すような出力画面を出力部40に出力してもよい。図5及び図6は、図3において入力された諸条件を満たすエネルギー設備の構成の一例として、分散型電源のスペックを示している。すなわち、ユーザは、図3に示す入力画面において諸条件を入力すると、図5又は図6に示すように、諸条件を満たす分散型電源の構成が提示される。これにより、ユーザは、例えば子会社Aにおいてどのような構成の分散型電源を導入すれば、グループ会社全体として、また子会社Aとしても、諸条件が満たされるのか容易に把握することができる。
 図4は、情報処理装置1において収集される情報の一例を示す図である。図4に示すように、情報処理装置1において、例えば親会社の条件として、全体省エネ目標が入力されてよい。この入力は、親会社の職員であるユーザが行ってもよいし、いずれかの子会社の職員であるユーザが行ってもよい。また、図4に示すように、情報処理装置1において、例えば子会社の条件として、図3に示したような複数の条件が入力されてよい。図4においては、子会社である会社A及び会社Bの複数の条件が入力された様子を示している。また、図4に示すように、会社Aは、複数の条件のうち、優先項目としてBCPを掲げており、会社Bは、複数の条件のうち、優先項目として投資回収期間を掲げている。このように、一実施形態に係る情報処理装置1は、子会社ごとに優先したい条件が異なる場合でも、それぞれの優先項目を考慮して各条件を満たすエネルギー設備を提示することができる。情報処理装置1において、図4に示すような各会社ごとの条件がグループ会社全体で全て揃うことにより、各子会社に対して諸条件を満たすエネルギー設備を提示することができる。
 ここで、上述した複数の条件と、エネルギー設備との関係について説明する。一般的に、エネルギー設備の規模が大きくなると、まず、省エネの効果も大きくなる傾向にある。ここで、エネルギー設備の規模とは、例えば分散型電源のうち、太陽電池の発電電力(電力量)、燃料電池の発電電力(電力量)、蓄電池の容量、及び蓄電池の出力(電力量)などとしてよい。また、エネルギー設備の規模が大きくなると、BCPも大きくなる傾向にある。さらに、エネルギー設備の規模が大きくなると、コストも大きくなる傾向にあることから、投資回収期間も長くなる傾向にある。
 太陽電池及び燃料電池の設備の規模が大きくなると、省エネの効果も大きくなる。一方で、この場合、発電の余剰(建物の電力負荷に対する供給が過剰になる度合い)が大きくなり得る。このため、経済性の効果が一定に収束し得るため、投資回収期間も長くなる傾向にある。蓄電池の容量及び出力が大きくなると、BCPも大きくなるが、投資回収期間も長くなる傾向にある。一実施形態に係る情報処理装置1において、制御部10は、上述のような各種のデータに基づいて、複数の条件を満たすエネルギー設備を決定してよい。
 図5は、情報処理装置1によって提示されたエネルギー設備の組合せの例を示す図である。情報処理装置1は、上述した条件の入力に基づいて、当該条件を満たすエネルギー設備の組合せを記憶部20から読み出して、出力部40に出力画面として出力してよい。
 図5に示すように、情報処理装置1は、全体省エネ目標を満たしつつ、さらに各子会社の条件も満たすようなエネルギー設備の組合せを決定して、出力部40に出力する。図5の[条件]の欄において、入力された全体省エネ目標が示されている。また、図5に示すように、子会社である会社A及び会社Bについて、それぞれの条件を満たすエネルギー設備の組合せが示されている。
 図5の[会社A]の欄は、条件を満たすエネルギー設備の組合せの例を3通り示している。図5の[会社A]の欄に示すように、太陽電池200kW、蓄電池200kWh、燃料電池100kWの組合せは、会社Aの条件を満たす。また、図5の[会社A]の欄に示すように、太陽電池300kW、蓄電池200kWh、燃料電池150kWの組合せも、会社Aの条件を満たす。さらに、図5の[会社A]の欄に示すように、太陽電池400kW、蓄電池200kWh、燃料電池200kWの組合せも、会社Aの条件を満たす。ただし、図5に示すように、これらの条件を満たす各組合せにおいて、それぞれ省エネ効果及び投資回収期間は異なる。一方、図4の[会社A]の欄に示したように、子会社AにおいてはBCPを優先項目として設定した。このため、図5の[会社A]の欄に示すように、会社AのBCPは全て72時間に固定されている。子会社AにおいてBCPが優先項目として設定されていることを示すために、例えば図5の[会社A]の欄において、BCPの欄及び/又は数値を、他と異なる色を付して表示するなど、他と区別される表示態様としてもよい。
 図5の[会社B]の欄も、条件を満たすエネルギー設備の組合せの例を3通り示している。図5の[会社B]の欄に示すように、太陽電池100kW、蓄電池20kWh、燃料電池30kWの組合せは、会社Bの条件を満たす。また、図5の[会社B]の欄に示すように、太陽電池50kW、蓄電池15kWh、燃料電池20kWの組合せも、会社Bの条件を満たす。さらに、図5の[会社B]の欄に示すように、太陽電池30kW、蓄電池10kWh、燃料電池20kWの組合せも、会社Bの条件を満たす。ただし、図5に示すように、これらの条件を満たす各組合せにおいて、それぞれ省エネ効果及びBCPは異なる。一方、図4の[会社B]の欄に示したように、子会社Bにおいては投資回収期間を優先項目として設定した。このため、図5の[会社B]の欄に示すように、会社Bの投資回収期間は全て5年に固定されている。子会社Bにおいて投資回収期間が優先項目として設定されていることを示すために、例えば図5の[会社B]の欄において、投資回収期間の欄及び/又は数値を、他と異なる色を付して表示するなど、他と区別される表示態様としてもよい。
 図5に示すように、情報処理装置1は、全体省エネ達成目標及び会社ごとの条件(さらに優先項目)を満たすエネルギー設備の組合せを複数提示してよい。図5に示すような情報を出力するために、制御部10は、例えば、予め設定された範囲内において、エネルギー設備の組合せを種々変化させて各数値を算出してよい。制御部10は、エネルギー設備の各組合せごとに、蓄電池の充放電パターン、燃料電池の発電パターン、太陽電池の発電パターン、系統からの買電電力パターンなどを算出してよい。このようなパターンに基づいて、制御部10は、エネルギー設備の各組合せごとに、省エネ効果、投資回収期間、及びBCPなどを算出してよい。
 次に、入力された条件が後から変更される場合について説明する。
 上述のように、図5の[会社B]の欄において、会社Bの投資回収期間は年に設定されている。これは、例えば、図4の[会社B]の欄において、投資回収期間は「5年以内」と入力されたことに起因している。この状態において、例えばユーザが、会社Bの条件を変更するために、図3に示すような条件の入力画面を呼び出して、投資回収期間の入力を、「5年以内」から「3年以内」に変更したとする。このように、ユーザによって入力された値が変更されると、制御部10は、変更された値に基づいて算出をやり直し、新たにエネルギー設備の組合せを算出して出力する。
 図6は、情報処理装置1によって提示されたエネルギー設備の組合せの新たな例を示す図である。情報処理装置1は、上述した条件の変更に基づいて、当該変更された条件を満たすエネルギー設備の組合せを記憶部20から読み出して、出力部40に出力画面として出力してよい。
 図6の[会社B]の欄は、変更された条件を満たすエネルギー設備の組合せの例を3通り示している。図5との比較から分かるように、図6の[会社B]の欄において、投資回収期間は、5年から3年に変更されている。図4の[会社B]の欄に示したように、子会社Bにおいては投資回収期間を優先項目として設定した。このため、図6の[会社B]の欄に示すように、会社Bの投資回収期間は全て3年に固定されている。子会社Bにおいて投資回収期間が変更されたことを示すために、例えば図6の[会社B]の欄において、投資回収期間の欄及び/又は数値を、図5の[会社B]の欄に示した投資回収期間の欄及び/又は数値と区別される表示態様としてもよい。
 また、図6の[会社B]の欄に示すように、会社Bにおいて投資回収期間の条件を変更すると、当該投資回収期間を達成するために、他の条件が影響を受けることがある。例えば、図5との比較から分かるように、図6の[会社B]の欄において、投資回収期間が変更されたことに伴い、蓄電池及び燃料電池の組合せも変更されている。また、図5との比較から分かるように、図6の[会社B]の欄において、投資回収期間が変更されたことに伴い、省エネ効果及びBCPも変更されている。
 さらに、図6の[会社B]の欄に示すように、会社Bにおいていずれかの条件が変更されると、全体省エネ目標を達成するために、他の会社の条件が影響を受けることもある。例えば、[会社B]の条件が変更されたことに伴い、図5との比較から分かるように、図6の[会社A]の欄において、太陽電池及び燃料電池の組合せも変更されている。また、[会社B]の条件が変更されたことに伴い、図5との比較から分かるように、図6の[会社A]の欄において、省エネ効果及び投資回収期間も変更されている。一方、図6の[会社A]の欄において、BCPは変更されていない。これは、例えば、図4の[会社A]の欄において、優先項目がBCPに設定されていることに起因している。
 このように、制御部10は、例えば子会社Bの条件が変更された場合であっても、得られる省エネ効果も小さくなるなどの影響が及ぶ場合、全体省エネ目標を満たすために、子会社Aにおけるエネルギー設備の組合せも再度算出する。そして、制御部10は、再度算出されたエネルギー設備の組合せの情報を更新して、出力部40から出力してよい。一実施形態に係る情報処理装置1によれば、一部の条件が変更されることに伴い、変更後の条件を満たすエネルギー設備の構成をユーザに提示することができる。
 図5及び図6に示した画面表示は、例えば、図3の右下に示す「計算」のボタンに対する入力に基づいて表示してもよい。
 次に、情報処理装置1において行う、より詳細な設定について説明する。
 情報処理装置1は、出力部40に出力された図3に示す入力画面において、左下の「詳細設定」オブジェクトに対する入力が検出されると、詳細な設定に関する情報を入力できる画面を表示してもよい。
 図7及び図8は、図3に示す「詳細設定」に対する入力に基づいて表示される詳細設定の画面の例を示す図である。図7及び図8に示すように、画面上端のタブを選択する入力に応じて、制御部10は、図7又は図8のいずれかの画面を出力部40に出力してよい。
 図7は、建物の情報を詳細に設定するための(建物情報設定)画面の例を示す図である。図7に示すように、制御部10は、建物の電力負荷の実績データの有無の入力をユーザに促すような画面を表示してよい。例えば、建物の電力負荷の実績データがある場合、制御部10は、そのようなデータの入力をユーザに促してもよい。また、制御部10は、そのようなデータを、通信部50からネットワークNを介して、外部サーバ100と通信することにより取得してもよい。
 一方、建物の電力負荷の実績データがない場合、制御部10は、図7に示すような各種の情報の入力をユーザに促すような画面を表示してよい。例えば、図7に示す例において、ユーザは、需要家の種別、建物の所在する地域、延床面積、建物電力負荷の計算に使用する係数、電気料金の実績データの有無などを、入力又は選択することができる。
 ここで、建物の電力負荷の実績データがない場合、制御部10は、予め用意された代表値のデータを用いて、補正値のデータを算出してもよい。例えば、代表値のデータを30分単位で用意されたデータとして、この代表値のデータに延床面積を掛けた値を、補正値のデータとしてもよい。ここで、延床面積比とは、延床面積として入力された値と、代表値データとして用意された延床面積の比率としてよい。また、代表値のデータの具体例としては、例えば「事務所」フォルダを用意して、この「事務所」のフォルダの中に、全国の各事務所別に代表的な負荷のパターンのデータを収集して保存してもよい。また、例えば「店舗」フォルダを用意して、この「店舗」フォルダの中に、全国の各店舗別に代表的な負荷のパターンのデータを収集して保存してもよい。
 さらに、図7に示すように、制御部10は、災害時の建物電力の負荷についてのデータの有無の入力をユーザに促すような画面を表示してよい。例えば、災害時の建物電力の負荷についてのデータがある場合、制御部10は、そのデータのファイルを読み込むためオブジェクトに対する入力に基づいて、データのファイルの読み込みを開始してよい。一方、災害時の建物電力の負荷についてのデータがない場合、制御部10は、停電時の利用負荷率の入力をユーザに促してもよい。
 また、図7に示すように、制御部10は、天気情報のデータがある場合、そのデータのファイルを読み込むためオブジェクトに対する入力に基づいて、データのファイルの読み込みを開始してよい。
 以上、電力負荷の観点から建物の情報を詳細に設定するための画面の例について説明した。一実施形態において、電力負荷の観点に代えて、又は電力負荷の観点とともに、制御部10は、熱負荷の観点から建物の情報を詳細に設定するための画面を表示して、ユーザに入力を促してもよい。
 図7の右下の「一時保存」のオブジェクトに対する入力が検出されると、制御部10は、図7に示す画面上の情報を記憶部20に記憶してよい。
 図8は、分散型電源に関連する設定をするための(分散型電源関連設定)画面の例を示す図である。図8に示すように、制御部10は、ユーザが導入を検討している各種の分散型電源に関する情報の入力をユーザに促すような画面を表示してよい。また、分散型電源関連設定の画面において、各子会社などで既に導入された分散型電源に基づくデータが入力されてもよい。
 例えば、図8に示すように、制御部10は、太陽光発電システム(太陽電池)の出力の対象範囲を規定する情報として、最小値及び最大値の入力をユーザに促すような画面を表示してよい。また、制御部10は、太陽光発電システムの発電実績データの有無の入力をユーザに促すような画面を表示してよい。例えば、太陽光発電システムの発電実績についてのデータがある場合、制御部10は、そのデータのファイルを読み込むためオブジェクトに対する入力に基づいて、データのファイルの読み込みを開始してよい。また、制御部10は、太陽光発電システムを導入するためのコスト、及び、太陽光発電システムをメンテナンスするためのコストの入力をユーザに促すような画面を表示してよい。
 また、図8に示すように、制御部10は、蓄電システム(蓄電池)の容量及び出力の対象範囲を規定する情報として、それぞれ最小値及び最大値の入力をユーザに促すような画面を表示してよい。また、制御部10は、蓄電システムの非常用残量の情報がある場合、その情報の入力をユーザに促すような画面を表示してよい。また、制御部10は、蓄電システムの容量劣化特性の詳細を設定することができる「詳細設定」のオブジェクトを表示して、当該オブジェクトに対するユーザの入力を検出してもよい。制御部10は、「詳細設定」のオブジェクトに対するユーザの入力が検出されると、例えばリアルタイムで取得される蓄電システムの劣化のデータに基づいて、蓄電システムの劣化特性を設定してもよい。また、制御部10は、蓄電システムを導入するためのコスト、及び、蓄電システムをメンテナンスするためのコストの入力をユーザに促すような画面を表示してよい。
 さらに、図8に示すように、制御部10は、ガス発電システム(燃料電池)の出力の対象範囲を規定する情報として、最小値及び最大値の入力をユーザに促すような画面を表示してよい。また、制御部10は、ガス発電システムの部分負荷特性の情報がある場合、その情報の入力をユーザに促すような画面を表示してよい。また、制御部10は、ガス発電システムの効率劣化特性の詳細を設定することができる「詳細設定」のオブジェクトを表示して、当該オブジェクトに対するユーザの入力を検出してもよい。制御部10は、「詳細設定」のオブジェクトに対するユーザの入力が検出されると、例えばリアルタイムで取得されるガス発電システムの劣化のデータに基づいて、ガス発電システムの劣化特性を設定してもよい。また、制御部10は、ガス発電システムを導入するためのコスト、及び、ガス発電システムをメンテナンスするためのコストの入力をユーザに促すような画面を表示してよい。
 また、図8に示すように、制御部10は、パワーコンディショナの情報の入力をユーザに促すような画面を表示してよい。ここで、パワーコンディショナは、例えば複数の直流電源の出力を入力することができるパワーコンディショナとしてもよい。例えば、制御部10は、パワーコンディショナの定格出力の入力をユーザに促すような画面を表示してよい。また、制御部10は、パワーコンディショナを導入するためのコスト、及び、パワーコンディショナをメンテナンスするためのコストの入力をユーザに促すような画面を表示してよい。
 図8の右下の「一時保存」のオブジェクトに対する入力が検出されると、制御部10は、図8に示す画面上の情報を記憶部20に記憶してよい。
 図7及び/又は図8に示すような詳細な情報が入力されることで、情報処理装置1は、より正確な情報に基づいて、エネルギー設備の組合せをユーザに提示することができる。また、図7及び図8に示すように、制御部10は、分散型電源関連設定の画面及び建物情報の画面のみならず、料金設定、エネルギー換算、及びデバイスなどに関する設定を行う画面を表示して、ユーザに各種の設定の入力を促してもよい。
 次に、一実施形態に係る情報処理装置1が出力する詳細グラフについて説明する。
 図9は、一実施形態に係る情報処理装置1が出力する詳細グラフの例を示す図である。図9は、各子会社に提示されるエネルギー設備の組合せについて、より詳細な情報を表示する画面を示している。図9の上端のタブは、この画面が特に投資回収期間に関連する情報を表示していることを示している。その他、情報処理装置1は、省エネ効果、及びBCPなどの詳細グラフを出力してもよい。図9に示すグラフは、例えば出力部40に表示された「詳細表示」オブジェクトに対する入力に応じて、出力部40に表示される画面としてよい。この詳細表示オブジェクトは、例えば図5又は図6のような画面における任意の箇所に表示されるようにしてもよい。
 図9の[固定値データ]の欄は、その下に示すグラフにおいて、固定値として設定するパラメータ、及び変動値として設定するパラメータの選択をユーザに促すための表示を示している。すなわち、図9の[固定値データ]の欄において、ユーザは、グラフに出力せずに固定されるパラメータを選択して設定することができる。図9に示す[固定値データ]の欄の例において、「燃料電池出力」を固定値としてある。すなわち、図9に示すグラフにおいて、「燃料電池出力」は固定値のため、その変化は表示されない。一方、図9に示す例において、「太陽電池出力」及び「蓄電池容量」は固定値ではないため、グレーアウトされて選択できないことが示してある。これは、図9に示すグラフにおいて、変化を示す軸として、「太陽電池出力」及び「蓄電池容量」が選択されていることに起因する。
 図9に示すグラフにおいて、縦軸は、投資回収期間を示している。また、図9に示すグラフにおいて、横軸は、太陽電池出力を示すように選択されている。このため、太陽電池出力は変数として扱われることにより、図9の[固定値データ]の欄において太陽電池出力は選択不能になっている。ここで、例えば図9のグラフにおいて横軸によって示される項目がユーザの入力によって変更されると、図9に示すグラフの表示も変更される。
 図9に示すグラフは、3軸を用いて3次元的に表示されている。図9に示すグラフにおいて、奥行き方向の軸は、蓄電池容量を示すように選択されている。このため、蓄電池容量は変数として扱われることにより、図9の[固定値データ]の欄において蓄電池容量は選択不能になっている。ここで、例えば図9のグラフにおいて奥行き方向の軸によって示される項目がユーザの入力によって変更されると、図9に示すグラフの表示も変更される。
 図9に示すグラフは、図3において入力されたような条件を満たす結果についてのみ表示される。したがって、ユーザは、図9に示すグラフを見ることによって、条件を満たすエネルギー設備の詳細な情報を容易に得ることができる。
 制御部10は、図9に示すグラフの他に、さらに図10に示すような画面も表示してよい。図10は、図9に示したグラフの詳細な結果を表示する画面の例を示している。
 図10に示すように、制御部10は、例えば投資回収期間を所定の期間とした場合に、その経済性効果が年あたりどの程度になるか表示するのみならず、分散型電源の導入の前後における差異を分かりやすく表示してよい。図10に示す例のように、制御部10は、条件を満たすエネルギー設備(分散型電源)を導入する前後における電気料金及びガス料金を列記してよい。これにより、ユーザは、条件を満たすエネルギー設備(分散型電源)を導入した場合のコストのメリットを容易に比較しつつ把握することができる。
 一実施形態において、制御部10は、図10に示すような画面を、例えば「詳細表示」オブジェクトに対する入力に応じて、出力部40に表示してもよい。この詳細表示オブジェクトは、例えば図5又は図6のような画面における任意の箇所に表示されるようにしてもよい。また、一実施形態において、制御部10は、図9に示したグラフと、図10に示した画面とを、互いに切替可能又は遷移可能な態様で出力部40に表示してもよい。また、一実施形態において、制御部10は、図9に示したグラフと、図10に示した画面とを、同一の画面上にまとめて表示してもよい。
 また、一実施形態において、制御部10は、例えば図10の右下に示した「導入効果グラフ」オブジェクトに対する入力に応じて、条件を満たすエネルギー設備(分散型電源)を導入した場合の効果をグラフにして示す画面を出力部40に表示してもよい。
 例えば、制御部10は、条件を満たすエネルギー設備(分散型電源)を導入した場合に、各パラメータの時間変化をグラフにして示してもよい。また、グラフに示すパラメータは、例えば建物の負荷、買電の電力、太陽光発電の出力、ガス発電の出力、充電池に充電する電力、充電池が放電する電力、ガス発電システムによるガスの消費、充電池のSOC(State of Charge)などとしてよい。さらに、制御部10は、電力の使用状況、ガスの使用状況、省エネによるエネルギーの創出量・消費量、及びCO2の排出量などの情報も、適宜、表示してよい。
 一実施形態において、制御部10は、例えば図9の棒グラフに示したいずれかの棒部分のオブジェクトに対する入力に応じて、当該棒グラフに関する各種詳細情報を表示してもよい。
 次に、一実施形態に係る情報処理装置1の動作について説明する。
 図11は、第1実施形態に係る情報処理装置1の動作を説明するフローチャートである。図11に示す処理は、例えば親会社及び/又は子会社の各会社において、図3に示すような入力画面にユーザが入力を行い、図4に示すような情報が例えば記憶部20などに記憶された状態において開始してよい。また、図11に示す処理は、例えば親会社及び/又は子会社の各会社において、図3に示すような入力画面にユーザが入力を行い、図4に示すような情報が例えば外部サーバ100などにおいて収集された状態において開始してよい。
 図11に示す動作が開始すると、制御部10は、全体省エネ目標Wtを取得する(ステップS1)。ステップS1において、制御部10は、例えば図4の[条件]の欄に示すような、全体省エネ目標の情報を取得してよい。この場合、制御部10は、記憶部20に全体省エネ目標の情報が記憶されていれば、記憶部20から当該情報を読み出してよい。一方、制御部10は、例えば他の子会社又は親会社の情報処理装置の記憶部に全体省エネ目標の情報が記憶されている場合、通信部50を介して当該情報を取得してもよい。
 ステップS1において全体省エネ目標が取得されたら、制御部10は、エネルギー設備の組合せを設定する(ステップS2)。ステップS2において、制御部10は、制御部10による算出の範囲として、エネルギー設備である分散型電源の組合せとして考えられ得る組合せのパターン全て又は一部を読み出して設定してよい。ここで、エネルギー設備である分散型電源の組合せのパターンとは、例えば図5に示したような、太陽電池、蓄電池、及び燃料電池のような分散型電源それぞれの出力が異なるような組合せとしてよい。ステップS2において、制御部10は、記憶部20から、又は通信部50を介して例えば外部サーバ100のような他の情報処理装置から、エネルギー設備である分散型電源の組合せの情報を読み出すことにより設定してよい。以降、制御部10が取得する情報は、適宜、記憶部20から、又は通信部50を介して例えば外部サーバ100のような他の情報処理装置から読み出すことにより取得する情報としてよい。
 ステップS2においてエネルギー設備の組合せが設定されたら、制御部10は、各子会社の優先項目を取得する(ステップS3)。ステップS3において、制御部10は、例えば図3の[優先項目]の欄において選択された優先項目として、図4に示すような各子会社別の優先項目の情報を、それぞれ読み出すことにより取得してよい。
 ステップS3において各社の優先項目が取得されたら、制御部10は、各子会社の複数の条件をそれぞれ取得する(ステップS4)。ステップS4において、制御部10は、会社ごとの条件として、上述のように、例えば投資回収期間、省エネ目標、及びBCPのような情報を取得してよい。ステップS4において、制御部10は、例えば図3の[条件]の欄において入力された項目として、図4に示すような各子会社別の条件の情報を、それぞれ読み出すことにより取得してよい。
 ステップS4において各社の各条件が取得されたら、制御部10は、エネルギー設備の組合せごとの各条件を算出する(ステップS5)。すなわち、ステップS5において、制御部10は、図5に示すように、エネルギー設備の組合せごとに、省エネ効果、投資回収期間、BCPを算出してよい。
 ステップS5において設備の組合せごとの各条件が算出されたら、制御部10は、優先項目を加味して各条件を満たすエネルギー設備の組合せが存在するか否か判定する(ステップS6)。
 ステップS6において各条件を満たすエネルギー設備の組合せが存在しない場合、制御部10は、優先項目以外の結果について、ユーザに条件の変更を促すように出力部40に表示してよい(ステップS7)。また、ステップS7において、制御部10は、入力部30からユーザが条件の変更を行う入力を検出する。ステップS7において優先項目以外の結果について条件が変更されたら、制御部10は、ステップS6に戻って、再び優先項目を加味して各条件を満たすエネルギー設備の組合せが存在するか否か再び判定する。ステップS5からステップS7までの処理は、例えば各子会社ごとに行う処理としてよい。
 一方、ステップS6において各条件を満たすエネルギー設備の組合せが存在する場合、制御部10は、その組合せについて、各社の省エネ効果の和Wsを算出する(ステップS8)。すなわち、ステップS8において、制御部10は、優先項目を加味して各条件を満たすエネルギー設備の組合せについて、各会社ごとの省エネ効果の和Wsを算出する。
 ステップS8において和Wsが算出されたら、制御部10は、和WsがステップS1において取得した全体省エネ目標Wt以上であるか否か判定する(ステップS9)。ステップS9において和Wsが全体省エネ目標Wt以上でない場合、制御部10は、優先項目以外の結果について、ユーザに条件の変更を促すように出力部40に表示してよい(ステップS10)。また、ステップS10において、制御部10は、入力部30からユーザが条件の変更を行う入力を検出する。ステップS10において優先項目以外の結果について条件が変更されたら、制御部10は、ステップS8に戻って、その組合せについて、各社の省エネ効果の和Wsを再び算出する。ステップS10の処理も、例えば各子会社ごとに行う処理としてよい。
 一方、ステップS9において和Wsが全体省エネ目標Wt以上である場合、制御部10は、エネルギー設備の組合せを出力部40に表示する(ステップS11)。すなわち、ステップS11において、制御部10は、全体省エネ目標及び各会社ごとに優先項目を加味して各条件を満たすエネルギー設備の組合せを表示する。また、ステップS11において、制御部10は、全体省エネ目標及び各会社ごとに優先項目を加味して各条件を満たすエネルギー設備の組合せが複数ある場合、その複数の組合せを全て表示してもよい。ステップS11において、制御部10は、出力部40において例えば図5に示すような表示を行ってよい。
 また、上述のように、特定の会社において、特定の条件のみがユーザによって変更される場合、制御部10は、ステップS3又はステップS4に戻って処理を続行してよい。すなわち、例えば図4の[会社B]の欄において、投資回収期間が「5年以内」から「3年以内」に変更されたような場合、制御部10は、ステップS3又はステップS4に戻って処理を続行してよい。これにより、新たなエネルギー設備の組合せが表示される。
 図11に示した処理において、制御部10は、例えば商用電源(系統)から買電した電力を加味して算出を行ってもよい。また、図11に示した処理において、制御部10は、例えば各子会社における負荷によって消費される電力も加味して算出を行ってもよい。また、上述の説明において、各会社とは、親会社及び子会社を含めてもよいし、子会社のみを含むものとしてもよい。また、上述の説明において、電力の観点から親会社を1つの子会社として扱ってもよい。
 以上説明したように、第1実施形態に係る情報処理装置1は、各種の情報に基づいて、事業の収益に関する情報を出力する。ここで、例えば、発電装置及び蓄電装置並びに商用電源から供給される電力に関する情報を、第1情報と記す。また、例えば、蓄電装置に蓄電される電力に関する情報を、第2情報と記す。また、例えば、負荷によって消費される電力に関する情報を、第3情報と記す。この場合、第1実施形態に係る情報処理装置1は、第1情報、第2情報、及び第3情報に基づいて、事業の収益に関する情報を出力する。すなわち、情報処理装置1は、第1情報、第2情報、及び第3情報に基づいて、電力に対する投資を回収する期間に関する情報を出力してもよい。
 また、第1実施形態に係る情報処理装置1は、電力に対する投資を回収する期間(例えば投資回収期間)に関する情報に基づいて、第1情報、第2情報、及び第3情報の少なくともいずれかを出力してもよい。また、第1実施形態に係る情報処理装置1は、第1情報、第2情報、第3情報、及び電力に対する投資を回収する期間に関する情報の少なくともいずれかの変更に基づいて、当該変更に伴う影響の結果を示す情報を出力してもよい。また、第1情報は、発電装置が発電する電力量及び当該電力量にかかるコスト、蓄電装置が放電する電力量及び当該電力量にかかるコスト、並びに、商用電源が買電する電力量及び当該電力量にかかるコストの少なくともいずれかを含んでもよい。
 第1実施形態に係る情報処理装置1によれば、親会社及び子会社のそれぞれの観点から種々の条件が満たされるような分散型電源の構成をシミュレートできる。したがって、ユーザは、分散型電源を新たに導入したり、既存の分散型電源の構成を変更したりする際に、そのようにした場合の効果を種々の観点から把握することができる。このため、第1実施形態によれば、電力の効率的な使用に資する情報処理装置1を提供することができる。
(第2実施形態)
 次に、第2実施形態に係る情報処理装置について説明する。
 第2実施形態は、第1実施形態に係る情報処理装置1と同様に構成した情報処理装置によって実施することができる。したがって、第2実施形態に係る情報処理装置の構成についての説明は省略する。第2実施形態に係る情報処理装置において、記憶部20に記憶される情報、通信部50が受信する情報、及び入力部30から入力される情報は、第1実施形態に係る情報処理装置1とは異なる。このような相違に基づいて、第2実施形態に係る情報処理装置は、出力部40から出力される情報も、第1実施形態に係る情報処理装置1とは異なる。
 近年、例えば地方自治体などにおいて、地域新電力などの新興の電力会社が数多く起業しつつある。例えば地方自治体などにおいて電力事業を起業する際、当該事業の成否について見極めることは、必ずしも容易でなく、また実現可能性の調査には時間を要することもある。そこで、第2実施形態に係る情報処理装置は、再生可能エネルギーなどのような発電設備及び/又は蓄電池などのエネルギー設備の有無及び規模がユーザに入力されることで、電力事業の収益の変化がユーザに容易に理解できる態様で出力する。このため、第2実施形態に係る情報処理装置のユーザは、事業計画立案又は機器設備の導入などの検討を簡易に行うことができる。また、第2実施形態に係る情報処理装置は、専門知識を持たないユーザであっても、容易に扱うことができるようにする。
 第2実施形態に係る情報処理装置において、制御部10は、入力部30から例えば以下のような情報がユーザによって入力されるようにする。
(1)エネルギー設備(太陽電池、蓄電池、及び風力発電など)の情報
(2)エネルギー設備の容量の情報(発電設備であれば定格出力(kW)、蓄電池であれば充放電電力(kW)及び容量(kWh)など)
(3)エネルギー設備が設置される位置の情報
(4)電力事業で販売する需要家全体の需要電力(kW)、需要電力量(kWh)、需要家の位置の情報、及び需要家情報(需要家種別)
 また、第2実施形態に係る情報処理装置において、記憶部20には、例えば以下のような情報が記憶されてよい。
(1)発電設備情報(太陽電池の場合であれば、容量、日射量、気象条件に対する発電量、及び発電パターンの情報など)
(2)気象情報(位置情報によって示される位置における気象情報及び日射量情報など)(3)需要家電力パターン(需要家種別による平均的な負荷のパターン)
(4)電力価格情報(各電源の価格に関する情報など(JEPX(一般社団法人日本卸電力取引所)であれば過去情報、電力会社であれば契約料金、従量料金、及び託送料など))
 次に、第2実施形態に係る情報処理装置の動作について説明する。
 図12は、第2実施形態に係る情報処理装置の動作を説明するフローチャートである。図12に示す処理は、例えば地方自治体などの電力事業者において、上述のような情報がユーザによって入力され、上述のような情報が記憶部20に記憶された状態において開始してよい。また、図12に示す処理は、例えば地方自治体などの電力事業者において、上述のような各種の情報が例えば外部サーバ100などにおいて収集された状態において開始してよい。
 図12に示す動作が開始すると、制御部10は、各種の情報を取得する(ステップS21)。ステップS21において、制御部10は、例えば入力部30から入力された上述のような各種情報を取得してよい。また、ステップS21において、制御部10は、例えば記憶部20に記憶された上述のような各種情報を取得してよい。
 ステップS21において各種情報が取得されたら、制御部10は、発電量を算出する(ステップS22)。ステップS22において、制御部10は、入力されたエネルギー設備による発電電力(電力量)算出する。すなわち、ステップS22において、制御部10は、エネルギー設備を構成する発電装置による発電量及び発電パターンを算出する。この場合、入力部30から入力された情報である発電装置に関する発電装置スペック(発電機種別、kW、kWh等)及び発電装置の設置位置などに基づいて、発電装置による発電量及び発電パターンを算出してよい。また、この場合、記憶部20から読み出した設置位置における気象条件などに基づいて、発電装置による発電量及び発電パターンを算出してもよい。また、制御部10は、CO2クレジットなどに基づいて、必要に応じてCO2削減量を算出してもよい。
 ステップS22において発電量が算出されたら、制御部10は、調整コストを算出する(ステップS23)。ステップS23において、制御部10は、例えば、インバランス料金、ピークカットによる電力コスト削減料金、及び時間帯等による電力の価格差による削減料金などを算出してよい。
 例えば、ステップS23において、制御部10は、調達電力(電力量)、発電電力販売量、インバランスコスト、ピークカット削減コスト、電力値差削減コスト、及び調達が必要な電力(電力量)の少なくともいずれかを算出してよい。この場合、制御部10は、入力部30から入力された需要電力(電力量)、需要家情報、及び、入力された蓄電池スペックの情報がある場合には当該情報に基づいて、上述の算出を行ってよい。また、この場合、制御部10は、記憶部20に記憶された需要家情報に対応する需要家電力パターン情報に基づいて、上述の算出を行ってもよい。このように、需要家電力パターンが既知の場合、これに基づいて算出を行うことにより、算出結果の精度を上げることができる。
 ここで、調達電力(電力量)は、需要電力(電力量)と、発電電力(電力量)との差から算出してよい。同様に、発電電力販売量は、発電電力が需要電力を上回る場合のみ発生し、この差分として算出してよい。また、インバランスコストは、インバランス電力、及びインバランス料金単価に基づいて算出してよい。ここで、インバランス電力は、需要家電力量、蓄電池出力、及び蓄電池容量から、蓄電池の調整により削減できる電力を表す。また、インバランス料金単価は、記憶部20に記憶された電力価格から取得してよい。
 また、ピークカット削減コストは、需要電力、電力パターン、発電パターン、発電量、及び蓄電池スペックに基づいて算出してよい。電力値差削減コストは、時間帯などに起因する電力値差によって得られる料金削減に基づいて算出してよい。などに起因する電力値差は、蓄電池のスペック、及び記憶部20に記憶された電力価格情報などに基づくものとしてよい。上述のインバランスコスト、ピークカット削減コスト、電力値差削減コストは、いずれも蓄電池を使って得られる効果である。このため、場合によってはトレードオフとなることもあり、最小のコストを算出するものとしてもよい。
 ステップS23において調整コストが算出されたら、制御部10は、電力収入を算出する(ステップS24)。ステップS24において、制御部10は、需要家に対する電力の販売収入、及び、設備による発電電力の売電収入を算出してよい。すなわち、ステップS24において、制御部10は、需要家に対して販売する電力で得られる電力販売収入、発電電力の売電が可能な場合にはその収入、及びCO2クレジット等でCO2削減量の販売が可能な場合にはその収入を算出してよい。この場合、制御部10は、発電量、発電パターン、調達する電力及び電力量、並びに発電電力のうち売電可能な電力量に基づいて、上述の算出を行ってよい。また、この場合、制御部10は、記憶部20に記憶された電力価格情報に基づいて、上述の算出を行ってもよい。
 ステップS24において電力収入が算出されたら、制御部10は、電力調達コスト、すなわち電力調達にかかるコストを算出する(ステップS25)。ステップS25において、制御部10は、需要家に対して電力を販売するために必要な電力の調達にかかるコストを算出してよい。この場合、制御部10は、電力価格情報に基づく電力価格及び調達電力(電力量)、並びにインバランスコストからピークカットによる削減料金及び電力値差による削減料金を引いたものに基づいて、上述の算出を行ってよい。
 ステップS25において電力調達にかかるコストが算出されたら、制御部10は、収益を算出する(ステップS26)。ステップS26において、制御部10は、電力調達コスト、電力収入、及び設備コストなどに基づいて、事業の収益を算出してよい。例えば、ステップS26において、制御部10は、電力の販売による収入、発電電力の売電による収入、電源調達コストに基づいて、電力事業の収益を算出してよい。この場合、制御部10は、入力部30から入力された設備コストの償却分に基づいて、電力事業の収益を算出してもよい。
 ステップS26において収益が算出されたら、制御部10は、算出された収益の結果を出力する(ステップS27)。ステップS27において、制御部10は、算出された収益の結果を出力部40に表示してもよい。
 このように、第2実施形態に係る情報処理装置は、再生可能エネルギーなどのような発電設備及び/又は蓄電池などのエネルギー設備の有無及び規模がユーザに入力されることで、電力事業の収益の変化がユーザに容易に理解できる態様で出力することができる。このため、ユーザは、事業計画立案又は機器設備の導入などの検討を簡易に行うことができる。また、例えば専門知識を持たないユーザであっても、第2実施形態に係る情報処理装置を容易に扱うことができる。したがって、第2実施形態によっても、電力の効率的な使用に資する情報処理装置を提供することができる。
(第2実施形態の変形例)
 次に、第2実施形態の変形例に係る情報処理装置について説明する。以下、上述した第2実施形態の説明とは異なる内容について、重点的に説明する。したがって、上述した第2実施形態の説明と同様になる内容については、適宜、説明を簡略化又は省略する。
 第2実施形態の変形例に係る情報処理装置は、記憶部20に地図情報、及びエネルギー設備の設置候補地の情報を記憶する。また、第2実施形態の変形例に係る情報処理装置において、制御部10は、図12に示したフローチャートにおいて、エネルギー設備の設置に関する算出を行うステップを追加する。
 第2実施形態の変形例において、制御部10は、入力部30から入力された需要家の位置の情報、需要化の電力情報、及び地図情報に基づいて、エネルギー設備(蓄電設備を含む)のスペックを算出してよい。この場合、制御部10は、例えば5km圏内にあるエネルギー設備を設置可能な場所においてエネルギー設備を設置可能な容量、及び電力需要から見積もられる必要なスペックに基づいて、上述のような算出を行ってよい。したがって、第2実施形態の変形例において、ユーザは、入力部30からエネルギー設備の情報を入力する必要がない。
 第2実施形態の変形例において、制御部10は、上述のようにスペックが算出されたら、それ以降は図12に示したフローチャートと同様に、事業性に関する算出を行うことができる。このようにして、第2実施形態の変形例に係る情報処理装置は、エネルギー設備の提案及び事業性に関する結果の情報を出力する。
 第2実施形態の変形例において、例えば地図情報に基づいてエネルギー設備の設置を算出する際に、予め登録されたエネルギー設備の設置候補地のデータベースなどがある場合には、それを利用してもよい。上述のように、第2実施形態の変形例において、需要家情報及び設備情報などから事業性に関する算出の結果を出力する。一方、第2実施形態の変形例において、同様の計算過程を複数回繰り返すことにより、需要家情報及び収益目標に基づいて、エネルギー設備の必要スペックを算出してもよい。
 このように、第2実施形態の変形例に係る情報処理装置も、電力事業の収益の変化がユーザに容易に理解できる態様で出力することができる。このため、ユーザは、事業計画立案又は機器設備の導入などの検討を簡易に行うことができる。したがって、第2実施形態の変形例によっても、電力の効率的な使用に資する情報処理装置を提供することができる。
 以上説明したように、第2実施形態又は第2実施形態の変形例に係る情報処理装置は、第1情報、第2情報、及び第3情報に基づいて、事業の収益に関する情報を出力する。ここで、第1情報、第2情報、及び第3情報は、それぞれ上述した第1実施形態と同様とすることができる。例えば、第1情報は、発電装置及び蓄電装置並びに商用電源から供給される電力に関する情報としてよい。また、第2情報は、蓄電装置に蓄電される電力に関する情報としてよい。また、第3情報は、負荷によって消費される電力に関する情報としてよい。
 また、第2実施形態又は第2実施形態の変形例に係る情報処理装置は、複数の拠点における電力の情報に基づいて、当該複数の拠点における事業者による電力事業の収益に関する情報を出力してよい。また、第2実施形態又は第2実施形態の変形例に係る情報処理装置は、複数の事業者における電力の情報に基づいて、当該複数の事業者を統括する事業者による電力事業の収益に関する情報を出力してもよい。また、第2実施形態又は第2実施形態の変形例に係る情報処理装置は、電力事業の収益に関する情報に基づいて、当該電力事業の成立性に関する情報を出力してもよい。ここで、第1情報は、発電装置及び蓄電装置並びに商用電源から出力される電力量及び当該電力量にかかるコストに関する情報を含んでよい。
 以上、実施形態を諸図面及び実施例に基づき説明したが、当業者であれば本開示に基づき種々の変形及び修正を行うことが容易であることに注意されたい。したがって、これらの変形及び修正は本開示の範囲に含まれることに留意すべきである。例えば、各部材、各手段、各ステップなどに含まれる機能などは論理的に矛盾しないように再配置可能であり、複数の手段及び/又はステップなどを1つに組み合わせたり、或いは分割したりすることが可能である。
 例えば、上述の第1実施形態と第2実施形態とは、別の実施形態として独立して実施されることに限定されるものではなく、それぞれの少なくとも一部を適宜組み合わせるなどして実施してもよい。
 上述した実施形態は、情報処理装置1としての実施のみに限定されない。例えば、上述した実施形態は、情報処理装置1のような情報処理装置の情報処理方法として実施してもよい。さらに、例えば、上述した実施形態は、情報処理装置1のような情報処理装置のプログラムとして実施してもよい。
 例えば、一実施形態に係る情報処理装置の情報処理方法は、以下のようなステップを含む。
 発電装置及び蓄電装置並びに商用電源から供給される電力に関する第1情報と、前記蓄電装置に蓄電される電力に関する第2情報と、負荷によって消費される電力に関する第3情報と、を取得するステップ。
 取得した前記第1情報、前記第2情報、及び前記第3情報に基づいて、事業の収益に関する情報を出力するステップ。
 また、例えば、一実施形態に係る情報処理装置のプログラムは、コンピュータに、以下のようなステップを実行させる。
 発電装置及び蓄電装置並びに商用電源から供給される電力に関する第1情報と、前記蓄電装置に蓄電される電力に関する第2情報と、負荷によって消費される電力に関する第3情報と、を取得するステップ。
 取得した前記第1情報、前記第2情報、及び前記第3情報に基づいて、事業の収益に関する情報を出力するステップ。
 1 情報処理装置
 10 制御部
 20 記憶部
 30 入力部
 40 出力部
 50 通信部
 100 外部サーバ
 

Claims (6)

  1.  所定の拠点における発電装置及び/又は蓄電装置から供給される電力並びに商用電源から前記所定の拠点に供給される電力に関する第1情報と、前記蓄電装置に蓄電される電力に関する第2情報と、前記所定の拠点において消費される電力に関する第3情報と、前記電力に対応するコストに関する情報と、前記発電装置及び/又は前記蓄電装置にかかるコストに関する情報と、に基づいて、前記発電装置及び/又は前記蓄電装置に起因する省エネルギーの経済的利益を算出するとともに、前記発電装置及び/又は前記蓄電装置にかかるコストが前記経済的利益によって回収される期間を算出する制御部を備える情報処理装置であって、
     前記制御部は、所定の期間の入力に基づいて、当該所定の期間に前記経済的利益が回収するコストによって実現可能な前記発電装置及び/又は前記蓄電池の構成に関する情報を出力する、情報処理装置。
  2.  前記第1情報、前記第2情報、前記第3情報、及び前記発電装置及び/又は前記蓄電装置にかかるコストが前記経済的利益によって回収される期間に関する情報の少なくともいずれかの変更に基づいて、当該変更に伴う影響の結果を示す情報を出力する、請求項1に記載の情報処理装置。
  3.  複数の拠点における電力の情報に基づいて、当該複数の拠点における前記発電装置及び/又は前記蓄電池の構成に関する情報を出力する、請求項1又は2に記載の情報処理装置。
  4.  複数の拠点における電力の情報に基づいて、当該複数の拠点を統括する拠点における前記発電装置及び/又は前記蓄電池の構成に関する情報を出力する、請求項3に記載の情報処理装置。
  5.  所定の拠点における発電装置及び/又は蓄電装置から供給される電力並びに商用電源から前記所定の拠点に供給される電力に関する第1情報と、前記蓄電装置に蓄電される電力に関する第2情報と、前記所定の拠点において消費される電力に関する第3情報と、前記電力に対応するコストに関する情報と、前記発電装置及び/又は前記蓄電装置にかかるコストに関する情報と、を取得するステップと、
     取得した前記第1情報、前記第2情報、前記第3情報、前記電力に対応するコストに関する情報、並びに、前記発電装置及び/又は前記蓄電装置にかかるコストに関する情報と、に基づいて、前記発電装置及び/又は前記蓄電装置に起因する省エネルギーの経済的利益を算出するとともに、前記発電装置及び/又は前記蓄電装置にかかるコストが前記経済的利益によって回収される期間を算出するステップと、
     所定の期間の入力に基づいて、当該所定の期間に前記経済的利益が回収するコストによって実現可能な前記発電装置及び/又は前記蓄電池の構成に関する情報を出力するステップと、
     を含む、情報処理装置の情報処理方法。
  6.  コンピュータに、
     所定の拠点における発電装置及び/又は蓄電装置から供給される電力並びに商用電源から前記所定の拠点に供給される電力に関する第1情報と、前記蓄電装置に蓄電される電力に関する第2情報と、前記所定の拠点において消費される電力に関する第3情報と、前記電力に対応するコストに関する情報と、前記発電装置及び/又は前記蓄電装置にかかるコストに関する情報と、を取得するステップと、
     取得した前記第1情報、前記第2情報、前記第3情報、前記電力に対応するコストに関する情報、並びに、前記発電装置及び/又は前記蓄電装置にかかるコストに関する情報と、に基づいて、前記発電装置及び/又は前記蓄電装置に起因する省エネルギーの経済的利益を算出するとともに、前記発電装置及び/又は前記蓄電装置にかかるコストが前記経済的利益によって回収される期間を算出するステップと、
     所定の期間の入力に基づいて、当該所定の期間に前記経済的利益が回収するコストによって実現可能な前記発電装置及び/又は前記蓄電池の構成に関する情報を出力するステップと、
     を実行させる、情報処理装置のプログラム。
     
     
     
PCT/JP2019/043421 2018-11-28 2019-11-06 情報処理装置、情報処理方法、及びプログラム WO2020110633A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US17/297,460 US20220012822A1 (en) 2018-11-28 2019-11-06 Information processing apparatus, information processing method, and program
EP19890152.2A EP3889857A4 (en) 2018-11-28 2019-11-06 INFORMATION PROCESSING DEVICE, INFORMATION PROCESSING METHOD AND PROGRAM

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018-222725 2018-11-28
JP2018222725 2018-11-28

Publications (1)

Publication Number Publication Date
WO2020110633A1 true WO2020110633A1 (ja) 2020-06-04

Family

ID=70854233

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/043421 WO2020110633A1 (ja) 2018-11-28 2019-11-06 情報処理装置、情報処理方法、及びプログラム

Country Status (3)

Country Link
US (1) US20220012822A1 (ja)
EP (1) EP3889857A4 (ja)
WO (1) WO2020110633A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20240070582A1 (en) * 2022-08-26 2024-02-29 Guang Teng Renewable Energy Co., Ltd. Apparatus for estimating the value of a solar power plant

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002049723A (ja) * 2000-08-04 2002-02-15 Mark Tec:Kk 省エネルギ診断システム及び方法
JP2011192010A (ja) 2010-03-15 2011-09-29 Hitachi Industrial Equipment Systems Co Ltd エネルギー計測・管理システム
WO2013168419A1 (ja) * 2012-05-10 2013-11-14 国立大学法人東京工業大学 情報処理システムおよびエネルギー情報の記録装置
JP2017174277A (ja) * 2016-03-25 2017-09-28 住友電気工業株式会社 運転計画算出装置、運転計画算出方法および運転計画算出プログラム

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5873251A (en) * 1995-09-13 1999-02-23 Kabushiki Kaisha Toshiba Plant operation control system
US8694163B2 (en) * 2010-06-24 2014-04-08 Noveda Technologies, Inc. System and method for managing resource sustainability performance
US9846886B2 (en) * 2013-11-07 2017-12-19 Palo Alto Research Center Incorporated Strategic modeling for economic optimization of grid-tied energy assets
WO2016118979A2 (en) * 2015-01-23 2016-07-28 C3, Inc. Systems, methods, and devices for an enterprise internet-of-things application development platform
US10222083B2 (en) * 2015-10-08 2019-03-05 Johnson Controls Technology Company Building control systems with optimization of equipment life cycle economic value while participating in IBDR and PBDR programs
US20190005554A1 (en) * 2017-06-28 2019-01-03 Nec Laboratories America, Inc. Optimal sizing of energy storage units in demand charge management and pv utilization applications
US10504195B2 (en) * 2017-11-13 2019-12-10 Mitsubishi Electric Research Laboratories, Inc. System and method for decentralized energy production

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002049723A (ja) * 2000-08-04 2002-02-15 Mark Tec:Kk 省エネルギ診断システム及び方法
JP2011192010A (ja) 2010-03-15 2011-09-29 Hitachi Industrial Equipment Systems Co Ltd エネルギー計測・管理システム
WO2013168419A1 (ja) * 2012-05-10 2013-11-14 国立大学法人東京工業大学 情報処理システムおよびエネルギー情報の記録装置
JP2017174277A (ja) * 2016-03-25 2017-09-28 住友電気工業株式会社 運転計画算出装置、運転計画算出方法および運転計画算出プログラム

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3889857A4

Also Published As

Publication number Publication date
EP3889857A1 (en) 2021-10-06
US20220012822A1 (en) 2022-01-13
EP3889857A4 (en) 2022-08-31

Similar Documents

Publication Publication Date Title
Hemmati et al. Coordinated short-term scheduling and long-term expansion planning in microgrids incorporating renewable energy resources and energy storage systems
Saad al-sumaiti et al. Smart home activities: A literature review
Yang et al. Parallel load schedule optimization with renewable distributed generators in smart grids
US8989909B2 (en) Graphical user interface for the multi-dimensional representation of energy control
JP2010166636A (ja) 電力需給運用管理サーバ、および電力需給運用管理システム
JP6264695B2 (ja) 電力管理装置、及び情報提示方法
US20190279262A1 (en) Information processing apparatus, method for generating electric power price list, information processing system, and display device
JP6045945B2 (ja) エネルギー管理システム、エネルギー管理方法、プログラムおよびサーバ装置
JP7038314B2 (ja) 表示制御方法、表示制御プログラム、及び表示制御システム
WO2016084313A1 (ja) 電力需要調整システム、需要調整装置、グループ生成装置及びグループ生成方法
WO2020110633A1 (ja) 情報処理装置、情報処理方法、及びプログラム
JP6669844B1 (ja) 情報処理装置、情報処理方法、及びプログラム
JP2017191522A (ja) 電気料金試算システム、電気料金試算方法、およびプログラム
JP2013090485A (ja) Co2排出量監視装置、co2排出量監視方法、co2排出量監視プログラム、およびco2排出量監視システム
JP2011065383A (ja) 設備運用支援システム及びプログラム
EP2600303A2 (en) Method and system for detection of communication activities of a meter board
JP6237321B2 (ja) 運転計画作成プログラム、運転計画作成方法および運転計画作成装置
JP5159729B2 (ja) 設備運用支援システム及びプログラム
JP2016095591A (ja) 電力管理装置、及び情報提示方法
JP6154974B1 (ja) エネルギー使用量の予測システム、エネルギー使用量の予測方法およびプログラム
JP6059666B2 (ja) 電力系統設備計画支援装置および電力系統設備計画支援方法
JPWO2014076785A1 (ja) ダイナミックプライシング支援装置、ダイナミックプライシング支援方法およびプログラム
JP6851007B2 (ja) 表示方法、プログラム、および表示システム
JP7058254B2 (ja) 情報処理装置、情報処理方法、及びプログラム
JP2014020840A (ja) 管理装置、表示装置、表示方法、および表示制御プログラム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19890152

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2019890152

Country of ref document: EP

Effective date: 20210628

NENP Non-entry into the national phase

Ref country code: JP