WO2020075294A1 - 天然ガス液化装置の設計方法及び天然ガス液化装置 - Google Patents

天然ガス液化装置の設計方法及び天然ガス液化装置 Download PDF

Info

Publication number
WO2020075294A1
WO2020075294A1 PCT/JP2018/038138 JP2018038138W WO2020075294A1 WO 2020075294 A1 WO2020075294 A1 WO 2020075294A1 JP 2018038138 W JP2018038138 W JP 2018038138W WO 2020075294 A1 WO2020075294 A1 WO 2020075294A1
Authority
WO
WIPO (PCT)
Prior art keywords
module
natural gas
floor
gas liquefaction
modules
Prior art date
Application number
PCT/JP2018/038138
Other languages
English (en)
French (fr)
Inventor
保夫 都築
和亮 角田
Original Assignee
日揮グローバル株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日揮グローバル株式会社 filed Critical 日揮グローバル株式会社
Priority to KR1020217007323A priority Critical patent/KR102461904B1/ko
Priority to SG11202102533PA priority patent/SG11202102533PA/en
Priority to PCT/JP2018/038138 priority patent/WO2020075294A1/ja
Priority to CN201880097534.7A priority patent/CN112703150B/zh
Publication of WO2020075294A1 publication Critical patent/WO2020075294A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • B63B73/20Building or assembling prefabricated vessel modules or parts other than hull blocks, e.g. engine rooms, rudders, propellers, superstructures, berths, holds or tanks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • B63B25/16Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed heat-insulated
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/04Arrangement of ship-based loading or unloading equipment for cargo or passengers of derricks, i.e. employing ships' masts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/16Arrangement of ship-based loading or unloading equipment for cargo or passengers of lifts or hoists
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63JAUXILIARIES ON VESSELS
    • B63J99/00Subject matter not provided for in other groups of this subclass

Definitions

  • the present invention relates to a natural gas liquefaction device that processes natural gas on the ocean.
  • LNG Liquidized Natural Gas
  • Patent Document 1 in the development of a natural gas field in the ocean or the ocean, natural gas liquefaction in which a facility for pretreatment or liquefaction of natural gas is provided on a floating body floating on the ocean A device (marine plant) is used.
  • Some of such natural gas liquefaction devices are equipped with a plurality of modules in which the devices constituting the above-mentioned facilities are arranged. Such a module is divided into, for example, a frame having a multi-story structure.
  • the maintenance target device may be detached and carried out of the module before performing the maintenance work. At this time, it is necessary to carry in / out the large-sized maintenance target device from the module using the carrier device.
  • the natural gas liquefaction device provided in the floating body part since the installation area of the facility is limited, it is difficult to provide a large number of large transport equipment such as a pedestel crane to cover the entire device. .
  • the present invention has been made under such a background, and in a natural gas liquefaction device installed on a floating body, an elevating mechanism used for transporting maintenance target equipment constituting the natural gas liquefaction device can be efficiently used. Provide placement technology.
  • a design method of a natural gas liquefaction device of the present invention is a design method of a natural gas liquefaction device installed on a floating body part floating in water,
  • the natural gas liquefaction device comprises a plurality of modules in which the constituent devices of the natural gas liquefaction device are separately arranged in a frame of a multi-story structure, (A) For one module of the plurality of modules, among the maintenance target devices that are arranged on the second floor or higher floor of the module and are detached during maintenance and are carried in and out from the outside of the module, A step of identifying a floor on which the largest equipment to be maintained is located; and (b) a loading / unloading equipment on the floor identified in the step (a), through a hoisting path on the side of the frame.
  • step (c) the largest equipment to be maintained among the remaining floors on which the arrangement position of the elevating mechanism is not set is arranged.
  • the method for designing the natural gas liquefaction device may have the following features. (1) In the step (b) or the step (d), the arrangement position of the lifting mechanism is set such that the conveyance distance between the maximum arrangement position of the maintenance target device and the lifting mechanism is the shortest. thing. (2)
  • the floating body portion has a planar shape that is longer in the ship length direction than in the ship width direction, and includes a module row in which the plurality of modules are arranged side by side along the ship length direction, and each module is lifted and lowered.
  • the arrangement position of the elevating mechanism in the step (d) is set while avoiding the ascending / descending path using the elevating mechanism whose arrangement position is already set.
  • the width of the gap is set to be less than twice the width of the ascending / descending path as viewed along the direction in which the modules are arranged.
  • the one module is divided into a partition part on one side and a partition part on the other side as viewed along the arrangement direction, and a module adjacent to the partition part on the one side.
  • the one side The step (c) and the step (d) are repeated after the step (a) to the step (d) are performed for each of the section and the other section.
  • the module in which the largest maintenance target device is arranged is selected as the one module, and the steps (a) to ( Following the execution of d), repeating the steps (c) and (d).
  • step (d) Regard the plurality of modules in the module row, the one module is sequentially selected in descending order of maintenance target devices, and the steps (a) to (steps) are performed in parallel with each module. Following step (d), repeating step (c) and step (d).
  • a pipe rack having a frame structure that holds a pipe group through which a fluid handled in the natural gas liquefaction device flows so as to extend along the ship length direction at a central position in the ship width direction.
  • the module rows are arranged on both sides of the pipe rack as viewed from the bow side of the floating body.
  • a laydown area in which the maintenance target device is stored is provided at a position adjacent to the pipe rack, and the maintenance target device is located between the elevating path and the laydown area along the gap and the pipe rack. Be transported.
  • the natural gas liquefaction device of the present invention is a natural gas liquefaction device installed on a floating body part having a plane shape that floats on water and is longer in the ship length direction than in the ship width direction,
  • the natural gas liquefaction device comprises a plurality of modules in which the components of the natural gas liquefaction device are arranged separately in a multi-story frame structure, and the plurality of modules are arranged in a row along the ship length direction. That the module rows are arranged side by side, The module row is arranged on the second floor or higher, and is removed during maintenance and is carried in and out from the outside of the module.
  • a hoisting path on the side of the frame When carrying in and out a maintenance target device, a hoisting path on the side of the frame.
  • the positions of the lifting mechanisms are such that the lifting path is located in the gap and when viewed in a plan view. It is characterized in that it is set so as to avoid overlapping of the elevating path of.
  • the transportation path for vertically transporting the maintenance target device using the lifting mechanism is limited to the side of the frame that constitutes the module, and the position of the lifting mechanism is arranged so that the transportation paths do not overlap each other. Therefore, it is possible to easily and efficiently arrange the lifting mechanism.
  • FIG. 7 is a process diagram showing a method for setting the HDZ arrangement.
  • FIGS. 1 and 2 are a plan view and a side view of a hull (floating body part) in a natural gas liquefaction device according to an embodiment.
  • FIG. 3 is a plan view in which a part of the natural gas liquefaction device is enlarged.
  • mooring equipment 3 is provided on the bow side of the floating body 9.
  • symbol 31 in FIG. 1 is a mooring equipment support part.
  • the mooring equipment 3 is connected to, for example, a mooring line 34 installed on the sea floor to moor the floating body 9, and is also connected to a riser 35 that transports the mined natural gas underwater.
  • the mooring facility 3 side of the floating body 9 will be referred to as the front.
  • a flare stack portion 5 for burning excess gas generated in the natural gas processing device 2 and the LNG tank in the floating body portion is provided at the port-side position of the end portion of the floating body portion 9 on the mooring facility 3 side.
  • a pipe rack 6 is provided at the center of the floating body 9 so as to extend along the length direction of the floating body 9.
  • a plurality of modules 20 (module rows) that form the natural gas liquefaction device 2 for liquefying natural gas are provided side by side in the front-rear direction.
  • the natural gas liquefaction device 2 is configured in the region between the modules 20 arranged on the starboard side of the pipe rack 6 on the front side of the floating body 9 and in the region rearward of the pipe rack 6 and the modules 20 group.
  • a laydown area 7 is provided for storing the equipment to be carried overboard. Further, the space on the lower side of the pipe rack 6 serves as a central transport path 93 for transporting the equipment transported from each module 20 to the laydown area 7.
  • Residential equipment 4 is provided on the rear side of the laydown area 7 on the rear side of the floating body 9.
  • the layout of the mooring equipment 3 and the living equipment 4 is not limited to the positions shown in the embodiments.
  • the laydown area 7 may be provided on either the front side or the rear side of the floating body 9.
  • FIG. 4 is a side view of the module 20 near the rear of the starboard-side row as viewed from the front, as viewed from the central transport path 93 side.
  • the frame 21 that constitutes the module 20 includes a plurality of floors, for example, floors 200A to 200D for four floors.
  • the first floor 200A provided at the height position of the deck is referred to as the second floor 200B to the fourth floor 200D in order from the upper floor side.
  • a gap 90 is provided between the modules 20 arranged adjacent to each other in the front-rear direction of the natural gas liquefaction device 2.
  • the gap 90 is also used as the transport path 24 for transporting the below-described maintenance target device 10 lowered to the deck of the floating body 9 on the deck.
  • FIGS. 5 to 8 are plan views schematically showing the first to fourth floors 200A to 200D, respectively.
  • the modules 20 are arranged such that the sides shown in the upper portions of FIGS. 5 to 8 face the pipe rack 6.
  • Each module 20 is provided with a plurality of heat exchangers 12, tower tanks 13 and 14, moving equipment 11 such as pumps and compressors, and a large number of equipment 10 such as pipes connecting these components, opening / closing valves, and flow control valves.
  • These devices 10 are provided separately on each floor 200A to 200D.
  • the tower tanks 13 and 14 may be provided so as to straddle a plurality of floors 200A to 200D.
  • a device (maintenance target device) 10 that is carried out to the outside as a target of maintenance
  • a tube bundle of the heat exchanger 12 a moving device 11, a valve (not shown) provided in a pipe, and the like
  • the tube bundle is one of the largest devices among the maintenance target devices 10
  • the moving device 11 and valves provided in large-diameter pipes are often the second largest after the tube bundle.
  • Some of these tube bundles, moving devices 11, and devices 10 that are smaller than large valves may also be carried out of the module 20 during maintenance as appropriate.
  • each floor 200A to 200D is provided with an evacuation route 22 for workers along the periphery.
  • the equipment 10 configuring the natural gas liquefaction device 2 cannot be installed in the evacuation route 22.
  • an evacuation staircase 25 that connects the floors 200A to 200D is installed on the side opposite to the pipe rack 6 when viewed from the module 20.
  • the central transportation path 93 on the lower side of the pipe rack 6 can also serve as a part of the evacuation path 22. Therefore, the evacuation route 22 of the first floor 200A is provided at the peripheral edge excluding the side of the central conveyance route 93.
  • each of the first floor 200A and the second floor 200B is provided with two moving devices 11 which are pumps for fluid transfer, and the third floor 200C is provided with each.
  • Three heat exchangers 12 are provided.
  • a tower 13 such as a processing tower is provided so as to penetrate the third floor 200C to the fourth floor 200D.
  • the tower 13 When the tower 13 is installed on the floating body 9, if the tower 13 having an elongated shape in the vertical direction is installed upright from the bottom plate, the swing width of the tip of the tower 13 becomes large when the floating body 9 swings, There is a risk of touching the equipment 10 and the frame 21 of the vehicle or falling over. Therefore, in this example, the tower 13 is provided with a skirt-shaped support member 15 whose opening diameter is widened toward the lower side. In the tower 13, for example, the side surface at the position from the middle to the upper side is held over the entire circumference by the inner surface of the upper end of the support member 15. Then, by fixing the lower end of the support member 15 to the floor surface of the fourth floor 200D, the contact with the device and the fall are suppressed.
  • the tower 13 penetrates the bottom surfaces of the fourth floor 200D and the third floor 200C, and the lower end portion thereof is arranged so as to float from the floor surface of the second floor 200B.
  • the swing width of the upper end and the lower end of the tower 13 becomes small even when the floating body 9 swings, so that the safety is improved.
  • each floor 200A to 200D is provided with a smaller tank 14 such as a receiving tank for receiving the liquid processed in the heat exchanger 12 or the tower 13.
  • a smaller tank 14 such as a receiving tank for receiving the liquid processed in the heat exchanger 12 or the tower 13.
  • the arrangement of the device 10 in the side view shown in FIG. 4 and the arrangement of the device 10 in the plan views shown in FIGS. 5 to 8 do not necessarily match.
  • an annular ring member 16 that supports the peripheral edge of the bottom of the device 10.
  • the bottom surface of the device 10 is placed and fixed on the ring member 16.
  • the maintenance target device 10 is conveyed in the vertical direction through the side of the module 20.
  • a hoisting path (HDZ: Handling Drop Zone) 100 of the maintenance target device 10 is set in the lateral region of the frame 21 that constitutes each module 20, here, in the gap 90 between the adjacent module 20. ing.
  • the maintenance target device 10 installed on the second floor or higher floors 200B to 200D is lowered to the deck, or the device 10 after maintenance is pulled up to each floor 200B to 200D.
  • the width of the gap 90 between the modules 20 is set to be less than twice the width of the HDZ 100.
  • the HDZ for conveying the maintenance target device 10 placed on the floors 200B to 200D shown in the figure is shown by a solid line, and the maintenance target devices 10 provided on other floors 200B to 200D are shown.
  • the HDZ 100 for carrying is shown by a broken line.
  • a transport path 24 for laterally transporting each maintenance target device 10 from the installation position to the HDZ 100 is set.
  • These transport paths 24 are routed from the installation position of each maintenance target device 10 to the peripheral side area facing the HDZ 100 installed on the floor 200B to 200D.
  • the area facing the HDZ 100 is, for example, a work area 26 that changes the direction of the device 10.
  • the work area 26 constitutes a part of the transport path 24.
  • the transport path 24 for laterally transporting each maintenance target device 10 from the installation position to the transport path 24 in the gap 90 between the modules and the central transport path 93 is set. There is.
  • a carrying beam 23 for lifting the device 10 and pulling it up to the carrying path 24 is provided above the device 10 on the ceiling of each floor 200B to 200D. Further, the transport beam 23 is provided so as to project from above the work area 26 to the HDZ 100 of the floor 200B to 200D.
  • the evacuation route 22 is set in the peripheral area of each floor 200B to 200D, and the device 10 cannot be installed in the evacuation route 22.
  • the setting of the work area 26 and the setting of the transporting beam 23 are performed as a temporary exception in the maintenance.
  • the HDZs 100 on the floors 200A to 200D are arranged so as not to overlap each other.
  • the modules 20A to 20C are sequentially arranged from the module on the left side in FIG. 9 when viewed from the front, attention is paid to two modules 20A and 20B (20B and 20C) arranged adjacent to each other with a gap 90 therebetween.
  • the HDZs 100A to 100C of the modules 20A to 20C are arranged so as not to overlap the HDZs 100A to 100C of the adjacent modules 20A to 20C. Details of the setting method of the arrangement position of the HDZ 100 will be described later.
  • FIG. 10 is a schematic diagram showing a configuration example of an elevating mechanism for carrying out vertical transportation of the device 10 through the HDZ 100.
  • the maintenance target device 10 is held in the work area 26 via a pulley 92 provided on the carrying beam 23.
  • the pulley 92 is connected to the carrying beam 23 via, for example, the moving body 91, is configured to move along the carrying beam 23, and can be moved to the HDZ 100.
  • the maintenance target device 10 for example, the tube bundle of the heat exchanger 12 or the impeller of the pump forming the moving device 11 is removed, and the maintenance beam 23 is formed. Is hung. Further, the maintenance target device 10 is carried to the peripheral work area 26 via the carrying path 24 set in each of 200A to 200D. Then, the maintenance target device 10 installed on the floors 200B to 200D on the second floor or higher is suspended by the pulley 92 of the transport beam 23 projecting toward the HDZ 100 and transported to the HDZ 100.
  • the maintenance target device 10 is lowered to the deck along the HDZ 100 by a worker on the deck side and placed on a carriage (not shown) for transportation. Further, it is transported to the laydown area 7 via the transport path 24 on the side of the gap 90 and the central transport path 93. Incidentally.
  • the equipment 10 on the first floor 200A is placed on a carriage for transportation on the transportation path 24 provided on the floor 200A, and transported to the laydown area 7 via the transportation path 24 on the gap 90 side and the central transportation path 93. To be done.
  • the maintenance target device 10 is transported from the laydown area 7 to a land base by, for example, an external ship or the like for maintenance. After that, the maintenance target device 10 that has undergone the maintenance is returned to the laydown area 7, is transported to the original floors 200A to 200D through, for example, a route opposite to that at the time of unloading, and is attached to the natural gas liquefaction device 2.
  • FIG. 11 is a process diagram relating to a method of setting the arrangement position of the HDZ 100 for the plurality of floors 200B to 200D in the module 20.
  • the transport route 24 and the HDZ 100 are set (P1, P2).
  • the HDZ 100 of The placement position is set.
  • the HDZ 100 is similarly set for the other device 10 on the third floor 200C.
  • the placement position of the largest maintenance target device 11 heat exchanger 12 in the above example
  • the pulley 92 that is the lifting mechanism are provided on the third floor 200C where the placement position of the HDZ 100 is set first. It is preferable to set the HDZ 100 installation position and set the transport path 24 to the HDZ 100 so that the transport distance to the transport beam 23 is the shortest.
  • the transport path 24 is set using the transport beam 23.
  • the maintenance target device 10 is transported to the work area 26 by using, for example, a transportation cart.
  • the HDZ 100 may be set at a location such as a corner of the third floor 200C that does not interfere with setting the placement position of the HDZ 100 on the other floors 200B and 200D.
  • the floor 200B on which the largest maintenance target device 10 is installed is selected, and the arrangement position of the transport path 24 and the HDZ 100 is set so as to avoid the already set HDZ 100 (P3). , P4).
  • a component removed from the moving device 11 on the second floor 200B corresponds to this. Therefore, the placement position of the HDZ 100 on the second floor 200B is set to a position that does not overlap the HDZ 100 on the third floor 200C and has the shortest transport distance from the installation position of the moving device 11.
  • the floor 200D on which the largest device 10 is installed is specified, and the setting of the transport path 24 and the HDZ 100 (P3, P4) is repeated so as to avoid the already set HDZ100.
  • the HDZ 100 of the fourth floor 200D is set.
  • the transport path 24 using the transport beam 23 is not set. According to the above procedure, the HDZ 100 arrangement position of each floor 200A to 200D can be set while avoiding the overlap when the module 20 is viewed in a plan view.
  • one module 20 of the plurality of modules 20 is placed on the second floor or higher floors 200B to 200D of the module 20.
  • the floor 200 ⁇ / b> C on which the largest device 10 is arranged among the devices 10 to be maintained that are arranged and removed and transported during maintenance is specified.
  • the HDZ 100 is set in order to carry in and out the specified equipment 10 on the floor 200C in the gap 90 between the modules 20.
  • the floor 200B in which the largest maintenance target device 10 is placed is specified, and the HDZ100 of the floor 200B is set so as to avoid the HDZ100 in which the placement position is already set.
  • the arrangement is repeatedly performed on all floors 200B to 200D in which the HDZ 100 needs to be installed. With such a configuration, the HDZ 100 can be set in order from the floor where the large-sized device 10 is located, and the transfer route 24 that can efficiently transfer the device 10 for maintenance is set.
  • the point where the transport distance from the heat exchanger 12 is the shortest is set to the arrangement position of the third HDZ 100.
  • the arrangement position of the HDZ 100 in order from the floor 200C on which the large maintenance target device 10 is installed, the larger the maintenance target device 10, the shorter the transport distance, and the more efficient the arrangement of the HDZ 100.
  • the setting of the HDZ 100 of each floor 200 is completed based on the process chart of FIG. 11 for the module 20 having the largest maintenance target device 10 among the plurality of modules 20. After that, the modules 20 including the large device 10 may be sequentially selected from the remaining modules 20, and the HDZ 100 may be set by the same method.
  • the floor 200 to which the HDZ 100 is set may be selected from the floors 200 of the plurality of modules 20 regardless of the modules 20.
  • the equipment 10 to be maintained may be selected from the floors 200 of all the modules 20 in descending order, and the HDZ 100 may be set in order from the floor 200 on which the equipment 10 is installed.
  • the HDZ 100 may be set at the peripheral edge (on the side of the floating body 9 shown in FIG. 3) of each floor 200 opposite to the central transport path 93. .
  • the modules 20 are arranged in the arrangement direction of the plurality of modules 20. Seen from the above, one side and the other side are divided, and the arrangement position of the HDZ100 is set for each of the one side division and the other side division by the method described with reference to FIG. Good.
  • Natural gas liquefier 9 Floating body 20 Module 100 HDZ 200A-D 1st to 4th floor 24 Conveying path 6 Pipe rack 93 Central conveying path

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Separation By Low-Temperature Treatments (AREA)

Abstract

【課題】浮体部上に設置される天然ガス液化装置において、天然ガス液化装置を構成する機器のメンテナンスのための搬送を効率よく実施できるように天然ガス液化装置を設計する技術を提供する。 【解決手段】浮体部上に設けられた天然ガス液化装置において、モジュール20の2階以上のフロアに配置され、メンテナンス時に取り外されて搬送されるメンテナンス対象機器のうち、最大の機器が配置されたフロアを特定している。さらにモジュール間の隙間に特定したフロアの機器を搬入出するため昇降経路を設定している。そして昇降経路が設定されていない残りのフロアのうち最大のメンテナンス対象機器が配置されたフロアを特定し、既に配置位置が設定されている昇降経路を避けるように当該フロアの昇降経路を配置することを、前記昇降経路の設置が必要な全てのフロアに対して繰り返し実施している。

Description

天然ガス液化装置の設計方法及び天然ガス液化装置
 本発明は、洋上にて天然ガスの処理を行う天然ガス液化装置に関する。
 井戸元より産出された炭化水素ガスである天然ガスに対しては、各種の処理設備を用いて、液化する前の天然ガスから各種の不純物を除去する前処理と、前処理後の天然ガスを液化してLNG(Liquidized Natural Gas)を得る液化処理と、が行われる。 
 例えば特許文献1に記載されているように、海洋あるいは湖洋の天然ガス田の開発にあたっては、洋上に浮かべた浮体部上に天然ガスの前処理や液化処理を行う設備を設けた天然ガス液化装置(海洋プラント)が用いられる。このような天然ガス液化装置には、前述の各設備を構成する機器が配置された複数のモジュールを備えているものがある。このようなモジュールは、例えば複数階構造の架構に分けて構成されている。
 一方で、天然ガス液化装置においては、装置の稼働を停止した後、メンテナンス対象の機器を取り外して、モジュール外に搬出してからメンテナンス作業を行う場合がある。このとき、大型のメンテナンス対象機器については、搬送機器を用いてモジュールからの搬出入を行う必要がある。 
 この点、浮体部に設けられた天然ガス液化装置においては、設備の設置面積が制限されるため、ペデステルクレーンなどのように大型の搬送機器を多数台設けて装置全体をカバーすることが難しい。
 そのためモジュールの各階に設置されたメンテナンス対象機器を運び出すにあたっては、各階に機器搬送用のビームや滑車(プーリ)などを配置し、予め設定された搬送経路を介して個別に運び出す必要がある。
 このようなモジュール化された天然ガス液化装置を設計するにあたっては、プロセス側の流体の流れなどを踏まえた効率的な機器配置に加え、上述のメンテナンスの際の機器の搬送経路を含めてモジュールの設計を行う必要があるため、最適な機器配置を行う設計作業が煩雑になってしまう問題があった。
韓国公開特許10-2016-0014918号公報
 本発明は、このような背景の下になされたものであり、浮体部上に設置される天然ガス液化装置において、天然ガス液化装置を構成するメンテナンス対象機器の搬送に用いられる昇降機構を効率よく配置する技術を提供する。
 本発明の天然ガス液化装置の設計方法は、水に浮かぶ浮体部上に設置される天然ガス液化装置の設計方法であって、
 前記天然ガス液化装置が、当該天然ガス液化装置の構成機器を複数階構造の架構内に分けて配置した複数のモジュールを備えるとき、
 (a)前記複数のモジュールのうちの一のモジュールについて、当該モジュールの2階以上のフロアに配置され、メンテナンス時に取り外されてモジュールの外部との間の搬入出が行われるメンテナンス対象機器のうち、最大のメンテナンス対象機器が配置されたフロアを特定する工程と、(b)前記工程(a)にて特定したフロアのメンテナンス対象機器を搬入出する際に、前記架構の側方の昇降経路を通って上下方向の搬送を行うために用いられる昇降機構の配置位置を設定する工程と、(c)前記昇降機構の配置位置が設定されていない残りのフロアのうち最大のメンテナンス対象機器が配置されたフロアを特定する工程と、(d)既に配置位置が設定されている昇降機構を用いた昇降経路を避けて、前記工程(c)にて特定したフロアのメンテナンス対象機器に係る昇降機構の配置位置を設定する工程と、を含み、前記昇降機構の設置が必要な全てのフロアに対して前記配置位置の設定が行われるまで、前記工程(c)及び工程(d)を繰り返し実施することを特徴とする。
 前記天然ガス液化装置の設計方法は以下の特徴を備えていてもよい。
 (1)前記工程(b)または工程(d)では、前記最大のメンテナンス対象機器の配置位置と前記昇降機構との間の搬送距離が最短となるように、当該昇降機構の配置位置を設定すること。
 (2)前記浮体部は、船幅方向よりも船長方向に長い平面形状を有し、前記複数のモジュールを、前記船長方向に沿って列状に並べて配置したモジュール列を備えることと、各昇降経路が、隣り合って配置されたモジュール間の隙間内に位置するように、前記昇降機構の配置位置を設定するとき、前記一のモジュールに加えて、前記隙間を介して当該一のモジュールと隣り合って配置されたモジュールについても、既に配置位置が設定されている昇降機構を用いた昇降経路を避けて、前記工程(d)の昇降機構の配置位置が設定されること。
(3)前記隙間の幅が、前記モジュールの並び方向に沿って見た、前記昇降経路の幅の2倍未満に設定されること。
(4)(2)において、前記一のモジュールを、前記並び方向に沿って見た一方側の区画部と、他方側の区画部とに区画し、前記一方側の区画部と隣り合うモジュールとの隙間内に前記昇降経路が設けられる昇降機構と、前記他方側の区画部と隣り合うモジュールとの隙間内に前記昇降経路が設けられる昇降機構と、を共通のフロアに設けるとき、前記一方側の区画部と、他方側の区画部との各々について、前記工程(a)~工程(d)の実施に続いて、前記工程(c)及び工程(d)を繰り返し実施すること。
(5)(2)において、前記モジュール列の複数のモジュールについて、最大のメンテナンス対象機器が配置されたモジュールを前記一のモジュールに選択し、当該一のモジュールについて、前記工程(a)~工程(d)の実施に続いて、前記工程(c)及び工程(d)を繰り返し実施すること。
(6)(2)において、前記モジュール列の複数のモジュールについて、メンテナンス対象機器の大きな順に、前記一のモジュールを順次、選択しながら、各モジュールに対して並行に、前記工程(a)~工程(d)の実施に続いて、工程(c)及び工程(d)を繰り返し実施すること。
(7)(2)において、前記船幅方向の中央位置に、船長方向に沿って延在するように、前記天然ガス液化装置内で取り扱われる流体が流れる配管群を保持する架構構造のパイプラックが設けられ、前記浮体部の船首側から見て、前記パイプラックの両脇に、各々、モジュール列が配置されること。このとき、前記パイプラックと隣接する位置に、前記メンテナンス対象機器が保管されるレイダウンエリアが設けられ、前記メンテナンス対象機器は、前記隙間及びパイプラックに沿って、前記昇降経路とレイダウンエリアとの間を搬送されること。
 本発明の天然ガス液化装置は、水に浮かび船幅方向よりも船長方向に長い平面形状を有する浮体部上に設置される天然ガス液化装置であって、
 前記天然ガス液化装置は、当該天然ガス液化装置の構成機器を複数階構造の架構内に分けて配置してなる複数のモジュールを備え、これら複数のモジュールが、前記船長方向に沿って列状に並べて配置されたモジュール列を構成していることと、
 前記モジュール列には、2階以上のフロアに配置され、メンテナンス時に取り外されてモジュールの外部との間の搬入出が行われるメンテナンス対象機器を搬入出する際に、前記架構の側方の昇降経路を通って上下方向の搬送を行うための昇降機構が設けられたモジュールが含まれることと、
 前記昇降機構を備えた2つのモジュールが、隙間を介して隣り合って配置されているとき、各昇降機構の配置位置は、前記昇降経路が前記隙間内に位置し、且つ、平面視したとき互いの昇降経路の重なりを避けて設定されていることと、を特徴とする。
 本発明は、昇降機構を用いてメンテナンス対象機器の上下方向の搬送を行う搬送経路を、モジュールを構成する架構の側方に限定し、且つ、搬送経路同士が重ならないように昇降機構の配置位置を決定するので、効率のよい昇降機構の配置を簡便に行うことができる。
天然ガス液化装置が設けられた浮体部の平面図である。 前記天然ガス液化装置が設けられた浮体部の側面図である。 前記浮体部の一部を拡大した平面図である。 天然ガス液化装置を構成するモジュールの側面図である。 モジュールの第1のフロアを示す平面図である。 モジュールの第2のフロアを示す平面図である。 モジュールの第3のフロアを示す平面図である。 モジュールの第4のフロアを示す平面図である。 隣り合うモジュールの間のHDZの配置を示す平面図である。 HDZに設けられる昇降機構を模式的に示す説明図である。 HDZの配置の設定方法を示す工程図である。
 図1、2は、実施の形態に係る天然ガス液化装置における船体(浮体部)の平面図及び側面図である。また図3は、天然ガス液化装置の一部を拡大した平面図である。図1、2に示すように浮体部9の、船首側には、係留設備3が設けられている。なお図1中の符号31は、係留設備支持部である。係留設備3は、例えば海底に設置された係留索34に接続されて浮体部9の係留を行うと共に、採掘された天然ガスの水中輸送を行うライザー35に接続される。以後の説明では、浮体部9の係留設備3側を前方とする。
 さらに浮体部9の係留設備3側の端部における、左舷寄りの位置には、天然ガス処理装置2や浮体部内のLNGタンクなどで発生した余剰なガスを燃焼するためのフレアスタック部5が設けられている
 浮体部9の中央には、浮体部9の長さ方向に沿って伸びるようにパイプラック6が設けられている。パイプラック6の左右両脇には、各々天然ガスを液化する天然ガス液化装置2を構成する複数のモジュール20(モジュール列)が前後方向に並べて設けられている。また浮体部9の前方寄りにおけるパイプラック6の右舷側に並ぶモジュール20群の間の領域と、パイプラック6及びモジュール20群よりも後方寄りの領域とには、各々天然ガス液化装置2を構成する機器を船外に運び出すために保管しておくレイダウンエリア7が設けられている。またパイプラック6の下部側の空間は、各モジュール20から搬出される機器をレイダウンエリア7に運び出すための中央搬送路93になっている。
 さらに浮体部9の後方側のレイダウンエリア7の後方側には、居住設備4が設けられている。係留設備3や居住設備4のレイアウトは実施の形態に示した位置に限られない。またレイダウンエリア7も浮体部9の前方側及び後方側のどちらに設けられてもよい。
 図4は、例えば前方から見て右舷側の列の後方寄りのモジュール20を中央搬送路93側から見た側面図である。図4に示すようにモジュール20を構成する架構21は、複数階、例えば4階分のフロア200A~200Dを備えている。なおこの例では、甲板の高さ位置に設けられた第1のフロア200Aから順に、上階側へ向けて第2のフロア200B~第4のフロア200Dと呼ぶ。また天然ガス液化装置2の前後方向に隣り合って配置されたモジュール20の間には、隙間90が設けられている。当該隙間90は、浮体部9の甲板まで下降させた後述のメンテナンス対象機器10を甲板上にて搬送するための搬送路24としても用いられる。
 各フロア200A~200Dについて、夫々第1~第4のフロア200A~200Dを模式的に示した平面図である図5~図8も参照して説明する。概略矩形状に構成された第1~第4のフロア200A~200Dにおいて、図5~8の上部側に示した辺がパイプラック6に臨む配置となるように、各モジュール20が配置されている。各モジュール20には、複数の熱交換器12や塔槽13、14、ポンプやコンプレッサーなどの動機器11、これらを繋ぐ配管や開閉バルブや流量調節バルブなどの機器10が多数設けられている。これらの機器10は、各フロア200A~200Dに分けて設けられている。あるいは、塔槽13、14のなかには、複数のフロア200A~200Dに跨るように設けられている場合もある。
 これらの機器10のうち、一部の機器は、メンテナンスの際に取り外されてモジュール20の外部に搬出される。メンテナンスの対象として外部へ搬出される機器(メンテナンス対象機器)10を例示すると、熱交換器12のチューブバンドルや動機器11、配管に設けられたバルブ(不図示)などを例示することができる。例えばチューブバンドルは、メンテナンス対象機器10のうちでも最も大きな機器の一種であり、また動機器11や、大径の配管に設けられたバルブは、チューブバンドルに次いで大型のものが多い。これらチューブバンドルや動機器11、大型のバルブよりも小型の機器10についても、適宜、メンテナンスの際にモジュール20の外部へ搬出されるものがある。
 また図5~8に示すように各フロア200A~200Dには、周縁に沿って作業者の避難路22が設けられる。避難路22には、天然ガス液化装置2を構成する機器10を設置することができない。さらに、モジュール20から見てパイプラック6とは反対側の側方には、各フロア200A~200D間を繋ぐ避難階段25が設置されている。なお第1のフロア200Aにおいては、パイプラック6の下部側の中央搬送路93が避難路22の一部を兼用することができる。そのため第1のフロア200Aの避難路22は、中央搬送路93側を除いた周縁に設けられている。
 例えば図5、6に示す例において、第1のフロア200A、第2のフロア200Bには、流体移送用のポンプである動機器11が夫々2基ずつ設けられ、また第3のフロア200Cには、3基の熱交換器12が設けられている。また例えば第3のフロア200C~第4のフロア200Dを貫通するように処理塔などの塔13が設けられている。
 塔13を浮体部9上に設けるにあたって、上下方向に細長い形状の塔13を底板から直立するように設置すると、浮体部9が搖動したときに、塔13の先端の振れ幅が大きくなり、周囲の機器10や架構21に接触したり、転倒などの危険がある。そこで、この例では、塔13に対し、下方側に向かって開口径が広がるスカート状の支持部材15を設けている。塔13には、例えば中間から上方寄りの位置の側面が支持部材15の上端部の内面によって、全周に亘って保持されている。そして、支持部材15の下端を第4のフロア200Dの床面に固定することで、機器との接触や転倒を抑えている。一方、塔13は、第4のフロア200D、第3のフロア200Cの底面を貫通し、その下端部は、第2のフロア200Bの床面から浮いた状態で配置されている。塔13の中間に近い部位を側面から固定することで、浮体部9が搖動したときにも塔13の上端及び下端の振れ幅が小さくなるため、安全性が高まる。さらに第2のフロア200Bに塔13を直立させるための支持部材を設ける必要がなく、塔13の下方側の領域が有効活用できる。
 この他、各フロア200A~200Dには、熱交換器12や塔13などで処理された液体を受ける受槽など、より小型の槽14が設けられている。なお、図示の便宜上、図4に示した側面図中の機器10の配置と、図5~8に示した平面図中の機器10の配置とは、必ずしも一致していない。これらの機器10のうち、例えば浮体部9に固定する部分(底部)が横断面で見て円形の機器10を設置するにあたっては、例えば機器10の底部の周縁を支持する円環状のリング部材16を各フロア200A~Dに配置し、リング部材16に機器10の底面を載置して固定する。このように底部の横断面が円形となっている機器10をリング部材16に載置することで安定して設置することができる。
 以上に説明した構成を備えたモジュール20において、モジュール20内に配置された各機器10の中には、モジュール20外へと搬出してメンテナンスを行わなければならない場合がある。そして、このようなメンテナンス対象機器10のうち、2階以上のフロア200C~200Dに配置されているものについては、当該機器10を浮体9の甲板まで降ろした後、レイダウンエリア7まで搬送する作業が必要となる。 
 本例のモジュール20においては、モジュール20の側方を通ってメンテナンス対象機器10の上下方向の搬送が行われる。
 上述の観点において、各モジュール20を構成する架構21の側方領域、ここでは、隣のモジュール20との隙間90には、メンテナンス対象機器10の昇降経路(HDZ:Handling Drop Zone)100が設定されている。このHDZ100を通って、2階以上のフロア200B~200Dに設置されているメンテナンス対象機器10が甲板まで降ろされ、あるいは、メンテナンス後の当該機器10が各フロア200B~200Dまで引き上げられる。この例ではモジュール20同士の隙間90の幅はHDZ100の幅の2倍未満に設定されている。なお図5~8では、その図に記載のフロア200B~200Dに配置されたメンテナンス対象機器10を搬送するためのHDZを実線で示し、他のフロア200B~200Dに設けられたメンテナンス対象機器10を搬送するためのHDZ100を破線で示している。
 そして各フロア200B~200Dには、設置位置からHDZ100まで、各メンテナンス対象機器10を横方向に搬送するための搬送路24が設定されている。これらの搬送路24は、各メンテナンス対象機器10の設置位置から、当該フロア200B~200Dに設置されたHDZ100と対向する周縁側の領域まで引き回されている。当該HDZ100と対向する領域は、例えば機器10の方向を変える作業領域26になっている。ここで作業領域26は、搬送路24の一部を構成している。なお、第1のフロア200Aについても、設置位置からモジュール間の隙間90の搬送路24や、中央搬送路93まで、各メンテナンス対象機器10を横方向に搬送するための搬送路24が設定されている。
 さらに各フロア200B~200Dの天井部における機器10の上方には、機器10を吊り上げて搬送路24まで引き出すための搬送用ビーム23が設けられている。また作業領域26の上方から、当該フロア200B~200DのHDZ100に張り出すように搬送用ビーム23が設けられている。
 なお既述のように、各フロア200B~200Dの周縁側の領域には避難路22が設定され、避難路22には機器10を設置することはできない。この点、メンテナンス時の一時的な例外対応として、既述の作業領域26の設定、搬送用ビーム23の設置がなされている。
 図9に示すように一のモジュール20に着目して平面視したとき、各フロア200A~200DのHDZ100は、互いに重なりを避けて配置されている。また同様に、また図9を正面に見て左側のモジュールから順番にモジュール20A~Cとすると、隙間90を介して隣り合って配置された2つのモジュール20A、20B(20B、20C)に着目した場合においても、各モジュール20A~CのHDZ100A~100Cは、隣り合うモジュール20A~CのHDZ100A~100Cと互いに重なりを避けて配置されている。これらのHDZ100の配置位置の設定手法の詳細については、後述する。
 図10はHDZ100を通って機器10の上下方向の搬送を実行するための昇降機構の構成例を示す模式図である。図10に示すようにメンテナンス対象機器10は、作業領域26にて、搬送用ビーム23に設けられた滑車92を介して保持される。滑車92は、例えば移動体91を介して搬送用ビーム23に接続され、搬送用ビーム23に沿って移動し、HDZ100に移動できるように構成されている。
 上述の構成を備えたモジュール20において、メンテナンスの実施にあたっては、初めにメンテナンス対象機器10、例えば熱交換器12のチューブバンドルや動機器11を成すポンプのインペラーなどが取り外され、搬送用ビーム23に吊るされる。さらにメンテナンス対象機器10は、各200A~200D内に設定された搬送路24を介して周縁の作業領域26まで運ばれる。そして2階以上のフロア200B~200Dに設置されたメンテナンス対象機器10については、HDZ100に向けて張り出した搬送用ビーム23の滑車92に吊り替えられ、HDZ100へと搬送される。
 次いでメンテナンス対象機器10は、甲板側の作業員により、HDZ100に沿って甲板まで降ろされ、搬送用の台車(不図示)に載せられる。さらに隙間90側の搬送路24、及び中央搬送路93を介して、レイダウンエリア7に搬送される。なお。第1のフロア200Aの機器10については、フロア200Aに設けられた搬送路24上で搬送用の台車に載せられ、隙間90側の搬送路24や中央搬送路93を介してレイダウンエリア7に搬送される。
 その後、メンテナンス対象機器10は、レイダウンエリア7から、例えば外部の船舶などにより陸上基地に搬送されメンテナンスが行われる。しかる後、メンテナンスを終えたメンテナンス対象機器10は、レイダウンエリア7に戻され、例えば搬出時とは逆の経路を通って元のフロア200A~200Dに搬送され、天然ガス液化装置2に取り付けられる。
 続いて天然ガスの液化装置2を設計するにあたっての各モジュール20のHDZ100の配置位置の設定を行う方法について説明する。 
 先ず一つのモジュール20内において、複数のフロア200B~200Dに対してHDZ100が配置される場合について説明する。図11はモジュール20内の複数のフロア200B~200Dに対してのHDZ100の配置位置を設定する方法に係る工程図である。
 図11に示すようにまず各フロア200A~200Dのうち2階以上のフロア200B~200Dにおいて、最大の機器10が設置されているフロアを特定し、搬送経路24とHDZ100とを設定する(P1、P2)。 
 図5~8に示す例では、例えば第3のフロア200Cの熱交換器12のチューブバンドルが最も大きいため、まず第3のフロア200Cに熱交換器12の搬送路24及び作業領域26、HDZ100の配置位置が設定される。また第3のフロア200Cの他の機器10についても同様にHDZ100を設定する。
 この時、最初にHDZ100の配置位置が設定される第3のフロア200Cにおいては、最大のメンテナンス対象機器11(上述の例では熱交換器12)の配置位置と昇降機構である滑車92が設けられた搬送用ビーム23との間の搬送距離が最短となるようにHDZ100設置位置を設定し、当該HDZ100までの搬送経路24を設定することが好ましい。
 なお、図8に示す例では、第3のフロア200Cの他のメンテナンス対象機器10は、例えば比較的小型の機器10であることなどから、搬送用ビーム23を用いた搬送路24の設定はされていない。当該メンテナンス対象機器10は、例えば搬送用の台車を用いて作業領域26に搬送される。この場合は、HDZ100は、第3のフロア200Cの隅など、他のフロア200B、200DのHDZ100の配置位置を設定する際の邪魔にならない場所に設定してもよい。
 次いで残るフロア200B、200Dのうちの最大のメンテナンス対象機器10が設置されているフロア200Bを選択し、既に設定されているHDZ100を避けるように搬送経路24とHDZ100との配置位置を設定する(P3、P4)。この例では、第2のフロア200Bの動機器11から取り外される部品がこれに相当する。そのため第3のフロア200CのHDZ100と重ならない位置であって、動機器11の設置位置からの搬送距離が最短となる位置に、第2のフロア200BのHDZ100の配置位置を設定する。そして残りのフロア200Dについても、最大の機器10が設置されているフロア200Dの特定、既に設定されているHDZ100を避けるように搬送経路24とHDZ100との設定(P3、P4)を繰り返す。ここでは、残りは第4のフロア200Dのみであるため第4のフロア200DのHDZ100が設定される。なお、この例では、第4のフロア200Dのメンテナンス対象機器10も比較的小型の機器10であることなどから、搬送用ビーム23を用いた搬送路24の設定はしていない。 
 以上の手順により、モジュール20を平面視したとき重なりを避けて各フロア200A~200DのHDZ100配置位置を設定することができる。
 上述の実施の形態によれば、浮体部9上に設けられた天然ガス液化装置2において、複数のモジュール20のうちの一のモジュール20について、当該モジュール20の2階以上のフロア200B~200Dに配置され、メンテナンス時に取り外されて搬送されるメンテナンス対象機器10のうち、最大の機器10が配置されたフロア200Cを特定している。さらにモジュール20間の隙間90に特定したフロア200Cの機器10を搬入出するためHDZ100を設定している。そしてHDZ100が設定されていない残りのフロア200B、200Dのうち最大のメンテナンス対象機器10が配置されたフロア200Bを特定し、既に配置位置が設定されているHDZ100を避けるように当該フロア200BのHDZ100を配置することを、前記HDZ100の設置が必要な全てのフロア200B~200Dに対して繰り返し実施している。このように構成することで大型の機器10のある階から順番にHDZ100を設定することができ、機器10のメンテナンスのための搬送を効率よく実施できる搬送経路24を設定することができる。
 特に図5~図8に示すモジュール20では、まず第3のフロア200CのHDZ100を設定するにあたって、熱交換器12からの搬送距離が最短となる地点を第3のHDZ100の配置位置に設定する。このように大きなメンテナンス対象機器10が設置されたフロア200Cから順に、HDZ100の配置位置を設定していくことにより、大型のメンテナンス対象機器10ほど搬送距離が短く、効率的なHDZ100の配置とすることができる。
 また列状に配置された複数のモジュール20間で互いに重なりを避けてHDZ100の配置位置を設定する手法の例について説明しておく。 
 1つ目の例として、これら複数のモジュール20のうち、最も大きいメンテナンス対象機器10を備えたモジュール20について、図11の工程図に基づき各フロア200のHDZ100の設定を完了させる。その後、残るモジュール20の中から、順次、大きな機器10を備えるモジュール20を選択して、同様の手法によりHDZ100の設定を実施してもよい。
 また2つ目の例として、複数のモジュール20の各フロア200から、モジュール20を問わずにHDZ100を設定するフロア200を選択するようにしてもよい。例えば全てのモジュール20のフロア200からメンテナンス対象の機器10を大きい順に選択し、当該機器10が設置されているフロア200ら順番にHDZ100の設定を実施していくようにしてもよい。
 さらに図6~8に示した例に限定されず、HDZ100は、各フロア200における中央搬送路93とは反対側の周縁(図3に示す浮体9の船べり側)に設定されていてもよい。 
 また図6、7に示す例のように、両脇の隙間90に対して各々、HDZ100が配置されるフロア200B、200Cを備えるモジュール20においては、モジュール20を複数のモジュール20の並び方向に沿って見た一方側と他方側とに区画して、一方側の区画部と他方側の区画部との各々について、図11を用いて説明した手法によりHDZ100の配置位置の設定を行うようにしてもよい。
2        天然ガス液化装置
9        浮体部
20       モジュール
100      HDZ
200A~D   第1~第4のフロア
24       搬送経路
6        パイプラック
93       中央搬送路

Claims (15)

  1.  水に浮かぶ浮体部上に設置される天然ガス液化装置の設計方法であって、
     前記天然ガス液化装置が、当該天然ガス液化装置の構成機器を複数階構造の架構内に分けて配置した複数のモジュールを備えるとき、
     (a)前記複数のモジュールのうちの一のモジュールについて、当該モジュールの2階以上のフロアに配置され、メンテナンス時に取り外されてモジュールの外部との間の搬入出が行われるメンテナンス対象機器のうち、最大のメンテナンス対象機器が配置されたフロアを特定する工程と、(b)前記工程(a)にて特定したフロアのメンテナンス対象機器を搬入出する際に、前記架構の側方の昇降経路を通って上下方向の搬送を行うために用いられる昇降機構の配置位置を設定する工程と、(c)前記昇降機構の配置位置が設定されていない残りのフロアのうち最大のメンテナンス対象機器が配置されたフロアを特定する工程と、(d)既に配置位置が設定されている昇降機構を用いた昇降経路を避けて、前記工程(c)にて特定したフロアのメンテナンス対象機器に係る昇降機構の配置位置を設定する工程と、を含み、前記昇降機構の設置が必要な全てのフロアに対して前記配置位置の設定が行われるまで、前記工程(c)及び工程(d)を繰り返し実施することを特徴とする天然ガス液化装置の設計方法。
  2.  前記工程(b)または工程(d)では、前記最大のメンテナンス対象機器の配置位置と前記昇降機構との間の搬送距離が最短となるように、当該昇降機構の配置位置を設定することを特徴とする請求項1に記載の天然ガス液化装置の設計方法。
  3.  前記浮体部は、船幅方向よりも船長方向に長い平面形状を有し、前記複数のモジュールを、前記船長方向に沿って列状に並べて配置したモジュール列を備えることと、
     各昇降経路が、隣り合って配置されたモジュール間の隙間内に位置するように、前記昇降機構の配置位置を設定するとき、前記一のモジュールに加えて、前記隙間を介して当該一のモジュールと隣り合って配置されたモジュールについても、既に配置位置が設定されている昇降機構を用いた昇降経路を避けて、前記工程(d)の昇降機構の配置位置が設定されることと、を特徴とする請求項1に記載の天然ガス液化装置の設計方法。
  4.  前記隙間の幅が、前記モジュールの並び方向に沿って見た、前記昇降経路の幅の2倍未満に設定されることを特徴とする請求項3に記載の天然ガス液化装置の設計方法。
  5.  前記一のモジュールを、前記並び方向に沿って見た一方側の区画部と、他方側の区画部とに区画し、前記一方側の区画部と隣り合うモジュールとの隙間内に前記昇降経路が設けられる昇降機構と、前記他方側の区画部と隣り合うモジュールとの隙間内に前記昇降経路が設けられる昇降機構と、を共通のフロアに設けるとき、前記一方側の区画部と、他方側の区画部との各々について、前記工程(a)~工程(d)の実施に続いて、前記工程(c)及び工程(d)を繰り返し実施することを特徴とする請求項3に記載の天然ガス液化装置の設計方法。
  6.  前記モジュール列の複数のモジュールについて、最大のメンテナンス対象機器が配置されたモジュールを前記一のモジュールに選択し、当該一のモジュールについて、前記工程(a)~工程(d)の実施に続いて、前記工程(c)及び工程(d)を繰り返し実施することを特徴とする請求項3に記載の天然ガス液化装置の設計方法。
  7.  前記モジュール列の複数のモジュールについて、メンテナンス対象機器の大きな順に、前記一のモジュールを順次、選択しながら、各モジュールに対して並行に、前記工程(a)~工程(d)の実施に続いて、工程(c)及び工程(d)を繰り返し実施することを特徴とする請求項3に記載の天然ガス液化装置の設計方法。
  8.  前記船幅方向の中央位置に、船長方向に沿って延在するように、前記天然ガス液化装置内で取り扱われる流体が流れる配管群を保持する架構構造のパイプラックが設けられ、前記浮体部の船首側から見て、前記パイプラックの両脇に、各々、モジュール列が配置されることを特徴とする請求項3に記載の天然ガス液化装置の設計方法。
  9.  前記パイプラックと隣接する位置に、前記メンテナンス対象機器が保管されるレイダウンエリアが設けられ、前記メンテナンス対象機器は、前記隙間及びパイプラックに沿って、前記昇降経路とレイダウンエリアとの間を搬送されることを特徴とする請求項8に記載の天然ガス液化装置の設計方法。
  10.  水に浮かび船幅方向よりも船長方向に長い平面形状を有する浮体部上に設置される天然ガス液化装置であって、
     前記天然ガス液化装置は、当該天然ガス液化装置の構成機器を複数階構造の架構内に分けて配置してなる複数のモジュールを備え、これら複数のモジュールが、前記船長方向に沿って列状に並べて配置されたモジュール列を構成していることと、
     前記モジュール列には、2階以上のフロアに配置され、メンテナンス時に取り外されてモジュールの外部との間の搬入出が行われるメンテナンス対象機器を搬入出する際に、前記架構の側方の昇降経路を通って上下方向の搬送を行うための昇降機構が設けられたモジュールが含まれることと、
     前記昇降機構を備えた2つのモジュールが、隙間を介して隣り合って配置されているとき、各昇降機構の配置位置は、前記昇降経路が前記隙間内に位置し、且つ、平面視したとき互いの昇降経路の重なりを避けて設定されていることと、を特徴とする天然ガス液化装置。
  11.  前記隙間の幅が、前記モジュールの並び方向に沿って見た、前記昇降経路の幅の2倍未満に設定されることを特徴とする請求項10に記載の天然ガス液化装置。
  12.  前記モジュール列には、複数の前記昇降機構を備えた一のモジュールが含まれ、当該モジュールの両脇に、隙間を介して他のモジュールが配置されているとき、これら複数の前記昇降機構の配置位置は、各々、昇降経路が前記両脇の隙間内に位置し、且つ、平面視したとき互いの昇降経路の重なりを避けて設定されていることを特徴とする請求項10または11に記載の天然ガス液化装置。
  13.  前記一のモジュールにおいては、より大きなメンテナンス対象機器程の搬送を行う昇降機構であるほど、当該メンテナンス対象機器の設置位置から当該昇降機構までの各フロア内の搬送距離が短くなるように、各昇降機構の配置位置が設定されていることを特徴とする請求項12に記載の天然ガス液化装置。
  14.  前記船幅方向の中央位置に、船長方向に沿って延在するように、前記天然ガス液化装置内で取り扱われる流体が流れる配管群を保持する架構構造のパイプラックが設けられ、前記モジュール列は、前記浮体部の船首側から見て、前記パイプラックの両脇に、各々、配置されることを特徴とする請求項13に記載の天然ガス液化装置。
  15.  前記パイプラックと隣接する位置に、前記メンテナンス対象機器前記メンテナンス対象機器が保管されるレイダウンエリアと、前記隙間及びパイプラックに沿って、前記メンテナンス対象機器を前記昇降経路とレイダウンエリアとの間を搬送する搬送路と、を備えたことを特徴とする請求項14に記載の天然ガス液化装置。

     
PCT/JP2018/038138 2018-10-12 2018-10-12 天然ガス液化装置の設計方法及び天然ガス液化装置 WO2020075294A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
KR1020217007323A KR102461904B1 (ko) 2018-10-12 2018-10-12 천연 가스 액화 장치의 설계 방법 및 천연 가스 액화 장치
SG11202102533PA SG11202102533PA (en) 2018-10-12 2018-10-12 Method of designing natural gas liquidizing apparatus and natural gas liquidizing apparatus
PCT/JP2018/038138 WO2020075294A1 (ja) 2018-10-12 2018-10-12 天然ガス液化装置の設計方法及び天然ガス液化装置
CN201880097534.7A CN112703150B (zh) 2018-10-12 2018-10-12 天然气液化装置的设计方法及天然气液化装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2018/038138 WO2020075294A1 (ja) 2018-10-12 2018-10-12 天然ガス液化装置の設計方法及び天然ガス液化装置

Publications (1)

Publication Number Publication Date
WO2020075294A1 true WO2020075294A1 (ja) 2020-04-16

Family

ID=70164661

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/038138 WO2020075294A1 (ja) 2018-10-12 2018-10-12 天然ガス液化装置の設計方法及び天然ガス液化装置

Country Status (4)

Country Link
KR (1) KR102461904B1 (ja)
CN (1) CN112703150B (ja)
SG (1) SG11202102533PA (ja)
WO (1) WO2020075294A1 (ja)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130009064A (ko) * 2011-07-14 2013-01-23 삼성중공업 주식회사 액화천연가스 설비 배치구조를 갖는 선박
KR20150058676A (ko) * 2013-11-20 2015-05-29 대우조선해양 주식회사 해양 구조물의 파이프랙 및 그 설치 방법
KR20150134122A (ko) * 2014-05-21 2015-12-01 삼성중공업 주식회사 유체화물 처리시설을 갖는 해양구조물
KR20160028545A (ko) * 2014-09-03 2016-03-14 현대중공업 주식회사 탑사이드 모듈 유지보수용 통로가 구비된 에프엘엔지선
KR20180032863A (ko) * 2016-09-23 2018-04-02 현대중공업 주식회사 파이프 랙의 통합 배치를 위한 해양 구조물의 탑 사이드 모듈용 데크 구조물 및 이를 이용한 파이프 랙과 탑 사이드 모듈 배치 구조

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014168843A1 (en) * 2013-04-12 2014-10-16 Excelerate Liquefaction Solutions, Llc Systems and methods for floating dockside liquefaction of natural gas
JP6314713B2 (ja) * 2014-07-14 2018-04-25 株式会社ダイフク 階間搬送設備
KR101613219B1 (ko) 2014-07-30 2016-04-18 대우조선해양 주식회사 해양 플랜트

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130009064A (ko) * 2011-07-14 2013-01-23 삼성중공업 주식회사 액화천연가스 설비 배치구조를 갖는 선박
KR20150058676A (ko) * 2013-11-20 2015-05-29 대우조선해양 주식회사 해양 구조물의 파이프랙 및 그 설치 방법
KR20150134122A (ko) * 2014-05-21 2015-12-01 삼성중공업 주식회사 유체화물 처리시설을 갖는 해양구조물
KR20160028545A (ko) * 2014-09-03 2016-03-14 현대중공업 주식회사 탑사이드 모듈 유지보수용 통로가 구비된 에프엘엔지선
KR20180032863A (ko) * 2016-09-23 2018-04-02 현대중공업 주식회사 파이프 랙의 통합 배치를 위한 해양 구조물의 탑 사이드 모듈용 데크 구조물 및 이를 이용한 파이프 랙과 탑 사이드 모듈 배치 구조

Also Published As

Publication number Publication date
KR102461904B1 (ko) 2022-11-01
SG11202102533PA (en) 2021-04-29
KR20210064196A (ko) 2021-06-02
CN112703150A (zh) 2021-04-23
CN112703150B (zh) 2023-08-25

Similar Documents

Publication Publication Date Title
EP2218953B1 (en) Marine pipeline installation system
CN102027278B (zh) 海洋铺管船舶、系统及方法
CN102083683A (zh) 海上管及立管处理钻探船
GB2508867A (en) Pipe-laying vessel with S-laying and J-laying capability
GB2439295A (en) Method and vessel for laying reeled articles at sea
KR20140028865A (ko) 시추용 드릴 파이프 운반 방법
WO2020075294A1 (ja) 天然ガス液化装置の設計方法及び天然ガス液化装置
US10625991B2 (en) Deck hoist tractor, rescue chute and tote tank
KR101589196B1 (ko) 유체화물 처리시설을 갖는 해양구조물
EP3911835B1 (en) Modular riser section storage and handling system
CN109665445B (zh) 一种火炬塔吊装运输工艺
KR20130064998A (ko) 부유식 해상구조물 제작방법
KR101335251B1 (ko) 파이프 설치 시스템 및 이를 구비한 파이프 설치선
KR101566524B1 (ko) 대형 블록 탑재 방법
KR20130109656A (ko) 선박의 진수방법
JP7252281B2 (ja) 波形隔壁タンク上部スツール内配管構造
CN117897532A (zh) 海上设备
KR102055400B1 (ko) 선박용 스러스터의 도크 내 장착 방법
KR20150032422A (ko) 부유식 해상구조물의 리퀴드돔 구역의 밸브장치 핸들링 방법 및 이를 실행하기 위한 핸들링 시스템
TW201917255A (zh) 海床及海底管線拋石覆蓋方法
KR20170139846A (ko) 해양 플랜트
KR101056061B1 (ko) Lng 재기화 선박용 stl콘 구조물의 제조방법
KR100747373B1 (ko) Lng 운송선의 설비 정비를 위한 설비 운반 시스템 및방법과 lng 운송선
CN109690161B (zh) 安装托架
KR101807600B1 (ko) 부유체 상부에서의 해양구조물 건조공법

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18936605

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18936605

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: JP