WO2020054828A1 - 電源システム - Google Patents

電源システム Download PDF

Info

Publication number
WO2020054828A1
WO2020054828A1 PCT/JP2019/036003 JP2019036003W WO2020054828A1 WO 2020054828 A1 WO2020054828 A1 WO 2020054828A1 JP 2019036003 W JP2019036003 W JP 2019036003W WO 2020054828 A1 WO2020054828 A1 WO 2020054828A1
Authority
WO
WIPO (PCT)
Prior art keywords
voltage
battery
current
power supply
supply system
Prior art date
Application number
PCT/JP2019/036003
Other languages
English (en)
French (fr)
Inventor
井野光泰
渡辺康人
Original Assignee
本田技研工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 本田技研工業株式会社 filed Critical 本田技研工業株式会社
Priority to JP2020546211A priority Critical patent/JP7445598B2/ja
Priority to US17/275,695 priority patent/US11594895B2/en
Publication of WO2020054828A1 publication Critical patent/WO2020054828A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/44Methods for charging or discharging
    • H01M10/441Methods for charging or discharging for several batteries or cells simultaneously or sequentially
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L50/00Electric propulsion with power supplied within the vehicle
    • B60L50/50Electric propulsion with power supplied within the vehicle using propulsion power supplied by batteries or fuel cells
    • B60L50/60Electric propulsion with power supplied within the vehicle using propulsion power supplied by batteries or fuel cells using power supplied by batteries
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/12Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries responding to state of charge [SoC]
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/12Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries responding to state of charge [SoC]
    • B60L58/13Maintaining the SoC within a determined range
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/12Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries responding to state of charge [SoC]
    • B60L58/14Preventing excessive discharging
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/12Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries responding to state of charge [SoC]
    • B60L58/15Preventing overcharging
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/18Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries of two or more battery modules
    • B60L58/21Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries of two or more battery modules having the same nominal voltage
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/18Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries of two or more battery modules
    • B60L58/22Balancing the charge of battery modules
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L7/00Electrodynamic brake systems for vehicles in general
    • B60L7/10Dynamic electric regenerative braking
    • B60L7/16Dynamic electric regenerative braking for vehicles comprising converters between the power source and the motor
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/48Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/48Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
    • H01M10/482Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte for several batteries or cells simultaneously or sequentially
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J1/00Circuit arrangements for dc mains or dc distribution networks
    • H02J1/10Parallel operation of dc sources
    • H02J1/102Parallel operation of dc sources being switching converters
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0013Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries acting upon several batteries simultaneously or sequentially
    • H02J7/0014Circuits for equalisation of charge between batteries
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0047Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries with monitoring or indicating devices or circuits
    • H02J7/0048Detection of remaining charge capacity or state of charge [SOC]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/007Regulation of charging or discharging current or voltage
    • H02J7/00712Regulation of charging or discharging current or voltage the cycle being controlled or terminated in response to electric parameters
    • H02J7/00714Regulation of charging or discharging current or voltage the cycle being controlled or terminated in response to electric parameters in response to battery charging or discharging current
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/007Regulation of charging or discharging current or voltage
    • H02J7/00712Regulation of charging or discharging current or voltage the cycle being controlled or terminated in response to electric parameters
    • H02J7/007182Regulation of charging or discharging current or voltage the cycle being controlled or terminated in response to electric parameters in response to battery voltage
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M3/00Conversion of dc power input into dc power output
    • H02M3/02Conversion of dc power input into dc power output without intermediate conversion into ac
    • H02M3/04Conversion of dc power input into dc power output without intermediate conversion into ac by static converters
    • H02M3/10Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode
    • H02M3/145Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal
    • H02M3/155Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only
    • H02M3/156Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only with automatic control of output voltage or current, e.g. switching regulators
    • H02M3/158Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only with automatic control of output voltage or current, e.g. switching regulators including plural semiconductor devices as final control devices for a single load
    • H02M3/1584Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only with automatic control of output voltage or current, e.g. switching regulators including plural semiconductor devices as final control devices for a single load with a plurality of power processing stages connected in parallel
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M2220/00Batteries for particular applications
    • H01M2220/20Batteries in motive systems, e.g. vehicle, ship, plane
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2207/00Indexing scheme relating to details of circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J2207/20Charging or discharging characterised by the power electronics converter
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M3/00Conversion of dc power input into dc power output
    • H02M3/02Conversion of dc power input into dc power output without intermediate conversion into ac
    • H02M3/04Conversion of dc power input into dc power output without intermediate conversion into ac by static converters
    • H02M3/10Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode
    • H02M3/145Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal
    • H02M3/155Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only
    • H02M3/156Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only with automatic control of output voltage or current, e.g. switching regulators
    • H02M3/158Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only with automatic control of output voltage or current, e.g. switching regulators including plural semiconductor devices as final control devices for a single load
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/80Technologies aiming to reduce greenhouse gasses emissions common to all road transportation technologies
    • Y02T10/92Energy efficient charging or discharging systems for batteries, ultracapacitors, supercapacitors or double-layer capacitors specially adapted for vehicles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/14Plug-in electric vehicles

Definitions

  • the present invention relates to a power supply system in which a plurality of chargeable / dischargeable batteries are connected in parallel to each other via a voltage converter.
  • a power supply system in which a plurality of rechargeable batteries are connected in parallel to each other via a voltage converter is disclosed in, for example, Japanese Patent No. 6293010.
  • the present invention has been made in view of such a problem, and provides a power supply system capable of equalizing voltages or SOCs of a plurality of batteries connected in parallel with each other while avoiding battery deterioration.
  • the purpose is to:
  • a plurality of chargeable / dischargeable batteries a primary side is connected to any of the plurality of batteries, a secondary side is connected to each other in parallel, and the voltage of the battery connected to the primary side is arbitrary.
  • a plurality of voltage converters that convert the converted voltage to the secondary side and output the converted voltage to the secondary side, and measure a current that is connected to the primary side of the plurality of voltage converters and flows through the primary side.
  • the present invention relates to a power supply system including a plurality of current measuring devices.
  • the transformation rate is a maximum value of a discharge current of a battery connected to the primary side, which is measured by a current measuring device connected to the primary side. And a maximum value of the charging current of the battery.
  • the battery having a higher voltage or SOC is automatically (naturally) changed from a battery having a higher voltage or a lower SOC.
  • An electric current flows and charging and discharging are performed.
  • the transformation ratio is adjusted so as to fall within the first range.
  • FIG. 4 is a configuration diagram of a modified example of the power supply system of FIG. 1.
  • 3A is a circuit diagram of a step-up voltage converter
  • FIG. 3B is a circuit diagram of a step-down voltage converter
  • FIG. 3C is a diagram of a step-down or step-up / step-down voltage converter of an interleave circuit system. It is a circuit diagram.
  • FIG. 4A is a conceptual diagram illustrating parallel connection of a plurality of batteries in a comparative example
  • FIG. 4B is a conceptual diagram illustrating parallel connection of a plurality of batteries in the present embodiment.
  • FIG. 2 is a conceptual diagram illustrating charging and discharging of a plurality of batteries in the embodiment.
  • 6A and 6B are conceptual diagrams illustrating charging and discharging of a plurality of batteries when a current flows through a load.
  • 7A to 7C are explanatory diagrams of charging and discharging between two batteries.
  • 8A to 8C are explanatory diagrams of charging and discharging between two batteries. It is explanatory drawing of charge / discharge between five batteries.
  • FIG. 10A and FIG. 10B are explanatory diagrams of charging and discharging between two batteries.
  • FIG. 11A and FIG. 11B are explanatory diagrams of charging and discharging between two batteries.
  • 12A to 12C are timing charts of the step-up operation, the step-down operation, and the step-up / step-down operation, respectively.
  • 5 is a timing chart showing charging and discharging between four batteries.
  • 2 is a flowchart illustrating an operation of the power supply system of FIG. 1. It is a flowchart of the 1st modification. It is a flowchart of the 2nd modification.
  • a power supply system 10 includes a plurality of batteries 12, a plurality of voltage converters 14, a plurality of primary-side current measuring devices 16, and a plurality of primary-side voltage measuring devices. 18, a secondary-side current measuring device 20, a secondary-side voltage measuring device 22, and a control unit 24.
  • the power supply system 10 is applied to, for example, a power supply system of an electric vehicle such as a motorcycle and a four-wheeled vehicle.
  • a power supply unit 28 for supplying the electric power of the plurality of batteries 12 to the load 26 such as the drive motor of the electric vehicle and for equalizing the voltage or the SOC of the plurality of batteries 12 described below is configured.
  • the plurality of batteries 12 are detachable from the power supply unit 28 of the power supply system 10 and are chargeable / dischargeable batteries.
  • the plurality of voltage converters 14 are DC / DC converters each having a primary side 30 and a secondary side 32, and arbitrarily set the voltage (primary side voltage) of the battery 12 connected to the primary side 30. Is converted by the transformation rate Tr (the boost rate Tru or the step-down rate Trd), and the converted voltage (secondary voltage) is output to the secondary side 32.
  • Tr the boost rate Tru or the step-down rate Trd
  • the converted voltage (secondary voltage) is output to the secondary side 32.
  • at least one of the batteries 12 may be detachable from the power supply system 10.
  • the primary side 30 of the plurality of voltage converters 14 is connected to any one of the batteries 12. That is, the positive terminal 12p of the battery 12 is connected to the positive terminal 30p of the primary side 30 of the voltage converter 14, and the negative terminal 12m of the battery 12 is connected to the negative terminal 30m of the primary side 30 of the voltage converter 14. Have been.
  • the secondary sides 32 of the plurality of voltage converters 14 are connected in parallel with each other, so that they are connected in parallel to the load 26. In this case, the positive terminals 32p on the secondary side 32 of the plurality of voltage converters 14 are connected to the positive terminal 26p of the load 26, and the negative terminals 32m on the secondary side 32 of the plurality of voltage converters 14 are connected to the negative terminal of the load 26. 26m.
  • the plurality of primary-side voltage measuring devices 18 are voltage sensors connected between the positive terminal 12p and the negative terminal 12m of the battery 12 on the primary side 30 of the voltage converter 14, respectively.
  • the plurality of primary-side current measuring devices 16 are each a current sensor connected between the positive terminal 12p of the battery 12 and the positive terminal 30p of the voltage converter 14 on the primary side 30 of the voltage converter 14. It is.
  • the secondary voltage measuring device 22 is a voltage sensor connected between the positive terminal 26p and the negative terminal 26m of the load 26 on the secondary side 32 of the plurality of voltage converters 14.
  • the secondary current measuring device 20 is a current sensor connected between the positive terminal 32p of the plurality of voltage converters 14 and the positive terminal 26p of the load 26 on the secondary side 32 of the plurality of voltage converters 14. It is. Further, on the secondary side 32 of the plurality of voltage converters 14, a capacitor 34 is connected between each positive terminal 32p and each negative terminal 32m.
  • the control unit 24 is a computer having a table 36 which will be described later.
  • the control unit 24 executes a program stored in a memory (not shown), and based on a request (load request) from the load 26, Controls the voltage conversion operation and the like between the primary side 30 and the secondary side 32.
  • the measuring devices 18 each measure the voltage (primary voltage) of the connected battery 12 and sequentially transmit the measurement results to the control unit 24.
  • the plurality of primary-side current measuring devices 16 each measure a current flowing through the primary side 30 (primary-side current), and sequentially transmit the measurement results to the control unit 24.
  • the primary-side current measuring device 16 measures a current (discharge current Id) flowing from the battery 12 to the voltage converter 14 when the battery 12 is discharged, while measuring the current from the voltage converter 14 when charging the battery 12.
  • the current (charging current Ic) flowing into the battery 12 is measured.
  • the secondary-side voltage measuring device 22 measures the voltage of the secondary side 32 (load voltage as the secondary-side voltage), and sequentially transmits the measurement result to the control unit 24.
  • the secondary-side current measuring device 20 measures a current flowing through the secondary side 32 (a load current IL as a secondary-side current), and sequentially transmits the measurement result to the control unit 24.
  • the secondary-side current measuring device 20 measures the load current IL (powering current) flowing from the plurality of voltage converters 14 to the load 26 during power running, whereas the secondary current measuring device 20 uses the plurality of voltage converters from the load 26 during regeneration.
  • the load current IL (regenerative current) flowing through 14 is measured.
  • the control unit 24 sets and sets a command value of the transformation rate Tr for each of the plurality of voltage converters 14 based on the received measurement results of each voltage and each current and a request (load request) from the load 26.
  • the command values thus transmitted are transmitted to the plurality of voltage converters 14.
  • the plurality of voltage converters 14 adjust the transformation rate Tr based on the received command value, use the adjusted transformation rate Tr to convert the voltage of the connected battery 12, and convert the converted voltage to the secondary side. 32.
  • the secondary sides 32 of the plurality of voltage converters 14 are connected to each other in parallel. Therefore, the control unit 24 transmits to each of the voltage converters 14 a command value such that the voltages on the secondary side 32 of the plurality of voltage converters 14 have the same value.
  • a load current IL power running current
  • a load current IL regeneration current
  • FIG. 2 is a modification of the power supply system 10 of FIG.
  • one battery 12, one voltage converter 14 connected to the battery 12, a primary current measuring device 16 connected to a primary 30 of the voltage converter 14, 1 differs from the configuration in FIG. 1 in that the primary-side voltage measuring device 18 is configured as one battery unit 38 and a plurality of battery units 38 can be attached to and detached from the power supply system 10.
  • the battery units 38 may be detachable from the power supply system 10.
  • each of the battery units 38 in FIG. 2 may have the function of the control unit 24 in FIG.
  • each of the battery units 38 communicates with the primary-side voltage measuring device 18 and the primary-side current measuring device 16 via a CAN (Controller Area Network). Can be transmitted / received to / from each other.
  • CAN Controller Area Network
  • the voltage converter 14 of each battery unit 38 receives the load request from the load 26, the measurement results of the primary-side voltage measuring device 18 and the primary-side current measuring device 16 of its own battery unit 38, Based on the measurement results of the primary-side voltage measuring device 18 and the primary-side current measuring device 16 and the measurement results of the secondary-side voltage measuring device 22 and the secondary-side current measuring device 20 received from the battery unit 38 of FIG. , The transformation ratio Tr of the own voltage converter 14 can be set.
  • FIGS. 3A to 3C are circuit diagrams showing specific examples of the voltage converter 14 of FIGS. 1 and 2.
  • the voltage converter 14 is, for example, a step-up (see FIG. 3A), step-down (see FIG. 3B), or step-down or step-up / step-down (see FIG. 3C) DC / DC converter of an interleaved circuit type. Since the configuration and operation of these DC / DC converters are well known, the connection relationship between the components in the circuit diagrams of FIGS. 3A to 3C will be briefly described here.
  • a capacitor 40 is connected between the positive terminal 30p and the negative terminal 30m of the primary side 30.
  • One end of a coil 42 is connected to the positive terminal 30p side of the capacitor 40.
  • the other end of the coil 42 is connected to the midpoint between two switching elements 44H and 44L connected in series.
  • the two switching elements 44H and 44L are configured by connecting MOSFETs (Metal Oxide Semiconductor Field Effect Transistor) 46H and 46L and Zener diodes 48H and 48L, which are parasitic diodes, in parallel.
  • MOSFETs Metal Oxide Semiconductor Field Effect Transistor
  • Zener diodes 48H and 48L which are parasitic diodes
  • a capacitor 50 is connected between the positive terminal 30p and the negative terminal 30m of the primary side 30.
  • Two switching elements 44H and 44L connected in series are connected in parallel to the capacitor 50.
  • One switching element 44H is a high-side switching element connected to the positive terminal 30p side of the capacitor 50.
  • the other switching element 44L is a low-side switching element connected to the negative terminal 30m side of the capacitor 50 and the negative terminal 32m of the secondary side 32.
  • One end of a coil 52 is connected to the middle point between the two switching elements 44H and 44L. The other end of the coil 52 is connected to the positive terminal 32p of the secondary side 32.
  • 3C is connected between the capacitor 50 connected to the positive terminal 30p and the negative terminal 30m on the primary side 30 and the positive terminal 32p and the negative terminal 32m on the secondary side 32, as shown in FIG. 3B is different from the voltage converter 14 in FIG. 3B in that two sets of circuits each including one switching element 44H and 44L and one coil 52 are connected in parallel.
  • any voltage converter 14 by changing the duty of the gate signal supplied to the gate terminals of the switching elements 44H and 44L (MOSFETs 46H and 46L), the voltage conversion rate Tr of the voltage converter 14 (step-up in FIG. The rate Tru, the step-down rate Trd in FIG. 3B, and the step-up rate Tru or the step-down rate Trd in FIG. 3C can be changed.
  • a characteristic function of the present embodiment is that a plurality of batteries 12 having different voltages or SOCs are connected in parallel to each other, and a current is caused to flow between the plurality of batteries 12 so that the voltages or the SOCs are equal to each other to perform charging and discharging.
  • a predetermined allowable range (first value) between the maximum discharge current value Idmax (the upper limit value of the absolute value of the discharge current Id) and the maximum charge value Icmax (the upper limit value of the absolute value of the charge current Ic) of the battery 12 is used. That is, the transformation ratios Tr of the plurality of voltage converters 14 are set so that the current falls within the range.
  • the maximum discharge current value Idmax is an upper limit value (threshold value) when the discharge current Id flows so as not to deteriorate the battery 12, and is a guaranteed value or a product guaranteed value of a manufacturer of the battery 12.
  • the charging current maximum value Imax is an upper limit value (threshold value) when the charging current Ic flows so as not to deteriorate the battery 12, and is a guaranteed value or a product guaranteed value of a manufacturer of the battery 12.
  • FIG. 4A is a conceptual diagram illustrating a problem (comparative example) in a case where a plurality of batteries 12 having different voltages or SOCs are connected in parallel to each other and the voltages or the SOCs are made equal to each other.
  • the same components as those in FIGS. 1 to 3C will be described with the same reference numerals.
  • FIG. 4A shows a case where four batteries 12 having different SOCs are connected in parallel as an example. Also, FIG. 4A illustrates a case where the SOC decreases in order from the left battery 12 to the right battery 12.
  • the magnitudes of the voltages or SOCs of the plurality of batteries 12 are schematically illustrated by the area of hatching in the blocks of the batteries 12.
  • the discharge current Id flows from the battery 12 having a relatively high SOC (the two batteries 12 on the left side in FIG. 4A), and thereby the battery 12 having a relatively low SOC (the two batteries 12 on the right side in FIG. 4A). ) Flows as charging current Ic.
  • FIG. 4B is a conceptual diagram illustrating a characteristic function of the present embodiment for solving the problem of FIG. 4A.
  • a plurality of batteries 12 are connected in parallel with each other via a plurality of current regulators 54.
  • each of the plurality of current regulators 54 performs a current limitation such that the current flowing through the battery 12 connected to the primary side 56 falls within a predetermined allowable range (first range).
  • the first range refers to an allowable range of the discharge current Id or the charge current Ic between the maximum discharge current value Idmax and the maximum charge current value Icmax of the battery 12.
  • the battery 12 whose voltage or SOC is relatively high functions as the battery 12 on the discharging side, and flows the discharging current Id.
  • the battery 12 whose voltage or SOC is relatively low becomes the battery 12 on the charging side, and the charging current Ic flows in. Therefore, the current regulator 54 performs a current limitation such that both the discharge current Id and the charge current Ic fall within the first range.
  • the discharge current Id or the charging current Ic falls within the first range depending on the peak current generated when the switching elements 44H and 44L are turned on or off. May deviate.
  • the secondary regulator 58 of the current regulator 54 of the battery 12 on the discharging side and the current regulator 54 of the battery 12 on the charging side are controlled so that the discharging current Id or the charging current Ic falls within the first range. What is necessary is just to make the voltage difference between the secondary side 54 and the secondary side 58 small. This makes it possible to quickly equalize the voltage or SOC of each battery 12 while keeping the discharge current Id or the charge current Ic within the first range.
  • a plurality of batteries 12 are connected in parallel via a plurality of voltage converters 14 (see FIGS. 1 and 2).
  • the plurality of voltage converters 14 output the converted voltage to the secondary side 32 by converting the voltage on the primary side 30 at an arbitrary transformation rate Tr.
  • Tr transformation ratio
  • the voltage converter 14 of FIGS. 1 to 3C corresponds to the current regulator 54 of FIG. 4B.
  • the primary side 30 of the voltage converter 14 corresponds to the primary side 56 of the current regulator 54.
  • the secondary side 32 of the voltage converter 14 corresponds to the secondary side 58 of the current regulator 54.
  • FIG. 5 shows a case where there is no load request (when there is no need to flow the load current IL) when a plurality of batteries 12 are connected in parallel to the load 26 via the current regulator 54 (voltage converter 14).
  • FIG. 3 is a conceptual diagram of a charging / discharging operation between a plurality of batteries 12.
  • the voltage or SOC of the left battery 12 is the largest and functions as the battery 12 on the discharging side.
  • the three batteries 12 on the right have relatively low voltages or SOCs, and serve as charging batteries 12. That is, in FIG. 5, while the discharge current Id flows from the left battery 12, the discharge current Id is distributed and flows into the three right batteries 12 as charge currents Ic1 to Ic3 (
  • ). Therefore, the load current IL does not flow (IL 0).
  • each current regulator 54 sets the discharge current Id and the charge currents Ic1 to Ic3 within the first range, that is, the absolute value of the discharge current Id becomes equal to or less than the discharge current maximum value Idmax (
  • Icmax the charging current maximum value
  • FIG. 6A is a conceptual diagram of the charging / discharging operation between a plurality of batteries 12 when there is a load request, that is, when the load current IL1 needs to flow to the load 26.
  • the distribution of the charge currents Ic1 to Ic3 flowing to the three right batteries 12 is reduced. That is, the absolute values of the charging currents Ic1 to Ic3 are reduced as compared with FIG. This allows the charging currents Ic1 to Ic3 to flow to the three batteries 12 while allowing the load current IL1 to flow to the load 26 in accordance with the load request, thereby making it possible to equalize the voltage or SOC between the plurality of batteries 12.
  • FIG. 6B shows a case where there is a load request larger than that in FIG. 6A, for example, when one battery 12 is used as a discharging battery 12, there is a load request to flow a discharging current Id that exceeds a discharging current maximum value Idmax.
  • FIG. 4 is a conceptual diagram of charging and discharging between a plurality of batteries 12 when the battery 12 is turned on.
  • the load current IL2 is large (IL2> IL1), if only one battery 12 is used for discharging, the absolute value of the discharge current Id flowing from one battery 12 exceeds the maximum discharge current value Idmax (
  • the three batteries 12 on the left are used for discharging, and the remaining one battery 12 on the right is used for charging.
  • the discharge currents Id1 to Id3 flow from the three batteries 12, and the sum of the discharge currents Id1 to Id3 is distributed to the load current IL2 and the charge current Ic (
  • the two batteries 12 are connected in parallel on the secondary side 32 via the voltage converter 14, the SOC of the left battery 12 is relatively large, and the SOC of the right battery 12 is relatively large. Shall be small.
  • the two voltage converters 14 have the same transformation rate Tr (step-up rate Tru)
  • the SOC of the two batteries 12 is greatly different, so the voltage on the secondary side 32 of the two voltage converters 14 The difference increases, and a large current flows from the left battery 12 on the discharging side to the right battery 12 on the charging side.
  • the absolute value of the discharge current Id falls within the maximum discharge current value Idmax, and the absolute value of the charge current Ic falls below the maximum charge current value Icmax. Is adjusted to fall within the range.
  • the two voltage converters 14 monitor the discharging current Id and the charging current Ic using the primary-side current measuring device 16 (see FIGS. 1 and 2).
  • the voltage on the secondary side 32 of the right voltage converter 14 is reduced by reducing the boosting rate Tru of the right voltage converter 14.
  • the voltage difference on the secondary side 32 of the two voltage converters 14 increases, so that a decrease in the absolute values of the discharge current Id and the charge current Ic can be suppressed.
  • the boosting rate Tru continues to be reduced, the voltage or SOC may be reversed between the two batteries 12. Therefore, the boosting rate Tru should not be reduced below the boosting rate Tru at the start of the equalization operation. pay attention to.
  • FIG. 9 illustrates a case where five batteries 12 are connected in parallel via a voltage converter 14 and the left battery 12 is used for discharging, thereby charging the right four batteries 12.
  • a voltage converter 14 which the left battery 12 is used for discharging, thereby charging the right four batteries 12.
  • the step-up rate Tru of the voltage converter 14 on the left side is reduced to thereby reduce the voltage converter.
  • the voltage on the secondary side 32 of 14 is reduced.
  • the voltage difference on the secondary side 32 between the left voltage converter 14 and the four right voltage converters 14 is reduced.
  • the right four batteries 12 are charged, and the voltage of the five batteries 12 or the SOC Can be equalized.
  • FIGS. 10A to 11B the configuration diagrams of FIGS. 1 and 2 show a case where two batteries 12 are connected in parallel on the secondary side 32 via the voltage converter 14. explain.
  • FIG. 10A corresponds to the conceptual diagram of FIG. 7A.
  • the voltage and current of one battery 12 are Vb1 and Ib1, respectively.
  • the current and the current of the other battery 12 are Vb2 and Ib2, respectively.
  • the boosting rates Tru of the two voltage converters 14 are Tru1 and Tru2, respectively.
  • the battery 12 may be deteriorated.
  • the switching elements 44H and 44L constituting the voltage converter 14 on the charging side (see FIGS. 3A to 3C).
  • the transformation ratio Tr may be changed.
  • the gate signal (“H” in FIG. 12A) supplied to the high-side switching element 44H is set to a low level.
  • the duty ratio of the gate signal (“L” in FIG. 12A) supplied to the low-side switching element 44L is changed to increase the boosting rate from Tru2 to Tru2r (> Tru2).
  • the duty of the gate signal supplied to the high-side and low-side switching elements 44H and 44L may be changed.
  • a dead time Td is provided between the two gate signals so that the two switching elements 44H and 44L are not simultaneously turned on.
  • FIG. 11A corresponding to the conceptual diagram of FIG. 6A, similarly to the case of FIG. 10B, the load is increased so that the absolute value of the discharge current Id does not exceed the discharge current maximum value Idmax while increasing the boosting rate from Tru2 to Tru2r.
  • the load current IL1 according to the request flows. Even in this case, it is possible to equalize the voltage or the SOC between the two batteries 12 while flowing the load current IL1 and the charging current Ic (Ic1).
  • FIG. 11B corresponding to the conceptual diagrams of FIGS. 6B and 9, the load request becomes larger and a larger load current IL2 (> IL1) needs to flow, as compared with FIG. 11A. May exceed the discharge current maximum value Idmax.
  • the duty of the gate signal supplied to the switching elements 44H and 44L of the voltage converter 14 on the discharge side is changed to change the transformation rate Tr (for example, the boosting rate Tru) from Tru1 to Tru1r ( ⁇ Tru1).
  • Tr for example, the boosting rate Tru
  • Tru1 the voltage difference on the secondary side 32 of the two voltage converters 14
  • the charging current Ic (Ic2) can be reduced. Since the load current IL2 flowing to the load 26 can be increased by the reduction of the charging current Ic, it is possible to equalize the voltage or the SOC between the two batteries 12 while flowing the load current IL2 according to the load request. Become.
  • FIG. 13 is a timing chart showing, in chronological order, changes in current of each battery 12 during execution of voltage or SOC equalization among the four batteries 12.
  • a positive side of 0 indicates a case where the discharge current Id flows from the battery 12
  • a negative side of 0 indicates a case where the charge current Ic flows into the battery 12.
  • the plurality of batteries 12 are sequentially switched from the charging side to the discharging side with the passage of time while the current flows from the discharging side battery 12 to the charging side battery 12.
  • the voltage or the SOC can be quickly equalized.
  • FIG. 14 is a flowchart of the operation in the power supply system 10 of FIG.
  • the operation subject in FIG. 14 is mainly the control unit 24 and each voltage converter 14 in FIG.
  • step S1 the control unit 24 sets the transformation rates Tr of the plurality of voltage converters 14 to initial values in order to set the value of the current flowing in the power supply system 10 to zero.
  • the control unit 24 refers to the table 36, sets a command value according to the initial value, and transmits the command value to each voltage converter 14. Thereby, each voltage converter 14 adjusts the transformation rate Tr to an initial value based on the received command value. As a result, the current flowing in the power supply system 10 becomes zero, and the deterioration of each battery 12 can be suppressed.
  • the control unit 24 starts the operation of equalizing the voltages or the SOCs of the plurality of batteries 12 so that the current from the discharging battery 12 to the charging battery 12 Is determined, and a command value corresponding to the determined pressure conversion rate Tr is set. Then, the control unit 24 transmits the set command value to each voltage converter 14.
  • Each voltage converter 14 adjusts the transformation ratio Tr based on the received command value. Thereby, each voltage converter 14 converts the voltage of the connected battery 12 according to the transformation rate Tr, and outputs the converted voltage to the secondary side 32. As a result, the discharge current Id flows from the battery 12 on the discharging side via the voltage converter 14, while the charging current Ic flows into the battery 12 on the charging side via the voltage converter 14.
  • step S2 as shown in FIGS. 5, 6A, and 9, when the battery 12 having the highest voltage is used as the battery 12 on the discharging side and the remaining battery 12 is used as the battery 12 on the charging side, power is distributed.
  • the step-down rate Trd of the voltage converter 14 connected to the battery 12 may be lower than the step-down rate Trd of the voltage converter 14 connected to the highest battery 12.
  • step S2 as shown in FIG. 6B, when the battery 12 having the lowest voltage is used as the battery 12 on the charge side and the remaining battery 12 is used as the battery 12 on the discharge side to distribute power, the battery 12 is used as the battery 12 having the lowest voltage.
  • the step-down rate Trd of the connected voltage converter 14 may be reduced.
  • each primary-side current measuring device 16 measures a current (discharge current Id or charging current Ic) flowing to the primary side 30 and transmits the measurement result to the control unit 24.
  • each primary side voltage measuring device 18 measures the voltage on the primary side 30
  • the secondary side current measuring device 20 measures the current on the secondary side 32
  • the secondary side voltage measuring device 22 May measure the voltage on the secondary side 32.
  • step S4 the control unit 24 sets the absolute value of the discharge current Id to the maximum value of the discharge current Idmax for the voltage converter 14 flowing the discharge current Id among the received currents of the respective primary sides 30. It is determined whether there is a voltage converter 14 exceeding. If there is a voltage converter 14 flowing the discharge current Id satisfying
  • step S5 the control unit 24 determines that there is a possibility that the battery 12 flowing the discharge current Id that satisfies
  • the transformation ratio Tr is changed to such a value that the voltage on the secondary side 32 becomes lower.
  • the control unit 24 changes the command value to reduce the transformation rate Tr (for example, the step-down rate Trd) and transmits the command value to the voltage converter 14.
  • the voltage converter 14 adjusts the transformation ratio Tr to a low value based on the received command value.
  • the voltage of the secondary side 32 decreases, and the discharge current Id decreases. Therefore, the absolute value of the discharge current Id is set to be equal to or less than the discharge current maximum value Idmax, and the voltage of the battery 12 connected to the voltage converter 14 Deterioration can be suppressed.
  • step S4 If the result of the determination in step S4 is negative (step S4: NO), that is, if there is no battery 12 flowing the discharge current Id such that
  • step S6 after step S4 or S5, the control unit 24 determines the absolute value of the charging current Ic for the voltage converter 14 flowing the charging current Ic based on the received measurement result of the current of each primary side 30. It is determined whether there is a voltage converter 14 whose value exceeds the charging current maximum value Icmax. If there is a voltage converter 14 flowing the charging current Ic satisfying
  • step S7 the control unit 24 determines that there is a possibility that the battery 12 flowing the charging current Ic satisfying
  • Tr for example, the step-down rate Trd
  • the voltage converter 14 increases the transformation rate Tr based on the received command value.
  • the voltage on the secondary side 32 increases, and the charging current Ic decreases. Therefore, the absolute value of the charging current Ic is set to be equal to or less than the charging current maximum value Imax, and the battery 12 connected to the voltage converter 14 Deterioration can be suppressed.
  • step S6 when the result of the determination is negative (step S6: NO), that is, when there is no battery 12 flowing the charging current Ic such that
  • step S8 the control unit 24 determines whether the voltage or SOC of each battery 12 falls within a predetermined threshold range (second range).
  • the second range refers to a voltage range or a range of SOC in which the voltage or SOC of each battery 12 can be considered to be equalized.
  • step S8: NO When the voltage or the SOC of each battery 12 is not within the second range (step S8: NO), the control unit 24 determines that the equalization of the voltage or the SOC of each battery 12 is not completed, and proceeds to step S2. Return to Therefore, the processes of steps S2 to S7 are repeatedly executed until the equalization of the voltage or SOC of each battery 12 is completed (step S8: YES).
  • step S9 the control unit 24 sets a command value for setting the transformation rate Tr (for example, the step-down rate Trd) of each voltage converter 14 to 1, and transmits the set command value to each voltage converter 14.
  • Tr for example, the step-down rate Trd
  • each voltage converter 14 adjusts the transformation rate Tr to 1 based on the received command value.
  • each of the voltage converters 14 stops the conversion operation and makes the positive terminal 30p on the primary side 30 and the positive terminal 32p on the secondary side 32 conductive.
  • a plurality of batteries 12 having equalized voltage values or SOCs can be connected in parallel to each other in a conductive state.
  • FIG. 15 is a flowchart of an operation (first modification) in the power supply system 10 of FIG. 15 is mainly the voltage converters 14 of FIG.
  • each primary side voltage measuring device 18 measures the voltage of the battery 12 and outputs the measurement result to the voltage converter 14 in the battery unit 38. In addition, each primary-side voltage measuring device 18 transmits the measurement result to the voltage converter 14 of another battery unit 38.
  • each primary current measuring device 16 measures the current flowing through the primary side 30 and outputs the measurement result to the voltage converter 14 in the battery unit 38. In addition, each primary-side current measuring device 16 transmits the measurement result to the voltage converter 14 of another battery unit 38.
  • the battery 12 with the lowest voltage has a lower voltage or SOC than the other batteries 12 and thus needs to be charged. Therefore, in step S14, the voltage converter 14 connected to the battery 12 having the lowest voltage adjusts the transformation rate Tr so that the charging current Ic becomes the charging current maximum value Imax.
  • the battery 12 of the own battery unit 38 becomes the battery 12 on the charging side, while the battery 12 of the other battery unit 38 becomes the battery 12 on the discharging side. Therefore, the charging current Ic has priority over the own battery 12. It will flow in.
  • each voltage converter 14 has the absolute value of the discharge current Id exceeding the maximum value of the discharge current Idmax based on the measurement result sent from the primary side current measuring device 16 of its own battery unit 38. Is determined.
  • step S15 the voltage converter 14 determines that the battery 12 of its own battery unit 38 may be deteriorated, and the voltage converter 14 The voltage is changed to a transformation ratio Tr at which the voltage becomes low. For example, the voltage converter 14 lowers the voltage on the secondary side 32 by lowering the step-down ratio Trd, and reduces the discharge current Id. As a result, the absolute value of the discharge current Id falls within the discharge current maximum value Idmax or less, so that deterioration of the battery 12 can be suppressed.
  • step S15 when
  • each voltage converter 14 sets the absolute value of the charging current Ic to the maximum charging current based on the measurement result sent from the primary current measuring device 16 of its own battery unit 38. It is determined whether the value exceeds the value Imax.
  • step S17 If
  • step S17 when
  • step S19 after step S17 or S18, each voltage converter 14 determines whether the voltage or SOC of the battery 12 of each battery unit 38 falls within the second range.
  • step S19: NO the control unit 24 determines that the equalization of the voltage or SOC of each battery 12 is not completed. Then, the process returns to step S12. Therefore, until the equalization of the voltage or SOC of each battery 12 is completed (step S19: YES), the processing of steps S12 to S18 is repeatedly executed.
  • each voltage converter 14 sets the transformation rate Tr (step-down rate Trd) to 0. Then, the conversion operation is stopped, and the positive terminal 30p on the primary side 30 and the positive terminal 32p on the secondary side 32 are conducted.
  • FIG. 16 is a flowchart of another operation (second modification) in the power supply system 10 of FIG. 1 or FIG.
  • the battery 12 with the lowest voltage is the battery 12 on the charging side, and while adjusting the transformation rate Tr (for example, the step-down rate Trd) in accordance with the voltage value of the battery 12, the voltage or SOC of the plurality of batteries 12 is adjusted.
  • Tr for example, the step-down rate Trd
  • the power supply system 10 of FIG. 1 will be described, but the power supply system 10 of FIG. 2 is also applicable.
  • each primary-side voltage measuring device 18 measures the voltage of the battery 12 and transmits the measurement result to the control unit 24.
  • control unit 24 transmits a command value based on the set transformation rate Tr to each voltage converter 14.
  • Each voltage converter 14 adjusts the transformation ratio Tr based on the received command value.
  • each primary-side current measuring device 16 measures the current flowing through the primary side 30, and transmits the measurement result to the control unit 24.
  • step S24 the control unit 24 sets the transformation ratio Tr of each voltage converter 14 based on the received measurement results so that the charging current Ic having the maximum charging current Icmax flows through the battery 12 having the lowest voltage. . Then, the control unit 24 transmits a command value based on the set transformation rate Tr to each voltage converter 14. Each voltage converter 14 adjusts the transformation ratio Tr based on the received command value. For example, the control unit 24 gradually increases the transformation rate Tr while monitoring the current measured by the primary current measuring device 16 for each of the plurality of voltage converters 14, and charges the battery 12 having the lowest voltage. When the charging current Ic having the current maximum value Icmax flows, the transformation ratio Tr of each voltage converter 14 may be fixed.
  • each primary-side current measuring device 16 measures the current on the primary side 30 and transmits the measurement result to the control unit 24.
  • each primary-side voltage measuring device 18 measures the voltage of the battery 12 and transmits the measurement result to the control unit 24.
  • the secondary-side current measuring device 20 measures the load current IL, and transmits the measurement result to the control unit 24.
  • the secondary side voltage measuring device 22 measures the voltage of the secondary side 32 and transmits the measurement result to the control unit 24.
  • step S26 the control unit 24 determines whether a regenerative current has flowed from the load 26 to the voltage converter 14 or whether there is a battery 12 with
  • step S27 when the regenerative current flows, the control unit 24 determines that the regenerative current flows on top of the charging current maximum value Icmax in the battery 12 having the lowest voltage, so that the battery 12 may be deteriorated. I do. When
  • control unit 24 sets the voltage conversion rate Tr for all the voltage converters 14 to the voltage value of the battery 12 having the lowest voltage.
  • the control unit 24 transmits a command value based on the set transformation rate Tr to each voltage converter 14.
  • each voltage converter 14 adjusts the transformation rate Tr based on the received command value. As a result, deterioration of each battery 12 is avoided.
  • step S26 NO
  • the process proceeds to step S28.
  • step S28 the control unit 24 determines that there is no risk of the battery 12 being deteriorated, and similarly to step S24, controls the voltage conversion so that the charging current Ic having the maximum charging current value Icmax flows through the battery 12 having the lowest voltage. Of the transformer 14 is set. Then, the control unit 24 transmits a command value based on the set transformation rate Tr to each voltage converter 14. Each voltage converter 14 adjusts the transformation ratio Tr based on the received command value.
  • step S29 after step S27 or S28, the control unit 24 determines whether the voltage or SOC of each battery 12 falls within the second range. When there is at least one battery 12 whose voltage or SOC is not within the second range (step S29: NO), the control unit 24 determines that the equalization of the voltage or SOC of each battery 12 is not completed. Then, the process returns to step S25. Therefore, until the equalization of the voltage or the SOC of each battery 12 is completed (step S29: YES), the processing of steps S25 to S28 is repeatedly executed.
  • each voltage converter 14 sets the transformation rate Tr (step-down rate Trd) to 0. Then, the conversion operation is stopped, and the positive terminal 30p on the primary side 30 and the positive terminal 32p on the secondary side 32 are conducted.
  • FIGS. 14 to 16 describe the case where the battery 12 having the higher voltage or the SOC is charged from the battery 12 having the lower voltage
  • the flowcharts shown in FIGS. It is possible to apply the description of. That is, in supplying power, there is no difference between the battery 12 on the charging side and the load 26. In this case, as the load request from the load 26 increases, it is considered that the battery 12 having a lower voltage or lower SOC is connected, and the load current IL according to the load request may be passed.
  • the plurality of chargeable / dischargeable batteries 12 and the primary side 30 are connected to one of the plurality of batteries 12, and the secondary side 32 is connected in parallel to each other.
  • a plurality of primary-side current measuring devices 16 connected to the primary side 30 of the plurality of voltage converters 14 and measuring currents (discharge current Id, charging current Ic) flowing through the primary side 30.
  • the transformation rate Tr is determined by measuring the current measured by the primary-side current measuring device 16 with the maximum discharge current Idmax of the battery 12 connected to the primary side 30 and the battery. It is set so as to fall within a first range between the twelve charging current maximum values Imax.
  • the voltage or the SOC is changed from the high battery 12 to the low battery 12.
  • the current flows automatically (naturally), and charging and discharging are performed.
  • the transformation ratio Tr is adjusted so as to fall within the first range.
  • charging / discharging is not performed while monitoring the voltage or the SOC, but within the range (first range) of the allowable current of each battery 12, a battery having a higher voltage or SOC is naturally changed to a lower battery.
  • the battery can be charged and discharged by a natural selection method in which current flows through the battery.
  • the voltage difference on the secondary side 32 of the plurality of voltage converters 14 is reduced, and the discharge current Id or the charge current Ic can be kept within the first range.
  • the voltage or SOC can be efficiently and quickly equalized while avoiding deterioration of the battery 12.
  • the voltage converters 14 stop the conversion operation and make the primary side 30 and the secondary side 32 conductive. I just need. As a result, the switching loss of the switching elements 44H and 44L is eliminated by the amount obtained by subtracting the conversion efficiency of the voltage converter 14, so that the overall efficiency of the voltage converter 14 can be improved.
  • the plurality of voltage converters 14 may release the conduction state between the primary side 30 and the secondary side 32 when the power supply system 10 stops operating. Thereby, even if spontaneous discharge between the batteries 12 or replacement of the batteries 12 is performed after the power supply system 10 is stopped, when the power supply system 10 is restarted, the voltage or SOC between the batteries 12 is equalized. Can be started promptly.
  • the transformation ratio Tr is set in advance to an initial value at which the current becomes substantially zero, the deterioration of the plurality of batteries 12 can be reliably avoided.
  • the power supply system 10 is connected to the primary side 30 of the voltage converters 14, respectively, and is connected to the primary side voltage measuring devices 18 for measuring the voltage of the primary side 30 and the secondary side 32. And a secondary-side voltage measuring device 22 for measuring the voltage of the secondary side 32.
  • the transformation ratio Tr of each voltage converter 14 can be easily set based on the measurement result of the primary side voltage measuring device 18.
  • the present embodiment can be easily applied to the power supply system 10 including the detachable battery 12.
  • a general-purpose battery pack is the battery 12 and a plurality of batteries 12 are connected in parallel via the voltage converter 14, some of the battery packs are fully charged without replacing all the battery packs at the same time.
  • charging is automatically performed from a fully charged battery pack.
  • the voltages or SOCs of all the battery packs can be automatically and quickly equalized.
  • one battery 12, the voltage converter 14 connected to the battery 12, and the primary current measuring device 16 connected to the primary side 30 of the voltage converter 14 constitute one unit. At least one of the battery units 38 may be detachable from the power supply system 10. Even in this case, the present embodiment can be easily applied to the power supply system 10 including the detachable battery unit 38.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Transportation (AREA)
  • Sustainable Energy (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • General Chemical & Material Sciences (AREA)
  • Electrochemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Secondary Cells (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

電源システム(10)において、複数の電圧変換器(14)では、充放電可能なバッテリ(12)が1次側(30)に接続され、2次側(32)が互いに並列接続されている。複数の電圧変換器(14)の各々について、変圧率(Tr)は、1次側電流計測器(16)で計測される電流が、1次側(30)に接続されるバッテリ(12)の放電電流最大値(Idmax)とバッテリ(12)の充電電流最大値(Icmax)との間の第1範囲内に収まるように設定される。

Description

電源システム
 本発明は、充放電可能な複数のバッテリが電圧変換器を介して互いに並列接続される電源システムに関する。
 充放電可能な複数のバッテリが電圧変換器を介して互いに並列接続される電源システムが、例えば、特許第6293010号公報に開示されている。
 ところで、電圧又はSOCの異なる複数のバッテリを互いに並列接続する場合、複数のバッテリの間では、電圧又はSOCが互いに均等になるように、各バッテリの電圧差に比例して電流が流れる充放電が行われる。この場合、複数のバッテリを単純に結線した際、無視できるほど小さな電圧差であれば、各バッテリを直接、並列接続しても問題はない。
 しかしながら、電圧差の大きな複数のバッテリを並列接続すると、当該電圧差に起因して大電流が流れる。また、このような状態では、複数のバッテリが電圧変換器を介して互いに並列接続される場合においても、電圧変換器のスイッチング素子をオンにした瞬間に大電流が流れ、一方で、オフにした瞬間に配線のインダクタンス成分に起因する高電圧が発生する。このような大電流又は高電圧の発生に起因してバッテリが劣化するおそれがある。
 本発明は、このような課題を考慮してなされたものであり、バッテリの劣化を回避しつつ、互いに並列接続される複数のバッテリの電圧又はSOCを均等化することができる電源システムを提供することを目的とする。
 本発明の態様は、充放電可能な複数のバッテリと、1次側が複数のバッテリのいずれかに接続され、2次側が互いに並列接続され、前記1次側に接続されているバッテリの電圧を任意の変圧率で変換し、変換した前記電圧を前記2次側に出力する複数の電圧変換器と、複数の前記電圧変換器の1次側に各々接続され、前記1次側に流れる電流を計測する複数の電流計測器とを備える電源システムに関する。この場合、複数の前記電圧変換器の各々について、前記変圧率は、前記1次側に接続される電流計測器で計測される電流が、前記1次側に接続されるバッテリの放電電流最大値と前記バッテリの充電電流最大値との間の第1範囲内に収まるように設定される。
 本発明によれば、電流計測器で計測される電流が放電電流最大値と充電電流最大値との第1範囲内にあれば、電圧又はSOCの高いバッテリから低いバッテリに自動的(自然)に電流が流れ、充放電が行われる。一方、電流が第1範囲内から逸脱する場合には、第1範囲内に収まるように変圧率が調整される。この結果、複数のバッテリの劣化を回避しつつ、互いに並列接続される複数のバッテリの電圧又はSOCを均等化することができる。
本実施形態に係る電源システムの構成図である。 図1の電源システムの変形例の構成図である。 図3Aは、昇圧型の電圧変換器の回路図であり、図3Bは、降圧型の電圧変換器の回路図であり、図3Cは、インターリーブ回路方式の降圧型又は昇降圧型の電圧変換器の回路図である。 図4Aは、比較例での複数のバッテリの並列接続を図示した概念図であり、図4Bは、本実施形態での複数のバッテリの並列接続を図示した概念図である。 本実施形態での複数のバッテリの充放電を図示した概念図である。 図6A及び図6Bは、負荷に電流を流す場合の複数のバッテリの充放電を図示した概念図である。 図7A~図7Cは、2つのバッテリ間での充放電の説明図である。 図8A~図8Cは、2つのバッテリ間での充放電の説明図である。 5つのバッテリ間での充放電の説明図である。 図10A及び図10Bは、2つのバッテリ間での充放電の説明図である。 図11A及び図11Bは、2つのバッテリ間での充放電の説明図である。 図12A~図12Cは、それぞれ、昇圧動作、降圧動作及び昇降圧動作のタイミングチャートである。 4つのバッテリ間での充放電を示すタイミングチャートである。 図1の電源システムの動作を示すフローチャートである。 第1変形例のフローチャートである。 第2変形例のフローチャートである。
 以下、本発明に係る電源システムについて好適な実施形態を例示し、添付の図面を参照しながら説明する。
[1.本実施形態の基本構成]
 本実施形態に係る電源システム10は、図1に示すように、複数のバッテリ12と、複数の電圧変換器14と、複数の1次側電流計測器16と、複数の1次側電圧計測器18と、2次側電流計測器20と、2次側電圧計測器22と、制御部24とを有する。電源システム10は、例えば、二輪車、四輪車等の電動車両の電源システムに適用される。また、複数の電圧変換器14、複数の1次側電流計測器16、複数の1次側電圧計測器18、2次側電流計測器20、2次側電圧計測器22、及び、制御部24等によって、複数のバッテリ12の電力を電動車両の駆動モータ等の負荷26に供給する一方で、後述する複数のバッテリ12の電圧又はSOCの均等化を図る電源供給ユニット28が構成される。
 複数のバッテリ12は、電源システム10を構成する電源供給ユニット28に対して着脱可能で、且つ、充放電可能なバッテリである。複数の電圧変換器14は、1次側30と2次側32とをそれぞれ有するDC/DCコンバータであって、1次側30に接続されているバッテリ12の電圧(1次側電圧)を任意の変圧率Tr(昇圧率Tru又は降圧率Trd)で変換することで、変換した電圧(2次側電圧)を2次側32に出力する。なお、本実施形態では、複数のバッテリ12のうち、少なくとも1つのバッテリ12が電源システム10に対して着脱可能であればよい。
 複数の電圧変換器14の1次側30は、複数のバッテリ12のうち、いずれかのバッテリ12に接続されている。すなわち、バッテリ12の正極端子12pと電圧変換器14の1次側30の正極端子30pとが接続され、バッテリ12の負極端子12mと電圧変換器14の1次側30の負極端子30mとが接続されている。また、複数の電圧変換器14の2次側32は、互いに並列接続されることで、負荷26に並列に接続される。この場合、複数の電圧変換器14の2次側32の正極端子32pが負荷26の正極端子26pに接続され、複数の電圧変換器14の2次側32の負極端子32mが負荷26の負極端子26mに接続されている。
 複数の1次側電圧計測器18は、それぞれ、電圧変換器14の1次側30で、バッテリ12の正極端子12pと負極端子12mとの間に接続された電圧センサである。また、複数の1次側電流計測器16は、それぞれ、電圧変換器14の1次側30で、バッテリ12の正極端子12pと電圧変換器14の正極端子30pとの間に接続された電流センサである。
 2次側電圧計測器22は、複数の電圧変換器14の2次側32で、負荷26の正極端子26pと負極端子26mとの間に接続された電圧センサである。また、2次側電流計測器20は、複数の電圧変換器14の2次側32で、複数の電圧変換器14の正極端子32pと負荷26の正極端子26pとの間に接続された電流センサである。さらに、複数の電圧変換器14の2次側32において、各正極端子32pと各負極端子32mとの間には、コンデンサ34が接続されている。
 制御部24は、後述するテーブル36を有するコンピュータであって、不図示のメモリに格納されたプログラムを実行することで、負荷26からの要求(負荷要求)に基づいて、複数の電圧変換器14による1次側30と2次側32との間での電圧変換動作等を制御する。
[2.本実施形態の基本動作]
 以上のように構成される電源システム10において、着脱式の複数のバッテリ12が電源供給ユニット28に接続され、且つ、負荷26が電源供給ユニット28に接続されている場合、複数の1次側電圧計測器18は、それぞれ、接続されているバッテリ12の電圧(1次側電圧)を計測し、その計測結果を制御部24に逐次送信する。また、複数の1次側電流計測器16は、それぞれ、1次側30を流れる電流(1次側電流)を計測し、その計測結果を制御部24に逐次送信する。なお、1次側電流計測器16は、バッテリ12の放電時には、バッテリ12から電圧変換器14に流れる電流(放電電流Id)を計測し、一方で、バッテリ12の充電時には、電圧変換器14からバッテリ12に流れ込む電流(充電電流Ic)を計測する。
 2次側電圧計測器22は、2次側32の電圧(2次側電圧としての負荷電圧)を計測し、その計測結果を制御部24に逐次送信する。また、2次側電流計測器20は、2次側32を流れる電流(2次側電流としての負荷電流IL)を計測し、その計測結果を制御部24に逐次送信する。なお、2次側電流計測器20は、力行時には、複数の電圧変換器14から負荷26に流れる負荷電流IL(力行電流)を計測し、一方で、回生時には、負荷26から複数の電圧変換器14に流れる負荷電流IL(回生電流)を計測する。
 制御部24は、受信した各電圧及び各電流の計測結果と、負荷26からの要求(負荷要求)とに基づいて、複数の電圧変換器14毎の変圧率Trの指令値を設定し、設定した各指令値を複数の電圧変換器14に送信する。複数の電圧変換器14は、受信した指令値に基づいて変圧率Trを調整し、調整した変圧率Trを用いて、接続されているバッテリ12の電圧を変換し、変換した電圧を2次側32に出力する。なお、図1では、複数の電圧変換器14の2次側32が互いに並列接続されている。そのため、制御部24は、複数の電圧変換器14の2次側32の電圧が同一値となるような指令値を各電圧変換器14に送信する。
 これにより、力行時には、複数のバッテリ12から複数の電圧変換器14を介して負荷26に、各バッテリ12から流れる電流の総和である負荷電流IL(力行電流)が流れ、駆動モータ等の負荷26を駆動させることができる。一方、回生時には、負荷26から複数の電圧変換器14を介して複数のバッテリ12に負荷電流IL(回生電流)が流れ、各バッテリ12を充電することができる。
[3.図1の構成の変形例]
 図2は、図1の電源システム10の変形例である。図2の変形例では、1つのバッテリ12と、当該バッテリ12に接続される1つの電圧変換器14と、当該電圧変換器14の1次側30に接続される1次側電流計測器16及び1次側電圧計測器18とが、1つのバッテリユニット38として構成され、電源システム10に対して複数のバッテリユニット38を着脱可能とした点で、図1の構成とは異なる。なお、本実施形態では、複数のバッテリユニット38のうち、少なくとも1つのバッテリユニット38が電源システム10に対して着脱可能であればよい。
 この場合、例えば、図2の各バッテリユニット38の電圧変換器14が図1の制御部24の機能を具備すればよい。また、複数のバッテリユニット38が電源システム10に装着されている状態において、各バッテリユニット38は、CAN(Controller Area Network)を介して、1次側電圧計測器18及び1次側電流計測器16の各計測結果等を互いに送受信可能である。これにより、各バッテリユニット38の電圧変換器14は、負荷26からの負荷要求と、自己のバッテリユニット38の1次側電圧計測器18及び1次側電流計測器16の各計測結果と、他のバッテリユニット38から受信した1次側電圧計測器18及び1次側電流計測器16の各計測結果と、2次側電圧計測器22及び2次側電流計測器20の各計測結果とに基づき、自己の電圧変換器14の変圧率Trを設定することができる。
[4.電圧変換器14の具体例]
 図3A~図3Cは、図1及び図2の電圧変換器14の具体例を示す回路図である。電圧変換器14は、例えば、昇圧型(図3A参照)、降圧型(図3B参照)、又は、インターリーブ回路方式の降圧型若しくは昇降圧型(図3C参照)のDC/DCコンバータである。これらのDC/DCコンバータの構成及び動作は、周知であるため、ここでは、図3A~図3Cの回路図における各構成要素の接続関係について簡単に説明する。
 図3Aの電圧変換器14において、1次側30の正極端子30pと負極端子30mとの間には、コンデンサ40が接続されている。コンデンサ40の正極端子30p側には、コイル42の一端が接続されている。コイル42の他端は、直列接続された2つのスイッチング素子44H、44Lの中点に接続されている。2つのスイッチング素子44H、44Lは、それぞれ、MOSFET(Metal Oxide Semiconductor Field Effect Transistor)46H、46Lと、寄生ダイオードであるツェナダイオード48H、48Lとが並列に接続されて構成される。一方のスイッチング素子44Hは、2次側32の正極端子32pに接続されるハイサイドのスイッチング素子である。他方のスイッチング素子44Lは、2次側32の負極端子32mに接続されるローサイドのスイッチング素子である。
 図3Bの電圧変換器14において、1次側30の正極端子30pと負極端子30mとの間には、コンデンサ50が接続されている。コンデンサ50には、直列接続された2つのスイッチング素子44H、44Lが並列接続されている。一方のスイッチング素子44Hは、コンデンサ50の正極端子30p側に接続されるハイサイドのスイッチング素子である。他方のスイッチング素子44Lは、コンデンサ50の負極端子30m側と2次側32の負極端子32mとに接続されるローサイドのスイッチング素子である。2つのスイッチング素子44H、44Lの中点には、コイル52の一端が接続されている。コイル52の他端は、2次側32の正極端子32pに接続されている。
 図3Cの電圧変換器14は、1次側30の正極端子30p及び負極端子30mに接続されたコンデンサ50と、2次側32の正極端子32p及び負極端子32mとの間に、図3Bの2つのスイッチング素子44H、44L及び1つのコイル52を組とする2組の回路が並列に接続されている点で、図3Bの電圧変換器14とは異なる。
 いずれの電圧変換器14においても、各スイッチング素子44H、44L(MOSFET46H、46L)のゲート端子に供給されるゲート信号のデューティを変更することで、電圧変換器14の変圧率Tr(図3Aでは昇圧率Tru、図3Bでは降圧率Trd、図3Cでは昇圧率Tru又は降圧率Trd)を変化させることができる。
[5.本実施形態の特徴的な機能]
 次に、本実施形態に係る電源システム10の特徴的な機能(以下、本実施形態の特徴的な機能ともいう。)について、図4A~図16を参照しながら説明する。本実施形態の特徴的な機能とは、電圧又はSOCの異なる複数のバッテリ12を互いに並列接続し、電圧又はSOCが互いに均等となるように複数のバッテリ12間に電流を流して充放電を行う場合に、バッテリ12の放電電流最大値Idmax(放電電流Idの絶対値の上限値)と充電電流最大値Icmax(充電電流Icの絶対値の上限値)との間の所定の許容範囲(第1範囲)内に当該電流が収まるように、複数の電圧変換器14の変圧率Trを設定するというものである。
 なお、放電電流最大値Idmaxとは、バッテリ12を劣化させない程度に放電電流Idを流すときの上限値(閾値)であって、該バッテリ12の製造メーカの保証値又は製品保証値である。充電電流最大値Icmaxとは、バッテリ12を劣化させない程度に充電電流Icを流すときの上限値(閾値)であって、該バッテリ12の製造メーカの保証値又は製品保証値である。
<5.1 問題点(比較例)>
 図4Aは、電圧又はSOCの異なる複数のバッテリ12を互いに並列接続し、電圧又はSOCを互いに均等にする場合の問題点(比較例)を図示した概念図である。なお、比較例では、図1~図3C中の構成要素と同じ構成要素については、同じ参照符号を付けて説明する。
 図4Aでは、一例として、SOCの異なる4つのバッテリ12を並列接続した場合を図示している。また、図4Aでは、左側のバッテリ12から右側のバッテリ12に向かって、SOCが順に小さい場合を図示している。図4Aでは、複数のバッテリ12の電圧又はSOCの大きさを、バッテリ12のブロック内のハッチングの面積の広さで模式的に図示している。
 比較例では、4つのバッテリ12を並列接続すると、SOCが均等化されるように、4つのバッテリ12間に電流が流れる。具体的に、SOCが相対的に高いバッテリ12(図4Aの左側の2つのバッテリ12)から放電電流Idが流れることで、SOCが相対的に低いバッテリ12(図4Aの右側の2つのバッテリ12)に充電電流Icとして流れ込む。
 そして、比較例のように、互いに並列接続するように4つのバッテリ12を単純に結線する場合、無視できるほど小さな電圧差であれば、各バッテリ12を直接、並列接続しても問題はない。しかしながら、電圧差の大きな複数のバッテリ12を並列接続すると、当該電圧差に起因して、結線した瞬間に大電流が流れる。また、このような状態では、電圧変換器14を介して複数のバッテリ12を互いに並列接続する場合においても、電圧変換器14のスイッチング素子44H、44Lを単純にオンすると、オンにした瞬間に大電流が流れる。さらに、スイッチング素子44H、44Lを単純にオフすると、オフにした瞬間に配線のインダクタンス成分に起因する高電圧が発生する。このような大電流又は高電圧の発生に起因して、バッテリ12が劣化するおそれがある。
<5.2 本実施形態の特徴的な機能の概要>
 図4Bは、図4Aの問題点を解決するための本実施形態の特徴的な機能を図示した概念図である。
 本実施形態の特徴的な機能では、複数のバッテリ12が複数の電流調整器54を介して互いに並列に接続されている。この場合、複数の電流調整器54は、それぞれ、1次側56に接続されているバッテリ12に流れる電流が所定の許容範囲(第1範囲)内となるような電流制限を行う。なお、第1範囲とは、バッテリ12の放電電流最大値Idmaxと充電電流最大値Icmaxとの間の放電電流Id又は充電電流Icの許容範囲をいう。
 ここで、電圧又はSOCが相対的に高いバッテリ12は、放電側のバッテリ12として機能し、放電電流Idを流す。一方、電圧又はSOCが相対的に低いバッテリ12は、充電側のバッテリ12となり、充電電流Icが流れ込む。従って、電流調整器54は、放電電流Id及び充電電流Icが共に第1範囲内に収まるような電流制限を行う。
 また、電流調整器54がスイッチング素子44H、44Lを含み構成されている場合、スイッチング素子44H、44Lをオン又はオフする際に発生するピーク電流によって、放電電流Id又は充電電流Icが第1範囲を逸脱する可能性がある。そのような場合には、放電電流Id又は充電電流Icが第1範囲内に収まるように、放電側のバッテリ12の電流調整器54の2次側58と、充電側のバッテリ12の電流調整器54の2次側58との電圧差を小さくすればよい。これにより、放電電流Id又は充電電流Icを第1範囲内に収めつつ、各バッテリ12の電圧又はSOCを速やかに均等化することが可能となる。
 なお、本実施形態に係る電源システム10では、複数のバッテリ12が複数の電圧変換器14を介して互いに並列接続されている(図1及び図2参照)。複数の電圧変換器14は、1次側30の電圧を任意の変圧率Trで変換することで、変換後の電圧を2次側32に出力する。この場合、変圧率Trを変化させれば、2次側32の電圧が調整され、複数の電圧変換器14の2次側32の電圧差を小さくして、放電電流Id及び充電電流Icを第1範囲内に収めることが可能となる。従って、図1~図3Cの電圧変換器14は、図4Bの電流調整器54に対応する。また、電圧変換器14の1次側30は、電流調整器54の1次側56に対応する。さらに、電圧変換器14の2次側32は、電流調整器54の2次側58に対応する。
<5.3 本実施形態の特徴的な機能による充放電の概要>
 次に、本実施形態の特徴的な機能による複数のバッテリ12間の充放電の手法について、図5~図6Bを参照しながら説明する。
 図5は、複数のバッテリ12が電流調整器54(電圧変換器14)を介して負荷26に並列接続されている場合に、負荷要求がないとき(負荷電流ILを流す必要がないとき)の複数のバッテリ12間での充放電の動作の概念図である。
 図5では、左側のバッテリ12の電圧又はSOCが最も大きく、放電側のバッテリ12として機能する。これに対して、右側の3つのバッテリ12は、電圧又はSOCが相対的に低く、充電側のバッテリ12となる。すなわち、図5では、左側のバッテリ12から放電電流Idが流れる一方で、放電電流Idが分配され、充電電流Ic1~Ic3として右側の3つのバッテリ12にそれぞれ流れ込む(|Id|=|Ic1|+|Ic2|+|Ic3|)。そのため、負荷電流ILは流れない(IL=0)。
 また、図5において、各電流調整器54は、放電電流Id及び充電電流Ic1~Ic3が第1範囲内に収まるように、すなわち、放電電流Idの絶対値が放電電流最大値Idmax以下となり(|Id|≦Idmax)、且つ、充電電流Ic1~Ic3の絶対値が充電電流最大値Icmax以下となるように(|Ic1|≦Icmax、|Ic2|≦Icmax、|Ic3|≦Icmax)、電流制限を行う。これにより、放電電流Id及び充電電流Ic1~Ic3を第1範囲内に収めつつ、複数のバッテリ12の電圧又はSOCを均等化させることが可能となる。
 図6Aは、負荷要求があるとき、すなわち、負荷電流IL1を負荷26に流す必要があるときの複数のバッテリ12間での充放電の動作の概念図である。この場合、放電電流Idの一部を負荷電流IL1として流すため、右側の3つのバッテリ12に流す充電電流Ic1~Ic3の配分を少なくする。すなわち、図5と比較して、充電電流Ic1~Ic3の絶対値を小さくする。これにより、負荷要求に応じて負荷26に負荷電流IL1を流しつつ、3つのバッテリ12に充電電流Ic1~Ic3を流し、複数のバッテリ12間の電圧又はSOCを均等化させることができる。
 図6Bは、図6Aよりも大きな負荷要求がある場合、例えば、1つのバッテリ12を放電用のバッテリ12としたときに、放電電流最大値Idmaxを超えるような放電電流Idを流す負荷要求があったときの複数のバッテリ12間での充放電の概念図である。この場合、負荷電流IL2が大きいので(IL2>IL1)、1つのバッテリ12のみを放電用とすると、1つのバッテリ12から流れる放電電流Idの絶対値が放電電流最大値Idmaxを超えてしまう(|Id|>Idmax)。
 そこで、図6Bの場合は、例えば、左側の3つのバッテリ12を放電用とし、右側の残り1つのバッテリ12を充電用とする。これにより、3つのバッテリ12から放電電流Id1~Id3が流れ、各放電電流Id1~Id3を合算した電流が、負荷電流IL2と充電電流Icとに分配される(|Id1|+|Id2|+|Id3|=|IL2|+|Ic|)。この結果、3つのバッテリ12から流れる放電電流Id1~Id3の絶対値を放電電流最大値Idmax以下に抑えつつ(|Id1|≦Idmax、|Id2|≦Idmax、|Id3|≦Idmax)、負荷要求に応じた負荷電流IL2を負荷26に流すと共に、1つのバッテリ12に充電電流Icを流すことができる。この場合でも、複数のバッテリ12間の電圧又はSOCを均等化させることができる。
<5.4 変圧率Trの変更による放電電流Id又は充電電流Icの調整>
 次に、本実施形態の特徴的な機能として、変圧率Trの変更により複数の電圧変換器14の2次側32の電圧差を調整することで、放電電流Id又は充電電流Icを調整する場合について、図7A~図9の説明図を参照しながら説明する。ここでは、一例として、複数の電圧変換器14が昇圧型のDC/DCコンバータ(図3A参照)である場合について説明する。
 図7Aに示すように、2つのバッテリ12が電圧変換器14を介して2次側32で並列接続され、左側のバッテリ12のSOCが相対的に大きく、右側のバッテリ12のSOCが相対的に小さいものとする。ここで、2つの電圧変換器14が同じ変圧率Tr(昇圧率Tru)である場合、2つのバッテリ12間では、SOCが大きく異なることから、2つの電圧変換器14の2次側32の電圧差が大きくなり、放電側の左側のバッテリ12から充電側の右側のバッテリ12に向かって大電流が流れる。
 一方、図7Bに示すように、2つの電圧変換器14の昇圧率Truを変化させ、2つの電圧変換器14の2次側32の電圧を同一にした場合、2次側32の電圧差がないため、放電側の左側のバッテリ12から充電側の右側のバッテリ12に電流は流れない(|Id|=|Ic|=0)。
 そこで、本実施形態の特徴的な機能では、図7Cに示すように、放電電流Idの絶対値が放電電流最大値Idmax以下に収まり、且つ、充電電流Icの絶対値が充電電流最大値Icmax以下に収まるように、昇圧率Truを調整する。これにより、左側のバッテリ12から右側のバッテリ12に所望の電流値Iの電流(|Id|=|Ic|=I)を流して、2つのバッテリ12の電圧又はSOCを均等化させることができる。
 また、図8Aのように、左側のバッテリ12から右側のバッテリ12に電流を流して、2つのバッテリ12間で電圧又はSOCの均等化を図る場合(|Id|=|Ic|=I1)、時間経過に伴って、左側のバッテリ12の電圧又はSOCが低下する一方で、右側のバッテリ12の電圧又はSOCが増加する。これにより、2つの電圧変換器14の昇圧率Truに変化がなければ、図8Bに示すように、2つの電圧変換器14の2次側32の電圧差が小さくなり、左側のバッテリ12から右側のバッテリ12に流れる電流が小さくなる(|Id|=|Ic|=I2<I1)。この結果、2つのバッテリ12間での電圧又はSOCの均等化が遅延する可能性がある。
 そこで、図8Cに示すように、2つの電圧変換器14において、1次側電流計測器16(図1及び図2参照)を用いて放電電流Id及び充電電流Icをモニタしながら、充電側(右側)の電圧変換器14の昇圧率Truを低下させることで、右側の電圧変換器14の2次側32の電圧を低下させる。これにより、2つの電圧変換器14の2次側32の電圧差が大きくなるので、放電電流Id及び充電電流Icの絶対値の低下を抑制することができる。なお、昇圧率Truを下げ続けると、2つのバッテリ12間で電圧又はSOCの大きさが逆転する可能性があるため、均等化の動作開始時の昇圧率Tru以下に下げないようにすることに留意する。
 図9は、5つのバッテリ12が電圧変換器14を介して並列接続され、左側のバッテリ12を放電用とすることで、右側の4つのバッテリ12を充電する場合における、5つのバッテリ12間での電圧又はSOCの均等化を図示したものである。
 ここで、放電電流Idの絶対値が放電電流最大値Idmaxを超える可能性がある場合(|Id|>Idmax)、左側の電圧変換器14の昇圧率Truを低下させることで、当該電圧変換器14の2次側32の電圧を低下させる。これにより、左側の電圧変換器14と右側の4つの電圧変換器14との間で、2次側32の電圧差が小さくなる。この結果、放電電流Idの絶対値を放電電流最大値Idmax以下に収める電流制限を行いつつ(|Id|≦Idmax)、右側の4つのバッテリ12に対する充電を行い、5つのバッテリ12の電圧又はSOCの均等化を図ることができる。
<5.5 実際の回路における放電電流Id又は充電電流Icの調整>
 図4A~図9で説明した概念的な内容を、図1~図3Cの実際の回路構成で実現する場合について、図10A~図13を参照しながら説明する。なお、図10A~図11Bでは、説明の簡略化のため、図1及び図2の構成図について、2つのバッテリ12が電圧変換器14を介して2次側32で並列接続されている場合について説明する。
 図10Aは、図7Aの概念図に対応する。図10Aにおいて、一方のバッテリ12の電圧及び電流を、それぞれ、Vb1、Ib1とする。また、他方のバッテリ12の電流及び電流を、それぞれ、Vb2、Ib2とする。さらに、2つの電圧変換器14の昇圧率Truを、それぞれ、Tru1、Tru2とする。
 この場合、Tru1=Tru2であれば、2つの電圧変換器14の2次側32の電圧差によって、大電流の放電電流Id及び充電電流Icが流れる。ここで、負荷電流ILがIL=0の場合、各バッテリ12の内部抵抗をrとすれば、放電電流Id及び充電電流Icは、下記の(1)式で表わされる。
   |Id|=|Ic|=|Vb1×Tru1-Vb2×Tru2|/r
                                 (1)
 この場合、放電電流Idの絶対値が放電電流最大値Idmaxを超えているか、又は、充電電流Icの絶対値が充電電流最大値Icmaxを超えている場合、バッテリ12が劣化するおそれがある。
 そこで、本実施形態の特徴的な機能では、例えば、図7Cの概念図に対応する図10Bのように、充電側の電圧変換器14を構成するスイッチング素子44H、44L(図3A~図3C参照)のゲート端子に供給するゲート信号のデューティを変化させることで、変圧率Trを変化させればよい。具体的に、昇圧型の電圧変換器14の場合、図3A及び図12Aに示すように、ハイサイドのスイッチング素子44Hに供給するゲート信号(図12Aの「H」)をローレベルにした状態で、ローサイドのスイッチング素子44Lに供給するゲート信号(図12Aの「L」)のデューティを変化させて、昇圧率をTru2からTru2r(>Tru2)に増加させる。
 これにより、2つの電圧変換器14の2次側32の電圧差が小さくなり、放電電流Id及び充電電流Icを第1範囲内に収めることができる。この結果、バッテリ12の劣化を抑えつつ、バッテリ12の電圧又はSOCの均等化を図ることができる。また、MOSFET46H、46Lを用いてスイッチング動作を行うので、オン抵抗値が低下し、電力損失を削減することができる。
 なお、降圧型の電圧変換器14の場合、図3B及び図12Bに示すように、ローサイドのスイッチング素子44Lに供給するゲート信号をローレベルにした状態で、ハイサイドのスイッチング素子44Hに供給するゲート信号のデューティを変化させればよい。また、昇降圧型の電圧変換器14の場合、図3C及び図12Cに示すように、ハイサイド及びローサイドのスイッチング素子44H、44Lに供給するゲート信号のデューティを変化させればよい。但し、昇降圧型の電圧変換器14については、2つのゲート信号間でデッドタイムTdを設け、2つのスイッチング素子44H、44Lを同時にオンにさせないことに留意する。
 図6Aの概念図に対応する図11Aでは、図10Bの場合と同様に、昇圧率をTru2からTru2rに増加させつつ、放電電流Idの絶対値が放電電流最大値Idmaxを超えないように、負荷要求に応じた負荷電流IL1を流す。この場合でも、負荷電流IL1と充電電流Ic(Ic1)とを流しつつ、2つのバッテリ12間の電圧又はSOCの均等化が可能となる。
 図6B及び図9の概念図に対応する図11Bでは、図11Aと比較して、負荷要求が大きくなり、より大きな負荷電流IL2(>IL1)を流す必要があるため、放電電流Idの絶対値が放電電流最大値Idmaxを超える可能性がある。この場合、放電側の電圧変換器14のスイッチング素子44H、44Lに供給するゲート信号のデューティを変化させ、変圧率Tr(例えば、昇圧率Tru)をTru1からTru1r(<Tru1)に変化させる。これにより、2つの電圧変換器14の2次側32の電圧差が小さくなり、充電電流Ic(Ic2)を小さくすることができる。充電電流Icを小さくした分、負荷26に流す負荷電流IL2を大きくすることができるので、負荷要求に応じた負荷電流IL2を流しつつ、2つのバッテリ12間の電圧又はSOCの均等化が可能となる。
 図13は、4つのバッテリ12間での電圧又はSOCの均等化の実行中における各バッテリ12の電流変化を時系列で図示したタイミングチャートである。図13において、縦軸の電流について、0よりも正側は、バッテリ12から放電電流Idが流れる場合を示し、0よりも負側は、バッテリ12に充電電流Icが流れ込む場合を示す。
 時点t0から時点t1までの時間帯では、放電側のバッテリ1から充電側のバッテリ2~4に電流が流れる。時点t1から時点t2までの時間帯では、バッテリ2が充電側から放電側に切り替わり、バッテリ1及び2からバッテリ3及び4に電流が流れる。時点t2から時点t3までの時間帯では、バッテリ3が充電側から放電側に切り替わり、バッテリ1~3からバッテリ4に電流が流れる。時点t3以降は、バッテリ1~4の電圧又はSOCが均等化されたことで、バッテリ1~4の充放電動作が終了する。
 このように、放電側のバッテリ12から充電側のバッテリ12に電流を流しつつ、時間経過に伴い、複数のバッテリ12が充電側から放電側に順次切り替わる。この結果、電圧又はSOCの均等化を速やかに行うことができる。
<5.6 電圧又はSOCの均等化の具体的な動作説明>
 次に、図1~図3Cの電源システム10での電圧又はSOCの均等化の具体的な動作について、図14~図16のフローチャートを参照しながら説明する。なお、図14~図16では、必要に応じて、図1~図13も参照しながら説明する。
 図14は、図1の電源システム10での動作のフローチャートである。図14の動作主体は、主として、図1の制御部24及び各電圧変換器14である。
 ステップS1において、制御部24は、電源システム10内に流れる電流の値を0にするため、複数の電圧変換器14の変圧率Trを初期値に設定する。テーブル36には、各電圧変換器14の変圧率Trの初期値が予め格納されている。例えば、最も電圧の低いバッテリ12に接続される電圧変換器14の降圧率Trdを1とした場合、各電圧変換器14の降圧率Trdは、下記の(2)式で表わされる。
   Trd=(最も電圧の低いバッテリ12の電圧値)
    /(電圧変換器14に接続されているバッテリ12の電圧値) (2)
 制御部24は、テーブル36を参照し、初期値に応じた指令値を設定して各電圧変換器14に送信する。これにより、各電圧変換器14は、受信した指令値に基づき、変圧率Trを初期値に調整する。この結果、電源システム10内に流れる電流が0となり、各バッテリ12の劣化を抑制することができる。
 次のステップS2において、制御部24は、複数のバッテリ12の電圧又はSOCの均等化の動作を開始するため、複数の電圧変換器14について、放電側のバッテリ12から充電側のバッテリ12に電流を流すための変圧率Trを決定し、決定した変圧率Trに応じた指令値を設定する。そして、制御部24は、設定した指令値を各電圧変換器14に送信する。
 各電圧変換器14は、受信した指令値に基づき、変圧率Trを調整する。これにより、各電圧変換器14は、接続されているバッテリ12の電圧を変圧率Trに応じて変換し、変換した電圧を2次側32に出力する。この結果、放電側のバッテリ12から電圧変換器14を介して放電電流Idが流れ、一方で、電圧変換器14を介して充電側のバッテリ12に充電電流Icが流れ込む。
 なお、ステップS2において、図5、図6A及び図9のように、最も高い電圧のバッテリ12を放電側のバッテリ12とし、残りのバッテリ12を充電側のバッテリ12として電力を分配する場合、残りのバッテリ12に接続されている電圧変換器14の降圧率Trdを、最も高いバッテリ12に接続されている電圧変換器14の降圧率Trdよりも低くすればよい。また、ステップS2において、図6Bのように、最も低い電圧のバッテリ12を充電側のバッテリ12とし、残りのバッテリ12を放電側のバッテリ12として電力を分配する場合、最も低い電圧のバッテリ12に接続されている電圧変換器14の降圧率Trdを低くすればよい。
 次のステップS3において、各1次側電流計測器16は、1次側30に流れる電流(放電電流Id又は充電電流Ic)を計測し、その計測結果を制御部24に送信する。なお、ステップS3において、各1次側電圧計測器18が1次側30の電圧を計測し、2次側電流計測器20が2次側32の電流を計測し、2次側電圧計測器22が2次側32の電圧を計測してもよい。これらの計測結果も制御部24に送信される。
 次のステップS4において、制御部24は、受信された各1次側30の電流のうち、放電電流Idを流している電圧変換器14について、放電電流Idの絶対値が放電電流最大値Idmaxを超える電圧変換器14が存在するかどうかを判定する。|Id|>Idmaxとなる放電電流Idを流している電圧変換器14が存在する場合(ステップS4:YES)、ステップS5に進む。
 ステップS5において、制御部24は、|Id|>Idmaxとなる放電電流Idを流しているバッテリ12が劣化するおそれがあると判断し、当該バッテリ12に接続されている電圧変換器14について、2次側32の電圧が低くなるような変圧率Trに変更する。具体的に、制御部24は、変圧率Tr(例えば、降圧率Trd)を低下させる指令値に変更し、当該電圧変換器14に送信する。これにより、当該電圧変換器14は、受信した指令値に基づいて、変圧率Trを低く調整する。この結果、2次側32の電圧が低下し、放電電流Idが小さくなるので、放電電流Idの絶対値を放電電流最大値Idmax以下に収めて、電圧変換器14に接続されているバッテリ12の劣化を抑えることができる。
 なお、ステップS4において、否定的な判定結果である場合(ステップS4:NO)、すなわち、|Id|>Idmaxとなるような放電電流Idを流しているバッテリ12が存在しない場合、ステップS5の処理がスキップされ、ステップS6に進む。
 ステップS4又はS5後のステップS6において、制御部24は、受信された各1次側30の電流の計測結果に基づいて、充電電流Icを流している電圧変換器14について、充電電流Icの絶対値が充電電流最大値Icmaxを超える電圧変換器14が存在するかどうかを判定する。|Ic|>Icmaxとなる充電電流Icを流している電圧変換器14が存在する場合(ステップS6:YES)、ステップS7に進む。
 ステップS7において、制御部24は、|Ic|>Icmaxとなる充電電流Icを流しているバッテリ12が劣化するおそれがあると判断し、当該バッテリ12に接続されている電圧変換器14について、2次側32の電圧が高くなるような変圧率Trに変更する。すなわち、制御部24は、変圧率Tr(例えば、降圧率Trd)を増加させる指令値に変更し、当該電圧変換器14に送信する。
 これにより、当該電圧変換器14は、受信した指令値に基づいて、変圧率Trを高くする。この結果、2次側32の電圧が増加し、充電電流Icが小さくなるので、充電電流Icの絶対値を充電電流最大値Icmax以下に収めて、電圧変換器14に接続されているバッテリ12の劣化を抑えることができる。
 なお、ステップS6でも、否定的な判定結果である場合(ステップS6:NO)、すなわち、|Ic|>Icmaxとなるような充電電流Icを流しているバッテリ12が存在しない場合、ステップS7の処理がスキップされ、ステップS8に進む。
 ステップS6又はS7後のステップS8において、制御部24は、各バッテリ12の電圧又はSOCが所定の閾値範囲(第2範囲)内に収まったか否かを判定する。なお、第2範囲とは、各バッテリ12の電圧又はSOCが均等化されているとみなすことができる電圧範囲又はSOCの範囲をいう。
 各バッテリ12の電圧又はSOCが第2範囲内に収まっていない場合(ステップS8:NO)、制御部24は、各バッテリ12の電圧又はSOCの均等化が完了していないと判断し、ステップS2に戻る。従って、各バッテリ12の電圧又はSOCの均等化が完了するまで(ステップS8:YES)、ステップS2~S7の処理が繰り返し実行される。
 一方、各バッテリ12の電圧又はSOCが第2範囲内に収まっている場合(ステップS8:YES)、ステップS9に進む。ステップS9において、制御部24は、各電圧変換器14の変圧率Tr(例えば、降圧率Trd)を1にする指令値を設定し、設定した指令値を各電圧変換器14に送信する。これにより、各電圧変換器14は、受信した指令値に基づいて変圧率Trを1に調整する。具体的に、各電圧変換器14は、変換動作を停止し、1次側30の正極端子30pと2次側32の正極端子32pとを導通させる。この結果、電圧値又はSOCが均等化された複数のバッテリ12を、導通状態で互いに並列接続させることができる。
 図15は、図2の電源システム10での動作(第1変形例)のフローチャートである。図15の動作主体は、主として、図2の各電圧変換器14である。
 図2の電源システム10では、バッテリユニット38毎に1次側電圧計測器18が設けられている。そのため、ステップS11において、各1次側電圧計測器18は、バッテリ12の電圧を計測し、その計測結果をバッテリユニット38内の電圧変換器14に出力する。また、各1次側電圧計測器18は、計測結果を他のバッテリユニット38の電圧変換器14にも送信する。
 ステップS12において、各電圧変換器14は、受信した各計測結果に基づき、最も低い電圧のバッテリ12に合わせて、自己の変圧率Tr(例えば、降圧率Trd)を設定する。すなわち、下記の(3)式を用いて降圧率Trdを設定する。
   Trd=(最も電圧の低いバッテリ12の電圧値)
    /(自己のバッテリユニット38のバッテリ12の電圧値)  (3)
 ステップS13において、各1次側電流計測器16は、1次側30に流れる電流を計測し、その計測結果をバッテリユニット38内の電圧変換器14に出力する。また、各1次側電流計測器16は、計測結果を他のバッテリユニット38の電圧変換器14にも送信する。
 ここで、最も低い電圧のバッテリ12は、他のバッテリ12と比較して電圧又はSOCが低いため、充電する必要がある。そこで、ステップS14において、最も低い電圧のバッテリ12に接続されている電圧変換器14は、充電電流Icが充電電流最大値Icmaxとなるような変圧率Trに調整する。これにより、自己のバッテリユニット38のバッテリ12が充電側のバッテリ12となる一方で、他のバッテリユニット38のバッテリ12が放電側のバッテリ12となるので、自己のバッテリ12に充電電流Icが優先的に流れ込むことになる。
 次のステップS15において、各電圧変換器14は、自己のバッテリユニット38の1次側電流計測器16から送られてくる計測結果に基づき、放電電流Idの絶対値が放電電流最大値Idmaxを超えるかどうかを判定する。
 |Id|>Idmaxである場合(ステップS15:YES)、次のステップS16において、電圧変換器14は、自己のバッテリユニット38のバッテリ12が劣化するおそれがあると判断し、2次側32の電圧が低くなるような変圧率Trに変更する。例えば、電圧変換器14は、降圧率Trdを低下させることで2次側32の電圧を低下させ、放電電流Idを小さくする。これにより、放電電流Idの絶対値が放電電流最大値Idmax以下に収まるので、バッテリ12の劣化を抑えることができる。
 なお、ステップS15において、|Id|≦Idmaxである場合(ステップS15:NO)、ステップS16の処理がスキップされ、ステップS17に進む。
 ステップS15又はS16後のステップS17において、各電圧変換器14は、自己のバッテリユニット38の1次側電流計測器16から送られてくる計測結果に基づき、充電電流Icの絶対値が充電電流最大値Icmaxを超えるかどうかを判定する。
 |Ic|>Icmaxである場合(ステップS17:YES)、次のステップS18において、電圧変換器14は、自己のバッテリユニット38のバッテリ12が劣化するおそれがあると判断し、2次側32の電圧が高くなるような変圧率Trに変更する。例えば、電圧変換器14は、降圧率Trdを高くすることで2次側32の電圧を増加させ、充電電流Icを小さくする。これにより、充電電流Icの絶対値が充電電流最大値Icmax以下に収まるので、バッテリ12の劣化を抑えることができる。
 なお、ステップS17において、|Ic|≦Icmaxである場合(ステップS17:NO)、ステップS18の処理がスキップされ、ステップS19に進む。
 ステップS17又はS18後のステップS19において、各電圧変換器14は、各バッテリユニット38のバッテリ12の電圧又はSOCが第2範囲内に収まったか否かを判定する。電圧又はSOCが第2範囲内に収まっていないバッテリ12が1つでもある場合(ステップS19:NO)、制御部24は、各バッテリ12の電圧又はSOCの均等化が完了していないと判断し、ステップS12に戻る。従って、各バッテリ12の電圧又はSOCの均等化が完了するまで(ステップS19:YES)、ステップS12~S18の処理が繰り返し実行される。
 一方、各バッテリ12の電圧又はSOCが第2範囲内に収まっている場合(ステップS19:YES)、次のステップS20において、各電圧変換器14は、変圧率Tr(降圧率Trd)を0にして変換動作を停止し、1次側30の正極端子30pと2次側32の正極端子32pとを導通させる。
 図16は、図1又は図2の電源システム10での他の動作(第2変形例)のフローチャートである。ここでは、最も電圧の低いバッテリ12を充電側のバッテリ12とし、当該バッテリ12の電圧値に合わせて変圧率Tr(例えば、降圧率Trd)を調整しつつ、複数のバッテリ12の電圧又はSOCの均等化を実行する場合について説明する。また、この動作説明では、図1の電源システム10について説明するが、図2の電源システム10でも同様に適用可能である。
 ステップS21において、各1次側電圧計測器18は、バッテリ12の電圧を計測し、その計測結果を制御部24に送信する。
 ステップS22において、制御部24は、受信した各計測結果に基づき、最も低い電圧のバッテリ12に合わせて、各電圧変換器14の変圧率Tr(例えば、降圧率Trd)を設定する。すなわち、下記(4)式を用いて降圧率Trdを設定する。
   Trd=(最も電圧の低いバッテリ12の電圧値)
    /(電圧変換器14に接続されているバッテリ12の電圧値) (4)
 そして、制御部24は、設定した変圧率Trに基づく指令値を各電圧変換器14に送信する。各電圧変換器14は、受信した指令値に基づいて、変圧率Trを調整する。
 ステップS23において、各1次側電流計測器16は、1次側30に流れる電流を計測し、その計測結果を制御部24に送信する。
 ステップS24において、制御部24は、受信した各計測結果に基づき、最も低い電圧のバッテリ12に充電電流最大値Icmaxの充電電流Icが流れるように、各電圧変換器14の変圧率Trを設定する。そして、制御部24は、設定した変圧率Trに基づく指令値を各電圧変換器14に送信する。各電圧変換器14は、受信した指令値に基づいて、変圧率Trを調整する。例えば、制御部24は、複数の電圧変換器14の各々について、1次側電流計測器16で計測される電流をモニタしながら、変圧率Trを徐々に上げ、最も低い電圧のバッテリ12に充電電流最大値Icmaxの充電電流Icが流れた場合、各電圧変換器14の変圧率Trを固定すればよい。
 次のステップS25において、各1次側電流計測器16は、1次側30の電流を計測し、その計測結果を制御部24に送信する。また、各1次側電圧計測器18は、バッテリ12の電圧を計測し、その計測結果を制御部24に送信する。さらに、2次側電流計測器20は、負荷電流ILを計測し、その計測結果を制御部24に送信する。さらにまた、2次側電圧計測器22は、2次側32の電圧を計測し、その計測結果を制御部24に送信する。
 次のステップS26において、制御部24は、受信される各計測結果に基づき、負荷26から電圧変換器14側に回生電流が流れたか、又は、|Id|>Idmaxのバッテリ12があるかどうかを判断する。回生電流が流れ、又は、|Id|>Idmaxである場合(ステップS26:YES)、次のステップS27に進む。
 ステップS27において、制御部24は、回生電流が流れる場合には、最も低い電圧のバッテリ12に充電電流最大値Icmaxに回生電流が上積みされて流れるので、当該バッテリ12が劣化するおそれがあると判断する。また、制御部24は、|Id|>Idmaxの場合、放電側のバッテリ12が劣化するおそれがあると判断する。
 次に、制御部24は、全ての電圧変換器14について、最も低い電圧のバッテリ12の電圧値に合わせた変圧率Trに設定する。制御部24は、設定した変圧率Trに基づく指令値を各電圧変換器14に送信する。これにより、各電圧変換器14は、受信した指令値に基づき変圧率Trを調整する。この結果、各バッテリ12の劣化が回避される。
 一方、負荷26から電圧変換器14側に回生電流が流れていない、又は、|Id|≦Idmaxの場合(ステップS26:NO)、ステップS28に進む。
 ステップS28において、制御部24は、バッテリ12が劣化するおそれがないと判断し、ステップS24と同様に、最も低い電圧のバッテリ12に充電電流最大値Icmaxの充電電流Icが流れるよう、各電圧変換器14の変圧率Trを設定する。そして、制御部24は、設定した変圧率Trに基づく指令値を各電圧変換器14に送信する。各電圧変換器14は、受信した指令値に基づいて、変圧率Trを調整する。
 ステップS27又はS28後のステップS29において、制御部24は、各バッテリ12の電圧又はSOCが第2範囲内に収まったか否かを判定する。電圧又はSOCが第2範囲内に収まっていないバッテリ12が1つでもある場合(ステップS29:NO)、制御部24は、各バッテリ12の電圧又はSOCの均等化が完了していないと判断し、ステップS25に戻る。従って、各バッテリ12の電圧又はSOCの均等化が完了するまで(ステップS29:YES)、ステップS25~S28の処理が繰り返し実行される。
 一方、各バッテリ12の電圧又はSOCが第2範囲内に収まっている場合(ステップS29:YES)、次のステップS30において、各電圧変換器14は、変圧率Tr(降圧率Trd)を0にして変換動作を停止し、1次側30の正極端子30pと2次側32の正極端子32pとを導通させる。
 なお、図14~図16のフローチャートは、電圧又はSOCの高いバッテリ12から低いバッテリ12に充電する場合について説明しているが、バッテリ12から負荷26に電力を供給する場合にも、これらのフローチャートの説明を適用することは可能である。すなわち、電力を供給する点では、充電側のバッテリ12であっても、負荷26であっても変わりがないからである。この場合、負荷26からの負荷要求が大きい程、電圧又はSOCの低いバッテリ12が接続されているとみなして、該負荷要求に応じた負荷電流ILを流せばよい。
[6.本実施形態の効果]
 以上説明したように、本実施形態に係る電源システム10は、充放電可能な複数のバッテリ12と、1次側30が複数のバッテリ12のいずれかに接続され、2次側32が互いに並列接続され、1次側30に接続されているバッテリ12の電圧を任意の変圧率Tr(昇圧率Tru、降圧率Trd)で変換し、変換した電圧を2次側32に出力する複数の電圧変換器14と、複数の電圧変換器14の1次側30に各々接続され、1次側30に流れる電流(放電電流Id、充電電流Ic)を計測する複数の1次側電流計測器16とを備える。
 この場合、複数の電圧変換器14の各々について、変圧率Trは、1次側電流計測器16で計測される電流が、1次側30に接続されるバッテリ12の放電電流最大値Idmaxとバッテリ12の充電電流最大値Icmaxとの間の第1範囲内に収まるように設定される。
 このように、1次側電流計測器16で計測される電流が放電電流最大値Idmaxと充電電流最大値Icmaxとの第1範囲内にあれば、電圧又はSOCの高いバッテリ12から低いバッテリ12に自動的(自然)に電流が流れ、充放電が行われる。一方、電流が第1範囲内から逸脱する場合には、第1範囲内に収まるように変圧率Trが調整される。この結果、複数のバッテリ12の劣化を回避しつつ、互いに並列接続される複数のバッテリ12の電圧又はSOCを均等化することができる。つまり、本実施形態では、電圧又はSOCをモニタしながら充放電を行うのではなく、各バッテリ12の許容電流の範囲(第1範囲)内で、電圧又はSOCの高いバッテリから低いバッテリへと自然に電流が流れる自然淘汰の手法で充放電を行うことができる。
 この場合、放電中のバッテリ12から流れる放電電流Idの絶対値が放電電流最大値Idmaxを超える場合(|Id|>Idmax)、当該バッテリ12に接続されている電圧変換器14の変圧率Trを低下させ、一方で、充電中のバッテリ12に流れ込む充電電流Icの絶対値が充電電流最大値Icmaxを超える場合(|Ic|>Icmax)、当該バッテリ12に接続されている電圧変換器14の変圧率Trを高くすればよい。
 これにより、複数の電圧変換器14の2次側32の電圧差が小さくなり、放電電流Id又は充電電流Icを第1範囲内に収めることができる。この結果、バッテリ12の劣化を回避しつつ、電圧又はSOCを効率よく且つ速やかに均等化することができる。
 また、複数の電圧変換器14は、複数のバッテリ12の電圧又はSOCが第2範囲内に収まっている場合、変換動作を停止して、1次側30と2次側32とを導通させればよい。これにより、電圧変換器14の変換効率を差し引いた分だけ、スイッチング素子44H、44Lのスイッチングロスが無くなるので、電圧変換器14の総合効率を向上させることができる。
 この場合、複数の電圧変換器14は、電源システム10が動作を停止した際に、1次側30と2次側32との導通状態を解除すればよい。これにより、電源システム10の停止後、複数のバッテリ12間での自然放電やバッテリ12の交換が行われても、電源システム10の再起動時に、複数のバッテリ12間での電圧又はSOCの均等化を速やかに開始させることができる。
 また、電流が略0となる初期値に変圧率Trを予め設定しておけば、複数のバッテリ12の劣化を確実に回避することができる。
 また、電源システム10は、複数の電圧変換器14の1次側30に各々接続され、1次側30の電圧を計測する複数の1次側電圧計測器18と、2次側32に接続され、2次側32の電圧を計測する2次側電圧計測器22とをさらに備えてもよい。これにより、1次側電圧計測器18の計測結果に基づいて各電圧変換器14の変圧率Trを容易に設定することができる。また、変圧率Trの調整後、2次側32の電圧が所望の電圧値に変化したかどうかを確認することができる。
 さらに、複数のバッテリ12のうち、少なくとも1つのバッテリ12が電源システム10に対して着脱可能であれば、着脱式のバッテリ12を備える電源システム10に本実施形態を容易に適用することができる。例えば、汎用のバッテリパックをバッテリ12とし、複数のバッテリ12が電圧変換器14を介して並列接続されている場合、全てのバッテリパックを同時に交換しなくても、一部のバッテリパックを満充電のバッテリパックに交換するだけで、満充電のバッテリパックから電圧又はSOCの低いバッテリパックへの充電が自動的に行われる。この結果、全てのバッテリパックの電圧又はSOCを自動的に且つ速やかに均等化することができる。
 さらにまた、1つのバッテリ12と、当該バッテリ12に接続される電圧変換器14と、当該電圧変換器14の1次側30に接続される1次側電流計測器16とを1つのユニットとする複数のバッテリユニット38のうち、少なくとも1つのバッテリユニット38は、電源システム10に対して着脱可能であってもよい。この場合でも、着脱式のバッテリユニット38を備える電源システム10に本実施形態を容易に適用することができる。
 なお、本発明は、上述の実施形態に限らず、この明細書の記載内容に基づき、種々の構成を採り得ることは勿論である。

Claims (8)

  1.  充放電可能な複数のバッテリ(12)と、
     1次側(30)が複数のバッテリのいずれかに接続され、2次側(32)が互いに並列接続され、前記1次側に接続されているバッテリの電圧を任意の変圧率(Tr、Tru、Trd)で変換し、変換した前記電圧を前記2次側に出力する複数の電圧変換器(14)と、
     複数の前記電圧変換器の1次側に各々接続され、前記1次側に流れる電流(Id、Ic)を計測する複数の電流計測器(16)と、
     を備える電源システム(10)において、
     複数の前記電圧変換器の各々について、前記変圧率は、前記1次側に接続される電流計測器で計測される電流が、前記1次側に接続されるバッテリの放電電流最大値(Idmax)と前記バッテリの充電電流最大値(Icmax)との間の第1範囲内に収まるように設定される、電源システム。
  2.  請求項1記載の電源システムにおいて、
     放電中の前記バッテリから流れる電流の絶対値が前記放電電流最大値を超える場合、当該バッテリに接続されている電圧変換器の変圧率を低下させ、
     一方で、充電中の前記バッテリに流れ込む電流の絶対値が前記充電電流最大値を超える場合、当該バッテリに接続されている電圧変換器の変圧率を高くする、電源システム。
  3.  請求項1又は2記載の電源システムにおいて、
     複数の前記電圧変換器は、複数の前記バッテリの電圧又はSOCが第2範囲内に収まっている場合、変換動作を停止して、前記1次側と前記2次側とを導通させる、電源システム。
  4.  請求項3記載の電源システムにおいて、
     複数の前記電圧変換器は、前記電源システムが動作を停止した場合、前記1次側と前記2次側との導通状態を解除する、電源システム。
  5.  請求項1~4のいずれか1項に記載の電源システムにおいて、
     前記変圧率は、前記電流が略0となる初期値に予め設定されている、電源システム。
  6.  請求項1~5のいずれか1項に記載の電源システムにおいて、
     複数の前記電圧変換器の1次側に各々接続され、前記1次側の電圧を計測する複数の1次側電圧計測器(18)と、
     前記2次側に接続され、前記2次側の電圧を計測する2次側電圧計測器(22)と、
     をさらに備える、電源システム。
  7.  請求項1~6のいずれか1項に記載の電源システムにおいて、
     複数の前記バッテリのうち、少なくとも1つのバッテリは、前記電源システムに対して着脱可能である、電源システム。
  8.  請求項7記載の電源システムにおいて、
     1つの前記バッテリと、当該バッテリに接続される前記電圧変換器と、当該電圧変換器の1次側に接続される前記電流計測器とを1つのユニットとする複数の前記ユニット(38)のうち、少なくとも1つのユニットは、前記電源システムに対して着脱可能である、電源システム。
PCT/JP2019/036003 2018-09-13 2019-09-13 電源システム WO2020054828A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2020546211A JP7445598B2 (ja) 2018-09-13 2019-09-13 電源システム
US17/275,695 US11594895B2 (en) 2018-09-13 2019-09-13 Power supply system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018171167 2018-09-13
JP2018-171167 2018-09-13

Publications (1)

Publication Number Publication Date
WO2020054828A1 true WO2020054828A1 (ja) 2020-03-19

Family

ID=69778406

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/036003 WO2020054828A1 (ja) 2018-09-13 2019-09-13 電源システム

Country Status (3)

Country Link
US (1) US11594895B2 (ja)
JP (1) JP7445598B2 (ja)
WO (1) WO2020054828A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022009984A1 (ja) * 2020-07-10 2022-01-13 株式会社オートネットワーク技術研究所 変換装置
WO2023188368A1 (ja) * 2022-03-31 2023-10-05 本田技研工業株式会社 駆動制御装置及び駆動制御装置の制御方法

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102019213076A1 (de) * 2019-08-30 2021-03-04 Robert Bosch Gmbh Regelvorrichtung für einen Gleichspannungskonverter, Gleichspannungskonverter und Verfahren zur Regelung eines Gleichspannungskonverters
JP2021099898A (ja) * 2019-12-19 2021-07-01 横河電機株式会社 二次電池管理装置及び二次電池管理方法
US11569668B2 (en) * 2020-07-14 2023-01-31 Igrenenergi, Inc. System and method for dynamic balancing power in a battery pack

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016208570A (ja) * 2015-04-15 2016-12-08 株式会社東芝 電池盤、電源装置および電池盤の制御方法
JP6293010B2 (ja) * 2014-07-23 2018-03-14 本田技研工業株式会社 蓄電システム

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5595493A (en) 1979-01-11 1980-07-19 Ricoh Co Ltd Microphone speaker
JP3947906B2 (ja) 2001-08-30 2007-07-25 株式会社日立製作所 バックアップ電源と電源装置
JP3872758B2 (ja) 2003-01-08 2007-01-24 株式会社日立製作所 電源制御装置
JP2005176461A (ja) * 2003-12-09 2005-06-30 Matsushita Electric Ind Co Ltd 直流無停電電源装置
JP4572850B2 (ja) 2006-03-24 2010-11-04 株式会社日立製作所 電源制御装置
JP5118913B2 (ja) * 2007-07-24 2013-01-16 トヨタ自動車株式会社 電源システムおよびそれを備えた電動車両ならびに電源システムの制御方法
JP4525809B2 (ja) 2008-07-28 2010-08-18 トヨタ自動車株式会社 電源システムおよびそれを備えた車両、ならびに電源システムの制御方法
CN102421630B (zh) 2009-05-08 2014-05-21 丰田自动车株式会社 电源系统及具备该电源系统的车辆
JP5755540B2 (ja) 2011-09-20 2015-07-29 株式会社東芝 蓄電池装置及び蓄電池装置の運転方法
JP6247039B2 (ja) 2013-07-25 2017-12-13 電源開発株式会社 電力貯蔵装置および電力貯蔵装置の充放電方法
JP2015192462A (ja) 2014-03-27 2015-11-02 株式会社Ihi 電池システム
JP6365222B2 (ja) 2014-10-20 2018-08-01 株式会社豊田自動織機 制御装置及び制御方法
DE112018000424T5 (de) * 2017-01-18 2019-10-10 Denso Corporation Energiewandlungssystemsteuergerät und Steuersystem

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6293010B2 (ja) * 2014-07-23 2018-03-14 本田技研工業株式会社 蓄電システム
JP2016208570A (ja) * 2015-04-15 2016-12-08 株式会社東芝 電池盤、電源装置および電池盤の制御方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022009984A1 (ja) * 2020-07-10 2022-01-13 株式会社オートネットワーク技術研究所 変換装置
WO2023188368A1 (ja) * 2022-03-31 2023-10-05 本田技研工業株式会社 駆動制御装置及び駆動制御装置の制御方法

Also Published As

Publication number Publication date
JP7445598B2 (ja) 2024-03-07
JPWO2020054828A1 (ja) 2021-09-02
US11594895B2 (en) 2023-02-28
US20220029428A1 (en) 2022-01-27

Similar Documents

Publication Publication Date Title
WO2020054828A1 (ja) 電源システム
CN108933526B (zh) 宽输入宽输出高效隔离型dc-dc转换器电池充电器
US7936573B2 (en) Bi-directional DC-DC converter and control method
US9438115B2 (en) Power supply system
US10848068B2 (en) Power conversion system control device and control system
US6297616B1 (en) Charge and discharge system for electric power storage equipment
JP5035978B2 (ja) 車両用dcdcコンバータ装置
CN102362419B (zh) 变压器耦合型升压器的控制装置
JP5786325B2 (ja) 電力変換回路システム
US9525356B2 (en) Electric power conversion system
US9868358B2 (en) Power conversion system suppressing reduction in conversion efficiency
JP6480935B2 (ja) 充電バランス装置
US9419532B2 (en) Electric power conversion system and electric power conversion method for stopping power upon a failure
US9727125B2 (en) Power supply system with a plurality of power supply circuits and control method of the same
EP4175108A1 (en) Battery current sharing control method and battery current sharing control system
CN111130165A (zh) 电源装置
WO2021133718A1 (en) Multi-port power converter
CN110015140B (zh) 电动汽车及其电源电路
US11855542B2 (en) Power-supply control device
KR20170100163A (ko) Dc-dc 컨버터
WO2022234784A1 (ja) 電力変換装置
WO2019117083A1 (ja) 車載充電システム
JPWO2019220915A1 (ja) 電源システム
JP2021175210A (ja) 電力システム及び電力供給装置
JP6066671B2 (ja) 電源システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19858848

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2020546211

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19858848

Country of ref document: EP

Kind code of ref document: A1