WO2020027202A1 - 電力予測システム、電力予測装置、電力予測方法、プログラム、及び記憶媒体 - Google Patents

電力予測システム、電力予測装置、電力予測方法、プログラム、及び記憶媒体 Download PDF

Info

Publication number
WO2020027202A1
WO2020027202A1 PCT/JP2019/030034 JP2019030034W WO2020027202A1 WO 2020027202 A1 WO2020027202 A1 WO 2020027202A1 JP 2019030034 W JP2019030034 W JP 2019030034W WO 2020027202 A1 WO2020027202 A1 WO 2020027202A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
charging device
charging
unit
battery
Prior art date
Application number
PCT/JP2019/030034
Other languages
English (en)
French (fr)
Inventor
雅之 川村
広考 遠藤
Original Assignee
本田技研工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 本田技研工業株式会社 filed Critical 本田技研工業株式会社
Priority to CN201980049950.4A priority Critical patent/CN112513916A/zh
Priority to US17/263,165 priority patent/US11545829B2/en
Priority to EP19844626.2A priority patent/EP3832583A4/en
Priority to JP2020506381A priority patent/JP7058718B2/ja
Publication of WO2020027202A1 publication Critical patent/WO2020027202A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/003Load forecast, e.g. methods or systems for forecasting future load demand
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R21/00Arrangements for measuring electric power or power factor
    • G01R21/133Arrangements for measuring electric power or power factor by using digital technique
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/367Software therefor, e.g. for battery testing using modelling or look-up tables
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0047Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries with monitoring or indicating devices or circuits
    • H02J7/0048Detection of remaining charge capacity or state of charge [SOC]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/02Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries for charging batteries from ac mains by converters
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/40The network being an on-board power network, i.e. within a vehicle
    • H02J2310/48The network being an on-board power network, i.e. within a vehicle for electric vehicles [EV] or hybrid vehicles [HEV]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/56The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
    • H02J2310/58The condition being electrical
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • H02J3/144Demand-response operation of the power transmission or distribution network
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/20Information technology specific aspects, e.g. CAD, simulation, modelling, system security

Definitions

  • the present invention relates to a power prediction system, a power prediction device, a power prediction method, a program, and a storage medium.
  • a portable charging / power feeding device including a battery and a charging / power feeding unit having a housing chamber capable of housing the battery is known (for example, see Patent Document 1). Reference 3).
  • the use of the charging device to cope with the demand response has not been sufficiently studied.
  • the amount of power that can be supplied by the charging device varies according to the number of batteries and the charging capacity, and it is difficult to predict how many users will use the charging device and at what timing.
  • An aspect of the present invention is to provide a power prediction system, a power prediction device, a power prediction method, a program, and a storage medium that can accurately predict a future amount of power that a charging device can supply to the outside.
  • the power prediction system, the power prediction device, the power prediction method, the program, and the storage medium according to the present invention employ the following configurations.
  • One embodiment of the present invention provides a battery detachably attached to a power device that uses electric power, a charging device that charges the battery, and at least one of a usage state or a usage environment of the charging device. And a power prediction device that predicts the amount of power that the charging device can supply outside the charging device by machine learning based on the usage information shown.
  • the aspect (3) is the aspect (2), wherein the power prediction device is mounted on the charging device at the second time and the number of the batteries mounted on the charging device at the second time. Derives the amount of power that can be supplied by the charging device to the outside of the charging device at the second time based on the charging capacity of the battery and the usage information of the charging device at the second time. And a learning processing unit that learns the model based on the teacher data associated with the derived electric energy.
  • the acquisition unit acquires the usage information of the charging device for each area where the plurality of charging devices are installed, and the learning processing unit Learning the model for each region based on the usage information acquired from the charging device for each region by the acquisition unit.
  • the prediction unit when the charging device receives a request for suppression of power consumption by the charging device, the prediction unit performs the processing based on the model. This is to predict the electric energy.
  • the power supply unit when the power prediction device receives a request for suppressing the power consumption of the charging device, the power amount predicted by the prediction unit is reduced. If the power amount is equal to or more than the requested power amount, the power supply unit further includes a supply power control unit that supplies power from the charging device to the outside of the charging device.
  • the usage condition includes an index value indicating a charging capacity of a battery mounted on the charging device, At least one of the number of mounted batteries and the time is included.
  • At least one of a use state and a use environment of the charging device which is transmitted from a charging device that charges a battery that is detachably attached to a power device that uses power, is transmitted.
  • a receiving unit that receives the usage information, and a prediction unit that predicts an amount of power that the charging device can supply to the outside of the charging device by machine learning based on the usage information of the charging device received by the receiving unit.
  • a power prediction device comprising:
  • a computer which is transmitted from a charging device which charges a battery which is detachably attached to a power device which uses electric power, and which is transmitted from a charging device.
  • a power prediction method including: receiving usage information indicating at least one of the above; and, based on the received usage information, predicting the amount of power that the charging device can supply to the outside of the charging device by machine learning. It is.
  • Another embodiment of the present invention is a computer-readable storage medium storing the program according to the above (10).
  • the user who is influenced by the usage status and the usage environment of the charging device is used.
  • the behavior pattern can be learned by the model.
  • the mode (4) since the model is learned for each area where the charging device is installed, it is possible to generate a model corresponding to the behavior pattern of the user in each area.
  • the charging device can respond to the demand response with the power that can be supplied to the outside in the time zone when the power supply and demand is tight.
  • the amount of power that can be supplied to the outside by the charging device is equal to or more than the amount of power requested to be suppressed by the consumer during the time when power supply and demand is tight, charging is performed. Since the power is supplied from the device to the power equipment of the customer, the customer can use the power as in other time zones while responding to the demand response from the power company.
  • FIG. 3 is a diagram illustrating an example of a configuration of a management server according to the embodiment. It is a flowchart which shows an example of the learning process of the learning model by a management server.
  • FIG. 3 is a diagram illustrating an example of a map including an area where a charging station is installed.
  • FIG. 3 is a diagram illustrating an example of a map including an area where a charging station is installed.
  • It is a figure showing an example of learning model information at the time of learning a learning model for every grid.
  • FIG. 1 is a diagram illustrating an example of a configuration of a power prediction system 1 according to the embodiment.
  • the power prediction system 1 is a system that can provide a shared service in which a plurality of users can share a detachable battery 14 that is a driving source of a saddle-ride type motorcycle 12.
  • a system 14 predicts the amount of power that can be supplied by the charging station 16.
  • the power prediction system 1 includes one or more saddle-type motorcycles 12, a detachable battery 14 capable of supplying power to each motorcycle 12, one or more charging stations 16, a management server 18, a terminal, Device 28.
  • the motorcycle 12 is an example of a “power device”
  • the charging station 16 is an example of a “charging device”
  • the management server 18 is an example of a “power prediction device”.
  • the “power device” is not limited to the motorcycle 12, and may be, for example, a vehicle (one-wheel, three-wheel, four-wheel, or the like) which can be driven by electric power and detachably attaches the detachable battery 14, or an assist-type bicycle. You may. Instead of these vehicle-type moving bodies, the “power device” may be a portable charging / powering device carried by a person or a vehicle described in JP-A-2019-068552. The “power device” may be a mobile robot, an autonomous traveling device, an electric bicycle, an autonomous traveling vehicle, another electric vehicle, a drone flying object, or another electric traveling device (electric mobility).
  • the “power device” is the motorcycle 12.
  • the detachable battery 14 is, for example, a cassette type power storage device (secondary battery) that is detachably attached to the motorcycle 12.
  • the detachable battery 14 includes a battery storage unit 145 described later.
  • the charging station 16 is a facility for storing and charging one or more detachable batteries 14, and is installed at a plurality of places (areas).
  • the housing 20 of the charging station 16 is provided with a plurality of (in the example of this figure, 12) slots 21, a display unit 161, and a reading unit 162.
  • a charging section 163 described later is provided on the back side of the slot 21.
  • the management server 18 is communicably connected to the charging station 16, the terminal device 28, and various devices of the power company 30 via the network NW. For example, the management server 18 predicts the amount of electric power that can be supplied to the outside by the charging station 16 (hereinafter, referred to as suppliable electric energy) based on information acquired from devices connected via the network NW.
  • the “outside” is, for example, a power facility of the customer 40 or a power system (Electric (al) / Power / System; EPS).
  • the management server 18 controls the charging station 16 based on the predicted suppliable power amount of the charging station 16 to supply the power to the power equipment of the customer 40 or the like. Supply.
  • the demand response request is information requesting the customer 40 to reduce the power consumption.
  • the demand response request includes a time zone for requesting suppression of power consumption (for example, two hours from 12:00 to 14:00) and a power amount (hereinafter, referred to as “power consumption”) indicating how much power consumption should be suppressed. (Referred to as a power saving request power amount).
  • the terminal device 28 is, for example, a mobile phone, a smartphone, or a tablet terminal, and is used by a user who owns the motorcycle 12 or the like.
  • the terminal device 28 is communicably connected to the management server 18 via the network NW.
  • the user accesses a website or the like provided by the management server 18 via the terminal device 28, and performs a registration procedure for using the share service of the removable battery 14.
  • FIG. 2 is a diagram illustrating an example of a configuration of the detachable battery 14 in the embodiment.
  • the detachable battery 14 includes a storage battery 141, a measurement sensor 142, a BMU (Battery Management Unit) 143, a connection unit 144, and a battery storage unit 145.
  • BMU Battery Management Unit
  • the storage battery 141 includes, for example, a secondary battery such as a lithium ion battery or a lead storage battery.
  • the configuration of the storage battery 141 may be other than this, and may be another type of secondary battery, a capacitor, or a composite battery combining these.
  • the measurement sensor 142 includes a sensor for detecting the voltage of the storage battery 141, a sensor for detecting the current of the storage battery 141, a sensor for detecting the temperature of the storage battery 141, and the like.
  • the measurement sensor 142 outputs to the BMU 143 a signal indicating the voltage, current, and temperature of the storage battery 141 detected while the detachable battery 14 is mounted on the motorcycle 12.
  • the BMU 143 includes, for example, a processor such as a CPU (Central Processing Unit) and a ROM (Read Only Memory).
  • the ROM stores, for example, a program read and executed by the processor.
  • the BMU 143 controls charging and discharging of the storage battery 141 based on a command from a control device mounted on the motorcycle 12.
  • the BMU 143 derives a SOC (State $ Of $ Charge) indicating the charge capacity of the storage battery 141 based on the detection result of the measurement sensor 142.
  • SOC State $ Of $ Charge
  • the BMU 143 causes the battery-side storage unit 145 to store the derivation result of the SOC.
  • the BMU 143 may cause the battery-side storage unit 145 to store identification information of the detachable battery 14 (hereinafter, referred to as a battery ID), a detection result detected by the measurement sensor 32, and the like.
  • the BMU 143 may cause the battery-side storage unit 145 to store user identification information (hereinafter, referred to as a user ID), for example, when authentication at a charging station 16 described later is successful.
  • the BMU 143 stores information such as the internal temperature of the storage battery 141 during charging, the internal temperature of the storage battery 141 during discharging, and the voltage of the storage battery 141 during discharging as detection results of the measurement sensor 142 in the battery-side storage unit. 145, and as the SOC derivation result, the battery-side storage unit 145 stores information such as the SOC of the storage battery 141 that fluctuates during the usage period from when the detachable battery 14 is lent to when it is returned. “From the time when the detachable battery 14 is lent to the time when it is returned” is the period from when the detachable battery 14 is removed from the charging station 16 to when the detachable battery 14 is attached to the charging station 16 again. May be.
  • the BMU 143 When the BMU 143 communicates with various sensors such as an odometer mounted on the motorcycle 12 when the detachable battery 14 is mounted on the motorcycle 12, the BMU 143 stores the detection results of these sensors in the battery side storage unit 145. You may. For example, the BMU 143 may cause the battery-side storage unit 145 to store the traveling distance of the motorcycle 12 measured by the odometer during the usage period from when the detachable battery 14 is lent to when it is returned. The BMU 143 may cause the battery-side storage unit 145 to store the capacity retention rate of the storage battery 141, the internal resistance increase rate, the SOC when left, the battery temperature when left, the elapsed time from the manufacturing time, the total number of times of charging, and the like.
  • connection unit 144 is an electrical terminal for charging the storage battery 141 or discharging the storage battery 141.
  • the battery-side storage unit 145 is realized by, for example, a RAM (Random Access Memory), an EEPROM (Electrically Erasable Programmable Read Only Memory), an HDD, a flash memory, or the like. As described above, the battery-side storage unit 145 stores the SOC of the storage battery 141, the battery ID, the user ID, the detection result of the measurement sensor 32, and the like.
  • FIG. 3 is a diagram illustrating an example of a configuration of the charging station 16 according to the embodiment.
  • the charging station 16 includes a display unit 161, a reading unit 162, a charging unit 163, a connection unit 164, a communication unit 165, a station-side storage unit 166, and a station-side control unit 167.
  • Communication unit 165 is an example of an “acquisition unit” or a “receiving unit”.
  • the display unit 161 includes, for example, an LCD (Liquid Crystal Display), an organic EL (Electroluminescence) display, and a touch panel, and displays various information.
  • the display unit 161 displays an image generated by the station-side control unit 167, or displays a GUI (Graphical User Interface) for receiving various input operations from the operator.
  • the reading unit 162 is a device (reader) that reads a user ID from an IC card (not shown) carried by the user using, for example, NFC (Near Field Communication). For example, when the IC card is a credit card, the reading unit 162 reads personal information such as a credit number as a user ID. The reading unit 162 outputs the read user ID to the station-side control unit 167.
  • NFC Near Field Communication
  • the charging unit 163 is provided, for example, one for each slot 21.
  • the charging section 163 is provided when the connection section 144 on the removable battery 14 side and the connection section 164 on the charging station side are electrically or mechanically connected to each other, that is, when the removable battery 14 is When mounted (loaded), power is supplied to the detachable battery 14 to charge the detachable battery 14.
  • a power supply (not shown) for supplying power to the detachable battery 14 may be connected to the charging unit 163.
  • connection portion 164 is a terminal that is electrically or mechanically connected to the connection portion 144 on the detachable battery 14 side.
  • the communication unit 165 includes a communication interface such as a NIC (Network Interface Card). For example, the communication unit 165 communicates with the management server 18 via the network NW and receives information from the management server 18. The communication unit 165 outputs the received information (received information) to the station-side control unit 167. The communication unit 165 may transmit information to another device connected via the network NW under the control of the station-side control unit 167.
  • a communication interface such as a NIC (Network Interface Card).
  • the communication unit 165 communicates with the management server 18 via the network NW and receives information from the management server 18.
  • the communication unit 165 outputs the received information (received information) to the station-side control unit 167.
  • the communication unit 165 may transmit information to another device connected via the network NW under the control of the station-side control unit 167.
  • the station-side storage unit 166 is realized by, for example, a ROM, a RAM, an EEPROM, an HDD, a flash memory, or the like.
  • the station-side storage unit 166 stores a user ID of a user who is authorized to use the share service of the detachable battery 14 (hereinafter, referred to as an authenticated user).
  • the user uses the terminal device 28 to access a website or the like that accepts a registration procedure for use of the share service, and registers the name, credit number, driver's license number, and the like as personal information on the website.
  • a combination of some or all of these pieces of information is stored in the station-side storage unit 166 as a user ID.
  • the user ID may be stored in the station-side storage unit 166 via the management server 18.
  • the station-side control unit 167 includes, for example, an information acquisition unit 1671, an authentication unit 1672, a first power control unit 1673, a second power control unit 1674, and a communication control unit 1675. These components are realized by a processor such as a CPU or a GPU (Graphics Processing Unit) executing a program (software). Some or all of these components are realized by hardware (including a circuit part; circuitry) such as an LSI (Large Scale Integration), an ASIC (Application Specific Integrated Circuit), and an FPGA (Field-Programmable Gate Array). It may be realized by cooperation of software and hardware.
  • a processor such as a CPU or a GPU (Graphics Processing Unit) executing a program (software).
  • Some or all of these components are realized by hardware (including a circuit part; circuitry) such as an LSI (Large Scale Integration), an ASIC (Application Specific Integrated Circuit), and an FPGA (Field-Programmable Gate Array). It may be realized by
  • the program may be stored in the station-side storage unit 166 in advance, or may be stored in a removable storage medium such as a DVD or a CD-ROM, and the storage medium is mounted on a drive device of the charging station 16. Thus, it may be installed in the station side storage unit 166.
  • the information acquisition unit 1671 acquires a user ID from the reading unit 162 and acquires reception information from the communication unit 165.
  • the information acquisition unit 1671 may acquire information such as the SOC of the removable battery 14 from the battery storage unit 145 of the removable battery 14 loaded in the slot 21.
  • FIG. 4 is a diagram illustrating an example of a configuration of the management server 18 according to the embodiment.
  • the management server 18 includes a communication unit 181, a server-side storage unit 182, and a server-side control unit 183.
  • the learning processing unit 1832 refers to calendar information, weather forecast information, and the like, and at time Ti , calculates the weather and temperature of the area where the charging station 16 is installed, the date, the day of the week, and the like. 16 usage environments are specified. Calendar information, weather forecast information, and the like may be stored in the server-side storage unit 182 in advance, or may be downloaded from an external device at a predetermined cycle.
  • FIGS. 6 and 7 show examples of maps including the area where the charging station 16 is installed.
  • a charging station 16-a and a charging station 16-b are installed in a certain area, and electric power facilities of the customers 40-a to 42-e are installed around the charging station 16-a and the charging station 16-b.
  • the learning processing unit 1832 divides the installation area of the charging station 16 into a grid GR of a predetermined size.
  • the installation area of the charging station 16 is divided into two grids GR1 and GR2.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Power Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Primary Health Care (AREA)
  • Game Theory and Decision Science (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

電力予測システムは、電力を利用する電力装置に対して着脱自在に装着されるバッテリと、前記バッテリを充電する充電装置と、前記充電装置の利用状況又は利用環境の少なくとも一方を示す利用情報に基づいて、機械学習により前記充電装置が外部に供給可能な電力量を予測する電力予測装置と、を備える。

Description

電力予測システム、電力予測装置、電力予測方法、プログラム、及び記憶媒体
 本発明は、電力予測システム、電力予測装置、電力予測方法、プログラム、及び記憶媒体に関する。
 本願は、2018年7月31日に出願された日本国特許出願2018-143636号に基づき優先権を主張し、その内容をここに援用する。
 電力会社が、電力需給がひっ迫する時間帯に使用電力を抑制するように需要家に対して要請するデマンドレスポンスが知られている。これに関連し、翌日の気温や天候などの予報から、翌日に電力会社からデマンドレスポンスとして要請されるであろう電力量を予測する技術が知られている(例えば、特許文献1参照)。一方で、電気スクータなどの移動体に装着されたバッテリを取り外し、取り外したバッテリを充電ステーションなどの充電装置に装着して充電させるとともに、すでに充電された別のバッテリを充電装置から取り外し、取り外したバッテリを移動体に装着させるようなバッテリの共同利用を促進させる技術が知られている(例えば、特許文献2参照)。また、バッテリが着脱可能な移動体の他の例として、バッテリと、バッテリを収容可能な収容室が形成された充電給電ユニットとを有する可搬型の充電給電装置が知られている(例えば、特許文献3参照)。
国際公開第2015/075794号 日本国特表2014-527689号公報 日本国特開2019-068552号公報
 しかしながら、従来の技術では、デマンドレスポンスに対応するために充電装置を利用することについて十分に検討されていなかった。例えば、充電装置が供給可能な電力量は、バッテリの個数や充電容量に応じて変動するため、何人のユーザがいつどのタイミングで充電装置を利用するのかを予測することが難しく、電力需給がひっ迫する時間帯(デマンドレスポンスが要請される時間帯)において、十分な電力量を供給できるのかを精度よく予測できていなかった。
 本発明の態様は、充電装置が外部に供給可能な将来の電力量を精度よく予測することができる電力予測システム、電力予測装置、電力予測方法、プログラム、及び記憶媒体を提供することを目的の一つとする。
 この発明に係る電力予測システム、電力予測装置、電力予測方法、プログラム、及び記憶媒体は、以下の構成を採用した。
 (1)本発明の一態様は、電力を利用する電力装置に対して着脱自在に装着されるバッテリと、前記バッテリを充電する充電装置と、前記充電装置の利用状況又は利用環境の少なくとも一方を示す利用情報に基づいて、機械学習により前記充電装置が前記充電装置外に供給可能な電力量を予測する電力予測装置と、を備える電力予測システムである。
 (2)の態様は、上記(1)の態様において、前記電力予測装置が、現在又は将来の第1時点における前記充電装置の前記利用情報を取得する取得部と、過去の第2時点における前記充電装置の前記利用情報が入力されると、前記第2時点における前記電力量を出力するように学習されたモデルに対して、前記取得部によって取得された前記利用情報を入力することで、前記第1時点において前記充電装置が前記充電装置外に供給可能な前記電力量を予測する予測部と、を有するものである。
 (3)の態様は、上記(2)の態様において、前記電力予測装置が、前記第2時点において前記充電装置に装着された前記バッテリの数と、前記第2時点において前記充電装置に装着された前記バッテリの充電容量とに基づいて、前記第2時点において前記充電装置が前記充電装置外に供給可能な前記電力量を導出し、前記第2時点における前記充電装置の前記利用情報に対して、前記導出した電力量が対応付けられた教師データに基づいて、前記モデルを学習する学習処理部を更に有するものである。
 (4)の態様は、上記(3)の態様において、前記取得部が、複数の前記充電装置のそれぞれが設置された地域ごとに、前記充電装置の前記利用情報を取得し、前記学習処理部が、前記取得部によって前記地域ごとの前記充電装置から取得された前記利用情報に基づいて、前記地域ごとに前記モデルを学習するものである。
 (5)の態様は、上記(2)から(4)のいずれか1つの態様において、前記予測部が、前記充電装置が使用電力の抑制の要請を受けた場合、前記モデルに基づいて、前記電力量を予測するものである。
 (6)の態様は、上記(5)の態様において、前記電力予測装置が、前記充電装置が使用電力の抑制の要請を受けた場合、前記予測部によって予測された前記電力量が、抑制するように要請された電力量以上である場合、前記充電装置から前記充電装置外に電力を供給させる供給電力制御部を更に備えるものである。
 (7)の態様は、上記(1)から(6)のいずれか一つの態様において、前記利用状況には、前記充電装置に装着されたバッテリの充電容量を表す指標値と、前記充電装置に装着されたバッテリの個数と、時刻と、のうち少なくとも一つ以上が含まれるものである。
 (8)の態様は、上記(1)から(7)のいずれか一つの態様において、前記利用環境には、前記充電装置が設置された地域の天候と、前記充電装置が設置された地域の気温と、日付と、曜日と、のうち少なくとも一つ以上が含まれるものである。
 (9)本発明の他の態様は、電力を利用する電力装置に対して着脱自在に装着されるバッテリを充電する充電装置から送信される、前記充電装置の利用状況又は利用環境の少なくとも一方を示す利用情報を受信する受信部と、前記受信部により受信された前記充電装置の前記利用情報に基づいて、機械学習により前記充電装置が前記充電装置外に供給可能な電力量を予測する予測部と、を備える電力予測装置である。
 (10)本発明の他の態様は、コンピュータが、電力を利用する電力装置に対して着脱自在に装着されるバッテリを充電する充電装置から送信される、前記充電装置の利用状況又は利用環境の少なくとも一方を示す利用情報を受信するステップと、前記受信した前記利用情報に基づいて、機械学習により前記充電装置が前記充電装置外に供給可能な電力量を予測するステップと、を含む電力予測方法である。
 (11)本発明の他の態様は、上記(10)の態様のプログラムを格納したコンピュータ読み取り可能な記憶媒体である。
 (1)、(2)、(7)-(11)の態様によれば、充電装置が外部に供給可能な将来の電力量を精度よく予測することができる。
 (3)の態様によれば、充電装置の利用状況及び利用環境を示す情報に教師ラベルが対応付けられたデータを教師データとするため、充電装置の利用状況及び利用環境に左右されるユーザの行動パターンをモデルに学習させることができる。
 (4)の態様によれば、充電装置が設置された地域ごとにモデルを学習するため、各地域のユーザの行動パターンに対応したモデルを生成することができる。
 (5)の態様によれば、電力需給がひっ迫する時間帯において、充電装置が外部に供給可能な電力で、デマンドレスポンスに対応可能か否かを判定することができる。
 (6)の態様によれば、電力需給がひっ迫する時間帯において、充電装置が外部に供給可能な電力量が、需要家に対して抑制するように要請された電力量以上である場合、充電装置から需要家の電力設備に対して電力を供給するため、需要家は、電力会社からのデマンドレスポンスに対応しつつ、他の時間帯と同様に、電力を使用することができる。
実施形態における電力予測システムの構成の一例を示す図である。 実施形態における着脱式バッテリの構成の一例を示す図である。 実施形態における充電ステーションの構成の一例を示す図である。 実施形態における管理サーバの構成の一例を示す図である。 管理サーバによる学習モデルの学習処理の一例を示すフローチャートである。 充電ステーションが設置された地域を含む地図の一例を示す図である。 充電ステーションが設置された地域を含む地図の一例を示す図である。 グリッドごとに学習モデルを学習したときの学習モデル情報の一例を示す図である。 管理サーバによる学習モデルを利用した電力予測処理の一例を示すフローチャートである。
 以下、図面を参照し、本発明の電力予測システム、電力予測装置、電力予測方法、プログラム、及び記憶媒体の実施形態について説明する。
 [電力予測システムの全体構成]
 図1は、実施形態における電力予測システム1の構成の一例を示す図である。図示の例のように、電力予測システム1は、鞍乗り型の自動二輪車12の駆動源である着脱式バッテリ14を、複数のユーザが共同利用するシェアサービスを提供可能なシステムにおいて、着脱式バッテリ14が充電ステーション16により供給可能な電力量を予測するシステムである。例えば、電力予測システム1は、一以上の鞍乗り型の自動二輪車12と、各自動二輪車12に電力を供給可能な着脱式バッテリ14と、一以上の充電ステーション16と、管理サーバ18と、端末装置28とを備える。自動二輪車12は「電力装置」の一例であり、充電ステーション16は「充電装置」の一例であり、管理サーバ18は「電力予測装置」の一例である。
 「電力装置」は、自動二輪車12に限られず、例えば、電力により走行可能かつ着脱自在に着脱式バッテリ14が装着可能な車両(一輪、三輪、四輪等)、またはアシスト式の自転車等であってもよい。これら車両型の移動体に代えて、「電力装置」は、日本国特開2019-068552号公報に記載の、人や車両によって運ばれる可搬型の充電給電装置であってもよい。また「電力装置」は、移動ロボット、自律走行装置、電動自転車、自律走行車、その他の電動車両、ドローン飛行体、又はその他の電動式移動装置(電動モビリティ)であってもよい。以下、一例として、「電力装置」が自動二輪車12であるものとして説明する。
 自動二輪車12は、着脱式バッテリ14により供給された電力を利用して走行する電動車両である。自動二輪車12は、ディーゼルエンジンやガソリンエンジンなどの内燃機関を駆動源として走行する車両であってもよいし、着脱式バッテリ14と内燃機関との組み合わせを駆動源として走行する車両であってもよい。
 着脱式バッテリ14は、例えば、自動二輪車12に対して着脱自在に装着されるカセット式の蓄電装置(二次電池)である。着脱式バッテリ14は、後述するバッテリ側記憶部145を備える。
 充電ステーション16は、一以上の着脱式バッテリ14の保管及び充電を行うための設備であり、複数の場所(地域)に設置される。充電ステーション16の筐体20には、複数(本図の例では、12個)のスロット21と、表示部161と、読取部162と、が設けられている。スロット21の奥側には、後述する充電部163が設けられている。
 充電ステーション16は、ネットワークNWを介して、管理サーバ18と通信可能に接続されている。ネットワークNWには、例えば、LAN(Local Area Network)やWAN(Wide Area Network)などが含まれる。
 管理サーバ18は、ネットワークNWを介して、充電ステーション16や端末装置28、電力会社30の各種装置と通信可能に接続されている。例えば、管理サーバ18は、ネットワークNWを介して接続された装置から取得した情報に基づき、充電ステーション16が外部に供給可能な電力量(以下、供給可能電力量と称する)を予測する。「外部」とは、例えば、需要家40の電力設備や、電力系統(Electric(al) Power System;EPS)などである。例えば、管理サーバ18は、電力会社30からデマンドレスポンスリクエストを受信すると、予測した充電ステーション16の供給可能電力量に基づいて、充電ステーション16を制御して、需要家40の電力設備などに電力を供給する。
 デマンドレスポンスリクエストは、需要家40に対して使用電力を抑制することを要請する情報である。例えば、デマンドレスポンスリクエストには、使用電力の抑制を要請する時間帯(例えば12時から14時までの二時間など)と、どの程度使用電力を抑制すべきなのかを表した電力量(以下、節電要請電力量と称する)とが含まれる。
 端末装置28は、例えば、携帯電話やスマーフォン、タブレット端末であり、自動二輪車12を所有するユーザなどによって利用される。端末装置28は、ネットワークNWを介して、管理サーバ18と通信可能に接続されている。例えば、ユーザは、端末装置28を介して、管理サーバ18によって提供されるウェブサイトなどにアクセスし、着脱式バッテリ14のシェアサービスを利用するための登録手続きなどを行う。
 [着脱式バッテリの構成]
 図2は、実施形態における着脱式バッテリ14の構成の一例を示す図である。図示の例のように、着脱式バッテリ14は、蓄電池141と、測定センサ142と、BMU(Battery Management Unit)143と、接続部144と、バッテリ側記憶部145とを備える。
 蓄電池141は、例えば、リチウムイオン電池や鉛蓄電池などの二次電池を含む。蓄電池141の構成はこれ以外であってもよく、他の種類の二次電池、キャパシタ、又はこれらを組み合わせた複合電池であってもよい。
 測定センサ142は、蓄電池141の電圧を検出するセンサや、蓄電池141の電流を検出するセンサ、蓄電池141の温度を検出するセンサなどを含む。測定センサ142は、着脱式バッテリ14が自動二輪車12に装着された状態下で検出された蓄電池141の電圧や電流、温度を示す信号をBMU143に出力する。
 BMU143は、例えば、CPU(Central Processing Unit)などのプロセッサや、ROM(Read Only Memory)などを含む。ROMには、例えば、プロセッサによって読み出されて実行されるプログラムが格納される。
 BMU143は、自動二輪車12に搭載された制御装置の指令に基づいて、蓄電池141の充放電を制御する。BMU143は、測定センサ142の検出結果に基づいて、蓄電池141の充電容量を示すSOC(State Of Charge)を導出する。BMU143は、SOCを導出すると、SOCの導出結果をバッテリ側記憶部145に記憶させる。この際、BMU143は、着脱式バッテリ14の識別情報(以下、バッテリIDと称する)や、測定センサ32により検出された検出結果などをバッテリ側記憶部145に記憶させてもよい。BMU143は、例えば、後述する充電ステーション16における認証が成功した場合に、ユーザの識別情報(以下、ユーザIDと称する)をバッテリ側記憶部145に記憶させてよい。
 より具体的には、BMU143は、測定センサ142の検出結果として、充電時の蓄電池141の内部温度や、放電時の蓄電池141の内部温度、放電時の蓄電池141の電圧といった情報をバッテリ側記憶部145に記憶させ、SOCの導出結果として、着脱式バッテリ14が貸し出されてから返却されるまでの使用期間において変動した蓄電池141のSOCなどの情報をバッテリ側記憶部145に記憶させる。「着脱式バッテリ14が貸し出されてから返却されるまで」とは、充電ステーション16から着脱式バッテリ14が取り出されてから、その着脱式バッテリ14が再度充電ステーション16に装着されるまでの期間であってよい。BMU143は、着脱式バッテリ14が自動二輪車12に装着されたときに、自動二輪車12に搭載されたオドメータなどの各種センサと通信する場合、これらのセンサの検出結果をバッテリ側記憶部145に記憶させてもよい。例えば、BMU143は、着脱式バッテリ14が貸し出されてから返却されるまでの使用期間にオドメータによって計測された自動二輪車12の走行距離をバッテリ側記憶部145に記憶させてよい。BMU143は、蓄電池141の容量維持率、内部抵抗増加率、放置時SOC、放置時バッテリ温度、製造時点からの経過時間、通算充電回数などをバッテリ側記憶部145に記憶させてもよい。
 接続部144は、蓄電池141を充電するため、または蓄電池141から放電するための電気的な端子である。
 バッテリ側記憶部145は、例えば、RAM(Random Access Memory)や、EEPROM(Electrically Erasable Programmable Read Only Memory)、HDD、フラッシュメモリなどにより実現される。バッテリ側記憶部145には、上述したように、蓄電池141のSOCや、バッテリID、ユーザID、測定センサ32の検出結果などが格納される。
 [充電ステーションの構成]
 図3は、実施形態における充電ステーション16の構成の一例を示す図である。図示の例のように、充電ステーション16は、表示部161と、読取部162と、充電部163と、接続部164と、通信部165と、ステーション側記憶部166と、ステーション側制御部167とを備える。通信部165は「取得部」または「受信部」の一例である。
 表示部161は、例えば、LCD(Liquid Crystal Display)や、有機EL(Electroluminescence)ディスプレイ、タッチパネルなどを含み、各種情報を表示する。例えば、表示部161は、ステーション側制御部167によって生成された画像を表示したり、操作者からの各種の入力操作を受け付けるためのGUI(Graphical User Interface)などを表示したりする。
 読取部162は、例えば、NFC(Near Field Communication)を用いて、ユーザが携行するICカード(不図示)からユーザIDを読み取る機器(リーダ)である。例えば、ICカードがクレジットカードである場合、読取部162は、クレジット番号などの個人情報をユーザIDとして読み取る。読取部162は、読み取ったユーザIDをステーション側制御部167に出力する。
 充電部163は、例えば、各スロット21に一つずつ設けられる。充電部163は、着脱式バッテリ14側の接続部144と、充電ステーション側の接続部164とが互いに電気的または機械的に接続した状態にあるときに、すなわち、スロット21に着脱式バッテリ14が装着(装填)されたときに、着脱式バッテリ14に電力を供給して着脱式バッテリ14を充電する。充電部163には、着脱式バッテリ14に電力を供給するための電源(不図示)が接続されていてよい。
 接続部164は、着脱式バッテリ14側の接続部144と電気的または機械的に接続される端子である。
 通信部165は、例えば、NIC(Network Interface Card)などの通信インターフェースを含む。例えば、通信部165は、ネットワークNWを介して管理サーバ18と通信し、管理サーバ18から情報を受信する。通信部165は、受信した情報(受信情報)をステーション側制御部167に出力する。通信部165は、ステーション側制御部167による制御を受けて、ネットワークNWを介して接続された他の装置に情報を送信してもよい。
 ステーション側記憶部166は、例えば、ROMや、RAMや、EEPROM、HDD、フラッシュメモリなどにより実現される。ステーション側記憶部166には、プログラムが格納されるほかに、着脱式バッテリ14のシェアサービスを利用する権限が与えられたユーザ(以下、認証済みのユーザと称する)のユーザIDなどが格納される。例えば、ユーザが、端末装置28を利用して、シェアサービスの利用の登録手続きを受け付けるウェブサイトなどにアクセスし、そのウェブサイトに、氏名やクレジット番号、運転免許証の番号などを個人情報として登録しておいた場合、これらの情報のうち一部または全部を組み合わせたものが、ユーザIDとしてステーション側記憶部166に記憶される。この際、ユーザIDは、管理サーバ18を介してステーション側記憶部166に記憶されてよい。
 ステーション側制御部167は、例えば、情報取得部1671と、認証部1672と、第1電力制御部1673と、第2電力制御部1674と、通信制御部1675とを備える。これの構成要素は、CPUやGPU(Graphics Processing Unit)などのプロセッサがプログラム(ソフトウェア)を実行することにより実現される。これらの構成要素のうち一部または全部は、LSI(Large Scale Integration)やASIC(Application Specific Integrated Circuit)、FPGA(Field-Programmable Gate Array)などのハードウェア(回路部;circuitryを含む)によって実現されてもよいし、ソフトウェアとハードウェアの協働によって実現されてもよい。プログラムは、予めステーション側記憶部166に格納されていてもよいし、DVDやCD-ROMなどの着脱可能な記憶媒体に格納されており、その記憶媒体が充電ステーション16のドライブ装置に装着されることでステーション側記憶部166にインストールされてもよい。
 情報取得部1671は、読取部162からユーザIDを取得したり、通信部165から受信情報を取得したりする。情報取得部1671は、スロット21に装填された着脱式バッテリ14のバッテリ側記憶部145から、その着脱式バッテリ14のSOCなどの情報を取得してよい。
 認証部1672は、情報取得部1671によって取得されたユーザIDと、ステーション側記憶部166に格納された認証済みユーザのユーザIDとを比較して、互いのユーザIDが一致する場合、読取部162がユーザIDを読み取ったICカードの持ち主が、認証済みユーザであるか否かを判定する。認証部1672は、ICカードの持ち主が、認証済みユーザであると判定した場合、読取部162に、認証が成功したことを示す情報を表示させる。これを受けて、ICカードを読取部162に読み取らせたユーザは、認証が成功した場合、充電済みの着脱式バッテリ14をスロット21から取り出し、その充電済みの着脱式バッテリ14を、自動二輪車12に装着された使用済みの着脱式バッテリ14と交換することで、着脱式バッテリ14をシェアする。使用済みの着脱式バッテリ14がスロット21に装填された場合、充電が開始される。
 第1電力制御部1673は、スロット21に着脱式バッテリ14が装填されたか否かを判定し、スロット21に着脱式バッテリ14が装填されたと判定した場合、充電部163を制御して、スロット21に装填された着脱式バッテリ14に電力を供給し、着脱式バッテリ14を充電する。例えば、第1電力制御部1673は、着脱式バッテリ14側の接続部144と、充電ステーション側の接続部164とが互いに電気的または機械的に接続した場合、スロット21に着脱式バッテリ14が装填されたと判定し、そうでない場合にはスロット21に着脱式バッテリ14が装填されていないと判定してよい。
 第2電力制御部1674は、通信部165によって管理サーバ18から特定のコマンド(後述する第2コマンド)が受信された場合、各スロット21に装填された着脱式バッテリ14に電力を放電させ、その放電させた電力を、電力系統を介して需要家40の電力設備へと供給する。
 通信制御部1675は、通信部165を制御して、所定の周期(例えば時間、日、週、月単位)で、充電ステーション16の利用状況を示す情報(以下、ステーション利用状況情報と称する)を管理サーバ18に送信する。例えば、通信制御部1675は、各スロット21に装填された着脱式バッテリ14のSOCと、スロット21に装填された着脱式バッテリ14の個数と、送信時刻とを含む情報を、ステーション利用状況情報として管理サーバ18に送信する。
 [管理サーバの構成]
 図4は、実施形態における管理サーバ18の構成の一例を示す図である。図示の例のように、管理サーバ18は、通信部181と、サーバ側記憶部182と、サーバ側制御部183とを備える。
 通信部181は、例えば、NICなどの通信インターフェースを含む。例えば、通信部181は、ネットワークNWを介して各充電ステーション16と通信し、各充電ステーション16から情報を受信する。通信部181は、ネットワークNWを介して電力会社30の装置と通信し、デマンドレスポンスリクエストを受信してよい。通信部181は、受信した情報(受信情報)をサーバ側制御部183に出力する。通信部181は、サーバ側制御部183による制御を受けて、ネットワークNWを介して接続された充電ステーション16に情報を送信する。
 サーバ側記憶部182は、例えば、ROMや、RAMや、EEPROM、HDD、フラッシュメモリなどにより実現される。サーバ側記憶部182には、プログラムが格納されるほかに、学習モデル情報1821が格納される。これについては後述する。
 サーバ側制御部183は、例えば、情報取得部1831と、学習処理部1832と、予測部1833と、供給電力制御部1834とを備える。これの構成要素は、CPUやGPUなどのプロセッサがプログラム(ソフトウェア)を実行することにより実現される。これらの構成要素のうち一部または全部は、LSIやASIC、FPGAなどのハードウェア(回路部;circuitryを含む)によって実現されてもよいし、ソフトウェアとハードウェアの協働によって実現されてもよい。プログラムは、予めサーバ側記憶部182に格納されていてもよいし、DVDやCD-ROMなどの着脱可能な記憶媒体に格納されており、その記憶媒体が管理サーバ18のドライブ装置に装着されることでサーバ側記憶部182にインストールされてもよい。
 情報取得部1831は、例えば、通信部181を介して、充電ステーション16からステーション利用状況情報を取得する。
 学習処理部1832は、情報取得部1831によって取得された情報に基づいて、サーバ側記憶部182に格納された学習モデル情報1821が示す学習モデルMDLを学習する。これによって学習モデル情報1821が更新される。
 学習モデル情報1821は、ある学習モデルMDLを表すプログラムまたはデータ構造である。学習モデルMDLは、ある時点の充電ステーション16の利用状況または利用環境の少なくとも一方または双方を示す情報が入力されると、同時点において充電ステーション16が外部に供給可能な電力量(すなわち供給可能電力量)を出力するように学習される。学習モデルMDLは、例えば、Deep Learningや、Random Forest Regression、XG-Boosting、Support Vector Machineのいずれか、あるいはこれらを組み合わせたアンサンブル学習手法によって学習されてよい。アンサンブル学習手法には、例えば、バギングやブースティング等が含まれる。
 予測部1833は、学習モデル情報1821が示す学習モデルMDLに基づいて、将来のある時点における充電ステーション16の供給可能電力量を予測する。例えば、予測部1833は、通信部181によって電力会社30からデマンドレスポンスリクエストが受信されると、このデマンドレスポンスリクエストに含まれる使用電力の抑制時間帯(将来の時間帯)における充電ステーション16の供給可能電力量を予測する。デマンドレスポンスリクエストに含まれる使用電力の抑制時間帯は、将来の時間帯に限られず、現在の時間帯であってもよい。
 供給電力制御部1834は、予測部1833によって予測された、使用電力の抑制時間帯における充電ステーション16の供給可能電力量と、デマンドレスポンスリクエストに含まれる節電要請電力量とを比較し、供給可能電力量が節電要請電力量以上である場合、充電ステーション16を制御して、充電ステーション16から需要家40の電力設備に電力を供給する。需要家40の電力設備は、「充電装置外」の一例である。
 [学習モデルの学習処理(トレーニング)のフロー]
 以下、学習モデルMDLの学習処理(トレーニング)について説明する。図5は、管理サーバ18による学習モデルMDLの学習処理の一例を示すフローチャートである。本フローチャートの処理は、例えば、通信部181によってステーション利用状況情報が受信された回数が所定回数に達した場合に行われてよい。
 まず、学習処理部1832は、通信部181によって受信された複数のステーション利用状況情報の中から、処理対象とする、ある送信時刻Tのステーション利用状況情報を選択する(ステップS100)。複数のステーション利用状況情報は、互いに送信時刻が異なる。
 次に、学習処理部1832は、選択したステーション利用状況情報の送信時刻Tにおける充電ステーション16の供給可能電力量Pを導出する(ステップS102)。
 例えば、学習処理部1832は、ステーション利用状況情報に含まれる着脱式バッテリ14の個数と、各着脱式バッテリ14のSOCとに基づいて、ステーション利用状況情報の送信時刻Tにおいて、それらの着脱式バッテリ14がスロット21に装填された充電ステーション16の供給可能電力量Pを導出する。
 次に、学習処理部1832は、学習モデルMDLを学習する(ステップS104)。例えば、学習処理部1832は、ある学習データに対して、着脱式バッテリ14の個数とSOCとに基づいて導出した充電ステーション16の供給可能電力量Pが教師ラベルとして対応付けられた教師データを生成する。学習データには、例えば、時刻Tにおいて、充電ステーション16がどういった利用環境下に置かれているのかということを示す情報と、充電ステーション16がどういった利用状況下に置かれているのかということを示す情報(時刻T時点のステーション利用状況情報)とが含まれる。教師データは、充電ステーション16がこういった利用環境下および利用状況下であれば、学習モデルMDLが出力する充電ステーション16の供給可能電力量は、こういった正解の電力量であるべきということを表している。
 例えば、学習処理部1832は、カレンダーの情報や、天気予報の情報などを参照して、時刻Tにおいて、その充電ステーション16が設置された地域の天候および気温と、日付、曜日などを充電ステーション16の利用環境として特定する。カレンダーの情報や天気予報の情報などは、予めサーバ側記憶部182に格納されていてもよいし、所定の周期で外部装置からダウンロードされてもよい。
 学習処理部1832は、充電ステーション16の利用環境として特定した時刻Tにおける充電ステーション16の設置地域の天候や気温、日付、曜日に加えて、その時刻(時間)Tなどを含むデータを、時刻Tにおける学習データとして生成する。そして、学習処理部1832は、生成した時刻Tの学習データに対して、着脱式バッテリ14の個数とSOCとに基づいて導出した時刻Tにおける充電ステーション16の供給可能電力量Pを教師ラベルとして対応付けることで、教師データを生成する。すなわち、学習処理部1832は、現時刻Tの充電ステーション16の利用環境および利用状況を示す情報に対して、現時刻Tの充電ステーション16の供給可能電力(理論的に求めた供給可能電力)が対応付けられたデータを、教師データとして生成する。学習処理部1832は、現時刻Tの充電ステーション16の利用環境または利用状況の少なくとも一方を示す情報に対して、現時刻Tの充電ステーション16の供給可能電力(理論的に求めた供給可能電力)が対応付けられたデータを、教師データとして生成してもよい。
 学習処理部1832は、教師データを生成すると、この教師データを用いて学習モデルMDLを学習する。例えば、学習処理部1832は、時刻Tにおける学習データを学習モデルMDLに入力して、その学習モデルMDLに、時刻Tにおける充電ステーション16の供給可能電力量P#を導出させる。学習処理部1832は、時刻Tの学習データを基にして学習モデルMDLに導出させた時刻Tにおける充電ステーション16の供給可能電力量P#と、時刻Tの学習データに教師ラベルとして対応付けられた、時刻Tにおける充電ステーション16の供給可能電力量Pとの差分(絶対値(P-P#))を導出する。学習処理部1832は、導出した差分が小さくなるように学習モデルMDLのパラメータを変更することで、学習モデルMDLを学習する。例えば、学習モデルMDLがニューラルネットワークである場合、学習処理部1832は、確率的勾配降下法などを利用して、供給可能電力量P#と供給可能電力量Pとの差分が小さくなるように、ニューラルネットワークの活性化関数の重み係数や結合係数などのパラメータを決定してよい。これによって本フローチャートの処理が終了する。このような一連の処理によって学習モデルMDLが学習されると、サーバ側記憶部182に格納された学習モデル情報1821が更新される。
 学習処理部1832は、電力予測システム1に複数の充電ステーション16が含まれる場合、複数の充電ステーション16のそれぞれが設置された地域ごとに、上述したフローチャートの処理を行うことで、各設置地域に対応した学習モデルMDLを生成してよい。
 図6および図7は、充電ステーション16が設置された地域を含む地図の一例を示す図である。図示の例では、ある地域に、充電ステーション16-aと、充電ステーション16-bとが設置されており、その周辺に、需要家40-aから42-eのそれぞれの電力設備が設置されている。学習処理部1832は、図7に例示するように、充電ステーション16の設置地域を、所定の大きさのグリッドGRに分割する。図7の例では、充電ステーション16の設置地域が、グリッドGR1とGR2の2つに分割されている。
 このような場合、例えば、学習処理部1832は、グリッドGR1に含まれる充電ステーション16-aから受信されたステーション利用状況情報を基に、そのステーション利用状況情報の送信時刻Tにおける充電ステーション16-aの供給可能電力量Pを導出する。学習処理部1832は、時刻Tにおける充電ステーション16-aの設置地域の天候や気温、日付、曜日、時刻などを含む学習データを生成し、この学習データに対して、時刻T時点における充電ステーション16-aの供給可能電力量Pを教師ラベルとして対応付けた教師データを生成する。そして、学習処理部1832は、生成した教師データを基に、第1学習モデルMDLを学習する。
 学習処理部1832は、グリッドGR2に含まれる充電ステーション16-bから受信されたステーション利用状況情報を基に、そのステーション利用状況情報の送信時刻Tにおける充電ステーション16-bの供給可能電力量Pを導出する。学習処理部1832は、時刻Tにおける充電ステーション16-bの設置地域の天候や気温、日付、曜日、時刻などを含む学習データを生成し、この学習データに対して、時刻T時点における充電ステーション16-bの供給可能電力量Pを教師ラベルとして対応付けた教師データを生成する。そして、学習処理部1832は、生成した教師データを基に、グリッドGR1用に学習した第1学習モデルMDLとは異なる第2学習モデルMDLを学習する。このように、学習処理部1832は、グリッドGRごとに学習モデルMDLを学習することで、地域に応じて特性の異なる学習モデルMDLを生成することができる。
 図8は、グリッドGRごとに学習モデルMDLを学習したときの学習モデル情報1821の一例を示す図である。図示の例のように、学習モデル情報1821は、市町村といった単位で区分された各地域に対して、グリッドGRを識別するグリッドIDや、学習モデルMDLを識別する学習モデルID、学習モデルMDLの更新日などが対応付けられた情報であってよい。地域は、市町村に限られず、都道府県単位であってもよいし、電力会社30の送電網(電力系統)上の所定の区域であってもよいし、その他任意の区域であってもよい。
 [学習モデルを利用した電力予測処理(ランタイム)のフロー]
 以下、学習モデルMDLを利用した電力予測処理(ランタイム)について説明する。図9は、管理サーバ18による学習モデルMDLを利用した電力予測処理の一例を示すフローチャートである。本フローチャートの処理は、例えば、所定の周期で繰り返し行われてよい。
 まず、予測部1833は、通信部181によってデマンドレスポンスリクエストが受信されたか否かを判定し(ステップS200)、通信部181によってデマンドレスポンスリクエストが受信されたと判定した場合、学習モデル情報1821に含まれる複数の学習モデルMDLの中から、デマンドレスポンスリクエストとして使用電力の抑制が要請された地域(以下、節電要請地域と称する)に対応した学習モデルMDLを選択する(ステップS202)。
 例えば、節電要請地域が「ABC市」という地域である場合、予測部1833は、図8に例示する学習モデル情報1821を参照し、「ABC市」という地域に対応付けられている、学習モデルIDが「MDL」である学習モデルMDLを選択する。
 次に、予測部1833は、選択した学習モデルMDLに基づいて、デマンドレスポンスリクエストに含まれる将来の使用電力の抑制時間帯において、節電要請地域に設置された充電ステーション16の供給可能電力量を予測する(ステップS202)。
 例えば、予測部1833は、使用電力の抑制時間帯として指定された将来の時間帯の節電要請地域の天候や気温を、天気予報の情報などから取得するとともに、デマンドレスポンスリクエストの受信日の日付や曜日をカレンダーの情報から取得する。予測部1833は、取得した抑制時間帯における節電要請地域の天候および気温と、デマンドレスポンスリクエストの受信日の日付、曜日、および受信時刻とを含むデータを、選択した学習モデルMDLに入力することで、将来の抑制時間帯における節電要請地域の充電ステーション16の供給可能電力量を導出する。
 次に、供給電力制御部1834は、予測部1833によって予測された抑制時間帯における充電ステーション16の供給可能電力量が、デマンドレスポンスリクエストに含まれる節電要請電力量以上であるか否かを判定する(ステップS206)。
 供給電力制御部1834は、供給可能電力量が節電要請電力量未満であると判定した場合、後述するS208およびS210の処理を省略して本フローチャートの処理を終了する。
 一方、供給電力制御部1834は、供給可能電力量が節電要請電力量以上であると判定した場合、通信部181を制御して、節電要請地域に存在する需要家40の電力設備に第1コマンドを送信する(ステップS208)。第1コマンドとは、需要家40の電力設備に、節電要請電力分の電力を削減させるための指令である。例えば、図7の例において、節電要請地域がグリッドGR1に含まれる地域である場合、供給電力制御部1834は、通信部181を制御して、需要家40-a、41-b、41-cのそれぞれの電力設備に第1コマンドを送信する。第1コマンドを受信した需要家40の電力設備は、例えば、電力会社30から受給する電力を減らし、代わりに、充電ステーション16から減らした分の電力の受給を開始する。
 次に、供給電力制御部1834は、通信部181を制御して、節電要請地域に存在する充電ステーション16に第2コマンドを送信する(ステップS210)。第2コマンドとは、充電ステーション16に、節電要請電力分の電力を需要家40の電力設備へと供給させるための指令である。例えば、図7の例において、節電要請地域がグリッドGR1に含まれる地域である場合、供給電力制御部1834は、通信部181を制御して、充電ステーション16-aに第2コマンドを送信する。
 充電ステーション16の第2電力制御部1674は、通信部165によって第2コマンドが受信されると、各スロット21に装填された着脱式バッテリ14に電力を放電させ、その放電させた電力を、電力系統を介して需要家40の電力設備へと供給する。これによって、節電要請電力分の電力が、充電ステーション16から各需要家40の電力設備へと供給される。
 以上説明した実施形態によれば、電力予測システム1が、電力を利用して移動可能な自動二輪車12に対して着脱自在に装着される1つ以上の着脱式バッテリ14と、スロット21に装填された着脱式バッテリ14を充電する充電ステーション16と、充電ステーション16の利用状況および利用環境に基づいて、機械学習により、将来のある時点において充電ステーション16によって供給可能な電力量を予測する管理サーバ18と、を備えることによって、充電ステーション16により供給可能な将来の電力量を精度よく予測することができる。これにより、例えば、電力需給がひっ迫する時間帯(デマンドレスポンスが要請される時間帯)において、電力会社30から需要家40へと抑制するよう要請された電力量に相当する十分な電力を、充電ステーション16から需要家40の電力設備へと供給することができる。この結果、需要家40は、電力会社30からのデマンドレスポンスに対応しつつ、デマンドレスポンスが要請されていない他の時間帯と同様に、電力を使用することができる。
 上述した実施形態によれば、ニューラルネットワークなどの学習モデルを学習する際に、充電ステーション16が設置された地域の天候や気温などを学習データとして利用するため、着脱式バッテリ14のシェアサービスを利用するユーザの行動パターンに適合した学習モデルを生成することができる。一般的に、雨や雪などの悪天候下では、ユーザは自動二輪車12に乗車しにくいことが知られている。このような場合、充電ステーション16の着脱式バッテリ14の使用率(交換頻度)は小さくなりやすく、供給可能電力量が、晴天などの良天候と比べて増大する、といったことが学習モデルMDLのパラメータに反映される。このように、天候や気温、曜日、時間といったことに左右されるユーザの行動パターンを学習モデルに学習させることができるため、充電ステーション16により供給可能な将来の電力量を、更に精度よく予測することができる。
 上述した実施形態によれば、充電ステーション16が設置された地域ごとに学習モデルMDLを学習するため、各地域のユーザの行動パターンに対応した学習モデルMDLを生成することができる。
 以上、本発明を実施するための形態について実施形態を用いて説明したが、本発明はこうした実施形態に何等限定されるものではなく、本発明の要旨を逸脱しない範囲内において種々の変形及び置換を加えることができる。
10‥電力予測システム、12…自動二輪車(電力装置)、14…着脱式バッテリ、141…蓄電池、142…測定センサ、143…BMU、144…接続部、145…バッテリ側記憶部、16…充電ステーション(充電装置)、161…表示部、162…読取部、163…充電部、164…接続部、165…通信部、166…ステーション側記憶部、167…ステーション側制御部、1671…情報取得部、1672…認証部、1673…第1電力制御部、1674…第2電力制御部、1675…通信制御部、18…管理サーバ(電力予測装置)、181…通信部、182…サーバ側記憶部、183…サーバ側制御部、1831…情報取得部、1832…学習処理部、1833…予測部、1834…供給電力制御部、28…端末装置、30…電力会社、40…需要家

Claims (12)

  1.  電力を利用する電力装置に対して着脱自在に装着されるバッテリと、
     前記バッテリを充電する充電装置と、
     前記充電装置の利用状況又は利用環境の少なくとも一方を示す利用情報に基づいて、機械学習により前記充電装置が前記充電装置外に供給可能な電力量を予測する電力予測装置と、
     を備える電力予測システム。
  2.  前記電力予測装置は、
      現在又は将来の第1時点における前記充電装置の前記利用情報を取得する取得部と、
      過去の第2時点における前記充電装置の前記利用情報が入力されると、前記第2時点における前記電力量を出力するように学習されたモデルに対して、前記取得部によって取得された前記利用情報を入力することで、前記第1時点において前記充電装置が前記充電装置外に供給可能な前記電力量を予測する予測部と、を有する、
     請求項1に記載の電力予測システム。
  3.  前記電力予測装置は、
      前記第2時点において前記充電装置に装着された前記バッテリの数と、前記第2時点において前記充電装置に装着された前記バッテリの充電容量とに基づいて、前記第2時点において前記充電装置が前記充電装置外に供給可能な前記電力量を導出し、
      前記第2時点における前記充電装置の前記利用情報に対して、前記導出した電力量が対応付けられた教師データに基づいて、前記モデルを学習する、
     学習処理部を更に有する、
     請求項2に記載の電力予測システム。
  4.  前記取得部は、複数の前記充電装置のそれぞれが設置された地域ごとに、前記充電装置の前記利用情報を取得し、
     前記学習処理部は、前記取得部によって前記地域ごとの前記充電装置から取得された前記利用情報に基づいて、前記地域ごとに前記モデルを学習する、
     請求項3に記載の電力予測システム。
  5.  前記予測部は、前記充電装置が使用電力の抑制の要請を受けた場合、前記モデルに基づいて、前記電力量を予測する、
     請求項2から4のうちいずれか一項に記載の電力予測システム。
  6.  前記電力予測装置は、前記充電装置が使用電力の抑制の要請を受けた場合、前記予測部によって予測された前記電力量が、抑制するように要請された電力量以上である場合、前記充電装置から前記充電装置外に電力を供給させる供給電力制御部を更に備える、
     請求項5に記載の電力予測システム。
  7.  前記利用状況には、前記充電装置に装着されたバッテリの充電容量を表す指標値と、前記充電装置に装着されたバッテリの個数と、時刻と、のうち少なくとも一つ以上が含まれる、
     請求項1から6のうちいずれか一項に記載の電力予測システム。
  8.  前記利用環境には、前記充電装置が設置された地域の天候と、前記充電装置が設置された地域の気温と、日付と、曜日と、のうち少なくとも一つ以上が含まれる、
     請求項1から7のうちいずれか一項に記載の電力予測システム。
  9.  電力を利用する電力装置に対して着脱自在に装着されるバッテリを充電する充電装置から送信される、前記充電装置の利用状況又は利用環境の少なくとも一方を示す利用情報を受信する受信部と、
     前記受信部により受信された前記充電装置の前記利用情報に基づいて、機械学習により前記充電装置が前記充電装置外に供給可能な電力量を予測する予測部と、
     を備える電力予測装置。
  10.  コンピュータが、
     電力を利用する電力装置に対して着脱自在に装着されるバッテリを充電する充電装置から送信される、前記充電装置の利用状況又は利用環境の少なくとも一方を示す利用情報を受信するステップと、
     前記受信した前記利用情報に基づいて、機械学習により前記充電装置が前記充電装置外に供給可能な電力量を予測するステップと、を含む、
     電力予測方法。
  11.  コンピュータに、
     電力を利用する電力装置に対して着脱自在に装着されるバッテリを充電する充電装置から送信される、前記充電装置の利用状況又は利用環境の少なくとも一方を示す利用情報を受信するステップと、
     前記受信した前記利用情報に基づいて、機械学習により前記充電装置が前記充電装置外に供給可能な電力量を予測するステップと、
     を実行させるためのプログラム。
  12.  請求項11に記載のプログラムを格納したコンピュータ読み取り可能な記憶媒体。
PCT/JP2019/030034 2018-07-31 2019-07-31 電力予測システム、電力予測装置、電力予測方法、プログラム、及び記憶媒体 WO2020027202A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN201980049950.4A CN112513916A (zh) 2018-07-31 2019-07-31 电力预测系统、电力预测装置、电力预测方法、程序及存储介质
US17/263,165 US11545829B2 (en) 2018-07-31 2019-07-31 Power prediction system, power prediction device, power prediction method, program, and storage medium
EP19844626.2A EP3832583A4 (en) 2018-07-31 2019-07-31 ENERGY PREDICTION SYSTEM, ENERGY PREDICTION DEVICE, ENERGY PREDICTION METHOD, STORAGE PROGRAM AND MEDIA
JP2020506381A JP7058718B2 (ja) 2018-07-31 2019-07-31 電力予測システム、電力予測装置、電力予測方法、プログラム、及び記憶媒体

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018143636 2018-07-31
JP2018-143636 2018-07-31

Publications (1)

Publication Number Publication Date
WO2020027202A1 true WO2020027202A1 (ja) 2020-02-06

Family

ID=69231816

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/030034 WO2020027202A1 (ja) 2018-07-31 2019-07-31 電力予測システム、電力予測装置、電力予測方法、プログラム、及び記憶媒体

Country Status (5)

Country Link
US (1) US11545829B2 (ja)
EP (1) EP3832583A4 (ja)
JP (1) JP7058718B2 (ja)
CN (1) CN112513916A (ja)
WO (1) WO2020027202A1 (ja)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112465195A (zh) * 2020-11-12 2021-03-09 广东电网有限责任公司广州供电局 考虑高比例分布式光伏接入的母线负荷预测方法及系统
WO2022191233A1 (ja) 2021-03-10 2022-09-15 本田技研工業株式会社 電力装置及びその制御方法
US11453683B1 (en) 2019-08-29 2022-09-27 Mirati Therapeutics, Inc. KRas G12D inhibitors
US11548888B2 (en) 2019-01-10 2023-01-10 Mirati Therapeutics, Inc. KRas G12C inhibitors
US11702418B2 (en) 2019-12-20 2023-07-18 Mirati Therapeutics, Inc. SOS1 inhibitors
US11890285B2 (en) 2019-09-24 2024-02-06 Mirati Therapeutics, Inc. Combination therapies
US11932633B2 (en) 2018-05-07 2024-03-19 Mirati Therapeutics, Inc. KRas G12C inhibitors

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20230046158A1 (en) * 2020-01-23 2023-02-16 Panasonic Intellectual Property Management Co., Ltd. Authentication method for power storage pack, power storage pack, charging device, electric moving body, and control device for electric moving body
US11605966B2 (en) * 2020-12-02 2023-03-14 Dish Network L.L.C. Anticipatory event based battery charging
US20220335546A1 (en) * 2021-04-20 2022-10-20 Volta Charging, Llc System and method for estimating electric vehicle charging station demand at specific points of interest
CN113537607B (zh) * 2021-07-23 2022-08-05 国网青海省电力公司信息通信公司 停电预测方法
US11572183B1 (en) 2022-01-13 2023-02-07 Beta Air, Llc Apparatuses and methods for preconditioning a power source of an electric aircraft
CN117937550A (zh) * 2024-03-25 2024-04-26 宁波市电力设计院有限公司 一种综合能源储能系统优化调度方法和系统

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011172315A (ja) * 2010-02-16 2011-09-01 Toyota Motor Corp 電力供給装置及び電力供給システム
WO2015075794A1 (ja) 2013-11-20 2015-05-28 株式会社 東芝 電力需要予測システム、電力需要予測方法、需要家プロファイリングシステム、及び需要家プロファイリング方法
JP2018033273A (ja) * 2016-08-26 2018-03-01 三菱電機ビルテクノサービス株式会社 電力管理システム、電力管理方法、アグリゲータシステム、需要家電力管理システム、及びプログラム
JP2018085825A (ja) * 2016-11-22 2018-05-31 株式会社竹中工務店 電力供給制御装置、電力供給制御プログラム、電力料金設定システム
JP2018143636A (ja) 2017-03-08 2018-09-20 国立大学法人九州大学 反応管及び空気浄化装置
JP2019068552A (ja) 2017-09-29 2019-04-25 本田技研工業株式会社 可搬型充電給電装置

Family Cites Families (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4164996B2 (ja) 2000-01-05 2008-10-15 日産自動車株式会社 電力マネジメントシステム
JP3935099B2 (ja) * 2003-04-15 2007-06-20 株式会社デンソー 車両用蓄電装置の内部状態検出システム
EP1691209B1 (en) * 2005-02-14 2008-10-01 Denso Corporation Method and apparatus for detecting charged state of secondary battery based on neural network calculation
JP5565104B2 (ja) * 2010-05-28 2014-08-06 トヨタ自動車株式会社 情報提供システム
TWI618019B (zh) 2011-07-26 2018-03-11 Gogoro Inc. 用於攜帶型電能儲存器件之方法、系統及媒體
WO2013016540A1 (en) 2011-07-26 2013-01-31 Gogoro, Inc. Apparatus, method and article for collection, charging and distributing power storage devices, such as batteries
JP5861107B2 (ja) * 2011-09-27 2016-02-16 パナソニックIpマネジメント株式会社 電力供給装置、電力供給方法、制御装置、プログラム
JP5403191B2 (ja) * 2011-11-08 2014-01-29 新神戸電機株式会社 蓄電池状態監視システム
JP6108148B2 (ja) * 2012-05-30 2017-04-05 日本電気株式会社 情報処理装置、情報処理システム、情報処理システムの制御方法、情報処理方法、および情報処理プログラム
KR101413291B1 (ko) * 2012-10-10 2014-06-27 한전케이디엔주식회사 전기 자동차의 배터리 충전 장치 및 방법
JP2015011576A (ja) * 2013-06-28 2015-01-19 株式会社東芝 蓄電池駆動車両の運行システム
CA2920582C (en) * 2013-08-06 2023-10-03 Systemex Energies International Inc. Method and apparatus for controlling the power supply from an electric vehicle to a dwelling or to an ac power distribution network
JP2015156748A (ja) * 2014-02-20 2015-08-27 株式会社オートネットワーク技術研究所 電気自動車のバッテリー管理装置
JP2015171189A (ja) * 2014-03-05 2015-09-28 清水建設株式会社 充放電管理装置、充放電管理方法及びプログラム
JP2016116401A (ja) * 2014-12-17 2016-06-23 株式会社ピューズ 電力負荷平準化装置
CN106664010B (zh) 2015-03-11 2019-06-21 富士电机株式会社 内部电源电路及半导体装置
MY183555A (en) * 2015-03-12 2021-02-26 Omron Tateisi Electronics Co Excess/deficiency determination device, method for controlling same, control program, and recording medium
JP6549896B2 (ja) * 2015-05-20 2019-07-24 一般財団法人電力中央研究所 電力需要調整装置、電力需要調整方法及び電力需要調整プログラム
WO2017009977A1 (ja) * 2015-07-15 2017-01-19 本田技研工業株式会社 充放電装置及び充放電制御方法
US10614146B2 (en) * 2015-12-17 2020-04-07 Siemens Aktiengesellschaft Adaptive demand response method using batteries with commercial buildings for grid stability and sustainable growth
CN106021923A (zh) * 2016-05-19 2016-10-12 江苏理工学院 纯电动汽车动力电池荷电状态预测方法及预测系统
JP6867145B2 (ja) * 2016-11-28 2021-04-28 アイフォーコムホールディングス株式会社 エネルギ需要予測システム
WO2018156732A1 (en) * 2017-02-22 2018-08-30 Iotecha Corp. Method and apparatus for charging a battery from an isolatable electric power grid
US20190033385A1 (en) * 2017-07-28 2019-01-31 Northstar Battery Company, Llc Systems and methods for determining a state of charge of a disconnected battery

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011172315A (ja) * 2010-02-16 2011-09-01 Toyota Motor Corp 電力供給装置及び電力供給システム
WO2015075794A1 (ja) 2013-11-20 2015-05-28 株式会社 東芝 電力需要予測システム、電力需要予測方法、需要家プロファイリングシステム、及び需要家プロファイリング方法
JP2018033273A (ja) * 2016-08-26 2018-03-01 三菱電機ビルテクノサービス株式会社 電力管理システム、電力管理方法、アグリゲータシステム、需要家電力管理システム、及びプログラム
JP2018085825A (ja) * 2016-11-22 2018-05-31 株式会社竹中工務店 電力供給制御装置、電力供給制御プログラム、電力料金設定システム
JP2018143636A (ja) 2017-03-08 2018-09-20 国立大学法人九州大学 反応管及び空気浄化装置
JP2019068552A (ja) 2017-09-29 2019-04-25 本田技研工業株式会社 可搬型充電給電装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3832583A4

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11932633B2 (en) 2018-05-07 2024-03-19 Mirati Therapeutics, Inc. KRas G12C inhibitors
US11548888B2 (en) 2019-01-10 2023-01-10 Mirati Therapeutics, Inc. KRas G12C inhibitors
US11453683B1 (en) 2019-08-29 2022-09-27 Mirati Therapeutics, Inc. KRas G12D inhibitors
US11964989B2 (en) 2019-08-29 2024-04-23 Mirati Therapeutics, Inc. KRas G12D inhibitors
US11890285B2 (en) 2019-09-24 2024-02-06 Mirati Therapeutics, Inc. Combination therapies
US11702418B2 (en) 2019-12-20 2023-07-18 Mirati Therapeutics, Inc. SOS1 inhibitors
CN112465195A (zh) * 2020-11-12 2021-03-09 广东电网有限责任公司广州供电局 考虑高比例分布式光伏接入的母线负荷预测方法及系统
WO2022191233A1 (ja) 2021-03-10 2022-09-15 本田技研工業株式会社 電力装置及びその制御方法

Also Published As

Publication number Publication date
US20210194244A1 (en) 2021-06-24
JPWO2020027202A1 (ja) 2020-08-06
EP3832583A1 (en) 2021-06-09
EP3832583A4 (en) 2021-12-08
JP7058718B2 (ja) 2022-04-22
CN112513916A (zh) 2021-03-16
US11545829B2 (en) 2023-01-03

Similar Documents

Publication Publication Date Title
WO2020027202A1 (ja) 電力予測システム、電力予測装置、電力予測方法、プログラム、及び記憶媒体
JP7217277B2 (ja) 推定システム、推定装置、推定方法、プログラム、及び記憶媒体
JP2023544919A (ja) 電気車両への電力供給
WO2012004897A1 (ja) 情報提供装置および情報提供方法
KR101413291B1 (ko) 전기 자동차의 배터리 충전 장치 및 방법
WO2020166602A1 (ja) 充電装置、充電方法、プログラム、及び記憶媒体
JP2021519436A (ja) バッテリ選択のためのシステム及び方法、長寿命性予測器、車両、バッテリ選択器
JP2015032286A (ja) 電力マネジメントシステム
JP7171537B2 (ja) バッテリ交換システム、管理装置、管理方法、およびプログラム
JP7029020B2 (ja) 情報処理装置、情報処理方法、サービスシステム、プログラム、及び記憶媒体
US11511646B2 (en) Management apparatus, management method, and program
US20190299794A1 (en) System and Method for Vehicle Telematics for Electric Vehicle
JPWO2020171056A1 (ja) 保管装置、推定装置、保管方法、プログラム、及び記憶媒体
WO2021005703A1 (ja) 情報提供装置、情報提供方法、およびプログラム
KR20150008517A (ko) 전기차의 전력 판매 시스템 및 방법
WO2020027087A1 (ja) 案内システム、サーバ装置、案内方法、コンピュータプログラム及び記憶媒体
WO2020250435A1 (ja) 情報処理装置、情報処理方法、およびプログラム
JP2021189640A (ja) 情報処理装置、情報処理方法、およびプログラム
US20230219449A1 (en) Server apparatus, system, and operating method
WO2023187875A1 (ja) 情報提供装置、情報提供方法、およびプログラム
JP7319795B2 (ja) 情報提供装置、情報提供方法、及びプログラム
CN114389324B (zh) 服务器、充电系统以及存储介质
WO2020027113A1 (ja) 充電状態マップ生成システム、サーバ装置、マップ生成方法、コンピュータプログラム及び記録媒体
WO2024069922A1 (ja) 管理装置、管理方法、およびプログラム
JP7254927B2 (ja) 情報提供装置、情報提供方法、およびプログラム

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2020506381

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19844626

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2019844626

Country of ref document: EP

Effective date: 20210301