JP2018085825A - 電力供給制御装置、電力供給制御プログラム、電力料金設定システム - Google Patents
電力供給制御装置、電力供給制御プログラム、電力料金設定システム Download PDFInfo
- Publication number
- JP2018085825A JP2018085825A JP2016226871A JP2016226871A JP2018085825A JP 2018085825 A JP2018085825 A JP 2018085825A JP 2016226871 A JP2016226871 A JP 2016226871A JP 2016226871 A JP2016226871 A JP 2016226871A JP 2018085825 A JP2018085825 A JP 2018085825A
- Authority
- JP
- Japan
- Prior art keywords
- power
- unit period
- load
- power supply
- planned
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
Abstract
【解決手段】1ブロック(1日)の開始前に、需要側が、当該ブロックで消費される電力を、計画電力として申告しておき、1単位期間(30分単位)毎に、ニューラルネットワーク等の予測演算処理によって以後の電力予測を実行し、予測電力と計画電力との差分に基づいて、予測電力が許容範囲を逸脱するか否かを判定すると共に、事前処理として、蓄電池48への充電及び/又は負荷抑制を実行することで、許容範囲の逸脱を回避するようにした。すなわち、余剰があれば、蓄電池48の充電を実行し、需要者側が不便さ実感しない範囲で負荷抑制を実行することで、計画電力どおりに消費電力が推移することを実現した。
【選択図】図3
Description
図1は、第1の実施の形態に係る電力供給側から需要側に電力を供給するための送電設備を示す概略図である。
図6〜図8は、図4及び図5の制御フローチャートに基づく電力供給制御での電力推移をシミュレーションしたときのタイミングチャートである。
図6は、1ブロックの制御開始から30分が経過したとき(時刻としては、11:30)の状況を示している。
図7は、図6のシミュレーションに対して、許容範囲を超える電力(時刻13:30〜15:30)に対して、事前対処することを付加したものである。
図8は、図6のシミュレーションに対して、許容範囲で消費される電力(時刻15:30〜16:30)に対して、未来(明日以降)に向けて充電量を増加することを付加したものである。
以下に本発明の第2の実施の形態について説明する。
第2の実施の形態では、需要側26に対して、計画電力に従って電力を消費することを奨励するために、計画電力の許容範囲内で実績電力が推移したか否かによって、請求する電力料金の増減を行うようにした。
12 発電所
12A 水力発電所
12B 火力発電所
12C 原子力発電所
14 変電所
16 送電線
18 送電線
20 配電用変電所
22 送電線
24 柱上変圧器
26 需要側
28 主電力計
30 受電設備
32 空調設備
34 照明設備
36 空調用電力計
38 変圧器
40 空調制御装置
42 照明用電力計
44 変圧器
46 照明制御装置
48 蓄電池
50 蓄電池用電力計
52 変圧器
54 蓄電池制御装置
56 電力供給制御装置
58 マイクロコピュータ
60 CPU
62 RAM
64 ROM
66 入出力ポート(I/O)
68 バス
70 大規模記憶装置(ハードディスク)
72 I/F(インターフェイス)
74 I/F
76 I/F
78 電力負荷計画部
80 電力負荷予測更新部(策定手段)
82 電力負荷差分予測演算部(演算手段)
84 蓄電池状態予測演算部
86 電力負荷差分演算部
88 現在電力計測部
90 蓄電池出力指令部
92 負荷抑制計画部(制御手段)
94 負荷抑制設定指令部(制御手段)
Claims (7)
- 電力供給側から電力を受けると共に、充放電可能な蓄電設備及び電力を消費する負荷を備えた需要側を対象として、予め定められた1ブロックの期間内の細分化された単位期間毎に、前記負荷が消費する計画電力を策定する策定手段と、
予め定めた予測演算処理によって、前記単位期間で消費される予測電力を演算する演算手段と、
前記演算手段により予測電力が演算された前記単位期間の中に、前記計画電力と前記予測電力との差が、予め定めた許容範囲を逸脱する特定単位期間が存在する場合に、前記特定単位期間に達するまでの各単位期間で、前記蓄電設備の充放電制御、及び負荷抑制制御の少なくとも一方を実行する制御手段と、
を有する電力供給制御装置。 - 前記制御手段が、
前記蓄電設備の蓄電残量に基づいて、前記蓄電設備の充放電制御の実行の可否を判定する請求項1記載の電力供給制御装置。 - 前記制御手段は、
前記特定単位期間の逸脱が、前記許容範囲の上限を超える逸脱の場合、当該特定単位期間で、前記負荷に対して、前記蓄電設備の放電による電力を供給すると共に、当該蓄電設備の放電による電力量が不足しているときは、前記負荷に対して負荷抑制を実行する請求項1又は請求項2記載の電力供給制御装置。 - 前記蓄電設備の充電は、電力供給側からの電力を受けて実行され、
前記制御手段は、
前記特定単位期間の逸脱が、前記許容範囲の上限を超える逸脱の場合、当該特定単位期間で、前記負荷に対して前記蓄電設備の放電による電力を供給する際に、蓄電残量が不足しているときは、前記特定単位期間に到達するまでの各単位期間において、前記蓄電設備を充電する請求項1〜請求項3の何れか1項記載の電力供給制御装置。 - 前記蓄電設備の充電を実行しても特定単位期間における前記許容範囲の上限超えが解消しない場合は、さらに、前記特定単位期間に到達するまでの各単位期間において、前記負荷に対して負荷抑制を実行する請求項4記載の電力供給制御装置。
- コンピュータを、
請求項1〜請求項5の何れか1項記載の電力供給制御装置として機能させる電力供給制御プログラム。 - 請求項1〜請求項5の何れか1項記載の電力供給制御装置を用いた需要側の電力料金を設定する電力料金設定システムであって、
予め定めた電力料金設定期間の終了時に、終了した電力料金設定期間毎に、計画電力を基準とした許容範囲内で消費電力が推移したか否かを判定する電力推移判定手段と、
前記電力推移判定手段の判定結果において、前記許容範囲を逸脱している場合に、次の電力料金設定期間における電力料金を通常よりも割高とし、許容範囲を逸脱したブロックが存在しない場合に、次の電力料金設定期間における電力料金を通常よりも割安とする電力料金調整手段と、
を有する電力料金設定システム。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2016226871A JP6764769B2 (ja) | 2016-11-22 | 2016-11-22 | 電力供給制御装置、電力供給制御プログラム、電力料金設定システム |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2016226871A JP6764769B2 (ja) | 2016-11-22 | 2016-11-22 | 電力供給制御装置、電力供給制御プログラム、電力料金設定システム |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2018085825A true JP2018085825A (ja) | 2018-05-31 |
JP6764769B2 JP6764769B2 (ja) | 2020-10-07 |
Family
ID=62237370
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2016226871A Active JP6764769B2 (ja) | 2016-11-22 | 2016-11-22 | 電力供給制御装置、電力供給制御プログラム、電力料金設定システム |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6764769B2 (ja) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020027202A1 (ja) * | 2018-07-31 | 2020-02-06 | 本田技研工業株式会社 | 電力予測システム、電力予測装置、電力予測方法、プログラム、及び記憶媒体 |
KR20200084454A (ko) * | 2018-12-27 | 2020-07-13 | 주식회사 에이치에너지 | 인공지능 기반 예측적 ess 충방전 운용 장치 및 방법 |
CN111738621A (zh) * | 2020-07-17 | 2020-10-02 | 深圳华工能源技术有限公司 | 需求侧可调节资源分时间尺度聚合参与需求响应的方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002123578A (ja) * | 2000-08-10 | 2002-04-26 | Osaka Gas Co Ltd | 電力小売システム |
JP2003299246A (ja) * | 2002-04-02 | 2003-10-17 | Nippon Steel Corp | 自家発電設備の出力調整方法 |
JP2006174654A (ja) * | 2004-12-17 | 2006-06-29 | Nippon Telegr & Teleph Corp <Ntt> | 分散型エネルギー需給制御方法および設定装置 |
JP2013215012A (ja) * | 2010-07-30 | 2013-10-17 | Sanyo Electric Co Ltd | デマンド制御装置 |
WO2015146200A1 (ja) * | 2014-03-27 | 2015-10-01 | 京セラ株式会社 | 電力管理システム、電力管理方法、及び制御装置 |
WO2016084347A1 (ja) * | 2014-11-25 | 2016-06-02 | 日本電気株式会社 | エネルギー管理装置、エネルギー管理方法及びプログラム記録媒体 |
-
2016
- 2016-11-22 JP JP2016226871A patent/JP6764769B2/ja active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002123578A (ja) * | 2000-08-10 | 2002-04-26 | Osaka Gas Co Ltd | 電力小売システム |
JP2003299246A (ja) * | 2002-04-02 | 2003-10-17 | Nippon Steel Corp | 自家発電設備の出力調整方法 |
JP2006174654A (ja) * | 2004-12-17 | 2006-06-29 | Nippon Telegr & Teleph Corp <Ntt> | 分散型エネルギー需給制御方法および設定装置 |
JP2013215012A (ja) * | 2010-07-30 | 2013-10-17 | Sanyo Electric Co Ltd | デマンド制御装置 |
WO2015146200A1 (ja) * | 2014-03-27 | 2015-10-01 | 京セラ株式会社 | 電力管理システム、電力管理方法、及び制御装置 |
WO2016084347A1 (ja) * | 2014-11-25 | 2016-06-02 | 日本電気株式会社 | エネルギー管理装置、エネルギー管理方法及びプログラム記録媒体 |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020027202A1 (ja) * | 2018-07-31 | 2020-02-06 | 本田技研工業株式会社 | 電力予測システム、電力予測装置、電力予測方法、プログラム、及び記憶媒体 |
CN112513916A (zh) * | 2018-07-31 | 2021-03-16 | 本田技研工业株式会社 | 电力预测系统、电力预测装置、电力预测方法、程序及存储介质 |
US11545829B2 (en) | 2018-07-31 | 2023-01-03 | Honda Motor Co., Ltd. | Power prediction system, power prediction device, power prediction method, program, and storage medium |
KR20200084454A (ko) * | 2018-12-27 | 2020-07-13 | 주식회사 에이치에너지 | 인공지능 기반 예측적 ess 충방전 운용 장치 및 방법 |
KR102232513B1 (ko) * | 2018-12-27 | 2021-03-26 | 주식회사 에이치에너지 | 인공지능 기반 예측적 ess 충방전 운용 장치 및 방법 |
CN111738621A (zh) * | 2020-07-17 | 2020-10-02 | 深圳华工能源技术有限公司 | 需求侧可调节资源分时间尺度聚合参与需求响应的方法 |
CN111738621B (zh) * | 2020-07-17 | 2020-11-24 | 深圳华工能源技术有限公司 | 需求侧可调节资源分时间尺度聚合参与需求响应的方法 |
Also Published As
Publication number | Publication date |
---|---|
JP6764769B2 (ja) | 2020-10-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11714441B2 (en) | Method and apparatus for delivering power using external data | |
US11201491B2 (en) | Method for balancing frequency instability on an electric grid using networked distributed energy storage systems | |
US10693294B2 (en) | System for optimizing the charging of electric vehicles using networked distributed energy storage systems | |
Thingvad et al. | Economic value of electric vehicle reserve provision in the Nordic countries under driving requirements and charger losses | |
WO2014208059A1 (ja) | 電力調整装置、電力調整方法、電力調整システム、蓄電装置、サーバ、プログラム | |
US9438041B2 (en) | System and method for energy distribution | |
JP5095495B2 (ja) | 電力システムおよびその制御方法 | |
JP6420912B2 (ja) | 管理サーバ、管理方法及び管理システム | |
KR101324483B1 (ko) | 수용가용 열병합 발전 및 에너지저장 복합 시스템과 그 최적운전 방법 | |
US10782721B2 (en) | Method and apparatus for balancing power on a per phase basis in multi-phase electrical load facilities using an energy storage system | |
US20140070617A1 (en) | Method and apparatus for stabalizing power on an electrical grid using networked distributed energy storage systems | |
US20140035374A1 (en) | Power control system | |
EP2973932A1 (en) | System and method for energy distribution | |
JP2014526230A (ja) | 電力装置 | |
WO2012057307A1 (ja) | 電力管理用の制御装置 | |
US20190027936A1 (en) | Power supply control method and system | |
US20150255982A1 (en) | Consumer Apparatus Operation Management System and Method | |
JP6764769B2 (ja) | 電力供給制御装置、電力供給制御プログラム、電力料金設定システム | |
Desdouits et al. | Multisource elevator energy optimization and control | |
TWI725606B (zh) | 電動車充電站分散式電能管理方法 | |
JP7386028B2 (ja) | 電力供給システム | |
JP2017046507A (ja) | 系統安定化システム | |
JP2019193479A (ja) | 蓄電池制御装置、蓄電池制御プログラム | |
JP6705652B2 (ja) | 蓄電池制御方法 | |
JP7386029B2 (ja) | 電力供給システム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20190925 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20200623 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20200625 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20200806 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20200908 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20200914 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6764769 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |