JP2014526230A - 電力装置 - Google Patents
電力装置 Download PDFInfo
- Publication number
- JP2014526230A JP2014526230A JP2014521877A JP2014521877A JP2014526230A JP 2014526230 A JP2014526230 A JP 2014526230A JP 2014521877 A JP2014521877 A JP 2014521877A JP 2014521877 A JP2014521877 A JP 2014521877A JP 2014526230 A JP2014526230 A JP 2014526230A
- Authority
- JP
- Japan
- Prior art keywords
- power
- schedule
- load
- energy storage
- storage device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/008—Circuit arrangements for ac mains or ac distribution networks involving trading of energy or energy transmission rights
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
- H02J3/32—Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
- H02J3/322—Arrangements for balancing of the load in a network by storage of energy using batteries with converting means the battery being on-board an electric or hybrid vehicle, e.g. vehicle to grid arrangements [V2G], power aggregation, use of the battery for network load balancing, coordinated or cooperative battery charging
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J4/00—Circuit arrangements for mains or distribution networks not specified as ac or dc
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S50/00—Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
- Y04S50/10—Energy trading, including energy flowing from end-user application to grid
Abstract
Description
ここで、kWhiは、時間間隔iにおける予測された負荷であり、αは、基礎電力消費(kWh)であり、Xi・・・nは、独立変数(例えば、天気(例えば、最小及び最大気温、湿度、降水量、風速)、日の種類(例えば、平日、週末、休日)、週の種類(例えば、月曜日、火曜日等)、月の種類(例えば、5月、6月、7月等)、季節の種類(例えば、夏、秋、冬、春)、時間間隔の種類等)であり、βi・・・nは、標準誤差項を最小にするための標準線形回帰方法を用いて計算された、各独立変数に対応する推定係数であり、εは、標準誤差項である。
ショルダー:0.13ドル/kWh(午前7時から午後2時、午後8時から午後10時 月曜日から金曜日、及び午前7時から午後10時 土曜日から日曜日)
オフピーク:0.08ドル/kWh(午後10時から午前7時 全日)
関連する料金アプローチはまた、系統レベルで適用されてもよい。
FCi=時間間隔iに対する予測コスト
間隔=1時間という単位での時間間隔iの長さ、及び
kWhi=時間間隔iにおける予測された負荷(上述されている)
典型的には、通常の運用及び電力の供給停止という2つのイベントのための2つのFCiが決定される。通常の運用のための最初のFCi(以下、FCiとしてしか称さない)は、信頼度予測料金iを含んでいない一方で、電力の供給停止というイベントのための2番目のFCi(以下、FCi供給停止と称する)は、信頼度予測料金iを含んでいる。典型的には、通常の運用のためのスケジュール及び電力の供給停止のためのスケジュールは、夫々、FCi通常及びFCi供給停止を用いて決定される。或いは、FCi供給停止及び電力の供給停止というイベントのための対応するスケジュールは、電力の供給停止が実際に起こった時点で決定されてもよい。
Claims (30)
- 主電力供給部に接続可能な入力部と、
エネルギー貯蔵デバイスと、
電力供給部からの電力を前記エネルギー貯蔵デバイスに貯蔵するためのエネルギーに変換する、前記電力供給部に選択的に接続可能な供給コンバータと、
前記エネルギー貯蔵デバイスからのエネルギーを電力負荷に供給するための電力に変換するように配置されている負荷コンバータと、
前記入力部及び前記負荷コンバータのいずれかに選択的に接続可能であって、それにより、前記電力負荷が電力を受け取ることができるように当該電力装置に接続されることになる出力部と、
通信ネットワークに接続される制御デバイスと
を備え、
前記制御デバイスは、
前記通信ネットワークから、前記主電力供給部に関連する時間依存電力料金データを受信し、
少なくとも前記受信した時間依存電力料金データを用いて、(i)前記エネルギー貯蔵デバイスの充電、(ii)前記入力部から前記出力部に対する電力の供給、及び(iii)前記出力部に対する前記エネルギー貯蔵デバイスの放電の夫々のスケジュールを決定し、
前記スケジュールに応じて、前記供給コンバータを前記入力部に選択的に接続し、
電力を前記電力負荷に提供するように、前記スケジュールに応じて、前記出力部を前記入力部及び前記負荷コンバータのいずれかに選択的に接続する
ように構成されている電力装置。 - 少なくとも一つの電力装置と、通信ネットワークと、サーバコンピュータデバイスとを備え、
前記電力装置は、
主電力供給部に接続可能な入力部と、
エネルギー貯蔵デバイスと、
電力供給部からの電力を前記エネルギー貯蔵デバイスに貯蔵するためのエネルギーに変換する、前記電力供給部に選択的に接続可能な供給コンバータと、
前記エネルギー貯蔵デバイスからのエネルギーを電力負荷に供給するための電力に変換するように配置されている負荷コンバータと、
前記入力部及び前記負荷コンバータのいずれかに選択的に接続可能であって、それにより、前記電力負荷が電力を受け取ることができるように当該電力装置に接続されることになる出力部と、
通信ネットワークに接続される制御デバイスであって、前記サーバコンピュータデバイスからスケジュールを受信し、それによって、前記受信したスケジュールに応じて、前記供給コンバータを前記入力部に選択的に接続し且つ前記出力部を前記入力部及び前記負荷コンバータのいずれかに選択的に接続する制御デバイスと
を備え、
前記サーバコンピュータデバイスは、前記通信ネットワークに接続されており、
前記サーバコンピュータデバイスは、
前記通信ネットワークから、前記主電力供給部に関連する時間依存電力料金データを受信し、
(i)前記エネルギー貯蔵デバイスの充電、(ii)前記入力部から前記出力部に対する電力の供給、及び(iii)前記出力部に対する前記エネルギー貯蔵デバイスの放電の夫々の、前記電力装置のための前記スケジュールを決定し、
前記決定したスケジュールを前記制御デバイスに送信する
ように構成されているシステム。 - 前記電力供給部は、前記受信した時間依存電力料金データに関連する前記主電力供給部である請求項1又は2に記載の発明。
- 前記電力供給部は、前記主電力供給部のそれに対する代替供給部であり、
前記代替供給部は、地域の太陽光供給部、地域の風力供給部、地域の水力供給部及び地域の発電機からなるグループから選択される請求項1から3のいずれか一項に記載の発明。 - 前記スケジュールを決定する前記デバイスは更に、
前記エネルギー貯蔵デバイスのための最小電力レベルを受信し、
前記エネルギー貯蔵デバイスの前記最小電力レベルを下回る放電を抑制する
ように構成されている請求項1から4のいずれか一項に記載の発明。 - 前記スケジュールを決定する前記デバイスは更に、
前記電力負荷の過去の電力消費データ又はこの種の電力負荷の標準プロファイルに基づいて、負荷の予測を決定し、
前記決定した負荷の予測に基づいて、(iii)のスケジュールを決定する
ように構成されている請求項1から5のいずれか一項に記載の発明。 - 前記スケジュールを決定する前記デバイスは更に、
前記時間依存電力料金データの予測を決定し、
前記決定した前記時間依存電力料金データの予測に基づいて、前記スケジュールを決定する
ように構成されている請求項1から6のいずれか一項に記載の発明。 - 前記スケジュールを決定する前記デバイスは更に、
料金閾値を受信し、
前記時間依存料金データが前記料金閾値を上回る場合に、前記エネルギー貯蔵デバイスを放電する
ように構成されている請求項1から7のいずれか一項に記載の発明。 - 前記スケジュールを決定する前記デバイスは更に、前記時間依存料金データが前記料金閾値を上回る場合には、前記エネルギー貯蔵デバイスの放電の後に、(i)、(ii)又は(iii)のスケジュールを再決定するように構成されている請求項8に記載の発明。
- 前記制御装置は更に、
前記通信ネットワークから、天気データを受信し、
前記受信した天気データを用いて、前記スケジュールを決定する
ように構成されている請求項1から9のいずれか一項に記載の発明。 - 前記制御装置は更に、
前記供給コンバータを前記入力部に選択的に接続する第1の制御可能なスイッチと、
前記出力部を前記入力部及び前記負荷コンバータのいずれかに選択的に接続する少なくとも一つの第2の制御可能なスイッチ
ように構成されている請求項1から10のいずれか一項に記載の発明。 - 前記スケジュールは、前記負荷コンバータが前記出力部に接続される時間からなる放電スケジュール及び前記供給コンバータが前記入力部に接続される時間からなる充電スケジュールを含む請求項1から11のいずれか一項に記載の発明。
- 前記充電スケジュールの決定は、前記エネルギー貯蔵デバイスの充電コストの考慮を含む請求項12に記載の発明。
- 前記充電スケジュールの決定は、前記エネルギー貯蔵デバイスの再充電プロファイルの考慮を含む請求項12から13のいずれか一項に記載の発明。
- 前記放電スケジュール及び/又は前記充電スケジュールは、前記エネルギー貯蔵デバイスの放電コストを最小にするように決定される請求項12から14のいずれか一項に記載の発明。
- 前記放電スケジュールは、前記電力負荷を操作する消費者に対する電力コストを最小にすることに基づいて決定される請求項12から15のいずれか一項に記載の発明。
- 前記放電スケジュールは、前記主供給部に対して電気エネルギーを提供する小売供給コストを最小にすることに基づいて決定される請求項12から16のいずれか一項に記載の発明。
- 前記放電スケジュール及び/又は前記充電スケジュールは、第三者のサービス提供者の利益を最大にすることに基づいて決定される請求項12から17のいずれか一項に記載の発明。
- 前記放電スケジュール及び/又は前記充電スケジュールは、前記エネルギー貯蔵デバイスの経済的耐用年数を最適化するように決定される請求項12から18のいずれか一項に記載の発明。
- 前記エネルギー貯蔵デバイスは、化学電池を含み、前記供給コンバータは、整流器及び充電器を含み、前記負荷コンバータは、インバータを含む請求項1から19のいずれか一項に記載の発明。
- 前記電池は、鉛酸電池及びリチウムイオン電池からなるグループから選択される請求項20に記載の発明。
- 前記電力装置は更に、前記エネルギー貯蔵デバイスのパラメータを監視するためのセンサを備えており、
前記センサは前記制御装置に接続されており、前記制御装置は前記監視されたパラメータに基づいて前記スケジュールを決定する請求項1から21のいずれか一項に記載の発明。 - 前記センサは、前記エネルギー貯蔵デバイスの温度を監視するための温度センサを含んでおり、前記スケジュールの決定は、前記監視された温度の考慮を含む請求項22に記載の発明。
- 前記センサは更に、前記エネルギー貯蔵デバイスの電圧を監視するための電圧センサを含んでおり、前記スケジュールの決定は、前記監視された電圧の考慮を含む請求項22又は23に記載の発明。
- 前記電力装置は、可搬型である請求項1から24のいずれか一項に記載の発明。
- 前記電力装置の出力部は、標準的な主電力供給ソケットの電力ソケットを備える請求項1から25のいずれか一項に記載の発明。
- 電力を電力負荷に対して供給するように構成されている電力装置の動作用のスケジュールを決定するための、コンピュータ化されたプロセッサによって実行可能なアプリケーションプログラムであって、
前記電力装置は、
主電力供給部に接続可能な入力部と、
エネルギー貯蔵デバイスと、
電力供給部からの電力を前記エネルギー貯蔵デバイスに貯蔵するためのエネルギーに変換する、前記電力供給部に選択的に接続可能な供給コンバータと、
前記エネルギー貯蔵デバイスからのエネルギーを電力負荷に供給するための電力に変換するように配置されている負荷コンバータと、
前記入力部及び前記負荷コンバータのいずれかに選択的に接続可能であって、それにより、前記電力負荷が電力を受け取ることができるように当該電力装置に接続されることになる出力部と、
前記スケジュールに応じて、前記供給コンバータを前記入力部に選択的に接続し、且つ、電力を前記電力負荷に提供するように、前記スケジュールに応じて、前記出力部を前記入力部及び前記負荷コンバータのいずれかに選択的に接続するように構成されている制御装置と
を備え、
前記アプリケーションプログラムは、
通信ネットワークから、前記主電力供給部に関連する時間依存電力料金データを受信するためのコードと、
前記電力負荷の過去の電力消費データ又はこの種の電力負荷の標準プロファイルに基づいて、負荷の予測を決定するためのコードと、
前記決定した負荷の予測、前記エネルギー貯蔵デバイスの放電コスト及び前記受信した時間依存電力料金データに基づいて、前記出力部に対する前記エネルギー貯蔵デバイスの放電のスケジュールを決定するためのコードと、
前記放電スケジュール、前記エネルギー貯蔵デバイスの再充電プロファイル及び前記受信した時間依存電力料金データに基づいて、前記エネルギー貯蔵デバイスの充電のスケジュールを決定するためのコードと
を備えるアプリケーションプログラム。 - 負荷の予測を決定するためのコードは更に、天気データ、日の種類、月の種類、週の種類、季節の種類、時間間隔の種類及びこれらの要素の任意の組み合わせからなる要素のグループから選択される要素を考慮する請求項27に記載のアプリケーションプログラム。
- アプリケーションプログラムは、前記コンピュータ化されたプロセッサを含む前記制御装置のメモリに格納されている請求項27に記載のアプリケーションプログラム。
- 前記アプリケーションプログラムは、サーバコンピュータにおいて格納及び実行され、更に、通信ネットワークを介して前記サーバコンピュータから前記電力装置に対して動作スケジュールを送信するためのコードを含む請求項27に記載のアプリケーションプログラム。
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU2011902973 | 2011-07-26 | ||
AU2011902973A AU2011902973A0 (en) | 2011-07-26 | Power apparatus | |
PCT/AU2012/000882 WO2013013267A1 (en) | 2011-07-26 | 2012-07-25 | Power apparatus |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2014526230A true JP2014526230A (ja) | 2014-10-02 |
JP2014526230A5 JP2014526230A5 (ja) | 2015-04-23 |
Family
ID=47600393
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2014521877A Pending JP2014526230A (ja) | 2011-07-26 | 2012-07-25 | 電力装置 |
Country Status (6)
Country | Link |
---|---|
US (1) | US20140172183A1 (ja) |
EP (1) | EP2737590A4 (ja) |
JP (1) | JP2014526230A (ja) |
AU (1) | AU2012286588B2 (ja) |
CA (1) | CA2842050A1 (ja) |
WO (1) | WO2013013267A1 (ja) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20160141461A (ko) * | 2015-06-01 | 2016-12-09 | 한국전자통신연구원 | 에너지 저장 장치의 건강 상태에 기반한 건물 에너지 관리 장치 및 방법 |
JP2019510464A (ja) * | 2016-03-09 | 2019-04-11 | インターナショナル パワー サプライ エーディー | 電力資産コマンドおよび制御アーキテクチャ |
JP2021516908A (ja) * | 2018-03-12 | 2021-07-08 | 華為技術有限公司Huawei Technologies Co.,Ltd. | 通信方法及び通信装置 |
Families Citing this family (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013125909A1 (ko) * | 2012-02-23 | 2013-08-29 | 한국전력공사 | 전력저장장치 스케줄링 장치 및 방법 |
JP2014236627A (ja) * | 2013-06-04 | 2014-12-15 | 日本電信電話株式会社 | サーバ装置、需要家の制御装置及び蓄電池の充放電制御方法 |
GB201310939D0 (en) * | 2013-06-19 | 2013-07-31 | Chargesync Ltd | Charging electronic devices |
CN104620457B (zh) * | 2013-09-11 | 2017-09-26 | 株式会社东芝 | 蓄电控制装置 |
FR3011885A1 (fr) * | 2013-10-11 | 2015-04-17 | E On France Man | Dispositif pour optimiser la production electrique d'une petite centrale hydroelectrique. |
WO2015063914A1 (ja) * | 2013-10-31 | 2015-05-07 | 中国電力株式会社 | 蓄電池の充放電計画装置、蓄電池の充放電計画方法、プログラム、蓄電池の充放電装置 |
WO2015100397A1 (en) | 2013-12-26 | 2015-07-02 | Thermo King Corporation | Method and system for configuring a transport refrigeration unit battery charger for use in a transport refrigeration system |
US9448083B2 (en) * | 2014-02-25 | 2016-09-20 | Ford Global Technologies, Llc | Method and apparatus for providing a navigation route with recommended charging |
US9762066B2 (en) | 2014-03-24 | 2017-09-12 | Abb Schweiz Ag | Control of energy storages in a microgrid |
US10066604B2 (en) | 2014-05-13 | 2018-09-04 | General Electric Company | Method and system for hybrid wind power generation |
US9843189B2 (en) * | 2014-05-19 | 2017-12-12 | The University Of North Carolina At Charlotte | Grid tied system controller including logic coupled to a photovoltaic station and an energy storage system |
CN104112879B (zh) * | 2014-05-26 | 2016-08-17 | 邓登 | 蓄电池电能的充入与储存方法 |
CN105099364A (zh) * | 2015-07-30 | 2015-11-25 | 北京京东方能源科技有限公司 | 光伏电站远程监控系统 |
US9645596B1 (en) * | 2016-11-23 | 2017-05-09 | Advanced Microgrid Solutions, Inc. | Method and apparatus for facilitating the operation of an on-site energy storage system to co-optimize battery dispatch |
US10734811B2 (en) | 2017-11-27 | 2020-08-04 | Ihi Inc. | System and method for optimal control of energy storage system |
US10897136B2 (en) * | 2018-11-13 | 2021-01-19 | Cummins Power Generation Ip, Inc. | Systems and methods for stationary energy storage system optimization |
WO2023135338A1 (en) * | 2022-02-09 | 2023-07-20 | Aktiebolag Solask Energi | System for providing electric power to an electric load, computer-implemented method therefor, computer program and non-volatile data carrier |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010233362A (ja) * | 2009-03-27 | 2010-10-14 | Toyota Motor Corp | 電力供給制御装置 |
JP2011050131A (ja) * | 2009-08-25 | 2011-03-10 | Hot Plan:Kk | 住宅用給電システム及びそれを構成する給電制御装置 |
WO2011065495A1 (ja) * | 2009-11-30 | 2011-06-03 | 京セラ株式会社 | 制御装置及び制御方法 |
JP2011114945A (ja) * | 2009-11-26 | 2011-06-09 | Fuji Electric Systems Co Ltd | 供給電力計画作成装置、そのプログラム |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002271992A (ja) * | 2001-03-14 | 2002-09-20 | Internatl Business Mach Corp <Ibm> | 電力供給装置、電力供給方法、電気機器および電気機器における電力供給方法 |
ES2936332T3 (es) * | 2007-11-30 | 2023-03-16 | Telecom Italia Spa | Aparato de suministro de electricidad de un sitio de telecomunicaciones |
JP5178242B2 (ja) * | 2008-02-29 | 2013-04-10 | 株式会社東芝 | エネルギー貯蔵装置の運転計画作成方法および運転計画作成装置 |
US8600571B2 (en) * | 2008-06-19 | 2013-12-03 | Honeywell International Inc. | Energy optimization system |
-
2012
- 2012-07-25 JP JP2014521877A patent/JP2014526230A/ja active Pending
- 2012-07-25 US US14/235,038 patent/US20140172183A1/en not_active Abandoned
- 2012-07-25 EP EP12818093.2A patent/EP2737590A4/en not_active Withdrawn
- 2012-07-25 AU AU2012286588A patent/AU2012286588B2/en active Active
- 2012-07-25 CA CA 2842050 patent/CA2842050A1/en not_active Abandoned
- 2012-07-25 WO PCT/AU2012/000882 patent/WO2013013267A1/en active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010233362A (ja) * | 2009-03-27 | 2010-10-14 | Toyota Motor Corp | 電力供給制御装置 |
JP2011050131A (ja) * | 2009-08-25 | 2011-03-10 | Hot Plan:Kk | 住宅用給電システム及びそれを構成する給電制御装置 |
JP2011114945A (ja) * | 2009-11-26 | 2011-06-09 | Fuji Electric Systems Co Ltd | 供給電力計画作成装置、そのプログラム |
WO2011065495A1 (ja) * | 2009-11-30 | 2011-06-03 | 京セラ株式会社 | 制御装置及び制御方法 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20160141461A (ko) * | 2015-06-01 | 2016-12-09 | 한국전자통신연구원 | 에너지 저장 장치의 건강 상태에 기반한 건물 에너지 관리 장치 및 방법 |
KR102534623B1 (ko) * | 2015-06-01 | 2023-05-22 | 한국전자통신연구원 | 에너지 저장 장치의 건강 상태에 기반한 건물 에너지 관리 장치 및 방법 |
JP2019510464A (ja) * | 2016-03-09 | 2019-04-11 | インターナショナル パワー サプライ エーディー | 電力資産コマンドおよび制御アーキテクチャ |
JP2021516908A (ja) * | 2018-03-12 | 2021-07-08 | 華為技術有限公司Huawei Technologies Co.,Ltd. | 通信方法及び通信装置 |
JP7239599B2 (ja) | 2018-03-12 | 2023-03-14 | ファーウェイ クラウド コンピューティング テクノロジーズ カンパニー リミテッド | 通信方法及び通信装置 |
US11770726B2 (en) | 2018-03-12 | 2023-09-26 | Huawei Cloud Computing Technologies Co., Ltd. | Communication method and communications apparatus |
Also Published As
Publication number | Publication date |
---|---|
EP2737590A1 (en) | 2014-06-04 |
EP2737590A4 (en) | 2015-07-29 |
CA2842050A1 (en) | 2013-01-31 |
US20140172183A1 (en) | 2014-06-19 |
AU2012286588B2 (en) | 2014-09-25 |
AU2012286588A1 (en) | 2013-03-28 |
WO2013013267A1 (en) | 2013-01-31 |
NZ621385A (en) | 2014-12-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2014526230A (ja) | 電力装置 | |
Kanakadhurga et al. | Demand side management in microgrid: A critical review of key issues and recent trends | |
US10535998B2 (en) | Controlling a behind the meter energy storage and dispatch system to improve power efficiency | |
US10277034B2 (en) | Virtual power plant system and method incorporating renewal energy, storage and scalable value-based optimization | |
KR102187327B1 (ko) | 자동기계학습 기반의 건물 부하 최적 관리 및 제어 시스템 | |
Zhu et al. | The case for efficient renewable energy management in smart homes | |
Mishra et al. | Greencharge: Managing renewableenergy in smart buildings | |
CA2846342A1 (en) | Use of demand response (dr) and distributed energy resources (der) to mitigate the impact of variable energy resources (ver) in power system operation | |
KR20190105173A (ko) | 에너지 저장 장치를 이용한 가상 발전소 | |
JP6069738B2 (ja) | 充放電制御システム、充放電制御方法、および充放電制御プログラム | |
Thornburg et al. | Simulating energy management strategies for microgrids with smart meter demand management | |
Zhang et al. | The operating schedule for battery energy storage companies in electricity market | |
Henri et al. | Design of a novel mode-based energy storage controller for residential PV systems | |
Pansota et al. | An optimal scheduling and planning of campus microgrid based on demand response and battery lifetime | |
Ippolito et al. | Economic feasibility of a customer-side energy storage in the Italian electricity market | |
CN113746105A (zh) | 电力需求响应的优化控制方法、装置、设备和存储介质 | |
JP2021096872A (ja) | 電力供給システム及び、電力管理方法 | |
Malik et al. | Integration of automated Demand Response and Energy Efficiency to enable a smart grid infrastructure | |
US20200350764A1 (en) | Systems and methods for grid management | |
Eswar | Smart grid-future for electrical systems | |
Henri et al. | A novel mode-based energy storage control approach for residential PV systems | |
Swanepoel | Microgrid energy management system based on artificial intelligence | |
Guldbrandsøy et al. | D5. 3 Campus Microgrid Model Prototype | |
NZ621385B2 (en) | Power apparatus | |
KR20220162198A (ko) | 재생에너지로 사용전력을 공급하는 태양광 발전소 공장의 에너지 관리 시스템 및 이를 이용한 에너지 관리 방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20150302 |
|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20150302 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20151126 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20160105 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20161101 |