WO2020016920A1 - 監視制御画面の作成支援装置 - Google Patents

監視制御画面の作成支援装置 Download PDF

Info

Publication number
WO2020016920A1
WO2020016920A1 PCT/JP2018/026686 JP2018026686W WO2020016920A1 WO 2020016920 A1 WO2020016920 A1 WO 2020016920A1 JP 2018026686 W JP2018026686 W JP 2018026686W WO 2020016920 A1 WO2020016920 A1 WO 2020016920A1
Authority
WO
WIPO (PCT)
Prior art keywords
drawing element
control screen
monitoring control
existing
elements
Prior art date
Application number
PCT/JP2018/026686
Other languages
English (en)
French (fr)
Inventor
村上 洋介
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to JP2018555294A priority Critical patent/JPWO2020016920A1/ja
Priority to PCT/JP2018/026686 priority patent/WO2020016920A1/ja
Publication of WO2020016920A1 publication Critical patent/WO2020016920A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F3/00Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
    • G06F3/01Input arrangements or combined input and output arrangements for interaction between user and computer
    • G06F3/048Interaction techniques based on graphical user interfaces [GUI]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/40Display of information, e.g. of data or controls

Definitions

  • the present invention relates to a monitoring control screen creation support device that supports creation of a monitoring control screen on which a single-line diagram is drawn.
  • a monitoring control screen is created in which a single-line diagram of the monitored and controlled power system is drawn.
  • the single-line diagram includes a plurality of drawing elements each representing a plurality of facilities provided in the power system.
  • a single-line diagram includes drawing elements that represent devices, buses, transmission lines, and the like.
  • a drawing element representing a transmission line is called a connection line.
  • the connection line connects one drawing element and the other drawing element, and expresses a connection relationship between one drawing element and the other drawing element.
  • a connection line may connect one drawing element representing one device and the other drawing element representing the other device, or one drawing element representing a device and the other drawing representing a bus. In some cases, it is connected to an element.
  • connection lines are created manually, there is a high risk that an inappropriate connection line will be created when the monitoring control screen is created.
  • the present invention has been made in view of this problem.
  • the problem to be solved by the present invention is to prevent an inappropriate connection line from being created when a monitoring control screen is created, and to efficiently create a monitoring control screen. It is an object of the present invention to provide a monitoring control screen creation support device that performs the above.
  • the monitoring control screen creation support device includes a screen display unit, a connection availability determination unit, and a connection line generation unit.
  • the screen display unit displays the monitoring control screen on the display.
  • a single-line diagram is drawn on the display.
  • the single-line diagram includes a plurality of drawing elements that respectively represent a plurality of facilities provided in the power system.
  • the connection availability determination unit is configured to, when requested to connect a drawing element included in the plurality of drawing elements and a special drawing element including at least one drawing element included in the plurality of drawing elements, to the drawing element and the special drawing It is determined whether or not the element can be connected.
  • connection line generation unit generates a connection line connecting the drawing element and the special drawing element when the connection availability determination unit determines that the drawing element and the special drawing element can be connected, and displays a plurality of displayed connection lines. Add a connection line to the drawing element.
  • ADVANTAGE OF THE INVENTION when a monitoring control screen is created, it can suppress that an inappropriate connection line is created, and the rework resulting from the creation of an inappropriate connection line occurs. Can be suppressed. Therefore, the monitoring control screen can be efficiently created.
  • FIG. 9 is a block diagram illustrating hardware of a monitoring control screen creation support device according to Embodiment 1-5.
  • FIG. 2 is a block diagram illustrating a monitoring control screen creation support device according to the first embodiment.
  • FIG. 4 is a diagram illustrating a monitoring control screen displayed on the monitoring control screen creation support device of the first embodiment.
  • FIG. 4 is a diagram illustrating special drawing elements displayed on the monitoring control screen creation support device of the first embodiment.
  • FIG. 4 is a diagram illustrating special drawing elements displayed on the monitoring control screen creation support device of the first embodiment.
  • 5 is a flowchart illustrating a flow of an operation for creating a monitoring control screen, which is executed by the monitoring control screen creation support device of the first embodiment.
  • FIG. 5 is a diagram illustrating an example of a determination table stored in the monitoring control screen creation support device according to the first embodiment.
  • FIG. 13 is a block diagram illustrating a monitoring control screen creation support device according to a second embodiment.
  • FIG. 13 is a diagram illustrating a part of a monitoring control screen before a change, which is displayed on the monitoring control screen creation support device according to the second embodiment.
  • FIG. 14 is a diagram illustrating a part of a changed monitoring control screen displayed on the monitoring control screen creation support device according to the second embodiment.
  • 11 is a flowchart illustrating an operation flow for changing the monitoring control screen as illustrated in FIGS. 9 and 10, which is executed by the monitoring control screen creation support device of the second embodiment.
  • FIG. 15 is a block diagram illustrating a monitoring control screen creation support device according to Embodiment 3-5.
  • FIG. 13 is a diagram illustrating a part of a monitoring control screen before a change displayed on the monitoring control screen creation support device according to the third embodiment.
  • FIG. 15 is a diagram illustrating a part of a changed monitoring control screen displayed on the monitoring control screen creation support device according to the third embodiment;
  • 15 is a flowchart illustrating a flow of an operation for changing the monitoring control screen as illustrated in FIGS. 13 and 14, which is executed by the monitoring control screen creation support device of the third embodiment.
  • FIG. 14 is a diagram illustrating a part of a monitoring control screen before a change displayed on the monitoring control screen creation support device according to the fourth embodiment.
  • FIG. 13 is a diagram illustrating a part of the monitoring control screen after the primary change displayed on the monitoring control screen creation support device according to the fourth embodiment.
  • FIG. 16 is a diagram illustrating a part of the monitoring control screen after the secondary change displayed on the monitoring control screen creation support device according to the fourth embodiment.
  • 19 is a flowchart illustrating a flow of an operation for changing the monitoring control screen as illustrated in FIGS. 16, 17, and 18 performed by the monitoring control screen creation support device according to the fourth embodiment.
  • FIG. 15 is a diagram illustrating a part of a monitoring control screen before a change displayed on the monitoring control screen creation support device according to the fifth embodiment.
  • FIG. 21 is a diagram illustrating a part of a changed monitoring control screen displayed on the monitoring control screen creation support device according to the fifth embodiment.
  • 22 is a flowchart illustrating an operation flow for changing the monitoring control screen as illustrated in FIGS. 20 and 21, which is executed by the monitoring control screen creation support device of the fifth embodiment.
  • FIG. 1 is a block diagram illustrating hardware of the monitoring control screen creation support device according to the first embodiment.
  • the monitoring control screen creation support apparatus 1000 includes a personal computer (PC) 1020.
  • the PC 1020 includes a central processing unit (CPU) 1040, a storage device 1042, an input device 1044, and an output device 1046.
  • the storage device 1042 stores a program.
  • the PC 1020 may be replaced with a computer other than the PC 1020.
  • the creation support device 1000 may include elements other than these elements.
  • the CPU 1040 executes a program stored in the storage device 1042, and performs an operation according to the program stored in the storage device 1042.
  • the storage device 1042 stores a program, and stores information necessary for executing the stored program.
  • the input device 1044 accepts input of information to the PC 1020.
  • the input device 1044 includes a keyboard, a mouse, and the like.
  • the output device 1046 outputs information from the PC 1020.
  • the output device 1046 includes a display for displaying information to be output.
  • FIG. 2 is a block diagram illustrating a monitoring control screen creation support device according to the first embodiment.
  • the monitoring control screen creation support apparatus 1000 includes a screen display unit 1100, a connection determination unit 1102, and a connection line generation unit 1104, and includes a drawing element 1120 and a special drawing element. Display 1122.
  • the screen display unit 1100, the connection availability determination unit 1102, and the connection line generation unit 1104 are configured by the CPU 1040 executing a program stored in the storage device 1042.
  • the drawing element 1120 and the special drawing element 1122 are displayed by the CPU 1040 executing a program stored in the storage device 1042. All or some of the components configured by the CPU 1040 executing the program may be configured by hardware that does not execute the program.
  • the creation support device 1000 may include elements other than these elements.
  • the screen display unit 1100 creates a monitoring control screen, and displays the created monitoring control screen on a display.
  • a drawing element 1120 and a special drawing element 1122 are drawn on the monitoring control screen.
  • connection possibility determination unit 1102 determines whether or not the drawing element 1120 and the special drawing element 1122 can be connected.
  • connection line generation unit 1104 When the connection possibility determination unit 1102 determines that the drawing element 1120 and the special drawing element 1122 can be connected, the connection line generation unit 1104 generates a connection line that connects the drawing element 1120 and the special drawing element 1122. .
  • FIG. 3 is a diagram illustrating a monitoring control screen displayed on the monitoring control screen creation support device according to the first embodiment.
  • the monitoring control screen 1200 shown in FIG. 3 is used to monitor and control the power system.
  • a single-line diagram 1220 is drawn on the monitoring control screen 1200.
  • the single-line diagram 1220 may be replaced with a single-line diagram other than the single-line diagram 1220.
  • the single-line diagram 1220 includes a plurality of drawing elements 1240 representing a monitored and controlled power system and representing a plurality of facilities provided in the represented power system, respectively.
  • the plurality of drawing elements 1240 include a drawing element 1260 representing a device, a drawing element 1262 representing a bus, and a drawing element 1264 representing a transmission line.
  • the plurality of drawing elements 1240 may include drawing elements other than these drawing elements.
  • the drawing element 1260 representing a device includes a drawing element 1280 representing a switch and a drawing element 1282 representing a transformer.
  • the drawing element 1260 representing the device may include drawing elements other than these drawing elements.
  • the drawing element 1262 expressing the bus bar includes a drawing element 1300 expressing the high-voltage side bus and a drawing element 1302 expressing the low-voltage side bus.
  • the drawing element 1262 representing the bus may include drawing elements other than these drawing elements.
  • the drawing element 1264 representing the transmission line is called a connection line.
  • a drawing element 1260 representing a device is a symbol.
  • the drawing element 1262 representing the bus is a line.
  • the drawing element 1120 illustrated in FIG. 2 is one drawing element included in the plurality of drawing elements 1240.
  • the special drawing element 1122 illustrated in FIG. 2 is an aggregate including two or more drawing elements included in the plurality of drawing elements 1240, and expresses a specific facility such as a feeder.
  • the special drawing element 1122 illustrated in FIG. 2 may be one drawing element included in the plurality of drawing elements 1240.
  • the special drawing element 1122 represents a feeder
  • the special drawing element 1122 includes a drawing element 1280 representing a switch and a connection line 1264 as shown in FIG.
  • FIGS. 4 and 5 are diagrams illustrating special drawing elements displayed on the monitoring control screen creation support device according to the first embodiment.
  • the feeder represented by the special drawing element 1400 shown in FIG. 4 is a drawing feeder that draws power from an external power supply system and is electrically connected to a high-voltage side bus.
  • FIG. 4 also illustrates a connection relationship between a drawing element 1300 expressing a high-voltage-side bus and a special drawing element 1400 expressing a drawing feeder.
  • the feeder represented by the special drawing element 1402 shown in FIG. 5 is a feeder for sending out power to an external power supply system, and is electrically connected to the low-voltage side bus.
  • FIG. 5 also illustrates a connection relationship between a drawing element 1302 expressing a low-voltage-side bus and a special drawing element 1402 expressing a feeder for sending.
  • FIG. 6 is a flowchart illustrating a flow of an operation for creating a monitoring control screen, which is executed by the monitoring control screen creation support device according to the first embodiment. .
  • step S101 shown in FIG. 6 the input device 1044 receives an operation of arranging a plurality of drawing elements 1240 on the monitoring control screen 1200. Further, screen display unit 1100 arranges a plurality of drawing elements 1240 on monitor control screen 1200 according to the accepted operation. When arranging the plurality of drawing elements 1240 on the monitoring control screen 1200, the screen display unit 1100 arranges the drawing element 1120 and the special drawing element 1122 illustrated in FIG. 2 on the monitoring control screen 1200. The screen display unit 1100 specifies at least one drawing element included in the special drawing element 1122 according to the information defining the special drawing element 1122 stored in the storage device 1042.
  • the screen display unit 1100 includes the special drawing element 1122 in accordance with the operation of selecting at least one drawing element included in the special drawing element 1122 from the arranged plurality of drawing elements 1240, which is received by the input device 1044. Specify at least one drawing element to be rendered.
  • the connection possibility determination unit 1102 detects that a request has been made to connect the drawing element 1120 and the special drawing element 1122.
  • the connection availability determination unit 1102 detects that a request to connect the drawing element 1120 and the special drawing element 1122 has been made. I do.
  • the connection availability determination unit 1102 connects the drawing element 1120 and the special drawing element 1122 when the connection line generation unit 1104 requests that a connection line connecting the drawing element 1120 and the special drawing element 1122 be generated. Detect that it has been requested to do so.
  • step S103 the connection possibility determination unit 1102 determines whether or not the drawing element 1120 and the special drawing element 1122 can be connected. If the connection possibility determination unit 1102 determines that the drawing element 1120 and the special drawing element 1122 can be connected, step S104 is executed. If the connection possibility determination unit 1102 determines that the drawing element 1120 and the special drawing element 1122 cannot be connected, step S105 is executed.
  • the connection possibility determination unit 1102 connects the drawing element 1120 and the special drawing element 1122 when the equipment represented by the drawing element 1120 and at least one facility expressed by the special drawing element 1122 can be electrically connected. It is determined that connection is possible. For example, since the high-voltage side bus and the drawing feeder can be electrically connected, the connection possibility determination unit 1102 determines that the drawing element 1120 is the drawing element 1300 that expresses the high-voltage side bus, and the special drawing element 1122 is If it is the special drawing element 1400 representing the pull-in feeder, it is determined that the drawing element 1120 and the special drawing element 1122 can be connected.
  • connection determination unit 1102 determines that the drawing element 1120 is a drawing element 1302 expressing the low-voltage side bus, and the special drawing element 1122 is If it is the special drawing element 1402 representing the sending feeder, it is determined that the drawing element 1120 and the special drawing element 1122 can be connected.
  • FIG. 7 is a diagram illustrating an example of a determination table stored in the monitoring control screen creation support device according to the first embodiment.
  • the determination table 1500 illustrated in FIG. 7 is stored in the storage device 1042.
  • type information 1520 of a drawing element and type information 1522 of a special drawing element are described, respectively.
  • the drawing element type information 1520 described in the second column of each row is associated with the special drawing element type information 1522 described in the first column of each row.
  • the drawing element type information 1520 and the special drawing element type information 1522 described in each row have the drawing element type information 1520 and the special drawing element type information 1522 in which the drawing element 1120 and the special drawing element 1122 are described, respectively. In this case, the drawing element 1120 and the special drawing element 1122 can be connected.
  • the drawing element type information 1520 is character string information indicating the type of equipment represented by the drawing element 1120, such as a "high-voltage side bus” or a “low-voltage side bus”.
  • the special drawing element type information 1522 is character string information indicating the type of equipment represented by the special drawing element 1122, such as a “draw-in feeder” or a “feed-out feeder”.
  • the type information of each drawing element 1120 arranged on the monitoring control screen 1200 indicates each drawing element. It is stored in the storage device 1042 in a state associated with the element 1120. Further, the type information of each special drawing element 1122 arranged on the monitoring control screen 1200 is stored in the storage device 1042 in a state where the type information is associated with each special drawing element 1122.
  • connection availability determination unit 1102 sets the type information of the drawing element 1120 associated with the drawing element 1120 and the type information of the special drawing element 1122.
  • the type information of the special drawing element 1122 is read from the storage device 1042.
  • connection possibility determination unit 1102 refers to the determination table 1500, searches the type information 1522 of the special drawing element described in the first column of the determination table 1500, and searches the first column of the determination table 1500.
  • the type information 1522 of the special drawing element that matches the read type information of the special drawing element 1122 is specified from the type information 1522 of the special drawing element described in (1).
  • the connection possibility determination unit 1102 determines whether the type information 1520 of the drawing element described in the same line as the line in which the type information 1522 of the specified special drawing element is described matches the type information of the read drawing element 1120. Determine whether or not. When the type information 1520 of the described drawing element matches the read type information of the drawing element 1120, the connection possibility determination unit 1102 determines that the drawing element 1120 and the special drawing element 1122 can be connected. On the other hand, when the type information 1520 of the described drawing element does not match the read type information of the drawing element 1120, the connection possibility determination unit 1102 determines that the drawing element 1120 and the special drawing element 1122 cannot be connected. .
  • the type information 1520 of the drawing element is character information indicating the type of the bus
  • the type information 1522 of the special drawing element includes character string information indicating the type of the feeder. Has become. Character information indicating the type of bus may be replaced with information indicating only whether connection to the bus is possible.
  • connection line generation unit 1104 In step S104 shown in FIG. 6, the connection line generation unit 1104 generates a connection line 1264 connecting the drawing element 1120 and the special drawing element 1122. Further, the connection line generation unit 1104 adds the generated connection line 1264 to the plurality of drawing elements 1240. The added connection line 1264 is drawn on the monitoring control screen 1200 and is arranged between the drawing element 1120 and the special drawing element 1122.
  • step S105 the connection line generation unit 1104 ignores the request to connect the drawing element 1120 and the special drawing element 1122, and sets the connection line 1264 connecting the drawing element 1120 and the special drawing element 1122. Do not generate.
  • the connection line generation unit 1104 displays a dialog indicating a connection destination error on the display.
  • the monitoring control screen creation support apparatus 1000 when the monitoring control screen 1200 is created, it is possible to prevent an inappropriate connection line from being created. Thus, it is possible to suppress the occurrence of rework due to the creation of an inappropriate connection line. Therefore, the monitoring control screen 1200 can be created efficiently.
  • connection line 1264 can be made easier by causing the connection line generation unit 1104 to automatically create the connection line 1264.
  • FIG. 1 is also a block diagram illustrating hardware of a monitoring control screen creation support device according to a second embodiment.
  • FIG. 8 is a block diagram illustrating a monitoring control screen creation support device according to the second embodiment.
  • the monitoring control screen creation support device 2000 according to the second embodiment illustrated in FIGS. 1 and 8 is different from the monitoring control screen creation support device 1000 according to the first embodiment in further including a copy generation unit 2020.
  • the copy generation unit 2020 is configured by the CPU 1040 executing a program.
  • the configuration adopted in the monitoring control screen creation support apparatus 1000 of the first embodiment is also adopted in the monitoring control screen creation support apparatus 2000 of the second embodiment.
  • the copy generation unit 2020 creates a copy of an existing special drawing element included in the plurality of drawing elements 1240. Further, the copy generation unit 2020 adds the generated copy of the existing special drawing element to the plurality of drawing elements 1240 to be drawn.
  • the connection line generation unit 1104 generates a new connection line that connects the existing drawing element included in the plurality of drawing elements 1240 and the generated copy of the existing special drawing element.
  • An existing drawing element that is connected to a copy of an existing special drawing element is an existing drawing element that has been connected to the existing special drawing element that has been copied. Further, the connection line generation unit 1104 adds the generated new connection line to the plurality of drawing elements 1240 to be drawn.
  • FIG. 9 is a diagram illustrating a part of the monitor control screen before change displayed on the monitor control screen creation support device according to the second embodiment.
  • FIG. 10 illustrates an example of a part of the changed monitoring control screen displayed on the monitoring control screen creation support device according to the second embodiment.
  • An existing drawing element 2060, an existing special drawing element 2062, and an existing connection line 2064 included in the plurality of drawing elements 1240 are drawn on a part 2040 of the monitoring control screen before the change illustrated in FIG. I have.
  • the existing drawing element 2060 and the existing special drawing element 2062 are connected by an existing connection line 2064.
  • the existing drawing element 2060 represents a bus.
  • the existing special drawing element 2062 represents a feeder.
  • An existing drawing element 2060, an existing special drawing element 2062, and an existing connection line 2064 are drawn on a part 2080 of the changed monitoring control screen illustrated in FIG. And a new connection line 2102 is further drawn.
  • the existing drawing element 2060 and the copy 2100 of the existing special drawing element 2062 are connected by a new connection line 2102.
  • a copy 2100 of the existing special drawing element 2062 represents a feeder.
  • FIG. 11 shows how the monitoring control screen is changed as shown in FIGS. 9 and 10, which is executed by the monitoring control screen creation support device of the second embodiment. Is a flowchart illustrating the flow of the operation for this.
  • step S201 shown in FIG. 11 the input device 1044 converts the existing special drawing element 2062 for creating a copy 2100 shown in FIG. 9 from the existing special drawing element arranged on the monitoring control screen 1200. Accept the operation of selecting.
  • the copy generation unit 2020 creates a copy 2100 of the selected existing special drawing element 2062 as shown in FIG. Further, the copy generation unit 2020 adds a copy 2100 of the created existing special drawing element 2062 to the plurality of drawing elements 1240. The duplicate 2100 of the added existing special drawing element 2062 is drawn on the monitoring control screen 1200.
  • step S202 at the timing when the copy generation unit 2020 creates the copy 2100 of the existing special drawing element 2062, the existing special drawing element 2062 in which the copy 2100 has been created is connected to the existing drawing element by the existing connection line 2064. It is determined whether or not the connection is made with 2060. When the copy generation unit 2020 determines that the existing special drawing element 2062 is connected to the existing drawing element 2060 by the existing connection line 2064, step S203 is executed. When the copy generation unit 2020 determines that the existing special drawing element 2062 is not connected to the existing drawing element 2060 by the existing connection line 2064, the operation for changing the monitoring control screen 1200 ends.
  • step S203 the copy generation unit 2020 determines whether or not the existing drawing element 2060 connected to the existing special drawing element 2062 from which the copy 2100 has been created represents a bus. If the copy generation unit 2020 determines that the existing drawing element 2060 represents a bus, step S204 is executed. When the copy generation unit 2020 determines that the drawing element 2060 does not represent a bus, the operation for changing the monitoring control screen 1200 ends.
  • connection line generation unit 1104 generates a new connection line 2102 that connects the existing drawing element 2060 and the copy 2100 of the existing special drawing element 2062. Further, the connection line generation unit 1104 adds the generated new connection line 2102 to the plurality of drawing elements 1240.
  • the added new connection line 2102 is drawn on the monitoring control screen 1200, and is arranged between the existing drawing element 2060 and the copy 2100 of the existing special drawing element 2062.
  • the position of the new connection line 2102 is determined by the position of the copy 2100 of the existing special drawing element 2062.
  • the direction DV in which the new connection line 2102 extends is perpendicular to the direction DH in which the existing drawing element 2060 extends.
  • the connection possibility determination unit 1102 may determine whether the existing drawing element 2060 and the copy 2100 of the existing special drawing element 2062 can be connected. .
  • the determination table 1500 may be referred to. Determining whether or not the existing drawing element 2060 and the copy 2100 of the existing special drawing element 2062 can be connected may be omitted. This is because whether the existing drawing element 2060 and the existing special drawing element 2062 can be connected when connecting the existing drawing element 2060 and the existing special drawing element 2062 by the existing connection line 2064 is already determined. This is because it has been determined.
  • the monitoring control screen creation support apparatus 2000 according to the second embodiment also creates the monitoring control screen 1200 in the same manner as the monitoring control screen creation support apparatus 1000 according to the first embodiment. In this case, it is possible to suppress creation of an inappropriate connection line, and it is possible to suppress occurrence of rework due to creation of an inappropriate connection line. Therefore, the monitoring control screen 1200 can be created efficiently.
  • a new connection line 2102 connecting the existing drawing element 2060 and the copy 2100 of the existing special drawing element 2062 is automatically generated. . Therefore, there is no need to manually create a new connection line 2102, and the monitoring control screen 1200 can be created more efficiently.
  • This effect creates a monitoring control screen, such as the monitoring control screen 1200 illustrated in FIG. 3, in which a single-line diagram including a plurality of special rendering elements of the same type connected to the rendering element representing the bus is drawn. This is particularly noticeable in the case.
  • FIG. 1 is also a block diagram illustrating hardware of a monitoring control screen creation support device according to a third embodiment.
  • FIG. 12 is a block diagram illustrating a monitoring control screen creation support device according to the third embodiment.
  • the monitoring control screen creation support device 3000 according to the third embodiment illustrated in FIGS. 1 and 12 is different from the monitoring control screen creation support device 1000 according to the first embodiment in further including a bus generation unit 3020.
  • the bus generation unit 3020 is configured by the CPU 1040 executing a program.
  • the configuration employed in the monitoring control screen creation support device 3000 according to the third embodiment will be described in relation to the above difference.
  • the configuration adopted in the monitoring control screen creation support device 1000 of the first embodiment is also adopted in the monitoring control screen creation support device 3000 of the third embodiment.
  • the bus generating unit 3020 generates a new drawing element that can be connected to a plurality of existing special drawing elements included in the plurality of drawing elements 1240. Further, the bus generating unit 3020 adds the generated new drawing element to the plurality of drawing elements 1240 to be displayed.
  • the generated new drawing element represents a bus.
  • connection line generation unit 1104 generates a plurality of new connection lines that connect the generated new drawing element and a plurality of existing special drawing elements, respectively. In addition, the connection line generation unit 1104 adds the generated new connection lines to the plurality of drawing elements 1240 to be displayed.
  • FIG. 13 illustrates a part of the monitor control screen before the change, which is displayed on the monitor control screen creation support device of the third embodiment.
  • FIG. 14 illustrates a part of the changed monitoring control screen displayed on the monitoring control screen creation support device according to the third embodiment.
  • a plurality of existing special drawing elements 3060 included in the plurality of drawing elements 1240 are drawn on a part 3040 of the monitoring control screen before the change illustrated in FIG.
  • the plurality of existing special drawing elements 3060 are the same kind of special drawing elements that respectively represent the same kind of feeders.
  • a plurality of existing special drawing elements 3060 are drawn on a part 3080 of the changed monitoring control screen illustrated in FIG. 14, and a new drawing element 3100 and a plurality of new connection lines 3102 are further added. Is drawn.
  • the new drawing element 3100 and the plurality of existing special drawing elements 3060 are connected by a plurality of new connection lines 3102, respectively.
  • the new drawing element 3100 represents a bus.
  • FIG. 15 shows a process of changing the monitor control screen as shown in FIGS. 13 and 14 which is executed by the monitor control screen creation support device of the third embodiment. Is a flowchart illustrating the flow of the operation for this.
  • step S301 illustrated in FIG. 15 the input device 1044 receives an operation of arranging a plurality of special drawing elements in parallel on the monitoring control screen 1200. Further, screen display unit 1100 arranges a plurality of special drawing elements on monitoring control screen 1200 in parallel according to the accepted operation.
  • a plurality of special drawing elements to be arranged may be newly created, or may be created by duplicating already arranged special drawing elements.
  • the input device 1044 receives an operation of selecting a plurality of existing special drawing elements 3060 to be connected shown in FIG. 13 from the plurality of arranged existing special drawing elements.
  • the selected plurality of existing special drawing elements 3060 are the same kind of special drawing elements that respectively represent the same kind of feeders. Instead of a plurality of existing special rendering elements 3060, one existing special rendering element 3060 may be selected.
  • the selected plurality of existing special rendering elements 3060 are not connected to the existing rendering elements that represent the buses, and are connected to new rendering elements 3100 that represent the later generated buses.
  • the bus generating unit 3020 generates a new drawing element 3100 connectable to the selected plurality of existing special drawing elements 3060. Further, the bus generating unit 3020 adds the generated new drawing element 3100 to the plurality of drawing elements 1240. The added new drawing element 3100 is drawn on the monitoring control screen 1200.
  • the bus generating unit 3020 When generating a new drawing element 3100, the bus generating unit 3020 refers to the determination table 1500 via the connection possibility determination unit 1102 and can connect to the selected plurality of existing special drawing elements 3060.
  • the type information 1520 of the drawing element is specified.
  • the bus generation unit 3020 generates a new drawing element 3100 having the type information 1520 of the specified drawing element.
  • connection line generation unit 1104 generates a plurality of new connection lines 3102 connecting the generated new drawing element 3100 and the selected plurality of existing special drawing elements 3060, respectively.
  • one new connection line 3102 is generated instead of the plurality of new connection lines 3102.
  • the connection line generation unit 1104 adds the generated new connection lines 3102 to the plurality of drawing elements 1240.
  • the added new connection lines 3102 are drawn on the monitoring control screen 1200, and are respectively arranged between the new drawing element 3100 and the plurality of existing special drawing elements 3060.
  • the monitor control screen 1200 is created similarly to the monitor control screen creation support device 1000 of the first embodiment. In this case, it is possible to suppress creation of an inappropriate connection line, and it is possible to suppress occurrence of rework due to creation of an inappropriate connection line. Therefore, the monitoring control screen 1200 can be created efficiently.
  • a new drawing element 3100 that can be connected to a plurality of existing special drawing elements 3060 is automatically generated, and a new drawing element 3100 is created.
  • a plurality of new connection lines 3102 that respectively connect the plurality of existing special drawing elements 3060 are automatically generated. Therefore, there is no need to manually create a new drawing element 3100 and a plurality of new connection lines 3102, and the monitoring control screen 1200 can be created more efficiently.
  • FIG. 1 is also a block diagram illustrating hardware of a monitoring control screen creation support device according to a fourth embodiment.
  • FIG. 12 is also a block diagram illustrating a monitoring control screen creation support device according to the fourth embodiment.
  • the monitoring control screen creation support device 4000 according to the fourth embodiment illustrated in FIGS. 1 and 12 is different from the first embodiment in that the bus generating unit 3020 aligns a plurality of selected existing special drawing elements 3060. 3 is different from the monitoring support screen creation support device 3000 of FIG.
  • the configuration employed in the monitor control screen creation support device 4000 according to the fourth embodiment will be described in relation to the above difference.
  • the configuration adopted in the monitoring control screen creation support device 3000 of the third embodiment is also adopted in the monitoring control screen creation support device 4000 of the fourth embodiment.
  • FIG. 16 is a diagram illustrating a part of the monitoring control screen before the change, which is displayed on the monitoring control screen creation support device of the fourth embodiment.
  • FIG. 17 is a diagram illustrating a part of the monitoring control screen after the primary change displayed on the monitoring control screen creation support device according to the fourth embodiment.
  • FIG. 18 is a diagram illustrating a part of the monitoring control screen after the secondary change displayed on the monitoring control screen creation support device according to the fourth embodiment.
  • a plurality of existing special drawing elements 3060 included in the plurality of drawing elements 1240 are drawn on a part 4020 of the monitoring control screen before the change illustrated in FIG. In a part 4020 of the monitoring control screen before the change, a plurality of existing special drawing elements 3060 are not aligned.
  • a plurality of existing special drawing elements 3060 are drawn on a part 4060 of the monitoring control screen after the primary change shown in FIG. In a part 4060 of the monitoring control screen after the primary change, a plurality of existing special drawing elements 3060 are aligned.
  • a plurality of existing special drawing elements 3060 are drawn in a part 4080 of the monitoring control screen after the secondary change illustrated in FIG. 18, and a new drawing element 3100 and a plurality of new connection lines 3102 are displayed. It is further drawn. In a part 4080 of the monitoring control screen after the secondary change, a plurality of existing special drawing elements 3060 are aligned.
  • the new drawing element 3100 represents a bus.
  • the new drawing element 3100 and the plurality of existing special drawing elements 3060 are connected by a plurality of new connection lines 3102, respectively.
  • FIG. 19 shows a monitor control screen as shown in FIGS. 16, 17 and 18 which is executed by the monitor control screen creation support apparatus of the fourth embodiment.
  • 5 is a flowchart illustrating a flow of an operation for changing the value.
  • steps S401 to S404 illustrated in FIG. 19 the same processes as those performed in steps S301 to S304 illustrated in FIG. 15 are performed.
  • step S402 a plurality of existing special drawing elements 3060 are selected.
  • step S405 performed after step S402 and before step S403, the bus generating unit 3020 arranges the selected plurality of existing special drawing elements 3060.
  • the plurality of existing special drawing elements 3060 are moved from the non-uniform arrangement shown in FIG. 16 to the uniform drawing shown in FIG. 17 in the direction DH in which a new drawing element 3100 generated later extends.
  • the plurality of existing special drawing elements 3060 are arranged at the same position shown in FIG. 17 from the state where they are arranged at different positions shown in FIG. 16 in the direction DV perpendicular to the direction DH. State.
  • the monitoring control screen 1200 is created similarly to the monitoring control screen creation support device 1000 of the first embodiment. In this case, it is possible to suppress creation of an inappropriate connection line, and it is possible to suppress occurrence of rework due to creation of an inappropriate connection line. Therefore, the monitoring control screen 1200 can be created efficiently.
  • a plurality of existing special drawing elements 3060 connected to the new drawing element 3100 are automatically aligned. Therefore, there is no need to manually align a plurality of existing special drawing elements 3060, and the monitoring control screen 1200 can be created more efficiently.
  • FIG. 1 is also a block diagram illustrating hardware of a monitoring control screen creation support device according to a fifth embodiment.
  • FIG. 12 is also a block diagram illustrating a monitoring control screen creation support device according to the fifth embodiment.
  • the bus generating unit 3020 converts the special drawing element connected to the drawing element expressing the bus into a drawing expressing the bus. In the case where it is required to move the drawing element representing the bus in the direction in which the element extends, the drawing element representing the bus is extended in the point that the drawing element representing the bus is extended. It is different from the device 3000.
  • the configuration employed in the monitoring control screen creation support device 5000 according to the fifth embodiment will be described in relation to the above difference.
  • the configuration adopted in the monitoring control screen creation support device 3000 of the third embodiment is also adopted in the monitoring control screen creation support device 5000 of the fifth embodiment.
  • FIG. 20 is a diagram illustrating a part of the monitoring control screen before the change displayed on the monitoring control screen creation support device of the fifth embodiment.
  • FIG. 21 is a diagram illustrating a part of the changed monitoring control screen displayed on the monitoring control screen creation support device according to the fifth embodiment.
  • An existing drawing element 5040, an existing special drawing element 5042, and an existing connection line 5044 are drawn on a part 5020 of the monitoring control screen before the change shown in FIG.
  • the existing drawing element 5040 represents a bus.
  • the existing special drawing element 5042 represents a feeder.
  • the existing connection line 5044 connects the existing drawing element 5040 and the existing special drawing element 5042.
  • the existing special drawing element 5042 is arranged within a range where the existing drawing element 5040 exists in the direction DH in which the existing drawing element 5040 extends.
  • a drawing element 5080 after extension, a special drawing element 5082 after moving, and a connection line 5084 are drawn on a part 5060 of the changed monitoring control screen shown in FIG.
  • the extended drawing element 5080 represents a bus.
  • the moved special drawing element 5082 represents a feeder.
  • the connection line 5084 connects the extended drawing element 5080 and the moved special drawing element 5082.
  • the moved special drawing element 5082 is arranged in a direction DH in which the extended drawing element 5080 extends within a range where the extended drawing element 5080 exists.
  • FIG. 22 shows how the monitoring control screen is changed as shown in FIGS. 20 and 21, which is executed by the monitoring control screen creation support device of the fifth embodiment. Is a flowchart illustrating the flow of the operation for this.
  • step S501 illustrated in FIG. 22 the input device 1044 accepts an operation of moving the existing special drawing element 5042 outside the range where the existing drawing element 5040 exists in the direction DH in which the existing drawing element 5040 extends.
  • the screen display unit 1100 displays the existing special drawing element 5042 outside the range where the existing drawing element 5040 exists in the direction in which the existing drawing element 5040 extends, as shown in FIG. To move.
  • the moved special drawing element 5082 is arranged on the right side of the range where the existing drawing element 5040 exists.
  • the moved special drawing element 5082 may be arranged on the left side of the range where the existing drawing element 5040 exists.
  • the screen display unit 1100 converts the coordinate information of the special drawing element to be drawn from the coordinate information of the existing special drawing element 5042 to the coordinate information of the moved special drawing element 5082. Update.
  • step S502 the bus generating unit 3020 determines whether the existing drawing element 5040 and the existing special drawing element 5042 are connected.
  • step S503 is executed. If the bus generating unit 3020 determines that the existing drawing element 5040 and the existing special drawing element 5042 are not connected, the operation for changing the monitoring control screen 1200 ends.
  • step S503 the bus generating unit 3020 extends the existing drawing element 5040.
  • the moved special drawing element 5082 is arranged in a direction DH in which the extended drawing element 5080 extends within a range where the extended drawing element 5080 exists.
  • the moved special drawing element 5082 may be arranged outside the range.
  • the bus generating unit 3020 When extending the existing drawing element 5040, the bus generating unit 3020 obtains the updated coordinate information of the special drawing element, and determines the length of the drawing element to be drawn based on the obtained coordinate information of the special drawing element.
  • the length of the existing drawing element 5040 is updated to the length of the drawn element 5080 after extension. Therefore, the length of the drawing element changes according to the position of the special drawing element 5082 after the movement.
  • connection line generation unit 1104 generates a connection line 5084 for reconnecting the extended drawing element 5080 and the moved special drawing element 5082.
  • the connection line 5084 is generated, the existing connection line 5044 is deleted, and a new connection line 5084 is generated.
  • the coordinate information of the connection line to be drawn is updated from the coordinate information of the existing connection line 5044 to the coordinate information of the connection line 5084.
  • the connection line generation unit 1104 adds the generated connection line 5084 to the plurality of drawing elements 1240.
  • the added connection line 5084 is drawn on the monitoring control screen 1200, and is arranged between the extended drawing element 5080 and the moved special drawing element 5082.
  • the monitoring control screen 1200 is created similarly to the monitoring control screen creation support device 1000 of the first embodiment. In this case, it is possible to suppress creation of an inappropriate connection line, and it is possible to suppress occurrence of rework due to creation of an inappropriate connection line. Therefore, the monitoring control screen 1200 can be created efficiently.
  • the existing drawing element 5040 is automatically extended after the existing special drawing element 5042 is moved. Therefore, it is not necessary to manually adjust the length of the existing drawing element 5042, and the monitoring control screen 1200 can be created more efficiently.

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • General Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Water Supply & Treatment (AREA)
  • Tourism & Hospitality (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Public Health (AREA)
  • General Business, Economics & Management (AREA)
  • Human Computer Interaction (AREA)
  • User Interface Of Digital Computer (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Abstract

監視制御画面が作成される際に不適切な接続線が作成されることを抑制することができ、監視制御画面を効率的に作成することができるようにする。監視制御画面の作成支援装置において、監視制御画面がディスプレイに表示される。ディスプレイには、単線結線図が描画される。単線結線図は、電力系統に備えられる複数の設備をそれぞれ表現する複数の描画要素を備える。複数の描画要素に含まれる描画要素と複数の描画要素に含まれる少なくともひとつの描画要素を含む特殊描画要素とを接続することが要求された場合に、描画要素と特殊描画要素とを接続可能であるか否かが判定される。描画要素と特殊描画要素とが接続可能であると判定された場合に、描画要素と特殊描画要素とを接続する接続線が生成され、接続線が表示される複数の描画要素に追加される。

Description

監視制御画面の作成支援装置
 本発明は、単線結線図が描画された監視制御画面の作成を支援する監視制御画面の作成支援装置に関する。
 電力系統を監視し制御する監視制御システムのエンジニアリングにおいては、監視され制御される電力系統の単線結線図が描画された監視制御画面が作成される。
 単線結線図は、電力系統に備えられる複数の設備をそれぞれ表現する複数の描画要素を含む。例えば、単線結線図は、機器、母線、送電線等を表現する描画要素を含む。送電線を表現する描画要素は、接続線と呼ばれる。接続線は、一方の描画要素と他方の描画要素とを接続し、一方の描画要素と他方の描画要素との接続関係を表現する。接続線は、一方の機器を表現する一方の描画要素と他方の機器を表現する他方の描画要素とを接続する場合もあるし、機器を表現する一方の描画要素と母線を表現する他方の描画要素とを接続する場合もある。
 大規模な単線結線図が描画された監視制御画面が作成される場合は、多数の描画要素対に含まれる各描画要素対について、各描画要素対を構成する一方の描画要素と各描画要素対を構成する他方の描画要素とを接続する接続線を作成しなければならない。このため、多数の接続線を作成しなければならない。そのような場合であっても、監視制御画面が作成されるのに先立って多数の描画要素の間の接続関係を特定するデータが入力されている場合は、入力されたデータを監視制御画面を作成する際に取り込むことにより、多数の接続線を自動的に作成することができる。
 特許文献1に記載された電力系統設備情報生成装置においては、電力系統設備間の関連を表す情報が入力データから自動作成される(発明の名称及び要約)。当該入力データは、多数の描画要素の間の接続関係を特定するデータとして利用することができる。
 特許文献2に記載された電力系統監視制御システムのフレームデータ編集方法においては、画面上のシンボルが単体で扱われず、それぞれの接続関係を含めた形での複数個のコピーを目的とし、画面編集専用のフレーム構造が作成される(段落0007)。単線結線図が作成される場合に各フレームの複製が作成されるときには、種類スロットと接続関係スロットだけがそのままコピーされ、表示座標スロットが予め求めておかれた相対座標を元に計算され格納される(段落0012及び0018)。これにより、接続関係を含めた形での複数個のコピーが可能となる(段落0024)。
特開2001-251763号公報 特開平8-65924号公報
 現実の監視制御システムのエンジニアリングにおいては、監視制御画面が作成されるのと並行して電力系統に備えられる設備に関連するデータが入力されることが多い。また、監視制御画面の仕様を先に確認するために、監視制御画面が初期の段階で作成されることが多い。このため、監視制御画面が作成される際に、多数の接続線を作成することを容易ならしめる多数の描画要素の間の接続関係を特定するデータが入力されていないことも多い。したがって、多数の接続線を手作業で作成しなければならないことも多い。
 また、特許文献2に記載された電力系統監視制御システムのフレームデータ編集方法が複数個の描画要素を含む集合体の複製に援用された場合は、集合体の複製が作成されるときに、集合体に含まれる接続線の複製が自動的に作成されるが、集合体とそれ以外の描画要素とを接続する接続線の複製は自動的には作成されない。このため、集合体とそれ以外の描画要素とを接続する接続線を手作業で作成しなければならない。
 しかし、接続線が手作業で作成された場合は、監視制御画面が作成される際に不適切な接続線が作成される危険性が高まる。また、不適切な接続線が作成された状態を解消するために、監視制御画面を作成する作業に手戻りが発生する危険性が高まり、監視制御画面を効率的に作成することができなくなる危険性が高まる。
 本発明は、この問題に鑑みてなされた。本発明が解決しようとする課題は、監視制御画面が作成される際に不適切な接続線が作成されることを抑制することができ、監視制御画面を効率的に作成することができるようにする監視制御画面の作成支援装置を提供することである。
 監視制御画面の作成支援装置は、画面表示部、接続可否判定部及び接続線生成部を備える。
 画面表示部は、監視制御画面をディスプレイに表示させる。ディスプレイには、単線結線図が描画される。単線結線図は、電力系統に備えられる複数の設備をそれぞれ表現する複数の描画要素を備える。
 接続可否判定部は、複数の描画要素に含まれる描画要素と複数の描画要素に含まれる少なくともひとつの描画要素を含む特殊描画要素とを接続することが要求された場合に、描画要素と特殊描画要素とを接続可能であるか否かを判定する。
 接続線生成部は、接続可否判定部が描画要素と特殊描画要素とを接続可能であると判定した場合に、描画要素と特殊描画要素とを接続する接続線を生成し、表示される複数の描画要素に接続線を追加する。
 本発明によれば、監視制御画面が作成される際に、不適切な接続線が作成されることを抑制することができ、不適切な接続線が作成されたことに起因する手戻りが発生することを抑制することができる。このため、監視制御画面を効率的に作成することができる。
 この発明の目的、特徴、局面及び利点は、以下の詳細な説明と添付図面とによって、より明白となる。
実施の形態1-5の監視制御画面の作成支援装置のハードウェアを図示するブロック図である。 実施の形態1の監視制御画面の作成支援装置を図示するブロック図である。 実施の形態1の監視制御画面の作成支援装置に表示される監視制御画面を図示する図である。 実施の形態1の監視制御画面の作成支援装置に表示される特殊描画要素を図示する図である。 実施の形態1の監視制御画面の作成支援装置に表示される特殊描画要素を図示する図である。 実施の形態1の監視制御画面の作成支援装置により実行される、監視制御画面を作成するための動作の流れを図示するフローチャートである。 実施の形態1の監視制御画面の作成支援装置に記憶される判定テーブルの例を図示する図である。 実施の形態2の監視制御画面の作成支援装置を図示するブロック図である。 実施の形態2の監視制御画面の作成支援装置に表示される、変化前の監視制御画面の一部を図示する図である。 実施の形態2の監視制御画面の作成支援装置に表示される、変化後の監視制御画面の一部を図示する図である。 実施の形態2の監視制御画面の作成支援装置により実行される、図9及び図10に図示されるように監視制御画面を変化させるための動作の流れを図示するフローチャートである。 実施の形態3-5の監視制御画面の作成支援装置を図示するブロック図である。 実施の形態3の監視制御画面の作成支援装置に表示される、変化前の監視制御画面の一部を図示する図である。 実施の形態3の監視制御画面の作成支援装置に表示される、変化後の監視制御画面の一部を図示する図である。 実施の形態3の監視制御画面の作成支援装置により実行される、図13及び図14に図示されるように監視制御画面を変化させるための動作の流れを図示するフローチャートである。 実施の形態4の監視制御画面の作成支援装置に表示される、変化前の監視制御画面の一部を図示する図である。 実施の形態4の監視制御画面の作成支援装置に表示される、1次変化後の監視制御画面の一部を図示する図である。 実施の形態4の監視制御画面の作成支援装置に表示される、2次変化後の監視制御画面の一部を図示する図である。 実施の形態4の監視制御画面の作成支援装置により実行される、図16、図17及び図18に図示されるように監視制御画面を変化させるための動作の流れを図示するフローチャートである。 実施の形態5の監視制御画面の作成支援装置に表示される、変化前の監視制御画面の一部を図示する図である。 実施の形態5の監視制御画面の作成支援装置に表示される、変化後の監視制御画面の一部を図示する図である。 実施の形態5の監視制御画面の作成支援装置により実行される、図20及び図21に図示されるように監視制御画面を変化させるための動作の流れを図示するフローチャートである。
 1 実施の形態1
 1.1 監視制御画面の作成支援装置のハードウェア
 図1は、実施の形態1の監視制御画面の作成支援装置のハードウェアを図示するブロック図である。
 図1に図示される実施の形態1の監視制御画面の作成支援装置1000は、パーソナルコンピューター(PC)1020を備える。PC1020は、中央演算処理装置(CPU)1040、記憶装置1042、入力装置1044及び出力装置1046を備える。記憶装置1042には、プログラムが記憶されている。PC1020が、PC1020以外のコンピュータに置き換えられてもよい。作成支援装置1000がこれらの要素以外の要素を備えてもよい。
 CPU1040は、記憶装置1042に記憶されたプログラムを実行し、記憶装置1042に記憶されたプログラムに従って演算を行う。
 記憶装置1042は、プログラムを記憶し、記憶したプログラムを実行する際に必要となる情報を記憶する。
 入力装置1044は、PC1020への情報の入力を受け付ける。入力装置1044は、キーボード、マウス等を備える。
 出力装置1046は、PC1020からの情報の出力を行う。出力装置1046は、出力される情報を表示するディスプレイ等を備える。
 1.2 監視制御画面の作成支援装置の概略
 図2は、実施の形態1の監視制御画面の作成支援装置を図示するブロック図である。
 実施の形態1の監視制御画面の作成支援装置1000は、図2に図示されるように、画面表示部1100、接続可否判定部1102及び接続線生成部1104を備え、描画要素1120及び特殊描画要素1122を表示する。画面表示部1100、接続可否判定部1102及び接続線生成部1104は、記憶装置1042に記憶されたプログラムをCPU1040が実行することにより構成される。描画要素1120及び特殊描画要素1122は、記憶装置1042に記憶されたプログラムをCPU1040が実行することにより表示される。CPU1040がプログラムを実行することにより構成される要素の全部又は一部がプログラムを実行しないハードウェアにより構成されてもよい。作成支援装置1000が、これらの要素以外の要素を備えてもよい。
 画面表示部1100は、監視制御画面を作成し、作成した監視制御画面をディスプレイに表示させる。監視制御画面には、描画要素1120及び特殊描画要素1122が描画される。
 接続可否判定部1102は、描画要素1120と特殊描画要素1122とを接続することが要求された場合に、描画要素1120と特殊描画要素1122とを接続可能であるか否かを判定する。
 接続線生成部1104は、接続可否判定部1102が描画要素1120と特殊描画要素1122とを接続可能であると判定した場合に、描画要素1120と特殊描画要素1122とを接続する接続線を生成する。
 1.3 監視制御画面
 図3は、実施の形態1の監視制御画面の作成支援装置に表示される監視制御画面を図示する図である。
 図3に図示される監視制御画面1200は、電力系統を監視し制御するために用いられる。
 監視制御画面1200には、単線結線図1220が描画される。単線結線図1220が単線結線図1220以外の単線結線図に置き換えられてもよい。単線結線図1220は、監視され制御される電力系統を表現し、表現する電力系統に備えられる複数の設備をそれぞれ表現する複数の描画要素1240を含む。複数の描画要素1240は、機器を表現する描画要素1260、母線を表現する描画要素1262、及び送電線を表現する描画要素1264を備える。複数の描画要素1240が、これらの描画要素以外の描画要素を含んでもよい。機器を表現する描画要素1260は、開閉器を表現する描画要素1280、及び変圧器を描画する描画要素1282を含む。機器を表現する描画要素1260がこれらの描画要素以外の描画要素を含んでもよい。母線を表現する描画要素1262は、高圧側の母線を表現する描画要素1300、及び低圧側の母線を表現する描画要素1302を含む。母線を表現する描画要素1262がこれらの描画要素以外の描画要素を含んでもよい。送電線を表現する描画要素1264は、接続線と呼ばれる。機器を表現する描画要素1260は、記号である。母線を表現する描画要素1262は、線である。
 図2に図示される描画要素1120は、複数の描画要素1240に含まれるひとつの描画要素である。図2に図示される特殊描画要素1122は、複数の描画要素1240に含まれるふたつ以上の描画要素を含む集合体であり、フィーダー等の特定の設備を表現する。図2に図示される特殊描画要素1122が、複数の描画要素1240に含まれるひとつの描画要素であってもよい。特殊描画要素1122がフィーダーを表現する場合は、特殊描画要素1122は、図3に図示されるように、開閉器を表現する描画要素1280、及び接続線1264を含む。
 1.4 フィーダー
 図4及び図5は、実施の形態1の監視制御画面の作成支援装置に表示される特殊描画要素を図示する図である。
 図4に図示される特殊描画要素1400により表現されるフィーダーは、引き込み用フィーダーであり、外部電源系統からの電力の引き込みを行い、高圧側の母線に電気的に接続される。図4には、高圧側の母線を表現する描画要素1300と引き込み用フィーダーを表現する特殊描画要素1400との接続関係も図示されている。
 図5に図示される特殊描画要素1402により表現されるフィーダーは、送り出し用フィーダーであり、外部電源系統への電力の送り出しを行い、低圧側の母線に電気的に接続される。図5には、低圧側の母線を表現する描画要素1302と送り出し用フィーダーを表現する特殊描画要素1402との接続関係も図示されている。
 1.5 監視制御画面を作成するための動作
 図6は、実施の形態1の監視制御画面の作成支援装置により実行される、監視制御画面を作成するための動作の流れを図示するフローチャートである。
 図6に図示されるステップS101においては、入力装置1044が、複数の描画要素1240を監視制御画面1200に配置する操作を受け付ける。また、画面表示部1100が、受け付けられた操作にしたがって、複数の描画要素1240を監視制御画面1200に配置する。画面表示部1100は、複数の描画要素1240を監視制御画面1200に配置する際に、図2に図示される描画要素1120及び特殊描画要素1122を監視制御画面1200に配置する。画面表示部1100は、記憶装置1042に記憶された、特殊描画要素1122を定義する情報にしたがって、特殊描画要素1122に含まれる少なくともひとつの描画要素を特定する。又は、画面表示部1100は、入力装置1044により受け付けられた、配置された複数の描画要素1240から特殊描画要素1122に含められる少なくともひとつの描画要素を選択する操作にしたがって、特殊描画要素1122に含まれる少なくともひとつの描画要素を特定する。
 続くステップS102においては、接続可否判定部1102が、描画要素1120と特殊描画要素1122とを接続することが要求されたことを検出する。接続可否判定部1102は、描画要素1120と特殊描画要素1122とを接続する操作を入力装置1044が受け付けた場合に、描画要素1120と特殊描画要素1122とを接続することが要求されたことを検出する。又は、接続可否判定部1102は、描画要素1120と特殊描画要素1122とを接続する接続線を生成することを接続線生成部1104が要求した場合に、描画要素1120と特殊描画要素1122とを接続することが要求されたことを検出する。
 続くステップS103においては、接続可否判定部1102が、描画要素1120と特殊描画要素1122とを接続可能であるか否かを判定する。描画要素1120と特殊描画要素1122とを接続可能であると接続可否判定部1102が判定した場合は、ステップS104が実行される。描画要素1120と特殊描画要素1122とを接続可能でないと接続可否判定部1102が判定した場合は、ステップS105が実行される。
 接続可否判定部1102は、描画要素1120により表現される設備と特殊描画要素1122により表現される少なくともひとつの設備とを電気的に接続可能である場合に、描画要素1120と特殊描画要素1122とを接続可能であると判定する。例えば、高圧側の母線と引き込み用フィーダーとは電気的に接続可能であるため、接続可否判定部1102は、描画要素1120が高圧側の母線を表現する描画要素1300であり、特殊描画要素1122が引き込み用フィーダーを表現する特殊描画要素1400である場合に、描画要素1120と特殊描画要素1122とを接続可能であると判定する。また、低圧側の母線と送り出し用フィーダーとは電気的に接続可能であるため、接続可否判定部1102は、描画要素1120が低圧側の母線を表現する描画要素1302であり、特殊描画要素1122が送り出し用フィーダーを表現する特殊描画要素1402である場合に、描画要素1120と特殊描画要素1122とを接続可能であると判定する。
 図7は、実施の形態1の監視制御画面の作成支援装置に記憶された判定テーブルの例を図示する図である。
 図7に図示される判定テーブル1500は、記憶装置1042に記憶される。判定テーブル1500の各行の第2列目及び第1列目には、それぞれ描画要素の型情報1520、及び特殊描画要素の型情報1522が記述される。各行の第2列目に記述された描画要素の型情報1520は、各行の第1列目に記述された特殊描画要素の型情報1522に対応づけられる。各行に記述された描画要素の型情報1520及び特殊描画要素の型情報1522は、描画要素1120及び特殊描画要素1122がそれぞれ記述された描画要素の型情報1520及び特殊描画要素の型情報1522を有する場合に描画要素1120と特殊描画要素1122とを接続可能であることを示す。描画要素の型情報1520は、「高圧側の母線」「低圧側の母線」等の、描画要素1120により表現される設備の種類を示す文字列情報である。特殊描画要素の型情報1522は、「引き込み用フィーダー」「送り出しフィーダー」等の、特殊描画要素1122により表現される設備の種類を示す文字列情報である。
 描画要素1120と特殊描画要素1122とを接続可能であるか否かを判定する際に判定テーブル1500が参照される場合は、監視制御画面1200に配置される各描画要素1120の型情報が各描画要素1120に関連づけられた状態で記憶装置1042に記憶される。また、監視制御画面1200に配置される各特殊描画要素1122の型情報が各特殊描画要素1122に関連づけられた状態で記憶装置1042に記憶される。
 接続可否判定部1102は、描画要素1120と特殊描画要素1122とを接続することが要求された場合に、描画要素1120に関連づけられた描画要素1120の型情報、及び特殊描画要素1122に関連づけられた特殊描画要素1122の型情報を記憶装置1042から読み出す。
 また、接続可否判定部1102は、判定テーブル1500を参照し、判定テーブル1500の第1列目に記述された特殊描画要素の型情報1522に対して検索を行い、判定テーブル1500の第1列目に記述された特殊描画要素の型情報1522の中から、読み出した特殊描画要素1122の型情報と一致する特殊描画要素の型情報1522を特定する。
 また、接続可否判定部1102は、特定した特殊描画要素の型情報1522が記述された行と同じ行に記述された描画要素の型情報1520と読み出した描画要素1120の型情報とが一致するか否かを判定する。接続可否判定部1102は、記述された描画要素の型情報1520と読み出した描画要素1120の型情報とが一致する場合は、描画要素1120と特殊描画要素1122とを接続可能であると判定する。一方、接続可否判定部1102は、記述された描画要素の型情報1520と読み出した描画要素1120の型情報とが一致しない場合は、描画要素1120と特殊描画要素1122とを接続可能でないと判定する。
 図7に図示される判定テーブル1500においては、描画要素の型情報1520が、母線の種類を示す文字情報となっており、特殊描画要素の型情報1522が、フィーダーの種類を示す文字列情報となっている。母線の種類を示す文字情報が、母線への接続可否のみを示す情報に置き換えられてもよい。
 図6に図示されるステップS104においては、接続線生成部1104が、描画要素1120と特殊描画要素1122とを接続する接続線1264を生成する。また、接続線生成部1104が、生成した接続線1264を複数の描画要素1240に追加する。追加された接続線1264は、監視制御画面1200に描画され、描画要素1120と特殊描画要素1122との間に配置される。
 ステップS105においては、接続線生成部1104が、描画要素1120と特殊描画要素1122とを接続することが要求されたことを無視し、描画要素1120と特殊描画要素1122とを接続する接続線1264を生成しない。また、接続線生成部1104が、接続先エラーを示すダイアログをディスプレイに表示させる。
 1.6 実施の形態1の利点
 実施の形態1の監視制御画面の作成支援装置1000においては、監視制御画面1200が作成される際に、不適切な接続線が作成されることを抑制することができ、不適切な接続線が作成されたことに起因する手戻りが発生することを抑制することができる。このため、監視制御画面1200を効率的に作成することができる。
 また、実施の形態1の監視制御画面の作成支援装置1000においては、接続線生成部1104に接続線1264を自動的に生成させることにより、接続線1264の作成をより容易にすることができる。
 2 実施の形態2
 2.1 実施の形態1との相違
 図1は、実施の形態2の監視制御画面の作成支援装置のハードウェアを図示するブロック図でもある。
 図8は、実施の形態2の監視制御画面の作成支援装置を図示するブロック図である。
 図1及び図8に図示される実施の形態2の監視制御画面の作成支援装置2000は、複製生成部2020をさらに備える点で、実施の形態1の監視制御画面の作成支援装置1000と相違する。複製生成部2020は、CPU1040がプログラムを実行することにより構成される。
 以下では、上記の相違に関連して実施の形態2の監視制御画面の作成支援装置2000において採用された構成が説明される。説明されない構成については、実施の形態1の監視制御画面の作成支援装置1000において採用された構成が、実施の形態2の監視制御画面の作成支援装置2000においても採用される。
 複製生成部2020は、複数の描画要素1240に含まれる既存の特殊描画要素の複製を作成する。また、複製生成部2020は、生成した既存の特殊描画要素の複製を、描画される複数の描画要素1240に追加する。
 接続線生成部1104は、複数の描画要素1240に含まれる既存の描画要素と生成された既存の特殊描画要素の複製とを接続する新たな接続線を生成する。既存の特殊描画要素の複製と接続される既存の描画要素は、複製が作成された既存の特殊描画要素と接続されていた既存の描画要素である。また、接続線生成部1104は、生成した新たな接続線を、描画される複数の描画要素1240に追加する。
 2.2 監視制御画面の変化
 図9は、実施の形態2の監視制御画面の作成支援装置に表示される、変化前の監視制御画面の一部を図示する図である。図10は、実施の形態2の監視制御画面の作成支援装置に表示される、変化後の監視制御画面の一部の例を図示する。
 図9に図示される、変化前の監視制御画面の一部2040には、複数の描画要素1240に含まれる既存の描画要素2060、既存の特殊描画要素2062及び既存の接続線2064が描画されている。既存の描画要素2060と既存の特殊描画要素2062とは、既存の接続線2064により接続されている。既存の描画要素2060は、母線を表現する。既存の特殊描画要素2062は、フィーダーを表現する。
 図10に図示される、変化後の監視制御画面の一部2080には、既存の描画要素2060、既存の特殊描画要素2062及び既存の接続線2064が描画されており、既存の特殊描画要素2062の複製2100及び新たな接続線2102がさらに描画されている。既存の描画要素2060と既存の特殊描画要素2062の複製2100とは、新たな接続線2102により接続されている。既存の特殊描画要素2062の複製2100は、フィーダーを表現する。
 2.3 監視制御画面を変化させるための動作
 図11は、実施の形態2の監視制御画面の作成支援装置により実行される、図9及び図10に図示されるように監視制御画面を変化させるための動作の流れを図示するフローチャートである。
 図11に図示されるステップS201においては、入力装置1044が、監視制御画面1200に配置された既存の特殊描画要素から、図9に図示される、複製2100が作成される既存の特殊描画要素2062を選択する操作を受け付ける。また、複製生成部2020が、図10に図示されるように、選択された既存の特殊描画要素2062の複製2100を作成する。また、複製生成部2020が、作成した既存の特殊描画要素2062の複製2100を複数の描画要素1240に追加する。追加された既存の特殊描画要素2062の複製2100は、監視制御画面1200に描画される。
 続くステップS202においては、複製生成部2020が、既存の特殊描画要素2062の複製2100を作成したタイミングに、複製2100が作成された既存の特殊描画要素2062が既存の接続線2064により既存の描画要素2060と接続されているか否かを判定する。既存の特殊描画要素2062が既存の接続線2064により既存の描画要素2060と接続されていると複製生成部2020が判定した場合は、ステップS203が実行される。既存の特殊描画要素2062が既存の接続線2064により既存の描画要素2060と接続されていないと複製生成部2020が判定した場合は、監視制御画面1200を変化させるための動作が終了する。
 ステップS203においては、複製生成部2020が、複製2100が作成された既存の特殊描画要素2062と接続された既存の描画要素2060が母線を表現するか否かを判定する。既存の描画要素2060が母線を表現すると複製生成部2020が判定した場合は、ステップS204が実行される。描画要素2060が母線を表現しないと複製生成部2020が判定した場合は、監視制御画面1200を変化させるための動作が終了する。
 ステップS204においては、接続線生成部1104が、既存の描画要素2060と既存の特殊描画要素2062の複製2100とを接続する新たな接続線2102を生成する。また、接続線生成部1104が、生成した新たな接続線2102を複数の描画要素1240に追加する。追加された新たな接続線2102は、監視制御画面1200に描画され、既存の描画要素2060と既存の特殊描画要素2062の複製2100との間に配置される。新たな接続線2102の位置は、既存の特殊描画要素2062の複製2100の位置により決まる。新たな接続線2102が延びる方向DVは、既存の描画要素2060が延びる方向DHと垂直をなす。
 ステップS203の後であってステップS204の前に、接続可否判定部1102が、既存の描画要素2060と既存の特殊描画要素2062の複製2100とを接続可能であるか否かを判定してもよい。既存の描画要素2060と既存の特殊描画要素2062の複製2100とを接続可能であるか否かが判定される際に、判定テーブル1500が参照されてもよい。既存の描画要素2060と既存の特殊描画要素2062の複製2100とを接続可能であるか否かを判定することが省略されてもよい。なぜならば、既存の描画要素2060と既存の特殊描画要素2062とを既存の接続線2064により接続する際に既存の描画要素2060と既存の特殊描画要素2062とを接続可能であるか否かが既に判定されているためである。
 2.4 実施の形態2の利点
 実施の形態2の監視制御画面の作成支援装置2000においても、実施の形態1の監視制御画面の作成支援装置1000と同様に、監視制御画面1200が作成される際に、不適切な接続線が作成されることを抑制することができ、不適切な接続線が作成されたことに起因する手戻りが発生することを抑制することができる。このため、監視制御画面1200を効率的に作成することができる。
 加えて、実施の形態2の監視制御画面の作成支援装置2000においては、既存の描画要素2060と既存の特殊描画要素2062の複製2100とを接続する新たな接続線2102が自動的に生成される。このため、新たな接続線2102を手作業で作成する必要がなく、監視制御画面1200をさらに効率的に作成することができる。この効果は、図3に図示される監視制御画面1200のような、母線を表現する描写要素と接続される同種の多数の特殊描写要素を備える単線結線図が描画された監視制御画面を作成する場合に特に顕著になる。
 3 実施の形態3
 3.1 実施の形態1との相違
 図1は、実施の形態3の監視制御画面の作成支援装置のハードウェアを図示するブロック図でもある。
 図12は、実施の形態3の監視制御画面の作成支援装置を図示するブロック図である。
 図1及び図12に図示される実施の形態3の監視制御画面の作成支援装置3000は、母線生成部3020をさらに備える点で、実施の形態1の監視制御画面の作成支援装置1000と相違する。母線生成部3020は、CPU1040がプログラムを実行することにより構成される。
 以下では、上記の相違に関連して実施の形態3の監視制御画面の作成支援装置3000において採用された構成が説明される。説明されない構成については、実施の形態1の監視制御画面の作成支援装置1000において採用された構成が、実施の形態3の監視制御画面の作成支援装置3000においても採用される。
 母線生成部3020は、複数の描画要素1240に含まれる複数の既存の特殊描画要素と接続可能である新たな描画要素を生成する。また、母線生成部3020は、生成した新たな描画要素を、表示される複数の描画要素1240に追加する。生成される新たな描画要素は、母線を表現する。
 接続線生成部1104は、生成された新たな描画要素と複数の既存の特殊描画要素とをそれぞれ接続する複数の新たな接続線を生成する。また、接続線生成部1104は、生成した複数の新たな接続線を、表示される複数の描画要素1240に追加する。
 3.2 監視制御画面の変化
 図13は、実施の形態3の監視制御画面の作成支援装置に表示される、変化前の監視制御画面の一部を図示する。図14は、実施の形態3の監視制御画面の作成支援装置に表示される、変化後の監視制御画面の一部を図示する。
 図13に図示される、変化前の監視制御画面の一部3040には、複数の描画要素1240に含まれる複数の既存の特殊描画要素3060が描画されている。複数の既存の特殊描画要素3060は、同種の複数のフィーダーをそれぞれ表現する同種の複数の特殊描画要素である。
 図14に図示される、変化後の監視制御画面の一部3080には、複数の既存の特殊描画要素3060が描画されており、新たな描画要素3100、及び複数の新たな接続線3102がさらに描画されている。新たな描画要素3100と複数の既存の特殊描画要素3060とは、それぞれ複数の新たな接続線3102により接続されている。新たな描画要素3100は、母線を表現する。
 3.3 監視制御画面を変化させるための動作
 図15は、実施の形態3の監視制御画面の作成支援装置により実行される、図13及び図14に図示されるように監視制御画面を変化させるための動作の流れを図示するフローチャートである。
 図15に図示されるステップS301においては、入力装置1044が、複数の特殊描画要素を監視制御画面1200に並列に配置する操作を受け付ける。また、画面表示部1100が、受け付けられた操作にしたがって、複数の特殊描画要素を監視制御画面1200に並列に配置する。配置される複数の特殊描画要素は、新規に作成されてもよいし、既に配置されている特殊描画要素を複製することにより作成されてもよい。
 続くステップS302においては、入力装置1044が、配置された複数の既存の特殊描画要素から、図13に図示される、接続対象となる複数の既存の特殊描画要素3060を選択する操作を受け付ける。選択される複数の既存の特殊描画要素3060は、同種の複数のフィーダーをそれぞれ表現する同種の複数の特殊描画要素である。複数の既存の特殊描画要素3060に代えて、ひとつの既存の特殊描画要素3060が選択されてもよい。選択された複数の既存の特殊描画要素3060は、母線を表現する既存の描画要素と接続されておらず、後に生成される母線を表現する新たな描画要素3100と接続される接続対象となる。
 続くステップS303においては、母線生成部3020が、選択された複数の既存の特殊描画要素3060と接続可能である新たな描画要素3100を生成する。また、母線生成部3020が、生成した新たな描画要素3100を複数の描画要素1240に追加する。追加された新たな描画要素3100は、監視制御画面1200に描画される。
 母線生成部3020は、新たな描画要素3100を生成する際に、接続可否判定部1102を経由して、判定テーブル1500を参照し、選択された複数の既存の特殊描画要素3060と接続可能である描画要素の型情報1520を特定する。また、母線生成部3020は、特定した描画要素の型情報1520を有する新たな描画要素3100を生成する。
 続くステップS304においては、接続線生成部1104が、生成された新たな描画要素3100と選択された複数の既存の特殊描画要素3060とをそれぞれ接続する複数の新たな接続線3102を生成する。複数の既存の特殊描画要素3060に代えてひとつの既存の特殊描画要素3060が選択される場合は、複数の新たな接続線3102に代えてひとつの新たな接続線3102が生成される。また、接続線生成部1104が、生成した複数の新たな接続線3102を複数の描画要素1240に追加する。追加された複数の新たな接続線3102は、監視制御画面1200に描画され、それぞれ新たな描画要素3100と複数の既存の特殊描画要素3060との間に配置される。
 3.4 実施の形態3の利点
 実施の形態3の監視制御画面の作成支援装置3000においても、実施の形態1の監視制御画面の作成支援装置1000と同様に、監視制御画面1200が作成される際に、不適切な接続線が作成されることを抑制することができ、不適切な接続線が作成されたことに起因する手戻りが発生することを抑制することができる。このため、監視制御画面1200を効率的に作成することができる。
 加えて、実施の形態3の監視制御画面の作成支援装置3000においては、複数の既存の特殊描画要素3060と接続可能である新たな描画要素3100が自動的に生成され、新たな描画要素3100と複数の既存の特殊描画要素3060とをそれぞれ接続する複数の新たな接続線3102が自動的に生成される。このため、新たな描画要素3100、及び複数の新たな接続線3102を手作業で作成する必要がなく、監視制御画面1200をさらに効率的に作成することができる。
 4 実施の形態4
 4.1 実施の形態3との相違
 図1は、実施の形態4の監視制御画面の作成支援装置のハードウェアを図示するブロック図でもある。
 図12は、実施の形態4の監視制御画面の作成支援装置を図示するブロック図でもある。
 図1及び図12に図示される実施の形態4の監視制御画面の作成支援装置4000は、母線生成部3020が、選択された複数の既存の特殊描画要素3060を整列させる点で、実施の形態3の監視制御画面の作成支援装置3000と相違する。
 以下では、上記の相違に関連して実施の形態4の監視制御画面の作成支援装置4000において採用された構成が説明される。説明されない構成については、実施の形態3の監視制御画面の作成支援装置3000において採用された構成が、実施の形態4の監視制御画面の作成支援装置4000においても採用される。
 4.2 監視制御画面の変化
 図16は、実施の形態4の監視制御画面の作成支援装置に表示される、変化前の監視制御画面の一部を図示する図である。図17は、実施の形態4の監視制御画面の作成支援装置に表示される、1次変化後の監視制御画面の一部を図示する図である。図18は、実施の形態4の監視制御画面の作成支援装置に表示される、2次変化後の監視制御画面の一部を図示する図である。
 図16に図示される、変化前の監視制御画面の一部4020には、複数の描画要素1240に含まれる複数の既存の特殊描画要素3060が描画されている。変化前の監視制御画面の一部4020においては、複数の既存の特殊描画要素3060は、整列させられていない。
 図17に図示される、1次変化後の監視制御画面の一部4060には、複数の既存の特殊描画要素3060が描画されている。1次変化後の監視制御画面の一部4060においては、複数の既存の特殊描画要素3060は、整列させられている。
 図18に図示される、2次変化後の監視制御画面の一部4080には、複数の既存の特殊描画要素3060が描画されており、新たな描画要素3100及び複数の新たな接続線3102がさらに描画されている。2次変化後の監視制御画面の一部4080においては、複数の既存の特殊描画要素3060は、整列させられている。新たな描画要素3100は、母線を表現する。新たな描画要素3100と複数の既存の特殊描画要素3060とは、それぞれ複数の新たな接続線3102により接続されている。
 4.3 監視制御画面を変化させるための動作
 図19は、実施の形態4の監視制御画面の作成支援装置により実行される、図16、図17及び図18に図示されるように監視制御画面を変化させるための動作の流れを図示するフローチャートである。
 図19に図示されるステップS401から及びS404までにおいては、それぞれ図15に図示されるステップS301からS304までにおいて行われた処理と同様の処理が行われる。ステップS402においては、複数の既存の特殊描画要素3060が選択される。
 ステップS402の後であってステップS403の前に実行されるステップS405においては、母線生成部3020が、選択された複数の既存の特殊描画要素3060を整列させる。これにより、複数の既存の特殊描画要素3060は、後に生成される新たな描画要素3100が伸びる方向DHについて、図16に図示される不均一に配列された状態から、図17に図示される均一に配列された状態となる。また、複数の既存の特殊描画要素3060は、方向DHと垂直をなす方向DVについて、図16に図示される互いに異なる位置に配置された状態から、図17に図示される同じ位置に配列された状態となる。
 4.4 実施の形態4の利点
 実施の形態4の監視制御画面の作成支援装置4000においても、実施の形態1の監視制御画面の作成支援装置1000と同様に、監視制御画面1200が作成される際に、不適切な接続線が作成されることを抑制することができ、不適切な接続線が作成されたことに起因する手戻りが発生することを抑制することができる。このため、監視制御画面1200を効率的に作成することができる。
 加えて、実施の形態4の監視制御画面の作成支援装置4000においては、新たな描画要素3100と接続される複数の既存の特殊描画要素3060が自動的に整列させられる。このため、複数の既存の特殊描画要素3060を手作業で整列させる必要がなく、監視制御画面1200をさらに効率的に作成することができる。監視制御画面1200の作成においては、母線に接続される多数のフィーダーをそれぞれ表現する多数の特殊描画要素を並列に配置しなければならないことが多いので、複数の既存の特殊描画要素3060を手作業で整列させる必要がないことは、監視制御画面1200を効率的に作成することに寄与する。
 5 実施の形態5
 5.1 実施の形態3との相違
 図1は、実施の形態5の監視制御画面の作成支援装置のハードウェアを図示するブロック図でもある。
 図12は、実施の形態5の監視制御画面の作成支援装置を図示するブロック図でもある。
 図1及び図12に図示される実施の形態5の監視制御画面の作成支援装置5000は、母線生成部3020が、母線を表現する描画要素と接続される特殊描画要素を、母線を表現する描画要素が伸びる方向について母線を表現する描画要素が存在する範囲外に移動することが要求された場合に、母線を表現する描画要素を延長する点で、実施の形態3の監視制御画面の作成支援装置3000と相違する。
 以下では、上記の相違に関連して実施の形態5の監視制御画面の作成支援装置5000において採用された構成が説明される。説明されない構成については、実施の形態3の監視制御画面の作成支援装置3000において採用された構成が、実施の形態5の監視制御画面の作成支援装置5000においても採用される。
 5.2 監視制御画面の変化
 図20は、実施の形態5の監視制御画面の作成支援装置に表示される、変化前の監視制御画面の一部を図示する図である。図21は、実施の形態5の監視制御画面の作成支援装置に表示される、変化後の監視制御画面の一部を図示する図である。
 図20に図示される、変化前の監視制御画面の一部5020には、既存の描画要素5040、既存の特殊描画要素5042、及び既存の接続線5044が描画されている。既存の描画要素5040は、母線を表現する。既存の特殊描画要素5042は、フィーダーを表現する。既存の接続線5044は、既存の描画要素5040と既存の特殊描画要素5042とを接続する。既存の特殊描画要素5042は、既存の描画要素5040が伸びる方向DHについて既存の描画要素5040が存在する範囲内に配置されている。
 図21に図示される、変化後の監視制御画面の一部5060には、延長後の描画要素5080、移動後の特殊描画要素5082、及び接続線5084が描画されている。延長後の描画要素5080は、母線を表現する。移動後の特殊描画要素5082は、フィーダーを表現する。接続線5084は、延長後の描画要素5080と移動後の特殊描画要素5082とを接続する。移動後の特殊描画要素5082は、延長後の描画要素5080が伸びる方向DHについて延長後の描画要素5080が存在する範囲内に配置されている。
 5.3 監視制御画面を変化させるための動作
 図22は、実施の形態5の監視制御画面の作成支援装置により実行される、図20及び図21に図示されるように監視制御画面を変化させるための動作の流れを図示するフローチャートである。
 図22に図示されるステップS501においては、入力装置1044が、既存の描画要素5040が伸びる方向DHについて既存の描画要素5040が存在する範囲外に既存の特殊描画要素5042を移動させる操作を受け付ける。また、画面表示部1100が、受け付けられた操作にしたがって、図20に図示されるように、既存の描画要素5040が伸びる方向について既存の描画要素5040が存在する範囲外に既存の特殊描画要素5042を移動させる。移動後の特殊描画要素5082は、既存の描画要素5040が存在する範囲より右側に配置される。移動後の特殊描画要素5082が、既存の描画要素5040が存在する範囲より左側に配置されてもよい。
 画面表示部1100は、既存の特殊描画要素5042を移動する際に、描画される特殊描画要素の座標情報を、既存の特殊描画要素5042の座標情報から移動後の特殊描画要素5082の座標情報へ更新する。
 続くステップS502においては、母線生成部3020が、既存の描画要素5040と既存の特殊描画要素5042とが接続されているか否かを判定する。既存の描画要素5040と既存の特殊描画要素5042とが接続されていると母線生成部3020が判定した場合は、ステップS503が実行される。既存の描画要素5040と既存の特殊描画要素5042とが接続されていないと母線生成部3020が判定した場合は、監視制御画面1200を変化させるための動作が終了する。
 ステップS503においては、母線生成部3020が、既存の描画要素5040を延長する。移動後の特殊描画要素5082は、延長後の描画要素5080が伸びる方向DHについて延長後の描画要素5080が存在する範囲内に配置される。移動後の特殊描画要素5082が当該範囲外に配置されてもよい。
 母線生成部3020は、既存の描画要素5040を延長する際に、更新された特殊描画要素の座標情報を取得し、取得した特殊描画要素の座標情報に基づいて描画される描画要素の長さを既存の描画要素5040の長さから延長後の描画要素5080の長さへ更新する。したがって、描画要素の長さの変化は、移動後の特殊描画要素5082の位置に応じて変化する。
 続くステップS504においては、接続線生成部1104が、延長後の描画要素5080と移動後の特殊描画要素5082とを再接続する接続線5084を生成する。接続線5084が生成される際には、既存の接続線5044が削除され、新たな接続線5084が生成される。又は、描画される接続線の座標情報が既存の接続線5044の座標情報から接続線5084の座標情報へ更新される。また、接続線生成部1104は、生成した接続線5084を複数の描画要素1240に追加する。追加された接続線5084は、監視制御画面1200に描画され、延長後の描画要素5080と移動後の特殊描画要素5082との間に配置される。
 5.4 実施の形態5の利点
 実施の形態5の監視制御画面の作成支援装置5000においても、実施の形態1の監視制御画面の作成支援装置1000と同様に、監視制御画面1200が作成される際に、不適切な接続線が作成されることを抑制することができ、不適切な接続線が作成されたことに起因する手戻りが発生することを抑制することができる。このため、監視制御画面1200を効率的に作成することができる。
 加えて、実施の形態5の監視制御画面の作成支援装置5000においては、既存の特殊描画要素5042を移動した後に既存の描画要素5040が自動的に延長される。このため、既存の描画要素5042の長さを手作業で調整する必要がなくなり、監視制御画面1200をさらに効率的に作成することができる。
 なお、本発明は、その発明の範囲内において、実施の形態を適宜、変形、省略することが可能である。
 この発明は詳細に説明されたが、上記した説明は、すべての局面において、例示であって、この発明がそれに限定されるものではない。例示されていない無数の変形例が、この発明の範囲から外れることなく想定され得るものと解される。
 1000,2000,3000,4000,5000 監視制御画面の作成支援装置、1100 画面表示部、1102 接続可否判定部、1104 接続線生成部、1120 描画要素、1122 特殊描画要素、1200 監視制御画面、1220 単線結線図、1240 複数の描画要素、2020 複製生成部、3020 母線生成部。

Claims (7)

  1.  電力系統に備えられる複数の設備をそれぞれ表現する複数の描画要素(1240)を備える単線結線図(1220)が描画された監視制御画面(1200)をディスプレイに表示させる画面表示部(1100)と、
     前記複数の描画要素(1240)に含まれる描画要素(1120)と前記複数の描画要素(1240)に含まれる少なくともひとつの描画要素を含む特殊描画要素(1122)とを接続することが要求された場合に、前記描画要素(1120)と前記特殊描画要素(1122)とを接続可能であるか否かを判定する接続可否判定部(1102)と、
     前記接続可否判定部(1102)が前記描画要素(1120)と前記特殊描画要素(1122)とを接続可能であると判定した場合に、前記描画要素(1120)と前記特殊描画要素(1122)とを接続する接続線(1264)を生成し、前記接続線(1264)を前記複数の描画要素(1240)に追加する接続線生成部(1104)と、
    を備える監視制御画面の作成支援装置(1000,2000,3000,4000,5000)。
  2.  前記接続可否判定部(1102)は、前記描画要素(1120)により表現される設備と前記特殊描画要素(1122)により表現される少なくともひとつの設備とを電気的に接続可能である場合に、前記描画要素(1120)と前記特殊描画要素(1122)とを接続可能であると判定する
    請求項1の監視制御画面の作成支援装置(1000,2000,3000,4000,5000)。
  3.  前記複数の描画要素(1240)に既存の描画要素(2060)、及び前記既存の描画要素(2060)に接続された既存の特殊描画要素(2062)が含まれる場合に、前記既存の特殊描画要素(2062)の複製(2100)を作成し、前記既存の特殊描画要素(2062)の複製(2100)を前記複数の描画要素(1240)に追加する複製生成部(2020)
    をさらに備え、
     前記接続線生成部(1104)は、前記既存の描画要素(2060)と前記既存の特殊描画要素(2062)の複製(2100)とを接続する新たな接続線(2102)を生成し、前記新たな接続線(2102)を前記複数の描画要素(1240)に追加する
    請求項1又は2の監視制御画面の作成支援装置(2000)。
  4.  前記複数の描画要素(1240)に含まれる少なくともひとつの既存の特殊描画要素(3060)と接続可能であり母線を表現する新たな描画要素(3100)を生成し、前記新たな描画要素(3100)を前記複数の描画要素(1240)に追加する母線生成部(3020)
    をさらに備える請求項1から3までのいずれかの監視制御画面の作成支援装置(3000,4000,5000)。
  5.  前記接続線生成部(1104)は、前記新たな描画要素(3100)と前記少なくともひとつの既存の特殊描画要素(3060)とをそれぞれ接続する少なくともひとつの新たな接続線(3102)を生成し、前記少なくともひとつの新たな接続線(3102)を前記複数の描画要素(1240)に追加する
    請求項4の監視制御画面の作成支援装置(3000,4000,5000)。
  6.  前記少なくともひとつの既存の特殊描画要素(3060)は、複数の既存の特殊描画要素(3060)であり、
     前記母線生成部(3020)は、前記複数の既存の特殊描画要素(3060)を整列させる
    請求項4又は5の監視制御画面の作成支援装置(4000)。
  7.  前記複数の描画要素(1240)に母線を表現する描画要素(5040)、及び前記母線を表現する描画要素(5040)と接続された既存の特殊描画要素(5042)が含まれ、前記既存の特殊描画要素(5042)を、前記母線を表現する描画要素(5040)が伸びる方向(DH)について前記母線を表現する描画要素(5040)が存在する範囲外に移動することが要求された場合に、前記母線を表現する描画要素(5040)を延長する母線生成部(3020)
    をさらに備える請求項1から6までのいずれかの監視制御画面の作成支援装置(5000)。
PCT/JP2018/026686 2018-07-17 2018-07-17 監視制御画面の作成支援装置 WO2020016920A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2018555294A JPWO2020016920A1 (ja) 2018-07-17 2018-07-17 監視制御画面の作成支援装置
PCT/JP2018/026686 WO2020016920A1 (ja) 2018-07-17 2018-07-17 監視制御画面の作成支援装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2018/026686 WO2020016920A1 (ja) 2018-07-17 2018-07-17 監視制御画面の作成支援装置

Publications (1)

Publication Number Publication Date
WO2020016920A1 true WO2020016920A1 (ja) 2020-01-23

Family

ID=69164856

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/026686 WO2020016920A1 (ja) 2018-07-17 2018-07-17 監視制御画面の作成支援装置

Country Status (2)

Country Link
JP (1) JPWO2020016920A1 (ja)
WO (1) WO2020016920A1 (ja)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05189509A (ja) * 1992-01-13 1993-07-30 Toshiba Corp 配電系統図面作成装置
JPH0879989A (ja) * 1994-09-07 1996-03-22 Toshiba Eng Co Ltd データベース生成装置及びその方法
WO2013093998A1 (ja) * 2011-12-19 2013-06-27 富士通株式会社 設計支援装置、設計支援方法および設計支援プログラム
JP2018098972A (ja) * 2016-12-15 2018-06-21 株式会社東芝 表示装置、表示方法およびプログラム

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5286129A (en) * 1976-01-14 1977-07-18 Hitachi Ltd Process for automatic decision of bus switching procedure
WO2015140973A1 (ja) * 2014-03-20 2015-09-24 株式会社日立製作所 計算機の制御方法、管理装置、及び計算機システム

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05189509A (ja) * 1992-01-13 1993-07-30 Toshiba Corp 配電系統図面作成装置
JPH0879989A (ja) * 1994-09-07 1996-03-22 Toshiba Eng Co Ltd データベース生成装置及びその方法
WO2013093998A1 (ja) * 2011-12-19 2013-06-27 富士通株式会社 設計支援装置、設計支援方法および設計支援プログラム
JP2018098972A (ja) * 2016-12-15 2018-06-21 株式会社東芝 表示装置、表示方法およびプログラム

Also Published As

Publication number Publication date
JPWO2020016920A1 (ja) 2020-07-27

Similar Documents

Publication Publication Date Title
JP6606304B2 (ja) プレビューにおけるネイティブ・ドキュメントのコメントの修正
WO2016060266A1 (ja) 制御プログラム保守装置、制御プログラム保守方法およびプログラム
US10613520B2 (en) Data setting system for robot, data setting method and program
WO2015132971A1 (ja) プログラミング装置
JP6441786B2 (ja) テスト支援装置、テスト支援方法、及びプログラム
JP6346450B2 (ja) エンジニアリング装置および制御ロジック検証方法
JP6954256B2 (ja) エンジニアリング装置、エンジニアリング装置の制御方法及びプログラム
WO2020016920A1 (ja) 監視制御画面の作成支援装置
JP2008310688A (ja) プラント監視制御装置の画面表示方法
JP2022066906A5 (ja)
JP2009181292A (ja) Mc/dcパターン生成装置
CN105320030B (zh) 工程装置、工程系统以及下载处理方法
JP2015215639A (ja) 障害管理システム、障害管理装置、機器、障害管理方法、及びプログラム
WO2020213129A1 (ja) デバッグ支援装置、デバッグ支援方法、デバッグ支援プログラム
JP2011041416A (ja) 電力系統の設備データ管理方法
JP6878992B2 (ja) 部品位置検出プログラム、部品位置検出方法および情報処理装置
CN117391002B (zh) 一种ip核扩展描述方法及ip核生成方法
US20180032461A1 (en) Control circuit board, micro-server, control system and control method thereof
EP4394608A1 (en) Application program monitoring method and apparatus, and readable storage medium
JP2023130052A (ja) 情報処理装置、情報処理方法及びプログラム
JP2011024289A (ja) 電力系統監視制御装置
WO2023195050A1 (ja) 作画支援プログラム、作画支援装置及び作画支援方法
JP2007183804A (ja) コンソール、操作管理装置、同時操作管理システムおよび複数装置の同時操作方法およびプログラム
WO2014181422A1 (ja) プログラマブル表示器用画面データ編集装置
JP5243302B2 (ja) ファンクションブロック図作成装置、作成方法及び作成プログラム

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2018555294

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18926973

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18926973

Country of ref document: EP

Kind code of ref document: A1