WO2019151139A1 - 作業者モニタリングシステム、それに用いる作業者端末、及び、ビーコンの配置方法 - Google Patents

作業者モニタリングシステム、それに用いる作業者端末、及び、ビーコンの配置方法 Download PDF

Info

Publication number
WO2019151139A1
WO2019151139A1 PCT/JP2019/002503 JP2019002503W WO2019151139A1 WO 2019151139 A1 WO2019151139 A1 WO 2019151139A1 JP 2019002503 W JP2019002503 W JP 2019002503W WO 2019151139 A1 WO2019151139 A1 WO 2019151139A1
Authority
WO
WIPO (PCT)
Prior art keywords
worker
beacon
area
monitoring system
work
Prior art date
Application number
PCT/JP2019/002503
Other languages
English (en)
French (fr)
Inventor
靖久 市原
久保 健一
康史 吉村
聡 谷川
Original Assignee
株式会社日立製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社日立製作所 filed Critical 株式会社日立製作所
Publication of WO2019151139A1 publication Critical patent/WO2019151139A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Definitions

  • the present invention relates to a worker monitoring system for grasping in which area a worker is located.
  • Patent Document 1 JP-A-2007-334582 (Patent Document 1) as a conventional system for grasping the position of a person.
  • infrared beacons are installed at various locations in a house, the infrared beacons transmit position information specific to the installation location, and the resident always carries a ubiquitous communicator and is transmitted from the infrared beacons.
  • the position of the ubiquitous communicator itself is recognized by the position information.
  • a unique terminal ID is assigned to the ubiquitous communicator, and both the location information and the terminal ID are transmitted from the ubiquitous communicator, and the management server transmits the ubiquitous communicator in the house based on the location information and the terminal ID.
  • An in-house monitoring system that recognizes a position and displays the position on a display unit of a monitor is disclosed.
  • Patent Document 1 Since Patent Document 1 is intended only for detecting the position of a person in a house, the beacon is not particularly devised, for example, placed in each room.
  • the place where the worker's location and movement are known. It is necessary to place a beacon.
  • the construction site changes from the start of construction to its progress, and the work place changes. Therefore, a beacon arrangement plan is necessary, and beacon movement may be necessary.
  • an object of the present invention is to provide a worker monitoring system capable of implementing a beacon placement plan by a simple method, a worker terminal used therefor, and a beacon placement method.
  • the present invention is, for example, a beacon installed in a predetermined area of a construction site and transmitting position information of each area, and carried by an operator to receive the position information.
  • a worker monitoring system comprising: a worker terminal that transmits position information and a worker ID unique to the terminal; and a base station that receives the position information and the worker ID and recognizes the worker's location area. Based on the progress data, associate the work of the construction process with the related workers and the work place, identify the work area required for the work according to the construction progress, and install the beacon of the work area identified by the environment of the identified work area Configure to select position.
  • a worker monitoring system that can implement a beacon placement plan by a simple method, a worker terminal used for the worker monitoring system, and a beacon placement method.
  • FIG. 1 is a configuration block diagram of an operator terminal in Embodiment 1.
  • FIG. It is a functional block diagram of an operator terminal in Example 1.
  • 1 is a configuration block diagram of a base station in Embodiment 1.
  • FIG. 2 is a functional block diagram of a base station in Embodiment 1.
  • FIG. It is the schematic which shows a worker's location detection by the beacon in the construction site in Example 1.
  • FIG. It is a figure which shows the process at the time of finishing apparatus carrying-in by the construction simulation in Example 1.
  • FIG. It is a figure which shows the processing flow until the time of finishing apparatus carrying-in by the construction simulation in Example 1.
  • FIG. 1 It is a figure which shows the CAD screen at the time of finishing apparatus carrying-in by the construction simulation in Example 1.
  • FIG. It is a figure which shows the process at the time of carrying in of the apparatus fixation by the construction simulation in Example 1, and completion of carrying in of B-1 piping. It is a figure which shows the processing flow to the time of carrying in of the apparatus fixation by the construction simulation in Example 1, and the completion of carrying in of B-1 piping.
  • FIG. 1 It is a figure which shows the process at the time of carrying in of the apparatus fixation by the construction simulation in Example 1, and completion of carrying in of B-1 piping.
  • FIG. It is a figure which shows the processing flow to the apparatus fixing completion state in the construction simulation in Example 1.
  • FIG. It is a figure which shows the CAD screen in the apparatus fixing completion state in the construction simulation in Example 1.
  • FIG. It is a figure which shows the process in the work completion state of the area B in the construction simulation in Example 1.
  • FIG. It is a figure which shows the processing flow in the work completion state of the area B in the construction simulation in Example 1.
  • FIG. It is a figure which shows the CAD screen in the work completion state of the area B in the construction simulation in Example 1.
  • FIG. It is a figure explaining reset of a beacon arrangement plan reflecting the field condition where construction actually started in Example 1.
  • FIG. It is an example of the worker registration database in Example 1.
  • FIG. 1 It is explanatory drawing which showed the example from which the beacon signal propagation by the work area environment in Example 1 differs. It is an example of the corresponding
  • FIG. It is a figure which shows the process in the example which displayed on the computer screen in Example 1 the progress of an actual field as an appearance. It is a figure which shows the appearance in the example which displayed the progress of the actual field as an appearance on the computer screen in Example 1.
  • FIG. It is a specific processing flow of an operator's location area in Example 2.
  • FIG. It is an example of the worker monitoring database in Example 2.
  • 10 is a processing flow illustrating an example of worker analysis in the second embodiment.
  • This example describes a worker monitoring system at a construction site.
  • FIG. 1 is a diagram showing a relationship between a beacon, a worker, and a base station, which is a premise of the present embodiment.
  • a beacon 1 installed in a predetermined area transmits a unique beacon signal (beacon ID) 111 indicating position information of each area.
  • the worker 10 attaches the worker terminal 20 to a predetermined position such as his / her helmet or belt, and the worker terminal 20 receives position information (beacon ID) of the area where the worker exists from the beacon 1.
  • the worker ID and the beacon ID are transmitted to the base station 30 (211). Thereby, the base station 30 can grasp the location of the worker.
  • the base station 30 is based on a signal from a device (not shown) that measures a heat index WBGT (Wet-Bulb Globe Temperature) indicating the risk of heat stroke when entering a dangerous place.
  • WBGT Heat index
  • An alarm 311 is transmitted to the worker terminal 20 when the user is in a heat stroke environment.
  • the worker terminal also has a function to issue a warning to the worker by voice or the like when a worker enters a dangerous place or restricted area, so that the terminal can be used without sending a warning signal from the base station to the worker.
  • An alarm can be issued to a worker carrying the terminal alone.
  • FIG. 2 is a configuration block diagram of the worker terminal in the present embodiment.
  • the worker terminal 20 includes a CPU 201, a memory 202, a sensor 203, a communication unit 204, a speaker 205, and a battery 206.
  • the memory 202 stores a basic operation program such as an operating system processed by the CPU 201 and other processing programs.
  • the sensor 203 is a measuring instrument that measures temperature, atmospheric pressure, and the like.
  • the communication unit 204 includes a beacon signal reception unit that receives a signal from a beacon, a reception unit that receives a transmission signal from the base station, an area signal transmission unit that transmits an area signal to the base station, and an alarm signal to the base station Has an alarm signal transmitter.
  • the speaker 205 sends an alarm, for example.
  • the battery 206 provides power for the worker terminal.
  • the CPU 201 performs overall control of the worker terminal 20 using a processing program stored in the memory 202.
  • FIG. 3 is a functional block diagram of the worker terminal in this embodiment.
  • the worker terminal 20 includes a communication processing unit 210, a beacon signal processing unit 220, a sensor signal processing unit 230, and a storage unit 240.
  • the communication processing unit 210 performs processing such as beacon signal reception, area signal transmission, alarm signal transmission, and sensor signal transmission by the communication unit 204 of FIG.
  • the beacon signal processing unit 220 determines a beacon signal from the received beacon signal and performs an area signal extraction process.
  • the sensor signal processing unit 230 converts the signal from the sensor 203 and performs sensor signal extraction processing.
  • the storage unit 240 performs processing for storing an area signal, a sensor signal, an alarm signal, and the like in the memory 202.
  • a mechanism for notifying the worker that the beacon signal has been received may be provided.
  • FIG. 4 is a configuration block diagram of the base station in the present embodiment.
  • the base station 30 includes a CPU 301, a memory 302, and a communication unit 303.
  • the memory 302 stores a basic operation program such as an operating system processed by the CPU 301 and other processing programs.
  • the communication unit 303 includes a worker terminal signal receiving unit that receives a signal from the worker terminal, and a transmission unit that transmits a signal to the worker terminal.
  • the CPU 301 performs overall control of the base station 30 by a processing program stored in the memory 302.
  • FIG. 5 is a functional block diagram of the base station in the present embodiment.
  • the base station 30 includes a communication processing unit 310, a data storage unit 320, a worker specifying unit 330, an area specifying unit 340, a work analysis processing unit 350, and an abnormality management unit 360.
  • the communication processing unit 310 performs processing such as signal reception from the worker terminal and signal transmission to the worker terminal by the communication unit 303 in FIG.
  • the data storage unit 320 stores data transmitted from the worker terminal.
  • the worker specifying unit 330 performs processing for specifying the worker from the worker ID from the worker terminal.
  • the area specifying unit 340 performs processing for specifying the worker's location area from the area signal from the worker terminal.
  • the work analysis processing unit 350 grasps the actual work status and the worker status from the worker location information, which will be described later, and performs productivity calculation, worker optimization processing, work improvement proposal processing, and the like. These processes can also be sent to an information system that collectively processes a plurality of field data.
  • the abnormality management unit 360 performs abnormality processing based on alarm information and sensor signals from the worker terminal.
  • FIG. 6 is a schematic diagram showing worker location detection by a beacon at a construction site.
  • reference numeral 100 denotes a building to be constructed at a construction site, and a beacon 1 is installed on each floor.
  • the worker terminal 20 wearing the worker 10 receives the beacon ID of the beacon 1-6 corresponding to the reception area 200.
  • the worker terminal 20 transmits the worker ID and the beacon ID to the base station 30 in the field office.
  • the worker terminal 20 has a GPS signal receiving function, and by transmitting the received GPS information to the base station 30, even when the worker 10 is outside the building 100, worker monitoring can be performed seamlessly indoors and outdoors. It may be a worker monitoring system.
  • the beacon arrangement plan includes (1) construction process, (2) worker list related to each activity (work) in the process, and (3) 3D CAD (3D CAD ( 3 Dimensional Computer Aided Design) system. Further, since there is a daily work instruction for work area allocation on the day of work, the work instruction may be referred to for detailed selection of the area to be monitored.
  • CAD (1) there are two 3D CAD systems for displaying the appearance as described above, and one is to build a target building on a computer screen based on a process plan, that is, a construction simulation based on a process.
  • CAD (2) The other is what shows the actual progress in the field on the computer screen (hereinafter referred to as CAD (2)).
  • CAD (1) before construction starts, beacon placement at a certain point in time is examined on a construction simulation screen based on the process plan in order to grasp the number of beacons.
  • CAD (2) the actual beacon state is started, and the beacon placement plan, which is the actual beacon placement plan, is reviewed.
  • FIGS. 7A to 10C are diagrams for explaining setting of a beacon arrangement plan in a construction simulation based on each process in CAD (1).
  • FIG. 7 is a diagram for explaining determination of the beacon arrangement at the time when the device loading in the area B is finished as shown in FIG. 7A.
  • FIG. 7 shows a case where the installation position of the beacon 1-1 on the steel frame 110 in a state where the device 120 is carried into the building 100 is determined as shown in FIG. 7C.
  • FIG. 7 shows a case where the installation position of the beacon 1-1 on the steel frame 110 in a state where the device 120 is carried into the building 100 is determined as shown in FIG. 7C.
  • the device name is fetched from the process database
  • the device registration number is fetched from the device list database
  • the corresponding device arrangement position and the upper steel frame position of the corresponding device arrangement position are output as CAD, as shown in FIG. 7C.
  • the corresponding device arrangement area display and the upper steel frame display are performed, and the beacon 1-1 is displayed on the upper steel frame 110 above the device 120.
  • the arrangement position of the beacon 1-1 that can detect the location of the worker who fixes the device, which is the next operation, is determined.
  • FIG. 8 is a diagram for explaining the determination of beacon arrangement at the time when the B-1 pipe is completely loaded, as shown in the process of FIG.
  • FIG. 8 shows a case where the installation position of the beacon on the steel frame 110 in a state where the B-1 pipe 130 is carried in as shown in FIG. 8C.
  • the display is the same as FIG.
  • the beacon installation interval is a specified value.
  • FIG. 9 is a diagram for explaining the determination of the beacon arrangement at the time when the equipment fixing is completed during the work of installing the B-1 temporary scaffold and the B-2 temporary scaffold as shown in the process of FIG. 9A. It is.
  • FIG. 9C shows the installation position of the beacon on the steel frame 110 in the state where the installation of the B-1 temporary scaffold and the B-2 temporary scaffold is in progress and the device fixing is completed. The case of determining is shown.
  • FIG. 9 is a diagram for explaining the determination of the beacon arrangement at the time when the equipment fixing is completed during the work of installing the B-1 temporary scaffold and the B-2 temporary scaffold as shown in the process of FIG. 9A. It is.
  • FIG. 9C the installation position of the beacon on the steel frame 110 in the state where the installation of the B-1 temporary scaffold and the B-2 temporary scaffold is in progress and the device fixing is completed. The case of determining is shown.
  • FIG. 9 is a diagram for explaining the determination of the beacon arrangement at the time when the equipment fixing is completed during the work of installing the B-1 temporary scaffold and
  • the scaffold data is taken from the scaffold plan on the CAD, and the corresponding scaffold placement position and the upper steel frame position of the relevant scaffold placement position are output as CAD.
  • FIG. The steel frame is displayed, and the beacons 1-2, 1-3, and 1-4 are displayed on the upper steel frame 110 at the upper part of the B-1 temporary scaffold 140 and the B-2 temporary scaffold 150. Also, the beacon 1-1 at the top of the device 120 is removed. As a result, the beacon for the process that has been completed is deleted, and the location of the beacons 1-2, 1-3, and 1-4 that can detect the location of the worker who installs the pipe, which is the next operation, is determined. decide.
  • FIG. 10 is a diagram for explaining beacon arrangement determination at the time when the B-1 system piping attachment and the B-2 system piping attachment are completed as shown in the process of FIG. 10A.
  • FIG. 10C shows the installation position of the beacon in the state where the B-1 system piping installation and the B-2 system piping installation are completed is shown.
  • FIG. 10B since the B-1 system piping attachment and the B-2 system piping installation are completed, the beacon at the upper part of the scaffold is deleted.
  • the work for area B has been completed, and as shown in the column for the number of beacons in FIG. 10A, the number of beacons in area B is estimated and aggregated together with the process, and a beacon arrangement plan database before construction starts is created.
  • FIG. 11 is a diagram for explaining the resetting of the actual beacon arrangement plan by reflecting the actual state of construction in CAD (2).
  • step S71 creates a beacon arrangement plan database before the start of construction by construction simulation based on each process in CAD (1) described with reference to FIGS.
  • step S72 the construction progress data is taken from the construction progress database and converted into CAD.
  • step S73 for example, the activity (work) of the work schedule for one week, the related worker taken from the worker registration database, and the work place taken from the work area-specific database are taken from the work schedule database. The association is performed based on the person's arrangement plan.
  • FIG. 12 is an example of a worker registration database, in which data of worker's affiliation company, name, worker registration number, and job type is accumulated.
  • FIG. 13 is an example of a work area-specific database, and for each work area, data of work date, work content, worker's company, name, worker registration number, and worker terminal ID are accumulated. .
  • step S74 of FIG. 11 the corresponding work place is displayed on the screen by 3D CAD.
  • the beacon installer sees the 3D CAD screen and specifies a work area actually required for work.
  • step S76 the beacon signal propagation range due to the work area environment is estimated.
  • the work area where the worker works may indicate an area surrounded by a wall-like object, or it may be virtually divided according to the size of the area to be worked or grasped in a wide floor without walls. It may indicate an area.
  • the signal propagation range of a beacon is influenced by the surrounding environment, and when there are many metals, a predetermined signal propagation range may not be obtained by radio wave reflection and absorption.
  • the beacon installation plan it is necessary to consider the size of the work area to be grasped and the influence of the surrounding environment on the radio waves. In this example, in order to examine the influence of the surrounding environment on the radio waves, Perform a simulation.
  • FIG. 14 is an explanatory diagram showing an example in which beacon signal propagation differs depending on the work area environment.
  • area C and area D of the same size if area D is more than area C and there are many radio disturbances, area C is covered by one of beacons 1-3. Needs to be covered by two beacons 1-1 and 1-5.
  • step S77 of FIG. 11 based on the beacon signal propagation range estimated in step S76, it is compared with the pre-construction beacon arrangement plan data created in step S71.
  • step S78 there is a problem in the propagation of beacon signals in the beacon arrangement plan. If there is a problem, proceed to step S79 to correct the beacon arrangement plan, correct the beacon position, add a beacon if not enough, and correct the beacon installation area and beacon ID correspondence database.
  • step S80 the installation beacon is fixed.
  • FIG. 15 is an example of a correspondence database of beacon installation areas and beacon IDs, and includes a beacon ID, an area name of the beacon installation, beacon coordinates, a beacon fixing place, a beacon installation planer name, and a beacon installer name.
  • the beacon ID is removed, the ID is cleared and becomes an unused beacon, and beacon installation is added by assigning a beacon ID to an unused beacon.
  • a beacon is installed including confirmation that a beacon can be installed at the actual construction site, and in step S82, the actual beacon installation location is registered in a correspondence database of beacon installation areas and beacon IDs.
  • FIG. 16A and FIG. 16B are examples in which the actual progress in the field is displayed on the computer screen.
  • FIG. 16A shows the process
  • FIG. 16B shows the appearance of area B at the time of process a. That is, at the time of step a, the device is being fixed, and it is the start stage of B-1 temporary scaffold installation, B-2 temporary scaffold installation, and B-1 system piping installation.
  • the beacon 1-1 is installed on the upper part of the equipment 120, the B-1 temporary scaffold installation and the B-2 temporary scaffold installation are performed, In order to confirm the position of the worker 10 who performs the installation work of the B-1 pipe 130, beacons 1-2, 1-3, 1-4 are placed on the upper parts of the B-1 temporary scaffold 140 and the B-2 temporary scaffold 150. Display to install.
  • the beacon placement plan can be executed by looking at the actual progress of the progress in the field, the beacon can be executed without depending on the construction expert who is familiar with the relationship between the process and the appearance. Can be realized. Further, not only the beacon placement remains in the 3D CAD record in time series, but also the radio wave simulation results can be made into a database, and beacon placement plans can be automated for similar construction projects.
  • the worker terminal 20 can be used to grasp which area the worker is in. A monitoring system that can estimate whether the work is performed in such an operation or working state will be described.
  • FIG. 17 shows a specific processing flow in the area where the worker is located in this embodiment.
  • the worker attaches the worker terminal to a predetermined position such as his / her helmet or belt when entering the site.
  • the system registers a worker terminal that transmits a worker registration number and an ID associated therewith.
  • the worker terminal receives the beacon ID, and the worker terminal transmits data obtained by integrating the beacon ID and the worker terminal ID to the base station.
  • the corresponding location area is identified from the beacon installation area and the corresponding DB of the beacon ID and the received beacon ID, and from the worker terminal ID of the received data Identify the worker. Then, the worker is registered in the worker monitoring database, and the worker is marked on the CAD data of the corresponding work area.
  • FIG. 18 shows an example of a worker monitoring database in the present embodiment, where worker IDs and worker location area names corresponding to times are stored as a database. That is, the number of workers and the staying time in the area where each worker is located are accumulated.
  • FIG. 19 is a processing flow showing an example of worker analysis in this embodiment.
  • the worker is identified from the worker terminal ID of the received data, and the work and work place of the worker for the day are extracted from the work instruction sheet. Then, the extracted work place is collated with the actual location of the worker.
  • step S92 it is determined whether the worker's actual location area is the set work place. If they do not match, in step S93, the worker is recorded as out of work, and the process proceeds to step S95. If the location area is the set work place, it is recorded that the worker is working in step S94, and the process proceeds to step S95.
  • step S95 it is determined whether the worker is out of work by comparing with a predetermined value. If there is not out of work, the process proceeds to step S97. If there is a lot of work out, work improvement with the worker is performed in step S96, and the process proceeds to step S97.
  • step S97 the start / end period of the work target is extracted from the volume information, the operation rate is extracted from the worker monitoring database based on the number of workers and the stay time of the worker, and the start / end period and the operation rate are determined. The productivity for the work target is calculated from the total number of workers in consideration, and a database is created.
  • the present invention is not limited to the above-described embodiments, and includes various modifications.
  • the above-described embodiments have been described in detail for easy understanding of the present invention, and are not necessarily limited to those having all the configurations described.
  • a part of the configuration of one embodiment can be replaced with the configuration of another embodiment, and the configuration of another embodiment can be added to the configuration of one embodiment.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Automation & Control Theory (AREA)
  • Manufacturing & Machinery (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

簡単な手法でビーコンの配置計画を実施できる作業者モニタリングシステム、それに用いる作業者端末、及び、ビーコンの配置方法を提供することを目的とする。 上記目的を達成するために、建設現場の所定のエリアに設置され各エリアの位置情報を発信するビーコンと、作業者によって携帯され前記位置情報を受信して位置情報と端末固有の作業者IDを送信する作業者端末と、位置情報と作業者IDを受信して作業者の所在エリアを認識する基地局とを有する作業者モニタリングシステムであって、建設進捗データに基づき、建設工程の作業と関係作業者と作業場所の関連付けを行い、建設進捗に応じた作業に必要な作業エリアを特定し、特定した作業エリアの環境により特定した作業エリアのビーコン設置位置を選定するように構成する。

Description

作業者モニタリングシステム、それに用いる作業者端末、及び、ビーコンの配置方法
 本発明は、作業者がどのエリアにいるのかを把握する作業者モニタリングシステムに関する。
 ビル、マンション、工場、プラント、社会インフラ等の建設現場では、作業の効率向上、作業者の最適化、作業の安全性向上を目的に、建設現場での作業者がどのエリアにいるのかを把握するモニタリングが必要となっている。
 人の位置を把握する従来のシステムとして、特開2007-334582号公報(特許文献1)がある。この特許文献1には、住宅内の各所に赤外線ビーコンを設置し、赤外線ビーコンは設置箇所固有の位置情報を発信し、居住者はユビキタスコミュニケータを常時携帯するものであり、赤外線ビーコンから発信される位置情報によりユビキタスコミュニケータ自身の位置認識が行われる。ユビキタスコミュニケータには固有の端末IDが付与されており、ユビキタスコミュニケータから位置情報と端末IDが共に送信され、管理サーバは、これら位置情報と端末IDとに基づいて住宅内におけるユビキタスコミュニケータの位置を認識し、モニタの表示部に表示させる住宅内監視システムが開示されている。
特開2007-334582号公報
 特許文献1は、住宅内での人の位置検出だけを目的としているため、ビーコンの設置は、例えば、各部屋に配置するなど、特にその工夫は必要ない。これに対して、建設現場において、作業の効率向上、作業者の最適化、作業の安全性向上を目的として作業者の位置や所在を把握するためには、作業者の所在、移動がわかる箇所にビーコンを配置する必要がある。建設現場は、着工からその進行とともに出来姿が変化し、さらに、作業場所が変っていくので、ビーコンの配置計画が必要であり、それにそったビーコンの移動も必要になる場合がある。
 本発明は、上記課題に鑑み、簡単な手法でビーコンの配置計画を実施できる作業者モニタリングシステム、それに用いる作業者端末、及び、ビーコンの配置方法を提供することを目的とする。
 本発明は、上記背景技術及び課題に鑑み、その一例を挙げるならば、建設現場の所定のエリアに設置され各エリアの位置情報を発信するビーコンと、作業者によって携帯され前記位置情報を受信して位置情報と端末固有の作業者IDを送信する作業者端末と、位置情報と作業者IDを受信して作業者の所在エリアを認識する基地局とを有する作業者モニタリングシステムであって、建設進捗データに基づき、建設工程の作業と関係作業者と作業場所の関連付けを行い、建設進捗に応じた作業に必要な作業エリアを特定し、特定した作業エリアの環境により特定した作業エリアのビーコン設置位置を選定するように構成する。
 本発明によれば、簡単な手法でビーコンの配置計画を実施できる作業者モニタリングシステム、それに用いる作業者端末、及び、ビーコンの配置方法を提供できる。
実施例1の前提となるビーコンと作業者、基地局との関係を示した図である。 実施例1における作業者端末の構成ブロック図である。 実施例1における作業者端末の機能ブロック図である。 実施例1における基地局の構成ブロック図である。 実施例1における基地局の機能ブロック図である。 実施例1における建設現場でのビーコンによる作業者の所在検知を示す概略図である。 実施例1における建設シミュレーションでの機器搬入を終えた時点での工程を示す図である。 実施例1における建設シミュレーションでの機器搬入を終えた時点までの処理フローを示す図である。 実施例1における建設シミュレーションでの機器搬入を終えた時点でのCAD画面を示す図である。 実施例1における建設シミュレーションでの機器固定の作業中でありB-1配管の搬入が完了した時点での工程を示す図である。 実施例1における建設シミュレーションでの機器固定の作業中でありB-1配管の搬入が完了した時点までの処理フローを示す図である。 実施例1における建設シミュレーションでの機器固定の作業中でありB-1配管の搬入が完了した時点でのCAD画面を示す図である。 実施例1における建設シミュレーションでの機器固定完了状態での工程を示す図である。 実施例1における建設シミュレーションでの機器固定完了状態までの処理フローを示す図である。 実施例1における建設シミュレーションでの機器固定完了状態でのCAD画面を示す図である。 実施例1における建設シミュレーションでのエリアBの作業終了状態での工程を示す図である。 実施例1における建設シミュレーションでのエリアBの作業終了状態での処理フローを示す図である。 実施例1における建設シミュレーションでのエリアBの作業終了状態でのCAD画面を示す図である。 実施例1における実際に建設が始まった現場状態を反映させて、ビーコン配置計画の再設定を説明する図である。 実施例1における作業者登録データベースの例である。 実施例1における作業エリア別担当データベースの例である。 実施例1における作業エリア環境によるビーコン信号伝播が異なる例を示した説明図である。 実施例1におけるビーコン設置エリアとビーコンIDの対応データベースの例である。 実施例1におけるコンピュータ画面上に実際の現場の進展を出来姿として表示した例での工程を示す図である。 実施例1におけるコンピュータ画面上に実際の現場の進展を出来姿として表示した例での出来姿を示す図である。 実施例2における作業者の所在エリアの特定の処理フローである。 実施例2における作業者モニタリングデータベースの例である。 実施例2における作業者の分析の例を示す処理フローである。
 以下、本発明の実施例について、図面を用いて詳細に説明する。
 本実施例は、建設現場での作業者のモニタリングシステムについて説明する。
 図1は、本実施例の前提となる、ビーコンと作業者、基地局との関係を示した図である。図1において、所定のエリアに設置されたビーコン1は各エリアの位置情報を示す固有のビーコン信号(ビーコンID)111を発信する。作業者10は作業者端末20を各自のヘルメットあるいはベルト等所定の位置に取り付けており、その作業者端末20は、作業者が存在するエリアの位置情報(ビーコンID)をビーコン1から受信して、作業者IDとビーコンIDを基地局30に送信する(211)。これにより、基地局30で、その作業者の所在地を把握できる。なお、基地局30は、危険場所に立ち入った場合とか、別途、熱中症の危険度を示す暑さ指数WBGT(Wet-Bulb Globe Temperature)を計測する機器(図示せず)からの信号を基に熱中症環境にいる場合などに、警報311を作業者端末20に送信する。これにより、作業者の作業実態の把握や作業者の状態把握ができる。また、作業者端末には、危険場所や立入禁止区域に作業者が入った場合、作業者に音声等で警報を発する機能もあり、基地局から作業者に警報信号を発信せずとも、端末単独で端末を携帯している作業者に警報を発することができる。
 図2は、本実施例における作業者端末の構成ブロック図である。図2において、作業者端末20は、CPU201、メモリ202、センサー203、通信部204、スピーカ205、電池206を有する。メモリ202には、CPU201で処理するオペレーティングシステムなどの基本動作プログラムやその他の処理プログラムを格納する。センサー203は、温度や気圧等を測定する計測器である。通信部204は、ビーコンからの信号を受信するビーコン信号受信部と、基地局からの送信信号を受信する受信部と、基地局にエリア信号を送信するエリア信号送信部と、基地局に警報信号を送信する警報信号送信部を有している。スピーカ205は、例えば、警報を発信する。また、電池206は、作業者端末の電源を賄う。CPU201は、メモリ202に記憶された処理プログラムにより作業者端末20の全体制御を行う。
 図3は、本実施例における作業者端末の機能ブロック図である。図3において、作業者端末20は、通信処理部210、ビーコン信号処理部220、センサー信号処理部230、記憶部240からなる。通信処理部210は、図2の通信部204により、ビーコン信号受信、エリア信号送信、警報信号送信、センサー信号送信等の処理を行う。ビーコン信号処理部220は、受信したビーコン信号からビーコン信号を判別しエリア信号の抽出処理を行う。また、センサー信号処理部230は、センサー203からの信号を変換し、センサー信号抽出処理を行う。また、記憶部240はメモリ202にエリア信号やセンサー信号、警報信号等を記憶させる処理を行う。また、ビーコンから発信されるビーコン信号を受信した際に、作業者にビーコン信号を受信したことを知らせる機構を備えてもよい。また、ビーコン信号を受信したことを基地局へ送信する機構を備えてもよい。
 図4は、本実施例における基地局の構成ブロック図である。図4において、基地局30は、CPU301、メモリ302、通信部303を有する。メモリ302には、CPU301で処理するオペレーティングシステムなどの基本動作プログラムやその他の処理プログラムを格納する。通信部303は、作業者端末からの信号を受信する作業者端末信号受信部と、作業者端末に信号を送信する送信部を有している。CPU301は、メモリ302に記憶された処理プログラムにより基地局30の全体制御を行う。
 図5は、本実施例における基地局の機能ブロック図である。図5において、基地局30は、通信処理部310、データ格納部320、作業者特定部330、エリア特定部340、作業分析処理部350、異常管理部360からなる。通信処理部310は、図4の通信部303により、作業者端末からの信号受信、作業者端末への信号送信等の処理を行う。データ格納部320は、作業者端末から送信されたデータを格納する。作業者特定部330は、作業者端末からの作業者IDから作業者を特定する処理を行う。また、エリア特定部340は作業者端末からのエリア信号から作業者の所在エリアを特定する処理を行う。また、作業分析処理部350は、後述する、作業者の所在情報から作業実態の把握や作業者の状態把握を行い、生産性演算や、作業者最適化処理、作業改善提案処理等を行う。なお、これらの処理は、複数の現場データを一括処理する情報システムに送り処理することも出来る。また、異常管理部360は、作業者端末からの警報情報やセンサー信号により、異常処理を行う。
 図6は、建設現場における、ビーコンによる作業者の所在検知を示す概略図である。図6において、100は建設現場にある建設対象の建屋であり、各フロアにビーコン1が設置される。ここで、作業者10がビーコン1-6の受信エリア200にいる場合は、受信エリア200に対応するビーコン1-6のビーコンIDを、作業者10が装着している作業者端末20が受信し、作業者端末20は、作業者IDとビーコンIDを現場事務所にある基地局30に送信する。これにより、現場事務所では、管理PCなどにより、作業者の位置表示、状態推定、生産性分析や、それらのデータベース化を実施できる。なお、作業者端末20にGPS信号受信機能を備え、受信したGPS情報を基地局30に送信することで、建屋100の外に作業者10がいる場合でも屋内外でシームレスに作業者モニタリングが可能となる作業者モニタリングシステムとしてもよい。
 ここで、建設現場では、作業工程の変化に伴い、作業者の作業場所が変化するため、エリアの位置情報を示す固有の信号(ビーコンID)を発信するビーコンの配置計画が必要となる。本実施例では、ビーコンの配置計画は、(1)建設工程と、(2)工程の各アクティビティ(作業)に係わる作業者リストと、(3)建設の進展に伴う出来姿を表示する3DCAD(3 Dimensional Computer Aided Design)システムにより作成する。さらに、作業当日の作業エリア割当に対しては、日々の作業指示書があるので、モニタリングするエリアの詳細選定には、作業指示書を参考にする場合もある。ここで、本実施例では、前記した出来姿を表示する3DCADシステムには2つあり、1つは、工程計画に基づきコンピュータ画面上で対象建屋を建てていくもの、つまり、工程に基づく建設シミュレーションを行うもの(以降、CAD(1)と称す)である。もう1つは、実際の現場の進展を出来姿としてコンピュータ画面上に表すもの(以降、CAD(2)と称す)である。CAD(1)では、建設が始まる前に、ビーコン数を把握するために工程計画に基づいた建設シミュレーションの画面で、ある時点ごとのビーコン配置を検討する。CAD(2)では、実際に建設が始まった現場状態を表すもので、実際のビーコンの配置計画である、ビーコン配置計画の再検討を行う。
 図7Aから図10Cは、CAD(1)における、各工程に基づく建設シミュレーションでのビーコン配置計画の設定を説明する図である。
 まず、図7A、図7B、図7C(以降、まとめて図7と称する)において、図7Aは工程、図7Bは処理フロー、図7CはCAD画面を示している。図7は、図7Aに示すように、エリアBにおける機器搬入を終えた時点でのビーコン配置の決定を説明する図である。図7においては、図7Cに示すように、建屋100に機器120を搬入した状態での鉄骨110上でのビーコン1-1の設置位置を決定する場合を示す。図7Bにおいて、工程のデータベースから機器名称を取り込み、機器リストデータベースから機器登録番号を取り込み、CADとして、該当機器配置位置と、該当機器配置位置の上部鉄骨位置を出力し、図7Cに示すように、該当機器配置エリア表示と上部鉄骨表示を行ない、機器120の上部の上部鉄骨110上にビーコン1-1を表示する。これにより、次の作業である機器固定を行う作業者の所在検知を行うことができるビーコン1-1の配置位置を決定する。
 図8A、図8B、図8C(以降、まとめて図8と称する)において、図7と同様に、図8Aは工程、図8Bは処理フロー、図8CはCAD画面を示している。図8は、図8Aの工程に示すように、機器固定の作業中であり、B-1配管の搬入が完了した時点でのビーコン配置の決定を説明する図である。図8においては、図8Cに示すように、B-1配管130を搬入した状態での鉄骨110上でのビーコンの設置位置を決定する場合を示す。図8Bにおいて、該当機器配置エリア表示と上部鉄骨表示を行なうまでは図7Bと同じであるが、B-1配管130の上部の上部鉄骨110上にビーコン1-2、1-3、1-4を表示する。なお、ビーコンの設置間隔は規定値とする。これにより、次の作業であるB-1仮設足場設置、B-2仮設足場設置を行う作業者の所在検知を行うことができるビーコン1-2、1-3、1-4の配置位置を決定する。
 図9A、図9B、図9C(以降、まとめて図9と称する)において、図7と同様に、図9Aは工程、図9Bは処理フロー、図9CはCAD画面を示している。図9は、図9Aの工程に示すように、B-1仮設足場設置、及び、B-2仮設足場設置の作業中であり、機器固定が完了した時点でのビーコン配置の決定を説明する図である。図9においては、図9Cに示すように、B-1仮設足場設置、及び、B-2仮設足場設置の作業中であり、機器固定が完了した状態での鉄骨110上でのビーコンの設置位置を決定する場合を示す。図9Bにおいて、CAD上の足場計画から足場データを取り込み、CADとして、該当足場配置位置と、該当足場配置位置の上部鉄骨位置を出力し、図9Cに示すように、該当足場配置エリア表示と上部鉄骨表示を行ない、B-1仮設足場140及びB-2仮設足場150の上部の上部鉄骨110上にビーコン1-2、1-3、1-4を表示する。また、機器120の上部のビーコン1-1を取り外す。これにより、作業終了した工程のためのビーコンを削除し、次の作業である配管取付けを行う作業者の所在検知を行うことができるビーコン1-2、1-3、1-4の配置位置を決定する。
 図10A、図10B、図10C(以降、まとめて図10と称する)において、図7と同様に、図10Aは工程、図10Bは処理フロー、図10CはCAD画面を示している。図10は、図10Aの工程に示すように、B-1系統配管取付け、B-2系統配管取付けが完了した時点でのビーコン配置の決定を説明する図である。図10においては、図10Cに示すように、B-1系統配管取付け、B-2系統配管取付けが完了した状態でのビーコンの設置位置を示す。図10Bにおいて、B-1系統配管取付け、及び、B-2系統配管取付けが終了したので、足場上部のビーコンを削除する。これにより、エリアBの作業が終了したので、図10Aのビーコン数の欄に示すように、工程とともにエリアBのビーコン数を推定、集計し、建設開始前のビーコン配置計画データベースを作成する。
 図11は、CAD(2)における、実際に建設が始まった現場状態を反映させて、実際のビーコン配置計画の再設定を説明する図である。図11において、ステップS71は、前述の図7から図10で説明した、CAD(1)における各工程に基づく建設シミュレーションにより建設開始前のビーコン配置計画データベースを作成する。次に、ステップS72で、建設進捗データベースから建設進捗データを取り込みCAD化する。次に、ステップS73で、工程表データベースから取り込んだ、例えば1週間分の工程表のアクティビティ(作業)と作業者登録データベースから取り込んだ関係作業者と作業エリア別担当データベースから取り込んだ作業場所を作業者の配置計画に基づき関連付けを行う。
 ここで、図12は、作業者登録データベースの例であり、作業者の所属会社、氏名、作業者登録番号、職種のデータが蓄積されている。また、図13は作業エリア別担当データベースの例であり、作業エリア毎に、作業日、作業内容、作業者の所属会社、氏名、作業者登録番号、作業者端末IDのデータが蓄積されている。
 そして、図11のステップS74で、該当する作業場所を3DCADで画面表示する。ステップS75では、ビーコン設置者が3DCAD画面を見て実際に作業に必要な作業エリアを特定する。そして、ステップS76で、作業エリア環境によるビーコン信号伝播範囲を推定する。ここで、作業者が作業する作業エリアとは、壁状のものに囲まれた領域を示す場合もあれば、壁のない広いフロアの中に作業あるいは把握したい領域の広さによって仮想的に分割領域を示す場合もある。そして、ビーコンの信号伝播範囲は、周りの環境に影響され、金属が多い場合で電波反射・吸収で所定の信号伝播範囲を得られない場合がある。また、把握したい作業者の作業が広いエリアで行われる場合、または、比較的広いエリアの作業者を把握したい場合は、ビーコンの信号強度を強くしビーコンが網羅できる範囲を広くする必要がある。逆に、把握したい作業者の作業が狭いエリアで行われる場合、または、比較的狭いエリアの作業者を把握したい場合は、ビーコンの信号強度を弱くしビーコンが網羅できる範囲を狭くする必要がある。したがって、ビーコン設置計画には、把握したい作業エリアの広さと周りの環境が電波に与える影響を考慮する必要があり、周りの環境が電波に与える影響を検討するために本実施例では、電波伝搬シミュレーションを行う。
 図14は、作業エリア環境によるビーコン信号伝播が異なる例を示した説明図である。図14において、同じ広さのエリアCとエリアDにおいて、エリアCに対してエリアDは物が多く電波障害が大きい場合は、エリアCはビーコン1-3の1つでカバーするが、エリアDは、ビーコン1-1と1-5の2つでカバーする必要がある。
 図11のステップS77では、ステップS76で推定したビーコン信号伝播範囲を基に、ステップS71で作成した建設開始前ビーコン配置計画データと照合し、ステップS78でビーコン配置計画でビーコン信号の伝播に問題がないかを判断し、問題があれば、ステップS79に進み、ビーコン配置計画を修正し、ビーコンの位置修正や、足りない場合はビーコン追加を行い、ビーコン設置エリアとビーコンIDの対応データベースを修正し、ステップS80で設置ビーコンを確定する。
 図15は、ビーコン設置エリアとビーコンIDの対応データベースの例であり、ビーコンID、ビーコン設置のエリア名称、ビーコン座標、ビーコン固定場所、ビーコン設置計画者名、ビーコン設置者名から構成される。ビーコンIDは、取り外すとIDはクリアされ、未使用のビーコンとなり、ビーコンの設置追加は未使用のビーコンにビーコンIDを付与することで追加される。
 図11のステップS81では実際の建設現場にてビーコンを設置できるかの確認を含めてビーコンを設置し、ステップS82で実際のビーコン設置場所をビーコン設置エリアとビーコンIDの対応データベースに登録する。
 このように、本実施例は、実際の現場の進展を出来姿としてコンピュータ画面上に表し、ビーコンの配置計画を作成するものである。図16A、図16Bは、コンピュータ画面上に実際の現場の進展を出来姿として表示した例である。図16Aは工程であり、図16Bは工程a時点でのエリアBの出来姿である。すなわち、工程a時点では、機器固定の途中であり、B-1仮設足場設置とB-2仮設足場設置と、B-1系統配管取付の開始段階である。そのため、機器固定のための作業を行う作業者10の位置確認を行うために、機器120の上部にビーコン1-1を設置し、B-1仮設足場設置とB-2仮設足場設置を行ない、B-1配管130の取付作業を行う作業者10の位置確認を行うために、B-1仮設足場140及びB-2仮設足場150の上部にビーコン1-2、1-3、1-4を設置するように表示する。
 以上のように、本実施例によれば、実際の現場の進展の出来姿を見てビーコン配置計画が実行できるので、工程と出来姿の関係を熟知している建設熟練者によらずともビーコンの配置計画が実現できる。また、ビーコン配置が時系列的に3DCADの記録に残るだけでなく、電波シミュレーション結果もデータベース化でき、類似の建設案件に対しては、ビーコン配置計画の自動化も可能となる。
 本実施例は、実施例1で設定したビーコン配置計画に基づいてビーコンを設置した後に、作業者端末20を用いて、作業者がどのエリアにいるのかを把握することができ、作業者がどのような動作、作業状態で作業を行っているかを推定することができるモニタリングシステムについて説明する。
 図17は本実施例における作業者の所在エリアの特定の処理フローである。図17において、まず作業者は現場入所時に、作業者端末を各自のヘルメットあるいはベルト等所定の位置に取り付ける。システムとしては、作業者の登録番号と、それに紐付けられたIDを発信する作業者端末を登録する。
 そして、作業現場では、作業者端末がビーコンIDを受信し、作業者端末はビーコンIDと作業者端末IDを一体化したデータを基地局へ送信する。
 基地局では、ビーコンIDと作業者端末IDを一体化したデータを受信し、ビーコン設置エリアとビーコンIDの対応DBと受信したビーコンIDから該当所在エリアを特定し、受信データの作業者端末IDから作業者を特定する。そして、作業者モニタリングデータベースへ登録し、該当する作業エリアのCADデータ上に、作業者をマーキングする。
 図18は本実施例における作業者モニタリングデータベースの例であり、作業者IDと、時刻に対応した作業者の所在エリア名称がデータベースとして蓄積される。すなわち、作業者数と、各作業者の所在エリアの滞在時間が蓄積される。
 図19は本実施例における作業者の分析の例を示す処理フローである。図19において、まず、ステップS91で受信データの作業者端末IDから作業者を特定し、作業指示書から該当作業者のその日の作業と作業場所を抽出する。そして、抽出した作業場所と作業者の実際の所在を照合する。そして、ステップS92で作業者の実際の所在エリアが設定された作業場所であるかを判定する。不一致であれば、ステップS93で当該作業者に対して作業外と記録し、ステップS95に進む。所在エリアが設定された作業場所である場合は、ステップS94で当該作業者に対し作業中と記録し、ステップS95に進む。
 ステップS95では、当該作業者に対し作業外が多いかを所定値と比較して判定し、作業外が少なければ、ステップS97に進む。作業外が多ければ、ステップS96で作業者との作業改善の実施を行い、ステップS97に進む。ステップS97では、出来高情報から作業対象の開始・終了期間を抽出し、作業者モニタリングデータベースから作業者数、作業者の滞在時間をもとに稼働率を抽出し、開始・終了期間と稼働率を加味したのべ作業者数から作業対象に対する生産性を演算し、データベース化する。
 以上のように、本実施例によれば、作業者の作業実態の把握や作業者の状態把握ができ、生産性演算により生産性効率向上に貢献できるが、さらに作業者位置把握と作業者データとのリンクによる作業者最適化処理や作業改善提案処理、さらに作業者の状態把握により作業安全の向上に貢献できる。
 以上実施例について説明したが、本発明は上記した実施例に限定されるものではなく、様々な変形例が含まれる。例えば、上記した実施例は本発明を分かりやすく説明するために詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。また、ある実施例の構成の一部を他の実施例の構成に置き換えることが可能であり、また、ある実施例の構成に他の実施例の構成を加えることも可能である。また、各実施例の構成の一部について、他の構成の追加・削除・置換をすることが可能である。
1:ビーコン、10:作業者、20:作業者端末、30:基地局、100:建屋、110:鉄骨、120:機器、130:B-1配管、140:B-1仮設足場、150:B-2仮設足場、200:受信エリア

Claims (13)

  1. 建設現場の所定のエリアに設置され、各エリアの位置情報を発信するビーコンと、
    作業者によって携帯され前記ビーコンから発信される位置情報を受信して該位置情報と端末固有の作業者IDを送信する作業者端末と、
    前記位置情報と前記作業者IDを受信して前記作業者の所在エリアを認識する基地局とを有する作業者モニタリングシステムであって、
    建設進捗データに基づき建設工程の作業と関係作業者と作業場所の関連付けを行い、
    建設進捗に応じた作業に必要な作業エリアを特定し、
    該特定した作業エリアの環境により該特定した作業エリアのビーコンの設置位置を選定することを特徴とする作業者モニタリングシステム。
  2. 請求項1に記載の作業者モニタリングシステムであって、
    前記建設進捗データに基づき建設の出来姿をCAD表示し、
    該CAD表示上で、前記特定した作業エリアを表示し、前記特定した作業エリアのビーコンの設置位置を表示することを特徴とする作業者モニタリングシステム。
  3. 請求項1に記載の作業者モニタリングシステムであって、
    前記特定した作業エリアの環境による前記ビーコンの設置位置の選定は、ビーコン信号伝播範囲を推定することにより選定することを特徴とする作業者モニタリングシステム。
  4. 請求項1に記載の作業者モニタリングシステムであって、
    建設前に前記ビーコンの各エリアへの配置計画を作成し、
    前記配置計画と前記選定したビーコンの設置位置を照合し、異なっている場合は前記配置計画を修正することを特徴とする作業者モニタリングシステム。
  5. 請求項1に記載の作業者モニタリングシステムであって、
    前記特定した作業エリアの環境により該特定した作業エリアに必要なビーコンの個数を選定することを特徴とする作業者モニタリングシステム。
  6. 建設現場の所定のエリアに設置され、各エリアの位置情報を発信するビーコンと、
    作業者によって携帯され前記ビーコンから発信される位置情報を受信して該位置情報と端末固有の作業者IDを送信する作業者端末と、
    前記位置情報と前記作業者IDを受信して前記作業者の所在エリアを認識する基地局とを有する作業者モニタリングシステムにおける、前記ビーコンの配置方法であって、
    建設進捗データに基づき、建設工程の作業と関係作業者と作業場所の関連付けを行い、
    建設進捗に応じた作業に必要な作業エリアを特定し、
    該特定した作業エリアの環境により該特定した作業エリアのビーコンの設置位置を選定することを特徴とするビーコンの配置方法。
  7. 請求項6に記載のビーコンの配置方法であって、
    前記建設進捗データに基づき建設の出来姿をCAD表示し、
    該CAD表示上で、前記特定した作業エリアを表示し、前記特定した作業エリアのビーコンの設置位置を表示することを特徴とするビーコンの配置方法。
  8. 請求項6に記載のビーコンの配置方法であって、
    前記特定した作業エリアの環境による前記ビーコンの設置位置の選定は、ビーコン信号伝播範囲を推定することにより選定することを特徴とするビーコンの配置方法。
  9. 請求項6に記載のビーコンの配置方法であって、
    建設前に前記ビーコンの各エリアへの配置計画を作成し、
    前記配置計画と前記選定したビーコンの設置位置を照合し、異なっている場合は前記配置計画を修正することを特徴とするビーコンの配置方法。
  10. 請求項6に記載のビーコンの配置方法であって、
    前記特定した作業エリアの環境により該特定した作業エリアに必要なビーコンの個数を選定することを特徴とするビーコンの配置方法。
  11. 請求項1に記載の作業者モニタリングシステムであって、
    前記ビーコンから発信される位置情報から得られる当該エリアにいた作業者数、滞在時間のデータと出来高のデータから生産性を推定することを特徴とする作業者モニタリングシステム。
  12. 請求項1に記載の作業者モニタリングシステムで使用される作業者端末であって、
    前記ビーコンから発信される位置情報を受信した際に作業者に該位置情報を受信したことを知らせる機構を備えたことを特徴とする作業者端末。
  13. 請求項1に記載の作業者モニタリングシステムで使用される作業者端末であって、
    前記ビーコンから発信される位置情報を受信した際に、該位置情報を受信したことを基地局へ送信する機構を備えたことを特徴とする作業者端末。
PCT/JP2019/002503 2018-01-30 2019-01-25 作業者モニタリングシステム、それに用いる作業者端末、及び、ビーコンの配置方法 WO2019151139A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018013441A JP2019133298A (ja) 2018-01-30 2018-01-30 作業者モニタリングシステム、それに用いる作業者端末、及び、ビーコンの配置方法
JP2018-013441 2018-01-30

Publications (1)

Publication Number Publication Date
WO2019151139A1 true WO2019151139A1 (ja) 2019-08-08

Family

ID=67479056

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/002503 WO2019151139A1 (ja) 2018-01-30 2019-01-25 作業者モニタリングシステム、それに用いる作業者端末、及び、ビーコンの配置方法

Country Status (2)

Country Link
JP (1) JP2019133298A (ja)
WO (1) WO2019151139A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022007754A1 (zh) * 2020-07-10 2022-01-13 炬星科技(深圳)有限公司 工人位置估算方法、设备及存储介质
WO2022070276A1 (ja) * 2020-09-29 2022-04-07 株式会社日立製作所 計算機システム及び進捗管理方法

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102279193B1 (ko) * 2020-01-22 2021-07-19 (주)사이버텔브릿지 IoT 기반의 항만 시설에서 작업자의 위치정보 수집하는 방법 및 시스템
JP7070594B2 (ja) * 2020-03-10 2022-05-18 カシオ計算機株式会社 リスト端末、作業時間管理装置、プログラム及び作業時間管理システム

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002108975A (ja) * 2000-10-02 2002-04-12 Komatsu Ltd 施工量管理システム
JP2013122665A (ja) * 2011-12-09 2013-06-20 Ohbayashi Corp 作業者管理システム
JP2016217773A (ja) * 2015-05-15 2016-12-22 株式会社日立産機システム 電波計測システムおよび基地局
JP2017156736A (ja) * 2016-03-03 2017-09-07 金寶電子工業股▲ふん▼有限公司 電子地図上にビーコンの受信状態を表示させる、コンピュータで実施される方法
WO2017158787A1 (ja) * 2016-03-17 2017-09-21 三菱電機株式会社 携帯端末装置及び車載装置
JP2017182313A (ja) * 2016-03-29 2017-10-05 前田建設工業株式会社 工程管理装置、工程管理方法及び工程管理プログラム

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002108975A (ja) * 2000-10-02 2002-04-12 Komatsu Ltd 施工量管理システム
JP2013122665A (ja) * 2011-12-09 2013-06-20 Ohbayashi Corp 作業者管理システム
JP2016217773A (ja) * 2015-05-15 2016-12-22 株式会社日立産機システム 電波計測システムおよび基地局
JP2017156736A (ja) * 2016-03-03 2017-09-07 金寶電子工業股▲ふん▼有限公司 電子地図上にビーコンの受信状態を表示させる、コンピュータで実施される方法
WO2017158787A1 (ja) * 2016-03-17 2017-09-21 三菱電機株式会社 携帯端末装置及び車載装置
JP2017182313A (ja) * 2016-03-29 2017-10-05 前田建設工業株式会社 工程管理装置、工程管理方法及び工程管理プログラム

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022007754A1 (zh) * 2020-07-10 2022-01-13 炬星科技(深圳)有限公司 工人位置估算方法、设备及存储介质
WO2022070276A1 (ja) * 2020-09-29 2022-04-07 株式会社日立製作所 計算機システム及び進捗管理方法

Also Published As

Publication number Publication date
JP2019133298A (ja) 2019-08-08

Similar Documents

Publication Publication Date Title
WO2019151139A1 (ja) 作業者モニタリングシステム、それに用いる作業者端末、及び、ビーコンの配置方法
US11361391B2 (en) Manufacturing control in the metal processing industry
JP6583384B2 (ja) プラント設備の管理システム及び管理方法
KR101970631B1 (ko) 실시간 작업자 위치 및 설비 상태 추적 기반의 공정 안전 관리 시스템
US20070027732A1 (en) Context-sensitive, location-dependent information delivery at a construction site
JP7263506B2 (ja) 自動車再仕上げ修理プロセスをデジタル的に追跡及び監視する方法及びシステム
CN105765310A (zh) 空调系统及空调管理程序
KR102391207B1 (ko) 3d 모델링 기반 작업자 위치 관리 시스템
CN110471028B (zh) 一种施工现场的人员定位方法、装置及系统
US9826360B2 (en) Network system, portable terminal device, and method for specifying device
CN106354105A (zh) 用于基于位置来控制设备和设施资源的系统和方法
JP2021068117A (ja) ゲートウェイ装置、ゲートウェイ装置の制御方法、設定方法、制御プログラム、および記録媒体
JP6510201B2 (ja) 給湯器リモートコントローラ及びプログラム
US10789556B2 (en) Self control
KR20180112951A (ko) 점검 시스템 및 방법
JP6466703B2 (ja) 作業支援システム、設定装置、設定方法及び設定プログラム
JP6621649B2 (ja) 情報端末およびサーバ
Seppänen et al. Intelligent construction site (icons) project final report
JP2015141507A (ja) 保守作業支援システムおよび保守作業支援方法
WO2022266757A1 (en) System for management of facility construction and maintenance
JP2017143458A (ja) 設備管理支援システム、設備管理支援方法、情報端末、及びプログラム
JP4613742B2 (ja) 空調機設置工事支援装置および空調機設置工事支援プログラム
WO2022054661A1 (ja) 締結管理の方法、システム、およびそのプログラム
JP7291036B2 (ja) 市場対応案件管理制御装置、市場対応案件管理制御プログラム
KR20220133620A (ko) 영상 분석 기술을 활용한 건설 현장 안전 관제 시스템

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19747709

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19747709

Country of ref document: EP

Kind code of ref document: A1