WO2019124017A1 - ガラス物品の製造方法及び製造装置 - Google Patents

ガラス物品の製造方法及び製造装置 Download PDF

Info

Publication number
WO2019124017A1
WO2019124017A1 PCT/JP2018/043953 JP2018043953W WO2019124017A1 WO 2019124017 A1 WO2019124017 A1 WO 2019124017A1 JP 2018043953 W JP2018043953 W JP 2018043953W WO 2019124017 A1 WO2019124017 A1 WO 2019124017A1
Authority
WO
WIPO (PCT)
Prior art keywords
transfer pipe
external force
main body
glass
glass article
Prior art date
Application number
PCT/JP2018/043953
Other languages
English (en)
French (fr)
Inventor
周作 玉村
脩佑 岡本
和幸 天山
Original Assignee
日本電気硝子株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本電気硝子株式会社 filed Critical 日本電気硝子株式会社
Priority to KR1020207004770A priority Critical patent/KR102493166B1/ko
Priority to CN201880070536.7A priority patent/CN111295362B/zh
Priority to US16/768,961 priority patent/US11370684B2/en
Publication of WO2019124017A1 publication Critical patent/WO2019124017A1/ja

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C03GLASS; MINERAL OR SLAG WOOL
    • C03BMANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
    • C03B5/00Melting in furnaces; Furnaces so far as specially adapted for glass manufacture
    • C03B5/16Special features of the melting process; Auxiliary means specially adapted for glass-melting furnaces
    • C03B5/26Outlets, e.g. drains, siphons; Overflows, e.g. for supplying the float tank, tweels
    • CCHEMISTRY; METALLURGY
    • C03GLASS; MINERAL OR SLAG WOOL
    • C03BMANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
    • C03B17/00Forming molten glass by flowing-out, pushing-out, extruding or drawing downwardly or laterally from forming slits or by overflowing over lips
    • C03B17/06Forming glass sheets
    • C03B17/064Forming glass sheets by the overflow downdraw fusion process; Isopipes therefor
    • CCHEMISTRY; METALLURGY
    • C03GLASS; MINERAL OR SLAG WOOL
    • C03BMANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
    • C03B5/00Melting in furnaces; Furnaces so far as specially adapted for glass manufacture
    • C03B5/16Special features of the melting process; Auxiliary means specially adapted for glass-melting furnaces
    • C03B5/235Heating the glass
    • CCHEMISTRY; METALLURGY
    • C03GLASS; MINERAL OR SLAG WOOL
    • C03BMANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
    • C03B5/00Melting in furnaces; Furnaces so far as specially adapted for glass manufacture
    • C03B5/16Special features of the melting process; Auxiliary means specially adapted for glass-melting furnaces
    • C03B5/42Details of construction of furnace walls, e.g. to prevent corrosion; Use of materials for furnace walls
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D3/00Hot-water central heating systems
    • F24D3/12Tube and panel arrangements for ceiling, wall, or underfloor heating
    • F24D3/14Tube and panel arrangements for ceiling, wall, or underfloor heating incorporated in a ceiling, wall or floor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D3/00Charging; Discharging; Manipulation of charge
    • F27D3/14Charging or discharging liquid or molten material

Definitions

  • the present invention relates to a method and apparatus for manufacturing glass articles such as sheet glass.
  • Patent Document 1 discloses, as a manufacturing apparatus for carrying out each of the above-described steps, a melting furnace, a clarification tank, a stirring tank, a forming apparatus, and a transfer pipe for interconnecting these components and for transferring molten glass.
  • A glass supply tube
  • expansion of the transfer pipe may not be sufficiently secured due to the difference in various conditions such as the support structure of the transfer pipe, the heating temperature, and the heating time. Insufficient expansion of the transfer pipe in the preheating step generates thermal stress in the transfer pipe. In this case, in the manufacture of the glass article after the assembly of the manufacturing apparatus, the transfer pipe is further expanded, so that the thermal stress of the transfer pipe is increased, which may cause damage.
  • the present invention has been made in view of the above-described circumstances, and an object of the present invention is to provide a method and an apparatus for producing a glass article in which the transfer pipe can be sufficiently expanded in the preheating step.
  • the present invention is intended to solve the above-mentioned problems, and comprises producing a glass article comprising a preheating step of heating a transfer tube, and a transfer step of circulating molten glass inside the transfer tube after the preheating step.
  • the transfer pipe includes a tubular main body and a flange formed at an end of the main body, the main body is held by a refractory, and the preheating process includes: It is characterized by including an external force application step of applying an external force to the transfer pipe to extend the transfer pipe.
  • the external force application step it is desirable to apply external force to the transfer pipe so that the measured expansion length of the transfer pipe approaches the theoretical expansion length.
  • the expansion length of the transfer pipe in the preheating step by bringing the expansion length (measured expansion length) of the transfer pipe measured in any heating time in the preheating step closer to the theoretical expansion length in the heating time (heating temperature) can be optimized with high precision.
  • the “measured expansion length” is a measurement value of the expansion length of the transfer pipe
  • the “theoretical expansion length” is the expansion length of the transfer pipe calculated from the heating temperature and the thermal expansion coefficient means.
  • the external force application step is performed when the difference between the theoretical expansion length and the measured expansion length exceeds a predetermined threshold.
  • the transfer pipe can be expanded efficiently.
  • the refractory is fixed to a casing, and in the external force applying step, the external force is applied to the transfer pipe by bringing a pressing member provided in the casing into contact with the flange portion.
  • the transfer pipe and the refractory can be moved along with the movement of the casing.
  • the pressing member By providing the pressing member with the casing, the pressing member can be moved along with the movement of the casing. Therefore, the operation of connecting the preheated transfer pipe and other components can be efficiently performed.
  • the external force application step it is desirable to apply the external force to a plurality of locations in the circumferential direction of the flange portion.
  • the main body can be suitably expanded while preventing local deformation of the flange.
  • the main body portion of the transfer pipe is disposed in an inclined posture, and in the external force applying step, it is desirable to apply the external force along the inclination direction of the main body portion.
  • the inclined main-body part can be expanded suitably.
  • the present invention is for solving the above-mentioned problems, and in a manufacturing apparatus of a glass article provided with a transfer pipe capable of circulating molten glass therein, and a refractory holding the transfer pipe.
  • the transfer pipe includes a tubular main body and a flange formed at an end of the main body, the main body is held by the refractory, and in the manufacturing apparatus, the transfer pipe is elongated
  • the apparatus further comprises external force applying means for applying an external force to the transfer pipe.
  • the expansion length of the transfer pipe can be optimized by applying an external force to the transfer pipe by the external force applying means provided in the manufacturing apparatus.
  • the transfer pipe can be sufficiently expanded in advance, so that deformation and buckling due to further expansion of the transfer pipe can be prevented in the manufacture of a glass article, and the life extension of the transfer pipe can be realized.
  • FIG. 1 to 8 show an embodiment (first embodiment) of a method and an apparatus for producing a glass article according to the present invention.
  • the apparatus for producing a glass article includes, in order from the upstream side, a dissolution tank 1, a clarification tank 2, a homogenization tank (stirring tank) 3, a pot 4, and a formed body. And 5 and glass supply paths 6a to 6d connecting the components 1 to 5.
  • the manufacturing apparatus includes an annealing furnace (not shown) for annealing the plate glass GR (glass article) formed by the molded body 5 and a cutting device (not shown) for cutting the plate glass GR after annealing.
  • the melting tank 1 is a container for performing a melting step of melting the input glass raw material to obtain the molten glass GM.
  • the dissolution tank 1 is connected to the clarification tank 2 by a glass supply passage 6a.
  • the fining tank 2 performs a fining step of degassing by the action of a fining agent while transferring the molten glass GM.
  • the fining tank 2 is connected to the homogenization tank 3 by a glass supply passage 6b.
  • the fining tank 2 of this embodiment is comprised by the transfer pipe which consists of platinum materials (platinum or platinum alloy).
  • the homogenization tank 3 is a container made of platinum material for carrying out the step of stirring and homogenizing the clarified molten glass GM (homogenization step).
  • the homogenization tank 3 includes a stirrer 3a having a stirring blade.
  • the homogenization tank 3 is connected to the pot 4 by a glass supply passage 6c.
  • the pot 4 is a container for performing a conditioning step of adjusting the molten glass GM to a state suitable for molding.
  • the pot 4 is illustrated as a volume part for viscosity control and flow control of molten glass GM.
  • the pot 4 is connected to the molded body 5 by a glass supply passage 6d.
  • the forming body 5 forms the molten glass GM into a desired shape (for example, a plate shape).
  • the molded body 5 shapes the molten glass GM into a plate shape by the overflow down draw method.
  • the molded body 5 has a substantially wedge-shaped cross-sectional shape (cross-sectional shape orthogonal to the paper surface of FIG. 1), and an overflow groove (not shown) is formed in the upper portion of the molded body 5 It is done.
  • the formed body 5 causes the molten glass GM to overflow from the overflow groove and flow down along the side wall surfaces (sides located on the front and back sides of the paper surface) on both sides of the formed body 5.
  • the formed body 5 fuses the molten glass GM that has flowed down at the lower top of the side wall surface. Thereby, a strip-shaped plate glass GR is formed.
  • the molded object 5 may perform other down draw methods, such as a slot down draw method.
  • the plate glass has, for example, a thickness of 0.01 to 2 mm, and is used as a flat panel display such as a liquid crystal display or an organic EL display, a substrate such as an organic EL illumination, a solar cell, or a protective cover.
  • the glass article according to the present invention is not limited to a sheet glass, and includes those having a glass tube and other various shapes. For example, when forming a glass tube, it replaces with the molded object 5 and the shaping
  • the non-alkali glass is a glass substantially not containing an alkali component (alkali metal oxide), and specifically, a glass having a weight ratio of an alkali component of 3000 ppm or less is there.
  • the weight ratio of the alkali component in the present invention is preferably 1000 ppm or less, more preferably 500 ppm or less, and most preferably 300 ppm or less.
  • the glass supply paths 6a to 6d are constituted by the transfer pipe 7.
  • the transfer pipe 7 includes an elongated main body 8 for transferring the molten glass GM, and flanges 9 a and 9 b provided at each end of the main body 8.
  • the main body 8 is held by the refractory 10, and the refractory 10 is fixed to the casing 11.
  • the main body portion 8 is formed of a platinum material (platinum or platinum alloy) in a cylindrical shape (for example, a cylindrical shape).
  • the main body 8 is longer than the refractory 10. For this reason, each end of the main body portion 8 protrudes from the end of the refractory 10 in the longitudinal direction.
  • the flanges 9a and 9b are configured in a plate shape.
  • the flanges 9 a and 9 b include a first flange 9 a provided at one end of the main body 8 and a second flange 9 b provided at the other end of the main body 8.
  • Each flange 9a, 9b is configured to surround the outer peripheral surface at the end of the main body 8.
  • the flanges 9 a and 9 b include a disc 12 and a plurality of projections 13 to 15 which project from the disc 12.
  • the disc portion 12 is fixed to each end of the main body portion 8 in the longitudinal direction, and is made of a platinum material.
  • Each of the protrusions 13 to 15 includes a first protrusion 13 protruding upward from the upper portion of the disc 12, and a second protrusion 14 and a third protrusion 15 protruding laterally from the side of the disc 12. Including.
  • the first protruding portion 13 is configured as an electrode portion (terminal) for causing a current to flow to the main body portion 8.
  • the flanges 9a and 9b directly apply heat to the main body 8 by applying a predetermined voltage to the first projection 13. Therefore, the first protrusion 13 is made of, for example, copper (including a copper alloy) or nickel (including a nickel alloy).
  • the first projection 13 is provided with a first portion 13a integrally formed with the flanges 9a and 9b, and the first portion 13a. And a second portion 13b integrally formed at an end of the portion 13a.
  • the first portion 13a is a rectangular plate that protrudes upward from the top of the flanges 9a and 9b.
  • the second portion 13 b is a rectangular plate connected at a right angle to the first portion 13 a.
  • the second portion 13 b protrudes from the upper end of the first portion 13 a substantially in the horizontal direction or in the longitudinal direction of the main body portion 8.
  • the second portion 13 b has a hole 13 c vertically penetrating the second portion 13 b.
  • the second protrusion 14 and the third protrusion 15 are formed in a long plate shape.
  • the second protrusion 14 protrudes radially outward from one side portion (a middle portion in the vertical direction) of the disk portion 12.
  • the third protrusion 15 protrudes from the other side (a middle portion in the vertical direction) of the disc 12 in the direction opposite to the second protrusion 14.
  • the second protrusion 14 and the third protrusion 15 can be made of, for example, steel, and like the first protrusion 13, may be made of copper or nickel.
  • the refractory 10 (for example, refractory brick) is made of a high zirconia-based refractory, but is not limited to this material.
  • the casing 11 is made of steel or other metal as a rectangular parallelepiped or a cylinder, but is not limited to this shape.
  • the casing 11 is supported so as to be changeable in position within a building such as a factory where a manufacturing apparatus for glass articles is disposed, by a mount or the like (not shown).
  • a support 17 supporting the transfer pipe 7 is interposed between the refractory 10 and the main body 8.
  • the support material 17 of the present embodiment is a bonded body configured by diffusion bonding by heating after filling the powder as the raw material between the main body 8 of the transfer pipe 7 and the refractory 10.
  • diffusion bonding refers to a method of bringing powders into contact with each other and bonding using diffusion of atoms generated between contact surfaces.
  • a powder used as a raw material of the support material 17 what mixed alumina powder and silica powder can be used, for example. In this case, it is desirable to use an alumina powder having a high melting point as the main component.
  • the present invention is not limited to the above constitution, and may be constituted by using alone an alumina powder, a silica powder, zirconia powder, yttria powder and other respective material powders, or mixing a plurality of powders.
  • the support material 17 may be configured by a refractory fiber layer in contact with the outer peripheral surface of the main body portion 8 of the transfer pipe 7 and an indeterminate refractory layer disposed outside the refractory fiber layer.
  • the casing 11 includes devices (pressing devices) 18 to 20 for pressing the flange portions 9 a and 9 b of the transfer tube 7 and a member (support member) 24 a for supporting the transfer tube 7. , 24b.
  • the pressing devices 18 to 20 apply an external force F to the transfer pipe 7 along the longitudinal direction of the transfer pipe 7.
  • the pressing devices 18 to 20 are provided at a plurality of places of the casing 11. That is, the pressing devices 18 to 20 are disposed on the outer surface of the casing 11 so as to correspond to the positions of the protrusions 13 to 15 of the flanges 9a and 9b.
  • the plurality of pressing devices 18 to 20 include a first pressing device 18 provided on the top of the casing 11, and a second pressing device 19 and a third pressing device 20 provided on the side of the casing 11.
  • Each pressing device 18 to 20 includes a bracket 21 provided on the outer surface of the casing 11 and a pressing member 22 supported by the bracket 21.
  • the bracket 21 is formed in a plate shape, and has a hole 21 a penetrating along the longitudinal direction of the casing 11 (longitudinal direction of the main body portion 8).
  • the pressing member 22 includes a shaft 22a, a pressing portion 22b fixed to the tip of the shaft 22a, and fixing members 23a and 23b fixing the shaft 22a to the bracket 21.
  • An external thread is formed on the shaft 22 a, and the external thread is inserted into the hole 21 a of the bracket 21.
  • the pressing portion 22b is formed in a disk shape by an insulating material, but is not limited to this shape.
  • the pressing portion 22b is configured to be able to approach and leave each of the protrusions 13 to 15 of the flange portions 9a and 9b by the rotation operation of the shaft portion 22a.
  • the fixing members 23a and 23b are configured by a pair of nuts.
  • the respective fixing members 23a and 23b are screwed into the male screw portion of the shaft portion 22a.
  • the fixing members 23a and 23b fix the shaft portion 22a by being fastened so as to sandwich the bracket 21.
  • the casing 11 corresponds to the first support member 24a corresponding to the first flange 9a and the second corresponding to the second flange 9b.
  • Each of the support members 24a and 24b includes a support 25 projecting upward from the upper outer surface of the casing 11 and a support 26 to which one end of each of the connection members 16a and 16b is connected.
  • the support 25 is made of steel or other metal in an elongated shape. One end (lower end) of the support 25 is fixed to the outer surface of the casing 11 by means such as welding.
  • the support portion 26 protrudes from the upper end portion of the support column 25 in the horizontal direction or in the longitudinal direction (cylindrical direction) of the casing 11.
  • the support portion 26 has a hole (hereinafter referred to as a "long hole") 26a which is elongated along the projecting direction.
  • the long hole 26 a penetrates the support portion 26 in the vertical direction. A part of each connecting member 16a, 16b is inserted through the long hole 26a.
  • the first connecting member 16a connects the first flange portion 9a and the first support member 24a
  • the second connecting member 16b connects the second flange portion 9b and the second support member 24b.
  • Each connecting member 16a, 16b is provided with a first rod 27 connected to the support portion 26, a second rod 28 connected to each flange portion 9a, 9b, and an insulation provided in the middle of the connecting members 16a, 16b. And a member 29.
  • the first rod 27 is supported by the support portion 26, and the second rod 28 is fixed to the first projection 13 of each flange 9a, 9b by the fixing members 30a, 30b.
  • the first rod 27 is constituted by a metal screw member. One end (upper end) of the first rod 27 is movably held by the support portions 26 of the support members 24 a and 24 b. The other end of the first rod 27 is screwed into a female screw provided in the insulating member 29.
  • a roller 27 a traveling on the upper surface of the support portion 26 is rotatably provided.
  • the roller 27a is in contact with the upper surface of the support portion 26 so as to follow the movement of the first rod 27 accompanying the expansion when the main body portion 8 of the transfer pipe 7 expands due to heating.
  • the second rod 28 is formed of a metallic screw member. One end (upper end) of the second rod 28 is tightened in a female screw provided in the insulating member 29 without contacting with the other end (lower end) of the first rod 27. The other end (lower end) of the second rod 28 is inserted into a hole 13c formed through the second portion 13b of the first projection 13 in each of the flanges 9a and 9b, and the fixing members 30a and 30b. Are fixed to the second portion 13b.
  • the fixing members 30a and 30b are configured by a pair of nuts. Each fixing member 30 a, 30 b is screwed to the second rod 28. Each fixing member 30a, 30b is fastened so as to sandwich the second portion 13b in a state where a portion of the second rod 28 is inserted into the hole 13c in the second portion 13b of the first protrusion 13. As a result, the second rod 28 is fixed to the second portion 13 b.
  • a insulator is suitably used, but in addition to this, a member formed in a rectangular parallelepiped shape or a cylindrical shape by synthetic rubber and other various materials can be used.
  • the insulating member 29 couples the first rod 27 and the second rod 28 in a state where the lower end portion of the first rod 27 and the upper end portion of the second rod 28 are separated without contacting each other.
  • the insulating member 29 supports the support members 24 a and 24 b and the first protrusion.
  • the method mainly includes a preheating step S1, an assembly step S2, a melting step S3, a molten glass supply step S4, a forming step S5, a slow cooling step S6, and a cutting step S7.
  • the components 1 to 5, 6a to 6d of the manufacturing apparatus are individually heated in a separated state.
  • the preheating step S1 a case where the temperature of the transfer pipe 7 constituting the glass supply paths 6a to 6d is raised will be described.
  • the preheating step S1 in order to raise the temperature of the main body 8 of the transfer pipe 7, a current is supplied to the main body 8 via the flanges 9a and 9b.
  • a current is supplied to the main body 8 via the flanges 9a and 9b.
  • the main body 8 of each transfer pipe 7 expands in its longitudinal direction (axial direction). Further, the main body portion 8 and the flange portions 9a and 9b expand in the radial direction.
  • the support material 17 filled between the refractory 10 and the main body 8 maintains the powder state, and in the space between the main body 8 and the refractory 10, It is possible to move (move).
  • the friction force between the main body 8 and the support member 17 is reduced by the powder serving as the support member 17 acting as a lubricant. That is, the main body 8 is held by the refractory 10 in a state in which the main body 8 can be extended by application of an external force.
  • the flanges 9 a and 9 b are displaced in the longitudinal direction of the main body 8.
  • the connection members 16a and 16b connected to the flange portions 9a and 9b roll on the upper surfaces of the support portions 26 of the support members 24a and 24b by the rollers 27a (the solid line in FIG. It can follow the displacement of each flange 9a, 9b). Therefore, the support structure by the support column 25 and the connecting members 16a and 16b can suitably support the flanges 9a and 9b without inhibiting the expansion of the transfer pipe 7 (main body 8).
  • the expansion length of the transfer pipe 7 is measured (measurement step).
  • the expansion length of the transfer pipe 7 is measured by the following method. For example, a laser irradiation device corresponding to each flange portion 9a, 9b is disposed at a position away from each flange portion 9a, 9b, and laser light is irradiated from the laser irradiation device in the vertical direction. The change in the distance between the laser beam and the flanges 9a and 9b is measured. The amount of change in this distance can be regarded as the expansion length of the transfer pipe 7 (main body 8).
  • the expansion length of the portion of the main body 8 covered by the casing 11 and the expansion length of the portion exposed from the casing 11 are separately measured, and the sum of these expansion lengths is the transfer pipe 7
  • the length of expansion may be used.
  • the preheating step S1 since the casing 11 is similarly expanded, the expansion length of the casing 11 in the longitudinal direction of the main body 8 is measured, and the expansion length related to the portion of the main body 8 covered with the casing 11 You can think of it.
  • FIG. 6 is a graph showing the relationship between the preheating time and the expansion length of the transfer pipe 7.
  • the theoretical expansion curve is indicated by a solid line.
  • the code L1M indicates the expansion length of the transfer pipe 7 measured at the preheating time T1.
  • the symbols L2M and L3M indicate the expansion length of the transfer pipe 7 measured at the preheating times T2 and T3, respectively.
  • a symbol L3L indicates the expansion length on the theoretical expansion curve at the preheating time T3.
  • the theoretical expansion curve is obtained as follows. That is, the relationship between the preheating time and the heating temperature of the transfer pipe 7 is obtained. The expansion length of the transfer pipe 7 is calculated using the obtained heating temperature and the thermal expansion coefficient of the transfer pipe 7.
  • the expansion length of the transfer pipe 7 is periodically measured, and the measured expansion length (hereinafter referred to as “measured expansion length”) is the length on the theoretical expansion curve (hereinafter “the theoretical expansion length Compared with the According to this comparison, when the difference between the measured expansion length and the theoretical expansion length exceeds a predetermined threshold value, pressing of the flanges 9a and 9b by the pressing devices 18 to 20 is executed (external force application step).
  • the measurement of the main body 8 it is determined that the expansion length is insufficient, and each pressing device 18 to 20 applies an external force F to the transfer pipe 7 so that the measured expansion length L3M approaches the theoretical expansion length L3L.
  • the threshold TH may be 1 mm.
  • the pressing members 22 of the pressing devices 18 to 20 are rotated to move the pressing portions 22b in the standby position away from the flanges 9a and 9b to the respective projecting portions of the flanges 9a and 9b. Make it approach toward 13-15. Thereby, the pressing part 22b contacts one surface of each flange part 9a, 9b (refer FIG. 7). Then, the pressing member 22 is rotated so that the pressing portion 22 b presses the protrusions 13 to 15. Thereby, an external force F is applied along the longitudinal direction of the main body 8 to the projections 13 to 15 provided at a plurality of locations in the circumferential direction of the flanges 9a and 9b.
  • the external force F is not for generating tensile stress in the longitudinal direction in the main body 8 but is applied to the flanges 9 a and 9 b in order to promote the expansion of the main body 8.
  • the main body portion 8 is extended, and the thermal stress (the compressive stress in the longitudinal direction) is reduced accordingly. Further, the main body portion 8 can expand to a length corresponding to the preheating time (heating temperature) (see FIG. 8).
  • the preheating step S1 is completed, and the assembling step S2 is performed.
  • the manufacturing device is assembled by connecting the components 1 to 5, 6a to 6d of the manufacturing device after being heated and expanded.
  • the glass raw material supplied into the melting tank 1 is heated, and molten glass GM is generated.
  • the molten glass GM of the dissolution tank 1 is sequentially transferred to the clarification tank 2, the homogenization tank 3, the pot 4 and the formed body 5 through the respective glass supply paths 6a to 6d.
  • molten glass GM is stirred and homogenized (homogenization process).
  • the state for example, the viscosity and the flow rate
  • the diffusion bonding of the powder is activated.
  • the heating temperature of the powder may be equal to or higher than a temperature at which diffusion bonding of the powder is activated, and is preferably set to 1400 ° C. or more and 1650 ° C. or less.
  • diffusion bonding occurs between the alumina powders in the powder and between the alumina powder and the silica powder.
  • mullite is generated by the alumina powder and the silica powder.
  • Mullite bonds alumina powders together.
  • Diffusion bonding progresses with the passage of time, and finally, the powder becomes one or a plurality of bonded bodies (supporting material 17). Since the support member 17 is in close contact with the main body portion 8 and the refractory 10, the movement of the main body portion 8 with respect to the refractory 10 is inhibited in the molten glass supply step S4. Thereby, the main body portion 8 is fixed to the refractory 10 so as not to cause positional displacement. The support 17 continues to support the main body 8 together with the refractory 10 until the manufacture of the glass sheet GR is completed.
  • the molten glass GM is supplied to the formed body 5 through the molten glass supplying step S4.
  • the formed body 5 causes the molten glass GM to overflow from the overflow groove and to flow down along the side wall surface.
  • the forming body 5 forms a strip-shaped plate glass GR by fusing the flow-down molten glass GM at the lower top.
  • the strip-shaped plate glass GR is cut out of a plate glass having a predetermined dimension through an annealing step S6 by an annealing furnace and a cutting step S7 by a cutting device.
  • the plate glass as a glass article is completed.
  • the strip-shaped sheet glass GR may be wound into a roll to obtain a glass roll as a glass article (winding step).
  • the external force F is applied to the flange portions 9a and 9b of the transfer pipe 7 to promote expansion of the main body portion 8 in the preheating step S1 to transfer
  • the pipe 7 can be sufficiently expanded, and the thermal stress generated in the transfer pipe 7 can be reduced. Therefore, since the thermal stress generated in the transfer pipe 7 can be reduced also in the manufacturing process of the glass article (the molten glass supply step S4), the deformation and buckling of the transfer pipe 7 due to expansion can be prevented, and the life of the transfer pipe 7 is extended Can be realized.
  • FIG. 9 shows another example (second embodiment) of the transfer pipe.
  • the transfer pipe 7 according to the present example is used, for example, in a glass supply path 6 a that connects the dissolution tank 1 and the clarification tank 2.
  • the main body 8 of the transfer pipe 7 is inclined such that the end on the first flange 9a side is positioned above the end on the second flange 9b.
  • the inclination angle of the main body 8 with respect to the horizontal direction is desirably, for example, 3 to 30 °.
  • a nut 27 b is provided at the upper end portion of the first rod 27 instead of the roller 27 a.
  • the nut 27 b can slide on the upper surface of the support portion 26.
  • the first projection 31 is a first portion 31 a that protrudes downward from the lower portion of the disc 12, and the first portion 31 a to the main body 8. And a second portion 31b projecting to the longitudinal central portion side of the The second portion 31 b extends horizontally.
  • the connecting member 32 includes a first rod 33 fixed to the lower surface of the casing 11, a second rod 34 connected to the second portion 31b, and an insulating member 35 provided in the middle of the connecting member 32. Equipped with The lower end portion of the second rod 34 is provided with a nut 34 b in contact with the lower surface of the second portion 31 b. The nut 34b can slide on the lower surface of the second portion 31b.
  • the second flange portion 9 b is supported by the casing 11 in a state in which the movement along the longitudinal direction of the transfer pipe 7 (main body portion 8) is permitted by the first projection 31 and the connecting member 32.
  • the distance from the support 26 to the second portion 13 b of the first projection 13 is shortened along with the extension of the main body 8 in the preheating step S 1, and The distance to the second portion 31b is increased. Therefore, the lengths of the connecting members 16a and 32 are adjusted to follow the change in the distance.
  • the lengths of the connecting members 16a and 32 may be adjusted, for example, by changing the tightening lengths of the first rods 27 and 33 and / or the second rods 28 and 34 to the insulating members 29 and 35.
  • the support portion 26 of the second embodiment extends horizontally but may be inclined so as to be parallel to the main body portion 8.
  • the second portion 31 b of the first protrusion 31 extends horizontally but may be inclined so as to be parallel to the main body 8.
  • the length adjustment of the connecting members 16a and 32 is not necessary.
  • other slide members or rollers capable of sliding movement may be used instead of the nuts 27b and 34b.
  • the first pressing device 18 corresponding to the second flange 9 b is provided on the lower surface of the casing 11. That is, the bracket 21 of the first pressing device 18 is fixed to the lower surface of the casing 11 and protrudes downward from the lower surface.
  • the pressing member 22 is supported by the bracket 21 so as to be able to move forward and backward via the shaft 22a.
  • the pressing member 22 brings the pressing portion 22b into contact with the first portion 31a of the first projecting portion 31 related to the second flange portion 9b, and presses the first portion 31a to exert an external force on the second flange portion 9b. Grant
  • the shaft 22 a is inclined at the same angle as the main body 8 so as to be parallel to the main body 8.
  • the pressing member 22 of the third pressing device 20 is also inclined at the same angle as the main body 8.
  • the pressing members 22 of the second pressing device 19 and the third pressing device 20 can press the second protrusion 14 and the third protrusion 15 of the flanges 9 a and 9 b along the inclination direction of the main body 8.
  • an external force for promoting the expansion can be applied to the flanges 9a and 9b by the pressing devices 18 to 20.
  • the transfer pipe 7 constituting the glass supply paths 6a to 6d is exemplified.
  • the present invention is not limited to this.
  • the fining tank 2 may be constituted by the transfer pipe 7 of the above embodiment. That is, the present invention is also applicable to the clarification tank 2.
  • the direction in which the external force is applied is not limited to the direction along the longitudinal direction (inclination direction) of the transfer tube 7, but if the transfer tube 7 can be extended, the direction having an angle with the longitudinal direction (inclination direction) of the transfer tube 7 It may be.
  • the direction perpendicular to the flanges 9a and 9b of the transfer pipe 7. You may apply external force along.
  • the angle between the direction of applying the external force and the longitudinal direction (tilt direction) of the transfer pipe 7 is preferably 30 ° or less, more preferably 15 ° or less, Most preferably, it is 0 °.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Re-Forming, After-Treatment, Cutting And Transporting Of Glass Products (AREA)
  • Glass Melting And Manufacturing (AREA)
  • Joining Of Glass To Other Materials (AREA)

Abstract

ガラス物品の製造方法は、移送管7を加熱する予熱工程S1と、予熱工程S1後に、移送管7の内部に溶融ガラスを流通させる移送工程S4と、を備える。移送管7は、管状の本体部8と、本体部8の端部に形成されるフランジ部9a,9bとを備える。本体部8は、耐火物10に保持される。予熱工程S1は、移送管7に外力Fを付与し、移送管7を伸長させる外力付与工程を含む。

Description

ガラス物品の製造方法及び製造装置
 本発明は、板ガラス等のガラス物品を製造する方法及び装置に関する。
 周知のように、液晶ディスプレイ、有機ELディスプレイ等のフラットパネルディスプレイでは、薄型化及び軽量化が進んでおり、これに伴い、フラットパネルディスプレイに使用される板ガラスについても更なる薄板化が要求される。
 一般に、フラットパネルディスプレイに使用される板ガラスを製造する方法としては、オーバーフローダウンドロー法等の各種成形法が用いられる。例えば板ガラスは、溶解工程、清澄工程、均質化工程、成形工程等の各工程を経て薄板状とされる。特許文献1には、上記の各工程を実行する製造装置として、溶解炉と、清澄槽と、攪拌槽と、成形装置と、これらの構成要素を相互に接続するとともに溶融ガラスを移送する移送管(ガラス供給管)とを備えたものが開示される。
 移送管によって移送される溶融ガラスは、高温となることから、板ガラス製造装置の操業にあたり、溶融ガラスを移送することができるように、事前に移送管を予備加熱する必要がある(以下、この工程を「予熱工程」という)。予熱工程において、移送管同士、又は移送管と清澄槽等の他の構成要素とを連結した状態で加熱すると、その連結部分に熱膨張(以下、単に「膨張」という)による変形が生じ、当該移送管が損傷する場合がある。このため、特許文献1では、移送管と他の構成要素とを分離した状態で予熱工程を行った後に、製造装置を組み立てることが開示されている。
特開2013-216535号公報
 しかしながら、従来の予熱工程では、移送管の支持構造、加熱温度、加熱時間等の各種条件の違いにより、移送管の膨張が十分に確保できない場合があった。予熱工程における移送管の膨張が不十分であると、移送管に熱応力が発生する。この場合、製造装置の組み付け後のガラス物品の製造において、移送管が更に膨張することから、移送管の熱応力が増大し、損傷を招くおそれがあった。
 本発明は上記の事情に鑑みてなされたものであり、予熱工程において移送管を十分に膨張させることが可能なガラス物品の製造方法及び製造装置を提供することを目的とする。
 本発明は上記の課題を解決するためのものであり、移送管を加熱する予熱工程と、前記予熱工程後に、前記移送管の内部に溶融ガラスを流通させる移送工程と、を備えるガラス物品の製造方法であって、前記移送管は、管状の本体部と、前記本体部の端部に形成されるフランジ部とを備え、前記本体部は、耐火物に保持されており、前記予熱工程は、前記移送管に外力を付与し、前記移送管を伸長させる外力付与工程を含むことを特徴とする。
 かかる構成によれば、移送管に外力を付与することにより、予熱工程において、当該移送管の膨張を促進して移送管を十分に膨張させることができ、移送管に発生する熱応力を低減できる。このため、予熱工程後におけるガラス物品の製造においても移送管の熱応力を低減できるので、膨張による移送管の変形や座屈を防止し、長寿命化を実現できる。
 前記外力付与工程では、前記移送管の測定膨張長さが理論膨張長さに近づくように、前記移送管に外力を付与することが望ましい。予熱工程における任意の加熱時間で測定された移送管の膨張長さ(測定膨張長さ)を、当該加熱時間(加熱温度)における理論膨張長さに近づけることで、予熱工程における移送管の膨張長さを精度良く最適化できる。ここで、「測定膨張長さ」とは、移送管の膨張長さの測定値であり、「理論膨張長さ」とは、加熱温度及び熱膨張率から算出される移送管の膨張長さを意味する。
 なお、前記外力付与工程は、前記理論膨張長さと前記測定膨張長さの差が所定の閾値を超えた場合に実行されることが望ましい。これにより、移送管を効率よく膨張させることができる。
 前記耐火物は、ケーシングに固定されており、前記外力付与工程では、前記ケーシングが備える押圧部材を前記フランジ部に接触させることにより、前記移送管に前記外力を付与することが望ましい。耐火物がケーシングに固定されることにより、ケーシングの移動に伴って移送管及び耐火物を移動させることができる。ケーシングが押圧部材を備えることにより、ケーシングの移動に伴って押圧部材も移動させることができる。したがって、予熱後の移送管と他の構成要素とを接続する作業を効率よく行うことができる。
 また、前記外力付与工程では、前記フランジ部の周方向の複数個所に前記外力を付与することが望ましい。これにより、フランジ部の局所的な変形を防止しつつ、本体部を好適に膨張させることができる。
 また、前記移送管の前記本体部は、傾斜姿勢で配置されており、前記外力付与工程では、前記本体部の傾斜方向に沿って前記外力を付与することが望ましい。これにより、傾斜した本体部を好適に膨張させることができる。
 本発明は上記の課題を解決するためのものであり、内部に溶融ガラスを流通させることが可能な移送管と、前記移送管を保持する耐火物と、を備えるガラス物品の製造装置において、前記移送管は、管状の本体部と、前記本体部の端部に形成されるフランジ部とを備え、前記本体部が、前記耐火物に保持されており、前記製造装置は、前記移送管が伸長するように前記移送管に外力を付与する外力付与手段をさらに備えることを特徴とする。
 かかる構成によれば、製造装置に備えられる外力付与手段によって移送管に外力を付与することで、移送管を予熱する場合に当該移送管の膨張長さを最適化できる。これにより、移送管を予め十分に膨張させることができ、ガラス物品の製造において、移送管の更なる膨張による変形や座屈を防止し、当該移送管の長寿命化を実現できる。
 本発明によれば、予熱工程において移送管を十分に膨張させることが可能である。
ガラス物品の製造装置の全体構成を示す側面図である。 移送管の側面図である。 移送管の正面図である。 ガラス物品の製造方法に係るフローチャートである。 予熱工程における移送管を示す側面図である。 移送管の予熱時間と膨張長さとの関係を示すグラフである。 予熱工程における移送管を示す側面図である。 予熱工程における移送管を示す側面図である。 移送管の他の例を示す側面図である。
 以下、本発明を実施するための形態について、図面を参照しながら説明する。図1乃至図8は、本発明に係るガラス物品の製造方法及び製造装置の一実施形態(第一実施形態)を示す。
 図1に示すように、本実施形態に係るガラス物品の製造装置は、上流側から順に、溶解槽1と、清澄槽2と、均質化槽(攪拌槽)3と、ポット4と、成形体5と、これらの各構成要素1~5を連結するガラス供給路6a~6dとを備える。この他、製造装置は、成形体5により成形された板ガラスGR(ガラス物品)を徐冷する徐冷炉(図示せず)及び徐冷後に板ガラスGRを切断する切断装置(図示せず)を備える。
 溶解槽1は、投入されたガラス原料を溶解して溶融ガラスGMを得る溶解工程を行うための容器である。溶解槽1は、ガラス供給路6aによって清澄槽2に接続されている。
 清澄槽2は、溶融ガラスGMを移送しながら清澄剤等の作用により脱泡する清澄工程を行う。清澄槽2は、ガラス供給路6bによって均質化槽3に接続されている。本実施形態の清澄槽2は、白金材料(白金又は白金合金)からなる移送管で構成される。
 均質化槽3は、清澄された溶融ガラスGMを攪拌し、均一化する工程(均質化工程)を行うための白金材料製の容器である。均質化槽3は、攪拌翼を有するスターラ3aを備える。均質化槽3は、ガラス供給路6cによってポット4に接続されている。
 ポット4は、溶融ガラスGMを成形に適した状態に調整する状態調整工程を行うための容器である。ポット4は、溶融ガラスGMの粘度調整及び流量調整のための容積部として例示される。ポット4は、ガラス供給路6dによって成形体5に接続されている。
 成形体5は、溶融ガラスGMを所望の形状(例えば板状)に成形する。本実施形態では、成形体5は、オーバーフローダウンドロー法によって溶融ガラスGMを板状に成形する。詳細には、成形体5は、断面形状(図1の紙面と直交する断面形状)が略楔形状を成しており、この成形体5の上部には、オーバーフロー溝(図示せず)が形成されている。
 成形体5は、溶融ガラスGMをオーバーフロー溝から溢れ出させて、成形体5の両側の側壁面(紙面の表裏面側に位置する側面)に沿って流下させる。成形体5は、流下させた溶融ガラスGMを側壁面の下頂部で融合させる。これにより、帯状の板ガラスGRが成形される。なお、成形体5は、スロットダウンドロー法などの他のダウンドロー法を実行するものであってもよい。
 このようにして得られた帯状の板ガラスGRを切断することにより、枚葉状の板ガラスが切り出される。板ガラスは、例えば、厚みが0.01~2mmであって、液晶ディスプレイや有機ELディスプレイなどのフラットパネルディスプレイ、有機EL照明、太陽電池などの基板や保護カバーに利用される。本発明に係るガラス物品は、板ガラスに限定されず、ガラス管その他の各種形状を有するものを含む。例えば、ガラス管を形成する場合には、成形体5に代えてダンナー法を利用する成形装置が配備される。
 板ガラスの材料としては、ケイ酸塩ガラス、シリカガラスが用いられ、好ましくはホウ珪酸ガラス、ソーダライムガラス、アルミノ珪酸塩ガラス、化学強化ガラスが用いられ、最も好ましくは無アルカリガラスが用いられる。ここで、無アルカリガラスとは、アルカリ成分(アルカリ金属酸化物)が実質的に含まれていないガラスのことであって、具体的には、アルカリ成分の重量比が3000ppm以下のガラスのことである。本発明におけるアルカリ成分の重量比は、好ましくは1000ppm以下であり、より好ましくは500ppm以下であり、最も好ましくは300ppm以下である。
 ガラス供給路6a~6dは、移送管7により構成される。図2に示すように、移送管7は、溶融ガラスGMを移送する長尺状の本体部8と、本体部8の各端部に設けられるフランジ部9a,9bとを備える。本体部8は、耐火物10で保持され、耐火物10は、ケーシング11に固定される。
 本体部8は、白金材料(白金又は白金合金)により筒状(例えば円筒状)に構成される。本体部8は、耐火物10よりも長く構成される。このため、本体部8の各端部は、耐火物10の端部から長手方向に突出している。
 フランジ部9a,9bは、板状に構成される。フランジ部9a,9bは、本体部8の一端部に設けられる第一フランジ部9aと、本体部8の他端部に設けられる第二フランジ部9bとを含む。各フランジ部9a,9bは、本体部8の端部における外周面を囲むように構成される。
 図2及び図3に示すように、フランジ部9a,9bは、円板部12と、この円板部12から突出する複数の突起部13~15とを備える。円板部12は、本体部8の長手方向各端部に固定され、白金材料により構成される。各突起部13~15は、円板部12の上部から上方に突出する第一突起部13、円板部12の側部から側方に突出する第二突起部14及び第三突起部15を含む。
 第一突起部13は、本体部8に電流を流すための電極部(ターミナル)として構成される。フランジ部9a,9bは、第一突起部13に所定の電圧を印加することで本体部8を直接的に通電加熱する。このため、第一突起部13は、例えば銅(銅合金を含む)又はニッケル(ニッケル合金を含む)により構成される。
 フランジ部9a,9bを、連結部材16a,16bを介してケーシング11で支持するため、第一突起部13は、フランジ部9a,9bと一体に構成される第一の部分13aと、この第一の部分13aの端部に一体に構成される第二の部分13bとを有する。第一の部分13aは、フランジ部9a,9bの上部から上方に突出する矩形状の板部である。第二の部分13bは、第一の部分13aに対して直角に繋がる矩形状の板部である。第二の部分13bは、第一の部分13aの上端部から略水平方向又は本体部8の長手方向に沿って突出する。第二の部分13bは、当該第二の部分13bを上下方向に貫通する孔13cを有する。
 第二突起部14及び第三突起部15は、長尺の板状に構成される。第二突起部14は、円板部12の一方の側部(上下方向における中途部)から半径方向外方に突出する。第三突起部15は、円板部12の他方の側部(上下方向における中途部)から第二突起部14とは反対の方向に突出する。第二突起部14及び第三突起部15は、例えば、鋼により構成することができ、第一突起部13と同様に、銅又はニッケルにより構成してもよい。
 耐火物10(例えば耐火煉瓦)は、高ジルコニア系耐火物により構成されるが、この材質に限定されるものではない。ケーシング11は、鋼その他の金属により直方体又は円筒体として構成されるが、この形状に限定されない。ケーシング11は、ガラス物品の製造装置が配置される工場等の建屋内において、図示しない架台等により位置変更可能に支持されている。
 耐火物10と本体部8との間には、移送管7を支持する支持材17が介在する。本実施形態の支持材17は、原料となる粉末を、移送管7の本体部8と耐火物10との間に充填した後に、加熱によって拡散接合させることにより構成される接合体である。ここで、「拡散接合」とは、粉末同士を接触させ、接触面間に生じる原子の拡散を利用して接合する方法をいう。
 支持材17の原料となる粉末としては、例えば、アルミナ粉末とシリカ粉末とを混合したものを使用できる。この場合、融点が高いアルミナ粉末を主成分することが望ましい。上記の構成に限らず、アルミナ粉末、シリカ粉末の他、ジルコニア粉末、イットリア粉末その他の各材料粉末を単体で使用し、或いは複数種の粉末を混合することにより構成され得る。なお、支持材17は、移送管7の本体部8の外周面と接触する耐火物繊維層と、耐火物繊維層の外側に配置される不定形耐火物層とで構成してもよい。
 図2及び図3に示すように、ケーシング11は、移送管7のフランジ部9a,9bを押圧する装置(押圧装置)18~20と、移送管7を支持するための部材(支持部材)24a,24bと、を備える。
 押圧装置18~20は、移送管7の長手方向に沿って、当該移送管7に外力Fを付与する。押圧装置18~20は、ケーシング11の複数箇所に設けられる。すなわち、押圧装置18~20は、フランジ部9a,9bの各突起部13~15の位置に対応するように、ケーシング11の外面に配置される。複数の押圧装置18~20は、ケーシング11の上部に設けられる第一押圧装置18と、ケーシング11の側部に設けられる第二押圧装置19及び第三押圧装置20とを含む。
 各押圧装置18~20は、ケーシング11の外面に設けられるブラケット21と、ブラケット21に支持される押圧部材22とを備える。ブラケット21は板状に構成されており、ケーシング11の長手方向(本体部8の長手方向)に沿って貫通する孔21aを有する。
 押圧部材22は、軸部22aと、当該軸部22aの先端に固定される押圧部22bと、軸部22aをブラケット21に固定する固定部材23a,23bと、を備える。軸部22aには雄ねじ部が形成されており、当該雄ねじ部は、ブラケット21の孔21aに挿通されている。押圧部22bは、絶縁材料により円板状に構成されるが、この形状に限定されない。押圧部22bは、軸部22aの回転動作により、フランジ部9a,9bの各突起部13~15に対して接近・離反可能に構成される。固定部材23a,23bは、一対のナットにより構成される。各固定部材23a,23bは、軸部22aの雄ねじ部に螺合している。各固定部材23a,23bは、ブラケット21を挟むように締結されることで、軸部22aを固定する。
 フランジ部9a,9bを、連結部材16a,16bを介してケーシング11で支持するため、ケーシング11は、第一フランジ部9aに対応する第一支持部材24aと、第二フランジ部9bに対応する第二支持部材24bとを含む。各支持部材24a,24bは、ケーシング11の上部外面から上方に突出する支柱25と、各連結部材16a,16bの一端部が連結される支持部26とを備える。
 支柱25は、鋼その他の金属により長尺状に構成される。支柱25は、その一端部(下端部)が溶接等の手段によりケーシング11の外面に固定されてなる。
 支持部26は、支柱25の上端部から水平方向又はケーシング11の長手方向(筒心方向)に沿って突出する。支持部26は、その突出方向に沿って長く構成される孔(以下「長孔」という)26aを有する。長孔26aは、支持部26を上下方向に貫通する。この長孔26aには、各連結部材16a,16bの一部が挿通される。
 第一連結部材16aは、第一フランジ部9aと第一支持部材24aとを連結し、第二連結部材16bは、第二フランジ部9bと第二支持部材24bとを連結する。各連結部材16a,16bは、支持部26に連結される第一ロッド27と、各フランジ部9a,9bに連結される第二ロッド28と、当該連結部材16a,16bの中途部に設けられる絶縁部材29とを備える。第一ロッド27は、支持部26に支持され、第二ロッド28は、固定部材30a,30bによって各フランジ部9a,9bの第一突起部13に固定されている。
 第一ロッド27は、金属製のねじ部材により構成される。第一ロッド27の一端部(上端部)は、各支持部材24a,24bの支持部26に移動可能な状態で保持される。第一ロッド27の他端部は、絶縁部材29が備える雌ねじ部に締め込まれている。
 第一ロッド27の上端部には、支持部26の上面を走行するローラ27aが回転自在に設けられる。ローラ27aは、移送管7の本体部8が加熱により膨張した場合に、当該膨張に伴う第一ロッド27の移動に追従するように、支持部26の上面に接触している。
 第二ロッド28は、第一ロッド27と同様に、金属製のねじ部材により構成される。第二ロッド28の一端部(上端部)は、第一ロッド27の他端部(下端部)と接触することなく、絶縁部材29が備える雌ねじ部に締め込まれている。第二ロッド28の他端部(下端部)は、各フランジ部9a,9bにおける第一突起部13の第二の部分13bに貫通形成された孔13cに挿通されるとともに、固定部材30a,30bによって当該第二の部分13bに固定される。
 固定部材30a,30bは、一対のナットにより構成される。各固定部材30a,30bは、第二ロッド28に螺合されている。各固定部材30a,30bは、第二ロッド28の一部が第一突起部13の第二の部分13bに係る孔13cに挿通された状態において、当該第二の部分13bを挟むように締結されることで、第二ロッド28を第二の部分13bに固定する。
 絶縁部材29としては、碍子が好適に使用されるが、この他、合成ゴムその他の各種材料により直方体状又は円柱状に構成されたものを使用できる。絶縁部材29は、第一ロッド27の下端部と、第二ロッド28の上端部とを接触させることなく離間した状態で、当該第一ロッド27及び第二ロッド28を連結する。このように、絶縁部材29は、第一ロッド27及び第二ロッド28により各支持部材24a,24bと第一突起部13とを繋いだ状態で、当該各支持部材24a,24bと第一突起部13との間に介在する。
 以下、上記構成の製造装置によってガラス物品(板ガラス)を製造する方法について説明する。図4に示すように、本方法は、予熱工程S1、組立工程S2、溶解工程S3、溶融ガラス供給工程S4、成形工程S5、徐冷工程S6、及び切断工程S7を主に備える。
 予熱工程S1では、製造装置の各構成要素1~5,6a~6dを個別に分離した状態で、これらを昇温する。以下では、予熱工程S1の例として、ガラス供給路6a~6dを構成する移送管7を昇温する場合について説明する。
 予熱工程S1では、移送管7の本体部8を昇温するため、フランジ部9a,9bを介して本体部8に電流を流す。この加熱により、図5において二点鎖線で示すように、各移送管7の本体部8は、その長手方向(軸心方向)に膨張する。また、本体部8及びフランジ部9a,9bは、半径方向に膨張する。
 このとき、ケーシング11内において、耐火物10と本体部8との間に充填された支持材17は、粉末の状態を維持しており、本体部8と耐火物10との間の空間において、流動(移動)可能である。このように、支持材17としての粉末が潤滑材として作用することで、本体部8と支持材17との間における摩擦力が低減される。つまり、外力付与によって本体部8が伸長可能な状態で本体部8が耐火物10で保持されている。
 また、本体部8の膨張に応じて、各フランジ部9a,9bは、当該本体部8の長手方向に変位する。このとき、各フランジ部9a,9bに連結される各連結部材16a,16bは、ローラ27aが、各支持部材24a,24bにおける支持部26の上面を転動することにより(図5における実線と二点鎖線を参照)、各フランジ部9a,9bの変位に追従できる。したがって、支柱25及び連結部材16a,16bによる支持構造は、移送管7(本体部8)の膨張を阻害することなくフランジ部9a,9bを好適に支持できる。
 予熱工程S1では、移送管7の膨張長さを測定する(測定工程)。移送管7の膨張長さは以下の方法により測定される。例えば、各フランジ部9a,9bから離れた位置に、当該各フランジ部9a,9bに対応するレーザ照射装置を配置し、当該レーザ照射装置から鉛直方向にレーザ光を照射し、一定の加熱時間毎に当該レーザ光と各フランジ部9a,9bとの距離の変化を測定する。この距離の変化量は、移送管7(本体部8)の膨張長さと見做すことができる。
 他の測定方法として、本体部8においてケーシング11に被覆されている部分の膨張長さと、ケーシング11から露出する部分の膨張長さを個別に測定し、これらの膨張長さの総和を移送管7の膨張長さとしてもよい。予熱工程S1では、ケーシング11も同様に膨張することから、本体部8の長手方向におけるケーシング11の膨張長さを測定し、これをケーシング11に被覆されている本体部8の部分に係る膨張長さと見做すことができる。
 図6は、予備加熱の時間と、移送管7の膨張長さとの関係を示すグラフである。図6において、理論膨張曲線を実線で示す。図6において、符号L1Mは、予熱時間T1に測定された移送管7の膨張長さを示す。同様に、符号L2M、L3Mは、それぞれ予熱時間T2,T3において測定された移送管7の膨張長さを示す。また、符号L3Lは、予熱時間T3における理論膨張曲線上の膨張長さを示す。
 なお、本実施形態において、理論膨張曲線は以下のようにして求められる。すなわち、予熱時間と移送管7の加熱温度の関係を得る。求めた加熱温度と移送管7の熱膨張率とを用いて移送管7の膨張長さを算出する。
 予熱工程S1では、定期的に移送管7の膨張長さを測定し、測定された膨張長さ(以下「測定膨張長さ」という)を、理論膨張曲線上の長さ(以下「理論膨張長さ」という)と比較する。この比較により、測定膨張長さと理論膨張長さとの差が所定の閾値を超える場合に、押圧装置18~20によるフランジ部9a,9bの押圧が実行される(外力付与工程)。
 すなわち、図6に示すように、予熱時間T3における測定膨張長さL3Mと、当該時間T3における理論膨張長さL3Lとの差(L3L-L3M)が、閾値THを超える場合、本体部8の測定膨張長さが不十分であると判断され、各押圧装置18~20は、この測定膨張長さL3Mが理論膨張長さL3Lに近づくように、移送管7に外力Fを付与する。例えば、移送管7の長さが2000mmであれば、閾値THは1mmとすればよい。
 この外力付与工程では、各押圧装置18~20の押圧部材22を回転させることで、各フランジ部9a,9bから離れた待機位置にある押圧部22bを、各フランジ部9a,9bの各突起部13~15に向かって接近させる。これにより、押圧部22bは、各フランジ部9a,9bの一方の面に接触する(図7参照)。そして、押圧部22bが各突起部13~15を押圧するように、押圧部材22を回転させる。これにより、各フランジ部9a,9bの周方向における複数箇所に設けられた各突起部13~15に、本体部8の長手方向に沿って外力Fが付与される。この外力Fは、本体部8に長手方向の引張応力を発生させるためのものではなく、本体部8の膨張を助長させるために各フランジ部9a,9bに付与される。このように、各突起部13~15に外力Fを付与することにより、本体部8が伸長し、これに伴って熱応力(長手方向の圧縮応力)が低減される。また、本体部8は、予熱時間(加熱温度)に応じた長さまで膨張することができる(図8参照)。
 本体部8が所定の温度(例えば1200~1400℃)にまで到達すると、予熱工程S1が終了し、組立工程S2が実行される。組立工程S2では、加熱されて膨張した後の製造装置の各構成要素1~5,6a~6dを連結することにより、製造装置が組み立てられる。
 溶解工程S3では、溶解槽1内に供給されたガラス原料が加熱され、溶融ガラスGMが生成される。なお、製造装置の立ち上げ期間を短縮するため、組立工程S2以前に溶解槽1内で予め溶融ガラスGMを生成してもよい。
 溶融ガラス供給工程S4では、溶解槽1の溶融ガラスGMを、各ガラス供給路6a~6dを介して、清澄槽2、均質化槽3、ポット4、そして成形体5へと順次移送する。溶融ガラス供給工程S4では、溶融ガラスGMが清澄槽2を流通する際、ガラス原料に配合された清澄剤の作用により溶融ガラスGMからガス(泡)が発生する。このガスは、清澄槽2から外部に排出される(清澄工程)。また、均質化槽3において、溶融ガラスGMは、攪拌されて均質化される(均質化工程)。溶融ガラスGMがポット4、ガラス供給路6dを通過する際には、その状態(例えば粘度や流量)が調整される(状態調整工程)。
 なお、溶融ガラス供給工程S4において、耐火物10と本体部8との間に介在する粉末の温度が高温になると、当該粉末の拡散結合が活性化する。粉末の加熱温度は、当該粉末の拡散接合が活性化する温度以上とすればよく、1400℃以上1650℃以下とすることが好ましい。
 本実施形態では、粉末中のアルミナ粉末同士、及びアルミナ粉末とシリカ粉末との間で、拡散接合が発生する。また、アルミナ粉末とシリカ粉末とによりムライトが発生する。ムライトは、アルミナ粉末同士を強固に接合する。時間の経過とともに拡散接合が進行し、最終的に、粉末は一個又は複数個の接合体(支持材17)となる。支持材17は、本体部8及び耐火物10と密着することから、溶融ガラス供給工程S4において耐火物10に対する本体部8の移動を阻害する。これにより、本体部8は、位置ずれが生じないように耐火物10に固定される。支持材17は、板ガラスGRの製造が終了するまでの間、耐火物10とともに本体部8を支持し続ける。
 成形工程S5では、溶融ガラス供給工程S4を経て溶融ガラスGMが成形体5に供給される。成形体5は、溶融ガラスGMをオーバーフロー溝から溢れ出させ、その側壁面に沿って流下させる。成形体5は、流下させた溶融ガラスGMを下頂部で融合させることで、帯状の板ガラスGRを成形する。
 その後、帯状の板ガラスGRは、徐冷炉による徐冷工程S6、切断装置による切断工程S7を経て、所定寸法の板ガラスが切り出される。以上により、ガラス物品としての板ガラスが完成する。或いは、切断工程S7で板ガラスGRの幅方向の両端を除去した後に、帯状の板ガラスGRをロール状に巻き取り、ガラス物品としてのガラスロールを得てもよい(巻取工程)。
 以上説明した本実施形態に係るガラス物品の製造方法によれば、移送管7のフランジ部9a,9bに外力Fを付与することにより、予熱工程S1において、本体部8の膨張を促進して移送管7を十分に膨張させることができ、移送管7に発生する熱応力を低減できる。したがって、ガラス物品の製造過程(溶融ガラス供給工程S4)においても移送管7に発生する熱応力を低減できるので、膨張による移送管7の変形や座屈を防止し、移送管7の長寿命化を実現できる。
 図9は、移送管の他の例(第二実施形態)を示す。本例に係る移送管7は、例えば溶解槽1と清澄槽2とを接続するガラス供給路6aに使用される。この移送管7の本体部8は、第一フランジ部9a側の端部が、第二フランジ部9b側の端部よりも上方に位置するように傾斜する。水平方向に対する本体部8の傾斜角度は、例えば3~30°とされることが望ましい。
 第二実施形態の第一フランジ部9aの支持構造では、ローラ27aに代えてナット27bが第一ロッド27の上端部に設けられる。このナット27bは、支持部26の上面を滑り移動可能である。
 第二実施形態の第二フランジ部9bの支持構造において、第一突起部31は、円板部12の下部から下方に突出する第一の部分31aと、この第一の部分31aから本体部8の長手方向中央部側に突出する第二の部分31bとを有する。第二の部分31bは、水平に伸びる。また、連結部材32は、ケーシング11の下面に固定される第一ロッド33と、第二の部分31bに連結される第二ロッド34と、当該連結部材32の中途部に設けられる絶縁部材35とを備える。第二ロッド34の下端部には、第二の部分31bの下面と接触するナット34bが設けられる。このナット34bは、第二の部分31bの下面を滑り移動可能である。このような第一突起部31及び連結部材32により、第二フランジ部9bは、移送管7(本体部8)の長手方向に沿う移動が許容された状態でケーシング11に支持されている。
 なお、予熱工程S1での本体部8の伸長に伴い、支持部26から第一突起部13の第二の部分13bに至る距離が短くなると共に、ケーシング11の下面から第一突起部31の第二の部分31bに至る距離が長くなる。このため、上記距離の変動に追従するように連結部材16a,32の長さを調整する。連結部材16a,32の長さは、例えば絶縁部材29,35への第一ロッド27,33及び/又は第二ロッド28,34の締め込み長さを変更することで調整すればよい。
 第二実施形態の支持部26は、水平に伸びるが、本体部8と平行となるように傾斜してもよい。また、第一突起部31の第二の部分31bは、水平に伸びるが、本体部8と平行となるように傾斜してもよい。支持部26及び第二の部分31bが傾斜する場合、連結部材16a,32の長さ調整が不要となる。また、ナット27b,34bに代え、滑り移動可能な他のスライド部材やローラを用いてもよい。
 第二フランジ部9bに対応する第一押圧装置18は、ケーシング11の下面に設けられている。すなわち、第一押圧装置18のブラケット21は、ケーシング11の下面に固定されるとともに、当該下面から下方に突出している。押圧部材22は、軸部22aを介してブラケット21に進退可能に支持される。押圧部材22は、押圧部22bを第二フランジ部9bに係る第一突起部31の第一の部分31aに接触させ、当該第一の部分31aを押圧することにより、第二フランジ部9bに外力を付与する。
 第二押圧装置19の押圧部材22は、本体部8と平行となるように、軸部22aが本体部8と同一の角度で傾斜している。図示していないが、第三押圧装置20の押圧部材22においても、本体部8と同じ角度で傾斜している。第二押圧装置19及び第三押圧装置20の各押圧部材22は、本体部8の傾斜方向に沿って各フランジ部9a,9bの第二突起部14及び第三突起部15を押圧できる。本例においても、予熱工程S1において本体部8の膨張が不十分な場合に、その膨張を促進させる外力を各押圧装置18~20により各フランジ部9a,9bに与えることができる。
 なお、本発明は、上記実施形態の構成に限定されるものではなく、上記した作用効果に限定されるものでもない。本発明は、本発明の要旨を逸脱しない範囲で種々の変更が可能である。
 上記の実施形態では、ガラス供給路6a~6dを構成する移送管7を例示したが、これに限らず、例えば清澄槽2を上記形態の移送管7で構成してもよい。すなわち、本発明は清澄槽2に対しても適用可能である。
 外力を付与する方向は、移送管7の長手方向(傾斜方向)に沿う方向に限らず、移送管7を伸長させることができれば、移送管7の長手方向(傾斜方向)と角度を有する方向であってもよい。例えば、図9のように傾斜する移送管7に鉛直面と平行なフランジ部9a,9bが設けられる場合、第一押圧装置18のように移送管7のフランジ部9a,9bと垂直な方向に沿って外力を付与してもよい。移送管7を効率よく伸長させる観点では、外力を付与する方向と移送管7の長手方向(傾斜方向)となす角度は30°以下であることが好ましく、15°以下であることがより好ましく、0°であることが最も好ましい。
 7      移送管
 8      本体部
 9a    第一フランジ部
 9b    第二フランジ部
10     耐火物
11     ケーシング
18     第一押圧装置(外力付与手段)
19     第二押圧装置(外力付与手段)
20     第三押圧装置(外力付与手段)
22     押圧部材
 F     外力
 S1    予熱工程
 S4    溶融ガラス供給工程(移送工程)
 L3L   理論膨張長さ
 L3M   測定膨張長さ
 TH    閾値

Claims (7)

  1.  移送管を加熱する予熱工程と、前記予熱工程後に、前記移送管の内部に溶融ガラスを流通させる移送工程と、を備えるガラス物品の製造方法であって、
     前記移送管は、管状の本体部と、前記本体部の端部に形成されるフランジ部とを備え、
     前記本体部は、耐火物に保持されており、
     前記予熱工程は、前記移送管に外力を付与し、前記移送管を伸長させる外力付与工程を含むことを特徴とするガラス物品の製造方法。
  2.  前記外力付与工程では、前記移送管の測定膨張長さが理論膨張長さに近づくように、前記移送管に外力を付与する請求項1に記載のガラス物品の製造方法。
  3.  前記外力付与工程は、前記理論膨張長さと前記測定膨張長さの差が所定の閾値を超えた場合に実行される請求項2に記載のガラス物品の製造方法。
  4.  前記耐火物は、ケーシングに固定されており、
     前記外力付与工程では、前記ケーシングが備える押圧部材を前記フランジ部に接触させることにより、前記移送管に前記外力を付与する請求項1から3のいずれか一項に記載のガラス物品の製造方法。
  5.  前記外力付与工程では、前記フランジ部の周方向の複数個所に前記外力を付与する請求項1から4のいずれか一項に記載のガラス物品の製造方法。
  6.  前記移送管の前記本体部は、傾斜姿勢で配置されており、
     前記外力付与工程では、前記本体部の傾斜方向に沿って前記外力を付与する請求項1から5のいずれか一項に記載のガラス物品の製造方法。
  7.  内部に溶融ガラスを流通させることが可能な移送管と、前記移送管を保持する耐火物と、を備えるガラス物品の製造装置において、
     前記移送管は、管状の本体部と、前記本体部の端部に形成されるフランジ部とを備え、
     前記本体部が、前記耐火物に保持されており、
     前記製造装置は、前記移送管が伸長するように前記移送管に外力を付与する外力付与手段をさらに備えることを特徴とするガラス物品の製造装置。
PCT/JP2018/043953 2017-12-20 2018-11-29 ガラス物品の製造方法及び製造装置 WO2019124017A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
KR1020207004770A KR102493166B1 (ko) 2017-12-20 2018-11-29 유리 물품의 제조 방법 및 제조 장치
CN201880070536.7A CN111295362B (zh) 2017-12-20 2018-11-29 玻璃物品的制造方法及制造装置
US16/768,961 US11370684B2 (en) 2017-12-20 2018-11-29 Method and device for manufacturing glass article

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017-244144 2017-12-20
JP2017244144A JP6925582B2 (ja) 2017-12-20 2017-12-20 ガラス物品の製造方法及び製造装置

Publications (1)

Publication Number Publication Date
WO2019124017A1 true WO2019124017A1 (ja) 2019-06-27

Family

ID=66994736

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/043953 WO2019124017A1 (ja) 2017-12-20 2018-11-29 ガラス物品の製造方法及び製造装置

Country Status (6)

Country Link
US (1) US11370684B2 (ja)
JP (1) JP6925582B2 (ja)
KR (1) KR102493166B1 (ja)
CN (1) CN111295362B (ja)
TW (1) TWI782151B (ja)
WO (1) WO2019124017A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022059429A1 (ja) * 2020-09-17 2022-03-24 日本電気硝子株式会社 ガラス板の製造方法及びその製造装置

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6925583B2 (ja) * 2017-12-20 2021-08-25 日本電気硝子株式会社 ガラス物品の製造方法及び製造装置
WO2024025818A1 (en) * 2022-07-27 2024-02-01 Corning Incorporated Methods and apparatus for manufacturing a glass ribbon

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02180720A (ja) * 1988-11-22 1990-07-13 Sorg Gmbh & Co Kg ガラス用導管
JP2013216535A (ja) * 2012-04-06 2013-10-24 Avanstrate Inc ガラス板の製造方法および製造装置
JP2014009125A (ja) * 2012-06-29 2014-01-20 Avanstrate Inc ガラス基板の製造方法

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3244495A (en) * 1962-07-02 1966-04-05 Bausch & Lomb Regulated flow glass melting furnace
JP4417470B2 (ja) * 1998-05-11 2010-02-17 株式会社アドバンテスト トレイ移送アーム、電子部品ハンドリング装置および電子部品試験装置
US6854290B2 (en) * 2001-07-18 2005-02-15 Corning Incorporated Method for controlling foam production in reduced pressure fining
KR100901098B1 (ko) * 2002-12-27 2009-06-08 아사히 가라스 가부시키가이샤 용융 유리용 도관, 용융 유리 탈포방법 및 용융 유리탈포장치
CN102173561A (zh) * 2006-01-05 2011-09-07 日本电气硝子株式会社 熔融玻璃供给装置及玻璃成形品的制造方法
CN101096289B (zh) * 2006-06-28 2012-09-05 Hoya株式会社 玻璃成形体的制造方法及压力成形用玻璃坯料的制造方法
US8695378B2 (en) * 2008-11-26 2014-04-15 Corning Incorporated Apparatus for making glass and methods
JP5675119B2 (ja) * 2010-01-18 2015-02-25 三菱重工業株式会社 管台取付構造
US8274018B2 (en) * 2010-02-25 2012-09-25 Corning Incorporated Apparatus for use in direct resistance heating of platinum-containing vessels
TW201210967A (en) * 2010-06-29 2012-03-16 Avanstrate Inc Production device of glass panel and production method using the same
US9242886B2 (en) * 2010-11-23 2016-01-26 Corning Incorporated Delivery apparatus for a glass manufacturing apparatus and methods
CN103221347B (zh) * 2011-11-18 2016-08-03 安瀚视特股份有限公司 玻璃的制造方法及搅拌装置
WO2016054356A1 (en) * 2014-10-01 2016-04-07 Corning Incorporated Apparatus for processing glass melt including tube segments joined together at an integral solid-state joint and methods
TW201641452A (zh) * 2015-03-20 2016-12-01 康寧公司 用以減少玻璃熔融物中附聚物的方法與系統
US9586846B2 (en) * 2015-04-13 2017-03-07 Corning Incorporated Apparatus and methods for processing molten material
KR102645627B1 (ko) 2015-10-21 2024-03-11 코닝 인코포레이티드 금속 용기를 가열하기 위한 장치 및 방법
TW201831410A (zh) * 2017-01-03 2018-09-01 美商康寧公司 用於生產包含結晶氧化鋯的玻璃之裝置及方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02180720A (ja) * 1988-11-22 1990-07-13 Sorg Gmbh & Co Kg ガラス用導管
JP2013216535A (ja) * 2012-04-06 2013-10-24 Avanstrate Inc ガラス板の製造方法および製造装置
JP2014009125A (ja) * 2012-06-29 2014-01-20 Avanstrate Inc ガラス基板の製造方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022059429A1 (ja) * 2020-09-17 2022-03-24 日本電気硝子株式会社 ガラス板の製造方法及びその製造装置

Also Published As

Publication number Publication date
CN111295362A (zh) 2020-06-16
KR20200090731A (ko) 2020-07-29
TW201930207A (zh) 2019-08-01
KR102493166B1 (ko) 2023-01-30
JP2019108258A (ja) 2019-07-04
JP6925582B2 (ja) 2021-08-25
TWI782151B (zh) 2022-11-01
CN111295362B (zh) 2022-09-16
US11370684B2 (en) 2022-06-28
US20210147275A1 (en) 2021-05-20

Similar Documents

Publication Publication Date Title
WO2019124017A1 (ja) ガラス物品の製造方法及び製造装置
JP5162725B2 (ja) ガラス板の製造方法及びガラス板製造装置
TWI757566B (zh) 玻璃物品的製造方法與製造裝置
TWI605022B (zh) Glass substrate for display
WO2018110217A1 (ja) ガラス供給管の支持構造、板ガラス製造装置、板ガラス製造方法、及びガラス供給管の予熱方法
JP7174360B2 (ja) ガラス物品の製造方法、溶解炉及びガラス物品の製造装置
JP5824433B2 (ja) ガラス板の製造方法、および、ガラス板の製造装置
JP2015051896A (ja) ガラス熔解装置、ガラスシート製造装置、ガラス熔解装置用の電極およびガラスシート製造方法
WO2023171385A1 (ja) ガラス物品の製造装置及び製造方法
WO2018110459A1 (ja) ガラス物品の製造方法及びガラス基板群
JP7276345B2 (ja) ガラス物品の製造装置及び製造方法
JP2019043815A (ja) 移送容器及び移送装置並びにガラス物品の製造方法
WO2022270555A1 (ja) ガラス物品の製造装置及び製造方法
WO2024048298A1 (ja) ガラス物品の製造装置及び製造方法
JP7115156B2 (ja) ガラス物品の製造方法
JP6333602B2 (ja) ガラス基板の製造方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18892105

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18892105

Country of ref document: EP

Kind code of ref document: A1