WO2019109602A1 - 矸石零排放短面无煤柱开采法 - Google Patents
矸石零排放短面无煤柱开采法 Download PDFInfo
- Publication number
- WO2019109602A1 WO2019109602A1 PCT/CN2018/087977 CN2018087977W WO2019109602A1 WO 2019109602 A1 WO2019109602 A1 WO 2019109602A1 CN 2018087977 W CN2018087977 W CN 2018087977W WO 2019109602 A1 WO2019109602 A1 WO 2019109602A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- mining
- working face
- short working
- short
- face
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
- E21F15/005—Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
Definitions
- the invention relates to a meteorite zero-emission short-face coal-free column mining method, which is especially suitable for use in zero-emission treatment of mine meteorites.
- the object of the present invention is to overcome the deficiencies in the prior art, and to provide a method for simplifying the operation and achieving a good effect of the zero-emission short-face coal-free column mining method.
- a short working face is set near the bottom of the mine.
- the starting position of the short working face is 500m ⁇ 1000m away from the bottom of the well, and the short work is mining away from the bottom of the well.
- the roof and the side wall are supported by bolts, and the bolt support includes the edge support along the short working face and the solid coal side support, and forms a retaining lane outside the short working face after the support, and is currently short Excavating the roadway outside the adjacent short working face of the working face;
- the tunnel is opened from the roadway to the current short working face, and the filling and mining face of the adjacent short working face is formed by using the roadway and the adjacent roadway to continue mining in full mining mode. And use the meteorite backfill, and at the same time transfer the excavation equipment to dig the adjacent roadway and open cut of the next short working face to prepare for the next short working face mining;
- steps b and c to achieve continuous mining of the short working face of the meteorite in the mine until all meteorites produced under the well are treated to achieve zero discharge of the surface meteorite.
- the short working face is used for underground storage of vermiculite, the short working face has a width of 30 to 50 m, the height is the height of the coal seam, and the length is 1000 m to 3000 m.
- the width of the roadway is 3-6 m.
- the short working face mining sequence is alternately performed between the forward type and the reverse type, and the lane running order is always forward.
- the present invention Since the above technical solution is adopted, the present invention has the following advantages compared with the prior art:
- the meteorite zero-emission short-face coal-free pillar mining method of the present invention is characterized by the following steps:
- a short working face 1 is arranged near the bottom of the mine, and the short working face 1 is used for underground storage of vermiculite.
- the short working face has a width of 30-50 m, the height is the height of the coal seam, and the length is 1000 m. ⁇ 3000m, the starting position of short working face mining is 500m ⁇ 1000m away from the bottom of the well, and the short working face 1 is mined away from the bottom of the well.
- the mining order of the short working face 1 is forward and reverse.
- the short working face 1 excavation sequence is always forward;
- Bolt support is provided for the roof and side walls of the roadway.
- the bolt support includes the edge support of the filling face along the short working face 1 and the solid coal side support, and forms a retaining lane outside the short working face 1 after the support. 2, the width of the roadway 2 is 3-6 m, and the roadway 3 is dug outside the adjacent short working face 5 of the current short working face 1;
- the road opening 3 is drilled from the roadway 3 to the current short working face 1 , and the filling and mining working face of the adjacent short working face 5 is formed by the roadway 2 and the adjacent roadway 3 Mining in full charge and backfilling with meteorites, while transferring the excavation equipment to dig the adjacent roadway 6 and open cut 4 of the next short working face to prepare for the next short face mining;
- steps b and c to achieve continuous mining of the short working face 1 of the mine treated vermiculite until all meteorites produced under the well are treated to achieve zero discharge of the downhole meteorite.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Remote Sensing (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Lining And Supports For Tunnels (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| AU2018308953A AU2018308953A1 (en) | 2017-12-08 | 2018-05-23 | Zero-gangue-discharge short-wall face pillar-free mining method |
| US16/319,033 US20210310356A1 (en) | 2017-12-08 | 2018-05-23 | Zero-gangue-discharge short-wall face pillar-free mining method |
| JP2018555277A JP6684922B2 (ja) | 2017-12-08 | 2018-05-23 | ぼたゼロ排出短切羽無支柱石炭採掘方法 |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201711290733.3 | 2017-12-08 | ||
| CN201711290733.3A CN108035714A (zh) | 2017-12-08 | 2017-12-08 | 矸石零排放短面无煤柱开采法 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2019109602A1 true WO2019109602A1 (zh) | 2019-06-13 |
Family
ID=62096112
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/CN2018/087977 Ceased WO2019109602A1 (zh) | 2017-12-08 | 2018-05-23 | 矸石零排放短面无煤柱开采法 |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US20210310356A1 (enExample) |
| JP (1) | JP6684922B2 (enExample) |
| CN (1) | CN108035714A (enExample) |
| AU (1) | AU2018308953A1 (enExample) |
| WO (1) | WO2019109602A1 (enExample) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP3998394A4 (en) * | 2019-07-09 | 2022-09-07 | Beijing Zhongkuang Innovation Alliance Energy Environment Science Academy | METHOD OF COAL MINING WITHOUT RESERVING A COAL PILLAR AND RUNWAY TUNNEL IN THE ENTIRE MINE AREA |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108035714A (zh) * | 2017-12-08 | 2018-05-15 | 中国矿业大学 | 矸石零排放短面无煤柱开采法 |
| CN110424966B (zh) * | 2019-07-25 | 2020-05-26 | 中国矿业大学 | 一种超高水材料充填工作面矸石泵送留巷无煤柱开采方法 |
| CN111156000A (zh) * | 2020-04-07 | 2020-05-15 | 北京中矿创新联盟能源环境科学研究院 | 薄煤层无煤柱后退式采煤方法 |
| CN116084945A (zh) * | 2022-11-30 | 2023-05-09 | 天地(榆林)开采工程技术有限公司 | 一种短壁综采工作面采充分离充填方法 |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3852967A (en) * | 1970-11-04 | 1974-12-10 | Dow Chemical Co | Method of filling subterranean voids with a particulate material |
| CN1483921A (zh) * | 2002-09-18 | 2004-03-24 | 杨新兴 | 洞穴填充式采煤方法 |
| CN1936271A (zh) * | 2006-08-21 | 2007-03-28 | 山东盛泉矿业有限公司 | 煤矿矸石充填无煤柱开采工作面采空区的方法 |
| JP2008163717A (ja) * | 2007-01-05 | 2008-07-17 | Eiichi Suzuki | 石材の採掘方法 |
| CN105089668A (zh) * | 2014-05-19 | 2015-11-25 | 梁捷 | 一种长壁工作面无煤柱开采方法 |
| CN108035714A (zh) * | 2017-12-08 | 2018-05-15 | 中国矿业大学 | 矸石零排放短面无煤柱开采法 |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102261247B (zh) * | 2011-08-02 | 2013-08-21 | 中国矿业大学 | 一种条带逆向膏体充填的二次采煤方法 |
| CN103410515B (zh) * | 2013-08-23 | 2015-09-16 | 山东科技大学 | 一种三软煤层往复式无煤柱综采方法 |
| CN106522948A (zh) * | 2016-11-25 | 2017-03-22 | 山东科技大学 | 一种短壁矸石胶结连采连充采煤法 |
-
2017
- 2017-12-08 CN CN201711290733.3A patent/CN108035714A/zh active Pending
-
2018
- 2018-05-23 US US16/319,033 patent/US20210310356A1/en not_active Abandoned
- 2018-05-23 JP JP2018555277A patent/JP6684922B2/ja not_active Expired - Fee Related
- 2018-05-23 WO PCT/CN2018/087977 patent/WO2019109602A1/zh not_active Ceased
- 2018-05-23 AU AU2018308953A patent/AU2018308953A1/en not_active Abandoned
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3852967A (en) * | 1970-11-04 | 1974-12-10 | Dow Chemical Co | Method of filling subterranean voids with a particulate material |
| CN1483921A (zh) * | 2002-09-18 | 2004-03-24 | 杨新兴 | 洞穴填充式采煤方法 |
| CN1936271A (zh) * | 2006-08-21 | 2007-03-28 | 山东盛泉矿业有限公司 | 煤矿矸石充填无煤柱开采工作面采空区的方法 |
| JP2008163717A (ja) * | 2007-01-05 | 2008-07-17 | Eiichi Suzuki | 石材の採掘方法 |
| CN105089668A (zh) * | 2014-05-19 | 2015-11-25 | 梁捷 | 一种长壁工作面无煤柱开采方法 |
| CN108035714A (zh) * | 2017-12-08 | 2018-05-15 | 中国矿业大学 | 矸石零排放短面无煤柱开采法 |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP3998394A4 (en) * | 2019-07-09 | 2022-09-07 | Beijing Zhongkuang Innovation Alliance Energy Environment Science Academy | METHOD OF COAL MINING WITHOUT RESERVING A COAL PILLAR AND RUNWAY TUNNEL IN THE ENTIRE MINE AREA |
| US11578598B2 (en) | 2019-07-09 | 2023-02-14 | Beijing Zhongkuang Innovation Alliance Energy Environment Science Academy | Method for coal mining without reserving coal pillar and tunneling roadway in whole mining area |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2020504253A (ja) | 2020-02-06 |
| JP6684922B2 (ja) | 2020-04-22 |
| CN108035714A (zh) | 2018-05-15 |
| US20210310356A1 (en) | 2021-10-07 |
| AU2018308953A1 (en) | 2019-06-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101839140B (zh) | 一种巷道底板注浆加固方法 | |
| CN102996131B (zh) | 一种预掘两巷前进式固体充填采煤方法 | |
| CN105298507B (zh) | 一种上部明挖下部掘进机施工的地下管廊施工方法 | |
| CN106049532B (zh) | 一种综合管廊明挖施工支挡装置及其施工方法 | |
| WO2016045440A1 (zh) | 一种采矿方法 | |
| CN105781554B (zh) | 一种露天煤矿拉斗铲无运输倒堆工艺开采方法 | |
| CN102146794B (zh) | 注浆固结沿空掘巷工艺方法 | |
| CN103758568A (zh) | 露天煤矿端帮充填开采方法 | |
| CN112282758A (zh) | 一种采煤工作面双巷循环采充一体化工艺 | |
| CN119466970B (zh) | 一种负碳同面充填系统布置与开采方法 | |
| CN107218045A (zh) | 岩质地层暗挖地铁车站出入口暗挖段的快速施工方法 | |
| CN109869150A (zh) | 一种矿山资源分段全采局充开采方法 | |
| CN108035714A (zh) | 矸石零排放短面无煤柱开采法 | |
| CN105065004B (zh) | 一种浅埋大跨度岩石隧道洞口段弱爆破开挖施工方法 | |
| CN108331580B (zh) | 一种清洁高效的采煤方法 | |
| CN103388478B (zh) | 露天煤矿应用吊斗铲的运输道路形成方法 | |
| JP2020504253A5 (enExample) | ||
| CN110030001B (zh) | 一种山岭隧道出洞的施工方法 | |
| Guo | A review of metro tunnel construction methods | |
| CN212508352U (zh) | 一种基于中立柱与仰拱的盾构隧道扩挖体系 | |
| CN104315251B (zh) | 土石组合地质条件下人工顶管施工方法 | |
| CN203347799U (zh) | 能够实现三维注浆的盾构机 | |
| CN108019211B (zh) | 一种富水砂卵石地层的导洞内截水帷幕及其施工方法 | |
| CN110410577A (zh) | 杂填土地质情况下大直径顶管减阻施工方法 | |
| CN205858367U (zh) | 隧道暗挖机的推板装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| ENP | Entry into the national phase |
Ref document number: 2018555277 Country of ref document: JP Kind code of ref document: A |
|
| ENP | Entry into the national phase |
Ref document number: 2018308953 Country of ref document: AU Date of ref document: 20180523 Kind code of ref document: A |
|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 18885169 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 18885169 Country of ref document: EP Kind code of ref document: A1 |