JP2020504253A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2020504253A5 JP2020504253A5 JP2018555277A JP2018555277A JP2020504253A5 JP 2020504253 A5 JP2020504253 A5 JP 2020504253A5 JP 2018555277 A JP2018555277 A JP 2018555277A JP 2018555277 A JP2018555277 A JP 2018555277A JP 2020504253 A5 JP2020504253 A5 JP 2020504253A5
- Authority
- JP
- Japan
- Prior art keywords
- short
- mining
- face
- tunnel
- working face
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201711290733.3 | 2017-12-08 | ||
| CN201711290733.3A CN108035714A (zh) | 2017-12-08 | 2017-12-08 | 矸石零排放短面无煤柱开采法 |
| PCT/CN2018/087977 WO2019109602A1 (zh) | 2017-12-08 | 2018-05-23 | 矸石零排放短面无煤柱开采法 |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JP2020504253A JP2020504253A (ja) | 2020-02-06 |
| JP6684922B2 JP6684922B2 (ja) | 2020-04-22 |
| JP2020504253A5 true JP2020504253A5 (enExample) | 2020-04-23 |
Family
ID=62096112
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2018555277A Expired - Fee Related JP6684922B2 (ja) | 2017-12-08 | 2018-05-23 | ぼたゼロ排出短切羽無支柱石炭採掘方法 |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US20210310356A1 (enExample) |
| JP (1) | JP6684922B2 (enExample) |
| CN (1) | CN108035714A (enExample) |
| AU (1) | AU2018308953A1 (enExample) |
| WO (1) | WO2019109602A1 (enExample) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108035714A (zh) * | 2017-12-08 | 2018-05-15 | 中国矿业大学 | 矸石零排放短面无煤柱开采法 |
| CN110130899B (zh) * | 2019-07-09 | 2019-11-05 | 北京中矿创新联盟能源环境科学研究院 | 全矿区无煤柱留设无巷道掘进采煤方法 |
| CN110424966B (zh) * | 2019-07-25 | 2020-05-26 | 中国矿业大学 | 一种超高水材料充填工作面矸石泵送留巷无煤柱开采方法 |
| CN111156000A (zh) * | 2020-04-07 | 2020-05-15 | 北京中矿创新联盟能源环境科学研究院 | 薄煤层无煤柱后退式采煤方法 |
| CN116084945A (zh) * | 2022-11-30 | 2023-05-09 | 天地(榆林)开采工程技术有限公司 | 一种短壁综采工作面采充分离充填方法 |
Family Cites Families (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3852967A (en) * | 1970-11-04 | 1974-12-10 | Dow Chemical Co | Method of filling subterranean voids with a particulate material |
| CN1483921A (zh) * | 2002-09-18 | 2004-03-24 | 杨新兴 | 洞穴填充式采煤方法 |
| CN1936271B (zh) * | 2006-08-21 | 2011-06-29 | 山东盛泉矿业有限公司 | 煤矿矸石充填无煤柱开采工作面采空区的方法 |
| JP4459966B2 (ja) * | 2007-01-05 | 2010-04-28 | 栄一 鈴木 | 石材の採掘方法 |
| CN102261247B (zh) * | 2011-08-02 | 2013-08-21 | 中国矿业大学 | 一种条带逆向膏体充填的二次采煤方法 |
| CN103410515B (zh) * | 2013-08-23 | 2015-09-16 | 山东科技大学 | 一种三软煤层往复式无煤柱综采方法 |
| CN105089668A (zh) * | 2014-05-19 | 2015-11-25 | 梁捷 | 一种长壁工作面无煤柱开采方法 |
| CN106522948A (zh) * | 2016-11-25 | 2017-03-22 | 山东科技大学 | 一种短壁矸石胶结连采连充采煤法 |
| CN108035714A (zh) * | 2017-12-08 | 2018-05-15 | 中国矿业大学 | 矸石零排放短面无煤柱开采法 |
-
2017
- 2017-12-08 CN CN201711290733.3A patent/CN108035714A/zh active Pending
-
2018
- 2018-05-23 US US16/319,033 patent/US20210310356A1/en not_active Abandoned
- 2018-05-23 JP JP2018555277A patent/JP6684922B2/ja not_active Expired - Fee Related
- 2018-05-23 WO PCT/CN2018/087977 patent/WO2019109602A1/zh not_active Ceased
- 2018-05-23 AU AU2018308953A patent/AU2018308953A1/en not_active Abandoned
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6684922B2 (ja) | ぼたゼロ排出短切羽無支柱石炭採掘方法 | |
| CN104405437B (zh) | 一种固体充填与综采混合式工作面开采方法 | |
| CN104131829B (zh) | 一种固体充填采煤液压支架撤架方法 | |
| CN103216238B (zh) | 一种露天煤矿开采工艺 | |
| CN105781554B (zh) | 一种露天煤矿拉斗铲无运输倒堆工艺开采方法 | |
| CN109869150B (zh) | 一种矿山资源分段全采局充开采方法 | |
| CN104806247B (zh) | 露天矿采场中间搭建纵向组合桥运输方法 | |
| CN108756875B (zh) | 一种内排露天煤矿中厚煤层连续开采装置及方法 | |
| CN103470262A (zh) | 一种露天煤田近水平矿床倒堆内排的开采方法 | |
| WO2016045440A1 (zh) | 一种采矿方法 | |
| JP2019531428A (ja) | 浅炭層保水採掘方法およびその応用 | |
| CN110344846A (zh) | 三台阶预留核心土带仰拱一次开挖方法 | |
| CN112282758A (zh) | 一种采煤工作面双巷循环采充一体化工艺 | |
| CN105421198B (zh) | 一种露天煤矿修筑斜坡道的方法 | |
| CN109931065A (zh) | 一种露天煤矿抛掷爆破-松动爆破分区开采方法 | |
| JP6688397B2 (ja) | クリーンで効率的な採炭方法 | |
| CN103388478B (zh) | 露天煤矿应用吊斗铲的运输道路形成方法 | |
| CN103334754A (zh) | 一种近水平矿床相邻条区转向期间转向方式与开采方法 | |
| CN111946393A (zh) | 一种超长固体充填工作面采煤系统及方法 | |
| CN111411964A (zh) | 用于露天矿片帮区的轮斗挖掘机采掘方法 | |
| CN119878170B (zh) | 一种露天矿中硬薄煤层双条带混合开采方法 | |
| JP2022133560A (ja) | ズリ搬送システム、及びトンネル掘削方法 | |
| JP2005090176A (ja) | トンネル掘削方法 | |
| CN110924944B (zh) | 一种煤矿大巷下压煤分段循环充填开采方法 | |
| CN116591759A (zh) | 短壁综采工作面架前开采架后同步干式充填的装置及方法 |