Prior art keywords
short
wall face
mining
gangue
roadway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
AU2018308953A
Other languages
English (en)
Inventor
Qun Wei
Zhengzheng Xie
Nong Zhang
Junyao ZHOU
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing
Original Assignee
China University of Mining and Technology
China University of Mining and Technology Beijing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology, China University of Mining and Technology Beijing filed Critical China University of Mining and Technology
Publication of AU2018308953A1 publication Critical patent/AU2018308953A1/en
Abandoned legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21C—MINING OR QUARRYING
    • E21C41/00—Methods of underground or surface mining; Layouts therefor
    • E21C41/16—Methods of underground mining; Layouts therefor
    • E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00—Methods or devices for placing filling-up materials in underground workings
    • E21F15/005—Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material
    • E—FIXED CONSTRUCTIONS
    • E21—EARTH OR ROCK DRILLING; MINING
    • E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00—Setting anchoring-bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
AU2018308953A 2017-12-08 2018-05-23 Zero-gangue-discharge short-wall face pillar-free mining method Abandoned AU2018308953A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201711290733.3 2017-12-08
CN201711290733.3A CN108035714A (zh) 2017-12-08 2017-12-08 矸石零排放短面无煤柱开采法
PCT/CN2018/087977 WO2019109602A1 (zh) 2017-12-08 2018-05-23 矸石零排放短面无煤柱开采法

Publications (1)

Publication Number Publication Date
AU2018308953A1 true AU2018308953A1 (en) 2019-06-27

Family

ID=62096112

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2018308953A Abandoned AU2018308953A1 (en) 2017-12-08 2018-05-23 Zero-gangue-discharge short-wall face pillar-free mining method

Country Status (5)

Country Link
US (1) US20210310356A1 (enExample)
JP (1) JP6684922B2 (enExample)
CN (1) CN108035714A (enExample)
AU (1) AU2018308953A1 (enExample)
WO (1) WO2019109602A1 (enExample)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035714A (zh) * 2017-12-08 2018-05-15 中国矿业大学 矸石零排放短面无煤柱开采法
CN110130899B (zh) * 2019-07-09 2019-11-05 北京中矿创新联盟能源环境科学研究院 全矿区无煤柱留设无巷道掘进采煤方法
CN110424966B (zh) * 2019-07-25 2020-05-26 中国矿业大学 一种超高水材料充填工作面矸石泵送留巷无煤柱开采方法
CN111156000A (zh) * 2020-04-07 2020-05-15 北京中矿创新联盟能源环境科学研究院 薄煤层无煤柱后退式采煤方法
CN116084945A (zh) * 2022-11-30 2023-05-09 天地(榆林)开采工程技术有限公司 一种短壁综采工作面采充分离充填方法

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3852967A (en) * 1970-11-04 1974-12-10 Dow Chemical Co Method of filling subterranean voids with a particulate material
CN1483921A (zh) * 2002-09-18 2004-03-24 杨新兴 洞穴填充式采煤方法
CN1936271B (zh) * 2006-08-21 2011-06-29 山东盛泉矿业有限公司 煤矿矸石充填无煤柱开采工作面采空区的方法
JP4459966B2 (ja) * 2007-01-05 2010-04-28 栄一 鈴木 石材の採掘方法
CN102261247B (zh) * 2011-08-02 2013-08-21 中国矿业大学 一种条带逆向膏体充填的二次采煤方法
CN103410515B (zh) * 2013-08-23 2015-09-16 山东科技大学 一种三软煤层往复式无煤柱综采方法
CN105089668A (zh) * 2014-05-19 2015-11-25 梁捷 一种长壁工作面无煤柱开采方法
CN106522948A (zh) * 2016-11-25 2017-03-22 山东科技大学 一种短壁矸石胶结连采连充采煤法
CN108035714A (zh) * 2017-12-08 2018-05-15 中国矿业大学 矸石零排放短面无煤柱开采法

Also Published As

Publication number Publication date
JP2020504253A (ja) 2020-02-06
JP6684922B2 (ja) 2020-04-22
CN108035714A (zh) 2018-05-15
US20210310356A1 (en) 2021-10-07
WO2019109602A1 (zh) 2019-06-13

Similar Documents

Publication Publication Date Title
AU2015320268B2 (en) Mining method
AU2013358812B2 (en) Solid-filling coal mining method with two pre-excavated tunnels for advancing
US20210310356A1 (en) Zero-gangue-discharge short-wall face pillar-free mining method
Zheng et al. Challenges and opportunities of using tunnel boring machines in mining
US5782539A (en) Wall-to-wall surface mining process
US20160102553A1 (en) Inclined layered solid-filling mining method in ultrathick coal layer
CN107542465A (zh) 一种浅埋煤层保水开采方法及其应用
CN103470262A (zh) 一种露天煤田近水平矿床倒堆内排的开采方法
CN104806247B (zh) 露天矿采场中间搭建纵向组合桥运输方法
CN109869150A (zh) 一种矿山资源分段全采局充开采方法
JP6688397B2 (ja) クリーンで効率的な採炭方法
Cheskidov et al. Specifics of internal overburden dumping in open pit mining
Spearing et al. A new automated, safe, environmentally sustainable, and high extraction soft-rock underground mining method
CN113738438B (zh) 一种煤柱回收与矸石充填一体化绿色开采方法
GB2224053A (en) Mining method
SELYUKOV et al. Improvement of Continuous Lateral Surface Mining Method for Coal Extraction from Closed Mines' Pillars.
CN205858367U (zh) 隧道暗挖机的推板装置
CN107246264A (zh) 一种坚硬顶板条件下的簿煤层走向条带充填开采方法
Bilim et al. Fully mechanized excavation system in underground coal mining
Markov et al. Application and improvement of technologies for underground mining of placer deposits in Yakutia
Mair et al. 10 Tunnelling methods
Matsui et al. Optimal highwall thick seam mining systems considering the in-situ stress conditions
CN105971624A (zh) 隧道暗挖机的推板装置
Mitić et al. Conceptual solution of the excavation method in'Biochki stan'mine in Niksic, Yugoslavia
Adamson et al. Sustainable phosphate rock mining

Legal Events

Date Code Title Description
MK5 Application lapsed section 142(2)(e) - patent request and compl. specification not accepted