CN102996131B - 一种预掘两巷前进式固体充填采煤方法 - Google Patents

一种预掘两巷前进式固体充填采煤方法 Download PDF

Info

Publication number
CN102996131B
CN102996131B CN201210527033.2A CN201210527033A CN102996131B CN 102996131 B CN102996131 B CN 102996131B CN 201210527033 A CN201210527033 A CN 201210527033A CN 102996131 B CN102996131 B CN 102996131B
Authority
CN
China
Prior art keywords
coal
filling
lane
mining
coal mining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210527033.2A
Other languages
English (en)
Other versions
CN102996131A (zh
Inventor
张吉雄
张强
邓雪杰
周楠
姜海强
汪贺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201210527033.2A priority Critical patent/CN102996131B/zh
Publication of CN102996131A publication Critical patent/CN102996131A/zh
Priority to PCT/CN2013/088632 priority patent/WO2014090108A1/zh
Priority to AU2013358812A priority patent/AU2013358812B2/en
Application granted granted Critical
Publication of CN102996131B publication Critical patent/CN102996131B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/04Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
    • E21D23/0481Supports specially adapted for use in combination with the placing of filling-up materials

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

一种预掘两巷前进式固体充填采煤方法,回采巷道采用预掘巷作为进回风巷道、采用沿空留巷巷道作为充填物料与煤炭的运输巷道的布置方式;煤炭回采与采空区回填采用综合机械化固体充填采煤工艺;以充填采煤工作面背向采区运煤上山方向推进开采顺序的采煤方法。预掘巷在工作面回采之前掘进形成,随工作面向前充填采煤推进作业的同时,利用优化设计的巷旁充填体形成沿空留巷巷道。本采煤方法工艺简单,技术上完全实现了无煤柱开采,煤炭资源回采率高,不仅有效解决了资源紧缺矿井实施充填开采过程中后退式布置俯采仰充工作面无法保障充填效果的技术难题,而且通过前进式布置仰采俯充工作面,使受地质条件限制的矿井实施综合机械化固体充填开采成为现实。

Description

一种预掘两巷前进式固体充填采煤方法
技术领域
本发明涉及煤矿一种预掘两巷前进式固体充填采煤方法,尤其适用于综合机械化固体充填开采近水平中厚煤层的无煤柱沿空留巷工作面。
背景技术
综合机械化固体物料充填采煤技术是充填开采技术的一项革命性技术,该技术自其研发以来,已在我国平顶山(村庄下)、济宁(密集村庄群下)、兖州(大型河堤下)、皖北(四含水体下)、开滦(铁路网下)等10多个矿区20多个工作面进行广泛的工业性推广,该技术在提高煤炭资源回收率;利用矿区固体物料以及保护矿区建(构)筑物、土地、水体和生态环境等方面具有突出的技术优势,成为解放“三下”压煤及其它呆滞煤炭资源的首选技术。由于该技术是通过固体物料密实充填采空区来控制采场上覆岩层的移动,从而控制矿压显现及地表沉陷,所以,采空区密实充填效果是该技术成功实施的关键。但由于固体充填采煤设备及充填技术本身工艺的限制,充填技术对煤层的倾角变化适应性具有一定局限性,而且要求固体充填采煤工作面尽量仰采俯充(仰斜采煤,俯斜充填)布置,所以在特定的地质条件下,应用充填技术遇到挑战。通常情况下,综合机械化采煤工作面后退式布置,沿区段边界向运输上山(或轨道上山)的方向推进,但是若该走向上煤层倾角变化比较大,即需要俯采仰充(俯斜采煤,仰斜充填)布置充填采煤工作面时,充填技术的应用效果则无法保证。
发明内容
技术问题:本发明的目的是针对已有技术中的不足之处,提供一种操作简单、煤炭资源回收率高以及充填效果易于控制的预掘两巷前进式固体充填采煤方法。
技术方案:本发明的预掘两巷前进式固体充填采煤方法,包括如下步骤:
a.从运煤上山开切口,并在煤体内从上山至区段边界方向掘进形成预掘运输巷;
b.从轨道上山开切口,并在煤体内从上山至区段边界方向掘进形成预掘轨道巷;
c.从预掘运输巷或预掘轨道巷开切口,形成联络巷,贯通预掘运输巷与预掘轨道巷;
d. 预留保护煤柱,自保护煤柱边界处开切眼,并在切眼内布置由采煤机、刮板输送机、充填采煤液压支架、多孔底卸式输送机、升降平台构成的工作面充填采煤设备;
e.在预掘运输巷布置由破碎机、运煤转载机、运煤带式输送机构成的巷内采煤设备;
f.在预掘轨道巷中布置由自移式转载输送机、运矸带式输送机构成的巷内充填设备;
g. 从上山至区段边界方向前进式推进充填采煤工作面,实施一个步距采煤、充填作业,
h.随着工作面的采煤充填作业,在预掘运输巷和预掘轨道巷内构筑巷旁充填体,完成一个步距沿空留巷作业;
i.重复步骤g、h,继续下一个步距的采煤、充填、沿空留巷渐进循环作业,直至完成一个工作面的采煤、充填、沿空留巷作业。
有益效果:本发明有效解决了资源紧缺矿井实施充填开采过程中后退式布置俯采仰充工作面无法保障充填效果的技术难题;采用双巷沿空留巷技术,完全实现了无煤柱开采,提高了煤炭资源回收率;通过前进式布置仰采俯充工作面,使受地质条件限制的矿井实施综合机械化固体充填开采成为现实。本发明由于采用固体物料充填采空区,有效地限制了采场上覆岩层的活动范围,有效控制了矿压显现与地表沉陷,保障了地面建构筑物的安全使用,在解放“三下”压煤方面凸现出了独特的技术优势。
附图说明
图1 是本发明的工艺流程状态图I;
图2 是本发明的工艺流程状态图II;
图3 是本发明的工作面布置图。
图中:1-运输上山,2-轨道上山,3-预掘运输巷,4-预掘轨道巷,5-留巷运输巷,6-留巷轨道巷,7-切眼,8-保护煤柱,9-巷旁充填体,10-采空区充填体,11-多孔底卸式输送机,12-运煤带式输送机,13-运矸带式输送机,14-充填采煤液压支架,15-自移式转载输送机,16-采煤机,17-夯实机构,18-前部刮板输送机,19-卸料口,20-充填采煤液压支架后顶梁,21-联络巷,22-保护煤柱边界,23-升降平台,24-破碎机,25-运煤转载输送机。
具体实施方式
下面结合附图对本发明的实施作进一步的描述:
本发明的预掘两巷前进式固体充填采煤方法:首先从运煤上山1开切口,并在煤体内自上山至区段边界方向掘进以形成预掘运输巷3;从轨道上山2开切口,并在煤体内自上山至区段边界方向掘进形成预掘轨道巷4;当两预掘巷道掘进至区段边界时,停止掘进;然后从预掘运输巷3或预掘轨道巷4开切口,形成联络巷21,以贯通预掘运输巷3与预掘轨道巷4;预掘运输巷3进风,预掘轨道巷4回风,以形成初始的通风系统;
预留保护煤柱8,自上山保护煤柱边界22处开切眼7,同样贯通预掘运输巷3与预掘轨道巷4,形成充填采煤工作面的通风系统;并在切眼7内布置采煤机16、刮板输送机18、充填采煤液压支架14、多孔底卸式输送机11、升降平台23工作面关键充填采煤设备;在预掘运输巷3内布置破碎机24、运煤转载机25、运煤带式输送机12巷内关键采煤设备;在预掘轨道巷4中布置自移式转载输送机15、运矸带式输送机13巷内关键充填设备;设备安装完毕后,开始前进式推进充填采煤工作面,实施采煤、充填、沿空留巷渐进循环作业,完成仰采俯充工艺流程;
采煤、充填、沿空留巷渐进循环作业的具体步骤:按照正规循环,首先启动采煤机16,进行正常进尺(截深0.6m)割煤,然后依次前移充填采煤液压支架14、刮板输送机18及留巷运输巷5内的运输设备,完成采煤工序;然后依次启动悬挂在充填采煤液压支架后顶梁20下的多孔底卸式输送机11、自移式转载机15、运矸带式输送机13及留巷轨道巷6内的运输设备进行固体物料(矸石、粉煤灰等)的输送;启动充填采煤液压支架14上的夯实机构17,对多孔底卸式输送机卸料口19卸下的固体物料进行夯实接顶,完成采空区充填体10的充填工序;随着工作面的采煤充填作业,在两巷内通过人工垒砌矸石袋或者浇筑混凝土等形式构筑巷旁充填体9,分别形成新的留巷运输巷5与留巷轨道巷6,以完成该步距内的沿空留巷工序;然后再下一个步距里依次重复以上采煤工序、充填工序以及沿空留巷工序的步骤,以循环完成采煤、充填、沿空留巷渐进循环作业;充填采煤工作面不断仰采俯充,前进式推进至区段边界,完成本区段的煤炭回采工作,然后接替至下一个工作面。

Claims (1)

1.一种预掘两巷前进式固体充填采煤方法,其特征在于包括如下步骤:
a.从运煤上山(1)开切口,并在煤体内从上山至区段边界方向掘进形成预掘运输巷(3);
b.从轨道上山(2)开切口,并在煤体内从上山至区段边界方向掘进形成预掘轨道巷(4);
c. 当两预掘巷道掘进至区段边界时,停止掘进,从预掘运输巷(3)或预掘轨道巷(4)开切口,形成联络巷(21),以贯通预掘运输巷(3)与预掘轨道巷(4),预掘运输巷(3)进风,预掘轨道巷(4)回风,以形成初始的通风系统;
d. 预留保护煤柱(8),自保护煤柱边界(22)处开切眼(7),同样贯通预掘运输巷(3)与预掘轨道巷(4),形成充填采煤工作面的通风系统;并在切眼(7)内布置由采煤机(16)、刮板输送机(18)、充填采煤液压支架(14)、多孔底卸式输送机(11)、升降平台(23)构成的工作面充填采煤设备;
e.在预掘运输巷(3)布置由破碎机(24)、运煤转载机(25)、运煤带式输送机(12)构成的巷内采煤设备;
f.在预掘轨道巷(4)中布置由自移式转载输送机(15)、运矸带式输送机(13)构成的巷内充填设备;
g. 从上山至区段边界方向前进式推进充填采煤工作面,实施一个步距采煤、充填作业,
h.随着工作面的采煤充填作业,在预掘运输巷(3)和预掘轨道巷(4)内构筑巷旁充填体(9),完成一个步距沿空留巷作业;
i.重复步骤g、h,继续下一个步距的采煤、充填、沿空留巷渐进循环作业,直至完成一个工作面的采煤、充填、沿空留巷作业。
CN201210527033.2A 2012-12-10 2012-12-10 一种预掘两巷前进式固体充填采煤方法 Active CN102996131B (zh)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201210527033.2A CN102996131B (zh) 2012-12-10 2012-12-10 一种预掘两巷前进式固体充填采煤方法
PCT/CN2013/088632 WO2014090108A1 (zh) 2012-12-10 2013-12-05 一种预掘两巷前进式固体充填采煤方法
AU2013358812A AU2013358812B2 (en) 2012-12-10 2013-12-05 Solid-filling coal mining method with two pre-excavated tunnels for advancing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210527033.2A CN102996131B (zh) 2012-12-10 2012-12-10 一种预掘两巷前进式固体充填采煤方法

Publications (2)

Publication Number Publication Date
CN102996131A CN102996131A (zh) 2013-03-27
CN102996131B true CN102996131B (zh) 2014-10-29

Family

ID=47925176

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210527033.2A Active CN102996131B (zh) 2012-12-10 2012-12-10 一种预掘两巷前进式固体充填采煤方法

Country Status (3)

Country Link
CN (1) CN102996131B (zh)
AU (1) AU2013358812B2 (zh)
WO (1) WO2014090108A1 (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306983A (zh) * 2019-06-15 2019-10-08 龙口矿业集团有限公司 一种采区的边角煤柱工作面开采方法
CN111364994A (zh) * 2020-03-24 2020-07-03 中国矿业大学 一种综采转充填连续推进协同开采方法

Families Citing this family (41)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102996131B (zh) * 2012-12-10 2014-10-29 中国矿业大学 一种预掘两巷前进式固体充填采煤方法
CN103362508B (zh) * 2013-07-31 2015-04-15 六盘水师范学院 一种矿井开拓方法
CN103527195B (zh) * 2013-10-23 2016-04-13 中国矿业大学 一种厚夹矸煤层分采分运矸石回填采空区方法
CN103527197B (zh) * 2013-10-28 2016-01-06 中国矿业大学 一种特厚煤层固体胶结充填巷式开采方法
CN103603681B (zh) * 2013-11-06 2016-08-17 神华集团有限责任公司 一种支撑隔离墙及其施工方法
CN103696771B (zh) * 2013-12-18 2015-06-10 中国矿业大学 一种跳采式旺格维利采场支巷充填采煤方法
CN103758567B (zh) * 2014-01-26 2016-02-03 山东科技大学 一种破碎顶板冒落区注浆充填方法
CN103758569B (zh) * 2014-01-26 2016-01-06 山东科技大学 一种破碎顶板冒落区注浆充填系统
CN103867225B (zh) * 2014-03-26 2016-03-30 辽宁工程技术大学 一种防止煤矿含煤层自燃并去除硫化氢的填充开采方法
CN103939102B (zh) * 2014-04-14 2016-09-28 中国矿业大学 一种固体充填回收露天矿终帮下压煤的采煤方法
CN103953345B (zh) * 2014-05-13 2016-04-20 中国矿业大学 一种沿空小断面留巷开采方法
CN104234714B (zh) * 2014-09-18 2016-06-01 安徽理工大学 一种煤矿井下绿色高效运输方法
CN104405437B (zh) * 2014-10-08 2016-05-18 中国矿业大学 一种固体充填与综采混合式工作面开采方法
CN104594900A (zh) * 2014-11-28 2015-05-06 贵州晨辉达矿业工程设计有限公司 在走向上分段倾向采煤法
CN104775819B (zh) * 2015-03-27 2017-01-18 中国矿业大学 一种深部倾斜煤层回采巷道矿压控制开采方法
WO2016206616A1 (zh) * 2015-06-24 2016-12-29 何满潮 无巷道无煤柱自留巷开采工法的装备系统
CN106168131B (zh) 2015-06-24 2018-05-18 北京中矿创新联盟能源环境科学研究院 无巷道无煤柱自留巷开采工法的装备系统
CN107905790B (zh) 2015-06-24 2019-05-31 何满潮 长壁开采n00工法
CN105065001B (zh) * 2015-07-31 2018-02-09 中国矿业大学(北京) 一种超长推进距离工作面的沿空掘巷开采方法
CN105003267B (zh) * 2015-08-13 2017-03-08 兖州煤业股份有限公司 异形工作面后期综采方法
CN105464700B (zh) * 2015-12-14 2017-12-26 中国矿业大学 综采‑充填混合开采工作面充填段长度确定方法
CN105604552B (zh) * 2015-12-21 2017-10-10 冀中能源集团有限责任公司 一种固体材料充填采煤沿空留巷方法
CN105952452B (zh) * 2016-04-22 2017-12-26 中国矿业大学 油囊式固体充填采煤三维物理相似模拟实验装置及方法
CN107091112B (zh) * 2017-06-30 2019-02-12 山东科技大学 一种适用于无损采矿的快速充填方法
CN107882565B (zh) * 2017-10-31 2019-07-05 中国中煤能源集团有限公司 一种无掘进无煤柱采留一体开采工艺
CN107676131A (zh) * 2017-11-10 2018-02-09 缪协兴 一种固体废弃物装袋充填采煤方法
CN108331580B (zh) * 2017-12-08 2020-01-10 中国矿业大学 一种清洁高效的采煤方法
CN108756882A (zh) * 2018-05-29 2018-11-06 中煤能源研究院有限责任公司 一种区段平巷无掘进式短充长采开采方法
CN109505649B (zh) * 2018-10-24 2020-11-20 太原理工大学 一种缓解沿空留巷巷旁充填体变形破坏的方法
CN109736806A (zh) * 2019-01-09 2019-05-10 太原理工大学 一种无预掘巷道前进式砌块充填采煤方法
CN109779631A (zh) * 2019-01-09 2019-05-21 太原理工大学 一种预掘单巷前进式砌块充填采煤方法
CN109882176B (zh) * 2019-04-04 2022-03-25 中国矿业大学(北京) 末采充填及液压支架切顶沿空留巷双翼交替协同回采方法
CN110284883A (zh) * 2019-07-08 2019-09-27 中国矿业大学 一种露天煤矿端帮采排充开采方法
CN110424966B (zh) * 2019-07-25 2020-05-26 中国矿业大学 一种超高水材料充填工作面矸石泵送留巷无煤柱开采方法
CN111255456B (zh) * 2020-02-24 2021-06-04 中国矿业大学 一种矿山前进式充填成巷开采方法
CN112627820B (zh) * 2020-12-30 2023-03-14 国电建投内蒙古能源有限公司 一种“三下”压煤的无煤柱采掘方法
CN112963196B (zh) * 2021-03-15 2023-10-03 中国煤炭科工集团太原研究院有限公司 巷间保护煤柱充填开采方法
CN113669060B (zh) * 2021-09-13 2022-05-20 中国矿业大学 一种h型采煤工作面回采巷道布置方法
CN115263312B (zh) * 2022-09-27 2022-12-13 北京科技大学 多断层错断近水平极薄矿体的采矿方法
CN116927809B (zh) * 2023-09-12 2023-12-05 北京中京矿安科技有限公司 一种巷道支护结构及其施工方法
CN117365474A (zh) * 2023-11-20 2024-01-09 西安科技大学 一种大断面掘进充填留巷一体化方法及系统

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101586460A (zh) * 2009-06-02 2009-11-25 中国矿业大学 一种采煤固体物充填方法
CN102444401A (zh) * 2011-11-28 2012-05-09 袁树来 薄煤层炮采工作面充填采煤方法及相关设备

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4102550A (en) * 1976-04-20 1978-07-25 Peabody Coal Company Mining method and apparatus
JPS5575098A (en) * 1978-11-30 1980-06-06 Mitsui Sekitan Kogyo Kk Long wall type method with reduced ground pressure on face working surface
RU2156358C2 (ru) * 1998-07-07 2000-09-20 ОАО Восточный научно-исследовательский горнорудный институт Способ засыпки воронки
CN101372891B (zh) * 2008-06-10 2010-08-11 沈阳市华祥矿山机械厂 条带充填整体回采采煤方法
CN101749020A (zh) * 2010-01-26 2010-06-23 淄博市王庄煤矿 充填法前进式采煤
CN202215249U (zh) * 2011-07-05 2012-05-09 徐州贝壳迈宁矿业科技有限公司 一种固体充填采煤沿空留巷垒砌矸石墙
CN102383857A (zh) * 2011-07-05 2012-03-21 徐州贝壳迈宁矿业科技有限公司 一种固体充填采煤垒砌矸石墙沿空留巷工艺
CN102493838B (zh) * 2011-12-17 2014-01-15 湖南科技大学 一种急倾斜煤层综采连续充填采煤方法
CN102552260A (zh) * 2012-01-10 2012-07-11 姚水成 一种治疗冻疮的药物
CN102996131B (zh) * 2012-12-10 2014-10-29 中国矿业大学 一种预掘两巷前进式固体充填采煤方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101586460A (zh) * 2009-06-02 2009-11-25 中国矿业大学 一种采煤固体物充填方法
CN102444401A (zh) * 2011-11-28 2012-05-09 袁树来 薄煤层炮采工作面充填采煤方法及相关设备

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306983A (zh) * 2019-06-15 2019-10-08 龙口矿业集团有限公司 一种采区的边角煤柱工作面开采方法
CN111364994A (zh) * 2020-03-24 2020-07-03 中国矿业大学 一种综采转充填连续推进协同开采方法
CN111364994B (zh) * 2020-03-24 2021-04-02 中国矿业大学 一种综采转充填连续推进协同开采方法

Also Published As

Publication number Publication date
WO2014090108A1 (zh) 2014-06-19
AU2013358812A1 (en) 2014-11-06
AU2013358812B2 (en) 2016-01-21
CN102996131A (zh) 2013-03-27

Similar Documents

Publication Publication Date Title
CN102996131B (zh) 一种预掘两巷前进式固体充填采煤方法
CN110656937B (zh) 一种流态化煤气同采系统及其同采方法
CN104405437B (zh) 一种固体充填与综采混合式工作面开采方法
CN101586460B (zh) 一种采煤固体物充填方法
CN106869933B (zh) 一种砌充结合减小特厚煤层停采煤柱宽度的方法
CN103742148B (zh) 一种急倾斜煤层柔掩支护下行矸石充填的采煤法
CN104251139B (zh) 采煤工作面冒落区充填开采方法
CN104564137B (zh) 双介质垛式支撑坚硬顶板的煤矿采空区处理方法及装置
CN103527196B (zh) 一种黄土充填回收房式煤柱的方法
CN103527197A (zh) 一种特厚煤层固体胶结充填巷式开采方法
CN101915100B (zh) 煤矿井下黄土充填采煤方法
CN106907177B (zh) 一种薄煤层沿空留巷巷旁充填支护方法
CN109869150B (zh) 一种矿山资源分段全采局充开采方法
CN103939139A (zh) 一种煤矿固体充填采煤工作面设备配套方法
CN109882239B (zh) 一种露天端帮压煤放射式充填开采方法
CN104088662B (zh) 一种固体充填采煤沿空留巷支护墙体的施工方法
CN108756875B (zh) 一种内排露天煤矿中厚煤层连续开采装置及方法
CN102619515B (zh) 一种顶部充填的高端壁无底柱分段崩落法开采工艺
CN103993881A (zh) 一种长壁巷式胶结充填开采方法
CN103161498B (zh) 急倾斜煤层区段煤柱巷旁充填方法
CN108301833B (zh) 全负压短壁充填采煤法
CN109899070B (zh) 基于椭球体放矿结构的缓倾斜中厚矿体无固废充填采矿法
CN108952725B (zh) 一种适用于缓倾斜薄矿体的低贫化采矿方法
CN105298494B (zh) 固体与胶结体复合充填采煤方法
CN108547658A (zh) 一种大倾角极薄煤层矸石自溜回填采空区方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant