WO2019009119A1 - 測量機の通信管理システム - Google Patents

測量機の通信管理システム Download PDF

Info

Publication number
WO2019009119A1
WO2019009119A1 PCT/JP2018/023977 JP2018023977W WO2019009119A1 WO 2019009119 A1 WO2019009119 A1 WO 2019009119A1 JP 2018023977 W JP2018023977 W JP 2018023977W WO 2019009119 A1 WO2019009119 A1 WO 2019009119A1
Authority
WO
WIPO (PCT)
Prior art keywords
maintenance
surveying instrument
setting
management server
unit
Prior art date
Application number
PCT/JP2018/023977
Other languages
English (en)
French (fr)
Inventor
武志 菊池
光隆 利田
空 大田黒
Original Assignee
株式会社トプコン
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社トプコン filed Critical 株式会社トプコン
Priority to US16/612,977 priority Critical patent/US11300423B2/en
Priority to EP18829082.9A priority patent/EP3650810A4/en
Publication of WO2019009119A1 publication Critical patent/WO2019009119A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C25/00Manufacturing, calibrating, cleaning, or repairing instruments or devices referred to in the other groups of this subclass
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
    • G01C15/002Active optical surveying means
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C3/00Measuring distances in line of sight; Optical rangefinders
    • G01C3/02Details
    • G01C3/04Adaptation of rangefinders for combination with telescopes or binoculars
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q20/00Payment architectures, schemes or protocols
    • G06Q20/04Payment circuits
    • G06Q20/06Private payment circuits, e.g. involving electronic currency used among participants of a common payment scheme
    • G06Q20/065Private payment circuits, e.g. involving electronic currency used among participants of a common payment scheme using e-cash
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q20/00Payment architectures, schemes or protocols
    • G06Q20/08Payment architectures
    • G06Q20/10Payment architectures specially adapted for electronic funds transfer [EFT] systems; specially adapted for home banking systems
    • G06Q20/105Payment architectures specially adapted for electronic funds transfer [EFT] systems; specially adapted for home banking systems involving programming of a portable memory device, e.g. IC cards, "electronic purses"
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B25/00Alarm systems in which the location of the alarm condition is signalled to a central station, e.g. fire or police telegraphic systems
    • G08B25/01Alarm systems in which the location of the alarm condition is signalled to a central station, e.g. fire or police telegraphic systems characterised by the transmission medium
    • G08B25/10Alarm systems in which the location of the alarm condition is signalled to a central station, e.g. fire or police telegraphic systems characterised by the transmission medium using wireless transmission systems

Definitions

  • the present invention relates to a communication management system that performs maintenance management of a surveying instrument.
  • a surveying instrument (total station) irradiates a distance measurement light to a target placed at a measurement point, receives the reflected light, and performs surveying. It is important to maintain the accuracy of the surveying instrument, since the surveying requires the measurement accuracy according to the purpose. For this reason, it is required to maintain the machine regularly or as needed, and to keep the machine in good condition at all times.
  • Patent Document 1 relates to maintenance management of a surveying instrument, displaying on a display that maintenance is necessary from information based on a maintenance history using a management program, and preparation of periodic maintenance or It is disclosed that the need for maintenance is transmitted to the surveying instrument via the Internet by looking at the situation of error depending on the situation.
  • the present invention has been made in view of the above circumstances, and an object of the present invention is to provide a communication management system of a surveying instrument capable of preventing the surveying instrument from being used without maintenance.
  • a communication management system of a surveying instrument includes a surveying unit for surveying a target, a control unit for controlling the surveying unit, and a communication unit connected to a communication network. And a remote terminal capable of communicating with the management server via the communication network, wherein the remote terminal is the surveying instrument of the surveying instrument.
  • Maintenance setting and cancellation of the maintenance setting are performed, and the maintenance setting and cancellation of the setting are stored in the management server, and the management server is in a state in which the surveying instrument requires a predetermined maintenance operation according to the maintenance setting. At least one of the surveying instrument user and the administrator, and the maintenance setting is resolved.
  • the maintenance setting includes setting associated with the maintenance period
  • the notification is characterized in that it comprises a pre-notification is performed before the arrival of the maintenance date.
  • the management server sets the surveying instrument in an unusable state until the maintenance setting is released.
  • the communication management system of the present invention it is possible to prevent the surveying instrument from being used without maintenance.
  • the manager of the surveying instrument TS refers to a surveying instrument manufacturer, an agent, a management company, or a person who belongs to these and manages the surveying instrument TS.
  • the user of the surveying instrument means the owner of the surveying instrument or a person who belongs to the owner's company and uses the surveying instrument on a daily basis.
  • FIG. 1 is a diagram showing an entire configuration of a communication management system 10 according to a first embodiment of the present invention.
  • the communication management system 10 includes a plurality of surveying instruments TS1, TS2... TSx (hereinafter, representative code is TS) to be managed, a management server MS, and a remote terminal RC.
  • the surveying instrument TS, the management server MS, and the remote terminal RC can communicate with each other via the communication network N.
  • the communication network N may include any communication network such as the Internet, a local area network such as an in-house LAN, a connection cable, and a sanitary communication network.
  • FIG. 2 is a configuration block diagram of the surveying instrument TS according to the present embodiment.
  • the surveying instrument TS is a total station (electronic range finder). As shown in FIG. 2, the surveying instrument TS includes a surveying unit 21, a control unit 22, a communication unit 23, a display unit 24, and a rotation drive unit 25.
  • the communication unit 23 may be configured to be added (externally attached) to the surveying instrument TS.
  • the surveying unit 21 includes a light emitting element, a ranging optical system, and a light receiving element disposed in a telescope (not shown) of the surveying instrument TS.
  • the surveying unit 21 emits distance measuring light from the light emitting element via the distance measuring optical system to illuminate a target, and receives light reflected from the target by the light receiving element to perform distance measurement.
  • the surveying unit 21 performs angle measurement by measuring the vertical rotation angle of the telescope and the horizontal rotation angle of a housing (not shown) of the telescope with a rotary encoder.
  • the communication unit 23 enables communication with the outside through the communication network N, and is connected to the Internet using, for example, the Internet protocol (TCP / IP).
  • TCP / IP the Internet protocol
  • the display unit 24 has a liquid crystal screen, is capable of inputting surveying conditions and the like, and displays various information related to surveying.
  • the rotation drive unit 25 is a motor, and there are one which vertically rotates the telescope and one which horizontally rotates the housing.
  • the control unit 22 is a control unit provided with at least a CPU and a memory (ROM, RAM, etc.).
  • the control unit 22 executes the survey application program and causes the display unit 24 to display a screen according to the application.
  • the control unit 22 drives the surveying unit 21 and the rotational drive unit 25 to perform automatic collimation, ranging and angle measurement of the target, and acquires survey data of the measurement point.
  • the control unit 22 also transmits and receives information to and from the management server MS via the communication network N using the communication unit 23, and executes a command from the management server MS. Furthermore, the control unit 22 confirms the state of the management server MS at a fixed cycle, for example, a cycle of once a day.
  • the management server checks the presence / absence of notification to be displayed on the MS by the surveying instrument TS. Further, the control unit 22 downloads a message stored in the management server MS based on the maintenance setting stored in the management server MS, and causes the display unit 24 to display the message.
  • FIG. 3 is a configuration block diagram of the remote terminal RC according to the present embodiment.
  • the remote terminal RC is, for example, a terminal such as a personal computer, a smartphone, or a tablet, which is owned by a surveying instrument manufacturer or a distributor.
  • the remote terminal RC at least includes a terminal communication unit 31, a terminal control unit 32, a terminal display unit 33, and a terminal input unit 34.
  • the terminal communication unit 31 can transmit and receive information with the server communication unit 41 of the management server MS described later via the communication network N.
  • the terminal control unit 32 is a control unit provided with at least a CPU and a memory (ROM, RAM, etc.). The terminal control unit 32 performs maintenance setting on the surveying instrument TS to be set. In addition, when the predetermined maintenance work is completed, the maintenance setting is canceled.
  • the terminal display unit 33 displays an operation screen for a manager based on an instruction from the terminal control unit 32, and is, for example, a liquid crystal display or the like.
  • the terminal input unit 34 is, for example, an input device such as a keyboard, a numeric keypad, or a touch panel, and inputs information necessary for the operation of the remote terminal RC.
  • FIG. 4 is a configuration block diagram of the management server MS according to the present embodiment.
  • the management server MS at least includes a server communication unit 41, a server control unit 42, a storage unit database 51, and a clock 44.
  • the server communication unit 41 can transmit and receive information between the communication unit 23 of the surveying instrument TS and the terminal communication unit 31 of the remote terminal RC via the communication network N.
  • the storage unit 43 includes at least a database 51.
  • the database 51 stores information received from the surveying instrument TS and the remote terminal RC in association with the management number of the surveying instrument TS.
  • the server control unit 42 is a control unit provided with at least a CPU and a memory (ROM, RAM, etc.). As shown in FIG. 4, the server control unit 42 includes a setting read unit 44, a determination execution unit 46, and an operation execution unit 47.
  • the setting reading unit 44 reads the maintenance setting stored in the database 51. Specifically, the date and time at which a predetermined maintenance operation is required (hereinafter referred to as “maintenance due date”) is read out. Further, when the prior notification setting is performed, the setting of the date and time of the prior notification, that is, the number of days before the maintenance notification before the notification (hereinafter referred to as “the prior notification date and time”) is read.
  • the determination execution unit 46 compares the current date and time acquired from the clock 44 built in the management server MS with the set maintenance date, and determines whether the current date and time exceeds the maintenance date. In addition, when the prior notification setting is made by the maintenance setting, the current date and time are compared with the prior notification date and it is determined whether the current date and time exceeds the prior notification date and time.
  • the operation execution unit 47 executes the set operation based on the maintenance setting stored in the database 51 at the request of the remote terminal RC. The specific operation will be described later.
  • FIG. 5 is a flowchart showing a communication management workflow of the surveying instrument TSx using the communication management system 10 according to the present embodiment.
  • step S101 the administrator opens the web page 50 from the remote terminal RC, and performs maintenance setting on the surveying instrument TSx to be managed.
  • Maintenance settings include settings associated with the maintenance period. Specifically, the maintenance setting includes setting of a maintenance date, setting of whether or not prior notification is given before notification of maintenance due (hereinafter referred to as "this notification"), and setting of prior notification date and time .
  • the maintenance date can be determined based on the maintenance schedule determined by the manufacturer, the type and status of the surveying instrument, and the like.
  • the maintenance setting includes the setting of the notification means, the setting of the notification target person, the setting of the content of the notification message, and the like.
  • the notification means is, for example, transmission of an electronic mail, display on the display unit 24 of the surveying instrument TS, display on the Web page 50. Further, in the case of display on an e-mail or a web page, at least one of the manager of the surveying instrument and the user may be selected as the notification target. Also, the contents of the notification and the notification of prior notification may be the same or different.
  • the maintenance setting may include a setting for locking the function of the surveying instrument TSx simultaneously with the notification.
  • step S102 when there is the prior notification setting, when the prior notification date and time comes, the process moves to step S102, and the management server MS performs the prior notification based on the above-mentioned maintenance setting.
  • Prior notice can be implemented as appropriate, such as once only once or once daily until the maintenance due date, depending on the type and nature of the surveying instrument TSx. If there is no prior notification setting, step S102 is skipped.
  • step S103 the management server MS notifies at least one of the manager and the owner of the surveying instrument to be managed based on the maintenance setting.
  • This notification can also be implemented appropriately, such as notifying once daily, notifying whenever the power of the surveying instrument is turned on, notifying once a week, etc., depending on the type and nature of the surveying instrument TSx. . However, this notification is continuously performed until the maintenance setting is released, and the notification is stopped when the maintenance setting is released.
  • step S104 the notification in steps S102 and S103 recognizes that the maintenance of the target surveying instrument TSx is necessary, and requests the administrator to perform maintenance work. Then, a predetermined maintenance operation is performed on the surveying instrument TSx.
  • step S105 the Web page 50 is opened from the remote terminal RC, and the maintenance state of the target survey instrument TSx is set to "done" to cancel the maintenance setting.
  • the surveying instrument TSx is returned to the user.
  • step S106 the administrator determines whether the next maintenance setting is necessary. If necessary, the process returns to step S101, the maintenance setting is performed again from the remote terminal RC, and the process is ended if unnecessary.
  • FIG. 6 is a flowchart of maintenance setting in the remote terminal RC in step S101.
  • the administrator of the surveying instrument TS logs in to the dedicated web page 50 (FIG. 1) provided by the surveying instrument manufacturer from the remote terminal RC.
  • the terminal display unit 33 displays a list of a plurality of registered surveying instruments TS1, TS2,.
  • the administrator selects the surveying instrument TSx to be set.
  • step S303 when the process proceeds to step S303, a maintenance setting screen is displayed on the web page 50 of the terminal display unit 33.
  • FIG. 7 shows an example of the maintenance setting screen (web page 50).
  • the maintenance setting is configured by the check box and the free input method.
  • the present invention is not limited to this, and maintenance date, presence / absence of prior notification, prior notification date / time, notification means, notification target person, notification contents, etc. can be set by means such as pull-down form, check box, free input method etc. It may be configured.
  • the administrator can set the operation according to his / her management intention.
  • step S304 a permission screen for setting completion is displayed on the terminal display unit 33.
  • the setting is stored in the management server MS.
  • FIG. 8 is a flowchart of maintenance setting cancellation in the remote terminal RC in step S105.
  • the administrator of the surveying instrument TS logs in to the web page 50 (FIG. 1) from the remote terminal RC.
  • the terminal display unit 33 displays a list of a plurality of registered surveying instruments TS1, TS2,.
  • the administrator selects the surveying instrument TSx to be reset.
  • step S313 the maintenance cancellation setting screen is displayed on the web page 50.
  • the administrator confirms that the maintenance of the target surveying instrument is completed, and cancels the maintenance setting by setting the maintenance state to "done".
  • step S314 a permission screen for setting completion is displayed on the terminal display unit 33.
  • this As “YES”, the maintenance history and the cancellation setting are stored in the management server MS.
  • FIG. 9 is a flowchart showing the operation of the management server MS according to the present embodiment.
  • the management server carries out the following operations all the time at a predetermined constant interval, for example, once a day.
  • the setting reading unit 44 of the management server MS reads the maintenance date set in the maintenance setting, and compares the current date acquired by the clock 44 with the maintenance date.
  • step S402 the determination execution unit 46 determines whether the current date and time exceeds the maintenance date. If it exceeds (Yes), the process proceeds to step S403 to execute the operation specified by the maintenance setting. Specifically, by sending an e-mail to a designated target person, displaying it on the owner or administrator's web page, or displaying it on the surveying instrument TSx 24, predetermined maintenance work can be performed. Notify that it is in the required state.
  • the function of the surveying instrument TSx can be locked to make the surveying instrument TSx unusable. Thereafter, the management server MS ends the process.
  • step S404 it is determined whether advance notification setting has been made and the current date and time exceeds the prior notification date.
  • step S405 the process proceeds to step S405, and the operation specified by the maintenance setting is performed. That is, it notifies that the maintenance date is approaching. Thereafter, the management server MS completes the process.
  • the management server MS ends the process.
  • FIG. 10 is a flowchart of the operation of the surveying instrument TSx according to the present embodiment.
  • the surveying instrument TSx communicates with the management server MS at a constant cycle, and executes the following operation.
  • step S201 the management server MS confirms the state. And it transfers to step S202 and it is judged whether the notification in surveying instrument TSx is required.
  • step S203 it is determined whether there is a message to be displayed.
  • step S204 If there is a message to be displayed (Yes), the process proceeds to step S204, and the message is downloaded and acquired from the management server MS. Next, the process proceeds to step S205, and a message is displayed on the display unit 24.
  • FIG. 11 is an example of a message to be displayed. Thereafter, the surveying instrument TSx completes the process.
  • step S202 when the notification by the surveying instrument TSx is not necessary (No), the surveying instrument TSx completes the process.
  • the management server MS reads out the stored maintenance settings once a day, compares the current date and time with the maintenance due date and the prior notification set date and time, and the current date and time exceeds each set date and time. Determine if there is.
  • Surveying instrument TSx checks the status of the server once a day.
  • the management server MS sends an advance notification by e-mail based on the maintenance setting of (1), and displays it on the display unit 24 of the surveying instrument TSx. indicate.
  • the user confirms the message and the mail displayed on the surveying instrument TSx, recognizes that a predetermined maintenance operation is necessary, and is expected to request the administrator to maintain the surveying instrument TSx.
  • the management server MS executes the maintenance setting based on (1). Send this notification by e-mail and display it on the display unit 24 of the surveying instrument TSx. This notification is carried out every day until the user brings the surveying instrument to the administrator or the administrator visits the user and carries out the prescribed maintenance work on the surveying instrument and the maintenance setting is canceled by the administrator. It will be. Therefore, the user strongly recognizes that maintenance is necessary, and requests maintenance to the administrator.
  • the administrator performs predetermined maintenance work on the surveying instrument TSx. After completion of the work, the administrator logs in to the web page 50 with the remote terminal RC, selects the surveying instrument TSx to be managed, cancels the maintenance setting, saves the setting, and closes the web page 50. When the maintenance setting is canceled, the message in the management server MS is cleared, and thereafter, notification by mail transmission and display on the surveying instrument TSx is stopped.
  • the user / administrator is notified that the surveying instrument TS is in a state requiring a predetermined maintenance operation, and the predetermined operation is actually performed. Since the notification does not stop unless the maintenance operation is completed and the administrator cancels the maintenance setting, the user / administrator can not ignore the notification and the surveying instrument TS requires a predetermined maintenance operation. We strongly recognize that it is. Therefore, the implementation of maintenance work can be promoted. As a result, the surveying instrument TS can be prevented from being used without maintenance.
  • the maintenance setting includes the setting associated with the maintenance period
  • the maintenance defined by the manufacturer that the state requires the predetermined maintenance work It can be set to notify according to a maintenance period determined based on a schedule, a model of surveying instrument TS, a state, and the like.
  • the maintenance schedule of the surveying instrument TS can be properly managed.
  • prior notification is performed before the arrival of the maintenance date, so maintenance work can be promoted before the arrival of the maintenance date. .
  • the maintenance history of the surveying instrument TS is stored in the management server MS, each of the user, the administrator and the maker can grasp the maintenance status of the surveying instrument TS. As a result, the number of surveying instruments TS used without maintenance can be reduced, and the surveying instruments TS can be maintained in a good state.
  • the maintenance request can be made more reliably.
  • FIG. 12 is a diagram showing an entire configuration of a communication management system 100 according to the second embodiment of the present invention.
  • a charging system AS is connected to the communication network N.
  • the same elements as those of the first embodiment are denoted by the same reference numerals, and detailed description will be omitted.
  • FIG. 13 is a configuration block diagram of the management server MS1 according to the present embodiment.
  • the management server MS1 has the server control unit 42 the virtual currency generation unit 48 and the virtual currency management unit 49, and the storage unit 43 the virtual currency quantity storage unit 52 At least.
  • the virtual currency is a monetary value that enables economic activities related to the service provided by the communication management system 100, but it has the exchange value to be converted into cash or used in other services. You may have.
  • the administrator can purchase this virtual currency, for example, by bank account debiting, credit card settlement, or using electronic money available on the web purchased in advance.
  • the virtual currency generation unit 48 In response to a request from the remote terminal RC, the virtual currency generation unit 48 generates a virtual currency in the form of exchange such as currency such as yen and dollar, and creates billing data corresponding to the quantity of virtual currency.
  • the virtual currency is a monetary value that enables economic activity related to the service provided by the remote control system 100, and is used for cash conversion or other services. It may have value.
  • the administrator can purchase this virtual currency, for example, by bank account debiting, credit card settlement, or using electronic money available on the web purchased in advance.
  • the charge data is data necessary for settlement, and includes, for example, a bank account number or a credit card number, a purchase price, and the like.
  • the charging system AS executes settlement based on the charging data corresponding to the virtual currency quantity transmitted from the management server MS.
  • a charging system AS is realized by a computer, it is a well-known technology and thus detailed description will be omitted. Also, the charging system AS may be incorporated in the management server MS.
  • the virtual currency purchased by the administrator or the like is stored in the database 51 in association with the account of the administrator or the like or the management number of the surveying instrument TSx.
  • the virtual currency management unit 49 manages the quantity of virtual currency stored in the database 51.
  • the virtual currency quantity storage unit 52 stores the quantity of virtual currency generated by the virtual currency generation unit 48 described later and managed by the virtual currency management unit 49.
  • FIG. 14 is a flowchart showing a communication management workflow of the surveying instrument TSx using the communication management system 100 according to the present embodiment.
  • step S1001 the administrator has previously purchased a virtual currency from the web page from the remote terminal RC.
  • step S1002 a Web page is opened from the remote terminal RC, and maintenance settings similar to those in the first embodiment are performed on the surveying instrument TSx to be managed.
  • the setting is stored in the management server MS1, and one unit of the virtual currency purchased in advance is consumed, and the quantity of the virtual currency subtracted is stored in the management server MS1. .
  • the manufacturer can arbitrarily set the amount of virtual currency consumed.
  • step S1003 when there is the setting of prior notification, when the prior notification date and time comes, the process moves to step S1003, and the management server MS performs prior notification based on the above-mentioned maintenance setting. If there is no prior notification setting, step S1003 is skipped.
  • step S1004 the management server MS1 notifies at least one of the manager and the owner of the surveying instrument to be managed based on the above-mentioned maintenance setting. This notification is continuously performed until the maintenance setting is cancelled, and the notification is stopped when the maintenance setting is cancelled.
  • step S1005 a user who recognizes that maintenance is necessary by the notification in steps S1003 and S1004 requests the administrator of the maintenance work of the surveying instrument TSx. Then, a predetermined maintenance operation is performed on the surveying instrument TSx.
  • step S1006 the Web page 50 is opened from the remote terminal RC, and the maintenance state of the target surveying instrument TSx is set to "done" to cancel the maintenance setting.
  • the cancellation of the maintenance setting is stored in the management server MS1, one unit of virtual currency is consumed, and the quantity of the virtual currency subtracted is stored in the management server MS1.
  • the manufacturer can arbitrarily set the amount of virtual currency consumed. Thereafter, the surveying instrument TSx is returned to the user.
  • step S1007 the administrator determines whether the next maintenance setting is necessary. If necessary, the process returns to step S1001 to perform maintenance setting again, and when unnecessary, the process ends.
  • the consumption of the virtual currency in steps S1002 and S1006 may be performed in both steps, but is not limited to this, and may be performed in only one of them in response to a market request or the like.
  • the surveying instrument manufacturer that provides the communication management system 100 provides the administrator with a notification function by maintenance setting as a paid service.
  • the notification function can significantly promote the user to request the administrator for maintenance work.
  • the administrator since a simple and secure payment system using virtual currency is used, the administrator does not have to perform complicated procedures for payment. Therefore, the use of the notification function by the administrator is strongly promoted.

Abstract

測量機がメンテナンスされずに使用され続けるのを防止することのできる測量機の通信管理システムを提供する。測量機の通信管理システムは(10)、ターゲットを測量する測量部(21)、前記測量部を制御する制御部(22)、および通信ネットワーク(N)に接続された通信部(23)を備える測量機(TS)と、前記通信ネットワーク(N)を介して記測量機(TS)と通信可能な管理サーバ(MS)と、前記通信ネットワーク(N)を介して前記管理サーバ(MS)と通信可能な遠隔端末(RC)とを備え、前記遠隔端末(RC)は、前記測量機(TS)のメンテナンス設定および該メンテナンス設定の解除を行い、前記メンテナンス設定およびその設定の解除を前記管理サーバ(MS)に保存し、前記管理サーバ(MS)は、前記メンテナンス設定に従って、前記測量機(TS)が所定のメンテナンス作業を要する状態であることを、前記測量機(TS)の使用者および管理者の少なくとも一方に通知をし、前記メンテナンス設定が解除されると、前記通知を停止し、前記メンテナンス設定は、メンテナンス期間に関連付けられた設定を含み、前記通知は、メンテナンス期日の到来前に行われる事前通知を含む。

Description

測量機の通信管理システム
 本発明は、測量機のメンテナンス管理を行う通信管理システムに関する。
 測量機(トータルステーション)は、測定点に置かれたターゲットに対し測距光を照射し、その反射光を受光して測量を行う。測量は、目的に応じた測定の精密さが求められるため、測量機の精度を維持することは重要である。このため、機械を定期的、または必要に応じてメンテナンスし、機械を常に良好な状態に保つことが求められる。
 特許文献1には、測量機のメンテナンス管理に関して、管理用プログラムを用いて、メンテナンス履歴に基づく情報から、メンテナンス必要な時期であることをディスプレイに表示することや、定期的なメンテナンスの準備や場合によってはエラーの状況を見て、メンテナンスの必要性を、インターネットを介して測量機に送信することが開示されている。
 しかしながら、単に測量機に表示されたり、通知が一度送信されたりするだけでは、実際には、使用者の気を引かず、機械が点検されないまま使用され続けることが多かった。このため、機械の精度を保つことができないという問題があった。
特開2007-170978号公報
 本発明は、上記のような事情に鑑みてなされたものであり、測量機がメンテナンスされずに使用され続けるのを防止することのできる測量機の通信管理システムを提供することを目的とする。
 上記課題を解決するために、本発明の1つの態様に係る測量機の通信管理システムは、ターゲットを測量する測量部、前記測量部を制御する制御部、および通信ネットワークに接続された通信部を備える測量機と、前記通信ネットワークを介して記測量機と通信可能な管理サーバと、前記通信ネットワークを介して前記管理サーバと通信可能な遠隔端末とを備え、前記遠隔端末は、前記測量機のメンテナンス設定および該メンテナンス設定の解除を行い、前記メンテナンス設定およびその設定の解除を前記管理サーバに保存し、前記管理サーバは、前記メンテナンス設定に従って、前記測量機が所定のメンテナンス作業を要する状態であることを、前記測量機の使用者および管理者の少なくとも一方に通知をし、前記メンテナンス設定が解除されると、前記通知を停止し、前記メンテナンス設定は、メンテナンス期間に関連付けられた設定を含み、前記通知は、メンテナンス期日の到来前に行われる事前通知を含むことを特徴とする。
 上記態様において、前記管理サーバが、前記メンテナンス設定が解除されるまで、前記測量機を使用不可能な状態に設定することも好ましい。
 上記態様において、前記測量機のメンテナンス設定および該メンテナンス設定の解除の少なくとも一方を行うために、前記測量機の通信管理に関わる決済のために予め生成された仮想通貨の1単位を消費することも好ましい。
 本発明の通信管理システムによれば、測量機がメンテナンスされずに使用され続けるのを防止することができる。
本発明の第1の実施の形態に係る通信管理システムの全体構成を示す図である。 同形態に係る測量機の構成ブロック図である。 同形態に係る遠隔端末の構成ブロック図である。 同形態に係る管理サーバの構成ブロック図である。 同形態に係る通信管理システムのワークフローを示すフローチャートである。 同形態に係る通信管理システムにおける、メンテナンス設定のフローチャートである。 同形態に係る通信管理システムにおける、メンテナンス設定を行うためのWebページの一例を示す図である。 同形態に係る通信管理システムにおける、メンテナンス設定解除のフローチャートである。 同形態に係る管理サーバの動作を示すフローチャートである。 同形態に係る測量機の動作を示すフローチャートである。 同実施の形態に係る測量機に表示されるメッセージの一例を示す図である。 本発明の第2の実施の形態に係る通信管理システムの全体構成を示す図である。 同形態に係る管理サーバの構成を示す構成ブロック図である。 同形態に係る本通信管理システムのワークフローを示すフローチャートである。
 以下、本発明の好適な実施の形態について、図面を参照しながら説明する。なお、本明細書において、測量機TSの管理者とは、測量機メーカ、代理店、管理会社、またはこれらに所属し、測量機TSの管理を行う者等をいう。また、測量機の使用者とは、測量機の所有者、または所有者の会社等に所属して日常的に測量機を使用する者等をいう。
第1の実施の形態
 (通信管理システムの全体構成)
 図1は、本発明の第1の実施の形態に係る通信管理システム10の全体構成を示す図である。図1に示すように、通信管理システム10は、管理対象である複数の測量機TS1、TS2・・・TSx(以下、代表符号をTSとする。)、管理サーバMS、および遠隔端末RCを備える。測量機TS、管理サーバMS、および遠隔端末RCは、通信ネットワークNを介して互いに通信可能となっている。通信ネットワークNは、インターネットや、社内LAN等のローカル・エリア・ネットワークや、接続ケーブルや、衛生通信ネットワークなど、任意の通信ネットワークを含んでもよい。
 (測量機の構成)
 図2は、本実施の形態に係る測量機TSの構成ブロック図である。測量機TSは、トータルステーション(電子式測距測角儀)である。図2に示すように、測量機TSは、測量部21、制御部22、通信部23、表示部24、および回転駆動部25を有する。なお、通信部23は、測量機TSに後付け(外付け)された構成であってもよい。
 測量部21は、測量機TSの望遠鏡(図示せず)内に配置された発光素子、測距光学系、および受光素子を備える。測量部21は、上記発光素子から、上記測距光学系を介して測距光を出射してターゲットを照射し、ターゲットからの反射光を上記受光素子で受光することにより、測距を行う。また、測量部21は、上記望遠鏡の鉛直回転角および上記望遠鏡の筐体(図示せず)の水平回転角をロータリエンコーダで測定することにより、測角を行う。
 通信部23は、通信ネットワークNを介して外部との通信を可能にするものであり、例えば、インターネットプロトコル(TCP/IP)を用いてインターネットと接続している。
 表示部24は、液晶画面を有し、測量条件等を入力可能であり、測量に関する各種情報が表示される。回転駆動部25は、モータであり、上記望遠鏡を鉛直回転させるものと、上記筐体を水平回転させるものがある。
 制御部22は、少なくともCPUおよびメモリ(ROM,RAM等)を備える制御ユニットである。制御部22は、測量アプリケーション・プログラムを実行し、アプリケーションに従った画面を表示部24に表示させる。制御部22は、測量部21および回転駆動部25を駆動し、ターゲットの自動視準、測距および測角を行い、測定点の測量データを取得する。また、制御部22は、通信部23を用いて、通信ネットワークNを介して、管理サーバMSと情報の送受信を行い、管理サーバMSからの指令を実行する。さらに、制御部22は、管理サーバMSに、一定の周期、例えば1日に一回の周期で状態を確認する。すなわち、管理サーバにMSに測量機TSが表示すべき通知の有無等を確認する。また、制御部22は、管理サーバMSに保存されたメンテナンス設定に基いて、管理サーバMSに保存されたメッセージをダウンロードし、表示部24に表示させる。
 (遠隔端末の構成)
 図3は本実施の形態に係る遠隔端末RCの構成ブロック図である。遠隔端末RCは、測量機メーカまたは代理店で所有されている、例えば、パーソナルコンピュータ、スマートフォン、タブレット等の端末である。図3に示すように、遠隔端末RCは、端末通信部31、端末制御部32、端末表示部33、および端末入力部34を少なくとも有する。
 端末通信部31は、通信ネットワークNを介して、後述する管理サーバMSのサーバ通信部41との間で情報の送受信が可能である。
 端末制御部32は、少なくともCPUおよびメモリ(ROM,RAM等)を備える制御ユニットである。端末制御部32は、設定対象とする測量機TSに関して、メンテナンス設定を行う。また、所定のメンテナンス作業が完了した場合には、メンテナンス設定の解除を行う。
 端末表示部33は、端末制御部32からの指令に基いて、管理者用の操作画面を表示するものであり、例えば液晶ディスプレイ等である。
 端末入力部34は、例えば、キーボード、テンキー、タッチパネル等の入力装置であり、遠隔端末RCの動作に必要な情報を入力する。
 (管理サーバの構成)
 図4は、本実施の形態に係る管理サーバMSの構成ブロック図である。管理サーバMSは、サーバ通信部41、サーバ制御部42、記憶部データベース51および時計44を少なくとも有する。
 サーバ通信部41は、通信ネットワークNを介して、測量機TSの通信部23および遠隔端末RCの端末通信部31との間で情報の送受信が可能である。
 記憶部43は、少なくともデータベース51を備え、データベース51は、測量機TSおよび遠隔端末RCから受信した情報を、測量機TSの管理番号と関連付けて保存している。
 サーバ制御部42は、少なくともCPUおよびメモリ(ROM,RAM等)を備える制御ユニットである。サーバ制御部42は、図4に示す様に、設定読み出し部44、判断実行部46および動作実行部47を備える。
 設定読み出し部44は、データベース51に保存されたメンテナンス設定を読み出す。具体的には、所定のメンテナンス作業が必要とされる日時(以下、「メンテナンス期日」という。)を読み出す。また、事前通知設定が行われている場合には、事前通知を行う日時、すなわち事前通知をメンテナンス期日の何日前に行うかの設定(以下、「事前通知日時」という。)を読み出す。
 判断実行部46は、管理サーバMSに内蔵される時計44から取得される現在日時と、設定されたメンテナンス期日とを比較し、現在日時がメンテナンス期日を超過しているか否かを判断する。また、上記メンテナンス設定により事前通知設定がなされている場合には、現在日時と、事前通知日時を比較して、現在日時が事前通知日時を超過しているか否かを判断する。
 動作実行部47は、遠隔端末RCの要求によりデータベース51に保存されたメンテナンス設定に基き、設定された動作を実行する。具体的な動作については後述する。
 (通信管理システム10による通信管理のワークフロー)
 図5は、本実施の形態に係る通信管理システム10を用いた測量機TSxの通信管理のワークフローを示すフローチャートである。
 ステップS101において、管理者は、遠隔端末RCからWebページ50を開き、管理対象の測量機TSxに対してメンテナンス設定を行う。
 メンテナンス設定は、メンテナンス期間に関連付けられた設定を含む。具体的には、メンテナンス設定は、メンテナンス期日の設定、メンテナンス期日到来の通知(以下、「本通知」という。)の前に、事前通知を行うか否かの設定、事前通知日時の設定を含む。メンテナンス期日は、メーカの定めるメンテナンススケジュールや、測量機の機種、状態等に基いて定めることができる。
 また、メンテナンス設定は、通知手段の設定、通知対象者の設定、通知メッセージの内容の設定などを含む。ここで、通知手段は、例えば、電子メールの送信や測量機TSの表示部24への表示、Webページ50への表示である。また、通知対象は、電子メールやWebページへの表示の場合は、測量機の管理者および使用者の少なくとも一方を選択できるようにしてもよい。また、本通知および事前通知の通知の内容は、同じであっても、異なっていてもよい。
 また、メンテナンス設定は、上記通知と同時に測量機TSxの機能をロックする設定を含んでいてもよい。
 上記メンテナンス設定において、事前通知設定ありの場合、事前通知日時が到来すると、ステップS102に移行して、管理サーバMSは、上記メンテナンス設定に基いて事前通知を行う。事前通知は、測量機TSxの機種や性質に応じて、1回のみ行う、またはメンテナンス期日が到来するまで毎日1回行う等、適宜実装することができる。事前通知の設定がない場合は、ステップS102はスキップされる。
 次に、メンテナンス期日が到来すると、ステップS103に移行して、管理サーバMSは、上記メンテナンス設定に基いて、管理対象の測量機の管理者および所有者の少なくとも一方に本通知を行う。本通知も、測量機TSxの機種や性質に応じて、毎日1回通知する、測量機の電源をONするたびに通知する、または、1週間に1回通知する等、適宜実装することができる。但し、本通知は、メンテナンス設定が解除されるまで継続して行われ、メンテナンス設定が解除されると、通知が停止する。
 ステップS104では、ステップS102およびS103での通知により、使用者は、対象の測量機TSxのメンテナンスが必要であることを認識し、管理者にメンテナンス作業を依頼する。そして、測量機TSxに対して所定のメンテナンス作業が実施される。
 所定のメンテナンス作業が完了すると、ステップS105に移行して、遠隔端末RCから、Webページ50を開き、対象の測量機TSxのメンテナンス状態を「済」に設定することにより、メンテナンス設定を解除する。測量機TSxは使用者に返却される。
 次に、ステップS106に移行して、管理者は、次回のメンテナンス設定が必要かどうかを判定する。必要な場合はステップS101に戻って遠隔端末RCから、再度メンテナンス設定を行い、不要な場合は終了する。
 (メンテナンス設定)
 図6は、ステップS101での、遠隔端末RCにおけるメンテナンス設定のフローチャートである。まず、ステップS301で、測量機TSの管理者は、遠隔端末RCから、測量機メーカが提供する専用のWebページ50(図1)にログインする。
 次に、ステップS302に移行すると、端末表示部33に、登録された複数の測量機TS1,TS2,・・・のリストが表示される。管理者は、設定対象となる測量機TSxを選択する。
 次に、ステップS303に移行すると、端末表示部33のWebページ50にメンテナンス設定画面が表示される。
 図7はメンテナンス設定画面(Webページ50)の一例である。図7ではチェックボックスおよび自由入力方式によりメンテナンス設定可能に構成されている。しかし、これに限らず、メンテナンス期日、事前通知の有無、事前通知日時、通知手段、通知対象者、および通知内容等を、例えば、プルダウン形式、チェックボックス、自由入力方式等の手段により設定可能に構成されていてもよい。管理者は、自身の管理の意向にしたがって動作を設定することができる。
 次に、ステップS304(図6)に移行すると、端末表示部33に、設定完了の許諾画面が表示される。これを「YES」とすることにより、設定が管理サーバMSに保存される。
 (メンテナンス設定解除)
 図8は、ステップS105での、遠隔端末RCにおけるメンテナンス設定解除のフローチャートである。まず、ステップS311で、測量機TSの管理者は、遠隔端末RCから、Webページ50(図1)にログインする。
 次にステップS312に移行すると、端末表示部33に、登録された複数の測量機TS1,TS2,・・・のリストが表示される。管理者は、設定解除の対象となる測量機TSxを選択する。
 次にステップS313に移行すると、Webページ50にメンテナンス解除設定画面が表示される。管理者は、対象の測量機のメンテナンスが完了していることを確認の上、メンテナンス状態を「済」に設定することにより、メンテナンス設定を解除する。
 次にステップS314に移行すると、端末表示部33に、設定完了の許諾画面が表示される。これを「YES」とすることにより、メンテナンス履歴および解除設定が管理サーバMSに保存される。
 (管理サーバの動作)
 図9は、本実施の形態に係る管理サーバMSの動作を示すフローチャートである。管理サーバは、常時、予め定められた一定の間隔で、例えば1日に1回、以下の動作を実施する。まず、ステップS401で、管理サーバMSの設定読み出し部44は、メンテナンス設定で設定されたメンテナンス期日を読み出し、時計44により取得される現在日時と、メンテナンス期日とを比較する。
 次に、ステップS402に移行すると、判断実行部46は、現在日時がメンテナンス期日を超過しているかどうかを判断する。超過している場合(Yes)には、ステップS403に移行して、メンテナンス設定により指定された動作を実行する。具体的には、指定された対象者に電子メールを送信したり、所有者または管理者のWebページ上に表示したり、測量機TSxの24に表示したりすることにより、所定のメンテナンス作業を要する状態である旨を通知する。
 また、上記の動作と共に、測量機TSxの機能をロックして、測量機TSxを使用不可能な状態とすることもできる。その後、管理サーバMSは処理を終了する。
 一方、現在日時がメンテナンス期日を超過していない場合(No)には、ステップS404に移行して、事前通知設定がなされておりかつ現在日時が事前通知日時を超過しているかどうかを判断する。
 ここで、事前通知設定がなされておりかつ事前通知日時を超過している場合(Yes)は、ステップS405に移行して、メンテナンス設定により指定された動作を実行する。すなわち、メンテナンス期日が接近している旨を通知する。その後、管理サーバMSは処理を完了する。
 一方、事前通知設定がなされていない場合、および事前通知設定がなされているが事前通知日時を超過していない場合(No)には、管理サーバMSは、処理を終了する。
 (測量機の動作)
 図10は、本実施の形態にかかる測量機TSxの動作のフローチャートである。測量機TSxは、一定の周期で管理サーバMSと通信し、以下の動作を実行する。
 まず、ステップS201で、管理サーバMSに状態を確認する。そして、ステップS202に移行して、測量機TSxでの通知が必要か否かを判断する。
 測量機TSxでの通知が必要な場合(Yes)は、ステップS203に移行して、表示するメッセージが存在するか否かを判断する。
 表示するメッセージが存在する場合(Yes)は、ステップS204に移行して、メッセージを管理サーバMSよりダウンロードして取得する。次に、ステップS205に移行して、表示部24にメッセージを表示する。図11は、表示するメッセージの一例である。その後、測量機TSxは処理を完了する。
 一方、表示するメッセージが存在しない場合(No)は、測量機TSxは処理を完了する。
 また、ステップS202において、測量機TSxでの通知が必要でない場合(No)は、測量機TSxは処理を完了する。
 (本実施形態の通信管理システムの使用例)
 代理店(管理者)が、使用者が測量機TSxの保守点検を失念しないように、本システムを用いてメンテナンス管理を行う例を示す。
(1)管理者は、遠隔端末RCでWebページ50にログインし、管理対象の測量機Tsxを選択し、メンテナンス設定を行い、保存してWebページ50を閉じる。
[設定例]
・メンテナンス期日:2017年12月15日
・事前通知:あり(事前通知設定日時:30日前)
・通知方法:管理者および使用者へのメール送信,測量機の表示部への表示
・メール本文および表示メッセージの内容:任意に設定
(2)管理サーバMSは、1日に1回、保存されたメンテナンス設定を読み出し、現在日時と、メンテナンス期日および事前通知設定日時とを比較して、現在日時がそれぞれの設定日時を超過していないか判断する。測量機TSxは、1日に1回サーバの状態を確認する。
(3)事前通知設定日時である2017年11月15日が到来すると、管理サーバMSは、(1)のメンテナンス設定に基いて、事前通知をメール送信し、かつ測量機TSxの表示部24に表示する。使用者は、測量機TSxに表示されたメッセージやメールを確認し、所定のメンテナンス作業が必要であること認識し、測量機TSxのメンテナンスを管理者に依頼することが期待される。
(4)しかしながら、メンテナンス期日である2017年12月15日が到来しても所定のメンテナンス作業が実施されず、メンテナンス設定が解除されない場合、管理サーバMSは、(1)のメンテナンス設定に基いて、本通知をメール送信および測量機TSxの表示部24への表示を行う。本通知は、使用者が測量機を管理者に持ち込み、或いは管理者が使用者のもとに出向いて測量機に所定のメンテナンス作業を実施し、管理者によりメンテナンス設定が解除されるまで毎日行われる。従って、使用者は、メンテナンスが必要であることを強く認識し、メンテナンスを管理者に依頼することになる。
(5)管理者は測量機TSxに所定のメンテナンス作業を施す。作業完了後、管理者は、遠隔端末RCでWebページ50にログインし、管理対象の測量機TSxを選択し、メンテナンス設定を解除し、設定を保存してWebページ50を閉じる。メンテナンス設定が解除されると、管理サーバMS内のメッセージはクリアされ、これ以降、メール送信および測量機TSxへの表示による通知は停止される。
 上記のように、本実施の形態に係る測量機の通信管理システム10によれば、測量機TSが所定のメンテナンス作業を要する状態であることが使用者/管理者に通知され、実際に所定のメンテナンス作業が完了し、管理者がメンテナンス設定を解除しない限り通知が停止しないので、使用者/管理者は、当該通知を無視することができずに、測量機TSが所定のメンテナンス作業を要する状態であることを強く認識する。そのため、メンテナンス作業の実施を促進することができる。この結果、測量機TSがメンテナンスされずに使用されるのを防止することができる。
 また、本実施の形態に係る測量機の通信管理システム10によれば、メンテナンス設定は、メンテナンス期間に関連付けられた設定を含むので、所定のメンテナンス作業を要する状態であることを、メーカの定めるメンテナンススケジュールや、測量機TSの機種、状態等に基いて定められたメンテナンス期間に従って通知するように設定することができる。この結果、測量機TSのメンテナンススケジュールを適切に管理することができる。
 また、本実施の形態に係る測量機の通信管理システム10によれば、メンテナンス期日の到来前に事前通知が行われるので、メンテナンス期日の到来前にメンテナンス作業の実施することを促進することができる。
 また、管理サーバMSには、測量機TSのメンテナンス履歴が保存されるので、使用者、管理者およびメーカのそれぞれが、測量機TSのメンテナンス状況を把握することができる。その結果、メンテナンスされずに使用される測量機TSの数を低減することができ、測量機TSを良好な状態に保つことができる。
 また、本実施の形態に係る測量機の通信管理システム10において、メンテナンス設定が解除されない限り、測量機を使用不可能な状態にすれば、より確実にメンテナンスの依頼につなげることができる。
 第2の実施の形態
 (通信管理システム100の全体構成)
 図12は、本発明の第2の実施の形態に係る通信管理システム100の全体構成を示す図である。図12に示すように、通信管理システム100は、第1の実施の形態に係る通信管理システム10に加えて、通信ネットワークNに課金システムASが接続されている。なお、第1の実施の形態と同一の要素には同一の符号を付し、詳細な説明は省略する。
 (管理サーバの構成)
 図13は、本実施の形態に係る管理サーバMS1の構成ブロック図である。管理サーバMS1は、第1の実施の形態に係る管理サーバMSの構成に加えて、サーバ制御部42に仮想通貨生成部48および仮想通貨管理部49を、記憶部43に仮想通貨数量保存部52を少なくとも備える。
 仮想通貨は、通信管理システム100により提供されるサービスに関する経済活動を行うことを可能とする、貨幣価値を有するものであるが、現金に換算したり、他のサービスで使用したりする交換価値を有していてもよい。管理者は、この仮想通貨を、例えば、銀行口座引き落としや、クレジットカード決済により購入したり、予め購入したWeb上で利用可能な電子マネーを利用して購入したりすることができる。
 仮想通貨生成部48は、遠隔端末RCからの要求に応じて、円、ドル等の通貨等の両替と言う形で仮想通貨を生成し、仮想通貨の数量に対応する課金データを作成する。ここで、仮想通貨は、遠隔操作システム100により提供されるサービスに関する経済活動を行うことを可能とする、貨幣価値を有するものであり、現金に換算したり、他のサービスで使用したりする交換価値を有していてもよい。管理者は、この仮想通貨を、例えば、銀行口座引き落としや、クレジットカード決済により購入したり、予め購入したWeb上で利用可能な電子マネーを利用して購入したりすることができる。
 また、課金データは、決済に必要なデータであり、例えば、銀行口座番号またはクレジットカード番号および購入金額等を含む。
 課金システムASは、管理サーバMSから送信された、仮想通貨の数量に対応する課金データに基いて決済を実行する。このような課金システムASについては、コンピュータにより実現するが、公知の技術であるため詳細な説明は省略する。また、課金システムASは、管理サーバMSに組み込まれていてもよい。
 管理者等により購入された仮想通貨は、管理者等のアカウントまたは測量機TSxの管理番号に関連付けられてデータベース51に保存される。仮想通貨管理部49は、データベース51に保存された仮想通貨の数量を管理する。
 仮想通貨数量保存部52は、後述する仮想通貨生成部48で生成され、仮想通貨管理部49で管理される仮想通貨の数量を保存している。
 (通信管理システム100による通信管理のワークフロー)
 図14は、本実施の形態に係る通信管理システム100を用いた測量機TSxの通信管理のワークフローを示すフローチャートである。
 ステップS1001において、管理者は、予め、遠隔端末RCからWebページから仮想通貨を購入している。
 次にステップS1002で、遠隔端末RCからWebページを開き、管理対象の測量機TSxに対して第1の実施の形態と同様のメンテナンス設定を行う。
 設定完了の許諾画面には、設定を完了するためには、仮想通貨を1単位分消費することが必要であることが表示される。これを「YES」とすることにより、設定が管理サーバMS1に保存されるとともに、予め購入しておいた仮想通貨が1単位消費され、減算された仮想通貨の数量が管理サーバMS1に保存される。消費される仮想通貨の数量については、メーカが任意に設定することができる。
 上記メンテナンス設定において、事前通知の設定ありの場合、事前通知日時が到来すると、ステップS1003に移行して、管理サーバMSは、上記メンテナンス設定に基いて事前通知を行う。事前通知の設定がない場合は、ステップS1003はスキップされる。
 次に、メンテナンス期日が到来すると、ステップS1004に移行して、管理サーバMS1は、上記メンテナンス設定に基いて、管理対象の測量機の管理者および所有者の少なくとも一方に本通知を行う。本通知は、メンテナンス設定が解除されるまで継続して行われ、メンテナンス設定が解除されると、通知が停止する。
 ステップS1005では、ステップS1003およびS1004での通知により、メンテナンスが必要であることを認識した使用者が、測量機TSxのメンテナンス作業を管理者に依頼する。そして、測量機TSxに対して所定のメンテナンス作業が実施される。
 所定のメンテナンス作業が完了すると、ステップS1006に移行して、遠隔端末RCから、Webページ50を開き、対象の測量機TSxのメンテナンス状態を「済」に設定することにより、メンテナンス設定を解除する。
 設定解除の許諾画面には、解除設定を保存するためには、仮想通貨を1単位分消費することが必要であることが表示される。これを「YES」とすることにより、メンテナンス設定の解除が管理サーバMS1に保存されるとともに、仮想通貨が1単位消費され、減算された仮想通貨の数量が管理サーバMS1に保存される。消費される仮想通貨の数量については、メーカが任意に設定することができる。その後、測量機TSxは使用者に返却される。
 次に、ステップS1007に移行すると、管理者は、次回のメンテナンス設定が必要かどうかを判定する。必要な場合はステップS1001に戻って再度メンテナンス設定を行い、不要な場合は終了する。
 ここで、ステップS1002およびS1006における、仮想通貨の消費は、両方のステップで実施してもよいが、これに限らず、市場の要請等により、いずれか一方でのみ実施してもよい。
 本実施の形態に係る通信管理システム100では、通信管理システム100を提供する測量機メーカは、メンテナンス設定による通知機能を有料のサービスとして管理者に提供する。当該通知機能は、使用者に対して、管理者へのメンテナンス作業の依頼を有意に促進することが可能である。一方、仮想通貨を用いた簡便で安全な決済システムを用いているため、管理者は、決済に関して煩雑な手続きを行う必要がない。従って、管理者による当該通知機能の利用が強く促進される。
 以上、本発明の好ましい実施の形態について述べたが、上記の実施例は本発明の一例であり、これらを当業者の知識に基づいて組み合わせることが可能であり、そのような形態も本発明の範囲に含まれる。
10 測量機の通信管理システム
21 測量部
22 制御部
23 通信部
100 測量機の通信管理システム
N 通信ネットワーク
MS 管理サーバ
MS1 管理サーバ
RC 遠隔端末
TS 測量機

Claims (3)

  1.  ターゲットを測量する測量部、前記測量部を制御する制御部、および通信ネットワークに接続された通信部を備える測量機と、
     前記通信ネットワークを介して記測量機と通信可能な管理サーバと、
     前記通信ネットワークを介して前記管理サーバと通信可能な遠隔端末とを備え、
     前記遠隔端末は、前記測量機のメンテナンス設定および該メンテナンス設定の解除を行い、前記メンテナンス設定およびその設定の解除を前記管理サーバに保存し、
     前記管理サーバは、前記メンテナンス設定に従って、前記測量機が所定のメンテナンス作業を要する状態であることを、前記測量機の使用者および管理者の少なくとも一方に通知をし、前記メンテナンス設定が解除されると、前記通知を停止し、
     前記メンテナンス設定は、メンテナンス期間に関連付けられた設定を含み、
     前記通知は、メンテナンス期日の到来前に行われる事前通知を含むことを特徴とする測量機の通信管理システム。
  2.  前記管理サーバが、前記メンテナンス設定が解除されるまで、前記測量機を使用不可能な状態に設定することを特徴とする請求項1に記載の通信管理システム。
  3.  前記測量機のメンテナンス設定および該メンテナンス設定の解除の少なくとも一方を行うために、前記測量機の通信管理に関わる決済のために予め生成された仮想通貨の1単位を消費することを特徴とする請求項1または2に記載の通信管理システム。
PCT/JP2018/023977 2017-07-07 2018-06-25 測量機の通信管理システム WO2019009119A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US16/612,977 US11300423B2 (en) 2017-07-07 2018-06-25 Communication management system for surveying instrument
EP18829082.9A EP3650810A4 (en) 2017-07-07 2018-06-25 COMMUNICATIONS MANAGEMENT SYSTEM FOR TOTAL STATIONS

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017134131A JP6867248B2 (ja) 2017-07-07 2017-07-07 測量機の通信管理システム
JP2017-134131 2017-07-07

Publications (1)

Publication Number Publication Date
WO2019009119A1 true WO2019009119A1 (ja) 2019-01-10

Family

ID=64950029

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/023977 WO2019009119A1 (ja) 2017-07-07 2018-06-25 測量機の通信管理システム

Country Status (4)

Country Link
US (1) US11300423B2 (ja)
EP (1) EP3650810A4 (ja)
JP (1) JP6867248B2 (ja)
WO (1) WO2019009119A1 (ja)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6867244B2 (ja) * 2017-06-28 2021-04-28 株式会社トプコン 測量機の通信管理システム
EP4290432A1 (en) * 2022-06-10 2023-12-13 Leica Geosystems AG Method and system for determining a need for maintenance for a coordinate measuring device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002163387A (ja) * 2000-11-24 2002-06-07 Tokyo Gas Co Ltd 設備の遠隔管理・メンテナンス方法
JP2004227249A (ja) * 2003-01-22 2004-08-12 Kobelco Contstruction Machinery Ltd 作業機械の管理方法およびその管理装置
JP2007170978A (ja) 2005-12-22 2007-07-05 Sokkia Co Ltd 測量機および測量機の遠隔管理装置
JP2009139386A (ja) * 2009-01-15 2009-06-25 Topcon Corp 測量機のメンテナンスシステム
JP2012117874A (ja) * 2010-11-30 2012-06-21 Topcon Corp 測量装置およびそれを含む測量装置通信システム
JP2016223904A (ja) * 2015-05-29 2016-12-28 株式会社トプコン 測量管理システム、測量管理システム用測量装置及び測量管理システム用管理サーバ装置

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006038581A (ja) 2004-07-26 2006-02-09 Topcon Corp 測量装置の管理システム
US9638523B2 (en) * 2010-12-10 2017-05-02 Sokkia Topcon Co., Ltd. Surveying system
US20150097674A1 (en) 2013-10-07 2015-04-09 Recon Dynamics, Llc System and method for automatic tool tracking, monitoring, and inventory management
WO2016179271A1 (en) 2015-05-04 2016-11-10 Milwaukee Electric Tool Corporation Power tool and method for wireless communication

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002163387A (ja) * 2000-11-24 2002-06-07 Tokyo Gas Co Ltd 設備の遠隔管理・メンテナンス方法
JP2004227249A (ja) * 2003-01-22 2004-08-12 Kobelco Contstruction Machinery Ltd 作業機械の管理方法およびその管理装置
JP2007170978A (ja) 2005-12-22 2007-07-05 Sokkia Co Ltd 測量機および測量機の遠隔管理装置
JP2009139386A (ja) * 2009-01-15 2009-06-25 Topcon Corp 測量機のメンテナンスシステム
JP2012117874A (ja) * 2010-11-30 2012-06-21 Topcon Corp 測量装置およびそれを含む測量装置通信システム
JP2016223904A (ja) * 2015-05-29 2016-12-28 株式会社トプコン 測量管理システム、測量管理システム用測量装置及び測量管理システム用管理サーバ装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3650810A4

Also Published As

Publication number Publication date
US11300423B2 (en) 2022-04-12
US20200200564A1 (en) 2020-06-25
EP3650810A4 (en) 2021-03-31
EP3650810A1 (en) 2020-05-13
JP2019016959A (ja) 2019-01-31
JP6867248B2 (ja) 2021-04-28

Similar Documents

Publication Publication Date Title
US20070083479A1 (en) Method, apparatus and program storage device for providing a prepaid metering system
JP7158132B2 (ja) 測量機の遠隔操作システム
JP6349450B1 (ja) 給与受取システム、給与受取方法、及びプログラム
CN105246061A (zh) 一种移动通信业务的服务终端
WO2019009119A1 (ja) 測量機の通信管理システム
JP2014164338A (ja) 料金決済メータ、通信端末、その制御プログラム、その制御方法および料金決済メータシステム
EP2940641B1 (en) Information accessing device, computer program, information processing system, access control system, mobile terminal, method for controlling mobile terminal, and program for controlling mobile terminal
KR100934868B1 (ko) 선불형 전자식 전력량계 및 그 동작 방법
WO2017154143A1 (ja) 決済処理システムおよび決済処理方法
JP5945891B1 (ja) 自動販売機システム
KR20160002430A (ko) 카드 결제를 위한 결제 대행 서버, 카드 단말기, 정산 시스템 및 그를 이용한 결제 정보 처리 방법
WO2003046787A1 (fr) Systeme de gestion de machine de location et machine de location
JP2007328748A (ja) 給料先払システムおよびその方法
KR102247158B1 (ko) 복지물품 보급 시스템 및 그 방법
KR102092036B1 (ko) 원격 검침 시스템
KR102471034B1 (ko) 집수리 서비스 시스템, 서버 및 방법
JP3099438U (ja) 貸与機器管理システム及び貸与機器
KR101766893B1 (ko) 대체 결제 서버 및 그를 이용한 대체 결제 서비스 제공 방법
KR100354493B1 (ko) 현금 및 카드 영수증 전산 발행장치 및 그 발행방법
KR20200046948A (ko) 결제 대금 정산 서비스 제공 방법 및 그를 수행하는 결제 대행 서버
KR20170120529A (ko) 무인 택배 장치, 이를 구비하는 택배 서비스 제공 시스템 및 이를 이용한 택배 서비스 제공 방법
KR101866549B1 (ko) 임대료 자동 결제 서비스 제공 방법
KR101971642B1 (ko) 송금 케어 서비스 제공 방법, 송금 케어 서버, 송금 케어 서버 시스템 및 송금인 단말기
KR20230032711A (ko) 스마트 계량 관리장치 및 방법
JP2008107928A (ja) サービス供給管理機能を備えた公共料金電子決済システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18829082

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2018829082

Country of ref document: EP

Effective date: 20200207