WO2018168053A1 - 電力管理装置、電力管理方法、及び、プログラム - Google Patents
電力管理装置、電力管理方法、及び、プログラム Download PDFInfo
- Publication number
- WO2018168053A1 WO2018168053A1 PCT/JP2017/038778 JP2017038778W WO2018168053A1 WO 2018168053 A1 WO2018168053 A1 WO 2018168053A1 JP 2017038778 W JP2017038778 W JP 2017038778W WO 2018168053 A1 WO2018168053 A1 WO 2018168053A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- power
- unit price
- consumer
- management apparatus
- generation company
- Prior art date
Links
- 238000007726 management method Methods 0.000 title claims description 125
- 238000010248 power generation Methods 0.000 claims abstract description 215
- 238000004364 calculation method Methods 0.000 claims abstract description 29
- 230000005540 biological transmission Effects 0.000 claims description 95
- 238000000034 method Methods 0.000 claims description 29
- 230000008569 process Effects 0.000 claims description 28
- 238000012545 processing Methods 0.000 description 30
- 238000010586 diagram Methods 0.000 description 9
- 230000005611 electricity Effects 0.000 description 9
- 230000000694 effects Effects 0.000 description 7
- 230000004044 response Effects 0.000 description 6
- 230000001629 suppression Effects 0.000 description 6
- 230000006870 function Effects 0.000 description 5
- 230000002093 peripheral effect Effects 0.000 description 4
- 230000004048 modification Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000003750 conditioning effect Effects 0.000 description 1
- 238000004146 energy storage Methods 0.000 description 1
- 238000005057 refrigeration Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/04—Trading; Exchange, e.g. stocks, commodities, derivatives or currency exchange
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
- H02J13/00007—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using the power network as support for the transmission
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
- H02J3/32—Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/16—Electric power substations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- Y04S40/121—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using the power network as support for the transmission
Definitions
- the present invention relates to a power management apparatus, a power management method, and a program.
- a power generation company may be notified of a power generation suppression command by designating a time zone in order to adjust power supply and demand balance. If power generation is suppressed according to the power generation suppression command, the utilization efficiency of the power generation system is reduced. Therefore, a service that avoids the suppression of power generation by power generation companies while maintaining the balance of power supply and demand by having power consumers consume (purchase) the amount of power to be suppressed during the above time period is being studied. .
- Patent Document 1 discloses a surplus power management system in which a power company purchases surplus power of a power generation company and supplies the purchased power directly from the power generation company to a power consumer through a transmission network.
- the surplus power management system includes: estimation means for estimating power demand of a power consumer; determination means for determining a power generation plan for sending power corresponding to the estimated power demand from a power generation company to a power grid; Notification means for notifying the power generation company of the generated power generation plan.
- An object of the present invention is to solve the problem.
- An acquisition means for acquiring a power purchase request including a power unit price from a power generation company For each pair of the power generation company and each of a plurality of power consumer groups that summarize a plurality of power consumers under the same substation, a calculation means for calculating a consignment unit price of power, Judgment means for judging whether to purchase power from the power generation company for each power consumer based on the total unit price of the power unit price and the consignment charge unit price and the standard unit price of each power consumer.
- Is provided When, Is provided.
- a program is provided that functions as:
- the power management system includes a power management device 10, a plurality of power consumer systems 20, and an IPP (independent power producer) system 30.
- the power management apparatus 10 is an apparatus belonging to, for example, a resource aggregator.
- the power consumer system 20 is a system belonging to a power consumer.
- the IPP system 30 is a system belonging to a power generation company.
- the power management apparatus 10, the power consumer system 20, and the IPP system 30 are connected to each other via a communication network such as the Internet, and can transmit and receive information to and from each other.
- “power generation company” may be referred to as “IPP”.
- the IPP system 30 transmits a power purchase request to the power management apparatus 10.
- the power customer system 20 has a power storage system 25.
- the power storage system 25 includes a system controller 21, a PCS (Power conditioning System) 22, a BMS (Battery Management System) 23, and a battery 24.
- PCS Power conditioning System
- BMS Battery Management System
- the system controller 21 controls the entire power storage system 25.
- the PCS 22 performs DC power / AC power conversion.
- the battery 24 stores electric power.
- the battery 24 includes, for example, a cell stack that stores energy, a battery monitor that monitors cell temperature, cell voltage, and the like.
- the BMS 23 controls the battery 24.
- the power management apparatus 10 when the power management apparatus 10 obtains a power purchase request including a power unit price from the power generation company (IPP system 30), the power management apparatus 10 generates power for each pair of the power generation company and each of the plurality of power consumer groups. Calculate the consignment charge unit price. Then, the power management apparatus 10 determines whether or not to purchase power from the power generation company for each power consumer in consideration of the power unit price and the consignment charge unit price.
- the power management apparatus 10 of the present embodiment which considers not only the unit price of power proposed by the power generation company but also the consignment charge unit price when the power is consigned from the power generation company to the power consumer, It is possible to accurately determine whether there is any merit in purchasing power. And only when there is a real merit, it can be judged that an electric power consumer will purchase electric power. For this reason, the merit of the electric power consumer by participating in the said service becomes large. As a result, it is possible to sufficiently secure power consumers who participate in the service.
- Each functional unit included in the power management apparatus 10 of the present embodiment includes a CPU (Central Processing Unit) of an arbitrary computer, a memory, a program loaded into the memory, and a storage unit such as a hard disk storing the program (the device is shipped in advance
- a storage unit such as a hard disk storing the program (the device is shipped in advance
- CD Compact Disc
- programs downloaded from servers on the Internet, etc. can also store storage media such as CD (Compact Disc) and programs downloaded from servers on the Internet, etc.), and hardware and software centering on communication network connection interfaces Realized by any combination of It will be understood by those skilled in the art that there are various modifications to the implementation method and apparatus.
- FIG. 3 is a block diagram illustrating a hardware configuration of the power management apparatus 10 of this embodiment.
- the power management apparatus 10 includes a processor 1A, a memory 2A, an input / output interface 3A, a peripheral circuit 4A, and a bus 5A.
- the peripheral circuit 4A includes various modules. The peripheral circuit 4A may not be provided.
- the power management apparatus 10 may be realized by a single apparatus that is physically and / or logically integrated, or may be realized by a plurality of apparatuses that are physically and / or logically separated from each other. Good. In the latter case, each of the plurality of devices may have a hardware configuration as shown in FIG. A plurality of devices may cooperate to realize the function of the power management device 10.
- the bus 5A is a data transmission path through which the processor 1A, the memory 2A, the peripheral circuit 4A, and the input / output interface 3A transmit / receive data to / from each other.
- the processor 1A is an arithmetic processing device such as a CPU (Central Processing Unit) or a GPU (Graphics Processing Unit).
- the memory 2A is a memory such as a RAM (Random Access Memory) or a ROM (Read Only Memory).
- the input / output interface 3A is an interface for acquiring information from an input device (eg, keyboard, mouse, microphone, etc.), external device, external server, external sensor, etc., and an output device (eg, display, speaker, printer, mailer). Etc.), an interface for outputting information to an external device, an external server, etc.
- the processor 1A can issue a command to each module and perform a calculation based on the calculation result.
- FIG. 4 shows an example of a functional block diagram of the power management apparatus 10 of the present embodiment.
- the power management apparatus 10 includes an acquisition unit 11, a determination unit 12, and a calculation unit 14.
- FIG. 5 shows another example of a functional block diagram of the power management apparatus 10 of the present embodiment.
- the power management apparatus 10 may include a distribution unit 13 in addition to the acquisition unit 11, the determination unit 12, and the calculation unit 14.
- the acquisition unit 11 acquires a power purchase request including a power unit price from a power generation company (eg, from the IPP system 30 in FIG. 1).
- the power unit price included in the power purchase request is a unit price of power when purchasing power in response to a power purchase request from a power generation company.
- the unit is, for example, “yen / kWh”.
- the power unit price can be arbitrarily determined by each power generation company.
- the power purchase request may further include the desired amount of power sales.
- the desired amount of electric power sales is the amount of electric power that the electric power consumer wants to purchase.
- the unit is, for example, “kWh”.
- the desired amount of electricity sales can be arbitrarily determined by each power generation company.
- the power generation company can set the surplus power amount as the power sales desired amount.
- the surplus power amount is, for example, the amount of power for which power generation is suppressed by a transmission / distribution company.
- the power transmission / distribution company defines a time zone for suppressing power generation, notifies the power generation company of power generation suppression for setting the output within that time zone to “0”, or sets an upper limit for output within that time zone.
- the power generation company calculates the amount of surplus power based on the content of the power generation suppression and the power generation forecast when the power generation system does not suppress power generation in the time zone when power generation is suppressed, and sells the surplus power amount It may be a desired amount.
- the power purchase request may further include a power consumption time zone.
- the power consumption time zone is a time zone during which power is consumed by receiving power from the power grid when purchasing power in response to a request from a power generation company.
- Each power generation company can arbitrarily determine the power consumption time zone.
- the power consumption time zone may be a time zone in which power generation is suppressed by the transmission / distribution company.
- the calculation unit 14 calculates the unit price of the power transfer fee for each pair of the power generation company and each of the plurality of power consumer groups.
- the consignment charge unit price is a unit price for consigning power from the power generation company to each power consumer group.
- the unit is, for example, “yen / kWh”.
- a power consumer group is a group of a plurality of power consumers who are under the same distribution substation.
- the calculation unit 14 may determine a power transmission route for each pair and calculate a consignment charge unit price based on the power transmission route. In order to perform these processes, the calculation unit 14 previously stores “information about the power system”, “information about the position of the power generation company in the power system”, and “information about the position of each power consumer group within the power system” in advance. It may be held.
- “Information about the power system”, “Information about the position of the power generation company within the power system” and “Information about the position within the power system of the power consumer group” are necessary for determining the transmission route and calculating the unit price of consignment charges. Contains information.
- the power system includes a large number of facilities such as power generation facilities, power transmission facilities, substation facilities, distribution facilities, and customer facilities, which are connected to each other.
- FIG. 6 shows a part of the power system.
- distribution substations 101 to 104 are connected to each other via power transmission lines 301 to 304.
- the facilities of the power consumer groups 201 to 203 and the facilities of the IPPs 401 to 403 are connected to the distribution substations 101 to 104 via the transmission lines 305 to 307, respectively.
- the facilities of the power consumer groups 201 to 203 include a power storage system 25.
- the facilities of the IPPs 401 to 403 include a power generation system.
- the power generation system may be a system that generates power using natural energy (eg, sunlight, geothermal, wind power, etc.).
- Information related to the power system includes information indicating the connection between distribution substations.
- system contains the attribute of a power transmission line, for example, power transmission capacity, a power transmission voltage, etc. (refer FIG. 7).
- the transmission line is divided into a plurality of sections by an arbitrary means, and the transmission capacity, the transmission voltage, and the like are managed for each section.
- the transmission line between two distribution substations may be set as one section (in the case of the example in FIG. 6, each of the transmission lines 301 to 304 is managed as one section).
- the information regarding the position of the power generation company in the power system includes information indicating which substations the power generation system of each power generation company is located under.
- the information regarding the position in the electric power system of the electric power consumer group includes information indicating which substation the electric power storage system 25 of each electric power consumer group is located.
- the calculation unit 14 can determine a power transmission route for each pair of a power generation company and each of a plurality of power consumer groups based on the above information, and can calculate a consignment charge unit price.
- the calculation unit 14 may determine a power transmission route with the lowest consignment charge unit price for each pair.
- the consignment charge unit price is calculated based on one or more of the following criteria, for example.
- the calculation unit 14 may determine a power transmission route that provides the lowest unit price for consignment charges while satisfying a predetermined condition.
- the predetermined condition include safety conditions such as “the amount of power transmitted through each transmission line does not exceed the transmission capacity of each transmission line”, but are not limited thereto.
- the calculation unit 14 includes each transmission line in the transmission route based on the transmission capacity (see FIG. 7) of each transmission line held in advance and the predicted value of the transmission amount of each transmission line in the power consumption time zone. It may be determined whether or not it is possible. For example, when “transmission capacity> predicted value of transmission amount + ⁇ ” is satisfied, it may be determined that the transmission line can be included in the transmission route.
- ⁇ is a value of 0 or more, and can be determined according to the output from the power generation company, the scale of each power consumer group (total output of the power storage system 25, etc.), and the like.
- the calculation part 14 may determine the power transmission route in which a consignment charge unit price becomes the cheapest for every said pair using only the power transmission line judged to be able to be included in a power transmission route.
- the determination unit 12 purchases power from the power generation company for each power consumer based on the total unit price of the power unit price and the consignment charge unit price and the standard unit price of each power consumer. Determine whether or not.
- the determination unit 12 determines, for each power consumer, “the total unit price is lower than the reference unit price” or “the total unit price is lower than the reference unit price by a predetermined level or more (eg, a predetermined value or more, a predetermined ratio or more). It is judged whether the condition of “cheap” is satisfied. And when judgment part 12 judges that the above-mentioned conditions are satisfied in the 1st electric power consumer, it judges that the 1st electric power consumer purchases electric power from a power generation enterprise.
- a predetermined level or more eg, a predetermined value or more, a predetermined ratio or more
- the power management apparatus 10 holds a reference unit price registered in advance for each power consumer (see FIG. 8).
- the reference unit price can be arbitrarily determined by each electric power consumer.
- the power consumer may use the unit price of the power purchased normally as the reference unit price, or set the unit price obtained by subtracting a predetermined value from the unit price of the power purchased normally.
- the consignment charge unit price is calculated for each power consumer group, but the reference unit price is determined for each power consumer. And the judgment whether electric power is purchased from a power generation company is performed for every electric power consumer.
- the distribution unit 13 shown in FIG. 5 distributes the desired power sales amount of the power generation company to one or a plurality of power consumers determined to purchase power from the power generation company. Each power consumer purchases the distributed portion from the power generation company.
- the distribution unit 13 predicts the free capacity of the power storage system 25 of each power consumer at the start timing of the power consumption time zone. For example, the charge / discharge schedule of each power storage system 25 on the same day including the capacity, rated output, and power consumption time zone of each power storage system 25 (the day including the power consumption time zone; the same applies hereinafter) (eg, night charge, daytime discharge) , Based on the power consumption prediction of each power consumer on the day, and if the power consumer has a power generator (eg, a power generator that generates power using natural energy), based on the power generation prediction of the power generator, etc.
- the available capacity of each power storage system 25 at the start timing may be predicted. The prediction can be realized according to the conventional technology. The calculated value is managed as shown in FIG.
- the distribution part 13 may be called the free capacity
- the smaller one of the first chargeable amount and the desired electric power sales amount may be distributed to the electric power consumer.
- the first chargeable amount is “the first available capacity of the power storage system 25 of the power consumer” and “the product of the rated output of the power storage system 25 of the power consumer and the time width of the power consumption time zone”. The smaller of the two.
- the desired power sales amount may be evenly distributed to the plurality of power consumers. Assuming that the number of power consumers determined to purchase power from the power generation company is M (M ⁇ 2) and the desired power sales amount is D, the distribution amount of each power consumer is D / M. When there is a power consumer whose first chargeable amount is less than D / M, the difference (the amount that cannot be fully charged) may be distributed to other power consumers.
- the desired amount of power sales may be distributed in order from the power consumer whose reference unit price is low.
- the desired amount of power sales is set according to the ratio of the power consumption (first chargeable amount) provided by each power consumer. You may apportion.
- the power management apparatus 10 of this embodiment it is possible to accurately determine whether or not there is a merit in purchasing power according to a request from the power generation company. And only when there is a real merit, an electric power consumer can be made to purchase electric power. For this reason, the merit of the electric power consumer of participating in the service which makes an electric power consumer consume electric power according to the electric power purchase request from the electric power generation company becomes large. As a result, it is possible to sufficiently secure power consumers who participate in the service.
- a plurality of power consumers under the same distribution substation are grouped to generate a power consumer group, and a consignment charge unit price is calculated for each power consumer group.
- the processing burden can be greatly reduced.
- the power management apparatus 10 of the present embodiment determines whether there is a merit in purchasing power from a power generation company based on a standard unit price determined by reflecting each situation for each power consumer, It can be judged whether there is the above-mentioned merit reflecting the circumstances of each electric power consumer. For this reason, the presence or absence of a merit can be judged accurately for every electric power consumer.
- the power management apparatus 10 can automatically determine the purchase of power without confirming with the power consumer each time, the accuracy of estimation of how much surplus power can be purchased (the amount of power) is increased. .
- the power consumer system 20 may include other power consuming devices (eg, energy storage system, electric device, etc.) instead of / in addition to the power storage system 25.
- the above-mentioned “first chargeable amount” can be read as “uploadable consumption amount”.
- the amount of power that can be loaded is the amount of power consumed by the power consumer on top of normal power consumption during the power consumption time period, and is represented by the product of the power consumption of the power consumption device and the power consumption time. It is.
- refrigeration equipment, vending machines, heat pump water heaters, etc. use electricity to cool and heat at certain intervals, but by adding the timing to the power consumption time zone, it adds to normal power consumption. Power can be consumed.
- the said modification is applicable to all the following embodiments.
- the power management system includes a power management apparatus 10, a plurality of power consumer systems 20, and a plurality of IPP systems 30. Whether the power management apparatus 10 of this embodiment purchases electric power from each electric power generation company for every electric power consumer, when acquiring the electric power purchase request from several electric power generation companies (multiple IPP systems 30). Means for judging. Details will be described below.
- the configurations of the power consumer system 20 and the IPP system 30 are the same as those in the first embodiment.
- An example of the hardware configuration of the power management apparatus 10 is the same as that of the first embodiment.
- FIG. 4 An example of a functional block diagram of the power management apparatus 10 of the present embodiment is illustrated in FIG. 4 or FIG. 5 as in the first embodiment.
- the acquisition unit 11 acquires a power purchase request including a power unit price from each of a plurality of power generation companies (for example, from each of the IPP systems 30 in FIG. 10).
- the power purchase request may include “power unit price”, “power sales desired amount”, “power consumption time zone”, and the like.
- the calculation unit 14 calculates a consignment charge unit price for each pair of each of the plurality of power generation companies and each of the plurality of power consumer groups.
- the calculation unit 14 can determine a power transmission route for each pair and calculate a consignment charge unit price.
- the power transmission route determination process and the consignment charge unit price calculation process are the same as those in the first embodiment.
- Information such as shown in FIG. 11 is obtained by the acquisition unit 11 and the calculation unit 14.
- the information shown in FIG. 11 is information indicating the sum of the power unit price and the consignment charge unit price for each pair of each of the plurality of power generation companies and each of the plurality of power consumer groups.
- An (n is the serial number of the power generation company) indicates the power unit price of each power generation company.
- Dnm (n is the serial number of the power generation company and m is the serial number of the power consumer group) is a unit charge unit price corresponding to each pair of the power generation company and the power consumer group.
- the sum of An and Dnm is the total unit price described in the first embodiment.
- the determination unit 12 determines whether or not to purchase power from each of a plurality of power generation companies for each power consumer based on the total unit price of the power unit price and the consignment charge unit price and the standard unit price of each power consumer. To do.
- the distribution unit 13 distributes the desired power sales amount of the first power generation company to one or a plurality of power consumers determined to purchase power from the first power generation company.
- the determination unit 12 selects one pair from unprocessed pairs based on the total unit price (see FIG. 11) calculated for each pair of each of the plurality of power generation companies and each of the plurality of power consumer groups. Is determined as a processing target. For example, a pair with the lowest total unit price among unprocessed pairs is determined as a processing target. Note that the pair to be processed may be determined based on other criteria.
- a power generation company included in a pair to be processed is referred to as a power generation company to be processed.
- the power consumer group included in the processing target pair is referred to as a processing target power consumer group.
- the electric power consumers included in the electric power consumer group to be processed are referred to as electric power consumers to be processed.
- the determination unit 12 determines whether or not the power sale desired remaining amount X of the power generation company to be processed is zero.
- the desired power sale remaining amount X is a portion of the desired power sales amount of the power generation company to be processed that has not yet been distributed to the power consumers.
- the initial value of the desired power sale remaining amount X is, for example, the desired power sale amount. As will be described below, the value is updated in the process.
- the determination unit 12 determines whether an unprocessed pair remains. When an unprocessed pair remains (Yes in S207), the process returns to S201, and the determination unit 12 sets another pair as a processing target. Then, the same processing is repeated. If no unprocessed pair remains (No in S207), the process ends.
- the process proceeds to S203.
- the determination unit 12 determines whether or not to purchase power from the power generation company to be processed in each power consumer to be processed.
- the determination unit 12 determines whether the condition that “the total unit price is lower than the reference unit price” or “the total unit price is lower than the reference unit price by a predetermined level” is satisfied for each power consumer to be processed.
- the total unit price used for the determination here is calculated in correspondence with the “unit price of power to be processed” and the pair of “target power generator and target power consumer group”. It is the sum of “consignment charge unit price”.
- the judgment part 12 judges that the 1 or several electric power consumer who satisfy
- a first power purchase target consumer one or a plurality of power consumers satisfying the above conditions.
- distribution part 13 computes total kWh total of free capacity kWh free of power storage system 25 of each first power purchase target consumer.
- the initial value of the free capacity kWh free of the power storage system 25 of each power consumer is, for example, a predicted value of the free capacity of each power storage system 25 at the start timing of the power consumption time zone. As will be described below, the value is updated in the process.
- the determination unit 12 determines whether an unprocessed pair remains. When an unprocessed pair remains (Yes in S207), the process returns to S201, and the determination unit 12 sets another pair as a processing target. Then, the same processing is repeated. If no unprocessed pair remains (No in S207), the process ends.
- the distribution unit 13 determines the amount of power kWh DR to be distributed to the power consumer group to be processed. For example, the smaller one of the total kWh total and the desired power sale remaining amount X is set as the amount of power kWh DR distributed to the power consumer group to be processed.
- the product of the rated output and the time width of the power consumption time zone is calculated, and the total of the products is calculated. May be. Then, the smallest value among the total kWh total , the calculated sum of products, and the desired power sale remaining amount X may be used as the power amount kWh DR distributed to the power consumer group to be processed.
- distribution part 13 distributes electric energy kWh DR distributed to the electric power consumer group for processing to the 1st electric power purchase object consumer.
- the distribution unit 13 distributes the desired power sales amount of the power generation company based on the free capacity kWh free of the power storage system 25 of each of the first power purchase target consumers.
- the smaller one of the second chargeable amount and the power amount kWh DR is given to the first power purchase target consumer. May be distributed.
- the second chargeable amount includes the free capacity kWh free of the power storage system 25 of the first power purchase target consumer, and the rated output and power consumption time zone of the power storage system 25 of the first power purchase target consumer. Is the smaller of the time width products.
- the power amount kWh DR may be evenly distributed to the plurality of first power purchase target consumers.
- M the number of first power purchase target consumers whose free capacity kWh free is not 0
- the distribution amount of each first power purchase target consumer is kWh DR / M.
- the difference the amount that cannot be fully charged is transferred to the other first power purchase target consumers. You may distribute.
- the power amount kWh DR may be distributed in order from the first power purchase target consumer whose reference unit price is low. It should be noted that the smaller one of the remaining chargeable amount and the remaining amount of power kWh DR (the amount not yet distributed) may be distributed to each first power purchase target consumer.
- the power consumption first power purchased consumer each space kWh free is not 0 is provided (second chargeable).
- the desired amount of electricity sales may be prorated according to the ratio of the amount.
- the desired power sale remaining amount X of the power generator to be processed and the free capacity kWh free of the power storage system 25 of each of the first power purchase target consumers are updated. Specifically, the desired power sale remaining amount “X” of the power generation company to be processed is replaced with “X-kWh DR ”. Further, the free capacity “kWh free ” of the power storage system 25 of each of the first power purchase target consumers is replaced with “kWh free ⁇ (value distributed to each power consumer)”.
- S207 the determination unit 12 determines whether an unprocessed pair remains. When an unprocessed pair remains (Yes in S207), the process returns to S201, and the determination unit 12 sets another pair as a processing target. Then, the same processing is repeated. If no unprocessed pair remains (No in S207), the process ends.
- the determination unit 12 can determine whether the total unit price corresponding to each of the plurality of pairs is lower than the reference unit price for each power consumer. When the determination unit 12 determines that one or more total unit prices are lower than the reference unit price of the first power consumer, the first power consumer corresponds to each of the one or more total unit prices 1 It can be determined that power is purchased from one or more power generation companies.
- the determination unit 12 determines, for each power consumer, whether there is a total unit price that satisfies a condition that “the total unit price is lower than the reference unit price” or “the total unit price is lower than the reference unit price by a predetermined level or more”. May be. For example, when the first power consumer included in the power consumer group D0001 of FIG. 11 is a processing target, the total unit price calculated for each pair of the power consumer group and each of the plurality of power generation companies, The total unit price that satisfies the above conditions can be extracted by comparison with the reference unit price of the first electric power consumer.
- the determination unit 12 determines that there are a plurality of total unit prices that satisfy the above condition in the first power consumer, the first power consumer has the lowest total unit price among the plurality of total unit prices that satisfy the above condition. It may be determined that power is purchased from a power generation company corresponding to the above.
- the determination unit 12 determines that the first power consumer has a consignment charge unit price among the plurality of total unit prices that are the lowest prices. May purchase power from the power generation company corresponding to the lowest total unit price.
- the determination unit 12 determines that there are a plurality of total unit prices that satisfy the above condition in the first power consumer, the first power consumer has a plurality of power generations corresponding to each of the plurality of total unit prices that satisfy the above condition. It may be determined that power is purchased from a business operator.
- the information shown in FIG. 13 is obtained by the processing by the determination unit 12.
- the information illustrated in FIG. 13 is information in which each power generation company is associated with a power consumer that is determined to purchase power from each.
- a certain electric power consumer may be associated with a plurality of power generation companies.
- the distribution unit 13 distributes the desired power sales amount of each power generation company to the power consumers associated with each power generation company in the information shown in FIG. An example of the flow of processing by the distribution unit 13 will be described with reference to the flowchart of FIG.
- the distribution unit 13 determines a power generation company to be processed (S102). For example, a power generation company with the lowest unit price of electricity among unprocessed power generation companies may be a processing target. In addition, the power generation company having the highest power unit price among unprocessed power generation companies may be set as the processing target. In addition, a power generation company having the largest desired power sales amount among unprocessed power generation companies may be set as a processing target. In addition, a power generation company having the smallest desired power sales amount among unprocessed power generation companies may be set as a processing target. Note that the power generation company to be processed may be determined based on other criteria. In the description of the flowchart of FIG. 14 below, the power consumer associated with the power generation company to be processed in the information as illustrated in FIG. 13 is referred to as a second power purchase target consumer.
- the power sales desired amount of the power generation company to be processed is distributed to the second power purchase target consumer.
- the distribution unit 13 distributes the desired power sales amount of the power generator to be processed based on the free capacity kWh free of the power storage system 25 of each second power purchase target consumer.
- the initial value of the free capacity kWh free of the power storage system 25 of each power consumer is, for example, a predicted value of the free capacity of each power storage system 25 at the start timing of the power consumption time zone. As will be described below, the value is updated in the process.
- the second power purchase target consumer when there is one second power purchase target consumer whose free capacity kWh free is not 0, the second power purchase target consumer includes the third chargeable amount and “the power generation business subject to processing”.
- the smaller of “the desired amount of electricity sales” may be distributed.
- the third chargeable amount includes the free capacity kWh free of the power storage system 25 of the second power purchase target consumer, and the rated output and power consumption time zone of the power storage system 25 of the second power purchase target consumer. Is the smaller of the time width products.
- the power sales desired amount of the processing power generation company is evenly distributed to the plurality of second power purchase target consumers. May be. Assuming that the number of second power purchase target consumers whose free capacity kWh free is not 0 is M (M ⁇ 2) and the desired power sales amount of the power generator to be processed is D, each of the second power purchase target consumers The distribution amount is D / M. When there is a second power purchase target consumer whose third chargeable amount is less than D / M, the difference (the amount that cannot be fully charged) is distributed to the other second power purchase target consumers. Also good.
- the power sales desired amount of the power generation company to be processed is distributed in order from the second power purchase target customer with the lowest standard unit price. May be. For each second power purchase target consumer, the smaller one of the third chargeable amount and the remaining amount of power sales desired by the power generation company to be processed (the amount not yet distributed) is distributed. May be.
- the desired amount of electricity sales may be prorated according to the ratio of the amount.
- the free capacity kWh free of the second power purchase target consumer is updated. Specifically, the free capacity “kWh free ” of the power storage system 25 of each second power purchase target consumer is replaced with “kWh free ⁇ (value distributed to each power consumer)”.
- the power sales desired amount of each power generation company is set to a plurality while securing the profits of power consumers. It can be distributed to electricity consumers.
- the power management apparatus 10 of the present embodiment when there are a plurality of total unit prices that satisfy the predetermined condition in the first power consumer, that is, when there is merit in purchasing power from a plurality of power generation companies, It can be determined that one electric power consumer purchases electric power from a power generation company corresponding to the lowest total unit price among a plurality of total unit prices that satisfy the above conditions. According to such a power management apparatus 10 of the present embodiment, it is possible to ensure the merits of power consumers.
- the first power consumer when there are a plurality of total unit prices that are the lowest price among a plurality of total unit prices that satisfy the above conditions, the first power consumer has a plurality of totals that are the lowest prices. It can be determined that electric power is purchased from a power generation company corresponding to the total unit price with the lowest consignment charge unit price in the unit price. According to the power management apparatus 10 of the present embodiment as described above, it is possible to minimize the loss due to power transmission while securing the merits of power consumers.
- the power management apparatus 10 of the present embodiment when there are a plurality of total unit prices that satisfy the predetermined condition in the first power consumer, that is, when there is merit in purchasing power from a plurality of power generation companies, It can be determined that one electric power consumer purchases from a plurality of power generation companies. By purchasing from multiple power generation companies, the total purchase amount can be increased. As a result, it becomes possible to purchase cheap electricity by fully utilizing the free space.
- the power consumers A to C belong to the same power consumer group.
- the standard unit prices of power consumers A to C are 10 yen / kWh, 12 yen / kWh, and 15 yen / kWh, respectively.
- the initial values of the free capacity kWh free of the power storage systems 25 of the power consumers A to C are 50 kWh, 30 kWh, and 30 kWh, respectively.
- the total unit price of the first power generation company is 9 yen / kWh, and the desired power sales amount is 60 kWh.
- the total unit price of the second power generation company is 11 yen / kWh, and the desired power sales amount is 40 kWh.
- the distribution unit 13 considers the merits of power consumers, and can first target a power generation company having a smaller total unit price to be processed, and distribute the power sales desired amount of the power generation company to a plurality of power consumers.
- the desired power sales amount of the power generation company to be processed is referred to as the distribution target power amount.
- the distribution part 13 can distribute equally the electric energy of distribution object to the some electric power consumer judged to purchase.
- the first power generation company (total unit price is 9 yen / kWh, power sales desired amount is 60 kWh) is a processing target.
- the total unit price of the first power generation company is lower than the standard unit price of the power consumers A to C, it is determined that all of the power consumers A to C purchase power from the first power generation company. .
- the distribution unit 13 distributes the distribution target power amount “60 kWh” evenly to the power consumers A to C. Specifically, as shown in FIG. 16, power with a total unit price of 9 yen / kWh is distributed to power consumers A to C by 20 kWh.
- the free capacities kWh free of the power storage systems 25 of the power consumers A to C are updated to 30 kWh, 10 kWh, and 10 kWh, respectively.
- the second power generation company (total unit price is 11 yen / kWh, power sales desired amount is 40 kWh) will be processed.
- the total unit price of the second power generation company is lower than the reference unit price of the power consumers B and C, it is determined that the power consumers B and C purchase power from the second power generation company.
- the total unit price of the second power generation company is lower than the standard unit price of the power consumer A, it is determined that the power consumer A does not purchase power from the second power generation company.
- the distribution unit 13 distributes the distribution target power amount “40 kWh” evenly to the power consumers B and C. In this case, 20 kWh is distributed to each of the power consumers B and C. However, the power consumers B and C both have a free capacity kWh free of 10 kWh. For this reason, as shown in FIG. 16, electric power with a total unit price of 11 yen / kWh is distributed to electric power consumers B and C by 10 kWh.
- the power management apparatus 10 can notify the second power generation company to that effect.
- the second power generation company can correct the sales price and the desired power sales amount based on the notification.
- the distribution unit 13 can execute a process of distributing the desired power sales amount in order from the power consumer whose reference unit price is low, instead of the process of evenly distributing the desired power sales amount to the plurality of power consumers.
- the distribution unit 13 considers the merits of power consumers, and first targets a power generation company with a smaller total unit price to be processed first, and distributes the power sales desired amount of the power generation company to a plurality of power consumers. it can.
- the first power generation company (total unit price is 9 yen / kWh, power sales desired amount is 60 kWh) is a processing target.
- the total unit price of the first power generation company is lower than the standard unit price of the power consumers A to C, it is determined that all of the power consumers A to C purchase power from the first power generation company. .
- the distribution unit 13 distributes the desired power sales amount in order from the power consumer whose reference unit price is low, for the power amount “60 kWh” to be distributed. Specifically, as shown in FIG. 17, electric power with a total unit price of 9 yen / kWh is distributed to electric power consumer A at 50 kWh and distributed to electric power consumer B at 10 kWh.
- the free capacities kWh free of the power storage systems 25 of the power consumers A to C are updated to 0 kWh, 20 kWh, and 30 kWh, respectively.
- the second power generation company (total unit price is 11 yen / kWh, power sales desired amount is 40 kWh) will be processed.
- the total unit price of the second power generation company is lower than the reference unit price of the power consumers B and C, it is determined that the power consumers B and C purchase power from the second power generation company.
- the total unit price of the second power generation company is lower than the standard unit price of the power consumer A, it is determined that the power consumer A does not purchase power from the second power generation company.
- the distribution unit 13 distributes the desired power sales amount in order from the power consumer whose reference unit price is low, with respect to the distribution target power amount “40 kWh”. Specifically, as shown in FIG. 17, the electric power with the total unit price of 11 yen / kWh is distributed to the electric power consumer B by 20 kWh and is distributed to the electric power consumer C by 20 kWh.
- the desired power sales amount of the first power generation company and the second power generation company is distributed to the power consumers without remaining.
- this distribution example it is possible to distribute to power consumers without leaving as much as possible the amount of power sales desired by multiple power generation companies. Moreover, since it is determined that a power consumer purchases power only when a predetermined condition is satisfied, the merit of the power consumer is ensured. As a result, it is possible to sufficiently secure power consumers who participate in a service that allows power consumers to consume (purchase) power in response to a power purchase request from a power generation company. It is also expected to increase the number of power generation companies participating in the service by increasing the sales contract rate.
- the acquisition unit 11 may receive a plurality of patterns of power purchase requests from one power generation company.
- a plurality of patterns of power purchase requests received from one power generation company may be different from each other in at least one of “power unit price”, “power sales desired amount”, and “power consumption time zone”.
- the determination unit 12 is based on the total unit price calculated for each pair of one or more patterns of power purchase requests of each power generation company and each of the plurality of power consumer groups, The determination described above may be performed.
- the determination means includes For each power consumer, determine whether the total unit price is lower than the reference unit price, The power management device that determines that the first power consumer purchases power from the power generation company when the total unit price is determined to be lower than the reference unit price of the first power consumer. 3.
- the acquisition means acquires the power purchase request from each of a plurality of the power generation companies,
- the said calculating means is a power management apparatus which calculates the said consignment charge unit price for every pair of each of the said several electric power generation company and each of the said some electric power consumer group. 4).
- the determination means includes For each power consumer, determine whether the total unit price corresponding to each of the plurality of pairs is lower than the reference unit price, If it is determined that one or more of the total unit prices are lower than the reference unit price of the first power consumer, the first power consumer is one corresponding to each of the one or more total unit prices. Alternatively, a power management apparatus that determines to purchase power from a plurality of the power generation companies. 5). 4. In the power management apparatus according to 4, The determination means includes When it is determined that a plurality of the total unit prices are lower than the reference unit price of the first power consumer, the first power consumer corresponds to the cheapest total unit price among the plurality of the total unit prices.
- a power management device that decides to purchase power from a power generation company. 6).
- the determination means includes When there are a plurality of the total unit prices that are the lowest price among the plurality of the total unit prices, the first electric power consumer is the sum of the lowest unit prices of the consignment charges among the plurality of total unit prices that are the lowest prices.
- a power management apparatus that determines to purchase power from the power generation company corresponding to the unit price. 7).
- the calculation means is a power management device that determines a power transmission route for each pair based on a predicted value of a power transmission capacity and a power transmission amount of a power transmission line, and calculates the consignment charge unit price based on the power transmission route.
- the power management apparatus that calculates the consignment unit price based on at least one of the number of substations included in the power transmission route and the transmission voltage of a power transmission line included in the power transmission route.
- the calculation means is a power management apparatus that calculates a higher unit price for consignment charges as the number of substations included in the power transmission route increases. 10.
- the consignment is higher than when the transmission route does not include a transmission line with a relatively low transmission voltage.
- a power management device that calculates unit prices. 11.
- the calculation means is a power management apparatus that calculates a higher consignment charge unit price as the power transmission route includes more sections of a transmission line having a relatively low transmission voltage.
- the power purchase request further includes a desired power sales amount
- a power management apparatus further comprising a distribution unit that distributes the desired power sales amount of the first power generation company to one or a plurality of power consumers determined to purchase power from the first power generation company.
- the distribution means is a power management apparatus that distributes the desired power sales amount of the first power generation company based on a free capacity of a power storage system of the power consumer.
- the distribution means is an electric power management apparatus that distributes the desired amount of electric power sales in order from the electric power consumer whose reference unit price is low. 15. In the power management apparatus according to 12 or 13, The distribution means is a power management apparatus that evenly distributes the desired amount of power sales to the plurality of power consumers. 16.
- An acquisition process of acquiring a power purchase request including a power unit price from a power generation company For each pair of the power generation company and a plurality of power consumer groups that summarize a plurality of power consumers under the same distribution substation, a calculation step of calculating a consignment charge unit price of power, A determination step of determining whether to purchase power from the power generation company for each power consumer based on a total unit price of the power unit price and the consignment charge unit price and a standard unit price of each power consumer.
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Power Engineering (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- General Business, Economics & Management (AREA)
- Strategic Management (AREA)
- Marketing (AREA)
- Human Resources & Organizations (AREA)
- General Health & Medical Sciences (AREA)
- Water Supply & Treatment (AREA)
- Primary Health Care (AREA)
- Public Health (AREA)
- Tourism & Hospitality (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- General Engineering & Computer Science (AREA)
- Development Economics (AREA)
- Technology Law (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
Description
発電事業者から電力単価を含む電力購入依頼を取得する取得手段と、
前記発電事業者と、同じ配変電所の配下にいる複数の電力需要家をまとめた複数の電力需要家グループ各々とのペア毎に、電力の託送料金単価を算出する算出手段と、
前記電力単価と前記託送料金単価との合計単価、及び、前記電力需要家各々の基準単価に基づき、前記電力需要家毎に、前記発電事業者から電力を購入するか否かを判断する判断手段と、
を有する電力管理装置が提供される。
コンピュータが、
発電事業者から電力単価を含む電力購入依頼を取得する取得工程と、
前記発電事業者と、同じ配変電所の配下にいる複数の電力需要家をまとめた複数の電力需要家グループ各々とのペア毎に、電力の託送料金単価を算出する算出工程と、
前記電力単価と前記託送料金単価との合計単価、及び、前記電力需要家各々の基準単価に基づき、前記電力需要家毎に、前記発電事業者から電力を購入するか否かを判断する判断工程と、
を実行する電力管理方法が提供される。
コンピュータを、
発電事業者から電力単価を含む電力購入依頼を取得する取得手段、
前記発電事業者と、同じ配変電所の配下にいる複数の電力需要家をまとめた複数の電力需要家グループ各々とのペア毎に、電力の託送料金単価を算出する算出手段、
前記電力単価と前記託送料金単価との合計単価、及び、前記電力需要家各々の基準単価に基づき、前記電力需要家毎に、前記発電事業者から電力を購入するか否かを判断する判断手段、
として機能させるプログラムが提供される。
まず、本実施形態の電力管理システムの全体像及び概要を説明する。図1に示すように、電力管理システムは、電力管理装置10と、複数の電力需要家システム20と、IPP(independent power producer)システム30とを有する。電力管理装置10は、例えばリソースアグリゲータに属する装置である。電力需要家システム20は、電力需要家に属するシステムである。IPPシステム30は、発電事業者に属するシステムである。電力管理装置10と、電力需要家システム20及びIPPシステム30とは、インターネット等の通信ネットワークを介して互いに繋がり、互いに情報の送受信を行えるようになっている。以下の説明では「発電事業者」を「IPP」という場合がある。
・送電ルートに含まれる送電線の送電電圧が相対的に低いほど高い。すなわち、送電ルートに含まれる送電線の送電電圧が相対的に高いほど低い。
・送電ルートに、送電電圧が相対的に低い送電線の区間が多く含まれるほど高い。すなわち、送電ルートに、送電電圧が相対的に高い送電線の区間が多く含まれるほど安い。
図10に示すように、本実施形態の電力管理システムは、電力管理装置10と、複数の電力需要家システム20と、複数のIPPシステム30とを有する。本実施形態の電力管理装置10は、複数の発電事業者(複数のIPPシステム30)から電力購入依頼を取得した場合に、電力需要家毎に、各発電事業者から電力を購入するか否かを判断する手段を有する。以下、詳細に説明する。
上述した判断を行ってもよい。
1. 発電事業者から電力単価を含む電力購入依頼を取得する取得手段と、
前記発電事業者と、同じ配変電所の配下にいる複数の電力需要家をまとめた複数の電力需要家グループ各々とのペア毎に、電力の託送料金単価を算出する算出手段と、
前記電力単価と前記託送料金単価との合計単価、及び、前記電力需要家各々の基準単価に基づき、前記電力需要家毎に、前記発電事業者から電力を購入するか否かを判断する判断手段と、
を有する電力管理装置。
2. 1に記載の電力管理装置において、
前記判断手段は、
前記電力需要家毎に、前記合計単価が前記基準単価より安いか判断し、
前記合計単価が第1の前記電力需要家の前記基準単価より安いと判断した場合、前記第1の電力需要家は前記発電事業者から電力を購入すると判断する電力管理装置。
3. 1に記載の電力管理装置において、
前記取得手段は、複数の前記発電事業者各々から前記電力購入依頼を取得し、
前記算出手段は、複数の前記発電事業者各々と、複数の前記電力需要家グループ各々とのペア毎に、前記託送料金単価を算出する電力管理装置。
4. 3に記載の電力管理装置において、
前記判断手段は、
前記電力需要家毎に、複数の前記ペア各々に対応した前記合計単価が前記基準単価より安いか判断し、
1つまたは複数の前記合計単価が第1の前記電力需要家の前記基準単価より安いと判断した場合、前記第1の電力需要家は前記1つまたは複数の前記合計単価各々に対応する1つ又は複数の前記発電事業者から電力を購入すると判断する電力管理装置。
5. 4に記載の電力管理装置において、
前記判断手段は、
複数の前記合計単価が前記第1の電力需要家の前記基準単価より安いと判断した場合、前記第1の電力需要家は前記複数の前記合計単価の中の最も安い前記合計単価に対応する前記発電事業者から電力を購入すると判断する電力管理装置。
6. 5に記載の電力管理装置において、
前記判断手段は、
前記複数の前記合計単価の中に最安値となる前記合計単価が複数ある場合、前記第1の電力需要家は最安値となる複数の前記合計単価の中の前記託送料金単価が最も安い前記合計単価に対応する前記発電事業者から電力を購入すると判断する電力管理装置。
7. 1から6のいずれかに記載の電力管理装置において、
前記算出手段は、送電線の送電容量及び送電量の予測値に基づき、前記ペア毎に送電ルートを決定し、前記送電ルートに基づき前記託送料金単価を算出する電力管理装置。
8. 7に記載の電力管理装置において、
前記算出手段は、前記送電ルートに含まれる配変電所の数、及び、前記送電ルートに含まれる送電線の送電電圧の少なくとも一方に基づき、前記託送料金単価を算出する電力管理装置。
9. 8に記載の電力管理装置において、
前記算出手段は、前記送電ルートに含まれる配変電所の数が多いほど、高い前記託送料金単価を算出する電力管理装置。
10. 8又は9に記載の電力管理装置において、
前記算出手段は、前記送電ルートに送電電圧が相対的に低い送電線が含まれている場合、前記送電ルートに送電電圧が相対的に低い送電線が含まれていない場合に比べて高い前記託送料金単価を算出する電力管理装置。
11. 8又は9に記載の電力管理装置において、
前記算出手段は、前記送電ルートに送電電圧が相対的に低い送電線の区間が多く含まれているほど、高い前記託送料金単価を算出する電力管理装置。
12. 1から11のいずれかに記載の電力管理装置において、
前記電力購入依頼は電力販売希望量をさらに含み、
第1の前記発電事業者から電力を購入すると判断された1又は複数の前記電力需要家に、前記第1の発電事業者の前記電力販売希望量を分配する分配手段をさらに有する電力管理装置。
13. 12に記載の電力管理装置において、
前記分配手段は、前記電力需要家の蓄電システムの空き容量に基づき、前記第1の発電事業者の前記電力販売希望量を分配する電力管理装置。
14. 12又は13に記載の電力管理装置において、
前記分配手段は、前記基準単価が安い前記電力需要家から順に前記電力販売希望量を分配する電力管理装置。
15. 12又は13に記載の電力管理装置において、
前記分配手段は、複数の前記電力需要家に前記電力販売希望量を均等に分配する電力管理装置。
16. コンピュータが、
発電事業者から電力単価を含む電力購入依頼を取得する取得工程と、
前記発電事業者と、同じ配変電所の配下にいる複数の電力需要家をまとめた複数の電力需要家グループ各々とのペア毎に、電力の託送料金単価を算出する算出工程と、
前記電力単価と前記託送料金単価との合計単価、及び、前記電力需要家各々の基準単価に基づき、前記電力需要家毎に、前記発電事業者から電力を購入するか否かを判断する判断工程と、
を実行する電力管理方法。
17. コンピュータを、
発電事業者から電力単価を含む電力購入依頼を取得する取得手段、
前記発電事業者と、同じ配変電所の配下にいる複数の電力需要家をまとめた複数の電力需要家グループ各々とのペア毎に、電力の託送料金単価を算出する算出手段、
前記電力単価と前記託送料金単価との合計単価、及び、前記電力需要家各々の基準単価に基づき、前記電力需要家毎に、前記発電事業者から電力を購入するか否かを判断する判断手段、
として機能させるプログラム。
Claims (17)
- 発電事業者から電力単価を含む電力購入依頼を取得する取得手段と、
前記発電事業者と、同じ配変電所の配下にいる複数の電力需要家をまとめた複数の電力需要家グループ各々とのペア毎に、電力の託送料金単価を算出する算出手段と、
前記電力単価と前記託送料金単価との合計単価、及び、前記電力需要家各々の基準単価に基づき、前記電力需要家毎に、前記発電事業者から電力を購入するか否かを判断する判断手段と、
を有する電力管理装置。 - 請求項1に記載の電力管理装置において、
前記判断手段は、
前記電力需要家毎に、前記合計単価が前記基準単価より安いか判断し、
前記合計単価が第1の前記電力需要家の前記基準単価より安いと判断した場合、前記第1の電力需要家は前記発電事業者から電力を購入すると判断する電力管理装置。 - 請求項1に記載の電力管理装置において、
前記取得手段は、複数の前記発電事業者各々から前記電力購入依頼を取得し、
前記算出手段は、複数の前記発電事業者各々と、複数の前記電力需要家グループ各々とのペア毎に、前記託送料金単価を算出する電力管理装置。 - 請求項3に記載の電力管理装置において、
前記判断手段は、
前記電力需要家毎に、複数の前記ペア各々に対応した前記合計単価が前記基準単価より安いか判断し、
1つまたは複数の前記合計単価が第1の前記電力需要家の前記基準単価より安いと判断した場合、前記第1の電力需要家は前記1つまたは複数の前記合計単価各々に対応する1つ又は複数の前記発電事業者から電力を購入すると判断する電力管理装置。 - 請求項4に記載の電力管理装置において、
前記判断手段は、
複数の前記合計単価が前記第1の電力需要家の前記基準単価より安いと判断した場合、前記第1の電力需要家は前記複数の前記合計単価の中の最も安い前記合計単価に対応する前記発電事業者から電力を購入すると判断する電力管理装置。 - 請求項5に記載の電力管理装置において、
前記判断手段は、
前記複数の前記合計単価の中に最安値となる前記合計単価が複数ある場合、前記第1の電力需要家は最安値となる複数の前記合計単価の中の前記託送料金単価が最も安い前記合計単価に対応する前記発電事業者から電力を購入すると判断する電力管理装置。 - 請求項1から6のいずれか1項に記載の電力管理装置において、
前記算出手段は、送電線の送電容量及び送電量の予測値に基づき、前記ペア毎に送電ルートを決定し、前記送電ルートに基づき前記託送料金単価を算出する電力管理装置。 - 請求項7に記載の電力管理装置において、
前記算出手段は、前記送電ルートに含まれる配変電所の数、及び、前記送電ルートに含まれる送電線の送電電圧の少なくとも一方に基づき、前記託送料金単価を算出する電力管理装置。 - 請求項8に記載の電力管理装置において、
前記算出手段は、前記送電ルートに含まれる配変電所の数が多いほど、高い前記託送料金単価を算出する電力管理装置。 - 請求項8又は9に記載の電力管理装置において、
前記算出手段は、前記送電ルートに送電電圧が相対的に低い送電線が含まれている場合、前記送電ルートに送電電圧が相対的に低い送電線が含まれていない場合に比べて高い前記託送料金単価を算出する電力管理装置。 - 請求項8又は9に記載の電力管理装置において、
前記算出手段は、前記送電ルートに送電電圧が相対的に低い送電線の区間が多く含まれているほど、高い前記託送料金単価を算出する電力管理装置。 - 請求項1から11のいずれか1項に記載の電力管理装置において、
前記電力購入依頼は電力販売希望量をさらに含み、
第1の前記発電事業者から電力を購入すると判断された1又は複数の前記電力需要家に、前記第1の発電事業者の前記電力販売希望量を分配する分配手段をさらに有する電力管理装置。 - 請求項12に記載の電力管理装置において、
前記分配手段は、前記電力需要家の蓄電システムの空き容量に基づき、前記第1の発電事業者の前記電力販売希望量を分配する電力管理装置。 - 請求項12又は13に記載の電力管理装置において、
前記分配手段は、前記基準単価が安い前記電力需要家から順に前記電力販売希望量を分配する電力管理装置。 - 請求項12又は13に記載の電力管理装置において、
前記分配手段は、複数の前記電力需要家に前記電力販売希望量を均等に分配する電力管理装置。 - コンピュータが、
発電事業者から電力単価を含む電力購入依頼を取得する取得工程と、
前記発電事業者と、同じ配変電所の配下にいる複数の電力需要家をまとめた複数の電力需要家グループ各々とのペア毎に、電力の託送料金単価を算出する算出工程と、
前記電力単価と前記託送料金単価との合計単価、及び、前記電力需要家各々の基準単価に基づき、前記電力需要家毎に、前記発電事業者から電力を購入するか否かを判断する判断工程と、
を実行する電力管理方法。 - コンピュータを、
発電事業者から電力単価を含む電力購入依頼を取得する取得手段、
前記発電事業者と、同じ配変電所の配下にいる複数の電力需要家をまとめた複数の電力需要家グループ各々とのペア毎に、電力の託送料金単価を算出する算出手段、
前記電力単価と前記託送料金単価との合計単価、及び、前記電力需要家各々の基準単価に基づき、前記電力需要家毎に、前記発電事業者から電力を購入するか否かを判断する判断手段、
として機能させるプログラム。
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU2017403852A AU2017403852A1 (en) | 2017-03-17 | 2017-10-26 | Power management apparatus, power management method, and program |
JP2019505696A JP6996550B2 (ja) | 2017-03-17 | 2017-10-26 | 電力管理装置、電力管理方法、及び、プログラム |
US16/479,096 US20190392534A1 (en) | 2017-03-17 | 2017-10-26 | Power management apparatus, power management method, and non-transitory storage medium |
EP17900627.5A EP3598379A4 (en) | 2017-03-17 | 2017-10-26 | POWER MANAGEMENT DEVICE, POWER MANAGEMENT METHOD AND PROGRAM |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017-052381 | 2017-03-17 | ||
JP2017052381 | 2017-03-17 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2018168053A1 true WO2018168053A1 (ja) | 2018-09-20 |
Family
ID=63522918
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2017/038778 WO2018168053A1 (ja) | 2017-03-17 | 2017-10-26 | 電力管理装置、電力管理方法、及び、プログラム |
Country Status (5)
Country | Link |
---|---|
US (1) | US20190392534A1 (ja) |
EP (1) | EP3598379A4 (ja) |
JP (1) | JP6996550B2 (ja) |
AU (1) | AU2017403852A1 (ja) |
WO (1) | WO2018168053A1 (ja) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10865774B2 (en) * | 2016-08-09 | 2020-12-15 | Mhi Vestas Offshore A/S | Wind turbine control method and system |
EP3662421A4 (en) | 2017-08-03 | 2021-01-20 | Heila Technologies, Inc. | ASSET MANAGER IN AN ELECTRICAL NETWORK |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001243358A (ja) * | 2000-02-25 | 2001-09-07 | Itochu Corp | 電力売買の仲介方法 |
JP2002271982A (ja) | 2001-03-14 | 2002-09-20 | Ennet Corp | 余剰電力管理システムおよびその制御方法 |
JP2003091659A (ja) * | 2001-09-19 | 2003-03-28 | Yasokazu Makino | 電力売買仲介システム |
JP2003180030A (ja) * | 2001-12-07 | 2003-06-27 | Mitsubishi Electric Corp | 需給計画作成装置 |
JP2004272441A (ja) * | 2003-03-06 | 2004-09-30 | Hitachi Ltd | 取引所システムの約定処理方法および約定処理装置 |
JP2007133813A (ja) * | 2005-11-14 | 2007-05-31 | Ntt Data Corp | 電気契約仲介装置および電気契約仲介方法 |
JP2007299180A (ja) * | 2006-04-28 | 2007-11-15 | Mitsubishi Electric Corp | 託送料金計算装置 |
JP2017052381A (ja) | 2015-09-09 | 2017-03-16 | 株式会社東海理化電機製作所 | 操作者判定装置 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6473744B1 (en) * | 1995-08-18 | 2002-10-29 | Mhc Investment Company | Apparatus and method for trading electric energy |
US20030009401A1 (en) * | 2001-04-27 | 2003-01-09 | Enerwise Global Technologies, Inc. | Computerized utility cost estimation method and system |
JP2005050164A (ja) * | 2003-07-29 | 2005-02-24 | Sekisui Chem Co Ltd | ネットワークを利用した電力売買仲介システム及び電力小売システム |
JP5587641B2 (ja) * | 2010-03-10 | 2014-09-10 | パナソニック株式会社 | 電力供給システム |
JP6187463B2 (ja) * | 2012-07-30 | 2017-08-30 | 日本電気株式会社 | グリッド統合制御装置、グリッド制御システム、グリッド制御装置、プログラム、及び制御方法 |
US20140188695A1 (en) * | 2012-12-27 | 2014-07-03 | Kabushiki Kaisha Toshiba | Electricity trading system and market providing type service system |
US10991041B2 (en) * | 2014-10-03 | 2021-04-27 | Open Access Technology International, Inc. | Next-generation energy market design and implementation |
-
2017
- 2017-10-26 WO PCT/JP2017/038778 patent/WO2018168053A1/ja active Application Filing
- 2017-10-26 US US16/479,096 patent/US20190392534A1/en not_active Abandoned
- 2017-10-26 JP JP2019505696A patent/JP6996550B2/ja active Active
- 2017-10-26 EP EP17900627.5A patent/EP3598379A4/en not_active Withdrawn
- 2017-10-26 AU AU2017403852A patent/AU2017403852A1/en not_active Abandoned
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001243358A (ja) * | 2000-02-25 | 2001-09-07 | Itochu Corp | 電力売買の仲介方法 |
JP2002271982A (ja) | 2001-03-14 | 2002-09-20 | Ennet Corp | 余剰電力管理システムおよびその制御方法 |
JP2003091659A (ja) * | 2001-09-19 | 2003-03-28 | Yasokazu Makino | 電力売買仲介システム |
JP2003180030A (ja) * | 2001-12-07 | 2003-06-27 | Mitsubishi Electric Corp | 需給計画作成装置 |
JP2004272441A (ja) * | 2003-03-06 | 2004-09-30 | Hitachi Ltd | 取引所システムの約定処理方法および約定処理装置 |
JP2007133813A (ja) * | 2005-11-14 | 2007-05-31 | Ntt Data Corp | 電気契約仲介装置および電気契約仲介方法 |
JP2007299180A (ja) * | 2006-04-28 | 2007-11-15 | Mitsubishi Electric Corp | 託送料金計算装置 |
JP2017052381A (ja) | 2015-09-09 | 2017-03-16 | 株式会社東海理化電機製作所 | 操作者判定装置 |
Non-Patent Citations (1)
Title |
---|
See also references of EP3598379A4 |
Also Published As
Publication number | Publication date |
---|---|
JP6996550B2 (ja) | 2022-01-17 |
EP3598379A4 (en) | 2020-01-29 |
AU2017403852A1 (en) | 2019-07-25 |
JPWO2018168053A1 (ja) | 2020-01-16 |
EP3598379A1 (en) | 2020-01-22 |
US20190392534A1 (en) | 2019-12-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP7455163B2 (ja) | 電力供給システムおよび電力供給方法 | |
JP6838792B2 (ja) | 制御装置、制御システム、制御装置の動作方法及びプログラム | |
JP6701965B2 (ja) | 処理装置、処理方法及びプログラム | |
JP6996494B2 (ja) | 電力制御装置、電力制御方法、およびプログラム | |
US20160196622A1 (en) | Power adjustment system, power adjustment method, and program | |
JP6268633B2 (ja) | 電力管理装置、電力管理方法、プログラム | |
JPWO2016013089A1 (ja) | 需給制御装置、充放電制御装置、蓄電装置、需給制御システムおよび需給制御方法 | |
EP3886034B1 (en) | Power trading system and management apparatus | |
JP6226282B2 (ja) | 電力調整装置、電力調整方法、プログラム | |
WO2018168053A1 (ja) | 電力管理装置、電力管理方法、及び、プログラム | |
JP7056579B2 (ja) | 電力管理装置、電力管理システム、電力管理方法、及び、プログラム | |
JP7078183B1 (ja) | 制御方法、管理装置、プログラム及び電力システム | |
JP6922570B2 (ja) | 処理装置、処理方法及びプログラム | |
US9979191B2 (en) | Power control method, device and system for instigating a power control based on the examined allocation | |
WO2017154116A1 (ja) | 電力制御装置、電力制御システム、電力制御方法、及び、プログラム | |
JP7024707B2 (ja) | 制御装置、制御方法及びプログラム | |
WO2020234953A1 (ja) | 貯蔵電力由来管理装置、方法、およびプログラム | |
JP2020202702A (ja) | 需要制御方法、制御装置、プログラム及び電力システム | |
JP7003509B2 (ja) | 処理装置、制御装置、pcs、処理方法、制御方法及びプログラム | |
WO2018230019A1 (ja) | 電力管理システム、電力制御装置、電力管理方法及びプログラム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 17900627 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 2019505696 Country of ref document: JP Kind code of ref document: A |
|
ENP | Entry into the national phase |
Ref document number: 2017403852 Country of ref document: AU Date of ref document: 20171026 Kind code of ref document: A |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2017900627 Country of ref document: EP |
|
ENP | Entry into the national phase |
Ref document number: 2017900627 Country of ref document: EP Effective date: 20191017 |