WO2018168053A1 - 電力管理装置、電力管理方法、及び、プログラム - Google Patents

電力管理装置、電力管理方法、及び、プログラム Download PDF

Info

Publication number
WO2018168053A1
WO2018168053A1 PCT/JP2017/038778 JP2017038778W WO2018168053A1 WO 2018168053 A1 WO2018168053 A1 WO 2018168053A1 JP 2017038778 W JP2017038778 W JP 2017038778W WO 2018168053 A1 WO2018168053 A1 WO 2018168053A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
unit price
consumer
management apparatus
generation company
Prior art date
Application number
PCT/JP2017/038778
Other languages
English (en)
French (fr)
Inventor
大樹 武内
木村 英和
Original Assignee
日本電気株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本電気株式会社 filed Critical 日本電気株式会社
Priority to AU2017403852A priority Critical patent/AU2017403852A1/en
Priority to JP2019505696A priority patent/JP6996550B2/ja
Priority to US16/479,096 priority patent/US20190392534A1/en
Priority to EP17900627.5A priority patent/EP3598379A4/en
Publication of WO2018168053A1 publication Critical patent/WO2018168053A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/26Power supply means, e.g. regulation thereof
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/04Trading; Exchange, e.g. stocks, commodities, derivatives or currency exchange
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00007Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using the power network as support for the transmission
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/121Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using the power network as support for the transmission

Definitions

  • the present invention relates to a power management apparatus, a power management method, and a program.
  • a power generation company may be notified of a power generation suppression command by designating a time zone in order to adjust power supply and demand balance. If power generation is suppressed according to the power generation suppression command, the utilization efficiency of the power generation system is reduced. Therefore, a service that avoids the suppression of power generation by power generation companies while maintaining the balance of power supply and demand by having power consumers consume (purchase) the amount of power to be suppressed during the above time period is being studied. .
  • Patent Document 1 discloses a surplus power management system in which a power company purchases surplus power of a power generation company and supplies the purchased power directly from the power generation company to a power consumer through a transmission network.
  • the surplus power management system includes: estimation means for estimating power demand of a power consumer; determination means for determining a power generation plan for sending power corresponding to the estimated power demand from a power generation company to a power grid; Notification means for notifying the power generation company of the generated power generation plan.
  • An object of the present invention is to solve the problem.
  • An acquisition means for acquiring a power purchase request including a power unit price from a power generation company For each pair of the power generation company and each of a plurality of power consumer groups that summarize a plurality of power consumers under the same substation, a calculation means for calculating a consignment unit price of power, Judgment means for judging whether to purchase power from the power generation company for each power consumer based on the total unit price of the power unit price and the consignment charge unit price and the standard unit price of each power consumer.
  • Is provided When, Is provided.
  • a program is provided that functions as:
  • the power management system includes a power management device 10, a plurality of power consumer systems 20, and an IPP (independent power producer) system 30.
  • the power management apparatus 10 is an apparatus belonging to, for example, a resource aggregator.
  • the power consumer system 20 is a system belonging to a power consumer.
  • the IPP system 30 is a system belonging to a power generation company.
  • the power management apparatus 10, the power consumer system 20, and the IPP system 30 are connected to each other via a communication network such as the Internet, and can transmit and receive information to and from each other.
  • “power generation company” may be referred to as “IPP”.
  • the IPP system 30 transmits a power purchase request to the power management apparatus 10.
  • the power customer system 20 has a power storage system 25.
  • the power storage system 25 includes a system controller 21, a PCS (Power conditioning System) 22, a BMS (Battery Management System) 23, and a battery 24.
  • PCS Power conditioning System
  • BMS Battery Management System
  • the system controller 21 controls the entire power storage system 25.
  • the PCS 22 performs DC power / AC power conversion.
  • the battery 24 stores electric power.
  • the battery 24 includes, for example, a cell stack that stores energy, a battery monitor that monitors cell temperature, cell voltage, and the like.
  • the BMS 23 controls the battery 24.
  • the power management apparatus 10 when the power management apparatus 10 obtains a power purchase request including a power unit price from the power generation company (IPP system 30), the power management apparatus 10 generates power for each pair of the power generation company and each of the plurality of power consumer groups. Calculate the consignment charge unit price. Then, the power management apparatus 10 determines whether or not to purchase power from the power generation company for each power consumer in consideration of the power unit price and the consignment charge unit price.
  • the power management apparatus 10 of the present embodiment which considers not only the unit price of power proposed by the power generation company but also the consignment charge unit price when the power is consigned from the power generation company to the power consumer, It is possible to accurately determine whether there is any merit in purchasing power. And only when there is a real merit, it can be judged that an electric power consumer will purchase electric power. For this reason, the merit of the electric power consumer by participating in the said service becomes large. As a result, it is possible to sufficiently secure power consumers who participate in the service.
  • Each functional unit included in the power management apparatus 10 of the present embodiment includes a CPU (Central Processing Unit) of an arbitrary computer, a memory, a program loaded into the memory, and a storage unit such as a hard disk storing the program (the device is shipped in advance
  • a storage unit such as a hard disk storing the program (the device is shipped in advance
  • CD Compact Disc
  • programs downloaded from servers on the Internet, etc. can also store storage media such as CD (Compact Disc) and programs downloaded from servers on the Internet, etc.), and hardware and software centering on communication network connection interfaces Realized by any combination of It will be understood by those skilled in the art that there are various modifications to the implementation method and apparatus.
  • FIG. 3 is a block diagram illustrating a hardware configuration of the power management apparatus 10 of this embodiment.
  • the power management apparatus 10 includes a processor 1A, a memory 2A, an input / output interface 3A, a peripheral circuit 4A, and a bus 5A.
  • the peripheral circuit 4A includes various modules. The peripheral circuit 4A may not be provided.
  • the power management apparatus 10 may be realized by a single apparatus that is physically and / or logically integrated, or may be realized by a plurality of apparatuses that are physically and / or logically separated from each other. Good. In the latter case, each of the plurality of devices may have a hardware configuration as shown in FIG. A plurality of devices may cooperate to realize the function of the power management device 10.
  • the bus 5A is a data transmission path through which the processor 1A, the memory 2A, the peripheral circuit 4A, and the input / output interface 3A transmit / receive data to / from each other.
  • the processor 1A is an arithmetic processing device such as a CPU (Central Processing Unit) or a GPU (Graphics Processing Unit).
  • the memory 2A is a memory such as a RAM (Random Access Memory) or a ROM (Read Only Memory).
  • the input / output interface 3A is an interface for acquiring information from an input device (eg, keyboard, mouse, microphone, etc.), external device, external server, external sensor, etc., and an output device (eg, display, speaker, printer, mailer). Etc.), an interface for outputting information to an external device, an external server, etc.
  • the processor 1A can issue a command to each module and perform a calculation based on the calculation result.
  • FIG. 4 shows an example of a functional block diagram of the power management apparatus 10 of the present embodiment.
  • the power management apparatus 10 includes an acquisition unit 11, a determination unit 12, and a calculation unit 14.
  • FIG. 5 shows another example of a functional block diagram of the power management apparatus 10 of the present embodiment.
  • the power management apparatus 10 may include a distribution unit 13 in addition to the acquisition unit 11, the determination unit 12, and the calculation unit 14.
  • the acquisition unit 11 acquires a power purchase request including a power unit price from a power generation company (eg, from the IPP system 30 in FIG. 1).
  • the power unit price included in the power purchase request is a unit price of power when purchasing power in response to a power purchase request from a power generation company.
  • the unit is, for example, “yen / kWh”.
  • the power unit price can be arbitrarily determined by each power generation company.
  • the power purchase request may further include the desired amount of power sales.
  • the desired amount of electric power sales is the amount of electric power that the electric power consumer wants to purchase.
  • the unit is, for example, “kWh”.
  • the desired amount of electricity sales can be arbitrarily determined by each power generation company.
  • the power generation company can set the surplus power amount as the power sales desired amount.
  • the surplus power amount is, for example, the amount of power for which power generation is suppressed by a transmission / distribution company.
  • the power transmission / distribution company defines a time zone for suppressing power generation, notifies the power generation company of power generation suppression for setting the output within that time zone to “0”, or sets an upper limit for output within that time zone.
  • the power generation company calculates the amount of surplus power based on the content of the power generation suppression and the power generation forecast when the power generation system does not suppress power generation in the time zone when power generation is suppressed, and sells the surplus power amount It may be a desired amount.
  • the power purchase request may further include a power consumption time zone.
  • the power consumption time zone is a time zone during which power is consumed by receiving power from the power grid when purchasing power in response to a request from a power generation company.
  • Each power generation company can arbitrarily determine the power consumption time zone.
  • the power consumption time zone may be a time zone in which power generation is suppressed by the transmission / distribution company.
  • the calculation unit 14 calculates the unit price of the power transfer fee for each pair of the power generation company and each of the plurality of power consumer groups.
  • the consignment charge unit price is a unit price for consigning power from the power generation company to each power consumer group.
  • the unit is, for example, “yen / kWh”.
  • a power consumer group is a group of a plurality of power consumers who are under the same distribution substation.
  • the calculation unit 14 may determine a power transmission route for each pair and calculate a consignment charge unit price based on the power transmission route. In order to perform these processes, the calculation unit 14 previously stores “information about the power system”, “information about the position of the power generation company in the power system”, and “information about the position of each power consumer group within the power system” in advance. It may be held.
  • “Information about the power system”, “Information about the position of the power generation company within the power system” and “Information about the position within the power system of the power consumer group” are necessary for determining the transmission route and calculating the unit price of consignment charges. Contains information.
  • the power system includes a large number of facilities such as power generation facilities, power transmission facilities, substation facilities, distribution facilities, and customer facilities, which are connected to each other.
  • FIG. 6 shows a part of the power system.
  • distribution substations 101 to 104 are connected to each other via power transmission lines 301 to 304.
  • the facilities of the power consumer groups 201 to 203 and the facilities of the IPPs 401 to 403 are connected to the distribution substations 101 to 104 via the transmission lines 305 to 307, respectively.
  • the facilities of the power consumer groups 201 to 203 include a power storage system 25.
  • the facilities of the IPPs 401 to 403 include a power generation system.
  • the power generation system may be a system that generates power using natural energy (eg, sunlight, geothermal, wind power, etc.).
  • Information related to the power system includes information indicating the connection between distribution substations.
  • system contains the attribute of a power transmission line, for example, power transmission capacity, a power transmission voltage, etc. (refer FIG. 7).
  • the transmission line is divided into a plurality of sections by an arbitrary means, and the transmission capacity, the transmission voltage, and the like are managed for each section.
  • the transmission line between two distribution substations may be set as one section (in the case of the example in FIG. 6, each of the transmission lines 301 to 304 is managed as one section).
  • the information regarding the position of the power generation company in the power system includes information indicating which substations the power generation system of each power generation company is located under.
  • the information regarding the position in the electric power system of the electric power consumer group includes information indicating which substation the electric power storage system 25 of each electric power consumer group is located.
  • the calculation unit 14 can determine a power transmission route for each pair of a power generation company and each of a plurality of power consumer groups based on the above information, and can calculate a consignment charge unit price.
  • the calculation unit 14 may determine a power transmission route with the lowest consignment charge unit price for each pair.
  • the consignment charge unit price is calculated based on one or more of the following criteria, for example.
  • the calculation unit 14 may determine a power transmission route that provides the lowest unit price for consignment charges while satisfying a predetermined condition.
  • the predetermined condition include safety conditions such as “the amount of power transmitted through each transmission line does not exceed the transmission capacity of each transmission line”, but are not limited thereto.
  • the calculation unit 14 includes each transmission line in the transmission route based on the transmission capacity (see FIG. 7) of each transmission line held in advance and the predicted value of the transmission amount of each transmission line in the power consumption time zone. It may be determined whether or not it is possible. For example, when “transmission capacity> predicted value of transmission amount + ⁇ ” is satisfied, it may be determined that the transmission line can be included in the transmission route.
  • is a value of 0 or more, and can be determined according to the output from the power generation company, the scale of each power consumer group (total output of the power storage system 25, etc.), and the like.
  • the calculation part 14 may determine the power transmission route in which a consignment charge unit price becomes the cheapest for every said pair using only the power transmission line judged to be able to be included in a power transmission route.
  • the determination unit 12 purchases power from the power generation company for each power consumer based on the total unit price of the power unit price and the consignment charge unit price and the standard unit price of each power consumer. Determine whether or not.
  • the determination unit 12 determines, for each power consumer, “the total unit price is lower than the reference unit price” or “the total unit price is lower than the reference unit price by a predetermined level or more (eg, a predetermined value or more, a predetermined ratio or more). It is judged whether the condition of “cheap” is satisfied. And when judgment part 12 judges that the above-mentioned conditions are satisfied in the 1st electric power consumer, it judges that the 1st electric power consumer purchases electric power from a power generation enterprise.
  • a predetermined level or more eg, a predetermined value or more, a predetermined ratio or more
  • the power management apparatus 10 holds a reference unit price registered in advance for each power consumer (see FIG. 8).
  • the reference unit price can be arbitrarily determined by each electric power consumer.
  • the power consumer may use the unit price of the power purchased normally as the reference unit price, or set the unit price obtained by subtracting a predetermined value from the unit price of the power purchased normally.
  • the consignment charge unit price is calculated for each power consumer group, but the reference unit price is determined for each power consumer. And the judgment whether electric power is purchased from a power generation company is performed for every electric power consumer.
  • the distribution unit 13 shown in FIG. 5 distributes the desired power sales amount of the power generation company to one or a plurality of power consumers determined to purchase power from the power generation company. Each power consumer purchases the distributed portion from the power generation company.
  • the distribution unit 13 predicts the free capacity of the power storage system 25 of each power consumer at the start timing of the power consumption time zone. For example, the charge / discharge schedule of each power storage system 25 on the same day including the capacity, rated output, and power consumption time zone of each power storage system 25 (the day including the power consumption time zone; the same applies hereinafter) (eg, night charge, daytime discharge) , Based on the power consumption prediction of each power consumer on the day, and if the power consumer has a power generator (eg, a power generator that generates power using natural energy), based on the power generation prediction of the power generator, etc.
  • the available capacity of each power storage system 25 at the start timing may be predicted. The prediction can be realized according to the conventional technology. The calculated value is managed as shown in FIG.
  • the distribution part 13 may be called the free capacity
  • the smaller one of the first chargeable amount and the desired electric power sales amount may be distributed to the electric power consumer.
  • the first chargeable amount is “the first available capacity of the power storage system 25 of the power consumer” and “the product of the rated output of the power storage system 25 of the power consumer and the time width of the power consumption time zone”. The smaller of the two.
  • the desired power sales amount may be evenly distributed to the plurality of power consumers. Assuming that the number of power consumers determined to purchase power from the power generation company is M (M ⁇ 2) and the desired power sales amount is D, the distribution amount of each power consumer is D / M. When there is a power consumer whose first chargeable amount is less than D / M, the difference (the amount that cannot be fully charged) may be distributed to other power consumers.
  • the desired amount of power sales may be distributed in order from the power consumer whose reference unit price is low.
  • the desired amount of power sales is set according to the ratio of the power consumption (first chargeable amount) provided by each power consumer. You may apportion.
  • the power management apparatus 10 of this embodiment it is possible to accurately determine whether or not there is a merit in purchasing power according to a request from the power generation company. And only when there is a real merit, an electric power consumer can be made to purchase electric power. For this reason, the merit of the electric power consumer of participating in the service which makes an electric power consumer consume electric power according to the electric power purchase request from the electric power generation company becomes large. As a result, it is possible to sufficiently secure power consumers who participate in the service.
  • a plurality of power consumers under the same distribution substation are grouped to generate a power consumer group, and a consignment charge unit price is calculated for each power consumer group.
  • the processing burden can be greatly reduced.
  • the power management apparatus 10 of the present embodiment determines whether there is a merit in purchasing power from a power generation company based on a standard unit price determined by reflecting each situation for each power consumer, It can be judged whether there is the above-mentioned merit reflecting the circumstances of each electric power consumer. For this reason, the presence or absence of a merit can be judged accurately for every electric power consumer.
  • the power management apparatus 10 can automatically determine the purchase of power without confirming with the power consumer each time, the accuracy of estimation of how much surplus power can be purchased (the amount of power) is increased. .
  • the power consumer system 20 may include other power consuming devices (eg, energy storage system, electric device, etc.) instead of / in addition to the power storage system 25.
  • the above-mentioned “first chargeable amount” can be read as “uploadable consumption amount”.
  • the amount of power that can be loaded is the amount of power consumed by the power consumer on top of normal power consumption during the power consumption time period, and is represented by the product of the power consumption of the power consumption device and the power consumption time. It is.
  • refrigeration equipment, vending machines, heat pump water heaters, etc. use electricity to cool and heat at certain intervals, but by adding the timing to the power consumption time zone, it adds to normal power consumption. Power can be consumed.
  • the said modification is applicable to all the following embodiments.
  • the power management system includes a power management apparatus 10, a plurality of power consumer systems 20, and a plurality of IPP systems 30. Whether the power management apparatus 10 of this embodiment purchases electric power from each electric power generation company for every electric power consumer, when acquiring the electric power purchase request from several electric power generation companies (multiple IPP systems 30). Means for judging. Details will be described below.
  • the configurations of the power consumer system 20 and the IPP system 30 are the same as those in the first embodiment.
  • An example of the hardware configuration of the power management apparatus 10 is the same as that of the first embodiment.
  • FIG. 4 An example of a functional block diagram of the power management apparatus 10 of the present embodiment is illustrated in FIG. 4 or FIG. 5 as in the first embodiment.
  • the acquisition unit 11 acquires a power purchase request including a power unit price from each of a plurality of power generation companies (for example, from each of the IPP systems 30 in FIG. 10).
  • the power purchase request may include “power unit price”, “power sales desired amount”, “power consumption time zone”, and the like.
  • the calculation unit 14 calculates a consignment charge unit price for each pair of each of the plurality of power generation companies and each of the plurality of power consumer groups.
  • the calculation unit 14 can determine a power transmission route for each pair and calculate a consignment charge unit price.
  • the power transmission route determination process and the consignment charge unit price calculation process are the same as those in the first embodiment.
  • Information such as shown in FIG. 11 is obtained by the acquisition unit 11 and the calculation unit 14.
  • the information shown in FIG. 11 is information indicating the sum of the power unit price and the consignment charge unit price for each pair of each of the plurality of power generation companies and each of the plurality of power consumer groups.
  • An (n is the serial number of the power generation company) indicates the power unit price of each power generation company.
  • Dnm (n is the serial number of the power generation company and m is the serial number of the power consumer group) is a unit charge unit price corresponding to each pair of the power generation company and the power consumer group.
  • the sum of An and Dnm is the total unit price described in the first embodiment.
  • the determination unit 12 determines whether or not to purchase power from each of a plurality of power generation companies for each power consumer based on the total unit price of the power unit price and the consignment charge unit price and the standard unit price of each power consumer. To do.
  • the distribution unit 13 distributes the desired power sales amount of the first power generation company to one or a plurality of power consumers determined to purchase power from the first power generation company.
  • the determination unit 12 selects one pair from unprocessed pairs based on the total unit price (see FIG. 11) calculated for each pair of each of the plurality of power generation companies and each of the plurality of power consumer groups. Is determined as a processing target. For example, a pair with the lowest total unit price among unprocessed pairs is determined as a processing target. Note that the pair to be processed may be determined based on other criteria.
  • a power generation company included in a pair to be processed is referred to as a power generation company to be processed.
  • the power consumer group included in the processing target pair is referred to as a processing target power consumer group.
  • the electric power consumers included in the electric power consumer group to be processed are referred to as electric power consumers to be processed.
  • the determination unit 12 determines whether or not the power sale desired remaining amount X of the power generation company to be processed is zero.
  • the desired power sale remaining amount X is a portion of the desired power sales amount of the power generation company to be processed that has not yet been distributed to the power consumers.
  • the initial value of the desired power sale remaining amount X is, for example, the desired power sale amount. As will be described below, the value is updated in the process.
  • the determination unit 12 determines whether an unprocessed pair remains. When an unprocessed pair remains (Yes in S207), the process returns to S201, and the determination unit 12 sets another pair as a processing target. Then, the same processing is repeated. If no unprocessed pair remains (No in S207), the process ends.
  • the process proceeds to S203.
  • the determination unit 12 determines whether or not to purchase power from the power generation company to be processed in each power consumer to be processed.
  • the determination unit 12 determines whether the condition that “the total unit price is lower than the reference unit price” or “the total unit price is lower than the reference unit price by a predetermined level” is satisfied for each power consumer to be processed.
  • the total unit price used for the determination here is calculated in correspondence with the “unit price of power to be processed” and the pair of “target power generator and target power consumer group”. It is the sum of “consignment charge unit price”.
  • the judgment part 12 judges that the 1 or several electric power consumer who satisfy
  • a first power purchase target consumer one or a plurality of power consumers satisfying the above conditions.
  • distribution part 13 computes total kWh total of free capacity kWh free of power storage system 25 of each first power purchase target consumer.
  • the initial value of the free capacity kWh free of the power storage system 25 of each power consumer is, for example, a predicted value of the free capacity of each power storage system 25 at the start timing of the power consumption time zone. As will be described below, the value is updated in the process.
  • the determination unit 12 determines whether an unprocessed pair remains. When an unprocessed pair remains (Yes in S207), the process returns to S201, and the determination unit 12 sets another pair as a processing target. Then, the same processing is repeated. If no unprocessed pair remains (No in S207), the process ends.
  • the distribution unit 13 determines the amount of power kWh DR to be distributed to the power consumer group to be processed. For example, the smaller one of the total kWh total and the desired power sale remaining amount X is set as the amount of power kWh DR distributed to the power consumer group to be processed.
  • the product of the rated output and the time width of the power consumption time zone is calculated, and the total of the products is calculated. May be. Then, the smallest value among the total kWh total , the calculated sum of products, and the desired power sale remaining amount X may be used as the power amount kWh DR distributed to the power consumer group to be processed.
  • distribution part 13 distributes electric energy kWh DR distributed to the electric power consumer group for processing to the 1st electric power purchase object consumer.
  • the distribution unit 13 distributes the desired power sales amount of the power generation company based on the free capacity kWh free of the power storage system 25 of each of the first power purchase target consumers.
  • the smaller one of the second chargeable amount and the power amount kWh DR is given to the first power purchase target consumer. May be distributed.
  • the second chargeable amount includes the free capacity kWh free of the power storage system 25 of the first power purchase target consumer, and the rated output and power consumption time zone of the power storage system 25 of the first power purchase target consumer. Is the smaller of the time width products.
  • the power amount kWh DR may be evenly distributed to the plurality of first power purchase target consumers.
  • M the number of first power purchase target consumers whose free capacity kWh free is not 0
  • the distribution amount of each first power purchase target consumer is kWh DR / M.
  • the difference the amount that cannot be fully charged is transferred to the other first power purchase target consumers. You may distribute.
  • the power amount kWh DR may be distributed in order from the first power purchase target consumer whose reference unit price is low. It should be noted that the smaller one of the remaining chargeable amount and the remaining amount of power kWh DR (the amount not yet distributed) may be distributed to each first power purchase target consumer.
  • the power consumption first power purchased consumer each space kWh free is not 0 is provided (second chargeable).
  • the desired amount of electricity sales may be prorated according to the ratio of the amount.
  • the desired power sale remaining amount X of the power generator to be processed and the free capacity kWh free of the power storage system 25 of each of the first power purchase target consumers are updated. Specifically, the desired power sale remaining amount “X” of the power generation company to be processed is replaced with “X-kWh DR ”. Further, the free capacity “kWh free ” of the power storage system 25 of each of the first power purchase target consumers is replaced with “kWh free ⁇ (value distributed to each power consumer)”.
  • S207 the determination unit 12 determines whether an unprocessed pair remains. When an unprocessed pair remains (Yes in S207), the process returns to S201, and the determination unit 12 sets another pair as a processing target. Then, the same processing is repeated. If no unprocessed pair remains (No in S207), the process ends.
  • the determination unit 12 can determine whether the total unit price corresponding to each of the plurality of pairs is lower than the reference unit price for each power consumer. When the determination unit 12 determines that one or more total unit prices are lower than the reference unit price of the first power consumer, the first power consumer corresponds to each of the one or more total unit prices 1 It can be determined that power is purchased from one or more power generation companies.
  • the determination unit 12 determines, for each power consumer, whether there is a total unit price that satisfies a condition that “the total unit price is lower than the reference unit price” or “the total unit price is lower than the reference unit price by a predetermined level or more”. May be. For example, when the first power consumer included in the power consumer group D0001 of FIG. 11 is a processing target, the total unit price calculated for each pair of the power consumer group and each of the plurality of power generation companies, The total unit price that satisfies the above conditions can be extracted by comparison with the reference unit price of the first electric power consumer.
  • the determination unit 12 determines that there are a plurality of total unit prices that satisfy the above condition in the first power consumer, the first power consumer has the lowest total unit price among the plurality of total unit prices that satisfy the above condition. It may be determined that power is purchased from a power generation company corresponding to the above.
  • the determination unit 12 determines that the first power consumer has a consignment charge unit price among the plurality of total unit prices that are the lowest prices. May purchase power from the power generation company corresponding to the lowest total unit price.
  • the determination unit 12 determines that there are a plurality of total unit prices that satisfy the above condition in the first power consumer, the first power consumer has a plurality of power generations corresponding to each of the plurality of total unit prices that satisfy the above condition. It may be determined that power is purchased from a business operator.
  • the information shown in FIG. 13 is obtained by the processing by the determination unit 12.
  • the information illustrated in FIG. 13 is information in which each power generation company is associated with a power consumer that is determined to purchase power from each.
  • a certain electric power consumer may be associated with a plurality of power generation companies.
  • the distribution unit 13 distributes the desired power sales amount of each power generation company to the power consumers associated with each power generation company in the information shown in FIG. An example of the flow of processing by the distribution unit 13 will be described with reference to the flowchart of FIG.
  • the distribution unit 13 determines a power generation company to be processed (S102). For example, a power generation company with the lowest unit price of electricity among unprocessed power generation companies may be a processing target. In addition, the power generation company having the highest power unit price among unprocessed power generation companies may be set as the processing target. In addition, a power generation company having the largest desired power sales amount among unprocessed power generation companies may be set as a processing target. In addition, a power generation company having the smallest desired power sales amount among unprocessed power generation companies may be set as a processing target. Note that the power generation company to be processed may be determined based on other criteria. In the description of the flowchart of FIG. 14 below, the power consumer associated with the power generation company to be processed in the information as illustrated in FIG. 13 is referred to as a second power purchase target consumer.
  • the power sales desired amount of the power generation company to be processed is distributed to the second power purchase target consumer.
  • the distribution unit 13 distributes the desired power sales amount of the power generator to be processed based on the free capacity kWh free of the power storage system 25 of each second power purchase target consumer.
  • the initial value of the free capacity kWh free of the power storage system 25 of each power consumer is, for example, a predicted value of the free capacity of each power storage system 25 at the start timing of the power consumption time zone. As will be described below, the value is updated in the process.
  • the second power purchase target consumer when there is one second power purchase target consumer whose free capacity kWh free is not 0, the second power purchase target consumer includes the third chargeable amount and “the power generation business subject to processing”.
  • the smaller of “the desired amount of electricity sales” may be distributed.
  • the third chargeable amount includes the free capacity kWh free of the power storage system 25 of the second power purchase target consumer, and the rated output and power consumption time zone of the power storage system 25 of the second power purchase target consumer. Is the smaller of the time width products.
  • the power sales desired amount of the processing power generation company is evenly distributed to the plurality of second power purchase target consumers. May be. Assuming that the number of second power purchase target consumers whose free capacity kWh free is not 0 is M (M ⁇ 2) and the desired power sales amount of the power generator to be processed is D, each of the second power purchase target consumers The distribution amount is D / M. When there is a second power purchase target consumer whose third chargeable amount is less than D / M, the difference (the amount that cannot be fully charged) is distributed to the other second power purchase target consumers. Also good.
  • the power sales desired amount of the power generation company to be processed is distributed in order from the second power purchase target customer with the lowest standard unit price. May be. For each second power purchase target consumer, the smaller one of the third chargeable amount and the remaining amount of power sales desired by the power generation company to be processed (the amount not yet distributed) is distributed. May be.
  • the desired amount of electricity sales may be prorated according to the ratio of the amount.
  • the free capacity kWh free of the second power purchase target consumer is updated. Specifically, the free capacity “kWh free ” of the power storage system 25 of each second power purchase target consumer is replaced with “kWh free ⁇ (value distributed to each power consumer)”.
  • the power sales desired amount of each power generation company is set to a plurality while securing the profits of power consumers. It can be distributed to electricity consumers.
  • the power management apparatus 10 of the present embodiment when there are a plurality of total unit prices that satisfy the predetermined condition in the first power consumer, that is, when there is merit in purchasing power from a plurality of power generation companies, It can be determined that one electric power consumer purchases electric power from a power generation company corresponding to the lowest total unit price among a plurality of total unit prices that satisfy the above conditions. According to such a power management apparatus 10 of the present embodiment, it is possible to ensure the merits of power consumers.
  • the first power consumer when there are a plurality of total unit prices that are the lowest price among a plurality of total unit prices that satisfy the above conditions, the first power consumer has a plurality of totals that are the lowest prices. It can be determined that electric power is purchased from a power generation company corresponding to the total unit price with the lowest consignment charge unit price in the unit price. According to the power management apparatus 10 of the present embodiment as described above, it is possible to minimize the loss due to power transmission while securing the merits of power consumers.
  • the power management apparatus 10 of the present embodiment when there are a plurality of total unit prices that satisfy the predetermined condition in the first power consumer, that is, when there is merit in purchasing power from a plurality of power generation companies, It can be determined that one electric power consumer purchases from a plurality of power generation companies. By purchasing from multiple power generation companies, the total purchase amount can be increased. As a result, it becomes possible to purchase cheap electricity by fully utilizing the free space.
  • the power consumers A to C belong to the same power consumer group.
  • the standard unit prices of power consumers A to C are 10 yen / kWh, 12 yen / kWh, and 15 yen / kWh, respectively.
  • the initial values of the free capacity kWh free of the power storage systems 25 of the power consumers A to C are 50 kWh, 30 kWh, and 30 kWh, respectively.
  • the total unit price of the first power generation company is 9 yen / kWh, and the desired power sales amount is 60 kWh.
  • the total unit price of the second power generation company is 11 yen / kWh, and the desired power sales amount is 40 kWh.
  • the distribution unit 13 considers the merits of power consumers, and can first target a power generation company having a smaller total unit price to be processed, and distribute the power sales desired amount of the power generation company to a plurality of power consumers.
  • the desired power sales amount of the power generation company to be processed is referred to as the distribution target power amount.
  • the distribution part 13 can distribute equally the electric energy of distribution object to the some electric power consumer judged to purchase.
  • the first power generation company (total unit price is 9 yen / kWh, power sales desired amount is 60 kWh) is a processing target.
  • the total unit price of the first power generation company is lower than the standard unit price of the power consumers A to C, it is determined that all of the power consumers A to C purchase power from the first power generation company. .
  • the distribution unit 13 distributes the distribution target power amount “60 kWh” evenly to the power consumers A to C. Specifically, as shown in FIG. 16, power with a total unit price of 9 yen / kWh is distributed to power consumers A to C by 20 kWh.
  • the free capacities kWh free of the power storage systems 25 of the power consumers A to C are updated to 30 kWh, 10 kWh, and 10 kWh, respectively.
  • the second power generation company (total unit price is 11 yen / kWh, power sales desired amount is 40 kWh) will be processed.
  • the total unit price of the second power generation company is lower than the reference unit price of the power consumers B and C, it is determined that the power consumers B and C purchase power from the second power generation company.
  • the total unit price of the second power generation company is lower than the standard unit price of the power consumer A, it is determined that the power consumer A does not purchase power from the second power generation company.
  • the distribution unit 13 distributes the distribution target power amount “40 kWh” evenly to the power consumers B and C. In this case, 20 kWh is distributed to each of the power consumers B and C. However, the power consumers B and C both have a free capacity kWh free of 10 kWh. For this reason, as shown in FIG. 16, electric power with a total unit price of 11 yen / kWh is distributed to electric power consumers B and C by 10 kWh.
  • the power management apparatus 10 can notify the second power generation company to that effect.
  • the second power generation company can correct the sales price and the desired power sales amount based on the notification.
  • the distribution unit 13 can execute a process of distributing the desired power sales amount in order from the power consumer whose reference unit price is low, instead of the process of evenly distributing the desired power sales amount to the plurality of power consumers.
  • the distribution unit 13 considers the merits of power consumers, and first targets a power generation company with a smaller total unit price to be processed first, and distributes the power sales desired amount of the power generation company to a plurality of power consumers. it can.
  • the first power generation company (total unit price is 9 yen / kWh, power sales desired amount is 60 kWh) is a processing target.
  • the total unit price of the first power generation company is lower than the standard unit price of the power consumers A to C, it is determined that all of the power consumers A to C purchase power from the first power generation company. .
  • the distribution unit 13 distributes the desired power sales amount in order from the power consumer whose reference unit price is low, for the power amount “60 kWh” to be distributed. Specifically, as shown in FIG. 17, electric power with a total unit price of 9 yen / kWh is distributed to electric power consumer A at 50 kWh and distributed to electric power consumer B at 10 kWh.
  • the free capacities kWh free of the power storage systems 25 of the power consumers A to C are updated to 0 kWh, 20 kWh, and 30 kWh, respectively.
  • the second power generation company (total unit price is 11 yen / kWh, power sales desired amount is 40 kWh) will be processed.
  • the total unit price of the second power generation company is lower than the reference unit price of the power consumers B and C, it is determined that the power consumers B and C purchase power from the second power generation company.
  • the total unit price of the second power generation company is lower than the standard unit price of the power consumer A, it is determined that the power consumer A does not purchase power from the second power generation company.
  • the distribution unit 13 distributes the desired power sales amount in order from the power consumer whose reference unit price is low, with respect to the distribution target power amount “40 kWh”. Specifically, as shown in FIG. 17, the electric power with the total unit price of 11 yen / kWh is distributed to the electric power consumer B by 20 kWh and is distributed to the electric power consumer C by 20 kWh.
  • the desired power sales amount of the first power generation company and the second power generation company is distributed to the power consumers without remaining.
  • this distribution example it is possible to distribute to power consumers without leaving as much as possible the amount of power sales desired by multiple power generation companies. Moreover, since it is determined that a power consumer purchases power only when a predetermined condition is satisfied, the merit of the power consumer is ensured. As a result, it is possible to sufficiently secure power consumers who participate in a service that allows power consumers to consume (purchase) power in response to a power purchase request from a power generation company. It is also expected to increase the number of power generation companies participating in the service by increasing the sales contract rate.
  • the acquisition unit 11 may receive a plurality of patterns of power purchase requests from one power generation company.
  • a plurality of patterns of power purchase requests received from one power generation company may be different from each other in at least one of “power unit price”, “power sales desired amount”, and “power consumption time zone”.
  • the determination unit 12 is based on the total unit price calculated for each pair of one or more patterns of power purchase requests of each power generation company and each of the plurality of power consumer groups, The determination described above may be performed.
  • the determination means includes For each power consumer, determine whether the total unit price is lower than the reference unit price, The power management device that determines that the first power consumer purchases power from the power generation company when the total unit price is determined to be lower than the reference unit price of the first power consumer. 3.
  • the acquisition means acquires the power purchase request from each of a plurality of the power generation companies,
  • the said calculating means is a power management apparatus which calculates the said consignment charge unit price for every pair of each of the said several electric power generation company and each of the said some electric power consumer group. 4).
  • the determination means includes For each power consumer, determine whether the total unit price corresponding to each of the plurality of pairs is lower than the reference unit price, If it is determined that one or more of the total unit prices are lower than the reference unit price of the first power consumer, the first power consumer is one corresponding to each of the one or more total unit prices. Alternatively, a power management apparatus that determines to purchase power from a plurality of the power generation companies. 5). 4. In the power management apparatus according to 4, The determination means includes When it is determined that a plurality of the total unit prices are lower than the reference unit price of the first power consumer, the first power consumer corresponds to the cheapest total unit price among the plurality of the total unit prices.
  • a power management device that decides to purchase power from a power generation company. 6).
  • the determination means includes When there are a plurality of the total unit prices that are the lowest price among the plurality of the total unit prices, the first electric power consumer is the sum of the lowest unit prices of the consignment charges among the plurality of total unit prices that are the lowest prices.
  • a power management apparatus that determines to purchase power from the power generation company corresponding to the unit price. 7).
  • the calculation means is a power management device that determines a power transmission route for each pair based on a predicted value of a power transmission capacity and a power transmission amount of a power transmission line, and calculates the consignment charge unit price based on the power transmission route.
  • the power management apparatus that calculates the consignment unit price based on at least one of the number of substations included in the power transmission route and the transmission voltage of a power transmission line included in the power transmission route.
  • the calculation means is a power management apparatus that calculates a higher unit price for consignment charges as the number of substations included in the power transmission route increases. 10.
  • the consignment is higher than when the transmission route does not include a transmission line with a relatively low transmission voltage.
  • a power management device that calculates unit prices. 11.
  • the calculation means is a power management apparatus that calculates a higher consignment charge unit price as the power transmission route includes more sections of a transmission line having a relatively low transmission voltage.
  • the power purchase request further includes a desired power sales amount
  • a power management apparatus further comprising a distribution unit that distributes the desired power sales amount of the first power generation company to one or a plurality of power consumers determined to purchase power from the first power generation company.
  • the distribution means is a power management apparatus that distributes the desired power sales amount of the first power generation company based on a free capacity of a power storage system of the power consumer.
  • the distribution means is an electric power management apparatus that distributes the desired amount of electric power sales in order from the electric power consumer whose reference unit price is low. 15. In the power management apparatus according to 12 or 13, The distribution means is a power management apparatus that evenly distributes the desired amount of power sales to the plurality of power consumers. 16.
  • An acquisition process of acquiring a power purchase request including a power unit price from a power generation company For each pair of the power generation company and a plurality of power consumer groups that summarize a plurality of power consumers under the same distribution substation, a calculation step of calculating a consignment charge unit price of power, A determination step of determining whether to purchase power from the power generation company for each power consumer based on a total unit price of the power unit price and the consignment charge unit price and a standard unit price of each power consumer.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Power Engineering (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • General Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Marketing (AREA)
  • Human Resources & Organizations (AREA)
  • General Health & Medical Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Primary Health Care (AREA)
  • Public Health (AREA)
  • Tourism & Hospitality (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • General Engineering & Computer Science (AREA)
  • Development Economics (AREA)
  • Technology Law (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

本発明によれば、発電事業者から電力単価を含む電力購入依頼を取得する取得部(11)と、発電事業者と、同じ配変電所の配下にいる複数の電力需要家をまとめた複数の電力需要家グループ各々とのペア毎に、電力の託送料金単価を算出する算出部(14)と、電力単価と託送料金単価との合計単価、及び、電力需要家各々の基準単価に基づき、電力需要家毎に、発電事業者から電力を購入するか否かを判断する判断部(12)と、を有する電力管理装置(10)が提供される。

Description

電力管理装置、電力管理方法、及び、プログラム
 本発明は、電力管理装置、電力管理方法、及び、プログラムに関する。
 発電事業者により発電された電力を処理する技術が検討されている。まず、発電事業者は、電力の需給バランス調整のため、時間帯を指定して発電抑制指令を通知される場合がある。発電抑制指令に従い発電を抑制すると、発電システムの利用効率が低下する。そこで、抑制すべき分の電力を上記時間帯に電力需要家に消費(購入)してもらうことで、電力の需給バランスを保ちつつ、発電事業者の発電抑制を回避するサービスが検討されている。
 特許文献1には、発電事業者の余剰電力を電気事業者が購入し、その購入電力を送電網により発電事業者から電力需要者へ直接的に供給する余剰電力管理システムが開示されている。余剰電力管理システムは、電力需要者の電力需要を推定する推定手段と、推定された電力需要に相当する電力を発電事業者から送電網に送出させるための発電計画を決定する決定手段と、決定された発電計画を発電事業者に通知する通知手段とを有する。
特開2002-271982号公報
 発電事業者からの依頼に応じて電力を消費(購入)することによるメリットが小さいと、上記サービスに参加する電力需要家を十分に確保できない。かかる場合、発電事業者からの依頼分を電力需要家サイドで消費しきれないという問題がある。本発明は、当該問題を解決することを課題とする。
 本発明によれば、
 発電事業者から電力単価を含む電力購入依頼を取得する取得手段と、
 前記発電事業者と、同じ配変電所の配下にいる複数の電力需要家をまとめた複数の電力需要家グループ各々とのペア毎に、電力の託送料金単価を算出する算出手段と、
 前記電力単価と前記託送料金単価との合計単価、及び、前記電力需要家各々の基準単価に基づき、前記電力需要家毎に、前記発電事業者から電力を購入するか否かを判断する判断手段と、
を有する電力管理装置が提供される。
 また、本発明によれば、
 コンピュータが、
 発電事業者から電力単価を含む電力購入依頼を取得する取得工程と、
 前記発電事業者と、同じ配変電所の配下にいる複数の電力需要家をまとめた複数の電力需要家グループ各々とのペア毎に、電力の託送料金単価を算出する算出工程と、
 前記電力単価と前記託送料金単価との合計単価、及び、前記電力需要家各々の基準単価に基づき、前記電力需要家毎に、前記発電事業者から電力を購入するか否かを判断する判断工程と、
を実行する電力管理方法が提供される。
 また、本発明によれば、
 コンピュータを、
 発電事業者から電力単価を含む電力購入依頼を取得する取得手段、
 前記発電事業者と、同じ配変電所の配下にいる複数の電力需要家をまとめた複数の電力需要家グループ各々とのペア毎に、電力の託送料金単価を算出する算出手段、
 前記電力単価と前記託送料金単価との合計単価、及び、前記電力需要家各々の基準単価に基づき、前記電力需要家毎に、前記発電事業者から電力を購入するか否かを判断する判断手段、
として機能させるプログラムが提供される。
 本発明によれば、発電事業者からの電力購入依頼に応じて電力需要家に電力を消費(購入)してもらうサービスに参加する電力需要家を十分に確保することが可能となる。
 上述した目的、およびその他の目的、特徴および利点は、以下に述べる好適な実施の形態、およびそれに付随する以下の図面によってさらに明らかになる。
本実施形態の電力管理システムの機能ブロック図の一例である。 本実施形態の蓄電システムの機能ブロック図の一例である。 本実施形態の電力管理装置のハードウエア構成の一例を概念的に示す図である。 本実施形態の電力管理装置の機能ブロック図の一例である。 本実施形態の電力管理装置の機能ブロック図の一例である。 電力系統の構成を説明するための図である。 本実施形態の電力管理装置により処理される情報の一例を模式的に示す図である。 本実施形態の電力管理装置により処理される情報の一例を模式的に示す図である。 本実施形態の電力管理装置により処理される情報の一例を模式的に示す図である。 本実施形態の電力管理システムの機能ブロック図の一例である。 本実施形態の電力管理装置により処理される情報の一例を模式的に示す図である。 本実施形態の電力管理装置の処理の流れの一例を示すフローチャートである。 本実施形態の電力管理装置により処理される情報の一例を模式的に示す図である。 本実施形態の電力管理装置の処理の流れの一例を示すフローチャートである。 本実施形態の電力管理装置の作用効果を説明するための図である。 本実施形態の電力管理装置の作用効果を説明するための図である。 本実施形態の電力管理装置の作用効果を説明するための図である。
<第1の実施形態>
 まず、本実施形態の電力管理システムの全体像及び概要を説明する。図1に示すように、電力管理システムは、電力管理装置10と、複数の電力需要家システム20と、IPP(independent power producer)システム30とを有する。電力管理装置10は、例えばリソースアグリゲータに属する装置である。電力需要家システム20は、電力需要家に属するシステムである。IPPシステム30は、発電事業者に属するシステムである。電力管理装置10と、電力需要家システム20及びIPPシステム30とは、インターネット等の通信ネットワークを介して互いに繋がり、互いに情報の送受信を行えるようになっている。以下の説明では「発電事業者」を「IPP」という場合がある。
 IPPシステム30は、電力購入依頼を電力管理装置10に送信する。
 電力需要家システム20は、蓄電システム25を有する。蓄電システム25は、例えば図2に示すように、システムコントローラー21と、PCS(Power conditioning System)22と、BMS(Battery Management System)23と、バッテリー24とを有する。
 システムコントローラー21は、蓄電システム25の全体を制御する。PCS22は、直流電力/交流電力の変換を行う。バッテリー24は、電力を貯蔵する。バッテリー24は、例えば、エネルギーを貯めるセルスタックや、セル温度及びセル電圧等を監視するバッテリモニタ等を含んで構成される。BMS23は、バッテリー24を制御する。
 図1に戻り、電力管理装置10は、発電事業者(IPPシステム30)から電力単価を含む電力購入依頼を取得すると、発電事業者と、複数の電力需要家グループ各々とのペア毎に、電力の託送料金単価を算出する。そして、電力管理装置10は、上記電力単価と上記託送料金単価とを考慮して、電力需要家毎に、当該発電事業者から電力を購入するか否かを判断する。
 発電事業者から提案された電力単価のみならず、発電事業者から電力需要家に電力を託送する際の託送料金単価をも考慮する本実施形態の電力管理装置10によれば、発電事業者からの電力購入にメリットがあるか否かを精度よく判断できる。そして、真にメリットがある場合のみ、電力需要家に電力を購入させると判断できる。このため、当該サービスに参加することの電力需要家のメリットが大きくなる。結果、当該サービスに参加する電力需要家を十分に確保することが可能となる。
 次に、電力管理装置10を詳細に説明する。まず、本実施形態の電力管理装置10のハードウエア構成の一例について説明する。本実施形態の電力管理装置10が備える各機能部は、任意のコンピュータのCPU(Central Processing Unit)、メモリ、メモリにロードされるプログラム、そのプログラムを格納するハードディスク等の記憶ユニット(あらかじめ装置を出荷する段階から格納されているプログラムのほか、CD(Compact Disc)等の記憶媒体やインターネット上のサーバ等からダウンロードされたプログラムをも格納できる)、通信ネットワーク接続用インターフェイスを中心にハードウエアとソフトウエアの任意の組合せによって実現される。そして、その実現方法、装置にはいろいろな変形例があることは、当業者には理解されるところである。
 図3は、本実施形態の電力管理装置10のハードウエア構成を例示するブロック図である。図3に示すように、電力管理装置10は、プロセッサ1A、メモリ2A、入出力インターフェイス3A、周辺回路4A、バス5Aを有する。周辺回路4Aには、様々なモジュールが含まれる。なお、周辺回路4Aを有さなくてもよい。
 なお、電力管理装置10は、物理的及び/又は論理的に一体となった1つの装置により実現されてもよいし、物理的及び/又は論理的に互いに分かれた複数の装置により実現されてもよい。後者の場合、複数の装置各々が、図3に示すようなハードウエア構成を備えてもよい。そして、複数の装置が協働して、電力管理装置10の機能を実現してもよい。
 バス5Aは、プロセッサ1A、メモリ2A、周辺回路4A及び入出力インターフェイス3Aが相互にデータを送受信するためのデータ伝送路である。プロセッサ1Aは、例えばCPU(Central Processing Unit) やGPU(Graphics Processing Unit)などの演算処理装置である。メモリ2Aは、例えばRAM(Random Access Memory)やROM(Read Only Memory)などのメモリである。入出力インターフェイス3Aは、入力装置(例:キーボード、マウス、マイク等)、外部装置、外部サーバ、外部センサ等から情報を取得するためのインターフェイスや、出力装置(例:ディスプレイ、スピーカ、プリンター、メーラ等)、外部装置、外部サーバ等に情報を出力するためのインターフェイスなどを含む。プロセッサ1Aは、各モジュールに指令を出し、それらの演算結果をもとに演算を行うことができる。
 次に、本実施形態の電力管理装置10の機能について詳細に説明する。図4に、本実施形態の電力管理装置10の機能ブロック図の一例を示す。図示するように、電力管理装置10は、取得部11と判断部12と算出部14とを有する。
 図5に、本実施形態の電力管理装置10の機能ブロック図の他の一例を示す。図示する様に、電力管理装置10は、取得部11と判断部12と算出部14に加えて、分配部13を有してもよい。
 取得部11は、発電事業者から(例:図1のIPPシステム30から)、電力単価を含む電力購入依頼を取得する。電力購入依頼に含まれる電力単価は、発電事業者からの電力購入依頼に応じて電力を購入する場合の電力の単価である。単位は、例えば「円/kWh」となる。電力単価は、各発電事業者が任意に定めることができる。
 電力購入依頼は、さらに電力販売希望量を含んでもよい。電力販売希望量は、電力需要家に購入してもらいたい電力量である。単位は、例えば「kWh」となる。
 電力販売希望量は、各発電事業者が任意に定めることができる。発電事業者は、例えば、余剰電力量を電力販売希望量とすることができる。余剰電力量は、例えば送配電事業者から発電を抑制された分の電力量である。
 送配電事業者は、例えば、発電を抑制する時間帯を定め、その時間帯内における出力を「0」にする発電抑制を発電事業者に通知したり、その時間帯内における出力の上限を定めた発電抑制を発電事業者に通知したりする。発電事業者は、当該発電抑制の内容と、発電を抑制された時間帯における発電システムの発電を抑制しなかった場合の発電予測とに基づき余剰電力量を算出し、当該余剰電力量を電力販売希望量としてもよい。
 電力購入依頼は、さらに電力消費時間帯を含んでもよい。電力消費時間帯は、発電事業者からの依頼に応じて電力を購入する場合に、電力系統から受電して電力を消費すべき時間帯である。電力消費時間帯は、各発電事業者が任意に定めることができる。例えば、電力消費時間帯は、送配電事業者から発電を抑制された時間帯であってもよい。
 算出部14は、発電事業者と、複数の電力需要家グループ各々とのペア毎に、電力の託送料金単価を算出する。託送料金単価は、発電事業者から各電力需要家グループに電力を託送する際の単価である。単位は、例えば「円/kWh」となる。電力需要家グループは、同じ配変電所の配下にいる複数の電力需要家をまとめたものである。
 例えば、算出部14は、上記ペア毎に送電ルートを決定し、送電ルートに基づき託送料金単価を算出してもよい。これらの処理を行うため、算出部14は、「電力系統に関する情報」、「発電事業者の電力系統内の位置に関する情報」及び「各電力需要家グループの電力系統内の位置に関する情報」を予め保持してもよい。
 「電力系統に関する情報」、「発電事業者の電力系統内の位置に関する情報」及び「電力需要家グループの電力系統内の位置に関する情報」は、送電ルートの決定及び託送料金単価の算出に必要な情報を含む。
 電力系統は、発電設備、送電設備、変電設備、配電設備、需要家設備等の多数の設備を含み、これらが互いに繋がっている。図6に、電力系統の一部を示す。図では、配変電所101乃至104が、送電線301乃至304を介して互いに繋がっている。また、配変電所101乃至104各々に、送電線305乃至307を介して電力需要家グループ201乃至203の設備や、IPP401乃至403の設備が繋がっている。
 電力需要家グループ201乃至203の設備は、蓄電システム25を含む。IPP401乃至403の設備は、発電システムを含む。発電システムは、自然エネルギー(例:太陽光、地熱、風力等)を利用して発電するシステムであってもよい。
 電力系統に関する情報は、配変電所間の繋がりを示す情報を含む。また、電力系統に関する情報は、送電線の属性、例えば送電容量や送電電圧等を含む(図7参照)。送電線は、任意の手段で複数の区間に分けられ、区間毎に送電容量や送電電圧等が管理される。例えば、2つの配変電所間の送電線を1つの区間としてもよい(図6の例の場合、送電線301乃至304各々を1つの区間として管理)。
 発電事業者の電力系統内の位置に関する情報は、各発電事業者の発電システムがどの配変電所の配下に位置するかを示す情報を含む。電力需要家グループの電力系統内の位置に関する情報は、各電力需要家グループの蓄電システム25がどの配変電所の配下に位置するかを示す情報を含む。
 算出部14は、上記情報に基づき、発電事業者と、複数の電力需要家グループ各々とのペア毎に送電ルートを決定し、託送料金単価を算出することができる。
 例えば、算出部14は、上記ペア毎に、託送料金単価が最も安くなる送電ルートを決定してもよい。託送料金単価は、例えば以下のような基準の1つ又は複数に基づき算出される。
・送電ルートに含まれる配変電所が多いほど高い。すなわち、送電ルートに含まれる配変電所の数が少ないほど安い。
・送電ルートに含まれる送電線の送電電圧が相対的に低いほど高い。すなわち、送電ルートに含まれる送電線の送電電圧が相対的に高いほど低い。
・送電ルートに、送電電圧が相対的に低い送電線の区間が多く含まれるほど高い。すなわち、送電ルートに、送電電圧が相対的に高い送電線の区間が多く含まれるほど安い。
 なお、算出部14は、所定の条件を満たしつつ、託送料金単価が最も安くなる送電ルートを決定してもよい。所定の条件は、「各送電線で送電する電力量が各送電線の送電容量を超えない」等の安全面の条件等が例示されるが、これらに限定されない。例えば、算出部14は、予め保持している各送電線の送電容量(図7参照)と、電力消費時間帯における各送電線の送電量の予測値に基づき、各送電線を送電ルートに含めることができるか否かを判断してもよい。例えば、「送電容量>送電量の予測値+α」を満たす場合、その送電線を送電ルートに含めることができると判断してもよい。αは、0以上の値であり、発電事業者からの出力や各電力需要家グループの規模(蓄電システム25の総出力等)等に応じて定めることができる。そして、算出部14は、送電ルートに含めることができると判断した送電線のみを用いて、上記ペア毎に、託送料金単価が最も安くなる送電ルートを決定してもよい。
 図4及び図5に戻り、判断部12は、電力単価と託送料金単価との合計単価、及び、電力需要家各々の基準単価に基づき、電力需要家毎に、発電事業者から電力を購入するか否かを判断する。
 具体的には、判断部12は、電力需要家毎に、「合計単価が基準単価より安い」、又は、「合計単価が基準単価より所定レベル以上安い(例:所定値以上安い、所定割合以上安い)」の条件を満たすか判断する。そして、判断部12は、第1の電力需要家において上記条件を満たすと判断した場合、第1の電力需要家は発電事業者から電力を購入すると判断する。
 電力管理装置10は、予め電力需要家毎に登録された基準単価を保持する(図8参照)。基準単価は、各電力需要家が任意に定めることができる。例えば、電力需要家は、普段購入している電力の単価を基準単価としてもよいし、普段購入している電力の単価から所定値を引いた単価を基準単価としてもよい。
 託送料金単価は電力需要家グループ毎に算出されるが、基準単価は電力需要家毎に定められる。そして、発電事業者から電力を購入するか否かの判断は、電力需要家毎に行われる。
 図5に示す分配部13は、発電事業者から電力を購入すると判断された1又は複数の電力需要家に、当該発電事業者の電力販売希望量を分配する。各電力需要家は、分配された分を発電事業者から購入することとなる。
 まず、分配部13は、電力消費時間帯の開始タイミングにおける各電力需要家の蓄電システム25の空き容量を予測する。例えば、各蓄電システム25の容量や定格出力、電力消費時間帯を含む当日(電力消費時間帯を含む日。以下同様。)の各蓄電システム25の充放電スケジュール(例:夜間充電、昼間放電)、各電力需要家の当日の電力消費予測、電力需要家が発電装置(例:自然エネルギーを利用して発電する発電装置)を有している場合は当該発電装置の発電予測等に基づき、上記開始タイミングにおける各蓄電システム25の空き容量を予測してもよい。当該予測は、従来技術に準じて実現できる。算出された値は、図9に示すように管理される。
 そして、分配部13は、発電事業者から電力を購入すると判断された1又は複数の電力需要家の蓄電システム25の上記開始タイミングにおける空き容量(以下、「第1の空き容量」という場合がある)に基づき、発電事業者の電力販売希望量を分配する。
 例えば、発電事業者から電力を購入すると判断された電力需要家が1人の場合、その電力需要家に、第1の充電可能量及び電力販売希望量の内の小さい方を分配してもよい。第1の充電可能量は、「その電力需要家の蓄電システム25の第1の空き容量」、及び、「その電力需要家の蓄電システム25の定格出力と電力消費時間帯の時間幅の積」の内の小さい方である。
 その他、発電事業者から電力を購入すると判断された電力需要家が複数いる場合、複数の電力需要家に電力販売希望量を均等に分配してもよい。発電事業者から電力を購入すると判断された電力需要家の数をM(M≧2)、電力販売希望量をDとすると、各電力需要家の分配量はD/Mとなる。なお、第1の充電可能量がD/M未満の電力需要家がいる場合、その差分(充電しきれない分)をその他の電力需要家に分配してもよい。
 その他、発電事業者から電力を購入すると判断された電力需要家が複数いる場合、基準単価が安い電力需要家から順に電力販売希望量を分配してもよい。なお、各電力需要家には、第1の充電可能量及び電力販売希望量の残分(まだ分配されていない分)の内の小さい方を分配してもよい。
 その他、発電事業者から電力を購入すると判断された電力需要家が複数いる場合、各電力需要家が提供する消費電力量(第1の充電可能量)の比率に応じて、電力販売希望量を按分してもよい。
 以上説明した本実施形態の電力管理装置10によれば、電力単価のみならず、託送料金単価をも考慮して、発電事業者からの電力購入にメリットがあるか否かを電力需要家毎に判断することができる。そして、その結果に基づき、各電力需要家がその発電事業者から電力を購入するか否かを判断することができる。
 このような本実施形態の電力管理装置10によれば、発電事業者からの依頼に応じた電力購入にメリットがあるか否かを精度よく判断できる。そして、真にメリットがある場合のみ、電力需要家に電力を購入させることができる。このため、発電事業者からの電力購入依頼に応じて電力需要家に電力を消費させるサービスに参加することの電力需要家のメリットが大きくなる。結果、当該サービスに参加する電力需要家を十分に確保することが可能となる。
 また、同じ配変電所の配下にいる複数の電力需要家をまとめて電力需要家グループを生成し、電力需要家グループ毎に託送料金単価を算出する本実施形態の電力管理装置10によれば、電力需要家毎に託送料金単価を算出する場合に比べて、処理負担を大幅に軽減できる。
 また、電力需要家毎に各々の事情を反映して定めた基準単価に基づき、発電事業者からの電力購入にメリットがあるか否かを判断する本実施形態の電力管理装置10によれば、電力需要家毎の事情を反映して、上記メリットがあるか否かを判断できる。このため、電力需要家毎に精度よくメリットの有無を判断できる。
 また、電力需要家に都度確認することなく自動的に電力管理装置10が電力購入の判断をすることができるため、余剰電力の買い取りがどの程度(電力量)できるのかの見積もりの精度が高くなる。
 ここで、変形例を説明する。電力需要家システム20は、蓄電システム25に代えて/又は加えて、その他の電力消費装置(例:エネルギー貯蔵システム、電気機器等)を有してもよい。この場合、上述した「第1の充電可能量」は「上積み消費可能量」に読み替えることができる。上積み消費可能量は、電力消費時間帯において電力需要家側が通常の電力消費に上乗せして電力を消費する電力量であり、電力消費装置の消費電力と電力消費時間の積で表される電力量である。例えば、冷凍機器、自動販売機、ヒートポンプ式給湯器などではある時間ごとに電気を使い冷却したり加熱したりするが、そのタイミングを電力消費時間帯に合わせることで通常の電力消費に上乗せして電力を消費することができる。当該変形例においても、同様の作用効果が実現される。なお、当該変形例は、以下の全ての実施形態に適用可能である。
<第2の実施形態>
 図10に示すように、本実施形態の電力管理システムは、電力管理装置10と、複数の電力需要家システム20と、複数のIPPシステム30とを有する。本実施形態の電力管理装置10は、複数の発電事業者(複数のIPPシステム30)から電力購入依頼を取得した場合に、電力需要家毎に、各発電事業者から電力を購入するか否かを判断する手段を有する。以下、詳細に説明する。
 電力需要家システム20及びIPPシステム30の構成は第1の実施形態と同様である。また、電力管理装置10のハードウエア構成の一例は第1の実施形態と同様である。
 次に、本実施形態の電力管理装置10の機能について詳細に説明する。本実施形態の電力管理装置10の機能ブロック図の一例は、第1の実施形態と同様、図4又は図5で示される。
 取得部11は、複数の発電事業者各々から(例:図10のIPPシステム30各々から)電力単価を含む電力購入依頼を取得する。第1の実施形態同様、電力購入依頼は、「電力単価」、「電力販売希望量」及び「電力消費時間帯」等を含んでもよい。
 算出部14は、複数の発電事業者各々と、複数の電力需要家グループ各々とのペア毎に、託送料金単価を算出する。算出部14は、上記ペア毎に送電ルートを決定し、託送料金単価を算出することができる。送電ルートの決定処理、及び、託送料金単価の算出処理は、第1の実施形態と同様である。
 取得部11及び算出部14により、図11に示すような情報が得られる。図11に示す情報は、複数の発電事業者各々と、複数の電力需要家グループ各々とのペア毎に、電力単価と託送料金単価との合計を示した情報である。An(nは発電事業者の通番)は、各発電事業者の電力単価を示す。Dnm(nは発電事業者の通番、mは電力需要家グループの通番)は、発電事業者と電力需要家グループの各ペアに対応した託送料金単価である。AnとDnmの和は、第1の実施形態で説明した合計単価である。
 判断部12は、電力単価と託送料金単価との合計単価、及び、電力需要家各々の基準単価に基づき、電力需要家毎に、複数の発電事業者各々から電力を購入するか否かを判断する。分配部13は、第1の発電事業者から電力を購入すると判断された1又は複数の電力需要家に、第1の発電事業者の電力販売希望量を分配する。
 ここで、図12のフローチャートを用いて、図11に示すような情報が得られた後に、判断部12と分配部13により実現される処理の一例を説明する。
 S201では、判断部12は、複数の発電事業者各々と複数の電力需要家グループ各々とのペア毎に算出された合計単価(図11参照)に基づき、未処理のペアの中から1つのペアを処理対象として決定する。例えば、未処理のペアの中の最も合計単価の安いペアを処理対象として決定する。なお、その他の基準で処理対象のペアを決定してもよい。
 以下の図12のフローチャートの説明においては、処理対象のペアに含まれる発電事業者を、処理対象の発電事業者という。また、処理対象のペアに含まれる電力需要家グループを、処理対象の電力需要家グループという。また、処理対象の電力需要家グループに含まれる電力需要家を、処理対象の電力需要家という。
 S202では、判断部12は、処理対象の発電事業者の売電希望残量Xが0か否かを判断する。売電希望残量Xは、処理対象の発電事業者の電力販売希望量のうち、まだ電力需要家に分配されていない分である。売電希望残量Xの初期値は例えば電力販売希望量である。以下で説明するが、当該値は処理の中で更新される。
 Xが0である場合(S202のYes)、すなわち処理対象の発電事業者の電力販売希望量のすべてが電力需要家に分配済みである場合、S207に進む。
 S207では、判断部12は、未処理のペアが残っているか判断する。未処理のペアが残っている場合(S207のYes)、S201に戻り、判断部12は、他のペアを処理対象とする。そして、同様の処理を繰り返す。未処理のペアが残っていない場合(S207のNo)、処理が終了する。
 一方、Xが0でない場合(S202のNo)、すなわち処理対象の発電事業者の電力販売希望量のうち、電力需要家に分配されていない分が残っている場合、S203に進む。S203では、判断部12は、処理対象の電力需要家各々において、処理対象の発電事業者から電力を購入するか否かを判断する。
 すなわち、判断部12は、処理対象の電力需要家毎に、「合計単価が基準単価より安い」、又は、「合計単価が基準単価より所定レベル以上安い」の条件を満たすか判断する。なお、ここでの判断に用いられる合計単価は、「処理対象の発電事業者の電力単価」と、「処理対象の発電事業者と処理対象の電力需要家グループとのペアに対応して算出された託送料金単価」との合計である。
 そして、判断部12は、上記条件を満たす1つ又は複数の電力需要家は、処理対象の発電事業者から電力を購入すると判断する。以下、上記条件を満たす1つ又は複数の電力需要家を、第1の電力購入対象需要家という。
 また、S203では、分配部13は、第1の電力購入対象需要家各々の蓄電システム25の空き容量kWhfreeの合計kWhtotalを算出する。電力需要家各々の蓄電システム25の空き容量kWhfreeの初期値は、例えば電力消費時間帯の開始タイミングにおける各蓄電システム25の空き容量の予測値である。以下で説明するが、当該値は処理の中で更新される。
 空き容量kWhfreeの合計kWhtotalが0である場合(S204のYes)、すなわち第1の電力購入対象需要家の蓄電システム25に、処理対象の発電事業者の電力を充電する余力がない場合、S207に進む。
 S207では、判断部12は、未処理のペアが残っているか判断する。未処理のペアが残っている場合(S207のYes)、S201に戻り、判断部12は、他のペアを処理対象とする。そして、同様の処理を繰り返す。未処理のペアが残っていない場合(S207のNo)、処理が終了する。
 一方、空き容量kWhfreeの合計kWhtotalが0でない場合(S204のYes)、すなわち第1の電力購入対象需要家の蓄電システム25に、処理対象の発電事業者の電力を充電する余力がある場合、S205に進む。
 S205では、分配部13は、処理対象の電力需要家グループに分配する電力量kWhDRを決定する。例えば、合計kWhtotal及び売電希望残量Xの内の小さい方を、処理対象の電力需要家グループに分配する電力量kWhDRとする。その他、空き容量kWhfreeが0でない第1の電力購入対象需要家の蓄電システム25各々に対応して、定格出力と電力消費時間帯の時間幅の積を算出し、その積の合計を算出してもよい。そして、合計kWhtotal、算出した積の合計、及び、売電希望残量Xの内の最も小さい値を、処理対象の電力需要家グループに分配する電力量kWhDRとしてもよい。
 また、S205では、分配部13は、処理対象の電力需要家グループに分配する電力量kWhDRを、第1の電力購入対象需要家に分配する。
 例えば、分配部13は、第1の電力購入対象需要家各々の蓄電システム25の空き容量kWhfreeに基づき、発電事業者の電力販売希望量を分配する。
 例えば、空き容量kWhfreeが0でない第1の電力購入対象需要家が1人の場合、その第1の電力購入対象需要家に、第2の充電可能量、及び、電力量kWhDRの小さい方を分配してもよい。第2の充電可能量は、その第1の電力購入対象需要家の蓄電システム25の空き容量kWhfree、及び、その第1の電力購入対象需要家の蓄電システム25の定格出力と電力消費時間帯の時間幅の積の内の小さい方である。
 その他、空き容量kWhfreeが0でない第1の電力購入対象需要家が複数いる場合、その複数の第1の電力購入対象需要家に電力量kWhDRを均等に分配してもよい。空き容量kWhfreeが0でない第1の電力購入対象需要家の数をM(M≧2)とすると、第1の電力購入対象需要家各々の分配量はkWhDR/Mとなる。なお、第2の充電可能量が電力量kWhDR/M未満の第1の電力購入対象需要家がいる場合、その差分(充電しきれない分)をその他の第1の電力購入対象需要家に分配してもよい。
 その他、空き容量kWhfreeが0でない第1の電力購入対象需要家が複数いる場合、基準単価が安い第1の電力購入対象需要家から順に電力量kWhDRを分配してもよい。なお、第1の電力購入対象需要家各々には、第2の充電可能量及び電力量kWhDRの残分(まだ分配されていない分)の内の小さい方を分配してもよい。
 その他、空き容量kWhfreeが0でない第1の電力購入対象需要家が複数いる場合、空き容量kWhfreeが0でない第1の電力購入対象需要家各々が提供する消費電力量(第2の充電可能量)の比率に応じて、電力販売希望量を按分してもよい。
 S206では、結果に基づき、処理対象の発電事業者の売電希望残量X、及び、第1の電力購入対象需要家各々の蓄電システム25の空き容量kWhfreeを更新する。具体的には、処理対象の発電事業者の売電希望残量「X」を、「X-kWhDR」に置き代える。また、第1の電力購入対象需要家各々の蓄電システム25の空き容量「kWhfree」を、「kWhfree-(各電力需要家に分配された値)」に置き代える。
 その後、S207に進む。S207では、判断部12は、未処理のペアが残っているか判断する。未処理のペアが残っている場合(S207のYes)、S201に戻り、判断部12は、他のペアを処理対象とする。そして、同様の処理を繰り返す。未処理のペアが残っていない場合(S207のNo)、処理が終了する。
 次に、図11に示すような情報が得られた後に、判断部12と分配部13により実現される処理の他の一例を説明する。
 当該例では、判断部12は、電力需要家毎に、複数の上記ペア各々に対応した合計単価が基準単価より安いか判断することができる。そして、判断部12は、1つまたは複数の合計単価が第1の電力需要家の基準単価より安いと判断した場合、第1の電力需要家は1つまたは複数の合計単価各々に対応する1つ又は複数の発電事業者から電力を購入すると判断することができる。
 具体的には、判断部12は、電力需要家毎に、「合計単価が基準単価より安い」、又は、「合計単価が基準単価より所定レベル以上安い」の条件を満たす合計単価があるか判断してもよい。例えば、図11の電力需要家グループD0001に含まれる第1の電力需要家を処理対象とする場合、当該電力需要家グループと、複数の発電事業者各々とのペア毎に算出された合計単価と、第1の電力需要家の基準単価との比較により、上記条件を満たす合計単価を抽出できる。
 そして、判断部12は、第1の電力需要家において条件を満たす合計単価があると判断した場合、第1の電力需要家は上記条件を満たす合計単価に対応する発電事業者から電力を購入すると判断する。
 なお、判断部12は、第1の電力需要家において上記条件を満たす合計単価が複数あると判断した場合、第1の電力需要家は上記条件を満たす複数の合計単価の中の最も安い合計単価に対応する発電事業者から電力を購入すると判断してもよい。
 さらに、判断部12は、上記条件を満たす複数の合計単価の中に最安値となる合計単価が複数ある場合、第1の電力需要家は最安値となる複数の合計単価の中の託送料金単価が最も安い合計単価に対応する発電事業者から電力を購入すると判断してもよい。
 その他、判断部12は、第1の電力需要家において上記条件を満たす合計単価が複数あると判断した場合、第1の電力需要家は上記条件を満たす複数の合計単価各々に対応した複数の発電事業者から電力を購入すると判断してもよい。
 判断部12による当該処理により、図13に示すような情報が得られる。図13に示す情報は、発電事業者各々に、各々から電力を購入すると判断された電力需要家を対応付けた情報である。なお、ある電力需要家が複数の発電事業者に対応付けられてもよい。
 分配部13は、各発電事業者の電力販売希望量を、図13に示すような情報において各発電事業者に対応付けられている電力需要家に分配する。図14のフローチャートを用いて、分配部13による処理の流れの一例を説明する。
 まず、未処理の発電事業者がある場合(S101のYes)、分配部13は、処理対象の発電事業者を決定する(S102)。例えば、未処理の発電事業者の中の電力単価が最も安い発電事業者を、処理対象としてもよい。その他、未処理の発電事業者の中の電力単価が最も高い発電事業者を、処理対象としてもよい。その他、未処理の発電事業者の中の電力販売希望量が最も大きい発電事業者を、処理対象としてもよい。その他、未処理の発電事業者の中の電力販売希望量が最も小さい発電事業者を、処理対象としてもよい。なお、その他の基準で処理対象の発電事業者を決定してもよい。以下の図14のフローチャートの説明においては、図13に示すような情報において処理対象の発電事業者に対応付けられている電力需要家を、第2の電力購入対象需要家という。
 S103では、処理対象の発電事業者の電力販売希望量を、第2の電力購入対象需要家に分配する。例えば、分配部13は、第2の電力購入対象需要家各々の蓄電システム25の空き容量kWhfreeに基づき、処理対象の発電事業者の電力販売希望量を分配する。電力需要家各々の蓄電システム25の空き容量kWhfreeの初期値は、例えば、電力消費時間帯の開始タイミングにおける各蓄電システム25の空き容量の予測値である。以下で説明するが、当該値は処理の中で更新される。
 例えば、空き容量kWhfreeが0でない第2の電力購入対象需要家が1人の場合、その第2の電力購入対象需要家に、第3の充電可能量、及び、「処理対象の発電事業者の電力販売希望量」の小さい方を分配してもよい。第3の充電可能量は、その第2の電力購入対象需要家の蓄電システム25の空き容量kWhfree、及び、その第2の電力購入対象需要家の蓄電システム25の定格出力と電力消費時間帯の時間幅の積の内の小さい方である。
 その他、空き容量kWhfreeが0でない第2の電力購入対象需要家が複数いる場合、その複数の第2の電力購入対象需要家に、処理対象の発電事業者の電力販売希望量を均等に分配してもよい。空き容量kWhfreeが0でない第2の電力購入対象需要家の数をM(M≧2)、処理対象の発電事業者の電力販売希望量をDとすると、第2の電力購入対象需要家各々の分配量はD/Mとなる。なお、第3の充電可能量がD/M未満の第2の電力購入対象需要家がいる場合、その差分(充電しきれない分)をその他の第2の電力購入対象需要家に分配してもよい。
 その他、空き容量kWhfreeが0でない第2の電力購入対象需要家が複数いる場合、基準単価が安い第2の電力購入対象需要家から順に処理対象の発電事業者の電力販売希望量を分配してもよい。なお、第2の電力購入対象需要家各々には、第3の充電可能量及び処理対象の発電事業者の電力販売希望量の残分(まだ分配されていない分)の内の小さい方を分配してもよい。
 その他、空き容量kWhfreeが0でない第2の電力購入対象需要家が複数いる場合、空き容量kWhfreeが0でない第2の電力購入対象需要家各々が提供する消費電力量(第3の充電可能量)の比率に応じて、電力販売希望量を按分してもよい。
 S104では、第2の電力購入対象需要家の空き容量kWhfreeを更新する。具体的には、第2の電力購入対象需要家各々の蓄電システム25の空き容量「kWhfree」を、「kWhfree-(各電力需要家に分配された値)」に置き代える。
 その後、S101に戻り、同様の処理を繰り返す。
 以上説明した本実施形態の電力管理装置10によれば、第1の実施形態と同様の作用効果を実現できる。
 また、本実施形態の電力管理装置10によれば、複数の発電事業者から電力購入依頼があった場合、各発電事業者の電力販売希望量を、電力需要家の利益を確保しつつ、複数の電力需要家に分配できる。
 また、本実施形態の電力管理装置10によれば、第1の電力需要家において所定の条件を満たす合計単価が複数ある場合、すなわち複数の発電事業者からの電力購入にメリットがある場合、第1の電力需要家は上記条件を満たす複数の合計単価の中の最も安い合計単価に対応する発電事業者から電力を購入すると判断することができる。このような本実施形態の電力管理装置10によれば、電力需要家のメリットを確保できる。
 また、本実施形態の電力管理装置10によれば、上記条件を満たす複数の合計単価の中に最安値となる合計単価が複数ある場合、第1の電力需要家は最安値となる複数の合計単価の中の託送料金単価が最も安い合計単価に対応する発電事業者から電力を購入すると判断することができる。このような本実施形態の電力管理装置10によれば、電力需要家のメリットを確保しつつ、送電によるロスを最小限に抑えることができる。
 また、本実施形態の電力管理装置10によれば、第1の電力需要家において所定の条件を満たす合計単価が複数ある場合、すなわち複数の発電事業者からの電力購入にメリットがある場合、第1の電力需要家は複数の発電事業者から購入すると判断することができる。複数の発電事業者から購入することで、購入量の総量を大きくすることができる。結果、空き容量をフルに活用し、割安な電力を購入することが可能となる。
 ここで、分配部13による分配の仕方の違いに応じた作用効果を、図15乃至図17を用いて説明する。
 電力需要家A乃至Cは、同じ電力需要家グループに属するものとする。電力需要家A乃至Cの基準単価は、各々、10円/kWh、12円/kWh、15円/kWhである。また、電力需要家A乃至Cの蓄電システム25の空き容量kWhfreeの初期値は、各々、50kWh、30kWh、30kwhである。
 そして、図15に示すように、2つの発電事業者から電力購入依頼があったとする。第1の発電事業者の合計単価は9円/kWhであり、電力販売希望量は60kWhとする。また、第2の発電事業者の合計単価は11円/kWhであり、電力販売希望量は40kWhとする。
 なお、ここでは説明を簡単にするため、電力需要家の数及び電力販売希望量等を小さいスケールで示している。
 例えば、分配部13は、電力需要家のメリットを考え、合計単価がより小さい発電事業者を先に処理対象とし、その発電事業者の電力販売希望量を複数の電力需要家に分配できる。以下、処理対象の発電事業者の電力販売希望量を、分配対象の電力量という。そして、分配部13は、分配対象の電力量を、購入すると判断される複数の電力需要家に均等に分配することができる。
 図15の例の場合、まず、第1の発電事業者(合計単価は9円/kWh、電力販売希望量は60kWh)が処理対象となる。ここでは、第1の発電事業者の合計単価は電力需要家A乃至Cいずれの基準単価よりも安いため、電力需要家A乃至Cいずれも第1の発電事業者から電力を購入すると判断される。
 そして、分配部13は、分配対象の電力量「60kWh」を、電力需要家A乃至Cに均等に分配する。具体的には、図16に示すように、合計単価が9円/kWhの電力は、電力需要家A乃至Cに20kWhずつ分配される。
 結果、電力需要家A乃至Cの蓄電システム25の空き容量kWhfreeは、各々、30kWh、10kWh、10kwhに更新される。
 次に、第2の発電事業者(合計単価は11円/kWh、電力販売希望量は40kWh)が処理対象となる。ここでは、第2の発電事業者の合計単価は電力需要家B及びCの基準単価よりも安いため、電力需要家B及びCは第2の発電事業者から電力を購入すると判断される。一方、第2の発電事業者の合計単価は電力需要家Aの基準単価よりも安いため、電力需要家Aは第2の発電事業者から電力を購入しないと判断される。
 そして、分配部13は、分配対象の電力量「40kWh」を、電力需要家B及びCに均等に分配する。この場合、電力需要家B及びC各々に20kWhが分配されることになる。しかし、電力需要家B及びCいずれも空き容量kWhfreeが10kWhである。このため、図16に示すように、合計単価が11円/kWhの電力は、電力需要家B及びCに10kWhずつ分配される。
 結果、第2の発電事業者の電力販売希望量のうちの20kWhは、分配されずに残ることとなる。この場合、電力管理装置10は、その旨を第2の発電事業者に通知できる。第2の発電事業者は、通知に基づき、販売価格や電力販売希望量を修正できる。
 当該分配例の場合、複数の電力需要家に安い電力を公平に分配できる。すなわち、公平性を確保できる。結果、発電事業者からの電力購入依頼に応じて電力需要家に電力を消費(購入)してもらうサービスに参加する電力需要家を十分に確保することが可能となる。
 なお、分配部13は、複数の電力需要家に電力販売希望量を均等に分配する処理に代えて、基準単価が安い電力需要家から順に電力販売希望量を分配する処理を実行できる。
 当該処理においても、分配部13は、電力需要家のメリットを考え、合計単価がより小さい発電事業者を先に処理対象とし、その発電事業者の電力販売希望量を複数の電力需要家に分配できる。
 図15の例の場合、まず、第1の発電事業者(合計単価は9円/kWh、電力販売希望量は60kWh)が処理対象となる。ここでは、第1の発電事業者の合計単価は電力需要家A乃至Cいずれの基準単価よりも安いため、電力需要家A乃至Cいずれも第1の発電事業者から電力を購入すると判断される。
 そして、分配部13は、分配対象の電力量「60kWh」を、基準単価が安い電力需要家から順に電力販売希望量を分配する。具体的には、図17に示すように、合計単価が9円/kWhの電力は、電力需要家Aに50kWh分配され、電力需要家Bに10kWh分配される。
 結果、電力需要家A乃至Cの蓄電システム25の空き容量kWhfreeは、各々、0kWh、20kWh、30kwhに更新される。
 次に、第2の発電事業者(合計単価は11円/kWh、電力販売希望量は40kWh)が処理対象となる。ここでは、第2の発電事業者の合計単価は電力需要家B及びCの基準単価よりも安いため、電力需要家B及びCは第2の発電事業者から電力を購入すると判断される。一方、第2の発電事業者の合計単価は電力需要家Aの基準単価よりも安いため、電力需要家Aは第2の発電事業者から電力を購入しないと判断される。
 そして、分配部13は、分配対象の電力量「40kWh」を、基準単価が安い電力需要家から順に電力販売希望量を分配する。具体的には、図17に示すように、合計単価が11円/kWhの電力は、電力需要家Bに20kWh分配され、電力需要家Cに20kWh分配される。
 結果、第1の発電事業者及び第2の発電事業者の電力販売希望量は、残ることなく電力需要家に分配される。
 当該分配例の場合、複数の発電事業者の電力販売希望量をできるだけ残すことなく電力需要家に分配できる。また、所定の条件を満たす場合のみ電力需要家は電力を購入すると判断されるため、電力需要家のメリットは確保される。結果、発電事業者からの電力購入依頼に応じて電力需要家に電力を消費(購入)してもらうサービスに参加する電力需要家を十分に確保できる。また、売買成約率を高めることで、当該サービスに参加する発電事業者の数を増やすことが期待される。
 ここで、変形例を説明する。取得部11は、1つの発電事業者から複数パターンの電力購入依頼を受信してもよい。1つの発電事業者から受信した複数パターンの電力購入依頼は、「電力単価」、「電力販売希望量」及び「電力消費時間帯」の中の少なくとも1つが互いに異なってもよい。この場合、判断部12は、各発電事業者の1つ又は複数パターンの電力購入依頼各々と、複数の電力需要家グループ各々とのペア毎に算出された合計単価に基づき、
上述した判断を行ってもよい。
 以下、参考形態の例を付記する。
1. 発電事業者から電力単価を含む電力購入依頼を取得する取得手段と、
 前記発電事業者と、同じ配変電所の配下にいる複数の電力需要家をまとめた複数の電力需要家グループ各々とのペア毎に、電力の託送料金単価を算出する算出手段と、
 前記電力単価と前記託送料金単価との合計単価、及び、前記電力需要家各々の基準単価に基づき、前記電力需要家毎に、前記発電事業者から電力を購入するか否かを判断する判断手段と、
を有する電力管理装置。
2. 1に記載の電力管理装置において、
 前記判断手段は、
  前記電力需要家毎に、前記合計単価が前記基準単価より安いか判断し、
  前記合計単価が第1の前記電力需要家の前記基準単価より安いと判断した場合、前記第1の電力需要家は前記発電事業者から電力を購入すると判断する電力管理装置。
3. 1に記載の電力管理装置において、
 前記取得手段は、複数の前記発電事業者各々から前記電力購入依頼を取得し、
 前記算出手段は、複数の前記発電事業者各々と、複数の前記電力需要家グループ各々とのペア毎に、前記託送料金単価を算出する電力管理装置。
4. 3に記載の電力管理装置において、
 前記判断手段は、
  前記電力需要家毎に、複数の前記ペア各々に対応した前記合計単価が前記基準単価より安いか判断し、
  1つまたは複数の前記合計単価が第1の前記電力需要家の前記基準単価より安いと判断した場合、前記第1の電力需要家は前記1つまたは複数の前記合計単価各々に対応する1つ又は複数の前記発電事業者から電力を購入すると判断する電力管理装置。
5. 4に記載の電力管理装置において、
 前記判断手段は、
  複数の前記合計単価が前記第1の電力需要家の前記基準単価より安いと判断した場合、前記第1の電力需要家は前記複数の前記合計単価の中の最も安い前記合計単価に対応する前記発電事業者から電力を購入すると判断する電力管理装置。
6. 5に記載の電力管理装置において、
 前記判断手段は、
  前記複数の前記合計単価の中に最安値となる前記合計単価が複数ある場合、前記第1の電力需要家は最安値となる複数の前記合計単価の中の前記託送料金単価が最も安い前記合計単価に対応する前記発電事業者から電力を購入すると判断する電力管理装置。
7. 1から6のいずれかに記載の電力管理装置において、
 前記算出手段は、送電線の送電容量及び送電量の予測値に基づき、前記ペア毎に送電ルートを決定し、前記送電ルートに基づき前記託送料金単価を算出する電力管理装置。
8. 7に記載の電力管理装置において、
 前記算出手段は、前記送電ルートに含まれる配変電所の数、及び、前記送電ルートに含まれる送電線の送電電圧の少なくとも一方に基づき、前記託送料金単価を算出する電力管理装置。
9. 8に記載の電力管理装置において、
 前記算出手段は、前記送電ルートに含まれる配変電所の数が多いほど、高い前記託送料金単価を算出する電力管理装置。
10. 8又は9に記載の電力管理装置において、
 前記算出手段は、前記送電ルートに送電電圧が相対的に低い送電線が含まれている場合、前記送電ルートに送電電圧が相対的に低い送電線が含まれていない場合に比べて高い前記託送料金単価を算出する電力管理装置。
11. 8又は9に記載の電力管理装置において、
 前記算出手段は、前記送電ルートに送電電圧が相対的に低い送電線の区間が多く含まれているほど、高い前記託送料金単価を算出する電力管理装置。
12. 1から11のいずれかに記載の電力管理装置において、
 前記電力購入依頼は電力販売希望量をさらに含み、
 第1の前記発電事業者から電力を購入すると判断された1又は複数の前記電力需要家に、前記第1の発電事業者の前記電力販売希望量を分配する分配手段をさらに有する電力管理装置。
13. 12に記載の電力管理装置において、
 前記分配手段は、前記電力需要家の蓄電システムの空き容量に基づき、前記第1の発電事業者の前記電力販売希望量を分配する電力管理装置。
14. 12又は13に記載の電力管理装置において、
 前記分配手段は、前記基準単価が安い前記電力需要家から順に前記電力販売希望量を分配する電力管理装置。
15. 12又は13に記載の電力管理装置において、
 前記分配手段は、複数の前記電力需要家に前記電力販売希望量を均等に分配する電力管理装置。
16. コンピュータが、
 発電事業者から電力単価を含む電力購入依頼を取得する取得工程と、
 前記発電事業者と、同じ配変電所の配下にいる複数の電力需要家をまとめた複数の電力需要家グループ各々とのペア毎に、電力の託送料金単価を算出する算出工程と、
 前記電力単価と前記託送料金単価との合計単価、及び、前記電力需要家各々の基準単価に基づき、前記電力需要家毎に、前記発電事業者から電力を購入するか否かを判断する判断工程と、
を実行する電力管理方法。
17. コンピュータを、
 発電事業者から電力単価を含む電力購入依頼を取得する取得手段、
 前記発電事業者と、同じ配変電所の配下にいる複数の電力需要家をまとめた複数の電力需要家グループ各々とのペア毎に、電力の託送料金単価を算出する算出手段、
 前記電力単価と前記託送料金単価との合計単価、及び、前記電力需要家各々の基準単価に基づき、前記電力需要家毎に、前記発電事業者から電力を購入するか否かを判断する判断手段、
として機能させるプログラム。
 この出願は、2017年3月17日に出願された日本出願特願2017-052381号を基礎とする優先権を主張し、その開示の全てをここに取り込む。

Claims (17)

  1.  発電事業者から電力単価を含む電力購入依頼を取得する取得手段と、
     前記発電事業者と、同じ配変電所の配下にいる複数の電力需要家をまとめた複数の電力需要家グループ各々とのペア毎に、電力の託送料金単価を算出する算出手段と、
     前記電力単価と前記託送料金単価との合計単価、及び、前記電力需要家各々の基準単価に基づき、前記電力需要家毎に、前記発電事業者から電力を購入するか否かを判断する判断手段と、
    を有する電力管理装置。
  2.  請求項1に記載の電力管理装置において、
     前記判断手段は、
      前記電力需要家毎に、前記合計単価が前記基準単価より安いか判断し、
      前記合計単価が第1の前記電力需要家の前記基準単価より安いと判断した場合、前記第1の電力需要家は前記発電事業者から電力を購入すると判断する電力管理装置。
  3.  請求項1に記載の電力管理装置において、
     前記取得手段は、複数の前記発電事業者各々から前記電力購入依頼を取得し、
     前記算出手段は、複数の前記発電事業者各々と、複数の前記電力需要家グループ各々とのペア毎に、前記託送料金単価を算出する電力管理装置。
  4.  請求項3に記載の電力管理装置において、
     前記判断手段は、
      前記電力需要家毎に、複数の前記ペア各々に対応した前記合計単価が前記基準単価より安いか判断し、
      1つまたは複数の前記合計単価が第1の前記電力需要家の前記基準単価より安いと判断した場合、前記第1の電力需要家は前記1つまたは複数の前記合計単価各々に対応する1つ又は複数の前記発電事業者から電力を購入すると判断する電力管理装置。
  5.  請求項4に記載の電力管理装置において、
     前記判断手段は、
      複数の前記合計単価が前記第1の電力需要家の前記基準単価より安いと判断した場合、前記第1の電力需要家は前記複数の前記合計単価の中の最も安い前記合計単価に対応する前記発電事業者から電力を購入すると判断する電力管理装置。
  6.  請求項5に記載の電力管理装置において、
     前記判断手段は、
      前記複数の前記合計単価の中に最安値となる前記合計単価が複数ある場合、前記第1の電力需要家は最安値となる複数の前記合計単価の中の前記託送料金単価が最も安い前記合計単価に対応する前記発電事業者から電力を購入すると判断する電力管理装置。
  7.  請求項1から6のいずれか1項に記載の電力管理装置において、
     前記算出手段は、送電線の送電容量及び送電量の予測値に基づき、前記ペア毎に送電ルートを決定し、前記送電ルートに基づき前記託送料金単価を算出する電力管理装置。
  8.  請求項7に記載の電力管理装置において、
     前記算出手段は、前記送電ルートに含まれる配変電所の数、及び、前記送電ルートに含まれる送電線の送電電圧の少なくとも一方に基づき、前記託送料金単価を算出する電力管理装置。
  9.  請求項8に記載の電力管理装置において、
     前記算出手段は、前記送電ルートに含まれる配変電所の数が多いほど、高い前記託送料金単価を算出する電力管理装置。
  10.  請求項8又は9に記載の電力管理装置において、
     前記算出手段は、前記送電ルートに送電電圧が相対的に低い送電線が含まれている場合、前記送電ルートに送電電圧が相対的に低い送電線が含まれていない場合に比べて高い前記託送料金単価を算出する電力管理装置。
  11.  請求項8又は9に記載の電力管理装置において、
     前記算出手段は、前記送電ルートに送電電圧が相対的に低い送電線の区間が多く含まれているほど、高い前記託送料金単価を算出する電力管理装置。
  12.  請求項1から11のいずれか1項に記載の電力管理装置において、
     前記電力購入依頼は電力販売希望量をさらに含み、
     第1の前記発電事業者から電力を購入すると判断された1又は複数の前記電力需要家に、前記第1の発電事業者の前記電力販売希望量を分配する分配手段をさらに有する電力管理装置。
  13.  請求項12に記載の電力管理装置において、
     前記分配手段は、前記電力需要家の蓄電システムの空き容量に基づき、前記第1の発電事業者の前記電力販売希望量を分配する電力管理装置。
  14.  請求項12又は13に記載の電力管理装置において、
     前記分配手段は、前記基準単価が安い前記電力需要家から順に前記電力販売希望量を分配する電力管理装置。
  15.  請求項12又は13に記載の電力管理装置において、
     前記分配手段は、複数の前記電力需要家に前記電力販売希望量を均等に分配する電力管理装置。
  16.  コンピュータが、
     発電事業者から電力単価を含む電力購入依頼を取得する取得工程と、
     前記発電事業者と、同じ配変電所の配下にいる複数の電力需要家をまとめた複数の電力需要家グループ各々とのペア毎に、電力の託送料金単価を算出する算出工程と、
     前記電力単価と前記託送料金単価との合計単価、及び、前記電力需要家各々の基準単価に基づき、前記電力需要家毎に、前記発電事業者から電力を購入するか否かを判断する判断工程と、
    を実行する電力管理方法。
  17.  コンピュータを、
     発電事業者から電力単価を含む電力購入依頼を取得する取得手段、
     前記発電事業者と、同じ配変電所の配下にいる複数の電力需要家をまとめた複数の電力需要家グループ各々とのペア毎に、電力の託送料金単価を算出する算出手段、
     前記電力単価と前記託送料金単価との合計単価、及び、前記電力需要家各々の基準単価に基づき、前記電力需要家毎に、前記発電事業者から電力を購入するか否かを判断する判断手段、
    として機能させるプログラム。
PCT/JP2017/038778 2017-03-17 2017-10-26 電力管理装置、電力管理方法、及び、プログラム WO2018168053A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
AU2017403852A AU2017403852A1 (en) 2017-03-17 2017-10-26 Power management apparatus, power management method, and program
JP2019505696A JP6996550B2 (ja) 2017-03-17 2017-10-26 電力管理装置、電力管理方法、及び、プログラム
US16/479,096 US20190392534A1 (en) 2017-03-17 2017-10-26 Power management apparatus, power management method, and non-transitory storage medium
EP17900627.5A EP3598379A4 (en) 2017-03-17 2017-10-26 POWER MANAGEMENT DEVICE, POWER MANAGEMENT METHOD AND PROGRAM

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017-052381 2017-03-17
JP2017052381 2017-03-17

Publications (1)

Publication Number Publication Date
WO2018168053A1 true WO2018168053A1 (ja) 2018-09-20

Family

ID=63522918

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2017/038778 WO2018168053A1 (ja) 2017-03-17 2017-10-26 電力管理装置、電力管理方法、及び、プログラム

Country Status (5)

Country Link
US (1) US20190392534A1 (ja)
EP (1) EP3598379A4 (ja)
JP (1) JP6996550B2 (ja)
AU (1) AU2017403852A1 (ja)
WO (1) WO2018168053A1 (ja)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10865774B2 (en) * 2016-08-09 2020-12-15 Mhi Vestas Offshore A/S Wind turbine control method and system
EP3662421A4 (en) 2017-08-03 2021-01-20 Heila Technologies, Inc. ASSET MANAGER IN AN ELECTRICAL NETWORK

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001243358A (ja) * 2000-02-25 2001-09-07 Itochu Corp 電力売買の仲介方法
JP2002271982A (ja) 2001-03-14 2002-09-20 Ennet Corp 余剰電力管理システムおよびその制御方法
JP2003091659A (ja) * 2001-09-19 2003-03-28 Yasokazu Makino 電力売買仲介システム
JP2003180030A (ja) * 2001-12-07 2003-06-27 Mitsubishi Electric Corp 需給計画作成装置
JP2004272441A (ja) * 2003-03-06 2004-09-30 Hitachi Ltd 取引所システムの約定処理方法および約定処理装置
JP2007133813A (ja) * 2005-11-14 2007-05-31 Ntt Data Corp 電気契約仲介装置および電気契約仲介方法
JP2007299180A (ja) * 2006-04-28 2007-11-15 Mitsubishi Electric Corp 託送料金計算装置
JP2017052381A (ja) 2015-09-09 2017-03-16 株式会社東海理化電機製作所 操作者判定装置

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6473744B1 (en) * 1995-08-18 2002-10-29 Mhc Investment Company Apparatus and method for trading electric energy
US20030009401A1 (en) * 2001-04-27 2003-01-09 Enerwise Global Technologies, Inc. Computerized utility cost estimation method and system
JP2005050164A (ja) * 2003-07-29 2005-02-24 Sekisui Chem Co Ltd ネットワークを利用した電力売買仲介システム及び電力小売システム
JP5587641B2 (ja) * 2010-03-10 2014-09-10 パナソニック株式会社 電力供給システム
JP6187463B2 (ja) * 2012-07-30 2017-08-30 日本電気株式会社 グリッド統合制御装置、グリッド制御システム、グリッド制御装置、プログラム、及び制御方法
US20140188695A1 (en) * 2012-12-27 2014-07-03 Kabushiki Kaisha Toshiba Electricity trading system and market providing type service system
US10991041B2 (en) * 2014-10-03 2021-04-27 Open Access Technology International, Inc. Next-generation energy market design and implementation

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001243358A (ja) * 2000-02-25 2001-09-07 Itochu Corp 電力売買の仲介方法
JP2002271982A (ja) 2001-03-14 2002-09-20 Ennet Corp 余剰電力管理システムおよびその制御方法
JP2003091659A (ja) * 2001-09-19 2003-03-28 Yasokazu Makino 電力売買仲介システム
JP2003180030A (ja) * 2001-12-07 2003-06-27 Mitsubishi Electric Corp 需給計画作成装置
JP2004272441A (ja) * 2003-03-06 2004-09-30 Hitachi Ltd 取引所システムの約定処理方法および約定処理装置
JP2007133813A (ja) * 2005-11-14 2007-05-31 Ntt Data Corp 電気契約仲介装置および電気契約仲介方法
JP2007299180A (ja) * 2006-04-28 2007-11-15 Mitsubishi Electric Corp 託送料金計算装置
JP2017052381A (ja) 2015-09-09 2017-03-16 株式会社東海理化電機製作所 操作者判定装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3598379A4

Also Published As

Publication number Publication date
JP6996550B2 (ja) 2022-01-17
EP3598379A4 (en) 2020-01-29
AU2017403852A1 (en) 2019-07-25
JPWO2018168053A1 (ja) 2020-01-16
EP3598379A1 (en) 2020-01-22
US20190392534A1 (en) 2019-12-26

Similar Documents

Publication Publication Date Title
JP7455163B2 (ja) 電力供給システムおよび電力供給方法
JP6838792B2 (ja) 制御装置、制御システム、制御装置の動作方法及びプログラム
JP6701965B2 (ja) 処理装置、処理方法及びプログラム
JP6996494B2 (ja) 電力制御装置、電力制御方法、およびプログラム
US20160196622A1 (en) Power adjustment system, power adjustment method, and program
JP6268633B2 (ja) 電力管理装置、電力管理方法、プログラム
JPWO2016013089A1 (ja) 需給制御装置、充放電制御装置、蓄電装置、需給制御システムおよび需給制御方法
EP3886034B1 (en) Power trading system and management apparatus
JP6226282B2 (ja) 電力調整装置、電力調整方法、プログラム
WO2018168053A1 (ja) 電力管理装置、電力管理方法、及び、プログラム
JP7056579B2 (ja) 電力管理装置、電力管理システム、電力管理方法、及び、プログラム
JP7078183B1 (ja) 制御方法、管理装置、プログラム及び電力システム
JP6922570B2 (ja) 処理装置、処理方法及びプログラム
US9979191B2 (en) Power control method, device and system for instigating a power control based on the examined allocation
WO2017154116A1 (ja) 電力制御装置、電力制御システム、電力制御方法、及び、プログラム
JP7024707B2 (ja) 制御装置、制御方法及びプログラム
WO2020234953A1 (ja) 貯蔵電力由来管理装置、方法、およびプログラム
JP2020202702A (ja) 需要制御方法、制御装置、プログラム及び電力システム
JP7003509B2 (ja) 処理装置、制御装置、pcs、処理方法、制御方法及びプログラム
WO2018230019A1 (ja) 電力管理システム、電力制御装置、電力管理方法及びプログラム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17900627

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2019505696

Country of ref document: JP

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 2017403852

Country of ref document: AU

Date of ref document: 20171026

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2017900627

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2017900627

Country of ref document: EP

Effective date: 20191017