WO2017154341A1 - カーシェアリングサービスの運用システム - Google Patents

カーシェアリングサービスの運用システム Download PDF

Info

Publication number
WO2017154341A1
WO2017154341A1 PCT/JP2017/000840 JP2017000840W WO2017154341A1 WO 2017154341 A1 WO2017154341 A1 WO 2017154341A1 JP 2017000840 W JP2017000840 W JP 2017000840W WO 2017154341 A1 WO2017154341 A1 WO 2017154341A1
Authority
WO
WIPO (PCT)
Prior art keywords
electric vehicle
reservation
charging plan
charging
cost
Prior art date
Application number
PCT/JP2017/000840
Other languages
English (en)
French (fr)
Inventor
伊藤 章
鈴木 達也
伸吉 稲垣
明彦 川島
Original Assignee
株式会社デンソー
国立大学法人名古屋大学
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社デンソー, 国立大学法人名古屋大学 filed Critical 株式会社デンソー
Priority to DE112017001212.0T priority Critical patent/DE112017001212T5/de
Priority to US16/082,310 priority patent/US11301785B2/en
Publication of WO2017154341A1 publication Critical patent/WO2017154341A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/02Reservations, e.g. for tickets, services or events
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/66Data transfer between charging stations and vehicles
    • B60L53/665Methods related to measuring, billing or payment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/12Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries responding to state of charge [SoC]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/40Business processes related to the transportation industry
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/12Electric charging stations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles

Definitions

  • This disclosure relates to an operation system for car sharing services.
  • the car sharing service is a service that rents out vehicles temporarily at the request of the user. In recent years, a car sharing service using an electric vehicle as a vehicle to be rented is also performed.
  • the car sharing service there are multiple stations that serve as a window for borrowing and returning electric vehicles. For example, a plurality of electric vehicles are stocked at each station.
  • a user of the car sharing service reserves an electric vehicle by performing an operation via the Internet, for example. After that, the electric vehicle is borrowed at the station designated at the time of reservation.
  • Patent Document 1 describes an operation management system for such a car sharing service.
  • an operation plan indicating which electric vehicle is allocated to which user is created in consideration of the charging rate of each electric vehicle.
  • the system can efficiently operate the car sharing service based on the created operation plan.
  • the present inventors have examined a system configuration in such a manner that charging of an electric vehicle stopped at a station can be performed not only by system power but also by photovoltaic power generation power. In such an aspect, the use of system power is suppressed, so that the electricity bill associated with the operation of the car sharing service can be reduced.
  • the number of electric vehicles that are stopped at the station that is, charging
  • the number of electric vehicles stopped at a station that is, not providing services
  • the effective use of photovoltaic power generation and the provision of services to users are contradictory to each other.
  • specific studies have been made on efficient operation while maintaining a balance between efficient use of photovoltaic power generation and rental of electric vehicles in response to user requests. It wasn't.
  • an object is to provide an operation system capable of operating the car sharing service more efficiently.
  • an operation system temporarily rents an electric vehicle (30) from a plurality of stations (20) provided in a specific service area according to a user's request.
  • This is an operation system (100) for a car sharing service.
  • the station is provided with a charging facility (210) that can charge the electric vehicle by supplying either the photovoltaic power or the grid power during a time period when the electric vehicle is not rented.
  • This operation system includes a reservation input unit (120) for inputting an electric vehicle use reservation from a user, and a result transmission unit for sending a reservation result indicating whether or not the use reservation can be supported to the user.
  • the charge plan creation unit creates a charge plan so that the operation cost calculated by the cost calculation unit is the smallest under given conditions.
  • the charging plan creation unit newly creates a charging plan corresponding to the usage reservation, and the result transmission unit is calculated corresponding to the charging plan.
  • a charge / discharge plan is newly created when the user reserves the request, that is, when the electric vehicle is rented according to the user reservation.
  • the charging / discharging plan is created so that the operation cost calculated based on at least the prediction of the photovoltaic power generation is minimized under given conditions.
  • the operating cost when temporarily corresponding to the input use reservation is calculated as a predicted value.
  • the operation costs created while taking into account charging with solar power and other factors are accepted as prescribed. If the conditions are not met, an operation is performed in which the request from the user is exceptionally rejected.
  • the above “acceptance condition” is, for example, a condition that an increase amount of the operation cost in the case of corresponding to the input use reservation falls within a predetermined threshold value.
  • the car sharing service can be operated more efficiently by maintaining a balance between the efficient use of photovoltaic power generation and the renting of an electric vehicle in response to a user request.
  • An operational system is provided.
  • FIG. 1 is a diagram schematically illustrating an operation system according to the present embodiment and a configuration necessary for providing a car sharing service operated thereby.
  • FIG. 2 is a block diagram showing an internal configuration in the operation system of FIG.
  • FIG. 3 is a diagram for explaining a time zone in which the car sharing service is performed.
  • FIG. 4 is a flowchart showing a flow of processing executed by the operation system of FIG.
  • FIG. 5 is a diagram for explaining conditions set for the amount of electricity stored in the electric vehicle.
  • FIG. 6 is a flowchart showing a flow of processing executed by the operation system of FIG.
  • the car sharing service (hereinafter may be simply referred to as “service”) is a service for temporarily renting out the electric vehicle 30 according to a user's request. Examples of components necessary for providing the service include the station 20, the electric vehicle 30, and the operation system 100. In FIG. 1, the entire structure is schematically shown as a car sharing system 10.
  • Station 20 is a facility that serves as a window for service users to visit.
  • a plurality of stations 20 are constructed in a specific area where service is provided, that is, in a service area.
  • the user visits one of the stations 20 and borrows the electric vehicle 30.
  • the station 20 is visited again and the electric vehicle 30 is returned.
  • the borrowing station 20 and the returning station 20 may be the same as or different from each other.
  • the user reserves the electric vehicle 30 in advance before receiving the service.
  • the user designates the station 20 at the time of borrowing, the station 20 at the time of return, a use start time, and a use end time.
  • the station 20 is provided with a building 220, and a parking space for parking the electric vehicle 30 is provided around the building 220.
  • the building 220 has a function as a service window that receives questions and the like from visiting users as needed, and a function as an office where office work necessary for providing services is performed. Although three stations 20 are illustrated in FIG. 1, the number of stations 20 provided in the service area may be four or more, for example, or only two.
  • a solar panel 230 is provided on the ceiling of the building 220. As is well known, the solar panel 230 converts sunlight energy into electric power. In the station 20, electric power generated by the solar panel 230 (hereinafter also referred to as “photovoltaic power generation”) is supplied to the electric vehicle 30, thereby charging the electric vehicle 30.
  • photovoltaic power generation electric power generated by the solar panel 230
  • the station 20 is supplied with power from the power system 11 (hereinafter also referred to as “system power”).
  • system power the grid power is supplied to the electric vehicle 30, thereby charging the electric vehicle 30.
  • the parking space provided around the building 220 is provided with a plurality of parking areas (not shown) separated by white lines or the like. Further, one charging facility 210 is provided in each parking area.
  • the charging facility 210 and the electric vehicle 30 are connected by a cable. Electric power is supplied to the electric vehicle 30 via the cable, and the electric vehicle 30 is charged.
  • the electric power supplied from the charging facility 210 to the electric vehicle 30 is either the photovoltaic power or the grid power as described above.
  • each station 20 is depicted as having two charging facilities 210 (and parking areas), but the number of charging facilities 210 is not limited thereto. .
  • the electric vehicle 30 includes a storage battery (not shown) therein, and is a vehicle configured to run with electric power stored in the storage battery.
  • the electric vehicle 30 includes a power converter (not shown) in addition to the storage battery.
  • the power converter converts the power supplied from the charging facility 210 to charge the storage battery. At this time, the power converter appropriately adjusts the magnitude of power supplied from the charging facility 210 to the electric vehicle 30 within a predetermined range.
  • the electric vehicle 30 may be a so-called hybrid vehicle including a storage battery and an internal combustion engine.
  • a plurality of electric vehicles 30 stopped at the same station 20 to interchange the electric power stored in each other's storage battery.
  • the electric power discharged from the storage battery of one electric vehicle 30 is used as the storage battery of the other electric vehicle 30 via the charging facility 210. It is possible to charge the battery and charge it.
  • the borrowing and returning of the electric vehicle 30 by the user is always performed at some station 20. That is, it is assumed that the electric vehicle 30 is not thrown away at a place other than the station 20. For this reason, during the time period when the car sharing service is performed, the electric vehicle 30 is stopped at any one of the stations 20 or rented to the user and traveling in a place other than the station 20. It can take only one of the state.
  • the operation system 100 is a control device that performs overall control of the entire car sharing system 10 in order to operate the car sharing service.
  • the operation system 100 is configured as a computer system including a CPU, a ROM, and the like.
  • the operation system may be installed at a specific station 20 or may be installed at a location different from the station 20. Further, for example, a mode in which a plurality of computer systems distributed and arranged at a plurality of stations 20 cooperate to function as the operation system 100 may be possible.
  • the operation system 100 has a function of accepting a use reservation from a user, a function of assigning the electric vehicle 30 to the use reservation, and the like.
  • the configuration of the operation system 100 will be described with reference to FIG.
  • the operation system 100 includes a charge presentation unit 110, a reservation input unit 120, a result transmission unit 130, a charging plan creation unit 140, and a cost calculation unit 150 as functional control blocks.
  • reference numeral 40 denotes a personal computer installed at the user's home.
  • PC 40 The personal computer 40 is a device that serves as an interface when a user who intends to use a service performs a reservation procedure.
  • a mobile communication terminal such as a smartphone may be used instead of the personal computer 40.
  • the fee presentation unit 110 is a part that communicates with the user's personal computer 40 via the Internet together with a reservation input unit 120 and a result transmission unit 130 described later.
  • the fee presentation unit 110 is a part that transmits information about the service usage fee to the personal computer 40 and displays the information on the screen of the personal computer 40. That is, the fee presentation unit 110 corresponds to a portion that presents a user with a usage fee that is to be paid for using the electric vehicle 30.
  • an amount proportional to the usage time of the electric vehicle 30 is set.
  • an amount proportional to the distance between the stations 20 may be set.
  • the usage fee is set so that the amount varies depending on the situation at the time when the user makes a reservation (the position of each electric vehicle 30 and the like) and the time zone in which the electric vehicle 30 is used. May be set.
  • the reservation input unit 120 is a part that receives the use reservation input by the user to the personal computer 40 from the personal computer 40 via the Internet.
  • the received use reservation is information including the station 20 at the time of borrowing, the station 20 at the time of return, the use start time, and the use end time.
  • the result transmission unit 130 displays a reservation result indicating whether or not the use reservation input to the reservation input unit 120 can be handled, that is, whether or not the electric vehicle 30 can be lent according to the use reservation. This is a part to be transmitted to 40.
  • the reservation result transmitted from the result transmitting unit 130 is displayed on the screen of the personal computer 40 and transmitted to the user. That is, when the user performs an operation for reservation of use, the reservation result is transmitted from the result transmission unit 130 as a reply to the operation and transmitted to the user.
  • the reservation result indicating that the reservation can be used includes information for specifying the electric vehicle 30 assigned to the reservation.
  • the user visits the station 20 designated by the user as the station 20 at the time of borrowing and borrows a specific electric vehicle 30 indicated in the reservation result.
  • the IC card in which the above information is registered may be used as a card key for releasing the key lock of the electric vehicle 30.
  • the charging plan creation unit 140 is a part that creates a charging plan.
  • the charging plan is data indicating a time zone in which charging of the electric vehicle 30 is performed in the station 20 for each of all the electric vehicles 30.
  • information hereinafter also referred to as “vehicle allocation plan” indicating which electric vehicle 30 is allocated to all the usage reservations input so far is also included. Created.
  • vehicle position plan information (hereinafter, also referred to as “vehicle position plan”) indicating where each of the electric vehicles 30 is located at each time of the period in which the service is provided is also created.
  • the cost calculation unit 150 is a part that calculates an operation cost required for operating the car sharing service.
  • This operating cost includes, for example, an electricity charge when charging the electric vehicle 30 using the grid power. Further, when the distribution of the electric vehicle 30 is biased to some stations 20, personnel expenses for moving the electric vehicle 30 to another station 20 by the operation of the staff are included.
  • the horizontal axis of the time chart shown in FIG. 3 indicates one day (24 hours) as a whole.
  • the time T S is the time when the car sharing service is started, and is set to 8:00 in the present embodiment.
  • the time T E is the time when the car sharing service ends, and is set to 20:00 in this embodiment. That is, the service provision period of the car sharing service is 12 hours from the time T S to the time T E.
  • the period from time T E to next day time T S is a service suspension period. It is possible for the user to make a reservation for use during both the service provision period and the service suspension period.
  • the charging plan creation unit 140 creates a charging plan, a vehicle allocation plan, and a vehicle location plan under the assumption that the usage reservation corresponds. Each of these is created as a service operation plan in a period TM0 from time T S to time T E.
  • the operation cost corresponding to the created charging plan is calculated by the cost calculation unit 150.
  • the operation cost satisfies a predetermined acceptance condition (described later)
  • the fact that the use reservation can be handled is transmitted to the user.
  • a service operation plan including a charging plan is created each time a use reservation from a user is input to the reservation input unit 120. That is, the service operation plan in the period from time T S to time T E is updated each time a use reservation is input. As a result, the allocation of the electric vehicle 30 to all the use reservations including those input so far is updated and optimized each time.
  • the service provision period starts and the service provision is started.
  • the electric vehicle 30 starts to move between the stations 20.
  • the number of electric vehicles 30 that are stopped (stocked) at each station 20 changes from the number in the initial state before time T S.
  • the charging plan creation unit 140 creates a charging plan, a vehicle allocation plan, and a vehicle location plan under the assumption that the usage reservation corresponds to the usage reservation.
  • these operation plan is created as an indication of the operation plan of service in the period TM1 from the current time t is available reserve reservation input unit 120 is input to the time T E.
  • the series of processing shown in FIG. 4 is repeatedly executed by the operation system 100 every time a predetermined period elapses.
  • step S01 it is determined whether or not a new use reservation has been input to the reservation input unit 120. If no use reservation has been input, the series of processing shown in FIG. 4 is terminated. When a use reservation is input, the process proceeds to step S02.
  • a charging plan is created.
  • this charging plan indicates an operation plan in the case of “temporarily” corresponding to the input use reservation.
  • the charging plan is created as data in the following format. ⁇ P i, j ( ⁇
  • t is the current time t when the use reservation is input to the reservation input unit 120.
  • represents each time in the period from the current time t to the time T E as a discrete time each time a predetermined step period ( ⁇ t) elapses from the current time t.
  • ⁇ t a predetermined step period
  • the time ⁇ when ⁇ t has elapsed from the current time t is “t + ⁇ t”, but this will be simplified and expressed as “t + 1” (see FIG. 3).
  • the time ⁇ at which ⁇ t ⁇ 2 has elapsed from the current time t is “t + 2 ⁇ t”, which will be simplified and expressed as “t + 2” below.
  • Subsequent times ⁇ are expressed in the same manner.
  • the time ⁇ takes a value from t + 1 to T E.
  • i is a variable in which an integer value for specifying the station 20 is entered.
  • the total number of stations 20 is S, and each station 20 is assigned an individual ID from 1 to S. Therefore, i takes any integer value from 1 to S.
  • j is a variable in which an integer value for specifying the electric vehicle 30 is entered.
  • the total number of electric vehicles 30 is V, and each electric vehicle 30 is assigned an individual ID from 1 to V. Therefore, j takes any integer value from 1 to V.
  • t) indicates the magnitude of electric power charged in the electric vehicle 30 with the ID of j at the station 20 with the ID of i at the specific time ⁇ after the current time t.
  • t) ⁇ is created as data indicating the magnitude of the power as described above for all combinations of ⁇ , i, and j.
  • t) ⁇ is data indicating the time zone for charging the electric vehicle 30 at the station 20 for each of the electric vehicles 30.
  • step S02 a vehicle allocation plan and a vehicle position plan are also created in addition to the above charging plan ⁇ p i, j ( ⁇
  • the vehicle allocation plan is created as data in the following format. ⁇ A j, k (t) ⁇
  • k is a variable that contains an integer value for specifying all the use reservations input so far including the newly input use reservation.
  • R the total number of use reservations
  • k takes any integer value from 1 to R. Since R increases every time a use reservation is input, it should be expressed accurately as “R (t)”.
  • a j, k (t) When the use reservation with ID k is assigned to the electric vehicle with ID j, the value of a j, k (t) is 1. In other cases, the value of a j, k (t) is 0. Thus, a j, k (t) expresses reservation allocation by taking a value of 0 or 1.
  • the vehicle allocation plan ⁇ a j, k (t) ⁇ is created as data indicating the allocation of reservations as described above at the current time t for all combinations of j and k.
  • the vehicle position plan is created as data in the following format. ⁇ X i, j ( ⁇
  • t) is 1. Otherwise, the value of x i, j ( ⁇
  • t) ⁇ is created as data indicating the value of x i, j ( ⁇
  • t) ⁇ must be expressed including the case where the electric vehicle 30 is not stopped at any station 20, that is, when the vehicle is running. . Therefore, the time when the electric vehicle 30 is traveling is expressed as the electric vehicle 30 stopped at the station 20 whose ID is S + 1 (which does not actually exist). That is, j in the vehicle position plan ⁇ x i, j ( ⁇
  • t) ⁇ The operation cost E shown in 1) is calculated as data that becomes the smallest under a predetermined condition (described later). That is, each operation plan is created as a result of the calculation that minimizes the operation cost E under a predetermined condition.
  • f d (i1, i2, ⁇ ) is a function representing the re-allocation cost required for re-allocation by the staff (not the user).
  • f d (i1, i2, ⁇ ) represents a redistribution cost when redistribution from the station 20 with ID i1 to the station 20 with ID i2 is performed at time ⁇ .
  • f d (i1, i2, ⁇ ) specifies only the re-distribution cost (amount) in the above case, and specifies whether or not the above re-allocation is actually performed. It is not a thing. Whether redistribution is actually performed is specified by d i1, i2 ( ⁇ ).
  • f d (i1, i2, ⁇ ) is a function of ⁇ is that, for example, the congestion situation of the road changes depending on the time zone, and the cost required for redistribution changes accordingly. Is. Moreover, you may consider that the hourly wage of a staff changes for every time slot
  • D i1, i2 ( ⁇ ) in the first term is a function represented by the following equation (2).
  • X i1, j ( ⁇ ) of the right side of the above equation (2) is 1 when the electric vehicle 30 with ID j stops at the station 20 with ID i1 at time ⁇ . . Also, x i2, j ( ⁇ + 1) becomes 1 when the same electric vehicle 30 as described above stops at the station 20 with ID i2 at time ⁇ + 1 (time when ⁇ t has elapsed from time ⁇ ). It is.
  • the value of d i1, i2 ( ⁇ ) represented by the expression (2) is 1 when the electric vehicle 30 with ID j is ID1 when ⁇ t elapses from time ⁇ . This is the case when moving from the station 20 to the station 20 with the ID of i2 by redistribution.
  • the first term of the formula (1) represents the redistribution cost required for the work in which the staff moves the electric vehicle 30 in advance between the stations 20 different from each other in order to correspond to the use reservation. It has become a thing.
  • g i ( ⁇ ) is a value (unit: W) of the photovoltaic power that can be generated at the station 20 with ID i at time ⁇ .
  • W power that can be generated
  • the power generation possible power g i ( ⁇ ) is data created in advance based on, for example, prediction data of the amount of sunlight acquired from a weather forecast company, a place where each station 20 is installed, and the like.
  • the power generation possible power g i ( ⁇ ) is preliminarily determined by the operation system 100 for all stations 20 having IDs (that is, i) from 1 to S and for all times ⁇ in the period from time T S to time T E. Created.
  • the value of the photovoltaic power generation actually generated at the station 20 at the time ⁇ does not necessarily coincide with the power generation possible power g i ( ⁇ ).
  • the solar panel 230 is configured to automatically suppress power generation in such a case. Therefore, it can be said that the power generation possible power g i ( ⁇ ) indicates the maximum value of the solar power generation power that can be generated at the station 20 at the time ⁇ .
  • w i ( ⁇ ) is defined as a value obtained by subtracting the value (unit: W) of the photovoltaic power actually generated at the station 20 with ID i from the above-described power generation possible power g i ( ⁇ ). It is a power value.
  • Such w i ( ⁇ ) can be said to indicate the value of electric power that has lost the opportunity to generate power, for example, because there is no electric vehicle 30 parked at the station 20. Accordingly, w i ( ⁇ ) is also expressed as “opportunity loss power w i ( ⁇ )” below.
  • l i ( ⁇ ) is a value (unit: W) of the system power supplied to the station 20 whose ID is i at time ⁇ .
  • W system power l i ( ⁇ ).
  • the grid power l i ( ⁇ ), the above-described power generation possible power g i ( ⁇ ), and the opportunity loss power w i ( ⁇ ) are in a relationship represented by the following expression (3).
  • the grid power l i ( ⁇ ) is charged so that charging is performed according to the charging plan ⁇ p i, j ( ⁇
  • the value is adjusted.
  • the value of the opportunity loss power w i ( ⁇ ) in the time period is 0.
  • each time is set so that the charging along the charging plan ⁇ p i, j ( ⁇
  • the value of the system power l i ( ⁇ ) at ⁇ is appropriately adjusted.
  • F w ( ⁇ ) in the second term of Equation (1) represents the value of the photovoltaic power generation per watt hour converted into a monetary amount.
  • f w ( ⁇ ) may be described as a function indicating a power selling price at time ⁇ .
  • the second term of the equation (1) is obtained by multiplying the sum of the opportunity loss power w i ( ⁇ ) for all the stations 20 by the above f w ( ⁇ ) and integrating this over the period after the current time t. It corresponds to thing. That is, it corresponds to the price of photovoltaic power generation in which the generation opportunity is lost in the remaining period of the service provision period.
  • F 1 ( ⁇ ) in the third term of the equation (1) represents the value of the system power per watt hour converted into an amount.
  • Such f l ( ⁇ ) corresponds to a power purchase price.
  • the third term of the equation (1) is obtained by multiplying the total of the system power l i ( ⁇ ) for all the stations 20 by the above f l ( ⁇ ) and integrating this over the period after the current time t. It corresponds to. In other words, in the remaining period of the service provision period, the system charging cost required to supply the system power to each electric vehicle 30 and perform charging is represented.
  • t) ⁇ that minimizes the operation cost E that is the sum of the first term, the second term, and the third term as described above.
  • t) ⁇ are respectively created. These are created by calculation performed by the charging plan creation unit 140 while the operation cost E is calculated by the cost calculation unit 150 each time.
  • the initial condition for example, the current position of each electric vehicle 30 is set.
  • the initial condition regarding the current position corresponds to each value of the vehicle position plan ⁇ x i, j (0
  • t) ⁇ when ⁇ 0.
  • Such information indicating the initial SOC is acquired in advance through communication performed between the electric vehicle 30 and the charging facility 210, for example.
  • the constraint condition for example, each of the storage battery mounted on the electric vehicle 30, the value of the SOC is set at time T E. That is, the final target value (target power storage amount) of each SOC at the end of the service providing period is set. It seems that it is desirable that the SOC at the service end time is as large as possible. However, for example, when the SOC is uniformly set to 100%, the opportunity lost power w i ( ⁇ ) on the next day increases. There is a possibility that. For this reason, it is not necessarily so desirable that it is large.
  • the SOC at this service end time is uniformly set to 50%, for example.
  • t) ⁇ and the like are created by the charging plan creation unit 140 so that each electric vehicle 30 at the end of the car sharing service is created.
  • the storage amount is set so as to match the target storage amount.
  • the amount of power consumed during the step period ( ⁇ t), that is, the amount of decrease in the amount of stored electricity is individually set for each electric vehicle 30.
  • an upper limit value and a lower limit value for the SOC during service operation are individually set for each electric vehicle 30.
  • t) by the charging plan creation unit 140 is provided under the condition that the SOC of each electric vehicle 30 during service operation always falls within the range from the lower limit value to the upper limit value. ⁇ Etc. will be made.
  • FIG. 5 shows an example of the transition of the upper limit value of SOC (line L1) and the transition of the lower limit value (line L2) set as the constraint conditions.
  • the upper limit value of the SOC is set to be 100% uniformly, and the value does not change in the middle.
  • the lower limit value of the SOC is set so as to temporarily increase during the period from time T 10 to time T 20.
  • the lower limit value of the SOC is set so as to temporarily increase during the period from time T 10 to time T 20.
  • the conditions shown in FIG. 5 are merely examples, and different conditions may be set.
  • a condition that the upper limit value of the SOC changes with time may be set.
  • the upper limit value and the lower limit value of the charging power when the electric vehicle 30 is charged may be added as a further constraint condition.
  • the upper limit value and the lower limit value of the electric power discharged from the electric vehicle 30 may be added as further constraints.
  • step S03 the operation cost E is calculated.
  • the value of the operating cost E calculated here is a value obtained as a result of minimizing the expression (1) in step S02. That is, this is the value of the operation cost E when the service is operated along the charging plan ⁇ p i, j ( ⁇
  • step S04 it is determined whether or not the operation cost E calculated in step S03 satisfies the acceptance condition.
  • the acceptance condition in the present embodiment is set such that the difference value obtained by subtracting the currently calculated operation cost E from the previously calculated operation cost E falls within a predetermined threshold.
  • the above difference value corresponds to the increase amount of the operation cost E by corresponding to the new use reservation input to the reservation input unit 120 in step S01.
  • step S05 When the operation cost E satisfies the acceptance condition, that is, when the difference value is below the threshold value, the process proceeds to step S05.
  • the transition to step S05 means that the increase amount of the operation cost E is relatively small even if it corresponds to a new use reservation. For this reason, in step S05, it is determined that it corresponds to the new use reservation input in step S01, and the use reservation is registered.
  • the result transmission unit 130 transmits a reservation result indicating that the use reservation can be supported to the user's personal computer 40.
  • the reservation result also includes information for identifying the electric vehicle 30 assigned to the use reservation.
  • step S06 the charging plan ⁇ p i, j ( ⁇
  • step S04 when the operation cost E does not satisfy the acceptance condition, the process proceeds to step S07.
  • the transition to step S07 means that the increase amount of the operation cost E becomes relatively large in response to a new use reservation. In such a case, there is a high possibility that the operation of the service will be confused, for example, because it is necessary to significantly change the time schedule of the staff for redistribution.
  • step S07 it is determined that it does not correspond to the new use reservation input to the reservation input unit 120 in step S01, and the use reservation is rejected. From the result transmission unit 130, a reservation result indicating that the use reservation cannot be handled is transmitted to the user's personal computer 40. In this case, all the operation plans created in step S02 are discarded. That is, the charging plan ⁇ p i, j ( ⁇
  • a charging plan ⁇ pi, j according to the current situation (current position, SOC, etc. of each electric vehicle 30). ( ⁇
  • the total number of electric vehicles 30 may change when some of the electric vehicles 30 break down or new electric vehicles 30 are inserted during the service provision period. In that case, the value of V is changed in accordance with the change, and the vehicle position plan ⁇ x i, j ( ⁇
  • t) ⁇ and the like by the charging plan creation unit 140 is performed periodically at a predetermined cycle even when a reservation for use is not input to the reservation input unit 120. Done. Processing performed for this purpose will be described with reference to FIG.
  • the series of processing shown in FIG. 6 is repeatedly executed by the operation system 100 every time a predetermined period elapses. Moreover, it is performed in parallel with a series of processes shown in FIG.
  • the update time is a time set in the service target period as a time for periodically updating the charging plan ⁇ p i, j ( ⁇
  • each time when a predetermined step period (for example, 15 minutes) elapses from time T S is set in advance as the update time.
  • step S12 If the current time is not the update time, the series of processing shown in FIG. If the current time is the update time, the process proceeds to step S12.
  • step S12 the same process as the process performed in step S02 of FIG. 4 is performed.
  • the charging plan is made so that the electric vehicle 30 is assigned to each use reservation input so far (and registered as being compatible).
  • t) ⁇ and the like are created.
  • t) ⁇ and the like reflect information on the current storage amount of each electric vehicle 30 and the current position.
  • step S13 the charging plan ⁇ p i, j ( ⁇
  • t) ⁇ is updated as a fixed plan as it is.
  • the operation is to respond as much as possible to the request (use reservation) from the user, but charging with solar power is considered.
  • the created operation cost E does not satisfy the predetermined acceptance condition, an operation is performed in which the request from the user is exceptionally rejected.
  • a condition that the value of the operation cost E calculated in step S03 falls below a predetermined threshold may be set as the acceptance condition used in step S04 in FIG.
  • a condition that the operating cost E in the case of dealing with a new use reservation falls within the threshold may be set as the acceptance condition.
  • t) ⁇ and the like described with reference to FIG. 4 is based on the vehicle allocation plan ⁇ a j, k (t) ⁇ each time a new usage reservation is input. It is intended to change the whole. That is, even after the electric vehicle 30 is assigned to the existing use reservation, when a new use reservation is input, all the existing assignments are discarded and the whole is assigned again. For this reason, depending on the scale of the car sharing system 10, the calculation load in the operation system 100 may become too large, and it may take a long time to create the charging plan ⁇ p i, j ( ⁇
  • the data in the vehicle allocation plan ⁇ a j, k (t) ⁇ where k is 1 to R ⁇ 1 is not changed. It will be used as a constraint condition. Accordingly, as a result of minimizing the operation cost E, the parts other than the above (that is, a j, R (t)) in the vehicle allocation plan ⁇ a j, k (t) ⁇ and the charging plan ⁇ p i, j ( ⁇
  • the distribution of the electric vehicles 30 is biased, and the number of electric vehicles 30 parked at some stations 20 may increase excessively. In that case, the electric vehicle 30 must be moved from the station 20 to another station 20 in order to be able to cope with the use reservation from the user. For this reason, the redistribution cost increases.
  • the operating cost E can be further reduced by changing the usage fee presented to the user by the fee presentation unit 110 according to the situation.
  • a usage fee for a usage mode traveling route
  • a usage mode traveling route
  • a usage fee for a usage mode that is borrowed at a station 20 with a large number of parked electric vehicles 30 and returned at a station 20 with a small number of parked electric vehicles 30 is What is necessary is just to show a user as a charge cheaper than the use charge in aspects other than. If the use in such a mode increases, the number of re-distributions due to the driving of the staff decreases, so that the re-distribution costs among the operation costs E can be suppressed.
  • the operation cost E is calculated as including the cost required for redistribution, the cost associated with the use of grid power, and the cost associated with an increase in opportunity loss power.
  • the operation cost E may be calculated so as to include other elements.
  • the expression (1) for calculating the operation cost E is changed so as to include a cost associated with a decrease in the usage fee paid by the user as a result of refusing a part of the usage reservation. Also good.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Primary Health Care (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Quality & Reliability (AREA)
  • Power Engineering (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

利用予約が利用者から新たに入力されたときには、充電計画作成部(140)は、当該利用予約に対応した場合における充電計画を新たに作成する。結果送信部(130)は、当該充電計画に対応して算出された運用コストが所定の受付条件を満たさなかった場合には、利用予約には対応不可能である旨の予約結果を利用者に送信する。

Description

カーシェアリングサービスの運用システム 関連出願の相互参照
 本出願は、2016年3月9日に出願された日本国特許出願2016-045920号に基づくものであって、その優先権の利益を主張するものであり、その特許出願の全ての内容が、参照により本明細書に組み込まれる。
 本開示は、カーシェアリングサービスの運用システムに関する。
 カーシェアリングサービスとは、利用者の求めに応じて車両の一時的な貸し出しを行うサービスである。近年では、貸出対象の車両として電気自動車を用いたカーシェアリングサービスも行われている。
 カーシェアリングサービスの提供対象となるサービスエリアには、電気自動車の借り受け及び返却の窓口となるステーションが複数設けられている。それぞれのステーションには、例えば複数台の電気自動車がストックされている。カーシェアリングサービスの一態様においては、カーシェアリングサービスの利用者は、例えばインターネットを介した操作を行うことによって電気自動車の予約を行う。その後、予約の際に指定したステーションにおいて電気自動車の借り受けを行う。
 下記特許文献1には、このようなカーシェアリングサービスの運用管理システムについて記載されている。当該システムによれば、どの利用者にどの電気自動車を割り当てるのかを示す運用計画が、各電気自動車における充電率等を考慮して作成される。当該システムは、作成された運用計画に基づいて、カーシェアリングサービスを効率的に運用することが可能となっている。
特開2014-41475号公報
 本発明者らは、ステーションに停車している電気自動車への充電を、系統電力のみならず太陽光発電電力によっても行い得るような態様のシステム構成を検討してきた。このような態様においては系統電力の使用が抑制されるので、カーシェアリングサービスの運用に伴う電気料金を低減することができる。
 ところで、太陽光発電電力を効率的に利用するという観点に基づけば、太陽光発電を行い得る日中の時間帯において、ステーションに停車している(つまり、充電を行っている)電気自動車の数は可能な限り多い方が好ましい。一方で、より多くの利用者にサービスを提供するという観点に基づけば、ステーションに停車している(つまり、サービスを行っていない)電気自動車の数は可能な限り少ない方が好ましい。このように、太陽光発電電力の有効利用と、利用者へのサービスの提供とは、互いに相反するものとなっている。太陽光発電電力を効率的に利用することと、利用者の要求に応じて電気自動車を貸し出すこととのバランスを保ちながら効率的な運用を行うことについては、従来は何ら具体的な検討がなされていなかった。
 本開示はこのような課題に鑑みてなされたものであり、その目的は、太陽光発電電力を効率的に利用することと、利用者の要求に応じて電気自動車を貸し出すこととのバランスを保つことにより、カーシェアリングサービスをより効率的に運用することのできる運用システムを提供することにある。
 上記課題を解決するために、本開示に係る運用システムは、特定のサービスエリア内に設けられた複数のステーション(20)から、利用者の求めに応じて電気自動車(30)の一時的な貸し出しを行うカーシェアリングサービス、の運用システム(100)である。ステーションは、電気自動車が貸し出されていない時間帯において、太陽光発電電力及び系統電力のいずれかを電気自動車に供給して充電を行うことのできる充電設備(210)を備えたものである。この運用システムは、利用者から、電気自動車の利用予約が入力される予約入力部(120)と、利用予約に対応可能であるか否かを示す予約結果を、利用者に送信する結果送信部(130)と、ステーションにおいて電気自動車の充電が行われる予定の時間帯を、電気自動車のそれぞれについて示す充電計画、を作成する充電計画作成部(140)と、少なくとも、それぞれのステーションから電気自動車に供給可能な太陽光発電電力の予測に基づいて、カーシェアリングサービスの運用コストを算出するコスト算出部(150)と、を備える。充電計画作成部は、コスト算出部により算出される運用コストが、与えられた条件の下で最も小さくなるように充電計画を作成するものである。利用予約が利用者から新たに入力されたときには、充電計画作成部は、当該利用予約に対応した場合における充電計画を新たに作成し、結果送信部は、当該充電計画に対応して算出された運用コストが所定の受付条件を満たさなかった場合には、利用予約には対応不可能である旨の予約結果を利用者に送信する。
 このような運用システムでは、利用予約が利用者から新たに入力されると、当該利用予約に対応した場合、すなわち、当該利用予約の通りに電気自動車の貸し出しを行った場合の充放電計画が新たに作成される。当該充放電計画は、少なくとも太陽光発電電力の予測に基づいて算出される運用コストが、与えられた条件の下で最も小さくなるように作成される。その結果、入力された利用予約に仮に対応した場合における運用コストが、予測値として算出される。上記のように算出された運用コストが所定の受付条件を満たさなかった場合には、入力された利用予約には対応不可能である旨の予約結果が利用者に送信される。
 つまり、上記運用システムでは、利用者からの要求(利用予約)に可能な限り応えるような運用を原則としながらも、太陽光発電電力による充電等を考慮しながら作成された運用コストが所定の受付条件を満たさなかった場合には、例外的に利用者からの要求を拒否するような運用を行う。上記の「受付条件」とは、例えば、入力された利用予約に対応した場合における運用コストの増加量が所定の閾値以下に収まる、という条件である。
 このような構成の運用システムにおいては、適切な受付条件を設定することにより、太陽光発電電力を効率的に利用して充電を行うことと、利用者の要求に応じて電気自動車を貸し出すこととのバランスを保つことができる。その結果、カーシェアリングサービスをより効率的に運用することが可能となる。
 本開示によれば、太陽光発電電力を効率的に利用することと、利用者の要求に応じて電気自動車を貸し出すこととのバランスを保つことにより、カーシェアリングサービスをより効率的に運用することのできる運用システムが提供される。
図1は、本実施形態に係る運用システムと、これによって運用されるカーシェアリングサービスの提供に必要な構成と、を模式的に示す図である。 図2は、図1の運用システムにおける内部構成を示すブロック図である。 図3は、カーシェアリングサービスが行われる時間帯について説明するための図である。 図4は、図1の運用システムによって実行される処理の流れを示すフローチャートである。 図5は、電気自動車の蓄電量に関し設定される条件について説明するための図である。 図6は、図1の運用システムによって実行される処理の流れを示すフローチャートである。
 以下、添付図面を参照しながら本実施形態について説明する。説明の理解を容易にするため、各図面において同一の構成要素に対しては可能な限り同一の符号を付して、重複する説明は省略する。
 図1を参照しながら、本実施形態に係る運用システム100、及び運用システム100の機能によって提供されるカーシェアリングサービスの概要について説明する。カーシェアリングサービス(以下では、単に「サービス」と表記することがある)は、利用者の希望に応じて電気自動車30を一時的に貸し出すサービスである。サービスの提供に必要な構成物としては、ステーション20と、電気自動車30と、運用システム100とが挙げられる。図1では、これら構成物の全体がカーシェアリングシステム10として模式的に示されている。
 ステーション20は、サービスの利用者が訪れる窓口となる設備である。ステーション20は、サービスの提供が行われる特定の領域、すなわちサービスエリア内に複数建設されている。利用者は、いずれかのステーション20を訪れて電気自動車30を借り受ける。また、電気自動車30を使用した後は、再びステーション20を訪れて電気自動車30を返却する。借り受け時のステーション20と、返却時のステーション20とは、互いに同一であってもよく、異なっていてもよい。
 本実施形態では、利用者はサービスの提供を受けるのに先立ち、予め電気自動車30の予約を行うものとする。また、当該予約の際には、借り受け時のステーション20、返却時のステーション20、利用開始時刻、及び利用終了時刻を利用者が指定するものとする。
 ステーション20には建物220が設置されており、その周囲に電気自動車30を駐車しておくための駐車スペースが設けられている。建物220は、訪れた利用者からの質問等を必要に応じて受けるサービス窓口としての機能や、サービスを提供するために必要な事務が行われる事務所としての機能等を有するものである。図1では3つのステーション20が描かれているが、サービスエリア内に設けられたステーション20の数は例えば4つ以上であってもよく、2つのみであってもよい。
 建物220の天井部分には太陽光パネル230が設けられている。太陽光パネル230は、周知の通り太陽光のエネルギーを電力に変換するものである。ステーション20では、太陽光パネル230で発生させた電力(以下、「太陽光発電電力」とも称する)を電気自動車30に供給し、これにより電気自動車30の充電を行うことが可能となっている。
 ステーション20には、電力系統11からの電力(以下、「系統電力」とも称する)が供給されている。ステーション20では、系統電力を電気自動車30に供給し、これにより電気自動車30の充電を行うことも可能となっている。
 建物220の周囲に設けられた駐車スペースには、白線等で区切られた駐車領域(不図示)が複数設けられている。また、それぞれの駐車領域には充電設備210が1つずつ設けられている。電気自動車30が駐車領域に駐車されているとき、すなわち、当該電気自動車30がサービスに利用されていないときには、充電設備210と電気自動車30との間がケーブルで接続される。当該ケーブルを介して電気自動車30に電力が供給され、電気自動車30の充電が行われる。充電設備210から電気自動車30に供給される電力は、既に述べた通り太陽光発電電力又は系統電力のいずれかである。
 尚、図1においては、それぞれのステーション20に充電設備210(及び駐車領域)が2台分ずつ設けられているように描かれているのであるが、充電設備210等の数はこれに限定されない。例えば、充電設備210等が1台分しか設けられていないステーション20が存在してもよく、3台分以上の充電設備210等が設けられたステーション20が存在してもよい。また、充電設備210等の数はステーション20毎に異なっていてもよい。
 電気自動車30は、内部に蓄電池(不図示)を備えており、当該蓄電池に蓄えられた電力によって走行するように構成された車両である。電気自動車30は、上記蓄電池に加えて電力変換器(不図示)も備えている。電力変換器は、充電設備210から供給された電力を電力変換して蓄電池へと充電する。このとき、電力変換器は、充電設備210から電気自動車30に供給される電力の大きさを、所定範囲内で適宜調整する。尚、電気自動車30は、蓄電池と内燃機関とを備えた所謂ハイブリッド車両であってもよい。
 更に、本実施形態では、同じステーション20に停車している複数の電気自動車30が、互いの蓄電池に蓄えられている電力を融通しあうことも可能となっている。例えば、隣り合う2つの充電設備210のそれぞれに電気自動車30が接続されている状態で、一方の電気自動車30の蓄電池から放電された電力を、充電設備210を介して他方の電気自動車30の蓄電池に供給し充電を行うようなことが可能となっている。
 本実施形態では、利用者による電気自動車30の借り受け及び返却が、必ずどこかのステーション20において行われるものとする。つまり、ステーション20以外の場所で電気自動車30が乗り捨てられることは無いものとする。このため、カーシェアリングサービスが行われている時間帯においては、電気自動車30は、いずれかのステーション20に停車している状態か、利用者に貸し出されておりステーション20以外の場所を走行している状態か、のいずれかのみをとり得ることになる。
 運用システム100は、カーシェアリングサービスの運用を行うために、カーシェアリングシステム10の全体を統括制御する制御装置である。運用システム100は、CPU、ROM等を備えたコンピュータシステムとして構成されている。運用システムは、特定のステーション20に設置されていてもよく、ステーション20とは異なる場所に設置されていてもよい。また、例えば複数のステーション20に分散配置された複数のコンピュータシステムが連携することで、これらの全体が運用システム100として機能するような態様であってもよい。
 運用システム100は、利用者からの利用予約を受け付ける機能や、その利用予約に電気自動車30を割り当てる機能等を有している。図2を参照しながら、運用システム100の構成について説明する。運用システム100は、機能的な制御ブロックとして、料金提示部110と、予約入力部120と、結果送信部130と、充電計画作成部140と、コスト算出部150と、を有している。
 尚、図2において符号40が付されているのは、利用者の自宅に設置されたパソコンである。以下、「パソコン40」と表記する。パソコン40は、サービスを利用しようとする利用者が、予約の手続きを行う際のインターフェイスとなる装置である。このような装置としては、パソコン40に替えて、例えばスマートフォン等の携帯通信端末が用いられてもよい。
 料金提示部110は、後述の予約入力部120及び結果送信部130と共に、利用者のパソコン40とインターネットを介して通信を行う部分となっている。料金提示部110は、サービスの利用料金に関する情報をパソコン40に向けて送信し、当該情報をパソコン40の画面に表示させる部分である。つまり、料金提示部110は、電気自動車30を使用するために支払われるべき利用料金を利用者に提示する部分、に該当する。
 料金提示部110によって利用者に提示される利用料金は、例えば、電気自動車30の利用時間に比例した金額が設定される。このような態様に替えて、ステーション20間の距離に比例した金額が設定されてもよい。また、本実施形態では、利用者が予約を行う時点における状況(それぞれの電気自動車30の位置など)や、電気自動車30が使用される時間帯等によっても異なる金額となるように、利用料金が設定されることがある。
 予約入力部120は、利用者がパソコン40に入力した利用予約を、インターネットを介してパソコン40から受信する部分である。既に述べたように、受信される利用予約は、借り受け時のステーション20、返却時のステーション20、利用開始時刻、及び利用終了時刻を含む情報となっている。
 結果送信部130は、予約入力部120に入力された利用予約に対応可能であるか否か、すなわち、その利用予約に応じて電気自動車30を貸し出すことができるかどうかを示す予約結果を、パソコン40に向けて送信する部分である。結果送信部130から送信された予約結果はパソコン40の画面に表示され、利用者に伝達される。つまり、利用者が利用予約のための操作を行うと、これに対する返信として結果送信部130から予約結果が送信され、利用者に伝達される。
 利用予約に対応可能であることを示す予約結果には、当該予約に割り当てられた電気自動車30を特定する情報も含まれる。利用開始時刻になると、利用者は、借り受け時のステーション20として自らが指定したステーション20を訪れて、予約結果に示された特定の電気自動車30を借り受ける。その際、上記情報が登録されたICカードが、電気自動車30のキーロックを解除するためのカードキーとして用いられるような態様であってもよい。
 利用予約の操作が行われたとき、既に他の多くの利用者から利用予約が入っており、電気自動車30を貸し出すことが不可能な場合には、その旨を示す予約結果が結果送信部130から送信される。尚、本実施形態では、ステーション20に停車しており、他の利用予約に割り当てられていない電気自動車30が存在する場合であっても、入力された利用予約には対応できない旨の予約結果が結果送信部130から送信される場合がある。これについては後述する。
 充電計画作成部140は、充電計画を作成する部分である。充電計画とは、ステーション20において電気自動車30の充電が行われる予定の時間帯を、全ての電気自動車30のそれぞれについて示すデータである。尚、このような充電計画が作成されるにあたっては、これまでに入力された全ての利用予約に、それぞれどの電気自動車30を割り当てるのかを示す情報(以下、「車両割当計画」とも称する)も合わせて作成される。更に、サービスが提供されている期間の各時刻において、全ての電気自動車30がそれぞれどの位置に存在するのかを示す情報(以下、「車両位置計画」とも称する)も合わせて作成される。
 コスト算出部150は、カーシェアリングサービスを運用するために要する運用コストを算出する部分である。この運用コストには、例えば、系統電力を用いて電気自動車30への充電を行う際の電気料金が含まれる。また、電気自動車30の分布が一部のステーション20に偏ってしまった場合において、スタッフの運転によって電気自動車30を他のステーション20に移動させるための人件費が含まれる。
 図3を参照しながら、カーシェアリングサービスが行われる時間帯、及び運用システム100が行う処理の概要について説明する。
 図3に示されるタイムチャートの横軸は、その全体で1日(24時間)を示すものとなっている。時刻TSは、カーシェアリングサービスが開始される時刻であって、本実施形態では8時に設定されている。また、時刻TEは、カーシェアリングサービスが終了する時刻であって、本実施形態では20時に設定されている。つまり、時刻TSから時刻TEまでの12時間が、カーシェアリングサービスのサービス提供期間となっている。また、時刻TEから翌日の時刻TSまでの期間はサービス休止期間となっている。サービス提供期間及びサービス休止期間のいずれにおいても、利用者が利用予約を行うことは可能となっている。
 例えば図3の矢印AR0で示される時点のように、サービス休止期間において利用予約の操作が行われた場合について説明する。この場合、予約入力部120に利用予約が入力されると、充電計画作成部140は、当該利用予約に対応するという仮定の下で、充電計画、車両割当計画、及び車両位置計画を作成する。これらはいずれも、時刻TSから時刻TEまでの期間TM0におけるサービスの運用計画を示すものとして作成される。
 このとき、作成された充電計画に対応する運用コストが、コスト算出部150によって算出される。運用コストが所定の受付条件(後述)を満たす場合には、利用予約に対応可能である旨が利用者に伝達される。
 充電計画等からなるサービスの運用計画は、利用者からの利用予約が予約入力部120に入力される毎に作成される。つまり、時刻TSから時刻TEまでの期間におけるサービスの運用計画が、利用予約が入力される毎に更新されて行く。これにより、これまでに入力されていたものを含めた全ての利用予約に対する電気自動車30の割り当て等が、都度更新されて最適化されて行く。
 時刻TS以降はサービス提供期間となり、サービスの提供が開始される。利用者が電気自動車30を使用することに伴って、ステーション20間において電気自動車30が移動し始める。その結果、それぞれのステーション20に停車している(ストックされている)電気自動車30の台数は、時刻TS以前の初期状態における台数から変化して行く。
 例えば図3の矢印AR1で示される時点のように、サービス提供期間において新たな利用予約の操作が行われた場合について説明する。この場合においても上記と同様の処理が行われる。すなわち、予約入力部120に利用予約が入力されると、充電計画作成部140は、当該利用予約に対応するという仮定の下で、充電計画、車両割当計画、及び車両位置計画を作成する。ただし、これらの運用計画は、予約入力部120に利用予約が入力された現在時刻tから時刻TEまでの期間TM1におけるサービスの運用計画を示すものとして作成される。
 図4を参照しながら、運用システム100によって行われる処理の具体的な内容について説明する。図4に示される一連の処理は、所定の周期が経過する毎に、運用システム100によって繰り返し実行される。
 最初のステップS01では、予約入力部120に新たな利用予約が入力されたか否かが判定される。利用予約が入力されていない場合には、図4に示される一連の処理を終了する。利用予約が入力された場合にはステップS02に移行する。
 ステップS02では、充電計画が作成される。既に述べたように、この充電計画は、入力された利用予約に「仮に」対応した場合における運用計画を示すものである。充電計画は以下のような形式のデータとして作成される。
{pi,j(τ|t)}
 上記の「t」は、予約入力部120に利用予約が入力された現在時刻tのことである。「τ」は、現在時刻tから時刻TEまでの期間における各時刻を、現在時刻tから所定のステップ期間(Δt)が経過する毎の離散的な時刻として表現したものである。尚、現在時刻tからΔtが経過した時刻τは「t+Δt」なのであるが、以下ではこれを簡略化して「t+1」と表記する(図3を参照)。同様に、現在時刻tからΔt×2が経過した時刻τは「t+2Δt」なのであるが、以下ではこれを簡略化して「t+2」と表記する。それ以降の時刻τについても同様に表記する。時刻τは、t+1からTEまでの値をとることになる。
 上記の「i」は、ステーション20を特定するための整数値が入る変数である。以下では、ステーション20の総数をSとし、それぞれのステーション20には1からSまでの個別のIDが付されているものとする。従って、上記のiは1からSまでのいずれかの整数値をとることになる。
 上記の「j」は、電気自動車30を特定するための整数値が入る変数である。以下では、電気自動車30の総数をVとし、それぞれの電気自動車30には1からVまでの個別のIDが付されているものとする。従って、上記のjは1からVまでのいずれかの整数値をとることになる。
 pi,j(τ|t)は、現在時刻t以降の特定の時刻τにおいて、IDがiのステーション20で、IDがjの電気自動車30に充電される電力の大きさを示している。充電計画{pi,j(τ|t)}は、上記のような電力の大きさを、全てのτ、i、jの組み合わせについて示すデータとして作成される。このような充電計画{pi,j(τ|t)}は、ステーション20において電気自動車30の充電が行われる予定の時間帯を、電気自動車30のそれぞれについて示すデータとなっている。
 ステップS02では、上記の充電計画{pi,j(τ|t)}に加えて、車両割当計画及び車両位置計画も作成される。このうち、車両割当計画は以下のような形式のデータとして作成される。
{aj,k(t)}
 上記の「k」は、新たに入力された利用予約を含めて、これまでに入力された全ての利用予約を特定するための整数値が入る変数である。以下では、利用予約の総数をRとし、それぞれの利用予約には1からRまでの個別のIDが付されているものとする。従って、上記のkは1からRまでのいずれかの整数値をとることになる。尚、Rは、利用予約が入力されていく毎に増加して行くものであるから、正確には「R(t)」と表記すべきものである。
 IDがkの利用予約が、IDがjの電気自動車に割り当てられた場合には、aj,k(t)の値は1とされる。それ以外の場合には、aj,k(t)の値は0とされる。このように、aj,k(t)は、0又は1の値をとることにより予約の割り当てを表現するものである。車両割当計画{aj,k(t)}は、現在時刻tにおける上記のような予約の割り当てを、全てのj、kの組み合わせについて示すデータとして作成される。
 車両位置計画は以下のような形式のデータとして作成される。
{xi,j(τ|t)}
 IDがjの電気自動車30が、IDがiのステーション20に停車しているときには、xi,j(τ|t)の値は1とされる。それ以外のときには、xi,j(τ|t)の値は0とされる。車両位置計画{xi,j(τ|t)}は、時刻τにおけるxi,j(τ|t)の値を、全てのτ、j、kの組み合わせについて示すデータとして作成される。これにより、各時刻τにおける電気自動車30の位置が表現される。
 尚、車両位置計画{xi,j(τ|t)}は、電気自動車30がいずれのステーション20にも停車していない場合、すなわち走行中である場合も含めて表現するものでなければならない。そこで、電気自動車30が走行中であるときのことを、(実際には存在しない)IDがS+1のステーション20に当該電気自動車30が停車しているものとして表現することとする。つまり、車両位置計画{xi,j(τ|t)}におけるjは、1からS+1までのいずれかの整数値をとることとする。
 以上の充電計画{pi,j(τ|t)}、車両割当計画{aj,k(t)}、及び車両位置計画{xi,j(τ|t)}は、以下の式(1)で示される運用コストEが、所定の条件(後述)の下で最も小さくなるようなデータとしてそれぞれ算出される。つまり、所定の条件の下で運用コストEを最小化する演算の結果として、それぞれの運用計画が作成される。
Figure JPOXMLDOC01-appb-M000001
 式(1)の各項について説明する。第1項におけるfd(i1,i2,τ)は、(利用者ではなく)スタッフによる再配車を行うのに要する再配車コストを表す関数である。fd(i1,i2,τ)は、IDがi1のステーション20から、IDがi2のステーション20への再配車が、時刻τに行われた場合における再配車コストを表している。尚、fd(i1,i2,τ)は、上記のような場合における再配車コスト(金額)のみを特定するものであって、上記のような再配車が実際に行われるかどうかまで特定するものではない。再配車が実際に行われるかどうかは、di1,i2(τ)によって特定される。
 fd(i1,i2,τ)がτの関数となっているのは、例えば、道路の混雑状況等が時間帯よって変化し、これに応じて再配車に要するコストが変化することを考慮したものである。また、スタッフの時給が時間帯ごとに変化することを考慮してもよい。
 第1項におけるdi1,i2(τ)は、以下の式(2)で表される関数である。
Figure JPOXMLDOC01-appb-M000002
 上記の式(2)右辺のうちxi1,j(τ)が1となるのは、時刻τにおいて、IDがjの電気自動車30が、IDがi1のステーション20に停車している場合である。また、xi2,j(τ+1)が1となるのは、時刻τ+1(時刻τからΔtが経過した時刻)において、上記と同じ電気自動車30が、IDがi2のステーション20に停車している場合である。
 このため、式(2)で表されるdi1,i2(τ)の値が1となるのは、時刻τからΔtが経過する際に、IDがjの電気自動車30が、IDがi1のステーション20からIDがi2のステーション20へと再配車により移動する場合、ということになる。
 以上のことから、式(1)の第1項は、利用予約に対応するために、互いに異なるステーション20の間で電気自動車30を予めスタッフが移動させておく作業、に要する再配車コストを表すものとなっている。
 式(1)の第2項及び第3項について説明する前に、gi(τ)、wi(τ)、及びli(τ)についてそれぞれ説明しておく。gi(τ)は、時刻τにおいて、IDがiのステーション20で発生し得る太陽光発電電力の値(単位:W)である。以下、「発電可能電力gi(τ)」とも表記する。
 発電可能電力gi(τ)は、例えば気象予報会社から取得される日照量の予測データや、それぞれのステーション20が設置されている場所等に基づいて、予め作成されたデータである。発電可能電力gi(τ)は、ID(つまりi)が1からSまでの全てのステーション20について、且つ時刻TSから時刻TEまでの期間における全ての時刻τについて、運用システム100によって予め作成される。
 尚、時刻τにおいてステーション20で実際に発生する太陽光発電電力の値は、必ずしも発電可能電力gi(τ)に一致するとは限らない。例えば、ステーション20の太陽光パネル230に十分な日光が入射していたとしても、当該ステーション20に駐車している電気自動車30が一台も存在しない場合には、発生した太陽光発電電力を受け入れることができない。太陽光パネル230は、このようなときには自動的に発電を抑制するように構成されている。従って、発電可能電力gi(τ)は、ステーション20で時刻τに発生し得る太陽光発電電力の最大値を示すもの、ということができる。
 wi(τ)は、上記の発電可能電力gi(τ)から、IDがiのステーション20で実際に発生する太陽光発電電力の値(単位:W)を差し引いたもの、として定義される電力値である。このようなwi(τ)は、ステーション20に駐車している電気自動車30が存在しない等の理由により、発電される機会が失われてしまった電力の値を示すもの、ということができる。従って、wi(τ)のことを以下では「機会損失電力wi(τ)」とも表記する。
 li(τ)は、時刻τにおいて、IDがiのステーション20に供給される系統電力の値(単位:W)である。以下では、系統電力li(τ)とも表記する。この系統電力li(τ)と、上記の発電可能電力gi(τ)及び機会損失電力wi(τ)とは、以下の式(3)で示される関係にある。
Figure JPOXMLDOC01-appb-M000003
 例えば、発電可能電力gi(τ)が比較的小さい時間帯には、充電計画{pi,j(τ|t)}の通りに充電が行われるように、系統電力li(τ)の値が調整される。その結果、当該時間帯における機会損失電力wi(τ)の値は0となる。
 また、発電可能電力gi(τ)が比較的大きく、且つ充電の必要性が比較的小さな時間帯には、系統電力li(τ)は0となり、機会損失電力wi(τ)は0よりも大きな値となる。式(1)の運用コストEを最小化する演算においては、充電計画{pi,j(τ|t)}に沿った充電が、可能な限り太陽光発電電力によって行われるように、各時刻τにおける系統電力li(τ)の値が適宜調整されることとなる。
 式(1)の第2項におけるfw(τ)は、1ワット時あたりにおける太陽光発電電力の価値を、金額に換算して表したものである。fw(τ)は、例えば、時刻τにおける売電価格を示す関数として記述されたものであってもよい。
 式(1)の第2項は、機会損失電力wi(τ)を全てのステーション20について合計したものに上記のfw(τ)を掛けて、これを現在時刻t以降の期間について積分したもの、に該当する。すなわち、サービス提供期間のうち残りの期間において、発電機会が失われる太陽光発電電力の価格に該当する。
 式(1)の第3項におけるfl(τ)は、1ワット時あたりにおける系統電力の価値を金額に換算して表したものである。このようなfl(τ)は買電価格に該当する。
 式(1)の第3項は、系統電力li(τ)を全てのステーション20について合計したものに上記のfl(τ)を掛けて、これを現在時刻t以降の期間について積分したもの、に該当する。すなわち、サービス提供期間のうち残りの期間において、系統電力を各電気自動車30に供給して充電を行うのに要する系統充電コスト、を表すものとなっている。
 図4のステップS02では、以上のような第1項、第2項、及び第3項の和である運用コストEを最小化するような、充電計画{pi,j(τ|t)}、車両割当計画{aj,k(t)}、及び車両位置計画{xi,j(τ|t)}がそれぞれ作成される。これらは、コスト算出部150による運用コストEの算出を都度行いながら、充電計画作成部140が行う計算によって作成される。
 尚、運用コストEを最小化する演算を行うにあたっては、種々の初期条件、及び種々の制約条件が設定される。最小化の演算はこれら複数の条件の下で行われる。初期条件としては、例えば、各電気自動車30の現在位置が設定される。この現在位置に関する初期条件は、τ=0のときにおける車両位置計画{xi,j(0|t)}の各値に該当するものである。
 また、各電気自動車30に搭載されたそれぞれの蓄電池の、現在時刻(τ=0)におけるSOC(蓄電量)も、初期条件として設定される。このような初期のSOCを示す情報は、例えば、電気自動車30と充電設備210との間で行われる通信により予め取得される。
 制約条件としては、例えば、各電気自動車30に搭載されたそれぞれの蓄電池の、時刻TEにおけるSOCの値が設定される。つまり、サービス提供期間が終了する時点における最終的な各SOCの目標値(目標蓄電量)が設定される。このようなサービス終了時刻のSOCは、可能な限り大きい方が望ましいようにも思われるのであるが、例えば一律に100%とした場合には、翌日の機会損失電力wi(τ)が大きくなってしまう可能性がある。このため、必ずしも大きい程望ましいというものではない。このサービス終了時刻のSOCは、例えば一律50%に設定される。
 上記のような制約条件が設定されることにより、充電計画作成部140による充電計画{pi,j(τ|t)}等の作成は、カーシェアリングサービスの終了時点におけるそれぞれの電気自動車30の蓄電量が、上記の目標蓄電量に一致するように行われる。
 他の制約条件としては、電気自動車30が走行中において、ステップ期間(Δt)が経過する間における消費電力量、すなわち蓄電量の減少量が、各電気自動車30について個別に設定される。
 更に他の制約条件として、サービス運用中におけるSOCについての上限値及び下限値が、それぞれの電気自動車30について個別に設定される。これにより、サービス運用中における各電気自動車30のSOCが、常に下限値から上限値までの範囲に収まるという条件の下で、充電計画作成部140による充電計画{pi,j(τ|t)}等の作成が行われることとなる。
 図5には、制約条件として設定されるSOCの上限値の推移(線L1)、及び下限値の推移(線L2)の一例が示されている。図5の例では、SOCの上限値は一律100%となるように設定されており、その値が途中で変化することは無い。
 一方、SOCの下限値は、時刻T10から時刻T20までの期間において一時的に上昇するように設定される。例えば、電気自動車30の貸し出し頻度が高くなるような時間帯が予め判明しているのであれば、当該時間帯におけるSOCの下限値をこのように一時的に大きくすることが望ましい。これにより、電気自動車30の蓄電量が走行中に減少し過ぎて、走行不可能となってしまうような事態を防止することができる。尚、図5に示される条件はあくまでも一例であって、これとは異なる条件が設定されてもよい。例えば、SOCの上限値が時間と共に変化するような条件が設定されてもよい。
 また、電気自動車30に充電が行われる際における充電電力の上限値及び下限値が、更なる制約条件として追加されてもよい。更に、電気自動車30間における電力の融通まで考慮する場合には、電気自動車30から放電される電力の上限値及び下限値が、更なる制約条件として追加されてもよい。
 尚、運用コストEを最小化するための演算を行うに当たっては、例えば、一つの利用予約に割り当てられる電気自動車30の台数を「1」に限定する等、現実の世界を記述するためには当然に必要となる制約条件が、上記に加えて用いられることは言うまでもない。
 図4に戻って説明を続ける。ステップS02において充電計画{pi,j(τ|t)}等が作成されると、ステップS03に移行する。ステップS03では、運用コストEが算出される。ここで算出される運用コストEの値は、ステップS02において、式(1)最小化した結果として得られる値である。つまり、ステップS02で作成された充電計画{pi,j(τ|t)}等に沿ってサービスが運用された場合における、運用コストEの値である。
 ステップS03に続くステップS04では、ステップS03で算出された運用コストEが、受付条件を満たすか否かが判定される。本実施形態における受付条件とは、前回算出された運用コストEから、今回算出された運用コストEを差し引いて得られる差分値が、所定の閾値以下に収まる、という条件に設定されている。上記の差分値は、ステップS01において予約入力部120に入力された新たな利用予約に対応することによる、運用コストEの増加量に該当するものである。
 運用コストEが受付条件を満たしていたとき、すなわち、上記差分値が閾値以下に収まっていたときには、ステップS05に移行する。ステップS05に移行したということは、新たな利用予約に対応したとしても、運用コストEの増加量は比較的小さいということである。このため、ステップS05では、ステップS01において入力された新たな利用予約に対応することが確定され、当該利用予約が登録される。
 このとき、結果送信部130からは、利用予約に対応可能であることを示す予約結果が、利用者のパソコン40に送信される。また、当該予約結果には、利用予約に割り当てられた電気自動車30を特定する情報も含まれる。
 ステップS05に続くステップS06では、充電計画{pi,j(τ|t)}、車両割当計画{aj,k(t)}、及び車両位置計画{xi,j(τ|t)}のそれぞれが、仮の計画ではなく確定した計画として更新される。その後は、この確定した充電計画{pi,j(τ|t)}等に沿ってサービスが運用される。
 ステップS04において、運用コストEが受付条件を満たしていなかったときには、ステップS07に移行する。ステップS07に移行したということは、新たな利用予約に対応すると、運用コストEの増加量が比較的大きくなってしまうということである。このような場合には、例えば、再配車を行うためのスタッフのタイムスケジュールを大幅に変更する必要が生じる等、サービスの運用に混乱が生じる可能性が高くなる。
 このため、ステップS07では、ステップS01において予約入力部120に入力された新たな利用予約に対応しないことが確定され、当該利用予約が拒否される。結果送信部130からは、利用予約に対応不可能であることを示す予約結果が、利用者のパソコン40に送信される。この場合には、ステップS02で作成された運用計画は全て破棄される。つまり、充電計画{pi,j(τ|t)}、車両割当計画{aj,k(t)}、及び車両位置計画{xi,j(τ|t)}はいずれも更新されない。
 以上のような処理が行われる結果、予約入力部120に利用予約が入力される度に、そのときの状況(各電気自動車30の現在位置やSOC等)に合わせて充電計画{pi,j(τ|t)}等が更新される。尚、サービス提供期間の途中において一部の電気自動車30が故障したり、新たな電気自動車30が投入されたりすることにより、電気自動車30の総数が変化することがある。その場合には、その変化に応じてVの値を変更し、車両位置計画{xi,j(τ|t)}を作成すればよい。このように、状況の変化に柔軟に対応しながら、適切なサービスの運用を行うことができる。
 尚、充電計画作成部140による充電計画{pi,j(τ|t)}等の作成、及び更新は、予約入力部120に利用予約が入力されない場合であっても、所定の周期で定期的に行われる。そのために行われる処理について、図6を参照しながら説明する。
 図6に示される一連の処理は、所定の周期が経過する毎に、運用システム100によって繰り返し実行される。また、図4に示される一連の処理と並行して行われる。
 最初のステップS11では、現在の時刻が更新時刻となったか否かが判定される。更新時刻とは、充電計画{pi,j(τ|t)}等の更新を定期的に行うための時刻として、サービス対象期間に複数設定された時刻である。本実施形態では、時刻TSから所定のステップ期間(例えば15分間)が経過する毎の各時刻が、上記の更新時刻として予め設定されている。
 現在の時刻が更新時刻となっていなければ、図6に示される一連の処理を終了する。現在の時刻が更新時刻となっていれば、ステップS12に移行する。
 ステップS12では、図4のステップS02で行われる処理と同一の処理が行われる。このとき、追加された新たな利用予約は存在しないので、これまでに入力された(且つ対応可能なものとして登録された)それぞれの利用予約に電気自動車30の割り当てが行われるように、充電計画{pi,j(τ|t)}等の作成が行われる。作成される充電計画{pi,j(τ|t)}等は、現時点における各電気自動車30の蓄電量や、現在位置の情報が反映されたものとなる。
 ステップS12に続くステップS13では、ステップS12で作成された充電計画{pi,j(τ|t)}、車両割当計画{aj,k(t)}、及び車両位置計画{xi,j(τ|t)}のそれぞれが、そのまま確定した計画として更新される。
 以上に説明したように、本実施形態に係る運用システム100では、利用者からの要求(利用予約)に可能な限り応えるような運用を原則としながらも、太陽光発電電力による充電等を考慮しながら作成された運用コストEが所定の受付条件を満たさなかった場合には、例外的に利用者からの要求を拒否するような運用が行われる。
 これより、太陽光発電電力を効率的に利用して電気自動車30の充電を行うことと、利用者の要求に応じて電気自動車30を貸し出すこととのバランスを、適切に保つことが可能となっている。その結果、カーシェアリングサービスをより効率的に運用することができる。
 以上に説明した運用システム100には、種々の変更や改良を加えることができる。例えば、図4のステップS04に用いられる受付条件として、ステップS03で算出された運用コストEの値が所定の閾値以下に収まる、という条件が設定されてもよい。すなわち、新たな利用予約に対応した場合の運用コストEが閾値以下に収まる、という条件が、受付条件として設定されてもよい。
 図4を参照しながら説明した充電計画{pi,j(τ|t)}等の作成方法は、新たな利用予約が入力される度に、車両割当計画{aj,k(t)}の全体を変更するものとなっている。つまり、既存の利用予約に対する電気自動車30の割り当てが行われた後であっても、新たな利用予約が入力されると、既存の割り当てをすべて破棄して全体を割り当て直すものとなっている。このため、カーシェアリングシステム10の規模によっては、運用システム100における計算負荷が大きくなり過ぎてしまい、充電計画{pi,j(τ|t)}の作成に長時間を要してしまう可能性がある。
 これに対する対策としては、入力された新たな利用予約についての電気自動車30の割り当てのみを行うこととし、それまでに確定していた割り当てについては変更しないこととしてもよい。つまり、予約入力部120に新たな利用予約が入力されたときには、充電計画作成部140が、それよりも前に入力されていた既存の利用予約に対する電気自動車30の割り当てを変更しないという制約の下で、充電計画{pi,j(τ|t)}、車両割当計画{aj,k(t)}、及び車両位置計画{xi,j(τ|t)}のそれぞれを作成することとしてもよい。
 この場合、式(1)の運用コストEを最小化するに当たっては、車両割当計画{aj,k(t)}のうち、kが1からR-1までのデータは変更されることなく、制約条件として用いられることとなる。従って、運用コストEを最小化した結果として得られるのは、車両割当計画{aj,k(t)}のうち上記以外の部分(つまりaj,R(t))と、充電計画{pi,j(τ|t)}と、車両位置計画{xi,j(τ|t)}ということになる。
 このような方法によれば、既存の割り当てが変更されないので、充電計画{pi,j(τ|t)}等を作成するための計算負荷を著しく低減させることができる。その結果、利用予約の手続に対する応答(つまり予約結果)を、短時間のうちに利用者に返すことが可能となる。
 サービスの運用中においては、電気自動車30の分布に偏りが生じ、一部のステーション20に駐車している電気自動車30の数が増加し過ぎてしまうことがある。その場合、利用者からの利用予約に対応可能な状態とするために、当該ステーション20から他のステーション20へと電気自動車30を移動させなければならない。このため、再配車コストが増加してしまう。
 このような場合には、料金提示部110によって利用者に提示される利用料金を状況に応じて変更することで、運用コストEを更に減少させることができる。例えば、駐車している電気自動車30の台数が多いステーション20で借り受けて、駐車している電気自動車30の台数が少ないステーション20で返却するような利用態様(走行経路)についての利用料金を、それ以外の態様における利用料金よりも低廉な料金として利用者に提示すればよい。そのような態様での利用が増加すれば、スタッフの運転による再配車の回数が減少するので、運用コストEのうち再配車コストを抑制することができる。
 本実施形態においては、運用コストEは、再配車に要するコストと、系統電力の使用に伴うコストと、機会損失電力の増加に伴うコストと、をそれぞれ含むものとして算出される。これらに加えて、別の要素をも含むように運用コストEが算出されてもよい。例えば、利用予約の一部を拒否する結果、利用者から支払われる使用料金が減少してしまうことに伴うコストをも含むように、運用コストEを算出するための式(1)を変更してもよい。
 以上、具体例を参照しつつ本実施形態について説明した。しかし、本開示はこれらの具体例に限定されるものではない。これら具体例に、当業者が適宜設計変更を加えたものも、本開示の特徴を備えている限り、本開示の範囲に包含される。前述した各具体例が備える各要素およびその配置、条件、形状などは、例示したものに限定されるわけではなく適宜変更することができる。前述した各具体例が備える各要素は、技術的な矛盾が生じない限り、適宜組み合わせを変えることができる。

Claims (13)

  1.  特定のサービスエリア内に設けられた複数のステーション(20)から、利用者の求めに応じて電気自動車(30)の一時的な貸し出しを行うカーシェアリングサービス、の運用システム(100)であって、
     前記ステーションは、前記電気自動車が貸し出されていない時間帯において、太陽光発電電力及び系統電力のいずれかを前記電気自動車に供給して充電を行うことのできる充電設備(210)を備えたものであり、
     利用者から、前記電気自動車の利用予約が入力される予約入力部(120)と、
     前記利用予約に対応可能であるか否かを示す予約結果を、利用者に送信する結果送信部(130)と、
     前記ステーションにおいて前記電気自動車の充電が行われる予定の時間帯を、前記電気自動車のそれぞれについて示す充電計画、を作成する充電計画作成部(140)と、
     少なくとも、それぞれの前記ステーションから前記電気自動車に供給可能な前記太陽光発電電力の予測に基づいて、カーシェアリングサービスの運用コストを算出するコスト算出部(150)と、を備え、
     前記充電計画作成部は、前記コスト算出部により算出される前記運用コストが、与えられた条件の下で最も小さくなるように前記充電計画を作成するものであって、
     前記利用予約が利用者から新たに入力されたときには、
     前記充電計画作成部は、当該利用予約に対応した場合における前記充電計画を新たに作成し、
     前記結果送信部は、当該充電計画に対応して算出された前記運用コストが所定の受付条件を満たさなかった場合には、前記利用予約には対応不可能である旨の前記予約結果を利用者に送信する運用システム。
  2.  前記運用コストは、
     前記利用予約に対応するために、互いに異なる前記ステーションの間で前記電気自動車を予め移動させておく作業、に要する再配車コストをも含むものとして算出される、請求項1に記載の運用システム。
  3.  前記運用コストは、
     系統電力を前記電気自動車に供給して充電を行うのに要する系統充電コストをも含むものとして算出される、請求項1に記載の運用システム。
  4.  前記受付条件とは、
     前記予約入力部に入力された新たな前記利用予約、に対応することによる前記運用コストの増加量が、所定の閾値以下に収まるという条件である、請求項1に記載の運用システム。
  5.  前記受付条件とは、
     前記予約入力部に入力された新たな前記利用予約、に対応した場合における前記運用コストの値が、所定の閾値以下に収まるという条件である、請求項1に記載の運用システム。
  6.  前記充電計画作成部は、現時点におけるそれぞれの前記電気自動車の蓄電量に基づいて前記充電計画を作成する、請求項1に記載の運用システム。
  7.  前記充電計画作成部は、カーシェアリングサービスの終了時点におけるそれぞれの前記電気自動車の蓄電量が、所定の目標蓄電量に一致するように前記充電計画を作成する、請求項1に記載の運用システム。
  8.  前記充電計画作成部は、
     カーシェアリングサービスの運用中において、それぞれの前記電気自動車の蓄電量が常に所定範囲に収まるように前記充電計画を作成する、請求項1に記載の運用システム。
  9.  前記所定範囲は、時間帯によって異なる範囲となるように設定されている、請求項8に記載の運用システム。
  10.  前記予約入力部に新たな前記利用予約が入力されたときには、
     前記充電計画作成部は、それよりも前に入力されていた既存の前記利用予約に対する前記電気自動車の割り当てを変更しないという制約の下で、前記充電計画を作成する、請求項1に記載の運用システム。
  11.  前記充電計画作成部が前記充電計画を作成する際には、
     それぞれの前記利用予約にどの前記電気自動車30を割り当てるのかを示す車両割当計画、もあわせて作成される、請求項1に記載の運用システム。
  12.  前記充電計画作成部が前記充電計画を作成する際には、
     カーシェアリングサービスが行われている期間の各時刻において、それぞれの前記電気自動車30がどの位置に存在するのかを示す車両位置計画、もあわせて作成される、請求項1に記載の運用システム。
  13.  前記予約入力部に前記利用予約が入力される際に、前記電気自動車を使用するために支払われるべき利用料金を利用者に提示する料金提示部(110)を更に備え、
     前記料金提示部は、
     前記再配車コストが抑制されるような経路で前記電気自動車が使用される場合の前記利用料金を、それ以外の場合における前記利用料金よりも低廉な料金として提示する、請求項2に記載の運用システム。
PCT/JP2017/000840 2016-03-09 2017-01-12 カーシェアリングサービスの運用システム WO2017154341A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DE112017001212.0T DE112017001212T5 (de) 2016-03-09 2017-01-12 System zum Betrieb für einen Fahrzeug-Sharing-Dienst
US16/082,310 US11301785B2 (en) 2016-03-09 2017-01-12 Operating system for vehicle-sharing service

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2016-045920 2016-03-09
JP2016045920A JP6475177B2 (ja) 2016-03-09 2016-03-09 カーシェアリングサービスの運用システム

Publications (1)

Publication Number Publication Date
WO2017154341A1 true WO2017154341A1 (ja) 2017-09-14

Family

ID=59790227

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2017/000840 WO2017154341A1 (ja) 2016-03-09 2017-01-12 カーシェアリングサービスの運用システム

Country Status (4)

Country Link
US (1) US11301785B2 (ja)
JP (1) JP6475177B2 (ja)
DE (1) DE112017001212T5 (ja)
WO (1) WO2017154341A1 (ja)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7003586B2 (ja) * 2017-11-09 2022-01-20 トヨタ自動車株式会社 カーシェアリング料金の料金設定装置、料金設定方法、料金設定システムおよび料金設定プログラム
JP2019101920A (ja) * 2017-12-06 2019-06-24 トヨタ自動車株式会社 情報処理装置および情報処理方法
JP7317537B2 (ja) * 2019-03-22 2023-07-31 東京瓦斯株式会社 情報処理システム及びプログラム
WO2021220501A1 (ja) * 2020-05-01 2021-11-04 三菱電機株式会社 エネルギーマネジメントシステム
JP2022126449A (ja) * 2021-02-18 2022-08-30 トヨタ自動車株式会社 制御装置、方法、及びプログラム

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011080905A1 (ja) * 2009-12-28 2011-07-07 パナソニック株式会社 充電システム及び充電システムの制御方法
JP2014032531A (ja) * 2012-08-03 2014-02-20 Toyota Motor Corp カーシェアリングシステムの運用計画システム、運用計画方法
JP2014041475A (ja) * 2012-08-22 2014-03-06 Toyota Motor Corp カーシェアリングシステムの運用管理システムおよび方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015052984A (ja) 2013-09-09 2015-03-19 株式会社オートネットワーク技術研究所 車両貸出システム、中央装置、及び車両貸出方法
JP2015069584A (ja) 2013-09-30 2015-04-13 株式会社日立製作所 カーシェアリングサービスシステム及びカーシェアリングサービス提供方法
JP2016045920A (ja) 2014-08-27 2016-04-04 三菱電機株式会社 認証システム、認証装置、認証方法及びプログラム

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011080905A1 (ja) * 2009-12-28 2011-07-07 パナソニック株式会社 充電システム及び充電システムの制御方法
JP2014032531A (ja) * 2012-08-03 2014-02-20 Toyota Motor Corp カーシェアリングシステムの運用計画システム、運用計画方法
JP2014041475A (ja) * 2012-08-22 2014-03-06 Toyota Motor Corp カーシェアリングシステムの運用管理システムおよび方法

Also Published As

Publication number Publication date
JP6475177B2 (ja) 2019-02-27
DE112017001212T5 (de) 2018-12-20
US11301785B2 (en) 2022-04-12
JP2017162180A (ja) 2017-09-14
US20190087753A1 (en) 2019-03-21

Similar Documents

Publication Publication Date Title
JP6583178B2 (ja) カーシェアリングサービスの運用システム
WO2017154341A1 (ja) カーシェアリングサービスの運用システム
CN113195299B (zh) 用于优化分布的充电站效率和用户体验的方法和系统
JP6183539B2 (ja) 作業員管理装置、作業員管理システム及び作業員管理方法
JP6129701B2 (ja) 充電管理装置、充電管理システムおよび充電管理方法
US20110246252A1 (en) Vehicle charging allocation managing server and vehicle charging allocation managing system
US20220048400A1 (en) Ev management system
JP2013027163A (ja) 蓄電池充電計画支援システム
WO2020255507A1 (ja) 配車管理方法、及び配車管理装置
JP2019033629A (ja) 電力制御方法、制御装置、充電システム及びプログラム
WO2020115992A1 (ja) 貸与情報生成装置、二次電池管理装置、ユーザ端末装置、コンピュータプログラム及び貸与情報生成方法
CN105701864A (zh) 拼出租车过程中的费用计算支付方法及其系统
JP2021002940A (ja) エネルギマネージメント方法、及びエネルギマネージメント装置
US20230001817A1 (en) Hierarchical energy management solution
IT201800011089A1 (it) Sistema per il controllo e la gestione della ricarica di veicoli elettrici
WO2019244213A1 (ja) 車両管理システム、車両管理コンピュータ、及び車両管理方法
JP7465140B2 (ja) 充電予約システム、充電予約管理サーバ、利用者端末、充電予約管理方法及びプログラム
Csiszár et al. Concept of an integrated mobile application aiding electromobility
Csonka et al. Integrated information service for plug-in electric vehicle users including smart grid functions
KR102601660B1 (ko) 이동형 에너지 저장 장치를 활용한 충전 서비스 제공 시스템 및 그 방법
US20230196236A1 (en) City management support apparatus, city management support method, and non-transitory computer-readable storage medium
JP7369502B1 (ja) 情報処理装置、情報処理方法及びプログラム
JP2024086572A (ja) 情報処理装置、情報処理方法及びプログラム
JP2024085995A (ja) 情報処理装置、情報処理方法及びプログラム
US20240217387A1 (en) Strategic Opportunity Charging for On-Route Electric Vehicles

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17762688

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 17762688

Country of ref document: EP

Kind code of ref document: A1