WO2017057275A1 - 作業機の管理システム - Google Patents
作業機の管理システム Download PDFInfo
- Publication number
- WO2017057275A1 WO2017057275A1 PCT/JP2016/078274 JP2016078274W WO2017057275A1 WO 2017057275 A1 WO2017057275 A1 WO 2017057275A1 JP 2016078274 W JP2016078274 W JP 2016078274W WO 2017057275 A1 WO2017057275 A1 WO 2017057275A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- work machine
- information
- communication device
- unit
- rental
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/2025—Particular purposes of control systems not otherwise provided for
- E02F9/2054—Fleet management
-
- G—PHYSICS
- G07—CHECKING-DEVICES
- G07C—TIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
- G07C5/00—Registering or indicating the working of vehicles
- G07C5/02—Registering or indicating driving, working, idle, or waiting time only
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60K—ARRANGEMENT OR MOUNTING OF PROPULSION UNITS OR OF TRANSMISSIONS IN VEHICLES; ARRANGEMENT OR MOUNTING OF PLURAL DIVERSE PRIME-MOVERS IN VEHICLES; AUXILIARY DRIVES FOR VEHICLES; INSTRUMENTATION OR DASHBOARDS FOR VEHICLES; ARRANGEMENTS IN CONNECTION WITH COOLING, AIR INTAKE, GAS EXHAUST OR FUEL SUPPLY OF PROPULSION UNITS IN VEHICLES
- B60K31/00—Vehicle fittings, acting on a single sub-unit only, for automatically controlling vehicle speed, i.e. preventing speed from exceeding an arbitrarily established velocity or maintaining speed at a particular velocity, as selected by the vehicle operator
- B60K31/0058—Vehicle fittings, acting on a single sub-unit only, for automatically controlling vehicle speed, i.e. preventing speed from exceeding an arbitrarily established velocity or maintaining speed at a particular velocity, as selected by the vehicle operator responsive to externally generated signalling
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01S—RADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
- G01S11/00—Systems for determining distance or velocity not using reflection or reradiation
- G01S11/02—Systems for determining distance or velocity not using reflection or reradiation using radio waves
- G01S11/06—Systems for determining distance or velocity not using reflection or reradiation using radio waves using intensity measurements
-
- G—PHYSICS
- G07—CHECKING-DEVICES
- G07B—TICKET-ISSUING APPARATUS; FARE-REGISTERING APPARATUS; FRANKING APPARATUS
- G07B15/00—Arrangements or apparatus for collecting fares, tolls or entrance fees at one or more control points
-
- G—PHYSICS
- G07—CHECKING-DEVICES
- G07C—TIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
- G07C3/00—Registering or indicating the condition or the working of machines or other apparatus, other than vehicles
-
- G—PHYSICS
- G07—CHECKING-DEVICES
- G07C—TIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
- G07C3/00—Registering or indicating the condition or the working of machines or other apparatus, other than vehicles
- G07C3/02—Registering or indicating working or idle time only
-
- G—PHYSICS
- G07—CHECKING-DEVICES
- G07C—TIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
- G07C5/00—Registering or indicating the working of vehicles
- G07C5/008—Registering or indicating the working of vehicles communicating information to a remotely located station
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/28—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
- E02F3/30—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with a dipper-arm pivoted on a cantilever beam, i.e. boom
- E02F3/32—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with a dipper-arm pivoted on a cantilever beam, i.e. boom working downwardly and towards the machine, e.g. with backhoes
- E02F3/325—Backhoes of the miniature type
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/96—Dredgers; Soil-shifting machines mechanically-driven with arrangements for alternate or simultaneous use of different digging elements
- E02F3/963—Arrangements on backhoes for alternate use of different tools
- E02F3/964—Arrangements on backhoes for alternate use of different tools of several tools mounted on one machine
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/2025—Particular purposes of control systems not otherwise provided for
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/2058—Electric or electro-mechanical or mechanical control devices of vehicle sub-units
- E02F9/2062—Control of propulsion units
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/26—Indicating devices
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/06—Buying, selling or leasing transactions
- G06Q30/0645—Rental transactions; Leasing transactions
Definitions
- the present invention relates to a work machine management system.
- Patent Document 1 there is a technique shown in Patent Document 1 as a technique for monitoring a storage location of a vehicle.
- the line sensor which can detect a vehicle is installed in the doorway of the garage which is a storage place of a vehicle.
- the storage location is monitored by enabling the line sensor to detect an intruder who attempts to enter the storage location.
- Patent Document 2 As a system for managing the expiration date of a conventional work machine, a technique disclosed in Patent Document 2 is known.
- an expiration date storage unit that stores an expiration date
- an operation limitation unit that limits the operation of the drive unit when the expiration date is reached
- an expiration date extension unit that extends the expiration date
- a wireless terminal is provided that can receive a permission signal permitting extension of the expiration date when entering a preset wireless communication area.
- Patent Document 3 when there is a work machine rental reservation, the rental company prepares an engine start key for the work machine (rental work machine) to be rented. The rental company deposits the prepared engine start key with the user who uses the rental work machine, so that the user can drive the rental work machine.
- Patent Document 1 in order to start monitoring the storage location, it was necessary to operate an operation panel or the like installed at the storage location after stopping the vehicle at the storage location. In this case, if the operation panel is forgotten, there is a problem that the storage location cannot be monitored, that is, the vehicle cannot be monitored. Further, Patent Document 1 is intended for monitoring storage locations such as automobiles, and the actual situation is that a system for monitoring work machines or the like has not been developed yet.
- the expiration date is stored on the work machine side, and when the expiration date comes, the work machine is limited. In such a system, it is necessary to write the expiration date on the work machine side. When setting the expiration date, it is necessary to connect to the work machine side from an external server or the like. That is, a great deal of processing is required for setting and determining the expiration date of the work implement. In the system disclosed in Patent Document 3, since the rental company handles a large number of work machines, it is very difficult to manage the engine start key.
- the present invention has been made to solve the above-described problems of the prior art, and an object thereof is to provide a work machine management system capable of easily monitoring the work machine. Another object of the present invention is to provide a work machine management system capable of easily controlling the operation of the work machine according to the expiration date. Another object of the present invention is to provide a work machine management system that can easily rent work machines.
- a work machine management system (work machine monitoring system) is installed in and around a storage area of the work machine and is capable of wireless communication, and is mounted on the work machine and includes the first communication device.
- a second communication device capable of wireless communication with one communication device, and a monitoring unit that monitors a work machine on which the second communication device is mounted based on communication between the first communication device and the second communication device. It is equipped with.
- the monitoring unit In a work machine management system (work machine monitoring system), the monitoring unit is mounted with the second communication device when the radio wave received by the first communication device includes information indicating the stop of the work machine. Start monitoring of the working machine.
- the monitoring unit In the work machine management system (work machine monitoring system), the monitoring unit is configured to receive the second communication device when the reception intensity of the radio wave received from the second communication device by the first communication device is equal to or higher than a predetermined value. Start monitoring of work machines equipped with.
- the first communication device is installed in a storage location of the work implement and is capable of wireless communication with the second communication device, and outside the storage location.
- An external communication device that is installed and capable of wireless communication with the second communication device, wherein the monitoring unit has a reception intensity of radio waves received from the second communication device by the external communication device that is greater than or equal to a predetermined value, and the internal communication
- the reception intensity of the radio wave received by the device from the second communication device is equal to or higher than a predetermined value, monitoring of the work machine on which the second communication device is mounted is started.
- the monitoring unit receives a reception intensity of a radio wave received by the first communication device from the second communication device at a predetermined value or more and received by the first communication device.
- the monitoring unit indicates driving of the work machine to radio waves received from the second communication apparatus by the first communication apparatus during monitoring of the work machine.
- an alarm is output to the outside.
- a work machine management system (work machine operation system) is mounted on a work machine and can control the work machine, and commands relating to control of the first control apparatus can be transmitted wirelessly.
- a first command device capable of outputting to the control device, wherein the first command device includes a first acquisition unit capable of acquiring an expiration date of the work implement from the outside, a first time calculation unit for obtaining a time, A third processing unit for determining whether or not the time determined by the first time calculation unit has reached the expiration date; and when the expiration date has been reached, control of the first control device is limited.
- a sixth communication unit that outputs a first command and outputs a second command for performing control of the first control device without limitation when the expiration date has not been reached.
- the first control device includes a sixth storage unit that stores determination information, and the first acquisition unit controls the first control device without restriction. Permission information and determination information stored in the sixth storage unit of the first control device can be acquired, and the third processing unit establishes authentication between the permission information and the determination information, and When the expiration date is not reached, the second command is output to the sixth communication unit.
- the first acquisition unit can obtain an extension period of the expiration date and an authorization code for validating the extension period from the outside.
- the third processing unit extends the expiration date based on the extension period when the authorization code acquired by the acquisition unit and the external code input from the outside are established.
- the work machine includes a display device capable of inputting the external code, and the processing unit inputs the external device to the display device with respect to the control device. A code can be requested.
- the work machine management system (work machine rental system) outputs first information, which is information about a work machine when a work machine is reserved for rental, when the work machine is reserved for rental.
- a fourth management server having a third management server having a seventh communication unit and a fourth management server having a ninth storage unit for storing second information that is information relating to a manufactured or sold work machine.
- the server refers to the first information and the second information stored in the ninth storage unit, a third issuing unit that issues command information including permission or non-permitted rental of a work machine, Have.
- the seventh communication unit outputs first information including first specification information for specifying the work machine
- the ninth storage unit is manufactured or sold.
- the second information including the second specifying information for specifying the work implement is stored, and the third issuing unit stores the second specifying information that matches the first specifying information in the ninth storage unit. If the second specific information is stored, the work machine corresponding to the second specific information is set as a rental work machine, and command information including the rental permission of the rental work machine is issued. To do.
- the work machine management system (work machine rental system) is capable of acquiring the command information issued by the third issuing unit, and outputs a control command to the work machine based on the command information.
- a command device is provided.
- a work machine management system (work machine rental system) includes a writing device capable of writing the command information into the second command device.
- a work machine management system (work machine rental system) includes a second control device that is mounted on the work machine and controls the work machine, and the second commanding device includes information indicating that the rental is permitted. If it is included in the information, information for permitting control of the rental work machine is wirelessly output to the second control device.
- the work machine can be easily monitored.
- the work machine management system (work machine operation system)
- the operation of the work machine can be easily controlled according to the expiration date.
- the work machine management system (work machine rental system)
- the work machine can be easily rented.
- FIG. 1 is an overall view of a work machine monitoring system in a first embodiment. It is a figure which shows the relationship between an ignition switch and SSID. It is a figure which shows the relationship between status information and SSID. It is a general view of the monitoring system of the working machine in 2nd Embodiment. It is explanatory drawing explaining a field intensity. It is the schematic of the rental system of the working machine in 3rd Embodiment. It is an example of work machine information. It is an example of rental information. It is an example of work machine information. It is a figure explaining the determination of the specific information by an issuing part. It is the schematic of the rental system in 4th Embodiment. It is the schematic of the rental system of the working machine in 5th Embodiment. It is the schematic of the rental system of the working machine in 6th Embodiment. It is a side view of a backhoe.
- FIG. 1 is an overall view of a work machine monitoring system.
- the work machine monitoring system 1 is a system that performs monitoring in a situation where the work machine 2 is stored in the storage place P.
- the work machine 2 is a construction machine such as a backhoe, an agricultural machine such as a tractor, a combine, a rice transplanter, a compact truck loader, a skid steer loader, or the like.
- the work machine monitoring system 1 includes a first communication device 10 and a second communication device 20.
- the first communication device 10 is a communication device installed at the storage location P of the work machine 2 or around the storage location P.
- the storage place P is, for example, a farmer's barn when the work machine 2 is an agricultural machine, and is a warehouse or a parking lot when the work machine is a construction machine.
- the surroundings of the storage place P are the surroundings of the storage place, for example, an entrance / exit through which the work machine 2 passes in a barn or a warehouse, a roof of a barn, a roof of a warehouse, or the like.
- the storage place P is not limited to the above-described example, and may be a place determined in advance for storing the work machine.
- a storage box 40 is installed on the wall or pillar of the storage place P such as a barn.
- the first communication device 10 can be stored in the storage box 40.
- the first communication device 10 is a communication module capable of performing short-range wireless communication such as WiFi (R), Bluetooth (R), ZigBee (R), and the like.
- the 1st communication apparatus 10 may be a smart phone, tablet PC, etc. which mount a communication module.
- the first communication device 10 is always installed around the storage location P or the storage location P when monitoring the work machine 2.
- the communication module is placed in the storage box 40 and is always installed around the storage location P or the storage location P.
- the first communication device 10 is a portable device such as a smartphone or a tablet PC
- the first communication device 10 is housed in the housing box 40 when the work machine 2 is monitored, and cannot be carried only during the monitoring.
- the second communication device 20 is a communication device that is mounted on the work machine 2 and can wirelessly communicate with the first communication device 10.
- the second communication device 20 is a communication module capable of performing short-range wireless communication, such as WiFi (R), Bluetooth (R), and ZigBee (R).
- the second communication device 20 may be equipped with a communication module that can be connected to the mobile phone communication network.
- the first communication device 10 and the second communication device 20 will be described in detail.
- the second communication device 20 is connected to an in-vehicle communication network provided in the work machine 2.
- the second communication device 20 includes a processing unit 21, a first communication unit (output unit) 22, and a first storage unit 23.
- the processing unit 21 includes a CPU and the like.
- the processing unit 21 can acquire information (sometimes referred to as status information) on the work machine flowing through the in-vehicle communication network.
- the processing unit 21 acquires values of sensors (accelerator pedal sensor, engine rotation detection sensor, crank position sensor, fuel sensor, water temperature sensor, vibration sensor, etc.) mounted on the work implement 2 as status information.
- the processing unit 21 uses status (ON, OFF) of a switch (ignition switch, parking brake switch, PTO switch, etc.) mounted on the work implement 2 as status information, or a CPU mounted on the work implement 2 or the like.
- the control signal of the control unit can be acquired.
- the processing unit 21 adds the acquired state (status information) of the work machine to the transmission signal.
- the transmission signal is a broadcast signal used in wireless communication between the first communication device 10 and the second communication device 20 and includes a service set identifier (SSID) and the like.
- the processing unit 21 adds status information to the SSID.
- SSID service set identifier
- a predetermined SSID may be referred to as a “set SSID”
- an SSID to which status information is added may be referred to as a “changed SSID”.
- FIG. 2 is a diagram showing the transition of the SSID.
- the processing unit 21 when the ignition switch (IG-SW) of the work machine is changed from OFF (OFF) to ON (ON) at time P1, the processing unit 21 indicates that the ignition switch is turned on. Get key-on information, which is information.
- the processing unit 21 acquires the key-on information, the processing unit 21 adds the key-on information to “KUBOTA” that is the set SSID, thereby changing the changed SSID to “KUBOTA-010”. That is, the processing unit 21 adds “010” indicating that the ignition switch is turned on to the end of the set SSID.
- the symbol “-” shown between “KUBOTA” and “010”, which are set SSIDs, indicates a delimiter between the set SSID and newly added key-on information.
- the processing unit 21 acquires key-off information that is status information indicating that the ignition switch is off. .
- the processing unit 21 adds the key-off information to “KUBOTA” that is the set SSID, thereby changing the changed SSID to “KUBOTA-011”. That is, the processing unit 21 adds “011” indicating that the ignition switch is turned off to the end of the set SSID. Therefore, the processing unit 21 can add status information indicating whether the ignition switch is on or off to the set SSID.
- the status information when the ignition switch is turned on or off has been described.
- the present invention is not limited to this.
- status information indicating whether or not the engine is started, whether or not the working device is driven, whether or not the working machine vibrates, whether or not traveling is performed, to the SSID.
- Whether the engine has been started can be detected by an engine rotation detection sensor or a crank position sensor.
- Whether or not the work machine is started can be detected by turning on or off the PTO switch of the work device.
- the presence or absence of vibration of the work implement can be detected by a vibration sensor.
- status information that can recognize whether or not the work machine is driven that is, a change in the drive of the work machine
- the processing unit 21 adds a number indicating status information (for example, 010, 011) to the end of the set SSID when creating the changed SSID. You may add to the position. Further, the processing unit 21 may change the set SSID by a predetermined calculation formula or the like based on predetermined status information. Further, the relationship between the status information acquired by the processing unit 21 and the number indicating the status information is stored in the second communication device 20 in advance, and the processing unit 21 creates a changed SSID using this relationship.
- the first communication unit 22 is a chip or the like that performs short-distance wireless communication, and performs wireless communication based on Wi-Fi (registered trademark) conforming to the IEEE 802.11 series that is a communication standard, for example.
- the first communication unit 22 receives data (information) received from the first communication device 10 and outputs a transmission signal including an SSID (set SSID, changed SSID) to the first communication device 10.
- storage part 23 is comprised from the non-volatile memory.
- the first storage unit 23 can store communication information related to communication, status information, data for creating a changed SSID, and the like.
- the communication information is, for example, a unique MAC address set on the network, an identifier (set SSID, changed SSID) for identifying the second communication device 20, an encryption key (network key), and the like.
- the first communication device 10 includes a second communication unit 11 and a second storage unit 12.
- the second communication unit 11 is a chip or the like that performs short-distance wireless communication, and can execute wireless communication based on Wi-Fi (registered trademark) conforming to the IEEE 802.11 series that is a communication standard, for example.
- the 2nd communication part 11 may be able to communicate by a data communication network or a mobile telephone communication network.
- the second storage unit 12 is composed of a nonvolatile memory or the like.
- the second storage unit 12 can store communication information and status information acquired from the second communication device 20.
- the communication information stores, for example, a unique MAC address set on the network, an encryption key (network key), an e-mail (notification destination), and the like.
- the work machine monitoring system 1 includes a monitoring unit 30 that monitors a work machine.
- the monitoring unit 30 is provided in the first communication device 10.
- the first communication device 10 is composed of electric, electronic components, programs, and the like.
- the monitoring unit 30 outputs an alarm to the outside when the state of the work implement changes during monitoring (after the start of monitoring). For example, the monitoring unit 30 outputs an alarm to the outside when starting from a state where the engine of the work machine is stopped or detecting movement from the state where the work machine is stopped during monitoring.
- the monitoring of the work machine 2 will be described in detail with reference to FIG.
- the first communication device 10 is housed in the storage box 40 before the work machine 2 is monitored.
- the first communication device 10 is configured as a portable communication device
- the first communication device 10 is fixed in the storage box 40 at all times during monitoring of the work machine 2 by being locked after being stored in the storage box 40. In this case, the first communication device 10 can be taken out from the storage box 40 only when the work machine 2 is not monitored.
- the first communication device 10 is configured as a communication device that cannot be carried, the first communication device 10 is always accommodated in the accommodation box 40.
- the communication range (communication distance) of the first communication device 10 is set to be approximately the same size as the storage location P.
- the communication range (communication distance) of the first communication device 10 may be larger than the storage location P, and the radio wave from the second communication device 20 at the storage location P where the work machine 2 stops. As long as it is within the receivable range.
- the work machine 2 equipped with the second communication device 20 returns to the barn P.
- the second communication device 20 of the work machine 2 outputs the SSID to the outside at regular intervals (for example, every second or every few seconds).
- the interval at which the second communication device 20 outputs the SSID is not limited to that described above.
- the drive of the work machine stops.
- the ignition switch of the work machine is turned off, and the drive of the engine and the work device is stopped.
- the processing unit 21 of the second communication device 20 generates a modified SSID to which “011” indicating that the ignition switch is turned off is added. .
- the first communication unit 22 outputs the changed SSID to the outside.
- the second communication unit 11 of the first communication device 10 can acquire the changed SSID output by the second communication device 20. That is, the first communication device 10 can grasp that the work machine 2 has stopped (the drive of the work machine 2 has stopped) through the changed SSID.
- the monitoring unit 30 monitors the work implement 2 based on radio waves in communication between the first communication device 10 and the second communication device 20.
- the monitoring unit 30 indicates the stop of the work implement 2.
- the first communication device 10 receives the changed SSID, monitoring of the work machine on which the second communication device 20 is mounted is started.
- the information indicating that the work machine 2 is stopped is not limited to “011”, and may be “025” indicating that the engine is not driven or other information.
- the monitoring unit 30 changes after the start of monitoring (during monitoring) that the ignition switch of the work machine 2 is turned on and the first communication device 10 indicates from the second communication device 20 that the ignition switch is turned on.
- the SSID (“KUBOTA-010”)
- KUBOTA-010” an alarm is sounded inside and outside the barn P.
- the monitoring unit 30 notifies the contact information such as an e-mail stored in the second storage unit 12 of the first communication device 10 of the change of the work machine.
- the alarm may be of any type, and the alarm may be notified by sound or the alarm may be notified by light.
- the monitoring unit 30 ends monitoring by, for example, providing an input unit in the first communication device 10 and comparing the input password with the password stored in the second storage unit 12 of the first communication device 10 in advance. When the passwords match, the monitoring is terminated (monitoring is canceled). Note that the end of monitoring is not particularly limited. For example, an input unit is provided in the second communication device 20 and the input password is transmitted to the first communication device 10. Then, the password transmitted from the second communication device 20 may be compared with the password stored in the second storage unit 12 of the first communication device 10, and the monitoring may be terminated when the passwords match. However, other methods may be used.
- the monitoring unit 30 when the information indicating the stop of the work implement is included in the radio wave (SSID) received by the first communication device 10, the monitoring unit 30 has the work unit 2 on which the second communication device 20 is mounted. Since the monitoring is started, the work machine 2 can be easily monitored without using a large-scale device such as an imaging device.
- the radio wave (change SSID) in communication between the first communication device 10 and the second communication device 20 includes a stop of the work machine 2
- the monitoring unit 10 monitors the work machine 2.
- monitoring by the monitoring unit 30 may be started by using the strength (reception strength) of the radio wave received by the first communication device 10 from the second communication device 20.
- the second communication device 20, the first communication device 10, and the work device 2 are located away from the storage location P in a situation where the first communication device 10 is accommodated in the accommodation box 40. Therefore, the reception strength of the first communication device 10 with respect to the second communication device 20, that is, the reception strength of a signal such as a transmission signal is small.
- the first communication device 10 cannot receive a signal such as a transmission signal from the second communication device 20. . That is, when the first communication device 10 cannot receive a signal from the second communication device 20, it can be said that the work machine equipped with the second communication device 20 is away from the storage location P.
- the first communication device 10 receives the transmission signal transmitted from the second communication device 20. That is, as the distance between the first communication device 10 and the second communication device 20 becomes shorter, the reception intensity of the transmission signal transmitted by the second communication device 20 gradually increases.
- the reception intensity of the first communication device 10 is equal to or higher than a predetermined value (threshold value)
- the monitoring unit 30 starts monitoring. That is, when the work machine enters the storage place P and the reception intensity of the first communication device 10 becomes a predetermined value or more, the monitoring unit 30 starts monitoring. Therefore, the work implement can be automatically monitored only by entering the storage location P.
- the predetermined value (threshold value) for judging the strength of the radio wave intensity is the radio wave intensity when the work machine 2 reaches the storage location (when entering the storage location), and is obtained by an experiment or a theoretical formula. Is possible.
- the monitoring unit 30 may cause the work machine 2 to move away from the storage location P. Output.
- the start of monitoring may be performed using the radio wave intensity, and the monitoring may be performed by monitoring the status of the work machine 2 using status information (SSID) as described above.
- SSID status information
- the processing unit 21 of the second communication device 20 does not need to generate the changed SSID, and the second communication device 20 Any radio wave (for example, set SSID) may be output to the outside.
- the monitoring unit 30 when the reception intensity of the first communication device 10 exceeds a predetermined value, the monitoring unit 30 has started monitoring.
- the work machine has returned from the work place to the storage place P. Monitoring may be started in conjunction with the operation of the case.
- Backhoe construction machines, tractors, combine harvesters, and rice transplanter farming machines are often placed on transport vehicles such as trucks and returned from the work site to the storage site P.
- the construction machine and the agricultural machine stop driving. That is, the construction machine and the agricultural machine are transported from the work place to the storage place P in a state where the ignition switch is off (a state where the engine is stopped).
- the construction machine or the agricultural machine turns on the ignition switch or the like from the off state, starts the engine, runs itself, and again in the storage location P.
- the stop position is reached, turn off the ignition switch.
- the ignition switch when looking at the process of returning from the work place of the work machine (construction machine, agricultural machine) to the storage place P, the ignition switch is off until the storage place P is reached.
- the ignition switch is turned on after being turned on. Therefore, the monitoring unit 30 changes (changes) the ignition switch of the work machine (construction machine, agricultural machine) from OFF to ON under the situation where the reception intensity of the first communication device 10 is equal to or higher than the predetermined value and is not being monitored.
- the SSID changes from KUBOTA-011 to KUBOTA-010
- the monitoring is started. Note that monitoring may be performed when the ignition switch of the work machine changes from off to on and further changes from on to off.
- Monitoring can be performed.
- the monitoring process after the start of monitoring may be performed only by the radio wave intensity, may be performed by a change in SSID (status information), or may be performed using both the radio wave intensity and the SSID. .
- the monitoring unit 30 may start monitoring when the vibration of the work implement is lost (vibration is not obtained) under the situation where the reception intensity of the first communication device 10 is equal to or higher than a predetermined value. It should be noted that when all of the first condition in which the reception intensity of the first communication device 10 is equal to or greater than the predetermined value, the second condition in which the ignition switch is changed from off to on, and the third condition in which no vibration is obtained are obtained. The monitoring unit 30 may start monitoring.
- the distance between the first communication device 10 and the second communication device 20 is always close.
- the reception intensity of one communication device 10 is always greater than or equal to a predetermined value. Therefore, the monitoring unit 30 starts monitoring when the reception intensity of the first communication device 10 is equal to or greater than a predetermined value, that is, when the elapsed time of the reception intensity continuously being equal to or greater than the predetermined value is equal to or greater than the predetermined time. May be.
- the predetermined time is a length considered that the work machine is stopped and stored in the storage place P, and is, for example, several minutes (a few minutes).
- FIG. 4 shows a work machine monitoring system according to the second embodiment.
- the first communication device 10 includes an internal communication device 10A and an external communication device 10B.
- the internal communication device 10 ⁇ / b> A is a communication device that is installed in a storage location and capable of wireless communication with the second communication device 20.
- the external communication device 10B is a communication device that is installed outside the storage location and capable of wireless communication with the second communication device 20. That is, as shown in FIG. 4, the work machine monitoring system 1 is a system in which the first communication device 10 is installed inside and outside the storage place P.
- the internal communication device 10A is accommodated in, for example, a storage box 40 provided on a pillar of the barn P.
- the communication range (communication distance) of the internal communication device 10A is set to be approximately the same as the storage location P. Note that the communication range (communication distance) of the internal communication device 10A may be larger than the storage location P, and the radio wave from the second communication device 20 is in the storage location P at a position where the work machine 2 stops. Any range that can be received is acceptable.
- the external communication device 10B is installed, for example, on the roof of the barn P or outside the doorway of the barn P.
- the internal communication device 10A and the external communication device 10B have a second communication unit 11 and a second storage unit 12, respectively.
- the monitoring unit 30 is provided in the internal communication device 10A.
- the internal communication device 10A and the external communication device 10B are connected, and the internal communication device 10A can acquire the reception intensity of the radio wave (the radio wave transmitted from the second communication device 20) received by the external communication device 10B.
- the radio wave received by the external communication device 10B is “first radio wave”
- the radio wave received by the internal communication device 10A is “second radio wave”
- the radio wave of the first radio wave in the external communication device 10B is referred to as a second radio wave intensity.
- the monitoring unit 30 has a first reception intensity of radio waves received from the second communication apparatus 20 by the external communication device 10B that is equal to or higher than a predetermined value, and a second reception intensity of radio waves received from the second communication apparatus 20 by the internal communication device 10A.
- the first radio wave intensity of the external communication device 10B is small.
- the second radio wave intensity of the internal communication device 10A is also small.
- the first radio wave intensity of the external communication device 10B gradually increases.
- the first radio wave intensity of the external communication device 10B is the highest, and becomes greater than or equal to a predetermined value (first threshold) at the entrance / exit of the storage location P.
- the second radio wave intensity of the internal communication device 10A gradually increases from the vicinity of the entrance / exit.
- the second radio wave intensity of the internal communication device 10A becomes equal to or higher than a predetermined value (second threshold).
- the monitoring unit 30 monitors the work implement 2 when the first radio wave intensity is equal to or higher than a predetermined value (first threshold) and the second radio wave intensity is equal to or higher than a predetermined value (second threshold).
- the first threshold value is, for example, the radio wave intensity at a position that is several meters to several tens of meters away from the entrance / exit of the storage location P (a location that is considered to have approached the storage location).
- the first threshold value and the second threshold value are the same.
- the threshold value may be set according to the size of the storage location P or the like, and the first threshold value and the second threshold value may be different. Good.
- the work machine 1 is grasp whether the work machine 1 is approaching or away from the storage location P by observing the transition of the first radio wave intensity of the external communication device 10B. Further, it can be determined whether or not the work machine 1 has entered the storage location P by looking at the second radio field intensity of the internal communication device 10A. For example, when the first radio wave intensity of the external communication device 10B is equal to or higher than a predetermined value, but the second radio wave intensity of the internal communication device 10A is less than the predetermined value, the work implement 2 is near the storage place P. However, it can be seen that it is not in the storage place P.
- the work machine management system includes a work machine operation system. An operation system of the work machine will be described.
- the work machine operation system is a system for managing the work machine operation, and can be applied to, for example, a work machine rental system. Prior to the description of the operation system of the work machine, the work machine rental system will be described. The operation system of the work machine can be applied to other than the work machine rental, and is not limited to the work machine rental system described later.
- FIG. 6 is a schematic diagram of a work machine rental system.
- the work machine rental system 1 is a system that performs a work machine rental system such as a construction machine (for example, a backhoe) and an agricultural machine (for example, a tractor, a combine, a rice transplanter). As shown in FIG. 6, the work machine rental system 101 includes a first management server 102 and a second management server 103.
- a work machine rental system such as a construction machine (for example, a backhoe) and an agricultural machine (for example, a tractor, a combine, a rice transplanter).
- the work machine rental system 101 includes a first management server 102 and a second management server 103.
- the first management server 102 is a server that manages the rental of the work machine 104 and is owned by, for example, a rental company.
- the second management server 103 is owned by a manufacturer or the like that manufactures or sells the work machine 104.
- the first management server 102 and the second management server 103 can exchange information with each other through the network N.
- the second management server 103 can provide the first management server 102 with various information (part information, specification information, operation manual, maintenance information, etc.) related to manufacture or sales of the work machine 104. .
- the first management server 102 can provide information related to rental to the second management server 103 as described later.
- Various devices (referred to as communication devices) 105 can be connected to the first management server 102 through the network N.
- the first management server 102 can be connected to a communication device 5 such as a personal computer (PC), a smartphone (multifunctional mobile phone), a PDA (mobile terminal), a tablet, or the like.
- a communication device 5 such as a personal computer (PC), a smartphone (multifunctional mobile phone), a PDA (mobile terminal), a tablet, or the like.
- the communication device 105 is connected to the first management server 102.
- the first management server 102 displays an input screen (for example, a Web screen) on the communication device 105.
- items (information) necessary for renting can be input.
- the debitor information debitor's address, name, phone number, etc.
- debit request information model of the work machine desired to be rented, the relevant model Desired number of units, lending period, etc.
- the first management server 102 determines whether or not the desired work machine 104 can lend during the desired lending period based on the debit request information, and if the work machine 104 can be lent during the desired lending period Then, the second management server 103 is queried for rental permission. When the second management server 103 permits the rental, the first management server 102 performs a predetermined process so that the work machine can be rented. As described above, in the work machine rental system 101, the work machine 104 is rented by linking the first management server 102 and the second management server 103.
- the first management server 102 includes a third storage unit (first work machine information storage unit) 110, a fourth storage unit (rental information storage unit) 111, a processing unit (second processing unit) 112, and a third communication. Part 113.
- the 3rd storage part 110 and the 4th storage part 111 are constituted by non-volatile memory.
- the second processing unit 112 and the third communication unit 113 are configured by electric / electronic components, programs, and the like incorporated in the first management server 102.
- the third storage unit 110 stores work machine information (work machine information) owned by the rental company.
- work machine information owned by the rental company.
- the third storage unit 110 stores a work machine management number, work machine identification information, a work machine model, and the like.
- the management number of the work machine is a number assigned for rental management by the rental company.
- the work machine identification information is information that identifies the work machine and is unique information (for example, a manufacturing number, a serial number, etc.) assigned to the work machine.
- the model of the work machine is a name uniquely set by the manufacturer according to the specifications of the work machine, the size of the work machine, and the like.
- the fourth storage unit 111 stores information related to rental of work machines (referred to as rental information). For example, as shown in FIG. 7B, the fourth storage unit 111 stores, as rental information, a management number of the working machine that has rented, identification information of the working machine, permission information, debiter information, a lending period, and the like. Yes.
- the permission information is a number (permission command information) indicating the permission of the rental notified from the second management server 103 when performing the rental.
- the 3rd communication part 113 is an apparatus which transmits / receives various information with the 2nd management server 103, the communication apparatus 105, etc.
- the third communication unit 113 transmits and receives predetermined information according to the processing of the first management server 102, the second management server 103, and the communication device 105.
- the second processing unit 112 is a part that performs various processes related to rental. For example, when the communication device 105 is connected to the first management server 102 and there is a request (input screen request) to rent to the first management server 102, the second processing unit 112 causes the communication device 105 to To display the input screen. In addition, when the debitor information, the debit request information, etc.
- the second processing unit 112 determines whether or not the desired working machine can lend during the desired lending period based on the debit request information. The process to judge is performed. Specifically, the second processing unit 112 refers to the model of the work machine stored in the third storage unit 110 and calculates how many kitchens the model of the work machine desired to be rented has. That is, the second processing unit 112 calculates the number of rental companies owned by the model desired for rental. In addition, the number of possessed machines may be stored in the third storage unit 110 by arranging the work machines in advance for each model.
- the second processing unit 112 refers to the fourth storage unit 111 to calculate the number of working machines that have already been rented during the lending period (the number of lending), and the rental is determined from the number of lending and the number of owned units. Calculate the number of work machines that can be rented. The second processing unit 112 determines that the desired working machine can be lent when the rentable number is equal to or larger than the desired number.
- the second processing unit 112 notifies the communication device 105 of the rentable number, asks the communication device 105 to change the desired number, and if the changed desired number is less than the rentable number, The processing unit 112 determines that lending can be performed.
- the second processing unit 112 After determining that the desired work machine can be rented, that is, when a rental reservation is made for a predetermined work machine, the second processing unit 112 receives the first information as the third communication unit 113.
- the first information is information on a predetermined work machine, that is, a work machine that can be rented, and is information managed by the first management server 102.
- the first information includes a work machine management number, identification information for identifying the work machine, a model of the work machine, and the like.
- the second processing unit 112 when a rental reservation is made for a work machine, refers to the third storage unit 110 and the fourth storage unit 111 and uses the same work machine as the desired work machine. Specific information (referred to as first specific information) is extracted.
- the third communication unit 113 transmits the first information including the first specific information extracted by the second processing unit 112 and the rental permission request to the second management server 103.
- the second management server 103 includes a fifth storage unit (second work machine information storage unit) 120, a fourth communication unit 121, and a first issue unit 122.
- the fifth storage unit 120 is configured by a nonvolatile memory or the like.
- the fourth communication unit 121 and the first issuing unit 122 are configured by electric / electronic components, programs, and the like incorporated in the second management server 103.
- the fifth storage unit 120 stores information on manufactured work machines or sold work machines. Information on manufactured work machines or sold work machines is referred to as second information. For example, as illustrated in FIG. 8A, the fifth storage unit 120 stores work machine identification information, a work machine model, and the like as the second information.
- the 4th communication part 121 is an apparatus which transmits / receives various information with the 1st management server 102 grade
- the fourth communication unit 121 receives or transmits predetermined information according to processing of the first management server 102, the second management server 103, and the like.
- the first issuing unit 122 first refers to the first information transmitted from the first management server 102 and the second information stored in the fifth storage unit 120 to permit a work machine (rental work machine) to permit the rental. ). Specifically, when the first management server 102 receives the first information including the first specific information and the rental permission request, the first issuing unit 122 receives the rental permission request and starts the indexing process. The first issuing unit 122 determines whether or not second specifying information that matches the first specifying information received by the first management server 102 is stored in the fifth storage unit 120.
- the first issuing unit 122 refers to the fifth storage unit 120 and stores “ It is determined whether the second specific information indicated by “K-RX253200” is stored. In this case, since “K-RX253200” is stored as the second specifying information in the fifth storage unit 120, the first issuing unit 122 stores the second specifying information that matches the first specifying information. It is determined that there is a working machine.
- the first issuing unit 122 rents a work machine corresponding to the first specific information (“K-RX253200”) that matches the second specific information (“K-RX253200”).
- the permission command information is information (information indicating rental permission) indicating that the work machine of the first specific information is certified as a rental work machine, and is indicated by a number of digits.
- the permission command information is associated with the work machine in advance, and the second specifying information (“K-RX253200”) and the permission command information are associated with each other in advance. That is, the first issuing unit 122 issues permission command information associated with the second specifying information in advance.
- the 1st issuing part 122 is with respect to the working machine of the said 1st specific information by issuing the permission instruction information matched with respect to the 1st specific information notified from the 1st management server 102. Grant rental.
- the first issuing unit 122 uses the flag indicating rental permission or the like as permission command information (permission information) in the first specific information notified from the first management server 102. Rental permission may be given to a work machine with one specific information.
- the first issuing unit 122 does not store “K-253800” as the second specific information in the fifth storage unit 120.
- the first issuing unit 122 determines that the second specific information that matches the first specific information is not stored (no work implement). If there is no work machine, the first issuing unit 122 sets the work machine corresponding to the first specific information (“K-253800”) as a work machine that cannot be rented, and indicates that the rental is not permitted.
- Issue command information is information (information indicating that the rental is not permitted) indicating that the work machine of the first specific information is a work machine that cannot issue a rental permission.
- the fourth communication unit 121 of the second management server 103 transmits the permission command information or the non-permission command information to the first management server 102 when the first command unit 122 issues the permission command information or the non-permission command information. To do.
- the third communication unit 113 of the first management server 102 receives the permission command information or the non-permission command information
- the second processing unit 112 performs processing corresponding to the permission command information or the non-permission command information.
- the second processing unit 112 indicates that the rental machine has been rented and that the rental machine has been rented, and that the rental machine has been rented. To be notified.
- the second processing unit 112 and the fourth storage unit 111 perform processing for updating information in the fourth storage unit 111.
- the second processing unit 112 stores, in the fourth storage unit 111, the management number, the first specific information of the work machine (rental work machine) for which rental permission has been granted, permission information (permission command information), debiter information, the lending period, and the like.
- the fourth storage unit 111 stores a management number, first identification information, permission information (permission command information), debiter information, a lending period, and the like.
- the second processing unit 112 continues the processing assuming that the rental of the work machine having the first specific information corresponding to the non-permission command information has not been made. For example, the second processing unit 112 extracts a work machine that can be lent during the lending period, sets the work machine as a substitute machine that replaces the work machine that is not permitted to be rented, and uses the first specific information of the substitute machine as the first specific information. 2 By making a notification to the management server 103, a rental permission request for an alternative device is made. The second management server 103 performs processing for determining whether or not the substitute machine is authorized as a rental work machine in the same manner as described above.
- the second processing unit 112 rents the substitute machine instead of the work machine desired by the borrower. Information that it is possible is transmitted to the communication device 105.
- the second processing unit 112 receives information indicating that the first management server 102 may be an alternative device, the second processing unit 112 notifies the communication device 105 of information indicating that the rental reservation has been completed.
- the second processing unit 112 obtains the management number, the management number, the first identification information of the alternative machine (rental work machine) for which the rental permission has been granted, the permission information (permission command information), the debiter information, the lending period, etc. Transmit to the fourth storage unit 111.
- the fourth storage unit 111 stores a management number, first identification information, permission information (permission command information), debiter information, a lending period, and the like. Next, processing after the rental work machine is determined will be described. The processing after the rental work machine is determined is not limited to the following embodiment.
- FIG. 12 shows a backhoe that is an example of the work machine 104.
- the backhoe 104 includes a lower traveling device 140 and an upper body 141.
- the traveling device 140 has a traveling body 142 having a rubber cover.
- a crawler type traveling device is adopted in which the traveling body 142 is driven by a traveling motor.
- a dozer 143 is provided at the front portion of the traveling device 140.
- the machine body 141 includes a swivel 144 and a work device (excavation device) 145.
- the swivel 144 is supported on the traveling device 140 via a bearing 158 so as to be pivotable about a swivel axis.
- the work device 145 is provided at the front portion of the swivel 144.
- An engine, a radiator, a driver's seat 146, a fuel tank, a hydraulic oil tank, and the like are provided on the swivel base 144.
- the working device 145 includes a swing bracket 147, a boom 150, an arm 151, and a bucket 152.
- the swing bracket 147 is supported by the support body 148 so as to be swingable about the vertical axis.
- the swing bracket 147 swings due to the expansion and contraction of a swing cylinder provided in the swivel base 144.
- the boom 150 is supported by the swing bracket 147 so as to be swingable about the horizontal axis.
- the boom 150 swings due to expansion and contraction of a boom cylinder 154 interposed between the boom 150 and the swing bracket 147.
- the arm 151 is supported at the tip of the boom 150 so as to be swingable about the horizontal axis.
- the arm 151 swings by the expansion and contraction of the arm cylinder 155 interposed between the arm 151 and the boom 150.
- the bucket 152 is provided at the tip of the arm 151 so that a squeeze / dump operation is possible.
- the bucket 152 is squeezed and dumped by expansion and contraction of a bucket cylinder 153 interposed between the bucket 152 and the arm 151.
- the backhoe includes a control device (first control device) 160 that performs various controls related to driving (operation) of the work machine.
- the control device 160 performs various controls such as auto idle control (AI control) and flow rate control.
- control in working machines, such as a backhoe is not limited to what is demonstrated below.
- the control device 160 includes operation amounts of operation members (for example, an operation lever 149 and an operation switch shown in FIG. 12) for operating various actuators such as a swing cylinder, a boom cylinder 154, an arm cylinder 155, and a bucket cylinder 153, and from a governor sensor.
- Various control signals such as governor angle (governor position), accelerator lever operation amount (angle), idle switch (AI-SW) on / off signal, and engine speed from the engine revolution sensor are input.
- the engine speed is increased or decreased according to the operation amount of the accelerator lever.
- the engine speed is fixed to the idling state.
- an idle switch ON signal is input with the operation lever 149 in the neutral position
- an idle signal is output to the auto idle motor regardless of the operation amount of the accelerator lever.
- the auto idle motor is driven to set the engine speed to the idle speed.
- the actuator is operated according to the operation amount of the operation member.
- a current (actuation) of a predetermined value corresponding to the operation amount of the operation lever 149 is applied to the solenoid of the electromagnetic proportional valve provided in the work implement. Signal).
- the electromagnetic proportional valve opens according to the current value (operation amount), the pilot pressure of the control valve corresponding to the actuator is controlled, and the actuator operates.
- the control device 160 includes a sixth storage unit 161 and a fifth communication unit 164.
- the sixth storage unit 161 is configured by a non-volatile memory or the like, stores work machine specifying information (third specifying information), and stores determination information corresponding to the third specifying information.
- the determination information is used for determination when control is performed by the control device 160 as will be described later, and is, for example, the same information as the permission command information issued by the first issuing unit 122.
- the third specifying information and the determination information are written in the sixth storage unit 161 when the work machine 104 is manufactured, when the work machine 104 is sold, or the like.
- the fifth communication unit 164 can communicate various information.
- the fifth communication unit 164 is a device that performs wireless communication such as WiFi (R), Bluetooth (R), and ZigBee (R), for example.
- the fifth communication unit 164 may be a communication device that can be connected to a mobile phone communication network.
- the operating system of the work machine includes a control device (first control device) 160, a command device (first command device) 130, and a writing device (first writing device) 131.
- the command device 130 is a device capable of storing command information and measuring time (time).
- the command device 130 has a calculation unit (processing unit) such as a CPU that can measure at least the time and perform a predetermined process, such as a tag or an IC card having a CPU.
- the command device 130 is a device different from an RFID or the like that does not have a calculation unit such as a CPU.
- the command device 130 is a device that can communicate with the fifth communication unit 164.
- the writing device 131 can be connected to the first management server 102 or the second management server 103 through a network, and for example, rental information including permission command information can be acquired through the network.
- rental information of a predetermined work machine (rental work machine) is acquired from the first management server 102 and connected to the command device 130, the writing device 131 writes the rental information in the command device 130.
- the command device 130 includes a first acquisition unit 132, a first time calculation unit (first timing unit) 133, a sixth communication unit 134, and a processing unit (third processing unit) 135.
- the command device 130 includes a first acquisition unit 132, a first time calculation unit (first time measuring unit) 133, a sixth communication unit 134, and a third processing unit 135, which are electric / electronic components and programs incorporated in the command device 130. Etc.
- the third processing unit 135 is configured by a CPU or the like.
- the first acquisition unit 132 acquires rental information including a lending period (expiration date), and acquires rental information by writing with the writing device 131.
- the writing device 131 gives the command device 130 the first specific information indicated by “K-RX253200”, the lending period indicated by “9/1 to 9/25”, and permission command information (permission information).
- the first acquisition unit 132 acquires “K-RX253200”, “9/1 to 9/25”, permission command information, and the like.
- the first acquisition unit 132 receives the rental information transmitted from the third communication unit 113 of the first management server 102 via the sixth communication unit 134 instead of acquiring the rental information via the writing device 131. You may get it.
- the first time calculation unit 133 is a timer for obtaining the current time.
- the sixth communication unit 134 can communicate various information.
- the sixth communication unit 134 is a device that performs short-range wireless communication or short-range wireless communication such as IWiFi (R), Bluetooth (R), and ZigBee (R), for example.
- the command device 130 When the sixth communication unit 134 of the command device 130 and the fifth communication unit 164 of the control device 160 enter the communicable range (within the communication area), the command device 130 notifies the control device 160 of the third specific information and the determination information. Make a request. Thereafter, the command device 130 acquires the third specifying information transmitted from the control device 160. And the 3rd process part 135 authenticates 3rd specific information and 1st specific information, and when 3rd specific information and 1st specific information correspond, it authenticates with determination information and permission instruction information. When authentication of the determination information and the permission command information is established (the determination information and the permission command information match), the third processing unit 135 determines whether or not the current time (time) is within the lending period. That is, it is determined whether or not the current time has reached the expiration date.
- the expiration date is the last day of the lending period and does not exceed the last day. For example, if the lending period is 9/1 to 9/25, 25,23: 59: 59 "is the expiration date.
- the third processing unit 135 determines that the control device 160 does not limit the control when the current time has not reached the expiration date.
- the sixth communication unit 134 outputs a permission command (second command) indicating that the control is not limited to the control device 160.
- the control device 160 acquires the permission command (second command) transmitted from the command device 130 (sixth communication unit 134), the control device 160 performs control as usual without restricting control of the traveling system and the working system.
- the third processing unit 135 performs control by the control device 160 when the current time has reached the expiration date. Judge that restriction is to be made. If the third processing unit 135 determines that the control device 160 performs control restriction, the sixth communication unit 134 outputs a restriction command (first command) for performing control restriction to the control device 160.
- the control device 160 obtains the restriction command (first command) transmitted from the command device 130 (sixth communication unit 134)
- the control device 160 restricts control of the traveling system and the working system. For example, the control device 160 limits the normal control of the work machine 104 so as not to perform AI control or flow rate control. That is, when the control by the control device 160 is restricted, the work machine 104 cannot perform normal control, and the operation of the work machine 104 can be stopped.
- the work machine 104 cannot be moved when the lending period expires (the expiration date expires), but in addition to this, the lending period may be extended. A modification of extending the lending period will be described.
- the second processing unit 112 of the management server 2 can lend the work machine desired by the debiter even after the lending period has elapsed (when it can be estimated that lending can be continued after the lending period).
- the second processing unit 112 presets an extension period that is continuous with the lending period within a range where lending is possible. For example, if the lending period is 9/1 to 9/25 and the lending period is 10 days, the extension period is set to 9/26 to 10/5.
- the second processing unit 112 issues an extension period associated with the permission information (permission command information).
- the fourth storage unit 111 stores an extension period associated with the permission information separately from the lending period. Further, the extension period associated with the permission information is transmitted from the first management server 102 at the same time when the command device 130 (writing device 131) acquires the rental information, that is, when the permission command information is acquired. (Writing device 131).
- the first acquisition unit 132 of the instruction device 130 can acquire the extended period associated with the permission information.
- the writing device 131 writes the extension period associated with the permission information to the command device 130
- the first acquisition unit 132 acquires the written extension period.
- the command device 130 is provided with a switch. When the switch is pressed in a state where the permission information matches the determination information and the extension period associated with the permission information is held in the command device 130, the third processing unit 135 of the command device 130 Allow use of extended period. That is, the third processing unit 135 extends the expiration date to the last day of the extension period.
- the second processing unit 112 may issue a code (permission code) different from the permission information separately from the extension period.
- the fourth storage unit 111 stores the extension period and the permission code separately from the lending period. Further, the extension period and the code are obtained from the first management server 102 at the same time when the command device 130 (writing device 131) acquires rental information, that is, when permission command information is acquired. Sent to.
- the first acquisition unit 132 of the command device 130 can acquire the extension period and the permission code.
- the writing device 131 writes the extension period and the permission code to the command device 130
- the first acquisition unit 132 acquires the written extension period and the permission code.
- a code can be input to a display device or the like mounted on the work machine 104.
- the third processing unit 135 of the command device 130 requests the control device 160 for an external code.
- control device 160 transmits the external code to command device 130.
- the third processing unit 135 of the command device 130 permits the use of the extended period when the external code transmitted from the control device 160 matches the permission code. That is, the third processing unit 135 extends the expiration date to the last day of the extension period.
- the command device 130 is connected to the first management server 102 when it is desired to perform the extension. Even without it, you can easily extend the expiration date offline.
- the writing device 131 has written permission command information (permission information) indicated by numbers or the like to the command device 130, but instead of writing “015501-389761” indicated by numbers or the like to the command device 130, lending During the period (9/1 to 9/25), a flag indicating that rental work is permitted for the rental work machine whose first specific information is “K-RX253200” (even if normal control is performed without restriction) Information may be written to the command device 130.
- the command device 130 determines that the control device 160 does not limit the control. On the other hand, the command device 130 limits the control by the control device 160 when the permission information cannot be acquired even when the current time has not reached the expiration date.
- the management of the work machine 104 by the rental company can be simplified.
- the rental company since the manufacturer gives permission for rental and permission command information (permission information) for driving the work machine 104 is issued from the manufacturer side, the rental company drives many work machines 104 owned by the rental company. Can be saved the trouble of managing the key (permission information). That is, by using information (work machine information) managed by the manufacturer at the time of manufacture or sale, a key for operating the rental work machine can be easily generated and provided to the rental company.
- FIG. 9 shows a work machine rental system according to the fourth embodiment.
- the work machine rental system shown in FIG. 9 is a system in which the second management server 103 is eliminated and the first management server 102 issues permission command information (permission information).
- the description of the same configuration as the above-described embodiment is omitted.
- the first management server 102 includes a second issuing unit 123.
- the second issuing unit 123 includes electrical / electronic components and programs incorporated in the first management server 102. After determining that the second processing unit 112 can lend the work machine desired by the second processing unit 112, the second issuing unit 123 recognizes and certifies the work machine that can be rented as a rental work machine that permits rental. Command information (permission command information) is issued.
- the second processing unit 112 After the permission command information is issued, the second processing unit 112 notifies the communication device 105 of information indicating that the rental reservation has been completed, assuming that the work machine desired by the borrower can be rented. In addition, the second processing unit 112 and the fourth storage unit 111 perform processing for updating information in the fourth storage unit 111.
- the second processing unit 112 displays the management number, the management number, the first identification information of the work machine (rental work machine) for which the rental permission has been granted, the permission information (permission command information), the debiter information, the lending period, and the like.
- the data is transmitted to the storage unit 111.
- the fourth storage unit 111 stores a management number, first identification information, permission information (permission command information), debiter information, a lending period, and the like.
- the writing device 131 When renting a work machine, the writing device 131 connects to the first management server 102 through the network, and acquires rental information including permission command information through the network.
- rental information such as the first specific information of the rental work machine, the rental period, and permission command information is written in the command device 130.
- command apparatus 130 in 4th Embodiment is the same as embodiment mentioned above.
- the command device 130 since the command device 130 has the authority to measure the time and what kind of control is performed in the control device 160, the command device 130 has the authority of the work machine 104 in a state where the lending period has elapsed. The work machine 104 can be stopped without making a determination to the control device 160.
- the second management server 103 issues permission command information corresponding to work machine specific information, while the control device 160 stores determination information corresponding to work machine specific information in advance. By doing so, in the work machine having the same specific information, the permission command information and the determination information match, and the normal control by the control device 160 can be performed without restriction.
- the control device 160 may be configured to perform normal control by the control device 160 without limitation without storing the determination information.
- the first specific information is encrypted using the permission command information issued by the first issuing unit 122 of the second management server 103.
- the second management server 103 transmits the encrypted first identification information, the unencrypted first identification information, and the permission command information to the first management server 102.
- the writing device 131 writes the encrypted first specific information, permission command information, and lending time limit to the command device 130.
- the third processing unit 135 restores the first identification information encrypted using the encrypted first identification information and the permission instruction information, and the third identification information and the first identification after restoration. It is determined whether or not the information matches. Also in this case, it is possible to determine whether or not the permission command information is valid without writing the determination information in the control device 160.
- control device 160 does not perform AI control or flow rate control as a control restriction.
- control device 160 is not limited to this as a matter of course.
- the engine speed is fixed at a low speed
- the work machine 104 may be prevented from moving normally by stopping the start itself (prohibiting engine start) or by restricting various other controls.
- the rental information including the permission command information (permission signal) transmitted from the first management server 102 is written in the command device 130.
- the rental information is obtained from the first management server 102. It does not have to be.
- the command device 130 may be connected to a personal computer or the like, information corresponding to rental information may be created by the personal computer, and the created rental information may be written into the command device 130.
- the work machine management system includes a work machine rental system. A working machine rental system will be described. In the work machine rental system, the description of the parts common to the above-described embodiment may be omitted for the sake of convenience.
- FIG. 10 is a schematic diagram of a work machine rental system according to the fifth embodiment.
- the work machine rental system 1 includes a third management server 202 and a fourth management server 203.
- the third management server 202 includes a seventh storage unit (first work machine information storage unit) 210, an eighth storage unit (rental information storage unit) 211, a processing unit (fourth processing unit) 212, and a seventh communication. Part 213.
- the seventh storage unit 210 and the eighth storage unit 211 are configured by a nonvolatile memory or the like.
- the fourth processing unit 212 and the seventh communication unit 213 are configured by electric / electronic components, programs, and the like incorporated in the third management server 202.
- the seventh storage unit 210 stores work machine information (work machine information) owned by the rental company.
- work machine information work machine information
- the seventh storage unit 210 stores a work machine management number, work machine identification information, a work machine model, and the like.
- the management number of the work machine is a number assigned for rental management by the rental company.
- the work machine identification information is information that identifies the work machine and is unique information (for example, a manufacturing number, a serial number, etc.) assigned to the work machine.
- the model of the work machine is a name uniquely set by the manufacturer according to the specifications of the work machine, the size of the work machine, and the like.
- the eighth storage unit 211 stores information on rental of work machines (referred to as rental information). For example, as shown in FIG. 7B, the eighth storage unit 211 stores, as rental information, a management number of the working machine that has rented, identification information of the working machine, permission information, debiter information, a lending period, and the like. Yes.
- the permission information is a number (permission instruction information) indicating the permission of rental notified from the fourth management server 203 when performing the rental.
- the seventh communication unit 213 is a device that transmits and receives various information to and from the fourth management server 203, the communication device 205, and the like.
- the seventh communication unit 213 transmits / receives predetermined information according to the processes of the third management server 202, the fourth management server 203, and the communication device 205.
- the fourth processing unit 212 is a part that performs various processes related to rental. For example, when the communication device 205 is connected to the third management server 202 and there is a request (input screen request) to rent to the third management server 202, the fourth processing unit 212 causes the communication device 205 to To display the input screen. Further, when the debiter information, the debit request information, etc.
- the fourth processing unit 212 determines whether or not the desired working machine can lend during the desired lending period based on the debit request information. The process to judge is performed. Specifically, the fourth processing unit 212 refers to the model of the work machine stored in the seventh storage unit 210 and calculates how many kitchens the model of the work machine desired to be rented has. That is, the fourth processing unit 212 calculates the number of rental companies owned by the model desired for rental. It should be noted that the number of the working machines may be stored in the seventh storage unit 210 by arranging the work machines for each model in advance.
- the fourth processing unit 212 refers to the eighth storage unit 211, calculates the number of work machines that have already been rented during the lending period (lending number), and rents from the lending number and the owned number. Calculate the number of work machines that can be rented. The fourth processing unit 212 determines that the desired working machine can be lent when the rentable number is equal to or greater than the desired number.
- the fourth processing unit 212 notifies the communication device 205 of the rentable number, requests the communication device 205 to change the desired number, and if the desired number after the change is equal to or less than the rentable number, 4 The processing unit 212 determines that lending can be performed.
- the fourth processing unit 212 After determining that the desired working machine can be rented, that is, when a rental reservation is made for a predetermined working machine, the fourth processing unit 212 sends the first information to the seventh communication unit 213.
- the first information is information on a predetermined work machine, that is, a work machine that can be rented, and is information managed by the third management server 202.
- the first information includes a work machine management number, identification information for identifying the work machine, a model of the work machine, and the like.
- the fourth processing unit 212 when a rental reservation is made for a work machine, refers to the seventh storage unit 210 and the eighth storage unit 211 and uses the same work machine as the desired work machine. Specific information (referred to as first specific information) is extracted.
- the seventh communication unit 213 transmits the first information including the first specific information extracted by the fourth processing unit 212 and the rental permission request to the fourth management server 203.
- the fourth management server 203 includes a ninth storage unit (second work machine information storage unit) 220, an eighth communication unit 221, and a third issue unit 222.
- the ninth storage unit 220 is configured by a nonvolatile memory or the like.
- the eighth communication unit 221 and the third issue unit 222 are configured by electric / electronic components, programs, and the like incorporated in the fourth management server 203.
- storage part 220 has memorize
- the ninth storage unit 220 stores work machine identification information, a work machine model, and the like as the second information.
- the 8th communication part 221 is an apparatus which transmits / receives various information with the 3rd management server 202 grade
- the eighth communication unit 221 receives and transmits predetermined information according to the processing of the third management server 202, the fourth management server 203, and the like.
- the third issuing unit 222 refers to the first information transmitted from the third management server 202 and the second information stored in the ninth storage unit 220, and permits a work machine (rental work machine) that permits the rental. ).
- the fourth management server 203 receives the first information including the first specific information and the rental permission request
- the third issuing unit 222 receives the rental permission request and starts the indexing process.
- the third issuing unit 222 determines whether or not the second specifying information that matches the first specifying information received by the fourth management server 203 is stored in the ninth storage unit 220.
- the third issuing unit 222 refers to the ninth storage unit 220 and stores “ It is determined whether the second specific information indicated by “K-RX253200” is stored. In this case, since “K-RX253200” is stored as the second specifying information in the ninth storage unit 220, the third issuing unit 222 stores the second specifying information that matches the first specifying information. It is determined that there is a working machine.
- the third issuing unit 222 rents a work machine corresponding to the first specific information (“K-RX253200”) that matches the second specific information (“K-RX253200”).
- the permission command information is information (information indicating rental permission) indicating that the work machine of the first specific information is certified as a rental work machine, and is indicated by a number of digits.
- the permission command information is associated with the work machine in advance, and the second specifying information (“K-RX253200”) and the permission command information are associated with each other in advance. That is, the third issuing unit 222 issues permission command information associated with the second specifying information in advance.
- the third issuing unit 222 issues the associated permission instruction information to the first specific information notified from the third management server 202, thereby providing a work machine having the first specific information. Grant rental.
- the third issuing unit 222 uses the flag indicating rental permission or the like as permission instruction information (permission information) in the first specific information notified from the third management server 202. Rental permission may be given to a work machine with one specific information.
- the third issuing unit 222 does not store “K-253800” as the second specific information in the ninth storage unit 220.
- the third issuing unit 222 determines that the second specific information that matches the first specific information is not stored (no work implement). If there is no work machine, the third issuing unit 222 sets the work machine corresponding to the first specific information (“K-253800”) as a work machine that cannot be rented, and indicates that the rental is not permitted.
- Issue command information is information (information indicating that the rental is not permitted) indicating that the work machine of the first specific information is a work machine that cannot issue a rental permission.
- the eighth communication unit 221 of the fourth management server 203 transmits the permission command information or the non-permission command information to the third management server 202 when the third issue unit 222 issues the permission command information or the non-permission command information. To do.
- the fourth processing unit 212 performs processing corresponding to the permission command information or the non-permission command information.
- the fourth processing unit 212 indicates that the work reservation desired by the debiter can be rented and indicates that the rental reservation has been completed for the communication device 205. To be notified.
- the fourth processing unit 212 and the eighth storage unit 211 perform processing for updating information in the eighth storage unit 211.
- the fourth processing unit 212 stores, in the eighth storage unit 211, the management number, the first specific information of the work machine (rental work machine) for which the rental permission has been granted, permission information (permission command information), debiter information, the lending period, and the like.
- the eighth storage unit 211 stores a management number, first identification information, permission information (permission command information), debiter information, a lending period, and the like.
- the fourth processing unit 212 continues the processing on the assumption that the rental of the work machine having the first specific information corresponding to the non-permission command information has not been made. For example, the fourth processing unit 212 extracts a work machine that can be lent during the lending period, uses the work machine as a substitute machine that replaces the work machine that is not permitted to rent, and uses the first specific information of the substitute machine as the first specification information. 4. By notifying the management server 203, a rental permission request for an alternative device is made. The fourth management server 203 performs processing for determining whether or not the substitute machine is authorized as a rental work machine in the same manner as described above.
- the fourth processing unit 212 rents the substitute machine instead of the work machine desired by the borrower. Information that it is possible is transmitted to the communication device 205.
- the fourth processing unit 212 receives information indicating that the third management server 202 may be an alternative device, the fourth processing unit 212 notifies the communication device 205 of information indicating that the rental reservation has been completed.
- the fourth processing unit 212 obtains the management number, the management number, the first specific information of the alternative machine (rental work machine) that has been granted the rental permission, the permission information (permission command information), the debiter information, the lending period, and the like. Transmit to the eighth storage unit 211.
- the eighth storage unit 211 stores a management number, first identification information, permission information (permission command information), debiter information, a lending period, and the like. Next, processing after the rental work machine is determined will be described. The processing after the rental work machine is determined is not limited to the following embodiment.
- the backhoe includes a control device (second control device) 260 that performs various controls related to driving (operation) of the work machine.
- the control device 260 performs various controls such as auto idle control (AI control) and flow rate control.
- control in working machines, such as a backhoe is not limited to what is demonstrated below.
- the control device 260 includes operation amounts of operation members (for example, an operation lever 149 and an operation switch shown in FIG. 12) for operating various actuators such as a swing cylinder, a boom cylinder 154, an arm cylinder 155, and a bucket cylinder 153, and from a governor sensor.
- Various control signals such as governor angle (governor position), accelerator lever operation amount (angle), idle switch (AI-SW) on / off signal, and engine speed from the engine revolution sensor are input.
- the engine speed is increased or decreased according to the operation amount of the accelerator lever.
- the engine speed is fixed to the idling state.
- an idle switch ON signal is input with the operation lever 149 in the neutral position
- an idle signal is output to the auto idle motor regardless of the operation amount of the accelerator lever.
- the auto idle motor is driven to set the engine speed to the idle speed.
- the actuator is operated according to the operation amount of the operation member.
- a current (actuated) corresponding to the operation amount of the operation lever 149 is applied to the solenoid of the electromagnetic proportional valve provided in the work implement. Signal). Then, the electromagnetic proportional valve opens according to the current value (operation amount), the pilot pressure of the control valve corresponding to the actuator is controlled, and the actuator operates.
- the control device 260 includes a tenth storage unit 261, a processing unit (fifth processing unit) 262, a second time calculation unit (second time measuring unit) 263, and a ninth communication unit 264.
- the tenth storage unit 261 is configured by a non-volatile memory or the like, stores the work machine specifying information (third specifying information), and stores determination information corresponding to the third specifying information.
- the determination information is used for determination when control is performed by the control device 260 as will be described later.
- the determination information is the same information as the permission command information issued by the third issuing unit 222. Note that the third specifying information and the determination information are written in the tenth storage unit 261 when the work machine 104 is manufactured, when the work machine 104 is sold, or the like.
- the fifth processing unit 262 and the second time calculation unit 263 are configured by electric / electronic components, programs, and the like incorporated in the control device 260.
- the fifth processing unit 262 determines whether to limit the control by the control device 260 based on the lending period or the like.
- the second time calculation unit 263 is a timer that obtains the current time.
- the ninth communication unit 264 can communicate various information.
- the ninth communication unit 264 is a device that performs short-range wireless communication such as an IC tag and an IC card, or wireless communication such as WiFi (R), Bluetooth (R), and ZigBee (R).
- the ninth communication unit 264 may be a communication device that can be connected to a mobile phone communication network.
- the work machine rental system 201 includes a command device (second command device) 230A and a writing device (second writing device) 231.
- the command device 230A is a device capable of storing command information including at least permission command information and capable of communicating with the ninth communication unit 264.
- the command device 230A is an IC tag, an IC card, or the like. It is.
- the writing device 231 is a device (writer) capable of writing command information including at least permission command information to the command device 230A, and is a device that writes information including command information to an IC tag or an IC card. .
- the writing device 231 can be connected to the third management server 202 or the fourth management server 203 through a network, and for example, rental information including permission command information can be acquired through the network.
- rental information of a predetermined work machine (rental work machine) is acquired from the third management server 202 and the command device 230A is brought close, the writing device 231 writes the rental information into the command device 230A.
- the writing device 231 acquires rental information of a rental work machine whose first specific information is “K-RX253200”, the writing device 231 displays “K-RX253200” indicating the first specific information, a lending period (9/1 to 9/25), “015501-389761” indicating permission command information is written in the command device 230A.
- the instruction device 230 ⁇ / b> A can communicate with the ninth communication unit 264 of the control device 260. If the command device 230A and the ninth communication unit 264 are within the communicable range, the command device 230A transmits the first specific information, the permission command information, and the lending period to the ninth communication unit 264 of the work machine 104. .
- the fifth processing unit 262 of the control device 260 stores the tenth storage unit 261 in the control device 260. It is determined whether or not the third specified information and the first specified information match (authentication of the specified information is performed). In addition, the fifth processing unit 262 of the control device 260 determines whether or not the determination information associated with the third specific information matches the permission command information transmitted from the command device 230A (determination information and permission Authentication with command information).
- the fifth processing unit 262 lends the current time (time) when the third specific information matches the first specific information (authentication established), and the determination information matches the permission command information (authentication established). It is determined whether it is within the period. In other words, it is determined whether or not the current time has reached the expiration date.
- the expiration date is a time that is the last day of the lending period and does not exceed the last day. For example, if the lending period is 9/1 to 9/25, “9/25, 23:59:59 "is the expiration date.
- the fifth processing unit 262 determines that the control by the control device 260 is not restricted when the current time has not reached the expiration date. That is, when the fifth processing unit 262 determines that the control by the control device 260 is not restricted, the control device 260 performs the control as usual without restricting the control of the traveling system and the work system. On the other hand, when the current time exceeds the lending period, that is, when the current time reaches the expiration date, the fifth processing unit 262 determines that the control by the control device 260 is limited. When limiting the control by the control device 260, the fifth processing unit 262 limits the control. For example, the fifth processing unit 262 limits the normal control of the work machine 104 so as not to perform AI control, flow rate control, or the like. That is, when the control of the fifth processing unit 262 is restricted, the work machine 104 cannot perform normal control, and the operation of the work machine 104 can be stopped.
- the writing device 231 has written permission command information (permission information) indicated by numbers or the like to the command device 230A, but instead of writing “015501-389761” indicated by numbers or the like to the command device 230A During the period (9/1 to 9/25), a flag indicating that rental work is permitted for the rental work machine whose first specific information is “K-RX253200” (even if normal control is performed without restriction) Information may be written to the instruction device 230A. In this case, the instruction device 230A transmits the permission information, the lending period, and the first specific information indicated by the flag or the like to the control device 260.
- the fifth processing unit 262 of the control device 260 does not limit the control by the control device 260 when the current time has not reached the expiration date and the permission information is acquired. On the other hand, the fifth processing unit 262 of the control device 260 limits the control by the control device 260 when the permission information cannot be acquired even when the current time has not reached the expiration date.
- the management of the work machine 104 by the rental company can be simplified. For example, since the manufacturer gives permission for rental and permission command information (permission information) for operating the work machine 104 is issued from the manufacturer, the rental company operates for a number of work machines 104 owned by the rental company. For this purpose can be saved. That is, by using information (work machine information) managed by the manufacturer at the time of manufacture or sale, a key for operating the rental work machine can be easily generated and provided to the rental company.
- FIG. 11 shows a work machine rental system according to the sixth embodiment.
- the work machine rental system is a system in which it is determined not on the control device 260 but on the command device side whether or not the control by the control device mounted on the work machine 104 is restricted.
- the description of the same configuration as the above-described embodiment is omitted.
- the command device (second command device) 230B is a device capable of storing command information and measuring time (time). That is, the instruction device 230B includes a calculation unit (processing unit) such as a CPU that can measure at least the time and perform a predetermined process, such as a tag or an IC card having a CPU. Note that the instruction device 230B is a device different from an RFID or the like that does not have a calculation unit such as a CPU.
- the instruction device 230 ⁇ / b> B includes a second acquisition unit 232, a second time calculation unit (second timekeeping unit) 233, a tenth communication unit 234, and a processing unit (sixth processing unit) 235.
- the second acquisition unit 232, the third time calculation unit (third timing unit) 233, the tenth communication unit 234, and the sixth processing unit 235 are configured by electric / electronic components, programs, and the like incorporated in the command device 230B,
- the sixth processing unit 235 is configured by a CPU or the like.
- the second acquisition unit 232 acquires rental information including a rental period (expiration date), and acquires rental information by writing in the writing device 231.
- the writing device 231 gives the command device 230B the first specific information indicated by “K-RX253200”, the lending period indicated by “9/1 to 9/25”, and permission command information (permission information).
- the second acquisition unit 232 acquires “K-RX253200”, “9/1 to 9/25”, permission command information, and the like.
- the second acquisition unit 232 receives the rental information transmitted from the seventh communication unit 213 of the third management server 202 via the tenth communication unit 234 instead of acquiring the rental information via the writing device 231. You may get it.
- the third time calculation unit 233 is a timer for obtaining the current time.
- the tenth communication unit 234 can communicate various information.
- the tenth communication unit 234 is a device that performs short-range wireless communication or short-range wireless communication such as IWiFi (R), Bluetooth (R), and ZigBee (R).
- the command device 230B sends the third specifying information and the determination information to the control device 260. Make a request.
- the 6th process part 235 authenticates 3rd specific information and 1st specific information, and when 3rd specific information and 1st specific information correspond, it authenticates determination information and permission instruction information.
- the sixth processing unit 235 determines whether or not the current time (time) is within the lending period. That is, it is determined whether or not the current time has reached the expiration date.
- the sixth processing unit 235 refers to the current time (time) obtained by the time calculation unit 33 when the specific information matches (authentication established) and the permission information matches (authorization information authentication established). Then, it is determined whether or not the current time is within the lending period. That is, based on the time obtained by the time calculation unit 33, it is determined whether or not the current time has reached the expiration date. If the current time has not reached the expiration date, the sixth processing unit 235 determines that control by the control device 260 is not restricted. When the sixth processing unit 235 determines that the control is not limited, the tenth communication unit 234 outputs a permission signal (permission command) indicating that the control is not limited to the control device 260. When the control device 260 acquires the permission signal transmitted from the command device 230B (the tenth communication unit 234), the control device 260 performs the control as usual without restricting the control of the traveling system and the working system.
- the sixth processing unit 235 limits the control by the control device 260 when the current time (time) obtained by the time calculation unit 33 exceeds the lending period, that is, when the current time reaches the expiration date. Judge to do.
- the tenth communication unit 234 outputs a restriction signal (a restriction command) for performing control restriction to the control device 260.
- the control device 260 acquires the restriction signal transmitted from the command device 230B (the tenth communication unit 234), the control device 260 restricts the control of the traveling system and the working system. For example, the control device 260 does not perform AI control or flow rate control, and restricts normal control of the work machine 104. That is, when the control restriction by the control device 260 is activated, the work machine 104 cannot perform normal control, and the operation of the work machine 104 can be stopped.
- the work machine 104 cannot be moved when the lending period expires (the expiration date expires), but in addition to this, the lending period may be extended. A modification of extending the lending period will be described.
- the fourth processing unit 212 of the management server 2 is able to lend the work machine desired by the debiter even after the lending period has elapsed (when it can be estimated that lending can be continued after the lending period).
- the fourth processing unit 212 presets an extension period that is continuous with the lending period in a range where lending is possible. For example, if the lending period is 9/1 to 9/25 and the lending period is 10 days, the extension period is set to 9/26 to 10/5.
- the 4th processing part 212 issues the extended period matched with permission information (permission command information).
- the eighth storage unit 211 stores an extension period associated with the permission information separately from the lending period. Further, the extension period associated with the permission information is transmitted from the third management server 202 at the same time when the command device 230B (writing device 231) acquires the rental information, that is, when the permission command information is acquired. Is transmitted to (writing device 231).
- the second acquisition unit 232 of the instruction device 230B can acquire the extended period associated with the permission information.
- the writing device 231 writes the extension period associated with the permission information to the commanding device 230B
- the second acquisition unit 232 acquires the written extension period.
- the command device 230B is provided with a switch. When the switch is pressed in a state where the permission information matches the determination information and the extension period associated with the permission information is held in the command device 230B, the sixth processing unit 235 of the command device 230B Allow use of extended period. That is, the sixth processing unit 235 extends the expiration date to the last day of the extension period.
- the 4th process part 212 may issue the code (permission code) different from permission information separately from an extension period.
- the eighth storage unit 211 stores the extension period and the permission code separately from the lending period. Further, the extension period and the code are obtained from the third management server 202 at the same time when the command device 230B (writing device 231) acquires rental information, that is, when permission command information is acquired, from the command device 230B (writing device 231). Sent to.
- the second acquisition unit 232 of the instruction device 230B can acquire the extension period and the permission code.
- the writing device 231 writes the extension period and the permission code to the instruction device 230B
- the second acquisition unit 232 acquires the written extension period and the permission code.
- a code can be input to a display device or the like mounted on the work machine 104.
- the sixth processing unit 235 of the command device 230B requests the control device 260 for an external code.
- the control device 260 transmits the external code to the command device 230B.
- the sixth processing unit 235 of the instruction device 230B permits the use of the extended period when the external code transmitted from the control device 260 matches the permission code. That is, the sixth processing unit 235 extends the expiration date to the last day of the extension period.
- the writing device 231 has written permission command information (permission information) indicated by numbers or the like to the command device 230B, but instead of writing “015501-389761” indicated by numbers or the like to the command device 230B During the period (9/1 to 9/25), a flag indicating that rental work is permitted for the rental work machine whose first specific information is “K-RX253200” (even if normal control is performed without restriction) Information) may be written in the instruction device 230B.
- the command device 230B determines that the control by the control device 260 is not restricted. On the other hand, the instruction device 230B limits the control by the control device 260 when the permission information cannot be acquired even when the current time has not reached the expiration date.
- the fourth management server 203 issues permission command information corresponding to the work machine specific information, while the control device 260 stores in advance determination information corresponding to the work machine specific information.
- the control device 260 may be configured to perform normal control by the control device 260 without limitation without storing the determination information.
- the first specific information is encrypted using the permission command information issued by the third issuing unit 222 of the fourth management server 203.
- the fourth management server 203 transmits the encrypted first identification information, the unencrypted first identification information, and the permission command information to the third management server 202.
- the writing device 31 writes the encrypted first specific information, permission command information, and lending time limit to the command device (command device 230B, command device 230B).
- the encrypted first specific information, permission command information, and lending time limit are transmitted to the control device 260.
- the sixth processing unit 235 of the control device 260 restores the first specific information encrypted using the permission command information, and whether or not the third specific information matches the restored first specific information. Judging. In this way, it is possible to determine whether or not the permission command information is valid without writing determination information in the control device 260.
- the sixth processing unit 235 restores the encrypted first specific information using the encrypted first specific information and the permission command information, and obtains the third specific information. And whether or not the first specific information after restoration matches. Also in this case, it is possible to determine whether or not the permission command information is valid without writing the determination information in the control device 260.
- control device 260 does not perform AI control or flow rate control as a control restriction.
- control device 260 is not limited to this as a matter of course.
- the engine speed is fixed at a low speed
- the work machine 104 may be prevented from moving normally by stopping the start itself (prohibiting engine start) or by restricting various other controls.
Landscapes
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Finance (AREA)
- Business, Economics & Management (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Combustion & Propulsion (AREA)
- Remote Sensing (AREA)
- Radar, Positioning & Navigation (AREA)
- Mechanical Engineering (AREA)
- Transportation (AREA)
- Chemical & Material Sciences (AREA)
- Selective Calling Equipment (AREA)
Abstract
作業機(2)の監視を簡単に行うことができるようにする。 作業機(2)の監視システム(1)は、作業機(2)の保管場所(P)及び/又は保管場所(P)の周囲に設置され、無線通信が可能な第1通信装置(10)と、作業機(2)に搭載され且つ第1通信装置(10)と無線通信可能な第2通信装置(20)と、第1通信装置(10)と第2通信装置(20)との通信に基づいて、当該第2通信装置(20)が搭載された作業機(10)についての監視を行う監視部(30)と、を備えている。監視部(30)は、第1通信装置(10)が受信した電波に作業機(2)の停止を示す情報が含まれる場合に、当該第2通信装置(20)が搭載された作業機(2)についての監視を開始する。
Description
本発明は、作業機の管理システムに関する。
従来より、車両の保管場所を監視する技術として特許文献1に示すものがある。
特許文献1では、車両の保管場所である車庫の出入り口に、車両を検知することができるラインセンサを設置する。そのうえで、保管場所の警戒中には、ラインセンサで保管場所に向けて侵入しようとする侵入者を検知できるようにすることにより、保管場所の監視を行っている。
特許文献1では、車両の保管場所である車庫の出入り口に、車両を検知することができるラインセンサを設置する。そのうえで、保管場所の警戒中には、ラインセンサで保管場所に向けて侵入しようとする侵入者を検知できるようにすることにより、保管場所の監視を行っている。
さて、従来の作業機の使用期限を管理するシステムとして、特許文献2に示す技術が知られている。特許文献2の作業機では、使用期限が記憶された使用期限記憶手段と、使用期限に達したときに駆動部の動作を制限する動作制限手段と、使用期限を延長する使用期限延長手段と、使用期限の延長を許可する許可信号を予め設定された無線通信エリアに入ったときに受信可能な無線端末を備えている。
また、従来の作業機のレンタルシステムでは、特許文献3に示すように、作業機のレンタル予約があると、レンタルを行う作業機(レンタル作業機)のエンジン始動キーをレンタル会社が用意する。レンタル会社は、用意したエンジン始動キーを、レンタル作業機を使用するユーザに預けることで、ユーザは、レンタル作業機を駆動させることができる。
特許文献1において、保管場所の監視を開始するには、保管場所に車両を止めた後、保管場所に設置した操作盤等を操作する必要があった。この場合、操作盤の操作を忘れてしまうと、保管場所の監視、即ち、車両の監視が行えないという問題がある。また、特許文献1は、自動車等の保管場所の監視を対象としており、作業機等の監視するシステムは未だ開発されていないのが実情である。
特許文献2では、作業機側に使用期限が記憶されていて、使用期限が来ると作業機の制限を行っている。このような方式である場合、作業機側に使用期限を書き込む必要があり、使用期限を設定する場合には必ず外部のサーバ等から作業機側に接続する必要がある。即ち、作業機の使用期限の設定や判定等に関して、大変な処理が必要である。
特許文献3おけるシステムでは、レンタル会社は、多数の作業機を扱っているため、エンジン始動キーの管理が非常に大変であった。
特許文献3おけるシステムでは、レンタル会社は、多数の作業機を扱っているため、エンジン始動キーの管理が非常に大変であった。
本発明は、上記したような従来技術の問題点を解決すべくなされたものであって、作業機の監視を簡単に行うことができる作業機の管理システムを提供することを目的とする。また、本発明は、簡単に使用期限に応じて作業機の動作を制御することができる作業機の管理システムを提供することを目的とする。また、本発明は、簡単に作業機のレンタルを行うことができる作業機の管理システムを提供することを目的とする。
上述の目的を達成するため、本発明においては以下の技術的手段を講じた。
作業機の管理システム(作業機の監視システム)は、作業機の保管場所及び/又は保管場所の周囲に設置され、無線通信が可能な第1通信装置と、前記作業機に搭載され且つ前記第1通信装置と無線通信可能な第2通信装置と、前記第1通信装置と第2通信装置との通信に基づいて、当該第2通信装置が搭載された作業機についての監視を行う監視部と、を備えている。
作業機の管理システム(作業機の監視システム)は、作業機の保管場所及び/又は保管場所の周囲に設置され、無線通信が可能な第1通信装置と、前記作業機に搭載され且つ前記第1通信装置と無線通信可能な第2通信装置と、前記第1通信装置と第2通信装置との通信に基づいて、当該第2通信装置が搭載された作業機についての監視を行う監視部と、を備えている。
作業機の管理システム(作業機の監視システム)において、前記監視部は、前記第1通信装置が受信した電波に作業機の停止を示す情報が含まれる場合に、当該第2通信装置が搭載された作業機についての監視を開始する。
作業機の管理システム(作業機の監視システム)において、前記監視部は、前記第1通信装置が第2通信装置から受信した電波の受信強度が所定値以上である場合に、当該第2通信装置が搭載された作業機についての監視を開始する。
作業機の管理システム(作業機の監視システム)において、前記監視部は、前記第1通信装置が第2通信装置から受信した電波の受信強度が所定値以上である場合に、当該第2通信装置が搭載された作業機についての監視を開始する。
作業機の管理システム(作業機の監視システム)において、前記第1通信装置は、作業機の保管場所に設置され且つ前記第2通信装置と無線通信可能な内部通信装置と、前記保管場所外に設置され且つ前記第2通信装置と無線通信可能な外部通信装置とを含み、前記監視部は、前記外部通信装置が第2通信装置から受信した電波の受信強度が所定以上で且つ、前記内部通信装置が第2通信装置から受信した電波の受信強度が所定以上である場合に、当該第2通信装置が搭載された作業機についての監視を開始する。
作業機の管理システム(作業機の監視システム)において、前記監視部は、前記第1通信装置が第2通信装置から受信した電波の受信強度が所定値以上で且つ、前記第1通信装置が受信した電波に作業機の停止を示す情報が含まれる場合に、当該第2通信装置が搭載された作業機についての監視を開始する。
作業機の管理システム(作業機の監視システム)において、前記監視部は、前記作業機の監視中において、前記第1通信装置が第2通信装置から受信した電波に、前記作業機の駆動を示す情報が含まれる場合に、外部に警報を出力する。
作業機の管理システム(作業機の監視システム)において、前記監視部は、前記作業機の監視中において、前記第1通信装置が第2通信装置から受信した電波に、前記作業機の駆動を示す情報が含まれる場合に、外部に警報を出力する。
作業機の管理システム(作業機の動作システム)は、作業機に搭載され且つ、前記作業機の制御可能な第1制御装置と、前記第1制御装置の制御に関する指令を、無線によって前記第1制御装置に出力可能な第1指令装置と、を備え、前記第1指令装置は、前記作業機の使用期限を外部から取得可能な第1取得部と、時間を求める第1時間算出部と、前記第1時間算出部で求めた時間が、前記使用期限に達したか否かを判断する第3処理部と、前記使用期限に達した場合には、前記第1制御装置の制御を制限する第1指令を出力し、前記使用期限に達していない場合には、前記第1制御装置の制御を制限なく行う第2指令を出力する第6通信部と、を有している。
作業機の管理システム(作業機の動作システム)において、前記第1制御装置は判定情報を記憶する第6記憶部を有し、前記第1取得部は、前記第1制御装置の制御を制限なくための許可情報と、前記第1制御装置の第6記憶部に記憶された判定情報とを取得可能であり、前記第3処理部は、前記許可情報と前記判定情報との認証が成立し且つ前記使用期限に達しない場合には、前記第6通信部に前記第2指令を出力させる。
作業機の管理システム(作業機の動作システム)において、前記第1取得部は、前記使用期限の延長期間、延長期間を有効にするための許可コードを外部から取得可能であり、
前記第3処理部は、前記取得部が取得した許可コードと、外部から入力された外部コードとの認証が成立した場合に、前記延長期間に基づいて使用期限を延長する。
作業機の管理システム(作業機の動作システム)において、前記作業機は前記外部コードを入力可能な表示装置を備え、前記処理部は、前記制御装置に対して前記表示装置に入力された前記外部コードを要求可能である。
前記第3処理部は、前記取得部が取得した許可コードと、外部から入力された外部コードとの認証が成立した場合に、前記延長期間に基づいて使用期限を延長する。
作業機の管理システム(作業機の動作システム)において、前記作業機は前記外部コードを入力可能な表示装置を備え、前記処理部は、前記制御装置に対して前記表示装置に入力された前記外部コードを要求可能である。
作業機の管理システム(作業機のレンタルシステム)は、作業機のレンタル予約が行われた場合に、所定の作業機に対してレンタルが行われる場合における作業機に関する情報である第1情報を出力可能な第7通信部を有する第3管理サーバと、製造又は販売された作業機に関する情報である第2情報を記憶する第9記憶部を有する第4管理サーバと、を備え、前記第4管理サーバは、前記第1情報と前記第9記憶部に記憶された前記第2情報とを参照して、作業機のレンタル許可又はレンタル不許可を含む指令情報を発行する第3発行部と、を有している。
作業機の管理システム(作業機のレンタルシステム)において、前記第7通信部は、前記作業機を特定する第1特定情報を含む第1情報を出力し、前記第9記憶部は、製造又は販売された作業機を特定する第2特定情報を含む第2情報を記憶し、前記第3発行部は、前記第1特定情報と一致する前記第2特定情報が、前記第9記憶部に記憶されているか否かを判断し、前記第2特定情報が記憶されている場合に、当該第2特定情報に対応する作業機をレンタル作業機とし、当該レンタル作業機のレンタル許可を含む指令情報を発行する。
作業機の管理システム(作業機のレンタルシステム)は、前記第3発行部によって発行された前記指令情報を取得可能で且つ前記指令情報に基づいて、前記作業機に制御に関する指令を出力する第2指令装置を備えている。
作業機の管理システム(作業機のレンタルシステム)は、前記指令情報を前記第2指令装置に書き込み可能な書込み装置を備えている。
作業機の管理システム(作業機のレンタルシステム)は、前記指令情報を前記第2指令装置に書き込み可能な書込み装置を備えている。
作業機の管理システム(作業機のレンタルシステム)は、前記作業機に搭載され当該作業機の制御を行う第2制御装置を備え、前記第2指令装置は、レンタルの許可をする情報が前記指令情報に含まれている場合には、前記レンタル作業機の制御を許可する情報を無線によって前記第2制御装置に出力する。
作業機の管理システム(作業機の監視システム)によれば、作業機の監視を簡単に行うことができる。作業機の管理システム(作業機の動作システム)によれば、簡単に使用期限に応じて作業機の動作を制御することができる。作業機の管理システム(作業機のレンタルシステム)によれば、簡単に作業機のレンタルを行うことができる。
以下、本発明に係る作業機の管理システムについて、適宜図面を参照しながら説明する。
作業機の管理システムは、作業機の監視システムを含んでいる。作業機の監視システムについて説明する。
[第1実施形態]
図1は、作業機の監視システムの全体図である。
作業機の管理システムは、作業機の監視システムを含んでいる。作業機の監視システムについて説明する。
[第1実施形態]
図1は、作業機の監視システムの全体図である。
作業機の監視システム1では、作業機2を保管場所Pに保管した状況下で監視を行うシステムである。作業機2とは、バックホー等の建設機械、トラクタ、コンバイン、田植機等の農業機械、或いは、コンパクトトラックローダ、スキッドステアローダ等である。
図1に示すように、作業機の監視システム1は、第1通信装置10と、第2通信装置20とを有している。
図1に示すように、作業機の監視システム1は、第1通信装置10と、第2通信装置20とを有している。
第1通信装置10は、作業機2の保管場所P又は保管場所Pの周囲に設置される通信装置である。保管場所Pとは、作業機2が農業機械の場合は、例えば、農家の納屋であり、作業機が建設機械の場合は、倉庫、駐車場である。保管場所Pの周囲とは、保管場所の周辺であって、例えば、納屋、倉庫において作業機2が通る出入口、納屋の屋根、倉庫の屋根等である。当然の如く、保管場所Pは、前述した例に限定されず、作業機を保管するために予め決められた場所であればよい。納屋等の保管場所Pの壁や柱等には、収容箱40が設置されている。収容箱40には、第1通信装置10が収容可能である。
第1通信装置10は、例えば、WiFi(R)、Bluetoooth(R)、ZigBee(R)等の近距離無線通信を行うことが可能な通信モジュールである。なお、第1通信装置10を、通信モジュールを搭載したスマートフォン、タブレットPC等であってもよい。第1通信装置10は、作業機2の監視を行う際は、必ず、保管場所P又は保管場所Pの周囲に設置される。例えば、第1通信装置10が通信モジュールである場合は、当該通信モジュールが収容箱40に入れられ、常時、保管場所P又は保管場所Pの周囲に設置にされる。一方、第1通信装置10は、スマートフォン、タブレットPC等の携帯可能な装置である場合、作業機2の監視時には、収容箱40に収容し、監視時のみ持ち運びが不能である。
第2通信装置20は、作業機2に搭載されていて、第1通信装置10と無線通信可能な通信装置である。第2通信装置20は、WiFi(R)、Bluetoooth(R)、ZigBee(R)等の近距離無線通信を行うことが可能な通信モジュールである。なお、第2通信装置20に、携帯電話通信網と接続可能な通信モジュールを搭載してもよい。
以下、第1通信装置10及び第2通信装置20について詳しく説明する。
以下、第1通信装置10及び第2通信装置20について詳しく説明する。
先に、第2通信装置20について説明する。
第2通信装置20は、作業機2に設けられた車載通信ネットワークに接続されている。第2通信装置20は、処理部21と、第1通信部(出力部)22と、第1記憶部23とを有している。処理部21は、CPU等で構成されている。
処理部21は、車載通信ネットワークに流れる作業機の情報(ステータス情報ということがある)を取得可能である。処理部21は、例えば、ステータス情報として、作業機2に搭載されたセンサ(アクセルペダルセンサ、エンジン回転検出センサ、クランク位置センサ、燃料センサ、水温センサ、振動センサ等)の値を取得する。また、処理部21は、ステータス情報として、作業機2に搭載されたスイッチ(イグニッションスイッチ、駐車ブレーキスイッチ、PTOスイッチ等)の状態(ON、OFF)、或いは、作業機2に搭載されたCPU等の制御部の制御信号を取得可能である。
第2通信装置20は、作業機2に設けられた車載通信ネットワークに接続されている。第2通信装置20は、処理部21と、第1通信部(出力部)22と、第1記憶部23とを有している。処理部21は、CPU等で構成されている。
処理部21は、車載通信ネットワークに流れる作業機の情報(ステータス情報ということがある)を取得可能である。処理部21は、例えば、ステータス情報として、作業機2に搭載されたセンサ(アクセルペダルセンサ、エンジン回転検出センサ、クランク位置センサ、燃料センサ、水温センサ、振動センサ等)の値を取得する。また、処理部21は、ステータス情報として、作業機2に搭載されたスイッチ(イグニッションスイッチ、駐車ブレーキスイッチ、PTOスイッチ等)の状態(ON、OFF)、或いは、作業機2に搭載されたCPU等の制御部の制御信号を取得可能である。
また、処理部21は、取得した作業機の状態(ステータス情報)を送信信号に付加する。ここで、送信信号とは、第1通信装置10と第2通信装置20との無線通信で用いられるブロードキャストの信号であって、サービスセット識別子(SSID)などを含む信号である。
処理部21は、SSIDにステータス情報を付加する。以下、説明の便宜上、予め定められたSSIDのことを「設定SSID」、ステータス情報が付加されたSSIDのことを「変更SSID」ということがある。
処理部21は、SSIDにステータス情報を付加する。以下、説明の便宜上、予め定められたSSIDのことを「設定SSID」、ステータス情報が付加されたSSIDのことを「変更SSID」ということがある。
図2は、SSIDの推移を示した図である。
図2に示すように、時点P1において、作業機のイグニッションスイッチ(IG-SW)がオフ(OFF)からオン(ON)に変化した場合、処理部21は、イグニッションスイッチがオンしたことを示すステータス情報であるキーオン情報を取得する。処理部21がキーオン情報を取得すると、処理部21は、設定SSIDである「KUBOTA」に、キーオン情報を付加することにより、変更SSIDを「KUBOTA-010」する。即ち、処理部21は、イグニッションスイッチがオンしたことを示す「010」を、設定SSIDの末尾に加える。なお、設定SSIDである「KUBOTA」と、「010」との間に示される記号「-」は、設定SSIDと、新たに加えられたキーオン情報との区切りを示している。
図2に示すように、時点P1において、作業機のイグニッションスイッチ(IG-SW)がオフ(OFF)からオン(ON)に変化した場合、処理部21は、イグニッションスイッチがオンしたことを示すステータス情報であるキーオン情報を取得する。処理部21がキーオン情報を取得すると、処理部21は、設定SSIDである「KUBOTA」に、キーオン情報を付加することにより、変更SSIDを「KUBOTA-010」する。即ち、処理部21は、イグニッションスイッチがオンしたことを示す「010」を、設定SSIDの末尾に加える。なお、設定SSIDである「KUBOTA」と、「010」との間に示される記号「-」は、設定SSIDと、新たに加えられたキーオン情報との区切りを示している。
また、時点P2において、イグニッションスイッチ(IG-SW)がオン(ON)からオフ(OFF)に変化した場合、処理部21は、イグニッションスイッチがオフしたことを示すステータス情報であるキーオフ情報を取得する。処理部21がキーオフ情報を取得すると、処理部21は、設定SSIDである「KUBOTA」に、キーオフ情報を付加することにより、変更SSIDを「KUBOTA-011」する。即ち、処理部21は、イグニッションスイッチがオフしたことを示す「011」を、設定SSIDの末尾に加える。したがって、処理部21では、設定SSIDに、イグニッションスイッチのオン、オフを示すステータス情報を付加することができる。
上述した実施形態では、イグニッションスイッチのオン又はオフにおけるステータス情報について説明したが、当然の如く、これに限定されない。
本発明においては、作業機の動き(駆動)を確認できるステータス情報をSSIDに付加することが好ましい。図3に示すように、例えば、エンジンの始動の有無、作業装置の駆動の有無、作業機の振動の有無、走行の有無等を示すステータス情報を、SSIDに付加することが好ましい。なお、エンジンの始動の有無は、エンジン回転検出センサやクランク位置センサによって検出することができる。作業機の始動の有無は、作業装置のPTOスイッチのオン又はオフで検出することができる。作業機の振動の有無は、振動センサで検出することができる。
本発明においては、作業機の動き(駆動)を確認できるステータス情報をSSIDに付加することが好ましい。図3に示すように、例えば、エンジンの始動の有無、作業装置の駆動の有無、作業機の振動の有無、走行の有無等を示すステータス情報を、SSIDに付加することが好ましい。なお、エンジンの始動の有無は、エンジン回転検出センサやクランク位置センサによって検出することができる。作業機の始動の有無は、作業装置のPTOスイッチのオン又はオフで検出することができる。作業機の振動の有無は、振動センサで検出することができる。
したがって、処理部21によれば、作業機の駆動の有無、即ち、作業機の駆動の変化を認識することができるステータス情報を、設定SSIDに付加することができる。
なお、処理部21は、変更SSIDを作成するに際して、設定SSIDの末尾にステータス情報を示す数字等(例えば、010、011)を加えていたが、ステータス情報を示す数字等は、設定SSIDのどこの位置に加えてもよい。また、処理部21は、所定のステータス情報に基づき、設定SSIDを予め定められた計算式等で変化させてもよい。また、処理部21が取得したステータス情報と、ステータス情報を示す数字との関係は、予め第2通信装置20に記憶されており、処理部21は、この関係を用いて変更SSIDを作成する。
なお、処理部21は、変更SSIDを作成するに際して、設定SSIDの末尾にステータス情報を示す数字等(例えば、010、011)を加えていたが、ステータス情報を示す数字等は、設定SSIDのどこの位置に加えてもよい。また、処理部21は、所定のステータス情報に基づき、設定SSIDを予め定められた計算式等で変化させてもよい。また、処理部21が取得したステータス情報と、ステータス情報を示す数字との関係は、予め第2通信装置20に記憶されており、処理部21は、この関係を用いて変更SSIDを作成する。
第1通信部22は、近距離無線通信を行うチップ等であり、例えば、通信規格であるIEEE802.11シリーズに準拠したWi-Fi(登録商標)による無線通信を実行する。第1通信部22は、第1通信装置10から受信したデータ(情報)を受信したり、SSID(設定SSID、変更SSID)を含む送信信号を第1通信装置10に出力する。
第1記憶部23は、不揮発性のメモリ等から構成されている。第1記憶部23は、通信に関する通信情報、ステータス情報、変更SSIDを作成するためのデータ等を記憶可能である。通信情報とは、例えば、ネットワーク上において設定された固有のMACアドレス、第2通信装置20を識別するための識別子(設定SSID、変更SSID)、暗号化キー(ネットワークキー)等である。
第1記憶部23は、不揮発性のメモリ等から構成されている。第1記憶部23は、通信に関する通信情報、ステータス情報、変更SSIDを作成するためのデータ等を記憶可能である。通信情報とは、例えば、ネットワーク上において設定された固有のMACアドレス、第2通信装置20を識別するための識別子(設定SSID、変更SSID)、暗号化キー(ネットワークキー)等である。
第1通信装置10は、第2通信部11と、第2記憶部12とを有している。
第2通信部11は、近距離無線通信を行うチップ等であり、例えば、通信規格であるIEEE802.11シリーズに準拠したWi-Fi(登録商標)による無線通信を実行可能である。また、第2通信部11は、データ通信網や携帯電話通信網によって通信を行うことができるものであってもよい。
第2通信部11は、近距離無線通信を行うチップ等であり、例えば、通信規格であるIEEE802.11シリーズに準拠したWi-Fi(登録商標)による無線通信を実行可能である。また、第2通信部11は、データ通信網や携帯電話通信網によって通信を行うことができるものであってもよい。
第2記憶部12は、不揮発性のメモリ等から構成されている。第2記憶部12は、通信情報、第2通信装置20から取得したステータス情報を記憶可能である。通信情報は、例えば、ネットワーク上において設定された固有のMACアドレス、暗号化キー(ネットワークキー)、電子メール(通知先)等が記憶されている。
作業機の監視システム1は、作業機についての監視を行う監視部30を備えている。監視部30は、第1通信装置10に設けられている。第1通信装置10に組み込まれた電気、電子部品、プログラム等から構成されている。
作業機の監視システム1は、作業機についての監視を行う監視部30を備えている。監視部30は、第1通信装置10に設けられている。第1通信装置10に組み込まれた電気、電子部品、プログラム等から構成されている。
監視部30は、監視中(監視開始後)において、作業機の状態が変化すると、外部に警報を出力する。例えば、監視部30は、監視中において、作業機のエンジンが停止した状態から始動したり、作業機が停止している状態から移動を検知すると、外部に警報を出力する。
図1を用いて、作業機2の監視について詳しく説明する。
図1を用いて、作業機2の監視について詳しく説明する。
図1に示すように、作業機2の監視を行う前には、収容箱40に第1通信装置10が収められている。例えば、第1通信装置10が持ち運びが可能な通信装置で構成した場合は、収容箱40に収納後、施錠することによって作業機2の監視時には常時、収容箱40内に固定である。この場合は、作業機2の監視を行っていない場合のみ、第1通信装置10を収容箱40から取出しが行える。一方、第1通信装置10が持ち運びが不能な通信装置で構成した場合は、当該第1通信装置10は、常時、収容箱40に収容される。
第1通信装置10の通信範囲(通信距離)は、保管場所Pと略同じ大きさに設定されている。なお、第1通信装置10の通信範囲(通信距離)は、保管場所Pよりも大きくてもよいし、保管場所Pであって作業機2が停止する位置において、第2通信装置20からの電波が受信可能な範囲であればよい。
作業機2による作業が終了すると、第2通信装置20を搭載した作業機2が納屋Pに帰ってくることになる。作業機2の第2通信装置20は一定の間隔(例えば、1秒毎、数秒毎)で、SSIDを外部に出力する。第2通信装置20がSSIDを出力する間隔は、上述したものに限定されない。
作業機2による作業が終了すると、第2通信装置20を搭載した作業機2が納屋Pに帰ってくることになる。作業機2の第2通信装置20は一定の間隔(例えば、1秒毎、数秒毎)で、SSIDを外部に出力する。第2通信装置20がSSIDを出力する間隔は、上述したものに限定されない。
作業機2が保管場所に入り所定の場所に停止すると、作業機の駆動は停止する。例えば、作業機のイグニッションスイッチはオフされ、エンジン及び作業装置の駆動を停止することになる。
作業機2が納屋Pに入り、イグニッションスイッチがオフすると、上述したように、第2通信装置20の処理部21がイグニッションスイッチがオフしたことを示す「011」が付加された変更SSIDを生成する。第1通信部22は変更SSIDを外部に出力する。一方、第1通信装置10の第2通信部11は、第2通信装置20が出力した変更SSIDを取得することができる。つまり、第1通信装置10は、変更SSIDを通じて作業機2が停止した(作業機2の駆動が停止した)ことを把握することができる。
作業機2が納屋Pに入り、イグニッションスイッチがオフすると、上述したように、第2通信装置20の処理部21がイグニッションスイッチがオフしたことを示す「011」が付加された変更SSIDを生成する。第1通信部22は変更SSIDを外部に出力する。一方、第1通信装置10の第2通信部11は、第2通信装置20が出力した変更SSIDを取得することができる。つまり、第1通信装置10は、変更SSIDを通じて作業機2が停止した(作業機2の駆動が停止した)ことを把握することができる。
さて、監視部30は、第1通信装置10と第2通信装置20との通信における電波に基づいて、作業機2の監視を行う。上述した例の場合、第1通信装置10が受信した電波(変更SSID)に作業機2の停止を示す情報(011)が含まれているため、監視部30は、作業機2の停止を示す変更SSIDを第1通信装置10が受信した時点で第2通信装置20が搭載された作業機についての監視を開始する。当然のごとく、作業機2の停止を示す情報は「011」に限定されず、エンジン駆動が無しを示す「025」であってもよいし、その他の情報であってもよい。
監視部30は、監視の開始後(監視中)、作業機2のイグニッションスイッチがオンし、第1通信装置10が第2通信装置20から「イグニッションスイッチがオンになっている」ことを示す変更SSID(「KUBOTA-010」)を受信した場合、納屋Pの内部及び外部に警報を鳴らす。或いは、監視部30は、第1通信装置10の第2記憶部12に記憶されている電子メール等の連絡先に、作業機の変化を通知する。警報は、どのような方式であってもよく、音で警報を知らせても、光で警報を知らせてもよい。
監視部30における監視の終了は、例えば、第1通信装置10に入力部を設けて、入力したパスワードと、予め第1通信装置10の第2記憶部12に記憶していたパスワードとを比較し、パスワードが一致した場合に、監視の終了(監視の解除)を行う。なお、監視の終了は、特に限定されない。例えば、第2通信装置20に入力部を設けて、入力したパスワードを第1通信装置10に送信する。そして、第2通信装置20から送信したパスワードと、第1通信装置10の第2記憶部12に記憶しているパスワードとを比較し、パスワードが一致した場合に、監視の終了を行ってもよいし、その他の方法であってもよい。
以上によれば、監視部30は、第1通信装置10が受信した電波(SSID)に作業機の停止を示す情報が含まれる場合に、第2通信装置20が搭載された作業機2についての監視を開始しているため、撮像装置等の大掛かりな装置を用いなくても作業機2の監視を簡単に行うことができる。
さて、上述した実施形態では、第1通信装置10と第2通信装置20との通信における電波(変更SSID)に作業機2の停止が含まれる場合に、監視部10は作業機2の監視を行っているが、これに代え、第1通信装置10が第2通信装置20から受信した電波の強度(受信強度)を用いて、監視部30による監視を開始してもよい。
さて、上述した実施形態では、第1通信装置10と第2通信装置20との通信における電波(変更SSID)に作業機2の停止が含まれる場合に、監視部10は作業機2の監視を行っているが、これに代え、第1通信装置10が第2通信装置20から受信した電波の強度(受信強度)を用いて、監視部30による監視を開始してもよい。
以下、第1通信装置10の受信強度による作業機の監視について説明する。
図1に示すように、第1通信装置10が収容箱40に収容している状況下で、作業機2が保管場所Pから離れた場所では、第2通信装置20と第1通信装置10とが離れているため、第2通信装置20に対する第1通信装置10の受信強度、即ち、送信信号等の信号の受信強度は小さい。特に、第1通信装置10から見て第2通信装置20が通信エリア外に位置する場合は、第1通信装置10は、第2通信装置20からの送信信号等の信号を受信することができない。つまり、第1通信装置10が第2通信装置20からの信号を受信できない場合は、当該第2通信装置20を搭載した作業機は、保管場所Pから離れていると言える。
図1に示すように、第1通信装置10が収容箱40に収容している状況下で、作業機2が保管場所Pから離れた場所では、第2通信装置20と第1通信装置10とが離れているため、第2通信装置20に対する第1通信装置10の受信強度、即ち、送信信号等の信号の受信強度は小さい。特に、第1通信装置10から見て第2通信装置20が通信エリア外に位置する場合は、第1通信装置10は、第2通信装置20からの送信信号等の信号を受信することができない。つまり、第1通信装置10が第2通信装置20からの信号を受信できない場合は、当該第2通信装置20を搭載した作業機は、保管場所Pから離れていると言える。
作業機が保管場所Pに次第に近づき、第1通信装置10と第2通信装置20との距離が短くなると、第1通信装置10は第2通信装置20から送信された送信信号を受信する。即ち、第1通信装置10と第2通信装置20との距離が短くなると、第2通信装置20が送信された送信信号の受信強度は次第に大きくなる。ここで、第1通信装置10の受信強度が所定値(閾値)以上となると、監視部30は、監視を開始する。即ち、作業機が保管場所Pに入ることによって、第1通信装置10の受信強度が所定値以上となると、監視部30は、監視を開始する。したがって、作業機が保管場所Pに入るだけで、自動的に作業機の監視を行うことができる。特に、複数の作業機を保管場所Pに止めて保管する場合、各作業機が作業場から保管場所Pに帰ってくる度に、監視する作業機の台数を増やすことができる。なお、電波強度の強さを判定する所定値(閾値)は、作業機2が保管場所に到達した場合(保管場所の中に入った場合)の電波強度であり、実験や理論式で求めることが可能である。
監視部30は、監視中(監視開始後)において、例えば、第1通信装置10の受信強度が所定値未満なると、作業機2が保管場所Pから離れた可能性があるため、警報を外部に出力する。なお、監視の開始は、電波強度を用いて行い、監視は、上述したように、作業機2の状態等をステータス情報(SSID)によって監視してもよい。
また、第1通信装置10の受信強度のみで、監視部30よる監視を行う場合は、第2通信装置20の処理部21は、変更SSIDを生成しなくてもよく、第2通信装置20は、電波(例えば、設定SSID)を外部に出力するものであればよい。
また、第1通信装置10の受信強度のみで、監視部30よる監視を行う場合は、第2通信装置20の処理部21は、変更SSIDを生成しなくてもよく、第2通信装置20は、電波(例えば、設定SSID)を外部に出力するものであればよい。
上述した例では、第1通信装置10の受信強度が所定値以上となると、監視部30は監視を開始していたが、これに加え、作業機が作業場所から保管場所Pに帰って来た場合の動作と連動して、監視を開始してもよい。
バックホーの建設機械、トラクタ、コンバイン及び田植機の農業機械は、トラック等の運搬車に載せられて、作業場所から保管場所Pに帰って来ることが多い。運搬車における運搬中は、建設機械や農業機械は駆動を停止している。即ち、建設機械や農業機械はイグニッションスイッチがオフの状態(エンジンを停止した状態)で作業場所から保管場所Pへと運搬される。そして、運搬車が保管場所P或いは保管場所Pの周囲に到着すると、建設機械や農業機械は、イグニッションスイッチ等をオフからオンにして、エンジンを始動し自走し、再び、保管場所P内で停止位置にくると、イグニッションスイッチをオフにする。
バックホーの建設機械、トラクタ、コンバイン及び田植機の農業機械は、トラック等の運搬車に載せられて、作業場所から保管場所Pに帰って来ることが多い。運搬車における運搬中は、建設機械や農業機械は駆動を停止している。即ち、建設機械や農業機械はイグニッションスイッチがオフの状態(エンジンを停止した状態)で作業場所から保管場所Pへと運搬される。そして、運搬車が保管場所P或いは保管場所Pの周囲に到着すると、建設機械や農業機械は、イグニッションスイッチ等をオフからオンにして、エンジンを始動し自走し、再び、保管場所P内で停止位置にくると、イグニッションスイッチをオフにする。
つまり、作業機(建設機械、農業機械)の作業場所から保管場所Pへ帰ってくる経緯を見てみると、保管場所Pに至るまではイグニッションスイッチはオフであり、保管場所Pに到達すると、イグニッションスイッチはオンしたのちオフする。そこで、監視部30は、第1通信装置10の受信強度が所定値以上で且つ監視中でない状況下で、作業機(建設機械、農業機械)のイグニッションスイッチがオフからオンに変化した場合(変更SSIDがKUBOTA-011からKUBOTA-010に変化した)場合、監視を開始する。なお、作業機のイグニッションスイッチがオフからオンに変化し、さらに、オンからオフに変化した場合に、監視を行ってもよい。
これによれば、第1通信装置10の受信強度の状態と、作業機におけるイグニッションスイッチの変化により、作業機が保管場所Pへ帰ってきたことを、より確実に検出したうえで、作業機の監視を行うことができる。
なお、監視の開始後における監視の処理は、電波強度のみで行ってもよいし、SSID(ステータス情報)の変化で行ってもよいし、電波強度とSSIDとの両方を用いて行ってもよい。
なお、監視の開始後における監視の処理は、電波強度のみで行ってもよいし、SSID(ステータス情報)の変化で行ってもよいし、電波強度とSSIDとの両方を用いて行ってもよい。
さて、作業機が駆動している状態では、当該作業機は振動する。作業機が振動しているか否かは、上述したように、変更SSIDから把握することができる。そこで、監視部30は、第1通信装置10の受信強度が所定値以上である状況下で、作業機の振動が無くなった(振動が得られない)場合に、監視を開始してもよい。なお、第1通信装置10の受信強度が所定値以上である第1条件、イグニッションスイッチがオフからオンに変化した第2条件と、振動が得られないという第3条件の全てが揃った場合に、監視部30が監視を開始してもよい。
さて、作業機が保管場所Pに留まっている状況、即ち、作業機が保管場所Pで止まっている状況下では、第1通信装置10と第2通信装置20との距離は常に近いため、第1通信装置10の受信強度は常に所定値以上となる。そこで、監視部30は、第1通信装置10の受信強度が所定値以上である時間、即ち、受信強度が連続して所定値以上の経過時間が所定時間以上である場合に、監視を開始してもよい。所定時間とは、作業機が保管場所Pで停止して保管していると考えられる長さであって、例えば、数分(2,3分)である。当然の如く、この数値は限定されないが、10分を超えないことが望ましい。これによれば、イグニッションスイッチの状態や振動の状態等、作業機の状態が得られない場合でも、自動的に作業機の監視を行うことができる。
[第2実施形態]
図4は、第2実施形態における作業機の監視システムを示している。図4に示すように、作業機の監視システムは、第1通信装置10は、内部通信装置10Aと、外部通信装置10Bとを含んでいる。内部通信装置10Aとは、保管場所内に設置され且つ第2通信装置20と無線通信が可能な通信装置である。外部通信装置10Bとは、保管場所外に設置され且つ第2通信装置20と無線通信が可能な通信装置である。即ち、図4に示すように、作業機の監視システム1では、保管場所Pの内部及び外部に、第1通信装置10を設置したシステムである。
[第2実施形態]
図4は、第2実施形態における作業機の監視システムを示している。図4に示すように、作業機の監視システムは、第1通信装置10は、内部通信装置10Aと、外部通信装置10Bとを含んでいる。内部通信装置10Aとは、保管場所内に設置され且つ第2通信装置20と無線通信が可能な通信装置である。外部通信装置10Bとは、保管場所外に設置され且つ第2通信装置20と無線通信が可能な通信装置である。即ち、図4に示すように、作業機の監視システム1では、保管場所Pの内部及び外部に、第1通信装置10を設置したシステムである。
内部通信装置10Aは、例えば、納屋Pの柱に設けた収容箱40に収容されている。内部通信装置10Aの通信範囲(通信距離)は、保管場所Pと略同じ大きさに設定されている。なお、内部通信装置10Aの通信範囲(通信距離)は、保管場所Pよりも大きくてもよいし、保管場所Pであって作業機2が停止する位置において、第2通信装置20からの電波が受信可能な範囲であればよい。
外部通信装置10Bは、例えば、納屋Pの屋根、或いは、納屋Pの出入口の外に設置されている。内部通信装置10A及び外部通信装置10Bは、第2通信部11及び第2記憶部12をそれぞれ有している。
監視部30は、内部通信装置10Aに設けられている。内部通信装置10Aと外部通信装置10Bとは接続されていて、内部通信装置10Aは、外部通信装置10Bが受信した電波(第2通信装置20から発信された電波)の受信強度を取得可能である。以下、説明の便宜上、外部通信装置10Bが受信した電波のことを「第1電波」、内部通信装置10Aが受信した電波のことを「第2電波」、外部通信装置10Bにおける第1電波の電波強度を第1電波強度、内部通信装置10Aにおける第2電波の電波強度を第2電波強度という。
監視部30は、内部通信装置10Aに設けられている。内部通信装置10Aと外部通信装置10Bとは接続されていて、内部通信装置10Aは、外部通信装置10Bが受信した電波(第2通信装置20から発信された電波)の受信強度を取得可能である。以下、説明の便宜上、外部通信装置10Bが受信した電波のことを「第1電波」、内部通信装置10Aが受信した電波のことを「第2電波」、外部通信装置10Bにおける第1電波の電波強度を第1電波強度、内部通信装置10Aにおける第2電波の電波強度を第2電波強度という。
監視部30は、外部通信装置10Bが第2通信装置20から受信した電波の第1受信強度が所定値以上で且つ、内部通信装置10Aが第2通信装置20から受信した電波の第2受信強度が所定値以上である場合に、第2通信装置20が搭載された作業機2についての監視を開始する。
例えば、図4に示すように、作業機2が保管場所Pから遠く離れている場所にいる場所に居るとき、外部通信装置10Bと第2通信装置20とが遠く離れているため、図5に示すように、外部通信装置10Bの第1電波強度は小さい。また、内部通信装置10Aと第2通信装置20とも遠く離れているため、内部通信装置10Aの第2電波強度も小さい。
例えば、図4に示すように、作業機2が保管場所Pから遠く離れている場所にいる場所に居るとき、外部通信装置10Bと第2通信装置20とが遠く離れているため、図5に示すように、外部通信装置10Bの第1電波強度は小さい。また、内部通信装置10Aと第2通信装置20とも遠く離れているため、内部通信装置10Aの第2電波強度も小さい。
図5に示すように、作業機2が保管場所Pに近づくにつれて、外部通信装置10Bの第1電波強度は次第に大きくなる。作業機2が保管場所Pの付近に位置した場合は、外部通信装置10Bの第1電波強度は最も大きく、保管場所Pの出入口で所定値(第1閾値)以上になる。一方、内部通信装置10Aの第2電波強度は、出入口付近から次第に大きくなる。さらに、作業機2が保管場所Pの出入口を通過して、保管場所Pに入ると、内部通信装置10Aの第2電波強度は所定値(第2閾値)以上になる。監視部30は、第1電波強度が所定値(第1閾値)以上で且つ、第2電波強度が所定値(第2閾値)以上になった場合に、作業機2の監視を行う。第1閾値は、例えば、保管場所Pの出入口から数m~数十m離れた位置(保管場所に近づいたとみなされる位置)における電波強度である。なお、図5では、第1閾値と第2閾値とが同じとなってるが、保管場所P等の大きさに応じて閾値は設定すればよく、第1閾値と第2閾値は異なっていてもよい。
このように、外部通信装置10Bの第1電波強度の推移を見ることによって、作業機1が保管場所Pに近づいているのか離れているのかを把握することができる。また、内部通信装置10Aの第2電波強度を見ることによって、作業機1が保管場所Pに入ったか否かを把握することができる。例えば、外部通信装置10Bの第1電波強度が所定値以上であったものの、内部通信装置10Aの第2電波強度が所定値未満である場合には、作業機2は保管場所Pの近くに居るものの、保管場所Pには入ってないことが分かる。
つまり、監視部30が第1電波強度と第2電波強度との両方を用いて、作業機2の監視をするか否かを決定しているため、外部から保管場所Pに帰ってきた作業機2の監視を行うことができる。
[第3実施形態]
作業機の管理システムは、作業機の動作システムを含んでいる。作業機の動作システムについて説明する。
[第3実施形態]
作業機の管理システムは、作業機の動作システムを含んでいる。作業機の動作システムについて説明する。
作業機の動作システムは、作業機の動作を管理するシステムで、例えば、作業機のレンタルシステムに適用することができる。作業機の動作システムの説明の前に、作業機のレンタルシステムについて説明する。なお、作業機の動作システムは、作業機のレンタル以外にも適用は可能であり、後述する作業機のレンタルシステムに限定されない。
図6は、作業機のレンタルシステムの概略図である。
図6は、作業機のレンタルシステムの概略図である。
作業機のレンタルシステム1は、建設機械(例えば、バックホー)、農業機械(例えば、トラクタ、コンバイン、田植機)等の作業機のレンタルシステムを行うシステムである。
図6に示すように、作業機のレンタルシステム101は、第1管理サーバ102と、第2管理サーバ103とを備えている。
図6に示すように、作業機のレンタルシステム101は、第1管理サーバ102と、第2管理サーバ103とを備えている。
第1管理サーバ102は、作業機104のレンタルを管理するサーバであって、例えば、レンタル会社等が所有する。第2管理サーバ103は、作業機104の製造又は販売するメーカ等が所有する。第1管理サーバ102と、第2管理サーバ103とはネットワークNを通じて互いに情報の送受信が行えるようになっている。第2管理サーバ103は、例えば、作業機104の製造、又は、販売に関する様々な情報(部品情報、仕様情報、操作マニュアル、メンテナンス情報等)を第1管理サーバ102に提供することが可能である。一方で、第1管理サーバ102は、後述するように、レンタルに関する情報を第2管理サーバ103に提供することができる。
第1管理サーバ102には、ネットワークNを通じて、様々な機器(通信機器という)105が接続可能である。例えば、第1管理サーバ102には、パーソナルコンピュータ(PC)、スマートフォン(多機能携帯電話)、PDA(携帯端末)、タブレット等の通信機器5が接続可能である。通信機器105を、第1管理サーバ102に接続することによって、作業機104のレンタルに関する処理を行うことができる。
作業機104のレンタルを行うには、まず、通信機器105を第1管理サーバ102に接続をする。第1管理サーバ102は、通信機器105が接続されたことを受けて、当該通信機器105に入力画面(例えば、Web画面)を表示させる。通信機器105に表示された入力画面には、レンタルを行うのに必要な事項(情報)が入力することができる。例えば、入力画面には、作業機を借りる者(借方)に関する情報である借方者情報(借方者の住所、氏名、電話番号等)、借方希望情報(レンタルを希望する作業機の機種、当該機種の希望台数、貸出期間等)を入力することができる。
第1管理サーバ102は、借方希望情報に基づき、希望する貸出期間中に希望する作業機104が貸し出しを行えるか否かを判断し、希望する貸出期間中に作業機104の貸出が行える場合は、第2管理サーバ103に対して、レンタルの許可の問い合わせを行う。第2管理サーバ103からレンタルの許可がなされると、第1管理サーバ102は、作業機の貸出が行えるように所定の処理を行う。このように、作業機のレンタルシステム101では、第1管理サーバ102と第2管理サーバ103とを連携させることにより、作業機104のレンタルを行っている。
以下、第1管理サーバ及び第2管理サーバについて詳しく説明する。
第1管理サーバ102は、第3記憶部(第1作業機情報記憶部)110と、第4記憶部(レンタル情報記憶部)111と、処理部(第2処理部)112と、第3通信部113とを備えている。第3記憶部110及び第4記憶部111は、不揮発性のモリ等で構成されている。第2処理部112及び第3通信部113は、第1管理サーバ102に組み込まれた電気・電子部品、プログラム等で構成されている。
第1管理サーバ102は、第3記憶部(第1作業機情報記憶部)110と、第4記憶部(レンタル情報記憶部)111と、処理部(第2処理部)112と、第3通信部113とを備えている。第3記憶部110及び第4記憶部111は、不揮発性のモリ等で構成されている。第2処理部112及び第3通信部113は、第1管理サーバ102に組み込まれた電気・電子部品、プログラム等で構成されている。
第3記憶部110は、レンタル会社が所有する作業機の情報(作業機情報)を記憶している。第3記憶部110は、例えば、図7Aに示すように、作業機の管理番号、作業機の特定情報、作業機の機種等を記憶している。作業機の管理番号は、レンタル会社がレンタルの管理のために付した番号である。作業機の特定情報は、作業機を特定する情報であって作業機に割り当てられた固有の情報(例えば、製造番号、シリアル番号等)である。作業機の機種は、作業機の仕様、作業機の大きさ等によって、製造メーカが独自に設定した名称等である。
第4記憶部111は、作業機のレンタルに関する情報(レンタル情報という)を記憶している。第4記憶部111は、例えば、図7Bに示すように、レンタル情報として、レンタルを行った作業機の管理番号、作業機の特定情報、許可情報、借方者情報、貸出期間等を記憶している。許可情報とは、レンタルを行う際に第2管理サーバ103から通知されたレンタルの許可を示す番号(許可指令情報)等である。
第3通信部113は、第2管理サーバ103、通信機器105等と様々な情報を送受信する装置である。第3通信部113は、第1管理サーバ102、第2管理サーバ103及び通信機器105の処理に応じて、所定の情報を送受信する。
第2処理部112は、レンタルに関する様々な処理を行う部分である。例えば、第1管理サーバ102に通信機器105が接続し、当該第1管理サーバ102に対してレンタルを行いたいという要求(入力画面の要求)があると、第2処理部112は、通信機器105に入力画面を表示させる処理を行う。また、第2処理部112は、入力画面に借方者情報、借方希望情報等が入力されると、借方希望情報に基づき、希望する貸出期間中に希望する作業機が貸し出しを行えるか否かを判断する処理を行う。詳しくは、第2処理部112は、第3記憶部110に記憶している作業機の機種を参照して、レンタルを希望する作業機の機種が、何台所有しているかを算出する。即ち、第2処理部112は、レンタル希望の機種におけるレンタル会社の所有台数を算出する。なお、作業機を予め機種毎に整理することで、所持している台数を第3記憶部110に記憶していてもよい。
第2処理部112は、レンタルに関する様々な処理を行う部分である。例えば、第1管理サーバ102に通信機器105が接続し、当該第1管理サーバ102に対してレンタルを行いたいという要求(入力画面の要求)があると、第2処理部112は、通信機器105に入力画面を表示させる処理を行う。また、第2処理部112は、入力画面に借方者情報、借方希望情報等が入力されると、借方希望情報に基づき、希望する貸出期間中に希望する作業機が貸し出しを行えるか否かを判断する処理を行う。詳しくは、第2処理部112は、第3記憶部110に記憶している作業機の機種を参照して、レンタルを希望する作業機の機種が、何台所有しているかを算出する。即ち、第2処理部112は、レンタル希望の機種におけるレンタル会社の所有台数を算出する。なお、作業機を予め機種毎に整理することで、所持している台数を第3記憶部110に記憶していてもよい。
そして、第2処理部112は、第4記憶部111を参照して、貸出期間中において既にレンタルを行っている作業機の台数(貸出台数)を算出し、貸出台数と所有台数とからレンタルが可能な作業機の台数(貸出可能台数)を算出する。第2処理部112は、貸出可能台数が、希望台数以上である場合、希望している作業機に対して貸出が行えると判断する。
なお、例えば、貸出可能台数が3台、希望台数が5台である場合、少なくとも貸出可能台数である3台の作業機は、レンタルすることが可能である。この場合は、第2処理部112は、貸出可能台数を通信機器105に通知し、通信機器105に希望台数の変更を求め、変更後の希望台数が貸出可能台数以下の場合には、第2処理部112は、貸し出しを行えると判断する。
第2処理部112は、希望している作業機に対して貸出が行えると判断後、即ち、所定の作業機に対してレンタル予約が行われた場合、第1情報を、第3通信部113から第2管理サーバ103に送信する処理を行う。第1情報とは、所定の作業機、即ち、貸出可能な作業機の情報であって、第1管理サーバ102が管理している情報である。第1情報は、作業機の管理番号、作業機を特定する特定情報、作業機の機種等である。
この実施形態では、作業機に対してレンタル予約が行われた場合、第2処理部112は、第3記憶部110及び第4記憶部111を参照し、希望している作業機と同じ作業機の特定情報(第1特定情報という)を抽出する。第3通信部113は、第2処理部112が抽出した第1特定情報を含む第1情報と、レンタル許可要求とを第2管理サーバ103に送信する。
さて、第2管理サーバ103は、第5記憶部(第2作業機情報記憶部)120と、第4通信部121と、第1発行部122とを有している。第5記憶部120は、不揮発性のメモリ等で構成されている。第4通信部121、第1発行部122は、第2管理サーバ103に組み込まれた電気・電子部品、プログラム等で構成されている。
第5記憶部120は、製造した作業機の情報、又は、販売した作業機の情報を記憶している。製造した作業機の情報、又は、販売した作業機の情報のことを第2情報という。第5記憶部120は、例えば、図8Aに示すように、第2情報として、作業機の特定情報、作業機の機種等を記憶している。
第5記憶部120は、製造した作業機の情報、又は、販売した作業機の情報を記憶している。製造した作業機の情報、又は、販売した作業機の情報のことを第2情報という。第5記憶部120は、例えば、図8Aに示すように、第2情報として、作業機の特定情報、作業機の機種等を記憶している。
第4通信部121は、第1管理サーバ102等と様々な情報を送受信する装置である。第4通信部121は、第1管理サーバ102、第2管理サーバ103等の処理に応じて、所定の情報を受信したり送信する。
第1発行部122は、まず、第1管理サーバ102から送信された第1情報と、第5記憶部120に記憶された第2情報とを参照して、レンタル許可する作業機(レンタル作業機という)を割り出す。具体的には、第1管理サーバ102が第1特定情報を含む第1情報及びレンタル許可要求を受信すると、第1発行部122は、レンタル許可要求を受けて割出処理を開始する。第1発行部122は、第1管理サーバ102が受信した第1特定情報と一致する第2特定情報が、第5記憶部120に記憶されているか否かを判定する。
第1発行部122は、まず、第1管理サーバ102から送信された第1情報と、第5記憶部120に記憶された第2情報とを参照して、レンタル許可する作業機(レンタル作業機という)を割り出す。具体的には、第1管理サーバ102が第1特定情報を含む第1情報及びレンタル許可要求を受信すると、第1発行部122は、レンタル許可要求を受けて割出処理を開始する。第1発行部122は、第1管理サーバ102が受信した第1特定情報と一致する第2特定情報が、第5記憶部120に記憶されているか否かを判定する。
例えば、図8Bに示すように、第1特定情報が「K-RX253200」である場合、第1発行部122は、第5記憶部120を参照して、当該第5記憶部120の中に「K-RX253200」で示された第2特定情報が記憶されているかを判定する。この場合、第5記憶部120中に第2特定情報として、「K-RX253200」が記憶されているため、第1発行部122は、第1特定情報と一致する第2特定情報が記憶されている(作業機有り)と判定する。
第1発行部122は、作業機有りの場合、第2特定情報(「K-RX253200」)と一致する第1特定情報(「K-RX253200」)に対応する作業機を、レンタル許可するレンタル作業機として認定し、認定したことを示す指令情報(許可指令情報)を発行する。許可指令情報とは、第1特定情報の作業機を、レンタル作業機として認定したことを示す情報(レンタル許可を示す情報)であって、数桁の数字等で示される。また、許可指令情報は、予め作業機と関連付けられていて、予め第2特定情報(「K-RX253200」)と許可指令情報とは対応づけられている。即ち、第1発行部122は、予め第2特定情報に対応付けられた許可指令情報を発行する。
したがって、第1発行部122は、第1管理サーバ102から通知された第1特定情報に対して、対応付けられた許可指令情報を発行することで、当該第1特定情報の作業機に対してレンタル許可を行う。
なお、上述した説明では、第1発行部122は、第1管理サーバ102から通知された第1特定情報に、レンタル許可を示すフラグ等を許可指令情報(許可情報)とすることで、当該第1特定情報の作業機に対してレンタル許可を行ってもよい。
なお、上述した説明では、第1発行部122は、第1管理サーバ102から通知された第1特定情報に、レンタル許可を示すフラグ等を許可指令情報(許可情報)とすることで、当該第1特定情報の作業機に対してレンタル許可を行ってもよい。
一方、第1特定情報が「K-253800」である場合、第1発行部122は、第5記憶部120の中に第2特定情報として、「K-253800」が記憶されていないため、第1発行部122は、第1特定情報と一致する第2特定情報は記憶ない(作業機無し)と判定する。
第1発行部122は、作業機無しの場合、第1特定情報(「K-253800」)に対応する作業機を、レンタルを許可できない作業機とし、レンタルが不許可であることを示す不許可指令情報を発行する。この場合、不許可指令情報とは、第1特定情報の作業機は、レンタルの許可を発行することができない作業機であることを示す情報(レンタル不許可を示す情報)である。
第1発行部122は、作業機無しの場合、第1特定情報(「K-253800」)に対応する作業機を、レンタルを許可できない作業機とし、レンタルが不許可であることを示す不許可指令情報を発行する。この場合、不許可指令情報とは、第1特定情報の作業機は、レンタルの許可を発行することができない作業機であることを示す情報(レンタル不許可を示す情報)である。
第2管理サーバ103の第4通信部121は、第1発行部122によって、許可指令情報又は不許可指令情報が発行されると、許可指令情報又は不許可指令情報を第1管理サーバ102に送信する。
第1管理サーバ102の第3通信部113が許可指令情報又は不許可指令情報を受信すると、第2処理部112は、許可指令情報又は不許可指令情報に対応して処理を行う。第1管理サーバ102が許可指令情報を受信した場合、第2処理部112は、借方者が希望している作業機がレンタル可能であるとして、通信機器105にレンタル予約が完了したことを示す情報を通知する。また、第2処理部112及び第4記憶部111は、第4記憶部111の情報を更新する処理を行う。第2処理部112は、管理番号、レンタル許可が下りた作業機(レンタル作業機)の第1特定情報、許可情報(許可指令情報)、借方者情報、貸出期間等を第4記憶部111に送信する。第4記憶部111は、管理番号、第1特定情報、許可情報(許可指令情報)、借方者情報、貸出期間等を記憶する。
第1管理サーバ102の第3通信部113が許可指令情報又は不許可指令情報を受信すると、第2処理部112は、許可指令情報又は不許可指令情報に対応して処理を行う。第1管理サーバ102が許可指令情報を受信した場合、第2処理部112は、借方者が希望している作業機がレンタル可能であるとして、通信機器105にレンタル予約が完了したことを示す情報を通知する。また、第2処理部112及び第4記憶部111は、第4記憶部111の情報を更新する処理を行う。第2処理部112は、管理番号、レンタル許可が下りた作業機(レンタル作業機)の第1特定情報、許可情報(許可指令情報)、借方者情報、貸出期間等を第4記憶部111に送信する。第4記憶部111は、管理番号、第1特定情報、許可情報(許可指令情報)、借方者情報、貸出期間等を記憶する。
一方、第1管理サーバ102が不許可指令情報を受信した場合、第2処理部112は、不許可指令情報に対応する第1特定情報の作業機のレンタル許可がなされなかったとして処理を続ける。例えば、第2処理部112は、貸出期間中で貸出可能な作業機を抽出し、当該作業機をレンタルの不許可になった作業機に代わる代替機とし、代替機の第1特定情報を第2管理サーバ103に通知することで、代替機のレンタル許可要求を行う。第2管理サーバ103は、上述した同様の方法で代替機について、レンタル作業機として認定するか否かの処理を行う。代替機に対してレンタル許可がなされる(代替機に対応する許可指令情報を受信する)と、第2処理部112は、借方者が希望している作業機の代わりに、代替機のレンタルが可能であるという情報を、通信機器105に送信する。第2処理部112は、第1管理サーバ102が代替機でも良いことを示す情報を受信すると、通信機器105にレンタル予約が完了したことを示す情報を通知する。
そして、第2処理部112は、管理番号、当該管理番号、レンタル許可が下りた代替機(レンタル作業機)の第1特定情報、許可情報(許可指令情報)、借方者情報、貸出期間等を第4記憶部111に送信する。第4記憶部111は、管理番号、第1特定情報、許可情報(許可指令情報)、借方者情報、貸出期間等を記憶する。
次に、レンタル作業機が決定後の処理について説明する。レンタル作業機の決定後の処理は、以下の実施形態に限定されない。
次に、レンタル作業機が決定後の処理について説明する。レンタル作業機の決定後の処理は、以下の実施形態に限定されない。
まず、作業機104について詳しく説明する。
図12は、作業機104の一例であるバックホーを示したものである。
図12に示すように、バックホー104は、下部の走行装置140と、上部の機体141とを備えている。
走行装置140は、ゴム製覆帯を有する走行体142を有している。走行体142を走行モータで駆動するようにしたクローラ式走行装置が採用されている。また、走行装置140の前部にはドーザ143が設けられている。
図12は、作業機104の一例であるバックホーを示したものである。
図12に示すように、バックホー104は、下部の走行装置140と、上部の機体141とを備えている。
走行装置140は、ゴム製覆帯を有する走行体142を有している。走行体142を走行モータで駆動するようにしたクローラ式走行装置が採用されている。また、走行装置140の前部にはドーザ143が設けられている。
機体141は、旋回台144と、作業装置(掘削装置)145とを備えている。旋回台144は、走行装置140上にベアリング158を介して旋回軸回りに旋回自在に支持されている。作業装置145は、旋回台144の前部に備えられている。旋回台144上には、エンジン,ラジエータ,運転席146,燃料タンク,作動油タンク等が設けられている。
作業装置145は、スイングブラケット147と、ブーム150と、アーム151と、バケット152とを備えている。スイングブラケット147は、支持体148に縦軸回りに揺動自在に支持されている。スイングブラケット147は、旋回台144内に備えられたスイングシリンダの伸縮によって揺動する。ブーム150は、スイングブラケット147に横軸回りに揺動自在に支持されている。ブーム150は、当該ブーム150とスイングブラケット147とのの間に介装されたブームシリンダ154の伸縮によって揺動する。アーム151は、ブーム150の先端に横軸回りに揺動自在に支持されている。アーム151は、当該アーム151とブーム150との間に介装されたアームシリンダ155の伸縮によって揺動する。バケット152は、アーム151の先端にスクイ・ダンプ動作可能に設けられている。バケット152は、当該バケット152とアーム151との間に介装されたバケットシリンダ153の伸縮によってスクイ・ダンプ動作される。
図6に示すように、バックホーは、作業機の駆動(作動)に関する様々な制御を行う制御装置(第1制御装置)160を備えている。制御装置160は、例えば、オートアイドル制御(AI制御)、流量制御等の様々な制御を行う。なお、バックホーなどの作業機における制御は、下記に説明するものに限定されない。
制御装置160には、スイングシリンダ、ブームシリンダ154、アームシリンダ155、バケットシリンダ153などの各種アクチュエータを操作する操作部材(例えば、図12に示す操作レバー149や操作スイッチ)の操作量、ガバナセンサからのガバナ角度(ガバナ位置)、アクセルレバーの操作量(角度)、アイドルスイッチ(AI-SW)のオン信号/オフ信号、エンジン回転センサからのエンジン回転数などの各種制御信号が入力される。
制御装置160には、スイングシリンダ、ブームシリンダ154、アームシリンダ155、バケットシリンダ153などの各種アクチュエータを操作する操作部材(例えば、図12に示す操作レバー149や操作スイッチ)の操作量、ガバナセンサからのガバナ角度(ガバナ位置)、アクセルレバーの操作量(角度)、アイドルスイッチ(AI-SW)のオン信号/オフ信号、エンジン回転センサからのエンジン回転数などの各種制御信号が入力される。
AI制御は、アーム151(アームシリンダ155)やブーム150(ブームシリンダ154)などを操作する操作部材が操作されているときは、アクセルレバーの操作量に応じてエンジン回転数を増減し、操作部材が操作されていないときは、エンジン回転数をアイドリング状態に固定する。
具体的には、制御装置160によるAI制御では、操作レバー149を中立位置にしてアイドルスイッチのオン信号が入力されると、アクセルレバーの操作量に関わらず、オートアイドルモータにアイドル信号を出力してオートアイドルモータを駆動し、エンジン回転数をアイドル回転数にする。また、制御装置160によるAI制御では、操作レバー149を前後又は左右に揺動してアイドルスイッチのオフ信号を入力すると、アクセル位置の信号に基づきオートアイドルモータに作動信号を出力してオートアイドルモータを駆動する。オートアイドルモータを駆動するとガバナレバーが作動しエンジン回転数が、アクセルレバーに対応した回転数になる。
具体的には、制御装置160によるAI制御では、操作レバー149を中立位置にしてアイドルスイッチのオン信号が入力されると、アクセルレバーの操作量に関わらず、オートアイドルモータにアイドル信号を出力してオートアイドルモータを駆動し、エンジン回転数をアイドル回転数にする。また、制御装置160によるAI制御では、操作レバー149を前後又は左右に揺動してアイドルスイッチのオフ信号を入力すると、アクセル位置の信号に基づきオートアイドルモータに作動信号を出力してオートアイドルモータを駆動する。オートアイドルモータを駆動するとガバナレバーが作動しエンジン回転数が、アクセルレバーに対応した回転数になる。
流量制御は、操作部材の操作量に応じてアクチュエータを動作させるものである。
制御装置160による流量制御では、例えば、操作レバー149を中立位置より揺動させると、作業機に設けられた電磁比例弁のソレノイドに、操作レバー149の操作量に対応した所定値の電流(作動信号)を出力する。そうすると、電磁比例弁は電流値(操作量)に応じて開き、アクチュエータに対応する制御弁のパイロット圧が制御され、アクチュエータが動作する。
制御装置160による流量制御では、例えば、操作レバー149を中立位置より揺動させると、作業機に設けられた電磁比例弁のソレノイドに、操作レバー149の操作量に対応した所定値の電流(作動信号)を出力する。そうすると、電磁比例弁は電流値(操作量)に応じて開き、アクチュエータに対応する制御弁のパイロット圧が制御され、アクチュエータが動作する。
制御装置160は、第6記憶部161と、第5通信部164とを有している。第6記憶部161は、不揮発性のメモリ等で構成され、作業機の特定情報(第3特定情報)を記憶すると共に、第3特定情報に対応した判定情報を記憶している。判定情報とは、後述するように制御装置160で制御を行う際の判定に用いられるもので、例えば、第1発行部122で発行された許可指令情報と同じ情報である。なお、第3特定情報及び判定情報は、作業機104の製造時や作業機104の販売時等に第6記憶部161に書き込まれる。
第5通信部164は、様々な情報を通信することができる。第5通信部164は、例えば、WiFi(R)、Bluetoooth(R)、ZigBee(R)等の無線通信を行う装置である。なお、第5通信部164は、携帯電話通信網に接続可能な通信装置であってもよい。
図6に示すように、作業機の動作システムは、制御装置(第1制御装置)160と、指令装置(第1指令装置)130と、書込み装置(第1書込み装置)131とを備えている。指令装置130は、指令情報を記憶可能で且つ時間(時刻)を計時することが可能な装置である。即ち、指令装置130は、少なくとも時刻を計時すると共に所定の処理を行えるCPU等の演算部(処理部)を有するもので、例えば、CPUを有するタグやICカード等である。なお、指令装置130は、CPU等の演算部を有さないRFID等とは異なる装置である。また、指令装置130は、第5通信部164と通信可能な装置である。
図6に示すように、作業機の動作システムは、制御装置(第1制御装置)160と、指令装置(第1指令装置)130と、書込み装置(第1書込み装置)131とを備えている。指令装置130は、指令情報を記憶可能で且つ時間(時刻)を計時することが可能な装置である。即ち、指令装置130は、少なくとも時刻を計時すると共に所定の処理を行えるCPU等の演算部(処理部)を有するもので、例えば、CPUを有するタグやICカード等である。なお、指令装置130は、CPU等の演算部を有さないRFID等とは異なる装置である。また、指令装置130は、第5通信部164と通信可能な装置である。
書込み装置131は、ネットワークを通じて第1管理サーバ102又は第2管理サーバ103に接続可能であり、例えば、許可指令情報を含むレンタル情報をネットワークを通じて取得可能である。所定の作業機(レンタル作業機)のレンタル情報を第1管理サーバ102から取得し且つ、指令装置130に接続すると、書込み装置131は、レンタル情報を指令装置130に書き込む。
例えば、書込み装置131は、第1特定情報が「K-RX253200」であるレンタル作業機のレンタル情報を取得した場合、当該第1特定情報を示す「K-RX253200」、貸出期間(9/1~9/25)、許可指令情報を示す「015501-389761」を指令装置130に書き込む。
指令装置130は、第1取得部132と、第1時間算出部(第1計時部)133と、第6通信部134と、処理部(第3処理部)135とを備えている。指令装置130は、第1取得部132、第1時間算出部(第1計時部)133、第6通信部134及び第3処理部135は、指令装置130に組み込まれた電気・電子部品、プログラム等で構成されている。第3処理部135は、CPU等で構成されている。
指令装置130は、第1取得部132と、第1時間算出部(第1計時部)133と、第6通信部134と、処理部(第3処理部)135とを備えている。指令装置130は、第1取得部132、第1時間算出部(第1計時部)133、第6通信部134及び第3処理部135は、指令装置130に組み込まれた電気・電子部品、プログラム等で構成されている。第3処理部135は、CPU等で構成されている。
第1取得部132は、貸出期間(使用期限)を含むレンタル情報を取得するもので、書込み装置131の書込みによりレンタル情報を取得する。例えば、書込み装置131が指令装置130に対して、「K-RX253200」で示される第1特定情報、「9/1~9/25」で示される貸出期間と、許可指令情報(許可情報)を書き込むと、第1取得部132は、「K-RX253200」、「9/1~9/25」、許可指令情報等を取得する。
なお、第1取得部132は、レンタル情報を書込み装置131を介して取得する代わりに、第1管理サーバ102の第3通信部113から送信されたレンタル情報を、第6通信部134を介して取得してもよい。第1時間算出部133は、現在の時刻を求めるタイマである。
第6通信部134は、様々な情報を通信することができる。第6通信部134は、例えば、IWiFi(R)、Bluetoooth(R)、ZigBee(R)等の近距離無線通信、或いは、短距離無線通信を行う装置である。
第6通信部134は、様々な情報を通信することができる。第6通信部134は、例えば、IWiFi(R)、Bluetoooth(R)、ZigBee(R)等の近距離無線通信、或いは、短距離無線通信を行う装置である。
指令装置130の第6通信部134と制御装置160の第5通信部164とが通信可能範囲(通信エリア内)入ると、指令装置130は、制御装置160に対して第3特定情報及び判定情報の要求を行う。その後、制御装置160から送信された第3特定情報を、指令装置130が取得する。そして、第3処理部135は、第3特定情報と第1特定情報との認証を行い、第3特定情報と第1特定情報とが一致すると、判定情報と許可指令情報との認証を行う。第3処理部135は、判定情報と許可指令情報の認証が成立すると(判定情報と許可指令情報とが一致する)、現在の時間(時刻)が貸出期間内であるか否かを判断する。即ち、現在の時刻が使用期限に達しているか否かを判断する。
第3処理部135は、例えば、特定情報の一致する(認証成立)、及び、許可情報が一致する(許可情報の認証成立)と、第1時間算出部133で求めた現在の時間(時刻)を参照し、現在の時刻が貸出期間内であるか否かを判断する。即ち、第1時間算出部133で求めた時刻に基づき、現在の時刻が使用期限に達しているか否かを判断する。
なお、使用期限とは、貸出期間のうち、貸出期間の最後の日であって最後の日を超えない時刻であり、例えば、貸出期間が9/1~9/25であれば、「9/25,23:59:59」が使用期限となる。
なお、使用期限とは、貸出期間のうち、貸出期間の最後の日であって最後の日を超えない時刻であり、例えば、貸出期間が9/1~9/25であれば、「9/25,23:59:59」が使用期限となる。
第3処理部135は、現在の時刻が使用期限に達していない場合、制御装置160による制御の制限を行わないと判断する。第6通信部134は、第3処理部135が制御の制限を行わないと判断した場合、制御の制限を行わないという許可指令(第2指令)を制御装置160に出力する。制御装置160は、指令装置130(第6通信部134)から送信された許可指令(第2指令)を取得すると、走行系や作業系の制御を制限せずに通常通り制御を行う。
一方、第3処理部135は、第1時間算出部133で求めた現在の時間(時刻)が貸出期間を超える、即ち、現在の時刻が使用期限に達した場合は、制御装置160による制御の制限を行うと判断する。第6通信部134は、第3処理部135が制御装置160による制御の制限を行うと判断した場合は、制御の制限を行うという制限指令(第1指令)を制御装置160に出力する。制御装置160は、指令装置130(第6通信部134)から送信された制限指令(第1指令)を取得すると、走行系や作業系の制御の制限をする。制御装置160は、例えば、AI制御や流量制御を行わないようにして、作業機104の通常制御を制限する。つまり、制御装置160による制御の制限が働くと、作業機104は通常制御が行えなくなり、作業機104の動作を停止することができる。
なお、上述した実施形態では、貸出期間が過ぎる(使用期限が切れる)と、作業機104を動かすことができなかったが、これに加え、貸出期間を延長することができるようにしてもよい。貸出期間の延長の変形例について説明する。
管理サーバ2の第2処理部112は、借方が希望する作業機について、貸出期間を経過後も貸出が可能である場合(貸出期間を過ぎても続けて貸し出すことができると推測できる場合)には、第2処理部112は、貸出が可能な範囲で、貸出期間に連続する延長期間を予め設定する。例えば、貸出期間が9/1~9/25である場合、10日間貸出が可能であれば、延長期間を9/26~10/5に設定する。
管理サーバ2の第2処理部112は、借方が希望する作業機について、貸出期間を経過後も貸出が可能である場合(貸出期間を過ぎても続けて貸し出すことができると推測できる場合)には、第2処理部112は、貸出が可能な範囲で、貸出期間に連続する延長期間を予め設定する。例えば、貸出期間が9/1~9/25である場合、10日間貸出が可能であれば、延長期間を9/26~10/5に設定する。
第2処理部112は、許可情報(許可指令情報)に対応付けた延長期間を発行する。第4記憶部111は、貸出期間とは別に、許可情報に対応付けられた延長期間を記憶する。また、許可情報に対応付けられた延長期間は、指令装置130(書込み装置131)がレンタル情報を取得する際、即ち、許可指令情報を取得する際に同時に第1管理サーバ102から、指令装置130(書込み装置131)に送信される。
指令装置130の第1取得部132は、許可情報に対応付けられた延長期間を取得可能である。第1取得部132は、書込み装置131が指令装置130に対して、許可情報に対応付けられた延長期間を書き込むと、書き込まれた延長期間を取得する。指令装置130には、スイッチが設けられている。指令装置130の第3処理部135は、許可情報と判定情報とが一致し且つ、当該許可情報に対応付けられた延長期間が指令装置130に保持されている状態で、スイッチが押されると、延長期間の使用を許可する。即ち、第3処理部135は、使用期限を延長期間の最後の日まで延長する。
なお、第2処理部112は、延長期間とは別に、許可情報とは異なるコード(許可コード)を発行してもよい。この場合、第4記憶部111は、貸出期間とは別に、延長期間及び許可コードを記憶する。また、延長期間及びコードは、指令装置130(書込み装置131)がレンタル情報を取得する際、即ち、許可指令情報を取得する際に同時に第1管理サーバ102から、指令装置130(書込み装置131)に送信される。
指令装置130の第1取得部132は、延長期間及び許可コードを取得可能である。第1取得部132は、書込み装置131が指令装置130に対して、延長期間及び許可コードを書き込むと、書き込まれた延長期間及び許可コードを取得する。一方、作業機104に搭載された表示装置等には、コード(外部コード)が入力可能である。指令装置130に設けられたスイッチ等を入れると、指令装置130の第3処理部135は、制御装置160に外部コードの要求を行う。一方、指令装置130からの外部コードの要求後に表示装置等に外部コードが入力されると、制御装置160は、外部コードを指令装置130に送信する。指令装置130の第3処理部135は、制御装置160から送信された外部コードと、許可コードが一致すると、延長期間の使用を許可する。即ち、第3処理部135は、使用期限を延長期間の最後の日まで延長する。
このようにすれば、作業機104のレンタルを開始後には、延長期間が指令装置130に書き込まれているため、延長を行いたいと思った時に、指令装置130を第1管理サーバ102に接続しなくても、オフラインで簡単に使用期限を延長することができる。
なお、書込み装置131は、数字等で示される許可指令情報(許可情報)を指令装置130に書き込んでいたが、数字等で示された「015501-389761」を指令装置130に書き込む代わりに、貸出期間(9/1~9/25)において、第1特定情報が「K-RX253200」であるレンタル作業機に対してレンタルが許可されていることを示すフラグ(制限なく通常通り制御を行ってもよいという情報)を指令装置130に書き込んでもよい。この場合、指令装置130は、現在の時刻が使用期限に達しておらず且つ許可情報を取得した場合には、制御装置160による制御の制限を行わないと判断する。一方、指令装置130は、現在の時刻が使用期限に達していない場合であっても、許可情報が取得できなかった場合には、制御装置160による制御の制限を行う。
なお、書込み装置131は、数字等で示される許可指令情報(許可情報)を指令装置130に書き込んでいたが、数字等で示された「015501-389761」を指令装置130に書き込む代わりに、貸出期間(9/1~9/25)において、第1特定情報が「K-RX253200」であるレンタル作業機に対してレンタルが許可されていることを示すフラグ(制限なく通常通り制御を行ってもよいという情報)を指令装置130に書き込んでもよい。この場合、指令装置130は、現在の時刻が使用期限に達しておらず且つ許可情報を取得した場合には、制御装置160による制御の制限を行わないと判断する。一方、指令装置130は、現在の時刻が使用期限に達していない場合であっても、許可情報が取得できなかった場合には、制御装置160による制御の制限を行う。
以上のように、レンタル会社が所有する第1管理サーバ102と、メーカが所有する第2管理サーバ103とを連携させることによって、レンタル会社による作業機104の管理を簡単にすることができる。例えば、レンタルの許可をメーカが行い、作業機104を駆動するための許可指令情報(許可情報)は、メーカ側から発行されるため、レンタル会社では、所有する多数の作業機104について、駆動するためのキー(許可情報)を管理する手間を省くことができる。即ち、メーカが製造時や販売時に管理している情報(作業機情報)を活用することで、レンタル作業機を作動するためのキーを簡単に生成して、レンタル会社に提供することができる。
また、レンタル会社が所有する第1管理サーバ102と、メーカが所有する第2管理サーバ103とを連携させているため、レンタル会社とメーカとの情報共有が行え、作業機104のレンタルをスムーズに行うことができる。
また、指令装置130が時刻を計時し且つ制御装置160においてどのような制御を行うかの権限を有しているため、指令装置130では、貸出期間が経過した状態では、作業機104の制御装置160に判断を行わせずに作業機104を停止することができる。即ち、制御装置160に計時する部分や使用期限が来たか否かの判断部等を設けなくてもよい。
[第4実施形態]
図9は、第4実施形態における作業機のレンタルシステムを示している。
また、指令装置130が時刻を計時し且つ制御装置160においてどのような制御を行うかの権限を有しているため、指令装置130では、貸出期間が経過した状態では、作業機104の制御装置160に判断を行わせずに作業機104を停止することができる。即ち、制御装置160に計時する部分や使用期限が来たか否かの判断部等を設けなくてもよい。
[第4実施形態]
図9は、第4実施形態における作業機のレンタルシステムを示している。
図9に示す作業機のレンタルシステムは、第2管理サーバ103を無くし、許可指令情報(許可情報)の発行を第1管理サーバ102が行うシステムである。上述した実施形態と同様の構成は説明を省略する。
第1管理サーバ102は、第2発行部123を備えている。第2発行部123は、第1管理サーバ102に組み込まれた電気・電子部品、プログラム等で構成されている。第2発行部123は、第2処理部112が希望している作業機に対して貸出が行えると判断後に、貸出が可能とされた作業機をレンタル許可するレンタル作業機として認定し、認定したことを示す指令情報(許可指令情報)を発行する。許可指令情報の発行後は、第2処理部112は、借方者が希望している作業機がレンタル可能であるとして、通信機器105にレンタル予約が完了したことを示す情報を通知する。また、第2処理部112及び第4記憶部111は、第4記憶部111の情報を更新する処理を行う。第2処理部112は、管理番号、当該管理番号、レンタル許可が下りた作業機(レンタル作業機)の第1特定情報、許可情報(許可指令情報)、借方者情報、貸出期間等を第4記憶部111に送信する。第4記憶部111は、管理番号、第1特定情報、許可情報(許可指令情報)、借方者情報、貸出期間等を記憶する。
第1管理サーバ102は、第2発行部123を備えている。第2発行部123は、第1管理サーバ102に組み込まれた電気・電子部品、プログラム等で構成されている。第2発行部123は、第2処理部112が希望している作業機に対して貸出が行えると判断後に、貸出が可能とされた作業機をレンタル許可するレンタル作業機として認定し、認定したことを示す指令情報(許可指令情報)を発行する。許可指令情報の発行後は、第2処理部112は、借方者が希望している作業機がレンタル可能であるとして、通信機器105にレンタル予約が完了したことを示す情報を通知する。また、第2処理部112及び第4記憶部111は、第4記憶部111の情報を更新する処理を行う。第2処理部112は、管理番号、当該管理番号、レンタル許可が下りた作業機(レンタル作業機)の第1特定情報、許可情報(許可指令情報)、借方者情報、貸出期間等を第4記憶部111に送信する。第4記憶部111は、管理番号、第1特定情報、許可情報(許可指令情報)、借方者情報、貸出期間等を記憶する。
作業機のレンタルを行う場合は、書込み装置131は、ネットワークを通じて第1管理サーバ102に接続して、許可指令情報を含むレンタル情報をネットワークを通じて取得する。そして、指令装置130を書込み装置131に接続すると、当該指令装置130には、レンタル作業機の第1特定情報、貸出期間、許可指令情報等のレンタル情報が書き込まれる。なお、第4実施形態における指令装置130は上述した実施形態と同じである。
このように、指令装置130が時刻を計時し且つ制御装置160においてどのような制御を行うかの権限を有しているため、指令装置130では、貸出期間が経過した状態では、作業機104の制御装置160に判断を行わせずに作業機104を停止することができる。
上述した実施形態では、第2管理サーバ103側で、作業機の特定情報に対応する許可指令情報を発行する一方で、制御装置160には、作業機の特定情報に対応する判定情報を予め記憶しておくことで、同一の特定情報を有する作業機においては、許可指令情報と判定情報とが一致し、制御装置160による通常制御を制限なく行えるようにしていた。これに代え、制御装置160には判定情報を記憶させずに、制御装置160による通常制御を制限なく行えるようにしてもよい。
上述した実施形態では、第2管理サーバ103側で、作業機の特定情報に対応する許可指令情報を発行する一方で、制御装置160には、作業機の特定情報に対応する判定情報を予め記憶しておくことで、同一の特定情報を有する作業機においては、許可指令情報と判定情報とが一致し、制御装置160による通常制御を制限なく行えるようにしていた。これに代え、制御装置160には判定情報を記憶させずに、制御装置160による通常制御を制限なく行えるようにしてもよい。
この場合は、第2管理サーバ103の第1発行部122が発行した許可指令情報を用いて、第1特定情報を暗号化する。そして、第2管理サーバ103は、暗号化した第1特定情報と、暗号化していない第1特定情報と、許可指令情報を第1管理サーバ102に送信する。書込装置131は、暗号化した第1特定情報、許可指令情報及び貸出期限を指令装置130に書き込む。指令装置130は、第3処理部135は、暗号化した第1特定情報と許可指令情報を用いて暗号化した第1特定情報の復元を行い、第3特定情報と、復元後の第1特定情報とが一致しているか否かを判断する。この場合も、制御装置160に判定情報を書き込まなくても、許可指令情報が正当であるか否かを判断することができる。
上述した実施形態では、制御装置160では、制御の制限として、AI制御や流量制御を行わないとしていたが、当然の如くこれに限定されず、例えば、エンジン回転数を低速に固定したり、エンジン始動のそのものを停止(エンジン始動の禁止)したり、その他、様々な制御に対して制限をかけることで、作業機104を通常通り動かさないようにすればよい。
上述した実施形態では、第1管理サーバ102から送信された許可指令情報(許可信号)を含むレンタル情報を指令装置130に書き込んでいたが、レンタル情報は、第1管理サーバ102から得られるものでなくてもよい。例えば、指令装置130をパーソナルコンピュータ等に接続して、当該パーソナルコンピュータで、レンタル情報に相当する情報を作成して、作成したレンタル情報を指令装置130に書き込んでもよい。
[第5実施形態]
作業機の管理システムは、作業機のレンタルシステムを含んでいる。作業機のレンタルシステムについて説明する。なお、作業機のレンタルシステムにおいて、上述した実施形態と共通する部分は、説明の便宜上、説明を省略することがある。
[第5実施形態]
作業機の管理システムは、作業機のレンタルシステムを含んでいる。作業機のレンタルシステムについて説明する。なお、作業機のレンタルシステムにおいて、上述した実施形態と共通する部分は、説明の便宜上、説明を省略することがある。
図10は、第5実施形態における作業機のレンタルシステムの概略図である。
図10に示すように、作業機のレンタルシステム1は、第3管理サーバ202と、第4管理サーバ203とを備えている。
第3管理サーバ202は、第7記憶部(第1作業機情報記憶部)210と、第8記憶部(レンタル情報記憶部)211と、処理部(第4処理部)212と、第7通信部213とを備えている。第7記憶部210及び第8記憶部211は、不揮発性のメモリ等で構成されている。第4処理部212及び第7通信部213は、第3管理サーバ202に組み込まれた電気・電子部品、プログラム等で構成されている。
図10に示すように、作業機のレンタルシステム1は、第3管理サーバ202と、第4管理サーバ203とを備えている。
第3管理サーバ202は、第7記憶部(第1作業機情報記憶部)210と、第8記憶部(レンタル情報記憶部)211と、処理部(第4処理部)212と、第7通信部213とを備えている。第7記憶部210及び第8記憶部211は、不揮発性のメモリ等で構成されている。第4処理部212及び第7通信部213は、第3管理サーバ202に組み込まれた電気・電子部品、プログラム等で構成されている。
第7記憶部210は、レンタル会社が所有する作業機の情報(作業機情報)を記憶している。第7記憶部210は、例えば、図7Aに示すように、作業機の管理番号、作業機の特定情報、作業機の機種等を記憶している。作業機の管理番号は、レンタル会社がレンタルの管理のために付した番号である。作業機の特定情報は、作業機を特定する情報であって作業機に割り当てられた固有の情報(例えば、製造番号、シリアル番号等)である。作業機の機種は、作業機の仕様、作業機の大きさ等によって、製造メーカが独自に設定した名称等である。
第8記憶部211は、作業機のレンタルに関する情報(レンタル情報という)を記憶している。第8記憶部211は、例えば、図7Bに示すように、レンタル情報として、レンタルを行った作業機の管理番号、作業機の特定情報、許可情報、借方者情報、貸出期間等を記憶している。許可情報とは、レンタルを行う際に第4管理サーバ203から通知されたレンタルの許可を示す番号(許可指令情報)等である。
第7通信部213は、第4管理サーバ203、通信機器205等と様々な情報を送受信する装置である。第7通信部213は、第3管理サーバ202、第4管理サーバ203及び通信機器205の処理に応じて、所定の情報を送受信する。
第4処理部212は、レンタルに関する様々な処理を行う部分である。例えば、第3管理サーバ202に通信機器205が接続し、当該第3管理サーバ202に対してレンタルを行いたいという要求(入力画面の要求)があると、第4処理部212は、通信機器205に入力画面を表示させる処理を行う。また、第4処理部212は、入力画面に借方者情報、借方希望情報等が入力されると、借方希望情報に基づき、希望する貸出期間中に希望する作業機が貸し出しを行えるか否かを判断する処理を行う。詳しくは、第4処理部212は、第7記憶部210に記憶している作業機の機種を参照して、レンタルを希望する作業機の機種が、何台所有しているかを算出する。即ち、第4処理部212は、レンタル希望の機種におけるレンタル会社の所有台数を算出する。なお、作業機を予め機種毎に整理することで、所持している台数を第7記憶部210に記憶していてもよい。
第4処理部212は、レンタルに関する様々な処理を行う部分である。例えば、第3管理サーバ202に通信機器205が接続し、当該第3管理サーバ202に対してレンタルを行いたいという要求(入力画面の要求)があると、第4処理部212は、通信機器205に入力画面を表示させる処理を行う。また、第4処理部212は、入力画面に借方者情報、借方希望情報等が入力されると、借方希望情報に基づき、希望する貸出期間中に希望する作業機が貸し出しを行えるか否かを判断する処理を行う。詳しくは、第4処理部212は、第7記憶部210に記憶している作業機の機種を参照して、レンタルを希望する作業機の機種が、何台所有しているかを算出する。即ち、第4処理部212は、レンタル希望の機種におけるレンタル会社の所有台数を算出する。なお、作業機を予め機種毎に整理することで、所持している台数を第7記憶部210に記憶していてもよい。
そして、第4処理部212は、第8記憶部211を参照して、貸出期間中において既にレンタルを行っている作業機の台数(貸出台数)を算出し、貸出台数と所有台数とからレンタルが可能な作業機の台数(貸出可能台数)を算出する。第4処理部212は、貸出可能台数が、希望台数以上である場合、希望している作業機に対して貸出が行えると判断する。
なお、例えば、貸出可能台数が3台、希望台数が5台である場合、少なくとも貸出可能台数である3台の作業機は、レンタルすることが可能である。この場合は、第4処理部212は、貸出可能台数を通信機器205に通知し、通信機器205に希望台数の変更を求め、変更後の希望台数が貸出可能台数以下である場合には、第4処理部212は、貸し出しを行えると判断する。
第4処理部212は、希望している作業機に対して貸出が行えると判断後、即ち、所定の作業機に対してレンタル予約が行われた場合、第1情報を、第7通信部213から第4管理サーバ203に送信する処理を行う。第1情報とは、所定の作業機、即ち、貸出可能な作業機の情報であって、第3管理サーバ202が管理している情報である。第1情報は、作業機の管理番号、作業機を特定する特定情報、作業機の機種等である。
この実施形態では、作業機に対してレンタル予約が行われた場合、第4処理部212は、第7記憶部210及び第8記憶部211を参照し、希望している作業機と同じ作業機の特定情報(第1特定情報という)を抽出する。第7通信部213は、第4処理部212が抽出した第1特定情報を含む第1情報と、レンタル許可要求とを第4管理サーバ203に送信する。
さて、第4管理サーバ203は、第9記憶部(第2作業機情報記憶部)220と、第8通信部221と、第3発行部222とを有している。第9記憶部220は、不揮発性のメモリ等で構成されている。第8通信部221、第3発行部222は、第4管理サーバ203に組み込まれた電気・電子部品、プログラム等で構成されている。
第9記憶部220は、製造した作業機の情報、又は、販売した作業機の情報を記憶している。製造した作業機の情報、又は、販売した作業機の情報のことを第2情報という。第9記憶部220は、例えば、図8Aに示すように、第2情報として、作業機の特定情報、作業機の機種等を記憶している。
第9記憶部220は、製造した作業機の情報、又は、販売した作業機の情報を記憶している。製造した作業機の情報、又は、販売した作業機の情報のことを第2情報という。第9記憶部220は、例えば、図8Aに示すように、第2情報として、作業機の特定情報、作業機の機種等を記憶している。
第8通信部221は、第3管理サーバ202等と様々な情報を送受信する装置である。第8通信部221は、第3管理サーバ202、第4管理サーバ203等の処理に応じて、所定の情報を受信したり送信する。
第3発行部222は、まず、第3管理サーバ202から送信された第1情報と、第9記憶部220に記憶された第2情報とを参照して、レンタル許可する作業機(レンタル作業機という)を割り出す。具体的には、第4管理サーバ203が第1特定情報を含む第1情報及びレンタル許可要求を受信すると、第3発行部222は、レンタル許可要求を受けて割出処理を開始する。第3発行部222は、第4管理サーバ203が受信した第1特定情報と一致する第2特定情報が、第9記憶部220に記憶されているか否かを判定する。
第3発行部222は、まず、第3管理サーバ202から送信された第1情報と、第9記憶部220に記憶された第2情報とを参照して、レンタル許可する作業機(レンタル作業機という)を割り出す。具体的には、第4管理サーバ203が第1特定情報を含む第1情報及びレンタル許可要求を受信すると、第3発行部222は、レンタル許可要求を受けて割出処理を開始する。第3発行部222は、第4管理サーバ203が受信した第1特定情報と一致する第2特定情報が、第9記憶部220に記憶されているか否かを判定する。
例えば、図8Bに示すように、第1特定情報が「K-RX253200」である場合、第3発行部222は、第9記憶部220を参照して、当該第9記憶部220の中に「K-RX253200」で示された第2特定情報が記憶されているかを判定する。この場合、第9記憶部220中に第2特定情報として、「K-RX253200」が記憶されているため、第3発行部222は、第1特定情報と一致する第2特定情報が記憶されている(作業機有り)と判定する。
第3発行部222は、作業機有りの場合、第2特定情報(「K-RX253200」)と一致する第1特定情報(「K-RX253200」)に対応する作業機を、レンタル許可するレンタル作業機として認定し、認定したことを示す指令情報(許可指令情報)を発行する。許可指令情報とは、第1特定情報の作業機を、レンタル作業機として認定したことを示す情報(レンタル許可を示す情報)であって、数桁の数字等で示される。また、許可指令情報は、予め作業機と関連付けられていて、予め第2特定情報(「K-RX253200」)と許可指令情報とは対応づけられている。即ち、第3発行部222は、予め第2特定情報に対応付けられた許可指令情報を発行する。
したがって、第3発行部222は、第3管理サーバ202から通知された第1特定情報に対して、対応付けられた許可指令情報を発行することで、当該第1特定情報の作業機に対してレンタル許可を行う。
なお、上述した説明では、第3発行部222は、第3管理サーバ202から通知された第1特定情報に、レンタル許可を示すフラグ等を許可指令情報(許可情報)とすることで、当該第1特定情報の作業機に対してレンタル許可を行ってもよい。
なお、上述した説明では、第3発行部222は、第3管理サーバ202から通知された第1特定情報に、レンタル許可を示すフラグ等を許可指令情報(許可情報)とすることで、当該第1特定情報の作業機に対してレンタル許可を行ってもよい。
一方、第1特定情報が「K-253800」である場合、第3発行部222は、第9記憶部220の中に第2特定情報として、「K-253800」が記憶されていないため、第3発行部222は、第1特定情報と一致する第2特定情報は記憶ない(作業機無し)と判定する。
第3発行部222は、作業機無しの場合、第1特定情報(「K-253800」)に対応する作業機を、レンタルを許可できない作業機とし、レンタルが不許可であることを示す不許可指令情報を発行する。この場合、不許可指令情報とは、第1特定情報の作業機は、レンタルの許可を発行することができない作業機であることを示す情報(レンタル不許可を示す情報)である。
第3発行部222は、作業機無しの場合、第1特定情報(「K-253800」)に対応する作業機を、レンタルを許可できない作業機とし、レンタルが不許可であることを示す不許可指令情報を発行する。この場合、不許可指令情報とは、第1特定情報の作業機は、レンタルの許可を発行することができない作業機であることを示す情報(レンタル不許可を示す情報)である。
第4管理サーバ203の第8通信部221は、第3発行部222によって、許可指令情報又は不許可指令情報が発行されると、許可指令情報又は不許可指令情報を第3管理サーバ202に送信する。
第3管理サーバ202の第7通信部213が許可指令情報又は不許可指令情報を受信すると、第4処理部212は、許可指令情報又は不許可指令情報に対応して処理を行う。第3管理サーバ202が許可指令情報を受信した場合、第4処理部212は、借方者が希望している作業機がレンタル可能であるとして、通信機器205にレンタル予約が完了したことを示す情報を通知する。また、第4処理部212及び第8記憶部211は、第8記憶部211の情報を更新する処理を行う。第4処理部212は、管理番号、レンタル許可が下りた作業機(レンタル作業機)の第1特定情報、許可情報(許可指令情報)、借方者情報、貸出期間等を第8記憶部211に送信する。第8記憶部211は、管理番号、第1特定情報、許可情報(許可指令情報)、借方者情報、貸出期間等を記憶する。
第3管理サーバ202の第7通信部213が許可指令情報又は不許可指令情報を受信すると、第4処理部212は、許可指令情報又は不許可指令情報に対応して処理を行う。第3管理サーバ202が許可指令情報を受信した場合、第4処理部212は、借方者が希望している作業機がレンタル可能であるとして、通信機器205にレンタル予約が完了したことを示す情報を通知する。また、第4処理部212及び第8記憶部211は、第8記憶部211の情報を更新する処理を行う。第4処理部212は、管理番号、レンタル許可が下りた作業機(レンタル作業機)の第1特定情報、許可情報(許可指令情報)、借方者情報、貸出期間等を第8記憶部211に送信する。第8記憶部211は、管理番号、第1特定情報、許可情報(許可指令情報)、借方者情報、貸出期間等を記憶する。
一方、第3管理サーバ202が不許可指令情報を受信した場合、第4処理部212は、不許可指令情報に対応する第1特定情報の作業機のレンタル許可がなされなかったとして処理を続ける。例えば、第4処理部212は、貸出期間中で貸出可能な作業機を抽出し、当該作業機をレンタルの不許可になった作業機に代わる代替機とし、代替機の第1特定情報を第4管理サーバ203に通知することで、代替機のレンタル許可要求を行う。第4管理サーバ203は、上述した同様の方法で代替機について、レンタル作業機として認定するか否かの処理を行う。代替機に対してレンタル許可がなされる(代替機に対応する許可指令情報を受信する)と、第4処理部212は、借方者が希望している作業機の代わりに、代替機のレンタルが可能であるという情報を、通信機器205に送信する。第4処理部212は、第3管理サーバ202が代替機でも良いことを示す情報を受信すると、通信機器205にレンタル予約が完了したことを示す情報を通知する。
そして、第4処理部212は、管理番号、当該管理番号、レンタル許可が下りた代替機(レンタル作業機)の第1特定情報、許可情報(許可指令情報)、借方者情報、貸出期間等を第8記憶部211に送信する。第8記憶部211は、管理番号、第1特定情報、許可情報(許可指令情報)、借方者情報、貸出期間等を記憶する。
次に、レンタル作業機が決定後の処理について説明する。レンタル作業機の決定後の処理は、以下の実施形態に限定されない。
次に、レンタル作業機が決定後の処理について説明する。レンタル作業機の決定後の処理は、以下の実施形態に限定されない。
図10に示すように、バックホーは、作業機の駆動(作動)に関する様々な制御を行う制御装置(第2制御装置)260を備えている。制御装置260は、例えば、オートアイドル制御(AI制御)、流量制御等の様々な制御を行う。なお、バックホーなどの作業機における制御は、下記に説明するものに限定されない。
制御装置260には、スイングシリンダ、ブームシリンダ154、アームシリンダ155、バケットシリンダ153などの各種アクチュエータを操作する操作部材(例えば、図12に示す操作レバー149や操作スイッチ)の操作量、ガバナセンサからのガバナ角度(ガバナ位置)、アクセルレバーの操作量(角度)、アイドルスイッチ(AI-SW)のオン信号/オフ信号、エンジン回転センサからのエンジン回転数などの各種制御信号が入力される。
制御装置260には、スイングシリンダ、ブームシリンダ154、アームシリンダ155、バケットシリンダ153などの各種アクチュエータを操作する操作部材(例えば、図12に示す操作レバー149や操作スイッチ)の操作量、ガバナセンサからのガバナ角度(ガバナ位置)、アクセルレバーの操作量(角度)、アイドルスイッチ(AI-SW)のオン信号/オフ信号、エンジン回転センサからのエンジン回転数などの各種制御信号が入力される。
AI制御は、アーム151(アームシリンダ155)やブーム150(ブームシリンダ154)などを操作する操作部材が操作されているときは、アクセルレバーの操作量に応じてエンジン回転数を増減し、操作部材が操作されていないときは、エンジン回転数をアイドリング状態に固定する。
具体的には、制御装置260によるAI制御では、操作レバー149を中立位置にしてアイドルスイッチのオン信号が入力されると、アクセルレバーの操作量に関わらず、オートアイドルモータにアイドル信号を出力してオートアイドルモータを駆動し、エンジン回転数をアイドル回転数にする。また、制御装置260によるAI制御では、操作レバー149を前後又は左右に揺動してアイドルスイッチのオフ信号を入力すると、アクセル位置の信号に基づきオートアイドルモータに作動信号を出力してオートアイドルモータを駆動する。オートアイドルモータを駆動するとガバナレバーが作動しエンジン回転数が、アクセルレバーに対応した回転数になる。
具体的には、制御装置260によるAI制御では、操作レバー149を中立位置にしてアイドルスイッチのオン信号が入力されると、アクセルレバーの操作量に関わらず、オートアイドルモータにアイドル信号を出力してオートアイドルモータを駆動し、エンジン回転数をアイドル回転数にする。また、制御装置260によるAI制御では、操作レバー149を前後又は左右に揺動してアイドルスイッチのオフ信号を入力すると、アクセル位置の信号に基づきオートアイドルモータに作動信号を出力してオートアイドルモータを駆動する。オートアイドルモータを駆動するとガバナレバーが作動しエンジン回転数が、アクセルレバーに対応した回転数になる。
流量制御は、操作部材の操作量に応じてアクチュエータを動作させるものである。
制御装置260による流量制御では、例えば、操作レバー149を中立位置より揺動させると、作業機に設けられた電磁比例弁のソレノイドに、操作レバー149の操作量に対応した所定値の電流(作動信号)を出力する。そうすると、電磁比例弁は電流値(操作量)に応じて開き、アクチュエータに対応する制御弁のパイロット圧が制御され、アクチュエータが動作する。
制御装置260による流量制御では、例えば、操作レバー149を中立位置より揺動させると、作業機に設けられた電磁比例弁のソレノイドに、操作レバー149の操作量に対応した所定値の電流(作動信号)を出力する。そうすると、電磁比例弁は電流値(操作量)に応じて開き、アクチュエータに対応する制御弁のパイロット圧が制御され、アクチュエータが動作する。
制御装置260は、第10記憶部261と、処理部(第5処理部)262と、第2時間算出部(第2計時部)263と、第9通信部264とを有している。第10記憶部261は、不揮発性のメモリ等で構成され、作業機の特定情報(第3特定情報)を記憶すると共に、第3特定情報に対応した判定情報を記憶している。判定情報とは、後述するように制御装置260で制御を行う際の判定に用いられるもので、例えば、第3発行部222で発行された許可指令情報と同じ情報である。なお、第3特定情報及び判定情報は、作業機104の製造時や作業機104の販売時等に第10記憶部261に書き込まれる。
第5処理部262及び第2時間算出部263は、制御装置260に組み込まれた電気・電子部品、プログラム等で構成されている。第5処理部262は、貸出期間等に基づいて、制御装置260による制御の制限を行うか否かを判断する。第2時間算出部263は、現在の時刻を求めるタイマである。
第9通信部264は、様々な情報を通信することができる。第9通信部264は、例えば、ICタグ、ICカード等の近距離無線通信、或いは、WiFi(R)、Bluetoooth(R)、ZigBee(R)等の無線通信を行う装置である。なお、第9通信部264は、携帯電話通信網に接続可能な通信装置であってもよい。
第9通信部264は、様々な情報を通信することができる。第9通信部264は、例えば、ICタグ、ICカード等の近距離無線通信、或いは、WiFi(R)、Bluetoooth(R)、ZigBee(R)等の無線通信を行う装置である。なお、第9通信部264は、携帯電話通信網に接続可能な通信装置であってもよい。
図10に示すように、作業機のレンタルシステム201は、指令装置(第2指令装置)230Aと、書込み装置(第2書込み装置)231とを備えている。指令装置230Aは、少なくとも許可指令情報を含む指令情報を記憶可能で第9通信部264と通信可能な装置であって、ICタグ、或いは、ICカード等であって、例えば、非接触型のRFIDである。書込み装置231は、少なくとも許可指令情報を含む指令情報を指令装置230Aに書き込み可能な装置(ライタ)であって、ICタグ、或いは、ICカードに対して、指令情報を含む情報を書き込む装置である。
書込み装置231は、ネットワークを通じて第3管理サーバ202又は第4管理サーバ203に接続可能であり、例えば、許可指令情報を含むレンタル情報をネットワークを通じて取得可能である。所定の作業機(レンタル作業機)のレンタル情報を第3管理サーバ202から取得し且つ、指令装置230Aを近接させると、書込み装置231は、レンタル情報を指令装置230Aに書き込む。
例えば、書込み装置231は、第1特定情報が「K-RX253200」であるレンタル作業機のレンタル情報を取得した場合、当該第1特定情報を示す「K-RX253200」、貸出期間(9/1~9/25)、許可指令情報を示す「015501-389761」を指令装置230Aに書き込む。
指令装置230Aは、制御装置260の第9通信部264と通信が可能である。指令装置230Aは、当該指令装置230Aと第9通信部264とが通信可能範囲内であれば、第1特定情報、許可指令情報及び貸出期間を、作業機104の第9通信部264に送信する。指令装置230Aから送信された第1特定情報、許可指令情報及び貸出期間を第9通信部264が受信すると、制御装置260の第5処理部262は、制御装置260に第10記憶部261に記憶された第3特定情報と、第1特定情報とが一致するか否かを判断する(特定情報の認証を行う)。また、制御装置260の第5処理部262は、第3特定情報に対応付けられた判定情報と、指令装置230Aから送信された許可指令情報とが一致か否かを判断する(判定情報と許可指令情報との認証を行う)。
指令装置230Aは、制御装置260の第9通信部264と通信が可能である。指令装置230Aは、当該指令装置230Aと第9通信部264とが通信可能範囲内であれば、第1特定情報、許可指令情報及び貸出期間を、作業機104の第9通信部264に送信する。指令装置230Aから送信された第1特定情報、許可指令情報及び貸出期間を第9通信部264が受信すると、制御装置260の第5処理部262は、制御装置260に第10記憶部261に記憶された第3特定情報と、第1特定情報とが一致するか否かを判断する(特定情報の認証を行う)。また、制御装置260の第5処理部262は、第3特定情報に対応付けられた判定情報と、指令装置230Aから送信された許可指令情報とが一致か否かを判断する(判定情報と許可指令情報との認証を行う)。
第5処理部262は、第3特定情報と第1特定情報とが一致(認証成立)し且つ、判定情報と許可指令情報とが一致する(認証成立)と、現在の時間(時刻)が貸出期間内であるか否かを判断する。言い換えれば、現在の時刻が使用期限に達しているか否かを判断する。使用期限とは、貸出期間のうち、貸出期間の最後の日であって最後の日を超えない時刻であり、例えば、貸出期間が9/1~9/25であれば、「9/25,23:59:59」が使用期限となる。
第5処理部262は、現在の時刻が使用期限に達していない場合、制御装置260による制御の制限を行わないと判断する。即ち、第5処理部262が制御装置260による制御の制限を行わないと判断した場合は、制御装置260は、走行系や作業系の制御を制限せずに通常通り制御が行われる。一方、第5処理部262は、現在の時刻が貸出期間を超える、即ち、現在の時刻が使用期限に達した場合は、制御装置260による制御の制限を行うと判断する。制御装置260による制御の制限を行う場合は、第5処理部262は、制御の制限をする。第5処理部262は、例えば、AI制御や流量制御等を行わないようにして、作業機104の通常制御を制限する。つまり、第5処理部262による制御の制限が働くと、作業機104は通常制御が行えなくなり、作業機104の動作を停止することができる。
なお、書込み装置231は、数字等で示される許可指令情報(許可情報)を指令装置230Aに書き込んでいたが、数字等で示された「015501-389761」を指令装置230Aに書き込む代わりに、貸出期間(9/1~9/25)において、第1特定情報が「K-RX253200」であるレンタル作業機に対してレンタルが許可されていることを示すフラグ(制限なく通常通り制御を行ってもよいという情報)を指令装置230Aに書き込んでもよい。この場合、指令装置230Aは、フラグ等で示された許可情報、貸出期間及び第1特定情報を制御装置260に送信する。制御装置260の第5処理部262は、現在の時刻が使用期限に達しておらず且つ許可情報を取得した場合には、制御装置260による制御の制限を行わない。一方、制御装置260の第5処理部262は、現在の時刻が使用期限に達していない場合であっても、許可情報が取得できなかった場合には、制御装置260による制御の制限を行う。
以上のように、レンタル会社が所有する第3管理サーバ202と、メーカが所有する第4管理サーバ203とを連携させることによって、レンタル会社による作業機104の管理を簡単にすることができる。例えば、レンタルの許可をメーカが行い、作業機104を作動するための許可指令情報(許可情報)は、メーカ側から発行されるため、レンタル会社では、所有する多数の作業機104について、作動するためのキー(許可情報等)を管理する手間を省くことができる。即ち、メーカが製造時や販売時に管理している情報(作業機情報)を活用することで、レンタル作業機を作動するためのキーを簡単に生成して、レンタル会社に提供することができる。また、レンタル会社が所有する第3管理サーバ202と、メーカが所有する第4管理サーバ203とを連携させているため、レンタル会社とメーカとの情報共有が行え、作業機104のレンタルをスムーズに行うことができる。
[第6実施形態]
図11は、第6実施形態における作業機のレンタルシステムを示している。
[第6実施形態]
図11は、第6実施形態における作業機のレンタルシステムを示している。
第6実施形態の作業機のレンタルシステムは、作業機104に搭載した制御装置による制御について制限をする否かを、制御装置260ではなく、指令装置側で行うシステムである。上述した実施形態と同じ構成については説明を省略する。
指令装置(第2指令装置)230Bは、指令情報を記憶可能で且つ時間(時刻)を計時することが可能な装置である。即ち、指令装置230Bは、少なくとも時刻を計時すると共に所定の処理を行えるCPU等の演算部(処理部)を有するもので、例えば、CPUを有するタグやICカード等である。なお、指令装置230Bは、CPU等の演算部を有さないRFID等とは異なる装置である。
指令装置(第2指令装置)230Bは、指令情報を記憶可能で且つ時間(時刻)を計時することが可能な装置である。即ち、指令装置230Bは、少なくとも時刻を計時すると共に所定の処理を行えるCPU等の演算部(処理部)を有するもので、例えば、CPUを有するタグやICカード等である。なお、指令装置230Bは、CPU等の演算部を有さないRFID等とは異なる装置である。
指令装置230Bは、第2取得部232と、第2時間算出部(第2計時部)233と、第10通信部234と、処理部(第6処理部)235とを備えている。第2取得部232、第3時間算出部(第3計時部)233、第10通信部234及び第6処理部235は、指令装置230Bに組み込まれた電気・電子部品、プログラム等で構成され、例えば、第6処理部235はCPU等で構成されている。
第2取得部232は、貸出期間(使用期限)を含むレンタル情報を取得するもので、書込み装置231の書込みによりレンタル情報を取得する。例えば、書込み装置231が指令装置230Bに対して、「K-RX253200」で示される第1特定情報、「9/1~9/25」で示される貸出期間と、許可指令情報(許可情報)を書き込むと、第2取得部232は、「K-RX253200」、「9/1~9/25」、許可指令情報等を取得する。
なお、第2取得部232は、レンタル情報を書込み装置231を介して取得する代わりに、第3管理サーバ202の第7通信部213から送信されたレンタル情報を、第10通信部234を介して取得してもよい。第3時間算出部233は、現在の時刻を求めるタイマである。
第10通信部234は、様々な情報を通信することができる。第10通信部234は、例えば、IWiFi(R)、Bluetoooth(R)、ZigBee(R)等の近距離無線通信、或いは、短距離無線通信を行う装置である。
第10通信部234は、様々な情報を通信することができる。第10通信部234は、例えば、IWiFi(R)、Bluetoooth(R)、ZigBee(R)等の近距離無線通信、或いは、短距離無線通信を行う装置である。
指令装置230Bの第10通信部234と制御装置260の第9通信部264とが通信可能範囲(通信エリア内)入ると、指令装置230Bは、制御装置260に対して第3特定情報及び判定情報の要求を行う。そして、第6処理部235は、第3特定情報と第1特定情報との認証を行い、第3特定情報と第1特定情報とが一致すると、判定情報と許可指令情報との認証を行う。第6処理部235は、判定情報と許可指令情報の認証が成立すると(判定情報と許可指令情報とが一致する)、現在の時間(時刻)が貸出期間内であるか否かを判断する。即ち、現在の時刻が使用期限に達しているか否かを判断する。
第6処理部235は、例えば、特定情報の一致する(認証成立)、及び、許可情報が一致する(許可情報の認証成立)と、時間算出部33で求めた現在の時間(時刻)を参照し、現在の時刻が貸出期間内であるか否かを判断する。即ち、時間算出部33で求めた時刻に基づき、現在の時刻が使用期限に達しているか否かを判断する。
第6処理部235は、現在の時刻が使用期限に達していない場合、制御装置260による制御の制限を行わないと判断する。第10通信部234は、第6処理部235が制御の制限を行わないと判断した場合、制御の制限を行わないという許可信号(許可指令)を制御装置260に出力する。制御装置260は、指令装置230B(第10通信部234)から送信された許可信号を取得すると、走行系や作業系の制御を制限せずに通常通り制御を行う。
第6処理部235は、現在の時刻が使用期限に達していない場合、制御装置260による制御の制限を行わないと判断する。第10通信部234は、第6処理部235が制御の制限を行わないと判断した場合、制御の制限を行わないという許可信号(許可指令)を制御装置260に出力する。制御装置260は、指令装置230B(第10通信部234)から送信された許可信号を取得すると、走行系や作業系の制御を制限せずに通常通り制御を行う。
一方、第6処理部235は、時間算出部33で求めた現在の時間(時刻)が貸出期間を超える、即ち、現在の時刻が使用期限に達した場合は、制御装置260による制御の制限を行うと判断する。第10通信部234は、第6処理部235が制御装置260による制御の制限を行うと判断した場合は、制御の制限を行うという制限信号(制限指令)を制御装置260に出力する。制御装置260は、指令装置230B(第10通信部234)から送信された制限信号を取得すると、走行系や作業系の制御の制限をする。制御装置260は、例えば、AI制御や流量制御を行わないようにして、作業機104の通常制御を制限する。つまり、制御装置260による制御の制限が働くと、作業機104は通常制御が行えなくなり、作業機104の動作を停止することができる。
なお、上述した実施形態では、貸出期間が過ぎる(使用期限が切れる)と、作業機104を動かすことができなかったが、これに加え、貸出期間を延長することができるようにしてもよい。貸出期間の延長の変形例について説明する。
管理サーバ2の第4処理部212は、借方が希望する作業機について、貸出期間を経過後も貸出が可能である場合(貸出期間を過ぎても続けて貸し出すことができると推測できる場合)には、第4処理部212は、貸出が可能な範囲で、貸出期間に連続する延長期間を予め設定する。例えば、貸出期間が9/1~9/25である場合、10日間貸出が可能であれば、延長期間を9/26~10/5に設定する。
管理サーバ2の第4処理部212は、借方が希望する作業機について、貸出期間を経過後も貸出が可能である場合(貸出期間を過ぎても続けて貸し出すことができると推測できる場合)には、第4処理部212は、貸出が可能な範囲で、貸出期間に連続する延長期間を予め設定する。例えば、貸出期間が9/1~9/25である場合、10日間貸出が可能であれば、延長期間を9/26~10/5に設定する。
第4処理部212は、許可情報(許可指令情報)に対応付けた延長期間を発行する。第8記憶部211は、貸出期間とは別に、許可情報に対応付けられた延長期間を記憶する。また、許可情報に対応付けられた延長期間は、指令装置230B(書込み装置231)がレンタル情報を取得する際、即ち、許可指令情報を取得する際に同時に第3管理サーバ202から、指令装置230B(書込み装置231)に送信される。
指令装置230Bの第2取得部232は、許可情報に対応付けられた延長期間を取得可能である。第2取得部232は、書込み装置231が指令装置230Bに対して、許可情報に対応付けられた延長期間を書き込むと、書き込まれた延長期間を取得する。指令装置230Bには、スイッチが設けられている。指令装置230Bの第6処理部235は、許可情報と判定情報とが一致し且つ、当該許可情報に対応付けられた延長期間が指令装置230Bに保持されている状態で、スイッチが押されると、延長期間の使用を許可する。即ち、第6処理部235は、使用期限を延長期間の最後の日まで延長する。
なお、第4処理部212は、延長期間とは別に、許可情報とは異なるコード(許可コード)を発行してもよい。この場合、第8記憶部211は、貸出期間とは別に、延長期間及び許可コードを記憶する。また、延長期間及びコードは、指令装置230B(書込み装置231)がレンタル情報を取得する際、即ち、許可指令情報を取得する際に同時に第3管理サーバ202から、指令装置230B(書込み装置231)に送信される。
指令装置230Bの第2取得部232は、延長期間及び許可コードを取得可能である。第2取得部232は、書込み装置231が指令装置230Bに対して、延長期間及び許可コードを書き込むと、書き込まれた延長期間及び許可コードを取得する。一方、作業機104に搭載された表示装置等には、コード(外部コード)が入力可能である。指令装置230Bに設けられたスイッチ等を入れると、指令装置230Bの第6処理部235は、制御装置260に外部コードの要求を行う。一方、指令装置230Bからの外部コードの要求後に表示装置等に外部コードが入力されると、制御装置260は、外部コードを指令装置230Bに送信する。指令装置230Bの第6処理部235は、制御装置260から送信された外部コードと、許可コードが一致すると、延長期間の使用を許可する。即ち、第6処理部235は、使用期限を延長期間の最後の日まで延長する。
このようにすれば、作業機104のレンタルを開始後には、延長期間が指令装置230Bに書き込まれているため、延長を行いたいと思った時に、指令装置230Bを第3管理サーバ202に接続しなくても、オフラインで簡単に使用期限を延長することができる。
なお、書込み装置231は、数字等で示される許可指令情報(許可情報)を指令装置230Bに書き込んでいたが、数字等で示された「015501-389761」を指令装置230Bに書き込む代わりに、貸出期間(9/1~9/25)において、第1特定情報が「K-RX253200」であるレンタル作業機に対してレンタルが許可されていることを示すフラグ(制限なく通常通り制御を行ってもよいという情報)を指令装置230Bに書き込んでもよい。この場合、指令装置230Bは、現在の時刻が使用期限に達しておらず且つ許可情報を取得した場合には、制御装置260による制御の制限を行わないと判断する。一方、指令装置230Bは、現在の時刻が使用期限に達していない場合であっても、許可情報が取得できなかった場合には、制御装置260による制御の制限を行う。
なお、書込み装置231は、数字等で示される許可指令情報(許可情報)を指令装置230Bに書き込んでいたが、数字等で示された「015501-389761」を指令装置230Bに書き込む代わりに、貸出期間(9/1~9/25)において、第1特定情報が「K-RX253200」であるレンタル作業機に対してレンタルが許可されていることを示すフラグ(制限なく通常通り制御を行ってもよいという情報)を指令装置230Bに書き込んでもよい。この場合、指令装置230Bは、現在の時刻が使用期限に達しておらず且つ許可情報を取得した場合には、制御装置260による制御の制限を行わないと判断する。一方、指令装置230Bは、現在の時刻が使用期限に達していない場合であっても、許可情報が取得できなかった場合には、制御装置260による制御の制限を行う。
今回開示された実施の形態はすべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は上記した説明ではなくて特許請求の範囲によって示され、特許請求の範囲と均等の意味及び範囲内での全ての変更が含まれることが意図される。
上述した実施形態では、第4管理サーバ203側で、作業機の特定情報に対応する許可指令情報を発行する一方で、制御装置260には、作業機の特定情報に対応する判定情報を予め記憶しておくことで、同一の特定情報を有する作業機においては、許可指令情報と判定情報とが一致し、制御装置260による通常制御を制限なく行えるようにしていた。これに代え、制御装置260には判定情報を記憶させずに、制御装置260による通常制御を制限なく行えるようにしてもよい。
上述した実施形態では、第4管理サーバ203側で、作業機の特定情報に対応する許可指令情報を発行する一方で、制御装置260には、作業機の特定情報に対応する判定情報を予め記憶しておくことで、同一の特定情報を有する作業機においては、許可指令情報と判定情報とが一致し、制御装置260による通常制御を制限なく行えるようにしていた。これに代え、制御装置260には判定情報を記憶させずに、制御装置260による通常制御を制限なく行えるようにしてもよい。
この場合は、第4管理サーバ203の第3発行部222が発行した許可指令情報を用いて、第1特定情報を暗号化する。そして、第4管理サーバ203は、暗号化した第1特定情報と、暗号化していない第1特定情報と、許可指令情報を第3管理サーバ202に送信する。書込装置31は、暗号化した第1特定情報、許可指令情報及び貸出期限を指令装置(指令装置230B、指令装置230B)に書き込む。第1実施形態(指令装置230B)の場合は、暗号化した第1特定情報、許可指令情報及び貸出期限を制御装置260に送信する。制御装置260の第6処理部235は、許可指令情報を用いて暗号化した第1特定情報の復元を行い、第3特定情報と、復元後の第1特定情報とが一致しているか否かを判断する。このようにすれば、制御装置260に判定情報を書き込まなくても、許可指令情報が正当であるか否かを判断することができる。
第2実施形態(指令装置230B)の場合は、第6処理部235は、暗号化した第1特定情報と許可指令情報を用いて暗号化した第1特定情報の復元を行い、第3特定情報と、復元後の第1特定情報とが一致しているか否かを判断する。この場合も、制御装置260に判定情報を書き込まなくても、許可指令情報が正当であるか否かを判断することができる。
上述した実施形態では、制御装置260では、制御の制限として、AI制御や流量制御を行わないとしていたが、当然の如くこれに限定されず、例えば、エンジン回転数を低速に固定したり、エンジン始動のそのものを停止(エンジン始動の禁止)したり、その他、様々な制御に対して制限をかけることで、作業機104を通常通り動かさないようにすればよい。
1 作業機の監視システム
2 作業機
10 第1通信装置
10A 内部通信装置
10B 外部通信装置
11 第2通信部
12 第2記憶部
20 第2通信装置
21 処理部
22 第1通信部
23 第1記憶部
30 監視部
40 収容箱
120 第5記憶部
121 第4通信部
122 第1発行部
130 指令装置(第1指令装置)
131 書込み装置(第1書込み装置)
132 第1取得部
133 第1時間算出部(計時部)
134 第6通信部
135 第3処理部
160 第1制御装置
161 第6記憶部
164 第5通信部
201 作業機のレンタルシステム
202 第3管理サーバ
203 第4管理サーバ
210 第7記憶部
211 第8記憶部
212 第4処理部
213 第7通信部
220 第9記憶部
221 第8通信部
222 第3発行部
30A 指令装置(第2指令装置)
231 書込み装置(第2書込み装置)
231B 指令装置(第2指令装置)
232 第2取得部
233 第3時間算出部(計時部)
234 第10通信部
235 第6処理部
260 第2制御装置
261 第10記憶部
262 第5処理部
263 第2時間算出部(計時部)
264 第9通信部
P 保管場所
N1 車載通信ネットワーク
2 作業機
10 第1通信装置
10A 内部通信装置
10B 外部通信装置
11 第2通信部
12 第2記憶部
20 第2通信装置
21 処理部
22 第1通信部
23 第1記憶部
30 監視部
40 収容箱
120 第5記憶部
121 第4通信部
122 第1発行部
130 指令装置(第1指令装置)
131 書込み装置(第1書込み装置)
132 第1取得部
133 第1時間算出部(計時部)
134 第6通信部
135 第3処理部
160 第1制御装置
161 第6記憶部
164 第5通信部
201 作業機のレンタルシステム
202 第3管理サーバ
203 第4管理サーバ
210 第7記憶部
211 第8記憶部
212 第4処理部
213 第7通信部
220 第9記憶部
221 第8通信部
222 第3発行部
30A 指令装置(第2指令装置)
231 書込み装置(第2書込み装置)
231B 指令装置(第2指令装置)
232 第2取得部
233 第3時間算出部(計時部)
234 第10通信部
235 第6処理部
260 第2制御装置
261 第10記憶部
262 第5処理部
263 第2時間算出部(計時部)
264 第9通信部
P 保管場所
N1 車載通信ネットワーク
Claims (15)
- 作業機の保管場所及び/又は保管場所の周囲に設置され、無線通信が可能な第1通信装置と、
前記作業機に搭載され且つ前記第1通信装置と無線通信可能な第2通信装置と、
前記第1通信装置と第2通信装置との通信に基づいて、当該第2通信装置が搭載された作業機についての監視を行う監視部と、
を備えている作業機の監視システム。 - 前記監視部は、前記第1通信装置が受信した電波に作業機の停止を示す情報が含まれる場合に、当該第2通信装置が搭載された作業機についての監視を開始する請求項1に記載の作業機の監視システム。
- 前記監視部は、前記第1通信装置が第2通信装置から受信した電波の受信強度が所定値以上である場合に、当該第2通信装置が搭載された作業機についての監視を開始する請求項1に記載の作業機の監視システム。
- 前記第1通信装置は、作業機の保管場所に設置され且つ前記第2通信装置と無線通信可能な内部通信装置と、前記保管場所外に設置され且つ前記第2通信装置と無線通信可能な外部通信装置とを含み、
前記監視部は、前記外部通信装置が第2通信装置から受信した電波の受信強度が所定以上で且つ、前記内部通信装置が第2通信装置から受信した電波の受信強度が所定以上である場合に、当該第2通信装置が搭載された作業機についての監視を開始する請求項3に記載の作業機の監視システム。 - 前記監視部は、前記第1通信装置が第2通信装置から受信した電波の受信強度が所定値以上で且つ、前記第1通信装置が受信した電波に作業機の停止を示す情報が含まれる場合に、当該第2通信装置が搭載された作業機についての監視を開始する請求項1に記載の作業機の監視システム。
- 前記監視部は、前記作業機の監視中において、前記第1通信装置が第2通信装置から受信した電波に、前記作業機の駆動を示す情報が含まれる場合に、外部に警報を出力する請求項1~5のいずれかに記載の作業機の監視システム。
- 作業機に搭載され且つ、前記作業機の制御可能な第1制御装置と、
前記第1制御装置の制御に関する指令を、無線によって前記第1制御装置に出力可能な第1指令装置と、
を備え、
前記第1指令装置は、
前記作業機の使用期限を外部から取得可能な第1取得部と、
時間を求める第1時間算出部と、
前記第1時間算出部で求めた時間が、前記使用期限に達したか否かを判断する第3処理部と、
前記使用期限に達した場合には、前記第1制御装置の制御を制限する第1指令を出力し、前記使用期限に達していない場合には、前記第1制御装置の制御を制限なく行う第2指令を出力する第6通信部と、
を有している作業機の動作システム。 - 前記第1制御装置は判定情報を記憶する第6記憶部を有し、
前記第1取得部は、前記第1制御装置の制御を制限なくための許可情報と、前記第1制御装置の第6記憶部に記憶された判定情報とを取得可能であり、
前記第3処理部は、前記許可情報と前記判定情報との認証が成立し且つ前記使用期限に達しない場合には、前記第6通信部に前記第2指令を出力させる請求項7に記載の作業機の動作システム。 - 前記第1取得部は、前記使用期限の延長期間、延長期間を有効にするための許可コードを外部から取得可能であり、
前記第3処理部は、前記取得部が取得した許可コードと、外部から入力された外部コードとの認証が成立した場合に、前記延長期間に基づいて使用期限を延長する請求項7に記載の作業機の動作システム。 - 前記作業機は前記外部コードを入力可能な表示装置を備え、
前記処理部は、前記制御装置に対して前記表示装置に入力された前記外部コードを要求可能である請求項9に記載の作業機の動作システム。 - 作業機のレンタル予約が行われた場合に、所定の作業機に対してレンタルが行われる場合における作業機に関する情報である第1情報を出力可能な第7通信部を有する第3管理サーバと、
製造又は販売された作業機に関する情報である第2情報を記憶する第9記憶部を有する第4管理サーバと、
を備え、
前記第4管理サーバは、
前記第1情報と前記第9記憶部に記憶された前記第2情報とを参照して、作業機のレンタル許可又はレンタル不許可を含む指令情報を発行する第3発行部と、
を有している作業機のレンタルシステム。 - 前記第7通信部は、前記作業機を特定する第1特定情報を含む第1情報を出力し、
前記第9記憶部は、製造又は販売された作業機を特定する第2特定情報を含む第2情報を記憶し、
前記第3発行部は、前記第1特定情報と一致する前記第2特定情報が、前記第9記憶部に記憶されているか否かを判断し、前記第2特定情報が記憶されている場合に、当該第2特定情報に対応する作業機をレンタル作業機とし、当該レンタル作業機のレンタル許可を含む指令情報を発行する請求項11に記載の作業機のレンタルシステム。 - 前記第3発行部によって発行された前記指令情報を取得可能で且つ前記指令情報に基づいて、前記作業機に制御に関する指令を出力する第2指令装置を備えている請求項11又は12に記載の作業機のレンタルシステム。
- 前記指令情報を前記第2指令装置に書き込み可能な書込み装置を備えている請求項13に記載の作業機のレンタルシステム。
- 前記作業機に搭載され当該作業機の制御を行う第2制御装置を備え、
前記第2指令装置は、レンタルの許可をする情報が前記指令情報に含まれている場合には、前記レンタル作業機の制御を許可する情報を無線によって前記第2制御装置に出力する請求項14に記載の作業機のレンタルシステム。
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE112016004426.7T DE112016004426T5 (de) | 2015-09-29 | 2016-09-26 | Verwaltungssystem für Arbeitsmaschine |
US15/938,670 US11335133B2 (en) | 2015-09-29 | 2018-03-28 | Management system for working machine |
US17/718,836 US20220237957A1 (en) | 2015-09-29 | 2022-04-12 | Management system for working machine |
Applications Claiming Priority (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015-191624 | 2015-09-29 | ||
JP2015-191622 | 2015-09-29 | ||
JP2015191622A JP6470667B2 (ja) | 2015-09-29 | 2015-09-29 | 作業機の動作システム |
JP2015191623A JP6470668B2 (ja) | 2015-09-29 | 2015-09-29 | 作業機のレンタルシステム |
JP2015-191623 | 2015-09-29 | ||
JP2015191624A JP6470669B2 (ja) | 2015-09-29 | 2015-09-29 | 作業機の監視システム |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US15/938,670 Continuation US11335133B2 (en) | 2015-09-29 | 2018-03-28 | Management system for working machine |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2017057275A1 true WO2017057275A1 (ja) | 2017-04-06 |
Family
ID=58423541
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2016/078274 WO2017057275A1 (ja) | 2015-09-29 | 2016-09-26 | 作業機の管理システム |
Country Status (3)
Country | Link |
---|---|
US (2) | US11335133B2 (ja) |
DE (1) | DE112016004426T5 (ja) |
WO (1) | WO2017057275A1 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019198436A1 (ja) * | 2018-04-10 | 2019-10-17 | 株式会社クボタ | 作業機の監視システム |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11184690B2 (en) * | 2018-12-07 | 2021-11-23 | Itt Manufacturing Enterprises Llc | Embedded system for vibration detection and analysis |
JP7405033B2 (ja) * | 2020-07-20 | 2023-12-26 | トヨタ自動車株式会社 | サーバ、更新管理方法、更新管理プログラム、ソフトウェア更新装置、サーバ及びソフトウェア更新装置を備えるシステム、センタ、otaマスタ、センタ及びotaマスタを備えるシステム |
US20220147933A1 (en) * | 2020-11-06 | 2022-05-12 | Moovila, Inc. | Systems and methods for characterizing work by working eqiupment based on proximity to a worker's computing device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08273015A (ja) * | 1995-03-29 | 1996-10-18 | Hitachi Constr Mach Co Ltd | 貸与作業機械の管理システム |
WO2012043239A1 (ja) * | 2010-09-30 | 2012-04-05 | 株式会社クボタ | 作業機の総合管理システム |
JP2012073913A (ja) * | 2010-09-29 | 2012-04-12 | Kubota Corp | 作業機の動作制限システム |
JP2013016119A (ja) * | 2011-07-06 | 2013-01-24 | Kubota Corp | 作業機及び作業機の代金支払い管理システム |
JP2013016120A (ja) * | 2011-07-06 | 2013-01-24 | Kubota Corp | 作業機の情報通信システム |
Family Cites Families (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5664113A (en) * | 1993-12-10 | 1997-09-02 | Motorola, Inc. | Working asset management system and method |
AU774006B2 (en) * | 1999-03-17 | 2004-06-10 | Komatsu Limited | Communication device of mobile unit |
US7656271B2 (en) * | 2002-01-09 | 2010-02-02 | I.D. Systems, Inc. | System and method for managing a remotely located asset |
US20080228346A1 (en) * | 2000-03-07 | 2008-09-18 | Michael Lucas | Apparatus, systems and methods for managing vehicle assets |
CA2314307A1 (en) * | 2000-07-21 | 2002-01-21 | Vansco Electronics Ltd. | Electrical control apparatus for leased equipment |
US7002465B2 (en) * | 2001-04-25 | 2006-02-21 | Hitachi Construction Machinery | Security system of construction machine |
US7346439B2 (en) * | 2002-11-07 | 2008-03-18 | International Business Machines Corporation | Location-based intelligent remote vehicle function control |
JP4068582B2 (ja) | 2003-03-27 | 2008-03-26 | 株式会社クボタ | 車輌の盗難防止システム |
JP2010102611A (ja) | 2008-10-27 | 2010-05-06 | Toyota Motor Corp | 敷地内警戒システム |
CA2768665C (en) * | 2009-08-12 | 2015-06-02 | Sergio Schulte De Oliveira | Information system for industrial vehicles |
US9858797B2 (en) * | 2015-09-22 | 2018-01-02 | International Business Machines Corporation | Tracking information technology (IT) assets |
US20110313937A1 (en) * | 2010-06-17 | 2011-12-22 | Moore Jr Robert Duane | Vehicle rental system and method |
JP5873388B2 (ja) * | 2012-05-10 | 2016-03-01 | 日立建機株式会社 | 産業車両の管理システム |
US10387826B2 (en) * | 2013-01-06 | 2019-08-20 | Directed, Llc | Vehicle inventory and customer relation management system and method |
US8841987B1 (en) * | 2013-11-22 | 2014-09-23 | Local Motion, Inc. | Upgrade kit for an ignition key and methods |
CN105051491B (zh) * | 2013-03-28 | 2017-07-25 | 本田技研工业株式会社 | 告知系统、电子设备、告知方法及程序 |
WO2016094696A1 (en) * | 2014-12-10 | 2016-06-16 | Gogoro Inc. | Systems and methods for asset tracking using an ad-hoc mesh network of mobile devices |
EP3264621A4 (en) * | 2015-02-27 | 2018-07-18 | Komatsu Ltd. | Communication system and work vehicle |
US10109201B2 (en) * | 2015-03-20 | 2018-10-23 | Automap, Llc | Vehicle monitoring devices, vehicle monitoring management devices, and vehicle monitoring systems |
-
2016
- 2016-09-26 DE DE112016004426.7T patent/DE112016004426T5/de active Pending
- 2016-09-26 WO PCT/JP2016/078274 patent/WO2017057275A1/ja active Application Filing
-
2018
- 2018-03-28 US US15/938,670 patent/US11335133B2/en active Active
-
2022
- 2022-04-12 US US17/718,836 patent/US20220237957A1/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08273015A (ja) * | 1995-03-29 | 1996-10-18 | Hitachi Constr Mach Co Ltd | 貸与作業機械の管理システム |
JP2012073913A (ja) * | 2010-09-29 | 2012-04-12 | Kubota Corp | 作業機の動作制限システム |
WO2012043239A1 (ja) * | 2010-09-30 | 2012-04-05 | 株式会社クボタ | 作業機の総合管理システム |
JP2013016119A (ja) * | 2011-07-06 | 2013-01-24 | Kubota Corp | 作業機及び作業機の代金支払い管理システム |
JP2013016120A (ja) * | 2011-07-06 | 2013-01-24 | Kubota Corp | 作業機の情報通信システム |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019198436A1 (ja) * | 2018-04-10 | 2019-10-17 | 株式会社クボタ | 作業機の監視システム |
JP2019182212A (ja) * | 2018-04-10 | 2019-10-24 | 株式会社クボタ | 作業機の監視システム |
US20210035380A1 (en) * | 2018-04-10 | 2021-02-04 | Kubota Corporation | Monitoring system for working machine |
US11954947B2 (en) | 2018-04-10 | 2024-04-09 | Kubota Corporation | Monitoring system for working machine |
Also Published As
Publication number | Publication date |
---|---|
US20180225892A1 (en) | 2018-08-09 |
DE112016004426T5 (de) | 2018-07-05 |
US11335133B2 (en) | 2022-05-17 |
US20220237957A1 (en) | 2022-07-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20220237957A1 (en) | Management system for working machine | |
US10929819B2 (en) | On-demand and on-site vehicle maintenance service | |
CN107107869B (zh) | 借助移动终端设备对车辆功能的远程控制 | |
US9878690B2 (en) | Vehicle communications | |
EP2626476B2 (en) | Working machine with settings change system | |
US9316196B2 (en) | Vehicle controller | |
CN102571345B (zh) | 车载设备、车辆认证系统及数据通信方法 | |
DE102017121962A1 (de) | Beziehungsverwaltung für fahrgemeinschaftssysteme | |
US9031715B2 (en) | Control device | |
CN106487778A (zh) | 车载网络服务器远程信息处理系统和方法 | |
CN101291229A (zh) | 控制移动平台上信息访问的系统和方法 | |
JP2009528520A (ja) | 車両の診断及び車両の受け付け方法 | |
JPWO2020208830A1 (ja) | 車両遠隔制御システム、車載器ないし通信モジュール、車両、サーバ、車両遠隔制御方法、車両遠隔制御プログラム及び記憶媒体 | |
KR20150029056A (ko) | 범용 차량 원격 제어장치 및 방법 | |
JP5748627B2 (ja) | 作業機及び作業機のレンタル管理システム | |
CN104899943A (zh) | 一种利用汽车智能门锁与智能钥匙和一键启动装置进行汽车快租的方法 | |
CN112389151A (zh) | 车辆控制方法及系统和用户终端设备 | |
US9201843B2 (en) | Control device | |
CN113424561B (zh) | 控制数据交换的方法、控制装置和机动车 | |
JP2010209642A (ja) | 自動車鍵管理システム | |
JP2013067997A (ja) | 作業機及び作業機のデータ通信システム | |
JP6470668B2 (ja) | 作業機のレンタルシステム | |
JP2010213185A (ja) | 自動車鍵管理システム | |
US11425560B2 (en) | Communication system for working machine and communication processing method for working machine | |
KR101389014B1 (ko) | 차고지 또는 경유지 영역 이탈을 실시간으로 경보하는 방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 16851446 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 112016004426 Country of ref document: DE |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 16851446 Country of ref document: EP Kind code of ref document: A1 |