WO2015162941A1 - 制御方法および制御装置 - Google Patents

制御方法および制御装置 Download PDF

Info

Publication number
WO2015162941A1
WO2015162941A1 PCT/JP2015/002252 JP2015002252W WO2015162941A1 WO 2015162941 A1 WO2015162941 A1 WO 2015162941A1 JP 2015002252 W JP2015002252 W JP 2015002252W WO 2015162941 A1 WO2015162941 A1 WO 2015162941A1
Authority
WO
WIPO (PCT)
Prior art keywords
value
storage battery
power
electric energy
discharge
Prior art date
Application number
PCT/JP2015/002252
Other languages
English (en)
French (fr)
Inventor
鈴木 一生
Original Assignee
京セラ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 京セラ株式会社 filed Critical 京セラ株式会社
Priority to JP2016514730A priority Critical patent/JP6317431B2/ja
Priority to EP15783548.9A priority patent/EP3136533B1/en
Priority to US15/306,476 priority patent/US10348087B2/en
Publication of WO2015162941A1 publication Critical patent/WO2015162941A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0068Battery or charger load switching, e.g. concurrent charging and load supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M7/00Conversion of ac power input into dc power output; Conversion of dc power input into ac power output
    • H02M7/66Conversion of ac power input into dc power output; Conversion of dc power input into ac power output with possibility of reversal
    • H02M7/68Conversion of ac power input into dc power output; Conversion of dc power input into ac power output with possibility of reversal by static converters

Definitions

  • the present invention relates to a storage battery control method and a control device provided in a consumer who receives power supply from a system.
  • a power supply system including a storage battery of a type has been proposed.
  • Such a system is installed in each home or commercial / industrial facility, for example, purchases power from the grid in a time zone such as midnight when the power cost is relatively low and stores it in a storage battery, and stores the battery in a time zone such as daytime. Is discharged to supply power to a household or premises power load.
  • Patent Document 1 discloses a power supply control device that supplies power from a storage battery when a predicted power generation amount is lower than a predicted demand power amount in a system connected to not only a system but also a generator.
  • Patent Literature 1 simply predicts the amount of power demand from the amount of power demand at a past date and time. For example, when peak power is generated varies depending on the environment such as outside air temperature, and the technique described in Patent Document 1 cannot be said to be able to suppress peak power from the system with high accuracy. It does not charge or discharge the storage battery with high efficiency.
  • An object of the present invention made in view of such circumstances is to provide a control method and a control device that can charge and discharge a storage battery with high efficiency.
  • a control method is a storage battery control method provided for a consumer who receives power supply from a system, and is supplied from the system at a unit time shorter than a predetermined time period.
  • a first monitoring step for monitoring the first power amount a second monitoring step for monitoring a second power amount supplied from the system for each predetermined time period, and the first power amount
  • the storage battery is fed to supply power to the load in the consumer according to a calculation step for determining a time change of the first power amount, a time change of the first power amount, and a past peak value of the second power amount.
  • An instruction step for instructing discharge is a storage battery control method provided for a consumer who receives power supply from a system, and is supplied from the system at a unit time shorter than a predetermined time period.
  • a control device is a control device that controls a storage battery provided to a consumer that receives power supply from a system, and the system is for each unit time shorter than a predetermined time period.
  • a calculation unit that obtains a temporal change in the first electric energy supplied from the power supply, a temporal change in the first electric energy, and a past about the second electric energy supplied from the system for each predetermined time period.
  • a charge / discharge instruction unit for instructing the storage battery to discharge so as to supply power to the load in the consumer according to the peak value.
  • the control method and control device according to the present invention can charge and discharge the storage battery with high efficiency.
  • FIG. 1 is a functional block diagram illustrating a schematic configuration of a power supply system including a control device according to the present embodiment.
  • the electric power supplied to the load 108 is indicated by a thick solid line, and the solid line with an arrow connecting each functional block represents a flow of a control signal or data.
  • the power supply system 10 is installed in each household or various commercial and industrial facilities, for example.
  • the power supply system 10 includes a storage battery 100, a voltage sensor 101 that detects the voltage of the storage battery 100, a control device 102 that controls charging / discharging of the storage battery 100, and a converter 122 that performs bidirectional conversion between AC power and DC power. .
  • the control device 102 charges the storage battery 100 with electric power from the system 104 via the converter 122. And the control apparatus 102 discharges the storage battery 100, and supplies electric power to the load 108 in a consumer. That is, the power supply system 10 can supply, to the load 108, the discharged power out of the power charged in the storage battery 100 in addition to the power supplied from the grid 104. The power supply system 10 can suppress the peak power from the grid 104 by the power discharged from the storage battery 100.
  • the control device 102 also controls the conversion between the AC power fed from the system 104 in the converter 122 and the DC power of the storage battery 100.
  • the converter 122 is, for example, a bidirectional inverter. Control of charging and discharging of the storage battery 100 of the control device 102 will be described in detail later.
  • the watt-hour meter 25 detects the amount of power supplied (power purchased) supplied from the grid 104 and outputs a pulse according to the amount of power supplied. As an example, the watt-hour meter 25 outputs pulses at a rate of 2000 pulses / 1 kWh. In other words, in this example, the watt-hour meter 25 outputs one pulse each time it detects a supply power amount of 0.5 Wh.
  • the demand monitoring device 24 is a device provided to specify a power charge for receiving power supply.
  • electric power from the grid 104 in a high-voltage power receiver such as a commercial facility is supplied from an electric power seller, and electric power is bought and sold based on a contract with the electric power seller.
  • the power price for purchase is the highest value in the past year among average power values calculated based on the supplied power amount (second power amount) in a predetermined time period (for example, 30 minutes), as will be described later. It is characterized by being determined by.
  • the demand monitoring device 24 measures the second power amount by counting the number of pulses from the watt-hour meter 25 in a predetermined time period.
  • the predetermined time period is a predetermined time period such as 30 minutes, and is also called a demand time period.
  • the demand time period varies depending on the country, and is set to, for example, 30 minutes in Japan, 60 minutes in the United States, and 15 minutes in Germany.
  • the second electric energy is measured based on the number of pulses detected from the start to the end of the predetermined time period. Specifically, the demand monitoring device 24 resets the count value of the number of pulses at the start of the predetermined time period, counts the number of pulses from the start to the end of the predetermined time period, and replaces this as the amount of power, thereby Measure the amount of power.
  • the storage battery 100 is provided to suppress the peak power from the system 104 as described above.
  • the storage battery 100 may be, for example, a lithium ion battery in which a plurality of cells are connected in series, or a nickel metal hydride battery.
  • the voltage sensor 101 that detects the voltage of the storage battery 100 transmits the detection result to the control device 102.
  • the control device 102 includes a charge / discharge instruction unit 120, a calculation unit 126, an air temperature determination unit 128 that receives an outside air temperature detected by the temperature sensor 103, and a storage unit 134.
  • the calculation unit 126 is synchronized with the demand monitoring device 24 and calculates the second electric energy based on the pulse from the same wattmeter 25 using the same logic as the demand monitoring device 24. That is, the calculation unit 126 also counts the pulses output from the watt-hour meter 25 for each predetermined time period synchronized with the demand monitoring device 24, and calculates the second electric energy based on the number of pulses from the start to the end of the predetermined time period. To do. In this way, it should be noted that the second power amount measured by the calculation unit 126 has the same value because it is synchronized in time and the power amount acquisition source is the same. Accordingly, the second power amount monitored by the demand monitoring device 24 can be monitored by the control device 102 (calculation unit 126).
  • the arithmetic unit 126 counts the number of pulses every time shorter than a predetermined time period (for example, 1 minute, hereinafter also referred to as unit time), and calculates the amount of power supplied (first power amount) in the unit time. .
  • the calculating part 126 calculates the difference of each 1st electric energy of the continuous unit time as a time change of the 1st electric energy, or calculates the value which differentiated the 1st electric energy with time, Output to the charge / discharge instruction unit 120 is also performed. Specifically, the arithmetic unit 126 calculates the difference ⁇ between two consecutive first power amounts, that is, the first power amount W (k ⁇ 1) at time k ⁇ 1 discretized in unit time and the time k.
  • the difference ⁇ W (k) ⁇ W (k ⁇ 1) from the first power amount W (k) at is calculated as a difference value of the first power amount.
  • the calculating part 126 calculates the approximated curve based on the plot of several 1st electric energy, for example using the least squares method, and makes the inclination of the approximated curve in arbitrary time the derivative value of the 1st electric energy. calculate.
  • the calculation unit 126 also calculates a predicted value of the second electric energy for each unit time.
  • the calculation unit 126 also calculates the first power amount calculated by the calculation unit 126, the time change of the first power amount, the second power amount, the past peak value of the second power amount, and the second power amount.
  • the predicted electric power value and the like are transferred to the storage unit 134 and stored together with a first threshold value and a second threshold value which will be described later.
  • the charge / discharge instruction unit 120 instructs the storage battery 100 to supply power to the load 108 in the consumer according to the time change of the first electric energy and the past peak value (maximum value) of the second electric energy. Instruct to discharge.
  • the charge / discharge instruction unit 120 receives the second power amount calculated up to the current time from the arithmetic unit 126 and monitors the second power amount (the integrated power amount monitored by the demand monitoring device 24).
  • the charge / discharge instruction unit 120 becomes minimum after the difference value or differential value of the first power amount becomes a positive value, for example, based on the time change of the first power amount in the predetermined time period to which the current time belongs. By detecting this, it is understood that peak power (power that may exceed the past peak value) may be generated in the predetermined time period.
  • the charge / discharge instruction unit 120 becomes minimum after the difference value or differential value of the first electric energy becomes a positive value while considering the past peak value of the second electric energy as described later. Is detected, and the storage battery 100 can be instructed to be discharged so as to supply power to the load 108 at the consumer. Therefore, peak power from the system 104 can be suppressed with high accuracy, and the storage battery 100 can be charged and discharged with high efficiency.
  • the local minimum here means a change point from a positive value to zero or a negative value. Also, the minimum is not always zero.
  • the arithmetic unit 126 measures only the first electric energy every unit time, zero is detected as a difference value of the first electric energy twice in the first electric energy. This is only the case when it is the same, and such a case is very rare. Therefore, for example, it is considered that there are many cases where the difference value of the first electric energy changes without detecting zero, such as “+4 kWh”, “+1 kWh”, “ ⁇ 3 kWh”.
  • the charge / discharge instruction unit 120 determines that “ ⁇ 3 kWh”, which is a negative value, is minimal.
  • the charge / discharge instruction unit 120 is minimal when the difference value or differential value of the first electric energy changes to a predetermined reference value (eg, “+2 kWh”) that is a positive value close to zero. You may judge. Specifically, the charge / discharge instruction unit 120 is minimal when the difference value or differential value of the first electric energy falls within a range from zero to the reference value from a value exceeding the reference value. judge. Preferably, the charge / discharge instruction unit 120 continuously or over a predetermined time after a difference value or a differential value of the first electric energy falls within the range from a value exceeding the reference value. When it is within the range, it is determined to be minimal.
  • a predetermined reference value eg, “+2 kWh”
  • the charge / discharge instruction unit 120 may instruct the storage battery 100 to start discharging to the load 108 when the difference value or the differential value of the first electric energy becomes a minimum value after becoming a positive value. .
  • the control apparatus 102 can suppress the power purchased from the system 104 at an appropriate timing. Therefore, the control apparatus 102 can avoid as much as possible that the electric energy exceeding the past peak value about the 2nd electric energy will generate
  • the charge / discharge instruction unit 120 when the difference value or differential value of the first power amount becomes a positive value, the charge / discharge instruction unit 120 has the second predicted value of the power amount and the first threshold when the difference value or differential value becomes a positive value. And compare.
  • the charge / discharge instruction unit 120 may instruct the storage battery 100 to start discharging to the load 108 when the predicted value of the second electric energy exceeds the first threshold value.
  • the control apparatus 102 can reduce unnecessary discharge by setting a 1st threshold value, and can charge / discharge the storage battery 100 still more efficiently. At this time, the charge / discharge instruction unit 120 does not instruct the storage battery 100 to discharge when the predicted value of the second electric energy is below the first threshold.
  • the charge / discharge instruction unit 120 can instruct the storage battery 100 to discharge. Therefore, it is possible to avoid a situation where the power of the storage battery 100 is insufficient before the discharge instruction.
  • the charge / discharge instruction unit 120 acquires a past peak value for the second power amount from the storage unit 134.
  • the charge / discharge instruction unit 120 may record the updated past peak value in the storage unit 134.
  • the first threshold value may be determined according to a past peak value for the second power amount.
  • the first threshold value may be the past peak value itself, but it is preferable that the first threshold value has a slight margin and is slightly lower than the past peak value.
  • the control device 102 may set a first threshold value by subtracting a predetermined value from the past peak value, and store the first threshold value in the storage unit 134. When the past peak value is updated, a new first threshold value is determined in conjunction with the updated peak value. With this configuration, the control device 102 can control the discharge of the flexible storage battery 100 in accordance with the current situation.
  • the charge / discharge instruction unit 120 uses the past peak value of the second power amount acquired from the storage unit 134 as the final second power amount in the predetermined time period to which the current time belongs. You may instruct
  • the charge / discharge instruction unit 120 compares the predicted value of the second electric energy with the second threshold value. When the charge / discharge instruction unit 120 determines that the predicted value of the second electric energy is less than the second threshold value, the charge / discharge instruction unit 120 may instruct the storage battery 100 to be charged.
  • the control device 102 can control the timing for charging the storage battery 100.
  • the second threshold value is set to be equal to or less than the first threshold value. When the second threshold value is equal to the first threshold value, charging is actively performed when the storage battery 100 is not instructed to be discharged.
  • the second threshold value may also be set based on the past peak value of the second power amount. For example, the control device 102 may set a second threshold value by subtracting a predetermined value from the past peak value of the second power amount and store the second threshold value in the storage unit 134.
  • the charge / discharge instruction unit 120 executes the control when the air temperature determination unit 128 determines that the outside air temperature is equal to or higher than the first temperature or lower than the second temperature lower than the first temperature. Good.
  • the air temperature determination unit 128 determines that the outside air temperature is equal to or higher than the first temperature or lower than the second temperature lower than the first temperature.
  • the power consumption of the load 108 may increase due to the high temperature.
  • the outside air temperature is lower than the second temperature (for example, 10 ° C.)
  • the power consumption of the load 108 may increase due to the low temperature.
  • the control described above can be effectively executed when there is a possibility that the power consumption of the load 108 becomes large.
  • FIG. 2 is a schematic diagram for explaining the power from the grid 104.
  • FIG. 2 is a bar graph showing a plurality of second electric energy amounts for one day.
  • the second power amount PPa when the control device 102 has not instructed charging or discharging of the storage battery 100 is shown.
  • the past peak value (hereinafter, peak value P0a) for the second power amount is 40 kWh based on the contract power.
  • the first threshold value TH1 and the second threshold value TH2 are set to 35 kWh.
  • the second power amount PPa takes the maximum of three times, and the second power amount PPa at the maximums P1 and P2 is equal to or greater than the first threshold value TH1, and at the maximum Px.
  • the second power amount PPa is less than the first threshold value TH1.
  • FIG. 3 is a diagram for explaining an example of charging and discharging of the storage battery 100 for suppressing peak power.
  • FIG. 3 is an enlarged view of a portion corresponding to the section Rx in FIG.
  • the air temperature determination unit 128 determines that the outside air temperature detected by the temperature sensor 103 is equal to or higher than the first temperature, and the charge / discharge instruction unit 120 instructs the storage battery 100 to charge and discharge. Yes. Therefore, unlike FIG. 2, FIG. 3 shows the discharge amount PDa and the charge amount PCa. That is, the second power amount PPa in FIG. 3 is suppressed by the amount of discharge PDa from the storage battery 100 and increases by the amount of charge PCa to the storage battery 100.
  • the charge / discharge instruction unit 120 detects that the difference value or the differential value of the first power amount PMa becomes a minimum after it becomes a positive value.
  • the first power amount PMa is represented by a curve instead of a bar graph.
  • the charge / discharge instruction unit 120 has the storage battery 100 at time Ta and time Tc, which are timings when the difference value or differential value of the first power amount PMa becomes a minimum after becoming a positive value.
  • the discharge instruction to the load 108 is started.
  • the second power amount PPa is suppressed by the amount of discharge PDa.
  • the charge / discharge instruction unit 120 prevents the second electric energy in the time periods (11:30 to 12:00 and 16:00 to 16:30 in this example) instructing the start of discharge from exceeding the peak value P0a.
  • the discharge amount PDa is also adjusted.
  • the charge / discharge instruction unit 120 uses not only the maximum timing but also that the predicted value of the second power amount PPa is equal to or greater than the first threshold value TH1. Therefore, the charge / discharge instruction unit 120 does not discharge at the timing of the maximum Px. That is, when there is no risk that the second power amount exceeds the past peak value (the contract power may be updated), the control device 102 determines that the difference value or differential value of the first power amount is a positive value. Even if it becomes the minimum after becoming, it does not discharge. By setting the predicted value of the second power amount PPa to be equal to or greater than the first threshold value TH1, it is possible to reduce unnecessary discharge.
  • the charge / discharge instruction unit 120 starts an instruction to discharge the load 108 at time Ta, and discharges until time Tb when the difference value or differential value of the first electric energy becomes a negative specified value.
  • the charge / discharge instruction unit 120 starts an instruction to discharge the load 108 at time Tc, and discharges until time Td when the difference value or differential value of the first electric energy becomes a negative specified value.
  • the negative specified value is a difference in the first electric energy, and may be a value such as “ ⁇ 1 kWh”, for example.
  • the discharge period to the load 108 becomes longer. For example, when the negative specified value is changed from “ ⁇ 1 kWh” to “ ⁇ 1.5 kWh”, the discharge period is extended. Therefore, the discharge period to the load 108 can be adjusted according to the specified value to be selected.
  • the charging / discharging instruction unit 120 may stop discharging to the load 108 at a boundary time of a predetermined time period (that is, at the beginning of the next predetermined time period). If it demonstrates using the example of FIG. 3, the charging / discharging instruction
  • the charge / discharge instruction unit 120 instructs the storage battery 100 to charge.
  • the charge / discharge instruction unit 120 charges the storage battery 100 at 10:30 to 11:00, 12:30 to 13:30, 14:00 to 15:30, and 16:30 to 17:00. Instruct.
  • the charging / discharging instruction unit 120 actively instructs charging when the predicted value of the second power amount PPa is less than the second threshold value TH2, so that the power of the storage battery 100 is insufficient when instructing discharging. You can avoid things.
  • the charge / discharge instruction unit 120 instructs the storage battery 100 to discharge, the timing when the difference value or differential value of the first electric energy becomes a positive value after becoming a positive value (in the example of FIG. 3).
  • the peak power can be suppressed at the maximum P1, P2).
  • the second power amount PPa takes a maximum value PN0 at the maximum P2.
  • the second power amount PPa falls within the maximum value PN1 at the maximum.
  • the maximum value PN1 is smaller than the maximum value PN0.
  • the contract power is determined by the highest value of power averaged for each predetermined time period in the past year. Therefore, the charging / discharging instruction
  • FIG. 4 is a flowchart showing an example of a specific operation procedure of the control apparatus 102.
  • the procedure in FIG. 4 is executed every minute, for example, in accordance with the unit time of the first electric energy.
  • the control device 102 receives information on the outside air temperature, specifically, data on the outside air temperature detected by the temperature sensor 103 (step S2).
  • the air temperature determination unit 128 of the control device 102 determines whether or not the outside air temperature detected by the temperature sensor 103 is equal to or higher than the first temperature or lower than the second temperature (step S4).
  • the second temperature is lower than the first temperature.
  • the air temperature determination unit 128 determines that the outside air temperature is equal to or higher than the second temperature and lower than the first temperature (No in step S4)
  • the charge / discharge control of the storage battery 100 by the charge / discharge instruction unit 120 described below is performed. Is not executed. That is, since it is determined that there is no possibility that the power consumption of the load 108 increases to the extent that the second power amount exceeds the past peak value, the charge / discharge instruction unit 120 may stop the operation. At this time, the storage battery 100 may be instructed to be charged and discharged by a conventional technique.
  • a conventional technique for example, there is a technique in which discharging is performed at a predetermined time in the daytime and charging is performed at a predetermined time in the nighttime.
  • the controller 102 causes the charge / discharge instruction unit 120 to operate and performs the following control. I do.
  • the control device 102 receives the first power amount (step S6), receives the second power amount (step S8), and obtains a difference value or differential value of the first power amount by the calculation unit 126 (step S10).
  • Step S6, step S8, and step S10 correspond to the first monitoring step, the second monitoring step, and the calculation step of the present invention, respectively.
  • the step in which the charge / discharge instruction unit 120 described below instructs the storage battery 100 to charge / discharge corresponds to the instruction step of the present invention.
  • the charge / discharge instruction unit 120 instructs the storage battery 100 to discharge (Yes in Step S12), and if the difference value or differential value of the first electric energy is less than the negative specified value (Yes in Step S14), Discharge of the storage battery 100 is stopped (step S16).
  • step S16 when there is no discharge instruction in the storage battery 100 (No in step S12), or when the difference value or differential value of the first electric energy is not less than the negative specified value (No in step S14), the charge / discharge instruction The unit 120 determines whether or not the predicted value of the second power amount is less than the second threshold (step S18). When determining that the predicted value of the second electric energy is less than the second threshold (Yes in step S18), the charge / discharge instruction unit 120 instructs charging of the storage battery 100 (step S20). As described above, in order to avoid a situation where the power of the storage battery 100 is insufficient when the discharge is instructed, the charge / discharge instruction unit 120 is active when the predicted value of the second electric energy is less than the second threshold value TH2. Instruct to charge.
  • step S20 After step S20 or when it is determined that the predicted value of the second power amount is equal to or greater than the second threshold (No in step S18), the charge / discharge instruction unit 120 indicates that the predicted value of the second power amount is the first value. It is determined whether or not the threshold value is greater than or equal to (step S22). The charge / discharge instruction unit 120 is minimum after the second power amount is equal to or greater than the first threshold (Yes in step S22) and the difference value or differential value of the first power amount becomes a positive value. When (Yes in step S24), the storage battery 100 is instructed to start discharging (step S26).
  • step S26 when it is determined that the predicted value of the second power amount is less than the first threshold (No in step S22), or the difference value or differential value of the first power amount becomes a positive value. If the minimum value is not reached after that (No in step S24), the control device 102 ends the series of processes.
  • the difference value or the differential value of the first electric energy becomes a positive value while considering the past peak value of the second electric energy.
  • the storage battery 100 can be instructed to be discharged so as to supply power to the load 108 at the consumer at a minimum timing. Therefore, the peak power from the system 104 can be suppressed with high accuracy, and the storage battery can be charged and discharged with high efficiency.
  • FIG. 5 is a diagram illustrating an example of charging and discharging of a storage battery for suppressing peak power by the control device according to the present embodiment.
  • the charge / discharge instruction unit 120 instructs the discharge of the storage battery 100 before the maximum timing.
  • the charge / discharge instruction unit 120 receives the difference value or differential value of the first electric energy from the calculation unit 126.
  • the charge / discharge instruction unit 120 instructs the storage battery 100 to discharge the load 108 during a period when the difference value or differential value of the first electric energy changes from a positive specified value to a negative specified value.
  • the positive specified value is a value having a sign different from that of the negative specified value.
  • the positive specified value is “+1 kWh” and the negative specified value is “ ⁇ 1 kWh”.
  • the time during which the storage battery 100 is discharged can be adjusted by setting these specified values.
  • the charge / discharge instruction unit 120 starts an instruction to discharge the load 108 at time Tx and discharges until time Ty.
  • the charge / discharge instruction unit 120 starts an instruction to discharge the load 108 at time Tz and discharges until time Tw.
  • a discharge instruction to the load 108 is started at a timing (time Tx, Tz) before the difference value or differential value of the first electric energy becomes minimum. To do. Therefore, the peak power can be suppressed from the timing before the maximums P1 and P2.
  • the maximum value in this section is the maximum value PN1, but in the example of FIG. 5, the maximum value can be further suppressed to the maximum value PN2 ( ⁇ maximum value PN1).
  • the charge / discharge instruction unit 120 instructs the storage battery 100 to charge when it determines that the predicted value of the second power amount PPa is less than the second threshold value TH2.
  • the second threshold value TH2 is set to a value smaller than the first threshold value TH1
  • the charge instruction from the charge / discharge instruction unit 120 due to the instantaneous fluctuation of the second electric energy PPa.
  • the discharge instruction can be prevented from being frequently switched.
  • FIG. 6 is a flowchart showing an example of a specific operation procedure of the control apparatus 102 according to the present embodiment.
  • steps S2, S4, S6, S8, and S10 in FIG. 6 are the same as the steps with the same reference numerals in FIG.
  • step S10 the control device 102 determines whether or not the predicted value of the second electric energy is less than the second threshold (step S18), an instruction to charge the storage battery 100 (step S20), and the second electric energy. A determination is made as to whether or not the predicted value is greater than or equal to the first threshold value (step S22).
  • the charge / discharge instruction unit 120 determines that the predicted value of the second power amount is equal to or greater than the first threshold (Yes in step S22), and the difference value or differential value of the first power amount is within a predetermined range (step) (Yes in S30), the storage battery 100 is instructed to start discharging, or the discharge state is maintained if the discharging instruction has already been made (step S32).
  • the difference value or differential value of the first electric energy is within a predetermined range means that the difference value or differential value of the first electric energy is included from a positive specified value to a negative specified value.
  • the difference value or differential value of the first electric energy is included from “+1 kWh” which is a positive specified value to “ ⁇ 1 kWh” which is a negative specified value
  • the charge / discharge instruction unit 120 The storage battery 100 is discharged.
  • step S34 If the difference value or differential value of the first electric energy is not within the predetermined range (No in Step S30) and the charge / discharge instruction unit 120 instructs the storage battery 100 to discharge (Yes in Step S34), The discharge instruction to the storage battery 100 is stopped (step S36). After step S32, after step S36, or when the storage battery 100 is not instructed to discharge (No in step S34), the control device 102 ends the series of processes.
  • control device 102 of the second embodiment can charge and discharge the storage battery 100 with high efficiency similarly to the first embodiment, and can further suppress the peak power than the first embodiment. There is sex.
  • control device 102 may use the detection result from the voltage sensor 101 as an instruction for charging or discharging the storage battery 100.
  • the charge / discharge instruction unit 120 may instruct charging when it is determined that the voltage of the storage battery 100 is less than the first threshold voltage, or the voltage of the storage battery 100 is equal to or higher than the second threshold voltage. You may instruct
  • the charge / discharge instruction unit 120 of the control device 102 has a large difference value or differential value of the first electric energy, and the second electric energy is predicted to exceed the past peak value based on the contract electric power. May instruct discharge to the storage battery 100.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

 蓄電池の充放電を高効率に行うことができる制御方法および制御装置を提供する。系統104からの電力供給を受ける需要家に設けられた蓄電池100の制御方法であって、所定時限よりも短い単位時間ごとの、系統104から供給される第1の電力量を監視する第1の監視ステップと、所定時限ごとの、系統104から供給される第2の電力量を監視する第2の監視ステップと、第1の電力量の時間変化を求める演算ステップと、第1の電力量の時間変化および第2の電力量についての過去のピーク値に応じて、需要家における負荷108への給電を行うよう蓄電池に放電を指示する指示ステップと、を含む。

Description

制御方法および制御装置 関連出願へのクロスリファレンス
 本出願は、日本国特許出願2014-090561号(2014年4月24日出願)に基づく優先権を主張するものであり、当該出願の開示全体を、ここに参照のために取り込む。
 本発明は、系統からの電力供給を受ける需要家に設けられた蓄電池の制御方法および制御装置に関する。
 社会全体としての電力供給のピークシフト(負荷分散)の要請および需要家の経済性の要求を背景として、商用電力系統(以下、系統という)の電力を蓄電してから使用するための系統連系型の蓄電池を備えた電力供給システムが提案されている。かかるシステムは、各家庭または商工業施設などに設置され、例えば電力コストが比較的安価な深夜などの時間帯に系統からの電力を購入して蓄電池に蓄電し、日中などの時間帯に蓄電池を放電させて家庭内または構内の電力負荷に電力を供給する。
 例えば、特許文献1は、系統だけでなく発電機にも接続されるシステムにおいて、予測した発電量が予測した需要電力量よりも低いときに蓄電池から給電する給電制御装置について開示する。
特開2013-165534号公報
 ここで、電力供給のピークシフトおよび経済性の観点からは、ピーク電力を考慮した適切なタイミングで蓄電池を充放電することによって、系統からのピーク電力を抑制できる電力供給システムが求められる。特許文献1に記載された技術は、需要電力量を単に過去の日時における需要電力量から予測するものである。例えばピーク電力がいつ発生するかは外気温等の環境によっても異なるものであり、特許文献1に記載された技術は系統からのピーク電力を高精度に抑制できるとは言えず、また、そのために蓄電池を高効率に充放電するものでもない。
 かかる事情に鑑みてなされた本発明の目的は、蓄電池の充放電を高効率に行うことができる制御方法および制御装置を提供することにある。
 上記課題を解決するために本発明に係る制御方法は、系統からの電力供給を受ける需要家に設けられた蓄電池の制御方法であって、所定時限よりも短い単位時間ごとの、前記系統から供給される第1の電力量を監視する第1の監視ステップと、前記所定時限ごとの、前記系統から供給される第2の電力量を監視する第2の監視ステップと、前記第1の電力量の時間変化を求める演算ステップと、前記第1の電力量の時間変化、および前記第2の電力量についての過去のピーク値に応じて、前記需要家における負荷への給電を行うよう前記蓄電池に放電を指示する指示ステップと、を含む。
 上記課題を解決するために本発明に係る制御装置は、系統からの電力供給を受ける需要家に設けられた蓄電池を制御する制御装置であって、所定時限よりも短い単位時間ごとの、前記系統から供給される第1の電力量の時間変化を求める演算部と、前記第1の電力量の時間変化、および、前記所定時限ごとの、前記系統から供給される第2の電力量についての過去のピーク値に応じて、前記需要家における負荷への給電を行うよう前記蓄電池に放電を指示する充放電指示部と、を備える。
 本発明に係る制御方法および制御装置によれば、蓄電池の充放電を高効率に行うことができる。
本発明の第1実施形態に係る制御装置および制御装置を備える電力供給システムの概略構成を示すブロック図である。 電力量変化を説明するための概略図である。 ピーク電力を抑制するための蓄電池の充電、放電の例を説明する図である。 本発明の第1実施形態の制御方法を説明するフローチャートである。 ピーク電力を抑制するための別の蓄電池の充電、放電の例を説明する図である。 本発明の第2実施形態の制御方法を説明するフローチャートである。
(第1実施形態)
 図1は、本実施形態に係る制御装置を含む電力供給システムの概略構成を示す機能ブロック図である。図1において、負荷108に供給される電力は太い実線で示され、各機能ブロックを結ぶ矢印付きの実線は制御信号またはデータの流れを表す。
 電力供給システム10は、たとえば、各家庭または各種商工業施設に設置される。電力供給システム10は、蓄電池100、蓄電池100の電圧を検知する電圧センサ101、蓄電池100の充放電を制御する制御装置102、および交流電力と直流電力の双方向の変換を行う変換器122を備える。
 制御装置102は、変換器122を介して、系統104からの電力で蓄電池100を充電する。そして、制御装置102は、蓄電池100を放電させて、需要家における負荷108に電力を供給する。つまり、電力供給システム10は、系統104から給電される電力の他に、蓄電池100に充電された電力のうち放電された電力を負荷108に供給可能である。電力供給システム10は、蓄電池100から放電される電力によって系統104からのピーク電力を抑制できる。
 制御装置102は、変換器122における系統104から給電される交流電力と蓄電池100の直流電力との変換も制御する。変換器122は、例えば双方向インバータである。制御装置102の蓄電池100の充電および放電の制御については後に詳細に説明する。
 電力量計25は、系統104から供給される供給電力量(買電電力)を検出し、供給電力量に応じてパルスを出力する。一例として電力量計25は、2000パルス/1kWhのレートでパルスを出力する。すなわちこの例では、電力量計25は、0.5Whの供給電力量を検出する都度、1パルス出力することになる。
 デマンド監視装置24は、電力供給を受けるにあたっての電力料金を特定するために設けられる装置である。日本においては、商業施設などの高圧受電者における系統104からの電力は電力販売者から供給されており、この電力販売者との契約に基づいて電力の売買が行われる。特に買い入れの電力料金は、後述するように、所定時限(例えば、30分間)における供給電力量(第2の電力量)に基づいて算出される平均電力値のうち、過去の1年における最高値によって定められるという特徴がある。
 デマンド監視装置24は、所定時限における電力量計25からのパルス数を計数することで、第2の電力量を測定する。所定時限は、例えば30分間といった所定の時間であり、デマンド時限とも呼ばれる。デマンド時限は、国によって異なり、例えば日本では30分間、アメリカでは60分間、およびドイツでは15分間と定められている。この所定時限の始期から終期までに検出されたパルス数に基づいて、第2の電力量が測定される。具体的には、デマンド監視装置24は所定時限の始期にパルス数の計数値をリセットし、所定時限の始期から終期までのパルス数を計数し、これを電力量として置き換えることによって、第2の電力量を測定する。
 そしてデマンド監視装置24は、測定された第2の電力量を、所定時限における平均電力値に換算する。例えば所定時限が30分間である場合において、測定された第2の電力量、すなわち30分間における供給電力量をa[kWh]とすると、30分間(0.5時間)における平均電力値P[kW]は、P=a/0.5=2a[kW]で示される。最終的にこの30分間における平均電力値に関する情報を過去1年について電力販売者はストックしておき、過去1年における平均電力値の最大値に基づいて電力料金を決定する。
 蓄電池100は、前記のように系統104からのピーク電力を抑制するために設けられている。蓄電池100は、例えば、複数のセルが直列接続されたリチウムイオン電池、またはニッケル水素電池でもよい。蓄電池100の電圧を検知する電圧センサ101は、その検知結果を制御装置102に送信する。
 制御装置102は、充放電指示部120、演算部126、温度センサ103が検知する外気温を受け取る気温判定部128、記憶部134を備える。
 演算部126は、デマンド監視装置24と同期しており、デマンド監視装置24と同様のロジックを用いて同じ電力量計25からのパルスに基づいて第2の電力量を算出する。すなわち、演算部126も電力量計25から出力されるパルスをデマンド監視装置24と同期した所定時限ごとに計数し、所定時限の始期から終期までのパルス数に基づいて第2の電力量を算出する。このように、時間的に同期し、なおかつ電力量取得原が同じであるため、演算部126によって測定される第2の電力量は同じ値となることに留意されたい。したがって、デマンド監視装置24によって監視される第2の電力量を、制御装置102(演算部126)によって監視することが可能となる。
 さらに演算部126は、所定時限よりも短い時間(例えば、1分間。以下、単位時間ともいう。)ごとにパルス数を計数し、単位時間における供給電力量(第1の電力量)を算出する。そして演算部126は、第1の電力量の時間変化として、連続する単位時間の各第1の電力量の差分を算出し、あるいは第1の電力量を時間で微分した値を算出して、充放電指示部120への出力も行う。具体的には、演算部126は、連続する2つの第1の電力量の差分Δ、すなわち単位時間で離散化された時刻k-1における第1の電力量W(k-1)と時刻kにおける第1の電力量W(k)との差分Δ=W(k)-W(k-1)を、第1の電力量の差分値として算出する。あるいは、演算部126は、例えば最小二乗法を用いて複数の第1の電力量のプロットに基づく近似曲線を算出し、任意の時刻における近似曲線の傾きを、第1の電力量の微分値として算出する。
 また、演算部126は、単位時間ごとに第2の電力量の予測値も算出する。ここで、第2の電力量の予測値とは、例えば現在時刻が属する所定時限の始期(時刻k=0)から現在時刻(時刻k=n)までの第1の電力量の合計(W(1)+W(2)+…+W(n))を、所定時限の始期から現在時刻までの時間(例えば、n分間)で割った値に所定時限(例えば、30分間)を乗じて得られる値である。つまり、第2の電力量の予測値は、まだ所定時限の終期に至っていない第2の電力量の予測値である。
 また、演算部126は、演算部126によって算出された第1の電力量、第1の電力量の時間変化、第2の電力量、第2の電力量の過去のピーク値、および第2の電力量の予測値などを記憶部134に渡し、その他後述する第1の閾値および第2の閾値などともに記憶させる。
 充放電指示部120は、第1の電力量の時間変化、および第2の電力量についての過去のピーク値(最大値)に応じて、需要家における負荷108への給電を行うよう蓄電池100に放電を指示する。充放電指示部120は、演算部126から、現在時刻までに算出された第2の電力量を受け取り、第2の電力量(デマンド監視装置24によって監視される積算電力量)を監視する。
 充放電指示部120は、現在時刻が属する所定時限において第1の電力量の時間変化に基づいて、例えば第1の電力量の差分値または微分値が正の値となった後に極小となることを検出することで、その所定時限でピーク電力(過去のピーク値を超える可能性のある電力)が生じ得ることを把握する。充放電指示部120は、後述するように第2の電力量についての過去のピーク値を考慮しながら、第1の電力量の差分値または微分値が正の値となった後に極小となることを検出して、需要家における負荷108への給電を行うよう蓄電池100に放電を指示できる。そのため、系統104からのピーク電力を高精度に抑制でき、蓄電池100を高効率に充放電できる。
 なお、ここでの極小とは、正の値からゼロまたは負の値への変化点であることを意味する。また、極小はゼロであるとは限らない。特に演算部126は第1の電力量について単位時間ごとにしか測定していないため、第1の電力量の差分値としてゼロが検出されるのは2回連続して第1の電力量が全く同じとなる場合だけであり、このようなケースは非常に稀なものとなる。したがって例えば、第1の電力量の差分値が“+4kWh”、“+1kWh”、“-3kWh”のようにゼロを検出することなく変化する場合が多々発生すると考えられるが、このような場合には充放電指示部120は負の値である“-3kWh”を極小であると判定する。あるいは、充放電指示部120は、第1の電力量の差分値または微分値が、ゼロに近い正の値である所定の基準値(例えば“+2kWh”)以下まで変化したときに極小であると判定してもよい。具体的には、充放電指示部120は、第1の電力量の差分値または微分値が、当該基準値を超える値から、ゼロ以上基準値以下の範囲内となったときに極小であると判定する。好適には充放電指示部120は、第1の電力量の差分値または微分値が、当該基準値を超える値から当該範囲内となった後、所定回数連続してまたは所定時間に亘って当該範囲内に収まっているときに極小であると判定する。
 充放電指示部120は、第1の電力量の差分値または微分値が正の値となった後に極小となったときに、蓄電池100に、負荷108への放電の開始を指示してもよい。このとき、制御装置102は、系統104から買い入れる電力を適切なタイミングで抑制することができるようになる。そのため、制御装置102は、第2の電力量についての過去のピーク値を上回る電力量が発生してしまうことを極力回避することができるようになる。また、仮に過去のピーク値を上回る電力量が発生してピーク値が更新されるとしても、制御装置102は、その増加分を抑制することができる。
 好適には、充放電指示部120は、第1の電力量の差分値または微分値が正の値となった後に極小となったときに、第2の電力量の予測値と第1の閾値とを比較する。そして充放電指示部120は、第2の電力量の予測値が第1の閾値を上回っている場合に、蓄電池100に、負荷108への放電の開始を指示してもよい。制御装置102は、第1の閾値を設定することで、不要な放電を減らし、蓄電池100の充放電をさらに高効率に行うことができる。このとき、充放電指示部120は、第2の電力量の予測値が第1の閾値を下回っている場合には蓄電池100に放電の指示を行わない。例えば、後述するように第1の閾値を第2の電力量の過去のピーク値に基づいて定める場合には、第2の電力量がピーク値を超えるおそれ(契約電力が更新されるおそれ)があるときにだけ、充放電指示部120は蓄電池100に放電の指示をすることができる。そのため、放電の指示の前に蓄電池100の電力が不足するような事態を避けられる。
 また、充放電指示部120は、第2の電力量についての過去のピーク値を記憶部134から取得する。ここで、第2の電力量についての過去のピーク値が更新されるときには、充放電指示部120が更新後の過去のピーク値を記憶部134に記録してもよい。
 第1の閾値は、第2の電力量についての過去のピーク値に応じて定められてもよい。第1の閾値は過去のピーク値そのものでもよいが、若干余裕を持たせ、過去のピーク値よりも少し低い値であることが好ましい。例えば、制御装置102は、過去のピーク値から所定の値を減じて第1の閾値を設定して、記憶部134に記憶させてもよい。過去のピーク値が更新されるときには、更新後のピーク値に連動して新たな第1の閾値が定められることになる。この構成によって、制御装置102は、現状に合わせた柔軟な蓄電池100の放電の制御が可能である。
 また、充放電指示部120は、記憶部134から取得した第2の電力量の過去のピーク値に基づいて、現在時刻が属する所定時限における最終的な第2の電力量が過去のピーク値を超えないように、蓄電池100に、負荷108への放電を指示してもよい。このとき、制御装置102は、蓄電池100が放電する電力を第2の電力量の過去のピーク値と対応させて調整できるので、さらに契約電力の更新がされにくいように制御可能である。
 また、充放電指示部120は、第2の電力量の予測値と第2の閾値とを比較する。充放電指示部120は第2の電力量の予測値が第2の閾値未満であると判定したとき、蓄電池100への充電を行うよう指示してもよい。第2の閾値を設定することによって、制御装置102は蓄電池100に充電するタイミングを制御できる。ここで、第2の閾値は第1の閾値以下に設定される。第2の閾値が第1の閾値と等しいときには、蓄電池100に放電が指示されないときに充電が積極的に実行される。また、第2の閾値も第2の電力量の過去のピーク値に基づいて設定されてもよい。例えば、制御装置102は、第2の電力量の過去のピーク値から所定の値を減じて第2の閾値を設定して、記憶部134に記憶させてもよい。
 ここで、充放電指示部120は、気温判定部128が外気温を第1の温度以上、または第1の温度よりも低い第2の温度未満と判定したときに前記の制御を実行してもよい。外気温が第1の温度(例えば25℃)以上である場合には、高温であるために負荷108の消費電力が大きくなる可能性がある。また、外気温が第2の温度(例えば10℃)未満である場合には、低温であるために負荷108の消費電力が大きくなる可能性がある。負荷108の消費電力が大きくなる可能性があるときに、前記の制御を効果的に実行することができる。
 次に、制御装置102による蓄電池100の充電および放電の制御について詳細に説明する。図2は、系統104からの電力を説明するための概略図である。図2は、ある1日の複数の第2の電力量を棒グラフで示している。図2の例では、前記の制御装置102による蓄電池100への充電の指示も、放電の指示もされていないときの第2の電力量PPaが示されている。
 図2において、第2の電力量についての過去のピーク値(以下、ピーク値P0a)は契約電力に基づく40kWhである。また、第1の閾値TH1と第2の閾値TH2とは35kWhに設定されている。10:30~17:00の区間Rxにおいて、第2の電力量PPaは3回の極大をとり、極大P1、P2における第2の電力量PPaは第1の閾値TH1以上であり、極大Pxにおける第2の電力量PPaは第1の閾値TH1未満である。
 図3は、ピーク電力を抑制するための蓄電池100の充電、放電の例を説明する図である。図3は図2の区間Rxに対応する部分を拡大表示したものである。図3の例では、気温判定部128は、温度センサ103によって検出された外気温が第1の温度以上であると判定し、充放電指示部120が蓄電池100に充電、放電の指示を行っている。そのため、図3では、図2とは異なり、放電量PDa、充電量PCaが示されている。つまり、図3における第2の電力量PPaは、蓄電池100からの放電量PDaの分だけ抑制されて、蓄電池100への充電量PCaの分だけ上昇する。
 まず、図3の例における放電について説明する。前記のように、充放電指示部120は、第1の電力量PMaの差分値または微分値が正の値となった後に極小となることを検出する。ここで、図3(および図5)では、見やすくするために、第1の電力量PMaは棒グラフではなく曲線で表している。
 図3の例では、充放電指示部120は、第1の電力量PMaの差分値または微分値が正の値となった後に極小となったときのタイミングである時刻Ta、時刻Tcで蓄電池100に負荷108への放電の指示を開始する。その結果、図3の極大P1、P2において、放電量PDaの分だけ第2の電力量PPaが抑制される。なお、充放電指示部120は、放電開始を指示する時限(この例では11:30~12:00、および16:00~16:30)における第2の電力量がピーク値P0aを超えないように放電量PDaも調整する。
 図3の例では、充放電指示部120は、極大のタイミングだけでなく、第2の電力量PPaの予測値が第1の閾値TH1以上であることも放電の条件としている。そのため、充放電指示部120は、極大Pxのタイミングで放電しない。つまり、制御装置102は、第2の電力量が過去のピーク値を超えるおそれ(契約電力が更新されるおそれ)がないときは、第1の電力量の差分値または微分値が正の値となった後に極小となったときであっても放電を行わない。第2の電力量PPaの予測値が第1の閾値TH1以上であることを放電の条件とすることで、不要な放電を減らすことができる。
 充放電指示部120は、時刻Taで負荷108への放電の指示を開始して、第1の電力量の差分値または微分値が負の規定値となった時刻Tbまで放電をしている。また、充放電指示部120は、時刻Tcで負荷108への放電の指示を開始して、第1の電力量の差分値または微分値が負の規定値となった時刻Tdまで放電をしている。図3の例では、負の規定値とは第1の電力量の差分であり、例えば“-1kWh”といった値でもよい。ここで、負の規定値として絶対値の大きな値を選択すると負荷108への放電期間が長くなる。例えば、負の規定値を“-1kWh”から“-1.5kWh”に変更すると、放電期間が延びる。したがって、選択する規定値によって負荷108への放電期間を調整できる。
 ここで、別の実施形態として、所定時限の境界の時間(すなわち、次の所定時限の始期)において、充放電指示部120は、負荷108への放電を停止させてもよい。図3の例を用いて説明すると、充放電指示部120は、時刻Taで負荷108への放電の指示を開始して、所定時限の境界の時間である時刻Teで放電を停止する。このとき、制御装置102は、新たな所定時限の監視を開始すると蓄電池100への充電または放電を停止させるので、所定時限を単位として充放電を管理できる。この別の実施形態では、充放電の制御が簡単になるため、制御装置102の演算処理等の負担が軽減される。
 次に、本実施形態における充電の制御について、図3を参照して説明する。充放電指示部120は、第2の電力量PPaの予測値が第2の閾値TH2未満であると判定したとき、蓄電池100に充電を指示する。図3の例では、10:30~11:00、12:30~13:30、14:00~15:30、16:30~17:00において、充放電指示部120は、蓄電池100に充電を指示する。充放電指示部120が、第2の電力量PPaの予測値が第2の閾値TH2未満であるときに積極的に充電を指示することで、放電を指示するときに蓄電池100の電力が不足する事態を避けられる。
 このように、充放電指示部120が蓄電池100に放電の指示をすることで、第1の電力量の差分値または微分値が正の値となった後に極小となるタイミング(図3の例では極大P1、P2)でピーク電力を抑制することができる。仮に、充放電指示部120が蓄電池100に放電の指示をしないとき、第2の電力量PPaは、極大P2において極大値PN0をとる。しかし、充放電指示部120が蓄電池100に放電の指示をすることで、第2の電力量PPaは最大でも極大値PN1に収まる。ここで、極大値PN1は極大値PN0に比べて小さい。前記のように、契約電力は、過去の1年の所定時限毎に平均化した電力の最高値によって定められる。よって、充放電指示部120が、このようにピーク電力を抑制することで、需要家の経済性の要求を満たすことができる。
 図4は、制御装置102の具体的な動作手順例を示すフローチャートである。図4の手順は、例えば第1の電力量の単位時間に合わせて1分ごとに実行される。
 まず、制御装置102は、外気温に関する情報、具体的には温度センサ103が検出した外気温のデータを受け取る(ステップS2)。制御装置102の気温判定部128は、温度センサ103が検出した外気温が第1の温度以上、または第2の温度未満であるか否かを判定する(ステップS4)。ここで、第2の温度は第1の温度よりも低い温度である。
 気温判定部128が、外気温が第2の温度以上かつ第1の温度未満であると判定したときには(ステップS4のNo)、以下に説明する充放電指示部120による蓄電池100の充放電の制御は実行されない。つまり、第2の電力量が過去のピーク値を超える程度に負荷108の消費電力が大きくなる可能性はないと判定されるので、充放電指示部120は動作を停止してもよい。このとき、蓄電池100は、従来技術によって充電および放電が指示されてもよい。従来技術としては、例えば昼間の所定の時間に放電を実行し、夜間の所定の時間に充電する技術が挙げられる。
 気温判定部128が、外気温が第1の温度以上、または第2の温度未満と判定したときには(ステップS4のYes)、制御装置102は、充放電指示部120が動作させて、以下の制御を行う。
 制御装置102は、第1の電力量を受け取り(ステップS6)、第2の電力量を受け取り(ステップS8)、演算部126によって第1の電力量の差分値または微分値を求める(ステップS10)。ステップS6、ステップS8、ステップS10は、それぞれ本発明の第1の監視ステップ、第2の監視ステップ、演算ステップに対応する。また、以下に説明する充放電指示部120が蓄電池100に充放電の指示を行うステップは、本発明の指示ステップに対応する。
 充放電指示部120は、蓄電池100に放電指示をして(ステップS12のYes)、第1の電力量の差分値または微分値が負の規定値未満であるならば(ステップS14のYes)、蓄電池100の放電を停止する(ステップS16)。
 ステップS16の後、蓄電池100に放電指示がないとき(ステップS12のNo)、または第1の電力量の差分値または微分値が負の規定値未満でないとき(ステップS14のNo)、充放電指示部120は、第2の電力量の予測値が第2の閾値未満であるか否かを判定する(ステップS18)。充放電指示部120は、第2の電力量の予測値が第2の閾値未満であると判定したときには(ステップS18のYes)、蓄電池100への充電を指示する(ステップS20)。前記のように、放電を指示するときに蓄電池100の電力が不足する事態を避けるために、充放電指示部120は第2の電力量の予測値が第2の閾値TH2未満であるときには積極的に充電を指示する。
 ステップS20の後、または第2の電力量の予測値が第2の閾値以上であると判定したときには(ステップS18のNo)、充放電指示部120は第2の電力量の予測値が第1の閾値以上か否かを判定する(ステップS22)。充放電指示部120は、第2の電力量が第1の閾値以上であり(ステップS22のYes)、第1の電力量の差分値または微分値が正の値となった後に極小となったときは(ステップS24のYes)、蓄電池100に放電開始を指示する(ステップS26)。
 ステップS26の後、第2の電力量の予測値が第1の閾値未満であると判定したとき(ステップS22のNo)、または第1の電力量の差分値または微分値が正の値となった後に極小となっていないとき(ステップS24のNo)には、制御装置102は一連の処理を終了する。
 以上のような構成の本実施形態の制御装置102によれば、第2の電力量についての過去のピーク値を考慮しつつ、第1の電力量の差分値または微分値が正の値となった後に極小となるタイミングで需要家における負荷108への給電を行うよう蓄電池100に放電を指示できる。そのため、系統104からのピーク電力を高精度に抑制でき、蓄電池を高効率に充放電できる。
(第2実施形態)
 以下、本発明の第2実施形態に係る制御装置について説明する。本実施形態に係る制御装置の構成は第1実施形態に係る制御装置と同じであり(図1参照)、説明を省略する。図5は、本実施形態に係る制御装置による、ピーク電力を抑制するための蓄電池の充電、放電の例を説明する図である。第1実施形態の例(図3参照)とは異なり、図5の例では充放電指示部120は、極大のタイミングよりも前で蓄電池100の放電を指示する。また、図5において図3と同じ要素には同じ符号を付しており説明を省略する。
 まず、図5の例における放電について説明する。第1実施形態と同じように、充放電指示部120は、演算部126から第1の電力量の差分値または微分値を受け取る。充放電指示部120は、第1の電力量の差分値または微分値が正の規定値から負の規定値まで変化する期間に、蓄電池100に負荷108への放電を指示する。ここで、正の規定値は負の規定値と符号が異なる値である。例えば、正の規定値は“+1kWh”であり、負の規定値は“-1kWh”である。第1実施形態と同じように、これらの規定値の設定によって蓄電池100が放電する時間を調整可能である。
 図5の例において、充放電指示部120は、時刻Txで負荷108への放電の指示を開始して、時刻Tyまで放電をしている。また、充放電指示部120は、時刻Tzで負荷108への放電の指示を開始して、時刻Twまで放電をしている。図5の例では、第1実施形態とは異なり、第1の電力量の差分値または微分値が極小となるよりも前のタイミング(時刻Tx、Tz)で負荷108への放電の指示を開始する。そのため、極大P1、P2よりも前のタイミングからピーク電力を抑制することができる。第1実施形態の例(図3参照)では、この区間における最大値は極大値PN1であったが、図5の例ではさらに極大値PN2(<極大値PN1)まで最大値を抑制できる。
 次に、図5の例における充電について説明する。充放電指示部120は、第1実施形態と同じように、第2の電力量PPaの予測値が第2の閾値TH2未満であると判定したとき、蓄電池100に充電を指示する。ここで、図5の例では、第2の閾値TH2を第1の閾値TH1よりも小さな値としているため、瞬間的な第2の電力量PPaの変動によって、充放電指示部120からの充電指示と放電指示とが頻繁に切り替わることを防止できる。
 図6は、本実施形態に係る制御装置102の具体的な動作手順例を示すフローチャートである。図6において、図4と同じステップには同じ符号を付しており説明を省略する。例えば、図6のステップS2、S4、S6、S8、S10については、図4の同じ符号のステップと同じであり説明を省略する。
 ステップS10の後、制御装置102は、第2の電力量の予測値が第2の閾値未満か否かの判定(ステップS18)、蓄電池100への充電指示(ステップS20)、第2の電力量の予測値が第1の閾値以上か否かの判定(ステップS22)を実行する。これらのステップは、図4の同じ符号のステップと同じであり説明を省略する。
 充放電指示部120は、第2の電力量の予測値が第1の閾値以上であり(ステップS22のYes)、第1の電力量の差分値または微分値が所定の範囲内ならば(ステップS30のYes)、蓄電池100に放電開始を指示するか、すでに放電指示をしていれば放電状態を維持する(ステップS32)。ここで、第1の電力量の差分値または微分値が所定の範囲内であるとは、第1の電力量の差分値または微分値が正の規定値から負の規定値までに含まれる状態をいう。図5の例では、第1の電力量の差分値または微分値が正の規定値である“+1kWh”から負の規定値である“-1kWh”に含まれるときに、充放電指示部120は蓄電池100に放電させる。
 充放電指示部120は、第1の電力量の差分値または微分値が所定の範囲内でなく(ステップS30のNo)、蓄電池100に放電指示をしているならば(ステップS34のYes)、蓄電池100への放電指示を停止する(ステップS36)。ステップS32の後、ステップS36の後、または蓄電池100に放電指示をしていないならば(ステップS34のNo)、制御装置102は一連の処理を終了する。
 以上のように、第2実施形態の制御装置102は、第1実施形態と同様に蓄電池100の充放電を高効率に行うことができ、第1実施形態よりも、さらにピーク電力を抑制できる可能性がある。
 本発明を図面および実施形態に基づき説明してきたが、当業者であれば本開示に基づき種々の変形または修正を行うことが容易であることに注意されたい。したがって、これらの変形または修正は本発明の範囲に含まれることに留意されたい。例えば、各ブロック、各ステップなどに含まれる機能などは論理的に矛盾しないように再配置可能であり、複数のブロックまたは複数のステップなどを1つに組み合わせたり、あるいは分割したりすることが可能である。
 例えば、制御装置102は、電圧センサ101からの検知結果を蓄電池100への充電、放電の指示に用いてもよい。例えば、充放電指示部120は、蓄電池100の電圧が第1の閾値電圧未満であると判定したときに充電を指示してもよいし、蓄電池100の電圧が第2の閾値電圧以上であると判定したときに放電を指示してもよい。
 また、例えば制御装置102の充放電指示部120は、第1の電力量の差分値または微分値が大きく、第2の電力量が契約電力に基づく過去のピーク値を超過すると予測される場合には、蓄電池100への放電を指示してもよい。
 10   電力供給システム
 24   デマンド監視装置
 25   電力量計
 100  蓄電池
 101  電圧センサ
 102  制御装置
 103  温度センサ
 104  系統
 108  負荷
 120  充放電指示部
 122  変換器
 126  演算部
 128  気温判定部
 134  記憶部

Claims (10)

  1.  系統からの電力供給を受ける需要家に設けられた蓄電池の制御方法であって、
     所定時限よりも短い単位時間ごとの、前記系統から供給される第1の電力量を監視する第1の監視ステップと、
     前記所定時限ごとの、前記系統から供給される第2の電力量を監視する第2の監視ステップと、
     前記第1の電力量の時間変化を求める演算ステップと、
     前記第1の電力量の時間変化、および前記第2の電力量についての過去のピーク値に応じて、前記需要家における負荷への給電を行うよう前記蓄電池に放電を指示する指示ステップと、を含む制御方法。
  2.  前記指示ステップは、
     前記第1の電力量の時間変化に基づいて、前記第1の電力量の差分値または微分値が、正の値となった後にゼロもしくは負の値となったときに、または、所定の基準値を超える値からゼロ以上前記基準値以下の範囲内となったときに、前記蓄電池に放電の開始を指示する、請求項1に記載の制御方法。
  3.  前記指示ステップは、
     現在時刻が属する時限の始期から現在時刻までの第1の電力量に基づいて算出される第2の電力量の予測値が第1の閾値を上回っている場合には前記蓄電池に放電の開始を指示し、前記予測値が前記第1の閾値を下回っている場合には前記蓄電池に放電の指示を行わない、請求項2に記載の制御方法。
  4.  前記第1の閾値は前記ピーク値に応じて変動する、請求項3に記載の制御方法。
  5.  前記指示ステップは、
     前記蓄電池に放電開始を指示する場合には、現在時刻が属する時限における第2の電力量が前記ピーク値を超えないように、前記蓄電池の放電を指示する、請求項2から4のいずれか一項に記載の制御方法。
  6.  前記指示ステップは、
     現在時刻が属する時限の始期から現在時刻までの第1の電力量に基づいて算出される第2の電力量の予測値が、第2の閾値未満であると判定したとき、前記蓄電池への充電を行うよう指示する、請求項1から5のいずれか一項に記載の制御方法。
  7.  前記指示ステップは、
     前記蓄電池の充電または放電を行っている状態で、前記第2の監視ステップにおいて新たな所定時限の監視が開始されると、前記蓄電池への充電または放電を停止する、請求項1から6のいずれか1項に記載の制御方法。
  8.  前記指示ステップは、
     前記需要家の外気温が第1の温度以上、または前記第1の温度よりも低い第2の温度未満と判定される場合に実行される、請求項1から7のいずれか1項に記載の制御方法。
  9.  前記指示ステップは、
     前記第1の電力量の時間変化に基づいて、第1の電力量の差分値または微分値が正の規定値から負の規定値まで変化する期間に、前記蓄電池に放電を行わせる、請求項1に記載の制御方法。
  10.  系統からの電力供給を受ける需要家に設けられた蓄電池を制御する制御装置であって、
     所定時限よりも短い単位時間ごとの、前記系統から供給される第1の電力量の時間変化を求める演算部と、
     前記第1の電力量の時間変化、および、前記所定時限ごとの、前記系統から供給される第2の電力量についての過去のピーク値に応じて、前記需要家における負荷への給電を行うよう前記蓄電池に放電を指示する充放電指示部と、を備える制御装置。
PCT/JP2015/002252 2014-04-24 2015-04-24 制御方法および制御装置 WO2015162941A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2016514730A JP6317431B2 (ja) 2014-04-24 2015-04-24 制御方法および制御装置
EP15783548.9A EP3136533B1 (en) 2014-04-24 2015-04-24 Control method and control device
US15/306,476 US10348087B2 (en) 2014-04-24 2015-04-24 Control method and control device

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2014-090561 2014-04-24
JP2014090561 2014-04-24

Publications (1)

Publication Number Publication Date
WO2015162941A1 true WO2015162941A1 (ja) 2015-10-29

Family

ID=54332115

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/002252 WO2015162941A1 (ja) 2014-04-24 2015-04-24 制御方法および制御装置

Country Status (4)

Country Link
US (1) US10348087B2 (ja)
EP (1) EP3136533B1 (ja)
JP (1) JP6317431B2 (ja)
WO (1) WO2015162941A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024070016A1 (ja) * 2022-09-29 2024-04-04 株式会社日立ハイテク 充電計画作成方法、充電計画作成装置及び充電計画提供システム

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112787356A (zh) * 2019-11-11 2021-05-11 阿里巴巴集团控股有限公司 放电装置、系统、方法及存储介质

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000152489A (ja) * 1998-11-06 2000-05-30 Toshiba Corp 電力動揺検出装置およびコンピュータが読取り可能な記憶媒体
JP2006158146A (ja) * 2004-12-01 2006-06-15 Toko Electric Corp 電力用供給管理システム
JP2008259402A (ja) * 2007-03-09 2008-10-23 Sanyo Electric Co Ltd デマンド制御システム、デマンドコントローラ、デマンドプログラム及びデマンド制御方法
WO2013038483A1 (ja) * 2011-09-13 2013-03-21 東芝三菱電機産業システム株式会社 ピークカットシステム

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6870279B2 (en) * 1998-01-05 2005-03-22 Capstone Turbine Corporation Method and system for control of turbogenerator power and temperature
CN101877487B (zh) * 2009-04-30 2013-04-10 比亚迪股份有限公司 一种用于平衡电网负荷的电池储能电站和方法
US8478452B2 (en) * 2010-04-06 2013-07-02 Battelle Memorial Institute Grid regulation services for energy storage devices based on grid frequency
JP2013165534A (ja) 2010-06-03 2013-08-22 Sanyo Electric Co Ltd 給電制御装置
WO2012127595A1 (ja) * 2011-03-18 2012-09-27 富士通株式会社 電力平準化制御装置、電力平準化蓄電装置、電力平準化制御方法、及び平準化プログラム
US8774976B2 (en) * 2012-05-31 2014-07-08 Sharp Laboratories Of America, Inc. Method and system for reducing peak load charge on utility bill using target peak load and countermeasures
US20160111920A1 (en) * 2013-03-19 2016-04-21 Electricite De France Energy management device and its associated method
GB2514092B (en) * 2013-03-21 2017-11-29 Powervault Ltd Electrical energy storage device and system
WO2015054869A1 (zh) * 2013-10-17 2015-04-23 国网新源张家口风光储示范电站有限公司 一种兆瓦级电池储能电站的监控系统及其方法
US10747289B2 (en) * 2013-10-28 2020-08-18 Virtual Power Systems, Inc. Data center power manipulation
US9956027B2 (en) * 2014-06-11 2018-05-01 Encision Inc. Device and method for detecting faults in a shielded instrument

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000152489A (ja) * 1998-11-06 2000-05-30 Toshiba Corp 電力動揺検出装置およびコンピュータが読取り可能な記憶媒体
JP2006158146A (ja) * 2004-12-01 2006-06-15 Toko Electric Corp 電力用供給管理システム
JP2008259402A (ja) * 2007-03-09 2008-10-23 Sanyo Electric Co Ltd デマンド制御システム、デマンドコントローラ、デマンドプログラム及びデマンド制御方法
WO2013038483A1 (ja) * 2011-09-13 2013-03-21 東芝三菱電機産業システム株式会社 ピークカットシステム

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024070016A1 (ja) * 2022-09-29 2024-04-04 株式会社日立ハイテク 充電計画作成方法、充電計画作成装置及び充電計画提供システム

Also Published As

Publication number Publication date
JPWO2015162941A1 (ja) 2017-04-13
EP3136533B1 (en) 2019-11-13
US10348087B2 (en) 2019-07-09
EP3136533A1 (en) 2017-03-01
US20170047736A1 (en) 2017-02-16
EP3136533A4 (en) 2017-12-20
JP6317431B2 (ja) 2018-04-25

Similar Documents

Publication Publication Date Title
JP5372724B2 (ja) 自然エネルギを用いた発電システム
US10135248B2 (en) Control apparatus, control system, control method, and recording medium for controlling devices to charge or discharge electricity storage apparatus
WO2015064641A1 (ja) 電力制御システム、電力制御方法および記録媒体
JP6302197B2 (ja) 電力需給制御装置及び電力需給制御方法
JP6033438B2 (ja) 電力制御システム
JP2013207933A (ja) 制御装置、制御システム、及び制御方法
JP6386064B2 (ja) 電力管理装置、電力管理方法及び電力管理システム
JP6317431B2 (ja) 制御方法および制御装置
JP6188523B2 (ja) 分散型電源システム
JP2019047612A (ja) 太陽光発電装置および太陽光発電装置の制御方法
JP5721498B2 (ja) デマンドコントロール装置
JP5587941B2 (ja) 無停電電源装置及び無停電電源供給方法
JP6183758B2 (ja) 電力制御装置及びそれを用いた電力供給システム、並びに電力制御方法
JP6447093B2 (ja) 電力管理システム
US20190103756A1 (en) Power storage system, apparatus and method for controlling charge and discharge, and program
JP6261722B2 (ja) 充放電制御システム、制御装置、充放電制御方法、及び、プログラム
JP6359948B2 (ja) 蓄電装置及び蓄電装置の制御方法
JP2019030162A (ja) 分散型電源システム
JP2019030161A (ja) 分散型電源システム
JP7173139B2 (ja) 系統連系用蓄電システム及び蓄電ユニット
JP2014002425A (ja) 電力供給システム
JP5939938B2 (ja) 電力供給システム
WO2015198678A1 (ja) 電力供給システムおよびコントローラ
JP6161646B2 (ja) 制御装置、制御システム、制御方法及びプログラム
JP6314603B2 (ja) 電動車両の充電装置及び方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15783548

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2016514730

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

REEP Request for entry into the european phase

Ref document number: 2015783548

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 15306476

Country of ref document: US

Ref document number: 2015783548

Country of ref document: EP