WO2014057724A1 - ショベル及びショベルの制御方法 - Google Patents

ショベル及びショベルの制御方法 Download PDF

Info

Publication number
WO2014057724A1
WO2014057724A1 PCT/JP2013/070086 JP2013070086W WO2014057724A1 WO 2014057724 A1 WO2014057724 A1 WO 2014057724A1 JP 2013070086 W JP2013070086 W JP 2013070086W WO 2014057724 A1 WO2014057724 A1 WO 2014057724A1
Authority
WO
WIPO (PCT)
Prior art keywords
equalization
circuit
circuit protection
switch
voltage
Prior art date
Application number
PCT/JP2013/070086
Other languages
English (en)
French (fr)
Inventor
竹尾 実高
誠 柳澤
Original Assignee
住友建機株式会社
住友重機械工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 住友建機株式会社, 住友重機械工業株式会社 filed Critical 住友建機株式会社
Priority to EP13845151.3A priority Critical patent/EP2908401B1/en
Priority to KR1020157009337A priority patent/KR102073677B1/ko
Priority to CN201380053238.4A priority patent/CN104718681B/zh
Priority to JP2014540771A priority patent/JP6290092B2/ja
Publication of WO2014057724A1 publication Critical patent/WO2014057724A1/ja
Priority to US14/678,100 priority patent/US9982416B2/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L3/00Electric devices on electrically-propelled vehicles for safety purposes; Monitoring operating variables, e.g. speed, deceleration or energy consumption
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L3/00Electric devices on electrically-propelled vehicles for safety purposes; Monitoring operating variables, e.g. speed, deceleration or energy consumption
    • B60L3/04Cutting off the power supply under fault conditions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/12Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries responding to state of charge [SoC]
    • B60L58/13Maintaining the SoC within a determined range
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/12Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries responding to state of charge [SoC]
    • B60L58/14Preventing excessive discharging
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/18Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries of two or more battery modules
    • B60L58/22Balancing the charge of battery modules
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/30Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with a dipper-arm pivoted on a cantilever beam, i.e. boom
    • E02F3/32Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with a dipper-arm pivoted on a cantilever beam, i.e. boom working downwardly and towards the machine, e.g. with backhoes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/2058Electric or electro-mechanical or mechanical control devices of vehicle sub-units
    • E02F9/2091Control of energy storage means for electrical energy, e.g. battery or capacitors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices
    • E02F9/267Diagnosing or detecting failure of vehicles
    • E02F9/268Diagnosing or detecting failure of vehicles with failure correction follow-up actions
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0013Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries acting upon several batteries simultaneously or sequentially
    • H02J7/0014Circuits for equalisation of charge between batteries
    • H02J7/0018Circuits for equalisation of charge between batteries using separate charge circuits
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • H02J7/342The other DC source being a battery actively interacting with the first one, i.e. battery to battery charging
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2200/00Type of vehicles
    • B60L2200/40Working vehicles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2210/00Converter types
    • B60L2210/10DC to DC converters
    • B60L2210/12Buck converters
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2210/00Converter types
    • B60L2210/10DC to DC converters
    • B60L2210/14Boost converters
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/40Drive Train control parameters
    • B60L2240/54Drive Train control parameters related to batteries
    • B60L2240/547Voltage
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/80Time limits
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • H02J7/345Parallel operation in networks using both storage and other dc sources, e.g. providing buffering using capacitors as storage or buffering devices
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/72Electric energy management in electromobility
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10STECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10S903/00Hybrid electric vehicles, HEVS
    • Y10S903/902Prime movers comprising electrical and internal combustion motors
    • Y10S903/903Prime movers comprising electrical and internal combustion motors having energy storing means, e.g. battery, capacitor

Definitions

  • the present invention relates to a shovel having a power storage device configured by a plurality of power storage cells that charge electricity generated by a generator, and an equalization circuit connected to each of the plurality of power storage cells, and a method for controlling the shovel.
  • an equalization circuit as described in Patent Document 1 performs equalization for cells whose interelectrode voltage is equal to or higher than a predetermined value at a certain point in time. That is, cells having an interelectrode voltage equal to or higher than a predetermined value are forcibly discharged, and the interelectrode voltages of a plurality of cells are equalized so that the interelectrode voltage becomes a predetermined value.
  • An excavator includes a capacitor composed of a plurality of storage cells that charge electricity generated by a generator, and a balance switch and a circuit protection switch connected to each of the plurality of storage cells. And an equalization control unit for outputting a balance control signal for switching off / on of the balance switch, and a circuit protection signal for shutting off the circuit protection switch.
  • the excavator control method includes a power storage device including a plurality of power storage cells that charge electricity generated by a power generator, and a balance switch connected to each of the plurality of power storage cells.
  • an equalization circuit including a circuit protection switch, a step of outputting a balance control signal for switching between cutoff and conduction of the balance switch, and a circuit for cutting off the circuit protection switch Outputting a protection signal.
  • the above-described means provides an excavator and a shovel control method for preventing a cell corresponding to the equalization circuit from being overdischarged even when an abnormality occurs in the equalization circuit.
  • FIG. 1 is a side view of an excavator according to an embodiment.
  • the shovel shown in FIG. 1 is a hybrid excavator
  • the present invention is not limited to the hybrid excavator, and can be applied to any type of excavator as long as it has a capacitor as a power source for driving an electric load. be able to.
  • an upper swing body 3 is mounted on a lower traveling body 1 of a hybrid excavator via a swing mechanism 2.
  • the upper swing body 3 is provided with a boom 4, an arm 5 and a bucket 6, and a boom cylinder 7, an arm cylinder 8 and a bucket cylinder 9 for hydraulically driving them.
  • the upper swing body 3 is equipped with a cabin 10 and a power source.
  • FIG. 2 is a block diagram showing the configuration of the drive system of the hybrid excavator.
  • the mechanical power system is indicated by a double line
  • the high-pressure hydraulic line is indicated by a solid line
  • the pilot line is indicated by a broken line
  • the electric drive / control system is indicated by a one-dot chain line.
  • the engine 11 as the mechanical drive unit and the motor generator 12 as the assist drive unit are both connected to the input shaft of the transmission 13.
  • a main pump 14 and a pilot pump 15 are connected to the output shaft of the transmission 13.
  • a control valve 17 is connected to the main pump 14 via a high pressure hydraulic line 16.
  • the control valve 17 is a hydraulic control device that controls the hydraulic system. Connected to the control valve 17 are hydraulic motors 1A (for right) and 1B (for left), a boom cylinder 7, an arm cylinder 8, and a bucket cylinder 9 for the lower traveling body 1 via a high-pressure hydraulic line.
  • the motor generator 12 is connected to a power storage device 120 including a power storage capacitor or battery via an inverter 18.
  • the power storage device 120 includes a capacitor 19 such as a lithium ion capacitor (Lithium-Ion-Capacitor (LIC)) or an electric double-layer capacitor (Electric Double-Layer Capacitor (EDLC)) as a capacitor.
  • a turning electric motor 21 is connected to the power storage device 120 via an inverter 20.
  • the capacitor 19 is shown as an example of the capacitor.
  • a rechargeable secondary battery such as a lithium ion battery (Lithium Ion Battery (LIB)), or any other device capable of transmitting and receiving power.
  • a power source of the form may be used as a capacitor.
  • a resolver 22, a mechanical brake 23, and a turning speed reducer 24 are connected to the rotating shaft 21A of the turning electric motor 21.
  • An operation device 26 is connected to the pilot pump 15 through a pilot line 25.
  • the control device 17 and a pressure sensor 29 as a lever operation detection unit are connected to the operation device 26 via hydraulic lines 27 and 28, respectively.
  • the pressure sensor 29 is connected to a controller 30 that performs electric system drive control.
  • the inverter 18 is provided between the motor generator 12 and the power storage device 120 as described above, and controls the operation of the motor generator 12 based on a command from the controller 30. Thus, when the inverter 18 controls the power running of the motor generator 12, the necessary power is supplied from the power storage device 120 to the motor generator 12. In addition, when the regeneration of the motor generator 12 is being operated and controlled, the electric power generated by the motor generator 12 is stored in the capacitor 19 of the power storage device 120.
  • the power storage device 120 is disposed between the inverter 18 and the inverter 20. Thereby, when at least one of the motor generator 12 and the turning electric motor 21 is performing a power running operation, the power storage device 120 supplies electric power necessary for the power running operation. In addition, when at least one of them is performing a regenerative operation, the power storage device 120 accumulates regenerative power generated by the regenerative operation as electric energy.
  • the inverter 20 is provided between the turning electric motor 21 and the power storage device 120 as described above, and performs operation control on the turning electric motor 21 based on a command from the controller 30.
  • the inverter controls the power running of the turning electric motor 21, necessary electric power is supplied from the power storage device 120 to the turning electric motor 21.
  • the turning electric motor 21 is performing a regenerative operation, the electric power generated by the turning electric motor 21 is stored in the capacitor 19 of the power storage device 120.
  • the charge / discharge control of the capacitor 19 of the power storage device 120 is performed in the charged state of the capacitor 19, the operating state of the motor generator 12 (powering operation or regenerative operation), and the operating state of the turning motor 21 (powering operation or regenerative operation). Based on the controller 30.
  • the controller 30 is a control device that performs drive control of the shovel, and includes a drive control device 32, an electric turning control device 40, and a main control unit 60.
  • the controller 30 includes a processing unit including a CPU (Central Processing Unit) and an internal memory.
  • the drive control device 32, the electric turning control device 40, and the main control unit 60 are devices that are realized when the CPU of the controller 30 executes a drive control program stored in an internal memory.
  • the controller 30 also includes an arithmetic processing unit (not shown) that converts a signal input from the pressure sensor 29 into a speed command. Thereby, the operation amount of the lever 26A is converted into a speed command (rad / s) for rotating the turning electric motor 21. This speed command is input to the drive control device 32, the electric turning control device 40, and the main control unit 60.
  • the drive control device 32 is a control device for performing operation control of the motor generator 12 (switching between power running operation or regenerative operation) and charge / discharge control of the capacitor 19.
  • the drive control device 32 switches between the power running operation and the regenerative operation of the motor generator 12 according to the load state of the engine 11 and the charge state of the capacitor 19.
  • the drive control device 32 performs charge / discharge control of the capacitor 19 via the inverter 18 by switching between the power running operation and the regenerative operation of the motor generator 12.
  • FIG. 3 is a circuit diagram of the power storage device 120.
  • Power storage device 120 includes a capacitor 19 as a power storage, a buck-boost converter 100, and a DC bus 110.
  • the DC bus 110 controls transmission and reception of electric power among the capacitor 19, the motor generator 12, and the turning electric motor 21.
  • the capacitor 19 is provided with a capacitor voltage detector 112 for detecting a capacitor voltage value and a capacitor current detector 113 for detecting a capacitor current value.
  • the capacitor voltage value and the capacitor current value detected by the capacitor voltage detection unit 112 and the capacitor current detection unit 113 are supplied to the controller 30.
  • the step-up / step-down converter 100 performs control to switch between the step-up operation and the step-down operation so that the DC bus voltage value falls within a certain range according to the operating state of the motor generator 12 and the turning electric motor 21.
  • the DC bus 110 is disposed between the inverters 18 and 20 and the step-up / down converter 100, and transfers power between the capacitor 19, the motor generator 12, and the turning electric motor 21.
  • Switching control between the step-up / step-down operation of the buck-boost converter 100 is performed by the DC bus voltage value detected by the DC bus voltage detection unit 111, the capacitor voltage value detected by the capacitor voltage detection unit 112, and the capacitor current detection unit 113. This is performed based on the detected capacitor current value.
  • the electric power generated by the motor generator 12 as an assist motor is supplied to the DC bus 110 of the power storage device 120 via the inverter 18 and supplied to the capacitor 19 via the step-up / down converter 100.
  • the regenerative power generated by the regenerative operation of the turning electric motor 21 is supplied to the DC bus 110 of the power storage system 120 via the inverter 20 and supplied to the capacitor 19 via the step-up / down converter 100.
  • the buck-boost converter 100 includes a reactor 101, a boosting IGBT (Insulated Gate Bipolar Transistor) 102A, a step-down IGBT 102B, a power connection terminal 104 for connecting the capacitor 19, an output terminal 106 for connecting the inverter 105, and a pair And a smoothing capacitor 107 inserted in parallel with the output terminal 106.
  • the output terminal 106 of the buck-boost converter 100 and the inverters 18 and 20 are connected by a DC bus 110.
  • reactor 101 One end of the reactor 101 is connected to an intermediate point between the step-up IGBT 102A and the step-down IGBT 102B, and the other end is connected to the power connection terminal 104.
  • Reactor 101 is provided in order to supply induced electromotive force generated when boosting IGBT 102 ⁇ / b> A is turned on / off to DC bus 110.
  • the step-up IGBT 102A and the step-down IGBT 102B are semiconductor elements (switching elements) that are composed of bipolar transistors in which MOSFETs (Metal Oxide Semiconductors Field Effect Transistors) are incorporated in a gate portion and can perform high-power high-speed switching.
  • the step-up IGBT 102A and the step-down IGBT 102B are driven by the controller 30 by applying a PWM voltage to the gate terminal.
  • Diodes 102a and 102b, which are rectifier elements, are connected in parallel to the step-up IGBT 102A and the step-down IGBT 102B.
  • Capacitor 19 may be a chargeable / dischargeable capacitor so that power can be exchanged with DC bus 110 via buck-boost converter 100.
  • the power connection terminal 104 may be a terminal to which the capacitor 19 can be connected, and the output terminal 106 may be a terminal to which the inverters 18 and 20 can be connected.
  • a capacitor voltage detection unit 112 that detects a capacitor voltage is connected between the pair of power supply connection terminals 104.
  • a DC bus voltage detector 111 that detects a DC bus voltage is connected between the pair of output terminals 106.
  • the capacitor voltage detector 112 detects the voltage value Vcap of the capacitor 19.
  • the DC bus voltage detection unit 111 detects the voltage value Vdc of the DC bus 110.
  • the smoothing capacitor 107 is a power storage element for smoothing the DC bus voltage, and is inserted between the positive terminal and the negative terminal of the output terminal 106. The smoothing capacitor 107 maintains the voltage of the DC bus 110 at a predetermined voltage.
  • the capacitor current detection unit 113 is a detection unit that detects a value of a current flowing between the capacitor 19 and the buck-boost converter 100 on the positive electrode terminal (P terminal) side of the capacitor 19 and includes a resistor for current detection. For example, the capacitor current detection unit 113 detects the current value I1 flowing through the positive terminal of the capacitor 19.
  • the capacitor current detection unit 116 is detection means for detecting the value of the current flowing between the capacitor 19 and the buck-boost converter 100 on the negative electrode terminal (N terminal) side of the capacitor, and includes a current detection resistor. . For example, the capacitor current detection unit 116 detects the current value I2 flowing through the negative terminal of the capacitor 19.
  • the buck-boost converter 100 when boosting the DC bus 110, a PWM voltage is applied to the gate terminal of the boosting IGBT 102A. Then, the induced electromotive force generated in the reactor 101 when the step-up IGBT 102A is turned on / off is supplied to the DC bus 110 via the diode 102b connected in parallel to the step-down IGBT 102B. Thereby, the DC bus 110 is boosted.
  • relays 130-1 and 130-2 are connected to the power supply line 114 that connects the positive terminal of the capacitor 19 to the power supply connection terminal 104 of the buck-boost converter 100 as a breaker that can cut off the power supply line 114.
  • Relay 130-1 is arranged between connection point 115 of capacitor voltage detection unit 112 to power supply line 114 and the positive terminal of capacitor 19. The relay 130-1 is operated by a signal from the controller 30, and the capacitor 19 can be disconnected from the buck-boost converter 100 by cutting off the power supply line 114 from the capacitor 19.
  • a relay 130-2 is provided as a circuit breaker capable of interrupting the power line 117 in the power line 117 that connects the negative terminal of the capacitor 19 to the power connection terminal 104 of the buck-boost converter 100.
  • the relay 130-2 is arranged between the connection point 118 of the capacitor voltage detection unit 112 to the power supply line 117 and the negative terminal of the capacitor 19.
  • the relay 130-2 is activated by a signal from the controller 30, and the capacitor 19 can be disconnected from the step-up / down converter 100 by cutting off the power supply line 117 from the capacitor 19.
  • the relay 130-1 and the relay 130-2 may be used as a single relay, and the power supply line 114 on the positive terminal side and the power supply line 117 on the negative terminal side may be simultaneously cut off to disconnect the capacitor 19.
  • a drive unit that generates a PWM signal for driving the boosting IGBT 102A and the step-down IGBT 102B exists between the controller 30 and the step-up IGBT 102A and the step-down IGBT 102B, but is omitted in FIG.
  • Such a driving unit can be realized by either an electronic circuit or an arithmetic processing unit.
  • FIG. 4 is a schematic diagram showing the configuration of the capacitor 19.
  • the capacitor 19 as a storage device actually has n capacitor cells (hereinafter referred to as storage cells or simply cells) 19-1 to 19-n as a plurality of storage units ( n is an integer of 2 or more) and the power storage management unit 140.
  • the electric drive system is indicated by a solid line
  • the control system is indicated by a broken line.
  • the power storage management unit 140 is a device that manages the power storage of the capacitor 19, and mainly includes an equalization circuit unit 141, an equalization control unit 142, and a voltage conversion unit 143.
  • the power storage management unit 140 has a capacitance measuring function for measuring the capacitance of each cell, an equalizing function for equalizing the capacitance of each cell, and a circuit protection function for preventing overdischarge of each cell.
  • a capacitance measuring function for measuring the capacitance of each cell
  • an equalizing function for equalizing the capacitance of each cell
  • a circuit protection function for preventing overdischarge of each cell.
  • all of the n cells 19-1 to 19-n are connected in series, and one power storage management unit 140 is provided for all the cells.
  • cells connected in series may be one group, a plurality of groups may be connected in series or in parallel, and one power storage management unit may be provided for each group.
  • an upper power storage management unit that controls a plurality of power storage management units may be provided.
  • all the cells 19-1 to 19-n may be collectively referred to as a cell 19-n, and the nth cell may be referred to as a cell 19-n.
  • the equalization circuit unit 141 is an electric circuit that realizes a capacitance measurement function, an equalization function, and a circuit protection function.
  • the equalization circuit unit 141 is directly controlled by the equalization control unit 142 to execute the capacitance measurement function and the equalization function, and is indirectly controlled via the voltage conversion unit 143.
  • Perform circuit protection functions. Indirect control via the voltage conversion unit 143 is effective for enhancing the independence of the circuit protection function. For example, even if a problem occurs in a part of the equalization control unit 142 and the equalization function malfunctions, it is effective for reliably operating the circuit protection function.
  • each of the equalization circuit units 141-n is connected to both ends of the corresponding one cell 19-n.
  • two electrodes of a specific cell 19-m are connected to an equalization circuit unit 141-m.
  • the equalizing circuit unit 141-m includes a balance switch 146-m, a circuit protection switch 147-m, and a discharge resistor 148-m.
  • the equalizing circuit unit 141-m includes a balancing switch 146-m, a circuit protection switch 147-m, and a discharge resistor 148-m in series between the two electrodes of the cell 19-m. Connect in parallel to 19-m.
  • the balance switch 146-m, the circuit protection switch 147-m, and the discharge resistor 148-m may be connected in any order as long as they are connected in series.
  • the equalizing circuit unit 141-m includes a voltage measuring unit 149-m that measures the inter-electrode voltage of the cell 19-m.
  • the balance switch 146-n is a switch that controls the discharge of the cell 19-n for equalization.
  • the balance switch 146-n discharges the cell 19-n when it is in the ON (conducting) state and when it is in the OFF (cut-off) state. The discharge of the cell 19-n is stopped.
  • the balance switch 146-n is configured by an FET (field effect transistor), and is switched between an ON (conduction) state and an OFF (cut-off) state according to a balance control signal from the equalization control unit 142. .
  • the circuit protection switch 147-n is a switch (shutoff unit) for preventing overdischarge of the cell 19-n, and enables discharge of the cell 19-n when it is in the ON (conduction) state. ), The discharge of the cell 19-n is prohibited.
  • the circuit protection switch 147-n is composed of an FET (field effect transistor), and is turned on (conductive) by the voltage conversion unit 143 according to the voltage applied to the gate of the circuit protection switch 147-n. ) State and OFF (shut off) state are switched.
  • the equalization control unit 142 is a device that controls the capacitance measurement function, the equalization function, and the circuit protection function.
  • the equalization control unit 142 controls the equalization circuit unit 141 and the voltage conversion unit 143. Specifically, the equalization control unit 142 outputs a voltage detection command to the equalization circuit unit 141-n, and acquires a voltage detection value from the equalization circuit unit 141-n.
  • the equalization control unit 142 outputs a balance control signal to the balance switch 146-n, and switches the balance switch 146-n between the ON (conductive) state and the OFF (cut-off) state.
  • the equalization control unit 142 outputs an operation signal or a circuit protection signal to the voltage conversion unit 143, and controls the voltage that the voltage conversion unit 143 applies to the gate of the circuit protection switch 147-n.
  • the equalization control unit 142 operates with a voltage derived from the capacitor 19.
  • the equalization control unit 142 may operate with a voltage derived from an external battery such as a 24V battery.
  • the voltage converter 143 is a device that controls the circuit protection function.
  • the voltage converter 143 controls the voltage applied to the gate of the circuit protection switch 147-n. Specifically, when the voltage conversion unit 143 receives the operation signal from the equalization control unit 142, the voltage conversion unit 143 changes the power supply voltage of the power supply 150 to a voltage that turns on the circuit protection switch 147-n (hereinafter, “ ON voltage ”).
  • ON voltage a voltage that turns on the circuit protection switch 147-n
  • the circuit protection switch 147-n in which the ON voltage is applied to the gate is turned on (conductive).
  • the voltage conversion unit 143 when the voltage conversion unit 143 receives the circuit protection signal from the equalization control unit 142, the voltage conversion unit 143 changes the power supply voltage of the power supply 150 to a voltage for turning off the circuit protection switch 147-n (hereinafter referred to as “OFF voltage”). ”).
  • the circuit protection switch 147-n to which the OFF voltage is applied to the gate is in the OFF (cut-off) state.
  • the power supply voltage of the power supply 150 may be a voltage derived from the capacitor 19 or a voltage derived from an external battery such as a 24V battery.
  • the voltage conversion unit 143 converts the power supply voltage of the power supply 150 into an ON voltage and applies it to the gate of the circuit protection switch 147-n, regardless of whether an operation signal is received or not. Also good.
  • the power storage management unit 140 configured as described above can individually measure the capacitance of each cell 19-n by the capacitance measurement function.
  • the equalization control unit 142 calculates a capacitance based on the voltage of each cell 19-n measured by the voltage measurement unit 149-n (see FIG. Not shown.)
  • the voltage measuring unit 149-n detects the interelectrode voltage of each cell 19-n (hereinafter, the interelectrode voltage is referred to as cell voltage Vn), and the detected voltage of each cell 19-n is detected.
  • the cell voltage Vn is sent to the capacitance calculation unit.
  • the capacitance calculation unit calculates the capacitance Cn of each cell 19-n based on the value of the cell voltage Vn of each cell 19-n sent from the voltage measurement unit 149-n.
  • the capacitance Cn is calculated as follows.
  • the cell voltage Vn0 of the cell 19-n targeted for capacitance calculation at the time when the calculation of the capacitance Cn is started is detected.
  • a balance control signal is sent to the gate of the balance FET 146-n as a balance switch and the balance FET 146-n is closed (ON (conductive) state), whereby the cell 19-n is short-circuited and discharged.
  • the discharge resistor 148-n is provided in the short circuit, the discharge current of the cell 19-n is a minute current. Therefore, the cell voltage Vn of the cell 19-n due to the discharge gradually decreases rather than suddenly.
  • the cell voltage Vn1 at that time is detected.
  • the capacitance Cn of the cell 19-n can be calculated by the following equation (1).
  • the capacitance decreases and the internal resistance increases. If the capacitance and internal resistance vary between cells, the cell voltage tends to vary. Therefore, although the same current is applied, the voltage between the cells is increased or decreased. As a result, the deteriorated cell is further deteriorated. For this reason, it is desirable to positively equalize the voltage of each cell in accordance with variation in cell deterioration.
  • the power storage management unit 140 determines the degree of deterioration of each cell 19-n based on the calculated current capacitance Cn of each cell 19-n by the equalization function. Then, the power storage management unit 140 performs the equalization of the cell voltage by causing the function of the equalization circuit to act only on the necessary cells in accordance with the degree of deterioration and causing the discharge.
  • FIG. 5 is a flowchart showing the flow of circuit protection processing.
  • FIG. 6 is a diagram showing the transition of the cell voltage when the circuit protection process is executed. The transition of the cell voltage related to the balance FET 146-1 in the abnormal state is shown by a solid line, and the balance voltage in the normal state The cell voltage transitions of the FET 146-2 and the balancing FET 146-3 are indicated by a one-dot chain line and a two-dot chain line, respectively.
  • the circuit protection process is executed in a state where there is no input / output of current to the capacitor 19, that is, in a state where no charge / discharge current flows through each cell 19-n of the capacitor 19.
  • the circuit protection process may be executed during operation of the excavator as long as no current is input to or output from the capacitor 19.
  • the power storage management unit 140 detects a charge / discharge stop state where there is no current flowing between the capacitor 19 and the buck-boost converter 100, or actively creates a charge / discharge stop state. Then, the presence / absence of an abnormality in the equalizing circuit unit 141-n is determined.
  • the power storage management unit 140 blocks between the two electrodes of the corresponding cell 19-n, and Prevent overdischarge.
  • step S1 of FIG. 5 a balance control signal is sent to the gates of the balancing FETs 146-n of all the cells 19-n to turn off the balancing FET 146-n (see time t0 in FIG. 6). ).
  • step S2 the cell voltages of all the cells 19-n are checked (see time t1 in FIG. 6). Subsequently, in step S3, it is determined whether or not the cell voltage check is the first check in the current circuit protection process. If the cell voltage check is a second or later check, the process proceeds to step S5. This is to prevent the cell voltage recorded at the start of the circuit protection process from being overwritten.
  • step S3 If it is determined in step S3 that the cell voltage detection is the first check in the current circuit protection process, the process proceeds to step S4. In step S4, the cell voltages of all the cells 19-n are recorded as the cell voltage Vna-n.
  • step S5 it is determined whether or not an elapsed time ⁇ Td from when the balancing FET 146-n is turned off (cut off) is equal to or longer than a predetermined time Td1. If it is determined that the elapsed time ⁇ Td is less than the predetermined time Td1, the process returns to step S2, assuming that the failure such as a short circuit or ON fixing of the balancing FET 146-n is not detected, and the process returns to step S2 and subsequent steps. The above process is executed again.
  • step S6 the cell voltages of all the cells 19-n are recorded as the cell voltage Vnb-n (see time t2 in FIG. 6). Specifically, the cell voltages of all the cells 19-n checked in the latest step S2 are recorded as the cell voltage Vnb-n.
  • step S7 the equalization control unit 142 as the equalization circuit abnormality determination unit determines whether the equalization circuit unit 141-n is abnormal. Specifically, whether or not the difference Vdif-n between the cell voltage Vna-n at the start of the circuit protection process and the cell voltage Vnb-n when the predetermined time Td1 has elapsed after the circuit protection process has started is equal to or greater than the predetermined voltage Va. Is determined. If it is determined that the difference Vdif-n between the cell voltage Vna-n and the cell voltage Vnb-n is not greater than or equal to the predetermined voltage Va, that is, less than the predetermined voltage Va, the balancing FET 146-n is short-circuited or fixed ON, etc.
  • the current circuit protection processing is terminated.
  • the transition of the cell voltage related to the balance FET 146-2 and the balance FET 146-3 in the normal state shown by the one-dot chain line and the two-dot chain line in FIG. 6 corresponds to this case.
  • the difference Vdif-2 between the cell voltage Vna-2 and the cell voltage Vnb-2 related to the balancing FET 146-2 and the difference Vdif ⁇ between the cell voltage Vna-3 and the cell voltage Vnb-3 related to the balancing FET 146-3. 3 is smaller than the predetermined voltage Va and is almost zero.
  • step S8 when it is determined that the difference Vdif-n between the cell voltage Vna-n and the cell voltage Vnb-n is greater than or equal to the predetermined voltage Va, a failure such as a short circuit or ON fixing of the balancing FET 146-n has occurred, that is, If the equalization circuit unit 141-n is abnormal, the process proceeds to step S8. This is because it can be determined that the cell 19-n has been discharged because the cell voltage has dropped despite the balance FET 146-n being in the OFF (cut-off) state. The transition of the cell voltage related to the balancing FET 146-1 in the abnormal state, which is indicated by the solid line in FIG. 6, corresponds to this case. Note that the difference Vdif-1 between the cell voltage Vna-1 and the cell voltage Vnb-1 related to the balancing FET 146-1 is larger than the predetermined voltage Va.
  • step S8 a circuit protection signal is output to the voltage converter 143.
  • the voltage converter 143 applies an OFF voltage to the gate of the circuit protection switch 147-n corresponding to the balancing FET 146-n that has caused a failure such as a short circuit or ON fixation.
  • the circuit protection switch 147-n corresponding to the balancing FET 146-n that has caused a failure such as a short circuit or ON fixing is in an OFF (shut off) state, and the balancing switch that has caused the failure such as a short circuit or ON fixing. Discharging the cell 19-n corresponding to the FET 146-n is prohibited (see time t3 in FIG. 6).
  • the transition of the cell voltage related to the balancing FET 146-1 in the abnormal state corresponds to this case.
  • the cell voltage related to the balancing FET 146-1 stops decreasing as a result of the discharge of the cell 19-1 being prohibited at time t3.
  • the power storage management unit 140 sets the circuit protection switch 147-n corresponding to the balancing FET 146-n that has caused a failure such as a short circuit or ON fixing to the OFF (cut-off) state, and the corresponding cell 19- n overdischarge can be prevented.
  • FIG. 7 is a schematic diagram showing the configuration of the capacitor 19 and corresponds to FIG. Therefore, the same reference numerals are assigned to common components, and the description thereof is omitted.
  • the power storage management unit 140A is different from the power storage management unit 140 of FIG. 4 in that the voltage conversion unit is omitted. Specifically, the equalization control unit 142 of the power storage management unit 140A does not indirectly switch the circuit protection switch 147-n between the ON (conduction) state and the OFF (cutoff) state via the voltage conversion unit. Instead, the state of the circuit protection switch 147-n is switched directly.
  • the equalization control unit 142 determines that a failure such as a short circuit or ON fixing of the balance switch 146-n has occurred as determined in the circuit protection process described above, the failure is generated.
  • a circuit protection signal is output to the circuit protection switch 147-n corresponding to the balance switch 146-n.
  • the equalization control unit 142 sends a circuit protection signal to the gate of the circuit protection FET 147-n serving as a circuit protection switch to turn off the circuit protection FET 147-n.
  • the equalizing circuit unit 141-n when the equalizing circuit unit 141-n is in an operating state, an ON voltage is applied to the gate of the circuit protection FET 147-n, and the circuit protection FET 147-n is in an ON (conductive) state.
  • the circuit protection FET 147-n may be operated by the same power source as the balance FET 146-n as a balance switch, or may be operated by a power source different from the balance FET 146-n.
  • the circuit protection FET 147-n may operate with a voltage derived from the capacitor 19, or may operate with a voltage derived from an external battery such as a 24V battery.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Sustainable Energy (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Transportation (AREA)
  • Sustainable Development (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Secondary Cells (AREA)
  • Operation Control Of Excavators (AREA)

Abstract

 本発明の実施例に係るショベルは、発電機が発電した電気を充電するセル(19-n)で構成されるキャパシタ(19)と、セル(19-n)のそれぞれに接続される、バランス用スイッチ(146-n)及び回路保護用スイッチ(147-n)を含む均等化回路(141-n)と、バランス用スイッチ(146-n)の遮断・導通を切り換えるバランス制御信号、及び、回路保護用スイッチ(147-n)を遮断する回路保護信号を出力する均等化制御部(142)とを有する。

Description

ショベル及びショベルの制御方法
 本発明は、発電機が発電した電気を充電する複数の蓄電セルで構成される蓄電器と、複数の蓄電セルのそれぞれに接続される均等化回路とを有するショベル、及び、ショベルの制御方法に関する。
 従来、直列接続された複数個の電気二重層コンデンサ(セル)と、セル毎に設けられたバランス回路(均等化回路)とを有するキャパシタが知られている(例えば、特許文献1参照)。
特開2010-213417号公報
 多数のセルを有するキャパシタにおいて、セルが劣化するとセル毎の静電容量にバラツキが生じる。セル毎の静電容量にバラツキが生じているままキャパシタの充放電を繰り返していると、劣化の度合いが大きいセルに対する負荷がさらに増大する。そのため、バラツキはさらに大きくなり、劣化の度合いが大きいセルの静電容量はさらに減少する。その結果、複数のセルの静電容量の総和であるキャパシタ全体の静電容量(すなわち、蓄電量)が減少し、内部抵抗が増大するといった問題が発生する。
 これに対し、特許文献1に記載されるような均等化回路は、ある時点において電極間電圧が所定値以上のセルに対して均等化を行う。すなわち、所定値以上の電極間電圧を有するセルを強制的に放電させ、その電極間電圧が所定値となるようにして複数のセルの電極間電圧を均等化する。
 しかしながら、均等化回路が短絡した場合、その均等化回路に対応するセルが過放電状態となり、キャパシタに悪影響を及ぼすおそれがある。
 そのため、均等化回路に異常が生じた場合にもその均等化回路に対応するセルが過放電状態となるのを防止することが望まれる。
 本発明の実施例に係るショベルは、発電機が発電した電気を充電する複数の蓄電セルで構成される蓄電器と、前記複数の蓄電セルのそれぞれに接続される、バランス用スイッチ及び回路保護用スイッチを含む均等化回路と、前記バランス用スイッチの遮断・導通を切り換えるバランス制御信号、及び、前記回路保護用スイッチを遮断する回路保護信号を出力する均等化制御部と、を有する。
 また、本発明の実施例に係るショベルの制御方法は、発電機が発電した電気を充電する複数の蓄電セルで構成される蓄電器と、前記複数の蓄電セルのそれぞれに接続される、バランス用スイッチ及び回路保護用スイッチを含む均等化回路と、を有するショベルの制御方法であって、前記バランス用スイッチの遮断・導通を切り換えるバランス制御信号を出力するステップと、前記回路保護用スイッチを遮断する回路保護信号を出力するステップと、を有する。
 上述の手段により、均等化回路に異常が生じた場合にもその均等化回路に対応するセルが過放電状態となるのを防止するショベル及びショベルの制御方法が提供される。
ハイブリッド型ショベルの側面図である。 一実施形態によるハイブリッド型ショベルの駆動系の構成を示すブロック図である。 蓄電装置の回路図である。 キャパシタの構成を示す概略図である。 回路保護処理の流れを示すフローチャートである。 セル電圧の推移を示す図である。 キャパシタの構成を示す概略図である。
 図面を参照しながら本発明の一実施形態について説明する。
 図1は、一実施形態によるショベルの側面図である。図1に示すショベルはハイブリッド型ショベルであるが、本発明はハイブリッド型ショベルに限られず、電気負荷の駆動用電源として蓄電器を備えているものであれば、どのような型のショベルにも適用することができる。
 図1に示すように、ハイブリッド型ショベルの下部走行体1には、旋回機構2を介して上部旋回体3が搭載されている。上部旋回体3には、ブーム4、アーム5、及びバケット6と、これらを油圧駆動するためのブームシリンダ7、アームシリンダ8、及びバケットシリンダ9が設けられる。また、上部旋回体3には、キャビン10及び動力源が搭載される。
 図2は、ハイブリッド型ショベルの駆動系の構成を示すブロック図である。図2では、機械的動力系を二重線、高圧油圧ラインを実線、パイロットラインを破線、電気駆動・制御系を一点鎖線でそれぞれ示す。
 機械式駆動部としてのエンジン11と、アシスト駆動部としての電動発電機12は、ともに変速機13の入力軸に接続されている。また、変速機13の出力軸には、メインポンプ14及びパイロットポンプ15が接続されている。メインポンプ14には、高圧油圧ライン16を介してコントロールバルブ17が接続されている。
 コントロールバルブ17は、油圧系の制御を行う油圧制御装置である。コントロールバルブ17には、下部走行体1用の油圧モータ1A(右用)及び1B(左用)、ブームシリンダ7、アームシリンダ8、及びバケットシリンダ9が高圧油圧ラインを介して接続される。
 電動発電機12には、インバータ18を介して、蓄電用のキャパシタ又はバッテリを含む蓄電装置120が接続されている。本実施形態では蓄電装置120は蓄電器としてリチウムイオンキャパシタ(Lithium Ion Capacitor(LIC))、電気二重層キャパシタ(Electric Double Layer Capacitor(EDLC))等のキャパシタ19を含む。蓄電装置120には、インバータ20を介して旋回用電動機21が接続されている。また、上述では蓄電器としてキャパシタ19を例として示したが、キャパシタ19の代わりに、リチウムイオン電池(Lithium Ion Battery(LIB))等の充電可能な二次電池、又は、電力の授受が可能なその他の形態の電源を蓄電器として用いてもよい。
 旋回用電動機21の回転軸21Aには、レゾルバ22、メカニカルブレーキ23、及び旋回減速機24が接続される。また、パイロットポンプ15には、パイロットライン25を介して操作装置26が接続される。
 操作装置26には、油圧ライン27及び28を介して、コントロールバルブ17及びレバー操作検出部としての圧力センサ29がそれぞれ接続される。この圧力センサ29には、電気系の駆動制御を行うコントローラ30が接続されている。
 インバータ18は、上述の如く電動発電機12と蓄電装置120との間に設けられ、コントローラ30からの指令に基づき、電動発電機12の運転制御を行う。これにより、インバータ18が電動発電機12の力行を運転制御している際には、必要な電力を蓄電装置120から電動発電機12に供給する。また、電動発電機12の回生を運転制御している際には、電動発電機12により発電された電力を蓄電装置120のキャパシタ19に蓄電する。
 蓄電装置120は、インバータ18とインバータ20との間に配設されている。これにより、電動発電機12と旋回用電動機21の少なくともどちらか一方が力行運転を行っている際には、蓄電装置120は、力行運転に必要な電力を供給する。また、少なくともどちらか一方が回生運転を行っている際には、蓄電装置120は回生運転によって発生した回生電力を電気エネルギとして蓄積する。
 インバータ20は、上述の如く旋回用電動機21と蓄電装置120との間に設けられ、コントローラ30からの指令に基づき、旋回用電動機21に対して運転制御を行う。これにより、インバータが旋回用電動機21の力行を運転制御している際には、必要な電力を蓄電装置120から旋回用電動機21に供給する。また、旋回用電動機21が回生運転をしている際には、旋回用電動機21により発電された電力を蓄電装置120のキャパシタ19に蓄電する。
 なお、蓄電装置120のキャパシタ19の充放電制御は、キャパシタ19の充電状態、電動発電機12の運転状態(力行運転又は回生運転)、旋回用電動機21の運転状態(力行運転又は回生運転)に基づき、コントローラ30によって行われる。
 コントローラ30は、ショベルの駆動制御を行う制御装置であり、駆動制御装置32、電動旋回制御装置40、及び主制御部60を含む。コントローラ30は、CPU(Central Processing Unit)及び内部メモリを含む演算処理装置で構成される。駆動制御装置32、電動旋回制御装置40及び主制御部60は、コントローラ30のCPUが内部メモリに格納される駆動制御用のプログラムを実行することにより、実現される装置である。
 また、コントローラ30は、圧力センサ29から入力される信号を速度指令に変換する演算処理部(図示せず。)を備える。これにより、レバー26Aの操作量は、旋回用電動機21を回転駆動させるための速度指令(rad/s)に変換される。この速度指令は、駆動制御装置32、電動旋回制御装置40及び主制御部60に入力される。
 駆動制御装置32は、電動発電機12の運転制御(力行運転又は回生運転の切り替え)、及び、キャパシタ19の充放電制御を行うための制御装置である。駆動制御装置32は、エンジン11の負荷の状態とキャパシタ19の充電状態に応じて、電動発電機12の力行運転と回生運転を切り替える。駆動制御装置32は、電動発電機12の力行運転と回生運転を切り替えることにより、インバータ18を介してキャパシタ19の充放電制御を行う。
 図3は、蓄電装置120の回路図である。蓄電装置120は、蓄電器としてのキャパシタ19と、昇降圧コンバータ100とDCバス110とを含む。DCバス110は、キャパシタ19、電動発電機12、及び旋回用電動機21の間での電力の授受を制御する。キャパシタ19には、キャパシタ電圧値を検出するためのキャパシタ電圧検出部112と、キャパシタ電流値を検出するためのキャパシタ電流検出部113が設けられている。キャパシタ電圧検出部112とキャパシタ電流検出部113によって検出されるキャパシタ電圧値とキャパシタ電流値は、コントローラ30に供給される。
 昇降圧コンバータ100は、電動発電機12及び旋回用電動機21の運転状態に応じて、DCバス電圧値が一定の範囲内に収まるように昇圧動作と降圧動作を切り替える制御を行う。DCバス110は、インバータ18及び20と昇降圧コンバータ100との間に配設されており、キャパシタ19、電動発電機12、及び旋回用電動機21の間での電力の授受を行う。
 昇降圧コンバータ100の昇圧動作と降圧動作の切替制御は、DCバス電圧検出部111によって検出されるDCバス電圧値、キャパシタ電圧検出部112によって検出されるキャパシタ電圧値、及びキャパシタ電流検出部113によって検出されるキャパシタ電流値に基づいて行われる。
 以上のような構成において、アシストモータである電動発電機12が発電した電力は、インバータ18を介して蓄電装置120のDCバス110に供給され、昇降圧コンバータ100を介してキャパシタ19に供給される。旋回用電動機21が回生運転して生成した回生電力は、インバータ20を介して蓄電系120のDCバス110に供給され、昇降圧コンバータ100を介してキャパシタ19に供給される。
 昇降圧コンバータ100は、リアクトル101、昇圧用IGBT(Insulated Gate Bipolar Transistor)102A、降圧用IGBT102B、キャパシタ19を接続するための電源接続端子104、インバータ105を接続するための出力端子106、及び、一対の出力端子106に並列に挿入される平滑用のコンデンサ107を備える。昇降圧コンバータ100の出力端子106とインバータ18、20との間は、DCバス110によって接続される。
 リアクトル101の一端は昇圧用IGBT102A及び降圧用IGBT102Bの中間点に接続され、他端は電源接続端子104に接続される。リアクトル101は、昇圧用IGBT102Aのオン/オフに伴って生じる誘導起電力をDCバス110に供給するために設けられている。
 昇圧用IGBT102A及び降圧用IGBT102Bは、MOSFET(Metal Oxide Semiconductor Field Effect Transistor)をゲート部に組み込んだバイポーラトランジスタで構成され、大電力の高速スイッチングが可能な半導体素子(スイッチング素子)である。昇圧用IGBT102A及び降圧用IGBT102Bは、コントローラ30により、ゲート端子にPWM電圧が印加されることによって駆動される。昇圧用IGBT102A及び降圧用IGBT102Bには、整流素子であるダイオード102a及び102bが並列接続される。
 キャパシタ19は、昇降圧コンバータ100を介してDCバス110との間で電力の授受が行えるように、充放電可能な蓄電器であればよい。
 電源接続端子104は、キャパシタ19が接続可能な端子であればよく、出力端子106は、インバータ18、20が接続可能な端子であればよい。一対の電源接続端子104の間には、キャパシタ電圧を検出するキャパシタ電圧検出部112が接続される。一対の出力端子106の間には、DCバス電圧を検出するDCバス電圧検出部111が接続される。
 キャパシタ電圧検出部112は、キャパシタ19の電圧値Vcapを検出する。DCバス電圧検出部111は、DCバス110の電圧値Vdcを検出する。平滑用のコンデンサ107は、DCバス電圧を平滑化するための蓄電素子であり、出力端子106の正極端子と負極端子との間に挿入される。この平滑用のコンデンサ107によって、DCバス110の電圧は予め定められた電圧に維持されている。
 キャパシタ電流検出部113は、キャパシタ19の正極端子(P端子)側においてキャパシタ19と昇降圧コンバータ100との間に流れる電流の値を検出する検出手段であり、電流検出用の抵抗器を含む。例えば、キャパシタ電流検出部113は、キャパシタ19の正極端子に流れる電流値I1を検出する。一方、キャパシタ電流検出部116は、キャパシタの負極端子(N端子)側においてキャパシタ19と昇降圧コンバータ100との間に流れる電流の値を検出する検出手段であり、電流検出用の抵抗器を含む。例えば、キャパシタ電流検出部116は、キャパシタ19の負極端子に流れる電流値I2を検出する。
 昇降圧コンバータ100において、DCバス110を昇圧する際には、昇圧用IGBT102Aのゲート端子にPWM電圧が印加される。そして、降圧用IGBT102Bに並列に接続されたダイオード102bを介して、昇圧用IGBT102Aのオン/オフに伴ってリアクトル101に発生する誘導起電力がDCバス110に供給される。これにより、DCバス110が昇圧される。
 DCバス110を降圧する際には、降圧用IGBT102Bのゲート端子にPWM電圧が印加される。そして、降圧用IGBT102B、インバータ18、20を介して供給される回生電力がDCバス110からキャパシタ19に供給される。これにより、DCバス110に蓄積された電力がキャパシタ19に充電され、DCバス110が降圧される。
 本実施形態では、キャパシタ19の正極端子を昇降圧コンバータ100の電源接続端子104に接続する電源ライン114に、当該電源ライン114を遮断することのできる遮断器としてリレー130-1、130-2が設けられる。リレー130-1は、電源ライン114へのキャパシタ電圧検出部112の接続点115とキャパシタ19の正極端子との間に配置されている。リレー130-1はコントローラ30からの信号により作動し、キャパシタ19からの電源ライン114を遮断することで、キャパシタ19を昇降圧コンバータ100から切り離すことができる。
 また、キャパシタ19の負極端子を昇降圧コンバータ100の電源接続端子104に接続する電源ライン117に、当該電源ライン117を遮断することのできる遮断器としてリレー130-2が設けられる。リレー130-2は、電源ライン117へのキャパシタ電圧検出部112の接続点118とキャパシタ19の負極端子との間に配置されている。リレー130-2はコントローラ30からの信号により作動し、キャパシタ19からの電源ライン117を遮断することで、キャパシタ19を昇降圧コンバータ100から切り離すことができる。なお、リレー130-1とリレー130-2を一つのリレーとして正極端子側の電源ライン114と負極端子側の電源ライン117の両方を同時に遮断してキャパシタ19を切り離すこととしてもよい。
 なお、実際には、コントローラ30と昇圧用IGBT102A及び降圧用IGBT102Bとの間には、昇圧用IGBT102A及び降圧用IGBT102Bを駆動するPWM信号を生成する駆動部が存在するが、図3では省略する。このような駆動部は、電子回路又は演算処理装置のいずれでも実現することができる。
 図4は、キャパシタ19の構成を示す概略図である。図4に示すように、蓄電器としてのキャパシタ19は、実際には、複数の蓄電部としてのn個のキャパシタセル(以下、蓄電セル、あるいは単にセルと称する。)19-1~19-n(nは2以上の整数)と蓄電管理部140とを含む。なお、図4では、電気駆動系を実線、制御系を破線でそれぞれ示す。
 蓄電管理部140は、キャパシタ19の蓄電を管理する装置であり、主に、均等化回路部141、均等化制御部142、及び電圧変換部143を含む。
 また、蓄電管理部140は、各セルの静電容量を測定する静電容量測定機能と各セルの静電容量を均一化する均等化機能と各セルの過放電を防止する回路保護機能とを有する。また、本実施形態では、説明の便宜上n個のセル19-1~19-nの全ては直列に接続され、全てのセルに対して一つの蓄電管理部140が設けられている。しかしながら、直列に接続されたセルを一つのグループとし、複数のグループが直列又は並列に接続され、グループ毎に一つの蓄電管理部が設けられてもよい。また、複数の蓄電管理部を制御する上位の蓄電管理部が設けられてもよい。
 なお、以下では、便宜上、全てのセル19-1~19-nをまとめてセル19-nと称することもあり、n番目のセルをセル19-nと称することもある。均等化回路部141、並びに、均等化回路部141の構成要素である後述のバランス用スイッチ146、回路保護用スイッチ147、放電抵抗148、及び電圧測定部149等についても同様である。
 均等化回路部141は、静電容量測定機能、均等化機能、及び回路保護機能を実現する電気回路である。本実施例では、均等化回路部141は、均等化制御部142によって直接的に制御されて静電容量測定機能及び均等化機能を実行し、電圧変換部143を介して間接的に制御されて回路保護機能を実行する。電圧変換部143を介した間接的な制御は、回路保護機能の独立性を高めるのに有効である。例えば、均等化制御部142の一部に問題が生じ、均等化機能が誤動作した場合であっても、回路保護機能を確実に動作させるのに有効である。
 具体的には、均等化回路部141-nのそれぞれは、対応する1つのセル19-nの両端に接続されている。例えば、図4に示すように、特定のセル19-m(mは1以上n以下の整数)の2つの電極は均等化回路部141-mに接続されている。また、均等化回路部141-mは、バランス用スイッチ146-m、回路保護用スイッチ147-m、及び放電抵抗148-mを有する。また、均等化回路部141-mは、セル19-mの2つの電極の間でバランス用スイッチ146-m、回路保護用スイッチ147-m、及び放電抵抗148-mを直列に、且つ、セル19-mに対して並列に接続する。なお、バランス用スイッチ146-m、回路保護用スイッチ147-m、及び放電抵抗148-mは、直列接続であればどのような順番で接続されてもよい。また、均等化回路部141-mは、セル19-mの電極間電圧を測定する電圧測定部149-mを含む。
 バランス用スイッチ146-nは、均等化のためのセル19-nの放電を制御するスイッチであり、ON(導通)状態のときにセル19-nを放電させ、OFF(遮断)状態のときにセル19-nの放電を停止させる。本実施例では、バランス用スイッチ146-nは、FET(電界効果トランジスタ)で構成され、均等化制御部142からのバランス制御信号に応じてON(導通)状態とOFF(遮断)状態とが切り替わる。
 回路保護用スイッチ147-nは、セル19-nの過放電を防止するためのスイッチ(遮断部)であり、ON(導通)状態のときにセル19-nの放電を可能にし、OFF(遮断)状態のときにセル19-nの放電を禁止する。本実施例では、回路保護用スイッチ147-nは、FET(電界効果トランジスタ)で構成され、電圧変換部143が回路保護用スイッチ147-nのゲートに対して印加する電圧に応じてON(導通)状態とOFF(遮断)状態とが切り替わる。
 均等化制御部142は、静電容量測定機能、均等化機能、及び回路保護機能を制御する装置である。本実施例では、均等化制御部142は、均等化回路部141及び電圧変換部143を制御する。具体的には、均等化制御部142は、均等化回路部141-nに対して電圧検出指令を出力し、均等化回路部141-nから電圧検出値を取得する。また、均等化制御部142は、バランス用スイッチ146-nに対してバランス制御信号を出力し、バランス用スイッチ146-nのON(導通)状態とOFF(遮断)状態とを切り替える。また、均等化制御部142は、電圧変換部143に対して作動信号又は回路保護信号を出力し、電圧変換部143が回路保護用スイッチ147-nのゲートに対して印加する電圧を制御する。なお、本実施例では、均等化制御部142は、キャパシタ19に由来する電圧で動作する。但し、均等化制御部142は、24Vバッテリ等の外部バッテリに由来する電圧で動作してもよい。
 電圧変換部143は、回路保護機能を制御する装置である。本実施例では、電圧変換部143は、回路保護用スイッチ147-nのゲートに対して印加する電圧を制御する。具体的には、電圧変換部143は、均等化制御部142から作動信号を受けると、電源150の電源電圧を、回路保護用スイッチ147-nをON(導通)状態にする電圧(以下、「ON電圧」とする。)に変換する。ゲートにON電圧が印加された回路保護用スイッチ147-nは、ON(導通)状態となる。一方、電圧変換部143は、均等化制御部142から回路保護信号を受けると、電源150の電源電圧を、回路保護用スイッチ147-nをOFF(遮断)状態にする電圧(以下、「OFF電圧」とする。)に変換する。ゲートにOFF電圧が印加された回路保護用スイッチ147-nは、OFF(遮断)状態となる。なお、電源150の電源電圧は、キャパシタ19に由来する電圧であってもよく、24Vバッテリ等の外部バッテリに由来する電圧であってもよい。また、電圧変換部143は、作動状態であれば、作動信号の受信の有無とは無関係に、電源150の電源電圧をON電圧に変換して回路保護用スイッチ147-nのゲートに印加してもよい。
 以上のような構成の蓄電管理部140は、静電容量測定機能により、各セル19-nの静電容量を個別に測定することができる。
 静電容量測定機能を実現するために、均等化制御部142は、電圧測定部149-nが測定した各セル19-nの電圧に基づいて静電容量を算出する静電容量算出部(図示せず。)を有する。
 電圧測定部149-nは、電圧検出指令が与えられると、各セル19-nの電極間電圧を検出し(以下、電極間電圧をセル電圧Vnと称する)、検出した各セル19-nのセル電圧Vnを静電容量算出部に送る。
 静電容量算出部は、電圧測定部149-nから送られてくる各セル19-nのセル電圧Vnの値に基づいて、各セル19-nの静電容量Cnを算出する。静電容量Cnの算出は以下のようにして行なう。
 まず、静電容量Cnの算出を始めた時点における、静電容量算出対象のセル19-nのセル電圧Vn0を検出する。そして、バランス用スイッチとしてのバランス用FET146-nのゲートにバランス制御信号を送ってバランス用FET146-nを閉じる(ON(導通)状態にする)ことにより、セル19-nを短絡して放電させる。短絡路には放電抵抗148-nが設けられているので、セル19-nの放電電流は微小電流である。したがって、放電によるセル19-nのセル電圧Vnは急激にではなく、徐々に降下する。所定の時間Tだけ放電させたら、その時点でのセル電圧Vn1を検出する。セル19-nの静電容量Cnは以下の式(1)により算出することができる。
 Cn=-T/(R1+R2)×ln-1{(R1+R2)/R2×Vn1/Vn0} ・・・(1)
 ここで、R1はセル19-nの内部抵抗であり、R2は放電抵抗148-nの内部抵抗である。ただし、R1<<R2のため、R1を無視すると、以下の式(2)が導き出される。
 Cn=-T/R2×ln-1(Vn1/Vn0) ・・・(2)
 算出したセル19-nの静電容量Cnを、予め求められているセル19-nの初期静電容量Cn0(セル19-nが使用される前の静電容量)と比較することで、現在のセル19-nがどの程度劣化しているかを判定することができる。
 セルの劣化が進むと、静電容量が小さくなるとともに内部抵抗が大きくなる。静電容量や内部抵抗が各セル間でばらつくと、セル電圧もばらつきやすくなってしまう。したがって、同一の電流を通電させているにもかかわらず、各セル間において電圧の高低が生じてしまう。その結果、劣化しているセルがより一層劣化することになる。このため、セルの劣化のばらつきに応じて積極的に各セルの電圧を均等にすることが望ましい。
 そこで、本実施形態では、蓄電管理部140は、均等化機能により、算出した各セル19-nの現在の静電容量Cnに基づいて各セル19-nの劣化度を判定する。そして、蓄電管理部140は、劣化度に応じて必要なセルのみに均等化回路の機能を働かせて放電させることで、セル電圧の均等化を行なう。
 また、蓄電管理部140は、回路保護機能により、各セル19-nの過放電を防止する。ここで、図5及び図6を参照しながら、各セル19-nの過放電を防止する回路保護処理について説明する。なお、図5は、回路保護処理の流れを示すフローチャートである。また、図6は、回路保護処理が実行されるときのセル電圧の推移を示す図であり、異常状態にあるバランス用FET146-1に関するセル電圧の推移を実線で示し、正常状態にあるバランス用FET146-2及びバランス用FET146-3に関するセル電圧の推移をそれぞれ一点鎖線及び二点鎖線で示す。
 回路保護処理は、キャパシタ19への電流の入出力が無い状態で、すなわち、キャパシタ19の各セル19-nに充放電電流が流れない状態で実行される。なお、回路保護処理は、キャパシタ19への電流の入出力が無い状態であれば、ショベルの運転中に実行されてもよい。具体的には、蓄電管理部140は、キャパシタ19と昇降圧コンバータ100との間を流れる電流が無い充放電停止状態を検出した上で、或いは、充放電停止状態を能動的に創出した上で、均等化回路部141-nの異常の有無を判断する。そして、蓄電管理部140は、均等化回路部141-nに異常があると判断した場合に、対応するセル19-nの2つの電極の間を遮断して、その対応するセル19-nの過放電を防止する。
 まず、図5のステップS1において、全セル19-nのバランス用FET146-nのゲートにバランス制御信号を送ってバランス用FET146-nをOFF(遮断)状態とする(図6の時刻t0参照。)。
 続いて、ステップS2において、全セル19-nのセル電圧がチェックされる(図6の時刻t1参照。)。続いて、ステップS3においてセル電圧のチェックが今回の回路保護処理における1回目のチェックであるか否かが判定される。セル電圧のチェックが2回目以降のチェックであれば、処理はステップS5に進む。回路保護処理開始時に記録されたセル電圧が上書きされないようにするためである。
 ステップS3においてセル電圧の検出が今回の回路保護処理における1回目のチェックであると判定されると、処理はステップS4に進む。ステップS4では、全セル19-nのセル電圧がセル電圧Vna-nとして記録される。
 次に、ステップS5において、バランス用FET146-nをOFF(遮断)状態としてからの経過時間ΔTdが所定時間Td1以上であるか否かが判定される。経過時間ΔTdが所定時間Td1未満であると判定されると、バランス用FET146-nの短絡又はON固定等の故障を検出できる条件にはなっていないとして、処理はステップS2に戻り、ステップS2以降の処理を再び実行する。
 一方、ステップS5において経過時間ΔTdが所定時間Td1以上であると判定されると、処理はステップS6に進む。ステップS6では、全セル19-nのセル電圧がセル電圧Vnb-nとして記録される(図6の時刻t2参照。)。具体的には、直近のステップS2でチェックした全セル19-nのセル電圧がセル電圧Vnb-nとして記録される。
 次に、ステップS7において、均等化回路異常判断部としての均等化制御部142により均等化回路部141-nの異常の有無が判断される。具体的には、回路保護処理開始時のセル電圧Vna-nと回路保護処理開始後に所定時間Td1が経過したときのセル電圧Vnb-nとの差Vdif-nが所定電圧Va以上であるか否かが判定される。セル電圧Vna-nとセル電圧Vnb-nとの差Vdif-nが所定電圧Va以上ではない、すなわち所定電圧Va未満であると判定されると、バランス用FET146-nの短絡又はON固定等の故障が発生していない、すなわち、均等化回路部141-nに異常がないとして、今回の回路保護処理は終了する。図6の一点鎖線及び二点鎖線で示す、正常状態にあるバランス用FET146-2及びバランス用FET146-3に関するセル電圧の推移がこの場合に相当する。なお、バランス用FET146-2に関するセル電圧Vna-2とセル電圧Vnb-2との差Vdif-2、及び、バランス用FET146-3に関するセル電圧Vna-3とセル電圧Vnb-3との差Vdif-3は、所定電圧Vaよりも小さく、ほぼゼロである。
 一方、セル電圧Vna-nとセル電圧Vnb-nとの差Vdif-nが所定電圧Va以上であると判定されると、バランス用FET146-nの短絡又はON固定等の故障が発生した、すなわち、均等化回路部141-nに異常があるとして、処理はステップS8に進む。バランス用FET146-nがOFF(遮断)状態であるにもかかわらずセル電圧が低下したことから、セル19-nで放電が行われたと判断できるためである。図6の実線で示す、異常状態にあるバランス用FET146-1に関するセル電圧の推移がこの場合に相当する。なお、バランス用FET146-1に関するセル電圧Vna-1とセル電圧Vnb-1との差Vdif-1は、所定電圧Vaよりも大きい。
 ステップS8では、電圧変換部143に対して回路保護信号が出力される。回路保護信号を受けた電圧変換部143は、短絡又はON固定等の故障を発生させたバランス用FET146-nに対応する回路保護用スイッチ147-nのゲートにOFF電圧を印加する。その結果、短絡又はON固定等の故障を発生させたバランス用FET146-nに対応する回路保護用スイッチ147-nはOFF(遮断)状態となり、短絡又はON固定等の故障を発生させたバランス用FET146-nに対応するセル19-nの放電が禁止される(図6の時刻t3参照。)。図6の実線で示す、異常状態にあるバランス用FET146-1に関するセル電圧の推移がこの場合に相当する。なお、バランス用FET146-1に関するセル電圧は、時刻t3においてセル19-1の放電が禁止された結果、その減少が止まる。
 以上の構成により、蓄電管理部140は、短絡又はON固定等の故障を発生させたバランス用FET146-nに対応する回路保護用スイッチ147-nをOFF(遮断)状態とし、対応するセル19-nの過放電を防止できる。
 次に、図7を参照しながら、蓄電管理部の別の構成例140Aについて説明する。なお、図7は、キャパシタ19の構成を示す概略図であり、図4に対応する。そのため、共通の構成要素については同じ参照番号を付し、その説明を省略する。
 蓄電管理部140Aは、電圧変換部を省略した点で、図4の蓄電管理部140と相違する。具体的には、蓄電管理部140Aの均等化制御部142は、電圧変換部を介して間接的に回路保護用スイッチ147-nのON(導通)状態とOFF(遮断)状態とを切り替えるのではなく、直接的に回路保護用スイッチ147-nの状態を切り替える。
 より具体的には、均等化制御部142は、上述の回路保護処理において判定したようにバランス用スイッチ146-nの短絡又はON固定等の故障が発生したと判定すると、その故障を発生させたバランス用スイッチ146-nに対応する回路保護用スイッチ147-nに対して回路保護信号を出力する。
 本実施例では、均等化制御部142は、回路保護用スイッチとしての回路保護用FET147-nのゲートに回路保護信号を送って回路保護用FET147-nをOFF(遮断)状態とする。なお、本実施例では、均等化回路部141-nが作動状態であれば、回路保護用FET147-nのゲートにはON電圧が印加され、回路保護用FET147-nはON(導通)状態となる。また、回路保護用FET147-nは、バランス用スイッチとしてのバランス用FET146-nと同じ系統の電源で動作してもよく、バランス用FET146-nとは異なる系統の電源で動作してもよい。なお、回路保護用FET147-nは、キャパシタ19に由来する電圧で動作してもよく、24Vバッテリ等の外部バッテリに由来する電圧で動作してもよい。
 また、本願は、2012年10月10日に出願した、日本国特許出願2012-225381号に基づく優先権を主張するものでありそれらの日本国特許出願の全内容を本願に参照により援用する。
 1 下部走行体
 1A、1B 油圧モータ
 2 旋回機構
 3 上部旋回体
 4 ブーム
 5 アーム
 6 バケット
 7 ブームシリンダ
 8 アームシリンダ
 9 バケットシリンダ
 10 キャビン
 11 エンジン
 12 電動発電機
 13 変速機
 14 メインポンプ
 15 パイロットポンプ
 16 高圧油圧ライン
 17 コントロールバルブ
 18、20 インバータ
 19 キャパシタ
 19-n セル
 21 旋回用電動機
 22 レゾルバ
 23 メカニカルブレーキ
 24 旋回変速機
 25 パイロットライン
 26 操作装置
 26A、26B レバー
 26C ペダル
 26D ボタンスイッチ
 27 油圧ライン
 28 油圧ライン
 29 圧力センサ
 30 コントローラ
 32 駆動制御装置
 40 電動旋回制御装置
 60 主制御部
 101 リアクトル
 102A 昇圧用IGBT
 102B 降圧用IGBT
 103 電源接続端子
 104 出力端子
 105 コンデンサ
 106 バッテリ電圧検出部
 107 バッテリ電流検出部
 110 DCバス
 111 DCバス電圧検出部
 120 蓄電装置
 140、140A 蓄電管理部
 141 均等化回路部
 142 均等化制御部
 143 電圧変換部
 146-1~146-n バランス用FET
 147-1~147-n 回路保護用スイッチ
 148-1~148-n 放電抵抗
 149-1~149-n 電圧測定部
 150 電源

Claims (8)

  1.  発電機が発電した電気を充電する複数の蓄電セルで構成される蓄電器と、
     前記複数の蓄電セルのそれぞれに接続される均等化回路、前記均等化回路の異常の有無を判断する均等化回路異常判断部、及び、異常があると判断された均等化回路に接続される蓄電セルの電極間を遮断する遮断部を含む蓄電管理部と、
     を有するショベル。
  2.  前記蓄電管理部は、前記均等化回路が異常と判断されるまでは、前記均等化回路により前記蓄電セルの均等化を行う、
     請求項1のショベル。
  3.  前記均等化回路は、各蓄電セルに直列に接続されるバランス用スイッチ、回路保護用スイッチ、及び抵抗を含み、
     前記蓄電管理部は、前記均等化回路を制御する均等化制御部を含み、
     前記均等化制御部は、前記バランス用スイッチ及び前記回路保護用スイッチのそれぞれの導通・遮断を制御することにより各蓄電セルの均等化を行い、前記均等化回路に異常が生じた場合には、前記回路保護用スイッチを遮断する回路保護信号を出力する、
     請求項1に記載のショベル。
  4.  前記均等化制御部は、前記バランス用スイッチを遮断するバランス制御信号を出力した場合に、前記均等化回路の前記バランス用スイッチに異常があると判断されると、前記回路保護用スイッチを遮断する回路保護信号を出力する、
     請求項3に記載のショベル。
  5.  前記均等化制御部は、前記バランス用スイッチを遮断するバランス制御信号を出力した場合に、対応する前記蓄電セルの電極間電圧が所定時間で所定電圧以上減少したときに、対応する前記回路保護用スイッチを遮断する回路保護信号を出力する、
     請求項3に記載のショベル。
  6.  前記蓄電管理部は、前記蓄電器と昇降圧コンバータとの間を流れる電流が無い充放電停止状態を検出した上で、或いは、充放電停止状態を能動的に創出した上で、前記均等化回路の異常の有無を判断する、
     請求項1に記載のショベル。
  7.  発電機が発電した電気を充電する複数の蓄電セルで構成される蓄電器と、前記複数の蓄電セルのそれぞれに接続される、バランス用スイッチ及び回路保護用スイッチを含む均等化回路と、を有するショベルの制御方法であって、
     前記バランス用スイッチの遮断・導通を切り換えるバランス制御信号を出力するステップと、
     前記回路保護用スイッチを遮断する回路保護信号を出力するステップと、
     を有する制御方法。
  8.  前記バランス用スイッチを遮断するバランス制御信号が出力された場合に、対応する前記蓄電セルの電極間電圧が所定時間で所定電圧以上減少したときに、対応する前記回路保護用スイッチを遮断する回路保護信号が出力される、
     請求項7の制御方法。
PCT/JP2013/070086 2012-10-10 2013-07-24 ショベル及びショベルの制御方法 WO2014057724A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
EP13845151.3A EP2908401B1 (en) 2012-10-10 2013-07-24 Shovel and method of controlling shovel
KR1020157009337A KR102073677B1 (ko) 2012-10-10 2013-07-24 쇼벨 및 쇼벨의 제어방법
CN201380053238.4A CN104718681B (zh) 2012-10-10 2013-07-24 挖土机及挖土机的控制方法
JP2014540771A JP6290092B2 (ja) 2012-10-10 2013-07-24 ショベル
US14/678,100 US9982416B2 (en) 2012-10-10 2015-04-03 Shovel and method of controlling shovel

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012225381 2012-10-10
JP2012-225381 2012-10-10

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US14/678,100 Continuation US9982416B2 (en) 2012-10-10 2015-04-03 Shovel and method of controlling shovel

Publications (1)

Publication Number Publication Date
WO2014057724A1 true WO2014057724A1 (ja) 2014-04-17

Family

ID=50477200

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/070086 WO2014057724A1 (ja) 2012-10-10 2013-07-24 ショベル及びショベルの制御方法

Country Status (6)

Country Link
US (1) US9982416B2 (ja)
EP (1) EP2908401B1 (ja)
JP (1) JP6290092B2 (ja)
KR (1) KR102073677B1 (ja)
CN (1) CN104718681B (ja)
WO (1) WO2014057724A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2765243A1 (en) * 2013-02-08 2014-08-13 Sumitomo (S.H.I.) Construction Machinery Co., Ltd. Shovel and method of controlling shovel
JP2019161888A (ja) * 2018-03-14 2019-09-19 日立建機株式会社 建設機械
US10615623B2 (en) 2017-07-20 2020-04-07 Doohyun Infra Co., Ltd Capacitor quick-charge apparatus

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3337001B1 (en) 2016-12-14 2022-03-02 GS Yuasa International Ltd. System and method for discharging a defective battery cell
DE102017213020A1 (de) * 2017-07-28 2019-01-31 Bayerische Motoren Werke Aktiengesellschaft Vorrichtung und verfahren zur symmetrierung eines energiespeichermoduls
WO2020241439A1 (ja) * 2019-05-31 2020-12-03 パナソニックIpマネジメント株式会社 蓄電システム

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06331679A (ja) * 1993-05-18 1994-12-02 Nippon Signal Co Ltd:The スイッチ回路故障検出装置
JP2004134372A (ja) * 2000-02-07 2004-04-30 Hitachi Ltd 蓄電装置及び蓄電器の電圧検出方法
JP2004266937A (ja) * 2003-02-28 2004-09-24 Denso Corp 車両用自己診断装置
JP2007151242A (ja) * 2005-11-24 2007-06-14 Ricoh Co Ltd 画像形成装置
JP2009159769A (ja) * 2007-12-27 2009-07-16 Gs Yuasa Corporation 組電池の電池管理装置
JP2010004679A (ja) * 2008-06-20 2010-01-07 Takeuchi Seisakusho:Kk 充電システム
JP2010213417A (ja) 2009-03-09 2010-09-24 Sumitomo Heavy Ind Ltd ハイブリッド型作業機械及びその制御方法

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5919122Y2 (ja) * 1981-04-23 1984-06-02 日立建機株式会社 油圧駆動回路
US6655136B2 (en) * 2001-12-21 2003-12-02 Caterpillar Inc System and method for accumulating hydraulic fluid
JP4101816B2 (ja) 2005-05-16 2008-06-18 日本テキサス・インスツルメンツ株式会社 バッテリ保護回路
JP2006351384A (ja) * 2005-06-16 2006-12-28 Renesas Technology Corp 充電制御システム
JP5113741B2 (ja) * 2006-04-13 2013-01-09 パナソニック株式会社 電池パックおよびその断線検知方法
JP2010088179A (ja) * 2008-09-30 2010-04-15 Panasonic Corp 電池均等化回路、及び電池電源装置
CN101409455B (zh) * 2008-11-19 2011-10-26 华为终端有限公司 一种电池系统的电压平衡装置及电压平衡方法
US9000716B2 (en) * 2009-01-28 2015-04-07 Sumitomo Heavy Industries, Ltd. Hybrid working machine and electric power accumulation controller
JP5448472B2 (ja) * 2009-01-28 2014-03-19 住友重機械工業株式会社 ハイブリッド型作業機械
JP5149826B2 (ja) * 2009-01-29 2013-02-20 住友重機械工業株式会社 ハイブリッド式作業機械及びサーボ制御システム
KR101234059B1 (ko) * 2010-02-22 2013-02-15 주식회사 엘지화학 셀 밸런싱부의 고장 진단 장치 및 방법
JP2011205865A (ja) * 2010-03-26 2011-10-13 Furukawa Electric Co Ltd:The 電源供給装置及び電源供給方法
US9024586B2 (en) * 2010-10-14 2015-05-05 GM Global Technology Operations LLC Battery fault tolerant architecture for cell failure modes series bypass circuit
CN102652265A (zh) * 2010-12-06 2012-08-29 科达汽车公司 使用电路故障自检测量装置来测量隔离高压以及检测隔离击穿
KR101948344B1 (ko) * 2011-03-31 2019-02-14 르네사스 일렉트로닉스 가부시키가이샤 전압 감시 모듈 및 이를 이용한 전압 감시 시스템

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06331679A (ja) * 1993-05-18 1994-12-02 Nippon Signal Co Ltd:The スイッチ回路故障検出装置
JP2004134372A (ja) * 2000-02-07 2004-04-30 Hitachi Ltd 蓄電装置及び蓄電器の電圧検出方法
JP2004266937A (ja) * 2003-02-28 2004-09-24 Denso Corp 車両用自己診断装置
JP2007151242A (ja) * 2005-11-24 2007-06-14 Ricoh Co Ltd 画像形成装置
JP2009159769A (ja) * 2007-12-27 2009-07-16 Gs Yuasa Corporation 組電池の電池管理装置
JP2010004679A (ja) * 2008-06-20 2010-01-07 Takeuchi Seisakusho:Kk 充電システム
JP2010213417A (ja) 2009-03-09 2010-09-24 Sumitomo Heavy Ind Ltd ハイブリッド型作業機械及びその制御方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2908401A4

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2765243A1 (en) * 2013-02-08 2014-08-13 Sumitomo (S.H.I.) Construction Machinery Co., Ltd. Shovel and method of controlling shovel
US9290904B2 (en) 2013-02-08 2016-03-22 Sumitomo(S.H.I.) Construction Machinery Co., Ltd. Shovel and method of controlling shovel
US10615623B2 (en) 2017-07-20 2020-04-07 Doohyun Infra Co., Ltd Capacitor quick-charge apparatus
JP2019161888A (ja) * 2018-03-14 2019-09-19 日立建機株式会社 建設機械
WO2019176392A1 (ja) * 2018-03-14 2019-09-19 日立建機株式会社 建設機械
KR20200035998A (ko) * 2018-03-14 2020-04-06 히다치 겡키 가부시키 가이샤 건설기계
CN111052534A (zh) * 2018-03-14 2020-04-21 日立建机株式会社 工程机械
US11085172B2 (en) 2018-03-14 2021-08-10 Hitachi Construction Machinery Co., Ltd. Construction machine
KR102335839B1 (ko) * 2018-03-14 2021-12-07 히다치 겡키 가부시키 가이샤 건설기계
JP6993911B2 (ja) 2018-03-14 2022-02-03 日立建機株式会社 建設機械
CN111052534B (zh) * 2018-03-14 2023-06-16 日立建机株式会社 工程机械

Also Published As

Publication number Publication date
JPWO2014057724A1 (ja) 2016-09-05
KR102073677B1 (ko) 2020-02-05
CN104718681A (zh) 2015-06-17
EP2908401B1 (en) 2017-05-10
JP6290092B2 (ja) 2018-03-07
US9982416B2 (en) 2018-05-29
US20150211212A1 (en) 2015-07-30
EP2908401A1 (en) 2015-08-19
KR20150063427A (ko) 2015-06-09
EP2908401A4 (en) 2015-12-23
CN104718681B (zh) 2018-06-19

Similar Documents

Publication Publication Date Title
KR102008329B1 (ko) 쇼벨 및 쇼벨의 제어방법
JP6290092B2 (ja) ショベル
JP6150821B2 (ja) ショベル及びショベルの制御方法
KR101888044B1 (ko) 쇼벨 및 쇼벨의 제어방법
WO2012102352A1 (ja) ショベル
JP6087190B2 (ja) ショベル
WO2013183496A1 (ja) 作業機械及びその制御方法
US11085172B2 (en) Construction machine
JP6000883B2 (ja) ショベル
JP6315545B2 (ja) ショベル
JP2019161888A5 (ja)
JP6430100B2 (ja) ショベル
JP2022077219A (ja) 車両

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13845151

Country of ref document: EP

Kind code of ref document: A1

DPE1 Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101)
ENP Entry into the national phase

Ref document number: 2014540771

Country of ref document: JP

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 20157009337

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

REEP Request for entry into the european phase

Ref document number: 2013845151

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2013845151

Country of ref document: EP