WO2013111582A1 - ジェットポンプ計測用配管の補修方法及びその補修装置 - Google Patents

ジェットポンプ計測用配管の補修方法及びその補修装置 Download PDF

Info

Publication number
WO2013111582A1
WO2013111582A1 PCT/JP2013/000318 JP2013000318W WO2013111582A1 WO 2013111582 A1 WO2013111582 A1 WO 2013111582A1 JP 2013000318 W JP2013000318 W JP 2013000318W WO 2013111582 A1 WO2013111582 A1 WO 2013111582A1
Authority
WO
WIPO (PCT)
Prior art keywords
pipe
measurement
connection
jet pump
repair
Prior art date
Application number
PCT/JP2013/000318
Other languages
English (en)
French (fr)
Inventor
裕紀 湊
邦彦 衣笠
森 啓
山本 智
弘幸 安達
忠浩 三橋
勝信 渡邉
義紀 片山
梢 松川
悟史 宮村
Original Assignee
株式会社 東芝
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社 東芝 filed Critical 株式会社 東芝
Priority to US14/371,056 priority Critical patent/US10283226B2/en
Publication of WO2013111582A1 publication Critical patent/WO2013111582A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C19/00Arrangements for treating, for handling, or for facilitating the handling of, fuel or other materials which are used within the reactor, e.g. within its pressure vessel
    • G21C19/20Arrangements for introducing objects into the pressure vessel; Arrangements for handling objects within the pressure vessel; Arrangements for removing objects from the pressure vessel
    • G21C19/207Assembling, maintenance or repair of reactor components
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C13/00Pressure vessels; Containment vessels; Containment in general
    • G21C13/02Details
    • G21C13/032Joints between tubes and vessel walls, e.g. taking into account thermal stresses
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C15/00Cooling arrangements within the pressure vessel containing the core; Selection of specific coolants
    • G21C15/24Promoting flow of the coolant
    • G21C15/243Promoting flow of the coolant for liquids
    • G21C15/25Promoting flow of the coolant for liquids using jet pumps
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C17/00Monitoring; Testing ; Maintaining
    • G21C17/02Devices or arrangements for monitoring coolant or moderator
    • G21C17/032Reactor-coolant flow measuring or monitoring
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C19/00Arrangements for treating, for handling, or for facilitating the handling of, fuel or other materials which are used within the reactor, e.g. within its pressure vessel
    • G21C19/19Reactor parts specifically adapted to facilitate handling, e.g. to facilitate charging or discharging of fuel elements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49229Prime mover or fluid pump making
    • Y10T29/49236Fluid pump or compressor making
    • Y10T29/49238Repairing, converting, servicing or salvaging

Definitions

  • Embodiments of the present invention relate to a repair method and a repair device for a jet pump measurement pipe for repairing a measurement pipe provided in a diffuser of a jet pump in a boiling water reactor.
  • a plurality of jet pumps 4 are installed at equal intervals along the circumferential direction between the reactor pressure vessel 1 and the shroud 2 whose axis is the vertical direction in the downcomer portion 3.
  • These jet pumps 4 have riser pipes 5 as shown in FIG.
  • the riser pipe 5 is fixed to the reactor pressure vessel 1 and introduces the coolant supplied from the recirculation inlet nozzle 6 of the recirculation pump into the reactor.
  • a pair of elbows 7A and 7B are connected to the upper portion of the riser pipe 5 via a transition piece 14.
  • a pair of inlet throats 9A and 9B are connected to the pair of elbows 7A and 7B via a pair of mixing nozzles 8A and 8B.
  • Diffusers 10A and 10B are connected to the pair of inlet throats 9A and 9B, respectively.
  • inlet throats 9A and 9B and the diffusers 10A and 10B are shown in common or collectively, they will be described as the inlet throat 9 and the diffuser 10, respectively.
  • the piping 11 for measurement is provided in the upper and lower parts of the diffusers 10A and 10B, the static pressure difference of the upper and lower parts in the diffuser 10 in operation
  • movement is measured by this piping 11 for measurement, and the calibration which measured this measured value before plant use
  • the flow rate of the jet pump 4 is calculated by calibrating with values.
  • the measurement pipe 11 is welded and supported by a block 12 as a support member fixed to the diffuser 10 and a support 13 shown in FIG. Further, the measurement pipe 11 is arranged in a complicated state at the lower part of the jet pump 4 as shown in FIGS. 25A and 25B, and is connected to the outside pipe through the jet pump measurement nozzle 15. .
  • Two jet pump measurement nozzles 15 are provided at symmetrical positions in the horizontal cross section of the reactor pressure vessel 1.
  • the jet pump 4 having such a configuration is used under severe conditions as compared with other devices due to the high temperature of about 300 ° C. and the flow of high-speed and large-volume cooling water fed from a recirculation pump (not shown). .
  • a large load acts on each member, and in particular, the measurement pipe 11 directly or directly supports the influence of the fluid vibration generated by the flow of the high-speed and large-volume cooling water fed from the recirculation pump of the diffuser 10 Severe stress acts through 13. Therefore, the measurement pipe 11 may be broken.
  • the measurement pipe 11 is broken in this way, the flow rate of the jet pump 4 cannot be measured, which impedes the power control of the nuclear reactor, and repair work is urgent.
  • the measurement pipe 11 is arranged in a narrow annular space 16 between the reactor pressure vessel 1 and the shroud 2 as shown in FIG. 25B, and above the measurement pipe 11 is shown in FIG. As shown, a riser pipe 5 and an inlet throat 9 are arranged.
  • the horizontal portion near the support 13 of the measurement pipe 11 shown in FIG. 24 is installed closest to the shroud 2, and the space between the shroud 2 and the shroud 2 is less than 150 mm.
  • an intermediate cylinder of the shroud 2 overhangs and covers the upper portion of the horizontal portion of the measurement pipe 11. For this reason, the shape, size, repair method, and the like of the repair device for the measurement pipe 11 are very limited, which makes repair work extremely difficult.
  • the periphery where the measurement pipe 11 is installed is in a high radiation area, it is extremely difficult for an operator to work close to the pipe section. From the above, the current situation is that there is no method for repairing the measurement pipe 11 except that it is performed remotely from directly above the core in water.
  • the horizontal portion of the measurement pipe 11 is difficult to repair for positional reasons, and further, remote repair work in water is an essential requirement in order to shorten the repair process. Therefore, when the horizontal part of the measurement pipe 11 is broken, it has been desired to establish a repair method remotely underwater.
  • An object of the present invention is to provide a method for repairing a pipe for measuring a jet pump and a repair device therefor.
  • a method for repairing a pipe for measuring a jet pump is a measuring system installed horizontally in a lower part of a jet pump provided in reactor water in a reactor pressure vessel.
  • a method for repairing a pipe for measurement of a jet pump for repairing a broken portion of the pipe wherein a support member fixing step for fixing a support member to the jet pump in the vicinity of the remaining measurement pipe, and after the support member fixing step
  • a connecting device attaching step for attaching a measuring pipe connecting device provided with a pipe repair pipe having a connecting pipe fitted at both ends to the support member; and after the connecting device attaching step, the measuring pipe connecting device is used. And connecting the remaining measurement pipe and the connection pipe.
  • a repair apparatus for a pipe for measuring a jet pump is a jet that repairs a broken part of a pipe for measuring installed horizontally in a lower part of a jet pump provided in reactor water in a reactor pressure vessel.
  • a pump measuring pipe repairing device comprising: a supporting member to which a supporting member is fixed to the jet pump in the vicinity of the remaining measuring pipe; and a pipe repairing pipe in which connection pipes are fitted at both ends, The measurement pipe connection device attached to the support member is connected to the remaining measurement pipe and the connection pipe by the measurement pipe connection device.
  • FIG. 3 is a front view of FIG. 2.
  • FIG. 2 is a perspective view which shows the piping support bracket for measurement used in embodiment of FIG.
  • FIG. 3 is a front view of FIG. 2.
  • FIG. 2 is a perspective view which shows the piping support bracket for measurement used in embodiment of FIG.
  • It is a disassembled perspective view which shows the state which attaches a connecting pipe feed mechanism and a connecting pipe feed wrench to the measurement piping support bracket of FIG.
  • It is a disassembled perspective view which shows the state before attachment of a piping holding apparatus to the piping support bracket for measurement of FIG.
  • It is a side view which shows the piping holding apparatus of FIG.
  • FIG. 12 is an elevational view showing a state in which a measurement pipe positioning device is attached to the pipe gripping device of FIG. 11.
  • FIG. 14 It is a perspective view which shows the state which removed the piping arrangement
  • FIG. 1 It is an elevation sectional view showing a schematic structure of a boiling water reactor. It is a perspective view which expands and shows the principal part of the jet pump shown in FIG. It is an elevation which shows the attachment state of the conventional piping for jet pump measurement.
  • (A), (b) is a block diagram which shows the piping for the conventional jet pump measurement.
  • FIG. 1 is a flowchart showing an embodiment of a method for repairing a pipe for measuring a jet pump according to the present invention. This flowchart is a repair flowchart applied when the horizontal portion of the measurement pipe 11 is broken.
  • the repair method of the present embodiment includes a step S1 for attaching a C-shaped clamp 17 as a support member, a step S2 for attaching a measurement pipe connection unit 30 as a measurement pipe connection device, and a measurement.
  • Step S3 for connecting the pipe 11 to be used, Step S4 for heating the connection pipe 24, and Step S5 for removing and removing the pipe gripping device 32, the connection pipe feed wrench 34 and the connection pipe feed mechanism 33 from the measurement pipe connection unit 30. And have.
  • step S1 the C-shaped clamp 17 used in step S1 will be described.
  • FIG. 2 is a plan view showing a C-shaped clamp used in the embodiment of FIG.
  • FIG. 3 is a front view of FIG.
  • the C-shaped clamp 17 includes a clamp body 17a, a positioning hook 18, a clamp fixing mechanism 19, two fixing screw holes 21, and two positioning holes 22. And four hanging ears 23 used when the clamp body 17a is suspended by a lifting tool that is not used.
  • the two fixing screw holes 21 are disposed on both sides of the positioning hook 18, and a fixing bolt of a measurement pipe support bracket described later is screwed in.
  • the two positioning holes 22 are arranged outside the two fixing screw holes 21 and into which positioning pins of a measurement pipe support bracket described later are inserted.
  • the clamp body 17a is formed in a plane C shape and attached so as to surround the outer periphery of the diffuser 10.
  • the clamp body 17a has two protrusions 17b on the inner peripheral surface.
  • the positioning hook 18 is fixed to the upper surface of the clamp body 17a and is hooked on the remaining portion of the support 13 that has been cut in advance, and performs positioning in the height direction and the circumferential direction to position the clamp body 17a.
  • the clamp fixing mechanism 19 is provided at the end of the clamp body 17a and fixes the clamp body 17a to the diffuser 10.
  • the clamp fixing mechanism 19 includes a slider 20 having an inclined surface on the outer peripheral side, a fixing bolt 19a that moves the slider 20 up and down by rotating in a tightening direction or a loosening direction, and an inner peripheral side. And a wedge block 19b having an inclined surface that contacts the inclined surface of the slider 20.
  • the slider 20 is moved downward by tightening the fixing bolt 19a with a wrench (not shown). Then, the slider 20 moves downward along the inclined surface of the wedge block 19b and simultaneously moves in the inner peripheral direction of the clamp body 17a.
  • step S1 for attaching the C-shaped clamp 17 will be described.
  • the C-shaped clamp 17 is suspended by using four hanging ears 23 by a lifting tool (not shown), and the C-shaped clamp 17 is suspended along the outer periphery of the shroud 2 with the clamp body 17a being vertical. Then, in the portion where the outer diameter of the upper part of the diffuser 10 is small, the clamp main body 17a is brought close to the horizontal state and the clamp main body 17a is loosely fitted on the outer peripheral surface of the diffuser 10, and then the clamp main body 17a is gradually suspended while being kept horizontal. . Next, the positioning hook 18 fixed to the upper surface of the clamp body 17a is hooked on the support 13, and the clamp body 17a is positioned by positioning in the height direction and the circumferential direction.
  • the fixing bolt 19a of the clamp fixing mechanism 19 is tightened with a torque of 15 to 20 N ⁇ m using a wrench (not shown). Thereby, the slider 20 is moved downward, and at the same time, is moved in the inner peripheral direction of the clamp body 17a.
  • step S2 for attaching the measurement pipe connection unit 30 will be described. First, the configuration of the measurement pipe connection unit 30 used in step S2 will be described.
  • FIG. 4 is a perspective view showing a pipe support bracket for measurement used in the embodiment of FIG.
  • FIG. 5 is an exploded perspective view showing a state in which the connection pipe feed mechanism and the connection pipe feed wrench are attached to the measurement pipe support bracket of FIG. 6 is an exploded perspective view showing a state before the pipe gripping device is attached to the measurement pipe support bracket of FIG.
  • FIG. 7 is an elevation view showing the pipe gripping device of FIG.
  • FIG. 8 is a side view showing the pipe gripping device of FIG.
  • FIG. 9 is a perspective view showing a state in which a pipe gripping device is attached to the measurement pipe support bracket of FIG.
  • FIG. 10 is an exploded perspective view showing a state before the measurement pipe connection unit is attached to the C-shaped clamp.
  • FIG. 11 is a perspective view showing a state in which the measurement pipe connection unit is attached to the C-shaped clamp.
  • FIG. 12 is an elevational view showing a gripping device suspension for suspending the piping gripping device of FIG.
  • the side facing the diffuser 10 in FIGS. 4 to 12 is the back side, and the opposite side is the front side.
  • the measurement pipe connection unit 30 roughly includes a measurement pipe support bracket 31, a connection pipe feed mechanism 33, a connection pipe feed wrench 34, and a pipe gripping device 32.
  • the measurement pipe connection unit 30 shown in FIGS. 9 to 11 is assembled in advance in the air such as an operation floor.
  • the measurement pipe support bracket 31 serves as a base portion when the measurement pipe connection unit 30 is attached to the C-shaped clamp 17.
  • the measurement pipe support bracket 31 is formed substantially symmetrical to the longitudinal direction.
  • a pipe repair pipe hereinafter referred to as a spool piece
  • SMA shape memory alloy
  • Measured piping support bracket 31 has fixing bolts 26 installed at symmetrical positions with respect to the longitudinal direction. These fixing bolts 26 are fastened to two fixing screw holes 21 formed in the C-shaped clamp 17 with a torque of 15 to 20 N ⁇ m using a wrench (not shown). As a result, the measurement pipe support bracket 31 is fixed to the C-shaped clamp 17.
  • the measurement pipe support bracket 31 is provided with positioning pins 27 on the bottom surfaces in the vicinity of both ends in the longitudinal direction. These positioning pins 27 are inserted into two positioning holes 22 formed in the C-shaped clamp 17. As a result, the measurement pipe support bracket 31 is positioned on the C-shaped clamp 17.
  • the measurement pipe support bracket 31 is provided with two mounting recesses 31a for mounting and fixing the connection pipe feed mechanism 33 at a position substantially in the center in the longitudinal direction. Two insertion holes 29 for inserting the operation portions 45a and 45b of the connecting pipe feed wrench 34 are formed on the back side of these mounting recesses 31a.
  • the pipe support bracket 31 for measurement is formed with two screw holes 31b into which the mounting bolts 36 of the pipe gripping device 32 are screwed in the vicinity of both ends in the longitudinal direction.
  • the connecting pipe feeding mechanism 33 is attached to the measurement pipe support bracket 31. Specifically, the shaft portions of the two mounting bolts 37 of the connection pipe feed mechanism 33 are inserted into the two mounting recesses 31 a of the measurement pipe support bracket 31. Then, these two mounting bolts 37 are tightened. As a result, the connecting pipe feed mechanism 33 is fixed to the measurement pipe support bracket 31.
  • connection pipe feed wrench 34 is attached to the measurement pipe support bracket 31. Specifically, as shown in FIG. 5, the operation portions 45 a and 45 b of the connection pipe feed wrench 34 are inserted into the two insertion holes 29. As a result, the connection pipe feed wrench 34 is attached to the measurement pipe support bracket 31.
  • a pipe gripping device 32 is attached to the measurement pipe support bracket 31 as shown in FIG.
  • the pipe gripping device 32 is formed in a front view portal shape.
  • the pipe gripping device 32 has suspension ears 49 fixed to both ends in the longitudinal direction of the upper surface portion.
  • openings 32a are formed that open to the front side and the back side, respectively.
  • the pipe gripping device 32 has two operation holes 32c in the front-rear direction for inserting a tool such as a wrench at the center in the longitudinal direction on the upper surface.
  • the pipe gripping device 32 is provided with a clamp 32b for gripping the measurement pipe 11 at the lower ends of both legs as shown in FIGS.
  • the pipe gripping device 32 is provided with two mounting bolts 36 in the vicinity of both leg portions. These mounting bolts 36 are screwed into the screw holes 31b formed in the measurement pipe support bracket 31 by tightening with a wrench 50 as shown in FIG. Accordingly, the pipe gripping device 32 is fixed to the measurement pipe support bracket 31.
  • the pipe gripping device 32 is hung by a gripping device lifting tool 35 shown in FIG. Specifically, the gripping device hanger 35 is provided with two hooks 35a on the bottom surface. These hooks 35 a hook the opening end of the opening 32 a of the pipe gripping device 32. As a result, the pipe gripping device 32 is suspended from the gripping device lifting tool 35.
  • the measurement pipe connection unit 30 shown in FIGS. 9 to 11 is provided by sequentially attaching the connection pipe feed mechanism 33, the connection pipe feed wrench 34, and the pipe gripping device 32 to the measurement pipe support bracket 31. Is assembled.
  • step S2 the measurement pipe connection unit 30 assembled in this manner is suspended in the furnace as shown in FIG. At this time, the measurement pipe connection unit 30 is suspended by the hook 35 a of the gripping device lifting tool 35 hooking the opening end of the opening 32 a of the pipe gripping device 32.
  • the positioning pin 27 of the measurement pipe support bracket 31 is inserted into the positioning hole 22 of the C-shaped clamp 17. Further, the fixing bolt 26 of the measurement pipe support bracket 31 is fastened and fixed to the fixing screw hole 21 of the C-shaped clamp 17 with a torque of 15 to 20 N ⁇ m using a wrench (not shown).
  • Step S2 for attaching the measurement pipe connection unit 30 through the above steps is completed.
  • step S3 for connecting the measurement pipe 11 will be described.
  • connection pipes 24 fitted to both ends of the spool piece 25 of the measurement pipe support bracket 31 are connected to the broken portions of the respective measurement pipes 11.
  • the measurement pipe 11 on the # 1 side (one end side) in the arrangement order of a large number of diffusers 10 and the measurement pipe 11 on the # 3 side (the other end side) in the arrangement order are connected to the pipe gripping device 32. It is gripped by the clamp 32b.
  • a pipe positioning device 43 for measurement is placed on the upper part of the pipe gripping device 32, and both are combined. Then, the pipe gripping device 32 is operated by the measurement pipe positioning device 43 to align the cores of the measurement pipe 11 and the connection pipe 24 on one end side and the other end side.
  • the connecting pipe feed wrench 34 is operated to insert the connecting pipe 24 into the measurement pipe 11.
  • the pipe positioning device 43 for measurement is recovered from the upper part of the pipe gripping device 32 and removed.
  • FIG. 13 is an elevation view showing a measurement pipe positioning device attached to the pipe gripping device of FIG.
  • FIG. 14 is an elevational view showing a state where a measurement pipe positioning device is attached to the pipe gripping device of FIG.
  • three stud bolts are installed on both sides in the longitudinal direction of the upper part of the pipe gripping device 32, and one of the stud bolts is operated by a wrench by remote hand work, as shown in FIG.
  • the cut measurement pipe 11 is held by the clamp 32b.
  • the measurement pipe positioning device 43 shown in FIG. 13 is suspended and is seated on the pipe gripping device 32 as shown in FIG.
  • the measurement pipe positioning device 43 has an electric wrench (not shown) incorporated in the part on the both measurement pipes 11 side.
  • an electric wrench (not shown) incorporated in the part on the both measurement pipes 11 side.
  • the cut measurement pipe 11 is adjusted so as to be positioned on the extension line of the spool piece 25. That is, it is confirmed by an underwater television camera or the like that the measurement pipe 11 is positioned on the extension line of the spool piece 25.
  • FIG. 15 is a perspective view showing a state where the measuring pipe positioning device is removed from FIG. 14 and a wrench is inserted.
  • FIG. 16 is a perspective view showing a state in which the feed wrench is operated in the state of FIG. 15 to connect the connection pipe to the measurement pipe.
  • connection pipe feed wrench 34 operates the feed arm 38 and inserts the connection pipe 24 into the measurement pipe 11. Specifically, the operation bolts 44a and 44b of the connecting pipe feed wrench 34 shown in FIG. 5 are rotated by a wrench 50 as shown in FIGS.
  • the wrench 50 is attached to the operation bolt 44a or 44b through the operation hole 32c formed in the pipe gripping device 32. And if operation bolt 44a or 44b is rotated using wrench 50, operation part 45a or 45b will rotate.
  • connection pipe 24 is connected to a rotating screw 33a or 33b provided in the connecting pipe feed mechanism 33 via a connecting member such as a bevel gear (not shown).
  • the rotary screws 33 a and 33 b are connected to the feed arm 38.
  • the feed arm 38 holds both ends of the connecting pipe 24 in the axial direction. Therefore, by rotating the operation bolt 44a or 44b using the wrench 50, the feed arm 38 is moved in the axial direction via the rotary screw 33a or 33b. Thereby, the connection pipe 24 can be inserted into the measurement pipe 11.
  • the measurement pipe positioning device 43 is lifted and removed from the state where the measurement pipe positioning device 43 is attached to the pipe gripping device 32.
  • the step S3 is completed.
  • step S4 for heating the connecting pipe 24 will be described.
  • FIG. 17 is a perspective view showing a state in which the connecting pipe is heated using a heating device in the state of FIG.
  • FIG. 18 is a block diagram showing an electrical system of the heating device of FIG.
  • the heating device 39 is attached to the opening 32 a of the pipe gripping device 32.
  • a heating coil 41 is attached to the heating device 39 via a connecting portion 39a.
  • the heating coil 41 is provided so as to sandwich the connecting pipe 24 when the heating device 39 is attached to the opening 32a.
  • the heating device 39 includes a high-frequency power supply device 40 and a transformer 42 as shown in FIG.
  • the high frequency power supply device 40 once converts the power source into direct current and generates high frequency energy of several hundred Hz to several MHz.
  • the transformer 42 adjusts the high frequency energy generated by the high frequency power supply device 40 to the voltage and current required for the heating coil 41 that is a load.
  • the heating coil 41 is formed in the shape according to the objectives, such as the shape of the connection pipe 24, and a heating site
  • connection pipe 24 made of a shape memory alloy surrounded by the heating coil 41 is heated by dielectric heating to reduce the inner diameter, thereby connecting the measurement pipe 11 and completing the repair of the measurement pipe 11. Thereafter, the heating device 39 is lifted by a lifting tool (not shown).
  • connection pipe 24 made of a shape memory alloy there are cases where heating is performed using a steam boiler or a heater.
  • a steam boiler or a heater in order to raise the ambient temperature of the connection pipe 24 to 100 ° C., it is necessary to surround the connection pipe 24 with a chamber and to drain and heat the water in the chamber.
  • the repair work requires a proficiency level and time.
  • connection tube 24 is heated only by the heating coil 41 by dielectric heating, the operation of attaching and removing the chamber is eliminated, the workability is improved, and the working time can be greatly shortened.
  • step S5 of removing and removing the pipe gripping device 32, the connection pipe feed wrench 34, and the connection pipe feed mechanism 33 from the measurement pipe connection unit 30 will be described.
  • FIG. 19 is an exploded perspective view showing a state in which the pipe gripping device is removed from the state of FIG. 20 is an exploded perspective view showing a state in which the connecting pipe feed wrench is removed from the state of FIG. 21 is a perspective view showing a state in which the connecting pipe feed wrench has been removed from the state of FIG.
  • the pipe gripping device 32 is lifted from the measurement pipe connection unit 30 using the gripping device lifting tool 35 and removed. Specifically, the mounting bolt 36 of the pipe gripping device 32 is loosened and removed from the measurement pipe support bracket 31. Then, the pipe gripping device 32 is lifted using the gripping device lifting tool 35 and removed.
  • connection pipe feed wrench 34 is pulled out from the insertion hole 29 of the measurement pipe support bracket 31 and removed by lifting the connection pipe feed wrench 34.
  • connection pipe feed mechanism 33 is loosened with a wrench (not shown), and the connection pipe feed mechanism 33 is removed from the mounting recess 31 a of the measurement pipe support bracket 31. Then, the connecting pipe feeding mechanism 33 is removed by lifting.
  • the C-shaped clamp 17 is attached to the diffuser 10. Then, the measurement pipe connection unit 30 provided with the spool piece 25 is attached to the C-shaped clamp 17.
  • the C-shaped clamp 17 and the measurement pipe connection unit 30 are separated from each other, and these are sequentially attached to the diffuser 10 to facilitate positioning and reduce the size of each member. Therefore, repair work can be easily performed even in a narrow part near the furnace bottom, and workability and quality can be improved as compared with the prior art, and work time can be greatly shortened.
  • the measuring pipe 11 and the spool piece 25 are aligned using the measuring pipe positioning device 43, so that the connecting work between the measuring pipe 11 and the spool piece 25 is easy. Therefore, workability can be improved.
  • connection tube 24 can be heated only by the heating coil 41 by dielectric heating, the work for mounting and removing the chamber is eliminated, the workability is improved, and the working time is greatly shortened. Is possible.
  • the pipe gripping device 32, the connection pipe feed wrench 34, and the connection pipe feed mechanism 33 are removed from the measurement pipe connection unit 30 and removed. Only a mechanism necessary for holding the piping 11 is installed. Therefore, it becomes possible to reduce the possibility of loose parts by the dropping member.
  • one end and the other end of the broken measurement pipe 11 are directly connected to the connecting pipe 24.
  • the present invention is not limited to this, and the broken measurement pipe 11 is accurately and accurately connected in advance using a cutting device. It is also possible to cut various positions. Similarly, the support 13 may be cut at an accurate position in advance using a cutting device.
  • Heating device 39a ... Connecting portion, 40 ... High frequency power supply device, 41 ... Heating coil, 42 ... Transformer, 43 ... Measuring pipe positioning device, 44a, 44b ... operation bolts, 45a, 45b ... operation part, 49 ... hanging ears, 50 ... wrench

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Plasma & Fusion (AREA)
  • General Engineering & Computer Science (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)

Abstract

ジェットポンプ計測用配管の補修方法は、原子炉圧力容器内の炉水中に設けられたジェットポンプの下部に水平方向に設置された計測用配管の破断部を補修する。補修方法は、残存した計測用配管の近傍における前記ジェットポンプに支持部材を固定する支持部材固定ステップ(S1)と、支持部材固定ステップ(S1)の後に、支持部材に、両端に接続管が嵌め込まれた配管補修管が設けられた計測用配管接続装置を取り付ける接続装置取付ステップ(S2)と、接続装置取付ステップ(S2)の後に、計測用配管接続装置を用いて残存した計測用配管と接続管を接続する接続ステップ(S3)とを有する。これにより、水中で計測用配管が水平方向に設置されているジェットポンプの下部で発生した破断事象に対応可能であり、狭隘部での補修作業を容易にする。

Description

ジェットポンプ計測用配管の補修方法及びその補修装置
 本発明の実施形態は、沸騰水型原子炉におけるジェットポンプのディフューザに設けられた計測用配管を補修するためのジェットポンプ計測用配管の補修方法及びその補修装置に関する。
 従来、沸騰水型原子炉では、出力密度を高くするため、原子炉圧力容器の外部に設置した再循環ポンプと、原子炉圧力容器の内部に設置したジェットポンプとを組み合せた、いわゆるジェットポンプシステムが採用されている。
 図22に示すように、ジェットポンプ4は、ダウンカマ部3内において軸を鉛直方向とする原子炉圧力容器1とシュラウド2との間で、周方向に沿って等間隔に複数設置されている。これらのジェットポンプ4は、図23に図22の要部を拡大して示すように、ライザ管5を有する。このライザ管5は原子炉圧力容器1に固定されており、再循環ポンプの再循環入口ノズル6から供給された冷却材を炉内に導入する。
 ライザ管5の上部には、トランジションピース14を介して一対のエルボ7A,7Bが接続されている。これら一対のエルボ7A,7Bには、一対の混合ノズル8A,8Bを介して一対のインレットスロート9A,9Bが接続されている。この一対のインレットスロート9A,9Bには、それぞれディフューザ10A,10Bが接続されている。
 なお、以下では、インレットスロート9A,9B、ディフューザ10A,10Bを共通して示す場合、あるいは一括して示す場合は、それぞれインレットスロート9、ディフューザ10として説明する。
 さて、原子力発電プラントの出力制御を行う上で、通常運転中のジェットポンプ4の流量を測定することは重要である。このため、ディフューザ10A,10Bの上下部に計測用配管11を設け、この計測用配管11により運転中のディフューザ10における上下部の静圧差を測定し、この測定値をプラント使用前に測定した較正値により較正し、ジェットポンプ4の流量を算出している。
 この計測用配管11は、ディフューザ10の上下部の静圧孔に溶接され、ディフューザ10に固定されている支持部材としてのブロック12及び図24に示すサポート13により溶接支持されている。また、計測用配管11は、図25(a),(b)に示すようにジェットポンプ4の下部において複雑な状態で配置され、ジェットポンプ計測用ノズル15を経て炉外配管と接続されている。このジェットポンプ計測用ノズル15は、原子炉圧力容器1の水平断面における対称位置に2箇所設けられている。
 このような構成のジェットポンプ4は、約300℃の高温度に加え図示しない再循環ポンプから送り込まれる高速大流量の冷却水の流れにより、他の機器に比較して厳しい条件下で使用される。このため、各部材には大きな負荷が作用し、特に計測用配管11はディフューザ10の再循環ポンプから送り込まれる高速大流量の冷却水の流れにより発生した流体振動の影響を直接またはブロック12、サポート13を介して受け、厳しい応力が作用する。したがって、計測用配管11は、破断を生じることもあり得る。このように計測用配管11が破断した場合は、ジェットポンプ4の流量が測定することができないため、原子炉の出力制御に支障を与えることになり、補修作業は急務であるといえる。
 ここで、計測用配管11は、図25(b)に示す通り原子炉圧力容器1とシュラウド2との間の狭い環状空間16に配置されるとともに、計測用配管11の上方には図23に示す通りライザ管5及びインレットスロート9などが配置されている。図24に示す計測用配管11のサポート13付近の水平部がシュラウド2に最も接近して設置され、シュラウド2との間隔は150mmにも満たない空間である。
 また、この計測用配管11の水平部の上部には、シュラウド2の中間胴がオーバーハングして上方を覆っている。このため、計測用配管11の補修機器の形状、大きさ、補修方法などが非常に限られ、非常に困難な補修作業となる。
 さらに、計測用配管11が設置されている周辺は、高放射線区域にあることから、その配管部へ作業員が接近して作業することは極めて困難である。以上のことから計測用配管11の補修作業は、水中で炉心真上から遠隔的に実施する以外に方法がないということが現状である。
 このような計測用配管11の補修方法として、例えば炉水を排水して実施する溶接装置や、水中レーザ溶接装置を用いた補修方法がある。(例えば特許文献1、2参照)
特許第4298527号公報 特開2004-209515号公報
 ところで、上述した計測用配管11は、その破断事象の多くが計測用配管11とブロック12との溶接部において発生し、その補修方法も従来ではジェットポンプ4の鉛直方向に設置された計測用配管11のみを対象としたものしか提案されていない。
 また、上述した図23及び図24に示すように計測用配管11の水平部の設置位置は、非常に狭隘部であるため、特許文献1、2に記載された技術では当該部の補修は困難である。
 さらに、上述したように計測用配管11の水平部は、位置的理由から補修が困難である上、さらに補修工程を短縮するためにも、水中での遠隔補修作業は必須要件となる。そのため、計測用配管11の水平部が破断した場合は、水中遠隔での補修方法を確立することが望まれていた。
 本発明の実施形態が解決しようとする課題は、水中で計測用配管が水平方向に設置されているジェットポンプの下部で発生した破断事象に対応可能であり、狭隘部での補修作業を容易にするジェットポンプ計測用配管の補修方法及びその補修装置を提供することを目的とする。
 上記目的を達成するために、本発明の実施形態に係るジェットポンプ計測用配管の補修方法は、原子炉圧力容器内の炉水中に設けられたジェットポンプの下部に水平方向に設置された計測用配管の破断部を補修するジェットポンプ計測用配管の補修方法であって、残存した前記計測用配管の近傍における前記ジェットポンプに支持部材を固定する支持部材固定ステップと、前記支持部材固定ステップの後に、前記支持部材に、両端に接続管が嵌め込まれた配管補修管が設けられた計測用配管接続装置を取り付ける接続装置取付ステップと、前記接続装置取付ステップの後に、前記計測用配管接続装置を用いて前記残存した計測用配管と前記接続管を接続する接続ステップと、を有することを特徴とする。
 本発明の実施形態に係るジェットポンプ計測用配管の補修装置は、原子炉圧力容器内の炉水中に設けられたジェットポンプの下部に水平方向に設置された計測用配管の破断部を補修するジェットポンプ計測用配管の補修装置であって、残存した前記計測用配管の近傍における前記ジェットポンプに支持部材が固定される支持部材と、両端に接続管が嵌め込まれた配管補修管を有し、前記支持部材に取り付けられる計測用配管接続装置と、前記計測用配管接続装置で前記残存した計測用配管と前記接続管を接続することを特徴とする。
 本発明の実施形態によれば、水中で計測用配管が水平方向に設置されているジェットポンプの下部で発生した破断事象に対応可能であり、狭隘部での補修作業を容易にすることができる。
本発明に係るジェットポンプ計測用配管の補修方法の一実施形態を示すフローチャートである。 図1の実施形態で用いるC形クランプを示す平面図である。 図2の正面図である。 図1の実施形態で用いる計測用配管支持ブラケットを示す斜視図である。 図4の計測用配管支持ブラケットに接続管送り機構及び接続管送りレンチを取り付ける状態を示す分解斜視図である。 図5の計測用配管支持ブラケットに配管把持装置の取付前の状態を示す分解斜視図である。 図6の配管把持装置を示す立面図である。 図6の配管把持装置を示す側面図である。 図5の計測用配管支持ブラケットに配管把持装置を取り付けている状態を示す斜視図である。 計測用配管接続ユニットをC形クランプに取り付ける前の状態を示す分解斜視図である。 計測用配管接続ユニットをC形クランプに取り付けた状態を示す斜視図である。 図6の配管把持装置を吊り下げる把持装置吊り具を示す立面図である。 図11の配管把持装置に取り付けられる計測用配管位置出し装置を示す立面図である。 図11の配管把持装置に計測用配管位置出し装置を取り付けた状態を示す立面図である。 図14から計測用配管位置出し装置を取り外してレンチを挿通させた状態を示す斜視図である。 図15の状態において送りレンチを操作して接続管を計測用配管に接続する状態を示す斜視図である。 図16の状態において加熱装置を用いて接続管を加熱する状態を示す斜視図である。 図17の加熱装置の電気系統を示すブロック図である。 図17の状態から配管把持装置を撤去する状態を示す分解斜視図である。 図19の状態から接続管送りレンチを撤去する状態を示す分解斜視図である。 図19の状態から接続管送りレンチを撤去した状態を示す斜視図である。 沸騰水原子炉の概略構成を示す立断面図である。 図22に示したジェットポンプの要部を拡大して示す斜視図である。 従来のジェットポンプ計測用配管の取付状態を示す立面図である。 (a),(b)は従来のジェットポンプ計測用配管を示す構成図である。
 以下に、本発明に係るジェットポンプ計測用配管の補修方法の実施形態について、図面を参照して説明する。
 なお、以下の実施形態では、図22~図25と同一の部分には、同一の符号を付して説明する。また、以下の実施形態では、軸を鉛直方向とした原子炉圧力容器1内の炉水中に設けられたジェットポンプ4のディフューザ10に、水平方向に設置された計測用配管11が破断した際、その破断部を補修する場合について説明する。さらに、この補修作業は、原子炉停止時に原子炉圧力容器1の上部を開放し、原子炉圧力容器1の内部及び上部に炉水を収容した状態で行うものである。
 図1は本発明に係るジェットポンプ計測用配管の補修方法の一実施形態を示すフローチャートである。このフローチャートは、計測用配管11の水平部が破断した際に適用される補修用のフローチャートである。
 本実施形態の補修方法は、図1に示すように大略的に支持部材としてのC形クランプ17を取り付けるステップS1と、計測用配管接続装置としての計測用配管接続ユニット30を取り付けるステップS2、計測用配管11を接続するステップS3と、接続管24を加熱するステップS4と、計測用配管接続ユニット30から配管把持装置32、接続管送りレンチ34及び接続管送り機構33を取り外して撤去するステップS5とを有する。
 まず、ステップS1で用いるC形クランプ17について説明する。
 図2は図1の実施形態で用いるC形クランプを示す平面図である。図3は図2の正面図である。
 図2及び図3に示すように、C形クランプ17は、クランプ本体17aと、位置決めフック18と、クランプ固定機構19と、2つの固定用ねじ孔21と、2つの位置決め用孔22と、図示しない吊り具によりクランプ本体17aを吊り下げるときに用いる4つの吊り耳23とを備えている。
 図2に示すように、2つの固定用ねじ孔21は、位置決めフック18の両側に配置され、後述する計測用配管支持ブラケットの固定ボルトがねじ込まれる。2つの位置決め用孔22は、2つの固定用ねじ孔21の外側に配置され、後述する計測用配管支持ブラケットの位置決めピンが挿入される。
 クランプ本体17aは、平面C字形に形成されてディフューザ10の外周を囲むように取り付けられる。また、クランプ本体17aは、内周面に2つの突起17bが形成されている。位置決めフック18は、クランプ本体17aの上面に固定され、予め切断されているサポート13の残存部に掛止し、高さ方向及び周方向の位置出しを行い、クランプ本体17aを位置決めする。
 クランプ固定機構19は、クランプ本体17aの端部に設けられてクランプ本体17aをディフューザ10に固定する。具体的に、クランプ固定機構19は、外周側の側面に傾斜面が形成されたスライダ20と、締付方向又は緩め方向に回転させることでスライダ20を上下動させる固定ボルト19aと、内周側の側面にスライダ20の傾斜面と接触する傾斜面が形成された楔ブロック19bとを備えている。
 したがって、固定ボルト19aを図示しないレンチで締め付けることにより、スライダ20を下方に移動させる。すると、スライダ20は、楔ブロック19bの傾斜面に沿って下方に移動すると同時に、クランプ本体17aの内周方向に移動する。
 これにより、スライダ20の内周面がディフューザ10の外周面を押圧することで、その反力によりクランプ本体17aの2つの突起17bがディフューザ10の外周面を押圧する。その結果、C形クランプ17がディフューザ10の外周面に固定される。
 次に、C形クランプ17を取り付けるステップS1の詳細な動作を説明する。
 まず、図示しない吊り具により4つの吊り耳23を用いてC形クランプ17を吊り下げ、クランプ本体17aを鉛直にした状態でC形クランプ17をシュラウド2の外周に沿って吊り込む。そして、ディフューザ10の上部の外径が小さい部分において、クランプ本体17aを水平状態に近づけクランプ本体17aをディフューザ10の外周面に遊嵌させた後、クランプ本体17aを水平に保ちつつ徐々に吊り降ろす。次いで、クランプ本体17aの上面に固定された位置決めフック18をサポート13に掛止し、高さ方向及び周方向の位置出しを行い、クランプ本体17aを位置決めする。その後、クランプ固定機構19の固定ボルト19aを図示しないレンチを用いて15~20N・mのトルクで締め付ける。これにより、スライダ20を下方に移動させると同時に、クランプ本体17aの内周方向に移動させる。
 すると、スライダ20の内周面がディフューザ10の外周面を押圧することで、その反力によりクランプ本体17aの2つの突起17bがディフューザ10の外周面を押圧する。これにより、C形クランプ17がディフューザ10の外周面に固定される。
 次に、計測用配管接続ユニット30を取り付けるステップS2について説明する。最初に、ステップS2で用いる計測用配管接続ユニット30の構成について説明する。
 図4は図1の実施形態で用いる計測用配管支持ブラケットを示す斜視図である。図5は図4の計測用配管支持ブラケットに接続管送り機構及び接続管送りレンチを取り付ける状態を示す分解斜視図である。図6は図5の計測用配管支持ブラケットに配管把持装置の取付前の状態を示す分解斜視図である。図7は図6の配管把持装置を示す立面図である。図8は図6の配管把持装置を示す側面図である。図9は図5の計測用配管支持ブラケットに配管把持装置を取り付けている状態を示す斜視図である。
 図10は計測用配管接続ユニットをC形クランプに取り付ける前の状態を示す分解斜視図である。図11は計測用配管接続ユニットをC形クランプに取り付けた状態を示す斜視図である。図12は図6の配管把持装置を吊り下げる把持装置吊り具を示す立面図である。
 なお、以下の説明では、図4~図12においてディフューザ10に対向する側を背面側とし、その反対側を前面側とする。
 ステップS2で用いる計測用配管接続ユニット30の各構成部材の構造について説明する。図10に示すように、計測用配管接続ユニット30は、大まかに計測用配管支持ブラケット31と、接続管送り機構33と、接続管送りレンチ34と、配管把持装置32とを備える。図9~図11に示す計測用配管接続ユニット30は、オペレーションフロアなどの気中で予め組み立てられる。
 図11に示すように、計測用配管支持ブラケット31は、計測用配管接続ユニット30をC形クランプ17に取り付ける際のベース部分となる。
 図4に示すように、計測用配管支持ブラケット31は、長手方向に対して略左右対称に形成されている。計測用配管支持ブラケット31の前面側には、両端に一定温度に達すると形状が回復する特性を備えた形状記憶合金(SMA)製の接続管24が嵌め込まれた配管補修管(以下、スプールピースという。)25が設けられている。
 計測用配管支持ブラケット31は、固定ボルト26が長手方向に対して左右対称位置に設置されている。これらの固定ボルト26は、C形クランプ17に形成された2つの固定用ねじ孔21に図示しないレンチを用いて15~20N・mのトルクで締め付けられる。これにより、計測用配管支持ブラケット31がC形クランプ17に固定される。
 計測用配管支持ブラケット31は、長手方向両端近傍の底面に位置決めピン27が設けられている。これらの位置決めピン27は、C形クランプ17に形成した2つの位置決め用孔22に挿入される。これにより、計測用配管支持ブラケット31がC形クランプ17に位置決めされる。
 計測用配管支持ブラケット31は、長手方向略中央の位置に接続管送り機構33を装着して固定するために2つの取付用凹部31aが設けられている。これらの取付用凹部31aの背面側には、接続管送りレンチ34の操作部45a,45bを挿入するための2つの挿入孔29が形成されている。計測用配管支持ブラケット31は、長手方向両端近傍に配管把持装置32の取付ボルト36がねじ込まれる2つねじ孔31bが並んで形成されている。
 次に、計測用配管接続ユニット30を組み立てる工程について説明する。
 まず、図5に示すように計測用配管支持ブラケット31に接続管送り機構33が取り付けられる。具体的には、計測用配管支持ブラケット31の2つの取付用凹部31aに接続管送り機構33の2本の取付ボルト37の軸部を挿入する。そして、これら2本の取付ボルト37を締め付ける。これにより、計測用配管支持ブラケット31に接続管送り機構33が固定される。
 次に、計測用配管支持ブラケット31に接続管送りレンチ34が取り付けられる。具体的には、図5に示すように接続管送りレンチ34の操作部45a,45bを2つの挿入孔29に挿入する。これにより、計測用配管支持ブラケット31に接続管送りレンチ34が装着される。
 さらに、図6に示すように計測用配管支持ブラケット31に配管把持装置32が取り付けられる。この配管把持装置32は、正面視門形に形成されている。配管把持装置32は、上面部における長手方向両端に吊り耳49が固定されている。これらの吊り耳49が固定された内側には、正面側及び背面側にそれぞれに開口する開口部32aが形成されている。配管把持装置32は、上面部における長手方向中央にレンチなどの工具を挿入するための操作孔32cが前後方向に2つ形成されている。
 配管把持装置32は、図7及び図8に示すように両脚部下端に計測用配管11を把持するためのクランプ32bが設けられている。配管把持装置32は、両脚部下近傍にそれぞれ2本の取付ボルト36が設置されている。これらの取付ボルト36は、図9に示すようにレンチ50を用いて締め付けることで、計測用配管支持ブラケット31に形成されたねじ孔31bにねじ込まれる。これにより、計測用配管支持ブラケット31に配管把持装置32が固定される。
 配管把持装置32は、図12に示す把持装置吊り具35により吊り下げられて計測用配管支持ブラケット31に取り付けられる。具体的には、把持装置吊り具35は、2つのフック35aが底面に設けられている。これらのフック35aは、配管把持装置32の開口部32aの開口端を掛止する。これにより、配管把持装置32が把持装置吊り具35に吊り下げられる。
 このように本実施形態では、計測用配管支持ブラケット31に接続管送り機構33、接続管送りレンチ34及び配管把持装置32を順次取り付けることにより、図9~図11に示す計測用配管接続ユニット30が組み立てられる。
 ステップS2では、このようにして組み立てられた計測用配管接続ユニット30を図10に示すように炉内に吊り込む。このとき、計測用配管接続ユニット30は、把持装置吊り具35のフック35aが配管把持装置32の開口部32aの開口端を掛止することにより、吊り下げられる。
 そして、図11に示すように計測用配管支持ブラケット31の位置決めピン27をC形クランプ17の位置決め用孔22に挿入する。また、計測用配管支持ブラケット31の固定ボルト26をC形クランプ17の固定用ねじ孔21に図示しないレンチを用いて15~20N・mのトルクで締め込み固定する。
 このように計測用配管接続ユニット30をC形クランプ17に固定した後、配管把持装置32に取り付けられた把持装置吊り具35を遠隔操作により開放操作を行い、把持装置吊り具35を配管把持装置32から取り外す。以上の工程を経て計測用配管接続ユニット30を取り付けるステップS2が終了する。
 次に、計測用配管11を接続するステップS3について説明する。
 ステップS3では、図11に示すように計測用配管支持ブラケット31のスプールピース25の両端に嵌め込まれた接続管24と、それぞれの計測用配管11の破断部とを接続する。
 具体的には、例えば多数のディフューザ10の並び順における♯1側(一端側)の計測用配管11と、並び順の♯3側(他端側)の計測用配管11を配管把持装置32のクランプ32bにより把持する。
 次いで、配管把持装置32の上部に計測用配管位置出し装置43を載置して両者を組み合わせる。そして、計測用配管位置出し装置43により配管把持装置32を操作して一端側及び他端側の両計測用配管11と接続管24との芯を合わせる。
 その後、接続管送りレンチ34を操作して接続管24を計測用配管11に挿入する。
 そして、計測用配管位置出し装置43を配管把持装置32の上部から回収して撤去する。
 上述した計測用配管11を把持する動作と、計測用配管11と接続管24を芯合せする動作を詳細に説明する。
 図13は図11の配管把持装置に取り付けられる計測用配管位置出し装置を示す立面図である。図14は図11の配管把持装置に計測用配管位置出し装置を取り付けた状態を示す立面図である。
 配管把持装置32の上部における長手方向両側に、図示しないがそれぞれ3本のスタッドボルトが設置され、そのうちの各1本のスタッドボルトを、遠隔手作業でレンチにより操作し、図11に示すように切断された計測用配管11をクランプ32bにより把持する。
 次いで、計測用配管11が把持されたことを水中テレビカメラなどで目視確認する。その後、図13に示す計測用配管位置出し装置43を吊り下ろし、図14に示すように配管把持装置32の上部に着座させる。
 そして、計測用配管位置出し装置43は、両計測用配管11側となる部分に図示しない電動レンチが組み込まれている。これらの電動レンチを気中に設置された操作盤により、配管把持装置32に設置された残りの各2本のスタッドボルトを回転操作することにより、両計測用配管11を上下方向及び水平方向に移動させる。
 このように、切断された計測用配管11をスプールピース25の延長線上に位置するように調整する。すなわち、水中テレビカメラなどで計測用配管11がスプールピース25の延長線上に位置することを確認する。
 次に、接続管24を計測用配管11に挿入する動作を詳細に説明する。
 図15は図14から計測用配管位置出し装置を取り外してレンチを挿通させた状態を示す斜視図である。図16は図15の状態において送りレンチを操作して接続管を計測用配管に接続する状態を示す斜視図である。
 接続管送りレンチ34は、送りアーム38を動作させ、接続管24を計測用配管11に挿入する。具体的には、図5に示す接続管送りレンチ34の操作ボルト44a,44bを図15及び図16に示すようにレンチ50により回転操作する。このレンチ50は、配管把持装置32に形成された操作孔32cを通り操作ボルト44a又は44bに装着される。そして、レンチ50を用いて操作ボルト44a又は44bを回転させると、操作部45a又は45bが回転する。
 図5に示す操作部45a又は45bの先端部は、図示しない傘歯車などの連結部材を介して接続管送り機構33に設けられた回転ねじ33a又は33bと連結されている。回転ねじ33a,33bは、送りアーム38と連結されている。送りアーム38は、接続管24の軸方向両端を保持する。したがって、レンチ50を用いて操作ボルト44a又は44bを回転させることより、回転ねじ33a又は33bを介して送りアーム38を軸方向に移動させる。これにより、接続管24を計測用配管11に挿入することができる。
 その後、配管把持装置32に計測用配管位置出し装置43を取り付けた状態から計測配管位置出し装置43を引き上げて撤去する。以上によりステップS3の工程を終了する。
 次に、接続管24を加熱するステップS4について説明する。
 図17は図16の状態において加熱装置を用いて接続管を加熱する状態を示す斜視図である。図18は図17の加熱装置の電気系統を示すブロック図である。
 図17に示すように、加熱装置39は、配管把持装置32の開口部32aに装着される。加熱装置39には、連結部39aを介して加熱コイル41が取り付けられている。この加熱コイル41は、加熱装置39が開口部32aに装着されたとき、接続管24を挟むように設けられる。
 加熱装置39は、加熱コイル41の他、図18に示すように高周波電源装置40及びトランス42を備えている。この高周波電源装置40は、電源を一旦直流に変換し、数100Hz~数MHzの高周波エネルギーを発生させる。トランス42は、高周波電源装置40で発生した高周波エネルギーを、負荷である加熱コイル41に必要な電圧及び電流に合わせる。そして、加熱コイル41は、接続管24の形状及び加熱部位などの目的に応じた形状に形成される。
 加熱コイル41により囲まれた形状記憶合金製の接続管24は、誘電加熱により加熱されて内径を縮めることにより計測用配管11を接続し、この計測用配管11の補修が完了する。その後、加熱装置39は、図示しない吊り具により吊り上げられる。
 ところで、一般に、形状記憶合金製の接続管24を収縮させるため、蒸気ボイラやヒータなどを用いて加熱する場合がある。この場合、接続管24の周囲温度を100℃まで上昇させるためには、接続管24をチャンバーで囲い、このチャンバー内の水を抜いて加熱する必要がある。しかし、炉内でのチャンバーの取付け及び取外し作業が困難であるため、補修作業に習熟度と時間を要するという問題がある。
 本実施形態では、誘電加熱による加熱コイル41のみで接続管24を加熱するため、チャンバーの取付け及び取外し作業がなくなり、作業性を向上させるとともに、作業時間の大幅な短縮が可能となる。
 次に、計測用配管接続ユニット30から配管把持装置32、接続管送りレンチ34及び接続管送り機構33を取り外して撤去するステップS5について説明する。
 図19は図17の状態から配管把持装置を撤去する状態を示す分解斜視図である。図20は図19の状態から接続管送りレンチを撤去する状態を示す分解斜視図である。図21は図19の状態から接続管送りレンチを撤去した状態を示す斜視図である。
 図19に示すように、計測用配管接続ユニット30から把持装置吊り具35を用いて配管把持装置32を吊り上げて撤去する。具体的には、配管把持装置32の取付ボルト36を緩めて計測用配管支持ブラケット31から取り外す。そして、把持装置吊り具35を用いて配管把持装置32を吊り上げることにより撤去する。
 次いで、図20に示すように、接続管送りレンチ34の操作部45a,45bを計測用配管支持ブラケット31の挿入孔29から引き抜き、接続管送りレンチ34を吊り上げることにより撤去する。
 さらに、接続管送り機構33の取付ボルト37を図示しないレンチにより緩め、接続管送り機構33を計測用配管支持ブラケット31の取付用凹部31aから取り外す。そして、接続管送り機構33を吊り上げることにより撤去する。
 このように本実施形態は、計測用配管11の補修完了後は、図21に示すように計測用配管11を保持するために必要な機構のみが設置されていることとなる。
 以上のように本実施形態では、原子炉圧力容器1内の炉水中に設けられたジェットポンプ4の下部に水平方向に設置された計測用配管11が破断した際、ディフューザ10にC形クランプ17を固定した後、このC形クランプ17にスプールピース25が設けられた計測用配管接続ユニット30を取り付けるようにしている。
 したがって、本実施形態によれば、C形クランプ17と計測用配管接続ユニット30に分離構成し、これらをディフューザ10に順次取り付けることにより、位置決めが容易となり、各部材の小型化が図られる。そのため、炉底部付近の狭隘部でも補修作業が容易となり、従来技術に比べ作業性及び品質が向上するとともに、作業時間の大幅な短縮化を図ることが可能となる。
 また、本実施形態によれば、計測用配管11とスプールピース25を、計測用配管位置出し装置43を用いて芯合せをするので、計測用配管11とスプールピース25との接続作業が容易になり、作業性を高めることができる。
 さらに、本実施形態によれば、誘電加熱により加熱コイル41のみで接続管24を加熱することができるため、チャンバーの取付け及び取外し作業がなくなり、作業性を向上させるとともに、作業時間の大幅な短縮が可能となる。
 そして、本実施形態によれば、計測用配管11の補修完了後は、計測用配管接続ユニット30から配管把持装置32、接続管送りレンチ34及び接続管送り機構33を取り外して撤去するため、計測用配管11を保持するために必要な機構のみが設置される。そのため、脱落部材によるルースパーツ化の可能性を低下させることが可能となる。
 以上のように本発明の一実施形態を説明したが、この実施形態は、単なる例として提示したものであり、発明の範囲を限定することは意図していない。この新規な実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更することができる。
 例えば、本実施形態では、破断した計測用配管11の一端と他端を接続管24に直接接続するようにしたが、これに限らず破断した計測用配管11を、切断装置を用いて予め正確な位置を切断しておいてもよい。同様に、サポート13も切断装置を用いて予め正確な位置を切断しておいてもよい。
1…原子炉圧力容器、2…シュラウド、3…ダウンカマ部、4…ジェットポンプ、5…ライザ管、6…再循環入口ノズル、7A,7B…エルボ、8A,8B…混合ノズル、9,9A,9B…インレットスロート、10,10A,10B…ディフューザ、11…計測用配管、12…ブロック、13…サポート、14…トランジションピース、15…ジェットポンプ計測用ノズル、16…環状空間、17…C形クランプ(支持部材)、17a…クランプ本体、17b…突起、18…位置決めフック、19…クランプ固定機構、19a…固定ボルト、19b…楔ブロック、20…スライダ、21…固定用ねじ孔、22…位置決め用孔、23…吊り耳、24…接続管、25…スプールピース(配管補修管)、26…固定ボルト、27…位置決めピン、28…固定用ねじ孔、29…挿入孔、30…計測用配管接続ユニット(計測用配管接続装置)、31…計測用配管支持ブラケット、31a…取付用凹部、31b…ねじ孔、32…配管把持装置、32a…開口部、32b…クランプ、32c…操作孔、33…接続管送り機構、33a,33b…回転ねじ、34…接続管送りレンチ、35…把持装置吊り具、35a…フック、36…取付ボルト、37…取付ボルト、38…送りアーム、39…加熱装置、39a…連結部、40…高周波電源装置、41…加熱コイル、42…トランス、43…計測用配管位置出し装置、44a,44b…操作ボルト、45a,45b…操作部、49…吊り耳、50…レンチ

Claims (9)

  1.  原子炉圧力容器内の炉水中に設けられたジェットポンプの下部に水平方向に設置された計測用配管の破断部を補修するジェットポンプ計測用配管の補修方法であって、
     残存した前記計測用配管の近傍における前記ジェットポンプに支持部材を固定する支持部材固定ステップと、
     前記支持部材固定ステップの後に、前記支持部材に、両端に接続管が嵌め込まれた配管補修管が設けられた計測用配管接続装置を取り付ける接続装置取付ステップと、
     前記接続装置取付ステップの後に、前記計測用配管接続装置を用いて前記残存した計測用配管と前記接続管を接続する接続ステップと、
     を有することを特徴とするジェットポンプ計測用配管の補修方法。
  2.  前記接続管が形状記憶合金製であり、前記接続ステップの後に、加熱装置の誘電加熱により前記接続管を加熱する加熱ステップを有することを特徴とする請求項1に記載のジェットポンプ計測用配管の補修方法。
  3.  前記加熱ステップの後に、前記加熱装置を撤去する加熱装置撤去ステップをさらに有することを特徴とする請求項2に記載のジェットポンプ計測用配管の補修方法。
  4.  前記接続装置取付ステップで用いる計測用配管接続装置は、前記支持部材に固定されて前記配管補修管が設けられた計測用配管支持ブラケットと、この計測用配管支持ブラケットに取り付けられて前記計測用配管を把持する配管把持装置と、前記計測用配管に前記接続管を接続する接続管送り機構と、この接続管送り機構を操作して前記計測用配管に前記接続管を挿入する接続管送りレンチとを備え、
     前記加熱ステップの後に、前記計測用配管支持ブラケットを残し、前記配管把持装置、前記接続管送り機構及び前記接続管送りレンチを撤去する複数装置撤去ステップを有することを特徴とする請求項1乃至3のいずれか一項に記載のジェットポンプ計測用配管の補修方法。
  5.  前記接続ステップでは、計測用配管位置出し装置を用いて前記計測用配管と前記配管補修管との芯合せを行うことを特徴とする請求項1乃至3のいずれか一項に記載のジェットポンプ計測用配管の補修方法。
  6.  原子炉圧力容器内の炉水中に設けられたジェットポンプの下部に水平方向に設置された計測用配管の破断部を補修するジェットポンプ計測用配管の補修装置であって、
     残存した前記計測用配管の近傍における前記ジェットポンプに支持部材が固定される支持部材と、
     両端に接続管が嵌め込まれた配管補修管を有し、前記支持部材に取り付けられる計測用配管接続装置と、
     前記計測用配管接続装置で前記残存した計測用配管と前記接続管を接続することを特徴とするジェットポンプ計測用配管の補修装置。
  7.  前記接続管が形状記憶合金製であり、前記接続管を誘電加熱により加熱する加熱装置を設けたことを特徴とする請求項6に記載のジェットポンプ計測用配管の補修装置。
  8.  前記計測用配管接続装置は、前記支持部材に固定されて前記配管補修管が設けられた計測用配管支持ブラケットと、この計測用配管支持ブラケットに取り付けられて前記計測用配管を把持する配管把持装置と、前記計測用配管に前記接続管を接続する接続管送り機構と、この接続管送り機構を操作して前記計測用配管に前記接続管を挿入する接続管送りレンチとを備えることを特徴とする請求項6又は7に記載のジェットポンプ計測用配管の補修装置。
  9.  前記配管補修管に対する前記計測用配管の芯合せを行う計測用配管位置出し装置を設けたことを特徴とする請求項6又は7に記載のジェットポンプ計測用配管の補修装置。
PCT/JP2013/000318 2012-01-24 2013-01-23 ジェットポンプ計測用配管の補修方法及びその補修装置 WO2013111582A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US14/371,056 US10283226B2 (en) 2012-01-24 2013-01-23 Method of repairing jet pump measuring pipe and repair device therefor

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012012099A JP2013152106A (ja) 2012-01-24 2012-01-24 ジェットポンプ計測用配管の補修方法及びその補修装置
JP2012-012099 2012-01-24

Publications (1)

Publication Number Publication Date
WO2013111582A1 true WO2013111582A1 (ja) 2013-08-01

Family

ID=48873310

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/000318 WO2013111582A1 (ja) 2012-01-24 2013-01-23 ジェットポンプ計測用配管の補修方法及びその補修装置

Country Status (4)

Country Link
US (1) US10283226B2 (ja)
JP (1) JP2013152106A (ja)
TW (1) TWI505290B (ja)
WO (1) WO2013111582A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8565366B2 (en) * 2007-04-09 2013-10-22 General Electric Company Methods and apparatuses for operating and repairing nuclear reactors

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62180800U (ja) * 1986-05-08 1987-11-17
JPH11267838A (ja) * 1998-03-18 1999-10-05 Toshiba Eng Co Ltd 溶接ロボット
JP2008256586A (ja) * 2007-04-06 2008-10-23 Toshiba Corp ジェットポンプのライザ管部作業におけるアクセス装置、アクセス装置の使用方法およびアクセス装置回転補助装置
JP2008261854A (ja) * 2007-04-09 2008-10-30 General Electric Co <Ge> 原子炉を運転するまた補修するための方法及び装置
JP2012122970A (ja) * 2010-12-10 2012-06-28 Toshiba Corp ジェットポンプ計測用配管の補修方法

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62153796A (ja) * 1985-12-27 1987-07-08 株式会社日立製作所 水中配管の修理方法
JPS62180800A (ja) 1986-01-31 1987-08-08 Seiji Motoki 廃棄物処理装置
JPS63307213A (ja) * 1987-06-04 1988-12-14 Kitazumi Yasuhiko 電磁誘電加熱装置
US6233301B1 (en) * 1998-09-25 2001-05-15 General Electric Company Jet pump sensing line T-bolt clamp electrode discharge machining tool
JP4521156B2 (ja) 2002-12-27 2010-08-11 株式会社東芝 ジェットポンプ計測配管の水中レーザ溶接補修方法およびレーザ溶接装置
JP4298527B2 (ja) 2004-01-26 2009-07-22 日立Geニュークリア・エナジー株式会社 ジェットポンプ差圧計測管の補修装置
US20120032064A1 (en) * 2010-08-04 2012-02-09 Ge-Hitachi Nuclear Energy Americas Llc Method and apparatus for a bwr jet pump support system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62180800U (ja) * 1986-05-08 1987-11-17
JPH11267838A (ja) * 1998-03-18 1999-10-05 Toshiba Eng Co Ltd 溶接ロボット
JP2008256586A (ja) * 2007-04-06 2008-10-23 Toshiba Corp ジェットポンプのライザ管部作業におけるアクセス装置、アクセス装置の使用方法およびアクセス装置回転補助装置
JP2008261854A (ja) * 2007-04-09 2008-10-30 General Electric Co <Ge> 原子炉を運転するまた補修するための方法及び装置
JP2012122970A (ja) * 2010-12-10 2012-06-28 Toshiba Corp ジェットポンプ計測用配管の補修方法

Also Published As

Publication number Publication date
JP2013152106A (ja) 2013-08-08
US10283226B2 (en) 2019-05-07
TWI505290B (zh) 2015-10-21
TW201344701A (zh) 2013-11-01
US20150016583A1 (en) 2015-01-15

Similar Documents

Publication Publication Date Title
US8608121B2 (en) Device and method for fixing a reactor metering pipe
JP5687481B2 (ja) ジェットポンプ計測用配管の補修方法
TW200936926A (en) Method and apparatus for repairing a core spray downcomer pipe in a nuclear reactor
EP3162477A1 (en) Valve seat machining device, and valve seat machining method using said valve seat machining device
KR101745802B1 (ko) 가압기 히터 슬리브 보수용 자동 용접장치와 그 설치방법
WO2013111582A1 (ja) ジェットポンプ計測用配管の補修方法及びその補修装置
JP2008256586A (ja) ジェットポンプのライザ管部作業におけるアクセス装置、アクセス装置の使用方法およびアクセス装置回転補助装置
US9718151B2 (en) Reactor measurement-pipe maintenance clamp apparatus
JP5021041B2 (ja) 管継手の構造一体性を確保するための機械的アセンブリ
CN114171224A (zh) 反应堆一回路主设备安装方法
KR200431175Y1 (ko) 증기발생기 전열관의 보링장치
KR200409916Y1 (ko) 증기발생기 전열관의 보링장치
US9847146B2 (en) Anti-seismic apparatus for control element drive mechanisms
JP6522366B2 (ja) 熱遮蔽体取付装置および取付方法
CN214212768U (zh) 一种机械异形焊接装置
CN211490296U (zh) 一种用于阀门焊接的工装夹具
US9171648B2 (en) Method of replacing shroud of boiling water nuclear reactor, and associated apparatus
KR101109905B1 (ko) 전기로 마스트 실린더의 패킹 교체용 지그
JP2000214290A (ja) 炉心スプレイ系配管の交換方法
KR20090116954A (ko) 원자로 스터드 체결 및 분해용 드라이버 툴
JP2003294879A (ja) 炉心スプレイ配管系統と組立方法、組立治具および測定装置
JP2010167476A (ja) 熱交換器用端栓の遠隔溶接施工方法および同溶接施工装置
JPS619991A (ja) 水中配管の切断溶接装置及び方法
JP2016075651A (ja) 原子炉圧力容器及びその改修方法
JP2000119728A (ja) オフラインランス芯出し治具

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13740992

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13740992

Country of ref document: EP

Kind code of ref document: A1