WO2013058104A1 - 射出装置 - Google Patents

射出装置 Download PDF

Info

Publication number
WO2013058104A1
WO2013058104A1 PCT/JP2012/075526 JP2012075526W WO2013058104A1 WO 2013058104 A1 WO2013058104 A1 WO 2013058104A1 JP 2012075526 W JP2012075526 W JP 2012075526W WO 2013058104 A1 WO2013058104 A1 WO 2013058104A1
Authority
WO
WIPO (PCT)
Prior art keywords
speed process
cylinder
rod
pressure
low
Prior art date
Application number
PCT/JP2012/075526
Other languages
English (en)
French (fr)
Inventor
和幸 山口
一起 舟橋
Original Assignee
株式会社 豊田自動織機
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社 豊田自動織機 filed Critical 株式会社 豊田自動織機
Priority to EP12841191.5A priority Critical patent/EP2769784B1/en
Priority to IN3516CHN2014 priority patent/IN2014CN03516A/en
Priority to CN201280050871.3A priority patent/CN103889617B/zh
Priority to US14/351,683 priority patent/US9108353B2/en
Publication of WO2013058104A1 publication Critical patent/WO2013058104A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/46Means for plasticising or homogenising the moulding material or forcing it into the mould
    • B29C45/53Means for plasticising or homogenising the moulding material or forcing it into the mould using injection ram or piston
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D17/00Pressure die casting or injection die casting, i.e. casting in which the metal is forced into a mould under high pressure
    • B22D17/20Accessories: Details
    • B22D17/32Controlling equipment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/46Means for plasticising or homogenising the moulding material or forcing it into the mould
    • B29C45/53Means for plasticising or homogenising the moulding material or forcing it into the mould using injection ram or piston
    • B29C45/531Drive means therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/76Measuring, controlling or regulating
    • B29C45/82Hydraulic or pneumatic circuits
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C2945/00Indexing scheme relating to injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould
    • B29C2945/76Measuring, controlling or regulating
    • B29C2945/76494Controlled parameter
    • B29C2945/76595Velocity
    • B29C2945/76598Velocity linear movement
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C2945/00Indexing scheme relating to injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould
    • B29C2945/76Measuring, controlling or regulating
    • B29C2945/76655Location of control
    • B29C2945/76658Injection unit
    • B29C2945/76678Injection unit injection piston
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/46Means for plasticising or homogenising the moulding material or forcing it into the mould
    • B29C45/47Means for plasticising or homogenising the moulding material or forcing it into the mould using screws
    • B29C45/50Axially movable screw
    • B29C45/5008Drive means therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/76Measuring, controlling or regulating
    • B29C45/77Measuring, controlling or regulating of velocity or pressure of moulding material

Definitions

  • the present invention relates to an injection apparatus that injects and fills a molding material into a mold and further increases the pressure.
  • an injection device of a molding machine advances an injection plunger in a sleeve by an injection cylinder, and extrudes a molding material (for example, molten metal) in the sleeve into a cavity formed between dies (molds) to thereby remove the molding material. Injection and filling the cavity.
  • the injection / filling process includes a low speed process, a high speed process, and a pressure increasing process. That is, in the initial stage of injection, the injection device moves the injection plunger forward at a relatively low speed in order to prevent entrainment of molding material air, and then injects at a relatively high speed from the viewpoint of shortening the molding cycle. Move the plunger forward.
  • the injection device increases the pressure of the molding material in the cavity by the force in the direction in which the injection plunger moves forward in order to eliminate the sink of the molded product.
  • an injection apparatus die casting machine disclosed in Patent Document 1 has been proposed.
  • the injection device of Patent Document 1 includes a hydraulic circuit, and an injection / filling process is performed by hydraulic control in the hydraulic circuit.
  • a filling accumulator 82 communicating with the gas cylinder 81 is connected to the head side chamber 80a of the injection cylinder 80 via a flow path.
  • a pilot check valve 84 and a speed control valve 85 are provided in this flow path.
  • the hydraulic oil to the filling accumulator 82 is replenished by being pressurized to a predetermined pressure by a hydraulic pump 83a.
  • a pressure increasing process accumulator 87 communicating with the gas cylinder 86 is connected to the flow path communicating with the speed control valve 85.
  • a flow rate control valve 88 is provided in the flow path connecting the filling accumulator 82, the pressure increasing process accumulator 87, and the head side chamber 80 a of the injection cylinder 80, and the flow rate control valve 88 controls the flow rate of the hydraulic oil. The moving speed of the piston 80c in the injection cylinder 80 is controlled.
  • the hydraulic oil accumulated in the filling accumulator 82 is supplied to the head side chamber 80a of the injection cylinder 80, and the piston 80c is moved at low speed or high speed. Done in The moving speed of the piston 80c is performed by controlling the speed control valve 85.
  • the pressure increasing process is performed by supplying high-pressure hydraulic oil from the pressure increasing process accumulator 87 to the head side chamber 80 a of the injection cylinder 80. At this time, the pressure increase time is controlled by controlling the flow rate of the hydraulic oil by the flow rate control valve 88.
  • the injection device disclosed in Patent Document 1 realizes a low-speed process, a high-speed process, and a pressure-increasing process by controlling the speed control valve 85 and the flow rate control valve 88 and controlling the oil pressure in the hydraulic circuit.
  • the low speed process there is a demand to precisely control the injection speed in order to prevent the entrainment of air in the molding material
  • the high speed process there is a demand to shorten the injection time.
  • the pressure increasing process there is a demand to reduce the size of the thrust generation source necessary for pressure increasing.
  • just controlling the hydraulic pressure in the hydraulic circuit as in Patent Document 1 it is difficult to control to eliminate the demand specific to each process.
  • An object of the present invention is to provide an injection apparatus capable of realizing control specialized in a low speed process, a high speed process, and a pressure increasing process.
  • the injection apparatus injects and fills a molding material into a mold and further increases the pressure.
  • the injection device includes a low-speed process unit, a high-speed process unit, a pressure-increasing process unit, and an injection plunger.
  • the low-speed process unit includes a low-speed process cylinder including a low-speed process rod and an electric drive source that drives the low-speed process cylinder.
  • the high-speed process unit includes a high-speed process cylinder including a high-speed process rod and a hydraulic drive source that drives the high-speed process cylinder.
  • the pressure-increasing step unit has a pressure-increasing step cylinder having a pressure-increasing step rod and a drive source for driving the pressure-increasing step cylinder.
  • the injection plunger injects the molding material into a mold.
  • the rod of the first unit which is any one of the three units, is mechanically connected to the injection plunger.
  • the rod of the second unit that is one of the two units other than the first unit is mechanically connected to the first unit.
  • a rod of a third unit which is a unit other than the first and second units, is mechanically connected to the second unit.
  • the graph which shows the change of the injection pressure and the injection speed in the injection device of FIG. The figure which shows typically the injection apparatus of FIG. 1 at the time of a low-speed process.
  • the mold K is formed of a fixed mold part 12 and a movable mold part 13, and the fixed mold part 12 and the movable mold part 13 are not shown.
  • the mold is opened, closed, and clamped.
  • the injection device 11 is a device for injecting and filling a metal material as a molding material into the cavity 14 formed in the mold K.
  • the metal material injected into the mold K is taken out after solidification, thereby forming a desired molded product.
  • the fixed mold portion 12 is provided with an injection sleeve 15 communicating with the cavity 14, and an injection plunger 16 is slidably provided in the injection sleeve 15. Then, in a state where the metal material is supplied to the injection sleeve 15 from a supply port (not shown) formed in the injection sleeve 15, the injection plunger 16 slides in the injection sleeve 15 toward the cavity 14, A metal material is injected and filled into the cavity 14.
  • the tip of the rod 18 c of the pressure-increasing process cylinder 18 is connected to the injection plunger 16 via a connecting member 17.
  • a piston 18 b integral with the rod 18 c is movably accommodated in the cylinder tube 18 a, and the rod on the side where the rod 18 c extends from the inside of the cylinder tube 18 a by the piston 18 b. It is divided into a side chamber 18e and a head side chamber 18d on the opposite side.
  • the rod side chamber 18e is opened to the atmosphere via a supply / discharge port (not shown) formed in the cylinder tube 18a, and the operating cylinder 20 is connected to the head side chamber 18d via an amplification oil passage 19. Yes.
  • the cylinder diameter of the operating cylinder 20 is smaller than the cylinder diameter of the pressure increasing process cylinder 18.
  • the rod 18c in the pressure-increasing process cylinder 18 is composed of an actuating cylinder 20 having a smaller diameter than the pressure-increasing process cylinder 18 and an amplifying oil passage 19 connecting the actuating cylinder 20 to the pressure-increasing process cylinder 18.
  • An amplifying circuit for amplifying the thrust is configured.
  • the piston 20b is movably accommodated in the cylinder tube 20a of the operating cylinder 20, and a rod 20c is integrally provided on the piston 20b.
  • the cylinder tube 20a of the actuating cylinder 20 is partitioned by a piston 20b into a rod side chamber 20e on the side where the rod 20c extends and a head side chamber 20d on the opposite side.
  • the head side chamber 20d of the actuating cylinder 20 and the head side chamber 18d of the pressure-increasing process cylinder 18 are connected by the amplifying oil passage 19, and the head side chambers 18d and 20d are incompressible. Hydraulic fluid as a fluid is enclosed.
  • an operating ball screw / nut mechanism BN1 for moving the rod 20c forward and backward is connected to the rod 20c of the operating cylinder 20. More specifically, an operating nut N1 is connected to the tip of the rod 20c, and the operating nut N1 is screwed into the operating ball screw B1, and this operating ball screw B1 serves as an operating electric drive source.
  • the motor M1 is used for rotation.
  • the actuating ball screw B1 rotates so that the actuating nut N1 moves forward or backward in the axial direction of the actuating ball screw B1. Therefore, the operation ball screw / nut mechanism BN1 includes the operation nut N1, the operation ball screw B1, and the operation motor M1.
  • the pressure-increasing process unit U1 is composed of the pressure-increasing process cylinder 18, the amplifying oil passage 19, the actuating cylinder 20, and the actuating ball screw / nut mechanism BN1.
  • the rod 30c of the low-speed process cylinder 30 in the low-speed process unit U2 is mechanically connected to the side opposite to the mold K.
  • a piston 30 b integrated with the rod 30 c is movably accommodated in the cylinder tube 30 a, and the inside of the cylinder tube 30 a is connected to the first working chamber 30 e on the mold K side by the piston 30 b.
  • the second working chamber 30d on the opposite side.
  • the low-speed process ball screw / nut mechanism BN2 for moving the rod 30c forward and backward is connected to the rod 30c. Specifically, a low speed process nut N2 is connected to the rod 30c, and a low speed process ball screw B2 is screwed to the low speed process nut N2. The low-speed process ball screw B2 is rotated by a low-speed process motor M2 as an electric drive source.
  • the low-speed process motor M2 causes the low-speed process nut N2 to move forward or backward in the axial direction of the low-speed process ball screw B2. Therefore, the low-speed process ball screw / nut mechanism BN2 includes the low-speed process nut N2, the low-speed process ball screw B2, and the low-speed process motor M2.
  • a low-speed process oil passage 31 is connected to the first working chamber 30e of the low-speed process cylinder 30 and the other end of the low-speed process oil passage 31 is connected to a second working chamber 30d. That is, the first working chamber 30e and the second working chamber 30d are closed by the low-speed process oil passage 31.
  • the low speed process oil passage 31 is provided with a low speed process electromagnetic switching valve 32.
  • the low speed process electromagnetic switching valve 32 has a first position 32a where communication between the second working chamber 30d and the first working chamber 30e is blocked, and hydraulic fluid flows from the second working chamber 30d to the first working chamber 30e. It is possible to switch to a second position 32b that permits
  • the low-speed process oil passage 31 is provided with a bypass oil passage 33 that bypasses the low-speed process electromagnetic switching valve 32, and the bypass oil passage 33 is provided with a check valve 34.
  • the check valve 34 prevents the hydraulic oil from flowing from the second working chamber 30d to the first working chamber 30e when the low-speed process electromagnetic switching valve 32 is in the first position 32a. The hydraulic oil is allowed to flow from 30e to the second working chamber 30d.
  • the low-speed electromagnetic switching valve 32 When the low-speed electromagnetic switching valve 32 is in the first position 32a, the back pressure from the mold K acts on the rod 30c, and the piston 30b is pressed toward the second working chamber 30d via the rod 30c.
  • the check valve 34 prevents the hydraulic oil in the second working chamber 30d from being discharged into the first working chamber 30e, and the back pressure is supported by the hydraulic oil. Therefore, in this embodiment, the check valve 34 and the low-speed process oil passage 31 constitute a back pressure support portion.
  • the low-speed process unit U2 includes the low-speed process cylinder 30, the low-speed process ball screw / nut mechanism BN2, and the back pressure bearing.
  • the first rod 40c of the high-speed process cylinder 40 in the high-speed process unit U3 is mechanically connected to the side opposite to the pressure-increasing process unit U1.
  • the high-speed process cylinder 40 is a double rod cylinder, and a piston 40b integrated with the first rod 40c is movably accommodated in the cylinder tube 40a of the high-speed process cylinder 40. Is integrally provided with a second rod 40f extending from the piston 40b in a direction opposite to the first rod 40c.
  • the cylinder tube 40a is partitioned by a piston 40b into a first chamber 40e on the first rod 40c side and a second chamber 40d on the second rod 40f side on the opposite side.
  • the supply / discharge mechanism T is connected to the first chamber 40e, and the supply / discharge mechanism T supplies hydraulic oil to the first chamber 40e and discharges the hydraulic oil in the first chamber 40e.
  • the supply / discharge mechanism T includes an oil tank 43, a pump 44 that pumps up hydraulic oil in the oil tank 43, and an electromagnetic switching valve 45 provided on the supply / discharge oil passage 47.
  • the electromagnetic switching valve 45 is capable of discharging the hydraulic oil pumped up from the oil tank 43 by the pump 44 to the first chamber 40e and discharging the hydraulic oil in the first chamber 40e to the oil tank 43. It is possible to switch to the second position 45b.
  • an accumulator 46 as a hydraulic drive source is connected to the second chamber 40 d of the high-speed process cylinder 40, and hydraulic oil is accumulated in the accumulator 46.
  • the hydraulic oil from the accumulator 46 is supplied to the second chamber 40d, and the hydraulic pressure toward the low-speed process unit U2 is constantly acting on the piston 40b.
  • a connecting portion 40g is formed at the tip of the second rod 40f of the high-speed process cylinder 40.
  • the high-speed process unit U3 is provided with a connection drive unit 49 that is separate from the high-speed process cylinder 40.
  • the connection drive part 49 can be mechanically connected to or disconnected from the connection part 40g.
  • the connection drive unit 49 is configured to be rotatable by a connection motor 49a. And in the state where the connection drive part 49 is connected to the connection part 40g, the forward movement of the piston 40b (first and second rods 40c, 40f) by the hydraulic oil from the accumulator 46 can be restricted.
  • the coupling mechanism R is constituted by the coupling portion 40g and the coupling driving portion 49, and the coupling portion 40g and the coupling driving portion 49 are constituted by a chuck structure.
  • the connecting mechanism R, the high-speed process cylinder 40, the supply / discharge mechanism T, and the accumulator 46 constitute a high-speed process unit U3.
  • the rod 18c of the pressure-increasing process unit U1 is mechanically connected to the mold K via the injection plunger 16, and the rod 30c of the low-speed process unit U2 is connected to the pressure-increasing process unit U1.
  • the rod 40c of the high-speed process unit U3 is mechanically connected to the low-speed process unit U2.
  • the rods 18c, 30c, 40c are arranged on the same axis, and the pressure-increasing process cylinder 18, the low-speed process cylinder 30, and the high-speed process cylinder 40 are arranged in series.
  • the injection device 11 is operated in three processes, a low speed process, a high speed process, and a pressure increasing process.
  • the low speed process is a process in the initial stage of injection, and is a process of operating the injection plunger 16 in the low speed process unit U2.
  • the high speed process is a process performed after the low speed process, and is a process of operating the injection plunger 16 at a higher speed than in the low speed process.
  • the high-speed process is a process of operating the injection plunger 16 with the high-speed process unit U3.
  • the pressure increasing step is a final step of injection performed after the high speed step, and is a step of increasing the pressure of the metal material in the cavity 14 by the force in the forward direction toward the mold K of the injection plunger 16.
  • the pressure increasing step is a step of operating the injection plunger 16 with the pressure increasing step unit U1.
  • the operation pattern required for the injection device 11 is different. That is, the injection plunger 16 needs to be operated at a higher speed in the high speed process than in the low speed process, but does not require a speed in the pressure increasing process. In addition, the injection plunger 16 needs to be operated so as to apply a higher pressure in the pressure increasing process than in the low speed process and the high speed process, while applying the same pressure as in the pressure increasing process in the low speed process and the high speed process. There is no need to activate it.
  • the injection plunger 16 of the injection sleeve 15, the rod 18 c of the pressure increasing process cylinder 18, the rod 20 c of the operating cylinder 20, the rod 30 c of the low speed process cylinder 30, and both rods of the high speed process cylinder 40 40c and 40f are located at predetermined initial positions as shown in FIG.
  • each rod 18c, 20c, 30c, 40c, 40f located in the initial position does not apply injection pressure to the metal material supplied into the injection sleeve 15 (time T1 in FIG. 2).
  • the low speed process electromagnetic switching valve 32 of the low speed process unit U2 is switched to the first position 32a so as to cut off the communication between the first working chamber 30e and the second working chamber 30d during molding.
  • the electromagnetic switching valve 45 of the supply / discharge mechanism T of the high-speed process unit U3 is switched to the first position 45a so that the hydraulic oil in the first chamber 40e in the high-speed process cylinder 40 does not return to the oil tank 43 during molding. ing.
  • the low speed process by the low speed process unit U2 is started.
  • the rod 30c of the low speed process cylinder 30 moves at the injection speed V1 shown in FIG.
  • the low-speed process motor M2 is driven, the low-speed process ball screw B2 rotates and the low-speed process nut N2 screwed into the low-speed process ball screw B2 moves forward.
  • a driving force is applied to the rod 30c of the low-speed process cylinder 30 via the low-speed process nut N2, and the forward movement is performed.
  • the forward movement of the rod 30c the entire pressure-increasing process unit U1 is pushed out toward the mold K and moves forward.
  • the pressure increasing process unit U1 moves forward at the injection speed V2 via the low speed process unit U2
  • the pressure increasing process cylinder 18 moves forward.
  • the injection plunger 16 connected to the rod 18c of the pressure increasing process cylinder 18 also moves forward at the injection speed V2, and the metal material in the injection sleeve 15 is injected into the cavity 14.
  • the pressure-increasing process unit U1 and the low-speed process unit U2 operate at a higher speed than in the low-speed process.
  • the back pressure from the mold K acts on the low-speed process cylinder 30 of the low-speed process unit U2 via the pressure-increasing process unit U1.
  • the check valve 34 prevents the hydraulic oil from flowing out from the second working chamber 30d to the first working chamber 30e, so that the rod 30c is moved to the second working chamber 30d by the back pressure. Backward movement is prevented.
  • the low-speed process ball screw B2 is prevented from rotating through the low-speed process nut N2 screwed to the rod 30c, and the low-speed process motor M2 is prevented from rotating.
  • the pressure increasing process will be described with reference to FIG.
  • the pressure applied by the rod 18c of the pressure increasing process cylinder 18 becomes the injection pressure P shown in FIG.
  • the rod 20c of the actuating cylinder 20 is given a driving force through the actuating nut N1 when the actuating nut N1 screwed into the actuating ball screw B1 is moved forward by the rotation of the actuating motor M1. And move forward.
  • the working oil in the head side chamber 20d is supplied to the head side chamber 18d of the pressure increasing process cylinder 18 through the amplifying oil passage 19.
  • the pressure in the head side chamber 18d increases due to the Pascal principle, and the injection plunger 16 is used for the pressure increasing process.
  • the pressure received from the cylinder 18 also increases.
  • the force with which the injection plunger 16 pressurizes the metal material in the cavity 14 increases.
  • air is pushed out from the rod side chamber 18e of the pressure increasing process cylinder 18, and this air is released to the atmosphere.
  • the back pressure from the mold K acts on the low speed process cylinder 30 of the low speed process unit U2 via the pressure increasing process unit U1.
  • the check valve 34 prevents the hydraulic oil from flowing from the second working chamber 30d to the first working chamber 30e, so that back pressure causes the rod 30c to enter the second working chamber 30d. Backward movement is prevented.
  • the rotation of the low-speed process ball screw B2 and the rotation of the low-speed process motor M2 through the low-speed process nut N2 screwed to the rod 30c are prevented.
  • the operating motor M1 is rotated in the reverse direction from that in the pressure increasing process.
  • the rod 20c of the actuating cylinder 20 is given a driving force through the actuating nut N1 when the actuating nut N1 screwed into the actuating ball screw B1 is moved backward by the rotation of the actuating motor M1. And move backwards.
  • the rod 20c of the working cylinder 20 moves backward, the working oil in the head side chamber 18d of the pressure-increasing process cylinder 18 is drawn into the head side chamber 20d of the working cylinder 20 through the amplifying oil passage 19 and increases accordingly.
  • the rod 18c of the pressure process cylinder 18 moves backward.
  • the injection plunger 16 moves backward in the injection sleeve 15.
  • the low-speed process electromagnetic switching valve 32 in the low-speed process unit U2 is controlled to switch to the second position 32b to allow the hydraulic oil to flow from the second working chamber 30d to the first working chamber 30e.
  • the low speed process motor M2 is rotated reversely to the low speed process.
  • the rod 30c of the low-speed process cylinder 30 is moved through the low-speed process nut N2 by the backward movement of the low-speed process nut N2 screwed into the low-speed process ball screw B2 by the rotation of the low-speed process motor M2.
  • the drive force is applied and the vehicle moves backward.
  • the electromagnetic switching valve 45 is controlled to switch to the first position 45a and drive the pump 44 to supply hydraulic oil from the oil tank 43 to the first chamber 40e. Then, the piston 40b moves backward toward the second chamber 40d, and the hydraulic oil in the second chamber 40d is accumulated in the accumulator 46. At the same time, when the piston 40b moves backward, a driving force is applied to the first rod 40c and the second rod 40f, and the piston 40b moves backward, and the low-speed process unit U2 connected to the first rod 40c moves backward. The pressure increasing process unit U1 to which the rod 30c of the low speed process unit U2 is connected also moves backward. As a result, the injection plunger 16 moves backward in the injection sleeve 15.
  • the connecting motor 49a is driven to connect the connecting drive portion 49 to the connecting portion 40g and the piston 40b is moved forward. regulate. Therefore, the injection plunger 16 of the injection sleeve 15, the rod 18 c of the pressure-increasing process cylinder 18, the rod 20 c of the operating cylinder 20, the rod 30 c of the low-speed process cylinder 30, and the both rods 40 c and 40 f of the high-speed process cylinder 40 are , Located at the initial position shown in FIG. Thereafter, the fixed mold part 12 and the movable mold part 13 are opened to remove the molded product from the mold.
  • the injection apparatus 11 is composed of a pressure-increasing process unit U1, a low-speed process unit U2, and a high-speed process unit U3, and the injection apparatus 11 is composed of units specialized for each process.
  • the rod 18c of the pressure-increasing process cylinder 18 in the pressure-increasing process unit U1 is mechanically connected to the die K via the injection plunger 16, and is connected to the pressure-increasing process unit U1.
  • the rod 30c of the low-speed process cylinder 30 in the low-speed process unit U2 was mechanically connected.
  • the rod 40c of the high-speed process cylinder 40 in the high-speed process unit U3 is mechanically connected to the low-speed process unit U2.
  • the drive source is the low-speed process motor M2 for the low-speed process unit U2 that performs the low-speed process. Then, by controlling the low-speed process motor M2, the moving speed and acceleration of the rod 30c in the low-speed process cylinder 30 can be precisely controlled, and as a result, the operating speed and acceleration of the injection plunger 16 can be precisely controlled. . Therefore, in the low-speed process, the injection plunger 16 can be operated at an optimum operating speed and acceleration, and the entrainment of the air of the metal material in the injection sleeve 15 is prevented or the metal material is prevented from undulating. Can be done more accurately.
  • the accumulator 46 is used as the drive source for the high-speed process unit U3 that performs high-speed processes. For this reason, by adjusting the pressure accumulation amount to the accumulator 46, the injection time in the high-speed process can be adjusted, and the injection time can be shortened.
  • the pressure-increasing step cylinder 18 for performing the pressure-increasing step is provided independently, and the actuating cylinder 20 and the actuating motor M1 are used as its drive sources. Prepare. For this reason, compared with the case where an accumulator, a flow control valve, and a hydraulic circuit are required as a drive source for performing the pressure increasing process as in the background art, the drive source can be downsized. Further, in the actuating cylinder 20, the piston 20b is moved to a desired position under the control of the actuating motor M1, so that the amount of hydraulic oil supplied (pressure) to the pressure increasing process cylinder 18 is accurately controlled. .
  • the operation motor M1 was adopted as the drive source of the pressure-increasing process unit U1, and the low-speed process motor M2 was adopted as the drive source of the low-speed process unit U2. Further, an accumulator 46 is employed as a drive source for the high-speed process unit U3. For example, in the high-speed process, if the drive source is an electric drive source, the electric drive source is increased in size to operate the high-speed process cylinder 40 at a high speed. However, by using the accumulator 46 as the drive source for the high-speed process, it is possible to operate the high-speed process cylinder 40 at high speed without increasing the drive source. Therefore, by properly using the electric drive source and the hydraulic drive source according to the characteristics required in each process, the injection device 11 can be provided at low cost and with high quality.
  • the low pressure process unit U2 is provided with a back pressure support part for supporting the back pressure from the mold K, and the back pressure support part causes the rod 30c of the low speed process cylinder 30 to move backward by the back pressure. That is, the rod 30C can be prevented from moving away from the mold K. As a result, the back pressure prevents the low speed process ball screw B2 from rotating through the low speed process nut N2. Therefore, even if the low-speed process motor M2 is employed as the drive source of the rod 30c, it is not necessary to support the back pressure with the low-speed process motor M2, and as a result, the low-speed process motor M2 rotates with the back pressure. Can be prevented.
  • the back pressure is supported by the back pressure support portion, there is no need to increase the size of the low speed process motor M2, and the low speed process motor M2 having the minimum output necessary for operating the low speed process cylinder 30 is provided. Can be adopted. Therefore, it is possible to reduce the cost of the low-speed process motor M2.
  • the low speed process nut N2 is connected to the rod 30c of the low speed process cylinder 30, and the low speed process nut M2 is rotated by the low speed process motor M2.
  • a ball screw B2 is screwed.
  • the back pressure support portion is connected to the low-speed process oil passage 31 connecting the first working chamber 30e and the second working chamber 30d of the low-speed process cylinder 30 and the bypass oil passage 33 of the low-speed process oil passage 31.
  • a check valve 34 provided. Accordingly, the back pressure from the mold K can be supported with a simple configuration such as a hydraulic circuit (closed circuit) and a check valve, and the rod 30c can be prevented from moving backward due to the back pressure.
  • the accumulator 46 is connected to the second chamber 40d of the high-speed process cylinder 40, and the connecting portion 40g integrated with the second rod 40f is mechanically connected to the connecting drive portion 49. Can be connected or disconnected. For this reason, by restricting the movement of the second rod 40f by the coupling mechanism R in a state where the hydraulic pressure of the accumulator 46 is applied to the second rod 40f, the hydraulic pressure can be applied to the second rod 40f.
  • the piston 40b to which the hydraulic pressure from the accumulator 46 is applied can be moved at a stroke toward the second chamber 40d, and the first high-speed process cylinder 40 can be moved.
  • the rod 40c can be moved forward at a stroke. Accordingly, for example, when the hydraulic oil accumulated in the accumulator 46 is supplied to the second chamber 40d by opening the valve, there is a time difference from the desired valve opening to the desired hydraulic pressure, which is compared with that case. As a result, the time until the desired hydraulic pressure is reached is shortened. As a result, it is possible to shorten the injection time of the high-speed process.
  • the drive source of the pressure-increasing process cylinder 18 is smaller in diameter than the pressure-increasing process cylinder 18, and the fluid pressure of the incompressible fluid is applied to the pressure-increasing process cylinder 18.
  • the actuating cylinder 20 is actuated, and the actuating motor M1 that drives the actuating cylinder 20 is configured. For this reason, by utilizing the size of the cylinder diameter, a large pressure can be generated in the pressure-increasing process cylinder 18 even if the small-diameter operation cylinder 20 is used as a drive source. Therefore, a motor having the minimum output necessary for operating the operating cylinder 20 can be employed as the operating motor M1. Therefore, the operating motor M1 can be reduced in size and the cost required for the operating motor M1 can be suppressed.
  • the coupling mechanism R is formed with a chuck structure including the coupling portion 40g and the coupling driving portion 49.
  • the coupling portion 40g and the coupling driving portion 49 may be a collet structure, a ball coupler structure, a BNC connector structure, or the like. It may be changed.
  • the check valve 34 may not be provided.
  • the low-speed process motor M2 may be enlarged so that the back pressure can be supported.
  • the drive sources of the operating cylinder 20 and the low-speed process cylinder 30 may be linear motors.
  • the rod 20c of the actuating cylinder 20 and the rod 30c of the low speed process cylinder 30 may be directly linearly moved by a linear motor.
  • a flow control valve may be provided between the accumulator 46 and the second chamber 40d of the high-speed process cylinder 40.
  • the operating speed of the high-speed process cylinder 40 may be controlled by controlling the amount of pressure oil discharged from the accumulator 46 by the flow rate control valve.
  • the injection device 11 is connected to the injection plunger 16 for the pressure increasing process unit U1, the low speed process unit U2 connected to the pressure increasing process unit U1, and the high speed connected to the low speed process unit U2.
  • the arrangement is made in the order of the process unit U3, the arrangement of the three units U1, U2, U3 may be changed as appropriate.
  • the present invention is not limited to this, and a supply / discharge mechanism for supplying hydraulic oil as an incompressible fluid to the rod side chamber 18e of the pressure increasing process cylinder 18 and discharging the hydraulic oil in the rod side chamber 18e is provided.
  • the rod 18c may be moved backward using a mechanism.
  • the injection device 11 may be applied to an injection device that manufactures a resin molded product by injecting a resin material into the cavity 14.

Abstract

 射出装置は、成形材料を型内に射出して充填し、さらに増圧させる。射出装置は、低速工程用のユニットと高速工程用のユニットと増圧工程用のユニットと射出プランジャとを備える。3つのユニットのうちのいずれか一つである第1のユニットのロッドが射出プランジャに機械的に連結される。第1のユニット以外の二つのユニットのうちの一方である第2のユニットのロッドが、第1のユニットに機械的に連結される。第1及び第2のユニット以外のユニットである第3のユニットのロッドが、第2のユニットに機械的に連結されている。

Description

射出装置
 本発明は、成形材料を型内に射出、充填し、さらに増圧させる射出装置に関する。
 一般に、成形機の射出装置は、射出シリンダにより射出プランジャをスリーブ内において前進させ、スリーブ内の成形材料(例えば溶湯)を型(金型)間に形成されたキャビティに押し出すことにより、成形材料をキャビティに射出・充填する。射出・充填工程は、低速工程、高速工程及び増圧工程からなる。すなわち、射出装置は、射出の初期段階においては、成形材料の空気の巻き込みを防止するために比較的低速で射出プランジャを前進動作させ、次に、成形サイクルの短縮の観点から比較的高速で射出プランジャを前進動作させる。その後、射出装置は、成形品のヒケをなくすために、射出プランジャの前進動作する方向の力によりキャビティ内の成形材料を増圧する。このような射出装置の動作を実現するために、例えば特許文献1に開示の射出装置(ダイカストマシン)が提案されている。
 図6に示すように、特許文献1の射出装置は油圧回路を備え、この油圧回路での油圧制御により射出・充填工程が行われるようになっている。具体的には、射出装置において、射出シリンダ80のヘッド側室80aには、ガスボンベ81と連通する充填用アキュムレータ82が流路を介して接続される。この流路にはパイロットチェック弁84及び速度制御バルブ85が設けられている。充填用アキュムレータ82への作動油は油圧ポンプ83aにより所定の圧力に昇圧されて補給されている。
 また、速度制御バルブ85に連通する流路には、ガスボンベ86と連通した増圧工程用アキュムレータ87が接続されている。充填用アキュムレータ82と増圧工程用アキュムレータ87と射出シリンダ80のヘッド側室80aとを接続する流路には流量制御弁88が設けられ、この流量制御弁88によって作動油の流量を制御することにより、射出シリンダ80におけるピストン80cの移動速度が制御される。
 そして、特許文献1の射出装置においては、低速工程及び高速工程は、充填用アキュムレータ82に蓄圧された作動油を射出シリンダ80のヘッド側室80aに供給し、ピストン80cを低速又は高速で移動させることで行われる。このピストン80cの移動速度は、速度制御バルブ85を制御することで行われる。増圧工程は、高圧の作動油を増圧工程用アキュムレータ87から射出シリンダ80のヘッド側室80aに供給することで行われる。このとき、流量制御弁88によって作動油の流量を制御することにより増圧時間が制御される。
特許第3662001号公報
 特許文献1に開示の射出装置は、速度制御バルブ85及び流量制御弁88を制御し、油圧回路での油圧を制御することで低速工程、高速工程、及び増圧工程を実現している。ところで、低速工程においては、成形材料の空気の巻き込みを防止する等のために射出速度を緻密に制御したいという要望があり、高速工程においては、射出時間をより短縮したいという要望がある。さらに、増圧工程においては、増圧に必要な推力の発生源を小型化したいという要望がある。しかし、特許文献1のように油圧回路での油圧を制御するだけでは、各工程に特有の要望を解消するための制御が困難である。
 本発明の目的は、低速工程、高速工程、及び増圧工程に特化した制御を実現することができる射出装置を提供することにある。
 上記目的を達成するため、本発明の一態様に係る射出装置は、成形材料を型内に射出して充填し、さらに増圧させる。射出装置は、低速工程用のユニットと高速工程用のユニットと増圧工程用のユニットと射出プランジャとを備える。前記低速工程用のユニットは、低速工程用のロッドを備える低速工程用シリンダと該低速工程用シリンダを駆動する電動駆動源とを有する。前記高速工程用のユニットは、高速工程用のロッドを備える高速工程用シリンダと該高速工程用シリンダを駆動する油圧駆動源とを有する。前記増圧工程用のユニットは、増圧工程用のロッドを備える増圧工程用シリンダと該増圧工程用シリンダを駆動する駆動源とを有する。前記射出プランジャは前記成形材料を型内に射出する。前記3つのユニットのうちのいずれか一つである第1のユニットのロッドが前記射出プランジャに機械的に連結される。前記第1のユニット以外の二つのユニットのうちの一方である第2のユニットのロッドが、前記第1のユニットに機械的に連結される。前記第1及び第2のユニット以外のユニットである第3のユニットのロッドが、前記第2のユニットに機械的に連結されている。
本発明の実施形態に係る射出装置を模式的に示す図。 図1の射出装置における射出圧力及び射出速度の変化を示すグラフ。 低速工程時の図1の射出装置を模式的に示す図。 高速工程時の図1の射出装置を模式的に示す図。 増圧工程時の図1の射出装置を模式的に示す図。 背景技術の射出装置を示す図。
 以下、本発明を具体化した一実施形態を図1~図5にしたがって説明する。
 まず、図1に示すように、型Kは、固定金型部12と、可動金型部13とから形成されるとともに、固定金型部12及び可動金型部13は、図示しない型締装置により型開閉及び型締がなされる。射出装置11は、型K内に形成されたキャビティ14に、成形材料としての金属材料を射出・充填する装置である。そして、型K内に射出された金属材料は、凝固後に取り出されることにより、所望の成形品となる。
 固定金型部12には、キャビティ14に連通する射出スリーブ15が設けられるとともに、この射出スリーブ15内には射出プランジャ16が摺動可能に設けられている。そして、射出スリーブ15に形成された供給口(図示せず)から金属材料が射出スリーブ15に供給された状態で、射出プランジャ16がキャビティ14に向かって射出スリーブ15内を摺動することにより、金属材料がキャビティ14に射出、充填されるようになっている。
 射出プランジャ16には、連結部材17を介して増圧工程用シリンダ18のロッド18cの先端が連結されている。増圧工程用シリンダ18において、シリンダチューブ18a内には、ロッド18cと一体のピストン18bが移動可能に収容されるとともに、このピストン18bによってシリンダチューブ18a内が、ロッド18cが延出する側のロッド側室18eと、その反対側のヘッド側室18dとに区画されている。
 ロッド側室18eは、シリンダチューブ18aに形成された給排口(図示せず)を介して大気開放されるとともに、ヘッド側室18dは、増幅用油路19を介して作動用シリンダ20が接続されている。この作動用シリンダ20のシリンダ径は、増圧工程用シリンダ18のシリンダ径より小さくなっている。そして、増圧工程用シリンダ18より小径をなす作動用シリンダ20と、この作動用シリンダ20を増圧工程用シリンダ18に接続する増幅用油路19とから、増圧工程用シリンダ18におけるロッド18cの推力を増幅させる増幅回路が構成されている。
 作動用シリンダ20のシリンダチューブ20a内には、ピストン20bが移動可能に収容されるとともに、このピストン20bにはロッド20cが一体に設けられている。作動用シリンダ20のシリンダチューブ20a内は、ピストン20bによってロッド20cが延出する側のロッド側室20eと、その反対側のヘッド側室20dとに区画されている。そして、作動用シリンダ20のヘッド側室20dと、増圧工程用シリンダ18のヘッド側室18dとは、上述の増幅用油路19によって接続されるとともに、両ヘッド側室18d,20d内には非圧縮性流体としての作動油が封入されている。
 また、作動用シリンダ20のロッド20cには、ロッド20cを前後進動作させる作動用ボールネジ・ナット機構BN1が連結されている。詳細には、ロッド20cの先端には作動用ナットN1が連結されるとともに、この作動用ナットN1は作動用ボールネジB1に螺合されており、この作動用ボールネジB1は、作動用電動駆動源としての作動用モータM1によって回転される。作動用ボールネジB1は、作動用ナットN1が作動用ボールネジB1の軸方向に前進又は後進動作するように回転する。よって、作動用ボールネジ・ナット機構BN1は、作動用ナットN1と、作動用ボールネジB1と、作動用モータM1とから構成されている。
 そして、本実施形態では、増圧工程用シリンダ18と、増幅用油路19と、作動用シリンダ20と、作動用ボールネジ・ナット機構BN1とから、増圧工程用ユニットU1が構成されている。
 増圧工程用ユニットU1において、型Kと反対側には、低速工程用ユニットU2における低速工程用シリンダ30のロッド30cが機械的に連結されている。低速工程用シリンダ30において、シリンダチューブ30a内には、ロッド30cと一体のピストン30bが移動可能に収容されるとともに、このピストン30bによってシリンダチューブ30a内が、型K側の第1作動室30eと、その反対側の第2作動室30dとに区画されている。
 ロッド30cには、ロッド30cを前後進動作させる低速工程用ボールネジ・ナット機構BN2が連結されている。詳細には、ロッド30cには低速工程用ナットN2が連結されるとともに、この低速工程用ナットN2に低速工程用ボールネジB2が螺合されている。また、低速工程用ボールネジB2は、電動駆動源としての低速工程用モータM2によって回転される。
 低速工程用モータM2により、低速工程用ナットN2は低速工程用ボールネジB2の軸方向へ前進又は後進動作する。よって、低速工程用ボールネジ・ナット機構BN2は、低速工程用ナットN2と、低速工程用ボールネジB2と、低速工程用モータM2とから構成されている。
 低速工程用シリンダ30の第1作動室30eには、低速工程用油路31の一端が接続されるとともに、この低速工程用油路31の他端は第2作動室30dに接続されている。すなわち、第1作動室30eと第2作動室30dとは、低速工程用油路31によって閉回路とされている。また、低速工程用油路31には、低速工程用電磁切換弁32が配設されている。この低速工程用電磁切換弁32は、第2作動室30dと第1作動室30eとの連通を遮断する第1位置32aと、第2作動室30dから第1作動室30eへ作動油が流れることを許す第2位置32bと、に切換可能になっている。
 また、低速工程用油路31には、低速工程用電磁切換弁32をバイパスするバイパス油路33が設けられるとともに、このバイパス油路33には逆止弁34が設けられている。この逆止弁34は、低速工程用電磁切換弁32が第1位置32aにあるとき、第2作動室30dから第1作動室30eへ作動油が流れることを阻止する一方で、第1作動室30eから第2作動室30dへ作動油が流れることを許す。
 そして、低速工程用電磁切換弁32が第1位置32aにあるとき、型Kからの背圧力がロッド30cに作用し、ロッド30cを介してピストン30bが第2作動室30d側に押圧されても、逆止弁34により、第2作動室30dの作動油が第1作動室30eに排出されることが阻止され、作動油によって背圧力が支承される。したがって、本実施形態では、逆止弁34及び低速工程用油路31により、背圧力支承部を構成している。また、本実施形態では、低速工程用シリンダ30と、低速工程用ボールネジ・ナット機構BN2と、背圧支承部とから低速工程用ユニットU2が構成されている。
 低速工程用ユニットU2において、増圧工程用ユニットU1とは反対側には、高速工程用ユニットU3における高速工程用シリンダ40の第1ロッド40cが機械的に連結されている。高速工程用シリンダ40は、両ロッド形のシリンダであり、この高速工程用シリンダ40のシリンダチューブ40a内には、第1ロッド40cと一体のピストン40bが移動可能に収容されるとともに、このピストン40bには、同ピストン40bから第1ロッド40cの反対方向に延びる第2ロッド40fが一体に設けられている。シリンダチューブ40a内は、ピストン40bによって第1ロッド40c側の第1室40eと、その反対側の第2ロッド40f側の第2室40dとに区画されている。
 第1室40eには、給排機構Tが接続されるとともに、この給排機構Tは、第1室40eに作動油を供給するとともに、第1室40eの作動油を排出する。また、給排機構Tは、油タンク43と、油タンク43内の作動油を汲み上げるポンプ44と、給排油路47上に設けられた電磁切換弁45と、からなる。電磁切換弁45は、ポンプ44によって油タンク43から汲み上げられた作動油を第1室40eへ供給可能とする第1位置45aと、第1室40e内の作動油を油タンク43に排出可能とする第2位置45bとに切換可能になっている。一方、高速工程用シリンダ40の第2室40dには、油圧駆動源としてのアキュムレータ46が接続されるとともに、アキュムレータ46には作動油が蓄圧されている。そして、このアキュムレータ46からの作動油が第2室40dに供給されるとともに、ピストン40bには、低速工程用ユニットU2に向けた油圧が常に作用している。
 また、高速工程用シリンダ40の第2ロッド40fの先端には、連結部40gが形成されている。高速工程用ユニットU3には、高速工程用シリンダ40とは別体の連結駆動部49が設けられる。連結駆動部49は連結部40gに機械的に連結又は連結解除可能になっている。連結駆動部49は、連結用モータ49aによって回転可能に構成されている。そして、連結部40gに対し、連結駆動部49が連結した状態では、アキュムレータ46からの作動油によるピストン40b(第1及び第2ロッド40c,40f)の前進動作が規制可能となっている。
 一方、連結駆動部49が連結用モータ49aによって駆動されると、連結部40gに対する連結が解除されるとともに、アキュムレータ46からの作動油によるピストン40bの前進動作が可能になる。そして、本実施形態では、連結部40gと連結駆動部49とから連結機構Rが構成されるとともに、連結部40gと連結駆動部49とはチャック構造により構成されている。また、この連結機構Rと、高速工程用シリンダ40と、給排機構Tと、アキュムレータ46とから、高速工程用ユニットU3が構成されている。
 本実施形態では、型Kに対し、射出プランジャ16を介して増圧工程用ユニットU1のロッド18cが機械的に連結されるとともに、増圧工程用ユニットU1に、低速工程用ユニットU2のロッド30cが機械的に連結されている。さらに、低速工程用ユニットU2に高速工程用ユニットU3のロッド40cが機械的に連結されている。また、ロッド18c,30c,40cは同一軸線上に配置されるとともに、増圧工程用シリンダ18と、低速工程用シリンダ30と、高速工程用シリンダ40とは直列に配置されている。
 次に、射出装置11の射出時における作動パターン(射出パターン)を、図2にしたがって説明する。
 射出装置11は、低速工程、高速工程、及び増圧工程の3工程で作動させる。低速工程は、射出の初期段階の工程であって、低速工程用ユニットU2で射出プランジャ16を作動させる工程である。
 高速工程は、低速工程の次に行われる工程であって、射出プランジャ16を低速工程時よりも高速で作動させる工程である。そして、高速工程は、高速工程用ユニットU3で射出プランジャ16を作動させる工程である。
 増圧工程は、高速工程の次に行われる射出の最終段階の工程であって、射出プランジャ16の型Kに向けた前進方向の力によりキャビティ14内の金属材料を増圧する工程である。そして、増圧工程は、増圧工程用ユニットU1で射出プランジャ16を作動させる工程である。
 これらの各工程では、図2に示すように、射出装置11に要求される作動パターンが相違する。すなわち、射出プランジャ16は、高速工程において低速工程よりも速い速度で作動させることが必要である一方で、増圧工程においては速度を必要としない。また、射出プランジャ16は、増圧工程において低速工程及び高速工程よりも高い圧力を付与するように作動させることが必要である一方で、低速工程及び高速工程において増圧工程時ほどの圧力を付与するように作動させる必要はない。
 以下、本実施形態の射出装置11の作用を、図3~図5にしたがって説明する。
 最初に、低速工程について図1及び図3に従って説明する。
 低速工程の開始前、射出スリーブ15の射出プランジャ16、増圧工程用シリンダ18のロッド18c、作動用シリンダ20のロッド20c、低速工程用シリンダ30のロッド30c、及び高速工程用シリンダ40の両ロッド40c,40fは、図1に示すような所定の初期位置に位置している。なお、初期位置に位置する各ロッド18c,20c,30c,40c,40fは、射出スリーブ15内に供給される金属材料に対して射出圧を付与していない(図2の時間T1)。
 また、低速工程用ユニットU2の低速工程用電磁切換弁32は、成形時、第1作動室30eと第2作動室30dとの連通を遮断するように第1位置32aに切り換えられている。さらに、高速工程用ユニットU3の給排機構Tの電磁切換弁45は、成形時、高速工程用シリンダ40における第1室40eの作動油が油タンク43に戻らないよう第1位置45aに切り換えられている。
 そして、固定金型部12と可動金型部13との型締め、及び射出スリーブ15への金属材料の供給などの成形準備が完了すると、低速工程用ユニットU2による低速工程を開始する。低速工程において、低速工程用シリンダ30のロッド30cは、図2に示す射出速度V1で移動する。そして、低速工程用モータM2が駆動されると、低速工程用ボールネジB2が回転するとともに、低速工程用ボールネジB2に螺合された低速工程用ナットN2が前進動作する。すると、図3に示すように、低速工程用ナットN2を介して低速工程用シリンダ30のロッド30cには駆動力が付与され、前進動作する。そして、このロッド30cの前進動作により、増圧工程用ユニットU1全体が型Kに向けて押し出され、前進動作する。
 増圧工程用ユニットU1が前進動作すると、増圧工程用シリンダ18が前進動作する。これにより、この増圧工程用シリンダ18のロッド18cに連結された射出プランジャ16も前進動作する。この射出プランジャ16の前進動作により、射出スリーブ15内の金属材料はキャビティ14内に射出される。
 そして、低速工程用シリンダ30のロッド30cが、低速工程時において前進動作させる位置に到達すると(図2の時間T2)、低速工程から高速工程に移行する。
 次に、高速工程について図4に従って説明する。
 高速工程において、射出プランジャ16が、図2に示す射出速度V2となるように、アキュムレータ46に作動油を蓄圧しておき、所定のタイミングで連結駆動部49の連結用モータ49aが駆動される。同時に、電磁切換弁45は第2位置45bに切り換えられる。そして、連結駆動部49と、高速工程用シリンダ40における第2ロッド40fの連結部40gとの連結状態が解除されると、アキュムレータ46の作動油が作用しているピストン40bは、一気に第1室40e側に向けて高速動作する。このとき、第1室40eの作動油が電磁切換弁45を介して油タンク43に排出される。そして、ピストン40bの高速動作に伴い、第1ロッド40cも高速移動し、低速工程用ユニットU2を介して増圧工程用ユニットU1が型Kに向けて高速で押し出され、前進動作する。
 低速工程用ユニットU2を介して増圧工程用ユニットU1が射出速度V2で前進動作すると、増圧工程用シリンダ18が前進動作する。これにより、この増圧工程用シリンダ18のロッド18cに連結された射出プランジャ16も射出速度V2で前進動作し、射出スリーブ15内の金属材料はキャビティ14内に射出されるようになる。高速工程時には、低速工程時に比して、増圧工程用ユニットU1及び低速工程用ユニットU2が高速動作する。
 この高速工程時、型Kからの背圧力が増圧工程用ユニットU1を介して低速工程用ユニットU2の低速工程用シリンダ30に作用する。しかし、低速工程用シリンダ30においては、逆止弁34により第2作動室30dから第1作動室30eへの作動油の流出が阻止されるため、背圧力によりロッド30cが第2作動室30dに向けた後進動作が阻止される。その結果、ロッド30cに螺着された低速工程用ナットN2を介して低速工程用ボールネジB2が回転することが阻止され、低速工程用モータM2が回転することが阻止される。
 次に、増圧工程について図5に従って説明する。
 増圧工程において、増圧工程用シリンダ18のロッド18cが付与する圧力が、図2に示す射出圧Pとなる。そして、作動用シリンダ20のロッド20cは、作動用モータM1の回転によって作動用ボールネジB1に螺合された作動用ナットN1が前進動作することで、その作動用ナットN1を介して駆動力が付与され、前進動作する。
 作動用シリンダ20のロッド20cが前進動作すると、ヘッド側室20dの作動油は、増幅用油路19を通じて、増圧工程用シリンダ18のヘッド側室18dへ供給される。本実施形態では、作動用シリンダ20から増圧工程用シリンダ18のヘッド側室18dに作動油を供給すると、パスカルの原理により、ヘッド側室18d内の圧力が上昇し、射出プランジャ16が増圧工程用シリンダ18から受ける圧力も上昇する。その結果、射出プランジャ16が、キャビティ14内の金属材料を加圧する力は増大する。なお、増圧工程時、増圧工程用シリンダ18のロッド側室18eからは空気が押し出され、この空気は大気開放される。
 また、増圧工程時も、型Kからの背圧力が増圧工程用ユニットU1を介して低速工程用ユニットU2の低速工程用シリンダ30に作用する。しかし、低速工程用シリンダ30においては、逆止弁34により第2作動室30dから第1作動室30eへの作動油の流出が阻止されるため、背圧によりロッド30cの第2作動室30dに向けた後進が阻止される。その結果、ロッド30cに螺着された低速工程用ナットN2を介した低速工程用ボールネジB2の回転及び低速工程用モータM2の回転が阻止される。
 その後、キャビティ14内の金属材料が凝固したならば、作動用モータM1を増圧工程時とは逆回転させる。そして、作動用シリンダ20のロッド20cは、作動用モータM1の回転によって作動用ボールネジB1に螺合された作動用ナットN1が後進動作することで、その作動用ナットN1を介して駆動力が付与され、後進動作する。作動用シリンダ20のロッド20cが後進動作すると、増圧工程用シリンダ18のヘッド側室18dの作動油が、増幅用油路19を通じて、作動用シリンダ20のヘッド側室20dに引き込まれ、これに伴い増圧工程用シリンダ18のロッド18cが後進動作する。その結果、射出プランジャ16が、射出スリーブ15内を後進動作する。
 続いて、低速工程用ユニットU2における低速工程用電磁切換弁32を制御することで第2位置32bに切り換え、第2作動室30dから第1作動室30eへの作動油の流れを可能にする。そして、低速工程用モータM2を低速工程時とは逆回転させる。そして、低速工程用シリンダ30のロッド30cは、低速工程用モータM2の回転によって低速工程用ボールネジB2に螺合された低速工程用ナットN2が後進動作することで、その低速工程用ナットN2を介して駆動力が付与され、後進動作する。低速工程用シリンダ30のロッド30cが後進動作すると、低速工程用シリンダ30の第2作動室30dの作動油が、低速工程用油路31及び低速工程用電磁切換弁32を通じて、第1作動室30eに流れる。その結果、ロッド30cが後進動作するとともに、このロッド30cが連結された増圧工程用ユニットU1が後進動作する。よって、射出プランジャ16が、射出スリーブ15内を後進動作する。
 続いて、高速工程用ユニットU3において、電磁切換弁45を制御することで、第1位置45aに切り換えるとともに、ポンプ44を駆動させ、油タンク43から第1室40eに作動油を供給する。すると、ピストン40bが第2室40dに向けて後進動作するとともに、第2室40dの作動油がアキュムレータ46に蓄圧される。同時に、ピストン40bが後進動作することで、第1ロッド40c及び第2ロッド40fに駆動力が付与され、後進動作し、この第1ロッド40cが連結された低速工程用ユニットU2が後進動作するとともに、その低速工程用ユニットU2のロッド30cが連結された増圧工程用ユニットU1も後進動作する。その結果、射出プランジャ16が、射出スリーブ15内を後進動作する。
 また、第2ロッド40fが後進動作し、連結部40gが連結駆動部49に到達すると、連結用モータ49aを駆動させ、連結部40gに連結駆動部49を連結させるとともに、ピストン40bの前進動作を規制する。したがって、射出スリーブ15の射出プランジャ16、増圧工程用シリンダ18のロッド18c、作動用シリンダ20のロッド20c、低速工程用シリンダ30のロッド30c、及び高速工程用シリンダ40の両ロッド40c,40fは、図1に示す初期位置に位置する。その後、固定金型部12と可動金型部13とを型開きすることにより、型から成形品が取り出される。
 上記実施形態によれば、以下のような利点を得ることができる。
 (1)射出装置11を増圧工程用ユニットU1と、低速工程用ユニットU2と、高速工程用ユニットU3とから構成し、射出装置11を各工程用に特化したユニットで構成した。そして、射出装置11においては、増圧工程用ユニットU1における増圧工程用シリンダ18のロッド18cを、射出プランジャ16を介して型Kに機械的に連結するとともに、増圧工程用ユニットU1に対し、低速工程用ユニットU2における低速工程用シリンダ30のロッド30cを機械的に連結した。さらに、低速工程用ユニットU2に対しては、高速工程用ユニットU3における高速工程用シリンダ40のロッド40cを機械的に連結した。
 このような射出装置11において、低速工程を行う低速工程用ユニットU2に関しては、駆動源を低速工程用モータM2とした。そして、低速工程用モータM2を制御することにより、低速工程用シリンダ30におけるロッド30cの移動速度及び加速度を緻密に制御し、結果として射出プランジャ16の作動速度及び加速度を緻密に制御することができる。よって、低速工程において、射出プランジャ16を最適な作動速度及び加速度で動作させることができ、射出スリーブ15内での金属材料の空気の巻き込みを防止したり、金属材料が波打つことを防止したりすることがより的確に行えるようになる。
 また、高速工程を行う高速工程用ユニットU3に関しては、駆動源をアキュムレータ46とした。このため、アキュムレータ46に対する蓄圧量を調節することで、高速工程時における射出時間を調節することができ、射出時間の短縮も可能である。
 さらに、増圧工程を行う増圧工程用ユニットU1に関しては、増圧工程を行うための増圧工程用シリンダ18を独立して備えるとともに、その駆動源として作動用シリンダ20及び作動用モータM1を備える。このため、背景技術のように、増圧工程を行う駆動源として、アキュムレータ、流量制御弁及び油圧回路を要する場合と比べると、駆動源の小型化が可能になる。また、作動用シリンダ20は、作動用モータM1の制御によってピストン20bが所望の位置に動作するから、増圧工程用シリンダ18に対する作動油の供給量(圧力)が正確に制御されることになる。
 したがって、低速工程、高速工程、及び増圧工程を各ユニットU1,U2,U3で独立して行うことで、各工程に特化した動作を可能にし、各工程に特有の要望を満たすことができる。また、各ユニットU1,U2,U3を機械的に連結することで、各ユニットU1,U2,U3を連動させるための油圧回路や制御弁が必要無くなり、射出装置11の構成を簡素化することができる。
 (2)増圧工程用ユニットU1の駆動源として、作動用モータM1を採用し、低速工程用ユニットU2の駆動源として低速工程用モータM2を採用した。また、高速工程用ユニットU3の駆動源としてアキュムレータ46を採用した。例えば、高速工程においては、その駆動源を電動駆動源とすると、高速工程用シリンダ40を高速で動作させるために電動駆動源が大型化してしまう。しかし、高速工程の駆動源をアキュムレータ46とすることで、駆動源を大型化せず、高速工程用シリンダ40を高速で動作させることが可能になる。よって、各工程で要求される特性に合わせて電動駆動源と油圧駆動源とを使い分けることで、射出装置11を安価で、かつ高品質で提供することができる。
 (3)低速工程用ユニットU2に、型Kからの背圧力を支承する背圧力支承部を設け、この背圧力支承部により、背圧力によって低速工程用シリンダ30のロッド30cが後進動作すること、すなわちロッド30Cが型Kから離間する方向へ移動することを阻止することができる。その結果、背圧力によって低速工程用ナットN2を介して低速工程用ボールネジB2が回転することが阻止される。よって、ロッド30cの駆動源として低速工程用モータM2を採用しても、背圧力を低速工程用モータM2で支承する必要が無く、結果として低速工程用モータM2が背圧力で回転してしまうことを防止できる。また、背圧力を背圧力支承部で支承するため、低速工程用モータM2を大型化する必要もなく、低速工程用シリンダ30を動作させるための必要最小限の出力を持つ低速工程用モータM2を採用することができる。そのため、低速工程用モータM2に掛かるコストを抑えることができる。
 (4)低速工程用ユニットU2において、低速工程用シリンダ30のロッド30cには、低速工程用ナットN2が連結されるとともに、この低速工程用ナットN2には低速工程用モータM2によって回転する低速工程用ボールネジB2が螺合されている。そして、背圧力支承部は、低速工程用シリンダ30の第1作動室30eと第2作動室30dとを接続する低速工程用油路31と、この低速工程用油路31のバイパス油路33に設けられた逆止弁34とからなる。よって、油圧回路(閉回路)及び逆止弁といった簡単な構成で、型Kからの背圧力を支承することができ、背圧力によってロッド30cが後進動作することを防止できる。
 (5)高速工程用ユニットU3において、高速工程用シリンダ40の第2室40dにはアキュムレータ46が接続されるとともに、第2ロッド40fに一体の連結部40gは、連結駆動部49に対して機械的に連結又は連結解除可能になっている。このため、第2ロッド40fにアキュムレータ46の油圧を作用させた状態で連結機構Rにより第2ロッド40fの移動を規制することで、第2ロッド40fには油圧を作用させておくことができる。連結部40gと連結駆動部49との連結が解除されると、アキュムレータ46からの油圧が作用したピストン40bを第2室40dに向かって一気に移動させることができ、高速工程用シリンダ40の第1ロッド40cを一気に前進動作させることができる。したがって、例えば、アキュムレータ46に蓄圧された作動油をバルブを開いて第2室40dに供給する場合は、所望のバルブ開度にしてから、所望の油圧となるまで時間差があり、その場合と比べると、所望の油圧に達するまでの時間が短くなる。その結果として、高速工程の射出時間の短縮を図ることができる。
 (6)増圧工程用ユニットU1において、増圧工程用シリンダ18の駆動源を、増圧工程用シリンダ18より小径をなし非圧縮性流体の流体圧を増圧工程用シリンダ18に付与して作動させる作動用シリンダ20と、この作動用シリンダ20を駆動させる作動用モータM1とから構成した。このため、シリンダ径の大小を利用することで、小径の作動用シリンダ20を駆動源としても増圧工程用シリンダ18では大きな圧力を発生させることができる。したがって、作動用モータM1として、作動用シリンダ20を動作させるための必要最小限の出力を持つモータを採用することができる。そのため、作動用モータM1を小型化することができるとともに作動用モータM1に掛かるコストを抑えることができる。
 なお、上記実施形態は以下のように変更してもよい。
 実施形態では、連結機構Rを、連結部40gと連結駆動部49とからなるチャック構造で形成したが、連結部40gと連結駆動部49とは、コレット構造、ボールカプラ構造、BNCコネクタ構造等に変更してもよい。
 低速工程用ユニットU2において、逆止弁34は無くてもよい。この場合、背圧力を支承できるように低速工程用モータM2を大型化してもよい。
 増圧工程用ユニットU1及び低速工程用ユニットU2において、作動用シリンダ20及び低速工程用シリンダ30の駆動源をリニアモータとしてもよい。この場合、リニアモータにより作動用シリンダ20のロッド20c及び低速工程用シリンダ30のロッド30cを直接、直線移動させてもよい。
 高速工程用ユニットU3において、アキュムレータ46と高速工程用シリンダ40の第2室40dとの間に流量制御弁を設けてもよい。この場合、この流量制御弁によりアキュムレータ46から放出される圧油量を制御して、高速工程用シリンダ40の動作速度を制御してもよい。
 実施形態では、射出装置11を、射出プランジャ16に連結された増圧工程用ユニットU1、増圧工程用ユニットU1に連結された低速工程用ユニットU2、及び低速工程用ユニットU2に連結された高速工程用ユニットU3の順に配置にしたが、3つのユニットU1,U2,U3の配置は適宜変更してもよい。
 実施形態では、増圧工程用ユニットU1における増圧工程用シリンダ18のロッド18cを後進動作させる場合、作動用モータM1を駆動させて後進動作を行った。しかし、これに限らず、増圧工程用シリンダ18のロッド側室18eに、非圧縮性流体としての作動油を供給するとともに、ロッド側室18eの作動油を排出する給排機構を設け、この給排機構を用いてロッド18cを後進動作させてもよい。
 射出装置11は、樹脂材料をキャビティ14内に射出して樹脂成形品を製造する射出装置に適用してもよい。

Claims (5)

  1.  成形材料を型内に射出して充填し、さらに増圧させる射出装置であって、
     低速工程用のロッドを備える低速工程用シリンダと該低速工程用シリンダを駆動する電動駆動源とを有する低速工程用のユニットと、
     高速工程用のロッドを備える高速工程用シリンダと該高速工程用シリンダを駆動する油圧駆動源とを有する高速工程用のユニットと、
     増圧工程用のロッドを備える増圧工程用シリンダと該増圧工程用シリンダを駆動する駆動源とを有する増圧工程用のユニットと、
     前記成形材料を型内に射出する射出プランジャと、を備え、
     前記3つのユニットのうちのいずれか一つである第1のユニットのロッドが、前記射出プランジャに機械的に連結され、
     前記第1のユニット以外の二つのユニットのうちの一方である第2のユニットのロッドが、前記第1のユニットに機械的に連結され、
     前記第1及び第2のユニット以外のユニットである第3のユニットのロッドが、前記第2のユニットに機械的に連結されている射出装置。
  2.  前記低速工程用シリンダは、高速工程及び増圧工程時の前記型からの背圧力を支承する背圧力支承部を有する請求項1に記載の射出装置。
  3.  前記低速工程用シリンダは同シリンダ内を第1作動室及び第2作動室に区画するピストンを有し、前記低速工程用のロッドは前記ピストンから前記第1作動室を通過するように延び、
     前記背圧力支承部は、前記第1作動室及び第2作動室を接続する非圧縮性流体用の閉回路と、前記背圧力によって前記非圧縮性流体が前記第1作動室から第2作動室へ流れることを阻止する逆止弁と、を含む請求項2に記載の射出装置。
  4.  前記射出プランジャに前記増圧工程用のロッドが連結され、前記増圧工程用のユニットに前記低速工程用のロッドが連結され、さらに、前記低速工程用のユニットに前記高速工程用のロッドが連結され、
     前記高速工程用シリンダは第1ロッド及び第2ロッドを有し、
     前記第1ロッドに前記低速工程用のユニットが連結され、前記第2ロッドには連結機構が設けられ、
     前記連結機構は、前記第2ロッドと機械的に連結して前記油圧駆動源の油圧による第1及び第2ロッドの移動を規制可能とし、かつ前記連結を機械的に解除可能とする請求項1~請求項3のうちいずれか一項に記載の射出装置。
  5.  前記増圧工程用のユニットの駆動源は、
     前記増圧工程用シリンダより小径をなし非圧縮性流体の流体圧を前記増圧工程用シリンダに付与して同増圧工程用シリンダを作動させる作動用シリンダと、
     前記作動用シリンダを駆動させる作動用電動駆動源と、を含む請求項1~請求項4のうちいずれか一項に記載の射出装置。
PCT/JP2012/075526 2011-10-19 2012-10-02 射出装置 WO2013058104A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
EP12841191.5A EP2769784B1 (en) 2011-10-19 2012-10-02 Injection apparatus
IN3516CHN2014 IN2014CN03516A (ja) 2011-10-19 2012-10-02
CN201280050871.3A CN103889617B (zh) 2011-10-19 2012-10-02 注射装置
US14/351,683 US9108353B2 (en) 2011-10-19 2012-10-02 Injection apparatus having a low speed operation unit and a high speed operation unit

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2011230016A JP5644735B2 (ja) 2011-10-19 2011-10-19 射出装置
JP2011-230016 2011-10-19

Publications (1)

Publication Number Publication Date
WO2013058104A1 true WO2013058104A1 (ja) 2013-04-25

Family

ID=48140756

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/075526 WO2013058104A1 (ja) 2011-10-19 2012-10-02 射出装置

Country Status (6)

Country Link
US (1) US9108353B2 (ja)
EP (1) EP2769784B1 (ja)
JP (1) JP5644735B2 (ja)
CN (1) CN103889617B (ja)
IN (1) IN2014CN03516A (ja)
WO (1) WO2013058104A1 (ja)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5673481B2 (ja) * 2011-10-19 2015-02-18 株式会社豊田自動織機 射出装置
JP2016055330A (ja) * 2014-09-11 2016-04-21 株式会社豊田自動織機 射出装置

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006315050A (ja) * 2005-05-13 2006-11-24 Toyo Mach & Metal Co Ltd ダイカストマシン
JP2008073708A (ja) * 2006-09-20 2008-04-03 Ube Machinery Corporation Ltd 制御性に優れたハイブリッド高速射出装置及び制御方法
JP2010029908A (ja) * 2008-07-29 2010-02-12 Toyo Mach & Metal Co Ltd ダイカストマシン
JP2011098385A (ja) * 2009-11-09 2011-05-19 Toyota Motor Corp 射出装置

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3586576T2 (de) * 1984-06-25 1993-01-07 Toshiba Machine Co Ltd Spritzgiessmaschinen und verfahren zu deren kontrolle.
JP3770688B2 (ja) 1997-02-25 2006-04-26 Ykk株式会社 射出成形機
JP3064282B2 (ja) 1998-07-17 2000-07-12 東芝機械株式会社 電動射出ダイカストマシン
JP2000108175A (ja) * 1998-10-06 2000-04-18 Mitsubishi Heavy Ind Ltd 射出成形機の電動射出駆動装置
JP2001001126A (ja) 1999-06-23 2001-01-09 Toshiba Mach Co Ltd 電動射出ダイカストマシン
US6368095B1 (en) * 2000-06-06 2002-04-09 Ying-Fu Chang Injection drive mechanism for a servo injection molding machine
JP3662001B2 (ja) 2001-10-04 2005-06-22 宇部テクノエンジ株式会社 ダイカストマシンの射出方法
US7017412B2 (en) * 2002-04-18 2006-03-28 University Of Utah Research Foundation Continuous wave ultrasonic process monitor for polymer processing
JP4098151B2 (ja) 2003-05-09 2008-06-11 東芝機械株式会社 射出装置および鋳造方法
JP3958268B2 (ja) * 2003-09-09 2007-08-15 ファナック株式会社 ノズルタッチ機構
CN101516546A (zh) * 2006-09-20 2009-08-26 宇部兴产机械株式会社 压铸机的注射装置
JP4429304B2 (ja) * 2006-12-19 2010-03-10 本田技研工業株式会社 射出成形方法及び射出成形装置
JP2009090321A (ja) 2007-10-09 2009-04-30 Toshiba Mach Co Ltd 成形機の射出装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006315050A (ja) * 2005-05-13 2006-11-24 Toyo Mach & Metal Co Ltd ダイカストマシン
JP2008073708A (ja) * 2006-09-20 2008-04-03 Ube Machinery Corporation Ltd 制御性に優れたハイブリッド高速射出装置及び制御方法
JP2010029908A (ja) * 2008-07-29 2010-02-12 Toyo Mach & Metal Co Ltd ダイカストマシン
JP2011098385A (ja) * 2009-11-09 2011-05-19 Toyota Motor Corp 射出装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2769784A4 *

Also Published As

Publication number Publication date
CN103889617B (zh) 2015-11-25
EP2769784B1 (en) 2016-12-07
JP2013086143A (ja) 2013-05-13
EP2769784A4 (en) 2015-04-15
US20140295019A1 (en) 2014-10-02
IN2014CN03516A (ja) 2015-10-09
CN103889617A (zh) 2014-06-25
US9108353B2 (en) 2015-08-18
EP2769784A1 (en) 2014-08-27
JP5644735B2 (ja) 2014-12-24

Similar Documents

Publication Publication Date Title
US7316259B2 (en) Diecasting machine
JP6457750B2 (ja) 成形装置
WO2013005597A1 (ja) 射出装置
WO2013005598A1 (ja) 射出装置
US9056418B2 (en) Injection apparatus
JP7132876B2 (ja) 射出装置及び成形機
JP5644735B2 (ja) 射出装置
EP2865461B1 (en) Injection device
JP5853876B2 (ja) 射出装置
JP5673481B2 (ja) 射出装置
JP7301192B2 (ja) 射出装置及び成形機
JP4646695B2 (ja) ダイカストマシン
JP2019181537A (ja) 射出装置及び成形機
JP5634776B2 (ja) 成形機の射出装置及び成形機
WO2023074851A1 (ja) 局部加圧装置、成形機及び成形方法
JP5279689B2 (ja) ダイカストマシン
JP5603176B2 (ja) 成形機の射出装置
JP2022187608A (ja) 射出装置及び成形機
JP2023073534A (ja) ダイカストマシンの射出装置
JP2013075333A (ja) ダイカストマシン及びダイカスト鋳造方法
JP2010172899A (ja) 射出装置及び射出方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12841191

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 14351683

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

REEP Request for entry into the european phase

Ref document number: 2012841191

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2012841191

Country of ref document: EP