WO2013035585A1 - 手すり先行型足場養生システムおよびこれを用いた手すり先行型足場、ならびに手すり先行型足場養生方法 - Google Patents

手すり先行型足場養生システムおよびこれを用いた手すり先行型足場、ならびに手すり先行型足場養生方法 Download PDF

Info

Publication number
WO2013035585A1
WO2013035585A1 PCT/JP2012/071701 JP2012071701W WO2013035585A1 WO 2013035585 A1 WO2013035585 A1 WO 2013035585A1 JP 2012071701 W JP2012071701 W JP 2012071701W WO 2013035585 A1 WO2013035585 A1 WO 2013035585A1
Authority
WO
WIPO (PCT)
Prior art keywords
handrail
shutter
curing
scaffold
guide rails
Prior art date
Application number
PCT/JP2012/071701
Other languages
English (en)
French (fr)
Inventor
博昭 山下
Original Assignee
Yamashita Hiroaki
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yamashita Hiroaki filed Critical Yamashita Hiroaki
Publication of WO2013035585A1 publication Critical patent/WO2013035585A1/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G5/147Railings specially adapted for mounting prior to the mounting of the platform
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/12Canopies
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G2005/148Railings latticed or netted

Definitions

  • the present invention relates to a handrail advance type scaffold curing system capable of simultaneously proceeding with a work for causing a handrail to precede a scaffold and a work for curing a scaffold, a handrail advance type scaffold using the same, and a handrail advance type scaffold curing method. Is.
  • the occupational safety and health rules regarding scaffolding, etc. were revised, raising the standards required for fall prevention measures and object fall prevention measures.
  • fall prevention measures for example, in the case of framed scaffolds, the lower brace and skirting board should be provided on the cross brace, and the upper bracelet and handrail frame shall be provided, or a soundproof panel and net frame shall be installed. It was decided to do. Also, as a fall prevention measure, it was decided to install a mesh sheet, a safety net, etc.
  • a forward-feeding type leading handrail frame comprising a plurality of handrail pillars and at least one handrail material connecting the handrail pillars is disclosed.
  • a handrail frame has been proposed in which the handrail pillar has a rake metal fitting having a shape that can be placed on a bar-like member, and the handrail material is rotatably connected to the handrail pillar ( Patent Document 1).
  • mesh sheets need to be tied together with a string by hand, it is very complicated and takes time and effort.
  • the mesh sheet has a high unit price, requires a regular cleaning fee, and must be discarded in about five years due to fading, damage, and the like.
  • the disposal cost is also expensive.
  • mesh sheets are difficult to recycle, they are currently disposed of in landfills, and there is also a problem of environmental burden.
  • seat is also disposable, it is the cost to reduce.
  • soundproof panels are not economical because they are more expensive than mesh sheets and are difficult to repair once they are damaged. Further, since the soundproof panel has a heavy weight per sheet, the higher the height is, the more difficult the lifting work and the mounting work become, which is very dangerous. Furthermore, even if the soundproofing property of the soundproofing panel itself is high, a gap is formed at the corner portion or the like, so that there are still defects in soundproofing and dustproofing properties.
  • An object of the present invention is to provide a handrail advance type scaffold curing system capable of shortening and assembling an extremely safe scaffold, a handrail advance type scaffold using the same, and a handrail advance type scaffold curing method.
  • a handrail advance type scaffold curing system is a scaffold curing system used when assembling a scaffold at a work site, and a pair of guide rails installed along a building frame constituting the scaffold, and the pair A handrail / curing shutter that is slid from bottom to top along the guide rails between the guide rails and installed outside the scaffold, and the pair of guide rails at a predetermined height. And shutter fixing means for fixing between them.
  • the guide rail may have a length corresponding to the height of the building frame and may have a connecting portion that is connected to another guide rail in the vertical direction.
  • the handrail / curing shutter may be configured by foldably connecting a plurality of small shutter panels.
  • the handrail / curing shutter may be configured by foldably connecting a plurality of mesh members having daylighting and air permeability.
  • a rail soundproof material may be attached to the guide rail along a guide surface that guides the handrail and curing shutter.
  • a gap closing panel that closes a gap between the handrail / curing shutter and the cloth plate of the scaffold is housed in the handrail / curing shutter on the inner surface of the handrail / curing shutter. It may be provided so that it can be taken in and out between the storage position to be closed and the closed position for closing the gap.
  • a baseboard storage space capable of storing an expandable / contractible sliding baseboard is provided on an inner surface of the handrail / curing shutter, and the slide is placed in the baseboard storage space.
  • An expression skirting board may be provided so that it can be taken in and out.
  • the handrail preceding type scaffold according to the present invention comprises the handrail preceding type scaffold curing system according to any one of claims 1 to 7.
  • the handrail advance type scaffold curing method is a handrail advance using a pair of guide rails installed along a building frame constituting the scaffold and a handrail and curing shutter installed outside the scaffold.
  • Rail type fixing method for fixing the pair of guide rails to the building frame in a state where each upper end of the pair of guide rails is higher than the cloth plate installed in the uppermost layer, the mold scaffold curing method
  • the handrail / curing shutter is slid from bottom to top along the guide rails between the pair of guide rails, and the upper end of the handrail / curing shutter is in the vicinity of the upper end of the guide rail.
  • the lower end portion of the new guide rail is connected to the upper end portion of the existing guide rail.
  • the new rail fixing step for fixing to the building frame, and the existing handrail and curing shutter are released and slid upward, and the upper end of the existing rail is positioned in the vicinity of the upper end of the new guide rail.
  • the handrail and curing shutter of the newly connected to the end portion may have a new shutter fixing step of fixing between the existing guide rail.
  • the handrail / curing treatment is performed by a gap closing panel provided on an inner surface of the handrail / curing shutter. You may have the clearance obstruction
  • a sliding skirting board provided on the inner surface of the handrail and curing shutter is taken out, and the cloth You may have the slide type baseboard installation process installed in the inner side of a board.
  • the present invention it is possible to provide a very safe scaffold by simultaneously reducing the construction cost and shortening the construction period by simultaneously proceeding the work of bringing the handrail to the scaffold and the work of curing the scaffold.
  • FIG. 1 It is a perspective view showing one embodiment of a handrail advance type scaffold curing system concerning the present invention. It is a front view showing the handrail advance type scaffold curing system of this embodiment. It is a top view which shows the handrail precedence type scaffold curing system of this embodiment. It is a right view which shows the handrail precedence type scaffold curing system of this embodiment. It is the (a) side view, (b) perspective view, and (c) top view which show the guide rail of this embodiment. It is a front view which shows the handrail and curing shutter of this embodiment. It is the figure which shows the (a) connection structure of the small shutter panel of this embodiment, and the (b) folded state.
  • the scaffold is a concept including all scaffolds configured by providing a fabric board on a building frame, a framework scaffold, a wedge-tight scaffold, a single pipe scaffold, a bracket one-side scaffold, an overhang scaffold, Suspended scaffolds, suspended shelf scaffolds, log scaffolds and the like.
  • the handrail advance type scaffold is a concept including all the scaffolds assembled according to the handrail advance method.
  • the handrail advance type scaffold curing system 1 of the present embodiment is a scaffold curing system used when assembling a scaffold at a work site such as a construction site or a dismantling site, and as shown in FIGS.
  • a pair of guide rails 2, 2 provided along the building frame 11, a handrail / curing shutter 3 guided between the pair of guide rails 2, 2, and the handrail / curing shutter 3 are used as a pair of guide rails 2.
  • 2 and a shutter fixing means 4 for fixing between the two.
  • each guide rail 2 sandwich the left and right ends of the handrail / curing shutter 3 and guide the sliding operation in the vertical direction.
  • each guide rail 2 has a substantially H-shaped cross section, and includes two rail grooves 21 and 21 that guide the left and right ends of the handrail / curing shutter 3. Yes.
  • each rail groove 21 has guide surfaces 22 facing each other, and a rail soundproof material 23 such as a rubber mat is attached along part or all of each guide surface 22.
  • each guide rail 2 is configured integrally with a substantially cylindrical leading support 24 as shown in FIGS. 3 and 5.
  • a joint pin 25 is provided at the upper end portion of the preceding support post 24. By inserting the joint pin 25 into the lower end portion of the preceding support post 24 of another guide rail 2, each guide rail 2 is connected in the vertical direction. Is done.
  • each guide rail 2 has a length corresponding to the height of the building frame 11 in order to easily connect the guide rails 2 in accordance with an increase in the number of scaffolds.
  • each guide rail 2 is provided at a first fixing member 26 provided at a position slightly below the center of the preceding support post 24 and at a position below the first fixing member 26.
  • a second fixing member 27 As shown in FIG. 5C, the first fixing member 26 has a fitting hole 28 that fits into the cylindrical portion protruding from the upper end portion of the building frame 11 from above.
  • the 2nd fixing member 27 is comprised by the clamp which hold
  • each guide rail 2 is fixed to the outside of the building frame 11 by the first fixing member 26 and the second fixing member 27, as shown in FIG.
  • Each guide rail 2 is fixed to the building frame 11 in a state of being higher than the installed cloth board 12.
  • the guide rail 2 is not limited to the above configuration, and a connecting portion 25 other than the joint pin 25 may be adopted as long as it has a function of connecting the guide rail 2 in the vertical direction. Further, the connecting portion 25, the first fixing member 26, and the second fixing member 27 may be directly attached to the guide rail 2 for weight reduction.
  • the handrail / curing shutter 3 is lifted from the bottom to the top between the pair of guide rails 2 and 2 and slid along the guide rails 2 and 2, and plays a role of a preceding handrail and curing at a predetermined position.
  • the handrail / curing shutter 3 has a structure in which a plurality of small shutter panels 32 are foldably connected by a hinge 31 as shown in FIGS. For this reason, as shown in FIG. 4, it can fold alternately and can be made compact and can be easily stored in the storage box 33. It is also convenient for transportation to the site.
  • each handrail / curing shutter 3 has a length corresponding to the height of the building frame 11 in order to facilitate the connection of the handrail / curing shutter 3 in accordance with an increase in the number of scaffolds.
  • a material of each small shutter panel 32 a material that is inexpensive, lightweight, high-strength, and recyclable is preferable, but is not limited thereto.
  • a gap closing panel 5 for closing a gap between the handrail / curing shutter 3 and the cloth board 12 is provided on the inner side surface of the handrail / curing shutter 3 so as to be able to be inserted and removed as appropriate.
  • a panel storage space 51 is formed in a small shutter panel 32 that faces the cloth plate 12, and a pair of guides are provided at both ends of the panel storage space 51.
  • the members 52 and 52 are fixed.
  • guide grooves 54 for guiding guide pins 53 provided at both ends of the gap closing panel 5 are formed in an inverted L shape.
  • the sliding type skirting board 6 includes a first skirting board member 61 and a second skirting board member 62, and a recess 63 provided at the right end of the first skirting board member 61.
  • the second base board member 62 is configured to be extendable and retractable by sliding it in and out.
  • an engagement hole 64 is formed in the right end portion of the first skirting member 61 so that the two fixing pins 65 urged in the protruding direction at the left end portion of the second skirting member 62 are engaged. It has become.
  • an L-shaped hook metal fitting 66 is rotatably housed at each end of the first baseboard member 61 and the second baseboard member 62, and is hooked on the building frame 11 when rotated 180 degrees. It becomes.
  • a wood storage space 67 is formed.
  • the opening 68 of the skirting board storage space 67 is formed to be larger than the shortest dimension of the sliding skirting board 6 and smaller than the longest dimension of the sliding skirting board 6 so that the sliding skirting board 6 can be inserted and removed. To do.
  • the handrail / curing shutter 3 is formed with two insertion openings 34 of the joint plate 7 at the upper and lower ends thereof.
  • the joint plate 7 has two locking pins 71 urged in the protruding direction.
  • Each insertion port 34 has a locking hole 35 that accommodates approximately half of the joint plate 7 and locks the locking pin 71.
  • each joint plate 7 is already installed above.
  • the handrail / curing shutter 3 is inserted into each insertion port 34 of the handrail / curing shutter 3, and the handrail / curing shutter 3 is connected in the vertical direction.
  • the shutter fixing means 4 fixes the handrail / curing shutter 3 between the pair of guide rails 2 and 2 at a predetermined height. As shown in FIGS. 2 and 6, the shutter fixing means 4 is provided on the small shutter panel 32 below in consideration of ease of operation. Further, as shown in FIG. 12, the shutter fixing means 4 is composed of a pair of lock bars 42, 42 connected to a rotary knob 41, and each lock bar 42 is small in accordance with the rotation of the rotary knob 41.
  • the shutter panel 32 is configured to be switchable between a retracted state and a protruding state from the left and right ends.
  • a locking projection 29 that locks the tip of each lock rod 42 is provided inside the rail groove 21 at a position below each guide rail 2.
  • the building frame 11 raised by the jack base 13 is reinforced with braces (not shown), and then the cloth plate 12 is installed to assemble the scaffolding.
  • the cloth board 12 becomes the uppermost cloth board 12, in order to follow the “handrail preceding construction method”, it is necessary for the operator to install the handrail in advance before getting on the cloth board 12.
  • the pair of guide rails 2 and 2 are fixed along the outer surface side of the building frame 11 adjacent to the left and right (rail fixing step).
  • first fixing member 26 is fitted into the cylindrical portion protruding from the upper end portion of the building frame 11 from above, the weight of the guide rail 2 is supported.
  • the second fixing member 27 holds the building frame 11 from the side by a clamp and holds the guide rail 2 in a substantially vertical direction.
  • the handrail / curing shutter 3 is lifted while sliding from the bottom to the top, and is fixed to the guide rail 2 by the shutter fixing means 4 (shutter fixing step).
  • shutter fixing step if the upper end portion of the handrail / curing shutter 3 is fixed in the vicinity of the upper end portion of each guide rail 2, the upper end portion of the handrail / curing shutter 3 precedes the uppermost cloth plate 12, so that the handrail Play a role.
  • the handrail / curing shutter 3 serves as a curving for covering the outside of the scaffold.
  • the handrail / curing shutter 3 is stored in the storage box 33 by alternately folding a plurality of small shutter panels 32, so that it is easy to handle and is easy to install even in a small site. Moreover, the noise at the time of sliding the handrail / curing shutter 3 up and down is reduced by the rail soundproofing material 23 provided on the guide surface 22 of each guide rail 2.
  • the stopper 36 for restricting the raising of the handrail / curing shutter 3 is attached to the upper end portion of each guide rail 2, the handrail / curing shutter 3 can be easily positioned.
  • the shutter fixing means 4 causes the lock rod 42 to protrude left and right simply by turning the rotary knob 41, and easily and quickly engages with the engagement protrusion 29 in the rail groove 21, thereby handrailing.
  • the cum curing shutter 3 is fixed to the guide rail 2.
  • the gap closing panel 5 is pulled out from the inner surface of the handrail / curing shutter 3 to close the gap between the handrail / curing shutter 3 and the cloth plate 12 (gap closing panel). Installation process).
  • the gap blockage panel 5 By installing the gap blockage panel 5, the operator can be prevented from falling or the tool or the like from falling. Further, since the gap closing panel 5 is lifted together with the handrail / curing shutter 3, there is no need for the operator to separately carry the gap closing panel 5 upward, the work is reduced, and the gap closing panel 5 itself is not dropped. Is prevented.
  • the guide pin 53 of the gap blockage panel 5 is guided by the guide member 52, it is easily and quickly put into and out of the storage position and the close position.
  • the slide-type skirting board 6 is taken out from the inner surface of the handrail / curing shutter 3 and installed inside the cloth board 12 (sliding-type skirting board). Installation process).
  • the sliding type skirting board 6 is lifted together with the handrail / curing shutter 3, there is no need for the operator to separately carry the skirting board upward, the work is reduced, and the accidental fall of the skirting board itself is prevented.
  • the sliding type skirting board 6 is configured to be extendable and retractable, it can be easily and quickly inserted into and out of the skirting board storage space 67.
  • the upper part of the sliding type skirting board 6 is fixed to the building frame 11 with a curing clamp 69 or the like.
  • each guide rail 2 receives the handrail and curing shutter 3 adjacent to each other in the left and right rail grooves 21.
  • each handrail and curing shutter 3 is connected without gaps in the left-right direction, and is highly soundproof and dustproof, and has a beautiful appearance.
  • the lower end portion of the new guide rail 2 is connected to the upper end portion of the existing guide rail 2, and is fixed to the building frame 11 (new rail fixing step).
  • the vertical dimension of each guide rail 2 corresponds to the height of the building frame 11
  • the height position of the upper end portion of the guide rail 2 with respect to the cloth plate 12 becomes constant even when the number of expansions is repeated.
  • the joint pin 25 of the existing guide rail 2 is inserted into the new guide rail 2, it is easily connected.
  • the existing handrail / curing shutter 3 is unlocked and slid upward, and the existing handrail / curing shutter 3 is installed in the new guide rail 2 with its upper end located in the vicinity of the upper end of the new guide rail 2. It fixes between the rails 2 (existing shutter re-fixing process).
  • the existing handrail / curing shutters 3 are sequentially lifted one by one from the top, so that the work can be easily performed by human power.
  • the vertical dimension of the handrail / curing shutter 3 corresponds to the height of the building frame 11
  • the height position of the upper end portion of the handrail / curing shutter 3 with respect to the cloth board 12 is constant even if the number of expansions is repeated, and as a leading handrail Secure the role of
  • a newly installed handrail / curing shutter 3 is inserted between the existing guide rails 2 from the lowermost layer and is slid and lifted, and its upper end is connected to the lower end of the existing handrail / curing shutter 3 (shutter connection). Process).
  • the joint plate 7 is lifted with the joint plate 7 inserted into the insertion port 34 on the upper end side of the newly installed handrail and curing shutter 3.
  • each joint plate 7 will be in the state where it was inserted in the insertion port 34 by the side of the lower end part in the existing handrail and curing shutter 3, and was connected and temporarily fixed. For this reason, it is not necessary to hold the existing handrail / curing shutter 3 at the time of fixing the newly installed handrail / curing shutter 3, and the work efficiency is improved.
  • the new handrail / curing shutter 3 connected to the lower end of the existing handrail / curing shutter 3 is fixed between the existing guide rails 2 (new shutter fixing step).
  • the handrail / curing shutters 3 are connected in the vertical direction without any gaps, and the sound and dust resistance is high and the appearance is also beautiful.
  • a handrail advance type scaffold curing system 1 connected in the left-right direction and the up-down direction is constructed as shown in FIG.
  • the upper part of the uppermost scaffold remains open. Therefore, the uppermost guide rail 2 and the uppermost handrail / curing shutter 3 having a length corresponding to half the height of the building frame 11 are separately prepared, and as shown in FIG. It is preferable to cure until.
  • the construction cost can be reduced and the construction period can be shortened, so that a highly safe scaffold can be constructed.
  • the handrail advance type scaffold curing system 1 can be easily connected in the vertical direction and / or the left and right direction, and the large-scale handrail advance type scaffold curing system 1 can be quickly constructed.
  • the handrail / curing shutter 3 can be folded, it can be easily brought into a narrow work site and work efficiency can be improved. 4). Since the rail soundproof material 23 is provided on the guide rail 2, noise caused by the vertical movement of the handrail / curing shutter 3 can be reduced. 5.
  • gap closing panel 5 is housed in the handrail / curing shutter 3 and lifted together, there is no need to lift it separately, and a fall accident can be prevented. 6). Since the sliding skirting board 6 is housed in the handrail and curing shutter 3 and can be lifted together, it is not necessary to lift it separately and a fall accident can be prevented.
  • handrail advance type scaffold curing system 1 the handrail advance type scaffold using the same, and the handrail advance type scaffold curing method are not limited to the above-described embodiment, and can be appropriately changed. .
  • the guide rail 2 having the two rail grooves 21 is used in order to easily connect the handrail advance type scaffold curing system 1 in the left-right direction.
  • the present embodiment is limited to this configuration. is not.
  • the guide rail 2 provided at one of the left and right ends only needs to have one rail groove 21.
  • the leading support 24 is integrated with the guide rail 2, but the present invention is not limited to this configuration.
  • the guide rails 2 may be directly connected to each other without providing the preceding support column 24, and the connecting portion 25, the first fixing member 26, and the second fixing member 27 may be directly attached to the guide rail 2.
  • a plurality of small shutter panels 32 are connected to form the handrail / curing shutter 3, but the present invention is not limited to this configuration, and is formed in a single panel shape. It may be. Further, as shown in FIG. 15, a handrail / curing shutter 3 having a daylighting window 37 may be used according to the site or user's request.
  • the gap closing panel 5 is slid using the guide member 52, but the present invention is not limited to this configuration.
  • a rotation shaft 55 may be provided at the left and right lower ends of the gap blockage panel 5, and the gap blockage panel 5 may be opened and closed around the rotation axis 55.
  • the present invention can be applied to any handrail advance scaffold.
  • pocket portions 14 are provided along the building frame 11 at predetermined intervals.
  • the first fixing member 26 and the second fixing member 27 of the guide rail 2 may be wedge-shaped and driven into the pocket portion 14 to be fixed.
  • the handrail / curing shutter 3 is configured by connecting a plurality of small shutter panels 32 on the assumption that it is mainly applied to a new construction work, but is limited to this configuration. It is not something. For example, when repair work or renovation work such as a condominium where a resident is located or a building containing a tenant is performed, there is a risk that a complaint may be made if sunlight is blocked or dust is accumulated.
  • the handrail / curing shutter 3 may be configured by using a mesh member 38 formed of a metal, a recyclable net or the like in a mesh shape.
  • a frame 39 having a substantially U-shaped cross section may be provided at the upper and lower ends of the mesh member 38, and the frame member 39 may be foldably connected by a hinge 31 provided on the frame 39.
  • the mesh member 38 may be a metal plate formed with a plurality of punch holes, such as punching metal, as long as it can ensure daylighting and air permeability.
  • the handrail / curing shutter 3 having a width of 1800 mm is used in accordance with a standard scaffold, but depending on the size of the scaffold and other conditions, the handrail / carriage of various sizes can be used.
  • a curing shutter 3 may be employed.
  • a 900 mm handrail / curing shutter 3 having a half width and a 3600 mm handrail / curing shutter 3 having a double width can be used.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

【課題】 足場に手すりを先行させる作業と、足場に養生を行う作業とを同時に進めて施工コストを低減するとともに施工期間を短縮し、極めて安全な足場を組み立てられる手すり先行型足場養生システムおよびこれを用いた手すり先行型足場、ならびに手すり先行型足場養生方法を提供する。 【解決手段】 作業現場で足場を組み立てる際に使用される足場養生システム1であって、足場を構成する建枠11に沿って設置される一対のガイドレール2,2と、一対のガイドレール2,2の間で各ガイドレール2,2に沿って下から上へスライドされて足場の外側に設置される手すり兼養生シャッター3と、手すり兼養生シャッター3を所定の高さで一対のガイドレール2,2間に固定するシャッター固定手段4とを有する。

Description

手すり先行型足場養生システムおよびこれを用いた手すり先行型足場、ならびに手すり先行型足場養生方法
 本発明は、足場に手すりを先行させる作業と、足場に養生を行う作業とを同時に進めることができる手すり先行型足場養生システムおよびこれを用いた手すり先行型足場、ならびに手すり先行型足場養生方法に関するものである。
 従来、厚生労働省において、足場からの墜落災害等を防止する有効な対策として、「手すり先行工法に関するガイドライン」が策定されている。この「手すり先行工法」とは、建設工事において、足場の組立て等の作業を行うに当たり、労働者が足場の作業床に乗る前に、当該作業床の端となる箇所に適切な手すりを先行して設置し、かつ、最上層の作業床を取りはずすときは、当該作業床の端の手すりを残置して行う工法をいう。
 また、平成21年には、足場等に関する労働安全衛生規則が改正され、墜落防止措置および物体の落下防止措置に求められる基準が引き上げられた。墜落防止措置としては、例えば、枠組足場にあっては、交さ筋かいに下さんや幅木等を設けた上で、上さんや手すり枠を設けること、あるいは防音パネルやネットフレーム等を設置することとされた。また、落下防止措置としては、メッシュシートや安全ネット等を設置することとされた。
 なお、上述した手すり先行工法に関する技術として、例えば、特開2006-226001号公報には、複数本の手摺柱とそれらの手摺柱を連結する少なくとも1本の手摺材からなる先送り方式の先行手摺枠であって、手摺柱が棒状部材の上にあずけることができる形状を有するあずけ金具を有し、かつ手摺材が手摺柱に対して回転可能に連結されている先行手摺枠が提案されている(特許文献1)。
特開2006-226001号公報
 しかしながら、特許文献1に記載された発明を含め、従来の足場においては、手すりを先行して設置する作業と、メッシュシートや防音パネル等で足場の外面を養生する作業とが別個に独立して行われている。このため、施工期間が長期化するとともに、施工コストが嵩んでしまうという問題がある。
 特に、メッシュシートは、一枚一枚手作業によって紐で結びつける必要があるため、極めて煩雑であり時間と手間がかかる。また、メッシュシートは単価が高く、定期的にクリーニング代金がかかる上、色あせや損傷等により5年程度で廃棄せざるを得ない。しかもその処分費用も高価である。さらに、メッシュシートはリサイクルが困難なため、現状では埋め立て処分されており、環境負荷の問題もある。なお、メッシュシートを結ぶ紐も使い捨てるため、削減したいコストである。
 一方、防音パネルは、メッシュシート以上に単価が高い上、一旦破損すると修理が困難であるため経済的ではない。また、防音パネルは、一枚あたりの重量が重いため、高所になるほど持ち上げ作業および取り付け作業が難しくなり大変危険である。さらに、防音パネル自体の防音性は高くても、コーナー部等では隙間ができてしまうため、防音性や防塵性においても欠点が残っている。
 本発明は、このような問題点を解決するためになされたものであって、足場に手すりを先行させる作業と、足場に養生を行う作業とを同時に進めて施工コストを低減するとともに施工期間を短縮し、極めて安全な足場を組み立てられる手すり先行型足場養生システムおよびこれを用いた手すり先行型足場、ならびに手すり先行型足場養生方法を提供することを目的としている。
 本発明に係る手すり先行型足場養生システムは、作業現場で足場を組み立てる際に使用される足場養生システムであって、足場を構成する建枠に沿って設置される一対のガイドレールと、前記一対のガイドレールの間で前記各ガイドレールに沿って下から上へスライドされて前記足場の外側に設置される手すり兼養生シャッターと、前記手すり兼養生シャッターを所定の高さで前記一対のガイドレール間に固定するシャッター固定手段とを有する。
 また、本発明の一態様として、前記ガイドレールは、前記建枠の高さに相当する長さを有するとともに、他のガイドレールと上下方向に連結される連結部を有していてもよい。
 さらに、本発明の一態様として、前記手すり兼養生シャッターは、複数枚の小形シャッターパネルを折り畳み自在に連結して構成されていてもよい。
 また、本発明の一態様として、前記手すり兼養生シャッターは、採光性および通気性を有する複数のメッシュ部材を折り畳み自在に連結して構成されていてもよい。
 また、本発明の一態様として、前記ガイドレールは、前記手すり兼養生シャッターを案内する案内面に沿ってレール防音材が取り付けられていてもよい。
 さらに、本発明の一態様として、前記手すり兼養生シャッターの内側面には、前記手すり兼養生シャッターと前記足場の布板との隙間を塞ぐ隙間閉塞パネルが、前記手すり兼養生シャッター内に収納される収納位置と、前記隙間を塞ぐ閉塞位置との間で出し入れ可能に設けられていてもよい。
 また、本発明の一態様として、前記手すり兼養生シャッターの内側面には、伸縮自在なスライド式幅木を収納可能な幅木収納空間が設けられており、この幅木収納空間内に前記スライド式幅木が出し入れ可能に設けられていてもよい。
 また、本発明に係る手すり先行型足場は、請求項1から請求項7のいずれかに記載の前記手すり先行型足場養生システムを備えてなる。
 また、本発明に係る手すり先行型足場養生方法は、足場を構成する建枠に沿って設置される一対のガイドレールと、前記足場の外側に設置される手すり兼養生シャッターとを用いた手すり先行型足場養生方法であって、前記一対のガイドレールの各上端部が最上層に設置された布板よりも高い位置にある状態で、前記一対のガイドレールを前記建枠に固定するレール固定工程と、前記一対のガイドレールの間で前記各ガイドレールに沿って前記手すり兼養生シャッターを下から上へスライドさせて、前記手すり兼養生シャッターの上端部が前記ガイドレールの上端部近傍位置にある状態で、前記手すり兼養生シャッターを前記ガイドレール間に固定するシャッター固定工程とを有する。
 また、本発明の一態様として、前記足場の増設に合わせて、前記ガイドレールおよび前記手すり兼養生シャッターを増設する場合、既設のガイドレールの上端部に新設のガイドレールの下端部を連結して前記建枠に固定する新設レール固定工程と、既設の手すり兼養生シャッターの固定を解除して上方にスライドさせるとともに、その上端部が前記新設ガイドレールの上端部近傍位置にある状態で、前記既設の手すり兼養生シャッターを前記新設ガイドレール間に固定する既設シャッター再固定工程と、前記既設のガイドレールの間に新設の手すり兼養生シャッターを最下層から挿入して上方にスライドし、その上端部を前記既設の手すり兼養生シャッターの下端部に連結するシャッター連結工程と、前記既設の手すり兼養生シャッターの下端部に連結された前記新設の手すり兼養生シャッターを前記既設のガイドレール間に固定する新設シャッター固定工程とを有していてもよい。
 さらに、本発明の一態様として、前記シャッター固定工程、前記既設シャッター再固定工程または前記新設シャッター固定工程の後、前記手すり兼養生シャッターの内側面に設けられた隙間閉塞パネルによって、前記手すり兼養生シャッターと前記布板との隙間を塞ぐ隙間閉塞パネル設置工程を有していてもよい。
 また、本発明の一態様として、前記シャッター固定工程、前記既設シャッター再固定工程または前記新設シャッター固定工程の後、前記手すり兼養生シャッターの内側面に設けられたスライド式幅木を取り出し、前記布板の内側に設置するスライド式幅木設置工程を有していてもよい。
 本発明によれば、足場に手すりを先行させる作業と、足場に養生を行う作業とを同時に進めて施工コストを低減するとともに施工期間を短縮し、極めて安全な足場を提供することができる。
本発明に係る手すり先行型足場養生システムの一実施形態を示す斜視図である。 本実施形態の手すり先行型足場養生システムを示す正面図である。 本実施形態の手すり先行型足場養生システムを示す平面図である。 本実施形態の手すり先行型足場養生システムを示す右側面図である。 本実施形態のガイドレールを示す(a)側面図、(b)斜視図、および(c)平面図である。 本実施形態の手すり兼養生シャッターを示す正面図である。 本実施形態の小形シャッターパネルの(a)連結構造を示す図および(b)折り畳んだ状態を示す図である。 本実施形態の隙間閉塞パネルおよびガイド部材を示す(a)正面図および(b)側面図である。 本実施形態の隙間閉塞パネルを収納位置から閉塞位置へスライドさせる動作を示す図である。 本実施形態のスライド式幅木を取り出して建枠へ設置する動作を示す図である。 本実施形態の手すり兼養生シャッターをジョイントプレートで連結する動作を示す図である。 本実施形態のシャッター固定手段が、(a)固定してない状態、および(b)固定している状態を示す図である。 本実施形態の手すり先行型足場養生方法により、本実施形態の手すり先行型足場養生システムを構築する様子を示す図である。 本実施形態の手すり先行型足場養生システムの最上部を示す図である。 本発明における手すり兼養生シャッターの他の実施形態を示す図である。 本発明における隙間閉塞パネルの他の実施形態を示す図である。 本発明におけるガイドレールの他の実施形態を示す図である。 本発明における手すり兼養生シャッターの他の実施形態を示す図である。
 以下、本発明に係る手すり先行型足場養生システムおよびこれを用いた手すり先行型足場、ならびに手すり先行型足場養生方法の実施形態について図面を用いて説明する。
 なお、本発明において、足場とは、建枠に布板を設けて構成される全ての足場を含む概念であり、枠組足場、くさび緊結式足場、単管足場、ブラケット一側足場、張出し足場、吊り足場、吊り棚足場、丸太足場等が挙げられる。また、手すり先行型足場とは、手すり先行工法に従って組み立てられる全ての足場を含む概念である。
 本実施形態の手すり先行型足場養生システム1は、建築現場や解体現場等の作業現場で足場を組み立てる際に使用される足場養生システムであって、図1から図4に示すように、主として、建枠11に沿って設けられる一対のガイドレール2,2と、これら一対のガイドレール2,2の間で案内される手すり兼養生シャッター3と、この手すり兼養生シャッター3を一対のガイドレール2,2間に固定するシャッター固定手段4とを有している。以下、各構成部について詳細に説明する。
 一対のガイドレール2,2は、手すり兼養生シャッター3の左右両端部を狭持し、上下方向へスライド動作をガイドするものである。各ガイドレール2は、図3および図5に示すように、断面略H字形状に形成されており、手すり兼養生シャッター3の各左右端部を案内する二つのレール溝21,21を備えている。各レール溝21は、図5に示すように、向かい合う案内面22を有しているとともに、これら各案内面22の一部あるいは全部に沿ってゴムマット等のレール防音材23が取り付けられている。
 本実施形態において、各ガイドレール2は、図3および図5に示すように、略円筒状の先行支柱24と一体的に構成されている。この先行支柱24の上端部には、ジョイントピン25が設けられており、このジョイントピン25を他のガイドレール2の先行支柱24の下端部に差し込むことにより、各ガイドレール2が上下方向に連結される。また、本実施形態では、足場の増設に合わせてガイドレール2を連接し易くするため、各ガイドレール2は、建枠11の高さに相当する長さを有している。
 また、各ガイドレール2は、図3から図5に示すように、先行支柱24の略中央よりやや下方位置に設けられる第1固定部材26と、この第1固定部材26より下方位置に設けられる第2固定部材27とを有している。第1固定部材26は、図5(c)に示すように、建枠11の上端部から突出する円筒部に上から嵌め入れる嵌入孔28を有している。第2固定部材27は、図4および図5(a)に示すように、建枠11を横から把持するクランプで構成されている。
 以上の構成により、第1固定部材26および第2固定部材27によって各ガイドレール2を建枠11の外側に固定すると、図4に示すように、各ガイドレール2の上端部が、最上層に設置された布板12よりも高い位置にある状態で、各ガイドレール2が建枠11に固定される。
 なお、ガイドレール2は、上記構成に限定されるものではなく、ガイドレール2を上下方向に連結する機能を有するものであれば、ジョイントピン25以外の連結部25を採用してもよい。また、軽量化のために連結部25や第1固定部材26および第2固定部材27をガイドレール2に直接取り付けてもよい。
 つぎに、手すり兼養生シャッター3は、一対のガイドレール2,2の間で下から上へ持ち上げられて前記ガイドレール2,2に沿ってスライドされ、所定位置において先行手すりおよび養生の役割を果たすものである。本実施形態において、手すり兼養生シャッター3は、図6および図7に示すように、ヒンジ31によって複数枚の小形シャッターパネル32が折り畳み自在に連結された構造を有している。このため、図4に示すように、交互に折り畳んでコンパクト化でき収納ボックス33に収納し易くなっている。また、現場への運送の際にも便利である。
 なお、本実施形態では、足場の増設に合わせて手すり兼養生シャッター3を連接し易くするため、各手すり兼養生シャッター3は、建枠11の高さに相当する長さを有している。また、各小形シャッターパネル32の素材としては、安価・軽量・高強度・リサイクル可能な素材が好ましいが、これに限定されるものではない。
 また、手すり兼養生シャッター3の内側面には、手すり兼養生シャッター3と布板12との隙間を塞ぐ隙間閉塞パネル5が、適宜、出し入れ可能に設けられている。具体的には、図8および図9に示すように、布板12に向かい合うこととなる小形シャッターパネル32にパネル収納空間51が形成されており、このパネル収納空間51の両端部に一対のガイド部材52,52が固定されている。各ガイド部材52には、隙間閉塞パネル5の両端部に設けられたガイドピン53を案内するガイド溝54が逆L字形状に形成されている。これらの構成により、図9に示すように、隙間閉塞パネル5を引き出し、あるいは戻すことにより、手すり兼養生シャッター3内に収納される収納位置と、隙間を塞ぐ閉塞位置との間で、出し入れ可能に設けられる。
 また、手すり兼養生シャッター3の内側面には、別途、布板12の内側に設置するためのスライド式幅木6が収納されている。このスライド式幅木6は、図10に示すように、第1幅木部材61と第2幅木部材62とから構成されており、第1幅木部材61の右端部に設けられた凹部63に、第2幅木部材62の左端部をスライドさせて出し入れすることで伸縮自在に構成されている。また、第1幅木部材61の右端部には係合孔64が形成されており、第2幅木部材62の左端部において突出方向に付勢された二つの固定ピン65を係合させるようになっている。さらに、第1幅木部材61および第2幅木部材62の各端部には、L字形状の引掛金具66が回転自在に収納されており、180度回転させると建枠11に引っ掛けられる状態となる。
 本実施形態では、スライド式幅木6の取り出し易さを考慮して、手すり兼養生シャッター3を構成する小形シャッターパネル32のうち上方の小形シャッターパネル32に、スライド式幅木6を収納する幅木収納空間67が形成されている。この幅木収納空間67の開口部68は、スライド式幅木6の最短寸法より大きく、かつ、スライド式幅木6の最長寸法より小さく形成されており、スライド式幅木6を出し入れ可能に収納する。
 なお、手すり兼養生シャッター3には、図6および図11に示すように、その上下端部にジョイントプレート7の差込口34が二つずつ形成されている。ジョイントプレート7は、突出方向に付勢された二つの係止ピン71を有している。また、各差込口34は、ジョイントプレート7の略半分を収容し、係止ピン71を係止させる係止孔35を有している。
 この構成により、後述するように、手すり兼養生シャッター3の上端部の各差込口34にジョイントプレート7を差し込んだ状態でガイドレール2に沿って持ち上げると、各ジョイントプレート7が上方に既設されている手すり兼養生シャッター3の各差込口34に差し込まれ、各手すり兼養生シャッター3が上下方向に連結される。
 シャッター固定手段4は、手すり兼養生シャッター3を所定の高さで一対のガイドレール2,2間に固定するものである。シャッター固定手段4は、図2および図6に示すように、操作のし易さを考慮して、下方の小形シャッターパネル32に設けられている。また、シャッター固定手段4は、図12に示すように、回転摘み41に連結された一対のロック棒42,42から構成されており、回転摘み41の回転に応じて、各ロック棒42が小形シャッターパネル32の左右端部から退避した状態と、突出した状態とに切り換え可能に構成されている。
 また、本実施形態では、図12に示すように、各ガイドレール2の下方位置におけるレール溝21の内部に、各ロック棒42の先端部を係止する係止突起29が設けられている。この構成により、手すり兼養生シャッター3の上端部が、ガイドレール2の上端部近傍位置にある状態で回転摘み41を回転させると、左右のロック棒42が突出して係止突起29に係止し、手すり兼養生シャッター3がガイドレール2に固定される。
 つぎに、以上の構成を備えた本実施形態の手すり先行型足場養生システム1および手すり先行型足場養生方法の作用について説明する。なお、本実施形態では、枠組足場を組み立てる場合の例について説明するが、他の足場にも適用可能であり、足場を解体する場合は、以下に示す工程を逆から進行すればよい。
 まず、図13(a)に示すように、ジャッキベース13で立ち上げた建枠11をブレース(図示せず)で補強した後、布板12を設置して足場を組み立てる。このとき、当該布板12が最上層の布板12となるため、「手すり先行工法」に従うには、作業者が当該布板12に乗る前に、手すりを先行して設置する必要がある。
 つぎに、図13(a)に示すように、左右に隣り合う建枠11の外面側に沿って一対のガイドレール2,2を固定する(レール固定工程)。このとき、第1固定部材26が、建枠11の上端部から突出する円筒部に上から嵌め入れられるため、ガイドレール2の自重を支持する。また、第2固定部材27は、クランプによって建枠11を横から把持し、ガイドレール2を略垂直方向に保持する。これにより、各ガイドレール2が建枠11の上方に固定されるため、図13(b)に示すように、各ガイドレール2の上端部が、最上層に設置された布板12よりも高い位置に配置される。
 つづいて、図13(b)に示すように、手すり兼養生シャッター3を下から上へスライドさせながら持ち上げて、シャッター固定手段4によってガイドレール2に固定する(シャッター固定工程)。このとき、手すり兼養生シャッター3の上端部が各ガイドレール2の上端部近傍位置にある状態で固定すると、手すり兼養生シャッター3の上端部が最上層の布板12に先行するため、手すりの役割を果たす。同時に、手すり兼養生シャッター3が、足場の外側を覆うため養生の役割を果たす。これにより、先行手すりの設置作業と、養生ネット等の設置作業とが同時に行われるため、安全性を確保しつつ、施工コストの低減と施工期間の短縮が図れる。
 また、本実施形態では、手すり兼養生シャッター3が、複数枚の小形シャッターパネル32を交互に折り畳んで収納ボックス33に収納されているため、取り扱いやすく、狭い現場でも施工しやすい。また、各ガイドレール2の案内面22に設けられたレール防音材23によって手すり兼養生シャッター3を上下にスライドする際の騒音を低減する。
 なお、図13(b)に示すように、各ガイドレール2の上端部に、手すり兼養生シャッター3の上昇を規制するストッパー36を取り付ければ、手すり兼養生シャッター3の位置決めが容易になる。また、シャッター固定手段4は、図12に示すように、回転摘み41を回すだけでロック棒42を左右に突出させ、簡単かつ迅速にレール溝21内の係止突起29に係止し、手すり兼養生シャッター3をガイドレール2に固定する。
 つぎに、図9および図13(b)に示すように、手すり兼養生シャッター3の内側面から隙間閉塞パネル5を引き出し、手すり兼養生シャッター3と布板12との隙間を塞ぐ(隙間閉塞パネル設置工程)。この隙間閉塞パネル5を設置することにより作業者の墜落や工具等の落下が防止される。また、隙間閉塞パネル5が手すり兼養生シャッター3と共に持ち上げられるため、作業者が隙間閉塞パネル5を別途、上方へ運ぶ手間が不要となり、作業が軽減されるとともに隙間閉塞パネル5自体の落下事故が防止される。さらに、本実施形態では、ガイド部材52によって隙間閉塞パネル5のガイドピン53を案内する構造であるため、簡単かつ迅速に収納位置と閉塞位置とに出し入れされる。
 また、本実施形態では、図10および図13(b)に示すように、手すり兼養生シャッター3の内側面からスライド式幅木6を取り出し、布板12の内側に設置する(スライド式幅木設置工程)。このようにスライド式幅木6を設置することで、足場の内側方向の安全性が確保され、作業者の墜落や工具等の落下が防止される。また、スライド式幅木6が手すり兼養生シャッター3と共に持ち上げられるため、別途、作業者が幅木を上方へ運ぶ手間が不要となり、作業が軽減されるとともに幅木自体の落下事故が防止される。さらに、本実施形態では、スライド式幅木6が伸縮自在に構成されているため、簡単かつ迅速に幅木収納空間67から出し入れされる。なお、スライド式幅木6は、養生クランプ69等で上部を建枠11に固定することが好ましい。
 以上の工程により、手すり先行型足場養生システム1の1ユニットが構築されるため、これを作業現場に必要な分だけ左右方向に連接する。このとき、本実施形態では、各ガイドレール2が、隣り合う手すり兼養生シャッター3をそれぞれ左右のレール溝21に受け入れる。このため、各手すり兼養生シャッター3が左右方向に隙間なく連接され、防音性や防塵性が高い上、外観も美しい。
 つづいて、最上層の布板12における作業が完了した後、さらに上方での作業が必要な場合には、既設の足場の上層に別途、足場を増設する。そして、当該足場の増設に合わせて、手すり先行型足場養生システム1を上方向に増設する。
 具体的には、まず、図13(c)に示すように、既設のガイドレール2の上端部に新設のガイドレール2の下端部を連結し、建枠11に固定する(新設レール固定工程)。このとき、各ガイドレール2の上下寸法が建枠11の高さに相当するため、増設を繰り返しても布板12に対するガイドレール2の上端部の高さ位置が一定となる。また、足場の増設に合わせて手すり先行型足場養生システム1を増設しやすい。さらに、既設ガイドレール2のジョイントピン25が、新設ガイドレール2に差し込まれるため、簡単に連結される。
 つぎに、既設の手すり兼養生シャッター3の固定を解除して上方にスライドさせるとともに、その上端部が新設ガイドレール2の上端部近傍位置にある状態で、既設の手すり兼養生シャッター3を新設ガイドレール2の間に固定する(既設シャッター再固定工程)。このとき、複数枚の手すり兼養生シャッター3が連接されている場合は、既設の手すり兼養生シャッター3を上から一枚ずつ順番に持ち上げるため、人力でも容易に作業が可能となる。また、手すり兼養生シャッター3の上下寸法が建枠11の高さに相当するため、増設を繰り返しても布板12に対する手すり兼養生シャッター3の上端部の高さ位置が一定となり、先行手すりとしての役割を担保する。また、足場の増設に合わせて手すり先行型足場養生システム1を増設しやすい。
 つづいて、既設のガイドレール2の間に新設の手すり兼養生シャッター3を最下層から挿入してスライドさせながら持ち上げ、その上端部を既設の手すり兼養生シャッター3の下端部に連結する(シャッター連結工程)。本実施形態では、新設の手すり兼養生シャッター3における上端部側の差込口34にジョイントプレート7を差し込んだ状態で持ち上げる。これにより、各ジョイントプレート7が、既設の手すり兼養生シャッター3における下端部側の差込口34に差し込まれて連結し仮留めされた状態となる。このため、新設の手すり兼養生シャッター3の固定作業に際し、既設の手すり兼養生シャッター3を保持しておく必要がなく、作業効率が向上する。
 つぎに、既設の手すり兼養生シャッター3の下端部に連結された新設の手すり兼養生シャッター3を既設のガイドレール2の間に固定する(新設シャッター固定工程)。これにより、各手すり兼養生シャッター3が上下方向に隙間なく連接され、防音性や防塵性が高い上、外観も美しい。
 その後、新設した手すり兼養生シャッター3のそれぞれについて、上述した隙間閉塞パネル設置工程およびスライド式幅木設置工程を実施する。
 以上の工程を繰り返し実施することにより、図1に示すように、左右方向および上下方向に連接された手すり先行型足場養生システム1が構築される。なお、足場が必要な高さまで組み立てられた場合、図14(a)に示すように、最上部の足場の上部が開放されたままとなる。このため、建枠11の半分の高さに相当する長さを有する最上部用ガイドレール2および最上部用手すり兼養生シャッター3を別途用意し、図14(b)に示すように、最上部まで養生することが好ましい。
 以上のような本実施形態によれば、以下のような効果を奏する。
1.足場に手すりを先行させる作業と、足場に養生を行う作業とを同時に進行させて、施工コストを低減するとともに施工期間を短縮することができ、極めて安全性の高い足場を構築できる。
2.手すり先行型足場養生システム1を簡単に上下方向および/または左右方向に連接することができ、大規模な手すり先行型足場養生システム1を迅速に構築することができる。
3.手すり兼養生シャッター3が折り畳みできるため、狭い作業現場にも簡単に持ち込むことができ、作業効率を向上することができる。
4.ガイドレール2には、レール防音材23が設けられているため、手すり兼養生シャッター3の上下動による騒音を低減することができる。
5.手すり兼養生シャッター3に隙間閉塞パネル5を収納して一緒に持ち上げられるため、別途、持ち上げる必要が無く、落下事故を防止することができる。
6.手すり兼養生シャッター3にスライド式幅木6を収納して一緒に持ち上げられるため、別途、持ち上げる必要が無く、落下事故を防止することができる。
 なお、本発明に係る手すり先行型足場養生システム1およびこれを用いた手すり先行型足場、ならびに手すり先行型足場養生方法は、前述した実施形態に限定されるものではなく、適宜変更することができる。
 例えば、上述した本実施形態では、手すり先行型足場養生システム1を左右方向に連接し易くするため、二つのレール溝21を有するガイドレール2を使用しているが、この構成に限定されるものではない。例えば、左右いずれかの端部に設けられるガイドレール2は、一つのレール溝21を有していればよい。
 また、上述した本実施形態では、ガイドレール2に先行支柱24が一体化されているが、この構成に限定されるものではない。例えば、先行支柱24を設けずに、ガイドレール2同士が直接連結される構成とし、連結部25、第1固定部材26および第2固定部材27を直接ガイドレール2に取り付けてもよい。
 さらに、上述した本実施形態では、複数枚の小形シャッターパネル32を連結して手すり兼養生シャッター3を構成しているが、この構成に限定されるものではなく、一枚のパネル状に形成されていてもよい。また、現場やユーザの希望に応じて、図15に示すように、採光窓37を有する手すり兼養生シャッター3を使用してもよい。
 また、本実施形態では、ガイド部材52を用いて隙間閉塞パネル5をスライド移動させているが、この構成に限定されるものではない。例えば、図16に示すように、隙間閉塞パネル5の左右下端部に回転軸55を設け、この回転軸55周りに隙間閉塞パネル5を開閉させるようにしてもよい。
 さらに、上述した本実施形態では、枠組足場を組み立てる場合の例について説明したが、いずれの手すり先行型足場にも適用可能である。例えば、くさび緊結式足場の場合には、建枠11に沿ってポケット部14が所定間隔で設けられている。このため、図17に示すように、ガイドレール2の第1固定部材26および第2固定部材27をくさび形状とし、ポケット部14に打ち込んで固定するようにしてもよい。
 また、上述した本実施形態では、主として、新築工事に適用することを想定して、複数枚の小形シャッターパネル32を連結して手すり兼養生シャッター3を構成しているが、この構成に限定されるものではない。例えば、住人がいるマンションやテナントが入ったビルディング等の補修工事や改修工事を行う場合、太陽光を遮ったり、塵埃がこもってしまうと苦情が出るおそれがある。
 そこで、図18に示すように、金属やリサイクル可能なネット等をメッシュ状に形成してなるメッシュ部材38を用いて手すり兼養生シャッター3を構成してもよい。具体的には、メッシュ部材38の上下端に、断面略コの字形状のフレーム39を設け、このフレーム39に設けたヒンジ31によって折り畳み自在に連結すればよい。この構成により、安全性を確保しつつ、高い採光性や通気性が得られるため、上述した補修工事や改修工事にも好適である。なお、メッシュ部材38は、採光性および通気性を確保しうるものであれば、パンチングメタル等のように、複数のパンチ穴を形成してなる金属板でもよい。
 さらに、上述した本実施形態では、標準的な足場に合わせて、横幅が1800mmの手すり兼養生シャッター3を使用しているが、足場のサイズやその他の条件に応じて、様々なサイズの手すり兼養生シャッター3を採用してもよい。例えば、横幅を半分にした900mmの手すり兼養生シャッター3や、横幅を二倍にした3600mmの手すり兼養生シャッター3を使用することもできる。
 1 手すり先行型足場養生システム
 2 ガイドレール
 3 手すり兼養生シャッター
 4 シャッター固定手段
 5 隙間閉塞パネル
 6 スライド式幅木
 7 ジョイントプレート
 11 建枠
 12 布板
 13 ジャッキベース
 14 ポケット部
 21 レール溝
 22 案内面
 23 レール防音材
 24 先行支柱
 25 ジョイントピン(連結部)
 26 第1固定部材
 27 第2固定部材
 28 嵌入孔
 29 係止突起
 31 ヒンジ
 32 小形シャッターパネル
 33 収納ボックス
 34 差込口
 35 係止孔
 36 ストッパー
 37 採光窓
 38 メッシュ部材
 39 フレーム
 41 回転摘み
 42 ロック棒
 51 パネル収納空間
 52 ガイド部材
 53 ガイドピン
 54 ガイド溝
 55 回転軸
 61 第1幅木部材
 62 第2幅木部材
 63 凹部
 64 係合孔
 65 固定ピン
 66 引掛金具
 67 幅木収納空間
 68 開口部
 69 養生クランプ
 71 係止ピン

Claims (12)

  1.  作業現場で足場を組み立てる際に使用される足場養生システムであって、
     足場を構成する建枠に沿って設置される一対のガイドレールと、
     前記一対のガイドレールの間で前記各ガイドレールに沿って下から上へスライドされて前記足場の外側に設置される手すり兼養生シャッターと、
     前記手すり兼養生シャッターを所定の高さで前記一対のガイドレール間に固定するシャッター固定手段と
     を有する、手すり先行型足場養生システム。
  2.  前記ガイドレールは、前記建枠の高さに相当する長さを有するとともに、他のガイドレールと上下方向に連結される連結部を有する、請求項1に記載の手すり先行型足場養生システム。
  3.  前記手すり兼養生シャッターは、複数枚の小形シャッターパネルを折り畳み自在に連結して構成されている、請求項1または請求項2に記載の手すり先行型足場養生システム。
  4.  前記手すり兼養生シャッターは、採光性および通気性を有する複数のメッシュ部材を折り畳み自在に連結して構成されている、請求項1または請求項2に記載の手すり先行型足場養生システム。
  5.  前記ガイドレールは、前記手すり兼養生シャッターを案内する案内面に沿ってレール防音材が取り付けられている、請求項1から請求項4のいずれかに記載の手すり先行型足場養生システム。
  6.  前記手すり兼養生シャッターの内側面には、前記手すり兼養生シャッターと前記足場の布板との隙間を塞ぐ隙間閉塞パネルが、前記手すり兼養生シャッター内に収納される収納位置と、前記隙間を塞ぐ閉塞位置との間で出し入れ可能に設けられている、請求項1から請求項5のいずれかに記載の手すり先行型足場養生システム。
  7.  前記手すり兼養生シャッターの内側面には、伸縮自在なスライド式幅木を収納可能な幅木収納空間が設けられており、この幅木収納空間内に前記スライド式幅木が出し入れ可能に設けられている、請求項1から請求項6のいずれかに記載の手すり先行型足場養生システム。
  8.  請求項1から請求項7のいずれかに記載の前記手すり先行型足場養生システムを備えてなる、手すり先行型足場。
  9.  足場を構成する建枠に沿って設置される一対のガイドレールと、前記足場の外側に設置される手すり兼養生シャッターとを用いた手すり先行型足場養生方法であって、
     前記一対のガイドレールの各上端部が最上層に設置された布板よりも高い位置にある状態で、前記一対のガイドレールを前記建枠に固定するレール固定工程と、
     前記一対のガイドレールの間で前記各ガイドレールに沿って前記手すり兼養生シャッターを下から上へスライドさせて、前記手すり兼養生シャッターの上端部が前記ガイドレールの上端部近傍位置にある状態で、前記手すり兼養生シャッターを前記ガイドレール間に固定するシャッター固定工程と
     を有する、手すり先行型足場養生方法。
  10.  前記足場の増設に合わせて、前記ガイドレールおよび前記手すり兼養生シャッターを増設する場合、
     既設のガイドレールの上端部に新設のガイドレールの下端部を連結して前記建枠に固定する新設レール固定工程と、
     既設の手すり兼養生シャッターの固定を解除して上方にスライドさせるとともに、その上端部が前記新設ガイドレールの上端部近傍位置にある状態で、前記既設の手すり兼養生シャッターを前記新設ガイドレール間に固定する既設シャッター再固定工程と、
     前記既設のガイドレールの間に新設の手すり兼養生シャッターを最下層から挿入して上方にスライドし、その上端部を前記既設の手すり兼養生シャッターの下端部に連結するシャッター連結工程と、
     前記既設の手すり兼養生シャッターの下端部に連結された前記新設の手すり兼養生シャッターを前記既設のガイドレール間に固定する新設シャッター固定工程と
     を有する、請求項9に記載の手すり先行型足場養生方法。
  11.  前記シャッター固定工程、前記既設シャッター再固定工程または前記新設シャッター固定工程の後、前記手すり兼養生シャッターの内側面に設けられた隙間閉塞パネルによって、前記手すり兼養生シャッターと前記布板との隙間を塞ぐ隙間閉塞パネル設置工程を有する、請求項9または請求項10に記載の手すり先行型足場養生方法。
  12.  前記シャッター固定工程、前記既設シャッター再固定工程または前記新設シャッター固定工程の後、前記手すり兼養生シャッターの内側面に設けられたスライド式幅木を取り出し、前記布板の内側に設置するスライド式幅木設置工程を有する、請求項9から請求項11のいずれかに記載の手すり先行型足場養生方法。
PCT/JP2012/071701 2011-09-09 2012-08-28 手すり先行型足場養生システムおよびこれを用いた手すり先行型足場、ならびに手すり先行型足場養生方法 WO2013035585A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2011196752A JP4995337B1 (ja) 2011-09-09 2011-09-09 手すり先行型足場養生システムおよびこれを用いた手すり先行型足場、ならびに手すり先行型足場養生方法
JP2011-196752 2011-09-09

Publications (1)

Publication Number Publication Date
WO2013035585A1 true WO2013035585A1 (ja) 2013-03-14

Family

ID=46793887

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/071701 WO2013035585A1 (ja) 2011-09-09 2012-08-28 手すり先行型足場養生システムおよびこれを用いた手すり先行型足場、ならびに手すり先行型足場養生方法

Country Status (2)

Country Link
JP (1) JP4995337B1 (ja)
WO (1) WO2013035585A1 (ja)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741956A (zh) * 2013-12-28 2014-04-23 广州市达蒙建筑技术有限公司 防护棚底板及自动升降防护棚
FR3006354A1 (fr) * 2013-05-28 2014-12-05 Sateco Sa Banche de coffrage comportant un garde-corps inferieur
CN107269000A (zh) * 2017-07-14 2017-10-20 深圳市双禹王声屏障工程技术有限公司 降噪式建筑施工平台
AU2017100965B4 (en) * 2016-07-15 2018-07-19 4 Ken Pty Ltd Safety Barrier System for Buildings
GB2577668A (en) * 2018-05-14 2020-04-08 Specialist Safety Netting Ltd An extendable scaffolding safety barrier and method

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015696B (zh) * 2012-11-28 2014-11-26 泰兴市第一建筑安装工程有限公司 一种超高层建筑用吊篮外防护层
CN105735663B (zh) * 2016-04-13 2018-03-06 上海建工二建集团有限公司 一种预制装配式建筑裙式防护网及安装方法
CN105908962A (zh) * 2016-06-16 2016-08-31 上海建工四建集团有限公司 盘扣式脚手架阳角外挂安全网连接组件及外挂安全网装置

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5984154U (ja) * 1982-11-30 1984-06-07 ナショナル住宅産業株式会社 足場シ−トの張り装置
JP2001107553A (ja) * 1999-10-07 2001-04-17 Mitsuhiro Minamimagoe 仮設足場のガイドレール

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5984154U (ja) * 1982-11-30 1984-06-07 ナショナル住宅産業株式会社 足場シ−トの張り装置
JP2001107553A (ja) * 1999-10-07 2001-04-17 Mitsuhiro Minamimagoe 仮設足場のガイドレール

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3006354A1 (fr) * 2013-05-28 2014-12-05 Sateco Sa Banche de coffrage comportant un garde-corps inferieur
CN103741956A (zh) * 2013-12-28 2014-04-23 广州市达蒙建筑技术有限公司 防护棚底板及自动升降防护棚
AU2017100965B4 (en) * 2016-07-15 2018-07-19 4 Ken Pty Ltd Safety Barrier System for Buildings
CN107269000A (zh) * 2017-07-14 2017-10-20 深圳市双禹王声屏障工程技术有限公司 降噪式建筑施工平台
GB2577668A (en) * 2018-05-14 2020-04-08 Specialist Safety Netting Ltd An extendable scaffolding safety barrier and method

Also Published As

Publication number Publication date
JP2013057210A (ja) 2013-03-28
JP4995337B1 (ja) 2012-08-08

Similar Documents

Publication Publication Date Title
JP4995337B1 (ja) 手すり先行型足場養生システムおよびこれを用いた手すり先行型足場、ならびに手すり先行型足場養生方法
JP5292441B2 (ja) 足場/養生ユニットおよびその連結装置
CN110259088B (zh) 具有扭曲立面的建筑物的外防护脚手架的搭设方法
GB2510880A (en) Climbing screen
JP4843381B2 (ja) 可搬式作業台および手摺部材
CN109098394A (zh) 铝合金观光电梯井架
JP6367629B2 (ja) 折り畳み式組立家屋
JP4814620B2 (ja) 外部養生ユニットのクライミング工法
JP4996916B2 (ja) 金網パネルおよび手摺の取付け方法
JP4948992B2 (ja) 階段
CN210370017U (zh) 一种建筑工程用脚手架
JP5632757B2 (ja) 折り畳み可能なl型幅木およびこのl型幅木を組み込んでなる仮設足場
CN209163354U (zh) 一种铝合金观光电梯井架
JP5703515B2 (ja) 隙間塞ぎ材および仮設足場
CN202611527U (zh) 具有逃生功能的防盗窗
JP5632758B2 (ja) 折り畳み可能なl型幅木およびこのl型幅木を組み込んでなる仮設足場
KR200495147Y1 (ko) 조립식 고소작업대
KR101800622B1 (ko) 다단 승강형 족장
JP4045201B2 (ja) 枠組足場用手摺枠
JPH08429Y2 (ja) 仮設足場用スライド式ブレース手摺枠
KR101241748B1 (ko) 개보수용 창틀 조립구조
JP2009084966A (ja) 先行手すり用ガイド
GB2553560A (en) Climbing screen
JP4700949B2 (ja) 枠組足場の手摺枠
JP5305432B2 (ja) 移動足場

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12830385

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 12830385

Country of ref document: EP

Kind code of ref document: A1