WO2012156417A1 - Eisenbahnarbeitsfahrzeug - Google Patents
Eisenbahnarbeitsfahrzeug Download PDFInfo
- Publication number
- WO2012156417A1 WO2012156417A1 PCT/EP2012/059052 EP2012059052W WO2012156417A1 WO 2012156417 A1 WO2012156417 A1 WO 2012156417A1 EP 2012059052 W EP2012059052 W EP 2012059052W WO 2012156417 A1 WO2012156417 A1 WO 2012156417A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- transport
- work vehicle
- modules
- railway
- transport body
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/02—Transporting, laying, removing, or renewing lengths of assembled track, assembled switches, or assembled crossings
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61D—BODY DETAILS OR KINDS OF RAILWAY VEHICLES
- B61D15/00—Other railway vehicles, e.g. scaffold cars; Adaptations of vehicles for use on railways
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61D—BODY DETAILS OR KINDS OF RAILWAY VEHICLES
- B61D49/00—Other details
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B27/00—Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
Definitions
- the present invention relates to a railroad work vehicle having a chassis carried chassis and working equipment carried by the chassis.
- Rail-operated work vehicles such as tamping machines, ballast plows, rapid rebuild trains, ballast bed cleaning machines, subsoil rebuilding machines, surface improvement machines, recycling plane improvement machines and the like, but also machines for dismantling, replacing or rebuilding rail tracks are used.
- combination machines such as ballast bed cleaning processing machines are used.
- material transport within the vehicle is required. For example, in a ballast bed cleaning machine, ballast must be transported from the receiving location of the machine to the cleaning facility of the machine and from there to the replacement site.
- the invention has for its object to provide an advantageous transport option for such materials within the work vehicle. This object is achieved in that below and / or above the working equipment at least one transport path is provided, on which transport body for objects or transport body forming objects in the form of cargo along the work vehicle can be moved.
- the invention for transporting materials within the work vehicle so transport body, in particular transport containers, used, which are movable on the transport path or the transport paths along the work vehicle.
- This has, inter alia, the advantage that any materials can be transported by the same means within the work vehicle, so in particular bulk material, such as sand, cement, gravel, gravel and the like, but also iron, sleepers, liquids such as fuels, water and whatever else is needed or must be disposed of, so should be transported.
- Even a transport of general cargo such as rails, sleepers or a complete track grid is possible in a suitably designed transport path.
- the track grid itself forms a transport body within the meaning of the invention.
- the invention also has the advantage that the transport body can be used not only for transport within the work vehicle, but also for the transport of Material over the work vehicle away.
- fuels on one side of the work vehicle can be transported by appropriate rail vehicles and transported across the work vehicle to a rail vehicle located on the other side of the work vehicle, for example to the drive unit of a supply train.
- An advantage of the use of transport bodies instead of conveyor belts is also that there is no segregation of the bulk materials and the pollution is less. Furthermore, different materials can be transported simultaneously on one and the same transport path by being transported in each case in a separate transport body. It is also possible to work flexibly since the transport containers can each be moved individually in each direction as long as the transport path is free in the corresponding direction. But it can also be provided for transport body two or more transport paths. The transport is thus even more flexible. In addition, this makes it possible to reorder the transport body by replacing transport body between the transport paths. In addition to these advantages, the use of transport bodies also increases transport process reliability.
- the provision of two or more parallel transport paths allows a continuous supply and / or removal of material by the transport body moved on a transport path to a loading or unloading and filled or unloaded there and loaded or unloaded on another transport path be driven away again from the loading or unloading. It is also preferred if the transport body can be moved on the transport paths in both directions, in particular also individually.
- the system is special flexible.
- the transportation lanes may be formed, for example, as lanes, roller conveyors, slideways, suspension railways, overhead conveyors, conveyor belts, conveyor chains or the like.
- the use of transport bodies also has the advantage that the work vehicle can easily be formed so that the train traffic on a neighboring track remains possible during use. It is also relatively easy to comply with the work vehicle a predetermined clearance profile during use and / or transport of the work vehicle.
- the transport body on the transport path without additional Verladeffen such as cranes are movable.
- the transport body are preferably moved directly on the transport path.
- the transport path preferably runs essentially horizontally. The complex and costly provision of gantry cranes or the like can be avoided.
- a device for mechanical transfer of transport bodies between the work vehicle and another work vehicle or a transport vehicle is provided at least at one end of the work vehicle, with which material for the work vehicle and / or transported away. This ensures a quick and easy supply and disposal of the vehicle.
- transport bodies can also be removed from the side and exchanged for other transport bodies in order, for example, to carry a transport filled with discharge material. Replace port body against an empty transport body to replace an empty transport body with another supply with material or pick up an old track rust and then put down a new track grid.
- This loading and unloading possibility can also consist solely in that the working vehicle provides access to a loading and unloading device such as, for example, an excavator or a lifting vehicle.
- the transport bodies can be designed as open or closed containers or as plate-like carriers. Open containers are easy to load while closed containers provide good protection for the transported goods. Plate-like carriers are particularly suitable for bulky goods.
- the transport bodies may be removable from the transport path, e.g. by lowering. In this way, a transport path operation is also possible during the loading process.
- a drive such as driven rollers.
- a drive can also be provided on the transport bodies themselves or elsewhere in the work vehicle, for example laterally of the transport paths.
- a drive on the work vehicle has the advantage that the transport body can be designed very simply, for example as a simple transport boxes.
- the drives are preferably designed so that with them a cornering of the transport body according to the track curve of the track can be generated and / or that a method of transport body is also possible in gradients, descents and elevations of the track. This makes it possible to move the transport body on any route.
- the transport body can be individually and / or in groups and / or jointly movable. This further increases the flexibility of the work vehicle. Among other things, it is possible to move at slopes less than all transport body at the same time to keep the necessary power and the necessary energy consumption low.
- the joint movability allows a fast loading and / or unloading.
- the Einzelverfahr Anlagenkeit facilitates reordering of the transport body.
- the transport bodies can be coupled to one another mechanically and / or by appropriate control. As a result, two or more transport bodies can be moved together in a simple manner.
- the transport body relative to a transport path or the Eisenbahnarbeitshus be locked. This can prevent that the transport body move when driving the railway work vehicle by itself.
- the transport body are provided with a machine-readable coding.
- the loading and / or unloading process can be automated.
- a remote control of the loading and / or unloading of the transport body and the movement of the transport body is possible.
- the railway work vehicle can also be designed with an additional loading and / or conveying option for goods such as liquids or gases, in particular pipes which can be coupled to one another.
- goods such as liquids or gases, in particular pipes which can be coupled to one another.
- the railway work vehicle according to the invention may be open or have a roof and / or side walls.
- a roof When a roof is provided, in particular open transport bodies are protected against weather influences.
- the required electrical insulation against a traction current line is guaranteed.
- sidewalls weather influences can be further kept away and the aerodynamics of the work train are improved during transfer trips.
- the noise pollution decreases.
- the railroad work vehicle may also be equipped with a traction drive for running on a track.
- a locomotive can thereby be dispensable.
- the railway work vehicle according to the invention can have a rail and / or ground chassis, in particular a crawler chassis. This is a driving the work vehicle under different conditions possible. Rollers, wheel suspensions, walking gears or other suitable running gears can also be used as a ground running gear. Depending on the amount of support load to be removed such suspensions may include caterpillars, rubber tracks or rubber wheels.
- the advantage of a walking mechanism is in particular that it requires only a relatively small height. Furthermore, a walker can be easily performed with a relatively large footprint so as to keep the specific surface pressure low. Walking works also allow a comparatively stiff support.
- the work vehicle according to the invention consists of two or more modules, each with at least one working device, preferably a group of working facilities for a complete operation such as ballast cleaning, track dismantling, track installation, track renewal, turnout, excavated soil or soil, construction of drainage systems and Lifting, straightening and tamping work.
- the individual modules can be put together as needed. This effort and cost of a labor input can be kept low.
- a problem with common work vehicles is that there is a largely rigid structure that allows changes in functionality only limited.
- a modular design significantly increases flexibility.
- the transport paths are designed to be with transport paths of another work vehicle or module or other rail vehicle with corresponding
- a method for carrying out work on railway tracks is characterized by the use of a railway work vehicle of the type described above.
- modules of the railway work vehicle are assembled as required to carry out the work.
- the modules can also be temporarily provided to keep the length of the work vehicle as low as possible.
- the Modules are changed during the execution of the work, for example, to keep a turnout as long as possible for the rest of traffic or to occupy it as late as possible.
- a module arranged on the front of the work vehicle can be converted to the end or another point of the work vehicle when approaching a switch. After passing through the other modules of the work vehicle, the module can then be converted back to the front end of the work vehicle if necessary.
- modules in addition to the flexibility in the arrangement of the modules has the advantage that the components of the railway work vehicle are each relatively small. There is thus the possibility of transporting the work vehicle transportable, in particular verschiffbar.
- a transfer of a module can also take place if the module does not have its own track chassis.
- the module could be drive on a wagon train from flatbed vehicles or on one or more trucks.
- the modules can be provided with a suspension for the transfer operation, with the suspension preferably being mechanically bridgeable in order to ensure greater stability during operation.
- the modules may be provided with a device with which the module floor or mounted on the module devices can be maintained even when driving on elevated tracks and / or tracks on slopes or slopes horizontally.
- the transfer of the modules may take place using a train of container wagons on which suitable support plates are located as transport bodies.
- These support plates are equipped with fixed or easily assembled and disassembled working equipment.
- Preferably, such support plates are compatible with common standard containers as known in the art.
- Such support plates can be loaded and transported together with the associated work equipment using the containerized infrastructure in many locations.
- means for supporting the modules can be provided on the ground.
- this support is exclusively on layers that are either still expand or have already been installed and compacted.
- the support on the pending floor can be avoided. It is favorable to design the support means in such a way that the specific surface pressure is as low as possible. If the specific surface pressure is less than the pressure under the Shoe of an operator of the working equipment, so the support is not expected to significantly affect the subsurface.
- the modules may each have a device for visual and / or audible warning of the operator before train travel or before movements on the transport path.
- the modules may have circulation plates which allow the operator to move quickly from module to module without having to dismount for this.
- the modules may also comprise fall protection means, e.g. facilitate the use of the relevant work equipment on bridges.
- the modules can be designed in container construction and be separable from the chassis of the associated railway work vehicle.
- Such working containers can - temporarily parked stationary without associated railroad cars, for example, as part of a stationary ballast recycling plant or a plant for soil washing. If such a system is completely carried out in container construction, it can be particularly easily transported by sea and / or land. The transport takes place here in an advantageous manner, regardless of the track width of the rail carriageway.
- the transport bodies can be conveyed along the modules, from module to module, and from working modules to other modules, such as pure transport or logistics modules, which are held on one side or both sides of a working module.
- a common data exchange infrastructure may be provided.
- data regarding the supply or discharge and / or the forwarding of appropriately filled or empty transport containers, of energy, of operating materials such as washing water or fuel, or of operating aids such as lubricant, can be exchanged and / or forwarded ,
- a master computer can receive information regarding the relevant container contents by means of such data transmission.
- the modules can be tailored to specific applications in a variety of ways.
- a track grid expansion module may be provided.
- the load on the rail due to the tensile stress from the bend has, according to experience, been highest in the region of the last wheel set moving on the rail.
- By appropriately controlled pressure rollers in this area the bending line of the rail, and thus the maximum tensile stress in the rail, can be favorably influenced.
- the iron can be solved by screwing or by violent destruction.
- a corresponding device for releasing the iron may optionally be carried out easily replaceable.
- the track grid expansion module can be easily adapted to various types of ironmongery.
- the arrival and removal of the release device can be done in a favorable manner by a suitable for this purpose and suitable for transport on the runway transport body.
- a small iron release device for rare ironmongery types only needs to be held once for several modules and can easily be exchanged between them.
- the Gleisrostausbaumodul have a device for processing the recorded rails for subsequent transport.
- Such a treatment can be, for example, the removal of grazes, weld seams or flash rust.
- a device for cutting the removed rails can be provided. Splitting the rails into small pieces may be required to allow the rails to be received in a container.
- the track rust removal module may include means for separating the ribbed panels from the associated timber or concrete sleepers and, optionally, means for removing the head bandages of the wooden sleepers.
- Wooden sleepers should be prepared directly on the track grate extension module for thermal disposal. Also, the removal of the sleepers can be particularly space-saving.
- the track rust removal module may also include a device for detecting the geometric data of the track prior to removal. This device can be designed to set the acquired geometric data in relation to other geometric data, such as fixed measuring points. A control device or an operator can use this data when installing the new track grid.
- the track grid extension module can have a device which is designed to photographically document the condition of the removed sleepers and / or the removed rails.
- a bulk material removal module is provided. Such a module takes the
- the attachment of the spoon to the machine can be carried out with a quick-change lock, which makes it possible for a spoon change to take place partially or fully automatically and in particular on site on the construction site can.
- the delivery and removal of the spoon can be done with a special transport container on the transport path of the bulk material expansion module. In this way, in construction site operation, for example, a wide spoon can be easily exchanged for a small spoon, or vice versa.
- a spoon with fangs can be exchanged for a spoon with cutting edge, or vice versa.
- the spoon could also be exchanged for another implement such as a hammer, a drill or a hammer drill.
- a precise guidance of the spoon can be accomplished with a guide device in Hexapodbauweise.
- a walker can provide the necessary traction to guide the spoon.
- the emptying of the spoon can be done by gravity or at least temporarily enforced. Forced evacuation avoids that highly clay-containing material sticks in the spoon.
- the spoon can be controlled manually, remotely or automatically depending on the application.
- Manual control can be carried out by means of a control unit, which can optionally be mobile or permanently installed.
- a fixed operating unit can be mounted in a control station, either process-oriented in front of the bucket or result-oriented behind the bucket.
- Manual control can be assisted by auxiliary functions such as an electronic depth stop.
- a device may be provided which prevents the unwanted penetration of the spoon in the clearance profile of a mile track or more miscellaneous tracks.
- Preferably behind the excavating spoon may further be provided a device for detecting hidden in the ground of metals such as duds.
- the bulk solids removal module described above can be easily adapted to other tasks, such as pulling side or center trenches.
- the bulk material expansion module preferably allows the temporary storage of a certain amount of removed material. As a result, the transport of the transport body on the transport path can be further optimized.
- the bulk material removal module can also include a lifting chain or a bucket elevator.
- an arrangement of several juxtaposed bulk solids expansion modules may be provided.
- This device may also be provided a device for weighing the loaded transport body. This device could also be designed to determine the center of gravity of the loaded transport body.
- a bulk material expansion module could have a device for geometric measurement of the ground before and / or after excavation.
- a bulk material removal module may further comprise a device for determining the carrying capacity of the ground before and / or after the excavation.
- a device for photographic documentation of the substrate before or after the excavation may be provided.
- a bulk material installation module is provided, which is designed to remove at least one loaded transport body from the transport path, to empty it into a storage bunker and subsequently to install and optionally to compact the contents of the transport body.
- the bulk material installation module can be designed to install one or more layers of geotextile, geogrid and / or polystyrene panels.
- the material required for this purpose can be conveyed in an advantageous manner by means of transport bodies on the transport path. During emptying of the transport body can be removed from the transport path.
- the bulk material insertion module may further comprise a device for chemically strengthening the upper and / or a lateral layer or two lateral layers.
- a device for chemically strengthening in particular a lime layer or a cement layer can be applied.
- the bulk material insertion module can also have a device which is designed to compress the edge or the two edges of the built-in layer in front of the head, ie laterally to the left and / or right.
- the bulk material installation module may include a device for determining the moisture content of the bulk material to be incorporated, a device for defined wetting of the bulk material to be incorporated, a device for washing the ballast, a device for compacting the bedrock bed, a device for detecting the compression parameters and / or a device to detect the built bulk amount.
- the bulk storage module may be provided with the same auxiliary and auxiliary devices as described above with respect to the bulk material removal module.
- a combined bulk material input and output module which combines the functionalities of the bulk material expansion module with those of the bulk material module.
- Such a module is preferably placed in the middle of the construction tip modules, at their lowest point, in the working configuration. With such a combined module, on the one hand, the length of the deepest section of the construction site can be kept relatively short and, on the other hand, the load transfer on the pending ground can be avoided.
- a combined Bulkgutein- and -ausbaumodul may be equipped on the left and / or on the right with a migratory Verbau. The module can be designed in particular separable.
- a track-laying module which removes at least one transporting body with, preferably new, sleepers from the transporting track and, with the addition of rails likewise conveyed, mounted a track grid.
- the track rock module may comprise a device for detecting, monitoring and optionally recording assembly parameters such as Tightening torque and the angle of rotation of the sleeper screws, a device for photographic documenting the mounted track grid, a device for grinding or milling the rails of the rails, a device for profiling the rail heads by grinding or milling, a device for connecting the rail sections to be installed before installation by means Flash butt welding and / or have a device for measuring the zero voltage temperature.
- the track frame module may comprise a device which is designed to install the rails with zero voltage. This can be done by warming about by means of inductance or thermal radiation.
- a track rock module as described above is capable of laying the new track grid so that it comes to rest relatively significantly relative to the old previously removed track grid. In conventional machines this can be achieved at most a few decimeters offset. By contrast, with a track rock module as described above, an offset of more than one may occur
- ballast supply module can be coupled in such a way that the tamping module can move by a few meters independently of the ballast supply module.
- the stuffing module is to be operated in a manner similar to a conventional stuffing machine without ballast feed, it is also possible to dispense with carrying a ballast supply module. If two or more stuffing modules are used in a work configuration, they can be supplied by a ballast supply module with supplementary ballast.
- the ballast supplementing, stuffing and straightening module may comprise a device for detecting and documenting the stuffing and / or straightening parameters.
- the ballast supplementing, stuffing and straightening module can be equipped with the same auxiliary and additional devices as already described above.
- a soil improvement or rock eruption module adapted to apply lime and / or cement to the pending soil and to mill in this.
- a milling drum provided for this purpose can also be used for milling out rock.
- the material to be introduced can advantageously be transported by a specially adapted transport body.
- the transport body can be temporarily removed from the runway if necessary.
- an energy module which supplies additional modules of different types with, in particular electrical, energy.
- Fuel cell or a gas turbine to be provided for power can also be done via an existing overhead line.
- the refilling of the fuel tank of the energy module can be done with a content of a conveyed on the transport path transport body. If desired, the transport body can be removed during the transfer of the fuel from the transport path. Optionally can thus be dispensed with the fuel tank of the power module, since the supply of the energy module can be done directly from the tank of a transport body.
- control, control and documentation module can be provided in which centrally all work parameters are defined and all measured values are monitored and optionally documented.
- this module can be equipped with means for, preferably chemical, analysis of material or liquid streams. Viewing windows for viewing the metabolism on the transport path and / or for viewing the long rail transport in a long rail transport device can also be provided.
- a bulk material discharge module is provided. If bulk materials such as excavated ballast or excavated tarpaulin material are to be recycled, the bulk material in question is first removed from the transport container. For this purpose, at least one transport body is temporarily removed from the transport path and its content is dumped in a container within the module. In the following, the dumped bulk material with a conveyor such as a belt conveyor is transferred as volume flow to another module.
- a conveyor such as a belt conveyor
- ballast transfer module can therefore be optionally provided with a device by means of which this separation process is effected, e.g. by the introduction of mechanical energy.
- the bulk material discharge module can be equipped with a device for measuring the volume flow and / or the mass flow.
- a memory for the bulk material to be tipped can be provided.
- a bulk material processing module can be provided, in which a dry, partially wet or wet ballast recycling process takes place.
- a bulk goods loading module can be provided which, after or during processing as part of a recycling process, loads the bulk goods in question into transport bodies for removal.
- Such a bulk material loading module preferably loads a material stream, for example conveyed by means of a conveyor belt, into at least one transport body removed therefrom for the transport path.
- such a bulk material loading module can have a device which passes through a stream or several streams and transfers it to a subsequent module.
- All the modules described above preferably operate with a continuous flow of material. However, a batch-wise process may be more suitable for processing small amounts of material, such as those incurred during turnout conversion.
- modules described above can also perform tasks for other modules.
- individual modules can include a power supply and thus provide other modules with energy.
- a drive means may be provided only in one or a part of the modules to move the railroad work vehicle.
- the railroad work vehicle may have a weight force management in order to carry out a removal of the weight force over a part of the modules. This has the advantage that individual modules temporarily have to remove any weight. This is especially at the beginning and end of the construction site as well when passing through discontinuities and for maintenance and repair purposes advantageous.
- transport bodies can also be weighed before and / or after filling and / or after emptying in order to determine and, if desired, document which quantity of which transported goods has been installed or removed at which location.
- Fig. 1 is a side view of a railway work vehicle according to the invention.
- the railway working vehicle according to the invention shown in FIG. 1 comprises a chassis 2 carried by a chassis 1 and working devices 3, 4 carried by the chassis 2.
- An excavating device 3 and a mounting device 4 are shown by way of example here.
- a transport path 5 is provided on which transport bodies 6 for goods can be moved along the work vehicle.
- the transport path 5 is designed as a roller conveyor with rollers 7, on which the trained as boxes transport body can be moved.
- the transport body 6 can accommodate all types of goods, in particular working materials such as gravel, sand, gravel, cement, sleepers, iron, platelets, asphalt, soil conditioners, Rammklalen and signal foundations, but also supplies such as fuel and water. They can serve both to supply and to dispose of the working devices 3, 4 of the work vehicle.
- the transport body 6 can be loaded, for example, via a conveyor belt 8 with excavated material of the excavating device 3. For this purpose, the transport bodies 6 can be moved between a loading position 9 and the transport path 5.
- a conveyor belt 10 may be provided, which can be filled via a filling device 1 1 with material from the transport bodies 6.
- a device not shown here for emptying the transport container 6 may be provided at a filling position 12.
- the work vehicle illustrated in FIG. 1 may represent a module of a railroad work vehicle.
- Several such modules can be assembled according to the invention.
- each module may have different working devices, but it can also be two or more identical modules are put together.
- the transport paths 5 of the modules are designed so that the transport paths of several modules form a continuous transport path. Also, the
- Transport lanes 5 form with appropriate transport paths of other rail vehicles a continuous transport path, for example, with supply and / or Entsorgungstooln. LIST OF REFERENCE NUMBERS
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Transportation (AREA)
- Mechanical Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Warehouses Or Storage Devices (AREA)
Abstract
Description
Claims
Priority Applications (10)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AP2013007256A AP2013007256A0 (en) | 2011-05-16 | 2012-05-15 | Railway work vehicle |
AU2012257707A AU2012257707B2 (en) | 2011-05-16 | 2012-05-15 | Railway work vehicle |
CN201280035293.6A CN103702887A (zh) | 2011-05-16 | 2012-05-15 | 铁路作业机车 |
BR112013029454-0A BR112013029454B1 (pt) | 2011-05-16 | 2012-05-15 | veículo de trabalho ferroviário e método para a realização de trabalhos em equipamento ferroviário. |
CA2836392A CA2836392C (en) | 2011-05-16 | 2012-05-15 | Railway work vehicle |
EA201391697A EA029866B1 (ru) | 2011-05-16 | 2012-05-15 | Путевая машина |
EP12720534.2A EP2709892B1 (de) | 2011-05-16 | 2012-05-15 | Eisenbahnarbeitsfahrzeug |
US14/118,134 US9605387B2 (en) | 2011-05-16 | 2012-05-15 | Railway work vehicle |
ES12720534T ES2703778T3 (es) | 2011-05-16 | 2012-05-15 | Vehículo de trabajo ferroviario |
MA36526A MA35240B1 (fr) | 2011-05-16 | 2013-12-04 | Engin de travaux ferroviaires |
Applications Claiming Priority (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102011101636.1 | 2011-05-16 | ||
DE102011101636 | 2011-05-16 | ||
DE102011111026.0 | 2011-08-19 | ||
DE201110111026 DE102011111026A1 (de) | 2011-08-19 | 2011-08-19 | Eisenbahnarbeitsfahrzeug |
DE102012005287A DE102012005287A1 (de) | 2011-05-16 | 2012-03-15 | System, Verfahren und Eisenbahnwagen zum gleisgebundenen Transport von Gegenständen |
DE102012005287.1 | 2012-03-15 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2012156417A1 true WO2012156417A1 (de) | 2012-11-22 |
Family
ID=47176327
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/EP2012/059052 WO2012156417A1 (de) | 2011-05-16 | 2012-05-15 | Eisenbahnarbeitsfahrzeug |
Country Status (10)
Country | Link |
---|---|
US (1) | US9605387B2 (de) |
EP (1) | EP2709892B1 (de) |
CN (1) | CN103702887A (de) |
AP (1) | AP2013007256A0 (de) |
AU (1) | AU2012257707B2 (de) |
BR (1) | BR112013029454B1 (de) |
CA (1) | CA2836392C (de) |
EA (1) | EA029866B1 (de) |
ES (1) | ES2703778T3 (de) |
WO (1) | WO2012156417A1 (de) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015090503A1 (de) * | 2013-12-17 | 2015-06-25 | Plasser & Theurer Export Von Bahnbaumaschinen Gesellschaft M.B.H. | Absturzsicherung für eine gleisbaumaschine |
CN109868698A (zh) * | 2019-01-25 | 2019-06-11 | 中国铁建高新装备股份有限公司 | 一种扣件养护作业车的控制方法、装置及多功能综合作业系统 |
WO2022171410A1 (de) * | 2021-02-10 | 2022-08-18 | Plasser & Theurer Export Von Bahnbaumaschinen Gesellschaft M. B. H. | Gleisgebundene instandhaltungsmaschine und verfahren zum betreiben der maschine |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6501798B2 (ja) * | 2014-05-20 | 2019-04-17 | プラッサー ウント トイラー エクスポート フォン バーンバウマシーネン ゲゼルシャフト ミット ベシュレンクテル ハフツングPlasser & Theurer, Export von Bahnbaumaschinen, Gesellschaft m.b.H. | ばら荷積卸車 |
CN105015365B (zh) * | 2014-07-27 | 2018-04-10 | 台州长天能源技术有限公司 | 上下双路物流轨道方法及装置 |
US11009886B2 (en) | 2017-05-12 | 2021-05-18 | Autonomy Squared Llc | Robot pickup method |
CN110424198B (zh) * | 2019-08-16 | 2021-10-29 | 米建军 | 一种轨道交通的轨道铺设方法及装置 |
CN117536029A (zh) * | 2023-10-20 | 2024-02-09 | 国网山东省电力公司建设公司 | 一种材料防护棚地轨施工装置 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE29820833U1 (de) * | 1998-11-20 | 1999-01-28 | Deutsche Bahn AG, 10365 Berlin | Zug |
EP1775190A2 (de) * | 2005-10-17 | 2007-04-18 | VolkerRail Nederland BV | Erneuerung des Schotterbettes eines Schienenwegs |
Family Cites Families (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE960288C (de) | 1954-05-14 | 1957-03-21 | Wilhelm Waesche | Maschine fuer das Aufnehmen und Aufbereiten der Bettungsstoffe von Eisenbahngleisen |
AT313341B (de) | 1969-10-07 | 1974-02-11 | Plasser Bahnbaumasch Franz | Fahrbare Einrichtung zum kontinuierlichen Auswechseln bzw. Erneuern eines Gleises |
AT351584B (de) | 1976-05-31 | 1979-08-10 | Plasser Bahnbaumasch Franz | Zugsverband zur aufnahme, abgabe und zum transport von schuettgut |
AT346887B (de) * | 1976-10-15 | 1978-04-15 | Plasser Bahnbaumasch Franz | Fahrbare einrichtung zum kontinuierlichen auswechseln eines aus schienen und quer- schwellen bestehenden gleises |
AT359113B (de) | 1978-06-16 | 1980-10-27 | Plasser Bahnbaumasch Franz | Selbstfahrbare gleisbett-reinigungsmaschine |
AT360572B (de) * | 1978-09-14 | 1981-01-26 | Plasser Bahnbaumasch Franz | Einrichtung zum betrieb von transportfahrzeugen auf einem gleisfahrzeugverband |
AT373833B (de) | 1982-01-15 | 1984-02-27 | Plasser Bahnbaumasch Franz | Gleisverfahrbare anlage zum transport von schuettgut |
CH646480A5 (fr) * | 1982-03-12 | 1984-11-30 | Canron Inc Crissier | Train de pose d'une nouvelle voie ferree. |
DE3641917A1 (de) | 1986-12-09 | 1988-06-16 | Unbehaun Olaf | Bettungsreinigungsmaschine fuer gleisanlagen |
SK280375B6 (sk) | 1992-02-05 | 1999-12-10 | Mechanizace Traťového Hospodářství | Súprava na zachytávanie a prepravu sypkého materiá |
AT409617B (de) * | 1995-06-30 | 2002-09-25 | Plasser Bahnbaumasch Franz | Speicherwagen zur speicherung von schüttgut |
US5778795A (en) * | 1995-07-31 | 1998-07-14 | Gobarail (Pty) Limited | Railway truck assembly for truck maintainence |
DE19650443A1 (de) | 1996-01-25 | 1997-07-31 | Weiss Gmbh & Co Leonhard | Mobile Aufbereitungseinrichtung für Bodenaushub bei einem Bahngleis |
DE19637218A1 (de) | 1996-09-12 | 1998-03-19 | D2 Consult Dr Wagner Dr Schult | Verfahren zum Bau von Tunnelanlagen |
DE10164821B4 (de) | 2001-04-12 | 2009-11-05 | Gsg Knape Gleissanierung Gmbh | Gleisbehandlungszug und Verfahren zur Aufnahme, Zwischenspeicherung und Abgabe von Materialien im Zusammenhang mit Gleisbauarbeiten |
AT5098U3 (de) | 2001-12-19 | 2002-09-25 | Plasser Bahnbaumasch Franz | Anlage zur sanierung eines planums |
CN2552999Y (zh) * | 2002-06-07 | 2003-05-28 | 中国铁道建筑总公司昆明机械厂 | 一种轨枕更换机 |
DE102004009746B3 (de) | 2004-02-25 | 2005-12-22 | Railion Deutschland Ag | Bewegliche Abdeckung für Rangiererfreiraum an oberer Ladeebene doppelstöckiger Autotransportwagen |
DE502006008191D1 (de) | 2005-08-11 | 2010-12-09 | Plasser Bahnbaumasch Franz | Maschine zum erneuern eines gleises |
AT505403B1 (de) * | 2007-06-19 | 2009-01-15 | Plasser Bahnbaumasch Franz | Maschine zur aufnahme und lagerung von kleineisen eines gleises sowie verfahren |
DE102009041237B4 (de) | 2009-09-11 | 2019-07-11 | Ralf Zürcher | Verfahren zum Sanieren des Gleisunterbaus einer Bahnstrecke |
DE102010014596B4 (de) | 2010-04-09 | 2012-09-20 | Db Bahnbau Gruppe Gmbh | Fahrzeug zur Durchführung von Baumaßnahmen im Gleisbereich des Eisenbahnverkehrs |
-
2012
- 2012-05-15 BR BR112013029454-0A patent/BR112013029454B1/pt active IP Right Grant
- 2012-05-15 AP AP2013007256A patent/AP2013007256A0/xx unknown
- 2012-05-15 EP EP12720534.2A patent/EP2709892B1/de active Active
- 2012-05-15 WO PCT/EP2012/059052 patent/WO2012156417A1/de active Application Filing
- 2012-05-15 EA EA201391697A patent/EA029866B1/ru not_active IP Right Cessation
- 2012-05-15 AU AU2012257707A patent/AU2012257707B2/en active Active
- 2012-05-15 US US14/118,134 patent/US9605387B2/en active Active
- 2012-05-15 ES ES12720534T patent/ES2703778T3/es active Active
- 2012-05-15 CA CA2836392A patent/CA2836392C/en active Active
- 2012-05-15 CN CN201280035293.6A patent/CN103702887A/zh active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE29820833U1 (de) * | 1998-11-20 | 1999-01-28 | Deutsche Bahn AG, 10365 Berlin | Zug |
EP1775190A2 (de) * | 2005-10-17 | 2007-04-18 | VolkerRail Nederland BV | Erneuerung des Schotterbettes eines Schienenwegs |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015090503A1 (de) * | 2013-12-17 | 2015-06-25 | Plasser & Theurer Export Von Bahnbaumaschinen Gesellschaft M.B.H. | Absturzsicherung für eine gleisbaumaschine |
US10011957B2 (en) | 2013-12-17 | 2018-07-03 | Plasser & Theurer Export Von Bahnbaumaschinen Gesellschaft M.B.H. | Fall prevention device for a track-laying machine |
CN109868698A (zh) * | 2019-01-25 | 2019-06-11 | 中国铁建高新装备股份有限公司 | 一种扣件养护作业车的控制方法、装置及多功能综合作业系统 |
WO2022171410A1 (de) * | 2021-02-10 | 2022-08-18 | Plasser & Theurer Export Von Bahnbaumaschinen Gesellschaft M. B. H. | Gleisgebundene instandhaltungsmaschine und verfahren zum betreiben der maschine |
AT17690U1 (de) * | 2021-02-10 | 2022-11-15 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Gleisgebundene Instandhaltungsmaschine und Verfahren zum Betreiben der Maschine |
Also Published As
Publication number | Publication date |
---|---|
US9605387B2 (en) | 2017-03-28 |
BR112013029454B1 (pt) | 2021-01-12 |
EA029866B1 (ru) | 2018-05-31 |
CA2836392A1 (en) | 2012-11-22 |
ES2703778T3 (es) | 2019-03-12 |
EP2709892B1 (de) | 2018-10-24 |
EP2709892A1 (de) | 2014-03-26 |
US20140202352A1 (en) | 2014-07-24 |
AP2013007256A0 (en) | 2013-11-30 |
EA201391697A1 (ru) | 2014-04-30 |
CA2836392C (en) | 2020-04-21 |
AU2012257707B2 (en) | 2017-03-23 |
BR112013029454A2 (pt) | 2018-05-29 |
AU2012257707A2 (en) | 2014-01-23 |
CN103702887A (zh) | 2014-04-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2709892B1 (de) | Eisenbahnarbeitsfahrzeug | |
EP2920366B1 (de) | Schienengebundenes transportsystem für eine gleisbaumaschine | |
EP0681062B1 (de) | Anlage zur Untergrundsanierung einer Schotterbettung eines Gleises | |
DE2754811C2 (de) | Fahrbare Einrichtung zum Verlegen von Schwellen | |
DD207014A5 (de) | Fahrbare anlage und verfahren zur kontinuierlich fortschreitenden sanierung des gleisunterbaues | |
EP2054552B1 (de) | Verfahren und vorrichtung zur erneuerung einer schotterbettung | |
DE4237712C2 (de) | Anlage zur Herstellung einer Planumschutzschicht | |
DE2529135A1 (de) | Verfahren zur vollstaendigen erneuerung einer eisenbahnschienenstrecke und bauzug zur durchfuehrung dieses verfahrens | |
EP0712961B1 (de) | Verfahren und Anlage zur Untergrundsanierung einer Schotterbettung eines Gleises | |
DE202008003589U1 (de) | Gleiswegsanierungsmaschine mit Tragschichtfräse | |
DE102010045068B3 (de) | Sanierverfahren für den mehrschichtigen Unterbau bei Bahnstrecken sowie Kopfarbeitswagen | |
WO2012103859A1 (de) | Vorrichtung und verfahren zum aufbau und zur bearbeitung von gleisanlagen | |
DD154226A5 (de) | Verfahren und vorrichtung zur untergrundsarnierung von eisenbahngleisen | |
DE60130254T2 (de) | Vorrichtung und verfahren zur entfernung von schotterbettung | |
DE102011111026A1 (de) | Eisenbahnarbeitsfahrzeug | |
EP1045070A1 (de) | Gerät zur Verwendung bei der Erneuerung einer Gleisanlage | |
EP2904152B1 (de) | System, verfahren und förderfahrzeug zum neuherstellen, sanieren oder rückbauen einer strasse | |
AT322608B (de) | Bettungsräummaschine | |
DE19529023C2 (de) | Fahrzeug zur Sanierung von weniger tragfähigen und kontaminierten Schichten des Unterbaues und/oder Untergrundes unter einer befestigten Verkehrsfläche, insbesondere eines Eisenbahngleises | |
WO2012103860A1 (de) | Vorrichtung und verfahren zum zerkleinern von fels unterhalb von gleisanlagen | |
DE9218109U1 (de) | Anlage zur Herstellung einer Planumschutzschichte | |
DE102012220877A1 (de) | System zum gleisgebundenen Transport von Gegenständen | |
EP2235263A1 (de) | Vorrichtung zum verbringen von baustoffen für einen unterbau und/oder oberbau einer fahrbahn |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 12720534 Country of ref document: EP Kind code of ref document: A1 |
|
DPE1 | Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101) | ||
ENP | Entry into the national phase |
Ref document number: 2836392 Country of ref document: CA |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
ENP | Entry into the national phase |
Ref document number: 2012257707 Country of ref document: AU Date of ref document: 20120515 Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: 201391697 Country of ref document: EA |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2012720534 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 14118134 Country of ref document: US |
|
REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112013029454 Country of ref document: BR |
|
REG | Reference to national code |
Ref country code: BR Ref legal event code: B01E Ref document number: 112013029454 Country of ref document: BR |
|
ENP | Entry into the national phase |
Ref document number: 112013029454 Country of ref document: BR Kind code of ref document: A2 Effective date: 20131114 |