WO2012111377A1 - 電力使用監視装置、電力使用監視システム - Google Patents

電力使用監視装置、電力使用監視システム Download PDF

Info

Publication number
WO2012111377A1
WO2012111377A1 PCT/JP2012/051029 JP2012051029W WO2012111377A1 WO 2012111377 A1 WO2012111377 A1 WO 2012111377A1 JP 2012051029 W JP2012051029 W JP 2012051029W WO 2012111377 A1 WO2012111377 A1 WO 2012111377A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
usage monitoring
amount
estimated
meter
Prior art date
Application number
PCT/JP2012/051029
Other languages
English (en)
French (fr)
Inventor
山本 心司
國吉 賢治
Original Assignee
パナソニック株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニック株式会社 filed Critical パナソニック株式会社
Publication of WO2012111377A1 publication Critical patent/WO2012111377A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. electricity meters
    • G01R22/06Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
    • G01R22/061Details of electronic electricity meters
    • G01R22/066Arrangements for avoiding or indicating fraudulent use
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Definitions

  • the present invention relates to a power usage monitoring device used for monitoring the presence or absence of power usage from the primary side of a power meter, and to a power usage monitoring system for notifying a management device of the results of monitoring by the power usage monitoring device. .
  • a power meter is installed in a power consumer, and the amount of power used by the consumer is measured using the power meter. Therefore, the power supply company (electric power company) charges the electricity bill by trusting the meter reading value of the power meter. In other words, if a bypass line that does not pass through the power meter is attached, the power is used without being measured by the power meter, and the power supplier loses the basis for charging the electricity bill. In other words, when so-called stealing is performed by attaching a bypass line, there arises a problem that the profit of the power supply company is compressed.
  • Document 1 Japanese Patent Application Publication No. 2004-340767
  • Document 1 has a branch between a first distribution line connected to a substation and a second distribution line that supplies power to consumers.
  • the technique which pays attention to the current in / out of the point is described.
  • the configuration described in Document 1 is based on the principle that the amount of current flowing into the branch point must match the amount of current flowing out of the branch point.
  • current detection devices are respectively provided on the upstream side and the downstream side of the branch point in the first distribution line.
  • the amount of current supplied from the branch point to the consumer is obtained from the meter reading value of a watt-hour meter (that is, a power meter) provided in the second distribution line.
  • a watt-hour meter that is, a power meter
  • Document 2 divides a region where power is supplied into a plurality of regions, and further includes a plurality of regions.
  • a technique is described in which the electric power is divided into areas and the electric energy for each area and the electric energy for each area are measured.
  • the configuration described in Document 2 is based on the principle that, in a hierarchical distribution network, the total amount of power used in the lower layer must match the amount of power in the upper layer.
  • a power accumulator that measures the amount of power used in one area and a power amount accumulator that measures the amount of power used for each area (which can be read as a consumer) that divides the area (power) Which can be read as a meter).
  • the total amount of electric power measured by the electric energy accumulator provided for each area is compared with the electric energy measured by the electric energy accumulator provided in the area, and both values are different (the electric energy in the area). If the total amount of power in the area is smaller), it is detected as an abnormality such as theft.
  • the amount of current or power is measured at a plurality of locations, and if the planned relationship is not established between the measured amount of current or power, It is judged that such an abnormality has occurred. Therefore, in addition to the power meter installed for each consumer, a device that measures the amount of current or the amount of power is required, and both the measurement results of those devices and the power meter are measured using communication technology. An apparatus for obtaining and determining whether there is an abnormality is required. That is, in order to adopt the techniques described in Documents 1 and 2 in the existing distribution network, the communication function is provided for both the current detection device and the electric energy integrator installed in the distribution line and the electric power meter installed in the consumer. Is required. In addition, since the techniques described in Documents 1 and 2 require a communication function for the power meter, an existing power meter that does not have a communication function for remote meter reading or the like must be replaced.
  • the present invention uses only one of the amount of power measured by the power distribution network and the amount of power measured by the power meter.
  • the purpose is to provide a power usage monitoring device that suppresses an increase in capital investment in the network, and further uses this power usage monitoring device to monitor whether power is being used from the primary side of the power meter.
  • the purpose is to provide a monitoring system.
  • the power usage monitoring device of the present invention includes a measuring instrument, an estimated power storage unit, an abnormality determination unit, and a notification unit.
  • the meter is configured to measure power supplied to a plurality of consumers.
  • the estimated power storage unit stores in advance an estimated range of the amount of power that should be consumed by the entire consumer in a predetermined period.
  • the abnormality determination unit is configured to determine that a state in which a total power amount for the plurality of consumers obtained from the measuring instrument exceeds an estimated range stored in the estimated power storage unit is abnormal.
  • the notification unit is configured to notify abnormality information when the abnormality determination unit determines that an abnormality has occurred.
  • the measuring instrument is a watt hour meter that is arranged on an electric circuit that supplies power to a plurality of consumers and measures the total amount of power that is supplied to the whole of the consumers.
  • the abnormality determination unit is configured to determine that a state in which the total electric energy measured by the watt hour meter exceeds the estimated range stored in the estimated power storage unit in a predetermined period is abnormal.
  • the measuring device is a power amount acquisition unit configured to acquire, by communication, the amount of power received for each consumer from a power meter that is disposed in each of the plurality of consumers and has a communication function.
  • the abnormality determination unit is configured to determine that a state in which the total amount of power measured by the power meter in a predetermined period exceeds the estimated range stored in the estimated power storage unit is abnormal.
  • the estimated power storage unit, the abnormality determination unit, and the notification unit are attached to a transformer that supplies power to the entire consumer.
  • the notification unit is configured to notify abnormality information along with the position of the watt-hour meter to the management device through the communication network.
  • the notification unit is configured to perform notification by visual stimulation.
  • the notification unit is configured to perform notification by auditory stimulation.
  • a power usage monitoring system includes the power usage monitoring device and a management device that communicates with the power usage monitoring device via a communication network, and the abnormality information is notified from the power usage monitoring device to the management device via the communication network. Configured to be.
  • the configuration of the present invention it is possible to detect whether power is being used from the primary side of the power meter by using only one of the power amount measured by the distribution network and the power amount measured by the power meter. As a result, there is an advantage that an increase in capital investment for the existing power distribution network can be suppressed.
  • FIG. 1 is a block diagram illustrating a first embodiment. It is a whole block diagram same as the above.
  • FIG. 6 is a block diagram illustrating a second embodiment.
  • a watt hour meter is arranged on a power circuit that supplies power to a plurality of consumers of interest in the distribution network, and power is illegally used from the primary side of the power meter based on the amount of power measured by the watt hour meter.
  • the structure which estimates whether it is done is employ
  • the plurality of consumers of interest in the present embodiment is a group of consumers that are receiving (consuming) power from the secondary side of one transformer provided by the power supply company in the distribution network. It is arranged on the secondary side of the transformer and on the upstream side of the branch point of the distribution network to each customer.
  • the transformer means a step-down transformer disposed on a power pole, above the ground, underground, in a building, or the like.
  • the amount of power measured by the watt-hour meter is the total amount of power received by the customer group from the secondary side of one transformer and the amount of power lost in the distribution network from the transformer to the power meter. And the total. Therefore, if the amount of power supplied from the secondary side of the transformer is compared with the total amount of power received by the customer group, the power is incorrect between the transformer and the power meter (that is, the primary side of the power meter). It can be determined whether or not it is used.
  • the power meter requires a communication function, and the existing power meter is replaced. Will require a large amount of capital investment. Therefore, in the configuration in which the communication function is provided in the power meter for each consumer, the spread is hindered.
  • the total amount of power received by the group of consumers on the secondary side of the transformer changes from moment to moment, but in a predetermined period in units of several hours, one day, one week, one month, etc.
  • Knowledge has been obtained that the total power received by the group is regular. For example, if the unit is several hours or one day, the total amount of power varies depending on the time of day and the day of the week, but there is no significant change in the total amount of power on the same day of each day or day of the week. Can be estimated.
  • the unit is one week or one month
  • the total electric energy varies depending on the season, but the amount of change in the total electric energy can be estimated in the adjacent week or adjacent month, and the total electric power in the same week or month of the year can be estimated. It can be estimated that there is no significant change in quantity. That is, if the period and the number of consumers are appropriate, the total power amount in the predetermined period can be estimated with a relatively small error range based on past results and the like.
  • the total amount of power to be received in a predetermined period by a group of consumers on the secondary side of the transformer is estimated using the total amount of power and time information. By using additional information, it is estimated with higher accuracy.
  • the total power supplied to the consumer group from the secondary side of the transformer uses the measured value measured by the watt hour meter, and uses the estimated value as the total power to be received by the consumer group.
  • a configuration is adopted in which presence or absence of use of power from the primary side of the power meter is detected.
  • each consumer 23 includes a power meter 24, and the power meter 24 measures the amount of power received by the consumer 23.
  • a power usage monitoring device 10 is disposed in the vicinity of the transformer 22.
  • the power usage monitoring device 10 is arranged on the upstream side of the distribution network 21 on the secondary side of the transformer 22 with respect to the part where the distribution network 21 for distributing power to each consumer 23 branches.
  • the power usage monitoring device 10 is provided to monitor the presence or absence of power usage from the primary side (upstream side) of the power meter 24, and from the upstream side (transformer 22 side) of the power usage monitoring device 10. It is preferable to dispose as close to the secondary side of the transformer 22 as possible so that power is not extracted.
  • EPS Electric Pipe Shaft
  • the main part of the power usage monitoring apparatus 10 is constituted by a microcomputer (microcomputer), and the functions of each component described below are realized by executing an appropriate program by the microcomputer.
  • the power usage monitoring apparatus 10 includes a program for causing the microcomputer to operate as each configuration described below.
  • the power usage monitoring apparatus 10 also includes a configuration that is not included in the microcomputer. Note that a PLD (Programmable Logic Device) other than the microcomputer may be used.
  • the power usage monitoring apparatus 10 includes a processing unit 11 that performs overall control and monitoring of each configuration described below, and a clock unit 12 that measures the date and time.
  • the processing unit 11 monitors the operation of each component of the power usage monitoring device 10 and gives an instruction to each component of the power usage monitoring device 10 at an appropriate timing.
  • the watt-hour meter 13 provided in the power usage monitoring device 10 measures the amount of power supplied from the secondary side of the transformer 22 to the consumer 23.
  • the watt-hour meter 13 measures the total amount (total amount of power) of the amount of power supplied to all the consumers 23 that receive power from the secondary side of the transformer 22.
  • the electric energy meter 13 is an electronic type, and calculates the electric energy from the voltage detected by the voltage sensor and the current detected by the current sensor.
  • a voltage dividing resistor is used for the voltage sensor
  • a current transformer is used for the current sensor, for example.
  • the calculation means for calculating the amount of electric power from the detected voltage and current is constituted by the microcomputer described above.
  • the power usage monitoring device 10 includes an actually measured power storage unit 14 that stores the power amount measured by the watt hour meter 13 in association with the date and time that the clock unit 12 is timing. That is, the processing unit 11 is configured to measure the amount of power measured by the watt hour meter 13 at a predetermined time (for example, 1 second, 30 seconds, 1 minute) counted by the clock unit 12, In association with each other, the measured power storage unit 14 accumulates them. The processing unit 11 not only stores the power amount and the date and time in association with each other in the actual power storage unit 14 but also stores the integrated value of the power amount in the predetermined period in the actual power storage unit 14.
  • a predetermined time for example, 1 second, 30 seconds, 1 minute
  • the power usage monitoring apparatus 10 includes an estimated power storage unit 15 that stores in advance an estimated range of the amount of power that should be received from the secondary side of the transformer 22 by the entire consumer 23 during the predetermined period described above.
  • the entire consumer 23 is the meaning of all the consumers 23 (customer group) that should receive power from the secondary side of one transformer 22.
  • the estimation range of the amount of power stored in the estimated power storage unit 15 estimates the amount of power supplied to the customer group in a predetermined period from past results, and takes into account estimation errors and loss in the distribution network 21 and the like. It is determined.
  • the estimated range of the amount of power stored in the estimated power storage unit 15 is It is associated with a period.
  • the estimated power storage unit 15 is registered in advance with a set of the estimation range and period of the electric energy.
  • the processing unit 11 designates the period in the estimated power storage unit 15, thereby The estimated range of the corresponding power amount can be extracted from the estimated power storage unit 15. Now, let us assume a case where one day from midnight of the previous day to midnight of the current day is defined as a period, and the estimated power storage unit 15 stores the estimation range of the daily power amount in this period.
  • the power usage monitoring apparatus 10 compares the measured value of the power amount for the predetermined period stored in the measured power storage unit 14 with the estimated range of the power amount for the predetermined period stored in the estimated power storage unit 15 in advance.
  • An abnormality determination unit 16 is provided. That is, the processing unit 11 stores the amount of power for one day in the measured power storage unit 14 and then instructs the abnormality determination unit 16 so that the amount of power stored in the measured power storage unit 14 is the estimated power storage unit 15. Is determined to be within the estimated range of daily power stored in the abnormality determination unit 16. Note that since the estimation range of the electric energy also changes when the date and time are different, the processing unit 11 sets the estimation range of the electric energy according to the period corresponding to the electric energy stored in the actual measurement electric power storage unit 14. It is preferable to extract from.
  • the abnormality determination unit 16 determines that there is an abnormality between. In particular, when power is used illegally from the primary side of the power meter 24, the amount of power stored in the measured power storage unit 14 rather than the estimated range of power stored in the estimated power storage unit 15. It is predicted that the relationship will increase. Therefore, the abnormality determination unit 16 determines that power is used illegally from the primary side of the power meter 24 when this relationship is established.
  • the measured power storage unit 14 stores the power amount for each short time, and when the abnormality determination unit 16 compares the power amount, the processing unit 11 calculates the total power amount. .
  • the actual power storage unit 14 may calculate the total amount of power during the comparison by the abnormality determination unit 16 without storing the power amount during a predetermined period.
  • the measured power storage unit 14 does not store the power amount for each short time, but stores the integrated value of the power amount, and uses the integrated value of the power amount for a predetermined period for comparison in the abnormality determination unit 16. Also good. If this configuration is adopted, the amount of data stored in the measured power storage unit 14 is reduced, so that a semiconductor memory having a small storage capacity can be used as the measured power storage unit 14.
  • the power usage monitoring device 10 includes a notification unit 17 that notifies abnormality information when the abnormality determination unit 16 determines that an abnormality has occurred.
  • the notification unit 17 can employ various configurations. For example, a configuration in which abnormal information is notified by visual stimulation or auditory stimulation can be employed.
  • the notification by visual stimulation uses an appropriate light emitting element such as a light emitting diode, and when the abnormality determining unit 16 determines that an abnormality has occurred, the light emitting element is turned on or the light emitting element is blinked and turned on. Notice.
  • abnormality information may be notified using a display such as a liquid crystal display or an organic EL display as the notification unit 17.
  • a technology that sounds a buzzer or generates a voice message is used.
  • the abnormality determination unit 16 is configured so that it cannot be reset unless it is an engineer of a power supply company.
  • the notification by the visual stimulus or the auditory stimulus is performed at the place where the power usage monitoring apparatus 10 is arranged, it is necessary to go to the place where the transformer 22 is arranged in order to know whether or not an abnormality has occurred. Therefore, it is preferable to know whether or not an abnormality has occurred according to the meter reading of the power meter 24. That is, it is preferable to set a period for comparison by the abnormality determination unit 16 in accordance with the timing of meter reading.
  • the notification unit 17 may be configured to have a communication function for notifying the management apparatus 30 of abnormality information through the communication path 31.
  • the presence / absence of an abnormality can be known remotely without going to the place where the power usage monitoring device 10 is located. That is, if the communication path 31 can be maintained, the notification unit 17 may be provided with a communication function. In order to adopt this configuration, it is necessary to notify the abnormality information together with the position of each power usage monitoring device 10 in order to know the location of the transformer 22 where the abnormality has occurred.
  • information on the position measured by a position measuring device such as GPS can be used. Further, if the fact that the power usage monitoring apparatus 10 is attached to the transformer 22 is used, information indicating the position of the transformer 22 can be used as the position information of the power usage monitoring apparatus 10.
  • a terminal device for maintenance (not shown) is connected to an interface (not shown) of the power usage monitoring device 10, and location information is registered in the power usage monitoring device 10 from the terminal device.
  • the management device 30 manages the identification information (communication address, etc.) of the power usage monitoring device 10 and the position of the installation location of the power usage monitoring device 10 in association with each other, the power usage The identification information of the monitoring device 10 may be used instead of the position information.
  • the plurality of consumers 23 to be focused on are consumers receiving power from the same transformer 22. It may not be 23.
  • This configuration is particularly effective when there are a plurality of transformers 22 in a single building, such as an apartment house. Even in this configuration, it is desirable to measure the amount of power supplied to the consumer 23 on the secondary side of the transformer 22. Therefore, it is preferable to obtain the total amount of power supplied to the consumer 23 of interest by providing a watt-hour meter 13 for each transformer 22 and communicating between the watt-hour meters 13 to be aggregated.
  • the amount of power received by the entire consumer 23 in a predetermined period varies not only by the date and time but also by external factors such as temperature and weather (mainly environmental external factors). Therefore, if necessary, a temperature sensor that monitors the temperature, an illuminance sensor that monitors the illuminance, a weather sensor that monitors the weather, and the like may be provided.
  • the first embodiment employs a configuration in which the power usage monitoring device 10 includes a watt hour meter 13 in order to measure the power supplied to the consumer 23 from the secondary side of the transformer 22. Yes. That is, while using the power meter 24 having only the function of measuring the amount of power received (consumed) by the consumer 23, it is detected that the power is illegally used from the primary side of the power meter 24.
  • the power meter 25 installed in each consumer 23 communicates with the measurement unit 251 that measures the amount of power received by the consumer 23 and the power amount measured by the measurement unit 251 as information. And a communication unit 252.
  • the power usage monitoring device 40 is arranged in the vicinity of the transformer 22 as in the first embodiment.
  • the power usage monitoring device 40 acquires the amount of power measured by the power meter 25 by communicating with the power meter 25 instead of measuring the power supplied from the secondary side of the transformer 22.
  • a communication technique between the power meter 25 and the power usage monitoring device 40 a technique of power line carrier communication using the distribution network 21 as a communication path is used.
  • the power usage monitoring device 40 of the present embodiment obtains the amount of power received by the customer 23 by communicating with the communication unit 252 of the power meter 25 instead of the watt hour meter 13 of FIG. A quantity acquisition unit 43 is provided.
  • Other configurations of the power usage monitoring apparatus 40 are the same as those of the power usage monitoring apparatus 10 described in the first embodiment. That is, reference numerals 41, 42, 44, 45, 46, and 47 in the present embodiment can be read as reference numerals 11, 12, 14, 15, 16, and 17 in the first embodiment, respectively.
  • the power usage monitoring device 40 includes a processing unit 41 that performs overall control and monitoring of each component, a clock unit 42 that measures the date and time, and a power amount acquisition unit 43 that acquires a power amount measured by the power meter 25. .
  • the power usage monitoring device 40 includes a measured power storage unit 44 that stores the power amount acquired by the power amount acquisition unit 43 in association with the date and time that the clock unit 42 is measuring, and the consumer 23 throughout the predetermined period.
  • An estimated power storage unit 45 that stores an estimated range of the amount of power to be received in advance is provided.
  • the power usage monitoring device 40 compares the measured value of the power amount for a predetermined period stored in the measured power storage unit 44 with the estimated range of the power amount for the predetermined period stored in advance in the estimated power storage unit 45.
  • An abnormality determination unit 46 is provided.
  • the power usage monitoring device 40 also includes a notification unit 47 that notifies abnormality information when the abnormality determination unit 46 determines that an abnormality has occurred.
  • the power usage monitoring device 40 acquires the amount of power measured by the power meter 25 for each consumer 23 that is supplying power from the secondary side of the transformer 22. Moreover, the electric energy acquisition part 43 totals the electric energy for every consumer 23 acquired from each electric power meter 25, and calculates
  • the power amount stored in the actually measured power storage unit 44 is compared with the estimated range of the power amount stored in the estimated power storage unit 45 in the abnormality determination unit 46 to determine whether there is an abnormality in the power supply.
  • the notification unit 47 notifies the occurrence of the abnormality.
  • the notification unit 47 is provided with a communication function for communicating with the power meter 25, and the power meter 25 notifies the display of abnormal information by a light emitting element or a buzzer. You may make it perform.
  • the power meter 25 may be provided with a liquid crystal display, an organic EL display, or the like to notify abnormality information.
  • the estimated power storage unit 45 stores the estimated range of the amount of power that should be received by the entire consumer 23 from the secondary side of the transformer 22 in the predetermined period described above,
  • the whole consumer 23 means all the consumers 23 (customer groups) that should receive power from the secondary side of one transformer 22. Therefore, if power is used illegally on the primary side of the power meter 25, the actually measured power amount is considered to be smaller than the estimated range.
  • the abnormality determination unit 46 if the amount of power stored in the measured power storage unit 44 is smaller than the estimated range of power stored in the estimated power storage unit 45, the power is illegal on the primary side of the power meter 25. It is determined that it has been used.
  • the estimation range of the energy is set based on P ⁇ n.
  • the first embodiment compares the amount of electric power supplied from the secondary side of the transformer 22 to the consumer 23 with the estimated range of the electric energy, whereas the present embodiment is different from each consumer 23.
  • the electric energy measured by the electric power meter 25 is compared with the estimated range of electric energy.
  • Other configurations and operations in the present embodiment are the same as those in the first embodiment.
  • the configuration in which the power usage monitoring device 40 is provided separately from the power meter 25 is illustrated, but the power usage monitoring device 40 is housed in the housing of the power meter 25 of any consumer 23. Is also possible. Alternatively, it is also possible to form a communication path between the power meter 25 and the management device 30 and provide the management device 30 with the function of the power usage monitoring device 40. In this case, in the management apparatus 30, in addition to paying attention to the plurality of consumers 23 receiving power from the secondary side of the transformer 22, it is possible to arbitrarily combine the plurality of paying consumers 23.
  • the consumer 23 may be each dwelling unit of an apartment house.
  • the consumer 23 is each dwelling unit of the apartment house, not only the communication between the power meter 25 and the power usage monitoring device 40 but also a part of the communication path between the power usage monitoring device 40 and the management device 30.
  • power line carrier communication technology may be used.
  • the power usage monitoring device 40 can be installed in an electrical room or an administrator room of the apartment house.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Quality & Reliability (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Tourism & Hospitality (AREA)
  • Educational Administration (AREA)
  • General Business, Economics & Management (AREA)
  • Development Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Power Engineering (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

 電力量計は、配電網に設けた変圧器の二次側から需要家の全体に供給する総電力量を計測する。推定電力記憶部は、需要家の全体によって変圧器の二次側から所定期間において受電されるべき電力量の推定範囲をあらかじめ記憶している。異常判定部は、電力量計で計測した所定期間の電力量を、推定電力記憶部に記憶されている電力量の推定範囲と比較し、計測した電力量が電力量の推定範囲を超えるときに異常と判定する。異常判定部が異常と判定したときに、通知部は異常情報を通知する。

Description

電力使用監視装置、電力使用監視システム
 本発明は、電力メータの一次側からの電力の使用の有無を監視するために用いる電力使用監視装置、および電力使用監視装置による監視の結果を管理装置に通知する電力使用監視システムに関するものである。
 一般に、電力の需要家には電力メータが設置され、電力メータを用いて需要家で使用する電力量が計測されている。したがって、電力供給事業者(電力会社)は、電力メータの検針値を信頼して電気料金の課金を行っている。逆に言えば、電力メータを通らないバイパス線が取り付けられると、電力メータで計測されずに電力が使用されることになり、電力供給事業者は電気料金を課金する根拠を失うことになる。言い換えると、バイパス線が取り付けられることによって、いわゆる盗電が行われると、電力供給事業者の収益が圧迫されるという問題を生じる。
 このような問題を解決するために、種々の技術が提案されている。たとえば、日本国特許出願公開番号2004-340767(以下「文献1」という)には、変電所に接続された第1の配電線と、需要家に電力を供給する第2の配電線との分岐点での電流の出入りに着目する技術が記載されている。すなわち、文献1に記載された構成は、分岐点に流入する電流量と、分岐点から流出する電流量とが一致しなければならないという原理に基づいている。
 したがって、分岐点に出入りする電流量を計測するために、第1の配電線における分岐点の上流側と下流側とに、それぞれ電流検出装置が設けられている。また、分岐点から需要家に供給される電流量は、第2の配電線に設けられた電力量計(すなわち、電力メータ)での検針値により求められている。この構成では、第1の配電線において、分岐点の上流側と下流側とでそれぞれ計測された電流量の差に対して、第2の配電線において計測された電流量が所定範囲を超えるときに(上記差より規定値を超えて小さいときに)、盗電が行われていると判断している。
 また、上述の問題を解決するために、日本国特許出願公開番号2003-209938(以下「文献2」という)には、電力を供給する地域を複数の領域に分割するとともに、領域をさらに複数の区域に分割し、領域ごとの電力量と区域ごとの電力量を計測する技術が記載されている。すなわち、文献2に記載された構成は、階層化された配電網において、下位階層で使用した電力量の総和と、上位階層の電力量とが一致しなければならないという原理に基づいている。
 したがって、1つの領域で使用した電力量を計測する電力量積算計と、当該領域を分割した区域(需要家と読み替えることができる)ごとに、使用した電力量を計測する電力量積算計(電力メータと読み替えることができる)とが設けられている。この構成では、区域ごとに設けた電力量積算計で計測した電力量の総和と、領域に設けた電力量積算計で計測した電力量とを比較し、両者の値が異なる(領域の電力量より区域の電力量の総和が少ない)場合に、盗電のような異常として検知される。
 文献1と文献2とに記載された技術では、電流量あるいは電力量が複数箇所で計測され、計測された電流量あるいは電力量の間に、予定されている関係が成立しない場合に、盗電のような異常が生じていると判断されている。したがって、需要家ごとに設置される電力メータのほかに、電流量あるいは電力量を計測する装置が必要になる上に、それらの装置の計測結果と電力メータの計測結果との両方を通信技術により取得して異常の有無を判断する装置が必要になる。すなわち、既存の配電網において文献1、2に記載された技術を採用するには、配電線に設置した電流検出装置や電力量積算計と、需要家に設置した電力メータとの双方に通信機能が必要になる。また、文献1、2に記載された技術は、電力メータに通信機能が必要であるから、遠隔検針などのための通信機能を備えていない既存の電力メータを交換しなければならない。
 このように、電力メータの一次側から電力が使用されるような異常の有無を検出するために、文献1、2に記載された技術を採用すると、既存の配電網に対して多額の設備投資が必要になる。
 本発明は、電力メータの一次側から電力が使用されているか否かを検出するにあたり、配電網で計測する電力量と電力メータで計測する電力量との一方のみを用いることによって、既存の配電網に対する設備投資の増加を抑制した電力使用監視装置を提供することを目的とし、さらに、この電力使用監視装置を用いて電力メータの一次側から電力が使用されているか否かを監視する電力使用監視システムを提供することを目的としている。
 本発明の電力使用監視装置は、計測器、推定電力記憶部、異常判定部および通知部を備える。計測器は、複数の需要家に供給される電力を計測するように構成される。推定電力記憶部は、前記需要家の全体によって所定期間において消費されるべき電力量の推定範囲をあらかじめ記憶している。異常判定部は、前記計測器から得られる前記複数の需要家に対する総電力量が前記推定電力記憶部に記憶した推定範囲を超える状態を異常と判定するように構成される。通知部は、前記異常判定部が異常と判定したときに異常情報を通知するように構成される。
 一実施形態において、計測器は、複数の需要家に電力を供給する電路上に配置され需要家の全体に供給する総電力量を計測するための電力量計である。異常判定部は、所定期間において電力量計で計測した総電力量が推定電力記憶部に記憶した推定範囲を超える状態を異常と判定するように構成される。
 一実施形態において、計測器は、複数の需要家にそれぞれ配置され通信機能を備えた電力メータから前記需要家ごとに受電した電力量を通信により取得するように構成される電力量取得部である、異常判定部は、所定期間において電力メータで計測した電力量の総和が推定電力記憶部に記憶した推定範囲を超える状態を異常と判定するように構成される。
 一実施形態において、推定電力記憶部と異常判定部と通知部とは、需要家の全体に電力を供給している変圧器に付設されている。
 一実施形態において、通知部は、通信網を通して管理装置に電力量計の位置とともに異常情報を通知するように構成される。
 一実施形態において、通知部は、視覚刺激による通知を行うように構成される。
 一実施形態において、通知部は、聴覚刺激による通知を行うように構成される。
 本発明に係る電力使用監視システムは、上記電力使用監視装置と、電力使用監視装置と通信網を介して通信する管理装置とを備え、電力使用監視装置から通信網を通して管理装置に異常情報が通知されるように構成される。
 本発明の構成によれば、配電網で計測する電力量と電力メータで計測する電力量との一方のみを用いるだけで、電力メータの一次側から電力が使用されているか否かを検出することが可能になり、結果的に、既存の配電網に対する設備投資の増加を抑制することができるという利点がある。
 本発明の好ましい実施形態をさらに詳細に記述する。本発明の他の特徴および利点は、以下の詳細な記述および添付図面に関連して一層良く理解されるものである。
実施形態1を示すブロック図である。 同上の全体構成図である。 実施形態2を示すブロック図である。
 (実施形態1)
 本実施形態は、配電網において着目する複数の需要家に給電する電路上に電力量計が配置され、この電力量計で計測された電力量により、電力メータの一次側から電力が不正に使用されているか否かを推定する構成を採用している。本実施形態において着目する複数の需要家は、電力供給事業者が配電網に設けた1台の変圧器の二次側から受電(消費)している需要家群であり、電力量計は、変圧器の二次側の電路上であって各需要家への配電網の分岐点よりも上流側に配置される。変圧器は、電柱、地上、地下、建物内などに配置される降圧用の変圧器を意味する。
 この構成では、電力量計で計測される電力量は、1台の変圧器の二次側から需要家群が受電する総電力量と、変圧器から電力メータまでの配電網で損失した電力量との合計になる。したがって、変圧器の二次側から供給した電力量と需要家群で受電した総電力量とを比較すれば、変圧器と電力メータとの間(つまり、電力メータの一次側)から電力が不正に使用されているか否かを判断することができる。
 ただし、需要家群で受電した総電力量が、需要家ごとに電力メータで計測している電力量の合計として求められる構成では、電力メータに通信機能が必要になり、既存の電力メータの交換が必要になって多額の設備投資が必要になる。そのため、需要家ごとに電力メータに通信機能を設ける構成では、普及が妨げられる。
 ところで、変圧器の二次側の需要家群が受電する総電力量は、時々刻々と変化しているが、数時間、1日、1週間、1ヶ月などを単位とする所定期間では需要家群が受電する総電力量に規則性があるという知見が得られている。たとえば、数時間あるいは1日を単位とすると、1日の時間帯や曜日による総電力量の変動があるが、日毎の同時間帯あるいは週毎の同曜日の総電力量には大きな変化はないと推定できる。また、1週間あるいは1ヶ月を単位とすると、季節による総電力量の変動があるが、隣接した週あるいは隣接した月では総電力量の変化量を推定でき、年間の同週あるいは同月の総電力量には大きな変化はないと推定できる。すなわち、期間と需要家の数とが適正であれば、過去の実績などに基づいて、所定期間における総電力量は比較的小さい誤差範囲で推定することができる。
 上述した例では、変圧器の二次側の需要家群によって所定期間において受電されるべき総電力量が、総電力量と時刻の情報とを用いて推定されているが、天候、気温などの付加的な情報を用いることにより、さらに高い精度で推定されることになる。
 本実施形態は、変圧器の二次側から需要家群に供給した総電力量は電力量計が計測した計測値を用い、需要家群によって受電されるべき総電力量としての推定値を用いることにより、電力メータの一次側からの電力の使用の有無を検出する構成を採用している。
 以下では、図2に示すように、配電網20、21に設けられた降圧用の変圧器22の二次側から複数の需要家23が受電する場合を例として説明する。変圧器22は、柱上変圧器を例示しているが、柱上変圧器と同等に用いる変圧器22であれば、配置場所についてとくに制限はない。各需要家23はそれぞれ電力メータ24を備え、電力メータ24は需要家23で受電した電力量を計測する。
 変圧器22の近傍には電力使用監視装置10が配置される。電力使用監視装置10は、変圧器22の二次側の配電網21において、各需要家23に配電するための配電網21が分岐する部位よりも上流側に配置される。また、電力使用監視装置10は、電力メータ24の一次側(上流側)からの電力の使用の有無を監視するために設けられ、電力使用監視装置10よりも上流側(変圧器22側)から電力が抜き取られることのないように、できるだけ変圧器22の二次側から近い場所に配置することが好ましい。
 変圧器22が柱上変圧器である場合は、電柱上に電力使用監視装置10が配置されるから、電力使用監視装置10の上流側から電力を抜き取ることが困難になる。電力使用監視装置10の上流側から電力を抜き取ることがさらに困難になるように、電力使用監視装置10が変圧器22と一体化された構成を採用したり、電力使用監視装置10が変圧器22とともに筐体に収納される構成を採用してもよい。変圧器22が電柱上以外の場所に配置されている場合も同様である。また、集合住宅の場合、需要家23に給電する変圧器22が電気室(EPS=Electric Pipe Shaft)に収納されることがあるから、電力使用監視装置10を変圧器22とともに電気室に収納しておけばよい。
 電力使用監視装置10は、主要部がマイコン(マイクロコンピュータ)で構成されており、適宜のプログラムをマイコンで実行することにより、以下に説明する各構成の機能を実現する。言い換えると、電力使用監視装置10は、マイコンを、以下に説明する各構成として動作させるためのプログラムを備える。なお、電力使用監視装置10は、マイコンに含まれない構成も備えている。なお、マイコン以外のPLD(Programmable Logic Device)を用いてもよい。
 電力使用監視装置10は、図1に示すように、以下に説明する各構成の制御および監視を統括して行う処理部11と、日時を計時する時計部12とを備える。処理部11は、電力使用監視装置10の各構成の動作を監視し、電力使用監視装置10の各構成に適宜のタイミングで指示を与える。
 変圧器22の二次側から需要家23に供給した電力量は、電力使用監視装置10に設けられた電力量計13が計測する。電力量計13は、変圧器22の二次側から電力を受電するすべての需要家23に供給した電力量の総量(総電力量)を計測する。
 電力量計13は、電子式であり、電圧センサで検出した電圧と、電流センサで検出した電流とから電力量を算出する。電圧センサには、たとえば分圧抵抗が用いられ、電流センサには、たとえば変流器が用いられる。検出した電圧と電流とから電力量を算出するため演算手段は、上述したマイコンにより構成される。
 電力使用監視装置10は、電力量計13が計測した電力量を、時計部12が計時している日時と対応付けて記憶する実測電力記憶部14を備える。すなわち、処理部11は、時計部12が計時する所定の時間(たとえば、1秒、30秒、1分)ごとに、電力量計13が計測した電力量を、時計部12が計時する日時と対応付けて実測電力記憶部14に蓄積させる。処理部11は、電力量と日時とを対応付けて実測電力記憶部14に蓄積させるだけではなく、上述した所定期間における電力量の積算値も実測電力記憶部14に記憶させる。
 ところで、電力使用監視装置10は、需要家23の全体によって変圧器22の二次側から上述した所定期間において受電されるべき電力量の推定範囲をあらかじめ記憶した推定電力記憶部15を備える。ここに、需要家23の全体は、1台の変圧器22の二次側から受電するべきすべての需要家23(需要家群)の意味である。推定電力記憶部15に記憶した電力量の推定範囲は、所定期間において需要家群に供給される電力量を過去の実績などから推定し、推定誤差および配電網21での損失などを考慮して決定される。また、変圧器22から所定期間に供給する電力量は、平日と休日の別や季節の別による変動を生じる可能性があるから、推定電力記憶部15に記憶される電力量の推定範囲は、期間に対応付けられる。要するに、推定電力記憶部15には、電力量の推定範囲と期間との組があらかじめ登録される。
 上述のように、推定電力記憶部15が電力量の推定範囲と期間とを組にして記憶しているから、処理部11は、推定電力記憶部15に期間を指定することにより、当該期間に対応する電力量の推定範囲を推定電力記憶部15から抽出することができる。いま、前日の午前零時から当日の午前零時までの1日を期間に定め、この期間における日毎の電力量の推定範囲を推定電力記憶部15が記憶している場合を想定する。
 ところで、電力使用監視装置10は、実測電力記憶部14が記憶している所定期間の電力量の実測値を、推定電力記憶部15があらかじめ記憶している所定期間の電力量の推定範囲と比較する異常判定部16を備える。すなわち、処理部11は、1日分の電力量を実測電力記憶部14に記憶させた後に異常判定部16に指示し、実測電力記憶部14に記憶させた電力量が、推定電力記憶部15が記憶している1日の電力量の推定範囲内であるか否かを異常判定部16に判定させる。なお、日時が異なれば電力量の推定範囲も変化するから、処理部11は、実測電力記憶部14に記憶させた電力量に対応する期間に応じた電力量の推定範囲を推定電力記憶部15から抽出するのが好ましい。
 異常判定部16は、実測電力記憶部14に記憶された電力量が、推定電力記憶部15が記憶している電力量の推定範囲を逸脱している場合に、変圧器22と電力メータ24との間に異常があると判定する。とくに、電力メータ24の一次側から電力が不正に使用されている場合には、推定電力記憶部15が記憶している電力量の推定範囲よりも、実測電力記憶部14に記憶された電力量が大きくなるという関係の成立が予測される。したがって、異常判定部16は、この関係が成立する場合に、電力メータ24の一次側から電力が不正に使用されていると判断する。
 なお、実測電力記憶部14において短時間ごとの電力量を記憶しておき、異常判定部16において電力量を比較する際に、処理部11が電力量の総和を求める構成を採用してもよい。すなわち、実測電力記憶部14には、所定期間における電力量を記憶させずに、異常判定部16での比較の際に電力量の総和を算出するようにしてもよい。また、実測電力記憶部14において、短時間ごとの電力量を記憶するのではなく、電力量の積算値を記憶し、所定期間における電力量の積算値を異常判定部16での比較に用いてもよい。この構成を採用すれば、実測電力記憶部14に記憶させるデータ量が少なくなるから、実測電力記憶部14として記憶容量の小さい半導体メモリを用いることができる。
 電力使用監視装置10は、異常判定部16が異常と判定したときに異常情報を通知する通知部17を備える。通知部17は、種々の構成を採用することができるが、たとえば、視覚刺激あるいは聴覚刺激により異常情報の通知を行う構成を採用することができる。視覚刺激による通知は、発光ダイオードのような適宜の発光素子を用い、異常判定部16が異常と判定したときに、発光素子を点灯させたり、発光素子を点滅点灯させることにより、異常の発生を通知する。あるいはまた、通知部17として液晶表示器や有機EL表示器のような表示器を用いて異常情報を報知してもよい。聴覚刺激による通知を行う場合は、ブザーを鳴動させたり、音声メッセージを発生させたりする技術を用いる。
 これらの通知を行う場合には、異常判定部16をリセットするまでは通知状態を継続することが好ましい。また、異常判定部16は、電力供給事業者の技術者でなければリセットができないように構成しておくことが好ましい。
 視覚刺激や聴覚刺激による通知は、電力使用監視装置10が配置されている場所で行われるから、異常発生の有無を知るには、変圧器22が配置されている場所まで出向く必要がある。したがって、電力メータ24の検針に合わせて異常の発生の有無を知ることができるようにしておくことが好ましい。すなわち、検針の時期に合わせて異常判定部16で比較する期間を設定しておくことが好ましい。
 通知部17は、通信路31を通して管理装置30に異常情報を通知する通信機能を備える構成としてもよい。この場合、電力使用監視装置10が配置されている場所まで出向かなくとも異常の有無を遠方で知ることができる。すなわち、通信路31を整備することができる場合には、通知部17に通信機能を設けておけばよい。この構成を採用するには、異常が生じている変圧器22の場所を知るために、電力使用監視装置10ごとの位置とともに異常情報を通知する必要がある。
 電力使用監視装置10の位置を示すには、GPSのような位置測定装置により計測した位置の情報を用いることができる。また、電力使用監視装置10が変圧器22に付設されていることを利用すれば、変圧器22の位置を示す情報を電力使用監視装置10の位置の情報として用いることができる。この場合、保守用の端末装置(図示せず)を電力使用監視装置10のインターフェース(図示せず)に接続して、端末装置から電力使用監視装置10に位置の情報を登録する。あるいはまた、管理装置30において、電力使用監視装置10の識別情報(通信用のアドレスなど)と、電力使用監視装置10の設置場所の位置とを対応付けて管理している場合には、電力使用監視装置10の識別情報を位置の情報に代えて用いればよい。
 なお、上述した構成例では、1台の変圧器22から受電している需要家23の全体に着目しているが、着目する複数の需要家23は、同一の変圧器22から受電する需要家23でなくてもよい。たとえば、複数台の変圧器22から受電している需要家23の全体に着目し、これらの需要家23に供給している電力量の総量を計測する構成としてもよい。この構成は、集合住宅のように1つの建物内に複数台の変圧器22が存在している場合にとくに有効である。この構成でも、需要家23に供給する電力量は変圧器22の二次側で計測することが望ましい。したがって、変圧器22ごとに電力量計13を設け、集約する電力量計13の間で通信を行うことにより、着目する需要家23に供給している電力量の総量を求めることが好ましい。
 また、上述したように、需要家23の全体が所定期間において受電する電力量は、日時だけではなく、気温、天候などの外因(主として環境的な外因)によっても変動する。したがって、必要があれば、気温を監視する温度センサ、照度を監視する照度センサ、気象を監視する気象センサなどを設けてもよい。
 (実施形態2)
 実施形態1は、図1に示すように、変圧器22の二次側から需要家23に供給する電力を計測するために、電力使用監視装置10が電力量計13を備える構成を採用している。すなわち、需要家23が受電(消費)した電力量を計測する機能のみを備える電力メータ24を用いながらも、電力メータ24の一次側から電力が不正に使用されていることを検出している。
 一方、最近では、遠隔検針のために通信機能を備える電力メータ25(図3参照)、あるいは電力の需給管理を行うために制御や管理の機能を通信機能とともに備えた電力メータ25(いわゆる、スマートメータ)が提案されている。本実施形態は、このように各需要家23に設けた電力メータ25が通信機能を備えていることを前提にしている。
 すなわち、各需要家23に設置される電力メータ25は、図3に示すように、需要家23で受電した電力量を計測する計測部251と、計測部251で計測した電力量を情報として通信する通信部252とを備える。
 本実施形態は、実施形態1と同様に、変圧器22の近傍に電力使用監視装置40を配置している。ただし、電力使用監視装置40は、変圧器22の二次側から供給する電力を計測する代わりに、電力メータ25との間で通信を行うことにより電力メータ25が計測した電力量を取得する。電力メータ25と電力使用監視装置40との間の通信技術には、配電網21を通信路として兼用する電力線搬送通信の技術を用いる。ただし、電力メータ25と電力使用監視装置40との間の通信路に配電網21を用いることは必須ではなく、別に有線の通信路を設けたり、無線の通信路を設けることも可能である。
 上述したように、本実施形態の電力使用監視装置40は、図1の電力量計13に代えて電力メータ25の通信部252と通信することにより需要家23が受電した電力量を取得する電力量取得部43を備える。電力使用監視装置40の他の構成は、実施形態1において説明した電力使用監視装置10と同様である。すなわち、本実施形態における符号41,42,44,45,46,47は、それぞれ実施形態1における符号11,12,14,15,16,17と読み替えることができる。
 すなわち、電力使用監視装置40は、各構成の制御および監視を統括して行う処理部41、日時を計時する時計部42、電力メータ25が計測した電力量を取得する電力量取得部43を備える。また、電力使用監視装置40は、電力量取得部43が取得した電力量を時計部42が計時している日時に対応付けて記憶する実測電力記憶部44、需要家23の全体によって所定期間において受電されるべき電力量の推定範囲をあらかじめ記憶した推定電力記憶部45を備える。さらに、電力使用監視装置40は、実測電力記憶部44が記憶している所定期間の電力量の実測値を、推定電力記憶部45があらかじめ記憶している所定期間の電力量の推定範囲と比較する異常判定部46を備える。電力使用監視装置40は、異常判定部46が異常と判定したときに異常情報を通知する通知部47も備える。
 上述した構成により、電力使用監視装置40は、変圧器22の二次側から電力を供給している需要家23ごとに電力メータ25で計測された電力量を取得する。また、電力量取得部43は、各電力メータ25から取得した需要家23ごとの電力量を合計し、需要家23の全体が受電した電力量の総量を求める。電力量取得部43が求めた電力量の総量は、時計部42で計時している日時とともに実測電力記憶部44に記憶される。
 実測電力記憶部44に記憶された電力量は、異常判定部46において、推定電力記憶部45に記憶されている電力量の推定範囲と比較され、電力の供給における異常の有無が判定される。また、異常判定部46を検出した場合は、通知部47により異常の発生を通知する。
 本実施形態では、電力メータ25が通信機能を備えているから、通知部47に電力メータ25と通信する通信機能を設け、電力メータ25において、発光素子による表示あるいはブザーなどによる異常情報の報知を行うようにしてもよい。また、電力メータ25に液晶表示器や有機EL表示器などを設けて異常情報を報知してもよい。
 ところで、電力量取得部43が求めた電力量の総量は、電力メータ25で計測された電力量の総量であるから、電力メータ25の一次側から電力が不正に使用されている場合、電力量取得部43で求めた電力量には不正に使用された電力量が含まれていない。実施形態1で述べたように、推定電力記憶部45は、需要家23の全体によって変圧器22の二次側から上述した所定期間において受電されるべき電力量の推定範囲を記憶しており、ここにおいて、需要家23の全体は、1台の変圧器22の二次側から受電するべきすべての需要家23(需要家群)を意味する。そのため、電力メータ25の一次側において電力が不正に使用されていると、実測した電力量は推定範囲よりも小さくなると考えられる。したがって、異常判定部46では、実測電力記憶部44に記憶した電力量が推定電力記憶部45に記憶している電力量の推定範囲よりも小さければ、電力メータ25の一次側で電力が不正に使用されたと判定する。一例において、需要家23の数がnであり、上記所定期間における各需要家23の平均消費電力量がPであるとき、電力量の推定範囲は、P×nに基づいて設定される。
 以上説明したように、実施形態1は変圧器22の二次側から需要家23に供給した電力量を電力量の推定範囲と比較しているのに対して、本実施形態は各需要家23の電力メータ25で計測した電力量を電力量の推定範囲と比較している。本実施形態の他の構成および動作は実施形態1と同様である。
 なお、本実施形態では、電力使用監視装置40を電力メータ25とは別に設けた構成を例示したが、いずれかの需要家23の電力メータ25の筐体に電力使用監視装置40を収納することも可能である。あるいはまた、電力メータ25と管理装置30との間に通信路を形成し、管理装置30に電力使用監視装置40の機能を設けることも可能である。この場合、管理装置30では、変圧器22の二次側から受電している複数の需要家23に着目するほかに、着目する複数の需要家23を任意に組み合わせることが可能になる。
 さらに、需要家23が戸建て住宅である場合のほか、需要家23が集合住宅の各住戸であってもよい。需要家23が集合住宅の各住戸である場合、電力メータ25と電力使用監視装置40との間の通信だけではなく、電力使用監視装置40と管理装置30との間の通信路の一部にも電力線搬送通信の技術を用いてもよい。集合住宅の場合には、電力使用監視装置40を、集合住宅の電気室あるいは管理人室に設置することも可能である。
 本発明を幾つかの好ましい実施形態について記述したが、この発明の本来の精神および範囲、即ち請求の範囲を逸脱することなく、当業者によって様々な修正および変形が可能である。

Claims (9)

  1.  複数の需要家に供給される電力を計測するための計測器と、
     前記需要家の全体によって所定期間において消費されるべき電力量の推定範囲をあらかじめ記憶している推定電力記憶部と、
     前記計測器から得られる前記複数の需要家に対する総電力量が前記推定電力記憶部に記憶した推定範囲を超える状態を異常と判定するように構成される異常判定部と、
     前記異常判定部が異常と判定したときに異常情報を通知するように構成される通知部と
     を備えることを特徴とする電力使用監視装置。
  2.  前記計測器は、前記複数の需要家に電力を供給する電路上に配置され前記需要家の全体に供給する総電力量を計測するための電力量計であり、
     前記異常判定部は、前記所定期間において前記電力量計で計測した総電力量が前記推定電力記憶部に記憶した推定範囲を超える状態を異常と判定するように構成される
     ことを特徴とする請求項1記載の電力使用監視装置。
  3.  前記計測器は、前記複数の需要家にそれぞれ配置され通信機能を備えた電力メータから前記需要家ごとに受電した電力量を通信により取得するように構成される電力量取得部であり、
     前記異常判定部は、前記所定期間において前記電力メータで計測した電力量の総和が前記推定電力記憶部に記憶した推定範囲を超える状態を異常と判定するように構成される
     ことを特徴とする請求項1記載の電力使用監視装置。
  4.  前記推定電力記憶部と前記異常判定部と前記通知部とは、前記需要家の全体に電力を供給している変圧器に付設されていることを特徴とする請求項1~3のいずれか1項に記載の電力使用監視装置。
  5.  前記通知部は、通信網を通して管理装置に前記電力量計の位置とともに前記異常情報を通知するように構成されることを特徴とする請求項1~3のいずれか1項に記載の電力使用監視装置。
  6.  前記通知部は、通信網を通して管理装置に前記電力量計の位置とともに前記異常情報を通知するように構成されることを特徴とする請求項4記載の電力使用監視装置。
  7.  前記通知部は、視覚刺激による通知を行うように構成されることを特徴とする請求項1~6のいずれか1項に記載の電力使用監視装置。
  8.  前記通知部は、聴覚刺激による通知を行うように構成されることを特徴とする請求項1~6のいずれか1項に記載の電力使用監視装置。
  9.  請求項1~8のいずれか1項に記載の前記電力使用監視装置と、前記電力使用監視装置と通信網を介して通信する管理装置とを備え、前記電力使用監視装置から前記通信網を通して前記管理装置に前記異常情報が通知されることを特徴とする電力使用監視システム。
PCT/JP2012/051029 2011-02-16 2012-01-19 電力使用監視装置、電力使用監視システム WO2012111377A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2011-031197 2011-02-16
JP2011031197A JP5842120B2 (ja) 2011-02-16 2011-02-16 電力使用監視装置、電力使用監視システム

Publications (1)

Publication Number Publication Date
WO2012111377A1 true WO2012111377A1 (ja) 2012-08-23

Family

ID=46672318

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/051029 WO2012111377A1 (ja) 2011-02-16 2012-01-19 電力使用監視装置、電力使用監視システム

Country Status (2)

Country Link
JP (1) JP5842120B2 (ja)
WO (1) WO2012111377A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5370566B1 (ja) * 2012-10-17 2013-12-18 三菱電機株式会社 結線状態診断装置および結線状態診断方法
CN103825428A (zh) * 2012-11-19 2014-05-28 苏州工业园区新宏博通讯科技有限公司 带电能计量功能的电源
CN111310854A (zh) * 2020-03-10 2020-06-19 长沙理工大学 基于用电负荷指纹的低误报率窃电检测二次筛选方法

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014080515A1 (ja) * 2012-11-26 2014-05-30 三菱電機株式会社 データ分析装置及びプログラム
CN103149431A (zh) * 2013-03-19 2013-06-12 青岛乾程电子科技有限公司 一种多功能电能表
JP6098024B2 (ja) * 2013-07-30 2017-03-22 パナソニックIpマネジメント株式会社 給電制御装置
CN103514514A (zh) * 2013-09-23 2014-01-15 广州供电局有限公司 电力营销业务数据在线监测方法
CN104484371B (zh) * 2014-12-05 2017-11-10 广州供电局有限公司 电力营销异常数据在线监控分析方法和系统
CN105403745A (zh) * 2015-11-23 2016-03-16 国家电网公司 一种智能防盗电系统监测方法
WO2017126273A1 (ja) * 2016-01-18 2017-07-27 東京電力ホールディングス株式会社 盗電検出装置及びプログラム
JP7206657B2 (ja) * 2017-09-15 2023-01-18 東京電力ホールディングス株式会社 盗電監視システム、盗電監視装置、盗電監視方法及びプログラム
JP6973014B2 (ja) * 2017-12-14 2021-11-24 株式会社デンソー 電力監視システム
KR102075660B1 (ko) * 2018-09-04 2020-02-10 주식회사 엠스테크 전력량계 순회 점검 시스템
JP7127461B2 (ja) * 2018-10-02 2022-08-30 中国電力株式会社 データ管理システム
CN115203274B (zh) 2022-07-25 2023-12-26 云南电网有限责任公司楚雄供电局 一种配电变压器容量异常的大数据筛查系统

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10334385A (ja) * 1997-05-30 1998-12-18 Toshiba Corp 電力管理システム
JP2005164561A (ja) * 2003-12-02 2005-06-23 Ipb:Kk 電力計測方式
JP2005249549A (ja) * 2004-03-03 2005-09-15 Kawamura Electric Inc パルス信号演算装置
WO2007013336A1 (ja) * 2005-07-25 2007-02-01 Yokogawa Electric Corporation 電力監視システム
JP2010187469A (ja) * 2009-02-12 2010-08-26 Hitachi Consumer Marketing Inc 消費エネルギー積算値管理警報システム

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3733910B2 (ja) * 2002-01-15 2006-01-11 横河電機株式会社 電力監視システム
JP2008135815A (ja) * 2006-11-27 2008-06-12 Murata Mach Ltd 通信システム及び通信端末装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10334385A (ja) * 1997-05-30 1998-12-18 Toshiba Corp 電力管理システム
JP2005164561A (ja) * 2003-12-02 2005-06-23 Ipb:Kk 電力計測方式
JP2005249549A (ja) * 2004-03-03 2005-09-15 Kawamura Electric Inc パルス信号演算装置
WO2007013336A1 (ja) * 2005-07-25 2007-02-01 Yokogawa Electric Corporation 電力監視システム
JP2010187469A (ja) * 2009-02-12 2010-08-26 Hitachi Consumer Marketing Inc 消費エネルギー積算値管理警報システム

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5370566B1 (ja) * 2012-10-17 2013-12-18 三菱電機株式会社 結線状態診断装置および結線状態診断方法
CN103825428A (zh) * 2012-11-19 2014-05-28 苏州工业园区新宏博通讯科技有限公司 带电能计量功能的电源
CN111310854A (zh) * 2020-03-10 2020-06-19 长沙理工大学 基于用电负荷指纹的低误报率窃电检测二次筛选方法

Also Published As

Publication number Publication date
JP5842120B2 (ja) 2016-01-13
JP2012168127A (ja) 2012-09-06

Similar Documents

Publication Publication Date Title
JP5842120B2 (ja) 電力使用監視装置、電力使用監視システム
US20110035063A1 (en) Water Management System
US7936163B2 (en) Method and system for detecting electricity theft
JP4584056B2 (ja) 電力需給予測・制御システム
US20130119974A1 (en) System and method for tamper detection in a utility meter
US20100036625A1 (en) Temperature Profiling in an Electricity Meter
JP4212369B2 (ja) 電力供給サービス方法およびシステム
US7801647B2 (en) Method of tracking power outages
US20110298635A1 (en) Self dynamo smart flow utility meter and system for flow utility real-time flow usage monitoring and control, self error and leakages monitoring
EP2150824A1 (en) Energy meter with power source
KR20100128921A (ko) 디지털 수도미터 및 이를 갖는 원격 수도검침 시스템
US20170292999A1 (en) Transformer monitoring and data analysis systems and methods
US20220163602A1 (en) System and method for electric meter outage time detection
US8484138B2 (en) Combined cathodic protection and meter reading monitoring system
KR101589329B1 (ko) 전자식 전력량계 및 이의 정보 저장 방법
JP2010213507A (ja) 自然エネルギー併用型蓄電システム、および自然エネルギー併用型蓄電方法
US7058523B2 (en) Electricity meter having gas consumption correction processing
JP6106904B2 (ja) 電力計測システム
US7991567B1 (en) Centralized operating meter for energy technologies
JP2008117247A (ja) 前払い式のlpガス料金徴収方法およびシステム
JP2015149069A (ja) ユーティリティメータにおける改竄検出のためのシステムおよび方法
US7511470B2 (en) Electronic tamper detection circuit for an electricity meter
JP2014032151A (ja) 電力表示器
CN113655272A (zh) 一种电量值的修正方法和装置、存储介质及电子设备
KR100637627B1 (ko) 변압기 부하관리와 검침을 통합 수행하는 원격관리시스템

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12746895

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 12746895

Country of ref document: EP

Kind code of ref document: A1