WO2011118841A1 - Tube d'acier à haute résistance soudé par résistance électrique et son procédé de fabrication - Google Patents

Tube d'acier à haute résistance soudé par résistance électrique et son procédé de fabrication Download PDF

Info

Publication number
WO2011118841A1
WO2011118841A1 PCT/JP2011/057928 JP2011057928W WO2011118841A1 WO 2011118841 A1 WO2011118841 A1 WO 2011118841A1 JP 2011057928 W JP2011057928 W JP 2011057928W WO 2011118841 A1 WO2011118841 A1 WO 2011118841A1
Authority
WO
WIPO (PCT)
Prior art keywords
less
steel pipe
strength
pipe
steel
Prior art date
Application number
PCT/JP2011/057928
Other languages
English (en)
Japanese (ja)
Inventor
昌利 荒谷
河端 良和
松岡 才二
知正 平田
Original Assignee
Jfeスチール株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jfeスチール株式会社 filed Critical Jfeスチール株式会社
Priority to US13/636,857 priority Critical patent/US20130160889A1/en
Priority to KR1020127026473A priority patent/KR101315568B1/ko
Priority to CN201180015165.0A priority patent/CN102822374B/zh
Priority to EP11759643.7A priority patent/EP2551366B1/fr
Publication of WO2011118841A1 publication Critical patent/WO2011118841A1/fr

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • B21C37/08Making tubes with welded or soldered seams
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D8/00Modifying the physical properties by deformation combined with, or followed by, heat treatment
    • C21D8/02Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D8/00Modifying the physical properties by deformation combined with, or followed by, heat treatment
    • C21D8/02Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips
    • C21D8/0205Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips of ferrous alloys
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/08Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for tubular bodies or pipes
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/46Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for sheet metals
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/04Ferrous alloys, e.g. steel alloys containing manganese
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/06Ferrous alloys, e.g. steel alloys containing aluminium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/40Ferrous alloys, e.g. steel alloys containing chromium with nickel
    • C22C38/58Ferrous alloys, e.g. steel alloys containing chromium with nickel with more than 1.5% by weight of manganese
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D2211/00Microstructure comprising significant phases
    • C21D2211/005Ferrite
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D2211/00Microstructure comprising significant phases
    • C21D2211/008Martensite

Definitions

  • the present invention is a high-strength electric steel pipe suitable for a crash member of an automobile such as a door impact beam, a cross member, a pillar, or the like.
  • the present invention relates to a resistance welded steel tube, and more particularly, to a high-strength electric resistance welded steel pipe excellent in both workability and shock absorption characteristics.
  • the automobile body is designed to absorb impact energy at the time of collision.
  • a door impact beam which is an impact absorbing member, is subjected to a quenching treatment as shown in, for example, Patent Document 1 to obtain a martensitic structure (martensitic structure).
  • high strength steel pipes having a desired high strength have been applied.
  • Patent Document 1 The technique described in Patent Document 1 is as follows: C: 0.15 to 0.22%, Mn: 1.5% or less, Si: 0.5% or less, Ti: 0.04% or less, B: 0.0003 1 to 2 or more of Ni: 0.5% or less, Cr: 0.5% or less, Mo: 0.5% or less
  • a high strength steel pipe for machine structure is obtained by quenching a steel pipe containing steel to obtain a high strength steel pipe for machine structure with a tensile strength of 120 kgf / mm 2 or more (electric resistance welded steel tube structural use). is there.
  • a high-strength steel pipe having the above-described good elongation and a tensile strength of 120 kgf / mm 2 or more can be obtained by a single heat treatment.
  • Patent Documents 2 to 7 describe techniques relating to high-strength cold-rolled steel sheets having a tensile strength of 900 MPa or more used for automobile structural members. .
  • Each of these steel sheets has a two-phase structure of a ferrite phase and a martensite phase, or a structure including a bainite phase and a retained austenite phase, and defines an upper limit value of the area ratio of the bainite phase and the retained austenite phase. By adopting such a structure, the steel sheet has both workability and high strength.
  • Patent Document 1 does not cause a big problem in the case of a door impact beam that is used in a straight pipe without performing special processing, but requires complicated processing into various shapes.
  • the steel pipe used is required to have a further excellent workability in addition to high strength.
  • Patent Documents 2 to 5 since the cooling rate after heating and holding during annealing is slow, carbides precipitate, the amount of solid solution C of ferrite becomes insufficient, and prestraining-paint baking treatment There is a problem in that the amount of increase in strength (BH amount) due to is small, and the BH amount: 100 MPa or more cannot be secured.
  • the cooling rate from heating and holding during annealing to the start of water quenching is not considered, for example, the time from the production line layout to the start of water quenching.
  • the cooling rate is long and slow, the distribution of C amount between ferrite and austenite proceeds, and the amount of solid solution C remaining in the ferrite that is considered to contribute to the BH characteristics becomes insufficient. Therefore, Patent Document 6 does not describe or guarantee that the amount of BH is 100 MPa or more.
  • the cooling rate at the time of finish annealing is as slow as 550 ° C./min at the maximum shown in the examples, and only about 8% elongation is obtained.
  • the elongation is low overall and is 11% at the maximum. Therefore, when the steel sheet manufactured by the technique described in Patent Document 7 is processed into an electric-resistance-welded steel pipe, the elongation is further reduced and the elongation of 10% or more is ensured as a steel pipe when considering the processing strain during pipe making. There is a problem that you can not.
  • the present invention provides a high-strength electric resistance welded steel pipe that has excellent workability and that can ensure excellent shock absorption characteristics that are suitable for automobile shock absorbing members and a method for manufacturing the same. The purpose is to provide.
  • “high strength” here refers to a case where the tensile strength TS is 1180 MPa or more.
  • excellent workability here refers to a tube axis direction (tube axis direction) obtained by a tensile test using a JIS No. 12 tensile test piece (GL: 50 mm) defined in JIS standards.
  • excellent shock absorption characteristics here means that the tube was subjected to 2% pre-strain and further subjected to heat treatment (baking finishing) at 170 ° C. ⁇ 10 min.
  • the difference in strength between 0.2% proof stress and 2% pre-strain strength is a strength increase (BH (hardening value)) of 100 MPa or more, and the yield ratio in the tube axis direction is 90%. This is the case.
  • the amount of BH is defined in FIG.
  • the present invention has been completed based on such findings and further investigations. That is, the gist of the present invention is as follows. (1) By mass%, C: 0.05 to 0.20%, Si: 0.5 to 2.0%, Mn: 1.0 to 3.0%, P: 0.1% or less, S: A composition comprising 0.01% or less, Al: 0.01 to 0.1%, N: 0.005% or less, the balance composed of Fe and inevitable impurities, and a two-phase structure composed of a ferrite phase and a martensite phase.
  • the martensite phase has a structure with a volume ratio of 20 to 60%, tensile strength TS is 1180 MPa or more, tube axis direction elongation El is 10% or more, and yield ratio is less than 90%.
  • the pre-strain 2%, and after applying the heat treatment at 170 ° C. for 10 minutes, the strength increase (BH amount) after the baking process is 100 MPa or more and the yield ratio is 90% or more.
  • Strength ERW steel pipe is 100 MPa
  • a hot rolling process for hot rolling a steel material into the steel material, and pickling the hot rolled sheet (pickling) cold rolling (cold rolling process) that is subjected to cold rolling (cold rolling sheet) and then subjected to annealing treatment (cold rolling process).
  • the steel pipe material is made into a steel pipe material by subjecting it to an annealing process to make a rolled and annealed sheet, and then the steel pipe material is continuously formed on the steel pipe material to form a substantially cylindrical shape.
  • Temperature in the two-phase temperature range Each time after heating and soaking, it was cooled to a temperature in the range of 600 to 750 ° C. at an average cooling rate of 10 ° C./s or more (defined as average cooling rate 1), From the temperature range of 600 to 750 ° C. to room temperature, on average, it is cooled at a cooling rate of 500 ° C./s or higher (defined as average cooling rate 2), and then the temperature range is 150 to 300 ° C.
  • a re-tempering treatment (tempering treatment) is performed to form a cold-rolled annealed plate, the forming is a cage roll type roll forming, the ERW steel pipe has a tensile strength TS of 1180 MPa or more, a pipe shaft Elongation El is 10% or more, yield ratio is less than 90%, pre-strain: 2%, and then heat treatment of 170 ° C x 10 min. ) Is a steel pipe having a yield ratio of 90% or higher and a yield ratio of 90 MPa or higher.
  • the composition in addition to the above-mentioned composition, in addition, by mass, Cu: 1.0% or less, Ni: 1.0% or less, Cr: 0.5% or less, Mo: 0.5% or less Nb: 0.05% or less, Ti: 0.05% or less, W: 0.05% or less, and B: 0.0050% or less.
  • the composition further contains, by mass%, Ca: 0.0050% or less and REM: 0.0050% or less. Manufacturing method of high strength ERW steel pipe.
  • ADVANTAGE OF THE INVENTION it is the high intensity
  • Steel pipes can be manufactured inexpensively and easily, and have remarkable industrial effects.
  • the high-strength electric resistance welded steel pipe according to the present invention is not limited to a door impact beam, and other automotive shock absorbing members such as cross members and pillars that require particularly workability, as well as automotive framework members such as automobile frame members. There is also an effect that it can be applied as a material for automobile parts.
  • C 0.05-0.20%
  • C is an element having an effect of strengthening steel, and in the present invention, it is necessary to contain 0.05% or more in order to secure a desired strength.
  • the content exceeding 0.20% lowers weldability. Therefore, in the present invention, C is limited to a range of 0.05 to 0.20%. Note that the content is preferably 0.08 to 0.18%.
  • Si acts as a deoxidizer, solidifies to strengthen steel, and further promotes the formation of ferrite, and is an important element for ensuring excellent workability. Moreover, Si can achieve a desired high strength by suppressing the martensite phase fraction to a low level by solid solution strengthening of the ferrite phase. In order to acquire such an effect, 0.5% or more of content is required. On the other hand, if the content exceeds 2.0%, a large amount of Si oxide is formed on the surface of the steel sheet, and chemical conversion treatability is lowered. Therefore, in the present invention, Si is limited to the range of 0.5 to 2.0%. Note that the content is preferably 1.0 to 1.8%.
  • Mn 1.0 to 3.0%
  • Mn is an element that improves the hardenability, facilitates the formation of a martensite phase, and increases the strength of the steel.
  • Mn is contained in an amount of 1.0% or more in the present invention. Need.
  • the content exceeds 3.0%, segregation is promoted, slab cracks are likely to occur during casting, and the martensite phase is excessively increased to reduce workability. For this reason, Mn was limited to the range of 1.0 to 3.0%. Note that the content is preferably 1.5 to 2.5%.
  • P 0.1% or less
  • P is preferably reduced as much as possible as an impurity in the present invention in order to avoid adverse effects on workability, but excessive reduction raises the refining cost. For this reason, P was limited to 0.1% or less, which has substantially no adverse effect. In addition, Preferably it is 0.05% or less.
  • S 0.01% or less S is an impurity in the present invention, as in P, and is preferably reduced as much as possible in order to avoid adverse effects on workability. However, excessive reduction increases the refining cost, so Was 0.01%. In addition, Preferably it is 0.005% or less.
  • Al 0.01 to 0.1%
  • Al is an element that acts as a deoxidizing agent, and in order to obtain such an effect, the content of 0.01% or more is required. On the other hand, even if the content exceeds 0.1%, the effect is saturated and an effect commensurate with the content cannot be expected. For this reason, Al was limited to the range of 0.01 to 0.1%. In addition, Preferably it is 0.01 to 0.08%.
  • N 0.005% or less
  • N is an element that strengthens steel and lowers formability and is preferably reduced as an impurity as much as possible. However, excessive reduction increases the refining cost. For this reason, N was limited to 0.005% or less with substantially no adverse effect. In addition, Preferably it is 0.004% or less.
  • the above components are basic components.
  • Cu 1.0% or less
  • Ni 1.0% or less
  • Cr 0.5% or less
  • Mo 0.5% or less
  • Nb 0.05% or less
  • Ti 0.05% or less
  • W 0.05% or less
  • B one or more selected from 0.0050% or less
  • And / or Ca 0.0050% or less
  • REM One or two selected from 0.0050% or less can be selected and contained.
  • Cu, Ni, Cr, Mo, Nb, Ti, W, and B are all elements that increase the strength of the steel, and can be selected as necessary and contained in one or more.
  • Cu is an element having an action of increasing the strength of steel and improving corrosion resistance, and can be contained as necessary. Such an effect is recognized with a content of 0.05% or more. However, a content exceeding 1.0% reduces the hot workability. For this reason, when it contains, it is preferable to limit Cu to 1.0% or less. More preferably, it is 0.08 to 0.5%.
  • Ni 1.0% or less
  • Ni is an element that has the effect of increasing the strength of steel and improving the corrosion resistance, and can be contained if necessary. Such an effect is recognized at a content of 0.05% or more, but Ni is an expensive element, and a large content exceeding 1.0% raises the material cost. For this reason, when it contains, it is preferable to limit Ni to 1.0% or less. More preferably, it is 0.08 to 0.5%.
  • Cr 0.5% or less Cr is an element having an effect of increasing the strength of steel through improving hardenability and improving corrosion resistance, and can be contained as necessary. Such an effect is recognized with a content of 0.05% or more, but if it exceeds 0.5%, the workability is lowered. For this reason, when it contains, it is preferable to limit Cr to 0.5% or less. More preferably, it is 0.05 to 0.4%.
  • Mo 0.5% or less
  • Mo is an element having an action of increasing the strength of steel by precipitation strengthening in addition to improving hardenability, and can be contained as necessary. Such an effect is recognized with a content of 0.05% or more. However, when the content exceeds 0.5%, the ductility is lowered and the material cost is increased. For this reason, when it contains, it is preferable to limit Mo to 0.5% or less. More preferably, the content is 0.1 to 0.4%.
  • Nb 0.05% or less
  • Nb is an element having an effect of refining crystal grains and increasing the strength of steel through precipitation strengthening, and can be contained as necessary. Such an effect is recognized at a content of 0.005% or more, but when it exceeds 0.05%, the ductility is lowered. For this reason, when it contains, it is preferable to limit Nb to 0.05% or less. More preferably, the content is 0.008 to 0.03%.
  • Ti 0.05% or less
  • Ti is an element having an effect of refining crystal grains and increasing the strength of steel through precipitation strengthening, and can be contained as necessary. Such an effect is recognized at a content of 0.005% or more, but if it exceeds 0.05%, the ductility is lowered. For this reason, when it contains, it is preferable to limit Ti to 0.05% or less. More preferably, the content is 0.008 to 0.03%.
  • W 0.05% or less W is an element having an action of increasing the strength of steel through precipitation strengthening and can be contained as necessary. Such an effect is recognized at a content of 0.01% or more, but if it exceeds 0.05%, the ductility is lowered. For this reason, when it contains, it is preferable to limit W to 0.05% or less. More preferably, the content is 0.01 to 0.03%.
  • B 0.0050% or less
  • B is an element having an action of adjusting the martensite fraction within a predetermined range through improvement of hardenability and increasing the strength of steel, and can be contained as necessary.
  • Such an effect is recognized with a content of 0.0005% or more, but a content exceeding 0.0050% is economically disadvantageous because the effect is saturated and an effect commensurate with the content cannot be expected.
  • it is preferable to limit B to 0.0050% or less. More preferably, the content is 0.001 to 0.003%.
  • Ca and REM are elements having an effect of improving ductility through the morphological control of sulfide inclusions. Can be contained depending on the case. Such an effect is recognized when the content of Ca and REM is 0.0020% or more. However, when the content exceeds 0.0050%, the amount of inclusions is excessively increased and the cleanness of the steel is decreased. For this reason, when it contains, it is preferable to limit both Ca and REM to 0.0050% or less. More preferably, the content is 0.0020 to 0.0040%. The balance other than the above components is Fe and inevitable impurities.
  • the steel pipe of the present invention has a two-phase structure including a martensite phase with a volume ratio of 20 to 60% and the remaining ferrite phase.
  • tissue By setting it as such a structure
  • the martensite phase is less than 20% by volume, it becomes a structure mainly composed of a ferrite phase and a desired high strength cannot be achieved.
  • the amount of martensite phase exceeds 60% by volume, it becomes a structure mainly composed of martensite and desired workability cannot be ensured.
  • the structure fraction of the martensite phase is limited to a range of 20 to 60% by volume.
  • the volume ratio is preferably 40 to 55%.
  • the preferable manufacturing method of this invention steel pipe is demonstrated.
  • the steel material is subjected to a hot rolling process, a cold rolling process, and an annealing process to obtain a steel pipe material, and then the steel pipe material is subjected to a pipe making process to obtain an electric-welded steel pipe.
  • the manufacturing method of the steel raw material to be used is not particularly limited, the molten steel having the above-described composition is melted by a conventional melting method such as a converter, and steel such as a slab by a continuous casting method or an ingot-rolling method. It is preferable to use a raw material.
  • the obtained steel material is then subjected to a hot rolling process that is hot-rolled to form a hot-rolled sheet.
  • the obtained steel material may be reheated after cooling, or when the steel material retains a predetermined amount of heat, it may be directly sent and hot rolled without reheating.
  • the heating temperature is preferably 1000 to 1250 ° C. If the heating temperature at the time of reheating is less than 1000 ° C., the deformation resistance is high and the load applied to the rolling mill becomes too large, and rolling may be difficult. On the other hand, when the heating exceeds 1250 ° C., the coarsening of crystal grains proceeds and the ductility and the like are significantly reduced.
  • Hot rolling consists of rough rolling and finish rolling.
  • the rough rolling conditions are not particularly limited as long as a sheet bar having a predetermined size and shape can be obtained.
  • the finish rolling finish temperature is higher than the Ar 3 transformation point of the steel strip as the material to be rolled, and the finish rolling is taken up at a winding temperature of 500 to 700 ° C.
  • the finish rolling finish temperature is less than the Ar 3 transformation point, the finish rolling is a rolling at two-phase region ( ⁇ + ⁇ ), and a mixed grain structure in which extremely coarse crystal grains and fine crystal grains are mixed. (Mixed grain structure).
  • the finish rolling finishing temperature of the hot rolling is limited to the Ar 3 transformation point or higher.
  • the coiling temperature is less than 500 ° C., a hard phase is generated during cooling, so that a rolling load at the time of cold rolling is increased and productivity is decreased.
  • the temperature is higher than 700 ° C., non-transformed austenite is transformed into pearlite, so that workability is deteriorated.
  • the coiling temperature is limited to a range of 500 to 700 ° C. In addition, Preferably it is 650 degrees C or less.
  • the hot-rolled sheet obtained through the hot-rolling process is subjected to pickling treatment, and then subjected to a cold-rolling process in which cold rolling is performed to obtain a cold-rolled sheet.
  • Conditions for the cold rolling process such as cold rolling reduction are not particularly specified.
  • the obtained cold-rolled sheet is then subjected to an annealing process to form a cold-rolled annealed sheet.
  • the annealing step is an important step in securing desired workability and desired paint bake hardenability (BH property).
  • the annealing process preferably uses a continuous annealing line.
  • the cold-rolled sheet is heated to a temperature in the two-phase temperature range from the Ac 1 transformation point to the Ac 3 transformation point, and is kept soaked, and then the average cooling rate of 10 to a temperature in the range of 600 to 750 ° C.
  • rapid cooling treatment (average cooling rate 2) is performed at a cooling rate of 500 ° C / s or higher on average from a temperature in the range of 600 to 750 ° C to room temperature.
  • a tempering treatment is performed to reheat to a temperature range of 150 to 300 ° C. to obtain a cold-rolled annealed plate.
  • the cooling rate (average cooling rate 1) from the heating and holding to the rapid cooling start temperature is preferably 15 ° C./s or more
  • the average cooling rate (average cooling rate 2) is preferably 800 ° C./s or more. More preferably, it is 1000 ° C./s or more. More preferably, it is 1100 degrees C / s or more.
  • the desired tissue fraction is obtained by rapid cooling thereafter.
  • the (ferrite + martensite) structure cannot be secured.
  • the cooling rate from the heating holding temperature to the rapid cooling start temperature average cooling rate 1
  • the distribution of the C amount of ferrite and austenite proceeds, and the solid content in the ferrite that is considered to contribute to the BH characteristics is increased. Since the amount of dissolved C is reduced, desired BH characteristics cannot be obtained.
  • the rapid cooling start temperature is out of the range of 750 ° C.
  • the quenching start temperature is higher than 750 ° C., the ductility is lowered, and if it is lower than 600 ° C., a desired high strength cannot be ensured.
  • the soaking time at the above-described temperature is 30 seconds or longer.
  • the cooling rate from the temperature in the range of 600 to 750 ° C. to room temperature is less than 500 ° C./s on average, the amount of martensite transformation is small, and the desired structure fraction (ferrite + (Martensite) structure cannot be obtained and desired high strength cannot be ensured.
  • the amount of dissolved C in ferrite that is considered to contribute to BH characteristics decreases, so the desired BH amount is 100 MPa or more. Cannot be obtained.
  • the cooling rate of the rapid cooling treatment is an average between the rapid cooling start temperature and 200 ° C.
  • thermo flow water jet flow water
  • a tempering treatment for reheating to a temperature range of 150 to 300 ° C. is performed after the rapid cooling treatment for the purpose of further improving the toughness. If the tempering temperature is less than 150 ° C., the toughness improving effect cannot be expected.
  • the temperature range of reheating was limited to 150 to 300 ° C.
  • the obtained cold-rolled annealed sheet may be further subjected to temper rolling if necessary. At this time, it is preferable that the rolling reduction of skinpass rolling is 0.2% or more and 1.0% or less. If the temper reduction ratio is less than 0.2%, the shape correction effect cannot be obtained. On the other hand, if it exceeds 1.0%, the deterioration of elongation becomes remarkable.
  • the cold-rolled annealed plate (cold-rolled annealed steel strip) that has undergone the above-described process is used as a steel pipe material, and then the steel pipe material is subjected to a pipe making process to obtain an electric-welded steel pipe.
  • the pipe making process is a process in which a steel pipe material is continuously formed to form a substantially cylindrical open pipe, and the open pipe is electro-welded to form an electric-welded pipe.
  • the forming in the pipe making process is a roll forming method using a cage roll method.
  • Roll forming by the cage roll method refers to roll forming of a method in which small rolls called cage rolls are lined up on the tube outer surface side and formed smoothly.
  • the CBR method Chance free Bulge Roll method
  • distortion applied to the band plate during molding can be minimized, and deterioration of material properties due to work hardening can be suppressed.
  • FIG. 1 An example of an ERW steel pipe manufacturing facility employing CBR roll forming is shown in FIG.
  • CBR roll forming both edge portions of the strip 1 are pre-formed with an edge bend roll 2 and then a center bend roll 3 and a cage roll 4 are used to form a central portion of the strip.
  • This is a forming method of forming a circular element pipe by performing stretch forming of the tube side part and bending and returning of the overbend part (bend and return forming) by reducing the diameter.
  • the roll forming method of the CBR method has less strain applied to the material (band plate) than the conventional BD (breakdown) method, and further, variation in strain applied in the tube circumferential direction. Is small. While pressing the circular element tube thus obtained with a squeeze roll 7, the butt portion is joined by welding means (high-frequency resistance welding) 6, and an electric-welded steel pipe 8 and To do.
  • the obtained high-strength ERW steel pipe has a tensile strength TS of 1180 MPa or more, an elongation El in the pipe axis direction of 10% or more, a yield ratio of less than 90%, and a pre-strain: 2%, and then 170 ° C. ⁇ 10 min.
  • This is a steel pipe having an increase in strength (BH amount) of 100 MPa or more and a yield ratio of 90% or more after the coating baking process for performing the heat treatment. If the elongation in the tube axis direction of the electric resistance welded steel pipe is less than 10%, the workability as a pipe is lowered and it becomes difficult to form a desired shape.
  • the elongation is preferably 12% or more, and if the yield ratio of the ERW steel pipe exceeds 90%, the workability as a pipe is lowered and it becomes difficult to form a desired shape.
  • the yield ratio is preferably 85% or less.
  • the amount of BH is 110 MPa or more.
  • the variation in the BH amount at each position in the pipe circumferential direction is small, and the BH amount at each position in the pipe circumferential direction excluding the ERW is uniform. Therefore, it can be set within the range of 100 to 130 MPa. Further, if the yield ratio of the ERW steel pipe is less than 90%, the energy that can be absorbed at the time of collision decreases, and the function as an impact member cannot be satisfied.
  • the heat treatment condition of the coating baking process is a heat treatment of 170 ° C. ⁇ 10 min. This condition is the lowest heat treatment condition that provides an increase in strength (BH amount) of 100 MPa or more after the coating baking process.
  • BH amount increase in strength
  • the ERW steel pipe of the present invention has a strength increase amount (BH amount) after the paint baking process of 100 MPa or more.
  • the heating temperature is in the range of 170 to 250 ° C. and the holding time is in the range of 10 to 30 minutes.
  • the heating temperature is less than 170 ° C.
  • the solid solution C necessary to bring about a desired increase in strength does not diffuse until dislocations are sufficiently fixed, so that the amount of increase in strength after the desired baking treatment ( BH amount) cannot be secured.
  • the temperature exceeds 250 ° C. and the temperature is excessively high, productivity is lowered and the material may be deteriorated because it may be heated to a blue-hot brittle region.
  • the holding time is as short as less than 10 min, the diffusion time is insufficient, and the required amount of solute C cannot reach dislocation, so that the amount of increase in strength after the desired baking process (BH amount) ) Cannot be secured.
  • the holding time is longer than 30 min, the productivity is lowered. Preferably it is 25 min or less.
  • Molten steel having the composition shown in Table 1 was melted in a converter and made into a slab (steel material) by a continuous casting method. These slabs (steel materials) are subjected to a hot rolling process under the conditions shown in Table 2 to form hot rolled sheets (thickness 2.4 to 3.0 mm), and then pickled and cold rolled on the hot rolled sheets. A cold-rolled step of forming a cold-rolled plate and an annealing step under the conditions shown in Table 2 were applied to the cold-rolled plate to obtain a cold-rolled annealed plate (plate thickness 1.2 to 1.8 mm), which was a steel pipe material. A specimen was collected from the obtained steel pipe material, and a structure observation and a tensile test were performed. The test method was as follows.
  • the obtained results are shown in Table 3.
  • the obtained steel pipe material was formed by CBR roll forming to obtain a substantially cylindrical open pipe. Next, while pressing the butt portion with a squeeze roll, the butt portion is electro-welded by high-frequency resistance welding, and an ERW steel pipe (size: outer diameter 48.6 mm ⁇ ⁇ wall thickness 1.2 to 1.8 mm) did.
  • the forming in the pipe making process is formed by the BD method.
  • the obtained ERW steel pipe was subjected to a structure observation, a tensile test, and a paint baking treatment test to evaluate the structure, tensile characteristics, and paint bake hardening characteristics.
  • the test method was as follows.
  • (1) Microstructure observation A specimen for microstructural observation is collected from the obtained steel pipe, the cross section in the axial direction of the pipe is polished, corroded using a nital liquid, and the structure is obtained using a scanning electron microscope (magnification: 2000 times). 10 images or more, and using an image analyzer, identify the type of tissue such as ferrite and martensite, and calculate the average tissue fraction (volume ratio) of each phase over 10 fields of view. did.
  • the coating bake hardening amount (BH amount) was calculated as a difference between the 0.2% proof stress after the coating baking treatment and the strength after applying the 2% tensile strain.
  • the amount of BH the maximum value and the minimum value at each position in the circumferential direction were obtained.
  • required the arithmetic average of the value in each position of the circumferential direction.
  • the tensile strength TS high strength of 1180 MPa or more
  • the elongation El in the tube axis direction is 10% or more
  • X 100 (%)) is less than 90%, pipe with excellent workability and 2% or more pre-strain and heat treatment (paint baking process) at 170 ° C x 10 min.
  • the electric resistance welded steel pipe has an excellent impact absorption characteristic with an axial yield ratio of 90% or more and a BH amount of 100 MPa or more. Further, in the example of the present invention, there is little variation in the BH amount at each position in the circumferential direction, and all are within the range of 100 to 130 MPa.
  • the tensile test piece was extract
  • collected from each pipe circumferential direction position (Electric seam part is 0 degree, a total of 11 positions at a 30 degree pitch in the circumferential direction. Excluding ERW part). Then, a tensile test is performed on the paint baking processed test piece to obtain 0.2% proof stress YS and tensile strength TS after the paint baking process, and the yield ratio after the paint baking process ( (YS / TS) ⁇ 100 (%)) was calculated. Further, as shown in FIG. 2, the coating bake hardening amount (BH amount) was calculated as a difference between the 0.2% proof stress after the coating baking treatment and the strength after applying the 2% tensile strain.
  • BH amount coating bake hardening amount
  • the heating temperature of the heat treatment is less than 170 ° C., which is a condition outside the range of the preferred paint baking treatment, a BH amount of 100 MPa or more is used unless an excessively long paint baking treatment is performed without considering a decrease in productivity. Is not secured stably.
  • the excessively long coating baking time here means time exceeding 30 minutes. Further, even when the heating temperature is 170 ° C. or higher, if the holding time is 5 minutes which is less than 10 minutes, a BH amount of 100 MPa or more may not be secured, and the desired BH amount cannot be secured stably. .

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Heat Treatment Of Sheet Steel (AREA)
  • Heat Treatment Of Steel (AREA)
  • General Engineering & Computer Science (AREA)
  • Heat Treatment Of Articles (AREA)

Abstract

L'invention concerne un tube d'acier à haute résistance soudé par résistance électrique convenant pour une utilisation dans un élément absorbant les chocs pour l'automobile. Ledit tube d'acier contient, en masse, entre 0,05 % et 0,20 % de carbone, entre 0,5 % et 2,0 % de silicium, entre 1,0 % et 3,0 % de manganèse, au plus 0,1 % de phosphore, au plus 0,01 % de soufre, entre 0,01 % et 0,1 % d'aluminium, et au plus 0,005 % d'azote, le solde comprenant du fer et les inévitables impuretés. Ledit tube d'acier possède une structure biphasée comprenant une phase ferrite et une phase martensite, la fraction volumique de la phase martensite se situant entre 20 et 60 %. Le tube d'acier décrit présente une résistance à la traction (TS) d'au moins 1,180 MPa, un allongement axial (El) d'au moins 10 % et un rapport d'élasticité inférieur à 90 %. Après un procédé de revêtement au four dans lequel le tube d'acier est précontraint à 2 % puis traité thermiquement à 170 °C pendant 10 minutes, la quantité de résistance (quantité BH) augmente jusqu'à au moins 100 MPa, et le rapport d'élasticité augmente jusqu'à au moins 90 %.
PCT/JP2011/057928 2010-03-24 2011-03-23 Tube d'acier à haute résistance soudé par résistance électrique et son procédé de fabrication WO2011118841A1 (fr)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US13/636,857 US20130160889A1 (en) 2010-03-24 2011-03-23 High-strength electric resistance welded steel tube and production method therefor
KR1020127026473A KR101315568B1 (ko) 2010-03-24 2011-03-23 고강도 전봉 강관 및 그 제조 방법
CN201180015165.0A CN102822374B (zh) 2010-03-24 2011-03-23 高强度电阻焊钢管及其制造方法
EP11759643.7A EP2551366B1 (fr) 2010-03-24 2011-03-23 Tube d'acier à haute résistance soudé par résistance électrique et son procédé de fabrication

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2010068499 2010-03-24
JP2010-068499 2010-03-24
JP2011-015076 2011-01-27
JP2011015076 2011-01-27

Publications (1)

Publication Number Publication Date
WO2011118841A1 true WO2011118841A1 (fr) 2011-09-29

Family

ID=44673378

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2011/057928 WO2011118841A1 (fr) 2010-03-24 2011-03-23 Tube d'acier à haute résistance soudé par résistance électrique et son procédé de fabrication

Country Status (6)

Country Link
US (1) US20130160889A1 (fr)
EP (1) EP2551366B1 (fr)
JP (1) JP4957854B1 (fr)
KR (1) KR101315568B1 (fr)
CN (1) CN102822374B (fr)
WO (1) WO2011118841A1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102605240A (zh) * 2011-12-09 2012-07-25 首钢总公司 一种具有高强度和高塑性的双相钢及其生产方法

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IN2014CN04226A (fr) 2011-11-28 2015-07-17 Arcelormittal Investigación Y Desarrollo Sl
CN105238995B (zh) * 2014-06-11 2017-08-11 鞍钢股份有限公司 一种液压成型钢管用热轧酸洗板及其制造方法
CN106048153A (zh) * 2016-07-20 2016-10-26 柳州科尔特锻造机械有限公司 一种合金钢的快速热处理工艺
JP6465249B2 (ja) * 2016-10-24 2019-02-06 Jfeスチール株式会社 高強度薄肉中空スタビライザー用電縫鋼管およびその製造方法
KR102043524B1 (ko) 2017-12-26 2019-11-12 주식회사 포스코 초고강도 열연 강판, 강관, 부재 및 그 제조 방법
WO2020071522A1 (fr) * 2018-10-04 2020-04-09 日本製鉄株式会社 Tôle d'acier laminée à froid
CN109465609A (zh) * 2018-12-29 2019-03-15 无锡苏嘉法斯特汽车零配件有限公司 一种汽车异型车门防撞梁用焊接钢管的制备方法
WO2020262653A1 (fr) * 2019-06-28 2020-12-30 日本製鉄株式会社 Élément d'absorption de chocs, procédé de fabrication d'élément d'absorption de chocs et procédé de fabrication de plaque d'acier pour formage par déformation plastique à froid

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03122219A (ja) 1989-10-06 1991-05-24 Nippon Steel Corp 引張り強さ120Kgf/mm↑2以上の機械構造用高強度鋼管の製造方法
JPH04276017A (ja) * 1991-03-01 1992-10-01 Kobe Steel Ltd 圧壊特性に優れたドアガードバーの製造方法
JP2005163055A (ja) 2003-11-28 2005-06-23 Jfe Steel Kk 成形後の耐遅れ破壊特性に優れた高加工性超高強度冷延鋼板の製造方法
JP2006299414A (ja) * 2005-03-24 2006-11-02 Jfe Steel Kk 低温靭性に優れた低降伏比電縫鋼管の製造方法
JP2007100114A (ja) 2005-09-30 2007-04-19 Jfe Steel Kk 高張力冷延鋼板の製造方法
JP2008111162A (ja) * 2006-10-31 2008-05-15 Jfe Steel Kk 塗装後降伏比の低い高靱性電縫鋼管用熱延鋼板およびその製造方法
JP2009030148A (ja) * 2007-06-22 2009-02-12 Sumitomo Metal Ind Ltd 冷延鋼板およびめっき鋼板の製造方法
JP2009203550A (ja) 2008-01-31 2009-09-10 Jfe Steel Corp 高強度鋼板およびその製造方法
JP2009242816A (ja) 2008-03-28 2009-10-22 Jfe Steel Corp 高強度鋼板とその製造方法
JP2010126787A (ja) 2008-11-28 2010-06-10 Kobe Steel Ltd 耐水素脆化特性および加工性に優れた超高強度鋼板とその製造方法
JP2010255094A (ja) 2008-11-28 2010-11-11 Jfe Steel Corp 成形性に優れた高強度冷延鋼板、高強度溶融亜鉛めっき鋼板およびそれらの製造方法

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW515847B (en) * 1997-04-09 2003-01-01 Kawasaki Steel Co Coating/baking curable type cold rolled steel sheet with excellent strain aging resistance and method for producing the same
EP1201780B1 (fr) * 2000-04-21 2005-03-23 Nippon Steel Corporation Plaque d'acier presentant une excellente aptitude a l'ebarbage et une resistance elevee a la fatigue, et son procede de production
JP4833835B2 (ja) * 2004-02-19 2011-12-07 新日本製鐵株式会社 バウシンガー効果の発現が小さい鋼管およびその製造方法
JP2006089804A (ja) * 2004-09-24 2006-04-06 Nisshin Steel Co Ltd 縮管性に優れたインパネリインフォースメント用高強度電縫鋼管の製造方法
CA2531615A1 (fr) * 2004-12-28 2006-06-28 Kabushiki Kaisha Kobe Seiko Sho (Kobe Steel, Ltd.) Tole mince d'acier a haute resistance possedant une resistance elevee a la fragilisation par l'hydrogene
BRPI0617763A2 (pt) * 2005-10-24 2011-08-02 Exxonmobil Upstream Res Co aço de fase dupla de resistência elevada com razão de deformação baixa, alta dureza e capacidade de fundição superior
JP4466619B2 (ja) * 2006-07-05 2010-05-26 Jfeスチール株式会社 自動車構造部材用高張力溶接鋼管およびその製造方法

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03122219A (ja) 1989-10-06 1991-05-24 Nippon Steel Corp 引張り強さ120Kgf/mm↑2以上の機械構造用高強度鋼管の製造方法
JPH04276017A (ja) * 1991-03-01 1992-10-01 Kobe Steel Ltd 圧壊特性に優れたドアガードバーの製造方法
JP2005163055A (ja) 2003-11-28 2005-06-23 Jfe Steel Kk 成形後の耐遅れ破壊特性に優れた高加工性超高強度冷延鋼板の製造方法
JP2006299414A (ja) * 2005-03-24 2006-11-02 Jfe Steel Kk 低温靭性に優れた低降伏比電縫鋼管の製造方法
JP2007100114A (ja) 2005-09-30 2007-04-19 Jfe Steel Kk 高張力冷延鋼板の製造方法
JP2008111162A (ja) * 2006-10-31 2008-05-15 Jfe Steel Kk 塗装後降伏比の低い高靱性電縫鋼管用熱延鋼板およびその製造方法
JP2009030148A (ja) * 2007-06-22 2009-02-12 Sumitomo Metal Ind Ltd 冷延鋼板およびめっき鋼板の製造方法
JP2009203550A (ja) 2008-01-31 2009-09-10 Jfe Steel Corp 高強度鋼板およびその製造方法
JP2009242816A (ja) 2008-03-28 2009-10-22 Jfe Steel Corp 高強度鋼板とその製造方法
JP2010126787A (ja) 2008-11-28 2010-06-10 Kobe Steel Ltd 耐水素脆化特性および加工性に優れた超高強度鋼板とその製造方法
JP2010255094A (ja) 2008-11-28 2010-11-11 Jfe Steel Corp 成形性に優れた高強度冷延鋼板、高強度溶融亜鉛めっき鋼板およびそれらの製造方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
KAWASAKI-- STEEL GIHO, vol. 32, 2000, pages 49 - 53
See also references of EP2551366A4 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102605240A (zh) * 2011-12-09 2012-07-25 首钢总公司 一种具有高强度和高塑性的双相钢及其生产方法

Also Published As

Publication number Publication date
JP2012167358A (ja) 2012-09-06
JP4957854B1 (ja) 2012-06-20
KR101315568B1 (ko) 2013-10-08
EP2551366B1 (fr) 2017-05-17
CN102822374A (zh) 2012-12-12
US20130160889A1 (en) 2013-06-27
KR20120123602A (ko) 2012-11-08
EP2551366A4 (fr) 2015-07-15
CN102822374B (zh) 2014-12-17
EP2551366A1 (fr) 2013-01-30

Similar Documents

Publication Publication Date Title
JP4957854B1 (ja) 高強度電縫鋼管およびその製造方法
US11279986B2 (en) Cold-rolled high-strength steel having tensile strength of not less than 1500 MPA and excellent formability, and manufacturing method therefor
CA2869700C (fr) Tole d'acier laminee a chaud pour tube d'acier carre destine a etre utilise comme element structural de construction et procede pour sa production
KR101630975B1 (ko) 구멍 확장성이 우수한 고항복비형 고강도 냉연강판 및 그 제조방법
JP6700398B2 (ja) 高降伏比型高強度冷延鋼板及びその製造方法
EP2792762B1 (fr) Tôle d'acier laminée à froid de haute résistance avec un rapport d'élasticité élevé et procédé de fabrication de l'acier
WO2014077294A1 (fr) Élément absorbeur d'énergie de collision automobile et procédé de fabrication associé
WO2012033210A1 (fr) Feuille d'acier laminé à froid à haute résistance ayant d'excellentes propriétés de déformabilité de bordage par étirage et son procédé de fabrication
CN112673122A (zh) 屈强比优异的超高强度高延展性钢板及其制造方法
JP6048623B2 (ja) 高強度鋼板
JP4954909B2 (ja) 焼き付け硬化特性と常温遅時効性に優れた低降伏比型高強度冷延鋼板とその製造方法
KR101620744B1 (ko) 고항복비형 초고강도 냉연강판 및 그 제조방법
WO2013051714A1 (fr) Tôle d'acier, et procédé de fabrication de celle-ci
JP5732999B2 (ja) 高強度電縫鋼管およびその製造方法
JP4306078B2 (ja) 焼付け硬化性および耐衝撃性に優れた高張力熱延鋼板およびその製造方法
JP4730070B2 (ja) 薄鋼板の製造方法
KR102456737B1 (ko) 코일드 튜빙용 열연 강판 및 그 제조 방법
JP6515386B2 (ja) 熱延鋼板およびその製造方法
JP2010126808A (ja) 冷延鋼板およびその製造方法
CN114058942B (zh) 一种扭力梁用钢板及其制造方法、扭力梁及其制造方法
KR101066691B1 (ko) 초고강도 고버링성 열연강판 및 그 제조방법
JP5549582B2 (ja) 薄鋼板
US20240141454A1 (en) Ultra high strength steel sheet having high yield ratio and excellent bendability and method of manufacturing same
JP4815729B2 (ja) 高強度電縫鋼管の製造方法
KR20220084651A (ko) 굽힘성 및 성형성이 우수한 고강도 강판 및 이의 제조방법

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201180015165.0

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11759643

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2601/KOLNP/2012

Country of ref document: IN

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 1201004939

Country of ref document: TH

ENP Entry into the national phase

Ref document number: 20127026473

Country of ref document: KR

Kind code of ref document: A

REEP Request for entry into the european phase

Ref document number: 2011759643

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2011759643

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 13636857

Country of ref document: US