WO2011062466A3 - Procedimiento y dispositivo para reforzar y aligerar el forjado de pisos y techos. - Google Patents

Procedimiento y dispositivo para reforzar y aligerar el forjado de pisos y techos. Download PDF

Info

Publication number
WO2011062466A3
WO2011062466A3 PCT/MX2010/000130 MX2010000130W WO2011062466A3 WO 2011062466 A3 WO2011062466 A3 WO 2011062466A3 MX 2010000130 W MX2010000130 W MX 2010000130W WO 2011062466 A3 WO2011062466 A3 WO 2011062466A3
Authority
WO
WIPO (PCT)
Prior art keywords
moulds
beams
bolts
lightening
devices
Prior art date
Application number
PCT/MX2010/000130
Other languages
English (en)
French (fr)
Other versions
WO2011062466A4 (es
WO2011062466A2 (es
Inventor
Javier Antonio Simon Domiguez
Original Assignee
Javier Antonio Simon Domiguez
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Javier Antonio Simon Domiguez filed Critical Javier Antonio Simon Domiguez
Priority to ES10831833.8T priority Critical patent/ES2663354T3/es
Priority to KR1020127016040A priority patent/KR101870930B1/ko
Priority to EP10831833.8A priority patent/EP2503076B1/en
Priority to CN201080061646.0A priority patent/CN102713106B/zh
Priority to BR112012011919-2A priority patent/BR112012011919B1/pt
Priority to JP2012539831A priority patent/JP5806676B2/ja
Priority to RU2012125629/03A priority patent/RU2553813C2/ru
Priority to US13/511,020 priority patent/US8910450B2/en
Publication of WO2011062466A2 publication Critical patent/WO2011062466A2/es
Publication of WO2011062466A3 publication Critical patent/WO2011062466A3/es
Publication of WO2011062466A4 publication Critical patent/WO2011062466A4/es

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/40Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for coffered or ribbed ceilings
    • E04G11/44Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for coffered or ribbed ceilings with supporting beams for the shuttering used simultaneously as permanent reinforcement of the ribs
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/17Floor structures partly formed in situ
    • E04B5/23Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
    • E04B5/26Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated with filling members between the beams
    • E04B5/261Monolithic filling members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/40Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for coffered or ribbed ceilings
    • E04G11/46Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for coffered or ribbed ceilings of hat-like or trough-like shape encasing a rib or the section between two ribs or encasing one rib and its adjacent flat floor or ceiling section
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/02Connecting or fastening means for non-metallic forming or stiffening elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/04Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/18Devices for suspending or anchoring form elements to girders placed in ceilings, e.g. hangers

Abstract

Procedimiento y dispositivo para reforzar y aligerar el forjado de pisos y techos, que integra firmemente a las viguetas con la capa de compresión y permite recuperar fácilmente los moldes o bovedillas aligerando el forjado. El procedimiento utiliza unos dispositivos, viguetas prefabricadas, moldes, malla, concreto colocado en obra y en caso necesario varillas de refuerzo. Los dispositivos consisten esencialmente de: un perfil, dos tornillos y un pasador. El perfil será resistente a la tensión, doblado en forma de "U" de acuerdo con las viguetas. El procedimiento consiste en fijar el dispositivo, abrazando transversalmente a la vigueta, igualmente se fijan varios dispositivos a lo largo de cada vigueta. Después se colocan las viguetas en sus muros o trabes, paralelas y separadas según los moldes, posteriormente se asientan los moldes en los segmentos sobresalientes de los tornillos del dispositivo hasta cubrir las luces, fijándose varillas de refuerzo en los laterales del dispositivo en caso necesario. Después se coloca la malla fijándola en los extremos de los dispositivos. Posteriormente se vacía el concreto hasta llenar la capa de compresión y los canales sobre las viguetas. Después del fraguado se quitan los tornillos para recuperar por abajo los moldes.
PCT/MX2010/000130 2009-11-20 2010-11-16 Procedimiento y dispositivo para reforzar y aligerar el forjado de pisos y techos. WO2011062466A2 (es)

Priority Applications (8)

Application Number Priority Date Filing Date Title
ES10831833.8T ES2663354T3 (es) 2009-11-20 2010-11-16 Procedimiento y dispositivo para reforzar y aligerar el forjado de pisos y techos
KR1020127016040A KR101870930B1 (ko) 2009-11-20 2010-11-16 바닥 및 지붕 골조를 보강하고 경량화하는 방법 및 장치
EP10831833.8A EP2503076B1 (en) 2009-11-20 2010-11-16 Method and device for strengthening and lightening floor and roof framing.
CN201080061646.0A CN102713106B (zh) 2009-11-20 2010-11-16 用于加强和轻量化地板和屋顶框架的方法和装置
BR112012011919-2A BR112012011919B1 (pt) 2009-11-20 2010-11-16 Dispositivo para reforçar e tornar mais leve a estrutura de piso e teto e método para reforçar e tornar mais leve a estrutura de piso e teto
JP2012539831A JP5806676B2 (ja) 2009-11-20 2010-11-16 フロア及びルーフのフレーム構造を補強及び軽量化するための方法及び装置
RU2012125629/03A RU2553813C2 (ru) 2009-11-20 2010-11-16 Способ и устройство для усиления и облегчения несущих конструкций пола и крыши
US13/511,020 US8910450B2 (en) 2009-11-20 2010-11-16 Method and device for strengthening and lightening floor and roof framing

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
MXMX/A/2009/012586 2009-11-20
MX2009012586A MX2009012586A (es) 2009-11-20 2009-11-20 Procedimiento y dispositivo para reforzar y aligerar el forjado de pisos y techos.

Publications (3)

Publication Number Publication Date
WO2011062466A2 WO2011062466A2 (es) 2011-05-26
WO2011062466A3 true WO2011062466A3 (es) 2011-09-22
WO2011062466A4 WO2011062466A4 (es) 2011-11-10

Family

ID=42830595

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/MX2010/000130 WO2011062466A2 (es) 2009-11-20 2010-11-16 Procedimiento y dispositivo para reforzar y aligerar el forjado de pisos y techos.

Country Status (12)

Country Link
US (1) US8910450B2 (es)
EP (1) EP2503076B1 (es)
JP (1) JP5806676B2 (es)
KR (1) KR101870930B1 (es)
CN (1) CN102713106B (es)
BR (1) BR112012011919B1 (es)
CL (1) CL2012001285A1 (es)
ES (1) ES2663354T3 (es)
MX (1) MX2009012586A (es)
PE (1) PE20130029A1 (es)
RU (1) RU2553813C2 (es)
WO (1) WO2011062466A2 (es)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10364569B2 (en) * 2014-01-23 2019-07-30 Harvel K. Crumley Guide device for retaining ties in masonry walls
CN103774764B (zh) * 2014-01-28 2016-03-09 北京华美科博科技发展有限公司 网片固定装置及多层平行钢丝网架夹芯保温板
CN104100032A (zh) * 2014-08-06 2014-10-15 安徽水利开发股份有限公司 楼板结构
CN104831919B (zh) * 2015-05-12 2017-01-18 华汇工程设计集团股份有限公司 一种用于预制整浇井字楼盖结构的支撑体系
US9680852B1 (en) * 2016-01-29 2017-06-13 Varmour Networks, Inc. Recursive multi-layer examination for computer network security remediation
US10410009B2 (en) * 2016-03-08 2019-09-10 Oracle International Corporation Partial-context policy enforcement
CO2016005799A1 (es) * 2016-12-26 2018-07-10 Carrascal Domingo De Guzman Claro Mecanismo de formaleta
US10260235B1 (en) * 2017-09-25 2019-04-16 Pravin Nanayakkara Construction metallic trapezoidal systems
US10538906B2 (en) * 2017-09-26 2020-01-21 Pravin Nanayakkara Composite floor joist
US11377852B1 (en) * 2018-11-14 2022-07-05 David Cotton Embed apparatus
US10597864B1 (en) * 2019-05-01 2020-03-24 Storage Structures, Inc. Structural member assemblies, beams, and support structures comprising same
CN111608414A (zh) * 2020-05-07 2020-09-01 中建科工集团有限公司 一种建筑钢结构的加固改造结构及方法
CN112177323B (zh) * 2020-09-09 2021-11-26 中国一冶集团有限公司 一种槽体结构装配式支撑体系
CN113309349A (zh) * 2021-06-21 2021-08-27 中冶天工集团有限公司 一种用于剪力墙根部模板加固装置及施工方法
CN114908914B (zh) * 2022-05-20 2023-11-21 江苏国鹏建工集团有限公司 Eps泡沫轻质填充体空心楼盖施工质量提高的方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US808951A (en) * 1905-03-06 1906-01-02 Lawrence Schuller Centering for arches.
US1461409A (en) * 1921-08-15 1923-07-10 Trucson Steel Company Steel form for concrete construction
US1928748A (en) * 1929-12-09 1933-10-03 Leonie S Young Concrete floor construction
FR1488413A (fr) * 1966-06-03 1967-07-13 Gustinelli Electro Plastique Dispositif de coffrage, notamment pour planchers
ES2013803A6 (es) * 1987-10-13 1990-06-01 Navarro Villarreal Jose Juan Encofrado autosustentable recuperable para losas sobre vigas prefabricadas.
KR100788740B1 (ko) * 2007-03-15 2007-12-26 (주) 콘스텍 행거를 이용한 다단의 슬라브 시공을 위한 데크의 결합구조

Family Cites Families (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2731824A (en) * 1956-01-24 hadley
DE346970C (de) * 1922-01-10 Peter Kaesberg Einrichtung zur Herstellung von Eisenbetondecken mit Hilfe einer Haengewerkruestung
US1690361A (en) * 1924-10-24 1928-11-06 Josephine B Bruce Beam form
US2344841A (en) * 1941-05-05 1944-03-21 Charles G Weber Concrete form
FR1136561A (fr) * 1955-11-14 1957-05-15 Plancher en béton armé avec coffrage léger autoporteur à profilés d'acier incorporés
JPS4933131B1 (es) * 1970-07-14 1974-09-05
JPS52101821A (en) * 1973-06-30 1977-08-26 Shiyoutarou Shimura Method of composite beam construction in method of assembly construction
US4211045A (en) * 1977-01-20 1980-07-08 Kajima Kensetsu Kabushiki Kaisha Building structure
US4387544A (en) * 1979-05-25 1983-06-14 Schilger Herbert K Reinforcing strips for pre-cast construction elements
US4685264A (en) * 1986-04-09 1987-08-11 Epic Metals Corporation Concrete slab-beam form system for composite metal deck concrete construction
JPH0745688Y2 (ja) * 1989-09-22 1995-10-18 レンゴー株式会社 スラブのコンクリート厚調整用ブロック
US5459967A (en) * 1994-02-10 1995-10-24 Bodtker; Carl E. Adjustable support structure
JPH08189125A (ja) * 1994-12-29 1996-07-23 Yaguchi Kenzai Kako Kk スラブの構築方法及びスラブ構造体
IN187663B (es) * 1995-02-28 2002-06-01 Andrea Mario Stodulka
US5657595A (en) * 1995-06-29 1997-08-19 Hexcel-Fyfe Co., L.L.C. Fabric reinforced beam and column connections
DE19826127A1 (de) * 1998-06-12 1999-12-16 Ioannis Vagias Betondecke für den Hochbau und Verfahren zu ihrer Herstellung
US6273393B1 (en) * 1998-12-31 2001-08-14 Mccoy David J. Concrete form support bracket and assembly
US7143554B2 (en) * 2000-08-15 2006-12-05 Sachs Melvin H Composite column and beam framing members for building construction
CA2358747C (en) * 2001-10-09 2006-04-25 Mike Strickland Ring beam/lintel system
US7147197B2 (en) * 2002-10-09 2006-12-12 Michael E. Dalton Concrete home building
CA2416644C (en) * 2003-01-20 2010-07-20 Paul Gillespie Concrete slab form system
JP4325316B2 (ja) * 2003-08-27 2009-09-02 株式会社大林組 コンクリート部材の補強構造及び補強方法
JP4801449B2 (ja) * 2006-01-18 2011-10-26 東急建設株式会社 コンクリート構造物の補強方法と補強構造。
US20080028719A1 (en) * 2006-02-27 2008-02-07 Rutledge Richard J Floor truss systems and methods
RU68545U1 (ru) * 2007-03-29 2007-11-27 Государственное образовательное учреждение высшего профессионального образования "Мордовский государственный университет им. Н.П. Огарева" Сборно-монолитное часторебристое перекрытие
DK176824B1 (da) * 2008-03-14 2009-11-02 Buildpod Internat Ltd Præfabrikeret, selvbærende bygningselement
US8484907B2 (en) * 2008-11-04 2013-07-16 Integrated Structures, Inc. Methods and apparatus for a building roof structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US808951A (en) * 1905-03-06 1906-01-02 Lawrence Schuller Centering for arches.
US1461409A (en) * 1921-08-15 1923-07-10 Trucson Steel Company Steel form for concrete construction
US1928748A (en) * 1929-12-09 1933-10-03 Leonie S Young Concrete floor construction
FR1488413A (fr) * 1966-06-03 1967-07-13 Gustinelli Electro Plastique Dispositif de coffrage, notamment pour planchers
ES2013803A6 (es) * 1987-10-13 1990-06-01 Navarro Villarreal Jose Juan Encofrado autosustentable recuperable para losas sobre vigas prefabricadas.
KR100788740B1 (ko) * 2007-03-15 2007-12-26 (주) 콘스텍 행거를 이용한 다단의 슬라브 시공을 위한 데크의 결합구조

Also Published As

Publication number Publication date
BR112012011919B1 (pt) 2019-07-02
KR20120089345A (ko) 2012-08-09
KR101870930B1 (ko) 2018-07-19
BR112012011919A2 (pt) 2017-10-10
RU2553813C2 (ru) 2015-06-20
CN102713106B (zh) 2015-06-10
US20130008114A1 (en) 2013-01-10
CL2012001285A1 (es) 2012-11-30
EP2503076B1 (en) 2017-12-27
WO2011062466A4 (es) 2011-11-10
RU2012125629A (ru) 2013-12-27
EP2503076A4 (en) 2014-03-12
JP5806676B2 (ja) 2015-11-10
US8910450B2 (en) 2014-12-16
PE20130029A1 (es) 2013-02-17
MX2009012586A (es) 2010-06-23
WO2011062466A2 (es) 2011-05-26
CN102713106A (zh) 2012-10-03
EP2503076A2 (en) 2012-09-26
ES2663354T3 (es) 2018-04-12
JP2013530322A (ja) 2013-07-25

Similar Documents

Publication Publication Date Title
WO2011062466A3 (es) Procedimiento y dispositivo para reforzar y aligerar el forjado de pisos y techos.
KR100667921B1 (ko) 프리캐스트콘크리트 가로보를 이용한 케이블교량의 주탑시공방법
CN107119574B (zh) 一种拱肋桥主梁的悬臂施工方法
CN203866982U (zh) 预制梁端节点构造
CN107849831B (zh) 用于使用预制底板和钢管混凝土桁架梁来顶推/建造桥梁的方法
CN105714684B (zh) 预应力混凝土变截面鱼腹式连续箱梁施工方法
WO2009011516A3 (en) Form with reinforcing bars, non-support form system and non-support construction method using the same
CN102587554B (zh) 跨度内应用钢筋180°弯锚连接的混凝土叠合板及连接方法
CN107905114B (zh) 一种特大跨径连续刚构拱桥的施工方法
WO2013009529A3 (en) Foundation system for bridges
CN101691742B (zh) 斜腿刚构桥背索平衡单边悬臂灌筑梁体的施工方法
CN109518858A (zh) 装配式梁板连接结构及其施工方法
EA201171077A1 (ru) Сборный строительный объект, который строят из сборных армоцементных элементов с ребрами по типу сэндвича, которые выливают в формах
CN114892552B (zh) 一种箱梁式桥梁改造施工方法
CN106436895A (zh) 一种钢剪结合装配式住宅建筑体系及其施工方法
CN102587555A (zh) 跨内应用钢筋180°弯锚及螺旋筋连接的叠合板及方法
CN110374234A (zh) 一种装配式墙体与建筑框架的空腔节点结构及施工方法
CN206220241U (zh) 一种钢剪结合装配式住宅建筑体系
CN209227824U (zh) 剪力墙与连梁的异形工字钢连接结构
CN101550724A (zh) 大跨度预应力后张纵横框架梁施工方法
CN202450676U (zh) 跨内应用钢筋180°弯锚及螺旋筋连接的叠合板
CN104562918B (zh) 自锚式悬索桥锚固跨现浇混凝土箱梁及其施工方法
CN109318363B (zh) 装配式建筑外墙板的制备方法及外墙自保温系统装配方法
CN105297892B (zh) 一种设有张拉钢筋的混凝土梁交叉连接结构的施工方法
CN207525962U (zh) 侧悬钢筋带抗剪键混凝土叠合楼板结构

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201080061646.0

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10831833

Country of ref document: EP

Kind code of ref document: A2

WWE Wipo information: entry into national phase

Ref document number: 000668-2012

Country of ref document: PE

WWE Wipo information: entry into national phase

Ref document number: 2012539831

Country of ref document: JP

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 4483/DELNP/2012

Country of ref document: IN

WWE Wipo information: entry into national phase

Ref document number: 2010831833

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 12101028

Country of ref document: CO

ENP Entry into the national phase

Ref document number: 20127016040

Country of ref document: KR

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 2012125629

Country of ref document: RU

WWE Wipo information: entry into national phase

Ref document number: 13511020

Country of ref document: US

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112012011919

Country of ref document: BR

ENP Entry into the national phase

Ref document number: 112012011919

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20120518