WO2011055195A1 - 建物の配電システム及びそれにおける幹線の保護方法 - Google Patents

建物の配電システム及びそれにおける幹線の保護方法 Download PDF

Info

Publication number
WO2011055195A1
WO2011055195A1 PCT/IB2010/002748 IB2010002748W WO2011055195A1 WO 2011055195 A1 WO2011055195 A1 WO 2011055195A1 IB 2010002748 W IB2010002748 W IB 2010002748W WO 2011055195 A1 WO2011055195 A1 WO 2011055195A1
Authority
WO
WIPO (PCT)
Prior art keywords
building
main line
power supply
storage battery
power
Prior art date
Application number
PCT/IB2010/002748
Other languages
English (en)
French (fr)
Inventor
善一 鹿田
小新 博昭
Original Assignee
パナソニック電工株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニック電工株式会社 filed Critical パナソニック電工株式会社
Priority to CN2010800502046A priority Critical patent/CN102640376A/zh
Priority to US13/508,190 priority patent/US20120236455A1/en
Priority to EP10827978A priority patent/EP2498361A1/en
Publication of WO2011055195A1 publication Critical patent/WO2011055195A1/ja

Links

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/48Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Definitions

  • the present invention relates to a power distribution system for buildings such as apartment houses and rental houses, and a trunk line protection method in such a power distribution system.
  • Patent Document 1 Japanese Unexamined Patent Application Publication No. 2 0 0 8-1 7 8 2 7 5
  • Patent Document 2 Japanese Unexamined Patent Publication No. 2 0 0 9-1 2 4 8 4 6
  • the present invention has been made in view of such circumstances, and it is possible to suitably prevent an overcurrent of the main line without interrupting the power supply, and protection of the main line in the building power distribution system. Provide a method.
  • a current sensor that detects a current value of a current flowing from a commercial AC power source to a trunk line in a building, and a storage battery installed in the building, and the current sensor detects
  • a building power distribution system is provided that starts supplying power from the storage battery to the building when the current value reaches a predetermined value.
  • the power distribution system further includes overcurrent protection means, each of the buildings is composed of a plurality of areas each provided with a power supply system, and the overcurrent protection means is a trunk line whose current value detected by the current sensor is defined. When the protection start current value is exceeded, power supply from the storage battery to the building is started to protect the trunk line in the building from overcurrent.
  • the main line protection control is activated and the power supply from the storage battery installed in the building is started. Become.
  • power supply from the storage battery is started in this way, a part of the power previously supplied by the power supply from the commercial AC power source is supplied by the power supply from the storage battery, and the current flowing from the commercial AC power source to the main line Will be reduced.
  • the reduction in the power supply of the commercial AC power supply at this time is compensated for by the power supply from the storage battery, the same power supply amount as before the activation can be maintained after the activation of the protection control.
  • the overcurrent of the main line can be suitably prevented without interrupting the power supply.
  • the storage battery may be provided on the opposite side of the main line from the commercial AC power supply side, and the overcurrent protection unit may disclose power supply from the storage battery to the main line in the building.
  • the protection control of the main line is activated, and the storage battery connected to the opposite side of the main line from the commercial AC power source to the main line A current flows.
  • the power supply from the storage battery is started in this way, the current that flows from the commercial AC power supply to the main line is such that part of the power previously supplied by the power supply from the commercial AC power supply is supplied by the power supply from the storage battery. Will be reduced.
  • the reduction in the power supply of the commercial AC power supply at this time is compensated by the power supply from the storage battery, the same power supply amount as before the activation can be maintained after the activation of the protection control. Therefore, according to the above configuration, the overcurrent of the main line can be suitably prevented without interrupting the power supply.
  • the storage battery may be provided in each of the regions, and the overcurrent protection unit may disclose power supply from the storage battery to the main line in the building.
  • the main line protection control is activated and power supply from the storage battery installed in the tenant wall of the dwelling unit in the building is started. Become so.
  • the power supply from the storage battery is started in this way, a part of the power previously supplied by the current supply from the commercial AC power supply will be supplied by the current supply from the storage battery.
  • the flowing current is reduced.
  • the reduction in the current supply of the commercial AC power supply at this time is compensated by the current supply from the storage battery, the same amount of power supply as before the activation can be maintained after the activation of the protection control. Therefore, according to the above configuration, the overcurrent of the main line can be suitably prevented without interrupting the power supply.
  • a storage battery current sensor that detects a current value supplied by the storage battery, and a sum of current values detected by the current sensor and the storage battery current sensor is a specified trunk protection release current. And release means for releasing power supply from the storage battery by the protection means when the value becomes less than or equal to the value.
  • the storage battery After the start of power supply from the storage battery, if the sum of the current value supplied by the commercial AC power supply and the current value supplied by the storage battery falls below the specified trunk protection release current value, the storage battery returns to the main line. The supply of current is released. Therefore, after confirming that the power supply from the commercial AC power supply does not become excessive even if the power supply from the storage battery is canceled, It becomes possible to cancel the protection control of the trunk line by supplying power. If it is desired to avoid the occurrence of overcurrent after recovery from protection control, it is desirable to set the trunk protection release current value to be equal to or less than the trunk protection start current value.
  • a certain amount of difference may be set between the main line protection start current value and the main line protection release current value.
  • a method for protecting the trunk line from overcurrent in a building distribution system that distributes power to each floor of the building through a trunk line wired through each floor of the building.
  • a step of detecting a current value of a current flowing from the commercial AC power source to the main line, and when the detected current value exceeds a specified main line protection start current value, the storage battery installed in the building Providing a method of protecting the main line from overcurrent in a building distribution system that protects the main line from overcurrent through starting power supply.
  • the main line protection control is activated and the power supply from the storage battery installed in the building is started.
  • FIG. 1 is a block diagram schematically showing an overall configuration of a power distribution system according to an embodiment of the present invention.
  • FIG. 2 is a block diagram schematically showing a configuration of a power supply system installed in each dwelling unit of the apartment house in the same embodiment.
  • FIG. 3 is a block diagram schematically showing the configuration of an integrated control unit in the same embodiment.
  • FIG. 4 is a block diagram schematically showing the configuration of a storage battery control unit in the same embodiment.
  • FIG. 5 is a block diagram schematically showing the configuration of an AC distribution board and a home control unit in the same embodiment.
  • FIG. 6 is a flowchart showing the processing procedure of the overall control unit in the main line protection control routine employed in the embodiment.
  • FIGS. 1-10 a first embodiment that embodies a power distribution system for buildings and a trunk line protection method in the power distribution system for buildings according to the present invention will be described in detail with reference to FIGS.
  • the present invention is described as being applied to an apartment house composed of a plurality of houses.
  • the present invention is not limited to this, for example, a plurality of layers each provided with a power supply system or the same. This also applies to buildings with multiple areas in the strata.
  • Figure 1 shows the schematic configuration of the building power distribution system according to this embodiment.
  • a trunk line 50 wired through each layer is provided. From the main line 50, distribution lines are branched on each floor and connected to the AC distribution board 11 of each dwelling unit 101.
  • a trunk breaker 51 is installed at the introduction part of the trunk 50 into the building to cut off the current when the current flowing through the trunk 50 may exceed the rated current.
  • a current sensor 52 for monitoring the current value of the current flowing from the commercial AC power source to the main line 50 is provided in the introduction part of the main line 50.
  • the detection signal of the current sensor 52 is input to the general control unit 53 that controls the power distribution of the entire housing complex 100.
  • a storage battery 55 is connected to an end portion of the main line 50 (for example, the uppermost layer portion in the present embodiment) via an A CZ D C converter 54.
  • the A CZ D C converter 54 is controlled by a storage battery control unit 56, and the storage battery 55 is charged and discharged through this control.
  • FIG. 2 shows a schematic configuration of a power supply system installed in each dwelling unit 100 of the apartment house 100.
  • each dwelling unit 1 0 1 of the apartment house 1 0 0 has a power supply that supplies power to various devices installed in the house (lighting equipment, air conditioner, home appliance, audio and video equipment, etc.) System 1 is provided.
  • the power supply system 1 uses a commercial AC power supply (AC power supply) supplied from the main line 50 as power to operate various devices, and also uses a reverse reaction to water electrolysis to generate electricity 3
  • the generated power is supplied to various devices as a power source.
  • the power supply system 1 has an AC power supply (A Power is also supplied to AC equipment 6 that operates by inputting (C power).
  • the power supply system 1 is provided with a home control unit 7 and a DC distribution board (built-in DC breaker) 8.
  • the power supply system 1 is provided with a control unit 9 and a release unit 10 as devices for controlling the operation of the DC device 5 of the dwelling unit.
  • the AC distribution board 11 for branching the AC power supply is connected to the home control unit 7 via the AC power line 12.
  • the in-home control unit 7 is connected to the commercial AC power source 2 via the AC distribution board 11 and also connected to the fuel cell 3 via the DC power line 13.
  • the home control unit 7 takes in AC power from the AC distribution board 11 1 and also takes direct power from the fuel cell 3 and converts these powers into predetermined DC power as a device power source. Then, the home control unit 7 outputs the converted DC power to the DC distribution board 8 via the DC power line 14 or to the storage battery 16 via the DC power line 15. To store the same power.
  • the home control unit 7 can not only take AC power from the AC distribution board 1 1 but also convert the DC power of the fuel cell 3 and storage battery 16 to AC power and supply it to the AC distribution board 1 1 Noh.
  • the home control unit 7 exchanges data with the DC distribution board 8 via the signal line 17.
  • the DC distribution board 8 is a type of breaker that supports DC power.
  • the DC distribution board 8 branches the DC power input from the home ⁇ control unit 7 and outputs the DC power after the branch to the control unit 9 via the DC power line 1 8 or the DC power line 1 9 or output to the reunit 10 through the 9. Further, the DC distribution board 8 exchanges data with the control unit 9 via the signal line 20 and exchanges data with the relay unit 10 via the signal line 21.
  • a plurality of DC devices 5 are connected to the control unit 9. These DC devices 5 are connected to a control unit 9 via a DC supply line 22 that can carry both DC power and data by a pair of wires.
  • the DC supply line 2 2 is a so-called power line carrier communication that superimposes a communication signal for transmitting re-data by a high-frequency carrier wave on a direct-current voltage serving as a power source for DC equipment. Both are transported to DC equipment 5.
  • the control unit 9 acquires the DC power source of the DC device 5 through the DC system power line 1 8 and determines which DC device 5 is based on the operation command obtained from the DC distribution board 8 through the signal line 20. Know how to control. Then, the control unit 9 outputs a DC voltage and an operation command to the instructed DC device 5 through the DC supply line 22, and controls the operation of the DC device 5.
  • the control unit 9 is connected to a switch 2 3 that is operated when switching the operation of the DC device 5 in the home via the DC supply line 2 2.
  • the control unit 9 is connected to a sensor 24 for detecting a radio wave transmitted from, for example, an infrared remote controller via a DC supply line 22. Therefore, not only the operation instruction from the DC distribution board 8, but also the operation of the switch 23 and the detection of the sensor 24, the communication signal is sent to the DC supply line 22 and the DC device 5 is controlled.
  • a plurality of DC devices 5 are connected to the relay unit 10 via individual DC power lines 25, respectively.
  • Relay unit 10 acquires the DC power supply of DC device 5 through DC power line 19 and operates which DC device 5 based on the operation command obtained from DC distribution board 8 through signal line 21. To figure out.
  • the relay unit 10 controls the operation of the DC device 5 by turning on / off the power supply to the DC power line 25 with the built-in relay for the instructed DC device 5. Also, the relay unit 10 is connected to a plurality of switches 26 for manual operation of the DC device 5, and the power supply to the DC power line 25 can be released by operating the switches 26. The DC device 5 is controlled by turning on and off.
  • a wall outlet or a floor outlet is connected to the DC distribution board 8 through a DC power line 2 8. If a DC device plug (not shown) is inserted into the DC outlet 27, DC power can be supplied directly to the device.
  • an electric power meter 29 capable of remotely measuring the usage amount of the commercial AC power source 2 is connected.
  • the power meter 29 has not only the function of remote meter reading of commercial power consumption, but also functions of power line carrier communication and wireless communication, for example.
  • the power meter 29 sends the meter reading result to an electric power company or the like via power line carrier communication or wireless communication.
  • the power supply system 1 is provided with a network system 30 that enables various devices in the home to be controlled by network communication.
  • the network system 30 is provided with a home server 31 as a control unit of the system 30.
  • the home server 3 1 is connected to a management server 3 2 outside the home via a network N such as the Internet, and is connected to the home equipment 3 4 via a signal line 33.
  • the in-home server 31 operates using DC power acquired from the DC distribution board 8 via the DC power line 35 as a power source.
  • a control box 36 that manages operation control of various devices in the home through network communication is connected to the home server 31 via a signal line 37.
  • the control box 36 is connected to the home control unit 7 and the DC distribution board 8 via the signal line 17 and can directly control the DC device 5 via the DC supply line 38.
  • a gas / water meter 39 that can remotely measure the amount of gas and water used is connected to the control box 36, and also connected to the operation panel 40 of the network system 30.
  • the operation panel 40 is connected to a monitoring device 41 including, for example, a door phone slave, a sensor, and a camera.
  • the control box 3 6 When the in-home server 3 1 inputs an operation command for various devices in the home via the network N, the control box 3 6 notifies the control box 3 6 of the instruction so that the various devices operate in accordance with the operation command. To work.
  • the in-house server 3 1 can provide various information acquired from the gas and water meter 39 to the management server 32 via the network N, and that the monitoring device 41 has detected an abnormality. When accepted from the operation panel 40, this is also provided to the management server 32 via the network N.
  • the integrated control unit 53 By the way, as described above, in the apartment house 100 where such a power supply system 1 is provided in each dwelling unit 100, the entire power distribution control is performed by the integrated control unit 53.
  • Figure 3 shows the configuration of such an integrated control unit 53.
  • the integrated control unit 53 includes a main current monitoring unit 57 that monitors the current value of the introduction part of the main line 50 detected by the current sensor 52.
  • the integrated control unit 53 also includes a current level determination unit 58 that determines whether the current value of the introduction part of the main line 50 is excessive, and the home control of each dwelling unit 1 0 1 based on the determination result.
  • a transmitter 5 9 for transmitting a command signal to the unit 7.
  • FIG. 4 shows the configuration of the storage battery control unit 56 that controls the storage battery 55 connected to the opposite side of the commercial AC power supply side of the main line 50.
  • the storage battery control unit 56 controls the operation of the receiving unit 60 that receives the command signal from the general control unit 53 and the operation of the A CZ DC converter 54 based on the received command signal.
  • a control unit 61 controls the operation of the home control unit 7 and the AC distribution board 11 provided in each dwelling unit 101.
  • the AC distribution board 11 includes a main breaker 6 2 and a plurality of branch breakers 6 3.
  • the main breaker 62 is a circuit breaker that cuts off the connection between the main line 50 and the power supply system 1 when the current supplied from the main line 50 becomes excessive.
  • the branch breaker 63 is a circuit breaker that cuts off the power supply to each AC load installed in the house as needed.
  • AC load refers to various AC electrical equipment installed in the home, such as lighting equipment, air conditioners, home appliances, audio visual equipment, etc.
  • the home control unit 7 includes a receiving unit 70 that receives a command signal from the general control unit 53 and a control unit 71.
  • the control unit 71 controls the operation of each load 64 in the home based on the command signal received by the receiving unit 70.
  • the control unit 71 controls the operation of the ACZ DC converter 72 and hence the charging / discharging of the storage battery 16 based on the command signal received by the receiving unit 70.
  • the main line protection control for protecting the main line 50 from the overcurrent is activated. It has become.
  • the trunk line protection control is performed by starting the power supply from the storage battery 55 connected to the opposite side of the commercial AC power supply side of the trunk line 50 and the storage battery 16 provided in each dwelling unit 101. It has become.
  • FIG. 6 shows the processing procedure of the main line protection control routine adopted by this embodiment. The processing of this routine is repeatedly executed by the overall control unit 53.
  • the integrated control unit 53 first receives the current value detected by the current sensor 52 provided in the introduction part of the trunk line 50 in step S100. Then, in step S 1 0 1, the total control unit 53 is the current value of the current sensor 5 2. Confirm that is equal to or greater than the first specified value.
  • the first predetermined value is set to, for example, a current value of 80% of the breaking current of main line breaker 51.
  • step S 1 0 2 If the current value of the current sensor 52 is not equal to or greater than the first predetermined value (S 1 0 1: NO), the overall control unit 5 3 proceeds to step S 1 0 2, and in step S 1 0 2, A power supply stop signal is transmitted to the control unit 7 and the storage battery control unit 5 6. Then, after outputting the power supply stop signal, the overall control unit 53 returns to the process of step S 100.
  • the home control unit 7 and the storage battery control unit 5 6 receive the power supply stop signal from the storage batteries 1 6 and 5 5, they stop the power supply from the storage batteries 1 6 and 5 5, if any. .
  • step S 1 0 3 the overall control unit 5 3 proceeds to step S 1 0 3 and proceeds to step S 1 0 3 In step 5, whether or not the current value of the current sensor 52 is equal to or greater than the second predetermined value.
  • the second predetermined value for example, a current value of 90% of the breaking current of main circuit breaker 51 is set to that value.
  • this step S 1 0 3 corresponds to the step of monitoring the current value of the current flowing from the commercial AC power source to the main line 50.
  • the second predetermined value corresponds to the trunk line protection start current value defined above.
  • the overall control unit 5 3 returns to the process of step S 1 0 0 as it is.
  • step S 1 0 4 corresponds to the following steps. That is, this step S 1 0 4 corresponds to each of the following steps.
  • step S 1 0 3 On the condition that the current value monitored in step S 1 0 3 exceeds the specified main line protection start current value, storage batteries 1 6 and 5 5 installed in the building (collective housing 1 0 0) The step of starting the power supply.
  • step S 1 0 3 On the condition that the current value monitored in step S 1 0 3 exceeds the specified main line protection start current value, the battery 5 5 connected to the opposite side of the commercial AC power supply side of the main line 50 to the main line 50 Starting power supply;
  • the apartment house 100 has a configuration corresponding to the above building.
  • the integrated control unit 53 performs the processing performed by the protection means. It is the composition to do.
  • the building power distribution system of the present embodiment commercial AC power is distributed to each floor through the trunk line 50 that is wired through each floor of the apartment house 100.
  • the building power distribution system according to the present embodiment includes a current sensor 5 2 that detects a current value flowing from the commercial AC power source to the main line 50 2, and storage batteries 1 6 and 5 5 installed in the apartment house 1 0 0. It is equipped with.
  • the integrated control unit 53 starts the power supply from the storage batteries 16 and 55 to the housing complex 100 when the current value detected by the current sensor 52 exceeds the specified main line protection start current value.
  • the main line 50 is protected from overcurrent.
  • the integrated control unit 53 starts to supply power to the main line 50 from the storage battery 55 connected to the opposite side of the main line 50 from the commercial AC power supply side. I have to.
  • the general control unit 53 starts to supply power from the storage battery 16 provided in each dwelling unit 100 to the main line 50.
  • power supply from storage batteries 1 6 and 5 5 is started in this way, a part of the power previously supplied by power supply from the commercial AC power supply will be supplied by power supply from storage batteries 1 6 and 5 5 Thus, the current flowing from the commercial AC power source to the main line 50 is reduced.
  • the first step is a step of monitoring the current value of the current flowing from the commercial AC power source to the main line 50.
  • the second step is also based on the assumption that the current value monitored in the first step exceeds the specified main line protection start current value, from the storage batteries 1 6 and 5 5 installed in the apartment house 1 0 0. This is the step to start the power supply to 100. More specifically, in the second step, power supply from the storage battery 55 connected to the side opposite to the commercial AC power supply side of the main line 50 to the main line 50 is started. In the second step, power supply from the storage battery 16 installed in each dwelling unit 101 is also started.
  • the present embodiment is the same as the first embodiment except for the condition of stopping power supply from the storage batteries 16 and 55 for protecting the main line 50.
  • the current value of the introduction part of the main line 50 detected by the current sensor 52 is the first predetermined value set to the current value of 80% of the breaking current of the main line breaker 51.
  • the power supply from the storage batteries 16 and 55 for protection of the main line 50 was stopped on condition that In this case, if the power supply from the storage batteries 1 6 and 5 5 is stopped, the current value of the main line 50 will rise again, and the power supply from the storage batteries 1 6 and 5 5 must be resumed. there is a possibility. Therefore, in the present embodiment, it is confirmed that even if the power supply from the storage batteries 1 6 and 5 5 is canceled, the power supply from the commercial AC power supply does not become excessive, and then the main line by the power supply from the storage battery is used. The protection control is released.
  • each of the storage batteries 1 6 and 5 5 is provided with a current sensor (another current sensor) that detects the current value supplied from the storage batteries 1 6 and 5 5. Yes.
  • the sum of the current value of the current sensor 1 that detects the current values of the storage batteries 1 6 and 5 5 and the current value of the introduction part of the main line 50 detected by the current sensor 52 is the prescribed main line protection release current value.
  • the power supply from the storage batteries 1 6 and 5 5 is canceled when the following occurs.
  • the main line protection release current value here is set to a current value smaller than the second predetermined value. Therefore, even if the power supply from the storage batteries 16 and 55 is stopped, the current flowing through the introduction part of the main line 50 is surely below the second predetermined value.
  • the release of power supply from the storage batteries 16 and 5 5 in the above aspect is performed based on a command from the general control unit 53. Therefore, in this embodiment, when the total control unit 53 detects that the sum of the current values detected by the current sensor and the other current sensors is equal to or less than the specified trunk protection release current value, the storage battery by the protection means This is equivalent to the release means for releasing the power supply from the power supply.
  • the present embodiment it is set so that there is a certain amount of difference between the main line protection start current value (second predetermined value) and the main line protection release current value. Therefore, after the start of power supply from storage batteries 1 6 and 5 5, the sum of the current value supplied by the commercial AC power supply and the current value supplied by storage batteries 1 6 and 5 5 is less than the main line protection start current value. The power supply of the storage batteries 1 6 and 5 5 will not be stopped unless it is sufficiently lowered. Therefore, protection control hunting can be suitably prevented from restarting protection control of the trunk line 50 immediately after the protection control of the trunk line 50 is released.
  • a certain amount of hysteresis is provided between the main line protection start current value (second default value) and the main line protection release current value.
  • second default value main line protection start current value
  • main line protection release current value main line protection release current value
  • the storage battery 55 connected to the opposite side of the main line 50 from the commercial AC power supply side, and each dwelling unit 10 The power supply from both storage batteries 1 and 6 installed in 1 was started.
  • the protection control of the main line 50 may be performed only by supplying power from either the storage battery 55 or the storage battery 16. In the case where the main line 50 is protected only by the storage battery 16 provided in each dwelling unit 101, the storage battery 55, the storage battery control unit 56, etc. may be omitted. When the main line 50 is protected only by the storage battery 55, it is not necessary to provide the storage battery 16 in each dwelling unit 101.
  • the present invention is applied to an apartment house 1 0 0 has been described.
  • the power distribution system and the trunk line protection method of the present invention are also applied to a building other than an apartment house such as a rental house. Can do.
  • the present invention can be applied to any distribution system that distributes power to each floor through a trunk line that runs through each area of the building.

Abstract

商用交流電源から建物内の幹線に流れる電流の電流値を検出する電流センサーと、前記建物に設置された蓄電池と、を有し、前記電流センサーの検出する電流値が所定値に達すると前記蓄電池から前記建物内への電力供給を開始する建物の配電システムが提供される。また、前記配電システムは、過電流保護手段を更に備え、前記建物はそれぞれ電力供給システムの設けられた複数の領域からなり、前記過電流保護手段は前記電流センサーの検出する電流値が規定の幹線保護開始電流値を上回るときに前記蓄電池から前記建物内への電力供給を開始することで前記建物内の幹線を過電流から保護する。

Description

明細書 建物の配電システム及びそれにおける幹線の保護方法 技術分野
本発明は、 共同住宅や賃貸住宅のような建物の配電システム及びそうした配電システム における幹線の保護方法に関するものである。 背景技術
特許文献 1、 2に見られるように、 マンションやテナント建物のような建物では、 各フ ロアを貫いて配線された幹線を通じて各住戸ゃ各テナン卜への配電が行われている。 幹線 からは、 各階において配電線が分岐されており、 その配電線を通じて各住戸や各テナント への配電が行われるようになつている。
【特許文献 1】 日本特開 2 0 0 8— 1 7 8 2 7 5号公報
【特許文献 2】 日本特開 2 0 0 9— 1 2 4 8 4 6号公報
こうした建物の配電システムでは、 建物全体の消費電力が高まると幹線の電流が過大と なって、 その定格電流を上回ってしまう虞がある。 幹線の電流が定格電流を上わると、 建 物に設けられたブレーカーの一部を落して電力供給を遮断することで、 幹線を過電流から 保護することになる。 しかしながら、 それでは、 電力供給の遮断された部位では、 復旧ま で電気を使えないことになリ、 住人に不便を感じさせることになる。 発明の概要
本発明は、 こうした実情に鑑みてなされたものであって、 電力供給を途切れさせること なく、 幹線の過電流を好適に防止することのできる建物の配電システム及び建物の配電シ ステムにおける幹線の保護方法を提供する。
本発明の第一の側面によると、 商用交流電源から建物内の幹線に流れる電流の電流値を 検出する電流センサーと、 前記建物に設置された蓄電池と、 を有し、 前記電流センサーの 検出する電流値が所定値に達すると前記蓄電池から前記建物内への電力供給を開始する建 物の配電システムが提供される。 また、 前記配電システムは過電流保護手段を更に備え、 前記建物はそれぞれ電力供給システムの設けられた複数の領域からなリ、 前記過電流保護 手段は前記電流センサーの検出する電流値が規定の幹線保護開始電流値を上回るときに前 記蓄電池から前記建物内への電力供給を開始することで前記建物内の幹線を過電流から保 護する。
上記構成では、 商用交流電源から幹線に流れる電流が幹線保護開始電流値を上回ると、 幹線の保護制御が発動して、 ビルに設置された蓄電池からの電力供給が開始されるように なる。 こうして蓄電池からの電力供給を開始すると、 それまで商用交流電源からの電力供 給で賄われていた電力の一部が蓄電池からの電力供給で賄われるようになり、 商用交流電 源から幹線に流れる電流が低減されるようになる。 しかも、 このときの商用交流電源の電 力供給の低減分は、 蓄電池からの電力供給で埋め合わされるため、 保護制御の発動後もそ の発動前と同様の電力供給量を維持することができる。 したがって上記構成によれば、 電 力供給を途切れさせることなく、幹線の過電流を好適に防止することができるようになる。 前記蓄電池は、 前記幹線の商用交流電源側の反対側に設けられ、 前記過電流保護手段は 前記蓄電池から前記建物内の幹線への電力供給を開示することにしてもいい。
上記構成では、 商用交流電源から幹線に流れる電流が幹線保護開始電流値を上回ると、 幹線の保護制御が発動して、 幹線の商用交流電源側の反対側に接続された蓄電池から幹線 に対して電流が流されるようになる。 こうして蓄電池からの電力供給を開始すると、 それ まで商用交流電源からの電力供給で賄われていた電力の一部が蓄電池からの電力供給で賄 われるようになリ、商用交流電源から幹線に流れる電流が低減されるようになる。しかも、 このときの商用交流電源の電力供給の低減分は、 蓄電池からの電力供給で埋め合わされる ため、 保護制御の発動後もその発動前と同様の電力供給量を維持することができる。 した がって上記構成によれば、 電力供給を途切れさせることなく、 幹線の過電流を好適に防止 することができるようになる。
また、 前記蓄電池は、 前記各領域に設けられ、 前記過電流保護手段は前記蓄電池から前 記建物内の幹線への電力供給を開示することも可能である。
上記構成では、 商用交流電源から幹線に流れる電流が幹線保護開始電流値を上回ると、 幹線の保護制御が発動して、 ビル内の住戸ゃテナン卜に設置された蓄電池からの電力供給 が開始されるようになる。 こうして蓄電池からの電力供給が開始されると、 それまで商用 交流電源からの電流供給で賄われていた電力の一部が蓄電池からの電流供給で賄われるよ うになリ、 商用交流電源から幹線に流れる電流が低減されるようになる。 しかも、 このと きの商用交流電源の電流供給の低減分は、 蓄電池からの電流供給で埋め合わされるため、 保護制御の発動後もその発動前と同様の電力供給量を維持することができる。 したがって 上記構成によれば、 電力供給を途切れさせることなく、 幹線の過電流を好適に防止するこ とができるようになる。
また、 前記建物の配電システムにおいて、 前記蓄電池の供給する電流値を検出する蓄電 池電流センサ一と、 前記電流センサ一と前記蓄電池電流センサ一が検出した電流値の総和 が規定の幹線保護解除電流値以下となったときに、 前記保護手段による前記蓄電池からの 電力供給を解除する解除手段と、 を更に備えてもいい。
上記構成では、 蓄電池からの電力供給の開始後に、 商用交流電源の供給する電流値と蓄 電池の供給する電流値との総和が規定の幹線保護解除電流値以下となると、 蓄電池から前 記幹線への電流の供給が解除されるようになる。 そのため、 蓄電池からの電力供給を解除 しても、 商用交流電源からの電力供給が過大とならないことを確認した上で、 蓄電池から の電力供給による幹線の保護制御を解除することが可能となる。 なお、 保護制御からの復 帰後の過電流の発生を確実に回避したいのであれば、 幹線保護解除電流値は、 上記幹線保 護開始電流値以下に設定することが望ましい。
前記幹線保護開始電流値と前記幹線保護解除電流値との間には、 一定量の差が設定され てもいい。
上記構成では、 幹線保護開始電流値と幹線保護解除電流値との間に一定量の差を設定し ている。 そのため、 蓄電池からの電力供給の開始後に、 商用交流電源の供給する電流値と 蓄電池の供給する電流値との総和が上記幹線保護開始電流値よリも十分低下してからでな いと、 蓄電池から前記幹線への電流の供給が解除されないようになる。 そのため、 保護制 御のハンチングを、 すなわち幹線の保護制御の解除後、 直ちに幹線の保護制御が再開され ることを好適に防止することができるようになる。
本発明の第二の側面によると、 建物の各フロアを貫いて配線された幹線を通じて前記建 物の各フロアへの配電を行う建物の配電システムにおける前記幹線を過電流から保護する 方法であって、 商用交流電源から前記幹線に流れる電流の電流値を検出するステップと、 前記検出された電流値が規定の幹線保護開始電流値を上回る場合、 前記建物に設置された 蓄電池から前記建物内への電力供給を開始するステップと、 を通じて前記幹線を過電流か ら保護する建物の配電システムにおける過電流からの幹線の保護方法が提供される。 上記保護方法では、 商用交流電源から幹線に流れる電流が幹線保護開始電流値を上回る と、 幹線の保護制御が発動して、 ビルに設置された蓄電池からの電力供給が開始されるよ うになる。 こうして蓄電池からの電力供給を開始すると、 それまで商用交流電源からの電 力供給で賄われていた電力の一部が蓄電池からの電力供給で賄われるようになり、 商用交 流電源から幹線に流れる電流が低減されるようになる。 しかも、 このときの商用交流電源 の電力供給の低減分は、 蓄電池からの電力供給で埋め合わされるため、 保護制御の発動後 もその発動前と同様の電力供給量を維持することができる。 したがって上記保護方法によ れば、 電力供給を途切れさせることなく、 幹線の過電流を好適に防止することができるよ うになる。 図面の簡単な説明
本発明の目的及び特徴は以下のような添付図面を参照する以後の好ましい実施例の説明 により明確になる。
【図 1】 本発明の一実施形態についてその配電システムの全体構成を模式的に示すブ ロック図。
【図 2】 同実施形態において集合住宅の各住戸に設置される電力供給システムの構成 を模式的に示すブロック図。
【図 3】 同実施形態における総合制御ュニッ卜の構成を模式的に示すブロック図。 【図 4】 同実施形態における蓄電池制御ュニットの構成を模式的に示すブロック図。 【図 5】 同実施形態における A C分電盤及び宅内制御ュニッ卜の構成を模式的に示す ブロック図。
【図 6】 同実施形態に採用される幹線保護制御ルーチンにおける総合制御ュニッ卜の 処理手順を示すフローチヤ一ト。
発明を実施するための形態
以下、 本発明の実施形態が本明細書の一部を成す添付図面を参照してより詳細に説明す る。 図面全体において同一又は類似する部分については同一参照符号を付して説明を省略 する。
(第 1の実施の形態)
以下、 本発明の建物の配電システム及び建物の配電システムにおける幹線の保護方法を 具体化した第 1の実施の形態を、 図 1〜図 6を参照して詳細に説明する。 以下の説明にお いては、 本願発明が複数の住宅からなる集合住宅に適用されたものとして説明されるが、 これに限定されず、 例えば、 電力供給システムがそれぞれ設けられた複数の層又は同層内 の複数の領域を備える建物などにも適用される。
図 1に、 本実施の形態に係る建物の配電システムの概略的な構成を示す。
同図に示す集合住宅 1 0 0には、 例えば各層を貫いて配線された幹線 5 0が設けられて いる。 幹線 5 0からは、 各フロアにおいて配電線が分岐されており、 各住戸 1 0 1の A C 分電盤 1 1に接続されている。 また幹線 5 0の建物内への導入部には、 幹線 5 0を流れる 電流が定格電流を超える虞のあるときに電流を遮断する幹線ブレーカー 5 1が設置されて いる。
更に幹線 5 0の導入部には、 商用交流電源から幹線 5 0へと流れる電流の電流値を監視 する電流センサ一 5 2が設けられている。 電流センサ一 5 2の検出信号は、 集合住宅 1 0 0全体の配電制御を司る総合制御ュニット 5 3に入力されている。
一方、 幹線 5 0の末端部 (例えば、 本実施形態では最上層部) には、 A CZ D Cコンパ ータ一 5 4を介して蓄電池 5 5が接続されている。 A CZ D Cコンバータ一 5 4は、 蓄電 池制御ュニット 5 6により制御されており、 その制御を通じて蓄電池 5 5の充放電が行わ れるようになっている。
図 2は、 集合住宅 1 0 0の各住戸1 0 1に設置される電力供給システムの概略構成を示 している。
同図 2に示すように、 集合住宅 1 0 0の各住戸1 0 1には、 宅内に設置された各種機器 (照明機器、 エアコン、 家電、 オーディオ及びビデオ機器等) に電力を供給する電力供給 システム 1が設けられている。 電力供給システム 1は、 幹線 5 0より供給された商用交流 電源 (A C電源) を電力として各種機器を動作させる他に、 水の電気分解と逆の反応を利 用して発電を行う燃料電池 3の発電した電力も各種機器に電源として供給する。 電力供給 システム 1は、直流電源(D C電源) を入力して動作する D C機器 5の他に、交流電源(A C電源) を入力して動作する A C機器 6にも電力を供給する。
電力供給システム 1には、 宅内制御ユニット 7及び D C分電盤 (直流ブレーカ内蔵) 8 が設けられている。 また、 電力供給システム 1には、 住戸の D C機器 5の動作を制御する 機器として制御ュニット 9及びリレ一ュニット 1 0が設けられている。
宅内制御ュニット 7には、 交流電源を分岐させる A C分電盤 1 1が交流系電力線 1 2を 介して接続されている。 宅内制御ユニット 7は、 この A C分電盤 1 1を介して商用交流電 源 2に接続されるとともに、 直流系電力線 1 3を介して燃料電池 3に接続されている。 宅 内制御ユニット 7は、 A C分電盤 1 1から交流電力を取り込むとともに燃料電池 3から直 流電力を取り込み、 これら電力を機器電源として所定の直流電力に変換する。 そして、 宅 内制御ュニット 7は、 この変換後の直流電力を、 直流系電力線 1 4を介して D C分電盤 8 に出力したり、 又は直流系電力線 1 5を介して蓄電池 1 6に出力して同電力を蓄電したり する。 宅内制御ユニット 7は、 A C分電盤 1 1から交流電力を取り込むのみならず、 燃料 電池 3や蓄電池 1 6の直流電力を交流電力に変換して A C分電盤 1 1に供給することも可 能である。 宅内制御ュニット 7は、 信号線 1 7を介して D C分電盤 8とデータやり取りを 実行する。
D C分電盤 8は、 直流電力対応の一種のブレーカである。 D C分電盤 8は、 宅 Λ制御ュ ニット 7から入力した直流電力を分岐させ、 その分岐後の直流電力を、 直流系電力線 1 8 を介して制御ュニット 9に出力したり、 直流系電力線 1 9を介してりレ一ュニット 1 0に 出力したりする。 また、 D C分電盤 8は、 信号線 2 0を介して制御ユニット 9とのデータ のやり取りをしたり、 信号線 2 1を介してリレ一ュニット 1 0とのデータのやり取りをし たりする。
制御ユニット 9には、 複数の D C機器 5が接続されている。 これら D C機器 5は、 直流 電力及びデータの両方を 1対の線によって搬送可能な直流供給線路 2 2を介して制御ュニ ット 9と接続されている。 直流供給線路 2 2は、 D C機器の電源となる直流電圧に、 高周 波の搬送波によリデータを電送する通信信号を重畳する、いわゆる電力線搬送通信によリ、 1対の線で電力及びデータの両方を D C機器 5に搬送する。 制御ユニット 9は、 直流系電 力線 1 8を介して D C機器 5の直流電源を取得し、 D C分電盤 8から信号線 2 0を介して 得る動作指令を基に、 どの D C機器 5をどのように制御するのかを把握する。 そして、 制 御ュニット 9は、 指示された D C機器 5に直流供給線路 2 2を介して直流電圧及び動作指 令を出力し、 D C機器 5の動作を制御する。
制御ュニット 9には、 宅内の D C機器 5の動作を切り換える際に操作するスィッチ 2 3 が直流供給線路 2 2を介して接続されている。 また、 制御ユニット 9には、 例えば赤外線 リモートコントローラからの発信電波を検出するセンサ一 2 4が直流供給線路 2 2を介し て接続されている。 よって、 D C分電盤 8からの動作指示のみならず、 スィッチ 2 3の操 作やセンサー 2 4の検知によっても、 直流供給線路 2 2に通信信号を流して D C機器 5が 制御される。 リレ一ュニット 1 0には、 複数の D C機器 5がそれぞれ個別の直流系電力線 2 5を介し て接続されている。 リレーュニット 1 0は、 直流系電力線 1 9を介して D C機器 5の直流 電源を取得し、 D C分電盤 8から信号線 2 1を介して得る動作指令を基に、 どの D C機器 5を動作させるのかを把握する。 そして、 リレーユニット 1 0は、 指示された D C機器 5 に対し、 内蔵のリレーにて直流系電力線 2 5への電源供給をオンオフすることで、 D C機 器 5の動作を制御する。 また、 リレーユニット 1 0には、 D C機器 5を手動操作するため の複数のスィツチ 2 6が接続されておリ、 スィッチ 2 6の操作によって直流系電力線 2 5 への電源供給をリレ一にてオンオフすることにより、 D C機器 5が制御される。
D C分電盤 8には、 例えば壁コンセントゃ床コンセントの態様で住戸に建て付けられた 直流コンセント 2 7が直流系電力線 2 8を介して接続されている。 この直流コンセント 2 7に D C機器のプラグ (図示略) を差し込めば、 同機器に直流電力を直接供給することが 可能である。
また、 商用交流電源 2と A C分電盤 1 1との間には、 商用交流電源 2の使用量を遠隔検 針可能な電力メ一タ 2 9が接続されている。 電力メータ 2 9には、 商用電源使用量の遠隔 検針の機能のみならず、 例えば電力線搬送通信や無線通信の機能が搭載されている。 電力 メータ 2 9は、 電力線搬送通信や無線通信等を介して検針結果を電力会社等に送信する。 電力供給システム 1には、 宅内の各種機器をネットワーク通信によって制御可能とする ネットワークシステム 3 0が設けられている。 ネットワークシステム 3 0には、 同システ ム 3 0のコントロールュニッ卜として宅内サーバ 3 1が設けられている。 宅内サーバ 3 1 は、 インターネットなどのネットワーク Nを介して宅外の管理サーバ 3 2と接続されると ともに、 信号線 3 3を介して宅内機器 3 4に接続されている。 また、 宅内サーバ 3 1は、 D C分電盤 8から直流系電力線 3 5を介して取得する直流電力を電源として動作する。 宅内サーバ 3 1には、 ネットワーク通信による宅内の各種機器の動作制御を管理するコ ントロールボックス 3 6が信号線 3 7を介して接続されている。 コントロールボックス 3 6は、 信号線 1 7を介して宅内制御ユニット 7及び D C分電盤 8に接続されるとともに、 直流供給線路 3 8を介して D C機器 5を直接制御可能である。 コントロールボックス 3 6 には、 例えば使用したガス量や水道量を遠隔検針可能なガス/水道メータ 3 9が接続され るとともに、 ネットワークシステム 3 0の操作パネル 4 0に接続されている。 操作パネル 4 0には、 例えばドアホン子器やセンサーやカメラからなる監視機器 4 1が接続されてい る。
宅内サーバ 3 1は、 ネットワーク Nを介して宅内の各種機器の動作指令を入力すると、 コントロールボックス 3 6に指示を報知して、 各種機器が動作指令に準じた動作をとるよ うにコントロールボックス 3 6を動作させる。 また、 宅内サーバ 3 1は、 ガス 水道メー タ 3 9から取得した各種情報を、 ネッ卜ワーク Nを通じて管理サーバ 3 2に提供可能であ るとともに、 監視機器 4 1で異常検出があったことを操作パネル 4 0から受け付けると、 その旨もネットワーク Nを通じて管理サーバ 3 2に提供する。 ところで、 上述したように、 こうした電力供給システム 1が各住戸 1 0 1に設けられた 集合住宅 1 0 0では、 その全体の配電制御が総合制御ユニット 5 3により行われるように なっている。 図 3は、 そうした総合制御ユニット 5 3の構成を示している。 同図に示すよ うに、 総合制御ユニット 5 3は、 上記電流センサ一 5 2の検出する幹線 5 0の導入部の電 流値を監視する幹線電流監視部 5 7を備えている。 また総合制御ユニット 5 3は、 幹線 5 0の導入部の電流値が過大となっていないかを判定する電流レベル判定部 5 8と、 その判 定結果に基づいて各住戸 1 0 1の宅内制御ユニット 7に指令信号を送信する送信部 5 9と を備えている。
図 4は、 幹線 5 0の商用交流電源側の反対側に接続された蓄電池 5 5の制御を司る蓄電 池制御ュニット 5 6の構成を示している。 同図に示すように蓄電池制御ュニット 5 6は、 総合制御ュニット 5 3からの指令信号を受信する受信部 6 0と、 その受信した指令信号に 基づいて A CZ D Cコンバーター 5 4の動作を制御する制御部 6 1とを備えている。 図 5は、 各住戸 1 0 1に設けられる宅内制御ユニット 7及び A C分電盤 1 1の構成を示 している。
同図に示すように、 A C分電盤 1 1は、 メインブレーカー 6 2と、 複数の分岐ブレーカ —6 3とを備えている。 メインブレーカ一 6 2は、 幹線 5 0から供給される電流が過大と なったときに幹線 5 0と電力供給システム 1との接続を遮断する遮断器となっている。 ま た分岐ブレーカー 6 3は、 宅内に設けられた各 A C負荷への電力供給を必要に応じて遮断 する遮断器となっている。 なお A C負荷とは、 照明機器、 エアコン、 家電、 オーディオビ ジユア Jレ機器等のような、 宅内に設置された各種の A C電気機器を指す。
一方、 宅内制御ユニット 7は、 総合制御ユニット 5 3からの指令信号を受信する受信部 7 0と、 制御部 7 1とを備えている。 制御部 7 1は、 受信部 7 0の受信した指令信号に基 づいて、 宅内の各負荷 6 4の動作を制御する。 また制御部 7 1は、 受信部 7 0の受信した 指令信号に基づいて、 A CZ D Cコンバータ一 7 2の動作を、 ひいては蓄電池 1 6の充放 電を制御する。
以上のように構成された本実施の形態の建物の配電システムでは、 幹線 5 0の過電流が 確認されたときに、 幹線 5 0を過電流から保護するための幹線保護制御が発動されるよう になっている。 幹線保護制御は、 幹線 5 0の商用交流電源側の反対側に接続された蓄電池 5 5、 及び各住戸 1 0 1に設けられた蓄電池 1 6からの電力供給を開始することで行われ るようになっている。
図 6は、 こうした本実施の形態の採用する幹線保護制御ルーチンの処理手順を示してい る。 本ルーチンの処理は、 総合制御ユニット 5 3によって終始繰り返し実行されるものと なっている。
さて本ルーチンが開始されると、 総合制御ユニット 5 3は、 まずステップ S 1 0 0にお いて、 幹線 5 0の導入部に設けられた電流センサ一 5 2の検出する電流値を受信する。 そ して、 総合制御ュニット 5 3は、 ステップ S 1 0 1において、 電流センサ一 5 2の電流値 が第 1規定値以上であるか否かを確認する。 なお本実施の形態では、 第 1既定値は、 例え ば幹線ブレーカー 5 1の遮断電流の 8 0 %の電流値がその値に設定されている。
ここで電流センサ一 5 2の電流値が第 1既定値以上でなければ(S 1 0 1 : N O )、総合 制御ュニット 5 3はステップ S 1 0 2に進み、 そのステップ S 1 0 2において宅内制御ュ ニット 7及び蓄電池制御ュニット 5 6に電力供給停止信号を送信する。 そして電力供給停 止信号の出力後、 総合制御ュニット 5 3はステップ S 1 0 0の処理に戻る。 なお宅内制御 ュニット 7及び蓄電池制御ュニット 5 6は、 蓄電池 1 6、 5 5からの電力供給停止信号を 受信すると、 もし行っているのであれば、 蓄電池 1 6、 5 5からの電力供給を停止する。 一方、電流センサー 5 2の電流値が第 1既定値以上となっていれば(S 1 0 1: Y E S ) . 総合制御ユニット 5 3は、 ステップ S 1 0 3に進み、 そのステップ S 1 0 3において、 電 流センサー 5 2の電流値が第 2既定値以上であるか否かを確認する。 なお本実施の形態で は、 第 2既定値は、 例えば幹線ブレーカ一 5 1の遮断電流の 9 0 %の電流値がその値に設 定されている。 ちなみに、 本実施の形態では、 このステップ S 1 0 3が、 商用交流電源か ら幹線 5 0に流れる電流の電流値を監視するステップに対応している。 また本実施の形態 では、 この第 2既定値が上記規定の幹線保護開始電流値に対応している。
ここで電流センサ一 5 2の電流値が第 2既定値以上でなければ(S 1 0 3 : N O )、総合 制御ュニット 5 3は、 そのままステップ S 1 0 0の処理に戻る。
一方、 電流センサ一 5 2の電流値が第 2既定値以上であれば(S 1 0 3 : Y E S )、総合 制御ユニット 5 3はステップ S 1 0 4において、 宅内制御ユニット 7及び蓄電池制御ュニ ット 5 6に、 蓄電池 1 6、 5 5からの電力供給開始信号を送信する。 そして総合制御ュニ ット 5 3は、 負荷抑制信号の送信後、 ステップ S 1 0 0の処理に戻る。 このときの電力供 給開始信号を受信した宅内制御ュニット 7及び蓄電池制御ュニット 5 6は、 その受信に応 じて蓄電池 1 6、 5 5からの電力供給を開始する。 なお本実施の形態では、 このステップ S 1 0 4が、 以下の各ステップに対応している。 すなわち、 このステップ S 1 0 4は、 以 下の各ステツプのそれぞれに対応している。
■ステップ S 1 0 3において監視する電流値が規定の幹線保護開始電流値を上回ること を条件に、 建物 (集合住宅 1 0 0 ) に設置された蓄電池 1 6、 5 5からの建物内への電力 供給を開始するステップ。
■ステップ S 1 0 3において監視する電流値が規定の幹線保護開始電流値を上回ること を条件に、 幹線 5 0の商用交流電源側の反対側に接続された蓄電池 5 5から幹線 5 0への 電力供給を開始するステップ。
■ステップ S 1 0 3において監視する電流値が規定の幹線保護開始電流値を上回ること を条件に、 住戸 1 0 1 (テナント) に設置された蓄電池 1 6から幹線 5 0への電力供給を 開始するステップ。
また以上説明した本実施の形態では、 集合住宅 1 0 0が上記建物の相当する構成となつ ている。 また本実施の形態では、 総合制御ユニット 5 3が上記保護手段の行う処理を実施 する構成となっている。
本実施形態の建物の配電システム及び建物の配電システムにおける幹線の保護方法によ れば、 次の効果を奏することができる。
( 1 ) 本実施の形態の建物の配電システムでは、 集合住宅 1 0 0の各フロアを貫いて配 線された幹線 5 0を通じて商用交流電力を各フロアへと配電するようにしている。 また本 実施の形態の建物の配電システムは、 商用交流電源から幹線 5 0に流れる電流の電流値を 検出する電流センサ一 5 2と、 集合住宅 1 0 0に設置された蓄電池 1 6、 5 5とを備えて いる。 そして総合制御ユニット 5 3は、 電流センサー 5 2の検出する電流値が規定の幹線 保護開始電流値を上回るときに蓄電池 1 6、 5 5から集合住宅 1 0 0への電力供給を開始 することで幹線 5 0を過電流から保護するようにしている。 より具体的には、 総合制御ュ ニット 5 3は、 幹線 5 0の保護に際して、 幹線 5 0の商用交流電源側の反対側に接続され た蓄電池 5 5から幹線 5 0に対する電力供給を開始するようにしている。 また総合制御ュ ニット 5 3は、 幹線 5 0の保護に際して、 各住戸 1 0 1に設けられた蓄電池 1 6から幹線 5 0へのの電力供給を開始するようにもしている。 こうして蓄電池 1 6、 5 5からの電力 供給を開始すると、 それまで商用交流電源からの電力供給で賄われていた電力の一部が蓄 電池 1 6、 5 5からの電力供給で賄われるようになり、 商用交流電源から幹線 5 0に流れ る電流が低減されるようになる。しかも、このときの商用交流電源の電力供給の低減分は、 蓄電池 1 6、 5 5からの電力供給で埋め合わされるため、 保護制御の発動後もその発動前 と同様の電力供給量を維持することができる。 したがって本実施の形態によれば、 電力供 給を途切れさせることなく、 幹線の過電流を好適に防止することができるようになる。
( 2 ) 本実施の形態の建物の配電システムにおける幹線の保護方法では、 次の各ステツ プを通じて幹線 5 0を過電流から保護するようにしている。 まず第 1のステップは、 商用 交流電源から幹線 5 0に流れる電流の電流値を監視するステップとなっている。 また第 2 のステップは、 第 1のステップにおいて監視する電流値が規定の幹線保護開始電流値を上 回ることを条件に、 集合住宅 1 0 0に設置された蓄電池 1 6、 5 5から集合住宅 1 0 0内 への電力供給を開始するステップとなっている。 より具体的には、 第 2のステップでは、 幹線 5 0の商用交流電源側の反対側に接続された蓄電池 5 5から幹線 5 0への電力供給を 開始することがなされている。 また第 2のステップでは、 各住戸 1 0 1に設置された蓄電 池 1 6からの電力供給を開始するようにもしている。 こうして蓄電池 1 6、 5 5からの電 力供給が開始されると、 それまで商用交流電源からの電力供給で賄われていた電力の一部 が蓄電池 1 6、 5 5からの電力供給で賄われるようになり、 商用交流電源から幹線 5 0に 流れる電流が低減されるようになる。 しかも、 このときの商用交流電源の電力供給の低減 分は、 蓄電池 1 6、 5 5からの電力供給で埋め合わされるため、 保護制御の発動後もその 発動前と同様の電力供給量を維持することができる。 したがつて本実施の形態の保護方法 によれば、 電力供給を途切れさせることなく、 幹線 5 0の過電流を好適に防止することが できるようになる。 (第 2の実施の形態)
続いて、 本発明の一実施形態による建物の配電システム及びその配電システムにおける 幹線の保護方法を更に具体化した第 2の実施の形態を説明する。 なお、 本実施の形態は、 幹線 5 0の保護のための蓄電池 1 6、 5 5からの電力供給停止の条件を除いては、 第 1の 実施の形態と同様となっている。
第 1の実施の形態では、 電流センサ一 5 2の検出する幹線 5 0の導入部の電流値が、 幹 線ブレーカー 5 1の遮断電流の 8 0 %の電流値に設定された第 1既定値を下回ったことを 条件に、 幹線 5 0の保護のための蓄電池 1 6、 5 5からの電力供給を停止するようにして いた。 この場合、 蓄電池 1 6、 5 5からの電力供給を停止すると、 再び幹線 5 0導入部の 電流値が上って、 蓄電池 1 6、 5 5からの電力供給を再開しなければならない事態に陥る 可能性がある。そこで本実施の形態では、蓄電池 1 6、 5 5からの電力供給を解除しても、 商用交流電源からの電力供給が過大とならないことを確認した上で、 蓄電池からの電力供 給による幹線の保護制御を解除するようにしている。
具体的には、 本実施の形態では、 蓄電池 1 6、 5 5の供給する電流値をそれぞれ検出す る電流センサー (他の電流センサ一) を蓄電池 1 6、 5 5のそれぞれに設けるようにして いる。 そしてそうした蓄電池 1 6、 5 5の電流値を検出する電流センサ一の電流値、 及び 電流センサー 5 2の検出する幹線 5 0の導入部の電流値の総和が、 規定の幹線保護解除電 流値以下となったときに、 蓄電池 1 6、 5 5からの電力供給を解除するようにしている。 ここでの幹線保護解除電流値は、 上記第 2既定値よリも小さい電流値に設定されている。 そのため、 蓄電池 1 6、 5 5からの電力供給を停止しても、 幹線 5 0の導入部に流れる電 流は、 確実に第 2既定値を下回ることになる。
なお本実施の形態では、 上記態様での蓄電池 1 6、 5 5からの電力供給の解除は、 総合 制御ユニット 5 3からの指令に基づき行われる。 したがって、 本実施の形態では、 総合制 御ュニット 5 3が、 電流センサ一及び他の電流センサーの検出する電流値の総和が規定の 幹線保護解除電流値以下となったときに、 保護手段による蓄電池からの電力供給を解除す る解除手段に相当する構成となっている。
ちなみに本実施の形態では、 幹線保護開始電流値 (第 2既定値) と上記幹線保護解除電 流値との間に一定量の差異を有するように設定している。 そのため、 蓄電池 1 6、 5 5か らの電力供給の開始後に、 商用交流電源の供給する電流値と蓄電池 1 6、 5 5の供給する 電流値との総和が上記幹線保護開始電流値よリも十分低下してからでないと、蓄電池 1 6、 5 5の電力供給が停止されないようになる。 そのため、 保護制御のハンチングを、 すなわ ち幹線 5 0の保護制御の解除後、 直ちに幹線 5 0の保護制御が再開されることを好適に防 止することができるようになる。
なお上記各実施の形態は、 以下のように変更して実施することもできる。
■第 2の実施の形態では、 幹線保護開始電流値 (第 2既定値) と幹線保護解除電流値と の間に一定量のヒステリシスを設けるようにしていたが、 保護制御の制御ハンチングが問 題とならないのであれば、 両電流値を同じ値としても良い。
■上記実施の形態では、 幹線 5 0の導入部に流れる電流が第 2既定値以上となると、 幹 線 5 0の商用交流電源側の反対側に接続された蓄電池 5 5と、 各住戸 1 0 1に設置された 蓄電池 1 6との双方からの電力供給を開始するようにしていた。 もっとも、 一方の蓄電池 のみで幹線 5 0の保護が十分可能であれば、 蓄電池 5 5及び蓄電池 1 6のいずれか一方の 電力供給だけで、 幹線 5 0の保護制御を行うようにしても良い。 なお、 各住戸 1 0 1に設 けられた蓄電池 1 6のみにより幹線 5 0の保護を行う場合には、 蓄電池 5 5や蓄電池制御 ュニット 5 6等は割愛しても良い。 また蓄電池 5 5のみにより幹線 5 0の保護を行う場合 には、 各住戸 1 0 1にそれぞれ蓄電池 1 6を設ける必要はないことになる。
■上記実施の形態では、 集合住宅 1 0 0に本発明を適用した場合を説明したが、 賃貸住 宅などの集合住宅以外の建物にも本発明の配電システムや幹線の保護方法を適用すること ができる。 要は、 建物の各領域を貫いて配線された幹線を通じて各フロアへの配電を行う 配電システムであれば、 本発明を適用が可能である。
以上、 本発明の好ましい実施形態が説明されたが、 本発明はこれらの特定実施形態に限 定されず、 後続する請求範囲の範疇を超えず、 多様な変更及び修正が行われることが可能 であり、 それも本発明の範疇に属すると言える。

Claims

請求範囲
【請求項 1】
商用交流電源から建物内の幹線に流れる電流の電流値を検出する電流センサーと、 前記建物に設置された蓄電池と、
を有し、
前記電流センサーの検出する電流値が所定値に達すると前記蓄電池から前記建物内への 電力供給を開始する建物の配電システム。
【請求項 2】
過電流保護手段を更に備え、
前記建物はそれぞれ電力供給システムの設けられた複数の領域からなり、
前記過電流保護手段は前記電流センサーの検出する電流値が規定の幹線保護開始電流値 を上回るときに前記蓄電池から前記建物内への電力供給を開始することで前記建物内の幹 線を過電流から保護する
請求項 1に記載の建物の配電システム。
【請求項 3】
前記蓄電池は、 前記幹線の商用交流電源側の反対側に設けられ、
前記過電流保護手段は前記蓄電池から前記建物内の幹線への電力供給を開示する請求項 2に記載の建物の配電システム。
【請求項 4】
前記蓄電池は、 前記各領域に設けられ、
前記過電流保護手段は前記蓄電池から前記建物内の幹線への電力供給を開示する請求項 2に記載の建物の配電システム。
【請求項 5】
前記蓄電池の供給する電流値を検出する蓄電池電流センサーと、
前記電流センサ一と前記蓄電池電流センサーが検出した電流値の総和が規定の幹線保護 解除電流値以下となったときに、 前記保護手段による前記蓄電池からの電力供給を解除す る解除手段と、
を更に備える請求項 2 - 4のいずれか 1項に記載の建物の配電システム。
【請求項 6】
前記幹線保護開始電流値と前記幹線保護解除電流値との間には、 一定量の差が設定され てなる
請求項 5に記載の建物の配電システム。
【請求項 7】
建物の各フロアを貫いて配線された幹線を通じて前記建物の各フロアへの配電を行う建 物の配電システムにおける前記幹線を過電流から保護する方法であって、 商用交流電源から前記幹線に流れる電流の電流値を検出するステップと、
前記検出された電流値が規定の幹線保護開始電流値を上回る場合、 前記建物に設置され た蓄電池から前記建物内への電力供給を開始するステップと、
を通じて前記幹線を過電流から保護する建物の配電システムにおける過電流からの幹線 の保護方法。
PCT/IB2010/002748 2009-11-06 2010-10-28 建物の配電システム及びそれにおける幹線の保護方法 WO2011055195A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN2010800502046A CN102640376A (zh) 2009-11-06 2010-10-28 建筑物的配电系统以及配电系统中的干线的保护方法
US13/508,190 US20120236455A1 (en) 2009-11-06 2010-10-28 Power distribution system for building and protection method for main line thereof
EP10827978A EP2498361A1 (en) 2009-11-06 2010-10-28 Power distribution system for building and protection method for main line thereof

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2009-255404 2009-11-06
JP2009255404A JP2011101531A (ja) 2009-11-06 2009-11-06 ビルの配電システム及びビルの配電システムにおける幹線の保護方法

Publications (1)

Publication Number Publication Date
WO2011055195A1 true WO2011055195A1 (ja) 2011-05-12

Family

ID=43969620

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/IB2010/002748 WO2011055195A1 (ja) 2009-11-06 2010-10-28 建物の配電システム及びそれにおける幹線の保護方法

Country Status (5)

Country Link
US (1) US20120236455A1 (ja)
EP (1) EP2498361A1 (ja)
JP (1) JP2011101531A (ja)
CN (1) CN102640376A (ja)
WO (1) WO2011055195A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104333111A (zh) * 2013-07-22 2015-02-04 光宝电子(广州)有限公司 直流不断电系统及装置

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103580271A (zh) * 2013-10-12 2014-02-12 合肥联信电源有限公司 模块化拔插式应急电源及其工作方法
KR20150071626A (ko) 2013-12-18 2015-06-26 대우조선해양 주식회사 해양 플랜트의 하이브리드 전력 공급 장치 및 방법
JP2016123241A (ja) * 2014-12-25 2016-07-07 株式会社村田製作所 パワーコンディショナ
CN104882955A (zh) * 2015-07-01 2015-09-02 成都福兰特电子技术股份有限公司 一种远程供电系统及其供电方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1155858A (ja) * 1997-07-30 1999-02-26 Meidensha Corp 自家用受変電所
JP2003028449A (ja) * 2001-07-11 2003-01-29 Osaka Gas Co Ltd 地域社会へのエネルギ供給システムおよび方法
JP2008148505A (ja) * 2006-12-12 2008-06-26 Chugoku Electric Power Co Inc:The 過負荷対策電力補償装置
JP2008178275A (ja) 2007-01-22 2008-07-31 Matsushita Electric Works Ltd 集合住宅幹線電流制御システム
JP2009124846A (ja) 2007-11-14 2009-06-04 Mitsubishi Electric Corp 集合住宅の電力配電システム、集合住宅の電力配分方法、集合住宅の電力配電管理装置

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2752067B2 (ja) * 1987-10-20 1998-05-18 三洋電機株式会社 系統連系インバータ装置
JPH09275632A (ja) * 1996-04-04 1997-10-21 Harness Sogo Gijutsu Kenkyusho:Kk 電力分配システム
JP4213941B2 (ja) * 2002-10-11 2009-01-28 シャープ株式会社 複数の分散電源の出力抑制方法および分散電源管理システム
JP3855912B2 (ja) * 2002-11-06 2006-12-13 株式会社ノーリツ コジェネレーションシステム
JP3964852B2 (ja) * 2003-10-22 2007-08-22 大阪瓦斯株式会社 分散型発電システム
JP4850019B2 (ja) * 2006-10-16 2012-01-11 東京瓦斯株式会社 電力系統に接続された自家発電設備における蓄電池設備および蓄電池設備の運転方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1155858A (ja) * 1997-07-30 1999-02-26 Meidensha Corp 自家用受変電所
JP2003028449A (ja) * 2001-07-11 2003-01-29 Osaka Gas Co Ltd 地域社会へのエネルギ供給システムおよび方法
JP2008148505A (ja) * 2006-12-12 2008-06-26 Chugoku Electric Power Co Inc:The 過負荷対策電力補償装置
JP2008178275A (ja) 2007-01-22 2008-07-31 Matsushita Electric Works Ltd 集合住宅幹線電流制御システム
JP2009124846A (ja) 2007-11-14 2009-06-04 Mitsubishi Electric Corp 集合住宅の電力配電システム、集合住宅の電力配分方法、集合住宅の電力配電管理装置

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104333111A (zh) * 2013-07-22 2015-02-04 光宝电子(广州)有限公司 直流不断电系统及装置
CN104333111B (zh) * 2013-07-22 2016-08-10 光宝电子(广州)有限公司 直流不断电系统及装置

Also Published As

Publication number Publication date
CN102640376A (zh) 2012-08-15
US20120236455A1 (en) 2012-09-20
JP2011101531A (ja) 2011-05-19
EP2498361A1 (en) 2012-09-12

Similar Documents

Publication Publication Date Title
JP5166379B2 (ja) 電力連携システム
US8942855B2 (en) Power distribution system
JP5838318B2 (ja) 配電システム
WO2010098456A1 (ja) 電力制御装置および方法
WO2013061826A1 (ja) 給電システム、分散型電源システム、管理装置、及び給電制御方法
WO2011055195A1 (ja) 建物の配電システム及びそれにおける幹線の保護方法
US20120235492A1 (en) Power supply system
EP2806524B1 (en) Power supply system and power source device
JP6767893B2 (ja) 充放電器及び充放電システム
JP2011234561A (ja) インテリジェント分電盤、分電装置、停電対策システム及び分電方法
JP2009153336A (ja) 配電システム
WO2011055205A1 (ja) コンセント及び配電システム
JP5805690B2 (ja) エネルギーマネジメントシステム、及び、エネルギー管理方法
JP4191983B2 (ja) 電流表示装置
JP7088372B2 (ja) スイッチ装置
JP2014132823A (ja) 配電システム
US9979228B2 (en) Energy management apparatus and method of controlling the same
WO2011055197A1 (ja) 配電システム及び配電システムにおける幹線の保護方法
JP4830940B2 (ja) 電力線搬送通信システム
RU2505900C1 (ru) Устройство лимитирования потребляемой мощности, способ лимитирования потребляемой мощности
JP2010086791A (ja) 配線器具
JPWO2009054023A1 (ja) 効果的電源消費制限装置
JP2011078278A (ja) 通信システム
JP2010063314A (ja) 配電システム、配電システムの制御方法、及び負荷接続用アダプタ
WO2015019386A1 (ja) 蓄電池管理装置および表示装置

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201080050204.6

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10827978

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2010827978

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 1088/KOLNP/2012

Country of ref document: IN

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 13508190

Country of ref document: US