WO2013061826A1 - 給電システム、分散型電源システム、管理装置、及び給電制御方法 - Google Patents

給電システム、分散型電源システム、管理装置、及び給電制御方法 Download PDF

Info

Publication number
WO2013061826A1
WO2013061826A1 PCT/JP2012/076708 JP2012076708W WO2013061826A1 WO 2013061826 A1 WO2013061826 A1 WO 2013061826A1 JP 2012076708 W JP2012076708 W JP 2012076708W WO 2013061826 A1 WO2013061826 A1 WO 2013061826A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
power supply
abnormality detection
abnormality
load
Prior art date
Application number
PCT/JP2012/076708
Other languages
English (en)
French (fr)
Inventor
勝哉 小島
Original Assignee
京セラ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 京セラ株式会社 filed Critical 京セラ株式会社
Priority to JP2013540733A priority Critical patent/JP5792824B2/ja
Priority to EP12843165.7A priority patent/EP2773007A4/en
Priority to US14/353,971 priority patent/US9923357B2/en
Publication of WO2013061826A1 publication Critical patent/WO2013061826A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H1/00Details of emergency protective circuit arrangements
    • H02H1/0007Details of emergency protective circuit arrangements concerning the detecting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/388Islanding, i.e. disconnection of local power supply from the network

Definitions

  • the present invention relates to a power supply system, a distributed power supply system, a management device, and a power supply control method for supplying power to a load using a distributed power supply.
  • the distributed power supply system includes a distributed power supply and a power conditioner.
  • a distributed power supply system that can supply power to a load by a self-sustained operation separated from the system in the event of a system power failure is also known.
  • a distributed power system capable of interconnected operation needs to prevent a state in which the output power of the distributed power system can flow backward to the system (ie, an independent operation) in the event of a system power failure.
  • the output power of the distributed power system is unstable compared to the power of the system. May be activated and power supply to the load may stop.
  • the present invention provides a power supply system, a distributed power supply system, a management device, which can reduce the possibility of stopping the power supply to the load even when the distributed power supply system performs a self-sustaining operation in the event of an abnormality such as a power failure of the system, It is another object of the present invention to provide a power supply control method.
  • the power supply system of the present invention has a plurality of distributed power supply systems capable of supplying power to a load by performing a grid-connected operation in parallel with a commercial power system or a disconnected independent operation, and the plurality of distributed power sources
  • One of the systems includes an abnormality detection unit that detects an abnormality in a power state supplied to the load.
  • the abnormality detection unit relaxes the condition for detecting an abnormality during the independent operation as compared with the time during the interconnection operation.
  • the abnormality detection unit detects an abnormality in the power supplied to the load in order to prevent an independent operation of at least one of the plurality of distributed power supply systems. To detect.
  • the abnormality detection unit is more effective than the interconnected operation when the autonomous operation is performed after the abnormality of the power state supplied to the load is detected. Relax the conditions for anomaly detection.
  • the abnormality detection unit performs abnormality detection using the first abnormality detection parameter during the interconnected operation, and performs the first operation during the independent operation.
  • the second abnormality detection parameter relaxed from the abnormality detection parameter is used instead of the first abnormality detection parameter.
  • the distributed power supply system includes a management device that manages an operation state of the plurality of distributed power supply systems, and includes the abnormality detection unit. And an abnormality occurrence notification unit that transmits an abnormality occurrence notification to the management device when an error is detected.
  • the power supply system includes a circuit breaker (for example, a service breaker SB) provided on a power line from the commercial power system, and the management device receives the abnormality occurrence notification. Then, a circuit breaker control unit that controls the circuit breaker so as to electrically disconnect the plurality of distributed power supply systems and the load from the commercial power system is included.
  • a circuit breaker for example, a service breaker SB
  • the distributed power supply system having the abnormality detection unit includes an output control unit that stops output of power from the own system when the abnormality detection unit detects an abnormality. including.
  • the management device causes the distributed power supply system having the abnormality detection unit to resume power output after the circuit breaker control unit controls the circuit breaker.
  • a transmission unit for transmitting information for the purpose.
  • the management device specifies a condition that is relaxed as compared with the time of the interconnection operation as a condition for detecting an abnormality in the autonomous operation after receiving the abnormality occurrence notification.
  • the control part which performs control which transmits the parameter information for this to the distributed power supply system which has the said abnormality detection part is included.
  • the plurality of distributed power systems include a solar cell system, and the control unit is configured to perform the self-sustaining operation according to the predicted power generation amount of the solar cell system. Determine the conditions for anomaly detection.
  • the condition for detecting an abnormality during the autonomous operation is determined such that the degree of relaxation increases as the predicted power generation amount of the solar cell system decreases.
  • a plurality of the loads are provided, and the management device receives the abnormality notification and then controls power supply for each of the plurality of loads. Includes a control unit.
  • the power supply control unit is configured to control the plurality of power supplies according to the amount of power that can be supplied to the plurality of loads and the amount of power required by the plurality of loads. Control is performed to stop power supply to a selected load among the loads.
  • the distributed power supply system having the abnormality detection unit is a fuel cell system.
  • the distributed power system of the present invention includes a distributed power source that can supply power to a load by performing a grid operation in parallel with a commercial power system or a self-sustaining operation that is disconnected, and the load at the time of the grid operation. And an abnormality detection unit for detecting an abnormality in the power state supplied to the power supply.
  • the abnormality detection unit relaxes the condition of abnormality detection more than that in the interconnected operation when the autonomous operation is performed after the abnormality of the power state supplied to the load is detected.
  • the management device of the present invention manages the operating state of a distributed power supply system that can supply power to a load by performing a grid-connected operation in parallel with a commercial power system or a self-sustaining operation that is disconnected.
  • the management device includes an abnormality detection unit that detects an abnormality in a power state supplied to the load.
  • the abnormality detection unit relaxes the condition of abnormality detection during the independent operation of the distributed power system than that during the grid operation.
  • the control method of the present invention is a control method in a power supply system having a distributed power supply system capable of supplying power to a load by performing a grid-connected operation in parallel with a commercial power system or a self-sustaining operation that is disconnected.
  • a step of detecting an abnormality of a power state supplied to the load, and the condition of abnormality detection during the independent operation is relaxed as compared with that during the interconnection operation.
  • a power supply system and a distributed power supply system that can reduce the possibility of power supply to a load being stopped even when a plurality of distributed power supply systems simultaneously operate independently in the event of an abnormality such as a power failure of the system .
  • a management device and a power supply control method can be provided.
  • FIG. 1 is a block diagram of a power feeding system according to the first to fourth embodiments of the present invention.
  • FIG. 2 is a block diagram of the SOFC PCS according to the first to fifth embodiments of the present invention.
  • FIG. 3 is a block diagram of the HEMS 500 according to the first to fifth embodiments of the present invention.
  • FIG. 4 is an operation sequence diagram when a power failure occurs in the power supply system according to the first embodiment of the present invention.
  • FIG. 5 is an operation sequence diagram when a power failure occurs in the power supply system according to the second embodiment of the present invention.
  • FIG. 6 is an operation sequence diagram when a power failure occurs in the power feeding system according to the third embodiment of the present invention.
  • FIG. 7 shows abnormality detection parameters according to the fourth embodiment of the present invention.
  • FIG. 1 is a block diagram of a power feeding system according to the first to fourth embodiments of the present invention.
  • FIG. 2 is a block diagram of the SOFC PCS according to the first to fifth embodiments of the present invention
  • FIG. 8 is an operation sequence diagram when a power failure occurs in the power supply system according to the fourth embodiment of the present invention.
  • FIG. 9 is a block diagram of a power feeding system according to the fifth embodiment of the present invention.
  • FIG. 10 is an operation sequence diagram when a power failure occurs in the power feeding system according to the fifth embodiment of the present invention.
  • FIG. 11 is a block diagram of a power feeding system according to Modification 1 of the first to fifth embodiments of the present invention.
  • FIG. 12 is a block diagram of a power feeding system according to Modification 2 of the first to fifth embodiments of the present invention.
  • FIG. 1 is a block diagram of a power feeding system according to the present embodiment.
  • the solid line between blocks shows a power line
  • a broken line shows a control line.
  • the control line may be wireless.
  • the power supply system according to the present embodiment is provided in a customer 1 that receives power (AC power) supplied from a grid 10.
  • the power supply system according to the present embodiment includes a power purchase meter 21, a power sale meter 22, a distribution board 30, a solar cell (PV) system 100, a solid oxide fuel cell (SOFC) system 300, a plurality of loads 400, and It has a residential energy management system (HEMS) 500.
  • the PV system 100, the SOFC system 300, and the plurality of loads 400 are connected to the distribution board 30 through a power line.
  • the power purchase meter 21 and the power sale meter 22 are provided on the power line between the system 10 and the distribution board 30.
  • the electricity purchase meter 21 measures electric power (electric power purchase) input from the grid 10 by the customer 1.
  • the power selling meter 22 measures the power (power sold power) output from the customer 1 to the grid 10.
  • the power purchase meter 21 and the power sale meter 22 transmit the measurement result to the HEMS 500.
  • Distribution board 30 distributes power from system 10 and power from a plurality of distributed power systems (PV system 100, SOFC system 300) to load 400. Moreover, the distribution board 30 outputs the surplus electric power which is not consumed by the load 400 among the electric power from the PV system 100 to the system 10 (power sale).
  • PV system 100 distributed power systems
  • SOFC system 300 distributed power systems
  • the distribution board 30 includes a power recovery detector 31, a service breaker SB, a leakage breaker ELB, a PV breaker B1, a SOFC breaker B3, and a plurality of load breakers B4 to B8.
  • the power recovery detector 31 is provided on the power line between the power sale meter 22 and the service breaker SB.
  • the power recovery detector 31 detects power recovery after a power failure of the system 10 and transmits a notification regarding the detection result to the HEMS 500.
  • the service breaker SB is provided on the power line between the power recovery detector 31 and the earth leakage breaker ELB.
  • the service breaker SB is switched from a conduction (on) state to a non-conduction (off) state and from an off state to an on state under the control of the HEMS 500.
  • the service breaker SB corresponds to a circuit breaker for electrically disconnecting the plurality of distributed power supply systems (PV system 100, SOFC system 300) and the load 400 from the system 10.
  • the earth leakage breaker ELB is provided on the power line between the service breaker SB and the breakers (PV breaker B1, SOFC breaker B3, and a plurality of load breakers B4 to B8).
  • the earth leakage breaker ELB switches from the on state to the off state when detecting the earth leakage.
  • PV breaker B1 is provided on the power line between earth leakage breaker ELB and PV power conditioner (PCS) 120.
  • the PV breaker B ⁇ b> 1 is switched from input a to input b and from input b to input a under the control of the HEMS 500.
  • Input a is connected to a normal power line to / from PC PCS 120, and input b is connected to a stand-alone power line to / from PC PCS 120.
  • the input a is used during normal operation (during linked operation), and the input b is used during independent operation.
  • the SOFC breaker B3 is provided on the power line between the earth leakage breaker ELB and the SOFC PCS320.
  • the SOFC breaker B3 is switched from the on state to the off state and from the off state to the on state under the control of the HEMS 500.
  • Load breakers B4 to B8 are provided corresponding to loads 400-1 to 400-5.
  • the load breaker B4 is provided on the power line between the earth leakage breaker ELB and the load 400-1.
  • Load breakers B5 to B8 are similarly provided.
  • Each of the load breakers B4 to B8 is switched from the on state to the off state and from the off state to the on state under the control of the HEMS 500.
  • PV system 100 has PV110 and PV PCS120.
  • PV 110 receives sunlight and generates power, and outputs the electric power obtained by power generation to PV PCS 120.
  • the amount of power generated by the PV 110 changes according to the amount of solar radiation irradiated on the PV 110.
  • PV PCS 120 receives power from PV 110, converts the input power from DC to AC, and outputs it to distribution board 30.
  • the PV PCS 120 connects the PV 110 to the grid 10 and performs a linked operation. During the interconnected operation, the PV PCS 120 outputs power that matches the state of the system 10 (voltage, current, phase, frequency, etc.).
  • PV PCS120 has an independent operation prevention function.
  • the isolated operation prevention function is a function in which a power generation apparatus capable of interconnected operation detects a power failure or its sign and stops the operation.
  • a power generation apparatus capable of interconnected operation detects a power failure or its sign and stops the operation.
  • a power generator that can be operated in a grid is capable of reverse power flow when the power failure of the system is detected for reasons of safety and ensuring the workability of the power company. It is required to avoid the situation (single operation). For this reason, the power generator capable of interconnecting operation is required to have an independent operation prevention function.
  • the PV PCS 120 monitors the state of the power line (voltage, current, phase, frequency, etc.) with the distribution board 30 and the range in which the monitored voltage or frequency is determined by the abnormality detection parameter. If it exceeds, it is determined that the system is in an abnormal state such as a power failure, and power output is stopped.
  • the method for determining an abnormality such as a power failure is substantially the same as the active method detection method in the isolated operation prevention function.
  • the PV PCS 120 can output electric power by a self-sustaining operation that does not link the PV 110 to the grid 10.
  • the SOFC system 300 includes a SOFC 310 and a SOFC PCS 320.
  • the SOFC 310 is an example of a fuel cell, and generates electric power through a chemical reaction between hydrogen extracted from natural gas and oxygen and oxygen in the air, and outputs the electric power obtained by the electric power generation to the SOFC PCS 320.
  • the power generation amount of the SOFC 310 changes according to the amount of gas and air input to the SOFC 310.
  • the amount of gas and air is controlled by SOFC PCS320.
  • the SOFC PCS 320 receives the power from the SOFC 310, converts the input power from DC to AC, and outputs it to the distribution board 30.
  • the SOFC PCS 320 performs a linked operation by connecting the SOFC 310 to the grid 10. During the interconnected operation, the SOFC PCS 320 outputs electric power that matches the state of the system 10 (voltage, current, phase, frequency, etc.).
  • the SOFC PCS320 has an independent operation prevention function. Specifically, the SOFC PCS 320 monitors the state of the power line (voltage, current, phase, frequency, etc.) with the distribution board 30 and the range in which the monitored voltage or frequency is determined by the abnormality detection parameter.
  • the SOFC PCS 320 can output power by a self-sustaining operation that does not link the SOFC 310 to the grid 10.
  • the load 400 receives power from the distribution board 30 through the power line, and operates by consuming the input power.
  • Each load 400 is, for example, an electric device such as a lighting, an air conditioner, a refrigerator, and a television.
  • the HEMS 500 performs various types of power management in the customer 1.
  • the HEMS 500 corresponds to a management device that manages the operating states of a plurality of distributed power supply systems.
  • the HEMS 500 communicates with the power recovery detector 31, various breakers, PV PCS 120, and SOFC PCS 320, and transmits and receives control signals. Further, the HEMS 500 may communicate with the power purchase meter 21 and the power sale meter 22. Note that communication such as transmission and reception of these control signals is performed using a signal format conforming to a predetermined communication protocol such as ECHONET Lite standard, ZigBee SEP2.0 standard, or KNX standard.
  • FIG. 2 is a block diagram of the SOFC PCS 320.
  • the solid line between blocks shows a power line, and a broken line shows a control line.
  • the PV PCS 120 is configured in the same manner as the SOFC PCS 320.
  • the SOFC PCS 320 includes a DC / DC converter 321, a DC / AC converter 322, a relay 323, a sensor 324, and a PCS controller 325.
  • the DC / DC converter 321 is provided on a power line between the SOFC 310 and the DC / AC converter 322.
  • the DC / DC converter 321 DC / DC converts the power from the SOFC 310 and outputs it to the DC / AC converter 322.
  • the DC / DC converter 321 performs DC / DC conversion in accordance with control from the PCS controller 325.
  • the DC / AC converter 322 is provided on a power line between the DC / DC converter 321 and the relay 323.
  • the DC / AC converter 322 performs DC / AC conversion on the power from the DC / DC converter 321 and outputs it to the relay 323.
  • the DC / AC converter 322 performs DC / AC conversion in accordance with control from the PCS controller 325.
  • the relay 323 is provided on a power line between the DC / AC converter 322 and the sensor 324.
  • the relay 323 is switched from the on state to the off state and from the off state to the on state under the control of the PCS controller 325.
  • the SOFC PCS 320 can output power
  • the relay 323 is in the OFF state, the SOFC PCS 320 cannot output power.
  • the sensor 324 is provided on the power line between the relay 323 and the distribution board 30.
  • the sensor 324 measures the voltage and frequency of the power line between the relay 323 and the distribution board 30 and outputs the measurement result to the PCS controller 325.
  • the PCS controller 325 includes a processor and a memory and performs various controls.
  • the PCS controller 325 controls the DC / DC converter 321, the DC / AC converter 322, and the relay 323 based on the measurement result from the sensor 324 and the control signal from the HEMS 500. Further, the PCS controller 325 transmits information related to the operating state of the SOFC PCS 320 to the HEMS 500.
  • the PCS controller 325 detects an abnormality in the power supplied to the load 400 based on the first abnormality detection parameter for preventing isolated operation and the measurement result of the sensor 324 during the interconnected operation. Is detected.
  • the first abnormality detection parameter for example, the voltage value can be an upper limit value of 115 V and a lower limit value of 85 V, and the frequency can be an upper limit value of 51 Hz and a lower limit value of 49 Hz.
  • the PCS controller 325 determines that an abnormality has been detected.
  • the sensor 324 and the PCS controller 325 constitute an abnormality detection unit.
  • the PCS controller 325 When the PCS controller 325 detects an abnormality using the first abnormality detection parameter, the PCS controller 325 switches the relay 323 from the on state to the off state. As a result, power output from the SOFC PCS 320 is stopped.
  • the relay 323 and the PCS controller 325 constitute an output control unit.
  • Detecting an abnormality using the first abnormality detection parameter and stopping the output when an abnormality is detected are performed according to a normal independent operation prevention function.
  • the PCS controller 325 when the PCS controller 325 detects an abnormality using the first abnormality detection parameter, the PCS controller 325 transmits an abnormality occurrence notification to the HEMS 500 in a signal format conforming to the above-described predetermined protocol such as ECHONET Lite.
  • the abnormality occurrence notification may be a notification that a power outage has occurred, or a notification that a sign of a power outage has occurred.
  • the PCS controller 325 corresponds to an abnormality occurrence notification unit.
  • the PCS controller 325 receives parameter information from the HEMS 500.
  • the parameter information specifies a second abnormality detection parameter that is more relaxed than the first abnormality detection parameter. That is, the voltage / frequency range defined by the second abnormality detection parameter is wider than the voltage / frequency range defined by the first abnormality detection parameter.
  • the second abnormality detection parameter for example, the voltage value can be an upper limit value of 120 V and a lower limit value of 80 V, and the frequency can be an upper limit value of 52 Hz and a lower limit value of 48 Hz.
  • the parameter information may be the numerical value of the second abnormality detection parameter itself, for example, an index indicating a predetermined set of numerical values of the second abnormality detection parameter as shown in FIG. .
  • the PCS controller 325 receives information for resuming output of power from the SOFC system 300 (SOFC PCS 320).
  • the information may be, for example, a power output restart instruction, a self-sustained operation start instruction, or a notification that the service breaker SB is turned off (hereinafter, a breaker off notification).
  • a power output restart instruction for resuming output of power from the SOFC system 300
  • the information may be, for example, a power output restart instruction, a self-sustained operation start instruction, or a notification that the service breaker SB is turned off (hereinafter, a breaker off notification).
  • a breaker off notification a notification that the service breaker SB is turned off
  • the PCS controller 325 When the PCS controller 325 receives the breaker off notification, the PCS controller 325 switches the relay 323 from the off state to the on state. As a result, power output from the SOFC PCS 320 can be resumed. Further, the PCS controller 325 controls the DC / DC converter 321 and the DC / AC converter 322 based on the measurement result from the sensor 324. Although details will be described later, since the service breaker SB is in an off state at this point, the SOFC PCS 320 performs a self-sustained operation (operation not connected to the grid 10).
  • the PCS controller 325 performs abnormality detection by changing to the second abnormality detection parameter designated by the parameter information from the HEMS 500 during such independent operation. Since the second abnormality detection parameter is more relaxed than the first abnormality detection parameter, the second abnormality detection parameter is less likely to be detected as abnormality detection than during the interconnected operation.
  • the PCS controller 325 detects an abnormality using the second abnormality detection parameter, the PCS controller 325 switches the relay 323 from the on state to the off state. As a result, power output from the SOFC PCS 320 is stopped.
  • the PCS controller 325 receives a power recovery notification from the HEMS 500.
  • the power recovery notification may be a notification that power has been recovered, or information that instructs to return to the first abnormality detection parameter.
  • the PCS controller 325 returns the second abnormality detection parameter to the first abnormality detection parameter and performs abnormality detection. After returning to the first abnormality detection parameter, the independent operation prevention operation according to the normal independent operation prevention function is performed.
  • FIG. 3 is a block diagram of the HEMS 500.
  • the HEMS 500 includes a communication unit 510, an input unit 520, a display unit 530, a storage unit 540, and a control unit 550.
  • the communication unit 510 communicates with each device provided in the customer 1. Specifically, the communication unit 510 communicates with the power recovery detector 31, various breakers, PV PCS 120, and SOFC PCS 320, and transmits and receives control signals in a signal format according to a predetermined communication protocol.
  • the input unit 520 receives an operation input from the user.
  • the display unit 530 performs various displays.
  • the input unit 520 and the display unit 530 may be integrated as a touch panel.
  • the display unit 530 may display the power purchase amount and the power sale amount in time series based on the information obtained from the power purchase meter 21 and the power sale meter 22.
  • the storage unit 540 includes a memory and stores various information used for control in the control unit 550.
  • the control unit 550 includes a processor and controls various functions of the HEMS 500.
  • the storage unit 540 stores, for example, a first abnormality detection parameter and a second abnormality detection parameter.
  • the first abnormality detection parameter and the second abnormality detection parameter may be input by the user operating the input unit 520, and are calculated by the control unit 550 based on various types of information stored in the storage unit 540. It may be a value.
  • the control unit 550 controls the service breaker SB to be switched from the on state to the off state when the communication unit 510 receives the abnormality occurrence notification from the SOFC PCS 320. Specifically, the communication unit 510 transmits an instruction to switch the service breaker SB to the off state. As a result, the service breaker SB is turned off, and the plurality of distributed power systems (PV system 100, SOFC system 300) and the load 400 are electrically disconnected from the system 10.
  • the communication part 510 and the control part 550 comprise a circuit breaker control part.
  • the control unit 550 sends information for resuming the output of power from the SOFC system 300 (here, the breaker off notification) to a plurality of distributed power systems (PV system 100, SOFC).
  • the communication unit 510 is controlled to transmit to the system 300).
  • the communication unit 510 and the control unit 550 constitute a transmission unit.
  • the control unit 550 sends parameter information for designating the second abnormality detection parameter to a plurality of distributed power supply systems (PV system 100, SOFC system 300).
  • the communication unit 510 is controlled to transmit.
  • the parameter information may be the numerical value of the second abnormality detection parameter itself, for example, an index indicating a set of predetermined numerical values of the second abnormality detection parameter as shown in FIG. It may be.
  • the control unit 550 sends a power recovery notification to a plurality of distributed power supply systems (PV system 100, SOFC system 300).
  • the communication unit 510 is controlled to transmit.
  • the power recovery notification may be a notification that power has been recovered, or information that instructs to return to the first abnormality detection parameter.
  • FIG. 4 is an operation sequence diagram when a power failure occurs in the power supply system according to the present embodiment.
  • the PV PCS 120 detects a power abnormality in step S101-1
  • the SOFC PCS 320 detects a power abnormality in step S101-3.
  • step S102-1 the PV PCS 120 stops outputting power in response to the abnormality detection.
  • step S102-3 the SOFC PCS 320 stops outputting power in response to the abnormality detection.
  • step S103 the SOFC PCS 320 transmits an abnormality occurrence notification to the HEMS 500.
  • step S104 when the HEMS 500 receives the abnormality occurrence notification from the SOFC PCS 320, the HEMS 500 transmits an instruction for switching the service breaker SB to the off state to the distribution board 30.
  • step S105 the distribution board 30 switches the service breaker SB to the off state in response to the breaker off instruction from the HEMS 500.
  • step S106 the HEMS 500 transmits a breaker-off notification to the PV PCS 120 and the SOFC PCS 320. Further, the HEMS 500 transmits parameter information to the PV PCS 120 and the SOFC PCS 320 as an instruction to change parameters.
  • step S107-1 the PV PCS 120 changes from the first abnormality detection parameter to the second abnormality detection parameter in accordance with the parameter information from the HEMS 500.
  • step S107-3 the SOFC PCS 320 changes from the first abnormality detection parameter to the second abnormality detection parameter in accordance with the parameter information from the HEMS 500.
  • step S108-1 the PV PCS 120 resumes the output of electric power by self-sustained operation in response to the breaker-off notification from the HEMS 500.
  • step S108-3 the SOFC PCS 320 restarts the output of electric power by the self-sustained operation in response to the breaker-off notification from the HEMS 500.
  • step S109 the power recovery detector 31 of the distribution board 30 detects power recovery.
  • step S110 the power recovery detector 31 transmits a signal indicating that power has been recovered to the HEMS 500.
  • step S111 the distribution board 30 switches the service breaker SB from the off state to the on state in response to detection of power recovery.
  • step S112 the HEMS 500 transmits a power recovery notification to the PV PCS 120 and the SOFC PCS 320 in response to a signal indicating that power has been recovered from the power recovery detector 31.
  • step S113-1 the PV PCS 120 returns to the first abnormality detection parameter in response to the power recovery notification from the HEMS 500.
  • step S113-3 the SOFC PCS 320 returns to the first abnormality detection parameter in response to the power recovery notification from the HEMS 500. That is, the power recovery notification also has an aspect as a signal for instructing parameter change.
  • the power supply system has a plurality of distributed power supply systems (PV system 100, SOFC system 300) that can supply power to the load 400 by a grid-operated operation with the system 10 or a self-sustained operation.
  • the SOFC system 300 detects an abnormality in the electric power supplied to the load 400 using the first abnormality detection parameter for preventing the isolated operation during the interconnected operation.
  • the SOFC system 300 uses the second abnormality detection parameter that is more relaxed than the first abnormality detection parameter during the self-sustained operation after the abnormality of the power supplied to the load 400 is detected as the first abnormality. Used in place of detection parameters.
  • the PV PCS 120 and the SOFC PCS 320 simultaneously restarted the power output by the independent operation.
  • the PV PCS 120 and the SOFC PCS 320 may restart the power output at different timings as described below.
  • FIG. 5 is an operation sequence diagram when a power failure occurs in the power supply system according to the present embodiment. Steps S201 to S205 are the same as steps S101 to S105 described in the first embodiment, and will be described from step S206.
  • step S206 the HEMS 500 transmits a breaker-off notification to the PV PCS 120 and the SOFC PCS 320.
  • step S207 the SOFC PCS 320 restarts the output of power by the self-sustained operation in response to the breaker-off notification from the HEMS 500.
  • step S208 the PV PCS 120 transmits a notification (preliminary notice) to the effect that the output of power is resumed by the self-sustaining operation to the HEMS 500.
  • a notification preliminary notice
  • the PV PCS 120 restarts the power output by the self-sustaining operation, it is necessary to change from the first abnormality detection parameter to the second abnormality detection parameter.
  • step S209 the HEMS 500 transmits parameter information for changing to the second abnormality detection parameter to the PV PCS 120 and the SOFC PCS 320 in response to the output restart notification from the PV PCS 120.
  • step S210-1 the PV PCS 120 changes from the first abnormality detection parameter to the second abnormality detection parameter in accordance with the parameter information from the HEMS 500.
  • step S210-3 the SOFC PCS 320 changes from the first abnormality detection parameter to the second abnormality detection parameter in accordance with the parameter information from the HEMS 500.
  • step S211 the PV PCS 120 restarts the output of power by the self-sustaining operation. Since subsequent operations are the same as those in the first embodiment, description thereof is omitted.
  • the HEMS 500 controls the power supply to the load 400 after receiving the abnormality occurrence notification from the SOFC PCS 320.
  • the control unit 550 of the HEMS 500 controls the power supply for each load 400 by controlling the communication unit 510 to transmit an instruction to switch to the off state to at least one of the load breakers B4 to B8. To do.
  • the communication unit 510 and the control unit 550 acquire information on the amount of power that can be supplied to the load 400 by communicating with the PV PCS 120 and the SOFC PCS 320. Moreover, the communication part 510 and the control part 550 acquire the information regarding the electric energy which the load 400 requires by communicating with the sensor provided in the distribution board 30. FIG. Then, the communication unit 510 and the control unit 550 stop power supply to the selected load 400 among the loads 400 according to the amount of power that can be supplied to the load 400 and the amount of power that the load 400 needs. Control.
  • the control unit 550 calculates the amount of power that is insufficient and corresponds to the amount of power that is insufficient. It is determined that power supply to at least one load 400 that requires power to be stopped is stopped. In addition, the control unit 550 specifies a load breaker corresponding to the load 400 whose power supply is to be stopped, and controls the communication unit 510 to transmit an off switching instruction to the load breaker. Thereby, the electric energy which load 400 requires can be made below into the electric energy which can be supplied to load 400.
  • the HEMS 500 may control the power supply for each load 400 by directly controlling any one of the load breakers B4 to B8 to turn it off, but may control the load 400 directly.
  • the HEMS 500 uses a communication protocol such as Echonet Lite or ZigBee (registered trademark) to directly communicate with the load 400 and load a control signal for turning off the power supply or a control signal for transitioning to a power saving state. By transmitting to 400, the power supply for each load 400 is controlled.
  • FIG. 6 is an operation sequence diagram when a power failure occurs in the power supply system according to the present embodiment. Steps S301 to S308 are the same as steps S101 to S108 described in the first embodiment, and will be described from step S309.
  • step S309 after the PV PCS 120 and the SOFC PCS 320 resume output by the self-sustained operation, the HEMS 500 compares the amount of power that can be supplied to the load 400 with respect to the amount of power required by the load 400. Judge whether or not there is a shortage. Here, it is assumed that it is determined to be insufficient.
  • step S310 the HEMS 500 transmits an instruction signal to the load breaker corresponding to the load 400 whose power supply is to be stopped, or transmits a direct control signal to the load 400 as an off switching instruction.
  • step S311 the load 400 that has received the off switching instruction is switched from the on state to the off state.
  • step S312 the power recovery detector 31 of the distribution board 30 detects power recovery.
  • step S313 the power recovery detector 31 transmits a notification indicating that power has been recovered to the HEMS 500.
  • step S314 the distribution board 30 switches the service breaker SB from the off state to the on state in response to detection of power recovery.
  • step S315 the distribution board 30 switches the load breaker that was turned off in step S311 from the off state to the on state in response to detection of power recovery.
  • step S316 the HEMS 500 transmits a power recovery notification to the PV PCS 120 and the SOFC PCS 320 in response to a signal indicating that power has been recovered from the power recovery detector 31.
  • step S317-1 the PV PCS 120 returns to the first abnormality detection parameter in response to the power recovery notification from the HEMS 500.
  • step S317-3 the SOFC PCS 320 returns to the first abnormality detection parameter in response to the power recovery notification from the HEMS 500.
  • the HEMS 500 may periodically acquire information on the amount of power that can be supplied to the load 400 and information on the amount of power that the load 400 requires. In this case, step S309 is repeated until the HEMS 500 receives a signal indicating that power has been restored from the power recovery detector 31. In step S309, as a result of determining whether or not the amount of power that can be supplied to the load 400 is insufficient with respect to the amount of power required by the load 400, the number of loads 400 that should stop power supply may be increased. In this case, in step S310, the HEMS 500 further transmits an off switching instruction to the load breaker corresponding to the load 400 whose power supply should be stopped.
  • step S311 the load 400 that has newly received the off switching instruction is switched from the on state to the off state.
  • the HEMS 500 may transmit an on-switch instruction to the load breaker corresponding to the load 400 that can restart power supply. Good.
  • the second abnormality detection parameter is fixedly determined.
  • the control unit 550 of the HEMS 500 determines the second abnormality detection parameter according to the predicted power generation amount of the PV system 100.
  • the control unit 550 acquires information indicating power that the PV system 100 is predicted to generate after the current time (hereinafter, “predicted power generation amount information”).
  • the predicted power generation amount information is provided to the HEMS 500 of the customer 1 from a service center or the like connected to an external network (for example, the Internet).
  • the HEMS 500 may provide, in advance, regional information of the customer 1 as element information required when the predicted power generation amount information is created in a service center or the like.
  • the control unit 550 acquires information (hereinafter, “weather information”) of the weather (for example, the amount of solar radiation) of the area of the customer 1 on the day from the external network, and generates the power generation of the PV system 100 from the acquired weather information. You may make it predict electric power and acquire prediction electric power generation amount information. And the control part 550 determines the 2nd abnormality detection parameter with the large relaxed degree, so that prediction electric power generation amount is small.
  • FIG. 7 shows abnormality detection parameters according to the present embodiment.
  • OVR indicates a voltage upper limit value
  • UVR indicates a voltage lower limit value
  • OFR indicates a frequency upper limit value
  • UFR indicates a frequency lower limit value.
  • the HEMS 500 and each PCS may hold a table as shown in FIG.
  • the abnormality detection parameter with the setting number (index) 0 corresponds to the first abnormality detection parameter as a default value used in normal time (at the time of grid connection).
  • any one of the abnormality detection parameters of setting numbers 1 to 5 is selected as the second abnormality detection parameter.
  • the control unit 550 selects, for example, the abnormality detection parameter having the setting number 1 or 2 as the second abnormality detection parameter with a low degree of mitigation. To do.
  • the abnormality detection parameter of setting number 4 or 5 is selected as the second abnormality detection parameter having a high degree of mitigation. .
  • the second abnormality detection parameter can be appropriately set by determining the second abnormality detection parameter in accordance with the predicted power generation amount of the PV system 100.
  • FIG. 8 is an operation sequence diagram when a power failure occurs in the power supply system according to the present embodiment. Steps S401 to S405 are the same as steps S101 to S105 described in the first embodiment, and thus will be described from step S406.
  • the HEMS 500 acquires the predicted power generation amount information of the PV system 100 and determines the second abnormality detection parameter by the method described above.
  • step S407 the HEMS 500 transmits a breaker-off notification to the PV PCS 120 and the SOFC PCS 320. Also, the HEMS 500 transmits the parameter information determined in step S406 to the PV PCS 120 and the SOFC PCS 320. Since subsequent operations are the same as those in the first embodiment, description thereof is omitted.
  • the PV PCS 120 and the SOFC PCS 320 detected a power abnormality and stopped outputting power.
  • power is provided by the uninterruptible power supply (UPS) for a predetermined time from the start of the power failure (or its sign) of the system 10, and during that time, it is changed to the second abnormality detection parameter.
  • the power output can be continued without stopping.
  • FIG. 9 is a block diagram of the power supply system according to the present embodiment.
  • the solid line between blocks shows a power line
  • a broken line shows a control line.
  • the control line may be wireless.
  • the power supply system further includes a UPS 32 provided on the power line between the service breaker SB and the earth leakage breaker ELB.
  • the UPS 32 incorporates a small storage battery, and supplies power from the storage battery to the load 400 when the system 10 is out of power or unstable.
  • the power recovery detector 31 also has a function of detecting a power failure (or an indication thereof) and notifying the HEMS 500.
  • a part of the output power of the UPS 32 is supplied to the PV-PCS 120 and the SOFC PCS 320.
  • the power supplied here is substantially a parameter used as a reference for the determination by the active method detection method in the isolated operation prevention function such as the voltage, current, phase, and frequency from the system 10 before the occurrence of a power failure or an unstable power state. Consistently. Therefore, PV PCS 220 and SOFC PCS 320 do not recognize the power outage or power instability state of system 10 due to the power supply from UPS 32 and do not operate the isolated operation prevention function.
  • FIG. 10 is an operation sequence diagram when a power failure occurs in the power supply system according to the present embodiment.
  • step S501 the power failure / recovery detector 31 of the distribution board 30 detects a power abnormality.
  • step S502 the distribution board 30 switches the service breaker SB to the OFF state in response to the abnormality detection by the power failure / recovery detector 31.
  • step S503 the distribution board 30 transmits a breaker-off notification to the HEMS 500.
  • step S504 the HEMS 500 transmits a breaker-off notification to the PV PCS 120 and the SOFC PCS 320. Further, the HEMS 500 transmits parameter information to the PV PCS 120 and the SOFC PCS 320.
  • step S505-1 the PV PCS 120 changes from the first abnormality detection parameter to the second abnormality detection parameter according to the parameter information from the HEMS 500.
  • step S505-3 the SOFC PCS 320 changes from the first abnormality detection parameter to the second abnormality detection parameter in accordance with the parameter information from the HEMS 500.
  • step S506 the power failure / recovery detector 31 of the distribution board 30 detects power recovery.
  • step S507 the power failure / recovery detector 31 transmits a signal indicating that power has been recovered to the HEMS 500.
  • step S508 the distribution board 30 switches the service breaker SB from the off state to the on state in response to the power failure detection by the power failure / recovery detector 31.
  • step S509 the HEMS 500 transmits a power recovery notification to the PV PCS 120 and the SOFC PCS 320 in response to a signal indicating that power has been recovered from the power recovery detector 31.
  • step S510-1 the PV PCS 120 returns to the first abnormality detection parameter in response to the power recovery notification from the HEMS 500.
  • step S510-3 the SOFC PCS 320 returns to the first abnormality detection parameter in response to the power recovery notification from the HEMS 500.
  • the PCS controller 325 of the SOFC PCS 320 has been described as corresponding to the abnormality detection unit and the abnormality occurrence notification unit.
  • the HEMS 500 may be an abnormality detection unit and an abnormality occurrence notification unit.
  • the HEMS 500 detects an abnormality in the power state supplied to the load 400 based on the first abnormality detection parameter during the interconnected operation.
  • the HEMS 500 detects an abnormality, the HEMS 500 notifies the PV PCS 120 and the SOFC PCS 320 (PCS controller 325) of the occurrence of the abnormality, and the PV PCS 120 and the SOFC PCS 320 stop outputting power.
  • the HEMS 500 detects an abnormality in the power state supplied to the load 400 based on the second abnormality detection parameter.
  • the HEMS 500 notifies the PV PCS 120 or SOFC PCS 320 that has detected the abnormality, and stops the output of power.
  • the HEMS 500 may use information received from the PV PCS 120 and SOFC PCS 320 in detecting an abnormality, or may use information received from a sensor provided in the distribution board 30. Communication between the HEMS 500 and the PV PCS 120 and SOFC PCS 320 is performed using a signal format compliant with the communication protocol such as ECHONET Lite described above.
  • FIG. 11 is a block diagram of a power feeding system according to the first modification of the embodiment described above.
  • the power feeding system illustrated in FIG. 11 includes a storage battery system 200 instead of the PV system 100 described in each of the above-described embodiments.
  • the storage battery system 200 includes a storage battery 210 and a storage battery PCS220.
  • Storage battery PCS 220 has not only a DC / AC conversion function for converting DC power obtained by discharging of storage battery 210 into AC, but also a DC / AC conversion function for charging storage battery 210.
  • Other configurations are the same as those of the above-described embodiments.
  • the operation sequence at the time of the occurrence of a power failure in the power supply system according to each embodiment described above can be applied to the power supply system shown in FIG.
  • FIG. 12 is a block diagram of a power feeding system according to the second modification of the embodiment described above.
  • the power supply system illustrated in FIG. 12 includes a storage battery system 200 in addition to the PV system 100 and the SOFC system 300 described in the above-described embodiments. Other configurations are the same as those of the above-described embodiments.
  • the operation sequence at the time of the occurrence of a power failure in the power supply system according to each embodiment described above can be applied to the power supply system shown in FIG.
  • the SOFC system 300 has been described as an example of the fuel cell system according to the present invention.
  • a fuel cell system using another type of fuel cell such as PEFC may be used.
  • the HEMS which is an energy management system provided in the home
  • a building energy management system (BEMS), a community energy management system (CEMS), or the like may be used as the management device according to the present invention.
  • a power supply system a distributed power supply system, and a power supply that can reduce the possibility of power supply to a load being stopped even when a plurality of distributed power supply systems simultaneously perform autonomous operation during a power failure.
  • a control method can be provided.

Abstract

 系統10と並列した連系運転、又は解列した自立運転を行うことにより、負荷400に電力を供給できる複数の分散型電源システムを有する。SOFCシステム300は、負荷400に供給される電力状態の異常を検出する。SOFCシステム300は、自立運転時における異常検出の条件を、連系運転時よりも緩和する。

Description

給電システム、分散型電源システム、管理装置、及び給電制御方法
 本発明は、分散型電源を用いて負荷に電力を供給するための給電システム、分散型電源システム、管理装置、及び給電制御方法に関する。
 近年、電力の需要家において、商用電力系統(以下、適宜「系統」と称する)の補助電源として、系統と並列した連系運転により負荷に電力を供給できる分散型電源システム(燃料電池システムや太陽電池システムなど)の導入が進んでいる。分散型電源システムは、分散型電源及びパワーコンディショナを含む。
 また、系統の停電時において、系統と解列した自立運転によって負荷に電力を供給できる分散型電源システムも知られている。
 一方、連系運転が可能な分散型電源システムは、系統の停電時において当該分散型電源システムの出力電力が系統に逆潮流可能な状態(すなわち、単独運転)を防止する必要がある。
 よって、負荷への供給電力の異常(例えば、系統の停電又は系統電力の不安定状態など)を検出して電力の出力を停止する単独運転防止機能を有する分散型電源システムが知られている(例えば、特許文献1参照)。
特開2007-209097号公報
 しかしながら、系統の停電等の異常時において、分散型電源システムが同時に自立運転を行う場合、分散型電源システムの出力電力は系統の電力に比べて不安定であることから、上述した単独運転防止機能が作動し、負荷への電力供給が停止する可能性がある。
 そこで、本発明は、系統の停電等の異常時において分散型電源システムが自立運転を行う場合でも、負荷への電力供給が停止する可能性を低減できる給電システム、分散型電源システム、管理装置、及び給電制御方法を提供することを目的とする。
 本発明の給電システムは、商用電力系統と並列した連系運転、又は解列した自立運転を行うことにより、負荷に電力を供給できる複数の分散型電源システムを有し、前記複数の分散型電源システムのうちのいずれかは、前記負荷に供給される電力状態の異常を検出する異常検出部を有する。前記異常検出部は、前記自立運転時における異常検出の条件を、前記連系運転時よりも緩和する。
 本発明の給電システムの他の特徴によれば、前記異常検出部は、複数の分散型電源システムのうちの少なくともいずれかの単独運転を防止するために、前記負荷に供給される電力の異常を検出する。
 本発明の給電システムの他の特徴によれば、前記異常検出部は、前記負荷に供給される電力状態の異常が検出された後に前記自立運転が行われる場合に、前記連系運転時よりも異常検出の条件を緩和する。
 本発明の給電システムの他の特徴によれば、前記異常検出部は、前記連系運転時において第1の異常検出パラメータを使用して、異常検出を行い、前記自立運転時においては前記第1の異常検出パラメータよりも緩和された第2の異常検出パラメータを、前記第1の異常検出パラメータに代えて使用する。
 本発明の給電システムの他の特徴によれば、前記複数の分散型電源システムの動作状態を管理する管理装置を有し、前記異常検出部を有する分散型電源システムは、前記異常検出部が異常を検出した場合に、前記管理装置に対して異常発生通知を送信する異常発生通知部を含む。
 本発明の給電システムの他の特徴によれば、前記商用電力系統からの電力ライン上に設けられた遮断器(例えば、サービスブレーカSB)を有し、前記管理装置は、前記異常発生通知を受信した後、前記複数の分散型電源システム及び前記負荷を前記商用電力系統から電気的に切り離すように前記遮断器を制御する遮断器制御部を含む。
 本発明の給電システムの他の特徴によれば、前記異常検出部を有する分散型電源システムは、前記異常検出部が異常を検出した場合に、自システムからの電力の出力を停止する出力制御部を含む。
 本発明の給電システムの他の特徴によれば、前記管理装置は、前記遮断器制御部が前記遮断器を制御した後、前記異常検出部を有する分散型電源システムに、電力の出力を再開させるための情報を送信する送信部を含む。
 本発明の給電システムの他の特徴によれば、前記管理装置は、前記異常発生通知を受信した後、前記自立運転における異常検出の条件として、前記連系運転時よりも緩和した条件を指定するためのパラメータ情報を、前記異常検出部を有する分散型電源システムに対して送信する制御を行う制御部を含む。
 本発明の給電システムの他の特徴によれば、前記複数の分散型電源システムは、太陽電池システムを含み、前記制御部は、前記太陽電池システムの予測発電量に応じて、前記自立運転時における異常検出の条件を決定する。
 本発明の給電システムの他の特徴によれば、前記自立運転時における異常検出の条件は、前記太陽電池システムの予測発電量が少ないときほど、前記緩和の度合いが大きくなるように決定される。
 本発明の給電システムの他の特徴によれば、前記負荷は、複数設けられており、前記管理装置は、前記異常発生通知を受信した後、前記複数の負荷毎に電力供給を制御する電力供給制御部を含む。
 本発明の給電システムの他の特徴によれば、前記電力供給制御部は、前記複数の負荷へ供給可能な電力量と、前記複数の負荷が必要とする電力量とに応じて、前記複数の負荷のうち選択した負荷への電力供給を停止するよう制御する。
 本発明の給電システムの他の特徴によれば、前記異常検出部を有する分散型電源システムは、燃料電池システムである。
 本発明の分散型電源システムは、商用電力系統と並列した連系運転、又は解列した自立運転を行うことにより、負荷に電力を供給できる分散型電源と、前記連系運転時において、前記負荷に供給される電力状態の異常を検出する異常検出部と、を有する。前記異常検出部は、前記負荷に供給される電力状態の異常が検出された後に前記自立運転が行われる場合には、前記連系運転時よりも異常検出の条件を緩和する。
 本発明の管理装置は、商用電力系統と並列した連系運転、又は解列した自立運転を行うことにより、負荷に電力を供給できる分散型電源システムの動作状態を管理する。管理装置は、前記負荷に供給される電力状態の異常を検出する異常検出部を有する。前記異常検出部は、前記分散型電源システムの前記自立運転時における異常検出の条件を、前記連系運転時よりも緩和する。
 本発明の制御方法は、商用電力系統と並列した連系運転、又は解列した自立運転を行うことにより、負荷に電力を供給できる分散型電源システムを有する給電システムにおける制御方法であって、前記負荷に供給される電力状態の異常を検出するステップを有し、前記自立運転時における異常検出の条件を、前記連系運転時よりも緩和する。
 本発明によれば、系統の停電等の異常時において、複数の分散型電源システムが同時に自立運転を行う場合でも、負荷への電力供給が停止する可能性を低減できる給電システム、分散型電源システム、管理装置、及び給電制御方法を提供できる。
図1は、本発明の第1実施形態~第4実施形態に係る給電システムのブロック図である。 図2は、本発明の第1実施形態~第5実施形態に係るSOFC PCSのブロック図である。 図3は、本発明の第1実施形態~第5実施形態に係るHEMS500のブロック図である。 図4は、本発明の第1実施形態に係る給電システムにおける停電発生時の動作シーケンス図である。 図5は、本発明の第2実施形態に係る給電システムにおける停電発生時の動作シーケンス図である。 図6は、本発明の第3実施形態に係る給電システムにおける停電発生時の動作シーケンス図である。 図7は、本発明の第4実施形態に係る異常検出パラメータを示す。 図8は、本発明の第4実施形態に係る給電システムにおける停電発生時の動作シーケンス図である。 図9は、本発明の第5実施形態に係る給電システムのブロック図である。 図10は、本発明の第5実施形態に係る給電システムにおける停電発生時の動作シーケンス図である。 図11は、本発明の第1実施形態~第5実施形態の変更例1に係る給電システムのブロック図である。 図12は、本発明の第1実施形態~第5実施形態の変更例2に係る給電システムのブロック図である。
 図面を参照して、本発明の第1実施形態~第5実施形態、及びその他の実施形態を説明する。以下の各実施形態に係る図面において、同一又は類似の部分には同一又は類似の符号を付す。
 [第1実施形態]
 (給電システムの全体構成)
 図1は、本実施形態に係る給電システムのブロック図である。図1において、ブロック間の実線は電力ラインを示し、破線は制御ラインを示す。制御ラインは無線としてもよい。
 図1に示すように、本実施形態に係る給電システムは、系統10から電力(AC電力)の供給を受ける需要家1に設けられる。本実施形態に係る給電システムは、買電メータ21、売電メータ22、分電盤30、太陽電池(PV)システム100、固体酸化物形燃料電池(SOFC)システム300、複数の負荷400、及び住宅エネルギー管理システム(HEMS)500を有する。PVシステム100、SOFCシステム300、及び複数の負荷400は、電力ラインを介して分電盤30に接続される。
 買電メータ21及び売電メータ22は、系統10と分電盤30との間の電力ライン上に設けられる。買電メータ21は、需要家1が系統10から入力する電力(買電電力)を測定する。売電メータ22は、需要家1が系統10に出力する電力(売電電力)を測定する。買電メータ21及び売電メータ22は、測定結果をHEMS500に送信する。
 分電盤30は、系統10からの電力及び複数の分散電源システム(PVシステム100、SOFCシステム300)からの電力を負荷400に分配する。また、分電盤30は、PVシステム100からの電力のうち負荷400で消費されない余剰電力を系統10に出力(売電)する。
 分電盤30は、復電検出器31、サービスブレーカSB、漏電ブレーカELB、PVブレーカB1、SOFCブレーカB3、及び複数の負荷ブレーカB4~B8を含む。
 復電検出器31は、売電メータ22とサービスブレーカSBとの間の電力ライン上に設けられる。復電検出器31は、系統10の停電後の復電を検出し、検出結果に関する通知をHEMS500に送信する。
 サービスブレーカSBは、復電検出器31と漏電ブレーカELBとの間の電力ライン上に設けられる。サービスブレーカSBは、HEMS500からの制御によって、導通(オン)状態から非導通(オフ)状態、オフ状態からオン状態に切り替えられる。本実施形態において、サービスブレーカSBは、複数の分散型電源システム(PVシステム100、SOFCシステム300)及び負荷400を系統10から電気的に切り離すための遮断器に相当する。
 漏電ブレーカELBは、サービスブレーカSBとブレーカ(PVブレーカB1、SOFCブレーカB3、及び複数の負荷ブレーカB4~B8)との間の電力ライン上に設けられる。漏電ブレーカELBは、漏電を検出すると、オン状態からオフ状態に切り替わる。
 PVブレーカB1は、漏電ブレーカELBとPVパワーコンディショナ(PCS)120との間の電力ライン上に設けられる。PVブレーカB1は、HEMS500からの制御によって、入力aから入力b、入力bから入力aに切り替えられる。入力aは、PC PCS120との間の通常電力ラインに接続され、入力bは、PC PCS120との間の自立電力ラインに接続される。通常時(連系運転時)には入力aが使用され、自立運転時には入力bが使用される。
 SOFCブレーカB3は、漏電ブレーカELBとSOFC PCS320との間の電力ライン上に設けられる。SOFCブレーカB3は、HEMS500からの制御によって、オン状態からオフ状態、オフ状態からオン状態に切り替えられる。 
 負荷ブレーカB4~B8は、負荷400-1~400-5に対応して設けられる。負荷ブレーカB4は、漏電ブレーカELBと負荷400-1との間の電力ライン上に設けられる。負荷ブレーカB5~B8も同様に設けられる。負荷ブレーカB4~B8のそれぞれは、HEMS500からの制御によって、オン状態からオフ状態、オフ状態からオン状態に切り替えられる。
 PVシステム100は、PV110及びPV PCS120を有する。
 PV110は、太陽光を受けて発電を行い、発電により得られた電力をPV PCS120に出力する。PV110の発電量は、PV110に照射される日射量に応じて変化する。
 PV PCS120は、PV110からの電力が入力され、当該入力された電力をDCからACに変換して分電盤30に出力する。PV PCS120は、PV110を系統10に連系して連系運転を行う。連系運転時において、PV PCS120は、系統10の状態(電圧、電流、位相、及び周波数等)に合わせた電力を出力する。
 PV PCS120は、単独運転防止機能を有する。単独運転防止機能とは、連系運転が可能な発電装置が、停電又はその兆候等を検出して運転を停止する機能をいう。一例として日本においては、連系運転が可能な発電装置は、安全上及び電力会社側の作業性担保などを理由として、系統の停電等を検出した時には、当該発電装置の出力電力が逆潮流可能になる状態(単独運転)を避けることが求められている。このため、連系運転が可能な発電装置は、単独運転防止機能を有することが求められている。
 詳細には、PV PCS120は、分電盤30との間の電力ラインの状態(電圧、電流、位相、及び周波数等)を監視しており、監視する電圧又は周波数が異常検出パラメータで定められる範囲を超えた場合に、系統が停電等の異常状態であると判断し、電力の出力を停止する。停電等の異常の判断方法は、単独運転防止機能における能動方式検出方法と実質的に同様である。また、PV PCS120は、PV110を系統10に連系しない自立運転により電力を出力することもできる。
 SOFCシステム300は、SOFC310及びSOFC PCS320を有する。
 SOFC310は、燃料電池の一例であり、天然ガスなどから取り出した水素と空気中の酸素との化学反応により発電を行い、発電により得られた電力をSOFC PCS320に出力する。SOFC310の発電量は、SOFC310に入力されるガス及び空気の量に応じて変化する。ガス及び空気の量は、SOFC PCS320によって制御される。
 SOFC PCS320は、SOFC310からの電力が入力され、当該入力された電力をDCからACに変換して分電盤30に出力する。SOFC PCS320は、SOFC310を系統10に連系して連系運転を行う。連系運転時において、SOFC PCS320は、系統10の状態(電圧、電流、位相、及び周波数等)に合わせた電力を出力する。SOFC PCS320は、単独運転防止機能を有する。詳細には、SOFC PCS320は、分電盤30との間の電力ラインの状態(電圧、電流、位相、及び周波数等)を監視しており、監視する電圧又は周波数が異常検出パラメータで定められる範囲を超えた場合に、系統が停電状態であると判断し、電力の出力を停止する。停電の判断方法は、単独運転防止機能における能動方式検出方法と実質的に同様である。また、SOFC PCS320は、SOFC310を系統10に連系しない自立運転により電力を出力することもできる。
 負荷400は、分電盤30から電力ラインを介して電力を入力し、当該入力した電力を消費して動作する。各負荷400は、例えば、照明、エアコン、冷蔵庫、テレビ等の電気機器である。
 HEMS500は、需要家1における各種の電力管理を行う。本実施形態において、HEMS500は、複数の分散型電源システムの動作状態を管理する管理装置に相当する。HEMS500は、復電検出器31、各種ブレーカ、PV PCS120、及びSOFC PCS320との通信を行い、制御信号を送受信する。さらに、HEMS500は、買電メータ21及び売電メータ22との通信を行ってもよい。なお、これら制御信号の送受信などの通信は、ECHONET Lite規格、ZigBee SEP2.0規格あるいはKNX規格といった、所定の通信プロトコルに準拠した信号フォーマットを用いて行われる。
 (SOFC PCSの構成)
 図2は、SOFC PCS320のブロック図である。図2において、ブロック間の実線は電力ラインを示し、破線は制御ラインを示す。PV PCS120は、SOFC PCS320と同様に構成される。
 図2に示すように、SOFC PCS320は、DC/DC変換器321、DC/AC変換器322、リレー323、センサ324、及びPCSコントローラ325を含む。
 DC/DC変換器321は、SOFC310とDC/AC変換器322との間の電力ライン上に設けられる。DC/DC変換器321は、SOFC310からの電力をDC/DC変換してDC/AC変換器322に出力する。DC/DC変換器321は、PCSコントローラ325からの制御に応じてDC/DC変換を行う。
 DC/AC変換器322は、DC/DC変換器321とリレー323との間の電力ライン上に設けられる。DC/AC変換器322は、DC/DC変換器321からの電力をDC/AC変換してリレー323に出力する。DC/AC変換器322は、PCSコントローラ325からの制御に応じてDC/AC変換を行う。
 リレー323は、DC/AC変換器322とセンサ324との間の電力ライン上に設けられる。リレー323は、PCSコントローラ325からの制御によって、オン状態からオフ状態、オフ状態からオン状態に切り替えられる。リレー323がオン状態であるときは、SOFC PCS320が電力を出力可能であり、リレー323がオフ状態であるときは、SOFC PCS320が電力を出力不能である。
 センサ324は、リレー323と分電盤30との間の電力ライン上に設けられる。センサ324は、リレー323と分電盤30との間の電力ラインの電圧や周波数を測定し、測定結果をPCSコントローラ325に出力する。
 PCSコントローラ325は、プロセッサ及びメモリを含み、各種の制御を行う。PCSコントローラ325は、センサ324からの測定結果と、HEMS500からの制御信号とに基づいて、DC/DC変換器321、DC/AC変換器322、及びリレー323を制御する。また、PCSコントローラ325は、SOFC PCS320の動作状態に関する情報をHEMS500に送信する。
 本実施形態では、PCSコントローラ325は、連系運転時において、単独運転を防止するための第1の異常検出パラメータと、センサ324の測定結果とに基づいて、負荷400に供給される電力の異常を検出する。第1の異常検出パラメータは、例えば、電圧値は上限値115V、下限値85Vとし、周波数は上限値51Hz、下限値49Hzとすることができる。PCSコントローラ325は、センサ324の測定結果が第1の異常検出パラメータで定められる範囲を超えると、異常を検出したと判断する。このように、本実施形態において、センサ324及びPCSコントローラ325は、異常検出部を構成する。
 PCSコントローラ325は、第1の異常検出パラメータを使用して異常を検出すると、リレー323をオン状態からオフ状態に切り替える。その結果、SOFC PCS320からの電力の出力が停止する。このように、本実施形態において、リレー323及びPCSコントローラ325は、出力制御部を構成する。
 第1の異常検出パラメータを用いた異常の検出、及び異常検出時の出力停止は、通常の独立運転防止機能に従って行われる。
 さらに、PCSコントローラ325は、第1の異常検出パラメータを使用して異常を検出すると、HEMS500に対して異常発生通知をECHONET Lite等の前述の所定のプロトコルに準拠した信号フォーマットにより送信する。異常発生通知とは、停電が発生した旨の通知であってもよく、停電の兆候が発生した旨の通知であってもよい。このように、本実施形態において、PCSコントローラ325は、異常発生通知部に相当する。
 その後、PCSコントローラ325は、HEMS500からのパラメータ情報を受信する。パラメータ情報は、第1の異常検出パラメータよりも緩和された第2の異常検出パラメータを指定するものである。すなわち、第2の異常検出パラメータで定められる電圧・周波数範囲は、第1の異常検出パラメータで定められる電圧・周波数範囲よりも広い。第2の異常検出パラメータは、例えば、電圧値は上限値120V、下限値80Vとし、周波数は上限値52Hz、下限値48Hzとすることができる。パラメータ情報は、第2の異常検出パラメータの数値自体であってもよく、例えば、図7に示すような、予め定められた第2の異常検出パラメータの数値の組を示すインデックスであってもよい。
 また、PCSコントローラ325は、SOFCシステム300(SOFC PCS320)からの電力の出力を再開するための情報を受信する。当該情報は、例えば、電力出力の再開指示であってもよく、自立運転の開始指示であってもよく、サービスブレーカSBをオフした旨の通知(以下、ブレーカオフ通知)であってもよい。以下においては、PCSコントローラ325がブレーカオフ通知を受信する一例を説明する。
 PCSコントローラ325は、ブレーカオフ通知を受信すると、リレー323をオフ状態からオン状態に切り替える。その結果、SOFC PCS320からの電力の出力が再開可能な状態になる。また、PCSコントローラ325は、センサ324からの測定結果に基づいて、DC/DC変換器321及びDC/AC変換器322を制御する。詳細については後述するが、この時点ではサービスブレーカSBがオフ状態であるため、SOFC PCS320は自立運転(系統10に連系しない運転)を行うことになる。
 さらに、PCSコントローラ325は、そのような自立運転時において、HEMS500からのパラメータ情報で指定された第2の異常検出パラメータに変更して異常検出を行う。第2の異常検出パラメータは、第1の異常検出パラメータよりも緩和されたものであるため、連系運転時に比べて異常検出と判断されにくい状態になる。PCSコントローラ325は、第2の異常検出パラメータを用いて異常を検出すると、リレー323をオン状態からオフ状態に切り替える。その結果、SOFC PCS320からの電力の出力が停止する。
 その後、PCSコントローラ325は、HEMS500からの復電通知を受信する。復電通知は、復電した旨の通知であってもよく、第1の異常検出パラメータに戻すよう指示する旨の情報であってもよい。PCSコントローラ325は、HEMS500からの復電通知を受信すると、第2の異常検出パラメータから第1の異常検出パラメータに戻して異常検出を行う。第1の異常検出パラメータに戻した以降は、通常の独立運転防止機能に従った独立運転防止動作が行われる。
 (HEMSの構成)
 図3は、HEMS500のブロック図である。
 図3に示すように、HEMS500は、通信部510、入力部520、表示部530、記憶部540、及び制御部550を含む。
 通信部510は、需要家1に設けられた各機器との通信を行う。詳細には、通信部510は、復電検出器31、各種ブレーカ、PV PCS120、及びSOFC PCS320との通信を行い、制御信号を所定の通信プロトコルに準じた信号フォーマットで送受信する。
 入力部520は、ユーザからの操作入力を受け付ける。表示部530は、各種の表示を行う。入力部520及び表示部530はタッチパネルとして一体化されていてもよい。表示部530は、買電メータ21及び売電メータ22から得られる情報に基づいて、買電量や売電量を時系列で表示してもよい。
 記憶部540は、メモリを含み、制御部550における制御に使用される各種情報を記憶する。制御部550は、プロセッサを含み、HEMS500の各種機能を制御する。
 記憶部540は、例えば、第1の異常検出パラメータ及び第2の異常検出パラメータを記憶する。第1の異常検出パラメータ及び第2の異常検出パラメータは、ユーザが入力部520を操作することによって入力してもよく、記憶部540に記憶された各種情報に基づいて、制御部550が算出した値であってもよい。
 制御部550は、通信部510がSOFC PCS320からの異常発生通知を受信すると、サービスブレーカSBをオン状態からオフ状態に切り替えるよう制御する。詳細には、サービスブレーカSBをオフ状態に切り替える指示を通信部510から送信させる。その結果、サービスブレーカSBがオフ状態になり、複数の分散型電源システム(PVシステム100、SOFCシステム300)及び負荷400が系統10から電気的に切り離される。このように、本実施形態において、通信部510及び制御部550は、遮断器制御部を構成する。
 制御部550は、サービスブレーカSBをオフ状態にした後、SOFCシステム300からの電力の出力を再開させるための情報(ここでは、ブレーカオフ通知)を複数の分散型電源システム(PVシステム100、SOFCシステム300)に対して送信するよう通信部510を制御する。このように、本実施形態において、通信部510及び制御部550は、送信部を構成する。
 また、制御部550は、サービスブレーカSBをオフ状態にした後、第2の異常検出パラメータを指定するためのパラメータ情報を、複数の分散型電源システム(PVシステム100、SOFCシステム300)に対して送信するよう通信部510を制御する。上述したように、パラメータ情報は、第2の異常検出パラメータの数値自体であってもよく、例えば、図7に示すような、予め定められた第2の異常検出パラメータの数値の組を示すインデックスであってもよい。
 その後、制御部550は、通信部510が復電検出器31から復電した旨を示す信号を受信すると、復電通知を複数の分散型電源システム(PVシステム100、SOFCシステム300)に対して送信するよう通信部510を制御する。上述したように、復電通知は、復電した旨の通知であってもよく、第1の異常検出パラメータに戻すよう指示する旨の情報であってもよい。
 (給電システムの動作)
 図4は、本実施形態に係る給電システムにおける停電発生時の動作シーケンス図である。
 図4に示すように、ステップS101-1においてPV PCS120が電力異常を検出し、ステップS101-3においてSOFC PCS320が電力異常を検出する。
 ステップS102-1において、PV PCS120は、異常検出に応じて電力の出力を停止する。また、ステップS102-3において、SOFC PCS320は、異常検出に応じて電力の出力を停止する。
 ステップS103において、SOFC PCS320は、HEMS500に対して異常発生通知を送信する。
 ステップS104において、HEMS500は、SOFC PCS320からの異常発生通知を受信すると、サービスブレーカSBをオフ状態に切り替える指示を分電盤30に対して送信する。
 ステップS105において、分電盤30は、HEMS500からのブレーカオフ指示に応じて、サービスブレーカSBをオフ状態に切り替える。
 ステップS106において、HEMS500は、ブレーカオフ通知をPV PCS120及びSOFC PCS320に対して送信する。また、HEMS500は、パラメータを変更する指示としてパラメータ情報をPV PCS120及びSOFC PCS320に対して送信する。
 ステップS107-1において、PV PCS120は、HEMS500からのパラメータ情報に応じて第1の異常検出パラメータから第2の異常検出パラメータに変更する。また、ステップS107-3において、SOFC PCS320は、HEMS500からのパラメータ情報に応じて第1の異常検出パラメータから第2の異常検出パラメータに変更する。
 ステップS108-1において、PV PCS120は、HEMS500からのブレーカオフ通知に応じて自立運転により電力の出力を再開する。また、ステップS108-3において、SOFC PCS320は、HEMS500からのブレーカオフ通知に応じて自立運転により電力の出力を再開する。
 その後、ステップS109において、分電盤30の復電検出器31は、復電を検出する。
 ステップS110において、復電検出器31は、復電した旨を示す信号をHEMS500に対して送信する。
 ステップS111において、分電盤30は、復電検出に応じてサービスブレーカSBをオフ状態からオン状態に切り替える。
 ステップS112において、HEMS500は、復電検出器31からの復電した旨を示す信号に応じて、復電通知をPV PCS120及びSOFC PCS320に対して送信する。
 ステップS113-1において、PV PCS120は、HEMS500からの復電通知に応じて第1の異常検出パラメータに戻す。また、ステップS113-3において、SOFC PCS320は、HEMS500からの復電通知に応じて第1の異常検出パラメータに戻す。すなわち、復電通知は、パラメータ変更を指示する信号としての側面も併せ持つ。
 (まとめ)
 以上説明したように、給電システムは、系統10との連系運転、又は自立運転により、負荷400に電力を供給できる複数の分散型電源システム(PVシステム100、SOFCシステム300)を有する。SOFCシステム300は、連系運転時において、単独運転を防止するための第1の異常検出パラメータを使用して、負荷400に供給される電力の異常を検出する。また、SOFCシステム300は、負荷400に供給される電力の異常が検出された後、自立運転時において、第1の異常検出パラメータよりも緩和された第2の異常検出パラメータを、第1の異常検出パラメータに代えて使用する。
 これにより、自立運転時において負荷400に供給される電力が異常とみなされ難くなるため、系統10の停電時において複数の分散型電源システムが同時に自立運転を行う場合でも、負荷400への電力供給が停止する可能性を低減できる。また、異常検出パラメータを変更するものの、負荷400に供給される電力の異常は検出可能であるため、例えば負荷400に供給される電力が過大であるような状況下では負荷400への電力供給を停止できる。
 [第2実施形態]
 以下、第2実施形態について、第1実施形態との相違点を主として説明する。
 上述した第1実施形態では、PV PCS120及びSOFC PCS320が同時に自立運転により電力出力を再開していた。しかしながら、例えばPV PCS120の自立運転への切り替えが手動で行われるような場合には、以下で説明するように、PV PCS120及びSOFC PCS320が異なるタイミングで電力出力を再開してもよい。
 図5は、本実施形態に係る給電システムにおける停電発生時の動作シーケンス図である。ステップS201~S205は、第1実施形態で説明したステップS101~S105と同様であるため、ステップS206から説明する。
 図5に示すように、ステップS206において、HEMS500は、ブレーカオフ通知をPV PCS120及びSOFC PCS320に対して送信する。
 ステップS207において、SOFC PCS320は、HEMS500からのブレーカオフ通知に応じて自立運転により電力の出力を再開する。
 ステップS208において、PV PCS120は、自立運転により電力の出力を再開する旨の通知(予告)をHEMS500に対して送信する。PV PCS120が自立運転により電力の出力を再開する場合、第1の異常検出パラメータから第2の異常検出パラメータに変更する必要が生じる。
 ステップS209において、HEMS500は、PV PCS120からの出力再開通知に応じて、第2の異常検出パラメータに変更するためのパラメータ情報をPV PCS120及びSOFC PCS320に対して送信する。
 ステップS210-1において、PV PCS120は、HEMS500からのパラメータ情報に応じて第1の異常検出パラメータから第2の異常検出パラメータに変更する。また、ステップS210-3において、SOFC PCS320は、HEMS500からのパラメータ情報に応じて第1の異常検出パラメータから第2の異常検出パラメータに変更する。
 ステップS211において、PV PCS120は、自立運転により電力の出力を再開する。以降の動作については、第1実施形態と同様であるため、説明を省略する。
 [第3実施形態]
 以下、第3実施形態について、第1実施形態との相違点を主として説明する。
 本実施形態では、HEMS500は、SOFC PCS320からの異常発生通知を受信した後、負荷400への電力供給を制御する。詳細には、HEMS500の制御部550は、負荷ブレーカB4~B8の少なくとも1つに対してオフ状態への切り替え指示を送信するよう通信部510を制御することで、負荷400毎に電力供給を制御する。
 本実施形態では、通信部510及び制御部550は、PV PCS120及びSOFC PCS320との通信を行うことで、負荷400へ供給可能な電力量に関する情報を取得する。また、通信部510及び制御部550は、分電盤30に設けられたセンサとの通信を行うことで、負荷400が必要とする電力量に関する情報を取得する。そして、通信部510及び制御部550は、負荷400へ供給可能な電力量と、負荷400が必要とする電力量とに応じて、負荷400のうち選択した負荷400への電力供給を停止するよう制御する。
 例えば、制御部550は、負荷400へ供給可能な電力量が、負荷400が必要とする電力量に対して不足する場合に、不足分の電力量を算出し、当該不足分の電力量に相当する電力を必要とする少なくとも1つの負荷400への電力供給を停止すると決定する。また、制御部550は、電力供給を停止すべき負荷400に対応する負荷ブレーカを特定し、当該負荷ブレーカに対するオフ切り替え指示を送信するよう通信部510を制御する。これにより、負荷400が必要とする電力量を、負荷400へ供給可能な電力量以下にすることができる。
 ここで、HEMS500は、負荷ブレーカB4~B8のいずれかを直接制御してオフ状態とすることで負荷400毎の電力供給を制御させてもよいが、負荷400を直接制御してもよい。この場合、HEMS500は、Echonet LiteあるいはZigBee(登録商標)などの通信プロトコルを用いて、負荷400と直接通信を行い、その電源をオフする制御信号、あるいは省電力状態へ遷移させる制御信号などを負荷400に送信することにより、負荷400毎の電力供給を制御する。
 図6は、本実施形態に係る給電システムにおける停電発生時の動作シーケンス図である。ステップS301~S308は、第1実施形態で説明したステップS101~S108と同様であるため、ステップS309から説明する。
 図6に示すように、ステップS309において、HEMS500は、PV PCS120及びSOFC PCS320が自立運転により出力を再開した後、負荷400へ供給可能な電力量が、負荷400が必要とする電力量に対して不足するか否かを判定する。ここでは、不足すると判定したとする。
 ステップS310において、HEMS500は、オフ切り替え指示として、電力供給を停止すべき負荷400に対応する負荷ブレーカに対して指示信号を送信、あるいは負荷400に対して直接の制御信号を送信する。
 ステップS311において、オフ切り替え指示を受信した負荷400は、オン状態からオフ状態に切り替わる。
 その後、ステップS312において、分電盤30の復電検出器31は、復電を検出する。
 ステップS313において、復電検出器31は、復電した旨を示す通知をHEMS500に対して送信する。
 ステップS314において、分電盤30は、復電検出に応じてサービスブレーカSBをオフ状態からオン状態に切り替える。
 ステップS315において、分電盤30は、復電検出に応じて、ステップS311でオフ状態にした負荷ブレーカをオフ状態からオン状態に切り替える。
 ステップS316において、HEMS500は、復電検出器31からの復電した旨を示す信号に応じて、復電通知をPV PCS120及びSOFC PCS320に対して送信する。
 ステップS317-1において、PV PCS120は、HEMS500からの復電通知に応じて第1の異常検出パラメータに戻す。また、ステップS317-3において、SOFC PCS320は、HEMS500からの復電通知に応じて第1の異常検出パラメータに戻す。
 また、HEMS500は、負荷400へ供給可能な電力量に関する情報と、負荷400が必要とする電力量に関する情報とを定期的に取得してもよい。この場合、HEMS500が復電検出器31から復電した旨を示す信号を受信するまで、ステップS309を繰り返す。ステップS309において、負荷400へ供給可能な電力量が、負荷400が必要とする電力量に対して不足するか否かを判定した結果、電力供給を停止すべき負荷400を増やしてもよい。この場合、ステップS310において、HEMS500は、さらに電力供給を停止すべき負荷400に対応する負荷ブレーカに対してオフ切り替え指示を送信する。その後、ステップS311において、新たにオフ切り替え指示を受信した負荷400が、オン状態からオフ状態に切り替わる。反対に、ステップS309において、電力供給が再開可能な負荷400があると判定した場合、HEMS500は、電力供給が再開可能な負荷400に対応する負荷ブレーカに対して、オン切り替え指示を送信してもよい。
 [第4実施形態]
 以下、第4実施形態について、第1実施形態との相違点を主として説明する。
 上述した第1実施形態では、第2の異常検出パラメータは固定的に定められていた。これに対し、本実施形態では、HEMS500の制御部550は、PVシステム100の予測発電量に応じて第2の異常検出パラメータを決定する。
 制御部550は、PVシステム100が、現時刻以降において発電することが予測される電力を示す情報(以下、「予測発電量情報」)を取得する。予測発電量情報は、外部ネットワーク(例えばインターネット)に接続されたサービスセンター等から需要家1のHEMS500へ提供される。この場合、HEMS500は、サービスセンター等において予測発電量情報が作成されるときに必要とされる要素情報として、需要家1の地域情報等を事前に提供してもよい。また、制御部550は、外部ネットワークから、その日の需要家1の地域の天候(例えば、日射量)の情報(以下、「天候情報」)を取得し、取得した天候情報からPVシステム100の発電電力を予測して、予測発電量情報を取得するようにしてもよい。そして、制御部550は、予測発電量が少ないほど、緩和された度合いの大きい第2の異常検出パラメータを決定する。
 図7は、本実施形態に係る異常検出パラメータを示す。図7において、OVRは電圧上限値、UVRは電圧下限値、OFRは周波数上限値、UFRは周波数下限値を示す。HEMS500及び各PCSは、図7に示すようなテーブルを予め保持していてもよい。
 図7に示すように、設定番号(インデックス)0番の異常検出パラメータは、通常時(系統連系時)に使用されるデフォルト値としての第1の異常検出パラメータに相当する。一方、設定番号1番~5番の何れかの異常検出パラメータは、第2の異常検出パラメータとして選択される。
 制御部550は、予測発電量が多い(例えば昼間かつ晴れである)場合には、緩和された度合いの小さい第2の異常検出パラメータとして、例えば設定番号1番又は2番の異常検出パラメータを選択する。これに対し、予測発電量が少ない(例えば夜間又は曇りである)場合には、緩和された度合いの大きい第2の異常検出パラメータとして、例えば設定番号4番又は5番の異常検出パラメータを選択する。
 このように、PVシステム100の予測発電量に応じて第2の異常検出パラメータを決定することで、第2の異常検出パラメータを適切に設定できる。
 図8は、本実施形態に係る給電システムにおける停電発生時の動作シーケンス図である。ステップS401~S405は、第1実施形態で説明したステップS101~S105と同様であるため、ステップS406から説明する。
 図8に示すように、ステップS406において、HEMS500は、パラメータ情報を送信する前に、PVシステム100の予測発電量情報を取得し、上述した方法で、第2の異常検出パラメータを決定する。
 ステップS407において、HEMS500は、ブレーカオフ通知をPV PCS120及びSOFC PCS320に対して送信する。また、HEMS500は、ステップS406で決定したパラメータ情報をPV PCS120及びSOFC PCS320に対して送信する。以降の動作については、第1実施形態と同様であるため、説明を省略する。
 [第5実施形態] 
 以下、第5実施形態について、第1実施形態との相違点を主として説明する。
 上述した各実施形態では、PV PCS120及びSOFC PCS320は、電力異常を検出し、電力の出力を停止していた。これに対し、本実施形態では、系統10の停電(又はその兆候)の開始時から所定時間において無停電電源装置(UPS)により電力を賄い、その間に第2の異常検出パラメータに変更することで、電力の出力を停止せずに継続可能にする。
 図9は、本実施形態に係る給電システムのブロック図である。図9において、ブロック間の実線は電力ラインを示し、破線は制御ラインを示す。制御ラインは無線としてもよい。
 図9に示すように、本実施形態に係る給電システムは、サービスブレーカSBと漏電ブレーカELBとの間の電力ライン上に設けられたUPS32をさらに有する。UPS32は、小型の蓄電池を内蔵しており、系統10の停電時又は不安定状態時に当該蓄電池からの電力を負荷400に供給する。また、本実施形態では、復電検出器31は、停電(又はその兆候)を検出してHEMS500に通知する機能も有する。
 UPS32の出力電力の一部は、PV PCS120及びSOFC PCS320に供給される。ここで供給される電力は、停電又は電力不安定状態発生前における系統10からの電圧、電流、位相、及び周波数等といった単独運転防止機能における能動方式検出方法にて判断する基準となるパラメータを実質的に一致させている。 よって、PV PCS220及びSOFC PCS320は、UPS32からの電力供給により、系統10の停電又は電力不安定状態を認識せず、単独運転防止機能を作動させない。
 図10は、本実施形態に係る給電システムにおける停電発生時の動作シーケンス図である。
 図10に示すように、ステップS501において、分電盤30の停電・復電検出器31は、電力異常を検出する。
 ステップS502において、分電盤30は、停電・復電検出器31による異常検出に応じて、サービスブレーカSBをオフ状態に切り替える。
 ステップS503において、分電盤30は、ブレーカオフ通知をHEMS500に対して送信する。
 ステップS504において、HEMS500は、ブレーカオフ通知をPV PCS120及びSOFC PCS320に対して送信する。また、HEMS500は、パラメータ情報をPV PCS120及びSOFC PCS320に対して送信する。
 ステップS505-1において、PV PCS120は、HEMS500からのパラメータ情報に応じて第1の異常検出パラメータから第2の異常検出パラメータに変更する。また、ステップS505-3において、SOFC PCS320は、HEMS500からのパラメータ情報に応じて第1の異常検出パラメータから第2の異常検出パラメータに変更する。
 その後、ステップS506において、分電盤30の停電・復電検出器31は、復電を検出する。
 ステップS507において、停電・復電検出器31は、復電した旨を示す信号をHEMS500に対して送信する。
 ステップS508において、分電盤30は、停電・復電検出器31による復電検出に応じて、サービスブレーカSBをオフ状態からオン状態に切り替える。
 ステップS509において、HEMS500は、復電検出器31からの復電した旨を示す信号に応じて、復電通知をPV PCS120及びSOFC PCS320に対して送信する。
 ステップS510-1において、PV PCS120は、HEMS500からの復電通知に応じて第1の異常検出パラメータに戻す。また、ステップS510-3において、SOFC PCS320は、HEMS500からの復電通知に応じて第1の異常検出パラメータに戻す。
 [その他の実施形態]
 上記のように、本発明は各実施形態によって記載したが、この開示の一部をなす論述及び図面はこの発明を限定するものであると理解すべきではない。この開示から当業者には様々な代替実施形態、実施例及び運用技術が明らかとなる。
 例えば、上述した各実施形態は、別個独立に実施する場合に限らず、相互に組み合わせて実施してもよい。
 また、上述した各実施形態においては、SOFC PCS320のPCSコントローラ325が異常検出部及び異常発生通知部に相当するものとして説明したが、HEMS500が異常検出部及び異常発生通知部であってもよい。この場合、HEMS500は、連系運転時においては、第1の異常検出パラメータに基づいて、負荷400に供給される電力状態の異常を検出する。HEMS500は、異常を検出すると、PV PCS120及びSOFC PCS320(PCSコントローラ325)に異常発生を通知し、PV PCS120及びSOFC PCS320は、電力の出力を停止する。また、自立運転時においては、HEMS500は、第2の異常検出パラメータに基づいて、負荷400に供給される電力状態の異常を検出する。HEMS500は、異常を検出したPV PCS120又はSOFC PCS320に異常発生を通知し、電力の出力を停止させる。HEMS500は、異常の検出にあたり、PV PCS120及びSOFC PCS320から受信した情報を用いてもよく、又は、分電盤30に設けられたセンサから受信した情報を用いてもよい。HEMS500と、PV PCS120及びSOFC PCS320との間の通信は、前述したECHONET Lite等の通信のプロトコルに準拠した信号フォーマットを用いて行われる。
 また、上述した各実施形態で説明したPVシステム100に代えて、蓄電池システムを使用してもよい。図11は、上述した実施形態の変更例1に係る給電システムのブロック図である。図11に示す給電システムは、上述した各実施形態で説明したPVシステム100に代えて蓄電池システム200を有する。蓄電池システム200は、蓄電池210及び蓄電池PCS220を有する。蓄電池PCS220は、蓄電池210の放電により得られたDC電力をACに変換するためのDC/AC変換機能だけでなく、蓄電池210を充電するためのDC/AC変換機能も有する。その他の構成は上述した各実施形態と同様である。上述した各実施形態に係る給電システムにおける停電発生時の動作シーケンスは、図11に示す給電システムに対して応用可能である。
 さらに、蓄電池システム200をPVシステム100と併用してもよい。図12は、上述した実施形態の変更例2に係る給電システムのブロック図である。図12に示す給電システムは、上述した各実施形態で説明したPVシステム100及びSOFCシステム300に加えて蓄電池システム200を有する。その他の構成は上述した各実施形態と同様である。上述した各実施形態に係る給電システムにおける停電発生時の動作シーケンスは、図12に示す給電システムに対して応用可能である。
 上述した各実施形態では、SOFCシステム300を本発明に係る燃料電池システムの一例として説明した。しかしながら、例えば、PEFCなどの他の方式の燃料電池を用いた燃料電池システムであってもよい。
 上述した各実施形態では、宅内に設けられるエネルギー管理システムであるHEMSを本発明に係る管理装置の一例として説明した。しかしながら、ビルエネルギー管理システム(BEMS)やコミュニティエネルギー管理システム(CEMS)などを本発明に係る管理装置としてもよい。
 なお、日本国特許出願第2011-236518(2011年10月27日出願)の全内容が、参照により、本願に組み込まれている。
 本発明によれば、系統の停電時において、複数の分散型電源システムが同時に自立運転を行う場合でも、負荷への電力供給が停止する可能性を低減できる給電システム、分散型電源システム、及び給電制御方法を提供することができる。

Claims (17)

  1.  商用電力系統と並列した連系運転、又は解列した自立運転を行うことにより、負荷に電力を供給できる複数の分散型電源システムを有し、
     前記複数の分散型電源システムのうちのいずれかは、前記負荷に供給される電力状態の異常を検出する異常検出部を有し、
     前記異常検出部は、前記自立運転時における異常検出の条件を、前記連系運転時よりも緩和する、
    ことを特徴とする給電システム。
  2.  前記異常検出部は、複数の分散型電源システムのうちの少なくともいずれかの単独運転を防止するために、前記負荷に供給される電力の異常を検出する
    ことを特徴とする請求項1に記載の給電システム。
  3.  前記異常検出部は、前記負荷に供給される電力状態の異常が検出された後に前記自立運転が行われる場合に、前記連系運転時よりも異常検出の条件を緩和する、
    ことを特徴とする請求項1に記載の給電システム。
  4.  前記異常検出部は、前記連系運転時において第1の異常検出パラメータを使用して、異常検出を行い、前記自立運転時においては前記第1の異常検出パラメータよりも緩和された第2の異常検出パラメータを、前記第1の異常検出パラメータに代えて使用する
    ことを特徴とする請求項1に記載の給電システム。
  5.  前記複数の分散型電源システムの動作状態を管理する管理装置を有し、
     前記異常検出部を有する分散型電源システムは、
     前記異常検出部が異常を検出した場合に、前記管理装置に対して異常発生通知を送信する異常発生通知部を含むことを特徴とする請求項1に記載の給電システム。
  6.  前記商用電力系統からの電力ライン上に設けられた遮断器を有し、
     前記管理装置は、
     前記異常発生通知を受信した後、前記複数の分散型電源システム及び前記負荷を前記商用電力系統から電気的に切り離すように前記遮断器を制御する遮断器制御部を含むことを特徴とする請求項5に記載の給電システム。
  7.  前記異常検出部を有する分散型電源システムは、
     前記異常検出部が異常を検出した場合に、自システムからの電力の出力を停止する出力制御部を含む
    ことを特徴とする請求項6に記載の給電システム。
  8.  前記管理装置は、
     前記遮断器制御部が前記遮断器を制御した後、前記異常検出部を有する分散型電源システムに、電力の出力を再開させるための情報を送信する送信部を含む
    ことを特徴とする請求項7に記載の給電システム。
  9.  前記管理装置は、
     前記異常発生通知を受信した後、前記自立運転における異常検出の条件として、前記連系運転時よりも緩和した条件を指定するためのパラメータ情報を、前記異常検出部を有する分散型電源システムに対して送信する制御を行う制御部を含む
    ことを特徴とする請求項5に記載の給電システム。
  10.  前記複数の分散型電源システムは、太陽電池システムを含み、
     前記制御部は、前記太陽電池システムの予測発電量に応じて、前記自立運転時における異常検出の条件を決定することを特徴とする請求項9に記載の給電システム。
  11.  前記自立運転時における異常検出の条件は、前記太陽電池システムの予測発電量が少ないときほど、前記緩和の度合いが大きくなるように決定されることを特徴とする請求項10に記載の給電システム。
  12.  前記負荷は、複数設けられており、
     前記管理装置は、
     前記異常発生通知を受信した後、前記複数の負荷毎に電力供給を制御する電力供給制御部を含む
    ことを特徴とする請求項5に記載の給電システム。
  13.  前記電力供給制御部は、前記複数の負荷へ供給可能な電力量と、前記複数の負荷が必要とする電力量とに応じて、前記複数の負荷のうち選択した負荷への電力供給を停止するよう制御する
    ことを特徴とする請求項12に記載の給電システム。
  14.  前記異常検出部を有する分散型電源システムは、燃料電池システムであることを特徴とする請求項5に記載の給電システム。
  15.  商用電力系統と並列した連系運転、又は解列した自立運転を行うことにより、負荷に電力を供給できる分散型電源と、
     前記連系運転時において、前記負荷に供給される電力状態の異常を検出する異常検出部と、を有し、
     前記異常検出部は、前記負荷に供給される電力状態の異常が検出された後に前記自立運転が行われる場合には、前記連系運転時よりも異常検出の条件を緩和する、ことを特徴とする分散型電源システム。
  16.  商用電力系統と並列した連系運転、又は解列した自立運転を行うことにより、負荷に電力を供給できる分散型電源システムの動作状態を管理する管理装置であって、
     前記負荷に供給される電力状態の異常を検出する異常検出部を有し、
     前記異常検出部は、
     前記分散型電源システムの前記自立運転時における異常検出の条件を、前記連系運転時よりも緩和する、
    ことを特徴とする管理装置。
  17.  商用電力系統と並列した連系運転、又は解列した自立運転を行うことにより、負荷に電力を供給できる分散型電源システムを有する給電システムにおける制御方法であって、
     前記負荷に供給される電力状態の異常を検出するステップを有し、
     前記自立運転時における異常検出の条件を、前記連系運転時よりも緩和する、
    ことを特徴とする制御方法。
PCT/JP2012/076708 2011-10-27 2012-10-16 給電システム、分散型電源システム、管理装置、及び給電制御方法 WO2013061826A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2013540733A JP5792824B2 (ja) 2011-10-27 2012-10-16 給電システム、分散型電源システム、管理装置、及び給電制御方法
EP12843165.7A EP2773007A4 (en) 2011-10-27 2012-10-16 POWER SUPPLY SYSTEM, DISTRIBUTED POWER SOURCE SYSTEM, ADMINISTRATIVE DEVICE THEREFOR AND POWER SUPPLY CONTROL METHOD
US14/353,971 US9923357B2 (en) 2011-10-27 2012-10-16 Power supply system, distributed power source system, management apparatus, and power supply control method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2011-236518 2011-10-27
JP2011236518 2011-10-27

Publications (1)

Publication Number Publication Date
WO2013061826A1 true WO2013061826A1 (ja) 2013-05-02

Family

ID=48167659

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/076708 WO2013061826A1 (ja) 2011-10-27 2012-10-16 給電システム、分散型電源システム、管理装置、及び給電制御方法

Country Status (4)

Country Link
US (1) US9923357B2 (ja)
EP (1) EP2773007A4 (ja)
JP (1) JP5792824B2 (ja)
WO (1) WO2013061826A1 (ja)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013168224A (ja) * 2012-02-14 2013-08-29 Jx Nippon Oil & Energy Corp 燃料電池システム
WO2015008707A1 (ja) * 2013-07-17 2015-01-22 京セラ株式会社 制御装置、分電盤及び制御方法
WO2015019621A1 (ja) * 2013-08-08 2015-02-12 パナソニックIpマネジメント株式会社 電力供給システム、電力変換装置、分電盤
JP2015119581A (ja) * 2013-12-19 2015-06-25 京セラ株式会社 電力制御装置および電力制御方法
JP2015220821A (ja) * 2014-05-15 2015-12-07 三菱電機株式会社 電力供給システム及び電力供給制御装置
JP2016100962A (ja) * 2014-11-20 2016-05-30 三菱電機株式会社 地絡検出装置
CN106415986A (zh) * 2014-04-18 2017-02-15 国立研究开发法人情报通信研究机构 资源管理系统
JP2017046544A (ja) * 2015-08-28 2017-03-02 京セラ株式会社 パワーコンディショナ及び電力管理装置
JP2018011503A (ja) * 2017-08-24 2018-01-18 京セラ株式会社 制御装置、制御システム、分電盤及び制御方法
CN109308548A (zh) * 2018-09-12 2019-02-05 中科绿建(天津)科技发展有限公司 一种基于网格预测的设备安全管理方法及系统

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2516414A (en) * 2013-05-28 2015-01-28 Meb Engineering & Commercial Services Ltd Residential Domestic Uninterruptable Power Supply
KR101557116B1 (ko) * 2013-11-13 2015-10-02 주식회사 케이티 개별 부하의 운영상태를 추정하는 장치 및 방법
US10642241B2 (en) 2015-04-22 2020-05-05 Siemens Aktiengesellschaft Systems, methods and apparatus for improved generation control of microgrid energy systems
JP6581998B2 (ja) * 2015-06-08 2019-09-25 京セラ株式会社 通信装置、電力管理装置及び電力管理方法
US20230018100A1 (en) * 2019-12-27 2023-01-19 Abb Schweiz Ag Method and apparatus of detecting grid islanding
JP7387497B2 (ja) * 2020-03-11 2023-11-28 株式会社東芝 電力変換装置

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0865899A (ja) * 1994-08-18 1996-03-08 Nissin Electric Co Ltd 分散型連系システムの運転制御方法
JP2007209097A (ja) 2006-01-31 2007-08-16 Kyocera Corp 電力変換装置、及びそれを具備する太陽光発電システム
JP2010108807A (ja) * 2008-10-31 2010-05-13 Toshiba Fuel Cell Power Systems Corp 燃料電池発電システムおよびその運転方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4942454B2 (ja) * 2006-10-31 2012-05-30 三洋電機株式会社 系統連系装置及び系統連系システム
US20130030587A1 (en) * 2011-07-29 2013-01-31 General Electric Company System and method for power curtailment in a power network

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0865899A (ja) * 1994-08-18 1996-03-08 Nissin Electric Co Ltd 分散型連系システムの運転制御方法
JP2007209097A (ja) 2006-01-31 2007-08-16 Kyocera Corp 電力変換装置、及びそれを具備する太陽光発電システム
JP2010108807A (ja) * 2008-10-31 2010-05-13 Toshiba Fuel Cell Power Systems Corp 燃料電池発電システムおよびその運転方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2773007A4 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013168224A (ja) * 2012-02-14 2013-08-29 Jx Nippon Oil & Energy Corp 燃料電池システム
WO2015008707A1 (ja) * 2013-07-17 2015-01-22 京セラ株式会社 制御装置、分電盤及び制御方法
JP2015023636A (ja) * 2013-07-17 2015-02-02 京セラ株式会社 制御装置、制御システム、分電盤及び制御方法
US10673233B2 (en) 2013-07-17 2020-06-02 Kyocera Corporation Control device, distribution board, and control method
EP3032682A4 (en) * 2013-08-08 2016-07-20 Panasonic Ip Man Co Ltd POWER SUPPLY SYSTEM, ELECTRIC CONVERSION DEVICE, AND DISTRIBUTION BOARD
WO2015019621A1 (ja) * 2013-08-08 2015-02-12 パナソニックIpマネジメント株式会社 電力供給システム、電力変換装置、分電盤
JP2015035893A (ja) * 2013-08-08 2015-02-19 パナソニックIpマネジメント株式会社 電力供給システム、電力変換装置、分電盤
JP2015119581A (ja) * 2013-12-19 2015-06-25 京セラ株式会社 電力制御装置および電力制御方法
CN106415986A (zh) * 2014-04-18 2017-02-15 国立研究开发法人情报通信研究机构 资源管理系统
EP3133715A4 (en) * 2014-04-18 2017-12-20 National Institute of Information and Communication Technology Resource management system
JP2015220821A (ja) * 2014-05-15 2015-12-07 三菱電機株式会社 電力供給システム及び電力供給制御装置
JP2016100962A (ja) * 2014-11-20 2016-05-30 三菱電機株式会社 地絡検出装置
JP2017046544A (ja) * 2015-08-28 2017-03-02 京セラ株式会社 パワーコンディショナ及び電力管理装置
JP2018011503A (ja) * 2017-08-24 2018-01-18 京セラ株式会社 制御装置、制御システム、分電盤及び制御方法
CN109308548A (zh) * 2018-09-12 2019-02-05 中科绿建(天津)科技发展有限公司 一种基于网格预测的设备安全管理方法及系统

Also Published As

Publication number Publication date
JPWO2013061826A1 (ja) 2015-04-02
US20140300187A1 (en) 2014-10-09
US9923357B2 (en) 2018-03-20
EP2773007A1 (en) 2014-09-03
EP2773007A4 (en) 2015-06-17
JP5792824B2 (ja) 2015-10-14

Similar Documents

Publication Publication Date Title
JP5792824B2 (ja) 給電システム、分散型電源システム、管理装置、及び給電制御方法
EP2738902B1 (en) Power supply system, distribution device, and power control device
JP5877480B2 (ja) 分散型電源の自立運転システム及びその方法
US20120235492A1 (en) Power supply system
JP5838318B2 (ja) 配電システム
KR101264142B1 (ko) 가정과 마이크로그리드에 적용 가능한 신재생에너지시스템
WO2011039608A1 (ja) 配電システム
JP2007124811A (ja) 電力貯蔵システム、ルート発生装置及びルート発生方法
JP6024929B2 (ja) 制御装置および配電システム
WO2013047595A1 (ja) 電力接続制御システム及び方法
JP2014073010A (ja) 分電盤および電力制御方法
JP2011083088A (ja) 直流配電システム
JP6194527B2 (ja) 系統連系電源装置
JP5796212B2 (ja) 電力供給システム
JP2015220791A (ja) 電力供給制御装置
JP2008187837A (ja) 系統連系装置及び系統連系システム
WO2013179358A1 (ja) 制御装置、蓄電池制御部および配電システム
JP2015057022A (ja) 分散電源装置、電力切替装置及び電力供給システム
WO2016117315A1 (ja) 電力供給装置
JP2014132823A (ja) 配電システム
WO2014027462A1 (ja) エネルギー管理装置、及びエネルギー管理装置の制御方法
JP2013090456A (ja) パワーコンディショナ
JP7113693B2 (ja) 電力供給システム
JP2017153304A (ja) パワーコンディショナ
JP5645767B2 (ja) 電力制御装置及び電力制御方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12843165

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2013540733

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 14353971

Country of ref document: US

Ref document number: 2012843165

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE