WO2011048671A1 - 制御設定装置及び制御設定方法 - Google Patents

制御設定装置及び制御設定方法 Download PDF

Info

Publication number
WO2011048671A1
WO2011048671A1 PCT/JP2009/068111 JP2009068111W WO2011048671A1 WO 2011048671 A1 WO2011048671 A1 WO 2011048671A1 JP 2009068111 W JP2009068111 W JP 2009068111W WO 2011048671 A1 WO2011048671 A1 WO 2011048671A1
Authority
WO
WIPO (PCT)
Prior art keywords
control
control setting
execution parameter
target plate
steel type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2009/068111
Other languages
English (en)
French (fr)
Inventor
一浩 小原
直樹 下田
光彦 佐野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Mitsubishi Electric Industrial Systems Corp
Original Assignee
Toshiba Mitsubishi Electric Industrial Systems Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Mitsubishi Electric Industrial Systems Corp filed Critical Toshiba Mitsubishi Electric Industrial Systems Corp
Priority to JP2011537052A priority Critical patent/JP5380544B2/ja
Priority to PCT/JP2009/068111 priority patent/WO2011048671A1/ja
Priority to KR1020127009827A priority patent/KR101443991B1/ko
Priority to CN200980162118.1A priority patent/CN102665948B/zh
Priority to US13/503,108 priority patent/US20120260708A1/en
Priority to TW098141364A priority patent/TWI439332B/zh
Publication of WO2011048671A1 publication Critical patent/WO2011048671A1/ja
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • B21B37/16Control of thickness, width, diameter or other transverse dimensions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • B21B37/74Temperature control, e.g. by cooling or heating the rolls or the product
    • B21B37/76Cooling control on the run-out table
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B45/00Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B45/02Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for lubricating, cooling, or cleaning
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B27/00Rolls, roll alloys or roll fabrication; Lubricating, cooling or heating rolls while in use
    • B21B27/06Lubricating, cooling or heating rolls
    • B21B27/10Lubricating, cooling or heating rolls externally
    • B21B2027/103Lubricating, cooling or heating rolls externally cooling externally
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B45/00Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B45/02Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for lubricating, cooling, or cleaning
    • B21B45/0203Cooling
    • B21B45/0209Cooling devices, e.g. using gaseous coolants
    • B21B45/0215Cooling devices, e.g. using gaseous coolants using liquid coolants, e.g. for sections, for tubes
    • B21B45/0218Cooling devices, e.g. using gaseous coolants using liquid coolants, e.g. for sections, for tubes for strips, sheets, or plates

Definitions

  • the present invention relates to a control setting apparatus and a control setting method for appropriately setting a control set value when rolling a material to be rolled in a hot rolling apparatus.
  • One example of customer request is the strength of rolled products.
  • high-strength steel sheets are used for pillars and chassis components.
  • strength steel plate is used and it is trying to prevent a passenger
  • steel plates that are easy to form, have low return after spring (spring back), and increase in strength during baking are used for the outer plates that require high forming accuracy.
  • the hot rolling apparatus may perform lubrication rolling using an oil emulsion between a roll and a material to be rolled in finish rolling.
  • the production of rolled products is performed by changing various rolling conditions, that is, parameters of the rolling operation process.
  • the parameters of this rolling operation process include, for example, whether or not to use (start or stop) for each pass of a descaler provided in the rolling mill, whether or not to use inter-stand cooling disposed between the stands of the continuous rolling mill There are initial flow rate used, amount of lubricating oil used in the finishing mill, and cooling pattern used in the run-out table.
  • the hot rolling device can set various parameters for the rolling operation process and perform hot rolling to produce a wide variety of rolled products. Manufacture.
  • Patent Document 1 proposes an outlet temperature control device for a hot finish rolling mill that controls a cooling spray for cooling a rolled material.
  • control system for controlling the hot rolling apparatus is often configured hierarchically for each function.
  • the control system is composed of a level 0 computer composed of drive control devices, hydraulic equipment, etc., a level 1 computer composed of a controller for control represented by PLC (Programmable Logic Controller), and a control computer from the lower order.
  • the level 2 computer is composed of a level 2 computer and a production management computer.
  • first method which is a higher-level computer of the level 2 computer, or a steel type in the level 2 computer
  • second method has been adopted in which a parameter table is provided for each group of steel types, and parameters are set using the steel type family, plate thickness, plate width, and the like as keys.
  • the first method has a problem that the load on the level 3 computer increases.
  • the level 3 computer is a computer that issues a production instruction based on the operation of the production manager, and usually performs production management of the entire factory. Therefore, when parameters of all the operation processes including the rolling process are determined, there is a problem that the load increases for the level 3 computer.
  • the present invention has been made in view of the above problems, and provides a control setting device and a control setting method capable of determining in detail parameters of a rolling operation process without causing an excessive load on a host computer. With the goal.
  • a first feature of the control setting device is that a combination of control setting values for controlling a control target device and an execution parameter number for uniquely identifying the combination of the control setting values.
  • 1st control information storage part memorized as 1 control information
  • 2nd control information memorize
  • a component information storage unit for storing the component information indicating the components of the steel type family as a component information table for each steel type family
  • the control setting device When a setting request signal for requesting determination of a combination of control setting values in the steel type family is supplied from a higher-order computer, the steel type family corresponding to the component information included in the setting request signal is extracted from the component information table Then, from the first control information, extract the execution parameter number corresponding
  • the execution parameter number corresponding to the steel type and the target plate thickness and target plate width included in the setting request signal is extracted from the information. And, from the execution parameter information, in that a control setting determination unit that determines a combination of the control set value corresponding to the extracted execution parameter number.
  • a first feature of the control setting method is that a combination of control setting values for controlling a control target device and an execution parameter number that uniquely identifies the combination of the control setting values.
  • a combination of control setting values for controlling a control target device and an execution parameter number that uniquely identifies the combination of the control setting values.
  • the execution parameter number corresponding to the target plate thickness and the target plate width is stored as second control information for each steel type.
  • a second control information storage step to be stored in the means, and a component information table indicating component information indicating the components of the steel type family for each of the steel type families Component information storage step to be stored in the storage means, and when a setting request signal for requesting determination of a combination of control setting values in the steel type family is supplied from a host computer connected to the control setting device, the component information table
  • the steel type family corresponding to the component information included in the setting request signal is extracted from the first control information, and the extracted steel type family and the target plate thickness and target plate width included in the setting request signal are extracted from the first control information.
  • the control parameter value combination corresponding to the extracted parameter parameter number is determined from the parameter parameter information, and the control parameter value combination in the steel type is determined from a higher-level computer.
  • the parameters of the rolling operation process can be determined in detail without causing an excessive load on the host computer.
  • FIG. 1 is a block diagram showing a configuration of a hot rolling apparatus controlled based on a control set value set by a control setting apparatus according to the first embodiment.
  • a hot rolling apparatus 20 includes a heating furnace 1, a primary descaler 2, a rough edger 3, a rough rolling unit 4, an RDT (Roughing4Mill Delivery Temperature) 5, and an FET (Finishing Mill). Entry Temperature) 6, crop shear 7, secondary descaler 8, finish rolling unit 9, FDT (Finishing Mill Delivery Temperature) 10, runout laminar spray cooling unit 11, CT (Coiler Entry Temperature) 12, A coiler 13 is provided.
  • the heating furnace 1 is a furnace for heating the material to be rolled 14.
  • the material to be rolled 14 is a metal that is rolled by the rough edger 3, the rough rolling unit 4, and the finish rolling unit 9 by being conveyed on the conveyance line.
  • it is also called a slab, a bar, or a coil every time it goes through each step of the rolling device 20, it is assumed here to be unified by the name of the material 14 to be rolled.
  • the primary descaler 2 removes the oxide film formed on the surface of the material to be rolled 14 by the heating of the heating furnace 1 by spraying high-pressure water from above and below the material to be rolled 14.
  • the rough edger 3 performs rolling in the width direction of the material to be rolled 14 when viewed from the upper surface direction of the line.
  • the rough rolling unit 4 includes one or more stands, and performs rolling in the vertical direction of the material to be rolled 14.
  • the rough rolling unit 4 needs to be shortened in line length, and further needs to be rolled by a plurality of passes (reciprocating motion in the conveying direction), and thus is often configured to include a reversible rolling mill.
  • the rough rolling section 4 includes a descaler for spraying high-pressure water onto the material to be rolled 14 that is a semi-finished product to remove the oxide film on the surface. Since rolling is performed at a high temperature, an oxide film is likely to be formed, and it is necessary to use an apparatus for removing such an oxide film as appropriate. Details will be described later.
  • RDT Roughing / Mill / Delivery / Temperature 5 measures the surface temperature of the material to be rolled 14, which is a semi-finished product during rolling.
  • FET (Finishing Mill Entry Temperature) 6 measures the surface temperature of the material to be rolled 14 at the entrance of the finish rolling section 9 because the distance between the rough rolling section 4 and the finish rolling section 9 is long. Since the temperature is closely related to the deformation resistance of the material of the material 14 to be rolled, the temperature immediately before the processing may be measured, or highly accurate temperature prediction may be performed.
  • the crop shear 7 cuts the leading end of the material 14 to be rolled.
  • the secondary descaler 8 is provided at the entrance of the finish rolling section 9 because the distance between the rough rolling section 4 and the finish rolling section 9 is long, and in order to improve the surface properties of the material to be rolled 14 after finish rolling,
  • the oxide film formed on the surface of the rolled material 14 is removed by spraying high-pressure water from above and below the material 14 to be rolled.
  • the finish rolling unit 9 employs a tandem type in which a plurality of rolling rolls called stands are installed, and the material to be rolled 14 having a target plate thickness can be obtained by rolling up and down with a plurality of rolling rolls. it can. A spray is provided between the stands of the finish rolling unit 9 in order to suppress the formation of an oxide film and to control the temperature. Details will be described later.
  • the FDT (Finishing Mill Delivery Temperature) 10 measures the surface temperature of the material 14 after rolling by the finish rolling section 9.
  • the temperature of the material to be rolled 14 is closely related to the formation and material of the metal structure of the product, and needs to be managed at an appropriate temperature.
  • the run-out laminar spray cooling unit 11 is a device that cools the material to be rolled 14 with cooling water in order to control the temperature of the material 14 to be rolled. These are provided with a forced cooling device in addition to a normal run-out table cooling device.
  • CT Cosmetic® Entry Temperature 12 measures the surface temperature of the material to be rolled 14 cooled by the run-out laminar spray cooling unit 11.
  • the temperature of the material to be rolled 14 is closely related to the formation and material of the metal structure of the rolled product, and needs to be managed at an appropriate temperature.
  • the coiler 13 winds up the material 14 to be rolled.
  • FIG. 2 is a block diagram showing a configuration of the rough edger 3 and the rough rolling unit 4 included in the hot rolling apparatus 20.
  • an upstream side coarse descaler 31 that injects high-pressure water from the vertical direction of the material to be rolled 14 is disposed upstream of the coarse edger 3 on the conveying line of the material to be rolled 14.
  • a downstream side coarse descaler 45 that injects high-pressure water from the vertical direction of the material to be rolled 14 is disposed downstream of the rough rolling portion 4 on the conveying line of the material to be rolled 14. Then, in the rough rolling section 4, a pair of first rolled material roll coolings 41 and 42 for injecting high pressure water to the upper rough rolling roller 4AA, and 1 for injecting high pressure water to the lower rough rolling roller 4AB A pair of second rolled material roll coolings 43 and 44 are provided.
  • the upstream coarse descaler 31 and the downstream coarse descaler 45 are set to start or stop as needed for each path. At the time of starting, it is set according to the generation of the oxide film. In a normal rolled material, it is necessary to keep the temperature of the rolled product as high as possible. Therefore, a control set value for using the minimum necessary amount is determined so that the oxide film is within an allowable range. Further, depending on the steel type of the material 14 to be rolled, there is a case where the temperature measured by RDT (Roughing Mill Delivery Temperature) 5 is given as a target due to the requirement on the metal structure, and it is used for this temperature adjustment. There is also.
  • RDT Rapiding Mill Delivery Temperature
  • FIG. 3 is a block diagram showing the configuration of one stand in the finish rolling section 9 provided in the hot rolling apparatus 20.
  • an interstand cooling 94 for injecting cooling water while changing the flow rate from the up-down direction of the material to be rolled 14 is arranged.
  • a strip spray 91, a roll gap spray 93, and a bottom spray 92 for injecting cooling water are provided upstream of the finish rolling unit 9 on the conveying line of the material to be rolled 14 in order to suppress the generation of secondary scale. Has been placed.
  • a fume suppression spray 95 for injecting cooling water is disposed downstream of the interstand cooling 94 in order to suppress generation of fine mineral dust called fume on the stand exit side.
  • a pair of fourth rolled material roll cooling 99a, 99b is provided.
  • the roll gap spray 93 is provided for the purpose of preventing secondary scale generation and peeling of the roll surface.
  • Roll gap lubrication sprays 97 and 98 lower the friction coefficient between the material to be rolled 14 and the finish rolling rollers 9A and 9B upstream of the finish rolling section 9 on the conveying line of the material to be rolled 14, and finish rolling rollers
  • an emulsion containing a lubricant is applied to the finish rolling rollers 9A and 9B or the material 14 to be rolled.
  • the fourth rolled material roll cooling 99a, 99b will be collectively referred to as spray.
  • FIG. 4 is a block diagram showing a configuration of a control system to which the control setting device according to the first embodiment is applied.
  • the control system 100 is represented from the lower level by, for example, a level 0 computer 104 configured by a drive control device or a hydraulic device of the hot rolling device 20 and, for example, a PLC (Programmable Logic Controller).
  • Level 1 computer 103 configured by a control controller
  • a control setting device 200 which is a level 2 computer configured by a control computer
  • an HMI (Human-Machine Interface) 102 and a level configured by a production management computer 3 computers 101.
  • Level 3 computer 101 based on the user's operation, chemical component information based on actual measurement information at the time of component adjustment of the material 14 to be rolled before casting, target plate thickness and target plate width of the material 14 to be rolled, A setting request signal including the steel type code, the target size of the coil, the target temperature at each temperature control point, and the rolling order is supplied to the control setting device 200.
  • the control setting device 200 controls the parameters of the rolling operation process, that is, the hot rolling device 20 based on the setting request signal supplied from the level 3 computer 101 and the operation signal and setting request signal supplied from the HMI 102.
  • the control setting value for the determination is determined, and the determined control setting value is supplied to the level 1 computer 103.
  • the HMI 102 supplies, for example, an operation signal for starting or stopping the spray to the control setting device 200 or a setting request signal for setting the spray pattern number to the control setting device 200 based on a user operation. To do.
  • the level 1 computer 103 controls the control target equipment other than the motor including the spray provided in the hot rolling apparatus 20 and sends a control signal to the level 0 computer 104 that controls the motor provided in the hot rolling apparatus 20. Supply.
  • the level 0 computer 104 mainly controls the motor provided in the hot rolling apparatus 20 based on the control signal supplied from the level 1 computer 103.
  • FIG. 5 is a block diagram showing the configuration of the control setting device 200 according to the first embodiment.
  • the control setting device 200 includes a ROM 202, a RAM 203, a first net rolled material portion 204, a second net rolled material portion 205, and a hard disk 206. Are connected to each other via a bus 300.
  • the ROM 202 is composed of a nonvolatile semiconductor or the like, and stores an operation system executed by the CPU 201.
  • the RAM 203 is composed of a volatile semiconductor or the like, and stores data necessary for the CPU 201 to execute various processes.
  • the first net rolled material unit 204 is a communication device such as a LAN card or a serial port, and is connected to the level 3 computer 101 and the level 1 computer 103 via the first net rolled material unit 204. Communication between the level 3 computer 101 and the level 1 computer 103 is performed.
  • the second net rolled material unit 205 is a communication device such as a LAN card or a serial port. By connecting to the HMI 102 via the second net rolled material unit 205, communication with the HMI 102 is performed. Do.
  • the hard disk 206 stores a control program executed by the CPU 201.
  • the hard disk 206 also includes a GCI table storage unit 206a, an SGF table storage unit 206b, a finish spray code table storage unit 206c, an execution parameter table storage unit 206d, and a component information storage unit 206e in terms of its functions.
  • the GCI table storage unit 206a stores the steel type code and the spray pattern number in association with each other.
  • the spray pattern number is a number that uniquely identifies, for example, a spray pattern associated with an execution parameter number corresponding to a target plate thickness and a target plate width for each steel type or each steel type family.
  • the SGF table storage unit 206b displays, for each steel type family including one or more steel types having similar characteristics, a spray pattern in which an execution parameter number corresponding to the target plate thickness and target plate width is associated with the SGF table (first control). Information).
  • the finishing spray code table storage unit 206c stores, as a finishing spray code table (second control information), a spray pattern in which an execution parameter number corresponding to the target plate thickness and the target plate width is associated with each steel type.
  • the execution parameter table storage unit 206d stores the combination of the control setting values for controlling the spray and the execution parameter number that uniquely identifies the combination of the control setting values as execution parameter information.
  • the combination of the control set values for controlling the spray is, for example, a value for instructing start or stop for the spray, or an initial flow rate for the spray.
  • the component information storage unit 206e stores, for each steel type family, component information indicating the components of this steel type family as a component information table.
  • the CPU 201 performs central control of the control setting device 200.
  • the CPU 201 stores the setting request signal supplied from the level 3 computer 101 and the operation signal supplied from the HMI 102 in the RAM 203.
  • the CPU 201 includes an input determination unit 201a and a control setting determination unit 201b in terms of its functions.
  • the input determination unit 201a When determining that the control setting period has been reached, the input determination unit 201a reads the setting request signal and operation signal stored in the RAM 203, and based on the read setting request signal and operation signal, the spray operation signal from the HMI 102. , Whether the spray pattern number is directly input from the HMI 102, whether the spray pattern number is directly input from the level 3 computer 101, and / or supplied from the level 3 computer 101. It is determined whether or not the spray pattern number corresponding to the steel type code included in the set request signal is “0”.
  • the control setting determination unit 201b is supplied with a setting request signal for requesting determination of a combination of control setting values in the steel type family from the level 3 computer 101 connected to the control setting device 200, that is, supplied from the level 3 computer 101.
  • the spray pattern number corresponding to the steel type code included in the setting request signal indicates “0”
  • the steel type family corresponding to the component information included in the setting request signal is extracted from the component information table, and the first control information is used.
  • An execution parameter number corresponding to the extracted steel type family and the target plate thickness and target plate width included in the setting request signal is extracted from a certain SGF table, and it corresponds to the extracted execution parameter number from the execution parameter information. Determine the control set value combination.
  • the control setting determination unit 201b is supplied with a setting request signal for requesting determination of a combination of control setting values in the steel type from the level 3 computer 101, that is, included in the setting request signal supplied from the level 3 computer 101.
  • a setting request signal for requesting determination of a combination of control setting values in the steel type from the level 3 computer 101, that is, included in the setting request signal supplied from the level 3 computer 101.
  • FIG. 6 is a flowchart showing the processing procedure of the control setting process of the control setting device 200 according to the first embodiment of the present invention.
  • the input determination unit 201a of the CPU 201 of the control setting device 200 determines whether or not the control setting period has been reached (step S101).
  • the control setting cycle is a cycle in which the control setting device 200 executes control setting for the level 1 computer 103.
  • step S101 When it is determined in step S101 that the control setting cycle has been reached (in the case of YES), the input determination unit 201a reads the setting request signal and the operation signal stored in the RAM 203 (step S103).
  • the input determination unit 201a determines whether or not a spray operation signal is directly input from the HMI 102 based on the operation signal read in step S103 (step S105). Specifically, the input determination unit 201a determines whether the read operation signal includes an operation signal for requesting activation or stop for each spray from the HMI 102 or an operation signal for setting an initial flow rate for the spray. Determine.
  • step S105 when it is determined that the spray operation signal is directly input from the HMI 102 (in the case of YES), the control setting determination unit 201b, based on the spray operation signal, the first net work material 204. Then, the control of the spray is set in the level 1 computer 103 (step S107).
  • the operation signal include an operation signal for instructing activation of the strip spray 91 and an operation signal for setting the initial flow rate of the interstand cooling 94.
  • step S105 when it is determined in step S105 that the spray operation signal is not directly input from the HMI 102 (in the case of NO), the input determination unit 201a is based on the setting request signal read in step S103. It is determined whether or not the spray pattern number is directly input from (step S109).
  • step S109 when it is determined that the spray pattern number is directly input from the HMI 102 (in the case of YES), the control setting determination unit 201b, based on the spray pattern number and the SGF table or the finish spray code table, A control set value for each spray is determined (step S111). Specifically, the control setting determination unit 201b extracts the SGF table or the finish spray code table corresponding to the spray pattern number from the SGF table storage unit 206b or the finish spray code table storage unit 206c, and this extracted SGF table. Alternatively, an execution parameter number corresponding to the target plate thickness and target plate width included in the setting request signal is extracted from the finish spray code table. Then, the control setting determination unit 201b extracts an execution parameter corresponding to the extracted execution parameter number from the execution parameter table storage unit 206d, and determines a control setting value for each spray based on the extracted execution parameter. To do.
  • step S109 when it is determined that the spray pattern number is not directly input from the HMI 102 (in the case of NO), the input determination unit 201a is based on the setting request signal read in step S103. It is determined whether or not the spray pattern number is directly input from (step S113).
  • step S113 when it is determined that the spray pattern number is directly input from the level 3 computer 101 (in the case of YES), the control setting determination unit 201b moves the process to step S111.
  • the input determination unit 201a determines the steel type included in the setting request signal supplied from the level 3 computer 101. It is determined whether or not the spray pattern number corresponding to the code indicates “0” (step S115). Specifically, the input determination unit 201a extracts the steel type code from the setting request signal supplied from the level 3 computer 101, and extracts the steel type code extracted from the GCI table stored in the GCI table storage unit 206a of the hard disk 206. Is extracted, and it is determined whether or not the extracted spray pattern number indicates “0”.
  • the control setting determination unit 201b determines the control setting value of each spray based on the component information and the SGF table.
  • Step S119 the control setting determination unit 201b extracts the steel type family corresponding to the component information included in the setting request signal supplied from the level 3 computer 101 from the component information storage unit 206e, and from the SGF table storage unit 206b. Then, an SGF table corresponding to the extracted steel type family is extracted, and an execution parameter number corresponding to the target plate thickness and the target plate width included in the setting request signal is extracted from the extracted SGF table. Then, the control setting determination unit 201b extracts an execution parameter corresponding to the extracted execution parameter number from the execution parameter table storage unit 206d, and determines a control setting value for each spray based on the extracted execution parameter. To do.
  • the control setting determination unit 201b determines the control setting value of each spray based on the steel type code and the finish spray table. Is determined (step S117). Specifically, the control setting determining unit 201b extracts the spray pattern number corresponding to the steel type code from the GCI table, and the finishing spray code table corresponding to the extracted spray pattern number from the finishing spray code table storage unit 206c. An execution parameter number corresponding to the target plate thickness and target plate width included in the setting request signal is extracted from the extracted finish spray code table. Then, the control setting determination unit 201b extracts an execution parameter corresponding to the extracted execution parameter number from the execution parameter table storage unit 206d, and determines a control setting value for each spray based on the extracted execution parameter. To do.
  • the control setting determination unit 201b causes the level 1 computer 103 to set the control of the spray via the first net workpiece 204 based on the control setting value set in step S111, step S117, or step S119. (Step S121).
  • FIG. 7A and 7B are diagrams schematically illustrating the control setting process of the control setting apparatus 200 according to the first embodiment of the present invention.
  • step S115 the spray pattern number corresponding to the steel type code of the setting request signal supplied from the level 3 computer 101 is “101” (step S115).
  • step S113 the spray pattern number is not directly input from the level 3 computer 101 (step S113), and the spray pattern number is not directly input from the HMI 102 (step S109).
  • the control setting determination unit 201b finishes the finish spray code corresponding to the spray pattern number “101” extracted from the finish spray code table storage unit 206c. Extract the table.
  • the control setting determination unit 201b extracts the finished spray.
  • the execution parameter number “1” corresponding to the target plate thickness “3” and the target plate width “5” included in the setting request signal is extracted from the code table.
  • control setting determination unit 201b extracts an execution parameter table corresponding to the extracted execution parameter number “1” from the execution parameter table storage unit 206d, and based on the extracted execution parameter table, Determine the control setting value.
  • the control setting determination unit 201b is directly input regardless of the control setting value of each spray determined based on the execution parameter table.
  • the level 1 computer 103 is set to control the spray via the first net rolled material 204.
  • the control setting device 200 when the setting request signal for requesting the determination of the combination of the control setting values in the steel type family is supplied from the level 3 computer 101,
  • the steel type family corresponding to the component information included in the setting request signal is extracted from the component information table, and the extracted steel type family, the target plate thickness and the target included in the setting request signal are extracted from the SGF table as the first control information.
  • the execution parameter number corresponding to the sheet width is extracted, and from the execution parameter information, the combination of the control setting values corresponding to the extracted execution parameter number is determined, and the combination of the control setting values in the steel type from the level 3 computer 101
  • the steel type is obtained from the finish spray code table as the second control information.
  • the execution parameter number corresponding to the target plate thickness and target plate width included in the setting request signal is extracted, and the combination of the control setting values corresponding to the extracted execution parameter number is determined from the execution parameter information. Without causing an excessive load on the computer 101, it is possible to finely set the parameters of the rolling operation process, specifically, the control set values for each spray.
  • control setting value of the spray which injects the cooling water in the finishing rolling part 9 was set, the liquid injected from a spray is not restricted to cooling water.
  • the control setting value of the spray for injecting the emulsion type lubricating oil used between the finishing roll and the material to be rolled 14 may be set.
  • control setting device 200 In the control setting device 200 according to the second embodiment of the present invention, the processing procedure of the control setting process in the rough rolling unit 4 will be described as an example.
  • the control setting device 200 according to the second embodiment of the present invention has the same configuration as that of the control setting device 200 according to the first embodiment of the present invention shown in FIGS.
  • the rough rolling unit 4 provided in the control setting device 200 according to the second embodiment of the present invention performs rough rolling while reciprocating the material to be rolled 14 in the conveying direction of the material to be rolled 14, Since the control setting value of each spray is determined in accordance with the number of reciprocations, this difference will be mainly described below.
  • FIGS. 8A and 8B are diagrams schematically illustrating the control setting process of the control setting device 200 according to the first embodiment of the present invention.
  • step S115 the spray pattern number of the rough rolling section 4 corresponding to the steel type code of the setting request signal supplied from the level 3 computer 101 is “0” (step S115).
  • step S113 the spray pattern number of the rough rolling section 4 is not directly input from the level 3 computer 101 (step S113), and the spray pattern number of the rough rolling section 4 is not directly input from the HMI 102 (step S109). .
  • the control setting determination unit 201b receives the setting request signal supplied from the level 3 computer 101 from the SGF table storage unit 206b. An SGF table corresponding to the contained component information is extracted.
  • the control setting determination unit 201b determines that the extracted SGF The execution parameter number “1” corresponding to the target plate thickness “3” and the target plate width “5” included in the setting request signal is extracted from the table.
  • the control setting determination unit 201b extracts an execution parameter from the execution parameter table storage unit 206d based on the extracted execution parameter number “1” and the number of paths included in the setting request signal, and extracts this execution parameter. Based on the executed execution parameter, the control setting value of each spray is determined. For example, if the number of passes included in the setting request signal is “7”, the control setting values “ON”, “OFF”, “ON”, “ON”, “OFF”, “OFF”, “1” to “7”. “ON” and “OFF” are set.
  • the rough rolling part 4 is to be rolled. Even in the case of rough rolling while reciprocating the material to be rolled in the material conveyance direction, the control set value of each spray can be set finely for each pass.
  • the control setting device 200 according to the third embodiment of the present invention will be described by taking as an example the processing procedure of the control setting process in the rough rolling unit 4 having two pairs of rough rolling rolls.
  • FIG. 9 is a block diagram of the rough rolling unit 4 including two pairs of rough rolling rolls provided in the control setting device 200 according to the third embodiment of the present invention.
  • the rough rolling unit 4 includes rough rolling rolls 4 ⁇ / b> A and 4 ⁇ / b> B, and the material to be rolled 14 is disposed upstream of each of the rough rolling rolls 4 ⁇ / b> A and 4 ⁇ / b> B on the conveyance line of the material 14 to be rolled.
  • Upstream coarse descalers 31A and 31B for injecting high-pressure water from above and below are disposed.
  • downstream rough descalers 45A and 45B for injecting high-pressure water from the up and down direction of the material to be rolled 14 are arranged downstream of the rough rolling rolls 4A and 4B on the conveying line of the material to be rolled 14, respectively.
  • the rough rolling roll 4A has a pair of first rolled material roll coolings 41 and 42 for injecting high pressure water to the upper rough rolling roller 4AA, and 1 for injecting high pressure water to the lower rough rolling roller 4AA.
  • a pair of second rolled material roll coolings 43 and 44 are provided.
  • a pair of third rolled material roll coolings 46 and 47 for injecting high-pressure water to the upper rough rolling roller 4BA and a high-pressure water to the lower rough rolling roller 4BB are sprayed to the rough rolling roll 4B.
  • a pair of fourth rolled material roll coolings 48 and 49 are provided.
  • the control setting value of each spray is determined according to the number of reciprocations of the rough rolling rolls 4A and 4B.
  • the control setting process for determining the control setting value for each spray will be described in detail below.
  • 10A and 10B are diagrams schematically illustrating the control setting process of the control setting device 200 according to the third embodiment of the present invention.
  • step S115 the spray pattern number of the rough rolling portion 4 corresponding to the steel type code of the setting request signal supplied from the level 3 computer 101 is “0” (step S115).
  • step S113 the spray pattern number of the rough rolling section 4 is not directly input from the level 3 computer 101 (step S113), and the spray pattern number of the rough rolling section 4 is not directly input from the HMI 102 (step S109). .
  • the control setting determination unit 201b receives the setting request signal supplied from the level 3 computer 101 from the SGF table storage unit 206b. An SGF table corresponding to the contained component information is extracted.
  • the control setting determination unit 201b determines that the extracted SGF The execution parameter number “1” corresponding to the target plate thickness “3” and the target plate width “5” included in the setting request signal is extracted from the table.
  • the control setting determination unit 201b extracts an execution parameter from the execution parameter table storage unit 206d based on the extracted execution parameter number “1” and the path schedule included in the setting request signal, and extracts this execution parameter. Based on the executed execution parameter, the control setting value of each spray is determined.
  • the pass schedule indicates the number of passes of each of the rough rolling rolls 4A and 4B, and when the rough rolling roll 4A performs rough rolling in a total of six passes, three times for the rough rolling roll 4A and three times for the rough rolling roll 4B, The schedule is “3-3”.
  • control setting values for the first to third passes of the rough rolling roll 4A are set to “ON”, “OFF”, and “ON”. Then, control setting values “ON”, “OFF”, and “ON” for the first to third passes are set in the rough rolling roll 4A.
  • the rough rolling rolls 4A and 4B are Even in the case where rough rolling is performed while reciprocating the material to be rolled 14 with respect to the conveyance direction of the material to be rolled 14, respectively, the control setting value of each spray can be set finely for each pass.
  • the control setting device 200 according to the fourth embodiment of the present invention will be described by taking the processing procedure of the control setting process in the run-out laminar spray cooling unit 11 as an example.
  • the end part When the material to be rolled 14 is cooled by the run-out laminar spray cooling unit 11, the end part is easily cooled, so that a temperature difference is generated between the center part and the end part, and the temperature difference may be deformed.
  • the run-out laminar spray cooling unit 11 provided in the control setting device 200 according to the second embodiment of the present invention prevents the cooling water to be sprayed from being injected in order to prevent overcooling of the end of the material 14 to be rolled. Control is performed so as not to hit the end of the rolled material 14.
  • FIG. 11 is a block diagram showing the configuration of the run-out laminar spray cooling unit 11 of the control setting device 200 according to the fourth embodiment of the present invention.
  • FIG. 11 shows only one bank of the run-out laminar spray cooling unit 11, but the run-out laminar spray cooling unit 11 has a plurality of banks in the conveying direction of the material to be rolled 14.
  • a ball screw 112 that rotates about the rotation axis P by the rotation of the motor 116, a nut portion 113 that moves up and down by the rotation of the ball screw 112, and one end portion of the nut portion 113.
  • 12A and 12B are diagrams schematically illustrating control setting processing of the control setting device 200 according to the fourth embodiment of the present invention.
  • step S115 the spray pattern number of the run-out laminar spray cooling unit 11 corresponding to the steel type code of the setting request signal supplied from the level 3 computer 101 is “0” (step S115).
  • the spray pattern number of the run-out laminar spray cooling unit 11 is not directly input from the level 3 computer 101 (step S113), and the spray pattern number of the rough rolling unit 4 is not directly input from the HMI 102 (step S113). S109).
  • the control setting determination unit 201b sets the setting request supplied from the level 3 computer 101 from the SGF table storage unit 206b. An SGF table corresponding to the component information included in the signal is extracted.
  • the control setting determination unit 201b determines that the extracted SGF The execution parameter number “1” corresponding to the target plate thickness “3” and the target plate width “5” included in the setting request signal is extracted from the table.
  • control setting determination unit 201b extracts an execution parameter from the execution parameter table storage unit 206d based on the extracted execution parameter number “1” and the offset amount from the finishing side setting width, Based on the extracted execution parameters, a control setting value for setting whether to use an edge mask, that is, whether to move the guard plates 111a and 111b in the R1 direction and the R2 direction is determined.
  • control setting device 200 in addition to the effects of the control setting device 200 according to the first embodiment of the present invention, in addition to the effects of the control setting device 200 according to the first embodiment of the present invention, the control set value of the motor 116 that moves the guard plates 111a and 111b is set finely so that the cooling water to be sprayed does not hit the end of the material to be rolled 14. be able to.
  • the present invention based on the SGF table stored in the SGF table storage unit 206b or the finishing spray code table stored in the finishing spray code table storage unit 206c, although the execution parameter number is extracted and the combination of the control setting values corresponding to the extracted execution parameter number is determined from the execution parameter information, the present invention is not limited to this.
  • control setting device 200 stores the steel type code and the execution parameter code in association with each other as a second GCI table, and is supplied with a setting request signal for requesting determination of a combination of control setting values in the steel type from the level 3 computer 101. Then, the execution parameter number corresponding to the steel type code, the target plate thickness and the target plate width included in the setting request signal is extracted from the GCI table, and the control setting corresponding to the extracted execution parameter number is extracted from the execution parameter information. A combination of values may be determined.
  • the present invention can be applied to a hot rolling system that controls a hot rolling apparatus for rolling a metal hot.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Control Of Metal Rolling (AREA)

Abstract

 本発明に係る制御設定装置(200)は、実行パラメータ情報を記憶する実行パラメータ情報記憶部(206d)と、SGFテーブルを記憶するSGFテーブル記憶部(206b)と、仕上スプレーコードテーブルを記憶する仕上げスプレーコードテーブル記憶部(206c)と、鋼種ファミリーの成分を示す成分情報テーブルを記憶する成分情報記憶部(206e)と、鋼種ファミリーにおける制御設定値の組合せの決定を要求されると、成分情報テーブルと、設定要求信号に含まれる成分情報、目標板厚及び目標板幅と、第1の制御情報と、実行パラメータ情報とに基づいて、制御設定値の組合せを決定すると共に、鋼種における制御設定値の組合せの決定を要求されると、第2の制御情報と、設定要求信号に含まれる鋼種、目標板厚及び目標板幅と、実行パラメータ情報とに基づいて、制御設定値の組合せを決定する制御設定決定部(201b)とを備える。

Description

制御設定装置及び制御設定方法
 本発明は、熱間圧延装置において、被圧延材を圧延処理する上で適切に制御設定値を設定する制御設定装置及び制御設定方法に関する。
 近年、鉄鋼の圧延製品は様々な用途で用いられ、圧延製品の製造メーカは、顧客要求に応じて用途に適用する圧延製品を製造する必要がある。
 顧客要求の1つとして、例えば、圧延製品の強度がある。自動車では、ピラー及び車台の構成部品に強度の高い鋼板が用いられる。また、衝突時に圧壊が予想される部分には、高強度部材で構成された乗員部を守るため、若干強度の低い鋼板が用いられ、乗員部の変形を防ぐようにしている。さらに、高い成形精度を要求される外板には、成形しやすく、プレス後の戻り(スプリングバック)が少ない低強度かつ焼き付け塗装時に強度が上昇する鋼板が用いられている。
 また、強度だけでなく、表面品質も重要な顧客要求の1つである。表面品質を高くするためには、熱間圧延装置は、仕上圧延においてロールと被圧延材との間に油のエマルジョンを用いる潤滑圧延を行うことがある。
 このように、圧延製品に対する顧客要求は多岐に渡っており、圧延製品の製造メーカは、顧客要求に応じて多種多様な圧延製品を製造するため、様々な仕様の圧延製品の作り分けを行う必要がある。
 圧延製品の作り分けは、熱間圧延では、様々な圧延条件、即ち圧延操業プロセスのパラメータを変更することにより行われる。この圧延操業プロセスのパラメータには、例えば、圧延機に備えられているデスケーラのパス毎の使用要否(起動又は停止)、連続圧延機のスタンド間に配置されたインタースタンドクーリングの使用要否と使用初期流量、仕上圧延機で用いる潤滑油量、ランナウトテーブルで用いる冷却パターンがある。熱間圧延装置は、被圧延材鋳造前に決定される被圧延材の化学成分に加えて、これら圧延操業プロセスのパラメータを適切に設定して熱間圧延することにより、多種多様な圧延製品を製造している。
 特許文献1には、圧延材を冷却する冷却スプレーを制御する熱間仕上圧延機の出側温度制御装置が提案されている。
特開2001-334304号公報
 しかしながら、特許文献1に記載の熱間仕上圧延機の出側温度制御装置では、圧延する被圧延材の鋼種にかかわらず圧延材を冷却する冷却スプレーを制御するので、様々な要求仕様を満たすために、圧延製品の作りわけを行うことが困難であった。
 また、熱間圧延装置を制御する制御システムは、機能毎に階層的に構成されている場合が多い。例えば、制御システムは、下位から、ドライブ制御装置や油圧機器などから構成されるレベル0計算機、PLC(Programmable Logic Controller)に代表される制御用コントローラで構成されるレベル1計算機、制御用コンピュータで構成されるレベル2計算機、生産管理用コンピュータで構成されるレベル3計算機を備える。
 そして、これら熱間圧延装置における圧延操業プロセスのパラメータの設定には、レベル2計算機の上位コンピュータであるレベル3計算機からパラメータを設定する方法(第1の方法)、又はレベル2計算機内に鋼種をグループ分けした鋼種ファミリー毎にパラメータのテーブルを持ち、鋼種ファミリー、板厚、板幅などをキーとしてパラメータを設定する方法(第2の方法)が採用されていた。
 しかしながら、第1の方法では、レベル3計算機の負荷が増大するという課題があった。具体的には、レベル3計算機は、生産管理者の操作に基づいて、生産指示を行う計算機であり、通常は工場全体の生産管理を行っている。そのため、圧延プロセスを含む全ての操業プロセスのパラメータを決定するようにすると、レベル3計算機にとって負荷が増大するという課題があった。
 また、第2の方法では、様々な仕様の製品の作り分けを行うため、詳細に圧延操業プロセスのパラメータを決定することが困難であった。例えば、同じ鋼種ファミリー内で異なった鋼種において、異なった圧延操業プロセスのパラメータを設定したい場合に、対応できない場合があった。
 本発明は上記課題を鑑みてなされたものであり、上位計算機に過度の負荷を生じさせることなく、圧延操業プロセスのパラメータを詳細に決定することができる制御設定装置及び制御設定方法を提供することを目的とする。
 上記目的を達成するため、本発明に係る制御設定装置の第1の特徴は、制御対象機器を制御するための制御設定値の組合せと、この制御設定値の組合せを一意に識別する実行パラメータ番号とを関連付けて実行パラメータ情報として記憶する実行パラメータ情報記憶部と、類似の特性を有する1以上の鋼種を含む鋼種ファミリー毎に、目標板厚及び目標板幅に対応する前記実行パラメータ番号を、第1の制御情報として記憶する第1の制御情報記憶部と、前記鋼種毎に、目標板厚及び目標板幅に対応する前記実行パラメータ番号を、第2の制御情報として記憶する第2の制御情報記憶部と、前記鋼種ファミリー毎に、この鋼種ファミリーの成分を示す成分情報を成分情報テーブルとして記憶する成分情報記憶部と、当該制御設定装置に接続された上位計算機から前記鋼種ファミリーにおける制御設定値の組合せの決定を要求する設定要求信号が供給されると、前記成分情報テーブルから前記設定要求信号に含まれる成分情報に対応する前記鋼種ファミリーを抽出し、前記第1の制御情報から、前記抽出された鋼種ファミリーと、前記設定要求信号に含まれる目標板厚及び目標板幅とに対応する前記実行パラメータ番号を抽出し、前記実行パラメータ情報から、前記抽出された実行パラメータ番号に対応する制御設定値の組合せを決定すると共に、上位計算機から前記鋼種における制御設定値の組合せの決定を要求する設定要求信号が供給されると、前記第2の制御情報から、前記鋼種と前記設定要求信号に含まれる目標板厚及び目標板幅とに対応する前記実行パラメータ番号を抽出し、前記実行パラメータ情報から、前記抽出された実行パラメータ番号に対応する制御設定値の組合せを決定する制御設定決定部とを備えたことにある。
 上記目的を達成するため、本発明に係る制御設定方法の第1の特徴は、制御対象機器を制御するための制御設定値の組合せと、この制御設定値の組合せを一意に識別する実行パラメータ番号とを関連付けて実行パラメータ情報として記憶手段に記憶させる実行パラメータ情報記憶ステップと、類似の特性を有する1以上の鋼種を含む鋼種ファミリー毎に、目標板厚及び目標板幅に対応する前記実行パラメータ番号を、第1の制御情報として記憶手段に記憶させる第1の制御情報記憶ステップと、前記鋼種毎に、目標板厚及び目標板幅に対応する前記実行パラメータ番号を、第2の制御情報として記憶手段に記憶させる第2の制御情報記憶ステップと、前記鋼種ファミリー毎に、この鋼種ファミリーの成分を示す成分情報を成分情報テーブルとして記憶手段に記憶させる成分情報記憶ステップと、制御設定装置に接続された上位計算機から前記鋼種ファミリーにおける制御設定値の組合せの決定を要求する設定要求信号が供給されると、前記成分情報テーブルから前記設定要求信号に含まれる成分情報に対応する前記鋼種ファミリーを抽出し、前記第1の制御情報から、前記抽出された鋼種ファミリーと、前記設定要求信号に含まれる目標板厚及び目標板幅とに対応する前記実行パラメータ番号を抽出し、前記実行パラメータ情報から、前記抽出された実行パラメータ番号に対応する制御設定値の組合せを決定すると共に、上位計算機から前記鋼種における制御設定値の組合せの決定を要求する設定要求信号が供給されると、前記第2の制御情報から、前記鋼種と前記設定要求信号に含まれる目標板厚及び目標板幅とに対応する前記実行パラメータ番号を抽出し、前記実行パラメータ情報から、前記抽出された実行パラメータ番号に対応する制御設定値の組合せを決定する制御設定決定ステップとを有することにある。
 本発明によれば、上位計算機に過度の負荷を生じさせることなく、圧延操業プロセスのパラメータを詳細に決定することができる。
本発明の第1の実施形態に係る制御設定装置により設定された制御設定値に基づいて制御される熱間圧延装置の構成を示したブロック図である。 本発明の第1の実施形態に係る制御設定装置により設定された制御設定値に基づいて制御される熱間圧延装置が備える粗エッジャー及び粗圧延部の構成を示したブロック図である。 本発明の第1の実施形態に係る制御設定装置により設定された制御設定値に基づいて制御される熱間圧延装置が備える仕上圧延部うち1つのスタンドの構成を示したブロック図である。 本発明の第1の実施形態に係る制御設定装置が適用された制御システムの構成を示したブロック図である。 第1の実施形態に係る制御設定装置の構成を示したブロック図である。 本発明の第1の実施形態に係る制御設定装置の制御設定処理の処理手順を示したフローチャートである。 本発明の第1の実施形態に係る制御設定装置の制御設定処理を模式的に説明した図である。 本発明の第1の実施形態に係る制御設定装置の制御設定処理を模式的に説明した図である。 本発明の第1の実施形態に係る制御設定装置の制御設定処理を模式的に説明した図である。 本発明の第1の実施形態に係る制御設定装置の制御設定処理を模式的に説明した図である。 本発明の第3の実施形態に係る制御設定装置に備えられた2対の粗圧延ロールを備える粗圧延部のブロック図である。 本発明の第3の実施形態に係る制御設定装置の制御設定処理を模式的に説明した図である。 本発明の第3の実施形態に係る制御設定装置の制御設定処理を模式的に説明した図である。 本発明の第4の実施形態に係る制御設定装置が備えるランアウトラミナースプレー冷却部の構成を示したブロック図である。 本発明の第4の実施形態に係る制御設定装置の制御設定処理を模式的に説明した図である。 本発明の第4の実施形態に係る制御設定装置の制御設定処理を模式的に説明した図である。
 以下、本発明に係る制御設定装置の実施の形態について図面を参照して説明する。
<第1の実施形態>
 本発明に係る第1の実施形態に係る制御設定装置の構成について説明する。
≪構成≫
 図1は、第1の実施形態に係る制御設定装置により設定された制御設定値に基づいて制御される熱間圧延装置の構成を示したブロック図である。
 図1に示すように、熱間圧延装置20は、加熱炉1と、プライマリデスケーラ2と、粗エッジャー3と、粗圧延部4と、RDT(Roughing Mill Delivery Temperature)5と、FET(Finishing Mill Entry Temperature)6と、クロップシャー7と、セカンダリデスケーラ8と、仕上圧延部9と、FDT(Finishing Mill Delivery Temperature)10と、ランアウトラミナースプレー冷却部11と、CT(Coiler Entry Temperature)12と、コイラー13とを備える。
 加熱炉1は、被圧延材14を加熱するための炉である。ここで、被圧延材14は、搬送ライン上を搬送されることにより、粗エッジャー3と、粗圧延部4と、仕上圧延部9とにより圧延される金属であり、一般的には、熱間圧延装置20の各工程を経る度に、スラブ、バー、コイルとも呼ばれるが、ここでは、被圧延材14という呼称で統一するものとする。
 プライマリデスケーラ2は、加熱炉1の加熱により被圧延材14表面に形成される酸化膜を、被圧延材14の上下方向から高圧水を噴射することにより除去する。
 粗エッジャー3は、ライン上面方向から見て、被圧延材14の幅方向の圧延を行う。
 粗圧延部4は、単数又は複数スタンドを備え、被圧延材14の上下方向の圧延を行う。また、粗圧延部4は、ライン長を短くする必要があり、さらに複数パス(搬送方向に対する往復運動)による圧延が必要であることから、可逆式圧延機を含んで構成される場合が多い。また、粗圧延部4は、半製品である被圧延材14に高圧水を噴射し、表面の酸化膜を除去するためのデスケーラを備えている。圧延は、高温で行われるため、酸化膜が形成されやすく、このような酸化膜を除去するための装置を適宜用いる必要がある。詳細については後述する。
 RDT(Roughing Mill Delivery Temperature)5は、圧延中の半製品である被圧延材14の表面温度を計測する。
 FET(Finishing Mill Entry Temperature)6は、粗圧延部4と仕上圧延部9の間の距離が長いため、仕上圧延部9の入口で被圧延材14の表面温度を計測する。温度は被圧延材14の材料の変形抵抗に密接に関係するため、加工直近での温度を計測するか、又は高精度の温度予測を行うようにしてもよい。
 クロップシャー7は、被圧延材14の先尾端部を切断する。
 セカンダリデスケーラ8は、粗圧延部4と仕上圧延部9の間の距離が長いため、仕上圧延部9の入口に設けられ、仕上圧延後の被圧延材14の表面性状を良くするため、粗圧延された被圧延材14表面に形成される酸化膜を、被圧延材14の上下方向から高圧水を噴射することにより除去する。
 仕上圧延部9は、スタンドと呼ばれる圧延ロールが複数列設置されたタンデム式が採用されており、複数の圧延ロールで上下方向に圧延することにより、目標板厚の被圧延材14を得ることができる。この仕上圧延部9のスタンドおよびスタンド間には、酸化膜形成を抑制するため、及び温度制御を行うために、スプレーが備えられている。詳細については後述する。
 FDT(Finishing Mill Delivery Temperature)10は、仕上圧延部9による圧延後の被圧延材14の表面温度を計測する。被圧延材14の温度は、製品の金属組織の形成や材質と密接に関連しており、適切な温度に管理される必要がある。
 ランアウトラミナースプレー冷却部11は、被圧延材14の温度を制御するために、冷却水により被圧延材14を冷却する装置である。これらには、通常のランナウトテーブル冷却装置に加えて、強制冷却装置も備えられている。
 CT(Coiler Entry Temperature)12は、ランアウトラミナースプレー冷却部11により冷却された被圧延材14の表面温度を計測する。被圧延材14の温度は、圧延製品の金属組織の形成や材質と密接に関連しており、適切な温度に管理される必要がある。
 コイラー13は、被圧延材14を搬送するために巻き取る。
 図2は、熱間圧延装置20が備える粗エッジャー3及び粗圧延部4の構成を示したブロック図である。
 図2に示すように、被圧延材14の搬送ライン上における粗エッジャー3の上流には、被圧延材14の上下方向から高圧水を噴射する上流側粗デスケーラ31が配置されている。
 また、被圧延材14の搬送ライン上における粗圧延部4の下流には、被圧延材14の上下方向から高圧水を噴射する下流側粗デスケーラ45が配置されている。そして、粗圧延部4には、上部の粗圧延ローラ4AAに高圧水を噴射する1対の第1の被圧延材ロールクーリング41,42と、下部の粗圧延ローラ4ABに高圧水を噴射する1対の第2の被圧延材ロールクーリング43,44とを備えている。
 上流側粗デスケーラ31と下流側粗デスケーラ45とは、パス毎に必要に応じて起動又は停止が設定される。起動に際しては、酸化膜の発生に応じて設定される。通常の圧延材では、なるべく圧延製品の温度を高く保つ必要があるため、酸化膜が許容範囲内になるように、必要最小限で用いられるための制御設定値が定められる。また、被圧延材14の鋼種によっては、金属組織上の要求からRDT(Roughing Mill Delivery Temperature)5により測定される温度を目標として与えられている場合があり、この温度調整のために用いられる場合もある。
 図3は、熱間圧延装置20が備える仕上圧延部9うち1つのスタンドの構成を示したブロック図である。
 図3に示すように、被圧延材14の搬送ライン上における仕上圧延部9の下流には、各スタンド間の被圧延材14の温度を制御するため、及び2次スケールが発生するのを押さえるため、被圧延材14の上下方向から流量を可変しながら冷却水を噴射するインタースタンドクーリング94が配置されている。
 また、被圧延材14の搬送ライン上における仕上圧延部9の上流には、2次スケールの発生を抑制するために、冷却水を噴射するストリップスプレー91、ロールギャップスプレー93、ボトムスプレー92とが配置されている。
 さらに、インタースタンドクーリング94の下流には、スタンド出側でヒュームと呼ばれる微細な鉱物性粉塵の発生を抑制するため、冷却水を噴射するヒュームサプレッションスプレー95が配置されている。
 また、仕上圧延部9には、上部の仕上圧延ローラ9Aに冷却水を噴射する1対の第3の被圧延材ロールクーリング96a,96bと、下部の仕上圧延ローラ9Bに冷却水を噴射する1対の第4の被圧延材ロールクーリング99a,99bとを備えている。
 ロールギャップスプレー93は、2次スケールの発生防止、及びロール表面のピーリング防止を目的として設けられている。
 ロールギャップルブリケーションスプレー97,98は、被圧延材14の搬送ライン上における仕上圧延部9の上流に、被圧延材14と仕上圧延ローラ9A,9Bとの間の摩擦係数を下げ、仕上圧延ローラ9A,9Bの摩耗を減らして寿命を延ばすため、及び被圧延材14の表面性状を向上させるために、仕上圧延ローラ9A,9B又は被圧延材14に潤滑材が含まれるエマルジョンを塗布する。
 これら上流側粗デスケーラ31と、下流側粗デスケーラ45と、1対の第1の被圧延材ロールクーリング41,42と、1対の第2の被圧延材ロールクーリング43,44と、インタースタンドクーリング94と、ストリップスプレー91と、ロールギャップスプレー93と、ロールギャップスプレー97,98と、ボトムスプレー92と、ヒュームサプレッションスプレー95と、1対の第3の被圧延材ロールクーリング96a,96bと1対の第4の被圧延材ロールクーリング99a,99bとを、以下スプレーと総称する。
 図4は、第1の実施形態に係る制御設定装置が適用された制御システムの構成を示したブロック図である。
 図4に示すように、制御システム100は、下位から、例えば、熱間圧延装置20のドライブ制御装置や油圧機器で構成されるレベル0計算機104と、例えば、PLC(Programmable Logic Controller)に代表される制御用コントローラで構成されるレベル1計算機103と、制御用コンピュータで構成されるレベル2計算機である制御設定装置200と、HMI(Human Machine Interface)102と、生産管理用コンピュータで構成されるレベル3計算機101とを備えている。
 レベル3計算機101は、利用者の操作に基づいて、鋳造前における被圧延材14の成分調整時の実測情報に基づいた化学的な成分情報、被圧延材14の目標板厚及び目標板幅、鋼種コード、コイルの目標サイズ、各温度管理点における目標温度、圧延順を含む設定要求信号を制御設定装置200に供給する。
 制御設定装置200は、レベル3計算機101から供給された設定要求信号と、HMI102から供給された操作信号及び設定要求信号とに基づいて、圧延操業プロセスのパラメータ、即ち、熱間圧延装置20を制御するための制御設定値を決定し、この決定した制御設定値をレベル1計算機103へ供給する。
 HMI102は、利用者の操作に基づいて、例えば、スプレー起動又は停止させるための操作信号を制御設定装置200に供給したり、スプレーパターン番号を設定するための設定要求信号を制御設定装置200に供給したりする。
 レベル1計算機103は、熱間圧延装置20に備えられたスプレーを含むモータ以外の制御対象機器を制御すると共に、熱間圧延装置20に備えられたモータを制御するレベル0計算機104へ制御信号を供給する。
 レベル0計算機104は、レベル1計算機103から供給された制御信号に基づいて、熱間圧延装置20に備えられた主にモータを制御する。
 図5は、第1の実施形態に係る制御設定装置200の構成を示したブロック図である。
 図5に示すように、第1の実施形態に係る制御設定装置200は、ROM202と、RAM203と、第1のネット被圧延材部204と、第2のネット被圧延材部205と、ハードディスク206とを備え、それぞれはバス300を介して接続されている。
 ROM202は、不揮発性半導体等で構成され、CPU201が実行するオペレーションシステムを記憶している。
 RAM203は、揮発性半導体等で構成され、CPU201が各種処理を実行する上で必要なデータ等を記憶する。
 第1のネット被圧延材部204は、LANカードやシリアルポートなどの通信機器であり、この第1のネット被圧延材部204を介してレベル3計算機101及びレベル1計算機103と接続することにより、レベル3計算機101及びレベル1計算機103との間で通信を行う。
 第2のネット被圧延材部205は、LANカードやシリアルポートなどの通信機器であり、この第2のネット被圧延材部205を介してHMI102と接続することにより、HMI102との間で通信を行う。
 ハードディスク206は、CPU201が実行する制御プログラムを記憶している。
 また、ハードディスク206は、その機能上、GCIテーブル記憶部206aと、SGFテーブル記憶部206bと、仕上スプレーコードテーブル記憶部206cと、実行パラメータテーブル記憶部206dと、成分情報記憶部206eとを備える。
 GCIテーブル記憶部206aは、鋼種コードとスプレーパターン番号とを関連付けて記憶する。ここで、スプレーパターン番号とは、例えば、鋼種毎又は鋼種ファミリー毎に、目標板厚及び目標板幅に対応する実行パラメータ番号を関連付けたスプレーパターンを一意に識別する番号である。
 SGFテーブル記憶部206bは、類似の特性を有する1以上の鋼種を含む鋼種ファミリー毎に、目標板厚及び目標板幅に対応する実行パラメータ番号を関連付けたスプレーパターンを、SGFテーブル(第1の制御情報)として記憶する。
 仕上スプレーコードテーブル記憶部206cは、鋼種毎に、目標板厚及び目標板幅に対応する実行パラメータ番号を関連付けたスプレーパターンを、仕上スプレーコードテーブル(第2の制御情報)として記憶する。
 実行パラメータテーブル記憶部206dは、スプレーを制御するための制御設定値の組合せと、この制御設定値の組合せを一意に識別する実行パラメータ番号とを関連付けて実行パラメータ情報として記憶する。スプレーを制御するための制御設定値の組合せとは、例えば、スプレーに対する起動又は停止を指示する値、又はスプレーに対する初期流量である。
 成分情報記憶部206eは、鋼種ファミリー毎に、この鋼種ファミリーの成分を示す成分情報を成分情報テーブルとして記憶する。
 CPU201は、制御設定装置200の中枢的な制御を行う。CPU201は、レベル3計算機101から供給される設定要求信号、及びHMI102から供給される操作信号をRAM203に記憶させる。
 また、CPU201は、その機能上、入力判定部201aと、制御設定決定部201bとを備えている。
 入力判定部201aは、制御設定周期に達したと判定すると、RAM203に記憶された設定要求信号及び操作信号を読み出し、読み出された設定要求信号及び操作信号に基づいて、HMI102からスプレーの操作信号が直接入力されているか否か、HMI102からスプレーパターン番号が直接入力されているか否か、レベル3計算機101からスプレーパターン番号が直接入力されているか否か、及び/又は、レベル3計算機101から供給された設定要求信号に含まれる鋼種コードに対応するスプレーパターン番号が“0”を示すか否かを判定する。
 制御設定決定部201bは、制御設定装置200に接続されたレベル3計算機101から鋼種ファミリーにおける制御設定値の組合せの決定を要求する設定要求信号が供給される、即ち、レベル3計算機101から供給された設定要求信号に含まれる鋼種コードに対応するスプレーパターン番号が“0”を示すとき、成分情報テーブルから設定要求信号に含まれる成分情報に対応する鋼種ファミリーを抽出し、第1の制御情報であるSGFテーブルから、抽出された鋼種ファミリーと、設定要求信号に含まれる目標板厚及び目標板幅とに対応する実行パラメータ番号を抽出し、実行パラメータ情報から、抽出された実行パラメータ番号に対応する制御設定値の組合せを決定する。
 また、制御設定決定部201bは、レベル3計算機101から鋼種における制御設定値の組合せの決定を要求する設定要求信号が供給される、即ち、レベル3計算機101から供給された設定要求信号に含まれる鋼種コードに対応するスプレーパターン番号が“0”以外であるとき、第2の制御情報である仕上スプレーコードテーブルから、鋼種と設定要求信号に含まれる目標板厚及び目標板幅とに対応する実行パラメータ番号を抽出し、実行パラメータ情報から、抽出された実行パラメータ番号に対応する制御設定値の組合せを決定する。
<作用>
 本発明の第1の実施形態に係る制御設定装置200の作用について説明する。
 図6は、本発明の第1の実施形態に係る制御設定装置200の制御設定処理の処理手順を示したフローチャートである。
 図6に示すように、制御設定装置200のCPU201の入力判定部201aは、制御設定周期に達したか否かを判定する(ステップS101)。ここで制御設定周期とは、制御設定装置200がレベル1計算機103に対して制御設定を実行する周期である。
 ステップS101において、制御設定周期に達したと判定された場合(YESの場合)、入力判定部201aは、RAM203に記憶された設定要求信号及び操作信号を読み出す(ステップS103)。
 次に、入力判定部201aは、ステップS103において読み出された操作信号に基づいて、HMI102からスプレーの操作信号が直接入力されているか否かを判定する(ステップS105)。具体的には、入力判定部201aは、読み出された操作信号に、HMI102から各スプレーに対する起動又は停止を要求する操作信号、又はスプレーに対する初期流量を設定する操作信号が含まれているか否かを判定する。
 ステップS105において、HMI102からスプレーの操作信号が直接入力されていると判定された場合(YESの場合)、制御設定決定部201bは、スプレーに対する操作信号に基づいて、第1のネット被圧延材204を介して、レベル1計算機103にスプレーの制御を設定させる(ステップS107)。この操作信号には、例えば、ストリップスプレー91の起動を指示する操作信号や、インタースタンドクーリング94の初期流量を設定する操作信号等がある。
 一方、ステップS105において、HMI102からスプレーの操作信号が直接入力されていないと判定された場合(NOの場合)、入力判定部201aは、ステップS103において読み出された設定要求信号に基づいて、HMI102からスプレーパターン番号が直接入力されているか否かを判定する(ステップS109)。
 ステップS109において、HMI102からスプレーパターン番号が直接入力されていると判定された場合(YESの場合)、制御設定決定部201bは、スプレーパターン番号と、SGFテーブル又は仕上スプレーコードテーブルとに基づいて、各スプレーの制御設定値を決定する(ステップS111)。具体的には、制御設定決定部201bは、SGFテーブル記憶部206b又は仕上スプレーコードテーブル記憶部206cから、スプレーパターン番号に対応するSGFテーブル又は仕上スプレーコードテーブルを抽出し、この抽出されたSGFテーブル又は仕上スプレーコードテーブルから、設定要求信号に含まれる目標板厚及び目標板幅とに対応する実行パラメータ番号を抽出する。そして、制御設定決定部201bは、実行パラメータテーブル記憶部206dから、抽出された実行パラメータ番号に対応する実行パラメータを抽出し、この抽出された実行パラメータに基づいて、各スプレーの制御設定値を決定する。
 ステップS109において、HMI102からスプレーパターン番号が直接入力されていないと判定された場合(NOの場合)、入力判定部201aは、ステップS103において読み出された設定要求信号に基づいて、レベル3計算機101からスプレーパターン番号が直接入力されているか否かを判定する(ステップS113)。
 ステップS113において、レベル3計算機101からスプレーパターン番号が直接入力されていると判定された場合(YESの場合)、制御設定決定部201bは、処理をステップS111に移行する。
 ステップS113において、レベル3計算機101からスプレーパターン番号が直接入力されていないと判定された場合(NOの場合)、入力判定部201aは、レベル3計算機101から供給された設定要求信号に含まれる鋼種コードに対応するスプレーパターン番号が“0”を示すか否かを判定する(ステップS115)。具体的には、入力判定部201aは、レベル3計算機101から供給された設定要求信号から鋼種コードを抽出し、ハードディスク206のGCIテーブル記憶部206aに記憶されたGCIテーブルから、抽出された鋼種コードに対応するスプレーパターン番号を抽出し、この抽出されたスプレーパターン番号が“0”を示すか否かを判定する。
 ステップS115において、スプレーパターン番号が“0”を示すと判定された場合(YESの場合)、制御設定決定部201bは、成分情報とSGFテーブルとに基づいて、各スプレーの制御設定値を決定する(ステップS119)。具体的には、制御設定決定部201bは、成分情報記憶部206eから、レベル3計算機101から供給された設定要求信号に含まれる成分情報に対応する鋼種ファミリーを抽出し、SGFテーブル記憶部206bから、抽出された鋼種ファミリーに対応するSGFテーブルを抽出し、この抽出されたSGFテーブルから、設定要求信号に含まれる目標板厚及び目標板幅とに対応する実行パラメータ番号を抽出する。そして、制御設定決定部201bは、実行パラメータテーブル記憶部206dから、抽出された実行パラメータ番号に対応する実行パラメータを抽出し、この抽出された実行パラメータに基づいて、各スプレーの制御設定値を決定する。
 一方、ステップS115において、スプレーパターン番号が“0”ではないと判定された場合(NOの場合)、制御設定決定部201bは、鋼種コードと仕上スプレーテーブルとに基づいて、各スプレーの制御設定値を決定する(ステップS117)。具体的には、制御設定決定部201bは、GCIテーブルから鋼種コードに対応するスプレーパターン番号を抽出し、仕上スプレーコードテーブル記憶部206cから、抽出されたスプレーパターン番号に対応する仕上スプレーコードテーブルを抽出し、この抽出された仕上スプレーコードテーブルから、設定要求信号に含まれる目標板厚及び目標板幅とに対応する実行パラメータ番号を抽出する。そして、制御設定決定部201bは、実行パラメータテーブル記憶部206dから、抽出された実行パラメータ番号に対応する実行パラメータを抽出し、この抽出された実行パラメータに基づいて、各スプレーの制御設定値を決定する。
 制御設定決定部201bは、ステップS111、ステップS117、又はステップS119において設定された制御設定値に基づいて、第1のネット被圧延材204を介して、レベル1計算機103にスプレーの制御を設定させる(ステップS121)。
 図7A及び図7Bは、本発明の第1の実施形態に係る制御設定装置200の制御設定処理を模式的に説明した図である。
 図7A及び図7Bに示すように、レベル3計算機101から供給された設定要求信号の鋼種コードに対応するスプレーパターン番号が“101”であったとする(ステップS115)。
 そして、レベル3計算機101からスプレーパターン番号が直接入力されておらず(ステップS113)、HMI102からもスプレーパターン番号が直接入力されていないとする(ステップS109)。
 このとき、鋼種コードに対応するスプレーパターン番号が“101”であるので、制御設定決定部201bは、仕上スプレーコードテーブル記憶部206cから、抽出されたスプレーパターン番号“101”に対応する仕上スプレーコードテーブルを抽出する。
 そして、レベル3計算機101から供給された設定要求信号に含まれる目標板厚及び目標板幅が、それぞれ“3”及び“5”であるとすると、制御設定決定部201bは、抽出された仕上スプレーコードテーブルから、設定要求信号に含まれる目標板厚“3”及び目標板幅“5”とに対応する実行パラメータ番号“1”を抽出する。
 次に、制御設定決定部201bは、実行パラメータテーブル記憶部206dから、抽出された実行パラメータ番号“1”に対応する実行パラメータテーブルを抽出し、この抽出された実行パラメータテーブルに基づいて、各スプレーの制御設定値を決定する。
 ここで、HMI102からスプレーの操作信号が直接入力されている場合(ステップS105)、制御設定決定部201bは、実行パラメータテーブルに基づいて決定された各スプレーの制御設定値にかかわらず、直接入力されたスプレーに対する操作信号に基づいて、第1のネット被圧延材204を介して、レベル1計算機103にスプレーの制御を設定させる。
 以上のように、本発明の第1の実施形態に係る制御設定装置200によれば、レベル3計算機101から鋼種ファミリーにおける制御設定値の組合せの決定を要求する設定要求信号が供給されると、成分情報テーブルから設定要求信号に含まれる成分情報に対応する鋼種ファミリーを抽出し、第1の制御情報であるSGFテーブルから、抽出された鋼種ファミリーと、設定要求信号に含まれる目標板厚及び目標板幅とに対応する実行パラメータ番号を抽出し、実行パラメータ情報から、抽出された実行パラメータ番号に対応する制御設定値の組合せを決定すると共に、レベル3計算機101から鋼種における制御設定値の組合せの決定を要求する設定要求信号が供給されると、第2の制御情報である仕上スプレーコードテーブルから、鋼種と設定要求信号に含まれる目標板厚及び目標板幅とに対応する実行パラメータ番号を抽出し、実行パラメータ情報から、抽出された実行パラメータ番号に対応する制御設定値の組合せを決定するので、レベル3計算機101に過度の負荷を生じさせることなく、圧延操業プロセスのパラメータ、具体的には、各スプレーの制御設定値を細かく設定することができる。
 なお、本発明の第1の実施形態に係る制御設定装置200では、仕上圧延部9における冷却水を噴射するスプレーの制御設定値を設定したが、スプレーから噴射される液体は冷却水に限らず、仕上ロールと被圧延材14との間に用いられるエマルジョンタイプの潤滑油を噴射するスプレーの制御設定値を設定するようにしてもよい。
<第2の実施形態>
 本発明に係る第1の実施形態に係る制御設定装置200では、仕上圧延部9における制御設定処理の処理手順を例に挙げて説明したがこれに限らない。
 本発明に係る第2の実施形態に係る制御設定装置200では、粗圧延部4における制御設定処理の処理手順を例に挙げて説明する。
 本発明に係る第2の実施形態に係る制御設定装置200は、図1~図5に示した本発明に係る第1の実施形態に係る制御設定装置200の構成と同様の構成を有する。
 ただし、本発明に係る第2の実施形態に係る制御設定装置200に備えられた粗圧延部4は、被圧延材14の搬送方向に対して被圧延材14を往復させながら粗圧延し、この往復回数に応じた各スプレーの制御設定値を決定する点が異なるので、この異なる点を主に以下に説明する。
 図8A及び図8Bは、本発明の第1の実施形態に係る制御設定装置200の制御設定処理を模式的に説明した図である。
 図8A及び図8Bに示すように、レベル3計算機101から供給された設定要求信号の鋼種コードに対応する粗圧延部4のスプレーパターン番号が“0”であったとする(ステップS115)。
 そして、レベル3計算機101から粗圧延部4のスプレーパターン番号が直接入力されておらず(ステップS113)、HMI102からも粗圧延部4のスプレーパターン番号が直接入力されていないとする(ステップS109)。
 このとき、鋼種コードに対応する粗圧延部4のスプレーパターン番号が“0”であるので、制御設定決定部201bは、SGFテーブル記憶部206bから、レベル3計算機101から供給された設定要求信号に含まれる成分情報に対応するSGFテーブルを抽出する。
 そして、レベル3計算機101から供給された設定要求信号に含まれる目標板厚及び目標板幅が、それぞれ“3”及び“5”であるとすると、制御設定決定部201bは、この抽出されたSGFテーブルから、設定要求信号に含まれる目標板厚“3”及び目標板幅“5”とに対応する実行パラメータ番号“1”を抽出する。
 次に、制御設定決定部201bは、実行パラメータテーブル記憶部206dから、抽出された実行パラメータ番号“1”と、設定要求信号に含まれるパス数とに基づいて、実行パラメータを抽出し、この抽出された実行パラメータに基づいて、各スプレーの制御設定値を決定する。例えば、設定要求信号に含まれるパス数が“7”パスだとすると、1~7パスまでの各スプレーの制御設定値“ON”、“OFF”、“ON”、“ON”、“OFF”、“ON”、“OFF”が設定される。
 以上のように、本発明の第2の実施形態に係る制御設定装置200によれば、本発明の第1の実施形態に係る制御設定装置200の効果に加え、粗圧延部4が、被圧延材の搬送方向に対して被圧延材を往復させながら、粗圧延する場合においても、そのパス毎に各スプレーの制御設定値を細かく設定することができる。
<第3の実施形態>
 本発明に係る第2の実施形態に係る制御設定装置200では、1対の粗圧延ロールを備える粗圧延部4における制御設定処理の処理手順を例に挙げて説明したが、これに限らない。
 本発明に係る第3の実施形態に係る制御設定装置200は、2対の粗圧延ロールを備える粗圧延部4における制御設定処理の処理手順を例に挙げて説明する。
 図9は、本発明に係る第3の実施形態に係る制御設定装置200に備えられた2対の粗圧延ロールを備える粗圧延部4のブロック図である。
 図9に示すように、粗圧延部4は、粗圧延ロール4A,4Bとを備えており、被圧延材14の搬送ライン上における粗圧延ロール4A,4Bそれぞれの上流には、被圧延材14の上下方向から高圧水を噴射する上流側粗デスケーラ31A,31Bが配置されている。
 また、被圧延材14の搬送ライン上における粗圧延ロール4A,4Bそれぞれの下流には、被圧延材14の上下方向から高圧水を噴射する下流側粗デスケーラ45A,45Bが配置されている。そして、粗圧延ロール4Aには、上部の粗圧延ローラ4AAに高圧水を噴射する1対の第1の被圧延材ロールクーリング41,42と、下部の粗圧延ローラ4AAに高圧水を噴射する1対の第2の被圧延材ロールクーリング43,44とを備えている。同様に、粗圧延ロール4Bには、上部の粗圧延ローラ4BAに高圧水を噴射する1対の第3の被圧延材ロールクーリング46,47と、下部の粗圧延ローラ4BBに高圧水を噴射する1対の第4の被圧延材ロールクーリング48,49とを備えている。
 本発明に係る第3の実施形態に係る制御設定装置200に備えられた粗圧延ロール4A,4Bは、被圧延材の搬送方向に対して被圧延材を往復させながら、それぞれ粗圧延するので、粗圧延ロール4A,4Bそれぞれの往復回数に応じた各スプレーの制御設定値を決定する。この各スプレーの制御設定値を決定する制御設定処理を以下に詳細に説明する。
 図10A及び図10Bは、本発明の第3の実施形態に係る制御設定装置200の制御設定処理を模式的に説明した図である。
 図10A及び図10Bに示すように、レベル3計算機101から供給された設定要求信号の鋼種コードに対応する粗圧延部4のスプレーパターン番号が“0”であったとする(ステップS115)。
 そして、レベル3計算機101から粗圧延部4のスプレーパターン番号が直接入力されておらず(ステップS113)、HMI102からも粗圧延部4のスプレーパターン番号が直接入力されていないとする(ステップS109)。
 このとき、鋼種コードに対応する粗圧延部4のスプレーパターン番号が“0”であるので、制御設定決定部201bは、SGFテーブル記憶部206bから、レベル3計算機101から供給された設定要求信号に含まれる成分情報に対応するSGFテーブルを抽出する。
 そして、レベル3計算機101から供給された設定要求信号に含まれる目標板厚及び目標板幅が、それぞれ“3”及び“5”であるとすると、制御設定決定部201bは、この抽出されたSGFテーブルから、設定要求信号に含まれる目標板厚“3”及び目標板幅“5”とに対応する実行パラメータ番号“1”を抽出する。
 次に、制御設定決定部201bは、実行パラメータテーブル記憶部206dから、抽出された実行パラメータ番号“1”と、設定要求信号に含まれるパススケジュールとに基づいて、実行パラメータを抽出し、この抽出された実行パラメータに基づいて、各スプレーの制御設定値を決定する。ここで、パススケジュールとは、粗圧延ロール4A,4Bそれぞれのパス数を示し、粗圧延ロール4Aが3回、粗圧延ロール4Bが3回の合計6回のパスで粗圧延を行う場合、パススケジュールは、“3-3”となる。
 例えば、設定要求信号に含まれるパススケジュールが“3-3”だとすると、粗圧延ロール4Aにおいて、1~3パスまでのスプレーの制御設定値は、“ON”、“OFF”、“ON”とい設定され、粗圧延ロール4Aにおいて、1~3パスまでのスプレーの制御設定値“ON”、“OFF”、“ON”が設定される。
 以上のように、本発明の第3の実施形態に係る制御設定装置200によれば、本発明の第2の実施形態に係る制御設定装置200の効果に加え、粗圧延ロール4A,4Bが、それぞれ被圧延材14の搬送方向に対して被圧延材14を往復させながら粗圧延する場合においても、そのパス毎に各スプレーの制御設定値を細かく設定することができる。
<第4の実施形態>
 本発明に係る第1の実施形態に係る制御設定装置200では、仕上圧延部9における制御設定処理の処理手順を例に挙げて説明したがこれに限らない。
 本発明に係る第4の実施形態に係る制御設定装置200では、ランアウトラミナースプレー冷却部11における制御設定処理の処理手順を例に挙げて説明する。
 被圧延材14は、ランアウトラミナースプレー冷却部11により冷却される際、端部が冷却され易いので中心部と端部との間で温度差が生じ、この温度差により変形することがある。
 そこで、本発明に係る第2の実施形態に係る制御設定装置200に備えられたランアウトラミナースプレー冷却部11は、被圧延材14の端部の過冷却を防止するため、噴射する冷却水が被圧延材14の端部に当たらないように制御する。
 図11は、本発明に係る第4の実施形態に係る制御設定装置200のランアウトラミナースプレー冷却部11の構成を示したブロック図である。なお、説明のため、図11では、ランアウトラミナースプレー冷却部11のうち1つのバンクのみを示しているが、ランアウトラミナースプレー冷却部11は、被圧延材14の搬送方向に複数のバンクを有する。
 図11に示すように、モータ116の回転により回転軸Pを中心に回転するボールねじ112と、ボールねじ112の回転により上下に移動するナット部113と、このナット部113に一方の端部が取り付けられた第1のアーム114a,114bと、第1のアーム114a,114bの他方の端部に取り付けられた第2のアーム115a,115bと、第2のアーム115a,115bの一方の端部に取り付けられたガード板111a,111bとを備えている。
 そして、ボールねじ112の回転により下方にナット部113が移動すると、ガード板111aがR1方向に移動し、ガード板111bがR2方向に移動する。これにより、下方向に冷却水を噴射するノズルを備えたラミナースプレー117により噴射された冷却水が、紙面手前に向かって搬送される被圧延材14の幅方向の端部に当たるのを防止することができる。
 図12A及び図12Bは、本発明の第4の実施形態に係る制御設定装置200の制御設定処理を模式的に説明した図である。
 図12A及び図12Bに示すように、レベル3計算機101から供給された設定要求信号の鋼種コードに対応するランアウトラミナースプレー冷却部11のスプレーパターン番号が“0”であったとする(ステップS115)。
 そして、レベル3計算機101からランアウトラミナースプレー冷却部11のスプレーパターン番号が直接入力されておらず(ステップS113)、HMI102からも粗圧延部4のスプレーパターン番号が直接入力されていないとする(ステップS109)。
 このとき、鋼種コードに対応するランアウトラミナースプレー冷却部11のスプレーパターン番号が“0”であるので、制御設定決定部201bは、SGFテーブル記憶部206bから、レベル3計算機101から供給された設定要求信号に含まれる成分情報に対応するSGFテーブルを抽出する。
 そして、レベル3計算機101から供給された設定要求信号に含まれる目標板厚及び目標板幅が、それぞれ“3”及び“5”であるとすると、制御設定決定部201bは、この抽出されたSGFテーブルから、設定要求信号に含まれる目標板厚“3”及び目標板幅“5”とに対応する実行パラメータ番号“1”を抽出する。
 次に、制御設定決定部201bは、実行パラメータテーブル記憶部206dから、抽出された実行パラメータ番号“1”と、仕上出側設定幅からのオフセット量とに基づいて、実行パラメータを抽出し、この抽出された実行パラメータに基づいて、エッジマスクを用いるか否か、即ちガード板111a,111bをR1方向及びR2方向に移動させるか否かを設定する制御設定値を決定する。
 以上のように、本発明の第4の実施形態に係る制御設定装置200によれば、本発明の第1の実施形態に係る制御設定装置200の効果に加え、
 被圧延材14の端部の過冷却を防止するため、噴射する冷却水が被圧延材14の端部に当たらないようにガード板111a,111bを移動させるモータ116の制御設定値を細かく設定することができる。
 なお、本発明の第1の実施形態~第4の実施形態では、SGFテーブル記憶部206bに記憶されたSGFテーブル、又は仕上スプレーコードテーブル記憶部206cに記憶された仕上スプレーコードテーブルに基づいて、実行パラメータ番号を抽出し、実行パラメータ情報から、抽出された実行パラメータ番号に対応する制御設定値の組合せを決定したが、これに限らない。
 例えば、制御設定装置200は、鋼種コードと実行パラメータコードとを関連付けて第2のGCIテーブルとして記憶し、レベル3計算機101から鋼種における制御設定値の組合せの決定を要求する設定要求信号が供給されると、GCIテーブルから、設定要求信号に含まれる鋼種コードと目標板厚及び目標板幅とに対応する実行パラメータ番号を抽出し、実行パラメータ情報から、抽出された実行パラメータ番号に対応する制御設定値の組合せを決定するようにしてもよい。
産業上の利用の可能性
 本発明は、熱間で金属を圧延する熱間圧延装置を制御する熱間圧延システムに適用できる。

Claims (2)

  1.  制御対象機器を制御するための制御設定値の組合せと、この制御設定値の組合せを一意に識別する実行パラメータ番号とを関連付けて実行パラメータ情報として記憶する実行パラメータ情報記憶部と、
     類似の特性を有する1以上の鋼種を含む鋼種ファミリー毎に、目標板厚及び目標板幅に対応する前記実行パラメータ番号を、第1の制御情報として記憶する第1の制御情報記憶部と、
     前記鋼種毎に、目標板厚及び目標板幅に対応する前記実行パラメータ番号を、第2の制御情報として記憶する第2の制御情報記憶部と、
     前記鋼種ファミリー毎に、この鋼種ファミリーの成分を示す成分情報を成分情報テーブルとして記憶する成分情報記憶部と、
     当該制御設定装置に接続された上位計算機から前記鋼種ファミリーにおける制御設定値の組合せの決定を要求する設定要求信号が供給されると、前記成分情報テーブルから前記設定要求信号に含まれる成分情報に対応する前記鋼種ファミリーを抽出し、前記第1の制御情報から、前記抽出された鋼種ファミリーと、前記設定要求信号に含まれる目標板厚及び目標板幅とに対応する前記実行パラメータ番号を抽出し、前記実行パラメータ情報から、前記抽出された実行パラメータ番号に対応する制御設定値の組合せを決定すると共に、上位計算機から前記鋼種における制御設定値の組合せの決定を要求する設定要求信号が供給されると、前記第2の制御情報から、前記鋼種と前記設定要求信号に含まれる目標板厚及び目標板幅とに対応する前記実行パラメータ番号を抽出し、前記実行パラメータ情報から、前記抽出された実行パラメータ番号に対応する制御設定値の組合せを決定する制御設定決定部と、
     を備えた制御設定装置。
  2.  制御対象機器を制御するための制御設定値の組合せと、この制御設定値の組合せを一意に識別する実行パラメータ番号とを関連付けて実行パラメータ情報として記憶手段に記憶させる実行パラメータ情報記憶ステップと、
     類似の特性を有する1以上の鋼種を含む鋼種ファミリー毎に、目標板厚及び目標板幅に対応する前記実行パラメータ番号を、第1の制御情報として記憶手段に記憶させる第1の制御情報記憶ステップと、
     前記鋼種毎に、目標板厚及び目標板幅に対応する前記実行パラメータ番号を、第2の制御情報として記憶手段に記憶させる第2の制御情報記憶ステップと、
     前記鋼種ファミリー毎に、この鋼種ファミリーの成分を示す成分情報を成分情報テーブルとして記憶手段に記憶させる成分情報記憶ステップと、
     制御設定装置に接続された上位計算機から前記鋼種ファミリーにおける制御設定値の組合せの決定を要求する設定要求信号が供給されると、前記成分情報テーブルから前記設定要求信号に含まれる成分情報に対応する前記鋼種ファミリーを抽出し、前記第1の制御情報から、前記抽出された鋼種ファミリーと、前記設定要求信号に含まれる目標板厚及び目標板幅とに対応する前記実行パラメータ番号を抽出し、前記実行パラメータ情報から、前記抽出された実行パラメータ番号に対応する制御設定値の組合せを決定すると共に、上位計算機から前記鋼種における制御設定値の組合せの決定を要求する設定要求信号が供給されると、前記第2の制御情報から、前記鋼種と前記設定要求信号に含まれる目標板厚及び目標板幅とに対応する前記実行パラメータ番号を抽出し、前記実行パラメータ情報から、前記抽出された実行パラメータ番号に対応する制御設定値の組合せを決定する制御設定決定ステップと、
     を有する制御設定方法。
PCT/JP2009/068111 2009-10-21 2009-10-21 制御設定装置及び制御設定方法 Ceased WO2011048671A1 (ja)

Priority Applications (6)

Application Number Priority Date Filing Date Title
JP2011537052A JP5380544B2 (ja) 2009-10-21 2009-10-21 制御設定装置及び制御設定方法
PCT/JP2009/068111 WO2011048671A1 (ja) 2009-10-21 2009-10-21 制御設定装置及び制御設定方法
KR1020127009827A KR101443991B1 (ko) 2009-10-21 2009-10-21 제어 설정 장치 및 제어 설정 방법
CN200980162118.1A CN102665948B (zh) 2009-10-21 2009-10-21 控制设定装置及控制设定方法
US13/503,108 US20120260708A1 (en) 2009-10-21 2009-10-21 Control setup device and control setup method
TW098141364A TWI439332B (zh) 2009-10-21 2009-12-03 Control setting means and control setting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2009/068111 WO2011048671A1 (ja) 2009-10-21 2009-10-21 制御設定装置及び制御設定方法

Publications (1)

Publication Number Publication Date
WO2011048671A1 true WO2011048671A1 (ja) 2011-04-28

Family

ID=43899918

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2009/068111 Ceased WO2011048671A1 (ja) 2009-10-21 2009-10-21 制御設定装置及び制御設定方法

Country Status (6)

Country Link
US (1) US20120260708A1 (ja)
JP (1) JP5380544B2 (ja)
KR (1) KR101443991B1 (ja)
CN (1) CN102665948B (ja)
TW (1) TWI439332B (ja)
WO (1) WO2011048671A1 (ja)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6188606B2 (ja) * 2014-03-06 2017-08-30 株式会社神戸製鋼所 冷間圧延におけるセットアップ条件の決定方法
JP6438753B2 (ja) * 2014-12-05 2018-12-19 株式会社日立製作所 タンデム圧延ミルの制御装置およびタンデム圧延ミルの制御方法
JP6233614B2 (ja) * 2016-01-27 2017-11-22 Jfeスチール株式会社 熱延鋼帯の製造設備列および熱延鋼帯の製造方法
CN106944482A (zh) * 2017-03-28 2017-07-14 首钢京唐钢铁联合有限责任公司 一种粗轧除鳞的控制方法
CN115254994B (zh) * 2022-08-24 2024-09-03 重庆钢铁股份有限公司 一种钛板轧制吹扫方法、装置、设备及存储介质
CN116748313B (zh) * 2023-06-01 2025-09-05 邯郸钢铁集团有限责任公司 一种热轧厚规格车轮钢温度控制方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63119919A (ja) * 1986-11-07 1988-05-24 Nippon Steel Corp 圧延における板厚制御方法
JPH1133616A (ja) * 1997-05-23 1999-02-09 Nippon Steel Corp 鋼帯の捲取温度制御装置
JP2007245204A (ja) * 2006-03-16 2007-09-27 Jfe Steel Kk 圧延荷重モデルの学習方法及びその装置

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62158825A (ja) * 1985-12-28 1987-07-14 Nippon Steel Corp 熱間圧延鋼板の冷却方法
DE4105321A1 (de) * 1991-02-20 1992-08-27 Siemens Ag Regelung eines warm- und/oder kaltwalzprozesses
ATE129938T1 (de) * 1991-06-28 1995-11-15 Siemens Ag Regelung bei dem herstellen von warmband mittels eines mehrgerüstigen warmbandwalzwerks.
US5609053A (en) * 1994-08-22 1997-03-11 Alcan Aluminum Corporation Constant reduction multi-stand hot rolling mill set-up method
JP3607029B2 (ja) * 1997-01-16 2005-01-05 東芝三菱電機産業システム株式会社 圧延機の制御方法及び制御装置
JP3348826B2 (ja) * 1997-12-04 2002-11-20 川崎製鉄株式会社 熱間圧延材の圧延条件設定方法
JP2000210708A (ja) * 1999-01-21 2000-08-02 Toshiba Corp 圧延機出側の圧延材温度制御方法及び圧延材温度制御装置
JP2000246325A (ja) * 1999-02-24 2000-09-12 Mitsubishi Heavy Ind Ltd 熱間圧延におけるスケール疵防止装置及び防止方法
JP2001334304A (ja) * 2000-05-22 2001-12-04 Mitsubishi Electric Corp 熱間仕上圧延機の出側温度制御装置
ATE307687T1 (de) * 2001-03-16 2005-11-15 Nakayama Steel Works Ltd Warmwalzwerk und warmwalzverfahren
JP4833531B2 (ja) * 2003-11-11 2011-12-07 新日本製鐵株式会社 プレス成形加工装置、プレス成形加工方法、コンピュータプログラム及び記録媒体
CN101134998A (zh) * 2006-08-31 2008-03-05 宝山钢铁股份有限公司 加速冷却过程的控制系统及控制方法
DE102006047718A1 (de) * 2006-10-09 2008-04-17 Siemens Ag Verfahren zur Nachverfolgung des physikalischen Zustands eines Warmblechs oder Warmbands im Rahmen der Steuerung einer Grobblechwalzstraße zur Bearbeitung eines Warmblechs oder Warmbands
WO2008090597A1 (ja) * 2007-01-22 2008-07-31 Toshiba Mitsubishi-Electric Industrial Systems Corporation 鋼板製造ラインの加熱制御方法及びその装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63119919A (ja) * 1986-11-07 1988-05-24 Nippon Steel Corp 圧延における板厚制御方法
JPH1133616A (ja) * 1997-05-23 1999-02-09 Nippon Steel Corp 鋼帯の捲取温度制御装置
JP2007245204A (ja) * 2006-03-16 2007-09-27 Jfe Steel Kk 圧延荷重モデルの学習方法及びその装置

Also Published As

Publication number Publication date
JPWO2011048671A1 (ja) 2013-03-07
US20120260708A1 (en) 2012-10-18
CN102665948A (zh) 2012-09-12
KR20120093221A (ko) 2012-08-22
CN102665948B (zh) 2014-11-05
JP5380544B2 (ja) 2014-01-08
TW201114512A (en) 2011-05-01
KR101443991B1 (ko) 2014-09-23
TWI439332B (zh) 2014-06-01

Similar Documents

Publication Publication Date Title
JP5380544B2 (ja) 制御設定装置及び制御設定方法
CN103079719B (zh) 用于通过全连续轧制制造带钢的方法
US12103061B2 (en) Cold rolling rolled stock in a mill train with multiple roll stands
AU2006286797A1 (en) Method for lubricating and cooling rollers and metal strips on rolling in particular on cold rolling of metal strips
CN1466495A (zh) 制造板带钢的方法及设备
JP4823400B1 (ja) 熱延鋼板の製造装置及び製造方法
CN101605617A (zh) 用于调节金属带的平直度和/或粗糙度的方法和润滑剂喷涂装置
CN104321151A (zh) 用于加工轧件的方法和轧机
JP2014133246A (ja) 設定値計算装置、設定値計算方法、及び設定値計算プログラム
CN106269905A (zh) 一种解决热轧高强钢密集冷却区扣头废钢的控制方法
KR20070089807A (ko) 상대적으로 얇은 금속 스트랜드, 특히 강 스트랜드를상승된 주조 속도에서 연속 주조 압연하고 이어서 열간압연하기 위한 방법, 및 연속 주조 압연 장치
JP5163485B2 (ja) ワークロールのロールクラウン予測計算方法
JP5962418B2 (ja) 圧延における潤滑油供給方法
JP6233614B2 (ja) 熱延鋼帯の製造設備列および熱延鋼帯の製造方法
US11883868B2 (en) Method for producing a metal article
JP5673370B2 (ja) 熱延鋼板の冷却方法
KR20130117519A (ko) 냉각 원인별 조압연 온도 강하량 제어 장치 및 방법
JP5821575B2 (ja) 冷延鋼板の圧延方法および極薄鋼板の製造方法
CN118616501B (zh) 改善热轧带钢卷取拉窄的控制方法
JP2007203303A (ja) 冷間圧延における形状制御方法
JP2006051512A (ja) 熱間圧延における被圧延材幅の制御方法及び熱延金属板の製造方法
JP6188606B2 (ja) 冷間圧延におけるセットアップ条件の決定方法
EP4647188A1 (en) Cold rolling condition-setting method, cold rolling method, cold rolled steel sheet manufacturing method, cold rolling condition-calculating device, and cold rolling mill
KR20180110085A (ko) 기결정 유형의 피가공재 제조 장치 및 그 방법
KR101657826B1 (ko) 조압연기의 역장입 제어 방법

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 200980162118.1

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 09850569

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2011537052

Country of ref document: JP

ENP Entry into the national phase

Ref document number: 20127009827

Country of ref document: KR

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 13503108

Country of ref document: US

122 Ep: pct application non-entry in european phase

Ref document number: 09850569

Country of ref document: EP

Kind code of ref document: A1