WO2010109632A1 - 温度調整装置、流体供給システム、暖房システム、温度調整装置の取付方法及び流体供給方法 - Google Patents
温度調整装置、流体供給システム、暖房システム、温度調整装置の取付方法及び流体供給方法 Download PDFInfo
- Publication number
- WO2010109632A1 WO2010109632A1 PCT/JP2009/056128 JP2009056128W WO2010109632A1 WO 2010109632 A1 WO2010109632 A1 WO 2010109632A1 JP 2009056128 W JP2009056128 W JP 2009056128W WO 2010109632 A1 WO2010109632 A1 WO 2010109632A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- supply pipe
- fluid
- hot water
- temperature
- supplied
- Prior art date
Links
- 238000010438 heat treatment Methods 0.000 title claims abstract description 295
- 239000012530 fluid Substances 0.000 title claims abstract description 137
- 238000000034 method Methods 0.000 title claims description 12
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 465
- 230000007423 decrease Effects 0.000 claims description 3
- 230000002708 enhancing effect Effects 0.000 abstract 1
- 230000001105 regulatory effect Effects 0.000 abstract 1
- 125000001145 hydrido group Chemical group *[H] 0.000 description 23
- 238000010586 diagram Methods 0.000 description 7
- 238000001514 detection method Methods 0.000 description 2
- 230000008014 freezing Effects 0.000 description 2
- 238000007710 freezing Methods 0.000 description 2
- 230000002265 prevention Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 239000008236 heating water Substances 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D3/00—Hot-water central heating systems
- F24D3/08—Hot-water central heating systems in combination with systems for domestic hot-water supply
- F24D3/082—Hot water storage tanks specially adapted therefor
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D12/00—Other central heating systems
- F24D12/02—Other central heating systems having more than one heat source
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D19/00—Details
- F24D19/10—Arrangement or mounting of control or safety devices
- F24D19/1006—Arrangement or mounting of control or safety devices for water heating systems
- F24D19/1009—Arrangement or mounting of control or safety devices for water heating systems for central heating
- F24D19/1015—Arrangement or mounting of control or safety devices for water heating systems for central heating using a valve or valves
- F24D19/1024—Arrangement or mounting of control or safety devices for water heating systems for central heating using a valve or valves a multiple way valve
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D19/00—Details
- F24D19/10—Arrangement or mounting of control or safety devices
- F24D19/1006—Arrangement or mounting of control or safety devices for water heating systems
- F24D19/1009—Arrangement or mounting of control or safety devices for water heating systems for central heating
- F24D19/1039—Arrangement or mounting of control or safety devices for water heating systems for central heating the system uses a heat pump
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D19/00—Details
- F24D19/10—Arrangement or mounting of control or safety devices
- F24D19/1006—Arrangement or mounting of control or safety devices for water heating systems
- F24D19/1066—Arrangement or mounting of control or safety devices for water heating systems for the combination of central heating and domestic hot water
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D19/00—Details
- F24D19/10—Arrangement or mounting of control or safety devices
- F24D19/1006—Arrangement or mounting of control or safety devices for water heating systems
- F24D19/1066—Arrangement or mounting of control or safety devices for water heating systems for the combination of central heating and domestic hot water
- F24D19/1072—Arrangement or mounting of control or safety devices for water heating systems for the combination of central heating and domestic hot water the system uses a heat pump
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D3/00—Hot-water central heating systems
- F24D3/10—Feed-line arrangements, e.g. providing for heat-accumulator tanks, expansion tanks ; Hydraulic components of a central heating system
- F24D3/1058—Feed-line arrangements, e.g. providing for heat-accumulator tanks, expansion tanks ; Hydraulic components of a central heating system disposition of pipes and pipe connections
- F24D3/1066—Distributors for heating liquids
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D3/00—Hot-water central heating systems
- F24D3/18—Hot-water central heating systems using heat pumps
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D2200/00—Heat sources or energy sources
- F24D2200/08—Electric heater
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D2200/00—Heat sources or energy sources
- F24D2200/12—Heat pump
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D2220/00—Components of central heating installations excluding heat sources
- F24D2220/20—Heat consumers
- F24D2220/2009—Radiators
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D2220/00—Components of central heating installations excluding heat sources
- F24D2220/20—Heat consumers
- F24D2220/2081—Floor or wall heating panels
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
- Y02B30/12—Hot water central heating systems using heat pumps
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T137/00—Fluid handling
- Y10T137/0318—Processes
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T137/00—Fluid handling
- Y10T137/6416—With heating or cooling of the system
- Y10T137/6579—Circulating fluid in heat exchange relationship
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T29/00—Metal working
- Y10T29/49—Method of mechanical manufacture
- Y10T29/4935—Heat exchanger or boiler making
Definitions
- the present invention relates to a technique for adjusting the temperature of a fluid such as water (hot water).
- Hot water heaters differ in required hot water temperature depending on the specifications. That is, the hot water heater includes a heater that requires hot water having a relatively high temperature (high temperature heater) and a heater that requires hot water having a relatively low temperature (low temperature heater).
- high temperature heater a heater that requires hot water having a relatively high temperature
- low temperature heater a heater that requires hot water having a relatively low temperature
- heating system in which a high-temperature heater and a low-temperature heater are connected in series.
- this heating system first, hot water having a high temperature heated by a heat source is supplied to a high-temperature heater.
- the hot water whose temperature has been reduced by radiating heat from the high-temperature heater is supplied to the low-temperature heater.
- Patent Documents 1 and 2 describe a heating system in which a high-temperature heater and a low-temperature heater are connected in parallel.
- hot water having a high temperature heated by a heat source is supplied to the high-temperature heater.
- the low-temperature heating appliance is supplied with hot water whose temperature is adjusted by mixing warm water having a high temperature heated by a heat source with low-temperature hot water, which is the return water of the low-temperature heating appliance itself, with a mixing valve.
- Patent Documents 3, 4, and 5 also describe a heating system in which a high-temperature heating appliance and a low-temperature heating appliance are connected in parallel.
- hot water having a high temperature heated by a heat source is supplied to the high-temperature heater.
- the hot water having a high temperature heated by the heat source is exchanged with the low temperature hot water which is the return water of the low temperature heating appliance itself by the heat exchanger, and the hot water whose temperature is adjusted is supplied to the low temperature heater.
- the temperature of the hot water supplied to the low-temperature heating appliance changes depending on the load of the high-temperature heating appliance. Therefore, if hot water having a temperature corresponding to the load of the high-temperature heating appliance is supplied, the temperature of the hot water supplied to the low-temperature heating appliance is not stable. That is, it is difficult to supply hot water at a temperature required by the high-temperature heating appliance and supply hot water at a temperature required by the low-temperature heating appliance.
- the water circuit is such that the pressure in the supply piping from the heat source to the mixing valve and the pressure in the return piping from the low temperature heating appliance are greater than the pressure in the supply piping from the mixing valve to the low temperature heating appliance.
- a mixing pump may be required.
- the temperature drop width of the hot water heated by the heat source depends on the size of the heat exchanger. Determined. For this reason, when hot water having a temperature corresponding to the load size of the high-temperature heating appliance is supplied to the high-temperature heating appliance, hot water having a temperature corresponding to the load size of the low-temperature heating appliance cannot be supplied to the low-temperature heating appliance. That is, it is difficult to supply hot water at a temperature required by the high-temperature heating appliance and supply hot water at a temperature required by the low-temperature heating appliance.
- An object of the present invention is to simultaneously supply a fluid having a required temperature to, for example, both a high-temperature heater and a low-temperature heater. Moreover, when adjusting the temperature of fluid, it aims at recovering excess heat and improving efficiency.
- the temperature adjustment device is, for example, A heat exchanger, A fluid supplied to the radiator flows, a first supply pipe passing through the heat exchanger; A second supply pipe through which a fluid supplied to the radiator flows; A fluid supply to the radiator, a mixed supply pipe through which a mixed fluid in which a first fluid flowing through the first supply pipe and a second fluid flowing through the second supply pipe are mixed flows; A fluid which is supplied to the radiator and dissipated from the heat flows and has a return pipe passing through the heat exchanger.
- the first supply pipe and the second supply pipe are formed to be branched from a parent supply pipe, and the fluid that flows through the parent supply pipe flows through the first supply pipe and the second supply pipe. It is characterized by.
- a fluid obtained by heating a fluid flowing through the return pipe with a heating device flows through the parent supply pipe.
- the temperature adjusting device further includes: A third supply pipe formed by branching from the parent supply pipe and connected to another radiator different from the radiator using the fluid having a temperature higher than the fluid used by the radiator; The high temperature fluid supplied to the other radiator through the third supply pipe flows in the parent supply pipe.
- the temperature adjusting device further includes: A mixing adjustment valve that adjusts a mixing ratio of the first fluid and the second fluid in the mixed fluid is provided.
- the temperature adjusting device further includes: Control that controls the mixing adjustment valve so that a ratio of a flow rate of the fluid flowing through the first supply pipe to a flow rate of the fluid flowing through the second supply pipe decreases when the temperature of the mixed fluid is lower than a predetermined temperature. It comprises a part.
- the mixing supply pipe is provided with a flow rate adjusting valve for adjusting a flow rate of a fluid supplied to the radiator.
- the fluid supply system is, for example, A heating device for heating the fluid; A heat exchanger, A fluid heated by the heating device, the fluid supplied to the radiator flows, and a first supply pipe passing through the heat exchanger; A second supply pipe through which the fluid heated by the heating device flows and the fluid supplied to the radiator; A fluid supply to the radiator, a mixed supply pipe through which a mixed fluid in which a first fluid flowing through the first supply pipe and a second fluid flowing through the second supply pipe are mixed flows; Supplied to the radiator, the radiated fluid flows, and a return pipe passing through the heat exchanger, The heating device heats the fluid flowing through the return pipe.
- the heating system according to the present invention is, for example, A heating device for heating the fluid; A heat exchanger, A fluid heated by the heating device flows, a first supply pipe passing through the heat exchanger; A second supply pipe through which the fluid heated by the heating device flows; A mixed supply pipe through which a mixed fluid in which a first fluid that flows through the first supply pipe and a second fluid that flows through the second supply pipe are mixed; A heater that is supplied with the fluid flowing through the mixed supply pipe and radiates the fluid; and A fluid supplied to the heating appliance flows, and a return pipe passing through the heat exchanger, The heating device heats the fluid flowing through the return pipe.
- the method for mounting the temperature control device according to the present invention is, for example, The fluid flowing through the return pipe is supplied to a heating device that heats water, and the fluid heated by the heating device is supplied to the first supply pipe and the second supply pipe. To a temperature adjusting device according to any one of 7 to 7, connected to the heating device, Connecting the temperature adjusting device to the radiator so that the fluid flowing through the mixed supply pipe is supplied to the radiator and the fluid supplied to the radiator is supplied to the return pipe.
- the fluid supply method includes, for example, Branching the parent supply pipe through which the fluid supplied to the radiator flows into a first supply pipe and a second supply pipe; Heat exchange between the fluid flowing through the first supply pipe and the fluid supplied to the radiator; The first supply pipe and the second supply pipe are merged again, and a mixed fluid obtained by mixing the fluid flowing through the first supply pipe and the fluid flowing through the second supply pipe is supplied to the radiator. It is characterized by doing.
- the temperature adjustment device is, for example, A heat exchanger, Fluid supplied to the radiator flows, supply piping passing through the heat exchanger, A main return pipe through which the fluid that is supplied to the radiator and the radiated fluid flows; A first branch pipe branched from the master return pipe and flowing through the master return pipe and passing through the heat exchanger; And a second return pipe that is branched from the parent return pipe and through which the fluid that has flowed through the parent return pipe flows.
- the temperature control device exchanges heat between the fluid flowing through the first supply pipe and the fluid flowing through the return pipe, and mixes the fluid flowing through the first supply pipe with the fluid flowing through the second supply pipe to dissipate heat. Supply to the vessel.
- the temperature adjustment apparatus can adjust the temperature of the fluid supplied to a heat radiator. Further, excess heat can be recovered by the fluid flowing through the return flow path.
- FIG. 1 is a fluid circuit diagram of a heating system according to Embodiment 1.
- water hot water
- the hot water heating system includes a heat source 1, a hydro unit 2, low temperature heaters 3a and 3b, and high temperature heaters 4a and 4b.
- the low-temperature heating appliances 3a and 3b are collectively referred to as a low-temperature heating appliance 3.
- the high temperature heating appliances 4a and 4b are collectively referred to as a high temperature heating appliance 4.
- the heat source 1 is an example of a heating device.
- the low temperature heater 3 and the high temperature heater 4 are examples of a radiator.
- a system combining the heat source 1 and the hydro unit 2 is a fluid supply system.
- the heat source 1 heats the hot water supplied from the return pipe 8a and supplies it to the supply pipe 7a.
- the heat source 1 is, for example, a heat pump device.
- the heat source 1 is provided with a plurality of temperature sensors 12a and 12b. Each temperature sensor 12 measures the temperature of the outside air, the temperature of warm water supplied from the return pipe 8a, and the like.
- the heat source 1 controls the heating operation based on the measured temperature.
- the heat source 1 is not limited to a heat pump device, and may be a boiler or the like.
- the low temperature heater 3 is a heater that requires hot water having a temperature lower than that of the high temperature heater 4.
- the low-temperature heater 3 is, for example, a floor heater, and requires hot water of about 30 ° C. to 40 ° C.
- the high temperature heater 4 is a heater that requires hot water having a temperature higher than that of the low temperature heater 3.
- the high-temperature heating appliance 4 is, for example, a radiator (panel heater), and requires hot water of about 50 ° C.
- the hydro unit 2 supplies the hot water heated by the heat source 1 to the low temperature heater 3 and the high temperature heater 4.
- the hydro unit 2 supplies hot water having a temperature required by the low-temperature heating appliance 3 and the high-temperature heating appliance 4 to the low-temperature heating appliance 3 and the high-temperature heating appliance 4 at the same time.
- the hydro unit 2 includes supply pipes 7a, 7b, 7c, 7d, 7e, 7f, 7g and return pipes 8a, 8b, 8c, 8d.
- the supply pipes 7a, 7b, 7c, 7d, 7e, 7f, and 7g are collectively referred to as the supply pipe 7.
- the supply pipe 7 is a pipe through which hot water supplied to the low-temperature heating appliance 3 and the high-temperature heating appliance 4 flows.
- the return pipe 8 is a pipe through which hot water (return water) supplied to the low-temperature heating appliance 3 and the high-temperature heating appliance 4 flows.
- One end of the supply pipe 7 a is connected to the heat source 1.
- a heater 15 is provided on the other end side of the supply pipe 7a. The heater 15 further heats the hot water heated by the heat source 1.
- the heater 15 is, for example, an electric heater.
- One end of the supply pipe 7 b is connected to the heater 15.
- the other end of the supply pipe 7b is branched at a supply pipe branch point 18 into a supply pipe 7c and a supply pipe 7d (parent supply pipe).
- the supply pipe 7 c is connected to the high temperature heating appliance 4.
- the supply pipe 7d is further branched into a supply pipe 7e (first supply pipe) and a supply pipe 7f (second supply pipe).
- the supply pipe 7e and the supply pipe 7f are joined again by the mixing valve 9 to become a supply pipe 7g (mixed supply pipe). That is, the supply pipe 7e and the supply pipe 7f are pipes provided in parallel. In addition, the supply pipe 7 e passes through the heat exchanger 10.
- the supply pipe 7g is branched and connected to the low-temperature heating appliance 3.
- One end of the return pipe 8 c is connected to the high-temperature heating appliance 4.
- One end of the return pipe 8 d is connected to the low-temperature heating appliance 3.
- the other end of the return pipe 8c and the other end of the return pipe 8d are joined at a return pipe junction 19 to form a return pipe 8b.
- the return pipe 8d passes through the heat exchanger 10 through which the supply pipe 7e passes.
- a circulation pump 6 is provided at the end of the return pipe 8b opposite to the return pipe junction 19.
- the circulation pump 6 is a pump for circulating hot water.
- the return pipe 8 a has one end connected to the circulation pump 6 and the other end connected to the heat source 1.
- a circuit formed by the supply pipes 7d, 7e, 7f, 7g, the return pipe 8d, the mixing valve 9, and the heat exchanger 10 is referred to as a hot water temperature adjusting device 5 (temperature adjusting circuit).
- the hot water temperature adjusting device 5 is indicated by a broken line.
- the hot water heated to the temperature required by the high-temperature heating appliance 4 is cooled by the heater 15 and lowered to the temperature required by the low-temperature heating appliance 3.
- the hot water cycle during operation of the hot water heating system will be described.
- hot water circulates between the heat source 1, the hydro unit 2, the low-temperature heating appliance 3, and the high-temperature heating appliance 4.
- the hot water discharged from the circulation pump 6 is heated by the heat source 1.
- the hot water heated by the heat source 1 flows through the supply pipe 7a, and when the hot water cannot be heated to the temperature required by the high-temperature heating appliance 4 by the heat source 1, it is heated by the heater 15 to the temperature required by the high-temperature heating appliance 4.
- the hot water heated by the heater 15 flows through the supply pipe 7b and is branched at the supply pipe branch point 18 into the supply pipe 7c and the supply pipe 7d.
- the hot water flowing through the supply pipe 7 c is supplied to the high temperature heating appliance 4 and radiated by the high temperature heating appliance 4.
- the hot water flowing through the supply pipe 7d is branched into the supply pipe 7e and the supply pipe 7f, and is merged again by the mixing valve 9 and flows through the supply pipe 7g.
- the hot water temperature adjusting device 5 the hot water is adjusted to a temperature required by the low-temperature heater 3. The processing in the hot water temperature adjusting device 5 will be described later.
- the hot water flowing through the supply pipe 7g is supplied to the low-temperature heating appliance 3 and radiated by the low-temperature heating appliance 3.
- the hot water radiated by the high-temperature heater 4 flows through the return pipe 8c.
- the hot water radiated by the low-temperature heating appliance 3 flows through the return pipe 8d.
- the hot water flowing through the return pipe 8 c and the hot water flowing through the return pipe 8 d are merged at the return pipe junction 19.
- the joined hot water flows through the return pipe 8 b and is absorbed by the circulation pump 6. The above process is repeated, and hot water having a required temperature is simultaneously supplied to the low temperature heater 3 and the high temperature heater 4.
- hot water having a temperature required by the high temperature heating appliance 4 flows through the supply pipe 7b. Therefore, high-temperature water also flows through the supply pipe 7d provided by branching from the supply pipe 7b. Similarly, high-temperature water flows into a supply pipe 7e and a supply pipe 7f that are branched from the supply pipe 7d. As described above, the hot water flowing through the supply pipe 7e and the hot water flowing through the return pipe 8d are subjected to heat exchange. The hot water flowing through the return pipe 8d is hot water (low-temperature water) that has been radiated by the low-temperature heater 3 and has become low temperature.
- the high temperature water flowing through the supply pipe 7e and the low temperature water flowing through the return pipe 8d are heat-exchanged to cool the high temperature water flowing through the supply pipe 7e and heat the low temperature water flowing through the return pipe 8d.
- the hot water (first hot water) cooled by flowing through the supply pipe 7e and the hot water (second hot water) flowing through the supply pipe 7f are mixed by the mixing valve 9 to obtain mixed hot water.
- the mixed hot water flows through the supply pipe 7 g and is supplied to the low-temperature heating appliance 3. Further, the control unit 11 adjusts the opening degree of the mixing valve 9. Thereby, the flow rate of the hot water flowing through the supply pipe 7e and the flow rate of the hot water flowing through the supply pipe 7f are adjusted.
- the control unit 11 adjusts the ratio of the first hot water and the second hot water in the mixed hot water by adjusting the opening of the mixing valve 9.
- the control unit 11 measures the temperature of the mixed warm water flowing through the supply pipe 7g with the temperature sensor 12d provided in the supply pipe 7g, and adjusts the opening of the mixing valve 9 according to the measured temperature. For example, when the opening degree of the mixing valve 9 on the supply pipe 7 e side and the opening degree of the mixing valve 9 on the supply pipe 7 f side are “5 to 5”, the mixing ratio of the first hot water and the second hot water is “ 5 to 5 ". Accordingly, the mixed hot water has an intermediate temperature between the temperature of the first hot water and the temperature of the second hot water.
- the mixing ratio of the first hot water and the second hot water is “10 to 0”. " Therefore, the mixed warm water becomes the temperature of the first warm water. Conversely, when the opening degree of the mixing valve 9 on the supply pipe 7e side is fully closed and the opening degree of the mixing valve 9 on the supply pipe 7f side is fully opened, the mixing ratio between the first hot water and the high-temperature second hot water is “ 0 vs. 10 ”. Therefore, the mixed warm water becomes the temperature of the second warm water.
- the hot water flowing through the supply pipe 7e and the low-temperature water flowing through the return pipe 8d are heat-exchanged to cool the high-temperature water flowing through the supply pipe 7e and to supply the low-temperature heating appliance 3 with hot water. Adjust the temperature.
- FIG. 2 is a flowchart showing a process in which the control unit 11 adjusts the temperature of the mixed hot water.
- the control unit 11 is, for example, a microcomputer.
- the control part 11 determines whether there exists a request
- the control unit 11 causes the heat source 1 (and the heater 15) to heat the hot water to a temperature required by the high-temperature heating appliance 4 (S4).
- the control unit 11 determines whether the temperature of the hot water supplied to the low-temperature heating appliance 3 (hot water temperature) is equal to (or close to) the temperature (required temperature) required by the low-temperature heating appliance 3. Is determined (S5). That is, the controller 11 measures the temperature of the mixed hot water flowing through the supply pipe 7g by the temperature sensor 12d provided in the supply pipe 7g, and the measured temperature (hot water temperature) is required by the low-temperature heating appliance 3.
- the control unit 11 determines whether or not the temperature (required temperature) is equal.
- the control unit 11 does not change the opening of the mixing valve 9 and maintains the state as it is (S6).
- the control unit 11 changes the opening of the mixing valve 9 (S7).
- the control unit 11 widens the opening degree on the supply pipe 7e side and narrows the opening degree on the supply pipe 7f side. That is, the control unit 11 increases the ratio of the first warm water in the mixed warm water and decreases the ratio of the second warm water.
- the control unit 11 narrows the opening degree on the supply pipe 7e side and widens the opening degree on the supply pipe 7f side. That is, the control part 11 increases the ratio of 2nd warm water while reducing the ratio of 1st warm water in mixed warm water.
- hot water having a temperature required by the low temperature heating appliance 3 and the high temperature heating appliance 4 can be simultaneously supplied to the low temperature heating appliance 3 and the high temperature heating appliance 4. Moreover, when adjusting the temperature of the hot water supplied to the low-temperature heating appliance 3, the excess heat is recovered in the return water, so that the heat efficiency is good and the energy is saved.
- the hydro unit 2 includes a temperature sensor 12c in the supply pipe 7b.
- the control unit 11 measures the temperature of the hot water flowing through the supply pipe 7b by the temperature sensor 12c.
- the controller 11 controls the heating of the heat source 1 (and the heater 15) according to the temperature measured by the temperature sensor 12c.
- the hot water can be heated to a temperature required by the high-temperature heating appliance 4 (in some cases, the low-temperature heating appliance 3) by the heat source 1, heating by the heater 15 is not necessary.
- the hydro unit 2 includes temperature sensors 12e, 12f, 12g, and 12h, respectively, in spaces where the low temperature heater 3 and the high temperature heater 4 are installed.
- the control part 11 measures the temperature of the space in which the low temperature heating appliance 3 and the high temperature heating appliance 4 are installed by the temperature sensors 12e, 12f, 12g, and 12h.
- the control unit 11 requires the low-temperature heating appliance 3 and the high-temperature heating appliance 4 based on the temperature measured by the temperature sensors 12e, 12f, 12g, and 12h, or the temperature measured by the temperature sensor 12a (the temperature of the outside air). Determine the temperature of the hot water to be used. Or you may determine the temperature of the warm water which the low temperature heating appliance 3 and the high temperature heating appliance 4 require according to the instruction
- the hydro unit 2 includes a valve 16a in a supply pipe 7g and a return pipe 8d connected to the low-temperature heating appliance 3.
- the hydro unit 2 includes a valve 16 b in a supply pipe 7 c and a return pipe 8 c connected to the high-temperature heating appliance 4.
- the control part 11 measures the temperature of the space in which the low temperature heating appliance 3 and the high temperature heating appliance 4 are provided by the temperature sensors 12e, 12f, 12g, and 12h.
- the control part 11 controls the flow volume of the hot water supplied to the low temperature heating appliance 3 and the high temperature heating appliance 4 by controlling the opening degree of the valves 16a and 16b based on the measured temperature. Thereby, the control part 11 controls the temperature of the low temperature heating appliance 3 and the high temperature heating appliance 4.
- the hydro unit 2 controls the temperature of the hot water by the heat source 1, the heater 15, and the hot water temperature adjustment device 5, and hot water supplied to the low temperature heating appliance 3 and the high temperature heating appliance 4 by the valves 16 a and 16 b.
- the flow rate may be controlled to control the temperatures of the low temperature heating appliance 3 and the high temperature heating appliance 4.
- temperature control with higher accuracy is possible.
- the valves 16 a and 16 b are provided on both sides of the supply pipe 7 side and the return pipe 8 side. However, the valves 16a and 16b need only be provided on either the supply pipe 7 side or the return pipe 8 side.
- the hydro unit 2 includes an antifreezing pipe 17 that connects the supply pipe 7b and the return pipe 8b. If the hot water heating system is not operated when the temperature is low and the hot water does not circulate through the pipe, water may freeze inside the pipe. Therefore, when the temperature is low, hot water is circulated through the heat source 1, the supply pipes 7a and 7b, the freeze prevention pipe 17, and the return pipes 8b and 8a to prevent the water from freezing inside the pipes.
- the hydro unit 2 includes an expansion tank 13 that temporarily stores hot water expanded by heating.
- the expansion tank 13 stores a part of the hot water expanded when the hot water expands, thereby preventing the pressure in the pipe (the supply pipe 7 and the return pipe 8) from increasing due to the expanded hot water.
- the hydro unit 2 includes a pressure relief valve 14 that outputs the hot water in the pipe to the outside when the expansion tank 13 cannot keep the pressure in the pipe from increasing.
- FIG. 3-6 is a diagram showing a different configuration of the hot water temperature adjusting device 5.
- 3-5 shows the hot water temperature adjusting device 5 shown by the broken line in FIG.
- FIG. 6 shows the overall configuration of the hot water heating system.
- the hot water temperature adjusting device 5 shown in FIG. 1 includes a mixing valve 9 at the junction of the supply pipe 7e and the supply pipe 7f.
- the hot water temperature adjusting device 5 shown in FIG. 3 includes a mixing valve 9 at a branch point between the supply pipe 7e and the supply pipe 7f.
- the supply pipe 7 side is not branched, and the return pipe 8 side is branched. That is, in the hot water temperature adjusting device 5 shown in FIG. 1, the supply pipe 7d is branched into the supply pipe 7e and the supply pipe 7f, and the hot water flowing through the supply pipe 7e and the hot water flowing through the return pipe 8d are heat-exchanged. In the hot water temperature adjusting device 5 shown in FIG. 4, the supply pipe 7d is not branched into the supply pipe 7e and the supply pipe 7f. However, in the hot water temperature adjusting device 5 shown in FIG.
- the return pipe 8g connected to the low-temperature heating appliance 3 is branched into the return pipe 8e and the return pipe 8f, joined again by the mixing valve 9, and becomes the return pipe 8d.
- the hot water temperature adjusting device 5 shown in FIG. 4 exchanges heat between the hot water flowing through the return pipe 8e and the hot water flowing through the supply pipe 7d.
- the hot water temperature adjusting device 5 is different from the hot water temperature adjusting device 5 shown in FIG. 4 in the position of the mixing valve 9.
- the hot water temperature adjusting device 5 shown in FIG. 4 includes a mixing valve 9 at the junction of the return pipe 8e and the return pipe 8f.
- the hot water temperature adjusting device 5 shown in FIG. 5 includes a mixing valve 9 at a branch point between the return pipe 8e and the return pipe 8f.
- the hot water temperature adjusting device 5 in the hydro unit 2 shown in FIG. 6 is different from the hot water temperature adjusting device 5 shown in FIG.
- the hot water supplied to the low-temperature heating appliance 3 and the hot water (return water) supplied to the low-temperature heating appliance 3 are subjected to heat exchange.
- the hot water temperature adjusting device 5 shown in FIG. 6 exchanges heat between the hot water supplied to the low-temperature heating appliance 3 and the hot water (return water) supplied to the high-temperature heating appliance 4. That is, the supply pipe 7e and the return pipe 8c pass through the heat exchanger 10, and the hot water flowing through the supply pipe 7e and the hot water flowing through the return pipe 8c are heat-exchanged.
- the application described with reference to FIG. 3-5 is also possible when heat exchange between the hot water supplied to the low-temperature heating appliance 3 and the hot water (return water) supplied to the high-temperature heating appliance 4 is performed. That is, the position of the mixing valve 9 may be provided on the branch point side instead of the junction point side. Further, the return pipe 8 side may be branched instead of the supply pipe 7 side being branched.
- the hydro unit 2 shown in FIG. 7 is different from the hydro unit 2 shown in FIG. 1 in the flow of hot water.
- the temperature of the hot water (return water) supplied to the high-temperature heating appliance 4 and radiated is adjusted by the hot water temperature adjusting device 5 and supplied to the low-temperature heating appliance 3. That is, the hydro unit 2 shown in FIG. 7 connects the high-temperature heating appliance 4 and the low-temperature heating appliance 3 in series, adjusts the temperature of the hot water radiated by the high-temperature heating appliance 4 with the hot water temperature adjustment device 5, Supply to the heater 3.
- FIGS. 3-5 the application described based on FIGS. 3-5 is also possible when the high-temperature heating appliance 4 and the low-temperature heating appliance 3 are connected in series.
- the position of the mixing valve 9 may be provided on the branch point side instead of the junction point side. Further, the return pipe 8 side may be branched instead of the supply pipe 7 side being branched. Alternatively, a pipe through which the hot water flowing through the supply pipe 7b flows to the supply pipe 7d without passing through the high-temperature heating appliance 4 may be provided. In this case, depending on whether or not there is a request for hot water from the high-temperature heating appliance 4, the valve is used to switch whether warm water flows from the supply pipe 7b to the high-temperature heating appliance 4 or from the supply pipe 7b to the supply pipe 7d. Also good.
- FIG. 8 is a fluid circuit diagram of a heating system having a hot water supply function.
- water hot water
- FIG. 8 is a hot water heating system having a hot water supply function.
- the hot water heating system shown in FIG. 8 includes a hot water heater 26 in addition to the hot water heating system shown in FIG.
- the hot water supply appliance 26 heats the hot water stored in the hot water storage tank 20 with the hot water flowing in the hot water supply heating coil 21. And the hot-water supply appliance 26 supplies the warm water heated by controlling the opening degree of the three-way valve 25.
- the supply pipe 7 b of the hydro unit 2 is branched to the supply pipe 7 h at the supply pipe branch point 24.
- the supply pipe 7 h is connected to the hot water supply heating coil 21 of the hot water supply appliance 26.
- a return pipe 8h is connected to the hot water supply heating coil 21.
- the return pipe 8h is joined to the return pipe 8b by the three-way valve 23.
- Other piping configurations are the same as in FIG.
- the hot water cycle during operation of the hot water heating system will be described.
- the hot water heating system operates by switching between a heating operation and a hot water supply operation.
- the control unit 11 switches between a heating operation and a hot water supply operation based on an instruction from a user who uses the hot water heating system.
- the control unit 11 switches between the heating operation and the hot water supply operation by switching the valve that the three-way valve 23 opens. That is, when the valve on the return pipe junction 19 side of the three-way valve 23 is opened and the valve on the return pipe 8h side is closed, the heating operation is started. On the other hand, when the valve on the return pipe 8h side of the three-way valve 23 is opened and the valve on the return pipe junction 19 side is closed, a hot water supply operation is started.
- the flow of hot water during the heating operation is as described in the first embodiment. Therefore, explanation of the flow of hot water during the heating operation is omitted, and the flow of hot water during the hot water supply operation is described.
- the hot water discharged from the circulation pump 6 is heated by the heat source 1.
- the hot water heated by the heat source 1 flows through the supply pipe 7 a and is heated by the heater 15 to a temperature required by the hot water supply heating coil 21.
- the hot water heated by the heater 15 flows through the supply pipe 7b and flows from the supply pipe branch point 24 to the supply pipe 7h. Since the return pipe junction 19 side of the three-way valve 23 is closed, the hot water does not flow from the supply pipe branch point 24 to the supply pipe branch point 18 side.
- hot water is not supplied to the low temperature heater 3 and the high temperature heater 4.
- the hot water flowing through the supply pipe 7 h is supplied to the hot water supply heating coil 21 and radiated by the hot water supply heating coil 21.
- the hot water radiated by the hot water supply heating coil 21 flows through the return pipe 8h and flows from the three-way valve 23 to the return pipe 8b.
- the hot water flowing through the return pipe 8b is absorbed by the circulation pump 6.
- the above process is repeated, and hot water having a required temperature is supplied to the hot water supply appliance 26.
- the valve on the return pipe 8h side of the three-way valve 23 is closed, hot water does not flow from the supply pipe branch point 24 to the return pipe 8h side. Therefore, hot water is not supplied to the hot water supply heating coil 21.
- the controller 11 measures the temperature of the hot water stored in the hot water storage tank 20 by the temperature sensor 12i.
- the control unit 11 controls the heat source 1 and the heater 15 based on the temperature measured by the temperature sensor 12i. That is, the control unit 11 controls the heat source 1 and the heater 15 so that the temperature measured by the temperature sensor 12i becomes a required value.
- the control unit 11 further heats the hot water stored in the hot water storage tank 20 by the heater 22.
- the hot water of the temperature which the low temperature heating appliance 3 and the high temperature heating appliance 4 require is simultaneously supplied to the low temperature heating appliance 3 and the high temperature heating appliance 4. It is possible.
- Embodiment 4 a heating system including high-temperature heating appliances 4c and 4d that require a fluid having a temperature different from that of the low-temperature heating appliances 3a and ab and the high-temperature heating appliances 4a and 4b will be described.
- the high temperature heating appliances 4c and 4d will be described as requiring fluid having a higher temperature than the high temperature heating appliances 4a and 4b.
- FIG. 9 is a fluid circuit diagram of a heating system including high-temperature heating appliances 4c and 4d.
- water hot water
- the heating system shown in FIG. 9 is a hot water heating system.
- the supply pipe 7b is branched to the supply pipe 7i at a supply pipe branch point 18b.
- the supply pipe 7i is connected to the high temperature heating appliances 4c and 4d.
- One end of the return pipe 8i is connected to the high-temperature heating appliances 4c and 4d, and the other end is joined to the return pipe 8b at the return pipe junction 19b.
- the supply pipe 7b is branched into a supply pipe 7c and a supply pipe 7d at a supply pipe branch point 18a.
- the supply pipe 7d is further branched into a supply pipe 7e (first supply pipe) and a supply pipe 7f (second supply pipe).
- the supply pipe 7e and the supply pipe 7f are merged again by the mixing valve 9a to become a supply pipe 7g (mixed supply pipe). That is, the supply pipe 7e and the supply pipe 7f are pipes provided in parallel. Further, the supply pipe 7e passes through the heat exchanger 10a.
- the supply pipe 7g is connected to the low temperature heater 3.
- One end of the return pipe 8d is connected to the low-temperature heating appliance 3, and the other end is joined at a return pipe junction 19a to form a return pipe 8b.
- the return pipe 8d passes through the heat exchanger 10a. That is, the hot water flowing through the supply pipe 7e and the hot water flowing through the return pipe 8d are heat-exchanged.
- the supply pipe 7c is branched into a supply pipe 7j (first supply pipe) and a supply pipe 7k (second supply pipe).
- the supply pipe 7j and the supply pipe 7k are merged again by the mixing valve 9b to become a supply pipe 7l (mixed supply pipe). That is, the supply pipe 7j and the supply pipe 7k are pipes provided in parallel.
- the supply pipe 7j passes through the heat exchanger 10b.
- the supply pipe 7l is connected to the high-temperature heating appliances 4a and 4b.
- One end of the return pipe 8c is connected to the high-temperature heating appliances 4a and 4b, and the other end is joined at the return pipe junction 19a to become the return pipe 8b.
- the return pipe 8c passes through the heat exchanger 10b.
- the hot water flowing through the supply pipe 7j and the hot water flowing through the return pipe 8c are heat-exchanged.
- a circuit formed by the supply pipes 7d, 7e, 7f, 7g, the return pipe 8d, the mixing valve 9a, and the heat exchanger 10a is referred to as a hot water temperature adjusting device 5a.
- a circuit formed by the supply pipes 7c, 7j, 7k, 7l, the return pipe 8c, the mixing valve 9b, and the heat exchanger 10b is referred to as a hot water temperature adjusting device 5b.
- the hot water temperature adjusting devices 5a and 5b are indicated by broken lines.
- the hot water heated to the temperature required by the high-temperature heating appliances 4c and 4d is cooled by the heater 15, and the temperatures required by the high-temperature heating appliances 4a and 4b and the low-temperature heating appliance 3 are required. To lower.
- the hot water discharged from the circulation pump 6 is heated by the heat source 1.
- the hot water heated by the heat source 1 flows through the supply pipe 7a and is heated by the heater 15 to a temperature required for the high-temperature heating appliances 4c and 4d.
- the hot water heated by the heater 15 flows through the supply pipe 7b and is branched to the supply pipe 7i at the supply pipe branch point 18b.
- the hot water flowing through the supply pipe 7i is supplied to the high temperature heating appliances 4c and 4d and radiated by the high temperature heating appliances 4c and 4d.
- the hot water flowing through the supply pipe 7b without being branched to the supply pipe 7i is branched into the supply pipe 7c and the supply pipe 7d at the supply pipe branch point 18a.
- the hot water flowing through the supply pipe 7c is branched into the supply pipe 7j and the supply pipe 7k, joined again by the mixing valve 9b, and flows through the supply pipe 7l.
- the hot water temperature adjusting device 5b the hot water is adjusted to a temperature required by the high temperature heating appliances 4a and 4b.
- the hot water flowing through the supply pipe 7l is supplied to the high temperature heating appliances 4a and 4b and radiated by the high temperature heating appliances 4a and 4b.
- the hot water flowing through the supply pipe 7d is branched into the supply pipe 7e and the supply pipe 7d, joined again by the mixing valve 9a, and flows through the supply pipe 7g.
- the hot water is adjusted to a temperature required by the low-temperature heater 3 in the hot water temperature adjusting device 5a.
- the hot water flowing through the supply pipe 7g is supplied to the low-temperature heating appliance 3 and radiated by the low-temperature heating appliance 3.
- movement of the warm water temperature adjustment apparatuses 5a and 5b is the same as that of the warm water temperature adjustment apparatus 5 which concerns on Embodiment 1.
- hot water at a temperature required by each heater can be simultaneously supplied to each heater.
- surplus heat is recovered in the return water, resulting in high thermal efficiency and energy saving.
- the hot water temperature control apparatus 5 in piping other than the heating appliance which requires the highest temperature, the temperature which each heating appliance requires is set. Hot water can be supplied to each heater at the same time.
- the high-temperature heating appliances 4c and 4d shown in FIG. In the third embodiment, the example of switching between the hot water supply operation and the heating operation has been described. However, the hot water supply operation and the heating operation can be performed by replacing the high-temperature heating appliances 4c and 4d shown in FIG. It can be operated simultaneously.
- the hot water heating system includes a temperature adjusting pipe branched in parallel from a supply pipe from a heat source to a load such as a hot water heater, a return pipe from a load such as the hot water heater, and the temperature.
- a heat exchanger for exchanging heat of relatively high temperature hot water flowing through the adjustment pipe and relatively low temperature hot water flowing through the return pipe; and a relatively high temperature hot water flowing through the supply pipe and the heat flowing through the temperature adjustment pipe
- a mixing valve that mixes relatively low temperature hot water that has been heat exchanged by the exchanger and adjusts the mixing ratio, can adjust the temperature of hot water supplied to a load such as the hot water heating appliance as required, and can be heated from a heat source.
- It is a hot water heating system equipped with a hot water temperature adjustment device characterized in that surplus heat generated when adjusting the temperature of fresh hot water can be recovered in the return water.
- the hot water heating system is mixed so that the temperature detection sensor for supplying hot water to a load such as a hot water heater and the hot water temperature supplied to the load such as the hot water heater become a predetermined value. Equipped with a control device that controls the mixing ratio of the two hot water by the valve, the hot water temperature supplied to the load such as the hot water heater can be adjusted as required, and the excess heat of the hot water from the heat source is recovered in the return water It is a hot water heating system equipped with a hot water temperature adjusting device characterized by being able to.
- the hot water heating system which concerns on the above embodiment requires the hot water heating appliance (henceforth hot water heating appliance A) and the hot water heating appliance A which require high temperature hot water connected in parallel with a heat source, a circulation pump.
- the hot water temperature adjusting device is provided between the hot water heater B and the hot water heater A can be supplied with hot water at a high temperature, and the hot water heater B can be supplied with hot water according to a required temperature at the same time.
- the hot water heating system which concerns on the above embodiment requires the hot water heating appliance (henceforth hot water heating appliance A) and the hot water heating appliance A which require high temperature hot water connected in parallel with a heat source, a circulation pump.
- a hot water heating system between a hot water storage tank, a coil for heating water or hot water in the hot water storage tank, and a branch point of a hot water heating supply pipe for supplying hot water to the heat source, the hot water heating appliance A, and the hot water heating appliance B
- the hot water supply pipe for supplying relatively hot water to the heating coil, the junction between the hot water heating appliance A and the hot water heating return pipe from the hot water heating appliance B, and the heating source A hot water supply return pipe that joins the relatively low temperature hot water radiated by the coil, a branch point to the hot water heating pipe and the hot water supply pipe, or a junction point from the hot water heating return pipe and the hot water return pipe
- a hot water supply to the heating coil (hot water supply operation) and a hot water supply to the hot water heater A and the hot water heater B (hot water heating operation) can be switched by switching the three-way valve. It is a hot water heating system with a featured hot water supply function.
- the hot water heating system which concerns on the above embodiment WHEREIN is a hot water heating appliance (henceforth, hot water heating appliance A) which requires the high temperature hot water connected to the heat source, the circulation pump, and parallel. And a hot water heater that requires hot water below the temperature required by the hot water heater A (hereinafter referred to as a hot water heater B) are connected in a ring shape by a pipe forming means, from the heat source to the hot water heater A and the hot water heater B.
- hot water heating system for supplying hot water
- the branch point of the hot water heating supply pipe for supplying hot water to the hot water heating apparatus A and the hot water heating apparatus B, and the joining of the return pipe for hot water heating from the hot water heating apparatus A and the hot water heating apparatus B A hot water heating system comprising a hot water temperature adjusting device and a temperature detection sensor for supplying hot water to the hot water heating appliance B between the point and the hot water heating appliance B.
- the hot water temperature adjusting device is connected to a temperature adjusting pipe branched in parallel from a supply pipe from a heat source to a load such as a hot water heater, and from a load such as a hot water heater.
- a heat exchanger that exchanges heat between the relatively hot water that flows through the return pipe and the temperature adjustment pipe and the relatively cold hot water that flows through the return pipe, and a relatively hot water and temperature adjustment pipe that flows through the supply pipe
- a hot water heating system comprising a mixing valve that mixes a relatively low temperature hot water heat-exchanged by a flowing heat exchanger and adjusts a mixing ratio.
- the fluid circuit diagram of a heating system The flowchart which shows the process which adjusts the temperature of mixed warm water.
- the figure which shows the structure of the warm water temperature adjustment apparatus The figure which shows the structure of the warm water temperature adjustment apparatus.
- the fluid circuit diagram of a heating system provided with the high temperature heating appliances 4c and 4d.
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Water Supply & Treatment (AREA)
- Steam Or Hot-Water Central Heating Systems (AREA)
- Domestic Hot-Water Supply Systems And Details Of Heating Systems (AREA)
Abstract
高温暖房器具と、高温暖房器具よりも温度の低い温水を必要とする低温暖房器具との両方へ、必要とする温度の温水を同時に供給すること、低温暖房器具へ供給する温水の温度を調整する際、余剰熱を回収して効率をよくすることを目的とする。高温暖房器具へ供給される温度の高い温水が流れる配管を第1供給配管と第2供給配管とに分岐する。第1供給配管を流れる温水と、第1機器へ供給された戻り水とを熱交換する。第1供給配管と第2供給配管とを再び合流させて、第1供給配管を流れた温水と第2供給配管を流れた温水とを混合させて低温暖房器具へ供給する。
Description
この発明は、例えば、水(温水)等の流体の温度を調整する技術に関する。
温水暖房器具は、仕様により要求される温水の温度が異なる。つまり、温水暖房器具には、比較的温度の高い温水が必要な暖房器具(高温暖房器具)と、比較的温度の低い温水が必要な暖房器具(低温暖房器具)とがある。
高温暖房器具と低温暖房器具とを直列に接続した暖房システムがある。この暖房システムでは、まず、熱源で加熱された温度の高い温水が高温暖房器具へ供給される。次に、高温暖房器具で放熱して温度が低くなった温水が低温暖房器具へ供給される。
特許文献1,2には、高温暖房器具と低温暖房器具とを並列に接続した暖房システムについての記載がある。この暖房システムでは、高温暖房器具には、熱源で加熱された温度の高い温水が供給される。一方、低温暖房器具には、熱源で加熱された温度の高い温水に低温暖房器具自身の戻り水である温度の低い温水を混合弁で混合させ、温度を調整した温水が供給される。
特許文献3,4,5にも、高温暖房器具と低温暖房器具とを並列に接続した暖房システムについての記載がある。この暖房システムでは、高温暖房器具には、熱源で加熱された温度の高い温水が供給される。一方、低温暖房器具には、熱源で加熱された温度の高い温水を低温暖房器具自身の戻り水である温度の低い温水と熱交換器により熱交換させ、温度を調整した温水が供給される。
特開平5-118566号公報
特開2004-198055号公報
特開昭62-238927号公報
実開平07-006612号公報
特開2006-046809号公報
高温暖房器具と低温暖房器具とを直列に接続した暖房システムでは、高温暖房器具の負荷の大きさにより低温暖房器具へ供給される温水の温度が変わる。そのため、高温暖房器具の負荷の大きさに応じた温度の温水を供給すると、低温暖房器具へ供給される温水の温度は安定しない。つまり、高温暖房器具が必要とする温度の温水を供給するとともに、低温暖房器具が必要とする温度の温水を供給することは困難である。
特許文献1,2に記載された高温暖房器具と低温暖房器具とを並列に接続した暖房システムでは、温度の高い温水に混合する戻り水の量により、熱源への戻り水の流量が変化する。そのため、熱源への戻り水の流量にかかわらず、熱源から出湯される温水の温度を安定させる措置をとる必要がある。この措置が施されていない場合、熱源から出湯される温水の温度が不安定になる。つまり、低温暖房器具の負荷の大きさに応じた温度の温水を供給すると、高温暖房器具へ供給される温水の温度と流量とが共に不安定になる。すなわち、高温暖房器具が必要とする温度の温水を供給するとともに、低温暖房器具が必要とする温度の温水を供給することは困難である。
また、この暖房システムでは、熱源から混合弁までの供給配管の圧力と低温暖房器具からの戻り配管の圧力とが、混合弁から低温暖房器具までの供給配管の圧力よりも大きくなるように水回路を構成しなければならない。そのため、混合用のポンプが必要となる場合がある。
また、この暖房システムでは、熱源から混合弁までの供給配管の圧力と低温暖房器具からの戻り配管の圧力とが、混合弁から低温暖房器具までの供給配管の圧力よりも大きくなるように水回路を構成しなければならない。そのため、混合用のポンプが必要となる場合がある。
特許文献3,4,5に記載された高温暖房器具と低温暖房器具とを並列に接続した暖房システムでは、熱源で加熱された温度の高い温水の温度下降幅は、熱交換器の大きさにより決まる。そのため、高温暖房器具の負荷の大きさに応じた温度の温水を高温暖房器具へ供給すると、低温暖房器具の負荷の大きさに応じた温度の温水を低温暖房器具へ供給することはできない。つまり、高温暖房器具が必要とする温度の温水を供給するとともに、低温暖房器具が必要とする温度の温水を供給することは困難である。
この発明は、例えば、高温暖房器具と低温暖房器具との両方へ、必要とする温度の流体を同時に供給することを目的とする。また、流体の温度を調整する場合に、余剰熱を回収して、効率をよくすることを目的とする。
本発明に係る温度調整装置は、例えば、
熱交換器と、
放熱器へ供給される流体が流れ、前記熱交換器を通る第1供給配管と、
前記放熱器へ供給される流体が流れる第2供給配管と、
前記放熱器へ供給される流体であって、前記第1供給配管を流れた第1流体と前記第2供給配管を流れた第2流体とが混合された混合流体が流れる混合供給配管と、
前記放熱器へ供給され、放熱された流体が流れ、前記熱交換器を通る戻り配管と
を備えることを特徴とする。
熱交換器と、
放熱器へ供給される流体が流れ、前記熱交換器を通る第1供給配管と、
前記放熱器へ供給される流体が流れる第2供給配管と、
前記放熱器へ供給される流体であって、前記第1供給配管を流れた第1流体と前記第2供給配管を流れた第2流体とが混合された混合流体が流れる混合供給配管と、
前記放熱器へ供給され、放熱された流体が流れ、前記熱交換器を通る戻り配管と
を備えることを特徴とする。
前記第1供給配管と前記第2供給配管とは、親供給配管から分岐されて形成され、前記第1供給配管と前記第2供給配管とには、前記親供給配管を流れた流体が流れる
ことを特徴とする。
ことを特徴とする。
前記親供給配管には、前記戻り配管を流れた流体を加熱装置により加熱した流体が流れる
ことを特徴とする。
ことを特徴とする。
前記温度調整装置は、さらに、
前記親供給配管から分岐されて形成されるとともに、前記放熱器が使用する流体よりも高温の流体を使用する前記放熱器とは異なる他の放熱器に接続された第3供給配管を備え、
前記親供給配管には、前記第3供給配管を経由して前記他の放熱器へ供給される前記高温の流体が流れる
ことを特徴とする。
前記親供給配管から分岐されて形成されるとともに、前記放熱器が使用する流体よりも高温の流体を使用する前記放熱器とは異なる他の放熱器に接続された第3供給配管を備え、
前記親供給配管には、前記第3供給配管を経由して前記他の放熱器へ供給される前記高温の流体が流れる
ことを特徴とする。
前記温度調整装置は、さらに、
前記混合流体における前記第1流体と前記第2流体との混合割合を調整する混合調整弁
を備えることを特徴とする。
前記混合流体における前記第1流体と前記第2流体との混合割合を調整する混合調整弁
を備えることを特徴とする。
前記温度調整装置は、さらに、
前記混合流体の温度が所定の温度より低い場合には、前記第2供給配管を流れる流体の流量に対する前記第1供給配管を流れる流体の流量の割合が減るように前記混合調整弁を制御する制御部
を備えることを特徴とする。
前記混合流体の温度が所定の温度より低い場合には、前記第2供給配管を流れる流体の流量に対する前記第1供給配管を流れる流体の流量の割合が減るように前記混合調整弁を制御する制御部
を備えることを特徴とする。
前記混合供給配管には、前記放熱器へ供給する流体の流量を調整する流量調整弁が設けられた
ことを特徴とする。
ことを特徴とする。
本発明に係る流体供給システムは、例えば、
流体を加熱する加熱装置と、
熱交換器と、
前記加熱装置が加熱した流体であって、放熱器へ供給される流体が流れ、前記熱交換器を通る第1供給配管と、
前記加熱装置が加熱した流体であって、前記放熱器へ供給される流体が流れる第2供給配管と、
前記放熱器へ供給される流体であって、前記第1供給配管を流れた第1流体と前記第2供給配管を流れた第2流体とが混合された混合流体が流れる混合供給配管と、
前記放熱器へ供給され、放熱された流体が流れ、前記熱交換器を通る戻り配管とを備え、
前記加熱装置は、前記戻り配管を流れた流体を加熱する
ことを特徴とする。
流体を加熱する加熱装置と、
熱交換器と、
前記加熱装置が加熱した流体であって、放熱器へ供給される流体が流れ、前記熱交換器を通る第1供給配管と、
前記加熱装置が加熱した流体であって、前記放熱器へ供給される流体が流れる第2供給配管と、
前記放熱器へ供給される流体であって、前記第1供給配管を流れた第1流体と前記第2供給配管を流れた第2流体とが混合された混合流体が流れる混合供給配管と、
前記放熱器へ供給され、放熱された流体が流れ、前記熱交換器を通る戻り配管とを備え、
前記加熱装置は、前記戻り配管を流れた流体を加熱する
ことを特徴とする。
本発明に係る暖房システムは、例えば、
流体を加熱する加熱装置と、
熱交換器と、
前記加熱装置が加熱した流体が流れ、前記熱交換器を通る第1供給配管と、
前記加熱装置が加熱した流体が流れる第2供給配管と、
前記第1供給配管を流れた第1流体と前記第2供給配管を流れた第2流体とが混合された混合流体が流れる混合供給配管と、
前記混合供給配管を流れた流体が供給され、流体を放熱する暖房器具と、
前記暖房器具へ供給された流体が流れ、前記熱交換器を通る戻り配管とを備え、
前記加熱装置は、前記戻り配管を流れた流体を加熱する
ことを特徴とする。
流体を加熱する加熱装置と、
熱交換器と、
前記加熱装置が加熱した流体が流れ、前記熱交換器を通る第1供給配管と、
前記加熱装置が加熱した流体が流れる第2供給配管と、
前記第1供給配管を流れた第1流体と前記第2供給配管を流れた第2流体とが混合された混合流体が流れる混合供給配管と、
前記混合供給配管を流れた流体が供給され、流体を放熱する暖房器具と、
前記暖房器具へ供給された流体が流れ、前記熱交換器を通る戻り配管とを備え、
前記加熱装置は、前記戻り配管を流れた流体を加熱する
ことを特徴とする。
本発明に係る温度調整装置の取付方法は、例えば、
水を加熱する加熱装置へ前記戻り配管を流れた流体が供給されるとともに、前記加熱装置が加熱した流体が前記第1供給配管と前記第2供給配管とへ供給されるように、請求項1から7までのいずれかに記載の温度調整装置を前記加熱装置に接続し、
前記混合供給配管を流れた流体が前記放熱器へ供給されるとともに、前記放熱器へ供給された流体が前記戻り配管へ供給されるように、前記温度調整装置を前記放熱器に接続する
ことを特徴とする。
水を加熱する加熱装置へ前記戻り配管を流れた流体が供給されるとともに、前記加熱装置が加熱した流体が前記第1供給配管と前記第2供給配管とへ供給されるように、請求項1から7までのいずれかに記載の温度調整装置を前記加熱装置に接続し、
前記混合供給配管を流れた流体が前記放熱器へ供給されるとともに、前記放熱器へ供給された流体が前記戻り配管へ供給されるように、前記温度調整装置を前記放熱器に接続する
ことを特徴とする。
本発明に係る流体供給方法は、例えば、
放熱器へ供給する流体が流れる親供給配管を第1供給配管と第2供給配管とに分岐し、
前記第1供給配管を流れる流体と、前記放熱器へ供給された流体とを熱交換し、
前記第1供給配管と前記第2供給配管とを再び合流させて、前記第1供給配管を流れた流体と前記第2供給配管を流れた流体とを混合させた混合流体を前記放熱器へ供給する
ことを特徴とする。
放熱器へ供給する流体が流れる親供給配管を第1供給配管と第2供給配管とに分岐し、
前記第1供給配管を流れる流体と、前記放熱器へ供給された流体とを熱交換し、
前記第1供給配管と前記第2供給配管とを再び合流させて、前記第1供給配管を流れた流体と前記第2供給配管を流れた流体とを混合させた混合流体を前記放熱器へ供給する
ことを特徴とする。
本発明に係る温度調整装置は、例えば、
熱交換器と、
放熱器へ供給される流体が流れ、前記熱交換器を通る供給配管と、
前記放熱器へ供給され、放熱された流体が流れる親戻り配管と、
前記親戻り配管から分岐され、前記親戻り配管を流れた流体が流れ、前記熱交換器を通る第1戻り配管と、
前記親戻り配管から分岐され、前記親戻り配管を流れた流体が流れる第2戻り配管と
を備えることを特徴とする。
熱交換器と、
放熱器へ供給される流体が流れ、前記熱交換器を通る供給配管と、
前記放熱器へ供給され、放熱された流体が流れる親戻り配管と、
前記親戻り配管から分岐され、前記親戻り配管を流れた流体が流れ、前記熱交換器を通る第1戻り配管と、
前記親戻り配管から分岐され、前記親戻り配管を流れた流体が流れる第2戻り配管と
を備えることを特徴とする。
この発明に係る温度調整装置は、第1供給配管を流れる流体を戻り配管を流れる流体とを熱交換するとともに、第1供給配管を流れる流体と第2供給配管を流れる流体とを混合して放熱器へ供給する。これにより、温度調整装置は、放熱器へ供給する流体の温度を調整できる。また、戻り流路を流れる流体により余剰熱を回収することができる。
実施の形態1.
図1は、実施の形態1に係る暖房システムの流体回路図である。なお、以下の説明では、流体の一例として水(温水)を用いる。つまり、図1に示す暖房システムは、温水暖房システムである。
温水暖房システムは、熱源1、ハイドロユニット2、低温暖房器具3a,3b、高温暖房器具4a,4bを備える。なお、以下の説明において、低温暖房器具3a,3bを総称して低温暖房器具3と呼ぶ。同様に、高温暖房器具4a,4bを総称して高温暖房器具4と呼ぶ。熱源1は、加熱装置の一例である。低温暖房器具3と高温暖房器具4とは、放熱器の一例である。熱源1とハイドロユニット2とを合わせたシステムが流体供給システムである。
図1は、実施の形態1に係る暖房システムの流体回路図である。なお、以下の説明では、流体の一例として水(温水)を用いる。つまり、図1に示す暖房システムは、温水暖房システムである。
温水暖房システムは、熱源1、ハイドロユニット2、低温暖房器具3a,3b、高温暖房器具4a,4bを備える。なお、以下の説明において、低温暖房器具3a,3bを総称して低温暖房器具3と呼ぶ。同様に、高温暖房器具4a,4bを総称して高温暖房器具4と呼ぶ。熱源1は、加熱装置の一例である。低温暖房器具3と高温暖房器具4とは、放熱器の一例である。熱源1とハイドロユニット2とを合わせたシステムが流体供給システムである。
熱源1は、戻り配管8aから供給された温水を加熱し、供給配管7aへ供給する。熱源1は、例えば、ヒートポンプ装置である。熱源1には、複数の温度センサ12a,12bが設けられる。各温度センサ12は、外気の温度、戻り配管8aから供給された温水の温度等を計測する。熱源1は、計測した温度に基づき、加熱運転の制御を行う。なお、熱源1は、ヒートポンプ装置に限らず、ボイラー等であってもよい。
低温暖房器具3は、高温暖房器具4よりも温度の低い温水を必要とする暖房器具である。低温暖房器具3は、例えば、床暖房器具であり、30℃-40℃程度の温水を必要とする。
高温暖房器具4は、低温暖房器具3よりも温度の高い温水を必要とする暖房器具である。高温暖房器具4は、例えば、ラジエータ(パネルヒータ)であり、50℃程度の温水を必要とする。
高温暖房器具4は、低温暖房器具3よりも温度の高い温水を必要とする暖房器具である。高温暖房器具4は、例えば、ラジエータ(パネルヒータ)であり、50℃程度の温水を必要とする。
ハイドロユニット2は、熱源1で加熱された温水を低温暖房器具3と高温暖房器具4とへ供給する。特に、ハイドロユニット2は、低温暖房器具3と高温暖房器具4とが必要とする温度の温水を、低温暖房器具3と高温暖房器具4とへ同時に供給する。
ハイドロユニット2は、供給配管7a,7b,7c,7d,7e,7f,7g、戻り配管8a,8b,8c,8dを備える。なお、以下の説明において、供給配管7a,7b,7c,7d,7e,7f,7gを総称して供給配管7と呼ぶ。同様に、戻り配管8a,8b,8c,8dを総称して戻り配管8と呼ぶ。供給配管7は、低温暖房器具3と高温暖房器具4へ供給される温水が流れる配管である。戻り配管8は、低温暖房器具3と高温暖房器具4とへ供給された温水(戻り水)が流れる配管である。
供給配管7aは、一端が熱源1に接続される。供給配管7aの他端側には、ヒーター15が設けられる。ヒーター15は、熱源1が加熱した温水をさらに加熱する。つまり、熱源1により高温暖房器具4が必要とする温度まで温水を加熱できない場合、さらにヒーター15により高温暖房器具4が必要とする温度まで温水を加熱する。ヒーター15は、例えば、電気ヒーターである。供給配管7bは、一端がヒーター15に接続される。供給配管7bは、他端が供給配管分岐点18で供給配管7cと供給配管7d(親供給配管)とに分岐される。供給配管7cは、高温暖房器具4に接続される。一方、供給配管7dは、さらに供給配管7e(第1供給配管)と供給配管7f(第2供給配管)とに分岐される。供給配管7eと供給配管7fとは、混合弁9で再び合流され供給配管7g(混合供給配管)となる。つまり、供給配管7eと供給配管7fとは並列に設けられた配管である。また、供給配管7eは、熱交換器10を通る。供給配管7gは、分岐され低温暖房器具3に接続される。
戻り配管8cは、一端が高温暖房器具4に接続される。戻り配管8dは、一端が低温暖房器具3に接続される。また、戻り配管8cの他端と戻り配管8dの他端とは、戻り配管合流点19で合流され戻り配管8bとなる。また、戻り配管8dは、供給配管7eが通る熱交換器10を通る。つまり、供給配管7eを流れる温水と戻り配管8dを流れる温水とは熱交換される。戻り配管合流点19の反対側の戻り配管8bの端部には、循環ポンプ6が設けられる。循環ポンプ6は、温水を循環させるポンプである。戻り配管8aは、一端が循環ポンプ6に接続され、他端が熱源1に接続される。
ここで、供給配管7d,7e,7f,7g、戻り配管8d、混合弁9、熱交換器10で形成された回路を温水温度調整装置5(温度調整回路)と呼ぶ。図1では、温水温度調整装置5を破線で示す。温水温度調整装置5では、ヒーター15で高温暖房器具4が必要とする温度まで加熱された温水を冷却して、低温暖房器具3が必要とする温度まで下げる。
ハイドロユニット2は、供給配管7a,7b,7c,7d,7e,7f,7g、戻り配管8a,8b,8c,8dを備える。なお、以下の説明において、供給配管7a,7b,7c,7d,7e,7f,7gを総称して供給配管7と呼ぶ。同様に、戻り配管8a,8b,8c,8dを総称して戻り配管8と呼ぶ。供給配管7は、低温暖房器具3と高温暖房器具4へ供給される温水が流れる配管である。戻り配管8は、低温暖房器具3と高温暖房器具4とへ供給された温水(戻り水)が流れる配管である。
供給配管7aは、一端が熱源1に接続される。供給配管7aの他端側には、ヒーター15が設けられる。ヒーター15は、熱源1が加熱した温水をさらに加熱する。つまり、熱源1により高温暖房器具4が必要とする温度まで温水を加熱できない場合、さらにヒーター15により高温暖房器具4が必要とする温度まで温水を加熱する。ヒーター15は、例えば、電気ヒーターである。供給配管7bは、一端がヒーター15に接続される。供給配管7bは、他端が供給配管分岐点18で供給配管7cと供給配管7d(親供給配管)とに分岐される。供給配管7cは、高温暖房器具4に接続される。一方、供給配管7dは、さらに供給配管7e(第1供給配管)と供給配管7f(第2供給配管)とに分岐される。供給配管7eと供給配管7fとは、混合弁9で再び合流され供給配管7g(混合供給配管)となる。つまり、供給配管7eと供給配管7fとは並列に設けられた配管である。また、供給配管7eは、熱交換器10を通る。供給配管7gは、分岐され低温暖房器具3に接続される。
戻り配管8cは、一端が高温暖房器具4に接続される。戻り配管8dは、一端が低温暖房器具3に接続される。また、戻り配管8cの他端と戻り配管8dの他端とは、戻り配管合流点19で合流され戻り配管8bとなる。また、戻り配管8dは、供給配管7eが通る熱交換器10を通る。つまり、供給配管7eを流れる温水と戻り配管8dを流れる温水とは熱交換される。戻り配管合流点19の反対側の戻り配管8bの端部には、循環ポンプ6が設けられる。循環ポンプ6は、温水を循環させるポンプである。戻り配管8aは、一端が循環ポンプ6に接続され、他端が熱源1に接続される。
ここで、供給配管7d,7e,7f,7g、戻り配管8d、混合弁9、熱交換器10で形成された回路を温水温度調整装置5(温度調整回路)と呼ぶ。図1では、温水温度調整装置5を破線で示す。温水温度調整装置5では、ヒーター15で高温暖房器具4が必要とする温度まで加熱された温水を冷却して、低温暖房器具3が必要とする温度まで下げる。
温水暖房システム運転時の温水のサイクルについて説明する。
循環ポンプ6が動作することにより、熱源1、ハイドロユニット2、低温暖房器具3及び高温暖房器具4の間を温水が循環する。
まず、循環ポンプ6から吐出された温水は熱源1で加熱される。熱源1で加熱された温水は、供給配管7aを流れ、熱源1により高温暖房器具4が必要とする温度まで温水を加熱できない場合、ヒーター15で高温暖房器具4が必要とする温度まで加熱される。ヒーター15で加熱された温水は、供給配管7bを流れ、供給配管分岐点18で供給配管7cと供給配管7dとに分岐される。供給配管7cを流れる温水は、高温暖房器具4へ供給され、高温暖房器具4で放熱される。一方、供給配管7dを流れる温水は、供給配管7eと供給配管7fとに分岐され、混合弁9で再び合流され供給配管7gを流れる。このとき、温水温度調整装置5において、温水は低温暖房器具3が必要とする温度に調整される。温水温度調整装置5における処理については後述する。供給配管7gを流れる温水は、低温暖房器具3へ供給され、低温暖房器具3で放熱される。
高温暖房器具4で放熱された温水は戻り配管8cを流れる。一方、低温暖房器具3で放熱された温水は戻り配管8dを流れる。戻り配管8cを流れる温水と戻り配管8dを流れる温水とは、戻り配管合流点19で合流される。合流された温水は、戻り配管8bを流れ、循環ポンプ6に吸収される。
以上の処理が繰り返され、低温暖房器具3と高温暖房器具4とへ必要とされる温度の温水が同時に供給される。
循環ポンプ6が動作することにより、熱源1、ハイドロユニット2、低温暖房器具3及び高温暖房器具4の間を温水が循環する。
まず、循環ポンプ6から吐出された温水は熱源1で加熱される。熱源1で加熱された温水は、供給配管7aを流れ、熱源1により高温暖房器具4が必要とする温度まで温水を加熱できない場合、ヒーター15で高温暖房器具4が必要とする温度まで加熱される。ヒーター15で加熱された温水は、供給配管7bを流れ、供給配管分岐点18で供給配管7cと供給配管7dとに分岐される。供給配管7cを流れる温水は、高温暖房器具4へ供給され、高温暖房器具4で放熱される。一方、供給配管7dを流れる温水は、供給配管7eと供給配管7fとに分岐され、混合弁9で再び合流され供給配管7gを流れる。このとき、温水温度調整装置5において、温水は低温暖房器具3が必要とする温度に調整される。温水温度調整装置5における処理については後述する。供給配管7gを流れる温水は、低温暖房器具3へ供給され、低温暖房器具3で放熱される。
高温暖房器具4で放熱された温水は戻り配管8cを流れる。一方、低温暖房器具3で放熱された温水は戻り配管8dを流れる。戻り配管8cを流れる温水と戻り配管8dを流れる温水とは、戻り配管合流点19で合流される。合流された温水は、戻り配管8bを流れ、循環ポンプ6に吸収される。
以上の処理が繰り返され、低温暖房器具3と高温暖房器具4とへ必要とされる温度の温水が同時に供給される。
温水温度調整装置5における処理について説明する。
上述したように、供給配管7bには高温暖房器具4が必要とする温度の温水(高温水)が流れる。したがって、供給配管7bから分岐されて設けられた供給配管7dにも高温水が流れる。同様に、供給配管7dから分岐されて設けられた供給配管7eと供給配管7fとにも高温水が流れ込む。上述したように、供給配管7eを流れる温水と戻り配管8dを流れる温水とは熱交換される。戻り配管8dを流れる温水は、低温暖房器具3で放熱され、低温になった温水(低温水)である。つまり、供給配管7eを流れる高温水と戻り配管8dを流れる低温水とを熱交換して、供給配管7eを流れる高温水を冷却するとともに、戻り配管8dを流れる低温水を加熱する。供給配管7eを流れ冷却された温水(第1温水)と、供給配管7fを流れた温水(第2温水)とを混合弁9で混合して混合温水とする。混合温水は、供給配管7gを流れ、低温暖房器具3へ供給される。
また、制御部11は、混合弁9の開度を調整する。これにより、供給配管7eを流れる温水の流量と、供給配管7fを流れる温水の流量とが調整される。つまり、制御部11は、混合弁9の開度を調整することにより、混合温水における第1温水と第2温水との割合を調整する。ここでは、制御部11は、供給配管7gに設けられた温度センサ12dにより、供給配管7gを流れる混合温水の温度を計測して、計測した温度に応じて混合弁9の開度を調整する。
例えば、供給配管7e側の混合弁9の開度と、供給配管7f側の混合弁9の開度とが「5対5」である場合、第1温水と第2温水との混合比は「5対5」となる。したがって、混合温水は、第1温水の温度と第2温水の温度との中間の温度となる。また、供給配管7e側の混合弁9の開度を全開、供給配管7f側の混合弁9の開度を全閉とした場合、第1温水と第2温水との混合比は「10対0」となる。したがって、混合温水は、第1温水の温度となる。逆に、供給配管7e側の混合弁9の開度を全閉、供給配管7f側の混合弁9の開度を全開とした場合、第1温水と高温の第2温水との混合比は「0対10」となる。したがって、混合温水は、第2温水の温度となる。
これにより、供給配管7dを流れる高温水の温度や、戻り配管8dを流れる低温水の温度が変化しても、低温暖房器具3が必要とする温度の温水を生成することができる。言い換えると、高温暖房器具4が必要とする温水の温度や、低温暖房器具3の負荷が変化しても、低温暖房器具3が必要とする温度の温水を生成することができる。
また、上述したように、供給配管7eを流れる高温水と戻り配管8dを流れる低温水とを熱交換して、供給配管7eを流れる高温水を冷却して、低温暖房器具3へ供給する温水の温度を調整する。この熱交換の際、供給配管7eを流れる高温水が冷却されるだけでなく、戻り配管8dを流れる低温水が加熱される。つまり、温水の温度を調整する際、余剰熱は戻り配管8dを流れる温水により回収される。
上述したように、供給配管7bには高温暖房器具4が必要とする温度の温水(高温水)が流れる。したがって、供給配管7bから分岐されて設けられた供給配管7dにも高温水が流れる。同様に、供給配管7dから分岐されて設けられた供給配管7eと供給配管7fとにも高温水が流れ込む。上述したように、供給配管7eを流れる温水と戻り配管8dを流れる温水とは熱交換される。戻り配管8dを流れる温水は、低温暖房器具3で放熱され、低温になった温水(低温水)である。つまり、供給配管7eを流れる高温水と戻り配管8dを流れる低温水とを熱交換して、供給配管7eを流れる高温水を冷却するとともに、戻り配管8dを流れる低温水を加熱する。供給配管7eを流れ冷却された温水(第1温水)と、供給配管7fを流れた温水(第2温水)とを混合弁9で混合して混合温水とする。混合温水は、供給配管7gを流れ、低温暖房器具3へ供給される。
また、制御部11は、混合弁9の開度を調整する。これにより、供給配管7eを流れる温水の流量と、供給配管7fを流れる温水の流量とが調整される。つまり、制御部11は、混合弁9の開度を調整することにより、混合温水における第1温水と第2温水との割合を調整する。ここでは、制御部11は、供給配管7gに設けられた温度センサ12dにより、供給配管7gを流れる混合温水の温度を計測して、計測した温度に応じて混合弁9の開度を調整する。
例えば、供給配管7e側の混合弁9の開度と、供給配管7f側の混合弁9の開度とが「5対5」である場合、第1温水と第2温水との混合比は「5対5」となる。したがって、混合温水は、第1温水の温度と第2温水の温度との中間の温度となる。また、供給配管7e側の混合弁9の開度を全開、供給配管7f側の混合弁9の開度を全閉とした場合、第1温水と第2温水との混合比は「10対0」となる。したがって、混合温水は、第1温水の温度となる。逆に、供給配管7e側の混合弁9の開度を全閉、供給配管7f側の混合弁9の開度を全開とした場合、第1温水と高温の第2温水との混合比は「0対10」となる。したがって、混合温水は、第2温水の温度となる。
これにより、供給配管7dを流れる高温水の温度や、戻り配管8dを流れる低温水の温度が変化しても、低温暖房器具3が必要とする温度の温水を生成することができる。言い換えると、高温暖房器具4が必要とする温水の温度や、低温暖房器具3の負荷が変化しても、低温暖房器具3が必要とする温度の温水を生成することができる。
また、上述したように、供給配管7eを流れる高温水と戻り配管8dを流れる低温水とを熱交換して、供給配管7eを流れる高温水を冷却して、低温暖房器具3へ供給する温水の温度を調整する。この熱交換の際、供給配管7eを流れる高温水が冷却されるだけでなく、戻り配管8dを流れる低温水が加熱される。つまり、温水の温度を調整する際、余剰熱は戻り配管8dを流れる温水により回収される。
制御部11が混合温水の温度を調整する処理について説明する。図2は、制御部11が混合温水の温度を調整する処理を示すフローチャートである。なお、制御部11は、例えば、マイクロコンピュータ等である。
制御部11は、高温暖房器具4から温水供給の要求があるか否かを判定する(S1)。
温水供給の要求がない場合(S1でNO)、制御部11は、混合弁9の供給配管7f側の開度を全開とするとともに、供給配管7e側の開度を全閉とする(S2)。そして、制御部11は、熱源1(及びヒーター15)に低温暖房器具3が必要とする温度に温水を加熱させる(S3)。
一方、温水供給の要求がある場合(S1でYES)、制御部11は、熱源1(及びヒーター15)に高温暖房器具4が必要とする温度に温水を加熱させる(S4)。次に、制御部11は、低温暖房器具3へ供給される温水の温度(温水温度)が、低温暖房器具3が必要とする温度(要求温度)と等しい(又は近接している)か否かを判定する(S5)。つまり、制御部11は、供給配管7gに設けられた温度センサ12dにより、供給配管7gを流れる混合温水の温度を計測して、計測した温度(温水温度)が、低温暖房器具3が必要としている温度(要求温度)と等しいか否かを判定する。温水温度が要求温度と等しい場合(S5でYES)、制御部11は、混合弁9の開度を変更せず、そのままの状態を維持する(S6)。一方、温水温度が要求温度と等しくない場合(S5でNO)、制御部11は、混合弁9の開度を変更する(S7)。温水温度が要求温度よりも高い場合(温水温度>要求温度)、制御部11は、供給配管7e側の開度を広げるとともに、供給配管7f側の開度を狭める。つまり、制御部11は、混合温水における第1温水の割合を増やすとともに第2温水の割合を減らす。一方、温水温度が要求温度よりも低い場合(温水温度<要求温度)、制御部11は、供給配管7e側の開度を狭めるとともに、供給配管7f側の開度を広げる。つまり、制御部11は、混合温水における第1温水の割合を減らすとともに第2温水の割合を増やす。
制御部11は、高温暖房器具4から温水供給の要求があるか否かを判定する(S1)。
温水供給の要求がない場合(S1でNO)、制御部11は、混合弁9の供給配管7f側の開度を全開とするとともに、供給配管7e側の開度を全閉とする(S2)。そして、制御部11は、熱源1(及びヒーター15)に低温暖房器具3が必要とする温度に温水を加熱させる(S3)。
一方、温水供給の要求がある場合(S1でYES)、制御部11は、熱源1(及びヒーター15)に高温暖房器具4が必要とする温度に温水を加熱させる(S4)。次に、制御部11は、低温暖房器具3へ供給される温水の温度(温水温度)が、低温暖房器具3が必要とする温度(要求温度)と等しい(又は近接している)か否かを判定する(S5)。つまり、制御部11は、供給配管7gに設けられた温度センサ12dにより、供給配管7gを流れる混合温水の温度を計測して、計測した温度(温水温度)が、低温暖房器具3が必要としている温度(要求温度)と等しいか否かを判定する。温水温度が要求温度と等しい場合(S5でYES)、制御部11は、混合弁9の開度を変更せず、そのままの状態を維持する(S6)。一方、温水温度が要求温度と等しくない場合(S5でNO)、制御部11は、混合弁9の開度を変更する(S7)。温水温度が要求温度よりも高い場合(温水温度>要求温度)、制御部11は、供給配管7e側の開度を広げるとともに、供給配管7f側の開度を狭める。つまり、制御部11は、混合温水における第1温水の割合を増やすとともに第2温水の割合を減らす。一方、温水温度が要求温度よりも低い場合(温水温度<要求温度)、制御部11は、供給配管7e側の開度を狭めるとともに、供給配管7f側の開度を広げる。つまり、制御部11は、混合温水における第1温水の割合を減らすとともに第2温水の割合を増やす。
以上のように、温水暖房システムでは、低温暖房器具3と高温暖房器具4とが必要とする温度の温水を、低温暖房器具3と高温暖房器具4とへ同時に供給することが可能である。
また、低温暖房器具3へ供給する温水の温度を調整する際、余剰熱を戻り水に回収するため、熱効率がよく省エネルギーにつながる。
また、低温暖房器具3へ供給する温水の温度を調整する際、余剰熱を戻り水に回収するため、熱効率がよく省エネルギーにつながる。
なお、ハイドロユニット2は、供給配管7bに温度センサ12cを備える。制御部11は、温度センサ12cにより供給配管7bを流れる温水の温度を計測する。制御部11は、温度センサ12cで計測した温度によって、熱源1(及びヒーター15)の加熱制御を行う。なお、熱源1により高温暖房器具4(場合によっては低温暖房器具3)が必要とする温度まで温水を加熱できる場合には、ヒーター15による加熱は不要である。
また、ハイドロユニット2は、低温暖房器具3と高温暖房器具4とが設置された空間に、それぞれ温度センサ12e,12f,12g,12hを備える。制御部11は、温度センサ12e,12f,12g,12hにより低温暖房器具3と高温暖房器具4とが設置された空間の温度を計測する。制御部11は、例えば、温度センサ12e,12f,12g,12hにより計測した温度や、温度センサ12aにより計測した温度(外気の温度)に基づき、低温暖房器具3と高温暖房器具4とが必要とする温水の温度を決定する。あるいは、低温暖房器具3と高温暖房器具4とが必要とする温水の温度は、温水暖房システムを使用する使用者からの指示により決定してもよい。
なお、ハイドロユニット2は、低温暖房器具3に接続された供給配管7gと戻り配管8dとに弁16aを備える。同様に、ハイドロユニット2は、高温暖房器具4に接続された供給配管7cと戻り配管8cとに弁16bを備える。制御部11は、温度センサ12e,12f,12g,12hにより、低温暖房器具3と高温暖房器具4とが設けられた空間の温度を計測する。制御部11は、計測した温度に基づき弁16a,16bの開度を制御することにより、低温暖房器具3と高温暖房器具4とへ供給される温水の流量を制御する。これにより、制御部11は、低温暖房器具3と高温暖房器具4との温度を制御する。
つまり、ハイドロユニット2は、熱源1及びヒーター15と、温水温度調整装置5とにより温水の温度を制御するとともに、弁16a,16bにより低温暖房器具3と高温暖房器具4とへ供給される温水の流量を制御して、低温暖房器具3と高温暖房器具4との温度を制御してもよい。これにより、より精度の高い温度制御が可能となる。
また、図1では、弁16a,16bは、供給配管7側と戻り配管8側との両側に設けた。しかし、弁16a,16bは、供給配管7側と戻り配管8側とのいずれか一方にのみ設けてあればよい。
つまり、ハイドロユニット2は、熱源1及びヒーター15と、温水温度調整装置5とにより温水の温度を制御するとともに、弁16a,16bにより低温暖房器具3と高温暖房器具4とへ供給される温水の流量を制御して、低温暖房器具3と高温暖房器具4との温度を制御してもよい。これにより、より精度の高い温度制御が可能となる。
また、図1では、弁16a,16bは、供給配管7側と戻り配管8側との両側に設けた。しかし、弁16a,16bは、供給配管7側と戻り配管8側とのいずれか一方にのみ設けてあればよい。
また、ハイドロユニット2は、供給配管7bと戻り配管8bとをつなぐ凍結防止配管17を備える。気温が低いときに温水暖房システムを運転せず、温水が配管を循環していない状態が続くと、配管の内部で水が凍結してしまう虞がある。そこで、気温が低いときには、熱源1、供給配管7a,7b、凍結防止配管17、戻り配管8b,8aに温水を循環させ、配管の内部で水が凍結することを防止する。
また、ハイドロユニット2は、加熱することで膨張した温水を一時的に貯める膨張タンク13を備える。膨張タンク13は、温水が膨張した場合に膨張した温水の一部を蓄えることで、膨張した温水により配管(供給配管7,戻り配管8)内の圧力が高くなることを防止する。さらに、ハイドロユニット2は、膨張タンク13により配管内の圧力が高くなることを抑えきれなくなった場合、配管内の温水を外部へ出力する圧力逃がし弁14を備える。
実施の形態2.
実施の形態2では、温水温度調整装置5の異なる構成について説明する。
図3-6は、温水温度調整装置5の異なる構成を示す図である。図3-5は、図1の破線で示した温水温度調整装置5部分を示す。図6は、温水暖房システムの全体構成を示す。
実施の形態2では、温水温度調整装置5の異なる構成について説明する。
図3-6は、温水温度調整装置5の異なる構成を示す図である。図3-5は、図1の破線で示した温水温度調整装置5部分を示す。図6は、温水暖房システムの全体構成を示す。
図3に示す温水温度調整装置5は、図1に示す温水温度調整装置5と混合弁9の位置が異なる。図1に示す温水温度調整装置5は、供給配管7eと供給配管7fとの合流点に混合弁9を備えた。図3に示す温水温度調整装置5は、供給配管7eと供給配管7fとの分岐点に混合弁9を備える。
図4に示す温水温度調整装置5は、供給配管7側は分岐されず、戻り配管8側が分岐されている。つまり、図1に示す温水温度調整装置5は、供給配管7dが供給配管7eと供給配管7fとに分岐され、供給配管7eを流れる温水と戻り配管8dを流れる温水とを熱交換した。図4に示す温水温度調整装置5は、供給配管7dは、供給配管7eと供給配管7fとに分岐されない。しかし、図4に示す温水温度調整装置5は、低温暖房器具3に接続する戻り配管8gが戻り配管8eと戻り配管8fとに分岐され、混合弁9で再び合流され、戻り配管8dとなる。そして、図4に示す温水温度調整装置5は、戻り配管8eを流れる温水と供給配管7dを流れる温水とを熱交換する。
図5に示す温水温度調整装置5は、図4に示す温水温度調整装置5と混合弁9の位置が異なる。図4に示す温水温度調整装置5は、戻り配管8eと戻り配管8fとの合流点に混合弁9を備えた。図5に示す温水温度調整装置5は、戻り配管8eと戻り配管8fとの分岐点に混合弁9を備える。
図6に示すハイドロユニット2における温水温度調整装置5は、図1に示す温水温度調整装置5と熱交換する配管が異なる。図1に示す温水温度調整装置5では、低温暖房器具3へ供給される温水と、低温暖房器具3へ供給された温水(戻り水)とを熱交換した。しかし、図6に示す温水温度調整装置5は、低温暖房器具3へ供給される温水と、高温暖房器具4へ供給された温水(戻り水)とを熱交換する。つまり、供給配管7eと戻り配管8cとが熱交換器10を通り、供給配管7eを流れる温水と戻り配管8cを流れる温水とが熱交換される。
なお、低温暖房器具3へ供給される温水と、高温暖房器具4へ供給された温水(戻り水)とを熱交換する場合にも、図3-5に基づき説明した応用は可能である。つまり、混合弁9の位置を合流点側ではなく、分岐点側に設けてもよい。また、供給配管7側を分岐するのではなく、戻り配管8側を分岐してもよい。
なお、低温暖房器具3へ供給される温水と、高温暖房器具4へ供給された温水(戻り水)とを熱交換する場合にも、図3-5に基づき説明した応用は可能である。つまり、混合弁9の位置を合流点側ではなく、分岐点側に設けてもよい。また、供給配管7側を分岐するのではなく、戻り配管8側を分岐してもよい。
図7に示すハイドロユニット2は、図1に示すハイドロユニット2とは、温水の流れが異なる。図7に示すハイドロユニット2では、高温暖房器具4へ供給され、放熱された温水(戻り水)を、温水温度調整装置5で温度調整して、低温暖房器具3へ供給する。つまり、図7に示すハイドロユニット2は、高温暖房器具4と低温暖房器具3とを直列に接続し、高温暖房器具4で放熱された温水を、温水温度調整装置5で温度調整して、低温暖房器具3へ供給する。
なお、高温暖房器具4と低温暖房器具3とを直列に接続する場合にも、図3-5に基づき説明した応用は可能である。つまり、混合弁9の位置を合流点側ではなく、分岐点側に設けてもよい。また、供給配管7側を分岐するのではなく、戻り配管8側を分岐してもよい。
また、供給配管7bを流れた温水が、高温暖房器具4を経由することなく供給配管7dへ流れる配管を設けてもよい。この場合、高温暖房器具4からの温水の要求の有無により、供給配管7bから高温暖房器具4側へ温水を流すか、供給配管7bから供給配管7dへ温水を流すかをバルブにより切り替えるようにしてもよい。
なお、高温暖房器具4と低温暖房器具3とを直列に接続する場合にも、図3-5に基づき説明した応用は可能である。つまり、混合弁9の位置を合流点側ではなく、分岐点側に設けてもよい。また、供給配管7側を分岐するのではなく、戻り配管8側を分岐してもよい。
また、供給配管7bを流れた温水が、高温暖房器具4を経由することなく供給配管7dへ流れる配管を設けてもよい。この場合、高温暖房器具4からの温水の要求の有無により、供給配管7bから高温暖房器具4側へ温水を流すか、供給配管7bから供給配管7dへ温水を流すかをバルブにより切り替えるようにしてもよい。
以上のように、温水温度調整装置5の構成を変更しても、実施の形態1に係る温水暖房システムと同様の効果を得ることができる。
しかし、図4,5に示すように、供給配管7側を分岐させず、戻り配管8側を分岐させた場合、供給配管7dを流れる温水は必ず熱交換器10を通ることになる。つまり、熱交換器10による熱交換が不要であっても、供給配管7dを流れる温水は必ず熱交換器10を通る。したがって、戻り配管8側を分岐させた場合は、供給配管7側を分岐させた場合に比べ効率が悪くなる虞がある。
しかし、図4,5に示すように、供給配管7側を分岐させず、戻り配管8側を分岐させた場合、供給配管7dを流れる温水は必ず熱交換器10を通ることになる。つまり、熱交換器10による熱交換が不要であっても、供給配管7dを流れる温水は必ず熱交換器10を通る。したがって、戻り配管8側を分岐させた場合は、供給配管7側を分岐させた場合に比べ効率が悪くなる虞がある。
実施の形態3.
実施の形態3では、給湯機能を備える暖房システムについて説明する。
図8は、給湯機能を備える暖房システムの流体回路図である。なお、実施の形態1と同様に、以下の説明では、流体の一例として水(温水)を用いる。つまり、図8に示す暖房システムは、給湯機能を備える温水暖房システムである。
図8に示す温水暖房システムは、図1に示す温水暖房システムに加え、さらに、給湯器具26を備える。
実施の形態3では、給湯機能を備える暖房システムについて説明する。
図8は、給湯機能を備える暖房システムの流体回路図である。なお、実施の形態1と同様に、以下の説明では、流体の一例として水(温水)を用いる。つまり、図8に示す暖房システムは、給湯機能を備える温水暖房システムである。
図8に示す温水暖房システムは、図1に示す温水暖房システムに加え、さらに、給湯器具26を備える。
給湯器具26は、貯湯タンク20に貯めた温水を、給湯加熱用コイル21に流れた温水により加熱する。そして、給湯器具26は、三方弁25の開度を制御して加熱した温水を供給する。
ハイドロユニット2の供給配管7bは、供給配管分岐点24で供給配管7hに分岐される。供給配管7hは、給湯器具26の給湯加熱用コイル21に接続される。また、給湯加熱用コイル21には、戻り配管8hが接続される。戻り配管8hは、三方弁23で戻り配管8bに合流される。その他の配管構成は、図1と同一である。
ハイドロユニット2の供給配管7bは、供給配管分岐点24で供給配管7hに分岐される。供給配管7hは、給湯器具26の給湯加熱用コイル21に接続される。また、給湯加熱用コイル21には、戻り配管8hが接続される。戻り配管8hは、三方弁23で戻り配管8bに合流される。その他の配管構成は、図1と同一である。
温水暖房システム運転時の温水のサイクルについて説明する。
温水暖房システムは、暖房運転と給湯運転とを切り替えて動作する。制御部11は、温水暖房システムを使用する使用者からの指示に基づき、暖房運転と給湯運転とを切り替える。制御部11は、三方弁23の開放する弁を切り替えすることにより、暖房運転と給湯運転とを切り替える。つまり、三方弁23の戻り配管合流点19側の弁を開き、戻り配管8h側の弁を閉じると暖房運転になる。一方、三方弁23の戻り配管8h側の弁を開き、戻り配管合流点19側の弁を閉じると給湯運転になる。
暖房運転時の温水の流れは、実施の形態1で説明した通りである。そこで、暖房運転時の温水の流れについての説明を省略し、給湯運転時の温水の流れについて説明する。
まず、循環ポンプ6から吐出された温水は熱源1で加熱される。熱源1で加熱された温水は、供給配管7aを流れ、ヒーター15で給湯加熱用コイル21が必要とする温度まで加熱される。ヒーター15で加熱された温水は、供給配管7bを流れ、供給配管分岐点24から供給配管7hへ流れる。なお、三方弁23の戻り配管合流点19側が閉じられているため、温水は供給配管分岐点24から供給配管分岐点18側へは流れない。したがって、低温暖房器具3、高温暖房器具4へ温水は供給されない。供給配管7hを流れる温水は、給湯加熱用コイル21へ供給され、給湯加熱用コイル21で放熱される。給湯加熱用コイル21で放熱された温水は、戻り配管8hを流れ、三方弁23から戻り配管8bへ流れる。戻り配管8bを流れる温水は、循環ポンプ6に吸収される。以上の処理が繰り返され、給湯器具26へ必要とされる温度の温水が供給される。
なお、暖房運転時には、三方弁23の戻り配管8h側の弁が閉じられているため、供給配管分岐点24から戻り配管8h側へ温水は流れない。したがって、給湯加熱用コイル21へは温水は供給されない。
温水暖房システムは、暖房運転と給湯運転とを切り替えて動作する。制御部11は、温水暖房システムを使用する使用者からの指示に基づき、暖房運転と給湯運転とを切り替える。制御部11は、三方弁23の開放する弁を切り替えすることにより、暖房運転と給湯運転とを切り替える。つまり、三方弁23の戻り配管合流点19側の弁を開き、戻り配管8h側の弁を閉じると暖房運転になる。一方、三方弁23の戻り配管8h側の弁を開き、戻り配管合流点19側の弁を閉じると給湯運転になる。
暖房運転時の温水の流れは、実施の形態1で説明した通りである。そこで、暖房運転時の温水の流れについての説明を省略し、給湯運転時の温水の流れについて説明する。
まず、循環ポンプ6から吐出された温水は熱源1で加熱される。熱源1で加熱された温水は、供給配管7aを流れ、ヒーター15で給湯加熱用コイル21が必要とする温度まで加熱される。ヒーター15で加熱された温水は、供給配管7bを流れ、供給配管分岐点24から供給配管7hへ流れる。なお、三方弁23の戻り配管合流点19側が閉じられているため、温水は供給配管分岐点24から供給配管分岐点18側へは流れない。したがって、低温暖房器具3、高温暖房器具4へ温水は供給されない。供給配管7hを流れる温水は、給湯加熱用コイル21へ供給され、給湯加熱用コイル21で放熱される。給湯加熱用コイル21で放熱された温水は、戻り配管8hを流れ、三方弁23から戻り配管8bへ流れる。戻り配管8bを流れる温水は、循環ポンプ6に吸収される。以上の処理が繰り返され、給湯器具26へ必要とされる温度の温水が供給される。
なお、暖房運転時には、三方弁23の戻り配管8h側の弁が閉じられているため、供給配管分岐点24から戻り配管8h側へ温水は流れない。したがって、給湯加熱用コイル21へは温水は供給されない。
制御部11は、温度センサ12iにより、貯湯タンク20に貯めた温水の温度を計測する。制御部11は、温度センサ12iにより計測した温度に基づき、熱源1とヒーター15とを制御する。つまり、制御部11は、温度センサ12iにより計測した温度が要求値となるように、熱源1とヒーター15とを制御する。
また、給湯加熱用コイル21による加熱だけでは、貯湯タンク20に貯めた温水が十分に温まらない場合、制御部11はヒーター22によりさらに貯湯タンク20に貯めた温水を加熱する。
また、給湯加熱用コイル21による加熱だけでは、貯湯タンク20に貯めた温水が十分に温まらない場合、制御部11はヒーター22によりさらに貯湯タンク20に貯めた温水を加熱する。
以上のように、給湯機能を備える温水暖房システムであっても、低温暖房器具3と高温暖房器具4とが必要とする温度の温水を、低温暖房器具3と高温暖房器具4とへ同時に供給することが可能である。
実施の形態4.
実施の形態4では、低温暖房器具3a,ab及び高温暖房器具4a,4bと異なる温度の流体を必要とする高温暖房器具4c,4dを備える暖房システムについて説明する。ここでは、高温暖房器具4c,4dは、高温暖房器具4a,4bよりも高い温度の流体を必要とするものとして説明する。
図9は、高温暖房器具4c,4dを備える暖房システムの流体回路図である。なお、実施の形態1と同様に、以下の説明では、流体の一例として水(温水)を用いる。つまり、図9に示す暖房システムは、温水暖房システムである。
実施の形態4では、低温暖房器具3a,ab及び高温暖房器具4a,4bと異なる温度の流体を必要とする高温暖房器具4c,4dを備える暖房システムについて説明する。ここでは、高温暖房器具4c,4dは、高温暖房器具4a,4bよりも高い温度の流体を必要とするものとして説明する。
図9は、高温暖房器具4c,4dを備える暖房システムの流体回路図である。なお、実施の形態1と同様に、以下の説明では、流体の一例として水(温水)を用いる。つまり、図9に示す暖房システムは、温水暖房システムである。
供給配管7bは、供給配管分岐点18bで供給配管7iに分岐される。供給配管7iは、高温暖房器具4c,4dに接続される。戻り配管8iは、一端が高温暖房器具4c,4dに接続され、他端が戻り配管合流点19bで戻り配管8bに合流される。また、供給配管7bは、供給配管分岐点18aで、供給配管7cと供給配管7dとに分岐される。
供給配管7dは、さらに供給配管7e(第1供給配管)と供給配管7f(第2供給配管)とに分岐される。供給配管7eと供給配管7fとは、混合弁9aで再び合流され供給配管7g(混合供給配管)となる。つまり、供給配管7eと供給配管7fとは並列に設けられた配管である。また、供給配管7eは、熱交換器10aを通る。供給配管7gは、低温暖房器具3に接続される。戻り配管8dは、一端が低温暖房器具3に接続され、他端が戻り配管合流点19aで合流され戻り配管8bとなる。また、戻り配管8dは、熱交換器10aを通る。つまり、供給配管7eを流れる温水と戻り配管8dを流れる温水とは熱交換される。
一方、供給配管7cは、供給配管7j(第1供給配管)と供給配管7k(第2供給配管)とに分岐される。供給配管7jと供給配管7kとは、混合弁9bで再び合流され供給配管7l(混合供給配管)となる。つまり、供給配管7jと供給配管7kとは並列に設けられた配管である。また、供給配管7jは、熱交換器10bを通る。供給配管7lは、高温暖房器具4a,4bに接続される。戻り配管8cは、一端が高温暖房器具4a,4bに接続され、他端が戻り配管合流点19aで合流され戻り配管8bとなる。また、戻り配管8cは、熱交換器10bを通る。つまり、供給配管7jを流れる温水と戻り配管8cを流れる温水とは熱交換される。
ここで、供給配管7d,7e,7f,7g、戻り配管8d、混合弁9a、熱交換器10aで形成された回路を温水温度調整装置5aと呼ぶ。同様に、供給配管7c,7j,7k,7l、戻り配管8c、混合弁9b、熱交換器10bで形成された回路を温水温度調整装置5bと呼ぶ。図9では、温水温度調整装置5a,5bを破線で示す。温水温度調整装置5a,5bでは、ヒーター15で高温暖房器具4c,4dが必要とする温度まで加熱された温水を冷却して、高温暖房器具4a,4bと低温暖房器具3とが必要とする温度まで下げる。
供給配管7dは、さらに供給配管7e(第1供給配管)と供給配管7f(第2供給配管)とに分岐される。供給配管7eと供給配管7fとは、混合弁9aで再び合流され供給配管7g(混合供給配管)となる。つまり、供給配管7eと供給配管7fとは並列に設けられた配管である。また、供給配管7eは、熱交換器10aを通る。供給配管7gは、低温暖房器具3に接続される。戻り配管8dは、一端が低温暖房器具3に接続され、他端が戻り配管合流点19aで合流され戻り配管8bとなる。また、戻り配管8dは、熱交換器10aを通る。つまり、供給配管7eを流れる温水と戻り配管8dを流れる温水とは熱交換される。
一方、供給配管7cは、供給配管7j(第1供給配管)と供給配管7k(第2供給配管)とに分岐される。供給配管7jと供給配管7kとは、混合弁9bで再び合流され供給配管7l(混合供給配管)となる。つまり、供給配管7jと供給配管7kとは並列に設けられた配管である。また、供給配管7jは、熱交換器10bを通る。供給配管7lは、高温暖房器具4a,4bに接続される。戻り配管8cは、一端が高温暖房器具4a,4bに接続され、他端が戻り配管合流点19aで合流され戻り配管8bとなる。また、戻り配管8cは、熱交換器10bを通る。つまり、供給配管7jを流れる温水と戻り配管8cを流れる温水とは熱交換される。
ここで、供給配管7d,7e,7f,7g、戻り配管8d、混合弁9a、熱交換器10aで形成された回路を温水温度調整装置5aと呼ぶ。同様に、供給配管7c,7j,7k,7l、戻り配管8c、混合弁9b、熱交換器10bで形成された回路を温水温度調整装置5bと呼ぶ。図9では、温水温度調整装置5a,5bを破線で示す。温水温度調整装置5a,5bでは、ヒーター15で高温暖房器具4c,4dが必要とする温度まで加熱された温水を冷却して、高温暖房器具4a,4bと低温暖房器具3とが必要とする温度まで下げる。
温水暖房システム運転時の温水のサイクルについて説明する。
まず、循環ポンプ6から吐出された温水は熱源1で加熱される。熱源1で加熱された温水は、供給配管7aを流れ、ヒーター15で高温暖房器具4c,4dが必要とする温度まで加熱される。ヒーター15で加熱された温水は、供給配管7bを流れ、供給配管分岐点18bで供給配管7iへ分岐される。供給配管7iを流れる温水は、高温暖房器具4c,4dへ供給され、高温暖房器具4c,4dで放熱される。一方、供給配管7iへ分岐されず供給配管7bを流れる温水は、供給配管分岐点18aで供給配管7cと供給配管7dとに分岐される。
供給配管7cを流れる温水は、供給配管7jと供給配管7kとに分岐され、混合弁9bで再び合流され供給配管7lを流れる。このとき、温水温度調整装置5bにおいて、温水は高温暖房器具4a,4bが必要とする温度に調整される。供給配管7lを流れる温水は、高温暖房器具4a,4bへ供給され、高温暖房器具4a,4bで放熱される。一方、供給配管7dを流れる温水は、供給配管7eと供給配管7dとに分岐され、混合弁9aで再び合流され供給配管7gを流れる。このとき、温水温度調整装置5aにおいて、温水は低温暖房器具3が必要とする温度に調整される。供給配管7gを流れる温水は、低温暖房器具3へ供給され、低温暖房器具3で放熱される。
なお、温水温度調整装置5a,5bの動作は、実施の形態1に係る温水温度調整装置5と同様である。
まず、循環ポンプ6から吐出された温水は熱源1で加熱される。熱源1で加熱された温水は、供給配管7aを流れ、ヒーター15で高温暖房器具4c,4dが必要とする温度まで加熱される。ヒーター15で加熱された温水は、供給配管7bを流れ、供給配管分岐点18bで供給配管7iへ分岐される。供給配管7iを流れる温水は、高温暖房器具4c,4dへ供給され、高温暖房器具4c,4dで放熱される。一方、供給配管7iへ分岐されず供給配管7bを流れる温水は、供給配管分岐点18aで供給配管7cと供給配管7dとに分岐される。
供給配管7cを流れる温水は、供給配管7jと供給配管7kとに分岐され、混合弁9bで再び合流され供給配管7lを流れる。このとき、温水温度調整装置5bにおいて、温水は高温暖房器具4a,4bが必要とする温度に調整される。供給配管7lを流れる温水は、高温暖房器具4a,4bへ供給され、高温暖房器具4a,4bで放熱される。一方、供給配管7dを流れる温水は、供給配管7eと供給配管7dとに分岐され、混合弁9aで再び合流され供給配管7gを流れる。このとき、温水温度調整装置5aにおいて、温水は低温暖房器具3が必要とする温度に調整される。供給配管7gを流れる温水は、低温暖房器具3へ供給され、低温暖房器具3で放熱される。
なお、温水温度調整装置5a,5bの動作は、実施の形態1に係る温水温度調整装置5と同様である。
以上のように、温水暖房システムでは、3つの異なる温度を要求する暖房器具を備える場合であっても、各暖房器具が必要とする温度の温水を各暖房器具へ同時に供給することができる。また、余剰熱を戻り水に回収するため、熱効率がよく省エネルギーにつながる。
なお、4つ以上の異なる温度を要求する暖房器具を備える場合にも、最も高い温度を要求する暖房器具以外の配管に温水温度調整装置5を設けることにより、各暖房器具が必要とする温度の温水を各暖房器具へ同時に供給することができる。
また、図9に示す高温暖房器具4c,4dを給湯器具26に置き換えることもできる。実施の形態3では、給湯運転と暖房運転とを切り替えして動作させる例を説明したが、図9に示す高温暖房器具4c,4dを給湯器具26に置き換えることで、給湯運転と暖房運転とを同時に動作させることができる。
以上をまとめると次のようになる。
以上の実施の形態に係る温水暖房システムは、熱源から温水暖房器具などの負荷への供給配管から並列に分岐する温度調整用配管と、前記温水暖房器具などの負荷からの戻り配管と、前記温度調整用配管を流れる比較的高温な温水と前記戻り配管を流れる比較的低温な温水の熱交換を行う熱交換器と、前記供給配管を流れる比較的高温な温水と温度調整用配管を流れる前記熱交換器により熱交換された比較的低温な温水を混合かつ混合比を調節する混合弁を備え、前記温水暖房器具などの負荷に供給する温水温度を要求に応じて調整でき、かつ熱源からの高温な温水を温度調整する際に生じる余剰熱を戻り水に回収できることを特徴とする温水温度調整装置を搭載した温水暖房システムである。
以上の実施の形態に係る温水暖房システムは、熱源から温水暖房器具などの負荷への供給配管から並列に分岐する温度調整用配管と、前記温水暖房器具などの負荷からの戻り配管と、前記温度調整用配管を流れる比較的高温な温水と前記戻り配管を流れる比較的低温な温水の熱交換を行う熱交換器と、前記供給配管を流れる比較的高温な温水と温度調整用配管を流れる前記熱交換器により熱交換された比較的低温な温水を混合かつ混合比を調節する混合弁を備え、前記温水暖房器具などの負荷に供給する温水温度を要求に応じて調整でき、かつ熱源からの高温な温水を温度調整する際に生じる余剰熱を戻り水に回収できることを特徴とする温水温度調整装置を搭載した温水暖房システムである。
また、以上の実施の形態に係る温水暖房システムは、温水暖房器具などの負荷に供給する温水の温度検出センサと、前記温水暖房器具などの負荷に供給する温水温度が所定値となるように混合弁による2つの温水混合比を制御する制御装置を備え、前記温水暖房器具などの負荷に供給する温水温度を要求に応じて調整でき、かつ熱源からの高温な温水の余剰熱を戻り水に回収できることを特徴とする温水温度調整装置を搭載した温水暖房システムである。
また、以上の実施の形態に係る温水暖房システムは、熱源、循環ポンプ、並列に接続した高温な温水を必要とする温水暖房器具(以下、温水暖房器具A)と温水暖房器具Aが必要とする温度以下の温水を必要とする温水暖房器具(以下、温水暖房器具B)を配管形成手段で環状に接続し、前記熱源から前記温水暖房器具Aと前記温水暖房器具Bへ温水を供給する温水暖房システムにおいて、前記温水暖房器具Aと前記温水暖房器具Bへ温水を供給する温水暖房用供給配管の分岐点、前記温水暖房器具Aと前記温水暖房器具Bからの温水暖房用戻り配管の合流点と前記温水暖房器具Bとの間に前記温水温度調整装置を備え、前記温水暖房器具Aへは高温な温水を、前記温水暖房器具Bには要求温度に応じた温水をそれぞれ同時に供給できることを特徴とする温水暖房システムである。
また、以上の実施の形態に係る温水暖房システムは、熱源、循環ポンプ、並列に接続した高温な温水を必要とする温水暖房器具(以下、温水暖房器具A)と温水暖房器具Aが必要とする温度以下の温水を必要とする温水暖房器具(以下、温水暖房器具B)を配管形成手段で環状に接続し、前記熱源から前記温水暖房器具Aと前記温水暖房器具Bへ温水を供給する温水暖房システムにおいて、貯湯タンクと、貯湯タンク内の水または温水の加熱用コイルと、前記熱源と前記温水暖房器具Aと前記温水暖房器具Bへ温水を供給する温水暖房用供給配管の分岐点との間に前記加熱用コイルに比較的高温な温水を供給する給湯用供給配管と、前記温水暖房器具Aと前記温水暖房器具Bからの温水暖房用戻り配管の合流点と前記熱源との間に前記加熱用コイルで放熱した比較的低温な温水を合流する給湯用戻り配管と、温水暖房用配管と前記給湯用供給配管への分岐点または温水暖房用戻り配管と前記給湯用戻り配管からの合流点に三方弁を備え、前記三方弁の切り替えにより、前記加熱用コイルへの温水供給(給湯運転)と、前記温水暖房器具Aと前記温水暖房器具Bへの温水供給(温水暖房運転)の切り替えができることを特徴とする給湯機能を付加した温水暖房システムである。
また、以上の実施の形態に係る温水暖房システムは、本発明に係る温水暖房システムは、熱源、循環ポンプ、並列に接続した高温な温水を必要とする温水暖房器具(以下、温水暖房器具A)と温水暖房器具Aが必要とする温度以下の温水を必要とする温水暖房器具(以下、温水暖房器具B)を配管形成手段で環状に接続し、熱源から温水暖房器具Aと温水暖房器具Bへ温水を供給する温水暖房システムにおいて、温水暖房器具Aと温水暖房器具Bへ温水を供給する温水暖房用供給配管の分岐点、温水暖房器具Aと温水暖房器具Bからの温水暖房用戻り配管の合流点と温水暖房器具Bとの間に温水温度調整装置と、温水暖房器具Bに供給する温水の温度検出センサを備えることを特徴とする温水暖房システムである。
また、以上の実施の形態に係る温水暖房システムは、温水温度調整装置は熱源から温水暖房器具などの負荷への供給配管から並列に分岐する温度調整用配管と、温水暖房器具などの負荷からの戻り配管と、温度調整用配管を流れる比較的高温な温水と戻り配管を流れる比較的低温な温水の熱交換を行う熱交換器と、供給配管を流れる比較的高温な温水と温度調整用配管を流れる熱交換器により熱交換された比較的低温な温水を混合かつ混合比を調節する混合弁を備えることを特徴とする温水暖房システムである。
1 熱源、2 ハイドロユニット、3 低温暖房器具、4 高温暖房器具、5 温水温度調整装置、6 循環ポンプ、7 供給配管、8 戻り配管、9 混合弁、10 熱交換器、11 制御部、12 温度センサ、13 膨張タンク、14 圧力逃がし弁、15 ヒーター、16 弁、17 凍結防止配管、18 供給配管分岐点、19 戻り配管合流点、20 貯湯タンク、21 給湯加熱用コイル、22 ヒーター、23,25 三方弁、24 供給配管分岐点、26 給湯器具。
Claims (12)
- 熱交換器と、
放熱器へ供給される流体が流れ、前記熱交換器を通る第1供給配管と、
前記放熱器へ供給される流体が流れる第2供給配管と、
前記放熱器へ供給される流体であって、前記第1供給配管を流れた第1流体と前記第2供給配管を流れた第2流体とが混合された混合流体が流れる混合供給配管と、
前記放熱器へ供給され、放熱された流体が流れ、前記熱交換器を通る戻り配管と
を備えることを特徴とする温度調整装置。 - 前記第1供給配管と前記第2供給配管とは、親供給配管から分岐されて形成され、前記第1供給配管と前記第2供給配管とには、前記親供給配管を流れた流体が流れる
ことを特徴とする請求項1に記載の温度調整装置。 - 前記親供給配管には、前記戻り配管を流れた流体を加熱装置により加熱した流体が流れる
ことを特徴とする請求項2に記載の温度調整装置。 - 前記温度調整装置は、さらに、
前記親供給配管から分岐されて形成されるとともに、前記放熱器が使用する流体よりも高温の流体を使用する前記放熱器とは異なる他の放熱器に接続された第3供給配管を備え、
前記親供給配管には、前記第3供給配管を経由して前記他の放熱器へ供給される前記高温の流体が流れる
ことを特徴とする請求項2又は3に記載の温度調整装置。 - 前記温度調整装置は、さらに、
前記混合流体における前記第1流体と前記第2流体との混合割合を調整する混合調整弁
を備えることを特徴とする請求項1から4までのいずれかに記載の温度調整装置。 - 前記温度調整装置は、さらに、
前記混合流体の温度が所定の温度より低い場合には、前記第2供給配管を流れる流体の流量に対する前記第1供給配管を流れる流体の流量の割合が減るように前記混合調整弁を制御する制御部
を備えることを特徴とする請求項5に記載の温度調整装置。 - 前記混合供給配管には、前記放熱器へ供給する流体の流量を調整する流量調整弁が設けられた
ことを特徴とする請求項1から6までのいずれかに記載の温度調整装置。 - 流体を加熱する加熱装置と、
熱交換器と、
前記加熱装置が加熱した流体であって、放熱器へ供給される流体が流れ、前記熱交換器を通る第1供給配管と、
前記加熱装置が加熱した流体であって、前記放熱器へ供給される流体が流れる第2供給配管と、
前記放熱器へ供給される流体であって、前記第1供給配管を流れた第1流体と前記第2供給配管を流れた第2流体とが混合された混合流体が流れる混合供給配管と、
前記放熱器へ供給され、放熱された流体が流れ、前記熱交換器を通る戻り配管とを備え、
前記加熱装置は、前記戻り配管を流れた流体を加熱する
ことを特徴とする流体供給システム。 - 流体を加熱する加熱装置と、
熱交換器と、
前記加熱装置が加熱した流体が流れ、前記熱交換器を通る第1供給配管と、
前記加熱装置が加熱した流体が流れる第2供給配管と、
前記第1供給配管を流れた第1流体と前記第2供給配管を流れた第2流体とが混合された混合流体が流れる混合供給配管と、
前記混合供給配管を流れた流体が供給され、流体を放熱する暖房器具と、
前記暖房器具へ供給された流体が流れ、前記熱交換器を通る戻り配管とを備え、
前記加熱装置は、前記戻り配管を流れた流体を加熱する
ことを特徴とする暖房システム。 - 水を加熱する加熱装置へ前記戻り配管を流れた流体が供給されるとともに、前記加熱装置が加熱した流体が前記第1供給配管と前記第2供給配管とへ供給されるように、請求項1から7までのいずれかに記載の温度調整装置を前記加熱装置に接続し、
前記混合供給配管を流れた流体が前記放熱器へ供給されるとともに、前記放熱器へ供給された流体が前記戻り配管へ供給されるように、前記温度調整装置を前記放熱器に接続する
ことを特徴とする温度調整装置の取付方法。 - 放熱器へ供給する流体が流れる親供給配管を第1供給配管と第2供給配管とに分岐し、
前記第1供給配管を流れる流体と、前記放熱器へ供給された流体とを熱交換し、
前記第1供給配管と前記第2供給配管とを再び合流させて、前記第1供給配管を流れた流体と前記第2供給配管を流れた流体とを混合させた混合流体を前記放熱器へ供給する
ことを特徴とする流体供給方法。 - 熱交換器と、
放熱器へ供給される流体が流れ、前記熱交換器を通る供給配管と、
前記放熱器へ供給され、放熱された流体が流れる親戻り配管と、
前記親戻り配管から分岐され、前記親戻り配管を流れた流体が流れ、前記熱交換器を通る第1戻り配管と、
前記親戻り配管から分岐され、前記親戻り配管を流れた流体が流れる第2戻り配管と
を備えることを特徴とする温度調整装置。
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2011505755A JP5174950B2 (ja) | 2009-03-26 | 2009-03-26 | 温度調整装置、流体供給システム、暖房システム、温度調整装置の取付方法及び流体供給方法 |
PCT/JP2009/056128 WO2010109632A1 (ja) | 2009-03-26 | 2009-03-26 | 温度調整装置、流体供給システム、暖房システム、温度調整装置の取付方法及び流体供給方法 |
EP09842246.2A EP2413042B1 (en) | 2009-03-26 | 2009-03-26 | Temperature regulator, fluid supply system, heating system, method of fixing temperature regulator, and fluid supply method |
US13/258,022 US20120018129A1 (en) | 2009-03-26 | 2009-03-26 | Temperature adjusting apparatus, fluid supply system, heating system, installation method of temperature adjusting apparatus, and fluid supply method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2009/056128 WO2010109632A1 (ja) | 2009-03-26 | 2009-03-26 | 温度調整装置、流体供給システム、暖房システム、温度調整装置の取付方法及び流体供給方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2010109632A1 true WO2010109632A1 (ja) | 2010-09-30 |
Family
ID=42780341
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2009/056128 WO2010109632A1 (ja) | 2009-03-26 | 2009-03-26 | 温度調整装置、流体供給システム、暖房システム、温度調整装置の取付方法及び流体供給方法 |
Country Status (4)
Country | Link |
---|---|
US (1) | US20120018129A1 (ja) |
EP (1) | EP2413042B1 (ja) |
JP (1) | JP5174950B2 (ja) |
WO (1) | WO2010109632A1 (ja) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101204515B1 (ko) | 2011-03-30 | 2012-11-26 | 한국지역난방공사 | 지역냉방용 제습냉방시스템의 사용자시설에 대한 미세유량 제어장치 |
CN103148537A (zh) * | 2013-03-07 | 2013-06-12 | 北京海林节能设备股份有限公司 | 一种集中供暖系统和方法 |
JP2014047947A (ja) * | 2012-08-30 | 2014-03-17 | Toho Gas Co Ltd | 給湯暖房システム |
EP2589893A3 (de) * | 2011-08-24 | 2016-07-13 | Nevzat Elkün | Fluidverteiler |
Families Citing this family (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5729910B2 (ja) * | 2010-03-05 | 2015-06-03 | 三菱重工業株式会社 | 温水ヒートポンプおよびその制御方法 |
NL2008324C2 (nl) * | 2012-02-21 | 2013-08-26 | Atag Verwarming Nederland B V | Systeem voor het verwarmen van twee onderling gescheiden vloeistoffen. |
DE102012013334B4 (de) * | 2012-07-06 | 2021-03-18 | Robert Bosch Gmbh | Fluidkreislauf mit mehreren Wärmeerzeugern und Verfahren zu dessen Betrieb |
US10429083B2 (en) * | 2013-08-30 | 2019-10-01 | Qingdao Hisense Hitachi Air-conditioning Systems Co., Ltd. | Multi-type air conditioner system |
DE102013218436A1 (de) * | 2013-09-13 | 2015-03-19 | Robert Bosch Gmbh | Heizungsanlage und Verfahren zum Betreiben einer Heizungsanlage |
US9699856B2 (en) | 2015-03-25 | 2017-07-04 | Cree, Inc. | Upgradeable lighting fixture |
JP2016217656A (ja) * | 2015-05-22 | 2016-12-22 | ダイキン工業株式会社 | 流体式温度調節ユニット |
JP2016217657A (ja) * | 2015-05-22 | 2016-12-22 | ダイキン工業株式会社 | 流体式温度調節ユニット |
SE541234C2 (en) * | 2015-11-20 | 2019-05-07 | Sens Geoenergy Storage Ab | Methods and systems for heat pumping |
WO2018073853A1 (ja) * | 2016-10-17 | 2018-04-26 | 三菱電機株式会社 | ヒートポンプ利用機器の室内機及びそれを備えたヒートポンプ利用機器 |
EP3361182B1 (de) * | 2017-02-08 | 2020-03-25 | Grundfos Holding A/S | Hydraulische baueinheit für eine heizungs- oder klimaanlage |
EP3611434A4 (en) * | 2017-04-12 | 2020-11-18 | Toshiba Carrier Corporation | HOT WATER HEATING DEVICE AND METHOD |
WO2019043935A1 (ja) * | 2017-09-04 | 2019-03-07 | 三菱電機株式会社 | 温度調整装置、中継装置、負荷装置、および冷凍サイクル装置 |
WO2019073591A1 (ja) * | 2017-10-13 | 2019-04-18 | 三菱電機株式会社 | 空気調和システム |
CN108131841A (zh) * | 2018-01-19 | 2018-06-08 | 广东瑞马热能设备制造有限公司 | 一种模块化采暖装置 |
DE102019213860A1 (de) * | 2019-09-11 | 2021-03-11 | Mahle International Gmbh | Klimatisierungssystem für ein Kraftfahrzeug |
CN111664598A (zh) * | 2020-06-18 | 2020-09-15 | 水发兴业能源(珠海)有限公司 | 太阳能热水系统 |
US20240110720A1 (en) * | 2022-09-30 | 2024-04-04 | Trane International Inc. | Controlled routing of hydronic flow using a distribution area director |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS62238927A (ja) | 1986-04-09 | 1987-10-19 | Matsushita Electric Ind Co Ltd | 温水暖房装置 |
JPH05118566A (ja) | 1991-10-31 | 1993-05-14 | Sanyo Electric Co Ltd | 温水暖房装置 |
JPH05180450A (ja) * | 1991-12-27 | 1993-07-23 | Mitsubishi Electric Corp | 温水循環式床暖房装置 |
JPH076612A (ja) | 1993-06-15 | 1995-01-10 | Toshiba Glass Co Ltd | 多層膜反射鏡 |
JPH10196974A (ja) * | 1996-12-27 | 1998-07-31 | Tokyo Gas Co Ltd | 床暖房システム |
JP2001147022A (ja) * | 1999-11-19 | 2001-05-29 | Osaka Gas Co Ltd | 床暖房装置 |
JP2002243176A (ja) * | 2001-02-13 | 2002-08-28 | Mitsubishi Electric Corp | 温水暖房装置 |
JP2004198055A (ja) | 2002-12-19 | 2004-07-15 | Denso Corp | 給湯式暖房装置 |
JP2006046809A (ja) | 2004-08-05 | 2006-02-16 | Noritz Corp | 温水暖房システムの熱源機 |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1377714A (en) * | 1917-03-01 | 1921-05-10 | Loomis Manning Filter Mfg Comp | Apparatus for supplying hot water in houses |
US2455040A (en) * | 1944-09-18 | 1948-11-30 | Frederick C Broderick | Heating system |
US2509607A (en) * | 1945-11-13 | 1950-05-30 | George A Mussen | Space heating system |
US3758031A (en) * | 1972-05-08 | 1973-09-11 | J Moran | Heater for automotive vehicles |
GB1462187A (en) * | 1973-09-29 | 1977-01-19 | Horne Eng Co Ltd | Fluid supply systems |
FR2373016A1 (fr) * | 1976-12-06 | 1978-06-30 | Messier Fa | Installation de chauffage, associant deux sources de chaleur de natures differentes a deux reseaux distincts de diffuseurs |
SE446905B (sv) * | 1985-04-29 | 1986-10-13 | Tour & Andersson Ab | Sett att och medel for att reglera flodet resp temperaturen serskilt vid golvvermeanleggningar |
US5119988A (en) * | 1990-06-28 | 1992-06-09 | Joachim Fiedrich | Hydronic heating water temperature control system |
US5003782A (en) * | 1990-07-06 | 1991-04-02 | Zoran Kucerija | Gas expander based power plant system |
SE502584C2 (sv) * | 1992-04-06 | 1995-11-20 | Erroell Ab | Shuntventilanordningar |
US5586449A (en) * | 1993-07-02 | 1996-12-24 | Krist; Gene | Hydronic interface system, method and apparatus |
US7044398B2 (en) * | 2004-07-26 | 2006-05-16 | Taco Inc. | Integrated fixture for transferring heat between higher and lower-temperature loops in a hydronic heating system |
GB0522307D0 (en) * | 2005-11-01 | 2005-12-07 | Zenex Technologies Ltd | A burner and heat exchanger combination, and a boiler including such a burner and heat exchanger combination |
-
2009
- 2009-03-26 US US13/258,022 patent/US20120018129A1/en not_active Abandoned
- 2009-03-26 EP EP09842246.2A patent/EP2413042B1/en active Active
- 2009-03-26 WO PCT/JP2009/056128 patent/WO2010109632A1/ja active Application Filing
- 2009-03-26 JP JP2011505755A patent/JP5174950B2/ja not_active Expired - Fee Related
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS62238927A (ja) | 1986-04-09 | 1987-10-19 | Matsushita Electric Ind Co Ltd | 温水暖房装置 |
JPH05118566A (ja) | 1991-10-31 | 1993-05-14 | Sanyo Electric Co Ltd | 温水暖房装置 |
JPH05180450A (ja) * | 1991-12-27 | 1993-07-23 | Mitsubishi Electric Corp | 温水循環式床暖房装置 |
JPH076612A (ja) | 1993-06-15 | 1995-01-10 | Toshiba Glass Co Ltd | 多層膜反射鏡 |
JPH10196974A (ja) * | 1996-12-27 | 1998-07-31 | Tokyo Gas Co Ltd | 床暖房システム |
JP2001147022A (ja) * | 1999-11-19 | 2001-05-29 | Osaka Gas Co Ltd | 床暖房装置 |
JP2002243176A (ja) * | 2001-02-13 | 2002-08-28 | Mitsubishi Electric Corp | 温水暖房装置 |
JP2004198055A (ja) | 2002-12-19 | 2004-07-15 | Denso Corp | 給湯式暖房装置 |
JP2006046809A (ja) | 2004-08-05 | 2006-02-16 | Noritz Corp | 温水暖房システムの熱源機 |
Non-Patent Citations (1)
Title |
---|
See also references of EP2413042A4 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101204515B1 (ko) | 2011-03-30 | 2012-11-26 | 한국지역난방공사 | 지역냉방용 제습냉방시스템의 사용자시설에 대한 미세유량 제어장치 |
EP2589893A3 (de) * | 2011-08-24 | 2016-07-13 | Nevzat Elkün | Fluidverteiler |
JP2014047947A (ja) * | 2012-08-30 | 2014-03-17 | Toho Gas Co Ltd | 給湯暖房システム |
CN103148537A (zh) * | 2013-03-07 | 2013-06-12 | 北京海林节能设备股份有限公司 | 一种集中供暖系统和方法 |
CN103148537B (zh) * | 2013-03-07 | 2015-11-18 | 北京海林节能设备股份有限公司 | 一种集中供暖系统和方法 |
Also Published As
Publication number | Publication date |
---|---|
JPWO2010109632A1 (ja) | 2012-09-20 |
US20120018129A1 (en) | 2012-01-26 |
EP2413042B1 (en) | 2020-09-09 |
JP5174950B2 (ja) | 2013-04-03 |
EP2413042A1 (en) | 2012-02-01 |
EP2413042A4 (en) | 2018-01-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5174950B2 (ja) | 温度調整装置、流体供給システム、暖房システム、温度調整装置の取付方法及び流体供給方法 | |
JP5604190B2 (ja) | 蓄熱システム | |
JP5202261B2 (ja) | 給湯機 | |
US9010281B2 (en) | Hot water supply system | |
EP3098541B1 (en) | Co2 water heater | |
JP2006343011A (ja) | 給湯装置 | |
JP4923812B2 (ja) | ブライン放熱式暖房装置 | |
JP2011043321A (ja) | 熱媒供給装置 | |
JP2009299941A (ja) | 温水供給システム | |
JP6153328B2 (ja) | コージェネレーションシステム及び暖房設備 | |
JP2008014585A (ja) | ブライン放熱式暖房装置 | |
KR100894297B1 (ko) | 삼방 밸브를 구비한 지열 냉난방 장치 | |
JP6429851B2 (ja) | コージェネレーションシステム及び暖房設備 | |
JP5746104B2 (ja) | 給湯暖房システム | |
JP5921416B2 (ja) | コージェネレーションシステム及び給湯設備 | |
JP5575184B2 (ja) | 暖房装置 | |
JP4889438B2 (ja) | 熱供給システム | |
JP3869801B2 (ja) | ヒートポンプ式給湯暖房装置 | |
JP4101198B2 (ja) | ヒートポンプ式給湯暖房装置 | |
JP2012180962A (ja) | 補助熱源付貯湯タンク給湯システム | |
JP2012122644A (ja) | 給湯機 | |
JP2009014305A (ja) | チラー装置 | |
JP6663740B2 (ja) | 熱利用システム | |
JP4148909B2 (ja) | ヒートポンプ式給湯暖房装置 | |
JP2002364912A (ja) | 多機能給湯装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 09842246 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2011505755 Country of ref document: JP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2009842246 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 13258022 Country of ref document: US |
|
NENP | Non-entry into the national phase |
Ref country code: DE |