WO2009139510A1 - Procédé de construction d'un mur parafouille continu - Google Patents

Procédé de construction d'un mur parafouille continu Download PDF

Info

Publication number
WO2009139510A1
WO2009139510A1 PCT/KR2008/002665 KR2008002665W WO2009139510A1 WO 2009139510 A1 WO2009139510 A1 WO 2009139510A1 KR 2008002665 W KR2008002665 W KR 2008002665W WO 2009139510 A1 WO2009139510 A1 WO 2009139510A1
Authority
WO
WIPO (PCT)
Prior art keywords
overlap
cut
casing
wall
cast
Prior art date
Application number
PCT/KR2008/002665
Other languages
English (en)
Inventor
Kwang Min Kim
Original Assignee
Kwang Min Kim
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kwang Min Kim filed Critical Kwang Min Kim
Priority to PCT/KR2008/002665 priority Critical patent/WO2009139510A1/fr
Publication of WO2009139510A1 publication Critical patent/WO2009139510A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/20Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete

Definitions

  • the present invention relates to a construction method of a cast-in-place cut-off wall using overlap casings and filling hoses, which can prevent sliding-down of earth and sand or subsidence of the ground occurring by underground water during public works, such as excavation, coffering, road extension, and so on.
  • the present invention relates to a construction method of a cast-in-placecut-off wall using overlap casings and filling hoses including the processes of: vertically drilling round holes to a predetermined depth of the ground using a general excavator!
  • each of the overlap casings having an arc face formed on the outer circumference thereof in a straight line, the overlap casings being continuously mounted in such a way that the arc face of one overlap casing is in close contact with the outer circumference of another adjacent overlap casing, so that the overlap casings are overlapped with each other! filling the continuously mounted overlap casings with a cut-off wall forming material, such as concrete, and inserting reinforcing rods and H-beams into the overlap casings located at predetermined intervals! pulling out the overlap casings after a lapse of a predetermined time period!
  • cast-in-place cut off wall in such a way that a filling hose is grouted into a discontinuous point of the cast-in-place concrete wall to form a cut-off wall body (discontinuous point) of excellent performance.
  • a guard wall In general, when various public works, such as an excavation work for constructing a building or a structure, a coffering work carried out in a river or in the sea, an extension work for extending a road, and so on, are carried out, in order to prevent sliding-down of earth and san or subsidence of the ground, a guard wall must be constructed and an impervious function to prevent an inflow of underground water gushed from the ground into a construction work zone must be provided.
  • the cut-off method and the earth-retaining method for constructing the guard wall are conventionally used in earth retaining methods of various kinds.
  • a sheet pile method of the conventional earth retaining methods is divided into a pile driving type (directly driving type) method for directly driving and forcedly inserting a sheet pile into the ground by a Vibro hammer using a crane and a hydraulic NPS (Normal Power Steering) method for forcedly inserting the sheet pile by a forcedly pulling-out device, and is used to construct a steel sheet pile, which simultaneously serves as a cut-off wall and an earth retaining wall.
  • a pile driving type directly driving type
  • NPS Normal Power Steering
  • the steel sheet pile can sufficiently serve as the earth retaining wall as a continuous wall type rigid body if it has excellent degree of strength and durability, and obtain an excellent cut-off effect since it has excellent water tightness at contact portions if the steel sheet pile is made of a watertight material.
  • the pile driving (directly driving) method has problems in that it causes a severe noise pollution and a violent vibration since the sheet piles must be directly driven whenever they are mounted.
  • the hydraulic NPS method can be carried out in a non-vibration and non-noise state
  • the hydraulic NPS method has several problems in that it is complicated in work preparation and construction progress, work efficiency is deteriorated due to a slow progress, and it requires a great deal of expenses since a reaction abutment, a power unit and a forced pile driver must be separately mounted for construction and the reaction abutment must be removed when the construction is finished.
  • the hydraulic NPS method has another problem in that it causes underground water pollution by water discharged through a water jet.
  • a conventional water jet and sheet pile method is carried out in the same way as the conventional sheet pile method.
  • the conventional sheet pile method in the conventional water jet and sheet pile method, after a water jet pipe is mounted on an edge portion of the sheet pile, the sheet pile is mounted by the Vibro hammer in the pile driving (directly driving) manner, and in this instance, the sheet pile is mounted while a jet pump is operated during the pile driving.
  • the water jet and sheet pile method is effective when the sheet pile is mounted in cohesive soil, fine gravel layer, and weathered rock layer, in which it is difficult to drive the sheet pile by a general pile driving.
  • the conventional water jet and sheet pile method has several problems in that it is complex to separately manufacture the water jet pipes and mount them to the edges of all sheet piles, and it requires much time and many expenses since the jet pump, an auxiliary crane and power generators are additionally mounted.
  • a conventional H-pile earth retraining wall method is a construction method to carry out excavation after mounting H-piles in the pile driving (directly driving) manner or after drilling vertical holes by an excavator for excavation and inserting H-piles into the vertical holes.
  • a lagging may serve as an earth retaining wall since it is constructed of a rigid body.
  • the conventional 11— pile earth retaining wall method has several problems in that it cannot provide the cut-off effect proper to soil conditions, in thai i t may cause a great relaxa tion of the real" ground since the top part and the head part are relatively greatly displaced, in that it is difficult to select and additionally carry out a cut-off grout method proper to the soil conditions, and in that it cannot provide an excellent cut-off effect since there is a possibility of a water leakage from connected portions.
  • a conventional LW (Labile Washer Glass) and H-pile earth retaining method is a method that an LW method is additionally performed to the H-pile earth retaining wall in order to enhance the cut-off effect of the H-pile earth retaining wall, and includes the steps of: mounting H-piles in the pile driving (directly driving) manner; mounting a lagging while performing excavation; drilling grouting holes in such a way as to be adjacent to the rear face of the H-piles and overlapped with the adjacent H-piles inserting a man jet tube in a state where a casing is mounted; and mounting a double packer, and then, grouting a seal agent, such as water glass.
  • a seal agent such as water glass.
  • the conventional LW and H-pile earth retaining wall method can provide an earth retaining wall function and a cut-off effect as a ferromagnetic body, and particularly, be easily applied to geological strata of a substantially large porosity, such as sandy gravel layer or boulder layer.
  • the conventional LW and H-pile earth retaining method has several problems in that it causes a severe noise since all 11— piles are mounted in the directly driving (pile driving) manner, in that it requires much time and main expenses since the 11 — pi Io earth retaining method and the LW method are carried out together, and in that the soil conditions must be inspected before the construction since an LW grouting effect is reduced in geological strata of a small porosity.
  • a conventional S. CW (Soil Cement Wall) and H-pile earth retaining wall method is a construction method to provide the cut-off effect to the H-pile earth retaining wall and an effect for preventing relaxation of the rear ground of the earth retaining wall.
  • S. C. W method a plain cast-in-place underground wall, into which reaction woods (H-piles) are not inserted, is formed.
  • the plain cast-in-place underground wall is formed through the steps of: mounting H-piles in the pile driving (directly driving) manner in such a way as to be adjacent to each other as close as possible; drilling soil cement grouting holes on the rear face of the H-piles in such a way as to be overlapped with each other in a state where a lagging is mounted; and grouting and hardening soil cement, in which soil and cement are mixed with each other.
  • the S. CW and H-pile earth retaining wall method can provide excellent earth retaining wall and cut-off effects since the wall body including the H-piles and the lagging and the cast-in-place wall body continuously installed in the ground are formed doubly.
  • the S. C. W and 11— pile earth retaining wall method has several problems in that it causes a severe noise when the H-piles are mounted since the 11— piles are mounted in the pile driving (directly driving) manner, in that i t requires many equipment expenses since it requires large-scale equipments, such as a large-scale crane, a mixer, and a pump, and in that it requires a long construction time period and many construction expenses since construction efficiency is low.
  • the conventional S. CW method is a construction method for constructing a cast-in-place underground wall, the construction method including the steps of: drilling soil cement grouting holes in the ground to a planned depth; grouting soil cement into the grouting holes to form a wall body; and inserting H-piles with reaction woods to thereby improve the earth retaining wall.
  • the continuous wall body serves to provide a cut-off function and an earth retaining function, but the S. C. W method has a problem in that a construction time period is increased and equipment expenses are also increased since the large-scale equipments, such as the large-scale crane, the mixer and the pump, are required and the construction efficiency is reduced.
  • the conventional C. I. P (Cast-In-Placed-Pile) method is a construction method for installing reinforced concrete columns in a cast-in-place manner on the spot by pouring reinforced concrete, and includes the steps of: drilling column holes and mounting a casing into each of the holes mounting reinforcing rods inside the casing! filling the casing with mortar, in which cement, gravels, sands are mixed together and hardening the mortar into a column! removing the casing and inserting H-piles into the columns spaced apart from each other at predetermined intervals.
  • the C. I. P method has several problems in that it requires a long installation period since it is necessary to repeatedly perform a series of processes of drilling the column holes, mounting a form in each of the holes, filling the column holes with mortar in a state where reinforcing rods are mounted, and removing the form after the mortar is hardened whenever the reinforced concrete columns are mounted, and in that a water leakage may occur since a space between the columns is not tightly sealed.
  • a conventional auxiliary grouting and C. I. P method is a construction method including the steps of: mounting reinforced concrete columns by the C. I. P method, and inserting H-piles into the reinforced concrete columns; and carrying out an auxiliary grouting for cut-off on the rear face between the reinforced concrete columns. Since the auxiliary grouting for cut-off is carried out additionally after the C. I. P method, which requires many installation expenses and much construction time period, is first carried out, the conventional auxiliary grouting and C. I. P method can ensure excellent earth retaining wall and cut-off functions, but has a problem in that it requires more installation expenses and time.
  • an earth retaining wall is installed on a boundary line between the ground and an excavated part.
  • the earth retaining wall is installed through the steps of: mounting H-piles at predetermined intervals on the boundary line of the excavated part by a Vibro hammer in the pile driving (directly driving) manner grouting a seal material to both sides of the inside of the H-piles by the LW method; carrying out the C. I. P method while grouting the seal material; and carrying out a J. S. P (Jumbo Special Pile Pattern) method to the outside of the H-piles, namely, on the boundary line of the ground to thereby support the ground more soundly.
  • the C. I. P method is performed on the boundary line between the excavated part and the ground, and if reinforcement is needed, the LW method is performed on the rear face of the reinforced concrete column mounted by the C. I. P method and the seal material (water glass) is grouted.
  • the above construction methods for performing the earth retaining work have several problems in that the construction methods require a great deal of time and expenses since various construction methods are performed together according to soil pressure and ground conditions, and in that they cause a severe noise when the earth retaining work is performed since the H-piles are mounted in a forcedly and directly driving (pile driving) manner.
  • Korean Patent No. 375,020 which was patented to the same inventor as the present invention, discloses a "cylindrical columns for constructing earth retaining wall and earth retaining method using the same".
  • FIGS. Ia to 3b Korean Patent No. 375,020 will be described.
  • a drilling process (DRA drilling process) of drilling round holes in the ground to a predetermined depth using a general excavator 6 is carried out, and then, an outer casing 2 is (longitudinally) inserted into each of the drilled holes.
  • an overlap casing 3 or an overlap square pipe 4 having an arc face 3- 1 formed on a side thereof is inserted (penetrated) into the outer casing 2, and then, as shown in FIG. Ic, the outer casing 2 is pulled out and removed through a third process (outer casing pulling out process) ( 1 -, ' >).
  • a process of repeatedly forming a cast-in-place concrete wall is carried out.
  • the first process (1- 1 drilling process
  • the third process 1-3; outer casing pulling out process
  • the concrete 11 , cement stabilizer or mortar which fills each of the overlap casings 3 or the overlap square pipes 4, is packed (filled) from the lower portion as much as a volume of a space portion 5 formed by the outer casing 2, and accordingly, the initially packed concrete 11 , cement stabilizer or mortar lowers from the top to a predetermined height, so that as pace portion is formed on the upper portion. After that, the concrete 1 1 . cement stabilizer or mortar is packed in the space portion formed on the upper portion of the geological stratum.
  • each of the overlap casings 3 or the overlap square pipes 4 is filled with the concrete 11, cement stabilizer or mortar, and then, pulled out.
  • the process of filling a space of the removed overlap casing 3 or overlap square pipe 4with the concrete 11, cement stabilizer or mortar is repeatedly performed to make good a deficiency, whereby a cast-in-place cut-off wall 10 is formed as shown in FIG. 2d or 3b.
  • FIGS. 1-10 in the cylindrical columns for constructing earth retaining and earth retaining method using the same, as shown in FIGS.
  • the present invention provides an improved construction method of a cast-in-place cut-off wall using overlap casings and filling hoses to solve the above-mentioned problems occurring in the prior arts. It is an object of the present invention to provide an improved construction method of a cast-in-placecut ⁇ off wall using overlap casings and filling hoses includes the processes of: vertically drilling round holes to a predetermined depth of the ground using a general excavator; mounting overlap casings in each of the drilled holes, each of the overlap casings having an arc face formed on the outer circumference thereof in a straight line, the overlap casings being continuously mounted in such a way that the arc face of one overlap casing is in close contact with the outer circumference of another adjacent overlap casing, so that the overlap casings are overlapped with each other; filling the continuously mounted overlap casings with a cut-off wall forming material, such as concrete, and inserting reinforcing rods and H-beams into the overlap
  • cast-in-place cut off wall a cast-in-place cut-off wall or an underground wall (hereinafter, called "cast-in-place cut off wall") in such a way that a filling hose is grouted into a discontinuous point of the 1 cast -in-place concrete wall.
  • the present invention provides a construction method of a cast-in-place cut-off wall using overlap casings and filling hoses, which includes: a drilling process (1-1) of vertically drilling round holes in the ground to a predetermined depth using a general excavator (6), and inserting an outer casing (2) into each of the holes; an outer casing penetrating process (1-2) of penetrating an overlap casing (3) or an overlap square pipe (4) into the outer casing (2) inserted into each of the holes; an outer casing pulling out process (1-3) of pulling out the outer casing (2), in which the overlap casing (3) or the overlap square pipe (4) is penetrated; a cast-in-place concrete wall forming process (1-4) of repeatedly performing the drilling process (1 ⁇ 1), the outer casing penetrating process (1-2) and the outer casing pulling out process (1-3) in such a way that an arc face (3- 1) of one overlap casing (3) or overlap square pipe ( I ) is in close contact with the outer circumference of another
  • the construction method comprising the processes of: penetrating a filling hose (20) and the overlap casing (3) or the overlap square pipe (4) into the outer casing (2) of a predetermined location when each of the outer casings (2) is inserted into each of the holes drilled by the excavator (6); grouting and filling the filling hose (20) with a filling material; pulling out each of the outer casings (2), in which the filling hose (20) and the overlap casing (3) or the overlap square pipe (4) are penetrated, inserting the reinforcing rods (12) or the H-beams (13) into the overlap casing (3) or the overlap square pipe (4), and fill
  • the construction method of a cast-in-place cut-off wall using overlap casings and filling hoses includes the processes of: vertically drilling round holes to a predetermined depth of the ground using a general excavator mountingoverlap casings in each of the drilled holes, each of the overlap casings having an arc face formed on the outer circumference thereof in a straight line, the overlap casings being continuously mounted in such a way that the arc face of one overlap casing is in close contact with the outer circumference of another adjacent overlap casing, so that the overlap casings are overlapped with each other; filling the continuously mounted overlap casings with a cut-off wall forming material, such as concrete, and inserting reinforcing rods and H-beams into the overlap casings located at predetermined intervals; pulling out the overlap casings after a lapse of a predetermined time period; and filling spaces of the removed overlap casings w i th the cut- o ff wall forming material and
  • the construction method of a cast-in-place cut-off wall using overlap casings and filling hoses can greatly improve the cut-off effect at the discontinuous point since the cast-in-place cut-off wall is formed by inserting the filling hose into the discontinuous point of the cast-in-place concrete wall, and which can prevent the ground weakening and ground subsidence occurring by a leakage of underground water since the cut-off effect at the discontinuous point is greatly improved.
  • FIGS. Ia to Id are views showing a conventional construction progress of a cast-in-place cut-off wall using overlap casings.
  • FIGS. 2a to 2d are exemplary views showing an installation state of the cast-in-place cut-ff wall using the overlap casings continuously mounted by the construction progress.
  • FIGS. 3a and 3b are exemplary views showing another installation state of the cast-in-place cut-off wall using the overlap casings continuously mounted by the construction progress.
  • FIGS. 4a and 4b are a construction progress view of a construction method of a cast-in-place cut-off wall using an overlap casing and a filling hose and a view showing an installation state of the cast-in-place cut-off wall according to a preferred embodiment of the present invention.
  • FIGS. 5 a and 5b are a construction progress view of a construction method of a cast-in-place cut-off wall using an overlap casing and a filling hose and a view showing an installation state of the cast-in-place cut-off wall according to another preferred embodiment of the present invention.
  • FIGS. 4a to 7b illustrate detailed examples of a construction method of a cast-in-place cut-off wall using an overlap casing and a filling hose according to the present invention
  • FIGS. 4a and 4b are a construction progress view of the construction method of the cast-in-placecut-off wall using the overlap casing and the filling hose and a view showing an installation state of the cast-in-place cut-off wall according to a preferred embodiment of the present invention
  • FIGS. 5 a and 5b are a construction progress view of the construction method of the cast-in-place cut-off wall using the overlap casing and the filling hose and a view showing an installation state of the cast-in-place cut-off wall according to another preferred embodiment of the present invention
  • MGS. 6, 7a and 7b are a view showing an inserted state of the filling hose and an exemplary view of the filling hose in the construction method of the cast-in-place cut-off wall according to the present invention.
  • the cast-in-place cut-off wall 10 according to the present invention is constructed on the basis of the cast-in-place cut-off wall construction progress 1 shown in FIGS. Ia to Id as follows.
  • a drilling process (1- 1) of vertically drilling round holes in the ground to a predetermined depth using a general excavator 6 is performed.
  • An outer casing penetrating process (1-2) of penetrating an overlap casing 3 or an overlap square pipe 4 into an outer casing 2 inserted into each of the holes is performed.
  • a cast-in-place concrete wall forming process (1-4) is performed.
  • the drilling process (1- 1), the outer casing penetrating process (1 -2) and the outer casing pulling out process (1-3) are repeatedly performed in such a way that an arc face (3- 1X4- 1) of one overlap casing 3 or overlap square pipe 4 is in close contact with the outer circumference of another overlap casing 3 or overlap square pipe 4 , so that the overlap casings 3 or the overlap square pipes 4 are overlapped with each other and continuously mounted.
  • Reinforcing rods 12 or H-beams 13 are inserted into the overlappedly and adjacently mounted overlap casings 3 or overlap square pipes 4, and then, the overlap casings 3 or overlap square pipes 4 are filled with a cut-off wall forming material, such as concrete, mortar, and cement stabilizer (cut-off wall forming material filling process).
  • a cut-off wall forming material such as concrete, mortar, and cement stabilizer
  • the filling hose 20 shown in FIG. 7a or 7b is a general hose, and may be a double pipe as shown in FIG. 7a or a hose having a plurality of holes (circulation holes) formed on the outer periphery thereof at uniform intervals so that the inside communicates with the outside as shown in FIG. 7b.
  • a filling material such as micro cement or cement mortar.
  • the filling mat erial which fills the filling hose 20 is discharged through the holes (circulation holes) and fills a space between the previously mounted cast-in-place cut-off wall 10 and the post mounted overlap casing 3 or overlap square pipe 4 to thereby keep the close contact state between the previously mounted cast-in-place cut-off wall 10 and the post mounted overlap casing 3 or overlap square pipe 4.
  • the reinforcing rods 12 or the H-beams 13 are inserted into a remaining portion of the overlap casing 3 or the overlap square pipe 4, and then, the cut-off wall forming material, such as concrete or cement stabilizer, is packed in the overlap casing 3 or the overlap square pipe 4.
  • the cut-off wall forming material such as concrete or cement stabilizer
  • the filling hose 20 which is filled with a filling material, is integrally embedded at the center of the formed cast-in-place cut-off wall 10 or at the discontinuous point between the cast-in-place cut-off walls 10 to thereby keep a watertight state.
  • the sealing (watertight) state can be kept by the filling hose 20, which is integrally embedded at the center of the formed cast-in-place cut-off wall 10 or at the discontinuous point between the cast-in-place cut-off walls 10, and hence, the cast-in-place cut-off wall 10 according to the present invention can greatly improve the cut-off effect at the discontinuous point and prevent the ground weakening and ground subsidence occurring by a leakage of underground water since the cut-off effect at the discontinuous point is improved greatly.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

L'invention concerne un procédé de construction d'un mur parafouille coulé sur place au moyen d'éléments de coffrage à recouvrement et de tuyaux de remplissage, ce qui peut empêcher le glissement de terre et de sable ou l'affaissement du sol provoqués par des eaux souterraines pendant des travaux publics, tels que des travaux d'excavation, d'entourage ou de prolongation de routes. Ce procédé peut, plus particulièrement, considérablement améliorer l'effet parafouille au niveau d'un point discontinu, étant donné que la construction du mur parafouille coulé sur place consiste à insérer le tuyau de remplissage dans le point discontinu du mur de béton coulé sur place, et empêcher l'affaiblissement et l'affaissement du sol dus à une fuite d'eau souterraine.
PCT/KR2008/002665 2008-05-14 2008-05-14 Procédé de construction d'un mur parafouille continu WO2009139510A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/KR2008/002665 WO2009139510A1 (fr) 2008-05-14 2008-05-14 Procédé de construction d'un mur parafouille continu

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/KR2008/002665 WO2009139510A1 (fr) 2008-05-14 2008-05-14 Procédé de construction d'un mur parafouille continu

Publications (1)

Publication Number Publication Date
WO2009139510A1 true WO2009139510A1 (fr) 2009-11-19

Family

ID=41318854

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2008/002665 WO2009139510A1 (fr) 2008-05-14 2008-05-14 Procédé de construction d'un mur parafouille continu

Country Status (1)

Country Link
WO (1) WO2009139510A1 (fr)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836247A (zh) * 2017-02-24 2017-06-13 中铁十九局集团第七工程有限公司 组合式围堰及其施工方法
CN107882211A (zh) * 2017-12-15 2018-04-06 赵建敏 建筑用约束组合墙结构
CN109477323A (zh) * 2017-05-18 2019-03-15 金思文 用于形成混凝土挡土墙的嵌入套管结构

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4268192A (en) * 1978-09-11 1981-05-19 Raymond International Builders, Inc. Concrete wall construction
JP2000290994A (ja) * 1999-04-09 2000-10-17 Ishioka Kensetsu Kk 柱列状連続孔の削孔方法とインナーケーシング
JP2001049662A (ja) * 1999-08-05 2001-02-20 Ishioka Kensetsu Kk インナーケーシング法線決定用定規
KR20030091836A (ko) * 2003-07-25 2003-12-03 케이엠토건 주식회사 원통기둥을 이용한 주열식 차수벽 및 그 설치공법

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4268192A (en) * 1978-09-11 1981-05-19 Raymond International Builders, Inc. Concrete wall construction
JP2000290994A (ja) * 1999-04-09 2000-10-17 Ishioka Kensetsu Kk 柱列状連続孔の削孔方法とインナーケーシング
JP2001049662A (ja) * 1999-08-05 2001-02-20 Ishioka Kensetsu Kk インナーケーシング法線決定用定規
KR20030091836A (ko) * 2003-07-25 2003-12-03 케이엠토건 주식회사 원통기둥을 이용한 주열식 차수벽 및 그 설치공법

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836247A (zh) * 2017-02-24 2017-06-13 中铁十九局集团第七工程有限公司 组合式围堰及其施工方法
CN109477323A (zh) * 2017-05-18 2019-03-15 金思文 用于形成混凝土挡土墙的嵌入套管结构
CN107882211A (zh) * 2017-12-15 2018-04-06 赵建敏 建筑用约束组合墙结构

Similar Documents

Publication Publication Date Title
KR101067707B1 (ko) 현장타설 콘크리트말뚝과 그라우팅 기둥을 이용한 주열식 토류벽 차수 시공방법
JP6762800B2 (ja) 既設杭基礎の補強工法及び補強構造
KR20100115019A (ko) 지하연속벽 시공용 패널 조인트 및 이를 이용한 지하연속벽 시공방법
KR100832490B1 (ko) 오버랩원통관과 충진용호스를 이용한 주열식차수벽의 설치공법
KR100927186B1 (ko) 흙막이 및 차수용 연속 벽체 시공방법
KR100415809B1 (ko) 흙막이용 프리캐스트 말뚝 및 이를 이용한 흙막이 시공공법
KR100375020B1 (ko) 흙막이 설치용 원통기둥 및 그것을 이용한 흙막이 설치공법
KR101021915B1 (ko) 흙막이 공사용 차수 가시설 시공방법
JP2019015100A (ja) 山留壁の撤去方法
KR100779988B1 (ko) 소구경 말뚝의 시공방법
JP2007009505A (ja) 基礎補強工法
WO2009139510A1 (fr) Procédé de construction d'un mur parafouille continu
KR200362565Y1 (ko) 프리캐스트 콘크리트 파일을 이용한 흙막이 구조체
JP4485006B2 (ja) 地下構造物の施工法
KR101021913B1 (ko) 흙막이 공사용 차수 가시설 시공방법
JP4888293B2 (ja) 親杭横矢板からなる土留め壁、親杭横矢板からなる土留め壁の止水構造、及び親杭横矢板からなる土留め壁の構築方法、並びに親杭横矢板からなる土留め壁の止水工法
JP3760343B2 (ja) 掘削底面安定化工法と地下建造物の構築法
CN114411745A (zh) 钢管桩桩端后注浆装置及其施工方法
JPH0663239B2 (ja) 地すべり抑止用井筒およびその築造方法
JP6259271B2 (ja) ケーソン沈設方法及び地中柱体群
KR100477357B1 (ko) 차수벽 흙막이 공법
KR100654973B1 (ko) 프리캐스트 콘크리트 파일을 이용한 흙막이 구조체 및이의 시공 방법
JP4905296B2 (ja) 山留め壁の構築方法及び山留め壁
CN110185295A (zh) 一种仅有支护桩的抗浮地下车库及其施工方法
KR20030091836A (ko) 원통기둥을 이용한 주열식 차수벽 및 그 설치공법

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 08753461

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 13.04.2011)

122 Ep: pct application non-entry in european phase

Ref document number: 08753461

Country of ref document: EP

Kind code of ref document: A1